Loading...
HomeMy WebLinkAboutR-1994-159RESOLUTION NO 159-94 A RESOLUTION OF THE CITY OF DANIA, FLORIDA, APPROVING PROPOSAL SUBMITTED AND JEFFERY GROSS/ASSOCIATES/ ARCHITECTS, P.A., RELATING TO CONSTRUCTION OF A NEW CONFERENCE ROOM AT DANIA CITY HALL; AND PROVIDING FOR AN EFFECTIVE DATE. BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA, FLORIDA: Section 1. That the Proposal submitted by Jeffery Gross/Associates/Architects, P.A., relating to construction of a new conference room at Dania City Hall, a copy of which is attached hereto as Exhibit "A", be and the same is hereby approved. Section 2. That all resolutions or parts of resolutions in conflict herewith be and the same are hereby repealed to the extent of such conflict. section 3. That this resolution shall be in force and take effect immediately upon its passage and adoption. PASSED and ADOPTED on this 22 day of November , 1994. M ayor -c mrssroner ATTEST -J/ /*)/,) City Clerk - Auditor APPROVED AS TO FORM & CORRECTNESS ( 6&.--By Frank C. Adler, City Attorney Resolution No 159-94 :) )E ERY GROSS / ASSOCIATES / ARCHITECTS PA \ 18 November 1994 Mr. Will Allen Growth Management Director City of Dania 1O0 Dania Beach Boulevard Dania FL 33004 Re: Proposed new conference room at Dania City Hall Dear Mr. Allen: It is a pleasure to present this proposal to you. At this time the City of Dania is proposing to construct a new conference room, at the existing City Hall Structure. The space consists of approximately 1,400 square feet and the layout will be based on our previously completed space study. My Firm would be pleased to provide the necessary services for your City. The project would be performed in three phases which would be as follows: Construction Documents-This phase of the work would cover the preparation of the project manual necessary for the preparation of bids by General Contractors and the Construction of the Pro.iect. Bidding-This phase of the work would include submission of the Construction Documents to General Contractors for project bids and review of those bids with the Owner. Construction Administration-This phase of the work would include field visits to the Site and review of Construction. Alt services would be provided in accordance with our standard General Conditions. Fee's for the services listed above would be as follows: Construction Document phase services would be performed for a lump sum amount of $6580.00. Bidding or negotiation and construction phase services would be based on an hourly rate. 1815 Sherman St.,HImmlf":*ff'o'o 305-925-3964 An estimate of hours required for this project is attached. Our Hourly rates for any Owner services would be Seventy Dollars per hourfor the Principal, Drafting and Design Support Staff personnel. A retainer of S2O0O.OO would be required prior to the start of the work with the balance due as work is completed, invoiced on a monthly basis. Looking f orward to working with you again. Si Jeffe SS Jeff Gross/Associates/Architects PA JG/ct 94O21PR,DOC CITY OF DANIA CONFEHENCE ROOM SCHEDULE OF SERVICES ESTIMATED HOURS SERVICES Hours Totals 12 CO N STRIJCTION DOCI IN/F NT PH SE 94 1.2.1 Development of Architectural Construction Drawin S (Constru ction Drawin s will be on 24"x36" sheets) .01 Site Location Plan No Scale 4 .02 First Floor Plan 114' = 1'-O"I .03 Roof Plan 114" = 1'-O"4 .O5 Wall Sections 314" =1'-O"12 .06 Bu iid ing Elevations 114" = 1'-O"I .08 Door Schedule Hardware Schedule & Details 4 .09 Finish Schedule & Details 4 .10 Specif ications 10 1.2.2 Develogment of Structural Construction Documents 15 .01 Foundation Plan 1/4" =1'-O".02 Roof Framing Plan 114" =1'-O" .03 Footing, Column & Beam Schedules 1/4" = 1'-0" .04 Deta ils & Specifications 314" =1'-O" 1.2.3 Development of Mechanical Construction Documents .O1 First Floor Plan 114" =1'-O".02 Sched ule & Details 114" =1'-O" 1.2.5 De velopment of Electrical Construction Documents 15 .01 First Floor Plan 114" =1'-O" .02 Luminaire and Panel Schedules, Schematic Diagram and Electrical Calculations 1_3. BrD DIN GO RNEGOTIATION PHASE 19 .O1 Preparation and distribution of Biddin s 3 Documents .O2 Responses and explanation to 3 Bidders over a !v./o week bidding period. .O3 Receipt of requested Bids 1 .04 Analysis and recommendation of Bids 3 .O5 Assistance in preparation of Construction IIr rI rIIrr I- IIr r rrIrrrIIrIIrIr IIrI]IrrIrI III 15 12 Contract 75 15.01 Processing of Shop Drawings and/or Submittals (5) Rebar. concrete tests, barioist, a/c unit, electrical fixtures q.02 Review and preparation of Change Orders 12.03 Review and recommendation of Certificate for payment Jb04 Site visits to review prolect pro gress 04 Final inspection to verify completion of work TOTAL rIIIIIIIr 94021C2.DOC 1.4 CONSTRUCTION PHASE