Loading...
HomeMy WebLinkAbout2010-07-27 City Commission Meeting Agenda AddendumADDENDUM DANIA BEACH CITY COMMISSION REGULAR MEETING TUESDAY, JULY 27, 2010 – 7:00 P.M. ANY PERSON WHO DECIDES TO APPEAL ANY DECISION MADE WITH REGARD TO ANY MATTER CONSIDERED AT THIS MEETING OR HEARING WILL NEED A RECORD OF THE PROCEEDING, AND FOR SUCH PURPOSE MAY NEED TO ENSURE THAT A VERBATIM RECORD OF THE PROCEEDING IS MADE WHICH RECORD INCLUDES THE TESTIMONY AND EVIDENCE UPON WHICH THE APPEAL IS TO BE BASED. LOBBYIST REGISTRATION REQUIRED. REGISTRATION AS A LOBBYIST IN THE CITY OF DANIA BEACH IS REQUIRED IF ANY PERSON, FIRM OR CORPORATION IS BEING PAID TO LOBBY THE COMMISSION ON ANY PETITION OR ISSUE PURSUANT TO ORDINANCE # 01-93. REGISTRATION FORMS ARE AVAILABLE IN THE CITY CLERK’S OFFICE IN THE ADMINISTRATION CENTER. IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT, PERSONS NEEDING ASSISTANCE TO PARTICIPATE IN ANY OF THESE PROCEEDINGS SHOULD CONTACT THE CITY CLERK’S OFFICE, 100 W. DANIA BEACH BOULEVARD, DANIA BEACH, FL 33004, (954) 924-6800 EXTENSION 3624, AT LEAST 48 HOURS PRIOR TO THE MEETING. IN CONSIDERATION OF OTHERS, WE ASK THAT YOU: A. PLEASE TURN CELL PHONES OFF, OR PLACE ON VIBRATE. IF YOU MUST MAKE A CALL, PLEASE STEP OUT INTO THE ATRIUM, IN ORDER NOT TO INTERRUPT THE MEETING. B. IF YOU MUST SPEAK TO SOMEONE IN THE AUDIENCE, PLEASE SPEAK SOFTLY OR GO OUT INTO THE ATRIUM, IN ORDER NOT TO INTERRUPT THE MEETING. 10. DISCUSSION AND POSSIBLE ACTION 10.1 RESOLUTION #2010-119 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, APPROVING AN AGREEMENT TO BE EXECUTED BY THE PROPER CITY OFFICIALS WITH WETTAPS, INC. FOR NECESSARY EMERGENCY REPAIR OF A PORTION OF A STORMWATER DRAINAGE SYSTEM IN AN AMOUNT NOT TO EXCEED FORTY ONE THOUSAND SIX HUNDRED SEVENTY FIVE DOLLARS ($41,675.00) FOR FISCAL YEAR 2009-2010, WITHOUT COMPETITIVE BIDDING AND WITHOUT ADVERTISEMENT FOR BIDS; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. 10.2 RESOLUTION #2010-120 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, RELATING TO CHANGE ORDER NO. 1 FOR THE CITY OF DANIA BEACH REPLACEMENT PRODUCTION WELL, TO INCREASE THE COSTS FOR WELL DEVELOPMENT, A REVISED PUMP AND PIPING TO CONNECT TO THE EXISTING PIPE FOR A NET INCREASE OF $51,287.00; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. MEMORANDUM Item #10.1 TO: Mayor C.K. McElyea Vice Mayor Anne Castro Commissioner Robert Anton Commissioner Walter Duke Commissioner Bobbie Grace FROM: Robert Baldwin, City Manager BY: Dominic F. Orlando, P.E. Director of Public Services BY: Leo Williams, Public Works Superintendent Date: July 26, 2010 RE: Wettaps Emergency Repairs Introduction and Background The existing drainage piping at the Meadowbrook’s complex east of 3rd Avenue between the North and South Lakes collapsed over a year ago. Since the lakes benefit the City with both storage volume capacity and pre-treatment, the City recommended contributing 50% to the cost of the repair. Negotiations with Association 4, North Lake and Association 5, South Lake have been on going. Several issues regarding transfer of easements and ownership of certain pipes from SE 3rd Avenue to the Lakes and the existing Meadowbrook Pump Station are still being finalized. Repair work is now an emergency, the access driveway asphalt over the pipe had collapsed. City obtained quotes for the work and decided to have Wettaps proceed with the repair work ASAP in an amount not to exceed forty one thousand six hundred seventy five ($41,675.00) while the legal paper work is being finalized. The following quotes were received: Wettaps $41,675.00 Atlantic Underground Construction $44,725.00 JD Backhoe, Inc. $47,663.75 Molloy Bros Inc. $54,115.25 Staff recommends approval to have Wettaps proceed with the work ASAP. Recommendation It is recommended that the City Commission approve a work authorization to Wettaps in the not-to-exceed amount of $41,675.00 and authorize the City Manager to execute the documents. RESOLUTION NO. 2010-119 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, APPROVING AN AGREEMENT TO BE EXECUTED BY THE PROPER CITY OFFICIALS WITH WETTAPS, INC. FOR NECESSARY EMERGENCY REPAIR OF A PORTION OF A STORMWATER DRAINAGE SYSTEM IN AN AMOUNT NOT TO EXCEED FORTY ONE THOUSAND SIX HUNDRED SEVENTY FIVE DOLLARS ($41,675.00) FOR FISCAL YEAR 2009-2010, WITHOUT COMPETITIVE BIDDING AND WITHOUT ADVERTISEMENT FOR BIDS; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Charter of the City of Dania Beach, Part III, Article 3, Section 4, Subsection (j), provides that during unusual conditions or emergencies, the City Commission may, by resolution, authorize the purchase by the City Manager of designated supplies, services, equipment and materials in amounts in excess of $25,000.00 without competitive bidding and without advertisement for bids; and WHEREAS, the Public Works Director has determined that an emergency condition has occurred stemming from degraded stormwater infrastructure that presents an immediate safety concern to the public that requires purchase of necessary emergency repair services from WETTAPS, Inc. for repairs to a portion of a stormwater system which serves the public located at the Meadowbrook Condominium Complex; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the emergency purchase of stormwater repair services for the work described above is authorized in an amount not to exceed forty one thousand six hundred seventy five dollars ($41,675.00) to be paid to WETTAPS, Inc. for the emergency repair service. Section 2. That this City emergency repair is approved based upon the commitment from authorized Medowbrook Condominium property owner representatives to pay the City of Dania Beach 50% of the emergency repair cost. Section 3. That funding for this previously unplanned work shall be provided by a transfer from Stormwater Fund contingency account #403-3801-538.99-10 (which has a projected available balance of $214,830.00 as of July 22, 2010) to Stormwater Maintenance account #403-3801-538.46-60. Section 4. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall be in force and take effect immediately upon its passage and adoption. PASSED AND ADOPTED on July 27, 2010. ________________________ C. K. McELYEA MAYOR-COMMISSIONER ATTEST: LOUISE STILSON, CMC CITY CLERK APPROVED AS TO FORM AND CORRECTNESS ________________________ THOMAS J. ANSBRO CITY ATTORNEY Item #10.2 TO: Mayor C. K. McElyea Vice Mayor Anne Castro Commissioner Robert Anton Commissioner Walter Duke Commissioner Bobbie Grace FROM: Robert Baldwin, City Manager BY: Dominic F. Orlando, P.E., Public Services Director BY: Leo Williams, Public Works Superintendent Date: July 14, 2010 RE: Approval of Change Order No. 1 to Diversified Drilling Corp. Inc. for City of Dania Beach Replacement Production Well Introduction and Background The City Commission awarded a contract to Diversified Drilling Corp. Inc on December 8, 2009 for construction of a new well at Site G. The contract was piggy-backed on a contract from Lee County. The initial contract price was $100,000, to include drilling, installation of the casing, and pump. The initial contract was to install an unscreened well with pump similar to the pump in Well G, but shallower. However, during construction, the unscreened well needed to be replaced with a screen, which had an increased cost. The screen was set 45 to 65 feet below the surface, which was a much longer open space than initially anticipated, but was done to increase capacity of the well (off set reduced capacity due to friction lost through the screen). The current well is in friable limestone, but no limestone was noted down to 63 ft. The well is completed entirely in surficial sands which has less production capacity than limestone, but are also much less likely to encourage saltwater intrusion. As a result, the cost also went up for well development and other issues associated with the reconfiguration. An initial reallocation of funds was performed administratively to deal with the screening issue. The screen was swapped for the contingency and the pump was removed from the contract to address the need for a screen ($36,000). Piping and new meters were not part of the initial contract. This change order includes piping ($21,333) to connect to the existing Well G discharge piping and the revised pump ($23,580) and added time for well development as a result of the screen ($6,600). The values in the contract are adjusted as noted in Attachment A. Net Change to Contract from this Change Order $51,287.00 0 days Staff recommends approval. Recommendation It is recommended that the City Commission approve the attached Change Order No. 1 to Diversified Drilling Constructors, Inc. for $51,287.00 for installation of new pump, screening, meters and piping, and development time, under the terms and conditions therein, and authorize and direct the City Manager to execute same. RESOLUTION NO. 2010-120 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, RELATING TO CHANGE ORDER NO. 1 FOR THE CITY OF DANIA BEACH REPLACEMENT PRODUCTION WELL, TO INCREASE THE COSTS FOR WELL DEVELOPMENT, A REVISED PUMP AND PIPING TO CONNECT TO THE EXISTING PIPE FOR A NET INCREASE OF $51,287.00; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Commission awarded a contract to Diversified Drilling Corp, Inc. in the amount of $100,000.00 to drill a new well at the site of Well G; and WHEREAS, the initial well was designed to be a open hole well, but this was not feasible, so a screened well was installed; and WHEREAS, the screened well costs more and requires a change in the pump and well development; and WHEREAS, piping to connect the new well to the existing well discharge piping to the City’s water plant was not part of the original bid; and WHEREAS, Diversified Drilling Corp, Inc. has submitted Change Order No. 1 to the project in the amount of $51,287.00 to install the connection piping, address added development time, and a revised pump; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AS FOLLOWS: Section 1. That the City Commission of the City of Dania Beach, Florida, approves Change Order No. 1 to the Dania Beach Replacement Production Well Project, and the proper City Officials are authorized to execute it. Section 2. That funding to pay for Change Order No. 1 shall be provided by available funds planned and budgeted in Water Fund – Distribution division account #401- 3302-533-6310, “Improvements Other than Building”. Section 3. That all resolutions or parts of resolutions in conflict with any of the provisions of this Resolution are hereby repealed. Section 4. That this Resolution shall become effective immediately upon its passage and adoption. PASSED AND ADOPTED on July 27, 2010. ________________________ ATTEST: C. K. McELYEA MAYOR-COMMISSIONER ______________________ LOUISE STILSON, CMC CITY CLERK APPROVED AS TO FORM AND CORRECTNESS: _____________________ THOMAS ANSBRO CITY ATTORNEY CHANGE ORDER No.: 1 PROJECT: City of Dania Beach Replacement Production Well DATE OF ISSUANCE June 16, 2010 EFFECTIVE DATE OWNER City of Dania Beach, Florida OWNER’s Contract No. Bid No. n/a DDC Project No. 71001 CONTRACTOR Diversified Drilling Corp. Inc ENGINEER You are directed to make the following changes in the Contract Documents: Description: Attachment “A” - Scope of Change Order. Reason for change order: Attachment “A” - Scope of Change Order. Attachments: Attachment “A” - Scope of Change Order. CHANGE IN CONTRACT PRICE Original Contract Price $ 100,000.00 CHANGE IN CONTRACT TIME Original Contract Times Substantial Completion: Ready for final payment: n/a Days or dates Net changes from previous Change Orders No.____ to No._____ $ 0.00 Net change from previous Change Orders No. to No. 0 Days Contract Price prior to this Change Order $ 100,000 Contract Time prior to this Change Order Substantial Completion: Ready for final payment: Sept. 30, 2010 Days or dates Net Increase (decrease) in this Change Order $ 51,287.00 Net Increase in this Change Order 0 days Contract Price with all approved Change Orders $ 151,287.00 Contract Time with all approved Change Orders Substantial Completion: Ready for final payment: Sept. 30, 2010 Days or dates RECOMMENDED BY: APPROVED BY: ACCEPTED BY: Engineer (Authorized Signature) Owner (Authorized Signature) Contractor (Authorized Signature) Date: Date: Date: CHANGE ORDER TO: City of Dania Beach, Florida PROJECT: City of Dania Beach Replacement Production Well CONTRACTOR: Diversified Drilling Corp. Inc. DATE: June 16, 2010 Amounts Prior to this Change Order: Base Bid Total = $100,000.00 Contingency = $0.00 Allowances = $0.00 (See revised distribution below) Original Contract Price = $100,000.00 This Change Order will authorize the following change to the Agreement: The Work as set forth in the Agreement is amended to include the items set forth in Attachments “A” and by this reference made a part of this document. ALLOWANCE COST & TIME SUMMARY Initial contract Value $100,000.00 Net Change to Contract from this Change Order $ 51,287.00 Revised Contract Value $151,287.00 This Change Order constitutes full, final, and complete authorization for compensation to the Contractor for all costs, expenses, overhead, and profit, and any damages of every kind that the Contractor may incur in connection with the above referenced change(s) in the Work, and any other effect on any of the Work under this Agreement. The Contractor acknowledges and agrees that (a) the Lump Sum of $151,287.00 under the Agreement will be unchanged by this Change Order, and (b) the schedule of performance of Work will be unchanged by this Change Order. Contractor expressly waives any claims for any additional compensation, damages or time extensions in connection with the above referenced change(s). Except as modified by the document, all terms of the Agreement shall remain in full force and effect and shall cover the performance of, and payment for, any work authorized under this document. Any defined terms not defined in this Change Order shall have the meanings set forth in the Agreement. By signing below the parties indicate acceptance of this Change Order as set forth in it. CONTRACTOR CITY OF DANIA BEACH, Diversified Drilling Corp. Inc. a Florida municipal corporation a Florida corporation By: _____________________________________ By: ______________________________ Robert Baldwin, City Manager Name: _________________________________ Title: _________________________________ Authorized by action of City Commission of the City of Dania Beach on , 2010 PROJECT MANAGER CITY OF DANIA BEACH, PUMPS, Inc. Public Services Department a Florida corporation By: _____________________________________ By: ______________________________ Name: Frederick Bloetscher, Ph.D., P.E. Dominic F. Orlando, P.E. Project Management Consultant Public Services Director