Loading...
HomeMy WebLinkAboutR-2025-102 WGI Inc. Proposal (CCNA) for Structural Repairs to PierRESOLUTION NO. 2025-102 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO AUTHORIZE PROFESSIONAL ENGINEERING DESIGN AND CONSTRUCTION SERVICES PROVIDED BY WGI, INC., FOR THE DANIA BEACH PIER STRUCTURAL EVALUATION, ENGINEERING DESIGN AND CONSTRUCTION PHASE SERVICES IN THE AMOUNT OF TWO HUNDRED ELEVEN THOUSAND DOLLARS ($211,000.00); PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, during the recent completion of the Dania Beach Pier’s surface deck and railing refurbishing, deterioration in sections of the concrete undercarriage was identified; and WHEREAS, the Public Services Department (PSD) sought a proposal from WGI, Inc., an experienced structural engineering firm that has previously worked on the pier; and WHEREAS, with input from PSD staff, WGI provided a comprehensive proposal for engineering design and construction services that will provide a thorough structural condition assessment, provide design drawings, specifications and bid documents, as well as bidding assistance and construction services; and WHEREAS, the City has an existing Continuing Services Agreement for Professional Engineering Services through RFQ 20-005 with WGI, Inc. and finds them qualified to perform the required services; and WHEREAS, the Public Services Department recommends approval of WGI’s proposal, which proposal is attached as Exhibit “A” and incorporated into this Resolution by this reference. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above “Whereas” clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That the City Commission authorizes the proper City officials to proceed with WGI for design and construction services for the Dania Beach pier’s undercarriage structure’s assessment and repair. 2 RESOLUTION #2025-102 Section 3. That funding for professional engineering and design services in the amount of Two Hundred Eleven Thousand Dollars ($211,000) will be appropriated from the “Prof. Services General” Account No. 415-72-15-572-31-10. Upon approval of this request, a budget transfer will be processed from the Pier Operation “Infrastructure Improvements other than Bldgs.” Account No. 415-72-15-572-63-10 into the Pier Operation “Prof. Services General” Account No. 415-72-15-572-31-10. Section 4. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall be effective 10 days after passage. PASSED AND ADOPTED on July 8, 2025. Motion by Vice Mayor Salvino, second by Commissioner Lewllen. FINAL VOTE ON ADOPTION: Unanimous X Yes No Commissioner Lori Lewellen ____ ____ Commissioner Luis Rimoli ____ ____ Commissioner Archibald J. Ryan IV ____ ____ Vice Mayor Marco Salvino ____ ____ Mayor Joyce L. Davis ____ ____ ATTEST: ELORA RIERA, MMC JOYCE L. DAVIS CITY CLERK MAYOR APPROVED AS TO FORM AND CORRECTNESS: EVE A. BOUTSIS CITY ATTORNEY