HomeMy WebLinkAboutR-1996-014RESOLUTION NO. 14-96
A RESOLUTION OF THE CITY OF DANIA, FLORIDA,
AUTHORIZING THE CITY MANAGER TO CONTRACT
FOR THE PURCHASE OF SUPPLIES, SERVICES,
EQUIPMENT AND MATERIALS IN THE AMOUNT OF
EIGHry THOUSAND, NINE HUNDRED AND EIGHTY
DOLLARS ($80,980.00) WTHOUT COMPET|T|VE
BIDDING AND WITHOUT ADVERTISEMENT FOR BIDS;
AND PROVIDING THAT ALL RESOLUTIONS OR PARTSOF RESOLUTIONS IN CONFLICT HEREWTH BE
REPEALED TO THE EXTENT OF SUCH CONFLICT; AND
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Charter of the City of Dania, Part lll, Article 3, Section 4,
Subsection (J), authorizes the City Manager to purchase supplies, services, equipment
and materials for the City Government in an amount up to and including Fifteen
Thousand Dollars ($15,000.00) without competitive bidding and without advertisement
for bids, if he is authorized to do so in advance by a resolution adopted by the City
Commission; and the City Commission may by resolution authorize the purchase by the
City Manager of designated supplies, services, equipment and materials in an amount
in excess of Fifteen Thousand Dollars ($15,000.00) without competitive bids and
without advertisement for bids
WHEREAS, the City Manager has determined that it is necessary to contract for
professional services relating to Tigertail dredge and fill project in connection with Bass
Pro Shops per Resolution 04-96
WHEREAS, the City Manager has determined that such services can be
obtained at the least cost to the City by accepting the proposal of Berry & Calvin lnc
copy of which is attached
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CIry OF DANIA, FLORIDA;
Section 1 .That the_City Manager be and is hereby authorized to contract with
Berry & Calvin, lnc. for professional services relating to Tigertail dredge and fill project
in connection with Bass Pro Shops without competitive bidding and without
advertisement for bids.
Section 2. That the City Manager be and he is hereby authorized to pay from
City funds to said Berry & Calvin, lnc. the sum of Eighty Thousand, Nine Hundred and
Eighty Dollars ($80,980.00) upon the satisfactory completion of the work provided to be
done by said contract.
Section 3. That all resolutions or parts of resolutions in conflict herewith be and
the same are hereby repealed to the extent of such conflict
Section 4. That this resolution shall be in force and take effect immediately
upon its passage and adoption
PASSED AND ADOPTED THIS 13th DAY OF FEBRUARY, 1996.
MAYOR MISSIONER
ATTEST:
CITY CLE ITOR
APPROVED AS TO FORM AND CORRECTNESS:
2".-l c 6:,U".-
CITY ATTORNEY RESOLUTION NO. 14-96
January 5, 1996
Mr. Michael Smith, City Manager
City of Dania
100 West Dania Beach Boulevard
Dania, Florida 33004
RE Proposal for Professional Services
Bass Pro Shops, Tigertail Lake Dredge and Fill
City of Dania, FloridaB&CNo. 95-1449R
Dear Mr. Smith:
We are pleased to submit this proposai for Professional Services on the above referenced project
located at Griffin Road and Ravenswood Road in the City of Dania. This proposal includes thefollowing environmental engineering, professional land surveying, civit engineering, andconstnrction services:
SCOPE OF SER.YICES
' Berry & calvin, Inc. will perform the following services based on our undersranding of the. projecl requrrements:
I. kofessional l,and Surveying Services
BERRY & CALVIN. INC.ENGTNEERS . suFtvEyons . pl'nrvr.rens
Preparation of dredge and fill plans and specifications for construction bidding:A. calculate the geometry of the proposed entEnce road and the proposed rri-Railparking area based on owner suppiied site pian.B. Perform soundings on the existing.lake on a 100 foot by 100 foot grid.C. Plot soundings on a 100 scaie drawing.
IL Euvironmental Permitting Services
(Assuming .that Federal, State, and Locai Environmental permits are required).
A. Gather available information necded to assist with the prcparation and processingof both environmenal permit applications and the ERp permit applications.B. Prepare for submital, the joint apprication materiais for the required u.S Armycorp of Engineers (usAcoE) and Broward county Depanment of Natural
Resource Protection (BCDNRP) dredge and fill permia.
HOLLYWOo0 2 C:twooo Eculevafc S!te 12lJ q^i],,^!.na Flo./j11r^?n f1^()o2r-7rq! cdy /ln<rer1.006?
:'....':'
City of Dania
B&C DOC:\PROPOSAlUaauary\95-1449R.N27
Page2
January 5, 1996
Prepare for submittai, the South Florida Water Management District's (SFWMD)
ERP permit application.
Coordinate and attend two (2) on-site mcetings with the permitting and
commenting agensies to assess the j urisdictional arcas and define probable agency
permit conditions.
Prepare a Mitigation Maintenance and Monitoring PIan as required by the
agencies.
Process the submitted permit applications with the Federai, S tate and County
agencies responding to requests for additional informadon and addressing
commenting agency questions and concerns, assuming minimai heid work.
III. Professional Civil Engineering Services
Prcparation of dredge and fill plans and specifications for construction bidding:
A, Prepare dredge and fill plans and specifications for the excavation and deepening
of the existing lake including the placement of the fiil on the proposed access road
and the Tri-Rail parking lot.
B. Prcpare the bid documents such that an excess quantity of fiil may be produced
and a credit is gained by the City for the excess.C. Assist the City in obtaining bidders, review the bids and make recommendations
on award of the bid for dredge and fill.
D. Prepare the site geometry of the access road and the Tri-Rail parking area in
order to determine the limits of embankment.
E. Assisr the City in obtaining bids for the project, review the bids and make
recommendations to the City on award of the bid for the fill work.
G. Perform services during the construction of the project consisting of review of
shop drawings, periodic field observations consisting of l0 hours per week,
rcview of pay requests, and performing three sets of soundings to calculate the
f,rll removed during that period.
H. Arrange for ten soil borings to be taken at a deplh of 60 feet each for use in the
bidding of the project.
I. Review of access road pians prepared by others 930 day time limit).
J. Attend coordination meetings of interested panies on behalf of Dania.
SCEEDULE OF FEES
Berry' & Calvin, Inc. will perform the Scope of Services for an hourly, not to exceed fee as
shown by the following recap:
C.
D.
E.
F.
City of Dania
B&C DOC:\PROPOSAlUanuary\95- 1449R.N27
Page 3
January 5, 1996
PROPOSED SCHEDIJLE OF TEES
ACTIITTY/PERSONI{EL--
HOURS AVERAGERATE TOIAL,"
I hofessional Land Srineyinf Serrics
Senior Rcgistercd Suweyor 32 65 2,080.00
Computer Calculation Technician 40 50 2,0@.00
Field Crew (3 Man)80 85 6,800.00
Design Technician l6 35 560.00
Ir.. Eirlhwork Plan Services
Associate Enginecring t2 105 r,260.00
Project Eagineer 80 60 4,Em.00
Senior Design Technician 80 45 3,600.00
Clencai 24 35 840.00
m. EnvironmentalPennittingServices
Environmeatal Spccialist 100 'lo 7,000.00
Senior Design Technician 66 45 2,970.oo
Clerical 42 35 I,470.00
IY. Access PlsD Reviov and Coordination Serricts
Associate Engineering l1 105 1,260.00
Projcct Eagrneer 24 60 1,440.00
V. S€rvic6 DurirS Construction
Construction Associate EO r00 E,000.00
Project Eogineer 40 60 2,400.00
Construction lospector 400 50 20,000.00
Survcy Crew 100 85
Subtota.l 74,980.00
Soil Borings (10 holes @ 60' each) = 600 feet @ $10/ft 6,000.00
s80,980.00GRAND TOTAL:
ESTIMATED
8.500.m
City of Dania
B&C DOC:\PROPOSALUaouary\95-1449R.N27
Page 4
January 5, 1996
ADDITIONAL FEES
Additionai services as required by the City of Dania which have not been inciuded in this
proposai will be addressed in a separate contractual agreement. Professional services required
due to changes in the site plan initiated by the client, their rcpresentatives or other consultans
(e.g. architecs, landscape architects, etc.) after either design or prcparation of the construction
drawings has commenced will be biiled as Additional Services.
Any outside engineering services, studies, or laboratory testing not specificaily mentioned in the
Scope of Services will be the responsibility of the City of Dania. All municipal, permit, and
agency fees as well as Title Certificates wiil be paid by the client.
Reimbursable Exoenses
Bcrry & Calvin, Inc. and its subcontraclors wiil be reimbursed for the printing of drawings and
specifications, deiiveries, federal express services, required travel time and travel expenses, long
disunce telephone calls, fax transmittals, and postage, as required. Reimbursable expenses wiil
be invoiced direltly to the City of Dania.
CLIENT RESPONSIBILITIES
The City of Dania or their representative shali be available to meet with Berry & Calvin, lnc.
and provide decisions in a timely manner throughout the course of the project. The City of
Dania will provide Berry & Caivin, Inc. wilh plans and other peninent information which may
be necessary to properly survey or engineer the site.
TERMS OF AGREEI\{EI{T
The terms of the Agreement shall be valid for the ciient's acceptance for a period of tJrirty (30)
days from the date of execution by Berrl' & Calvin, Inc. after which time this contract offer
becomes null and void if not accepted formaily (evidenced by receipt of an executed copy of this
document). All rates and fees quoted in this document shall be effective for a period of six (6)
months, after which time they may be renegotiated with the City of Dania.
All original documents shall be retained by Berq, & Caivin, Inc. and will remain their properry.
This informadon is proprietary and will not be shared with others without prior written consent.
The City of Dania may request reproducible copies of aII originai documents upon payment of
City of Dania
B&C DOC:\PROPOSALUaouary\95-lrt49R.N27
Page 5
January 5, 1996
all outstanding invoices, and at the client's expense.
Invoices for work iccompiished to date will be submitted twice monthly and are payable within
thirty (30) days. The City of Dania will pay invoices upon receipt and understands interest
charges of 1.57o per month wiil be applied to any unpaid baiance past thirry (30) days. Berry
& Calvin, Inc. may elect to stop work until paymenr is received. If work is stopped for thirty
(30) days or more, Berry & Calvin, Inc. may request compensation for stan-up costs when work
resumes.
We appreciate the opportunity to submit this proposal. Berry & Calvin, Inc. is prepared with
the necessary manpower to prcceed with tie proposed scop€ of services upon receipt of the
executed authorization, Our personnei are committed to completing the project in a timely
manner. Plee"e indicate your acceptance of this proposai by signing below and returning one
executed copy to this offtce. We look fonvard !o working with you on this project.
Very truly yours,
ur[*Y & CALVIN, INC.
John . Calvin, P.E.
P t
IWC\paw-KLM
Atachlnetrr
ACCEPTANCE OF CONTRACT
City of Dania
By:
NCme:
Title:
t|l
(t
ICL .fi,-,4
{vl th t-Md-
DAte:
w,6)-
l'n-q (
BERRY & CALVIN. INC.
ENGINEEFIS . SURVEYORS . PL,ANNEFIS
BMRY & CALVIN, INC.
PROTESSIONAL TEE SCHEDI'LE
Priacipd, PrtsideatlExo ivc Vic..,Prcsid€st l3!i:Oo:r'
Spcci.l Projccts Rcscarcher 50:00
.
Exccutivo Assisuat 4:HOO...
EIIGINEER,ING TRANSFORTATION
Associatq Erigiaccrirg 1O5.OO Arsocials 125;00"
Dircctor 90.m Chicf Transporutiou Engiaccr t5.00
Senior Registcred Eagiaet 80.00 Tralsportation Enginecr 65:00
Environmealal Pemittiag 70.00 Treasporariou Aarly* 50.00
Project Engineer 60.00 Trensportatioo Techdciea 35;00
Engineer AdEiristrative Assist rt 45.00
3S:m,,:iPenDit Admidstnlor.,ClEiicsl
Senior Dasigu Technician
Dosigr Tecbaician. .. ..
Clericel
SURVENNG
Associate. Vice Presideut
Seirior Registered Suweyor
Computer Calculatioa Technicier
Survcy Crew.Suporvisor
Ficld Crew (3 og!)
Sdior Desigr Td;hnicial.
Dcsigu Techaiciaa
Ctlricd
CONSTRUCfiON
essoci"rc
I[sp€ctor
PI.,ATTING
Diretor
Assistsnr DirEctor
C,rioputer C.slculrriou. T&baisira,,
Seaior Desigu Techaiciaa
Ctc.ical
lfl)i0O
50.00
. r-l
, . .1|
ETPER.T'WTTNESS
Principd/Associate
Chiof/Seaior Engipcar. :
Tnosporatioo Engiaecr
85.00
65:fi}
50.00
" 45i00
E5.00
.:45:00
35.00
35:00
2m.00
.,: ,, :: ,,, ,: 175:00'.
85.00
70:m..
50.00
50r'0t},
45.00
35:00 ,
PLANNING CONSI'LTAITT
Horty As Necdcd ,1000Or::,.
ln &ition a thc houtly ,rrus ligd &ow, dnrycs will hcbde dina ou4f pockcl crpcnses sudt as
nptdaabn, ovenigltt nai\ and oihcr rcinbulbhs billcd u a mutdpllzr of 1.25.
'_::'i:
H0tIY1v00D 2 oakwood Soulevard. Su,le 120. Hollwood. Fonda 33020 (305) 921.7781 FAX: {305) 921-8807
MIAMI Aln 1 S r// 87!h Avenue. Suile I 1 1 Miami Pcrda 33173 {3051 27-0{210 FAX (3C5) 27-0-6323
TO:
FROM:
RE:
DATE:
CITY OF DANIA
INTEROFFICE MEMORANDUM
GROWTH MANAGEMENT DEPARTMENT
Michael Smith
City Manager
\Mll Allen
Growth Manasement Director') l/ 0111*-
PROFESSIONAL SERVICES RELATED TO THE DREDGE AND FILLOPERATIONS AT TIGERTAIL PARK
January 8, '1996
The attached proposar frgm Benv and carvin, rnc. updates the December 12, 1gg5groposal conceming professionar services rerated to'ttre oreate ano'niil"ririti""
"tTigertail park. _The crty of Dania tas agreeJ-io-obrigations toward providing fil foraccess to the Bass pro / IGFA site, providing weflandmitigati;;-;;; [rivriing nrr torparking areas.
The updated scope of services removes design of the road which wifi be done byothers. Five tasks are risted in the propos-ar incruding r"na "rr"virlJ services,earthwork plan services, environmentar permitting, pran review and coordination withother agencies and the deveroper and constructioi services. Th";;.i;;;rylervice isthe actuai monitoring of the dredge and fill operation.
It is. extremery important that the engineering be started as soon as possibre. Theenvironmentar permitting may take ufwards 6f nine months. rt is recommended thiswork be authorized as soon as possible.
wA;lc