Loading...
HomeMy WebLinkAboutR-2025-109 SP-091-06 MOD VA-021025 - Tesla IncRESOLUTION NO. 2025 –109 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, APPROVING THE SITE PLAN MODIFICATION (SP-91- 06MOD) AND VARIANCE (VA-021-25) APPLICATIONS TO MODIFY THE LANDSCAPING REQUIREMENT AND APPROVE ELECTRIC VEHICLE CHARGING SPACES ON THE PROPERTY, SUBMITTED BY THE APPLICANT, TESLA INC., FOR PROPERTIES LOCATED AT 2061, 2071 AND 2081 GRIFFIN ROAD, IN THE CITY OF DANIA BEACH, FLORIDA; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Legislature of the State of Florida has, in Chapter 166, Florida Statutes, conferred upon local governments the authority to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry; and WHEREAS, the City Code of Ordinances, Chapter 28, entitled “Land Development Code” (“LDC”) of Part 6, entitled 'Development Review Procedures and Requirements’ of Article 635, entitled “Site Plans” of Section 635-80, provides that site plan modifications or deviations are required prior to commencement of construction; and WHEREAS, the Applicant has requested a site plan modification and variance at the properties legally described in Exhibit "A", a copy of which is made a part of and incorporated into this Resolution by this reference; and WHEREAS, Griffin Road One LLC., and Tesla Inc. (the “Applicants”), applied to the City of Dania Beach (the “City”) for approval of a site plan modification (SP-091-06MOD) to convert sixty (60) existing parking spaces to fifty-four (54) electric vehicle charging spaces as attached as Exhibit “B”, and is incorporated into this resolution by this reference; and WHEREAS, Chapter 28, Part 6 of the LDC, Article 625, entitled "Variances," Section 625- 40 states that the City Commission may grant a variance based on its determination that the petitioner has demonstrated that the necessary criteria identified in the LDC have been satisfied; and WHEREAS, the Applicant has requested a Variance to reduce the required perimeter landscape buffer from ten feet (10’) to six feet and eight inches (6’8”), as required by Section 275- 120 of the LDC, to allow for the installation of electric vehicle chargers and mechanical equipment associated with the electric vehicle chargers (VA -021-25); and 2 RESOLUTION #2025-109 WHEREAS, the requested variance is consistent with, and in furtherance of, the goals, objectives, and policies of the adopted Comprehensive Plan, as amended from time to time, and all other similar plans adopted by the city; and WHEREAS, the Applicant has provided sufficient justification demonstrating compliance with the approval criteria to meet the requirements of the Code; and WHEREAS, the City’s Staff Report analyzes the applicant’s request based on the criteria and supports the Applicant’s request, and is incorporated by reference herein as the City’s findings WHEREAS, the City Commission conducted a duly noticed public hearing in accordance with Article 610 of the LDC; and WHEREAS, the City Commission finds that approval of the Site Plan Modification (SP- 091-006MOD and Variance (VA-021-25) to permit the future development of the subject property pursuant to and consistent with the attached site plan provided as Exhibit "B", a copy of which is made a part of and incorporated into this resolution; and WHEREAS, the City Commission finds that approval of the Site Plan Modification (SP- 091-006MOD and Variance (VA-021-25) are consistent with the City's Land Development Code and Comprehensive Plan and will protect the health, safety, and welfare of the residents of the City, and furthers the purpose, goals, objectives, and policies of the Comprehensive Plan. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the foregoing “WHEREAS” clauses are ratified and confirmed as being true and correct and that they are made a part of incorporated into this resolution by reference. Section 2. That pursuant to Chapter 28 LDC, Part 6 “Development Review Procedures and Requirements,” Article 635 “Site Plan,” the following Site Plan Modification (SP-091- 06MOD), attached as Exhibit “B”, a copy of which is made a part of and incorporated into this Resolution by this reference, is approved. Section 3. That pursuant to Chapter 28, "Land Development Code", Part 6 “Development Review Procedures and Requirements," Article 625 "Variances, the Variance application (VA-021-25) is approved as consistent with the Site Plan provided in Exhibit "a". Section 4. That the approvals granted by this Resolution are subject to the Applicant’s compliance with the following conditions: 3 RESOLUTION #2025-109 1. The project shall monitor the operation of the parking spaces and charging stations to ensure that vehicle queuing or overflow does not impact internal intersections, Griffin Road, or Ravenswood Road/Anglers Avenue. If the actual operational impacts exceed those identified in the Traffic Impact Study, the City may require the implementation of mitigation measures to address project-related traffic concerns. (Traffic/ Engineering). 2. During building permitting, the applicant shall demonstrate that the site meets the intent of the city code section Ch 27-227 and provide a copy of the BC SWM License. (Engineering) 3. In the event that the proposed construction causes adverse drainage effects to the surrounding areas, it is the responsibility of the owner of the development to address the concerns of the neighbors and provide a solution at the owner’s expense. (Engineering) 4. All ADA areas and routes shall be ADA compliant. (Engineering) 5. Additional comments may apply and will need to be addressed prior to Building Permit approval. (Engineering); 6. All outside agency permits and approvals are due at the time of building permitting., and 'in accordance with Americans with Disability Act (ADA). (Engineering) 7. A Broward County Stormwater Management License modification may be necessary for the proposed improvements and shall be provided at the time of building permitting. (Engineering) 8. STORMWATER PLAN: Per the Dania Beach Code of Ordinances, Chapter 27, Section 27-227, “a stormwater management plan shall be submitted to the City for all projects that add impervious area or modify pervious area, whether or not City Commission approval is required.” Please provide a stormwater management plan for engineering review and comment. New pervious calculations are required. (Planning and Zoning) 9. The existing eight-foot (8’) tall hedges along Ravenswood Road in the Perimeter Landscape Buffer be maintained to meet Code Section 511-40 (C): Where hedges are utilized and adequate space exists, a tiered effect is required. The existing eight-foot (8’) hedge must be maintained to have a tiered effect. (Planning and Zoning) 10. Removal of the storage containers after the expiration of the temporary storage container permit. (Planning and Zoning) 11. The developer is required to participate in the City’s Public Art program, as delineated in Article 811 of the Land Development Code, by payment into the City’s Public Art fund or through payment and installation of public art. The amount of the Public Art Fund contribution is dependent on the value of the construction, which will be established at the time of building permit submittal (Planning and Zoning). 12. All proposed businesses shall apply for a Certificate of Use and Business Tax Receipt before operating to the public. (Planning and Zoning) 13. The proposed forty-eight-inch (48”) hedges that will screen the mechanical equipment must be maintained in a manner to allow them to grow so that they completely screen the mechanical equipment. (Planning and Zoning). 4 RESOLUTION #2025-109 Section 5. That pursuant to LDC Section 635-100 “Expiration of Site Plans,” the Site Plan Modification (SP-091-06MOD) approval shall automatically expire and become null and void unless the Applicant commences with construction of the improvements shown on the Site Plan, within eighteen (18) months from the date of this Resolution. Section 6. That pursuant to Section 625-500 “Expiration of Variances,” of the Land Development Code, the variance (VA-001-25) shall automatically expire and become null and void unless the applicant files a complete building permit application with construction drawings for the improvements shown on the site plan, within eighteen (18) months from the date of this Resolution. Section 7. That the issuance of a development order by a municipality does not in any way create any right on the part of an Applicant to obtain a permit from a state or federal agency, and does not create any liability on the part of the municipality on the part the municipality for issuance of the development order if the Applicant fails to obtain requisite approvals or does not fulfill the obligations imposed by a state or federal agency, or undertakes actions that result in a violation of state or federal law. Section 8. That the associated Planning & Zoning Division Staff Report prepared for the above application(s) is incorporated into this resolution as findings of fact. Section 9. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 10. That this resolution shall become effective 10 days after passage. PASSED AND ADOPTED on July 8, 2025. Motion by Vice Mayor Salvino, second by Commissioner Lewellen. FINAL VOTE ON ADOPTION: Unanimous X Yes No Commissioner Lori Lewellen ____ ____ Commissioner Luis Rimoli ____ ____ Commissioner Archibald J. Ryan IV ____ ____ Vice Mayor Marco Salvino ____ ____ Mayor Joyce L. Davis ____ ____ 5 RESOLUTION #2025-109 ATTEST: ELORA RIERA, MMC JOYCE L. DAVIS CITY CLERK MAYOR APPROVED AS TO FORM AND CORRECTNESS: EVE A. BOUTSIS CITY ATTORNEY 6 RESOLUTION #2025-109 EXHIBIT A LEGAL DESCRIPTION 2061 GRIFFIN ROAD, DANIA BEACH: AIRPORT COMMERCE CENTER 175-38 B PORTION PARCEL A DESC AS BEG AT NE COR PAR A,SE 373.83 ALG E/L,SW 64.69,NW 188.33,SW 60,SE 141, NE 18,SE 47.46,SW 214.12,NW 173.91,SW 29.64,NW 194,NE 349.01 TO POB AKA:HOTEL TWO PARCEL 2071 GRIFFIN ROAD, DANIA BEACH: AIRPORT COMMERCE CENTER 175-38 B PORTION PARCEL A,DESC AS COMM AT NE COR PAR A,SE 373.83 TO POBCONT SE 199.17 ALG E/L,SW 42.05 SW 17.29,NW 51.42,SW 390.44,NW 107.27,SW 145.02,NW 71.33,NE 311.48,NW 50.10,NE 214.12,NW 47.46,SW 18,NW 141,NE 60,SE 188.33,NE 64.69 TO POB AKA:OFFICE PARCEL 2081 GRIFFIN ROAD, DANIA BEACH: AIRPORT COMMERCE CENTER PLAT 175-38 B PORTION PARCEL A DESC AS COMM ATNE COR PAR A,SW 349.01 ALG N/L, TO POB,SW 270.89,SE 262.19,SW 101.24,SE 51.18,NE 311.48,NW 224.01,SW 29.64,NW 194 TO POB AKA: HOTEL ONE PARCEL 7 RESOLUTION #2025-109 EXHIBIT B (SP-091-06MOD) SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 T-1 TITLE SHEET FORT LAUDERDALE, FL - GRIFFIN RD. TRT ID: 34112 SITE ADDRESS: 2081 GRIFFIN RD. FORT LAUDERDALE, FL 33004 SITE CONTRACTOR SHALL VERIFY ALL PLANS AND EXISTING DIMENSIONS ANDCONDITIONS ON THE JOB SITE AND SHALL IMMEDIATELY NOTIFY THE TESLAREPRESENTATIVE IN WRITING OF DISCREPANCIES BEFORE PROCEEDING WITH THEWORK OR BE RESPONSIBLE FOR SAME. PROPOSED TESLA EV SITE ADDRESS:2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 PROPERTY OWNER:GRIFFIN ROAD ONE LLC225 NE MIZNER BLVD #430BOCA RATON, FL 33432-4078 PARCEL ID:PARCEL ID: 504228170010 POWER COMPANY:FPLCONTACT: ALONZO RUSSELLPHONE: (954) 717-2096EMAIL: ALONZO.RUSSELL@FPL.COMWORK ORDER: #13660625 COUNTY:BROWARD COUNTY LATITUDE*:26° 03' 50.9" N LONGITUDE*:80° 10' 06.1" W*BASED ON GOOGLE EARTH CONTACT ENGINEER:NATHAN R. KREUSER, P.E.DEWBERRY ENGINEERS INC.(321) 354-9755NKREUSER@DEWBERRY.COM LANDSCAPE ARCHITECT:MICHAEL URCHUK, RLADEWBERRY ENGINEERS INC. (321) 354-9744MURCHUK@DEWBERRY.COM DEVELOPER:TESLA3500 DEER CREEK ROADPALO ALTO, CA 94304GABRIELA ARAQUE (786)400-7836GARAQUE@TESLA.COM N N SITE INFORMATION APPLICABLE CODES ZONING INFORMATION DRAWING INDEX CONTRACTOR NOTE AERIAL MAP LOCATION MAP CALL BEFORE YOU DIG BEFORE SCALING SITE SHEET TITLESHT. NO. TITLE SHEET DETAILED SITE PLAN T-1 C-1 EQUIPMENT/PARKING PLAN C-2 C-3 EXISTING CONDITIONS PLAN ELECTRICAL ONE-LINE DIAGRAM IE-1 SUNSHINE 811 811 OR (813) 223-0800 CONTRACTOR SHALL COMPLETE INSTALL PER THE SIGNEDAND SEALED SET OF DRAWINGS. ANY NECESSARYDEVIATIONS FROM THE DRAWINGS MUST BE SUBMITTEDTHROUGH AN RFI REQUEST PROCESS WITH ENGINEERINGFOR AN APPROVAL PRIOR TO CONTRACTOR PROCEEDINGWITH A DEVIATION OF THE SIGNED AND SEALED SET OFDRAWINGS. x INSTALL (2) 480V PAD MOUNTED UTILITY TRANSFORMERSxINSTALL (1) 3000A SWITCHGEARxINSTALL (1) 4000A SWITCHGEARxINSTALL (1) LEVEL 2 CABINETxINSTALL (12) TESLA SUPERCHARGER CABINETSxINSTALL (48) TESLA STANDALONE LEVEL 3 CHARGEPOSTSxINSTALL (6) TESLA LEVEL 2 CHARGERSxINSTALL (4) WASTE MANAGEMENT BINS PERMITTING JURISDICTION: CITY OF DANIA BEACHAPN: 504228170010 ELECTRICAL ONE-LINE DIAGRAM IIE-2 E-3 ALL WORK SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODESFLORIDA STATE UNIFORM BUILDING & ENERGY CODES, CONSISTENT WITH THE FOLLOWINGCODES:x 2023 FBC-BUILDING, 8TH EDITION - (IBC 2021 WITH AMENDMENTS).x 2023 FBC-ENERGY CONSERVATION, 8TH EDITION (IECC 2021 WITH AMENDMENTS).x 2020 NATIONAL ELECTRIC CODE (NEC).x 8TH EDITION OF THE FLORIDA FIRE PREVENTION CODE.IN THE EVENT OF CONFLICT, THE MOST RESTRICTIVE CODE SHALL PREVAIL. PROJECT DESCRIPTION WIND DESIGN DATA:x ULTIMATE WIND SPEED = 156 MPH (PER FBC 8th EDITION SECTION 1620.2)x OCCUPANCY CATEGORY: IxWIND IMPORTANCE FACTOR: I = 1.0xWIND EXPOSURE CATEGORY: CSEISMIC DESIGN DATA:x OCCUPANCY CATEGORY: IxSEISMIC IMPORTANCE FACTOR: I = 1.00xSITE CLASS: D (ASSUMED)x MAPPED SPECTRAL RESPONSE COEFFICIENTS:Ss = 0.05 S1 = 0.022xDESIGN SPECTRAL RESPONSE COEFFICIENTS: SDS = 0.045 SD1 = 0.031xSEISMIC DESIGN CATEGORY: AASSUMED SOIL PROPERTIES:x ALLOWABLE BEARING PRESSURE: 1,500 PSFxALLOWABLE LATERAL BEARING PRESSURE: 100 PSF/FT STRUCTURAL DESIGN CRITERIA GENERAL NOTES IGN-1 GENERAL NOTES IIGN-2 CONSTRUCTION DETAILS IC-4 CONSTRUCTION DETAILS IIC-5 CONSTRUCTION DETAILS IIIC-6 CONSTRUCTION DETAILS IVC-7 E-4 E-5 E-6 CONSTRUCTION DETAILS VC-8 ELECTRICAL & UTILITY DETAILS I ELECTRICAL & UTILITY DETAILS II G-1 GROUNDING SCHEMATIC & DETAILS PANEL SCHEDULES C-1A CONSTRUCTION STAGING PLAN OVERALL SITE PLANSP-1 EXISTING LANDSCAPE PLANLS-1 PROPOSED LANDSCAPE PLANLS-2 LANDSCAPE DETAILSLS-3 ELECTRICAL & UTILITY DETAILS III EASEMENT & UTILITY PLANC-3A CONSTRUCTION DETAILS VIC-9 ZONING DATA PLANSP-2 Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:47:57-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 GN-1 GENERAL NOTES I GENERAL NOTES:SITE WORK NOTES: Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:47:58-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 GN-2 GENERAL NOTES II REINFORCED CONCRETE NOTES: ELECTRICAL NOTES:TRAFFIC MANAGEMENT NOTES: HORIZONTAL DIRECT DRILLING NOTES: ’ “” Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:47:58-04'00' E E WV WV WV WV WV WV WV WV WV WM WMWM WM WM WMWM IV IV IV IV IV IVIV IVIV IVIV IV IV IV IVIV IV IV IV IB IV COCO CO CO CO CO CO IVIV SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 SP-1 EXISTING PARKING REQUIREMENTS (PREVIOUS APPROVAL) PROPOSED USE SPACES REQUIRED SPACES PROVIDED WENDY'SRESTAURANT (1/50 S.F. OF CUSTOMER AREA) 1,562.41 / 50 = 32 43 23 ONSITE(INCLUDING 2 ADA)(1/200 S.F. OF REMAIN GROSS BLDG.AREA)1,863.14 / 200 = 10 (INCLUDING 2 ADA) (1/200 S.F. OUTDOOR SEATING AREA)64.67 = 200 = 1 PARKING PROVIDED PER LEASE AGREEMENT FROM SITE SURPLUS PARKING (30 SURPLUSAREA) BICYCLE PARKING REQUIRED 10% OF PARKING SPACES 43 x 10% = 4.3 SPACES TOTAL BICYCLE PARKING PROVIDED:5 SPACES FAIRFIELD INN(157 ROOMS)(1) SP. PER EACH ROOM (1.5 SP x 157 RMS) = 157 RMS 190(INCLUDING 6 ADA)180(INCLUDING 6 ADA)(10) SPACES PER 1,000 S.F. OF FLOORAREA DEVOTED TO BALLROOMS, MEETINGROOMS, RESTAURANTS, LOUNGES, SHOPSAND OTHER ACCESSORY USES (3,279 S.F./1,000 S.F.)x10 = 33 RMS HOMEWOODSUITES(124 ROOMS) (1) SP. PER EACH ROOM (1 SP x 124 RMS) = 124 RMS 216(INCLUDING 7 ADA)147(INCLUDING 8 ADA)(10) SPACES PER 1,000 S.F. OF FLOORAREA DEVOTED TO BALLROOMS, MEETINGROOMS, RESTAURANTS, LOUNGES, SHOPSAND OTHER ACCESSORY USES (9,167 S.F./1,000 S.F.)x10 = 92 RMS PARKING LOT TOTAL ADDITIONAL (SURPLUS) PARKING PROVIDED 187 TOTAL PARKING REQUIRED (INCLUDING ADA):449 SPACES TOTAL ADA PARKING REQUIRED 15 SPACES TOTAL EXISTING PARKING PROVIDED (INCLUDING ADA):567 SPACE TOTAL EXISTING ADA PARKING PROVIDED 16 SPACES TOTAL FINAL PARKING PROVIDED (INCLUDING ADA & EV) 561 SPACES (SEE PROPOSED EV STALL TABLE FOR BREAKDOWN) TOTAL FINAL ADA PARKING PROVIDED (INCLUDING EV)19 SPACES PROPOSED EV PARKING STALLS EXISTING STALLS TO BE UTILIZED 60 SPACES PROPOSED PROPOSED LEVEL 3 STALLS 46 SPACES PROPOSED LEVEL 3 ADA STALLS 2 SPACES PROPOSED LEVEL 2 STALLS 5 SPACES PROPOSED LEVEL 2 ADA STALLS 1 SPACE TOTAL PROPOSED EV STALLS 54 SPACES NET STALL CHANGE -6 S4 2 ° 5 1 ' 1 7 " W 42 . 0 5 ' S01°39'14"E 199.15' ANGLERS AVENUE (PUBLIC R.O.W. VARIES)C-2 1 C-3 1 BOOK 45442, PAGE 343APN: 5042 28 17 0030OWNER: GRIFFIN ROAD THREE LLC BOOK 45442, PAGE 335APN: 5042 28 17 0010OWNER: GRIFFIN ROAD ONE, LLC AP N : 5 0 4 2 2 8 0 5 0 0 1 0 OW N E R : I N T E R M A R I N E I N C . GR I F F I N R O A D ( S T A T E H I G H W A Y 8 1 8 ) (P U B L I C R . O . W . V A R I E S ) N8 7 ° 3 1 ' 1 4 " E 2 7 0 . 8 9 ' S01°21'03"E 194.00'N8 8 ° 3 9 ' 3 3 " E 29 . 6 4 ' S01°32'33"E 224.01' S8 8 ° 3 9 ' 3 1 " W 18 . 0 0 ' N01°20'28"W 141.00' N01°36'02"W 262.19'N01°36'02"W51.18' N01°36'09"W 92.71' L1 S8 7 ° 2 1 ' 1 9 " W 8 6 . 7 1 ' S8 7 ° 2 1 ' 1 9 " W 3 9 0 . 4 3 ' N7 9 ° 0 8 ' 5 6 " W 51. 4 2 ' S8 7 ° 2 1 ' 2 2 " W 17 . 2 9 ' N8 8 ° 2 8 ' 3 7 " E 6 4 . 6 9 ' S01°19'45"E 188.33' N8 8 ° 3 9 ' 3 1 " E 6 0 . 0 0 ' N01°31'23"W 47.46' N8 8 ° 2 8 ' 3 7 " E 2 1 4 . 1 2 ' S8 8 ° 2 5 ' 0 6 " W 3 1 1 . 4 8 ' N8 7 ° 2 1 ' 1 9 " E 1 4 5 . 0 2 ' S01°36'04"E 107.27' N01°36'02"W 71.33' S01°36'04"E 119.27' N05°14'32"E 101.24' S01°32'38"E 173.91' S01°32'15"E50.10' ∆=0 ° 0 9 ' 1 5 " R= 1 1 3 9 8 . 4 1 ' L= 3 0 . 6 8 ' S8 7 ° 2 1 ' 1 9 " W 39 0 . 4 3 ' S01°36'04"E12.00' APN: 5042 28 01 0190OWNER: SDS DEVELOPMENTAND TRUST LLC APN: 5042 28 17 0020OWNER: GRIFFIN ROAD TWO LLC HOMEWOODSUITES WENDY'SRESTAURANT FAIRFIELD INN NOTES: 1. SPACES REQUIRED REFERENCED FROM DANIA BEACH CODE OF ORDINANCES, SEC. 265-50. EXISTING PARKING DATA TAKEN FROM PREVIOUS SITE PLAN COMPLETED BY CKE GROUP INC., DATED 12/17/15 & CITY OF DANIA BEACH COMMUNITY DEVELOPMENT STAFF REPORT, DATED01/16/16 (SE-123-15/SE-81-15/VA-84-15/SP-80-15). CURRENT PARKING LOT CONFIGURATION AND STALL TOTALS HAVE NOT BEENVERIFIED BY DEWBERRY ENGINEERS AND VALUES INCLUDED IN THIS TABLE ARE FOR REFERENCE ONLY. Existing ADAStalls (Qty.-2) Existing ADAStalls (Qty.-3) Existing ADA Stalls (Qty.-3) Existing ADA Stalls (Qty.-2) Existing ADAStalls (Qty.-2) Existing ADA Stalls (Qty.-2) Existing ADAStalls (Qty.-2) OVERALL SITE PLAN SCALE:1"=80' FOR 11"x17"1"=40' FOR 22"x34" 40'0'80' 1OVERALL SITE PLAN NOTES: 1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: APORTION OF THE NE 1/4 OF SECTION 9, TOWNSHIP 29SOUTH, RANGE 20 EAST, TALLAHASSEE MERIDIAN, BROWARDCOUNTY, FL BY CLARK LAND SURVEYING, INC. DATED04/04/24. 2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIESSTANDARDS, CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION,FPL WORK ORDER #13660625. 3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHINAREA OF PROPOSED TRENCH & EQUIPMENT SITE AREA. HANDDIG AND RELOCATE AS REQUIRED. 4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILTBAG DURING CONSTRUCTION. 5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS. 6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OFIMPERVIOUS AREA THAT HAS BEEN DETERMINED TO HAVE NOADVERSE AFFECTS ON THE EXISTING STORMWATER SYSTEM.SEE COMPLETED MEMORANDUM BY DEWBERRY ENGINEERS INC. DATED 06/05/25. 7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PERTESLA DIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CM FOR STICKER PLACEMENT & HEIGHT. 8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION,AND THE CITY STANDARDS. 9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSEDFOR THIS PROJECT, STALL RESTRIPING ONLY. APN: 5042 28 01 0192OWNER: BROWARD COUNTY ±8'-6"±12'-8"±6'-8" SITE DATA DESCRIPTION QUANTITY TOTAL SITE AREA 8.14 AC EXISTING SITE AREAS IMPERVIOUS AREA 6.23 AC (76.5%) PERVIOUS AREA 1.91 AC (23.5%) PROPOSED SITE AREAS PERVIOUS AREA PROPOSED FORREMOVAL (PER PROJECT PLANS)1,396 S.F. (0.03 AC) IMPERVIOUS AREA 6.26 AC (76.9%) PERVIOUS AREA 1.88 AC (23.1%) CHANGE IN IMPERVIOUS AREA*+0.03 AC (+0.4%) SITE DATA INCLUDING EXISTING PERVIOUS AND IMPERVIOUS AREASREFERENCED FROM PREVIOUS DRAINAGE CALCULATION REPORT BY ZAMORA &ASSOCIATES, INC. DATED 03/14/08. * THE PROPOSED PROJECT RESULTS AN AN INCREASE OF IMPERVIOUS AREATHAT HAS BEEN DETERMINED TO HAVE NO ADVERSE AFFECTS ON THEEXISTING STORMWATER SYSTEM. SEE COMPLETED MEMORANDUM BY DEWBERRYENGINEERS INC. DATED 06/05/25. Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:00-04'00' E E WV WV WV WV WV WV WV WV WV WM WMWM WM WM WMWM IV IV IVIV IV IVIV IVIV IVIV IVIV IV IVIV IV IV IV IB IV COCOCO CO CO CO CO IVIV SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 SP-2 ZONING DATA PLAN SCALE:1"=120' FOR 11"x17"1"=60' FOR 22"x34" 60'0'120' 1ZONING DATA PLAN ANGLERS AVENUE (PUBLIC R.O.W. VARIES)C-2 1 C-3 1 BOOK 45442, PAGE 343APN: 5042 28 17 0030OWNER: GRIFFIN ROAD THREE LLC BOOK 45442, PAGE 335APN: 5042 28 17 0010OWNER: GRIFFIN ROAD ONE, LLC AP N : 5 0 4 2 2 8 0 5 0 0 1 0 OW N E R : I N T E R M A R I N E I N C . GR I F F I N R O A D ( S T A T E H I G H W A Y 81 8 ) ( P U B L I C R . O . W . V A R I E S ) APN: 5042 28 010190OWNER: SDSDEVELOPMENT ANDTRUST LLC APN: 5042 28 17 0020OWNER: GRIFFIN ROAD TWO LLC HOMEWOODSUITES WENDY'SRESTAURANT FAIRFIELDINN CITY OF DANIA BEACH ZONING DATA PARCEL NO.DESCRIPTION 5042-28-17-0010 ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINE, OVERLAY DISTRICT: HO - DISTRICT OVERLAYUSE CODE 39-02 HOTEL - LIMITED SERVICE WITHOUT FOODABBREVIATED LEGAL DESCRIPTION AIRPORT COMMERCE CENTER PLAT 175-38 B PORTION PARCEL A DESC AS COMM AT NE CORPAR A,SW 349.01 ALG N/L, TO POB,SW 270.89,SE 262.19,SW 101.24,SE 51.18,NE 311.48,NW 224.01,SW 29.64,NW 194 TO POBAKA: HOTEL ONE PARCEL.GROSS ACRES: 2.76BLDG. S.F.: 78,143 5042-28-17-0020 ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINE, OVERLAY DISTRICT: HO - DISTRICT OVERLAYUSE CODE 39-02 HOTEL - LIMITED SERVICE WITHOUT FOODABBREVIATED LEGAL DESCRIPTION AIRPORT COMMERCE CENTER 175-38 B PORTION PARCEL A DESC AS BEG AT NE COR PARA,SE 373.83 ALG E/L, SW 64.69,NW 188.33,SW 60,SE 141, NE 18,SE 47.46,SW 214.12,NW 173.91,SW 29.64,NW 194,NE 349.01TO POB AKA:HOTEL TWO PARCEL.GROSS ACRES: 2.62BLDG. S.F.: 99,520 5042-28-17-0030 ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINE, OVERLAY DISTRICT: HO - DISTRICT OVERLAYUSE CODE 22-01 RESTAURANTS - FAST FOOD, FRANCHISEABBREVIATED LEGAL DESCRIPTION AIRPORT COMMERCE CENTER 175-38 B PORTION PARCEL A,DESC AS COMM AT NE COR PARA,SE 373.83 TO POB CONT SE 199.17 ALG E/L,SW 42.05 SW 17.29,NW 51.42,SW 390.44,NW 107.27,SW 145.02,NW 71.33,NE311.48,NW 50.10,NE 214.12,NW 47.46,SW 18,NW 141,NE 60,SE 188.33,NE 64.69 TO POB AKA:OFFICE PARCEL.GROSS ACRES: 2.77BLDG. S.F.: 3,412 5042-28-01-0190 ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINE, OVERLAY DISTRICT: HO - DISTRICT OVERLAYUSE CODE 22-01 RESTAURANTS - FAST FOOD, FRANCHISEABBREVIATED LEGAL DESCRIPTION REED LAND CO SUB 2-32 D 28-50-42 TH PT OF LOT 12 BLK 3 DESC AS E 150 OF W185 OF N 150 OF S 185 OF SEC 28 LESS PARCEL 1 E OF CA #81-7143 FOR RD.GROSS ACRES: 0.39BLDG. S.F.: 1,751 5042-28-01-0192 ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINE, OVERLAY DISTRICT: HO - DISTRICT OVERLAYUSE CODE 94 RIGHT-OF-WAY, STREETS, ROADS, IRRIGATION CHANNEL, DITCH, ETCABBREVIATED LEGAL DESCRIPTION: PLAT OF SECTIONS 28,29,31 & 32 2-32 D 28-50-42 THAT PT OF LOT 12 BLK 3 DESC AS:COMM SW COR OF SW1/4 OF SEC 28, E 676.20,N 65.75 TO POB,W 184.39 NWLY 61.19,W 100,SWLY 37.95,W 109.61,N 119.24,W145,N 490 M/L, W 5,S 490 M/L,E 5,E 145,S 119.24 S 30.76,E 490,N 30.76 TO POB.GROSS ACRES: 0.06BLDG. S.F.: 0 5042-28-01-0200 ZONE: IROM-AA - INDSTRL-RSRCH-OFFICE-MRNE-AA, OVERLAY DISTRICT: HO - DISTRICT OVERLAYUSE CODE 20-12 MARINA-SLIPS / GROUND STORAGEABBREVIATED LEGAL DESCRIPTION: REED LAND CO SUB 2-32 B 28-50-42 PORTION OF TRACT 13 BLK 3 LYING W OF SALR/W LESS S 669 THEREOF TOG WITH W 30 OF S 669 OF TRACT 13 BLK 3 LESS S 35 & LESS PT DESC AS:COMM AT SW COROF SW1/4 OF SAID SEC 28, E 706.1, N 65.75 TO POB, W 30.01, S 30.76, E 30.01, N 30.76 TO POB.GROSS ACRES: 0.63BLDG. S.F.: 15,930 5042-28-05-0010 ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINEUSE CODE 22-11 MARINA - SLIPS / RACK STORAGEABBREVIATED LEGAL DESCRIPTION: RAVENSWOOD RIDGE AMEN 43-5 B THAT PART OF TR A TOGETHER WITH THAT PART OF LOT11 OF REED LAND CO SUB 2-32 D DESC AS BEG SW COR OF TR 11,N 302.54,ELY 260.19,NLY 19.38,NELY 108.61,NELY 103,SLY 71.98,ELY 204.19 TO PT ON E/L OF TR 11,SLY 285.91,WLY 671.87 TO POB,LESS W 35 FOR RD R/W & LESS W 5'THEREOF AKA:SOUTH PARCEL.GROSS ACRES: 4.45BLDG. S.F.: 13,282 5042-28-15-0010 ZONE: C-4 - GENERAL COMMERCIALUSE CODE 48-03 WAREHOUSE - MINI STORAGE (ENCLOSED)ABBREVIATED LEGAL DESCRIPTION: WLA QUINTA PLAT I 147-30 B PARCEL A.GROSS ACRES: 0.93BLDG. S.F.: 137,585 5042-29-06-0060 ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 27-04 GARAGE/AUTO BODY/AUTO PAINT SHOPABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 7 LESS COMM AT SE COR OF SE1/4,NLY 235.34,WLY 52TO POB,NLY 49.99 TO BEG OF CUR, NLY & WLY 39.28,ELY 17 TO BEG OF CUR,ELY & SLY 39.28,SLY 49.99 WLY 17 TO POBBLK 1.GROSS ACRES: 0.22BLDG. S.F.: 3,006 5042-29-06-0070 ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 27-04 GARAGE/AUTO BODY/AUTO PAINT SHOPABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 8 LESS RD AS DESC IN PARCEL #79-W,CA 82-9401BLK 1.GROSS ACRES: 0.23BLDG. S.F.: 1,231 5042-29-06-0080 ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 26-02 SERVICE STATION (WITH SMALL CONVENIENCE STORE)ABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 9 LESS RD AS DESC IN PARCEL NO 78-W OF C A82-10815 BLK 1.GROSS ACRES: 0.28BLDG. S.F.: 924 5042-29-06-0180 ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 48-01 WAREHOUSINGABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 7 BLK 2.GROSS ACRES: 0.24BLDG. S.F.: 2,857 5042-29-06-0190 ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 17-01 OFFICE BUILDING - NON PROFESSIONAL, 1 STORYABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 8 BLK 2.GROSS ACRES: 0.24BLDG. S.F.: 3,367 5042-29-06-0200 ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 48-01 WAREHOUSINGABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 9 BLK 2.GROSS ACRES: 0.24BLDG. S.F.: 2,400 5042-29-06-0210 ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 12-01 MIXED STORE OR OFFICE AND RESIDENTIALABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 10 LESS COMM SE COR OF SE1/4 SEC 29-50-42,NLY435.47, WLY 46.45 TO POB,SWLY 46.56, SLY 3.91 TO P/C,SLY & WLY ARC DIST 39.26,NE 17 TO P/C,ELY & NLY ARC DIST39.26,NLY 50.13, SWLY 11.45 TO POB BLK 2.GROSS ACRES: 0.23BLDG. S.F.: 1,736 5042-29-33-0010 ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINEUSE CODE 48-09 WAREHOUSE - FLEXABBREVIATED LEGAL DESCRIPTION: THE DON TRACT 113-44 B PARCEL A,B.GROSS ACRES: 9.03BLDG. S.F.: 142,079NOTES: 1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: APORTION OF THE NE 1/4 OF SECTION 9, TOWNSHIP 29SOUTH, RANGE 20 EAST, TALLAHASSEE MERIDIAN, BROWARDCOUNTY, FL BY CLARK LAND SURVEYING, INC. DATED04/04/24. 2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIESSTANDARDS, CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION,FPL WORK ORDER #13660625. 3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHINAREA OF PROPOSED TRENCH & EQUIPMENT SITE AREA. HANDDIG AND RELOCATE AS REQUIRED. 4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILTBAG DURING CONSTRUCTION. 5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS. 6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OFIMPERVIOUS AREA THAT HAS BEEN DETERMINED TO HAVE NOADVERSE AFFECTS ON THE EXISTING STORMWATER SYSTEM.SEE COMPLETED MEMORANDUM BY DEWBERRY ENGINEERS INC.DATED 06/05/25. 7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PER TESLA DIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CMFOR STICKER PLACEMENT & HEIGHT. 8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION,AND THE CITY STANDARDS. 9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSEDFOR THIS PROJECT, STALL RESTRIPING ONLY. APN: 5042 28 01 0192OWNER: BROWARD COUNTY APN: 5042 29 33 0010OWNER: G&I IX 2200 SW LLC APN: 5042 29 06 0180OWNER: BLUESTARMARINE HOLDINGS LLC APN: 5042 29 06 0190OWNER: BLUESTARMARINE HOLDINGS LLC APN: 5042 29 06 0200OWNER: POINTER FAM REVLIV TR, POINTER, DEAN A TRS APN: 5042 29 06 0210OWNER: SAHRIFEH, NASER & JEAN APN: 5042 29 06 0060OWNER: POINTER FAM REV LIVTR, POINTER, DEAN A TRS APN: 5042 29 06 0070OWNER: C & L SUNSHINEENTERPRISES INC APN: 5042 29 06 0080OWNER: GRIFFIN PROPERTYINVESTMENT LLC APN: 5042 28 01 0200OWNER: 2051 GRIFFIN ROAD LLC APN: 5042 28 15 0010OWNER: TKG-STORAGEMART PARTNERS PORTFOLIO LLC Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:01-04'00' E EM IV WV WM IB CO E E WV WV WV WV WV WV WV WV WV WM WMWM WM WM WMWM IV IV IV IV IV IVIV IVIV IVIV IV IV IV IVIV IV IV IV IB IV COCO CO CO CO CO CO IVIV SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 C-1 SCALE:1"=60' FOR 11"x17"1"=30' FOR 22"x34" 30'0'60' 1DETAILED SITE PLAN LEGEND BOOK 45442, PAGE 343 APN: 5042 28 17 0030OWNER: GRIFFIN ROAD THREE LLC BOOK 45442, PAGE 335 APN: 5042 28 17 0010OWNER: GRIFFIN ROAD ONE, LLC AP N : 5 0 4 2 2 8 0 5 0 0 1 0 OW N E R : I N T E R M A R I N E I N C . N8 7 ° 3 1 ' 1 4 " E 2 7 0 . 8 9 ' S01°21'03"E 194.00'N8 8 ° 3 9 ' 3 3 " E 29 . 6 4 ' S01°32'33"E 224.01' N01°36'02"W 262.19'N01°36'02"W51.18' N01°36'09"W 92.71' L1 S8 7 ° 2 1 ' 1 9 " W 8 6 . 7 1 ' S8 7 ° 2 1 ' 1 9 " W 3 9 0 . 4 3 ' S8 8 ° 2 5 ' 0 6 " W 3 1 1 . 4 8 ' N8 7 ° 2 1 ' 1 9 " E 1 4 5 . 0 2 ' S01°36'04"E 107.27' N01°36'02"W 71.33' S01°36'04"E 119.27' N05°14'32"E 101.24' S01°32'38"E 173.91'S01°32'15"E 50.10' ∆=0 ° 0 9 ' 1 5 " R= 1 1 3 9 8 . 4 1 ' L= 3 0 . 6 8 ' S8 7 ° 2 1 ' 1 9 " W 39 0 . 4 3 ' ExistingBuilding ANGLERS AVENUE (PUBLIC R.O.W. VARIES) GR I F F I N R O A D ( S T A T E H I G H W A Y 8 1 8 ) (P U B L I C R . O . W . V A R I E S ) Existing Underground Electric Line (Typ.) Existing StormInlet (Typ.) Existing Wheelstop(Typ.) Existing UtilityPole (Typ.) Existing Shrub(Typ.) Existing Tree(Typ.) Existing Light Post (Typ.) Existing StormDrain (Typ.) 9 9 9 9 8 9 8 9 9 9 8 9 9 8 9 8 9 9 1010 10 10 10 10 9 9 10 10 11 10 9 9 10 10 8 8 9 9 9 8 9 98 10 9 9 9 9 8 10 10 10 10 10 1010 10 99 9 9 9 9 9 9 9 9 9 10 9 9 9 9 C-2 1 C-3 1 DETAILED SITE PLAN 30'-0" UTILITYEASEMENT 20'-0" BUILDINGSETBACK 30'-0" UTILITYEASEMENT 10'-0" ELECTRICEASEMENT 40'-0" ACCESS EASEMENT 10'-0" ELECTRICEASEMENT EQUIPMENT SHIPPED BY TESLA EQUIPMENT QTY GRAY 4" STANDARD DEEP MOUNTCRASHCORE BOLLARD 5 GRAY MINI OFFSET EV FLEX REBOUNDINGBOLLARD 50 V3.5 CABINET (4 POST)12 ACCESSIBLE USE LAST SIGN 3 V4 POST 48 GEN 3 TESLA 24FT 6 CABINET FUSE 12 ARUBA ACCESS POINT 5 4" SUPERFLEX CONDUIT (FT)1,542' 4" SUPERFLEX STRAIGHT COUPLER 20 4" DURALINE CONDUIT (FT)9,201' 4" ADAPTER - DURALINE TO PVC 96 4" COUPLER - DURALINE TO DURALINE 25 Existing Fence Gate(TO REMAIN) Existing Fence (TO REMAIN) Existing Concrete Wall &Lattice Fence (6'-2" High)(TO REMAIN) NOTES: 1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A PORTION OFTHE NE 1/4 OF SECTION 9, TOWNSHIP 29 SOUTH, RANGE 20 EAST,TALLAHASSEE MERIDIAN, BROWARD COUNTY, FL BY CLARK LANDSURVEYING, INC. DATED 04/04/24. 2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIES STANDARDS,CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION, FPL WORK ORDER#13660625. 3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREAOF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG ANDRELOCATE AS REQUIRED. 4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILT BAGDURING CONSTRUCTION. 5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS. 6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OF IMPERVIOUSAREA THAT HAS BEEN DETERMINED TO HAVE NO ADVERSE AFFECTSON THE EXISTING STORMWATER SYSTEM. SEE COMPLETEDMEMORANDUM BY DEWBERRY ENGINEERS INC. DATED 06/05/25. 7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PER TESLADIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CM FORSTICKER PLACEMENT & HEIGHT. 8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION, AND THECITY STANDARDS. 9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSED FORTHIS PROJECT, STALL RESTRIPING ONLY. 10. RELOCATE SIX (6) EXISTING WHEELSTOPS TO THE SOUTHWESTSTALLS IN THE PARKING LOT . Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:02-04'00' E WV IVIV IVIV IVIV IV IV CO SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 C-1A CONSTRUCTION STAGING PLAN Existing Light Post (Typ.) Existing Sign(Typ.)Existing Water Valve (Typ.) Existing FireHydrant (Typ.) Existing Utility Pole (Typ.) ExistingTrash Area Existing StormInlet (Typ.)(SEE NOTE 4) Existing Tree (Typ.) Existing Fence(Typ.) Existing Hedge Row (Typ.) Existing Storm Drain (Typ.) Existing Unknown Manhole (Typ.) Existing ParkingStriping (Typ.) CONSTRUCTION FENCING LEGEND CONSTRUCTION PARKING CONSTRUCTION DEBRIS STAGING AREA EQUIPMENT STAGING AREA SCALE:1"=30' FOR 11"x17"1"=15' FOR 22"x34" 15'0'30' 1CONSTRUCTION STAGING PLAN CONSTRUCTIONFENCING EQUIPMENT STAGING AREA CONSTRUCTION DEBRISSTAGING AREA CONSTRUCTIONPARKING CONSTRUCTIONPARKING Existing Fence (Typ.) ANGLERS AVENUE (PUBLIC R.O.W. VARIES) NOTES: 1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A PORTION OFTHE NE 1/4 OF SECTION 9, TOWNSHIP 29 SOUTH, RANGE 20 EAST,TALLAHASSEE MERIDIAN, BROWARD COUNTY, FL BY CLARK LANDSURVEYING, INC. DATED 04/04/24. 2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIES STANDARDS,CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION, FPL WORK ORDER#13660625. 3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREAOF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG ANDRELOCATE AS REQUIRED. 4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILT BAGDURING CONSTRUCTION. 5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS. 6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OF IMPERVIOUSAREA THAT HAS BEEN DETERMINED TO HAVE NO ADVERSE AFFECTSON THE EXISTING STORMWATER SYSTEM. SEE COMPLETEDMEMORANDUM BY DEWBERRY ENGINEERS INC. DATED 06/05/25. 7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PER TESLADIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CM FORSTICKER PLACEMENT & HEIGHT. 8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION, AND THECITY STANDARDS. 9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSED FORTHIS PROJECT, STALL RESTRIPING ONLY. 10. RELOCATE SIX (6) EXISTING WHEELSTOPS TO THE SOUTHWESTSTALLS IN THE PARKING LOT . Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:03-04'00' E WV IVIV IVIV IVIV IV IV CO SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 C-2 EXISTING CONDITIONSPLAN 9'-0"±(TYP.) 17 ' - 8 " (T y p . ) Existing Light Post (Typ.) N01°36'02"W 262.19' N01°36'02"W51.18' N05°14'32"E 101.24' 8 9 9 8 9 9 10 10 10 10 10 9 9 10 10 11 10 9 10 10 8 8 S8 8 ° 2 5 ' 0 6 " W 3 1 1 . 4 8 ' Existing Palm Tree (Typ.)(TO BE RELOCATEDAS NECESSARY) Existing IrrigationValve (Typ.)(TO BE RELOCATED AS NECESSARY) Existing Sign(Typ.) Existing WaterValve (Typ.) Existing FireHydrant (Typ.) Existing Utility Pole (Typ.) 24 ' - 2 " Existing Wheelstop (Typ.)(TO BE REMOVED)(TYP.-34) (SEE NOTE 10) Existing ParkingStriping (Typ.) (TO BE MODIFIED) ExistingTrash AreaExisting Conc. Curb(TO BE REMOVED)(±90 L.F.) Existing StormInlet (Typ.) (SEE NOTE 4) Existing Fence (Typ.) Existing Hedge Row (Typ.) Existing Storm Drain (Typ.) Existing Unknown Manhole (Typ.) Existing Conc. Curb(TO BE REMOVED)(±55 L.F.) Existing ParkingStriping (Typ.)(TO BE MODIFIED)Existing ParkingStriping (Typ.) (TO BE MODIFIED) Existing Parking Striping (Typ.)(TO BE MODIFIED) SCALE:1"=30' FOR 11"x17"1"=15' FOR 22"x34" 15'0'30' 1EXISTING CONDITIONS PLAN Existing LandscapeArea(TO BE REMOVED)(±195 S.F.) Existing Asphalt Area(TO BE REMOVED)(±127 SF TOTAL) Existing Asphalt Area (TO BE REMOVED)(±158 SF) 24'-0" ANGLERS AVENUE (PUBLIC R.O.W. VARIES) 1.6%1. 8 % LEGEND EXISTING ASPHALTTO BE REMOVED EXISTING LANDSCAPINGTO BE REMOVED Existing Deciduous Tree (Typ.)(TO BE RELOCATEDAS NECESSARY) Existing Conc. Curb(TO BE REMOVED)(±63 L.F.) Existing Conc. Curb(TO BE REMOVED) (±90 L.F.) Existing Conc. Curb (TO BE REMOVED)(±90 L.F.) Existing Conc. Curb (TO BE REMOVED)(±35 L.F.) Existing LandscapeArea (TO BE REMOVED)(±108 S.F.) Existing LandscapeArea(TO BE REMOVED)(±153 S.F.) Existing LandscapeArea(TO BE REMOVED)(±192 S.F.) Existing LandscapeArea (TO BE REMOVED)(±80 S.F.) 21'-0" 9'- 0 " 8'-10" 8'-10" 8'- 1 0 " 40'-9" 4'- 0 " 37'-2" 3'-10"53'-9" Existing Landscape Area(TO BE REMOVED) (±78 S.F.)Existing Landscape Area (TO BE REMOVED)(±189 S.F.) Existing Asphalt Area(TO BE REMOVED)(±64 SF) ±55'-0" ±4'-3"±5'-0" ±64'-0"±91'-0"±91'-0" Existing Landscape Area(TO BE REMOVED)(±78 S.F.) Existing Landscape Area(TO BE REMOVED)(±179 S.F.) Existing HotelPool ExistingHotel HotTub Existing Concrete Wall & Lattice Fence (6'-2" High) (TO REMAIN) 5'- 1 0 " 17'-7" ±36'-0" 2'- 4 " 1'- 1 0 " 1'- 8 " 1'- 8 " 31"(TYP.) 11 ' - 0 " (TY P . ) 3'- 9 " (TY P . ) 1'-6" 15'-2" 8'- 1 0 " 7'- 8 " 26'-8" 1'-2" ±5'-0" ±5'-0" NOTES: 1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A PORTION OFTHE NE 1/4 OF SECTION 9, TOWNSHIP 29 SOUTH, RANGE 20 EAST,TALLAHASSEE MERIDIAN, BROWARD COUNTY, FL BY CLARK LANDSURVEYING, INC. DATED 04/04/24. 2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIES STANDARDS,CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION, FPL WORK ORDER#13660625. 3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREAOF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG ANDRELOCATE AS REQUIRED. 4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILT BAGDURING CONSTRUCTION. 5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS. 6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OF IMPERVIOUSAREA THAT HAS BEEN DETERMINED TO HAVE NO ADVERSE AFFECTSON THE EXISTING STORMWATER SYSTEM. SEE COMPLETEDMEMORANDUM BY DEWBERRY ENGINEERS INC. DATED 06/05/25. 7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PER TESLADIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CM FORSTICKER PLACEMENT & HEIGHT. 8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION, AND THECITY STANDARDS. 9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSED FORTHIS PROJECT, STALL RESTRIPING ONLY. 10. RELOCATE SIX (6) EXISTING WHEELSTOPS TO THE SOUTHWESTSTALLS IN THE PARKING LOT . 0.5% 2.0 %2.0 % 1.4%9'-0"±(TYP.) Existing LandscapeArea(TO BE REMOVED)(±72 S.F.) Existing Trash Can &Concrete Foundation (Typ.-3)(TO BE REMOVED) Existing Palm Tree(TO BE RELOCATED)(TYP.)LS-1 1 3'-0"Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:04-04'00' E WV IVIV IVIV IVIV IV IV CO IVIV SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 C-3 EQUIPMENT/PARKINGPLAN SCALE:1"=30' FOR 11"x17"1"=15' FOR 22"x34" 15'0'30' 1EQUIPMENT/PARKING PLAN PARKING STALL SCHEDULE DESCRIPTION QUANTITY EXISTING STALLS (TO BE UTILIZED)60 PROPOSED TESLA LEVEL 3 STALLS 46 PROPOSED TESLA LEVEL 3 ADA STALLS 2 PROPOSED TESLA LEVEL 2 STALLS 5 PROPOSED TESLA LEVEL 2 ADA STALL 1 NET PARKING STALL CHANGE -6 3A4A3B3C3D N01°36'02"W 262.19' N01°36'02"W 51.18' N05°14'32"E 101.24' 9 10 10 S8 8 ° 2 5 ' 0 6 " W 31 1 . 4 8 ' PROPOSED UNDERGROUNDELECTRICAL CONDUCTOR ROUTEDTO PROPOSED CHARGE POSTS 1A1B1C1D4B4C4D5A 7A 5B5C5D 7B 7C 7D 8A 9B8B8C8D 9C 9D 6'-0"(TYP.-2) 11C 3'- 0 " 3 11D 12A 12C12B TESLA LEVEL 2 CHARGE POST **# LEGEND TESLA LEVEL 3 CHARGE POST * # 12'-0" (TYP.) 4'-6"(TYP.) # 6 5 4 2 7 # 8 9 10 11 12 9'-0"±(TYP.) 6'-6"12'-0" 1 2 #UTILITY TRANSFORMER # 16'-2" 9'-0"(TYP.) 18 ' - 0 " (T Y P . ) 24 ' - 0 " 18 ' - 0 " (T Y P . ) 1.6% V4 CABLE TERMINUS CONCRETE ANGLERS AVENUE (PUBLIC R.O.W. VARIES) 0.5% 1.6 % 2. 0 % 1.4% ±55'-0" 1.8 % 24'-0" Existing StormInlet (Typ.) (SEE NOTE 4) Existing Light Post (Typ.) Existing StormDrain (Typ.) Existing Fence(Typ.)Existing WaterValve (Typ.) Existing Fire Hydrant (Typ.)Existing UtilityPole (Typ.) ExistingTrash Area Existing UnknownManhole (Typ.) Existing HedgeRow (Typ.) PROPOSED CONCRETE CURB (±63 LF) PROPOSED 26" WIDECURB W/ INTEGRATEDTESLA LEVEL 3 CHARGEPOST PROPOSED GREENPARKING STRIPING (TYP.) PROPOSED 4000A277/480V SWITCHGEARMOUNTED ON CONC. PAD #1PROPOSED WASTEMANAGEMENT BIN(TYP.-4) PROPOSED 480V PAD MOUNTEDUTILITY TRANSFORMER (TYP.-2) (SIZED BY UTILITY) PROPOSED SUPERCHARGER CABINETMOUNTED ON 21'-0"x9'-0"CONCRETE PAD #2 (TYP.-6) PROPOSED SIGN POST WITHACCESSIBLE SIGNAGE (TYP.) PROPOSED RELOCATEDIRRIGATION VALVE (TYP.-2) PROPOSED DISABLED ACCESSSTRIPING AISLE & STALL(TYP.) (SEE NOTE 5) PROPOSED 18" WIDE CURB W/INTEGRATED DUAL-STALLLEVEL 2 CHARGE PEDESTAL (TYP.-2) PROPOSED 7.3M CHARGECABLE FOR ADA POST PROPOSED DISABLED ACCESSSTRIPING AISLE & STALL(TYP.) (SEE NOTE 5) PROPOSED McCUECRASH COREBOLLARD (TYP.-5) PROPOSED SIGN POST WITHACCESSIBLE SIGNAGE (TYP.-1) ADA 30"x48" CLEARFLOOR SPACE (TYP.) PROPOSED LANDSCAPESCREENING AROUND EQUIPMENT (TYP.) PROPOSED EPO BUTTON #2 WITHEMERGENCY "POWER-OFF" SIGNAGEMOUNTED TO PROPOSED POST PROPOSED EPO BUTTON #1 WITHEMERGENCY "POWER-OFF" SIGNAGEMOUNTED TO PROPOSED POST PROPOSED 3000A SWITCHGEAR MOUNTED ON CONC. PAD #2 PROPOSED SINGLE-STALLLEVEL 2 CHARGEPEDESTAL (TYP.-2) PROPOSED LANDSCAPE SCREENINGAROUND EQUIPMENT (TYP.) C-5 4 C-7 1 C-4 2 C-6 4 C-7 7 E-4 2 C-6 1-3 E-4 3 E-5 1 C-7 4 C-7 2 C-7 8 C-5 4 C-7 1 LS-2 1 E-2 1 E-1 1 C-5 1-2 LS-2 1 1 12456 7'-6"7'-6" 20'-9" 18 ' - 0 " (T Y P . ) 18 ' - 0 " (T Y P . ) ±5'-0" 13'-2" 3'-0" 18 ' - 0 " (TY P . ) 2A2B2C2D6A6B6C6D 10B 10C 10D 11A 11B 24 ' - 0 " ±5'-0" 4'-6"(TYP.) 3 C-5 1-2 PROPOSED 31" WIDE FOUNDATION FLUSH WITH GRADE W/INTEGRATED TESLA LEVEL 3CHARGE POST (TYP.-5, 10 CHARGE POST)C-4 3 ±4'-3" ExistingHotelPool Existing HotelHot Tub Existing Concrete Fence Wall & Lattice Fence (6'-2" High)(TO REMAIN) 53'-10"37'-2" 4'- 5 " (T Y P . ) C-3 2 9A 10A 12D 21'-0"7'- 8 " 9'- 0 " RELOCATED 5.5" TALLWHEEL STOPS (TYP.-6)(SEE NOTE 10)30'-1" PROPOSED SUPERCHARGER CABINET MOUNTED ON 40'-9"x4'-0" (APPROX.)CONCRETE PAD #1 (TYP.-6)C-6 1-3 TESLA LEVEL 3 CHARGE POST * TESLA LEVEL 2 CHARGE POST ** TESLA SUPERCHARGER CABINET TESLA SWITCHGEAR TRANSFORMER REBOUNDING MINI BOLLARD TRASH RECEPTACLE McCUE CRASH CORE BOLLARD SIGN POST WITH ACCESSIBLE SIGNAGE PROPOSEDSIDEWALKEXPANSION(±72 S.F.)C-7 5 6'-0" (TYP.-2)12'-0"(TYP.) 18 ' - 0 " ( T Y P . ) 2'-3"(TYP.) 4'- 5 " 6'-0"(TYP.) SCALE:1"=10' FOR 11"x17"1"=5' FOR 22"x34" 5'0'10' 2ACCESIBLE STALL LAYOUTS 18 ' - 0 " (T Y P . ) ADA 30"x48" CLEARFLOOR SPACE (TYP.) PROPOSEDCONCRETE LANDING 6'-6"(TYP.) SCALE:1"=10' FOR 11"x17"1"=5' FOR 22"x34" 5'0'10' 3REGULAR STALL LAYOUTS TESLA 'STAR-POINT' SUPERCHARGER CABINET # TESLA 'STAR-CENTER'SUPERCHARGER CABINET # EPO BUTTON WITHEMERGENCY "POWER-OFF" 10 ' - 0 " (T Y P . ) PROPOSED GREENPARKING STRIPING(TYP.) PROPOSED McCUEMINI REBOUNDINGBOLLARD (TYP.)C-7 3 10'-9"(TYP.) PROPOSED 31" WIDEFOUNDATION FLUSH WITHGRADE W/INTEGRATED TESLALEVEL 3 CHARGE POST (TYP.)C-4 3 9C 9D C-3 3 PROPOSEDLANDSCAPINGLS-2 1 PROPOSED DIRECTIONAL STICKER (SHOWN ASTYPICAL PER SET OF CHARGE POSTS)(TYP.-STALLS 9A THROUGH 11B) (SEE NOTE 7) 18 ' - 0 " (TY P . ) 10'-2"(TYP.) 9'-0"(TYP.) 18 ' - 0 " (TY P . ) PROPOSED 18" WIDE CURBW/ INTEGRATED TESLALEVEL 2 CHARGE POST PROPOSED DUAL-STALLLEVEL 2 CHARGEPEDESTAL C-5 1 C-5 1-2 C-3 3 CHARGE FROM THIS SIDE / DO NOTCHARGE FROM THIS SIDE STICKER TOBE PLACED AT ALL POSTS ±5'-0" ±5'-0"38'-7" 10" PROPOSED SIGN POSTWITH ACCESSIBLE SIGNAGE (TYP.-2)C-5 4 C-7 1 C-8 1 * LEVEL 3 POST ADDS APPROXIMATELY 100 TO 200+MILES OF RANGE PER 30 MINUTES OF CHARGING. ** LEVEL 2 POST ADDS APPROXIMATELY 25 MILES OFRANGE PER HOUR OF CHARGING. NOTES: 1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A PORTION OFTHE NE 1/4 OF SECTION 9, TOWNSHIP 29 SOUTH, RANGE 20 EAST,TALLAHASSEE MERIDIAN, BROWARD COUNTY, FL BY CLARK LANDSURVEYING, INC. DATED 04/04/24. 2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIES STANDARDS,CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION, FPL WORK ORDER#13660625. 3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREAOF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG ANDRELOCATE AS REQUIRED. 4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILT BAGDURING CONSTRUCTION. 5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS. 6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OF IMPERVIOUSAREA THAT HAS BEEN DETERMINED TO HAVE NO ADVERSE AFFECTSON THE EXISTING STORMWATER SYSTEM. SEE COMPLETEDMEMORANDUM BY DEWBERRY ENGINEERS INC. DATED 06/05/25. 7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PER TESLADIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CM FORSTICKER PLACEMENT & HEIGHT. 8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION, AND THECITY STANDARDS. 9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSED FORTHIS PROJECT, STALL RESTRIPING ONLY. 10. RELOCATE SIX (6) EXISTING WHEELSTOPS TO THE SOUTHWESTSTALLS IN THE PARKING LOT . C-8 1 12'-0"(TYP.) 1.6% 1.8 % ADA 30"x48" CLEAR FLOOR SPACE (TYP.) PROPOSED 18" WIDE CURBW/ INTEGRATED TESLALEVEL 2 CHARGE POST PROPOSEDSINGLE-STALL LEVEL 2CHARGE PEDESTAL C-5 1 C-5 1-2 PROPOSED DISABLED ACCESSSTRIPING AISLE & STALL(TYP.) (SEE NOTE 5) PROPOSED SIGN POSTWITH ACCESSIBLESIGNAGE (TYP.)C-5 4 C-7 1 C-8 1 C-8 1 ELEV: ±7.73 ELEV:±7.75 ELEV:±7.92 ELEV: ±8.01 ELEV: ±8.32 ELEV: ±8.29 ELEV: ±8.12 ELEV:±8.10 ELEV:±8.08 ELEV:±7.79 2'-3"(TYP.) ELEV: ±8.89 ELEV: ±8.76 ELEV: ±9.18 ELEV: ±8.57 ELEV: ±8.89 ELEV: ±9.07 0.5% 1.6 % 2.0% 1.6 % 0.3% 2.0 %1.7 % 1.5% 0.3% 2.0 % 6'-0"(TYP.) ±5'-0" 10 ' - 0 " (T Y P . ) ±8 ' - 6 " ±6 ' - 8 " PROPOSED LEVEL 2 SWITCHGEARMOUNTED ON CONC. PAD #1 E-4 4 PROPOSED McCUEMINI REBOUNDING BOLLARD (TYP.)C-7 3 5'- 6 " PROPOSED 4" TALL WHEEL STOPS (TYP.-10)C-5 5 2'-0"(TYP.) ±1 2 ' - 8 " PROPOSED H-FRAME FOR TELCO BOX E-5 3 TELCO FRAME 10'-8" PROPOSED UTILITY BOLLARDS(PER UTILITY SPEC) PROPOSED SUPERCHARGERON CONCRETE FOUNDATION(TYP.-2)C-4 1 EXISTING RELOCATEDPALM TREELS-1 1 Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:06-04'00' E WV IVIV IVIV IVIV IV IV CO IVIV SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 C-3A EASEMENT & UTILITY PLAN SCALE:1"=30' FOR 11"x17"1"=15' FOR 22"x34" 15'0'30' 1EASEMENT & UTILITY PLAN N01°36'02"W 262.19' N01°36'02"W 51.18' S8 8 ° 2 5 ' 0 6 " W 3 1 1 . 4 8 ' LEGEND ELECTRIC UTILITY EASEMENT WATER UTILITY EASEMENT 10'-0"ELECTRICEASEMENT ANGLERS AVENUE (PUBLIC R.O.W. VARIES) Existing Underground Water Line (Typ.) Existing OverheadElectric Line (Typ.) Existing Underground Storm Line (Typ.)Existing StormInlet (Typ.) (SEE NOTE 4) Existing DeciduousTree (Typ.)(TO REMAIN) Existing Light Post (Typ.) Existing Storm Drain (Typ.) Existing Fence (Typ.)Existing Water Valve (Typ.) Existing FireHydrant (Typ.) Existing Utility Pole (Typ.) ExistingTrash Area Existing Water Line. ApproximateLocation, Based On MapProvided By Broward County Existing UndergroundElectric Line (Typ.) Existing UnknownManhole (Typ.) Existing HedgeRow (Typ.) Existing Sewer Line. ApproximateLocation, Based On MapProvided By Broward County Existing EasementBoundary (Typ.) C-7 8 10'-0" APPROXIMATEELECTRIC EASEMENT 10'-0"ELECTRICEASEMENT 15'-0"ELECTRICEASEMENT 25 ' - 0 " W A T E R EA S E M E N T 40'-0" WATEREASEMENT 20 ' - 0 " W A T E R EA S E M E N T 20 ' - 0 " W A T E R EA S E M E N T 10'-0"ELECTRICEASEMENT 30 ' - 0 " W A T E R EA S E M E N T 15'-0"ELECTRICEASEMENT 25'-0"WATEREASEMENT 15'-0"ELECTRICEASEMENT NOTES: 1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A PORTION OFTHE NE 1/4 OF SECTION 9, TOWNSHIP 29 SOUTH, RANGE 20 EAST,TALLAHASSEE MERIDIAN, BROWARD COUNTY, FL BY CLARK LANDSURVEYING, INC. DATED 04/04/24. 2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIES STANDARDS,CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION, FPL WORK ORDER#13660625. 3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREAOF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG ANDRELOCATE AS REQUIRED. 4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILT BAGDURING CONSTRUCTION. 5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS. 6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OF IMPERVIOUSAREA THAT HAS BEEN DETERMINED TO HAVE NO ADVERSE AFFECTSON THE EXISTING STORMWATER SYSTEM. SEE COMPLETEDMEMORANDUM BY DEWBERRY ENGINEERS INC. DATED 06/05/25. 7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PER TESLADIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CM FORSTICKER PLACEMENT & HEIGHT. 8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION, AND THECITY STANDARDS. 9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSED FORTHIS PROJECT, STALL RESTRIPING ONLY. 10. RELOCATE SIX (6) EXISTING WHEELSTOPS TO THE SOUTHWESTSTALLS IN THE PARKING LOT . Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:07-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 C-4 CONSTRUCTIONDETAILS I SCALE: N.T.S.1V4 SUPERCHARGER POST CAST-IN-PLACE FOUNDATION DETAIL NOTES: 1. BACKFILL FOOTING WITH EXCAVATED SOIL COMPACTED TOSAME DENSITY AS UNDISTURBED SOIL. 2. CONTRACTOR TO PROVIDE A MINIMUM OF 6" OF COMPACTEDCRUSHED STONE FOR CAPILLARY BREAK AND CONSTRUCTIONCONTROL UNDER ALL CONCRETE SLABS. 3. CONTRACTOR SHALL IDENTIFY POOR DRAINING SOILS ANDPROVIDE ADDITIONAL COMPACTED, WELL GRADEDCOURSE-GRAINED SOIL BACKFILL TO FROST DEPTH WHEREREQUIRED. CONTRACTOR TO NOTIFY TESLA CM AND ENGINEER. 4. WIND RATING (WITHOUT SIGN & BOLLARD) = 156 MPH SUPERCHARGER PEDESTAL INSTALLATION NOTE: WHEN INSTALLED BEHIND CURB, THE TOP OF THEPEDESTAL SHOULD BE FLUSH WITH THE CURB.WHEN INSTALLED IN A PAVEMENT AREA OR BEHINDTHE EDGE OF PAVEMENT, THE TOP OF THEPEDESTAL SHOULD BE FLUSH WITH THE PAVEMENT. PLAN 6" 1'-6"2'-2" 1'-1"5" 2'-2 3/4" 6'- 4 1 / 2 " TOP OFCONCRETE (2) #6 LONGITUDINALBARS TOP & BOTTOM Existing Grade (TO REMAIN) 1/4" WIDE X 1" DEEPSAWN OR TOOLED CONTROLJOINT @ 9' O.C. 3/4" CHAMFER PROPOSED 26" CONCRETECURB W/INTEGRATEDCHARGE POSTS PROPOSED V4 TESLA CHARGE POST INTEGRATED W/26"CONCRETE CURB (TYP.) EXPANSION JOINT(TYP.) TESLASUPERCHARGERHANDLE V4 TESLASUPERCHARGER POSTWEIGHT: 200 LBS 1/2"Ø HILTI KWIK BOLT TZ2 SSW/ 3-1/4" EFFECTIVE (3-3/4"NOMINAL) EMBEDMENT (ORAPPROVED EQUIVALENT) (TYP.-4) TESLASUPERCHARGER POST CAR SIDE ExistingAsphaltLevel #3 TIES @ 12" (2) #6LONGITUDINALBARS TOP &BOTTOM 6" 1'-0" OFFSET BOLLARD OFFSETBOLLARD 3"(TYP.) ExistingAsphaltLevel (3) 1/2"Ø HILTI KWIK BOLT TZ2 SS W/ 2-1/2" EFFECTIVE(3" NOMINAL) EMBEDMENT(OR APPROVED EQUIVALENT)& MIN 5" FROM EDGE OF PAD 5"(MIN.)60 ° BOLLARDANCHORS 3-3/4" 3-3 / 4 " A A SCALE: N.T.S.2V4 SUPERCHARGER POST CAST-IN-PLACE CURB DETAIL OFFSETBOLLARD #3 TIES @ 12" 6" SCALE: N.T.S. 3V4 SUPERCHARGER POST CAST-IN-PLACE STRIP FOUNDATION DETAIL FRONT VIEW SIDE VIEW "A" 1'- 6 " 6" 6" MIN. COMPACTEDCLASS 2 AGGREGATEBASE (4) #5 CONTINUOUSREBAR AT T&B #3 @ 12" O.C. 6" 1'- 6 " 2'-7"A A EXPANSION JOINT Existing ParkingLot Surface(TO REMAIN) EXPANSION JOINT Existing ParkingLot Surface (TO REMAIN) PREPARED SUBGRADE(95% STANDARD PROCTOR) 3"TYP. (3) 1/2"Ø HILTI KWIK BOLTTZ2 SS W/ 2-1/2" EFFECTIVE(3" NOMINAL) EMBEDMENT(OR APPROVED EQUIVALENT)& MIN 5" FROM EDGE OF PAD 5"(MIN.)60 ° BOLLARD ANCHORS 3-3/4" 3-3 / 4 " #3 TIES @12" O.C. (4) #5 CONTINUOUSREBAR AT T&B V4 TESLASUPERCHARGER POSTWEIGHT: 200 LBS TOP VIEW 4'-9" 11'-0" 4'-9" 1'-3 1/2" 2'- 7 " A A McCUE REBOUNDINGMINI BOLLARD W/ GRAYSLIP COVER 2'-2 3/4" 6'- 4 1 / 2 " TESLASUPERCHARGERHANDLE V4 TESLASUPERCHARGER POSTWEIGHT: 200 LBS CAR SIDE 1/2"Ø HILTI KWIK BOLT TZ2 SS W/ 3-3/4" EFFECTIVE (3-1/4" NOMINAL)EMBEDMENT (OR APPROVEDEQUIVALENT) (TYP.-4) 1'-6" McCUE REBOUNDINGBOLLARD W/ GRAYSLIP COVER 9-1/2"OPTIONAL REAR BOLLARD (AS NEEDED) OPTIONAL REAR BOLLARD(AS NEEDED)6'- 4 1 / 2 " (SEE NOTE 2, 3, 4) SIDE ELEVATION MAXIMUMOBSTRUCTION(SEE NOTE 2) MAXIMUM GRIP HEIGHT(SEE NOTES 3 & 4) 34 " SCALE: N.T.S. GRAB HEIGHT DETAIL NOTES: 1. DETAIL IS IN REFERENCE TO 2010 ADA STANDARDS OFACCESSIBLE DESIGN. 2. PER 2010 ADA STANDARDS OF ACCESSIBLE DESIGN SECTION308.3.1 & 308.3.2, MAXIMUM OBSTRUCTION TO BE NOLARGER THAN 24 INCHES IN WIDTH AND 34 INCHES INHEIGHT. 3. PER 2010 ADA STANDARDS OF ACCESSIBLE DESIGN SECTION308.3.1 & 308.3.2, THE HIGH SIDE REACH SHALL NOTEXCEED 48 INCHES MAXIMUM FOR A REACH DEPTH OF 10INCHES MAXIMUM. 4. PER 2010 ADA STANDARDS OF ACCESSIBLE DESIGN SECTION308.3.1 & 308.3.2, WHERE THE REACH DEPTH EXCEEDS 10INCHES, THE HIGH SIDE REACH SHALL NOT EXCEED 46INCHES MAXIMUM FOR A REACH DEPTH OF 24 INCHESMAXIMUM. 5. OPERABLE PART OF CABLE HANDLE COMPLIES WITH REACHRANGES PER 2010 ADA STANDARDS OF ACCESSIBLE DESIGNSECTION 309,. 6. PER 2010 ADA STANDARDS OF ACCESSIBLE DESIGN SECTION308.3.2, EXCEPTIONS 2, OPERABLE PARTS OF CABLE HANDLESHALL BE PERMITTED TO BE 54 INCHES MEASURED FROMTHE SURFACE OF THE VEHICULAR WAY WHERE CABLEHANDLES ARE INSTALLED ON EXISTING CURBS.FRONT ELEVATION 48 " V4 TESLACHARGE POST MAXIMUM GRIP HEIGHT(SEE NOTES 3 & 4) 4 EXPANSIONJOINT (TYP.) NATIVE SOIL PROPOSED OREXISTING PARKINGSURFACE 2'- 0 " 6" (6) #3 TIES@ 9" O.C. (4) #6 CONTINUOUSREBAR AT T&B@ 8" O.C. 1" CHAMFER(TYP.) EXPANSION JOINT (TYP.) 2'-10" 4'-8" 1'-10" 2'- 9 " 1'-0" TOP VIEW 1'-8" CENTER OF STALL (4) #6 CONTINUOUSREBAR AT T&B@ 8" O.C. (6) #3 @ 9" O.C. 6" 2'- 0 " 2'-9" 2" 3" 5"(MIN.)60 ° SIDE VIEWFRONT VIEW FRONT 6" MIN. COMPACTEDCLASS 2AGGREGATE BASE 2'-2 3/4" TESLASUPERCHARGERHANDLE V4 TESLASUPERCHARGER POSTWEIGHT: 200 LBS V4 TESLASUPERCHARGER POSTWEIGHT: 200 LBS CAR SIDE BOLLARDANCHORS 3-3/4" 3-3 / 4 " (3) 1/2"Ø HILTI KWIK BOLT TZ2 SS W/ 2-1/2" EFFECTIVE(3" NOMINAL) EMBEDMENT (ORAPPROVED EQUIVALENT) AND MIN 5" FROM EDGE OF PAD 1/2"Ø HILTI KWIK BOLT TZ2 SS W/ 3-3/4" EFFECTIVE(3-1/4" NOMINAL)EMBEDMENT (OR APPROVED EQUIVALENT) (TYP.-4) OFFSETBOLLARD OFFSETBOLLARD 6'- 4 1 / 2 " 6'- 4 1 / 2 " 6'- 4 1 / 2 " Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:08-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 C-5 CONSTRUCTIONDETAILS II SCALE: N.T.S. V4 ACCESSIBILITY LAYOUT DETAIL FINISHGRADE FINISHGRADE NOTES: 1. 48" MAX HEIGHT OF SUPERCHARGER HANDLE AT ACCESSIBLECHARGE POSTS FROM SURFACE OF VEHICULAR WAY. 2. DETAIL IS SCHEMATIC IN NATURE. CONTRACTOR TO REFERENCEPLAN SHEETS FOR ALL CURB & CHARGER DIMENSIONS ANDLOCATIONS & REFERENCE CONSTRUCTION DETAILS FORMATERIAL SPECIFICATIONS. 3. CONTRACTOR TO FEATHER CURB/GUTTER TOWARD EXISTINGCURB/GUTTER & MATCH EXISTING GRADE. LENGTH OFTRANSITION WILL VARY BASED ON EXISTING CONDITIONS.MAXIMUM 8% GRADE CHANGE ALONG LENGTH OF CURB.TRANSITION GUTTER GRADE MAXIMUM 5% PER FOOT. 4. CONTRACTOR TO SAW CUT CURB/GUTTER AS NEEDED PER PLAN& DISPOSED OF DEBRIS PROPERLY. ACCESSIBLE STALL(2% MAX. IN ALL DIRECTIONS) ACCESSIBLE AISLE(STRIPING TO MATCHEXISTING SITE) V4 TESLA SUPERCHARGER POST(PLACE IN AGNOSTIC/CENTER STALL POSITION & FOUNDATION TO BE FLUSH W/GRADE) 6'-0" PER P L A N PROPOSED CURB(TO MATCH EXISTING) PROPOSEDCONCRETE LANDING CONTRACTOR TOSAW CUT EXISTINGCURB/GUTTER ≤2% A-A ACCESIBLE STALL (REGRADED TO 2% MAX.IN ALL DIRECTIONS)(AS NEEDED) MATCH LANDING &ASPHALT GRADE 2%MAX. PROPOSEDCONCRETE LANDING PROPOSED CONCRETECURB/GUTTER EXISTING GRADE COMPACTED SUB-GRADEPER DESIGN SECTION 'A-A' C-5 6'-0" 12'-0 " ≤2% 3 C-7 4 C-7 5 NUMBER PLACEMENT FOR PEDESTAL INSTRUCTION QR PLACEMENTFOR WALL MOUNTS SCALE: N.T.S.2LEVEL 2 NUMBER & QR DETAIL 12" 18 " SCALE: N.T.S. ACCESSIBLE SIGNAGE DETAIL 4 PROPOSED McCUE MINIREBOUNDING BOLLARDC-7 3 PROPOSED SIGN POST WITH ACCESSIBLE SIGNAGE (TYP.-2)C-5 4 C-7 1 SCALE: N.T.S.1LEVEL 2 GEN 3 CONNECTOR - CAST IN PLACE DETAIL FRONT VIEW 0.53"Ø (TYP.-4) PROPOSED 1/2"Ø HILTIKWIK BOLT TZ2 SS316W/2-1/2" NOMINAL EMBEDMENT (2'' EFFECTIVEEMBEDMENT) (TYP.-4)(CONFIRM W/TESLA CM) 1'- 6 " PROPOSED 4000PSI CONCRETE PAD 3/4" CHAMFER (TYP.)PROPOSED McCUE MINIREBOUNDING BOLLARD (TYP.) 10 " 7" 10 " 7" 6'- 3 3 / 4 ' ' CABLE BRACKET 6''2'' ELONGATEDPEDESTAL 5" SIDE VIEW MOUNTING PLAN PLAN VIEW PROPOSED McCUE MINI REBOUNDING BOLLARD (TYP.) OPTIONAL DUAL CHARGER(SEE NOTE 1) OPTIONALDUALCHARGER(SEE NOTE 1) 6" 18" 3"(TYP.) #3 TIES @ 12" (4) #5 LONGITUDINALBARS TOP & BOTTOM Existing Grade(TO REMAIN)3/4"CHAMFER EXPANSIONJOINT(TYP.) ExistingAsphaltLevel 0'-6" #3 TIES @ 12" (2) #5 REBAR 10" O.C. EACHDIRECTION (EVENLY SPACED) (TOP & BOTTOM) TOP OFCONCRETE1/4" WIDE X 1" DEEPSAWN OR TOOLEDCONTROL JOINT @ 9' O.C. ExistingAsphaltLevel 6" #3 TIES @ 12" NOTE: 1. SEE SHEET C-3 FOR LOCATION OF SINGLE AND DUAL POST LOCATIONS. SINGLE POSTLOCATIONS WILL HAVE THE CHARGER FACING THE STALL. DUAL POST LOCATION SHALLBE ROTATED 90° TO PROVIDED CHARGER ACCESS TO BOTH STALLS. (3) 1/2"Ø HILTI KWIK BOLTTZ2 SS W/ 2-1/2" EFFECTIVE(3" NOMINAL) EMBEDMENT(OR APPROVED EQUIVALENT)& MIN 5" FROM EDGE OF PAD 5" (MIN.)6 0 ° BOLLARD ANCHORS3-3/4" 3-3 / 4 " 72" 6" MANUFACTURER U LINE H-4608B/WMODEL No 6' RUBBERDESCRIPTION 72"x6"x4"DIMS (LxWxH) 34 LBSWEIGHT NOTES: 1. INSTALL PER MANUFACTURERSSPECIFICATIONS & TESLASTANDARDS. 2. CONTRACTOR TO SUBSTITUTEPRODUCT AS NEEDED W/TESLA CM APPROVAL. SCALE: N.T.S. RUBBER CURB STOP DETAIL 4" 5 Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:10-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 C-6 CONSTRUCTIONDETAILS III SCALE: N.T.S.1TESLA SUPERCHARGER CABINET DETAIL 52.76" 33 . 8 6 " 60 " 49.38" 69 . 9 4 " 89 . 5 0 " 17.81" 49.21"54.72"9.43" 35.83" 88 . 3 2 " 37.80"41.98" .75"Ø (TYP.-4) (SEE NOTE 2) NOTES: 1. SEE NOTE #31 ON SHEET GN-2 FORCABINET NOTES. 2. ANCHOR TO CIP CONCRETE WITH (4) 1/2"Ø HILTI KWIK BOLT TZ2 WITH 3-1/4"EFFECTIVE EMBEDMENT W/OVERSIZEWASHER. 3. ANCHOR TO PRECAST SLAB WITH (4) 5/8"Ø HEAVY HEX BOLT WITH 1-1/2"THREAD LENGTH, ASTM 320 GRADE B AND LOCK WASHER (OR APPROVED EQUIVALENT) TESLA SUPERCHARGERENCLOSURE DATA: IP67 - NEMA 4 WEIGHT: 2448 LBS. MINIMUM CLEARANCE: OVERHEAD: 3'-0"SIDE: 0'-6"FRONT: 5'-0"REAR : 0'-6" FRONT VIEW SIDE VIEW TOP VIEW SERVICE AREA 1'-10" DC BUS- UP TO (10) 3"CONDUIT (AS NEEDED TOFEED 'STAR-CENTER'MASTER CABINET)DC POST- (4) 4" CONDUIT AC-(2) 4"CONDUITS CONDUITOPENING (6) #5 BARSEQUALLY SPACED (1) #5 BARS #5 BARS ATEACH CORNER (2) #5 BARS (2) #5 BARS (4) #5 BARSEQUALLY SPACED(1) #5 BARS NOTES: 1. SEE CONCRETE NOTES ON SHEET GN-1. 2. DETAIL SHOWN AS TYPICAL FOR (1) V3.5 SUPERCHARGERCABINET. PAD TO BE INCREASED AS NEEDED FORADDITIONAL CABINETS OR ELECTRICAL EQUIPMENT. 3. CONTRACTOR TO PROVIDE A MIN OF 6" OF COMPACTEDCRUSHED STONE FOR CAPILLARY BREAK ANDCONSTRUCTION CONTROL UNDER ALL CONCRETE SLABS.CONTRACTOR SHALL IDENTIFY POOR DRAINING SOILS ANDPROVIDE ADDITIONAL COMPACTED, WELL GRADEDCOURSE-GRAINED SOIL BACKFILL TO FROST DEPTH.CONTRACTOR TO NOTIFY TESLA CM AND ENGINEER. CAST IN PLACE PLAN (OPTION#1) SCALE:3/8"=1' FOR 11"x17"3/4"=1' FOR 22"x34" 0'1'2'3' 2V3.5 CABINET FOUNDATION PLAN CONDUITOPENING 5'-3" 0'-9" 3'- 6 " 0'-4" 0'-5" PROPOSED 8" THICK, 4000PSI CONCRETE PAD 3/4" CHAMFER(TYP.- ALL SIDES) V3.5 METALGUIDE TEMPLATE PROPOSED 6" CLEANCOMPACTED GRAVEL(SEE NOTE 3) PROPOSEDGRADE PREPARED SUBGRADE(95% STANDARD PROCTOR) PROPOSED 8" CONCRETE PAD(OPTION #1:CAST IN PLACE)(OPTION #2:PRECAST) 0'-8" COMMUNICATION CABLE (CAT6)IN 1" CONDUIT PROPOSED SUPERCHARGERCABINET ANCHOR. SEENOTES ON DETAIL 1/C-6FOR ANCHOR INFORMATION CAST IN PLACE REBAR PLAN (OPTION#1) PRECAST PLAN (OPTION#2) 5'-3 3/8" 3'- 8 1 / 2 " 2'- 8 1 1 / 1 6 " 9 5/8" EASED EDGE R 1/2" ALLOUTSIDE EDGES (4) 5/8"Øx6" LOOPINSERT 8" PRECAST SECTION (OPTION#2) HEBA-T ANCHORFOR LIFTING V3.5 CONCRETECABINET BASE(P/N 1648207-00-A) V3.5 CONCRETECABINET BASE(P/N 1648207-00-A) V3.5 SUPERCHARGERCABINET (2448 LBS.) 3/4" CHAMFER(TYP.- ALL SIDES) 2'- 6 " 1'-9" 1"-2" CAST IN PLACE (OPTION#1) & PRECAST (OPTION#2) POST COMMUNICATION - (4)1.25" OD DURALINE CABLE 2" CLR GRADE SCALE: N.T.S. 3CONCRETE PAD DETAIL #5 BARS @ 12"O.C. EACH WAY PROPOSED 8" THICKCONCRETE PAD SEE TABLE FOR PAD SIZE 3/4" CHAMFER (TYP.- ALL SIDES) PROPOSED COMPACTEDCLEAN GRAVEL PREPARED SUBGRADE(95% STANDARD PROCTOR) 4" M I N 8" 6" NOTES: 1. IF FREE OF ORGANIC OR OTHERDELETERIOUS MATERIAL, EXCAVATEDMATERIAL MAY BE USED FORBACKFILL. 2. IF NOT, PROVIDE CLEAN,COMPACTIBLE MATERIAL. COMPACT IN8" LIFTS. REMOVE ANY LARGE ROCKSPRIOR TO BACKFILLING. CONTRACTORTO VERIFY LOCATION OF EXISTING U/G UTILITIES PRIOR TO DIGGING. 3. CONCRETE ENCASE CONDUIT WHENTRENCHING UNDER SITE ACCESSROAD. 4. ANY PAVEMENT DAMAGE DURINGCONSTRUCTION SHALL BE REPAIREDOR REPLACED BY THE CONTRACTORTO PRE CONSTRUCTION CONDITIONSOR BETTER. 5. MAINTAIN 12" SEPARATION MIN.BETWEEN AC OR DC CONDUCTORSAND COMMUNICATION CABLES. 6. MAINTAIN 2" SEPARATION MINIMUMBETWEEN OUTER WALLS OFCONDUITS. 7. CONFIRM ALL DEPTHS W/UTILITY &NEC PRIOR TO CONSTRUCTION. CONCRETE PAD DIMENSIONS PAD TYPE CONCRETE L W t (THICKNESS)AREAEQUIPMENT PAD #1*4000 PSI 40'-9" 4'-0" 8"179.0 S.F.** * REFER TO DETAIL 2/C-6 FOR SUPERCHARGER CABINET CONCRETE PAD REINFORCEMENT. ** REFER TO LAYOUT ON C-3 FOR TOTAL DIMENSIONS AS SWITCHGEAR SECTIONS WILL REQUIREA LARGER PAD AREA. NOTES: 1. SEE CONCRETE NOTES ON SHEET GN-2. 2. SWITCHGEAR ANCHORS SHALL BE: 1/2"Ø HILTI KWIK BOLT TZ2 SS W/ 2-1/2" EFFECTIVE (3" NOMINAL) EMBEDMENT (OR APPROVED EQUIVALENT) (TYP.-4) EQUIPMENT PAD #2*4000 PSI 21'-0" 9'-0" 8" 189.0 S.F. 1/4" WIDE X 1" DEEP SAWN ORTOOLED CONTROL JOINT @ 24' MAX MINIMUM CENTER TO CENTERCONDUIT SPACING SWITCHGEAR TO CABINETS 7.5" O.C. DC (BUSS) 7.5" O.C. SCALE: N.T.S. TYP. BURIED CONDUIT TRENCH DETAILS 6 ML YELLOW WARNING TAPE NATIVE SOD 18 " 6" UNDISTURBED SOIL (TYP.) CLEAN GRANULAR BACKFILL, 6"LIFT MAXIMUM, PLATE TAMP (1/2") 95% COMPACTION MIN.(SEE NOTE 8) NATIVE BACKFILL PE R U T I L I T Y & N E C CONCRETE SIDEWALK (MATCH EXISTING WHERE NEEDED) STONE BED (MATCH EXISTING) ExistingGrade 12" 12"2" MAX MILL AND REPLACE WITH BITUMINOUSPAVEMENT SURFACE COURSE, (2") I-5 REPLACE EXISTING BASE WITH BITUMINOUSPAVEMENT BASE COURSE, (4") I-2 6" DENSE GRADEDAGGREGATE BASE COURSE NOTES: 1. IF FREE OF ORGANIC OR OTHER DELETERIOUS MATERIAL, EXCAVATED MATERIAL MAY BE USED FOR BACKFILL. 2. IF NOT, PROVIDE CLEAN, COMPACTIBLE MATERIAL. COMPACT IN 8" LIFTS. REMOVE ANY LARGE ROCKS PRIORTO BACKFILLING. CONTRACTOR TO VERIFY LOCATION OF EXISTING U/G UTILITIES PRIOR TO DIGGING. 3. CONCRETE ENCASE CONDUIT WHEN TRENCHING UNDER SITE ACCESS ROAD. 4. ANY PAVEMENT DAMAGE DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED BY THE CONTRACTORTO PRE CONSTRUCTION CONDITIONS OR BETTER. 5. MAINTAIN 12" SEPARATION MIN. BETWEEN AC OR DC CONDUCTORS AND COMMUNICATION CABLES. 6. MAINTAIN 2" SEPARATION MINIMUM BETWEEN OUTER WALLS OF CONDUITS. 7. CONFIRM ALL DEPTHS W/UTILITY & NEC PRIOR TO CONSTRUCTION. 8. THE USE OF LOW STRENGTH FLUIDIZED THERMAL (SLURRY) BACKFILL WITH MIN 28 DAY COMPRESSIVESTRENGTH OF 150 PSI TO ACHIEVE A MAX RHO 90 MAY BE USED IN LIEU OF COMPACTED BACKFILL. T.B.D. 6" MIN PER TABLE HAND TAMPED 1/2"GRANULAR BACKFILL 4" DC POST CONDUIT (TYP.-CLUSTER OF 16 MAX.) 24" MIN 6" MIN 4 Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:11-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 C-7 CONSTRUCTION DETAILS IV TOP VIEW BOTTOM VIEW CONCRETE SURFACES: ANCHORWITH (4) MANUFACTURERPROVIDED CONCRETE ANCHORSLANDSCAPE AREAS: ANCHOR WITH (4) MIN. 12" LONGJ-HOOK REBAR ANCHORS Ø0.5" ANCHOR HOLE (TYP.) CONCRETE SLABOR LANDSCAPE FRONT VIEW NOTE:TRASH & RECYCLING BINS TO BEPROVIDED BY TESLA RECYCLE ONLY USE BLUE BINW/ "RECYCLE" TEXT &SYMBOLS IN LOCATIONSINDICATED ON SITE PLAN (IF ANY) SCALE: N.T.S. WASTE MANAGEMENT BIN DETAIL 11 " 3'- 6 " 2'-4"Ø 8.73" 7 CD CD SECTION CD-CD 3'- 4 " 5.25"Ø CONCRETE PIER 9C016 - 4" PLASTIC COVERW/ REFLECTIVE TAPE 3'- 6 " 2'- 0 " 10" 3" 3'- 0 " 4" SCALE: N.T.S. McCUE CRASH CORE BOLLARD DETAIL 4"Ø 10"Ø CONCRETEPIER REBAR CAGEPROVIDED BYMANUFACTURER 2 SOLID SQUARESTOCK SIGN POSTW/ END CAP 3'- 0 " 6'- 0 " FINISH GRADE PLAINCONCRETEFOOTING4'- 0 " 1'-0" EPOXY BEAD BETWEENPOST & SIGN SCALE: N.T.S. SQUARE SIGN POST DETAIL CONCRETE EMBEDMENT 3/8" DIA. ALUMINUM SECURITY PINBOLT RIVET W/ 3/4" DIA. DOMEHEAD FLANGE & 0.330" GRIP LENGTH(TOP & BOTTOM) (TYP.) ACCESSIBLE SIGN C-5 4 5'- 0 " (M I N . ) 1 3 3/4" 3 3 / 4 " 3 3 / 4 " 3'- 0 " 3 3/8"Ø 2 7/8" 4" BOLT PATTERN (3) 5/8" DIA SS HILTI KWIK-BOLTTZ2 WITH 4" MIN EFFECTIVEEMBEDMENT PER ESR-4266 SCALE: N.T.S.3McCUE MINI REBOUNDING BOLLARD SCALE: N.T.S. CONCRETE CURB DETAIL NOTES: 1. SAW CUT AREA TO BE REPAIRED/REPLACED. DISPOSE OF DEBRISPROPERLY OFF SITE. 2. INSTALL FORMS AS NECESSARY. 3. COMPACT EXISTING SUBGRADE MATERIAL TO ACHIEVE 95%COMPACTION. 4. CONCRETE TO BE 4000 PSI AIR ENTRAINED CONCRETE. 5. INSTALL CONTROL JOINTS EVERY 10 LINEAR FEET. 7" 6" PROPOSED PAVEMENT R=1-1/2" BATTER 1" ON 6"R=1/4" 20 " PROPOSED 6" CLEANCOMPACTED GRAVEL UNDISTURBED ORCOMPACTED FILL CLEANCOMPACTEDGRANULARBACKFILL 6" MATCH EXISTINGCONDITIONS 4 CONCRETE SIDEWALK DETAIL SEE CONSTRUCTION PLAN 5" MIN. THICK CONC.WALK 4,000 PSI MIN.28 DAY STRENGTHWWF 6X6-W2.9XW2.9W2.9XW2.9 2" BELOWTOP SURFACE EXISTINGGRADE 6" MIN. COMPACTEDAGGREGATE BASE, 95%STANDARD PROCTOR NOTES: 1. SAW CUT AREA TO BE REPAIRED/REPLACED. DISPOSE OFDEBRIS PROPERLY OFF SITE. 2. INSTALL FORMS AS NECESSARY. 3. COMPACT EXISTING SUBGRADE MATERIAL TO ACHIEVE 95%COMPACTION. 4. CONCRETE TO BE 4,000 PSI AIR ENTRAINED CONCRETE. 5. INSTALL CONTROL JOINTS EVERY 10 LINEAR FEET. 5 ASPHALT PAVEMENT DETAIL SCALE:N.T.S. 2" HOT BIT.PAVEMENTSURFACE COURSE EXISTINGSURFACE 6" MIN. COMPACTED SUBGRADE (100% STD. PROCTOR) EXISTING BASE (TYP.) 2% SLOPE (SEE NOTE 1) NOTE: 1. MAINTAIN EXISTING DRAINAGE PATTERNS.SLOPE TOWARD EXISTING STORM DRAIN. SEAL AT SAW CUTSEAM (TYP.) 6 6-8" COMPACTED NCDOT TYPE ABCSTONE (100% STD. PROCTOR)NOTES: 1. THIS TEMPORARY PROTECTION FOR EXISTINGCATCH BASIN INLETS TO BE REMOVED BYCONTRACTOR AFTER COMPLETION OF WORK. 2. DETAIL SIMILAR FOR ROUND INLET. INSTALLATION DETAIL 1" REBAR FOR BAGREMOVAL FROM INLET (REBAR NOT INCLUDED) OVERFLOW SILTSACKDUMP LOOPS(REBAR NOTINCLUDED) EXPANSIONRESTRAINT FOAM EXISTING GRATE SCALE: N.T.S. CATCH BASIN INLET PROTECTION DETAIL 8 Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:11-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 C-8 CONSTRUCTION DETAILS V SCALE: N.T.S.12023-2024 FDOT STANDARD PLANS INDEX 711-001 - PAVEMENT MARKINGS Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:13-04'00' E WV IV IVIV IVIV IVIV IV IV CO IVIV SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 C-9 CONSTRUCTION DETAILS VI FINISHGRADE EXISTING LIGHT POLE PROPOSED ARUBAACCESS POINT PROPOSED ARUBA MOUNT (TYP.) SCALE: N.T.S. 2ARUBA ACCESS POINT POLE MOUNTING DETAIL PROPOSED HOSECLAMPS (TYP.-2)(SEE NOTE) NOTE: 1. ATTACH MOUNT TO EXISTING POLE IN ACCORDANCE WITH MANUFACTURER INSTALLATION INSTRUCTIONS. 12 ' - 0 " M I N . 1'-6"1'-0" 5'- 0 " 18"Ø, 4000 PSICONCRETE FOOTING CROWN EACHFOOTING FINISH GRADE 12 ' - 0 " M I N . 4" SCH. 40 PIPE(GALV.) WITH PIPE CAP HOSE CLAMP (TYP.-2) PROPOSED ARUBAACCESS POINT PROPOSED ARUBA MOUNT (TYP.) CONDUIT STRAP EVERY 3' MIN. (TYP.-3) SCALE: N.T.S. ARUBA ACCESS POINT POLE MOUNTING DETAIL 1" LIQUID-TIGHT NON-METALLICCONDUIT W/ FITTINGS 3 SCALE:1"=30' FOR 11"x17"1"=15' FOR 22"x34" 15'0'30' 1WI-FI ACCESS COVERAGE PLAN PROPOSED Wi-Fi ACCESS POINTMOUNTED TO PROPOSED POST (MOUNT PER MANUFACTURER SPEC)(12'-0" AGL) (TYP.-1)C-9 3 PROPOSED Wi-Fi ACCESS POINT MOUNTED TOEXISTING LIGHT POLE (MOUNT PERMANUFACTURER SPEC) (12'-0" AGL) (TYP.-4)C-9 2 EXISTING LIGHT FIXTURE 80' WI-FI RADIUS (TYP.-5) NOTE: 1. ATTACH MOUNT TO PROPOSED POLEIN ACCORDANCE WITH MANUFACTURERINSTALLATION INSTRUCTIONS. 1" LIQUID-TIGHT NON-METALLIC CONDUIT W/ FITTINGS CONDUIT STRAP EVERY 3' MIN. (TYP.-3) LEGEND ACCESS POINT MOUNTEDON EXISTING LIGHT POLE ACCESS POINT MOUNTEDON PROPOSED POLE PROPOSED H-FRAMEFOR TELCO BOX E-5 3 PROPOSED UNDERGROUNDCOMMUNICATION LINE UNDERGROUNDCOMMUNICATION FIBER LINEUC Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:13-04'00' Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:14-04'00' Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:15-04'00' Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:16-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 E-1 ELECTRICAL ONE-LINEDIAGRAM I NOTES: 1. CONDUCTOR LENGTHS ARE ESTIMATES ONLY. FINAL CONDUCTOR ROUTING PATH ANDLENGTHS SHALL BE DETERMINED BY THE CONTRACTOR IN THE FILED BASED ONPHYSICAL MEASUREMENTS. CONTRACTOR TO ORDER CONDUCTORS BASED ON FIELD MEASUREMENTS (MUST BE APPROVED BY TESLA INSTALLATION MANAGER). 2. ALL ELECTRICAL WORK AND RELATED ACTIVITIES PREFORMED ON-SITE SHALL BEDONE IN ACCORDANCE WITH NATIONAL ELECTRIC CODE (NEC) AND UTILITY COMPANY STANDARDS. 3. NEUTRAL MUST BE INCLUDED FOR PROPER OPERATION OF TESLA SUPERCHARGERS. 4. ALL CONDUCTORS TO RECEIVE ANTI-OXIDATIVE COATING DURING INSTALLATION. 5. ALL EQUIPMENT SHALL BE HOUSED IN LOCKABLE, NEMA 3R ENCLOSURE. 6. USE OF DURALINE FOR SUPERCHARGER TO CHARGE POST DC CONDUITS IS ANAPPROVED ASSEMBLY 7. DC RUN LENGTH MAXIMUM IS 330' INCLUDING BURIED DEPTH. ANY DC RUNLENGTHS OVER THE MAXIMUM SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTIONOF TESLA. 8. UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITHTHE APPROPRIATE UTILITY ENGINEER AT TIME OF PRE CONSTRUCTION MEETING TOENSURE ACCURACY OF INSTALLATION. 9. UTILITY CONDUITS, CONNECTORS, TRANSFORMER PAD & TRANSFORMER FOUNDATIONTO BE INSTALLED PER UTILITY SPECIFICATION. CONFIRM LATEST SPECIFICATIONSPRIOR TO CONSTRUCTION. 10. EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREA OF PROPOSED TRENCH &EQUIPMENT SITE AREA. HAND DIG AND RELOCATE AS REQUIRED. 11. CONTRACTOR RESPONSIBLE FOR ALL TRAFFIC SAFETY MEASURES THROUGHOUTDURATION OF CONSTRUCTION. COORDINATE ANY ACCESS ROAD CLOSURESW/OWNER. 12. CONTRACTOR TO GROUND SYSTEM TO CONCRETE-ENCASED GROUNDING ELECTRODEPER NEC 250.50. GROUNDING RESISTANCE SHALL BE LESS THAN 25Ω PER NEC.CONTRACTOR TO ADD GROUND RODS TO SYSTEM UNTIL PROPER RESISTANCE ISMET. 13. THE DC BUS SHALL BE CONFIGURED IN A RADIAL FASHION WHERE ALLCONDUCTORS ROUTE FROM EACH 'TYPICAL' SUPERCHARGER CABINET, TO THE ONE,'STAR-CENTER' SUPERCHARGER CABINET. 14. USE OF DURALINE FOR SUPERCHARGER TO CHARGE POST DC CONDUITS IS AN APPROVED ASSEMBLY. (SEE TUV CERTIFICATION ON SHEET E-7). SCOPE OF WORK BY UTILITY BY CONTRACTOR PROVIDE & INSTALL PRIMARY CONDUCTORS PROVIDE & INSTALL PRIMARY TRENCHING &CONDUITS PROVIDE & INSTALL SECONDARY CONDUCTORS PROVIDE & INSTALL SECONDARY TRENCHING &CONDUITS INSTALL UTILITY METER BASE & METER PEDESTAL PROVIDE & INSTALL TRANSFORMER PAD &ASSOCIATED GROUNDING X X X X UTILITY S.O.W. RESPONSIBILITIES PROVIDE UTILITY TRANSFORMER W/INTERNAL CTs X INSTALL PRIMARY CONNECTIONS AT TRANSFORMER X INSTALL SECONDARY CONNECTIONS AT TRANSFORMER X PROVIDE UTILITY METER BASE & METER PEDESTAL PROVIDE & INSTALL UTILITY METER X X X X SERVICE ELECTRICAL CIRCUIT SCHEDULE NO: FROM TO CONFIGURATION TRANSFORMER PROPOSED 3000ASWITCHGEAR [10 SETS](3) 600MCM AL (THWN-2) & (1) 600MCM AL (THWN-2) NEUT IN 4" PVCCONDUIT PROPOSED SERVICEEQUIPMENT: PANEL (600A BREAKER) PROPOSED TESLASUPERCHARGER [2 SETS:](3) 500MCM AL (THWN-2)(1) 500MCM AL (THWN-2) NEUT (1) 2/0 AL EGC* IN 4" PVC/HDPE CONDUIT** PROPOSED TESLASUPERCHARGER PROPOSED TESLA POST [1 SET PER CHARGING POST](4) 600MCM AL (XHHW-2) (1000V), (1) #2/0 CU EGC, &(1) 1000V V4 LV+COMM CABLE***IN 4" PVC/HDPE** 'STAR CENTER'SUPERCHARGERCABINET DC BUS DC BUS OF EACHTYPICALSUPERCHARGERCABINET [2 SETS] (2) 600MCM AL (XHHW-2)(1) #1/0 CU GROUND &(1) #3/0 AWG AL DC MID 1000V RATEDIN 3" PVC/HDPE** SITE CONTROLLER SUPERCHARGER (1) SHIELDED 600V CAT6+ IN 1" PVC/HDPE** PROPOSED ROUTER PROPOSED WIFIANTENNA (1) CAT6 COMM CABLE IN 1" PVC/HDPECONDUIT** PROPOSED SERVICEBREAKERS PROPOSED EPO (2) #12, (1) #12 G IN 3/4" CONDUIT PROPOSED 4000ASWITCHGEAR PROPOSED TESLALEVEL 2 ENCLOSURE [1 SET](4) 600MCM CU &(1) #3 AWG CU GROUND IN 4" CONDUIT PROPOSED TESLALEVEL 2 ENCLOSURE PROPOSED TESLALEVEL 2 UNIVERSALVEHICLE CHARGER [1 SET PER CHARGER](2) #6 AWG CU (THWN-2) & (1) #10 AWG CU (THWN-2) GROUND IN 1"PVC/HDPE CONDUIT** * MODIFIED PER NEC 250.64(A)(2)** PER UL 615A AND NEC 253, LISTED HDPE CONDUIT PERMITTED. CONTRACTOR TO CONFIRM USE W/TESLA CM*** 1000V V4 COMM WIRE TO BE ROUTED IN 4" CONDUIT. 1.25" DURALINE CAN BE INSTALLED FOR LONGRUNS (200+ FT) 1 2 3 4 5 6 7 8 9 SCALE: N.T.S. 1SYSTEM ONE-LINE DIAGRAM FOR SWITCHGEAR #1 600A,3P 2 5 PROPOSED VEHICLE CHARGING POSTS(TYP.-4 PER SUPERCHARGER) 4 TYPICALSUPERCHARGERCABINET #1 A BCD 'STAR CENTER'SUPERCHARGERCABINET #3 3 A BCD A BCD SITE MASTERCONTROLLER FACTORYINSTALLEDWIRING 6 POWER SUPPLY120VAC - 24VDC FIBERROUTER 15A, 2PFUSE 3AFUSE 3AFUSE 3KVACPT 480V 120V 3000A, 480/277V, 3Ø, 4W, 65KAIC, NEMA 3R SWITCHGEAR MOUNTED ON CONCRETE PAD 4 33 600A,3P 600A,3P 15A,2P A B C D 3 TYPICALSUPERCHARGERCABINET #4 600A,3PM14000A/3AF 3000A/3AT100% RATEDW/RELTSWITCH GR N D NE U T #3/0 AWG BARE CuGROUNDING ELECTRODECONDUCTOR PER NEC250.66(B) CONCRETE ENCASEDELECTRODE PER NEC250.52(A)(3) OR (2) #3/0 AWG BARE Cu GROUNDINGELECTRODE CONDUCTOR PERNEC 250.66(A) 600 KCMIL CuPER NEC 250.66 PROPOSED 3000A SERVICEEQUIPMENT 480/277V, 3Ø, 4W,65KAIC, NEMA 3R, LOCKABLE GROUNDING ELECTRODE5/8"x8'-0" COPPER CLADGROUND ROD INSTALLATIONPER NEC 250.52(A)(5),250.53(A) & 250.68 6'-0" MIN.SYSTEM GROUNDING RESISTANCESHALL BE LESS THAN 25Ω PER NEC.ADD ADDITIONAL GROUND RODS ASNEEDED TO SYSTEM UNTILRESISTANCE IS MET. COORDINATEWITH VENDOR FOR REQUIRED SYSTEMGROUNDING RESISTANCE BEYOND 25Ω MAIN BREAKER SECTION MANUFACTURER-PROVIDEDMAIN BONDING JUMPERPER NEC 250.24(A)(4),250.28(C), 250.8(A)(7) 1 M UTILITY APPROVEDMETER ENCLOSUREFOR TESLA SERVICE PROPOSED UTILITYGROUND(PER UTILITY) PROPOSEDUTILITYTRANSFORMER #1W/INTERNAL CTs GFPST EPO #1 TO BEMOUNTED TO POST 7 EPO 7 A B C D 3 TYPICALSUPERCHARGERCABINET #5 A B C D 3 TYPICALSUPERCHARGERCABINET #6 TYPICALSUPERCHARGERCABINET #2 4 4 600A,3P 600A,3P 5AFUSE PROPOSED WIFIACCESS POINT 4 GROUND PERTESLA STANDARDS UTILITY FAULTCURRENT TRANSFORMER: TBDSECONDARY VOLTAGE: 277/480VSECONDARY FAULT CURRENT: TBD * FINAL FAULT CURRENT INFORMATIONPROVIDED BY FPL FACTORY INSTALLEDSECONDARY WIRING (BY MANUFACTURER) 60A2P 10'-0" MAX.DISTANCE 160KVA TRANSFORMER FACTORYINSTALLED BY SWITCHGEARMANUFACTURERPRI: 480V - 3Ø 65kAICSEC: 240V - 3Ø 3W 10kAIC 9 LEVEL 2 ENCLOSURE LEVEL 2CHARGER#1 60A2P LEVEL 2CHARGER#2 60A2P LEVEL 2CHARGER#3 60A2P LEVEL 2CHARGER#4 8 60A2P LEVEL 2CHARGER#5 60A2P LEVEL 2CHARGER#6 400A3P 1.25" CONDUIT FORFIBER CABLE TOSWITCHGEAR #2 600A,3PSPARE 600A,3PSPARE 250A3P Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:16-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 E-2 ELECTRICAL ONE-LINEDIAGRAM II SCALE: N.T.S. 1SYSTEM ONE-LINE DIAGRAM FOR SWITCHGEAR #2 600A,3P 2 5 PROPOSED VEHICLE CHARGING POSTS(TYP.-4 PER SUPERCHARGER) 4 TYPICALSUPERCHARGERCABINET #7 A BCD 'STAR CENTER'SUPERCHARGERCABINET #9 3 A BCD A BCD SITE MASTERCONTROLLER FACTORYINSTALLEDWIRING POWER SUPPLY120VAC - 24VDC 15A, 2PFUSE 3AFUSE 3AFUSE 3KVACPT 480V 120V 3000A, 480/277V, 3Ø, 4W, 65KAIC, NEMA 3R SWITCHGEAR MOUNTED ON CONCRETE PAD 4 33 600A,3P 600A,3P 15A,2P A B C D 3 TYPICALSUPERCHARGERCABINET #10 600A,3PM13000A/3AF 3000A/3AT100% RATEDW/RELTSWITCH GR N D NE U T #3/0 AWG BARE CuGROUNDING ELECTRODECONDUCTOR PER NEC250.66(B) CONCRETE ENCASEDELECTRODE PER NEC250.52(A)(3) OR (2) #3/0 AWG BARE Cu GROUNDINGELECTRODE CONDUCTOR PERNEC 250.66(A) 600 KCMIL CuPER NEC 250.66 PROPOSED 3000A SERVICEEQUIPMENT 480/277V, 3Ø, 4W,65KAIC, NEMA 3R, LOCKABLE GROUNDING ELECTRODE5/8"x8'-0" COPPER CLADGROUND ROD INSTALLATIONPER NEC 250.52(A)(5),250.53(A) & 250.68 6'-0" MIN.SYSTEM GROUNDING RESISTANCESHALL BE LESS THAN 25Ω PER NEC.ADD ADDITIONAL GROUND RODS ASNEEDED TO SYSTEM UNTILRESISTANCE IS MET. COORDINATEWITH VENDOR FOR REQUIRED SYSTEMGROUNDING RESISTANCE BEYOND 25Ω MAIN BREAKER SECTION MANUFACTURER-PROVIDEDMAIN BONDING JUMPERPER NEC 250.24(A)(4),250.28(C), 250.8(A)(7) 1 M UTILITY APPROVEDMETER ENCLOSUREFOR TESLA SERVICE PROPOSED UTILITYGROUND(PER UTILITY) PROPOSEDUTILITYTRANSFORMER #2W/INTERNAL CTs GFPST EPO #2 TO BEMOUNTED TO POST 6 EPO 6 A B C D 3 TYPICALSUPERCHARGERCABINET #11 A B C D 3 TYPICALSUPERCHARGERCABINET #12 TYPICALSUPERCHARGERCABINET #8 4 4 600A,3P 600A,3P 5AFUSE 4 GROUND PERTESLA STANDARDS NOTES: 1. CONDUCTOR LENGTHS ARE ESTIMATES ONLY. FINAL CONDUCTOR ROUTING PATH ANDLENGTHS SHALL BE DETERMINED BY THE CONTRACTOR IN THE FILED BASED ONPHYSICAL MEASUREMENTS. CONTRACTOR TO ORDER CONDUCTORS BASED ON FIELD MEASUREMENTS (MUST BE APPROVED BY TESLA INSTALLATION MANAGER). 2. ALL ELECTRICAL WORK AND RELATED ACTIVITIES PREFORMED ON-SITE SHALL BEDONE IN ACCORDANCE WITH NATIONAL ELECTRIC CODE (NEC) AND UTILITY COMPANY STANDARDS. 3. NEUTRAL MUST BE INCLUDED FOR PROPER OPERATION OF TESLA SUPERCHARGERS. 4. ALL CONDUCTORS TO RECEIVE ANTI-OXIDATIVE COATING DURING INSTALLATION. 5. ALL EQUIPMENT SHALL BE HOUSED IN LOCKABLE, NEMA 3R ENCLOSURE. 6. USE OF DURALINE FOR SUPERCHARGER TO CHARGE POST DC CONDUITS IS ANAPPROVED ASSEMBLY 7. DC RUN LENGTH MAXIMUM IS 330' INCLUDING BURIED DEPTH. ANY DC RUNLENGTHS OVER THE MAXIMUM SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTIONOF TESLA. 8. UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITHTHE APPROPRIATE UTILITY ENGINEER AT TIME OF PRE CONSTRUCTION MEETING TOENSURE ACCURACY OF INSTALLATION. 9. UTILITY CONDUITS, CONNECTORS, TRANSFORMER PAD & TRANSFORMER FOUNDATIONTO BE INSTALLED PER UTILITY SPECIFICATION. CONFIRM LATEST SPECIFICATIONSPRIOR TO CONSTRUCTION. 10. EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREA OF PROPOSED TRENCH &EQUIPMENT SITE AREA. HAND DIG AND RELOCATE AS REQUIRED. 11. CONTRACTOR RESPONSIBLE FOR ALL TRAFFIC SAFETY MEASURES THROUGHOUTDURATION OF CONSTRUCTION. COORDINATE ANY ACCESS ROAD CLOSURESW/OWNER. 12. CONTRACTOR TO GROUND SYSTEM TO CONCRETE-ENCASED GROUNDING ELECTRODEPER NEC 250.50. GROUNDING RESISTANCE SHALL BE LESS THAN 25Ω PER NEC.CONTRACTOR TO ADD GROUND RODS TO SYSTEM UNTIL PROPER RESISTANCE ISMET. 13. THE DC BUS SHALL BE CONFIGURED IN A RADIAL FASHION WHERE ALLCONDUCTORS ROUTE FROM EACH 'TYPICAL' SUPERCHARGER CABINET, TO THE ONE,'STAR-CENTER' SUPERCHARGER CABINET. 14. USE OF DURALINE FOR SUPERCHARGER TO CHARGE POST DC CONDUITS IS AN APPROVED ASSEMBLY. (SEE TUV CERTIFICATION ON SHEET E-7). SCOPE OF WORK BY UTILITY BY CONTRACTOR PROVIDE & INSTALL PRIMARY CONDUCTORS PROVIDE & INSTALL PRIMARY TRENCHING &CONDUITS PROVIDE & INSTALL SECONDARY CONDUCTORS PROVIDE & INSTALL SECONDARY TRENCHING &CONDUITS INSTALL UTILITY METER BASE & METER PEDESTAL PROVIDE & INSTALL TRANSFORMER PAD &ASSOCIATED GROUNDING X X X X UTILITY S.O.W. RESPONSIBILITIES PROVIDE UTILITY TRANSFORMER W/INTERNAL CTs X INSTALL PRIMARY CONNECTIONS AT TRANSFORMER X INSTALL SECONDARY CONNECTIONS AT TRANSFORMER X PROVIDE UTILITY METER BASE & METER PEDESTAL PROVIDE & INSTALL UTILITY METER X X X X SERVICE ELECTRICAL CIRCUIT SCHEDULE NO: FROM TO CONFIGURATION TRANSFORMER PROPOSED 3000ASWITCHGEAR [10 SETS](3) 600MCM AL (THWN-2) &(1) 600MCM AL (THWN-2) NEUT IN 4" PVCCONDUIT PROPOSED SERVICEEQUIPMENT: PANEL(600A, 80% RATED) PROPOSED TESLASUPERCHARGER [2 SETS:] (3) 500MCM AL (THWN-2) (1) 500MCM AL (THWN-2) NEUT(1) 2/0 AL EGC* IN 4"PVC/HDPE CONDUIT** PROPOSED TESLASUPERCHARGER PROPOSED TESLA POST [1 SET PER CHARGING POST](4) 600MCM AL (XHHW-2) (1000V),(1) #2/0 CU EGC, &(1) 1000V V4 LV+COMM CABLE*** IN 4" PVC/HDPE** 'STAR CENTER'SUPERCHARGERCABINET DC BUS DC BUS OF EACHTYPICALSUPERCHARGERCABINET [2 SETS](2) 600MCM AL (XHHW-2)(1) #1/0 CU GROUND & (1) #3/0 AWG AL DC MID 1000V RATEDIN 3" PVC/HDPE** SITE CONTROLLER SUPERCHARGER (1) SHIELDED 600V CAT6+ IN 1" PVC/HDPE** PROPOSED SERVICEBREAKERS PROPOSED EPO (2) #12, (1) #12 G IN 3/4" CONDUIT PROPOSED ROUTER PROPOSED WIFIANTENNA (1) CAT6 COMM CABLE IN 1" PVC/HDPECONDUIT** * MODIFIED PER NEC 250.64(A)(2)** PER UL 615A AND NEC 253, LISTED HDPE CONDUIT PERMITTED. CONTRACTOR TO CONFIRM USE W/TESLA CM*** 1000V V4 COMM WIRE TO BE ROUTED IN 4" CONDUIT. 1.25" DURALINE CAN BE INSTALLED FOR LONGRUNS (200+ FT) 1 2 3 4 5 6 7 UTILITY FAULTCURRENT TRANSFORMER: TBDSECONDARY VOLTAGE: 277/480VSECONDARY FAULT CURRENT: TBD * FINAL FAULT CURRENT INFORMATIONPROVIDED BY FPL 7 FIBERROUTER PROPOSED WIFIACCESS POINT 1.25" CONDUIT FORFIBER CABLE TOSWITCHGEAR #1 Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:17-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 E-3 PANEL SCHEDULES SCALE: N.T.S.3LEVEL 2 LOAD SCHEDULE SCALE: N.T.S.1SWITCHBOARD #1 LOAD SCHEDULE SCALE: N.T.S.2SWITCHBOARD #2 LOAD SCHEDULE SERVICE SWITCHBOARD 'SS-TESLA #1' LOAD SCHEDULE CKT NO.TRIP AMPS DESCRIPTION KVA KVA DESRIPTION TRIP AMPS CKT NO.A BCA BC 1 600A SUPERCHARGER #1 129.00 - - 129.00 - - SUPERCHARGER #2 600A 2 3 - 129.00 - - 129.00 -4 5 - - 129.00 - - 129.00 6 7 600A SUPERCHARGER #3 129.00 - - 129.00 - - SUPERCHARGER #4 600A 8 9 - 129.00 - - 129.00 - 10 11 - - 129.00 - - 129.00 12 13 600A SUPERCHARGER #5 129.00 - - 129.00 - - SUPERCHARGER #6 600A 14 15 - 129.00 - - 129.00 - 16 17 - - 129.00 - - 129.00 18 19- - ---23.00 -- LEVEL 2 PANEL 250A 20 21- - ----23.00 -22 23- - -----23.00 24 25 15A SITE LIGHTING 0.75 --0.05 --SITE CONTROLLER 15A 26 27 15A CRADLEPOINT WIFI 0.25 ---0.05 -28 TOTAL CONNECTED PHASE A B C TOTAL APPARENT POWER 798.1KVA 797.1KVA 797.0KVA 2392.1KVA CURRENT 2877.2 A LOADCENTER 'LC-1' LOAD SCHEDULE CKT NO. TRIP AMPS DESCRIPTION KVA KVA DESRIPTION TRIP AMPS CKT NO.ABCABC 1 60A G3WC-1 5.76 - - 5.76 - -G3WC-2 60A 2 3 - 5.76 - - 5.76 - 4 5 60A G3WC-3 - - 5.76 - - 5.76 G3WC-4 60A 6 7 5.76 - - 5.76 - - 8 9 60A G3WC-5 -5.76 --5.76 -G3WC-6 60A 10 11 - -5.76 --5.76 12 13- - ------ - -14 15- - ------ - -16 17- - ------ - -18 19- - ------ - -20 TOTAL CONNECTED PHASE A B C TOTAL APPARENT POWER 23.0 KVA 23.0 KVA 23.0 KVA 69.1 KVA CURRENT 166.3 A SERVICE SWITCHBOARD 'SS-TESLA #2' LOAD SCHEDULE CKT NO.TRIP AMPS DESCRIPTION KVA KVA DESRIPTION TRIP AMPS CKT NO.A BCA BC 1 600A SUPERCHARGER #1 129.00 - - 129.00 - - SUPERCHARGER #2 600A 2 3 - 129.00 - - 129.00 -4 5 - - 129.00 - - 129.00 6 7 600A SUPERCHARGER #3 129.00 - - 129.00 - - SUPERCHARGER #4 600A 8 9 - 129.00 - - 129.00 - 10 11 - - 129.00 - - 129.00 12 13 600A SUPERCHARGER #5 129.00 - - 129.00 - - SUPERCHARGER #6 600A 14 15 - 129.00 - - 129.00 - 16 17 - - 129.00 - - 129.00 18 19- - ---0.05 --SITE CONTROLLER 15A 20 21- - ----0.05 -22 TOTAL CONNECTED PHASE A B C TOTAL APPARENT POWER 774.1KVA 774.1KVA 774.0KVA 2322.1KVA CURRENT 2793.1 A Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:19-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 E-4 ELECTRICAL & UTILITYDETAILS I SECONDARY SERVICE LENGTHS TRANSFORMER #1 TOSWITCHGEAR #1*:9' 34' TOTAL LENGTH OF AC AL WIRE**:136' NUMBER OF WIRE SETS:10 TOTAL LENGTH OF AL WIRE***:1,360' TRANSFORMER #2 TOSWITCHGEAR #2*:17' 42' TOTAL LENGTH OF AC AL WIRE**:168' NUMBER OF WIRE SETS:10 TOTAL LENGTH OF AL WIRE***:1,680' NOTES: 1. ANY DC RUN OVER 330' SHALL BE BROUGHT TO THE ATTENTIONOF TESLA CM. * 22 FT IS ADDED TO THE HORIZONTAL RUN LENGTH TOACCOUNT FOR BURIED DEPTH & TRANSITIONS. ** ESTIMATED LENGTH OF DC WIRE = SUM OF ESTIMATED LENGTHX 4 WIRES PER SUPERCHARGER NOTES: * AC CONDUCTORS: 25 FT IS ADDED TO THE HORIZONTAL RUNLENGTH TO ACCOUNT FOR BURIED DEPTH & TRANSITIONS. ** ESTIMATED LENGTH OF Al WIRE = SUM OF ESTIMATED LENGTHX 4 WIRES PER SET *** LENGTH OF AL WIRE PER DISCONNECT =ESTIMATED TOTAL LENGTH OF AL WIRE X # WIRE SETS NOTES: * AC CONDUCTORS: 25 FT IS ADDED TO THE HORIZONTAL RUNLENGTH TO ACCOUNT FOR BURIED DEPTH & TRANSITIONS. ** ESTIMATED LENGTH OF Al WIRE = SUM OF ESTIMATEDLENGTH X 4 WIRES PER SUPERCHARGER *** LENGTH = LENGTH OF AC AL WIRE PER CONDUIT X # OFCONDUITS **** TOTAL LENGTH = SUM OF AC LENGTHS ***** TOTAL LENGTH OF EGC = LENGTH X # SETS SCALE: N.T.S. 1CONDUCTOR LENGTH TABLES AC SUPERCHARGER LENGTHS SUPERCHARGER LINEAR LENGTHSWITCHGEAR TOSUPERCHARGER ESTIMATEDLENGTH* 1 28' 53' LENGTH OF AC AL WIRE PER CONDUIT**: 212' TOTAL NUMBER OF CONDUITS: 2 LENGTH OF AC AL WIRE ***: 424' 2 23' 48' LENGTH OF AC AL WIRE PER CONDUIT**: 192' TOTAL NUMBER OF CONDUITS: 2 LENGTH OF AC AL WIRE***: 384' 3 18' 43' LENGTH OF AC AL WIRE PER CONDUIT**: 172' TOTAL NUMBER OF CONDUITS: 2 LENGTH OF AC AL WIRE***: 344' 4 13' 38' LENGTH OF AC AL WIRE PER CONDUIT**: 152' TOTAL NUMBER OF CONDUITS: 2 LENGTH OF AC AL WIRE***: 304' 5 8' 33' LENGTH OF AC AL WIRE PER CONDUIT**: 132' TOTAL NUMBER OF CONDUITS: 2 LENGTH OF AC AL WIRE***: 264' 63'28' LENGTH OF AC AL WIRE PER CONDUIT**:112' TOTAL NUMBER OF CONDUITS:2 LENGTH OF AC AL WIRE***:224' 7 3' 28' LENGTH OF AC AL WIRE PER CONDUIT**:112' TOTAL NUMBER OF CONDUITS:2 LENGTH OF AC AL WIRE***:224' 8 8' 33' LENGTH OF AC AL WIRE PER CONDUIT**:132' TOTAL NUMBER OF CONDUITS:2 LENGTH OF AC AL WIRE***:264' 9 13' 38' LENGTH OF AC AL WIRE PER CONDUIT**:152' TOTAL NUMBER OF CONDUITS:2 LENGTH OF AC AL WIRE***:304' 10 5' 30' LENGTH OF AC AL WIRE PER CONDUIT**:120' TOTAL NUMBER OF CONDUITS:2 LENGTH OF AC AL WIRE***:240' 11 10' 35' LENGTH OF AC AL WIRE PER CONDUIT**:140' TOTAL NUMBER OF CONDUITS:2 LENGTH OF AC AL WIRE***:280' 12 15' 40' LENGTH OF AC AL WIRE PER CONDUIT**:160' TOTAL NUMBER OF CONDUITS: 2 LENGTH OF AC AL WIRE***: 320' TOTAL LENGTH OF AC AL WIRE****:3,576' TOTAL LENGTH OF EGC*****:894' DC CHARGING POST LENGTHS SUPERCHARGER CHARGE POST LINEAR LENGTH ESTIMATED DCWIRE LENGTH* 1 1A 95' 117' 1B 104' 126' 1C 113' 135' 1D 122' 144' 2 2A 126' 148' 2B 135' 157' 2C 144' 166' 2D 159' 181' 3 3A 163' 185' 3B 172' 194' 3C 181' 203' 3D 190' 212' 4 4A 194' 216' 4B 203' 225' 4C 212' 234' 4D 221' 243' 5 5A 226' 248' 5B 241' 263' 5C 250' 272' 5D 259' 281' 6 6A 263' 285' 6B 272' 294' 6C 281' 303' 6D 290' 312' 7 7A 282' 304' 7B 264' 286' 7C 239' 261' 7D 230' 252' 8 8A 228' 250' 8B 219' 241' 8C 210' 232' 8D 188' 210' 9 9A 188' 210' 9B 167' 189' 9C 167' 189' 9D 146' 168' 10 10A 149' 171' 10B 128' 150' 10C 128' 150' 10D 107'129' 11 11A 107'129' 11B 81' 103' 11C 72'94' 11D 63' 85' 12 12A 55'77' 12B 46'68' 12C 37' 59' 12D 28' 50' CONDUIT LENGTH:9,201' TOTAL CONDUCTOR LENGTH**:36,804' TOTAL LENGTH OF #2/0 AWG GND & COMM CABLE**:9,201' TESLA AC CHARGING POST LENGTHS CHARGE POST LINEAR LENGTH ESTIMATED ACWIRE LENGTH* 1 35' 57' 2 35' 57' 3 53' 75' 4 53' 75' 5 68' 90' 6 92' 114' CONDUIT LENGTH:* 468' TOTAL CONDUCTOR LENGTH**:1,872' TOTAL LENGTH OF EGC: 264' NOTES: * AC CONDUCTORS: 22 FT IS ADDED TO THE HORIZONTAL RUNLENGTH TO ACCOUNT FOR BURIED DEPTH & TRANSITIONS. ** ESTIMATED LENGTH OF Al WIRE = SUM OF ESTIMATEDLENGTH X 4 WIRES PER SUPERCHARGER *** TOTAL LENGTH OF EGC = LENGTH X # SETS PLAN VIEW(DOOR OPEN)FRONT VIEW(SHOWN WITHOUT DOORS) CONDUIT CONFIGURATIONSECTION SCALE: N.T.S.3EV-2 MCB SWITCHGEAR NO. 2 PLAN VIEW(DOOR OPEN)FRONT VIEW(SHOWN WITHOUT DOORS) CONDUIT CONFIGURATIONSECTION SCALE: N.T.S.2EV-2 MCB SWITCHGEAR NO. 1 SCALE: N.T.S.4EV-2 MCB LEVEL 2 SWITCHGEAR CONDUIT CONFIGURATIONSECTION PLAN VIEW(DOOR OPEN)FRONT VIEW(SHOWN WITHOUT DOORS) Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:20-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 E-5 ELECTRICAL & UTILITYDETAILS II NOTES: 1. CONDUCTOR LENGTHS ARE ESTIMATES ONLY. FINAL CONDUCTOR ROUTING PATH AND LENGTHSSHALL BE DETERMINED BY THE CONTRACTOR IN THE FILED BASED ON PHYSICALMEASUREMENTS. CONTRACTOR TO ORDER CONDUCTORS BASED ON FIELD MEASUREMENTS(MUST BE APPROVED BY TESLA INSTALLATION MANAGER). 2. ALL ELECTRICAL WORK AND RELATED ACTIVITIES PREFORMED ON-SITE SHALL BE DONE INACCORDANCE WITH NATIONAL ELECTRIC CODE (NEC) AND UTILITY COMPANY STANDARDS. 3. ALL CONDUCTORS TO RECEIVE ANTI-OXIDATIVE COATING DURING INSTALLATION. 4. ALL EQUIPMENT SHALL BE HOUSED IN LOCKABLE, NEMA 3R ENCLOSURE. 5. UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITH THEAPPROPRIATE UTILITY ENGINEER AT TIME OF PRE CONSTRUCTION MEETING TO ENSUREACCURACY OF INSTALLATION. 6. UTILITY CONDUITS, CONNECTORS, TRANSFORMER PAD & TRANSFORMER FOUNDATION TO BEINSTALLED PER UTILITY SPECIFICATION. CONFIRM LATEST SPECIFICATIONS PRIOR TOCONSTRUCTION. 7. EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREA OF PROPOSED TRENCH &EQUIPMENT SITE AREA. HAND DIG AND RELOCATE AS REQUIRED. 8. CONTRACTOR RESPONSIBLE FOR ALL TRAFFIC SAFETY MEASURES THROUGHOUT DURATION OFCONSTRUCTION. COORDINATE ANY ACCESS ROAD CLOSURES W/OWNER. 9. CONTRACTOR TO GROUND SYSTEM TO CONCRETE-ENCASED GROUNDING ELECTRODE PER NEC250.50. GROUNDING RESISTANCE SHALL BE LESS THAN 25Ω PER NEC. CONTRACTOR TO ADDGROUND RODS TO SYSTEM UNTIL PROPER RESISTANCE IS MET. 10. CONTRACTOR TO REFERENCE WALL CONNECTOR INSTALLATION MANUAL (PUBLISHED BY TESLA)PRIOR TO CONSTRUCTION. SCALE: N.T.S.3ELECTRICAL H-FRAME DETAIL V.I . F . 5'- 0 " SPACE AS EQUIRED 1'-6" 1'- 0 " V.I.F. 18"Ø, 4000 PSICONCRETE FOOTING FINISH GRADE CROWN EACHFOOTING NOTES: 1. CONTRACTOR TO INSTALLELECTRICAL & METERINGEQUIPMENT PER UTILITYREQUIREMENTS. 2. CONTRACTOR TO KEEP H-FRAMEHEIGHT AS SHORT AS ALLOWABLEPER NEC REQUIREMENTS & SITECONDITIONS. P1000T UNISTRUT(TYP.) 1/2" U-BOLT (GALV.) (TYP.) 3" SCH. (3-1/2" O.D.) 40 PIPE (GALV.) WITH PIPECAP (TYP.-2) SCALE: N.T.S.4SYSTEM PLACARDS SERVICE DISCONNECT1 OF 2 DISCONNECTS PLACE ON SWITCHGEARSERVICE DISCONNECT #1 NOTE: 1. PLACARDS TO BE MADE OF RED PHENOLIC PLASTIC W/ 1" WHITELETTERING. ATTACH PLACARDS USING RIVETS OR SELF-TAPPING SCREWS. PLACE ON SWITCHGEARSERVICE DISCONNECT #2 SERVICE DISCONNECT2 OF 2 DISCONNECTS PLACE ON EPO#1 EMERGENCY DISCONNECT1 OF 2, DISCONNECT 2LOCATED BYEAST EQUIPMENT EMERGENCY DISCONNECT2 OF 2, DISCONNECT 1LOCATED BYWEST EQUIPMENT PLACE ON EPO#2 TESLA EV SYSTEMDISCONNECT PLACE ON EACHSERVICE DISCONNECT SCALE: N.T.S.1TRANSFORMER PAD SCALE: N.T.S.2POST MOUNTED METER DETAIL NOTES: 1. SPECIFICATION TAKEN FROM FPL ELECTRIC SERVICE STANDARDS, NOVEMBER 2023. 2. CONTRACTOR TO CONFIRM LATEST SPECIFICATIONS & DESIGN W/UTILITY PRIOR TOCONSTRUCTION OR ORDERING. 3. METER TO BE INSTALLED ON MINIMUM 10'-0" x 0'-6" CONCRETE REINFORCED POST,4'-0" IN GROUND UNLESS OTHERWISE APPROVED BY UTILITY. Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:22-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 E-6 ELECTRICAL & UTILITYDETAILS III SCALE: N.T.S.1DURALINE CONDUIT TUV CERTIFICATION NOTES: 1. DURALINE SMOOTH-COR FLEX CONDUIT HAS BEEN CERTIFIED AS ACRITICAL COMPONENT OF THE SUPERCHARGER POST BY TUV. 2. PRODUCT WILL BE USED TO CONNECT THE SUPERCHARGER CABINETTO SUPERCHARGER POST. 3. DURALINE SMOOTH-COR FLEX CONDUIT SHALL NOT BE INSTALLEDWITHIN SUPERCHARGER CABINETS OR POST. CONTRACTOR SHALLTRANSITION SMOOTH-COR FLEXIBLE CONDUIT TO PVC CONDUIT ANDSWEEP PVC CONDUIT INTO THE SUPERCHARGER CABINETS OR POST. SCALE: N.T.S.3DURALINE TO PVC TRANSITION DURALINE SMOOTH-CORFLEX CONDUIT(SEE SERVICE ELECTRICALCIRCUIT SCHEDULE ONSHEET E-1 FOR CONDUIT SIZE AND QUANTITY) SUPERCHARGERCABINET 90° PVC TRANSITION INTO CHARGE POST(SEE NOTE 2)90° PVC TRANSITION INTO CABINET(SEE NOTE 2) NOTES: 1. DURALINE SMOOTH-COR FLEX CONDUIT HAS BEENCERTIFIED AS A CRITICAL COMPONENT OF THESUPERCHARGER POST BY TUV. TESTING REPORTSSHOWING HOW THIS PRODUCT MEETS UL STANDARDSARE AVAILABLE UPON REQUEST. PRODUCT WILL BEUSED FOR "DC-POST" CONDUIT RUN. 2. DURALINE SMOOTH-COR FLEX CONDUITS REQUIRETHE USE OF 90° PVC TRANSITIONS AT EACH ENDAND/OR HARD BENDS. CONTRACTOR TO SUPPLYPVC TRANSITIONS TO TESLA EQUIPMENT. SUPERCHARGERPOST (V4) Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:23-04'00' SUBMITTALS APPROVED BY: CHECKED BY: NRK NRK REV. DATE DESCRIPTION SITE NAME: FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112) SITE ADDRESS: 2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004 DRAWN BY: HMP PROJECT #:50123704 JOB #:50163349 0 03/21/24 ISSUED FOR S&S 1 10/31/24 ISSUED PER COMMENTS 2 04/11/25 ISSUED PER COMMENTS 3 04/21/25 ISSUED PER ENG. COMMENTS 4 05/01/25 ISSUED PER ZON. COMMENTS 5 05/15/25 ISSUED PER COMMENTS 6 05/23/25 ISSUED PER COMMENTS 7 05/27/25 ISSUED PER LS COMMENTS 8 05/30/25 ISSUED PER COMMENTS 9 06/05/25 ISSUED PER COMMENTS Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794 G-1 GROUNDING SCHEMATIC& DETAILS CADWELD CONNECTIONS(OR APPROVED EQUAL)BURNDY CONNECTIONS(OR APPROVED EQUAL) PARALLEL HORIZONTALCONDUCTORSPARALLEL THROUGHCONNECTION OF HORIZONTALTYPE PT THROUGH CABLE TOGROUND RODTHROUGH CABLE TO TOPOF GROUND ROD TYPE GT HORIZONTAL SPLICESPLICE OF HORIZONTALCABLES HORIZONTAL STEEL SURFACETO FLAT STEEL SURFACE ORHORIZONTAL PIPE TYPE HS VERTICAL STEEL SURFACECABLE DOWN AT 45° TOVERTICAL STEEL SURFACEINCLUDING PIPE TYPE VS VERTICAL PIPECABLE DOWN AT 45° TORANGE OF VERTICALPIPES TYPE VS "C" CONNECTORHYPRESS TYPE YGHC BOND JUMPERFIELD FABRICATED GREENSTRANDED INSULATED TYPE2-YA-2 COPPER LUGSTWO HOLE - LONGBARREL LENGTH TYPEYA-2 SCALE: N.T.S. GROUND CONNECTION DETAILS 2 GRADE CONCRETE ENCASED ELECTRODE DETAIL NOTE: 1. REBAR BONDED TOGETHER WITH STEEL TIE WIRES. PROPOSEDCONCRETE PAD #3/0 AWG COPPER EQUIPMENTGROUNDING CONDUCTORNON-METALLICPROTECTIVE SLEEVE LISTED CONNECTION SCALE: N.T.S. SEE NOTE 1 3 1GROUNDING SCHEMATIC SCALE: N.T.S. GRND NE U T PANELBOARD #3/0 Cu PERNEC 250.66 MANUFACTURER-PROVIDED MAINBONDING JUMPER PER NEC250.24(A)(4), 250.28(C),250.8(A)(7) #3/0 AWG BARE Cu GROUNDINGELECTRODE CONDUCTOR PERNEC 250.66(B) CONCRETE ENCASEDELECTRODE PER NEC250.52(A)(3) OR (2) #3/0 AWG BARE Cu GROUNDINGELECTRODE CONDUCTOR PER NEC 250.66(A) GROUNDING ELECTRODE 5/8"x8'-0"WITH 12" MIN. DEPTH COPPER CLADGROUND ROD INSTALLATION PERNEC 250.52(A)(5), 250.53(A) &250.68 PROPOSED 4"UNDERGROUNDCONDUIT (TYP.)#2/0 AL EGC OR #1 AWG CU EGC(PER NEC 250.64(A)(2))(1) #2/0 CU GROUNDING CONDUCTOR TESLA CHARGING POST(TYP.) VEHICLE CONNECTOR (TYP.) TESLASUPERCHARGER(TYP.) PROPOSED 4" UNDERGROUNDCONDUIT (TYP.) FACTORYINSTALLEDGROUND BAR(TYP.)CHASSIS MOUNTGROUND BAR(TYP.) (1) #1/0 CU GROUNDING CONDUCTOR (TYP.) PROPOSED 3"UNDERGROUND CONDUIT(DC BUS) (TYP.) GROUND LUGTERMINATION DETAIL 6'-0" MIN. SYSTEM GROUNDING RESISTANCE SHALLBE LESS THAN 25Ω PER NEC. ADDADDITIONAL GROUND RODS AS NEEDEDTO SYSTEM UNTIL RESISTANCE IS MET.COORDINATE WITH VENDOR FORREQUIRED SYSTEM GROUNDINGRESISTANCE BEYOND 25Ω PROPOSED 3/4"CONDUIT-EMT (TYP.) PROPOSED LEVEL 2CHARGE POST (TYP.) (1) #10 AWGCU EGC (TYP.) (1) #3 AWGCU EGC (1) #1/0 AWGCU EGC REFERENCEGROUNDINGDIAGRAM G PANEL LC-1 SEE ITEM NUMBER 3 ONSERVICE ELECTRICAL CIRCUITSCHEDULE FOR ALLOWABLEGROUNDING CONDUCTOR CHARGE POST A: SEE ITEM NUMBER3 ON SERVICE ELECTRICAL CIRCUITSCHEDULE FOR ALLOWABLEGROUNDING CONDUCTOR CONTRACTOR SUPPLIED GROUNDINGLUG SIZED PER APPLICABLE GROUNDING CONDUCTOR (TYP.) #1/0 COPPER DC BUSGROUNDING CONDUCTOR(TYP.-EACH SUPERCHARGER) #2/0 AL EGC OR#1 AWG CU EGC(PER NEC 250.64(A)(2)) CHARGE POST C: SEE ITEM NUMBER 3ON SERVICE ELECTRICAL CIRCUITSCHEDULE FOR ALLOWABLEGROUNDING CONDUCTOR CHARGE POST D: SEE ITEM NUMBER3 ON SERVICE ELECTRICAL CIRCUITSCHEDULE FOR ALLOWABLEGROUNDING CONDUCTOR CHARGE POST B: SEE ITEM NUMBER3 ON SERVICE ELECTRICAL CIRCUITSCHEDULE FOR ALLOWABLEGROUNDING CONDUCTOR Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:23-04'00'