HomeMy WebLinkAbout2025-07-08 City Commission Meeting Agenda Packet
AGENDA
DANIA BEACH CITY COMMISSION
REGULAR MEETING
TUESDAY, JULY 8, 2025 - 7:00 PM
ANY PERSON WHO DECIDES TO APPEAL ANY DECISION MADE WITH REGARD TO ANY MATTER CONSIDERED AT THIS
MEETING OR HEARING WILL NEED A RECORD OF THE PROCEEDING, AND FOR SUCH PURPOSE MAY NEED TO ENSURE
THAT A VERBATIM RECORD OF THE PROCEEDING IS MADE WHICH RECORD INCLUDES THE TESTIMONY AND EVIDENCE
UPON WHICH THE APPEAL IS TO BE BASED.
LOBBYIST REGISTRATION IS REQUIRED. PRIOR TO ENGAGING IN ANY LOBBYING ACTIVITIES, WHETHER OR NOT
COMPENSATION IS PAID OR RECEIVED IN CONNECTION WITH THOSE ACTIVITIES, EACH LOBBYIST SHALL FILE WITH THE
CITY CLERK AN ANNUAL REGISTRATION STATEMENT AND PAY AN ANNUAL TWO HUNDRED FIFTY DOLLARS ($250.00)
REGISTRATION FEE FOR EACH PRINCIPAL OR EMPLOYER. REGISTRATION FORMS ARE AVAILABLE ON THE CITY WEBSITE:
WWW.DANIABEACHFL.GOV. (ORDINANCE #2012-019; AMENDED BY ORDINANCE #2019-019)
IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT, PERSONS NEEDING ASSISTANCE TO PARTICIPATE IN
ANY OF THESE PROCEEDINGS SHOULD CONTACT THE CITY CLERK'S OFFICE, 100 W. DANIA BEACH BOULEVARD, DANIA
BEACH, FL 33004, (954) 924-6800 EXTENSION 3624, AT LEAST 48 HOURS PRIOR TO THE MEETING.
IN CONSIDERATION OF OTHERS, WE ASK THAT YOU:
A. PLEASE TURN CELL PHONES OFF, OR PLACE ON VIBRATE. IF YOU MUST MAKE A CALL, PLEASE STEP OUT INTO THE
ATRIUM, IN ORDER NOT TO INTERRUPT THE MEETING.
B. IF YOU MUST SPEAK TO SOMEONE IN THE AUDIENCE, PLEASE SPEAK SOFTLY OR GO OUT INTO THE ATRIUM, IN
ORDER NOT TO INTERRUPT THE MEETING.
DECORUM POLICY FOR MEETINGS OF THE CITY COMMISSION
OF THE CITY OF DANIA BEACH, FLORIDA:
INDIVIDUALS WHO WISH TO MAKE ANY “CITIZEN’S COMMENTS” UNDER THAT PORTION OF THE CITY COMMISSION
AGENDA, OR WHO OTHERWISE WANT TO ADDRESS THE CITY COMMISSION, MUST FIRST BE REGISTERED WITH THE CITY
CLERK (FORMS ARE AVAILABLE OUTSIDE OF THE CITY COMMISSION CHAMBERS AND MUST BE GIVEN TO THE CLERK
BEFORE THE MEETING). OTHERS WHO WANT TO ADDRESS THE COMMISSION ON ANY MATTERS MUST FIRST BE
RECOGNIZED BY THE MAYOR. ALL SUCH PERSONS MUST USE THE PODIUM IN THE COMMISSION CHAMBER. NO MORE
THAN ONE PERSON AT A TIME MAY ADDRESS THE COMMISSION FROM THE PODIUM. COMMENTS ARE ONLY TO BE MADE
TO THE CITY COMMISSION AND ARE NOT TO BE DIRECTED TO THE AUDIENCE OR CITY STAFF.
NO INDIVIDUAL SHALL MAKE ANY SLANDEROUS OR UNDULY REPETITIVE REMARKS, OR ENGAGE IN ANY OTHER
FORM OF BEHAVIOR THAT DISRUPTS OR IMPEDES THE ORDERLY CONDUCT OF THE MEETING, AS DETERMINED BY THE
MAYOR. NO INDIVIDUAL MAY SPEAK DIRECTLY TO OR ADDRESS THE MAYOR, CITY COMMISSIONER OR CITY STAFF:
COMMENTS ARE TO BE ONLY DIRECTED TO THE COMMISSION AS A WHOLE. NO CLAPPING, APPLAUDING, HECKLING OR
VERBAL OUTBURSTS IN SUPPORT OF OR OPPOSITION TO A SPEAKER OR HIS OR HER REMARKS SHALL BE PERMITTED. NO
SIGNS OR PLACARDS SHALL BE PERMITTED IN THE COMMISSION CHAMBER.
IF ANY PERSON’S CONDUCT AS DETERMINED BY THE MAYOR IS FOUND TO BE DISRUPTIVE OR INTERFERES WITH
THE ORDERLY CONDUCT OF THE MEETING, THE PERSON MAY BE ASKED BY THE MAYOR TO LEAVE THE COMMISSION
CHAMBERS; IF THE PERSON DOES NOT LEAVE AND THE CONDUCT PERSISTS, THE CITY POLICE DEPARTMENT WILL BE
REQUESTED TO ESCORT THE INDIVIDUAL FROM THE CITY COMMISSION CHAMBERS.
ALL CELLULAR TELEPHONES ARE TO BE SILENCED DURING THE MEETING. ALL PERSONS EXITING THE COMMISSION
CHAMBER SHALL DO SO QUIETLY. (RESOLUTION #2020-032)
1. CALL TO ORDER/ROLL CALL
2. MOMENT OF SILENCE AND PLEDGE OF ALLEGIANCE
3. PRESENTATIONS AND SPECIAL EVENT APPROVALS
Agenda – Dania Beach City Commission
Tuesday, July 8, 2025 - 7:00 PM
Page 2 of 8
1. Community Foundation of Broward Building Stronger Communities Together -
Sponsored by Mayor Davis
2. Resilient Broward - Countywide Resilience Plan 2025 - Sponsored by Mayor Davis
3. Presentation of Proposed Landscape Design for Dania Beach Blvd./East - Citywide
Landscape Master Plan by KCI, Inc. - Public Services
4. Special Event Application: - Parks and Rec
- White Family SE Fee Waiver
5. Request for Proclamation Approvals:
- International Overdose Day - August 31, 2025 - Sponsored by Mayor Davis
- Parks and Recreation Month - July 2025 - Parks and Rec.
4. PROCLAMATIONS
1. Parks & Recreation Month - July 2025 - Parks & Recreation
5. ADMINISTRATIVE REPORTS
1. City Manager
2. City Attorney
3. City Clerk - Reminders:
- August 26, 2025 CRA Board Meeting - 6 p.m.
- August 26, 2025 City Commission Meeting - 7 p.m.
6. PUBLIC SAFETY REPORTS
7. CITIZENS' COMMENTS
Addressing the Commission: A thirty (30) minute "Citizen Comments" period shall be designated on the agenda for citizens and
interested persons to speak on matters whether or not scheduled on that day's agenda. Individuals wishing to speak on a matter
not included on the "Public Hearing" section of the agenda, which matter pertains to an item before the City Commission which
requires a decision of the City Commission, may do so by signing in and submitting a form to that effect with the City Clerk prior
to the meeting. Speakers at Public Hearings shall also submit such a form. Each speaker shall be limited to 3 minutes for his or
her comments. If more than ten (10) speakers express a desire to speak, the Commission shall determine on a meeting by meeting
basis whether to (a) extend the time allotted for citizen comments to accommodate all speakers, or (b) whether to limit the number
of speakers or amount of time per speaker. A speaker's time shall not be transferable to another speaker.
8. CONSENT AGENDA
1. Minutes: June 24, 2025 City Commission Meeting Minutes
2. Travel Requests: None.
Agenda – Dania Beach City Commission
Tuesday, July 8, 2025 - 7:00 PM
Page 3 of 8
3. RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE CITY TO EXCEED THE ANNUAL SINGLE
VENDOR PURCHASING POLICY OF FIFTY THOUSAND DOLLARS
($50,000.00); AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE
AGREEMENTS FOR THE CITY’S FULLY INSURED MEDICAL PLAN WITH THE
FLORIDA MUNICIPAL INSURANCE TRUST, CIGNA, EYEMED, AND BEYOND
MED FOR INSURANCE COVERAGES BEGINNING OCTOBER 1, 2025
THROUGH SEPTEMBER 30, 2026, FOR ACTIVELY WORKING AND NON-
MEDICARE ELIGIBLE RETIRED EMPLOYEES; PROVIDING FOR PAYMENTS
UNDER THE CITY’S HIGH-DEDUCTIBLE HEALTH PLAN; AND PROVIDING
INCENTIVE PAYMENTS FOR THOSE OPTING OUT OF THE CITY’S HEALTH
INSURANCE PROGRAM; PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE. (Human Resources)
4. RESOLUTION NO. 2025-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING EXECUTION OF AN AGREEMENT PURSUANT TO
CITY REQUEST FOR QUALIFICATIONS (“RFQ”) NO. 25-011 ENTITLED,
“CONSTRUCTION MANAGEMENT AT RISK SERVICES” FOR CONSTRUCTION
MANAGEMENT SERVICES RELATED TO NEW CONSTRUCTION AT P.J. MELI
AQUATIC COMPLEX TO BURKHARDT CONSTRUCTION, INC., IN THE
AMOUNT OF EIGHTY EIGHT THOUSAND SIX HUNDRED AND SIXTY
DOLLARS ($88,660.00) FOR PRE-CONSTRUCTION SERVICES, WITH A
MUTUALLY AGREED UPON GUARANTEED MAXIMUM PRICE (“GMP”) TO
BE PROVIDED ONCE THE DESIGN REACHES COMPLETION AND
ESTABLISHING THE PROCESS FOR CONSTRUCTION SERVICES ONCE GMP
IS APPROVED; AND TO EXCEED AN ANNUAL VENDOR EXPENDITURE
THRESHOLD OF FIFTY THOUSAND DOLLARS ($50,000.00); PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE (Parks and
Recreation)
5. RESOLUTION NO. 2025-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, RELATING TO THE IMPOSITION OF FIRE RESCUE ASSESSMENTS
AND THE PROVISION OF FIRE SERVICES, FACILITIES AND PROGRAMS
WITHIN THE CITY OF DANIA BEACH, FLORIDA; PROVIDING AUTHORITY;
PROVIDING FOR PROVISION AND FUNDING OF FIRE SERVICES; PROVIDING
FOR IMPOSITION AND COLLECTION OF SUCH ASSESSMENTS; PROVIDING
LEGISLATIVE DETERMINATIONS OF SPECIAL BENEFIT AND FAIR
APPORTIONMENT; PROVIDING UPDATED ASSESSMENT CALCULATIONS;
ESTABLISHING PRELIMINARY NOT-TO-EXCEED ASSESSMENT RATES FOR
Agenda – Dania Beach City Commission
Tuesday, July 8, 2025 - 7:00 PM
Page 4 of 8
FIRE ASSESSMENTS TO PROVIDE FOR THE PROVISION OF FIRE SERVICES,
FACILITIES AND PROGRAMS FOR THE FISCAL YEAR BEGINNING OCTOBER
1, 2025; DIRECTING THE PREPARATION OF A PRELIMINARY ASSESSMENT
ROLL; AUTHORIZING A PUBLIC HEARING AND DIRECTING THE PROVISION
OF MAILED AND PUBLISHED NOTICE OF SUCH HEARING; PROVIDING FOR
CONFLICTS; PROVIDING FOR SEVERABILITY; FURTHER, PROVIDING FOR
AN EFFECTIVE DATE. (Finance)
6. RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, RELATING TO THE COLLECTION AND DISPOSAL OF SOLID
WASTE IN THE CITY OF DANIA BEACH, FLORIDA; ESTABLISHING THE NOT
TO EXCEED ASSESSMENT RATE FOR SOLID WASTE SERVICE
ASSESSMENTS AGAINST ASSESSED PROPERTY LOCATED WITHIN
BOUNDARIES OF THE CITY OF DANIA BEACH, FOR THE FISCAL YEAR
BEGINNING OCTOBER 1, 2025; DIRECTING THE PREPARATION OF AN
ASSESSMENT ROLL; AUTHORIZING A PUBLIC HEARING AND DIRECTING
THAT NOTICE OF THE HEARING BE ISSUED; PROVIDING FOR CONFLICTS;
FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Finance)
7. RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, RELATING TO THE PROVISION OF STORMWATER SERVICES,
FACILITIES AND PROGRAMS WITHIN THE CITY OF DANIA BEACH,
FLORIDA; ESTABLISHING THE NOT TO EXCEED ASSESSMENT RATE FOR
STORMWATER ASSESSMENTS FOR THE FISCAL YEAR BEGINNING
OCTOBER 1, 2025; DIRECTING THE PREPARATION OF RESPECTIVE
ASSESSMENT ROLL; AUTHORIZING A PUBLIC HEARING AND DIRECTING
THE PROVISION OF NOTICE OF SUCH HEARING; PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Finance)
8. RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AS REQUIRED BY THE CITY CHARTER AND SECTION 200.065,
FLORIDA STATUTES, APPROVING THE PROPOSED MILLAGE RATE
NECESSARY TO BE LEVIED FOR THE FISCAL YEAR 2025-2026 FOR
OPERATING PURPOSES; ESTABLISHING THE DEBT MILLAGE RATE AS
APPROVED BY THE ELECTORATE; PROVIDING FOR A PUBLIC HEARING TO
HEAR OBJECTIONS AND QUESTIONS CONCERNING THE MILLAGE RATE,
AND AT WHICH MEETING THE QUESTIONS AND CONCERNS WILL BE
ANSWERED; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN
EFFECTIVE DATE. (Finance)
Agenda – Dania Beach City Commission
Tuesday, July 8, 2025 - 7:00 PM
Page 5 of 8
9. RESOLUTION NO. 2025-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA AUTHORIZING THE ISSUANCE OF ITS CAPITAL
IMPROVEMENT REVENUE NOTE, SERIES 2025 EVIDENCED BY A LOAN IN
AN AMOUNT NOT TO EXCEED $3,100,000 FROM TD PUBLIC FINANCE LLC
TO THE CITY TO ACQUIRE, CONSTRUCT, RENOVATE, AND EQUIP CERTAIN
CAPITAL PROJECTS, AS DESCRIBED HEREIN; AUTHORIZING THE
NEGOTIATED SALE OF SUCH NOTE TO TD PUBLIC FINANCE LLC
PURSUANT TO THE TERMS AND CONDITIONS OF A LOAN AGREEMENT BY
AND AMONG THE FLORIDA MUNICIPAL LOAN COUNCIL, CITY OF DANIA
BEACH, FLORIDA, AND TD PUBLIC FINANCE LLC; APPROVING THE FORM
OF AND AUTHORIZING THE EXECUTION AND DELIVERY OF THE LOAN
AGREEMENT; MAKING CERTAIN OTHER COVENANTS AND AGREEMENTS
IN CONNECTION WITH THE ISSUANCE OF SUCH NOTE; PROVIDING FOR
SEVERABILITY; FURTHER, PROVIDING AN EFFECTIVE DATE. (Finance)
10. RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO AUTHORIZE
PROFESSIONAL ENGINEERING DESIGN AND CONSTRUCTION SERVICES
PROVIDED BY WGI, INC., FOR THE DANIA BEACH PIER STRUCTURAL
EVALUATION, ENGINEERING DESIGN AND CONSTRUCTION PHASE
SERVICES IN THE AMOUNT OF TWO HUNDRED ELEVEN THOUSAND
DOLLARS ($211,000.00); PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE. (Public Services)
11. RESOLUTION NO. 2025-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH U.S.
WATER SERVICES CORPORATION D/B/A ROCHA CONTROLS, FOR
CALIBRATIONS AND REPAIRS OF FLOW METERS AND RELATED DEVICES;
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE
DATE. (Public Services)
12. RESOLUTION NO. 2025-____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH RIC-
MAN INC. FOR THE SOUTHEAST DRAINAGE RETROFIT PROJECT PHASE II,
IN AN AMOUNT NOT TO EXCEED NINETEEN MILLION SEVEN HUNDRED
FIFTY-FOUR THOUSAND FOUR HUNDRED NINETY-FOUR DOLLARS AND
Agenda – Dania Beach City Commission
Tuesday, July 8, 2025 - 7:00 PM
Page 6 of 8
FIFTY-ONE CENTS ($19,754,494.51); WHICH INCLUDES A TEN PERCENT (10%)
CONTINGENCY; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR
AN EFFECTIVE DATE. (Public Services)
13. Request for Use of Discretionary Funds:
- Back to School Beach Clean-Up & Backpack Giveaway - Sponsored by Mayor Davis
- Summer Camp - American Legion Post 209 - Sponsored by Vice Mayor Salvino
9. BIDS AND REQUESTS FOR PROPOSALS
1. RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO APPROVE
PROFESSIONAL ENGINEERING DESIGN, BIDDING ASSISTANCE, AND
LIMITED CONSTRUCTION SERVICES PROVIDED BY KIMLEY-HORN AND
ASSOCIATES, INC (KHA) FOR THE SW 29TH TERRACE & PJ MELI PARK
DRAINAGE IMPROVEMENT PROJECT IN THE AMOUNT OF TWO HUNDRED
SIXTY-SIX THOUSAND AND TWO HUNDRED SEVENTY FIVE DOLLARS
($266,275.00); PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN
EFFECTIVE DATE. (Public Services)
2. RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING PROFESSIONAL ENGINEERING DESIGN, BIDDING
ASSISTANCE, AND LIMITED CONSTRUCTION SERVICES TO BE PROVIDED
BY KIMLEY-HORN AND ASSOCIATES, INC (KHA) FOR THE SW 34TH COURT
STORMWATER IMPROVEMENTS PROJECT, WHICH SERVICES SHALL NOT
EXCEED THE AMOUNT OF ONE HUNDRED FOURTEEN THOUSAND AND
THREE HUNDRED NINETY FIVE DOLLARS ($114,395.00); PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Public
Services)
10. QUASI-JUDICIAL & PUBLIC HEARING ITEMS
1. RESOLUTION NO. 2025-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, APPROVING THE VARIANCE REQUEST TO WAIVE THE
SIDEWALK INSTALLATION REQUIREMENT OF SECTION 22-27, OF THE
CITY’S CODE ORDINANCES (VA-038-24) SUBMITTED BY THE
APPLICANT/PROPERTY OWNER, SGM DEVELOPMENT, INC., FOR PROPERTY
LOCATED AT 3951 RAVENSWOOD ROAD, IN THE CITY OF DANIA BEACH,
FLORIDA; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN
Agenda – Dania Beach City Commission
Tuesday, July 8, 2025 - 7:00 PM
Page 7 of 8
EFFECTIVE DATE. (Community Development)
2. RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, PURSUANT TO THE CRITERIA OF SECTION 630-50, ENTITLED
“SPECIAL EXCEPTION USE DEVELOPMENT STANDARDS”, TO APPROVE
THE APPLICANT’S REQUEST FOR A SPECIAL EXCEPTION (SE-033-024) TO
ALLOW OUTDOOR DINING ASSOCIATED WITH AN EXISTING
RESTAURANT, SUBMITTED BY APPLICANT, 2750 GRIFFIN LIVING, LLLP,
FOR PROPERTY LOCATED AT 2750 GRIFFIN ROAD BEACH, FLORIDA;
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE
DATE. (Community Development)
3. RESOLUTION NO. 2025-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, APPROVING THE SITE PLAN MODIFICATION (SP-91-06MOD) AND
VARIANCE (VA-021-25) APPLICATIONS TO MODIFY THE LANDSCAPING
REQUIREMENT AND APPROVE ELECTRIC VEHICLE CHARGING SPACES ON
THE PROPERTY, SUBMITTED BY THE APPLICANT, TESLA INC., FOR
PROPERTIES LOCATED AT 2061, 2071 AND 2081 GRIFFIN ROAD, IN THE CITY
OF DANIA BEACH, FLORIDA; PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE. (Community Development)
11. FIRST READING ORDINANCES: None.
First reading ordinances under this section are not subject to public hearing and may be taken all at once, unless pulled by the
City Commission. A public hearing and discussion will take place at second reading of all ordinances within its respective section
of the agenda.
12. SECOND READING ORDINANCES
1. ORDINANCE NO. 2025-_____
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AMENDING THE CITY’S PUBLIC ART FEE IMPOSED ON
DEVELOPMENTS, BY AMENDING CHAPTER 28, ENTITLED THE “LAND
DEVELOPMENT CODE” AT SECTION 811-50, “APPLICATION PROCEDURES
FOR PLACEMENT OF ART ON PRIVATE PROPERTY,” AND SECTION 811-70.
ENTITLED “BUILDING PERMITS”; PROVIDING FOR CONFLICTS; PROVIDING
FOR CODIFICATION; PROVIDING FOR SEVERABILITY; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE (Community Development).
Agenda – Dania Beach City Commission
Tuesday, July 8, 2025 - 7:00 PM
Page 8 of 8
13. DISCUSSION AND POSSIBLE ACTION
1. Selecting a Voting Delegate from those Attending the Florida League of Cities Annual
Conference
2. Request to Attend the Annual Southeast Florida Climate Leadership Summit and
Discussion on Sponsorship - Sponsored by Mayor Davis
3. Appointments to the Airport Noise Abatement Committee - City Clerk
4. RESOLUTION NO. 2025-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE CREATION OF A SHORT LIST OF ARTISTS
FROM THE “CREATIVE VISION” CALL TO ARTISTS; PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Community
Development)
5. RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE DANIA BEACH,
FLORIDA, PERTAINING TO RESOLUTION 2024-79, WHICH MODIFIED
RESOLUTION 28-85, AND PRESCRIBES RULES OF PROCEDURE FOR CITY
COMMISSION MEETINGS; AMENDING THE RULES TO LIMIT THE NUMBER
OF PRESENTATIONS REQUESTED BY ELECTED OFFICIALS TO TWO, PER
MEETING, WITH NO TIME LIMIT; PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE.(Sponsored by Mayor Davis)
6. Access to the Construction Site of Gymnasium at CW Thomas Park for Tamara James
14. APPOINTMENTS: None.
15. COMMISSION COMMENTS
16. ADJOURNMENT
City of Dania Beach
Parks & Recreation Memorandum
DATE: 7/8/2025
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Tyrone Cornileus / Event Liaison / Parks and Recreation
SUBJECT: Special Event Application: White Family SE Fee Waiver
Request:
Ashley Wheaton & the White Family have requested fees to be waived for a special event
request for the Henry N White Street Naming Community Celebration event taking place at the
American Legion Hall (806 NW 1st St, Dania Beach, FL 33004) on Saturday, June 21, 2025
from 12:00pm to 5:00pm.
Background:
This is a community event to give back to the community of Dania Beach and their will be a DJ
inside facility along with two food trucks. We will be doing raffles, trivia, and games.
Budgetary Impact
Special Event Fee : $450 (Request for reimbursement)
Recommendation
NA
CITY OF DANIA BEACH
OFFICE OF THE CITY MANGER
100 West Dania Beach Blvd ∙ Dania Beach, FL 33004 ∙ (954) 924-6800 ∙ (954) 921-2604 (fax)
MEMORANDUM
Date: July 8, 2025
To: Mayor Joyce L. Davis
Vice Mayor Marco A. Salvino, Sr.
Commissioner Lori Lewellen
Commissioner Luis Rimoli
Commissioner A. J. Ryan IV
From: Ana M. Garcia, ICMA-CM, City Manager
Subject: Manager’s Report
I am sharing, below, an update on procurement activities. Procurement is a vital part of our
operations. I also wanted to share that the webinar for which our procurement manager served as
a panelist went very well! It was an awesome opportunity for Manager Ramos to represent Dania
Beach and share information alongside the Chief Commerce Officer for the Port of Albany and the
Senior VP of Product Strategy at Euna Solutions. This particular session reached public sector
employees across the country. Leading via best practices is always our goal and this can only
occur via networking and professional development. Below is an update on the current state of
Procurement.
On Monday, June 30th, our Public Services Team began to place American flags throughout our City
focusing on major entry way points, parks and City Hall. This year we will have over 150 flags in
Dania Beach! As we prepare for 2026 celebrating our 250th anniversary of Independence Day in our
Country, I will be putting together a committee to ensure we have a game plan in place of great
impact!
On July 2nd, I met with Director Cassi Waren to go over summer camp and discuss our ongoing
commitment to enhancing what we do and how we do it. I am very happy to report our Lifeguard
Camps have been very successful with a record of 85 registered participants, with 2 sessions sold
out! The plan is in place for 2026 to be our best year yet, as we will host our 1st ever Theater Camp
at IT Parker and a Sports Camp at CW Thomas Park.
After a meeting on Monday, June 30th, with key members of our City team from the Safety
Committee and our Marketing team we are rebranding the “See Something Say Something” App/
Initiative, to the “Eagle Eye” program. The feedback we were getting was that folks felt like they
were “tattling” and now we are shifting towards a different direction. Once we have the game plan
fully developed and executed, we will update you.
We have two other initiatives that we are fine tuning that will focus on incentivizing our more than
200 employees on ideas to save money and to generate revenues for our City. We have great minds
at all levels, and we are excited to hear about all the possibilities. At the August meeting our Chief
Human Resources Officer will fully present all 3 of these initiatives.
Our July CORE Conversation community meeting will take place on Thursday, the 8th at the SW
Community Center, and our rescheduled August CORE Conversations community meeting will
take place on August 20th at IT Parker Center. Start time for CORE meetings is 5:30 pm.
Our City Team, FDOT and the Joe Milton group have been working seamlessly on the Gulfstream
Road improvement project. The project is at the homestretch of phase 1 and many items from
phase 2 have been incorporated in this initial phase. As of July 2nd, via my communication with Mr.
Luis Mata from the Joe Milton group, phase 1 will be completed by months end and remains on
schedule. This will allow the road to open by early August.
All our one-on-one budget meetings with our City Commission have been set and we look forward
to going over our proposed FY 25/26 budget with all of you. Our budget workshop back in early
spring and both Saturday Strategic Planning sessions leading to your unanimously adopted
Strategic Master Plan were of extreme significance in the preparation of our proposed FY 2025/26
budget. In addition to our City residents present at the meeting, employees from both Ft
Lauderdale and Coconut Creek were in attendance to witness our process in how we rolled out the
Smart Meter program.
On Wednesday, June 25th, we hosted a Smart Meter workshop to update our community on the
Smart Meter process. Kudos to our Marketing, Utility and Finance teams who ensured the success
of the workshop as we continue to elevate our communication and engagement with our
community.
For your perusal, I have included an email from Nicole Gomez Goldmeier, from October of 2023.
Nicole is a partner with the LSN Partners group, a friend and our former Chief of Staff/
Communications Director in NMB. Her introduction to Attorney James Ferraro regarding PFAS has
resulted in our City benefiting to the tune of over $1.5 million in a settlement. The baton was
passed by Nicole to me and immediately I passed the baton to our City Attorney who commenced
working with Mr. Ferraro. This is another example of how we operate and seize every opportunity
that can be of benefit to our community. There are no restrictions on these monies and per my
meeting with CFO Guzman we will place the monies in the newly formed Capital Revenue Fund to
be used for future projects per the priorities of our City Commission. Grateful to Nicole for thinking
of me/ Dania Beach and grateful to Eve for grabbing the baton and seizing over $1.5 million for our
City!
From: Nicole Gomez <ngomez@lsnpartners.com>
Sent: Friday, October 20, 2023 4:48 PM
To: Garcia, Ana <agarcia@daniabeachfl.gov>; James L. Ferraro Jr. <james@ferrarolaw.com>
Subject: Dania Beach PFAS Discussion
CAUTION: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Manager,
As a follow-up to our discussion, I am connecting you with James Ferraro, whose firm is proactively
investigating potential claims against the 3M Company and other entities on behalf of numerous cities
and counties. These entities, including 3M, knowingly manufactured and distributed products containing
hazardous per- and polyfluorinated substances (PFAS), posing substantial threats to human health and
the environment. The release of these substances into the air, soil, and groundwater, notably during
firefighting exercises, presents a significant risk to those exposed.
James Ferraro's firm is uniquely positioned as a member from South Florida on the Plaintiff’s Executive
Committee representing various municipalities. These include Hialeah, Fort Lauderdale, North Miami
Beach, North Miami, Boca Raton, and Cooper City, among many others across the US.
In a recent development, 3M has disclosed a settlement of a minimum of $10.3 billion to address PFAS
contamination in public drinking water systems. This settlement is designed to reimburse water
providers for PFAS pollution, with potential compensations escalating to $12.5 billion over a span of 13
years. The disbursement hinges on the detection of PFAS during mandatory testing of public water
systems in the upcoming three years, covering filtration costs and additional testing.
I’ll defer to you to coordinate a meeting with your City Attorney to further evaluate the viability of a
claim for Dania Beach and to determine the most favorable course of action.
Thank you and have a great weekend!
Nicole Gomez Goldmeier
Partner LSN Partners 3800 NE 1st Avenue, Suite 200 Miami, Florida 33137 (786) 431-7722 - Mobile
www.lsnpartners.com
IMPORTANT - The information in this e-mail is confidential and may be legally privileged. It is intended solely for the addressee. Access to this e-mail by anyone else is unauthorized. If you are not the intended recipient, you are notified that any disclosing, copying, distributing, or taking any action in reliance on the
contents of this information is strictly prohibited. Any views, opinions or advice contained in this e-mail are those of the sending individual and not necessarily those of LSN Partners, LLC or its subsidiaries. It is possible for data transmitted by e-mail to be deliberately or accidentally corrupted or intercepted.
City of Dania Beach
100 WEST DANIA BEACH BLVD DANIA BEACH, FLORIDA 33004
July 10,2025
Special Magistrate Agenda
Page
1
of
7
Case # Status Hearing Type Property Address Cited Party Default Inspector
2024-00001708 Active H-EXTENSION - Extension
Hearing
220 SW 16 ST COFFEECAKE HOLDINGS LLC
Alberto Chavarria
2024-00001952 Active H-EXTENSION - Extension
Hearing
731 SW 5 ST LOUISE HENDERSON
Alberto Chavarria
2025-00000366 Active H-FIRST HEARING - First
Hearing
221 SW 3 PL MALVAREZ, GUSTAVO ALEJANDRO Alberto Chavarria
2025-00000394 Active H-FIRST HEARING - First
Hearing
234 SW 3 PL BROKENBOROUGH MANAGEMENT LLC
Alberto Chavarria
2025-00000401 Active H-FIRST HEARING - First
Hearing
209 SW 3 TER MORALES, BLANCA & RICARDO Alberto Chavarria
2025-00000403 Active H-FIRST HEARING - First Hearing
243 SW 15 ST BAFFI JUVIEL, PABLO LAZARO, MABEL ADORACION
Alberto Chavarria
2025-00000434 Active H-FIRST HEARING - First
Hearing
255 SW 12 ST RENDEROS, JULIO Alberto Chavarria
2025-00000435 Active H-FIRST HEARING - First Hearing
317 SW 14 ST BRODEUR YVES Alberto Chavarria
2025-00000437 Active H-FIRST HEARING - First
Hearing
215 SW 5 ST OGANESIAN, ARTHUR Alberto Chavarria
2025-00000455 Active H-FIRST HEARING - First
Hearing
220 SW 5 ST ROSA INDHIRA REINOSO Alberto Chavarria
2025-00000456 Active H-FIRST HEARING - First
Hearing
508 SW 2 AVE WILLIAM MONTESTE Alberto Chavarria
2025-00000476 Active H-FIRST HEARING - First Hearing 42 SW 11 ST AQUIN GARDENS LLC
Alberto Chavarria
2025-00000478 Active H-FIRST HEARING - First Hearing
150 SW 10 ST MANNING, JODIE & RODRIGUEZ, MIGUEL Alberto Chavarria
City of Dania Beach
100 WEST DANIA BEACH BLVD DANIA BEACH, FLORIDA 33004
July 10,2025
Special Magistrate Agenda
Page
2
of
7
2025-00000479 Active H-FIRST HEARING - First
Hearing
49 SW 11 ST MANZALIKO LLC
Alberto Chavarria
2025-00000480 Active H-FIRST HEARING - First Hearing 228 SW 8 ST GABRIEL CHAPUI
Alberto Chavarria
2025-00000509 Active H-FIRST HEARING - First
Hearing
732 SW 6 ST NANCY ESTHER SANCHEZ Alberto Chavarria
2025-00000545 Active H-FIRST HEARING - First
Hearing
205 SW 7 ST E.A&N MANAGEMENT SERVICE LLC
Alberto Chavarria
2025-00000546 Active H-FIRST HEARING - First
Hearing
324 SW 13 ST MARIE MARTHE BEAUBRUN / LUCKNIE JEAN
BAPTISTE
Alberto Chavarria
2025-00000547 Active H-FIRST HEARING - First Hearing
604 SW 2 AVE 604 SW 2ND AVE LLC
Alberto Chavarria
2025-00000570 Active H-FIRST HEARING - First Hearing 209 SW 5 ST ZOMINHAN, IAN Alberto Chavarria
2025-00000571 Active H-FIRST HEARING - First
Hearing
1470 SW 2 AVE DANIA REAL ESTATE LLLP Alberto Chavarria
2025-00000611 Active H-FIRST HEARING - First
Hearing
753 SW 3 PL RACHEL HAUO
Alberto Chavarria
2025-00000733 Active H-FIRST HEARING - First
Hearing
202 SE 10 ST 102 MEADOWBROOK LAKES SECA A
RECREATION CENTER INC
Andre Smith
2025-00000784 Active H-FIRST HEARING - First
Hearing
4155 SW 49 ST ZE MANAGEMENT LLC Andre Smith
2023-00001386 Active H-CONFIRMATION - Confirmation Hearing
146 NE 1 AVE ANITA MIGNONE Anson Westberry
2024-00000494 Active H-EXTENSION - Extension
Hearing
720 SE 3 CT MCCUTCHEON, ROSALIND P Anson Westberry
City of Dania Beach
100 WEST DANIA BEACH BLVD DANIA BEACH, FLORIDA 33004
July 10,2025
Special Magistrate Agenda
Page
3
of
7
2024-00001647 Active H-ABATEMENT - Abatement
Hearing
NW 13 CT PEREZ, CARLOS JAVIER Anson Westberry
2024-00001899 Active H-EXTENSION - Extension
Hearing
217 NW 7 AVE A & R PARTNERS LLC
Anson Westberry
2025-00000287 Active H-FIRST HEARING - First
Hearing
431 SE 3 ST MEADOWBROOK LAKES VIEW ASSN B Anson Westberry
2025-00000754 Active H-FIRST HEARING - First
Hearing
22 SE 10 TER 22 & DANIA LLC Anson Westberry
2025-00000296 Active H-FIRST HEARING - First
Hearing
129 NW 4 AVE NEW BHNV DANIA COMMERCIAL LLC Luciano Nibbs
2025-00000298 Active H-FIRST HEARING - First
Hearing
129 NW 4 AVE NEW BHNV DANIA COMMERCIAL LLC Luciano Nibbs
2025-00000354 Active H-FIRST HEARING - First
Hearing
NW 14 AVE BESNER HILDA & JACK BESNER IRREV TR
Luciano Nibbs
2025-00000355 Active H-FIRST HEARING - First
Hearing
NW 14 AVE ADELE BESNER TR BESNER HANNA S TRSTEE
Luciano Nibbs
2025-00000356 Active H-FIRST HEARING - First
Hearing
NW 14 AVE ADELE BESNER TR BESNER HANNA S TRSTEE
Luciano Nibbs
2025-00000357 Active H-FIRST HEARING - First
Hearing
NW 14 AVE ADELE BESNER TR BESNER HANNA S TRSTEE
Luciano Nibbs
2025-00000364 Active H-FIRST HEARING - First
Hearing
806 NW 1 ST AMERICAN LEGION #209 Luciano Nibbs
2025-00000373 Active H-FIRST HEARING - First
Hearing
525 NW 7 ST BOIKO IOURI & TATIANA Luciano Nibbs
2025-00000564 Active H-FIRST HEARING - First
Hearing
126 NW 13 AVE JOHN LAND SAINT TR & G TRSTEE TOSTI
%CAMITON ASSOC Luciano Nibbs
2025-00000580 Active H-FIRST HEARING - First
Hearing
140 S FEDERAL HWY MOUNTAINEER PROPERTY DEVELOPMENT
CORP
Luciano Nibbs
City of Dania Beach
100 WEST DANIA BEACH BLVD DANIA BEACH, FLORIDA 33004
July 10,2025
Special Magistrate Agenda
Page
4
of
7
2023-00001411 Active H-CONFIRMATION -
Confirmation Hearing
PHIPPEN RD WILEY, IRIAM B Michelle Shahryar
2024-00000190 Active H-CONFIRMATION -
Confirmation Hearing
4555 SW 32 AVE RJK IHC LLC Michelle Shahryar
2024-00000322 Active H-CONFIRMATION -
Confirmation Hearing
4680 SW 32 AVE DANIA RIVERFRONT LLC Michelle Shahryar
2024-00000324 Active H-CONFIRMATION -
Confirmation Hearing
4664 SW 32 AVE DANIA RIVERFRONT LLC Michelle Shahryar
2024-00000377 Active H-EXTENSION - Extension
Hearing
4420 SW 32 AVE WEBB, LOUIS &
WEBB, ROSEANN
Michelle Shahryar
2025-00000011 Active H-EXTENSION - Extension
Hearing
SW 36 ST FASTMARK CORP Michelle Shahryar
2025-00000332 Active H-FIRST HEARING - First
Hearing
4621 SW 34 AVE MAZUR, C K & MILDRED A Michelle Shahryar
2025-00000387 Active H-FIRST HEARING - First
Hearing
2249 SW 47 ST LAURA BURKE BERTRAM
Michelle Shahryar
2025-00000420 Active H-FIRST HEARING - First
Hearing
4700 SW 25 AVE SIGALA, ABEL & SYLVIA L Michelle Shahryar
2025-00000426 Active H-FIRST HEARING - First
Hearing
2296 W STATE RD 84 AMERICAN RECOVERY SPECIALISTS
OF FT LAUDERDALE INC
Michelle Shahryar
2025-00000430 Active H-FIRST HEARING - First
Hearing
4402 SW 24 AVE CEBALLO, JAIME MIGUEL/ IGLESIAS, LIVAN
MARTELL
Michelle Shahryar
2025-00000450 Active H-FIRST HEARING - First
Hearing
4485 SW 25 TER 4485 SW 25TH TERRACE LLC
Michelle Shahryar
2025-00000451 Active H-FIRST HEARING - First
Hearing
4497 SW 25 TER ANNERYS & RAFAEL H/E PUIG, RAFAEL &
ROSA PUIG
Michelle Shahryar
2025-00000452 Active H-FIRST HEARING - First
Hearing
4489 SW 25 TER JEFFREY & KRISTA MATTEO
Michelle Shahryar
City of Dania Beach
100 WEST DANIA BEACH BLVD DANIA BEACH, FLORIDA 33004
July 10,2025
Special Magistrate Agenda
Page
5
of
7
2025-00000454 Active H-FIRST HEARING - First
Hearing
4471 SW 34 DR CAROLYN AUGUSTINE & CAROLYN JOHNSON
AUGUSTINE REV
Michelle Shahryar
2025-00000459 Active H-FIRST HEARING - First
Hearing
4731 SW 26 TER BAEZA, EDWARD Michelle Shahryar
2025-00000460 Active H-FIRST HEARING - First
Hearing
4564 SW 25 AVE SWENSON, KRISTIE L Michelle Shahryar
2025-00000462 Active H-FIRST HEARING - First
Hearing
2401 SW 45 ST KIRKLAND, ENNIS & ERIN
Michelle Shahryar
2025-00000481 Active H-FIRST HEARING - First Hearing 4716 SW 34 TER ANNE COLLINS-RIVERA & RONALD RIVERA Michelle Shahryar
2025-00000483 Active H-FIRST HEARING - First
Hearing
3040 SW 45 ST WEBSTER,ROBERT S Michelle Shahryar
2025-00000484 Active H-FIRST HEARING - First
Hearing
4681 SW 33 AVE OLYNS USA LLC Michelle Shahryar
2025-00000511 Active H-FIRST HEARING - First
Hearing
3061 SW 47 ST RAYMOND S ARMSTRONG Michelle Shahryar
2025-00000516 Active H-FIRST HEARING - First
Hearing
2756 SW 47 ST GUILLERMO PUERTA Michelle Shahryar
2025-00000517 Active H-FIRST HEARING - First
Hearing
4417 SW 34 TER BORONAT, ALICIA VICTORIA & ALICIA
VICTORIA BORONAT REV TR
Michelle Shahryar
2025-00000519 Active H-FIRST HEARING - First
Hearing
3040 SW 46 CT SANTILLI,NICHOLAS J BARRACO,JENNIFER S Michelle Shahryar
2025-00000542 Active H-FIRST HEARING - First
Hearing
4484 SW 26 AVE 4484 PARTNERS LLC Michelle Shahryar
2025-00000559 Active H-FIRST HEARING - First
Hearing
2831 RAVENSWOOD RD CARRIG ASSOCIATES LLC Michelle Shahryar
2023-00000253 Active H-CONFIRMATION -
Confirmation Hearing
5511 WOODLAND LN L CHAIM FARM LLC Ricky Ali
City of Dania Beach
100 WEST DANIA BEACH BLVD DANIA BEACH, FLORIDA 33004
July 10,2025
Special Magistrate Agenda
Page
6
of
7
2023-00000552 Active H-ABATEMENT - Abatement
Hearing
4685 SW 33 AVE DAMARI, HILA
YAISH, YESHAYA
Ricky Ali
2025-00000358 Active H-FIRST HEARING - First
Hearing
5950 SW 40 AVE PALM TOWERS EMERALD LLC Ricky Ali
2025-00000392 Active H-FIRST HEARING - First
Hearing
4407 SW 37 AVE KANE, MICHAEL Ricky Ali
2025-00000651 Active H-FIRST HEARING - First
Hearing
4417 SW 38 TER 4417 SW 38TH TER
Ricky Ali
2021-00000851 Active H-CONFIRMATION -
Confirmation Hearing
1211 STIRLING RD ATLANTIC 18 LLC Windy Damis
2021-00001150 Active H-CONFIRMATION -
Confirmation Hearing
1211 STIRLING RD ATLANTIC 18 LLC Windy Damis
2023-00000217 Active H-CONFIRMATION -
Confirmation Hearing
4975 SW 28 AVE AVERY, VIVIAN Windy Damis
2023-00001287 Active H-CONFIRMATION -
Confirmation Hearing
3211 ROYAL PALM CT PSARAS, GEORGIOS A
Windy Damis
2025-00000353 Active H-FIRST HEARING - First
Hearing
3200 ROYAL PALM CT LEGER, MARTIN & PARADIS, KATHY Windy Damis
2025-00000368 Active H-FIRST HEARING - First
Hearing
5741 SW 24 AVE HOUDE, JONATHAN Windy Damis
2025-00000472 Active H-FIRST HEARING - First Hearing
5000 SW 29 WAY CARLOS L H/E MARTINEZ & ANIELKA M MARTINEZ
Windy Damis
2025-00000473 Active H-FIRST HEARING - First Hearing
5180 SW 28 AVE JOEL KLASS
Windy Damis
City of Dania Beach
100 WEST DANIA BEACH BLVD DANIA BEACH, FLORIDA 33004
July 10,2025
Special Magistrate Agenda
Page
7
of
7
2025-00000475 Active H-FIRST HEARING - First
Hearing
5021 SW 29 TER 5021 ASSOCIATES LLC Windy Damis
2025-00000492 Active H-FIRST HEARING - First
Hearing
4990 SW 28 AVE JOAN ALICE LEHMAN REV TR
LEHMAN, JOAN ALICE TRSTEE
Windy Damis
2025-00000493 Active H-FIRST HEARING - First
Hearing
5018 SW 28 AVE FAY, DAVID Windy Damis
2025-00000501 Active H-FIRST HEARING - First
Hearing
4954 SW 25 AVE RUBIO FERNANDEZ JHON A
DUQUE CARVAJAL MARYURY
Windy Damis
2025-00000502 Active H-FIRST HEARING - First
Hearing
2700 GRIFFIN RD K E 2700 LLC Windy Damis
2025-00000507 Active H-FIRST HEARING - First
Hearing
2697 SW 51 CT MADINA & ALEXANDR SHUMILIN Windy Damis
2025-00000508 Active H-FIRST HEARING - First
Hearing
4921 SW 29 AVE ABBY NEASE H/E & CHRISTOPHER EVANS
Windy Damis
2025-00000532 Active H-FIRST HEARING - First
Hearing
5731 SW 24 AVE SHIRAN DAVID
Windy Damis
2025-00000533 Active H-FIRST HEARING - First Hearing 5320 SW 30 TER ESTEBANA MORAN
Windy Damis
2025-00000548 Active H-FIRST HEARING - First Hearing
5519 SW 24 AVE PRIME REAL ESTATE HOLDINGS INC
Windy Damis
MINUTES OF REGULAR MEETING
DANIA BEACH CITY COMMISSION
TUESDAY, JUNE 24, 2025 - 7:00 P.M.
1.CALL TO ORDER/ROLL CALL
Mayor Davis called the meeting to order at 7:00 p.m.
Present:
Mayor Joyce L. Davis
Vice-Mayor Marco A. Salvino, Sr.
Commissioner Lori Lewellen
Commissioner Luis Rimoli
Commissioner A. J. Ryan IV
City Manager Ana M. Garcia, ICMA-CM
City Attorney Eve Boutsis
City Clerk Elora Riera, MMC
2.MOMENT OF SILENCE AND PLEDGE OF ALLEGIANCE
Mayor Davis called for a moment of silence followed by the Pledge of Allegiance to the United
States Flag.
3.PRESENTATIONS AND SPECIAL EVENT APPROVALS
3.1 Mr. Marty Kiar, Broward County Property Appraiser - Sponsored by Commissioner
Lewellen
Marty Kiar thanked the Dania Beach staff and said they are the one of easiest in Broward Coun-
ty to work with. He provided information on assessments, exemptions, property values and title
fraud.
3.2 Presentation to Principal Tracy D. Jackson, Collins Elementary School - Sponsored
by Commissioner Rimoli
Commissioner Rimoli spoke about Principal Jackson’s impact on the community and Mayor
Davis and Commissioner Lewellen expressed their sentiments to Principal Jackson.
Minutes of Regular Meeting
Dania Beach City Commission
Tuesday, June 24, 2025 – 7:00 p.m.
2
Principal Jackson addressed and thanked the Commission.
City Manager Garcia said that Principal Jackson sets the standard with her passion and
genuineness, and she will be greatly missed.
3.3 Advisory Board Reports:
- Green Advisory Board
There was no report for the Green Advisory Board.
- Marine Advisory Board
Stacy Brown of the Marine Advisory Board presented a PowerPoint presentation and touched on
recommendations from the board.
Mayor Davis thanked Ms. Brown for her presentation and inquired of the top 3 requests of the
board and Ms. Brown responded, beach events, beach renourishment and dune restoration.
3.4 Presentation of Resident Only Cemetery Burials - Public Services
Deputy Director of Public Services Sean Shutten provided a presentation on the proposal of
residents only cemetery burials.
Deputy City Manager Sosa-Cruz suggested coming back in July with a resolution on what is
being proposed and the possibility of building up and possibly allowing former residents.
There was Commission consensus to move forward as is with the promise to come back with
suggestions brought forward by Vice Mayor Salvino.
3.5 Request for Proclamation Approval:
- St. Ruth Missionary Baptist Church - 117th Anniversary - August 17, 2025 -
Sponsored by Mayor Davis
- Juneteenth Day - Sponsored by Mayor Davis
There was Commission consensus to approve the proclamation requests.
3.6 Special Event Application:
- Rita Crockett Beach Sports Academy - Festival Event
- Lululemon Grand Opening Weekend
There was Commission consensus to approve the special event applications.
4.PROCLAMATIONS
4.1 Juneteenth Day - Sponsored by Mayor Davis
Mayor Davis read the proclamation into the record.
Minutes of Regular Meeting
Dania Beach City Commission
Tuesday, June 24, 2025 – 7:00 p.m.
3
5.ADMINISTRATIVE REPORTS
5.1 City Manager
City Manager Garcia presented her administrative report and touched on the following topics:
- Legislative session in Tallahassee
- Conference call with Rana Brown from the Book Team
- Service Sign Monument
- Emergency Management Plan for 2025
- Meeting with RMA for presentation at CRA Board Meeting
- CORE Conversastions
- Proposed balance budget and introduction of Deputy Finance Director Barbara Trinka
- Key projects in the city
5.2 City Attorney
City Attorney Boutsis said former Mayor Tamara James would like to visit the gym under
construction that will bear her name at C.W. Thomas Park. She advised former Mayor James
that she would raise the issue and bring it back to the Commission at the July 8th meeting
consistent with the City policies including a hold harmless and list of persons to be present with
her to take pictures of the facility bring constructed.
5.3 City Clerk - Reminders
City Clerk Riera reminded the Commission of the following upcoming meetings:
- July 8, 2025 - CRA Board Meeting - 6 p.m.
- July 8, 2025 City Commission Meeting - 7 p.m.
6.PUBLIC SAFETY REPORTS
Captain Tarala thanked Mr. Kiar for the kind words about his father and spoke about recent
criminal activity in the city. He spoke about a high number of juveniles at Dania Point over the
weekend and advised they will be increasing their law enforcement presence. He advised that
they are preparing for the 4th of July and working with the City of Hollywood for traffic control
for the firework show.
District Chief Fucci summarized the activities of fire rescue for the past month to include
construction at the fire station, Quint refurbishment, Class 1 rating with Commission on
Ambulance Accreditation, community outreach events and fire inspections.
7.CITIZENS’ COMMENTS
The following spoke under citizens’ comments:
- Aaron Miller – 224 SE 6th Street
Minutes of Regular Meeting
Dania Beach City Commission
Tuesday, June 24, 2025 – 7:00 p.m.
4
8.CONSENT AGENDA
Vice Mayor Salvino made a motion to approve the consent agenda minus item 8.4 and 8.10.
The motion was seconded by Commissioner Lewellen which carried unanimously on voice
vote.
8.1 Minutes: June 10, 2025 City Commission Meeting
Approved under consent agenda.
8.2 Travel Requests: None.
8.3 Request for Use of Discretionary Funds:
- I.T. Parker Center Rental Fees - Sponsored by Mayor Davis
Approved under consent agenda.
8.4 RESOLUTION NO. 2025-____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AMENDING RESOLUTION NO.’S 2018-031, 2018-043, AND 2025-023,
RELATING TO THE CITY’S BRAND DESIGN AND LOGO, TO CLARIFY WHEN THE
LOGO CAN BE USED; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN
EFFECTIVE DATE. (Sponsored by Mayor Davis)
City Attorney Boutsis read the title of the resolution.
Commissioner Rimoli wanted to ensure that the marketing staff will verify the placement and
size is accurate.
City Attorney Boutsis commented that language can be added to include “but shall require
approval by the City Manager’s designee as to the placement, and size of the logo on any flyer or
promotional material”.
Commissioner Rimoli made a motion to approve the item with the amended language. The
motion was seconded by Commissioner Lewellen which carried unanimously on voice vote.
8.5 RESOLUTION NO. 2025-____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE A ONE-YEAR
EXTENSION OF THE MEMORANDUM OF UNDERSTANDING AGREEMENT (MOU)
BETWEEN THE CITY OF DANIA BEACH AND THE BROWARD COUNTY SHERIFF’S
OFFICE FOR THE FY 2022 EDWARD BYRNE JUSTICE ASSISTANCE GRANT
PROGRAM (JAG); PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN
EFFECTIVE DATE.(Public Services)
Minutes of Regular Meeting
Dania Beach City Commission
Tuesday, June 24, 2025 – 7:00 p.m.
5
Approved under consent agenda.
8.6 RESOLUTION NO. 2025-____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE AN
AGREEMENT WITH METRIC ENGINEERING INC. FOR THE SOUTHEST DRAINAGE
PHASE II CONSTRCUTION, ENGINEERING, AND INSPECTION (“CEI”) SERVICES
PURSUANT TO REQUEST FOR QUALIFICATIONS (“RFQ”) NO. 2025-008 IN THE
AMOUNT OF NINE HUNDRED NINETY-THREE THOUSAND NINE-HUNDRED FIFTY
DOLLARS ($993,950.00); PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN
EFFECTIVE DATE. (Public Services)
Approved under consent agenda.
8.7 RESOLUTION NO. 2025-____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, APPROVING CHANGE ORDER NO. 3 TO THE CONTRACT FOR THE LIFT
STATION GENERATORS PROJECT (LIFT STATIONS 1, 2 AND 3), TO COVER SCOPE
CHANGES DUE TO REVISED ELECTRICAL PLANS IN AN AMOUNT NOT TO EXCEED
SEVENTY-TWO THOUSAND EIGHT HUNDRED NINETY-FOUR DOLLARS AND FIFTY-
FIVE CENTS ($72,894.55); PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR
AN EFFECTIVE DATE. (Public Services)
Approved under consent agenda.
8.8 RESOLUTION NO. 2025-____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE THE 2025
AMENDED AND RESTATED TRANSPORTATION SYSTEM SURTAX INTERLOCAL
AGREEMENT WITH BROWARD COUNTY; PROVIDING FOR CONFLICTS; FURTHER
PROVIDING FOR AN EFFECTIVE DATE. (Public Services)
Approved under consent agenda.
8.9 RESOLUTION NO. 2025-____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, UPDATING AND AMENDING THE FEE SCHEDULE UNDER THE
MITIGATION FEE PROGRAM ASSOCIATED WITH THE MITIGATION OF TRAFFIC
IMPACTS FOR THE AREA WITHIN THE DANIA BEACH REGIONAL ACTIVITY
CENTER (“RAC”), DESIGNATED ON THE FUTURE LAND USE ELEMENT OF THE
COMPREHENSIVE PLAN, AS OUTLINED IN THE BROWARD COUNTY LONG RANGE
TRANSPORTATION PLAN (“LRTP”); PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE. (Community Development)
Minutes of Regular Meeting
Dania Beach City Commission
Tuesday, June 24, 2025 – 7:00 p.m.
6
Approved under consent agenda.
8.10 RESOLUTION NO. 2025-____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING A LICENSE AGREEMENT WITH SOUTH BROWARD
HOSPITAL DISTRICT TO USE PARKING SPACES LOCATED IN THE CITY PARKING
GARAGE UPON PAYMENT OF APPLICABLE FEES; PROVIDING FOR CONFLICTS;
FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Community Development)
City Attorney Boutsis read the title of the resolution.
Deputy Director of Community Development Corinne Lajoie introduced the item.
Vice Mayor Salvino questioned why the parking garage is being utilized if there were designated
parking spots allocated for the stores that are there.
Deputy Director Lajoie responded that it is a mixed-use building with commercial offices on the
ground floor, they do have parking on the ground floor, but the medical offices have higher
traffic. In an abundance of caution Memorial has asked for 20 spaces for their employees to
allow on-site parking for visitors.
Vice Mayor Salvino expressed his concern regarding running out of parking and suggested
adding 2 additional floors to the parking garage.
City Manager Garcia stated that Chief Financial Officer Guzman is looking at creating a capital
fund so that the City can look at ways to invest; in addition to adding additional floors, they are
looking at additional parking opportunities around the City Hall campus.
Vice Mayor Salvino made a motion to approve the item. The motion was seconded by
Commissioner Lewellen which carried unanimously on voice vote.
8.11 RESOLUTION NO. 2025-____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, APPROVING A GRANT AGREEMENT WITH THE FLORIDA DEPARTMENT
OF MANAGEMENT SERVICES (DMS) UNDER THE LOCAL GOVERNMENT
CYBERSECURITY PROGRAM; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING
FOR AN EFFECTIVE DATE. (Information Technology)
Approved under consent agenda.
9.BIDS AND REQUESTS FOR PROPOSALS
9.1 RESOLUTION NO. 2025-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE AWARDING FOR THE INVITATION TO BID (ITB) NO.
Minutes of Regular Meeting
Dania Beach City Commission
Tuesday, June 24, 2025 – 7:00 p.m.
7
25-013 TO U.S. WATER SERVICES CORPORATION DBA ROCHA CONTROLS FOR
CALIBRATIONS AND REPAIRS OF FLOW METERS AND RELATED DEVICES TO BE
VALID EACH YEAR THE CONTRACT IS IN PLACE, AND FURTHER PROVIDING THAT
SUCH PURCHASES ARE TO BE MADE WITHIN THE WATER DIVISION’S APPROVED
BUDGET APPROPRIATIONS ACCOUNT; IN AN AMOUNT OF SEVENTY-FIVE
THOUSAND DOLLARS ($75,000.00); PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE. (Public Services)
City Attorney Boutsis read the title of the resolution.
Director of Public Services Fernando Rodriguez introduced the item.
Commissioner Rimoli made a motion to approve the item. The motion was seconded by
Commissioner Ryan which carried unanimously on voice vote.
9.2 RESOLUTION NO. 2025-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE CITY COMMISSION TO RANK THE THREE FIRMS
THAT RESPONDED TO THE CITY’S REQUEST FOR QUALIFICATIONS (“RFQ”) NO. 25-
011, ENTITLED “CONSTRUCTION MANAGER AT RISK SERVICES”, FOR
CONSTRUCTION MANAGEMENT SERVICES RELATED TO NEW CONSTRUCTION AT
P.J. MELI AQUATIC COMPLEX, AND TO AUTHORIZE CONTRACT NEGOTIATIONS TO
BEGIN WITH THE TOP-RANKED CONSULTANT; PROVIDING FOR CONFLICTS;
FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Parks and Recreation)
City Attorney Boutsis read the title of the resolution.
Director of Parks and Recreation Cassi Warren introduced the item.
Vice Mayor Salvino made a motion to approve the item. The motion was seconded by
Commissioner Rimoli which carried unanimously on voice vote.
10.QUASI-JUDICIAL HEARINGS
None.
11.FIRST READING ORDINANCES
11.1 ORDINANCE NO. 2025-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AMENDING CHAPTER 28, ENTITLED “LAND DEVELOPMENT CODE”, AT
PART 2, ENTITLED “SITE DEVELOPMENT REGULATIONS”, ARTICLE 265 ENTITLED
“OFF STREET PARKING REQUIREMENTS AT SECTION 265-50 ENTITLED “OFF-
STREET PARKING REQUIRED; ON-STREET PARKING CREDIT” IN ORDER TO
REDUCE THE REQUIRED PARKING FOR HOTELS IN THE CRA FORM-BASED
ZONING DISTRICT; PROVIDING FOR CODIFICATION; PROVIDING FOR CONFLICTS;
Minutes of Regular Meeting
Dania Beach City Commission
Tuesday, June 24, 2025 – 7:00 p.m.
8
PROVIDING FOR SEVERABILITY; FURTHER, PROVIDING FOR AN EFFECTIVE
DATE.(Community Development)
City Attorney Boutsis read the title of the ordinance.
Deputy Director of Community Development Corinne Lajoie introduced the item.
Mayor Davis asked for anyone wishing to speak on the item and there was none.
Vice Mayor Salvino questioned if it would be retroactive and Deputy Director Lajoie responded
that they could come forward and amend the site plan, but they are currently abiding by the
approved site plan.
Discussion ensued regarding the off-street/on-street parking.
Commissioner Ryan made a motion to approve the item. The motion was seconded by
Commissioner Lewellen which carried unanimously on voice vote.
11.2 ORDINANCE NO. 2025-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AMENDING THE CITY’S PUBLIC ART FEE IMPOSED ON DEVELOPMENTS,
BY AMENDING CHAPTER 28, ENTITLED THE “LAND DEVELOPMENT CODE” AT
SECTION 811-50, “APPLICATION PROCEDURES FOR PLACEMENT OF ART ON
PRIVATE PROPERTY,” AND SECTION 811-70. ENTITLED “BUILDING PERMITS”;
PROVIDING FOR CONFLICTS; PROVIDING FOR CODIFICATION; PROVIDING FOR
SEVERABILITY; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Community
Development)
City Attorney Boutsis read the title of the ordinance.
Deputy Director of Community Development Corinne Lajoie introduced the item.
Mayor Davis asked for anyone wishing to speak on the item and there was none.
Commissioner Ryan feels that the rates are fine as is and is not in favor of the amendment.
Mayor Davis commented that she did attend the Florida Public Art meeting where professionals
from across the state get together and they were in alignment with the 0.5% increase to 1.0%.
She commented that there are not that many cities in Broward County that have public art plans,
but those that do, understand that this fee is a cost to the developers. This is money that would
benefit the beautification of the city, and she is in favor with putting our city in alignment with
the rest of the cities in Broward County and those not in Broward County.
Vice Mayor Salvino said the nicer the art gets in our city, the more attractive it gets and people
want to live here. People that are moving to Dania Beach can afford to pay the price, otherwise
they wouldn’t be moving here. He agrees with what is being recommended.
Minutes of Regular Meeting
Dania Beach City Commission
Tuesday, June 24, 2025 – 7:00 p.m.
9
Commissioner Lewellen inquired that it is an increase to 1% and an increase in the maximum to
$500,000.00 and Director of Community Development Eleanor Norena responded affirmatively
and said the developer would still have the option to install art onsite and they would only pay
half percent.
Discussion continued regarding maintenance and existing projects.
Commissioner Rimoli asked what the minimum amount would be on an art piece that someone
would want to put in and Director Norena responded that it would need to be the value of half
percent. Commissioner Rimoli commented that he is inclined to proceed but does not want to
invest additional money for consultants and would love to see that money go into projects.
Deputy Director Lajoie stated that they agree, however, having the professional recommendation
and experience has been invaluable and they value the guidance of staff and the board.
Mayor Davis commented that she has worked with Linda for the past couple of years while on
the art board and the new public art installations and murals are award winning. She spoke about
her qualifications and said her expertise and what she brings to the table is invaluable as far as
guidance with the board and making sure our board is successful.
Vice Mayor Salvino made a motion to approve the item. The motion was seconded by
Commissioner Lewellen which carried 4-1 with Commissioner Lewellen, Commissioner
Rimoli, Vice Mayor Salvino and Mayor Davis voting yes and Commissioner Ryan voting
no.
12.SECOND READING ORDINANCES
None.
13.DISCUSSION AND POSSIBLE ACTION
13.1 Request to Attend the Annual Southeast Florida Climate Leadership Summit and
Discussion on Sponsorship - Sponsored by Mayor Davis
This item was moved to the July 8, 2025 Commission meeting.
13.2 Discussion on Policy for Commission Presentations - Sponsored by Mayor Davis
This item was moved to the July 8, 2025 Commission meeting.
13.3 RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AMENDING THE CITY COMMISSION SPENDING POLICY AND
PROCEDURE FOR BUDGETED EVENTS OUTSIDE OF COMMUNITY GRANTS OR
DISCRETIONARY FUNDS POLICIES TO ELIMINATE THE REQUIREMENT FOR
REVIEW OF THE TAX RETURNS; PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE. (Sponsored by Commissioner Ryan)
Minutes of Regular Meeting
Dania Beach City Commission
Tuesday, June 24, 2025 – 7:00 p.m.
10
This item was withdrawn from the agenda.
14.APPOINTMENTS
There were no appointments on this agenda.
15.COMMISSION COMMENTS
15.1 Commissioner Lewellen
Commissioner Lewellen thanked City Manager Garcia for moving the CORE Meeting in
August to allow the Commission to attend as it conflicted with a Florida League of Cities event.
She thanked her colleagues for passing the consent agenda item for the transportation surtax.
15.2 Commissioner Rimoli
Commissioner Rimoli commented that he was happy to represent Dania Beach at the Broward
County PBA Officer of the Year Awards Banquet. He shared that the Lions Club asked him to
extend their sincere appreciation to the Commission for its support. He spoke about attending the
Juneteenth event and said it was very hot; it started out slow but was well attended later in the
day. He thanked everyone involved in the planting of the tree for Tom Ansbro and said it was a
beautiful tribute to a kind gentleman.
15.3 Commissioner Ryan
Commissioner Ryan said he had no comments but inquired further about former Commissioner
James’ request to use the gym and said he was not aware that it would need to be an item.
City Attorney Boutsis responded that she told Commissioner James that she would bring it to the
attention of the Commission and place it on the next agenda as the city as a protocol for items on
the agenda. Her request is to go in and take pictures so that she has a memory of how the gym
was created and named after her. She said it is up to the Commission on how they proceed.
Commissioner Ryan questioned why it has to be an agenda item and said they have never had to
sign indemnifications in the past.
City Attorney Boutsis said she is going by protocols but if you would like to take action, take
action. The city has had contractors going to construction sites sign hold harmless agreements.
Commissioner Ryan commented that he would like to resolve this now and does not think it is an
issue.
Mayor Davis responded that this is not the place to take action, it needs to be placed on the
agenda and properly voted for.
15.4 Vice-Mayor Salvino
Minutes of Regular Meeting
Dania Beach City Commission
Tuesday, June 24, 2025 – 7:00 p.m.
11
Vice Mayor Salvino had no comments.
15.5 Mayor Davis
Mayor Davis spoke about attending the 93rd Annual US Conference of Mayors and touched on
various topics of the conference. She visited JA World in Coconut Creek and said it was a
gorgeous place; she met with CEO Cerillo and looks forward to visiting when Dania Beach
students attend. She participated in a ribbon cutting at Design Center of the Americas and looks
forward to bringing more art and awareness to the community and the City of Dania Beach. She
also attended the Dania Beach Chamber of Commerce luncheon where there was a partnership
with Broward Health and Memorial Healthcare System and said that she is excited that they
continue to tout Dania Beach as having the first mobile clinic in Broward County. She is excited
for the groundbreaking of the Rita Crocket Beach Sports Center that is happening this Saturday
at 10:00 a.m. and noted that there will be a lot of raffles and giveaways. She wished everyone a
Happy 4th of July.
16.ADJOURNMENT
Mayor Davis adjourned the meeting at 9:34 p.m.
ATTEST: CITY OF DANIA BEACH
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
Approved:
City of Dania Beach
Human Resources Memorandum
DATE: 7/8/2025
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Linda Gonzalez, SPHR, SHRM-SCP, Chief Human Resources Officer
SUBJECT: Health Insurance and other Renewals
Request:
This memo is to serve as background and recommendation for the City’s renewal of a Medical,
Dental, Vision, and Life Insurance providers, a self-insured Short-Term Disability Plan, Flexible
Spending Account and Health Savings Account, and for supplemental benefits for the 2025/2026
plan year. Medical plan design changes, the termination of Headspace, and the implementation
of BeyondMed are being requested.
Background:
2025-2026 Background
Although we will have a 17.2% overall health insurance increase this year, we are still below the
premium rates that we had in the 19/20 Fiscal Year, because the City has benefitted from four
years of reduced premiums and one year of flat renewal. When averaged across the past six
years, medical insurance costs have remained stable despite current market conditions.
The broader health insurance market is experiencing substantial increases, driven by inflationary
trends, rising prescription drug costs (including GLP-1 medications), and provider network
pricing changes. According to the City’s benefits consultant, Gehring Group, municipalities of
similar size are facing renewal increases ranging from 15% to 25%, significantly higher than the
historical 8% to 12%. The Florida Municipal Insurance Trust (FMIT) also reports a loss ratio
exceeding 100%, above its target benchmark of 85%.
Internally, the City has experienced a 32% increase in medical claims over the prior year,
primarily due to a 40% increase in high-cost claimants among both active employees and pre-
Medicare retirees, amounting to approximately $1.3 million in additional expenses. The City’s
employee benefits broker, Gehring Group, released a full Request for Proposals (RFP) for both
Medical and Dental Insurance, and negotiated the renewals for Vision coverage. All other
coverages are in rate guarantees until at least the end of the 2026/2027 plan year and are
recommended to be renewed with no changes.
MEDICAL INSURANCE RENEWAL FOR 25/26 PLAN YEAR
The Medical RFP was released to all carriers including FMIT, UHC, Aetna, Cigna, Florida Blue,
and AvMed. Due to the City’s claims history over the past year, all carriers declined to submit
proposals, except for FMIT as they were not competitive. The original increase from FMIT was
at a 23.5% increase, but this was decreased through negotiations and plan design changes to a
19% increase. This increase represents a total increase of $531,239 per year in annual premium.
Of this increase, the City’s increase equates to $428,158 and the team members increase equates
to $103,080 per year (keeping in mind the City pays 84% of employees’ premium and two thirds
for retirees under 65 premiums). The below represents the Employee’s per pay increase for both
City’s plans:
Plan 005 High-Deductible Plan*
Plan design changes include the In-network deductible increasing from $1,600/$3,200
(single/family) to $1,650/$3,300 due to the IRS changing the qualified high-deductible health
plan limits for the upcoming plan year.
Plan 004 Traditional Plan*
Plan design changes include the In-network deductible increasing from $250/$500
(single/family) to $500/$1,000 and out of network deductible increasing from $500/$1,000
(single/family) to $1,000/$2,000. The out-of-pocket maximum for the in-network out of pocket
will increase from $2,500/$5,000 (single/family) to $3,000/$6,000 and the out of network
deductible will increase from $5,000/$10,000 (single/family) to $6,000/$12,000. Additionally,
the copay structure for PCP, specialists, advanced imaging, hospital services, and mental health
services will be changing.
*All health insurance deductions are made over 24 paychecks. There are 2 paychecks/year with
no deductions.
OTHER BENEFITS:
• Due to the 2025 IRS deductible minimums, the City will continue to fund a Health
Savings Account for current (11) employees and any new participants that elect the High-
Deductible Health Plan in accordance with their tier of enrollment. The City contributes
half of the applicable deductible, which will increase by $25 per participant with single
coverage and $50 per participant with family coverage.
• Opt-Out Incentive: The City will increase the annual opt-out incentive from $4,000 to
$4,760 to align with the overall 19% medical premium increase.
• An RFP was also released for dental insurance in which six (6) different carriers
responded, including the City’s incumbent Cigna. It is recommended that the City
remain with Cigna, and transition from a 3-tier rate system (EE Only, +1, + Family) to a
4-tier rate system (EE Only, + Spouse, + Child(ren), + Family) to give employees more
options and more equitably distribute costs. Cigna’s increase is 2.5%. The City’s cost
for this benefit is estimated to be $144,265 for the 2025/26 plan year based on current
enrollment.
• The vision insurance premium will not be changing for the 2025/26 plan year, and the
recommendation is to transition from a 3-tier to a 4-tier system for the same reasons as
the dental tiers. The cost for this benefit is estimated to be $16,838 for the 2025/26 plan
year based on current enrollment.
Employee Dental Rates per pay period*
CURRENT NEW $
Change
Employee only $2.43 $2.62 $0.20
Employee + 1 $5.80 n/a -
Employee + Spouse n/a $6.23 $0.43
Employee +
Child(ren)
n/a $6.45 $0.66
Employee + Family $8.69 $8.96 $0.27
*all health insurance deductions are made over 24 paychecks. There are 2 paychecks/year with
no deductions.
NEW BENEFIT: BEYOND MED REPLACING HEADSPACE
Due to the 1.5%, (low utilization rate) of the newly added benefit, Headspace, in 2024, it is
recommended that Beyond Med replace Headspace effective 10/1/25. BeyondMed offers a
broader range of discounted elective and wellness services, that not only include mental health
and wellness, but multiple other elective procedures, including acupuncture, anti-aging, bariatric,
chiropractic, dermatology, fertility, hair restoration, hearing aids, spa (Botox), physical therapy,
plastic surgery, surgical vision, vein therapy, veterinary, and weight loss medications. This
benefit responds directly to employee interest and will be made available to all eligible
employees. Estimated annual cost: $14,700 (replacing Headspace at $12,000).
BENEFITS ADMINISTRATION – GEHRING GROUP BROKER AND BENTEK
BENEFITS SOFTWARE
The Gehring Group continues to provide strategic guidance, claims management, and employee
advocacy and continue to provide the City’s electronic benefits administration and enrollment
system, Bentek, for employees and retirees, and supports the City’s Wellness programs and
initiatives, which include our Health Fair and other multiple Wellness events, as part of our
overall package, including our Thriving Thursday programs. The Gehring Group also offers
employee advocacy, open enrollment support, claims monitoring and reporting, strategy
consultation, and more. The City also utilizes Bentek to report monthly and administer retirees
through the General Employees Pension and Police and Fire Pension.
Benefits Program History
Over the last 5 years, the City has had 4 decreases to insurance costs and 1 flat renewal. This
year’s renewal represents an increase, however if we average the City’s medical insurance costs
over the last 6 years, they have remained flat per the graph below:
TOTAL ANNUAL HEALTH INSURANCE COSTS
The projected annual cost of medical insurance for employees and retirees under 65, for the
2025/2026 plan year is $3.33 million, with the City contributing 84% of the cost for active
employees and 2/3 for non-Medicare retirees, resulting in an annual expenditure of $2.68
million.
The total cost of all insurance programs concurrent with an October 1 effective renewal date for
which the City subsidizes in whole or in part is projected to be $3.78 million for FY 2025-2026
as shown in the attached Executive Summary. The City’s share of the cost is projected to be
$3.09 million, with employees/retirees contributing an estimated $692,238.
The total insurance program lines of coverage include:
- Medical
- Opt-Out
- HSA
- Dental
- Vision
- Basic Life/AD&D
- LTD
- FSA
- EAP
- FMLA
- Identity Theft
- BeyondMed
Budgetary Impact
The total increase in costs for the proposed renewals is $450,174, representing a 17.2% increase
over the current year. These costs are incorporated into the City’s proposed FY 2025/2026
budget.
Recommendation
It is respectfully recommended that the City Commission approve the attached resolution
authorizing the renewal and modification of the City’s employee health insurance and benefits
package for the 2025/2026 plan year, as outlined in this memorandum.
cc: Executive Summary
Medical Plan Design Changes
Premium Rate Comparison
Beyond Med Program Overview
Footnote:
[1] Voluntary lines of insurance (at employee expense) include Voluntary additional life
insurance, Preferred Legal/legal assistance, Identity Works (family credit protection), Trustmark
(death benefit), AFLAC (cancer policy, critical illness, hospital indemnity and accident)
[2] Other benefits (not health insurance related) paid by City: IDX (credit protection), met-life
pet insurance, discount programs, City gym, childcare discounts
City of Dania Beach
Executive Summary
2025/2026 Plan Year Rates
MEDICAL 3-TIER*
PLAN 1
BASE PLAN Total Employer Employee Total Employer Employee 24 Pay
ER
24 Pay
EE
Employee Only 10 $632.68 $531.45 $101.23 $785.79 $660.06 $125.73 $330.03 $62.86
Employee + 1 0 $1,247.54 $1,047.93 $199.61 $1,549.44 $1,301.53 $247.91 $650.76 $123.96
Employee + Family 1 $1,914.39 $1,608.09 $306.30 $2,377.67 $1,997.24 $380.43 $998.62 $190.21
Retiree Only 2 $632.68 $421.79 $210.89 $785.79 $523.86 $261.93
Retiree + 1 0 $1,247.54 $831.69 $415.85 $1,549.44 $1,032.96 $516.48
Retiree + Family 0 $1,914.39 $1,276.26 $638.13 $2,377.67 $1,585.11 $792.56
ANNUAL PREMIUM 13 $114,079 $93,194 $20,885 $141,686 $115,747 $25,939
PLAN 2
BUY-UP PLAN Total Employer Employee Total Employer Employee 24 Pay
ER
24 Pay
EE
Employee Only 62 $732.24 $615.08 $117.16 $869.70 $730.55 $139.15 $365.27 $69.58
Employee + 1 28 $1,443.85 $1,212.83 $231.02 $1,714.91 $1,440.52 $274.39 $720.26 $137.19
Employee + Family 42 $2,215.63 $1,861.13 $354.50 $2,631.58 $2,210.53 $421.05 $1,105.26 $210.53
Retiree Only 33 $732.24 $488.16 $244.08 $869.70 $579.80 $289.90
Retiree + 1 5 $1,443.85 $962.57 $481.28 $1,714.91 $1,143.27 $571.64
Retiree + Family 6 $2,215.63 $1,477.09 $738.54 $2,631.58 $1,754.39 $877.19
ANNUAL PREMIUM 176 $2,682,721 $2,160,558 $522,163 $3,186,352 $2,566,163 $620,190
TOTAL ANNUAL PREMIUM 189 $2,796,800 $2,253,752 $543,048 $3,328,038 $2,681,910 $646,128
$ INCREASE/DECREASE N/A N/A N/A $531,239 $428,158 $103,080
% INCREASE/DECREASE N/A N/A N/A 19.0%19.0%19.0%
OPT-OUT INCENTIVE
Opt-Out Incentive Total Employer Employee Total Employer Employee
($4,000/$4,760 Annually)21 $84,000 $84,000 $0 $99,960 $99,960 $0
ANNUAL PREMIUM 21 $84,000 $84,000 $0 $99,960 $99,960 $0
$ INCREASE/DECREASE N/A N/A N/A $15,960 $15,960 $0
% INCREASE/DECREASE N/A N/A N/A 19.0%19.0%0.0%
HSA ADMINISTRATION
Total Employer Employee Total Employer Employee
Single HSA ($800/$825)10 $8,000.00 $8,000.00 $0.00 $8,250.00 $8,250.00 $0.00
Family HSA ($1,600/$1,650)1 $1,600.00 $1,600.00 $0.00 $1,650.00 $1,650.00 $0.00
ANNUAL PREMIUM 11 $9,600 $9,600 $0 $9,900 $9,900 $0
$ INCREASE/DECREASE N/A N/A N/A $300 $300 $0
% INCREASE/DECREASE N/A N/A N/A 3.1%3.1%0.0%
DENTAL 3-TIER to 4-TIER*
Total Employer Employee Total Employer Employee 24 Pay
ER
24 Pay
EE
Employee Only 73 73 $30.34 $25.49 $4.85 $32.77 $27.53 $5.24 $13.77 $2.62
Employee + 1 / Spouse 15 29 $72.41 $60.82 $11.59 $77.82 $65.37 $12.45 $32.69 $6.23
Employee + Child(ren)31 0 N/A N/A N/A $80.60 $67.70 $12.90 $33.85 $6.45
Employee + Family 34 51 $108.62 $91.24 $17.38 $111.96 $94.05 $17.91 $47.02 $8.96
Retiree Only 52 52 $30.34 $20.23 $10.11 $32.77 $21.85 $10.92
Retiree + 1 / Spouse 39 40 $72.41 $48.27 $24.14 $77.82 $51.88 $25.94
Retiree + Child(ren)1 0 N/A N/A N/A $80.60 $53.73 $26.87
Retiree + Family 7 7 $108.62 $72.41 $36.21 $111.96 $74.64 $37.32
ANNUAL PREMIUM 252 252 $181,065 $141,209 $39,856 $185,617 $144,265 $41,352
$ INCREASE/DECREASE N/A N/A N/A $4,552 $3,056 $1,496
% INCREASE/DECREASE N/A N/A N/A 2.5%2.2%3.8%
VISION 3-TIER to 4-TIER*
Total Employer Employee Total Employer Employee 24 Pay
ER
24 Pay
EE
Employee Only 73 73 $4.39 $3.69 $0.70 $4.39 $3.69 $0.70 $1.84 $0.35
Employee + 1 / Spouse 26 15 $8.33 $7.00 $1.33 $8.33 $7.00 $1.33 $3.50 $0.67
Employee + Child(ren)0 27 N/A N/A N/A $8.78 $7.38 $1.40 $3.69 $0.70
Employee + Family 52 36 $12.24 $10.28 $1.96 $12.83 $10.78 $2.05 $5.39 $1.03
Retiree Only 52 52 $4.39 $2.93 $1.46 $4.39 $2.93 $1.46
Retiree + 1 / Spouse 36 35 $8.33 $5.55 $2.78 $8.33 $5.55 $2.78
Retiree + Child(ren)0 1 N/A N/A N/A $8.78 $5.85 $2.93
Retiree + Family 8 8 $12.24 $8.16 $4.08 $12.83 $8.55 $4.28
ANNUAL PREMIUM 247 247 $21,595 $16,838 $4,757 $21,307 $16,585 $4,722
$ INCREASE/DECREASE N/A N/A N/A -$288 -$253 -$35
% INCREASE/DECREASE N/A N/A N/A -1.3%-1.5%-0.7%
BASIC LIFE/AD&D
Total Employer Employee Total Employer Employee
Basic Life Rate/$1,000 $0.180 $0.180 $0.000 $0.180 $0.180 $0.000
Basic AD&D Rate/$1,000 $0.020 $0.020 $0.000 $0.020 $0.020 $0.000
Total Rate/$1,000 $0.200 $0.200 $0.000 $0.200 $0.200 $0.000
Life and AD&D Volume $24,458,500 $24,458,500 $24,458,500 $24,458,500 $24,458,500 $24,458,500
ANNUAL PREMIUM $58,700 $58,700 $0 $58,700 $58,700 $0
$ INCREASE/DECREASE N/A N/A N/A $0 $0 $0
% INCREASE/DECREASE N/A N/A N/A 0.0%0.0%0.0%
ALTERNATIVE #2
84/16 All Active Tiers
2025-2026 Plan Year
FMIT Choice Plus HDHP Plan 005
CURRENT
84/16 All Active Tiers
2024-2025 Plan Year
FMIT Choice Plus HDHP Plan 005
FMIT Choice Plus Traditional Plan 002
Per Pay
Per PayFMIT Choice Plus Traditional Plan 004
$4,000 Annually
Cigna Per Pay
$4,760 Annually
Cigna
EyeMed
New York Life
Per PayEyeMed
New York Life
1
City of Dania Beach
Executive Summary
2025/2026 Plan Year Rates
LONG-TERM DISABILITY
Total Employer Employee Total Employer Employee
Total Rate/$100 $0.320 $0.320 $0.000 $0.320 $0.320 $0.000
Long-Term Disability Volume $1,001,980 $1,001,980 $1,001,980 $1,001,980 $1,001,980 $1,001,980
ANNUAL PREMIUM $38,476 $38,476 $0 $38,476 $38,476 $0
$ INCREASE/DECREASE N/A N/A N/A $0 $0 $0
% INCREASE/DECREASE N/A N/A N/A 0.0%0.0%0.0%
FSA
Total Employer Employee Total Employer Employee
PEPM 18 $4.95 $4.95 $0.00 $4.95 $4.95 $0.00
ANNUAL PREMIUM $1,239 $1,239 $0 $1,239 $1,239 $0
$ INCREASE/DECREASE N/A N/A N/A $0 $0 $0
EAP
Total Employer Employee Total Employer Employee
PEPM 175 $2.00 $2.00 $0.00 $2.00 $2.00 $0.00
ANNUAL PREMIUM $4,200 $4,200 $0 $4,200 $4,200 $0
$ INCREASE/DECREASE N/A N/A N/A $0 $0 $0
FMLA & ABSENCE MGMT
Total Employer Employee Total Employer Employee
PEPM 175 $1.79 $1.79 $0.00 $1.79 $1.79 $0.00
ANNUAL PREMIUM $3,759 $3,759 $0 $3,759 $3,759 $0
$ INCREASE/DECREASE N/A N/A N/A $0 $0 $0
ID THEFT
Total Employer Employee Total Employer Employee
PEPM 170 $6.21 $6.21 $0.00 $6.21 $6.21 $0.00
ANNUAL PREMIUM $12,668 $12,668 $0 $12,668 $12,668 $0
$ INCREASE/DECREASE N/A N/A N/A $0 $0 $0
HEADSPACE
Total Employer Employee Total Employer Employee
Annual Flat Fee 62 0 $12,000 $12,000 $0.00
ANNUAL PREMIUM $12,000 $12,000 $0
$ INCREASE/DECREASE N/A N/A N/A N/A N/A N/A
BEYONDMED
Total Employer Employee Total Employer Employee
PEPM 175 $7.00 $7.00 $0.00
ANNUAL PREMIUM $14,700 $14,700 $0
$ INCREASE/DECREASE N/A N/A N/A $14,700 $14,700 $0
TOTAL PROGRAM SUMMARY
Total Employer Employee Total Employer Employee
TOTAL MONTHLY PREMIUM $268,661 $219,689 $48,972 $314,866 $257,183 $57,684
TOTAL ANNUAL PREMIUM $3,223,933 $2,636,272 $587,661 $3,778,396 $3,086,193 $692,203
$ INCREASE N/A N/A N/A $554,463 $449,921 $104,542
% INCREASE N/A N/A N/A 17.2%17.1%17.8%
*Enrollment is for illustrative purposes only. Total premium will change based on final enrollment.
New York Life
Ameriflex
New York Life
Ameriflex
Managed Care Concepts
Work & Well
Managed Care Concepts
Work & Well
IDX
Headspace
IDX
Headspace
Current
BeyondMed
NOT CURRENTLY OFFERED
NO LONGER OFFERED
BeyondMed
Renewal
2
Lifetime Maximum
In Network Out of Network In Network Out of Network In Network Out of Network In Network Out of Network
Calendar Year Deductible (CYD)
Single $250 $500 $1,600 $2,500 $500 $1,000 $1,650 $2,500
Family $500 $1,000 $3,200 $5,000 $1,000 $2,000 $3,300 $5,000
Coinsurance (Member Responsibility)10%30%10%30%20%30%10%30%
Out-of-Pocket Maximum
Single $2,500 $5,000 $3,750 $7,500 $3,000 $6,000 $3,750 $7,500
Family $5,000 $10,000 $7,500 $15,000 $6,000 $12,000 $7,500 $15,000
Non-Hospital Services
Primary Care Physician Office Visit $15 30% after CYD 10% after CYD 30% after CYD $25 30% after CYD 10% after CYD 30% after CYD
Specialist Office Visit $30 30% after CYD 10% after CYD 30% after CYD $50 30% after CYD 10% after CYD 30% after CYD
Virtual Visits No Charge Not Covered $0 after CYD Not Covered No Charge Not Covered $0 after CYD Not Covered
Preventive Services No Charge Not Covered No Charge Not Covered No Charge Not Covered No Charge Not Covered
Laboratory Services (Independent Clinical Lab)No Charge 30% after CYD 10% after CYD 30% after CYD No Charge 30% after CYD 10% after CYD 30% after CYD
Advanced Imaging - CT, PET, MRI $100 30% after CYD 10% after CYD 30% after CYD 20% after CYD 30% after CYD 10% after CYD 30% after CYD
Urgent Care Center $50 30% after CYD 10% after CYD 30% after CYD $50 30% after CYD 10% after CYD 30% after CYD
Hospital Services
Inpatient 10% after CYD 30% after CYD 10% after CYD 30% after CYD 20% after CYD 30% after CYD 10% after CYD 30% after CYD
Outpatient $100 30% after CYD 10% after CYD 30% after CYD 20% after CYD 30% after CYD 10% after CYD 30% after CYD
Physician Services 10% after CYD 30% after CYD 10% after CYD 30% after CYD 20% after CYD 30% after CYD 10% after CYD 30% after CYD
Emergency Room 10% after CYD 10% after INN CYD 10% after CYD 10% after INN CYD
Mental Health/Substance Abuse Services
Inpatient 10% after CYD 30% after CYD 10% after CYD 30% after CYD 20% after CYD 30% after CYD 10% after CYD 30% after CYD
Outpatient Office Visit $15 30% after CYD 10% after CYD 30% after CYD $25 30% after CYD 10% after CYD 30% after CYD
Prescription Drug Benefit
Generic Drugs $10 $10 $10 $10
Formulary Drugs $35 $35 $35 $35
Non-Formulary Drugs $60 $60 $60 $60
Specialty Drugs / Injectables Tier 1-3 Tier 1-3 Tier 1-3 Tier 1-3
Mail Order - 90 Day Supply 2.5x Retail Copay Not Covered 2.5x Retail Copay Not Covered 2.5x Retail Copay Not Covered 2.5x Retail Copay Not Covered
Monthly Rates - Active/Pre-65 Retiree P2 P5
Employee Only 95 12
Employee + 1 33 0
Employee + Family 48 1
Monthly Premium 176 13
Annual Premium
Annual Opt-Out Incentive Expense
Total Monthly Premium*
Total Annual Premium
$ Change
% Change
*Total Monthly Premium Does Not Included Opt-Out Cost.
N/A 19.0%
$2,880,800 $3,427,998
N/A $547,199
$233,067 $277,337
$3,186,352 $141,686
$2,377.67
$223,560 $9,507
21 $84,000
$265,529 $11,807
189 $2,682,721 $114,079
$99,960
$2,215.63 $1,914.39 $2,631.58
$785.79
$1,443.85 $1,247.54 $1,714.91 $1,549.44
$732.24 $632.68 $869.70
(Rx Copays After CYD)
Tier 1-3 Copay +
any amount over
the allowed
amount
Tier 1-3 Copay +
any amount over
the allowed
amount
Tier 1-3 Copay +
any amount over
the allowed
amount
Tier 1-3 Copay +
any amount over
the allowed
amount
(Rx Copays After CYD)
$125 $150
Includes All Costs Includes All Costs Includes All Costs Includes All Costs
Choice Plus Traditional Plan 004 Choice Plus HDHP Plan 005
Unlimited Unlimited Unlimited Unlimited
CURRENT ALTERNATIVE #2
FMIT - UHC FMIT - UHCSchedule of Benefits FMIT - UHC FMIT - UHC
Choice Plus Traditional Plan 002 Choice Plus HDHP Plan 005
City of Dania Beach
Medical Insurance Evaluation - 3-Tier
Effective Date: October 1, 2025
1
City of Dania Beach
Wellness Program Support Evaluation
Effective Date: October 1, 2025
Schedule of Benefits
Eligibility
Funding
Executive Wellness
Screenings (Y/N)
Wellness Challenges/
Campaigns
Marketing/
Promotional Materials
Wellness Screenings are provided to all eligible employees who are on the FMIT medical
plans. This is provided at no cost to the City.
Health Coaching is available for all eligible employees. They are able to provide support with:
Weight Management, Tobacco cessation, Nutrition, Exercise, Stress management, and
Emotional health. Virtual/In-person educational presentations/webinars are also made
available to the City via FMIT's Care24 program and Onsite Health Coach. HTH Advantage is
available to members that manage a chronic condition such as diabetes, asthma or coronary
artery disease, a member of the United Healthcare team may reach out to them to help
identify recommendations to supplement or support their care.
Three wellness challenges are offered annually through FMIT's dedicated Hometown Health
portal every program year. Challenges vary year to year (examples: Invitational-Team Steps,
Rethink Your Drink-Hydration, Five to Thrive- Nutrition, etc).
All promotional/marketing materials are provided by HTH and UHC Coach. Flyers, Brochures,
Email Templates for Email Blasts, Newsletters, and targeted email communications.
HTH Wellness Staff Member and Onsite UHC Health Coach are available to attend
health/wellness fairs to promote participation and engagement in wellness programs and
connect/answer questions about the various tools and resources that are available. Onsite
wellness presentations are open to all City employees.
- Organize Events
- Targeted Communications
CURRENT
Employees on the FMIT Medical Plan
FMIT will not be providing an independent wellness fund, but will continue to offer
Hometown Health (Wellness portal and programming) and corresponding gift card incentives
valued over $120,000
FMIT
RENEWAL
FMIT
Employees on the FMIT Medical Plan
FMIT will not be providing an independent wellness fund, but will continue to offer
Hometown Health (Wellness portal and programming) and corresponding gift card incentives
valued over $120,000
Health Fair
HTH Wellness Staff Member and Onsite UHC Health Coach are available to attend
health/wellness fairs to promote participation and engagement in wellness programs and
connect/answer questions about the various tools and resources that are available. Onsite
wellness presentations are open to all City employees.
Wellness Screenings/Onsite
Clinics
Biometrics (non-members can access onsite biometric screenings at the contracted rate,
billed separately)
Flu Shot
Wellness Screenings are provided to all eligible employees who are on the FMIT medical
plans. This is provided at no cost to the City.
Program Menu
Health Coaching is available for all eligible employees. They are able to provide support with:
Weight Management, Tobacco cessation, Nutrition, Exercise, Stress management, and
Emotional health. Virtual/In-person educational presentations/webinars are also made
available to the City via FMIT's Care24 program and Onsite Health Coach. HTH Advantage is
available to members that manage a chronic condition such as diabetes, asthma or coronary
artery disease, a member of the United Healthcare team may reach out to them to help
identify recommendations to supplement or support their care.
Three wellness challenges are offered annually through FMIT's dedicated Hometown Health
portal every program year. Challenges vary year to year (examples: Invitational-Team Steps,
Rethink Your Drink-Hydration, Five to Thrive- Nutrition, etc).
All promotional/marketing materials are provided by HTH and UHC Coach. Flyers, Brochures,
Email Templates for Email Blasts, Newsletters, and targeted email communications.
Biometrics (non-members can access onsite biometric screenings at the contracted rate,
billed separately)
Flu Shot
Dedicated Wellness
Coordinator (Y/N)Y
Wellness Coordinator Duties - Organize Events
- Targeted Communications
Y
2
City of Dania Beach
Dental Insurance Evaluation - 4-Tier Option
Effective Date: October 1, 2025
Plan Basics In Network Out of Network In Network Out of Network
Annual Benefit Maximum
Orthodontic Lifetime Max
Deductibles
Single $50 $50 $50 $50
Family $150 $150 $150 $150
Yes Yes Yes Yes
Benefits
Class 1 - Preventive / Diagnostic 100%100%100%100%
Class 2 - Basic Services 80%80%80%80%
Class 3 - Major Services 50%50%50%50%
Class 4 - Orthodontia (Up to Age 19)50%50%50%50%
Waiting Period
Class 3 - Major Services
Coverage Clarification
Participation Requirement
Monthly Rates 3T 4T
Employee 125 125
Employee + 1/ EE + Spouse 69 54
Employee + Child(ren)0 32
Employee + Family 58 41
Monthly Premium 252 252
Annual Premium
$ Change
% Change N/A 2.5%
N/A $4,552
$181,065 $185,617
$15,089 $15,468
$108.62 $111.96
N/A $80.60
$72.41 $77.82
$30.34 $32.77
Rate Guarantee Year 2 of 2: Expires 9/30/2025 Year 1 of 1: Expires 9/30/2026
65%65%
Out of Network Benefits Payable Level 80% of UCR 80% of UCR
Endodontic and Periodontic are Covered as:Class 2 Services Class 2 Services
Class 4 - Orthodontia (Up to Age 19)None None
Deductible Waived for Preventive Services?
None None
$1,000 $1,000
$2,000 $2,000
Schedule of Benefits Cigna
Total DPPO
Cigna
Total DPPO
CURRENT BAFO RENEWAL
3
City of Dania Beach
Vision Insurance Evaluation - 4-Tier Option
Effective Date: October 1, 2025
Schedule of Benefits
In Network Out of Network In Network Out of Network
Frequency
(Exam/Lenses/Frames)
Services Copay Reimbursement Copay Reimbursement
Eye Exam $0/$15 Copay Up to $40 $0/$15 Copay Up to $40
Materials $15 Copay N/A $15 Copay N/A
Lenses Copay Reimbursement Copay Reimbursement
Single Lenses $15 Copay Up to $30 $15 Copay Up to $30
Bifocal Lenses $15 Copay Up to $50 $15 Copay Up to $50
Trifocal Lenses $15 Copay Up to $70 $15 Copay Up to $70
Contact Lenses & Frames Allowance Reimbursement Allowance Reimbursement
Frames Up to $100/$150; 20%
off Balance Up to $70 Up to $100/$150; 20%
off Balance Up to $70
Contact Lenses (Elective)Up to $120; 15%
off Balance Up to $84 Up to $120; 15%
off Balance Up to $84
Medically Necessary Paid in Full Up to $300 Paid in Full Up to $300
Rate Guarantee
Monthly Rates 3T 4T
Employee 125 125
Employee + 1 62 50
Employee + Child(ren)0 28
Employee + Family 60 44
Monthly Premium 247 247
Annual Premium
$ Change
% Change
N/A $8.78
-1.3%
$21,307
CURRENT
EyeMed
12 / 12 / 12 Months
$4.39
$12.24
Year 4 of 4: Expires 9/30/2025
$8.33
N/A
N/A
$1,800
$21,595
$4.39
$12.83
$1,776
$8.33
-$288
RENEWAL
EyeMed
12 / 12 / 12 Months
Year 1 of 4: Expires 9/30/2029
4
City of Dania Beach
Basic Life and AD&D Insurance Evaluation
Effective Date: October 1, 2025
CURRENT RENEWAL
Basic Life / AD&D New York Life New York Life
Class Description
Class 1 – F/T EE Working At Least 30
Hours/Week, Excluding
Officals/Commissioners
2 X Salary to a maximum of $200,000 in
increments of $1,000
2 X Salary to a maximum of $200,000 in
increments of $1,000
Class 2 – Elected Officials or
Commissioners
2 X Salary to a maximum of $200,000 in
increments of $1,000
2 X Salary to a maximum of $200,000 in
increments of $1,000
Class 5 – Retiree $5,000 $5,000
Features
Waiver of Premium Included Included
Conversion Privileges Included Included
Accelerated Benefit 75% to Max of Basic Life Benefit 75% to Max of Basic Life Benefit
Age Reduction Schedule (Reduced to):50% at age 70 50% at age 70
Rate Guarantee Year 1 of 3: Expires 9/30/2027 Year 2 of 3: Expires 9/30/2027
Monthly Rates
Basic Life Rate / $1,000 $0.180 $0.180
AD&D Rate / $1,000 $0.020 $0.020
Total Life and AD&D Rate $0.200 $0.200
Estimated Life Volume $24,458,500 $24,458,500
Estimated AD&D Volume $24,458,500 $24,458,500
Total Monthly Premium $4,892 $4,892
Total Annual Premium $58,700 $58,700
$ Change N/A $0
% Change N/A 0.0%
5
City of Dania Beach
Voluntary Life Insurance Evaluation
Effective Date: October 1, 2025
CURRENT RENEWAL
Benefit New York Life New York Life
Active Employees $10,000 to $200,000 in $10,000
increments
$10,000 to $200,000 in $10,000
increments
Spouse $5,000 up $50,000 in $5,000 increments
(cannot exceed 100% of EE amount)
$5,000 up $50,000 in $5,000 increments
(cannot exceed 100% of EE amount)
Child Birth - 6 Months: $500
6 Months - 26: $5,000
Birth - 6 Months: $500
6 Months - 26: $5,000
Guaranteed Issue
Employee $150,000 or 7x salary, whichever is less $150,000 or 7x salary, whichever is less
Spouse $30,000 $30,000
Other Policy Provisions
Age Reduction
(Reduced to):50% at age 70 50% at age 70
Conversion Included Included
Waiver of Premium Included Included
Participation Requirement 20%20%
Rate Guarantee Year 1 of 3: Expires 9/30/2027 Year 2 of 3: Expires 9/30/2027
EE / SP Rates (per $1,000)
<30 $0.090 $0.090
30 - 34 $0.100 $0.100
35 - 39 $0.140 $0.140
40 - 44 $0.210 $0.210
45 - 49 $0.380 $0.380
50 - 54 $0.580 $0.580
55 - 59 $0.940 $0.940
60 - 64 $1.070 $1.070
65 - 69 $1.510 $1.510
70+$3.520 $3.520
Child $0.170 $0.170
*Spouse Coverage ends at age 70.*Spouse Coverage ends at age 70.
6
City of Dania Beach
Short-Term Disability Insurance Evaluation
Effective Date: October 1, 2025
Benefit
Plan Option Option 1 Option 2 Option 3 Option 1 Option 2 Option 3
Weekly Benefit 50% of weekly
earnings
50% of weekly
earnings
60% of weekly
earnings
50% of weekly
earnings
50% of weekly
earnings
60% of weekly
earnings
Maximum Benefit $300 $300 $400 $300 $300 $400
Elimination Period
(Injury / Illness)0 / 7 30 / 30 90 / 90 0 / 7 30 / 30 90 / 90
Minimum Benefit
Maximum Benefit
Period (Injury / Illness)26 weeks 52 weeks 52 weeks 26 weeks 52 weeks 52 weeks
Paid Time Offset
Take-Over/Run-Out Fee
Rate Guarantee
Rates
PEPM 164
Monthly Premium
Annual Premium
$ Change
% Change
CURRENT
Maxon Companies
N/A 0.0%
RENEWAL
Maxon Companies
Unavailable
Plan does not pay a benefit if receiving paid time
(including sick, vacation, PTO, etc.)
Ongoing
$4.25
$8,364 $8,364
N/A $0
$697
N/A
$4.25
$697
Unavailable
Ongoing
Plan does not pay a benefit if receiving paid time
(including sick, vacation, PTO, etc.)
N/A
7
City of Dania Beach
Long Term Disability Insurance Evaluation
Effective Date: October 1, 2025
CURRENT RENEWAL
Long Term Disability New York Life New York Life
Eligibility All, Active Full-Time Employee Working 30 or
More Hours Per Week
All, Active Full-Time Employee Working 30 or
More Hours Per Week
Benefit 60% of monthly earnings 60% of monthly earnings
Elimination Period 180 Days 180 Days
Own Occupation Period 24 Months 24 Months
Duration of Benefit SSNRA SSNRA
Maximum Monthly Benefit $5,000 $5,000
Pre-Existing Condition Limitation 3/12 3/12
Rate Guarantee Period Year 1 of 3: Expires 9/30/2027 Year 2 of 3: Expires 9/30/2027
LTD Rate / $100 $0.320 $0.320
Estimated Volume $1,001,980 $1,001,980
Monthly Premium $3,206 $3,206
Annual Premium $38,476 $38,476
$ Change N/A $0
% Change N/A 0.0%
8
City of Dania Beach
Flexible Spending Account Evaluation
Effective Date: October 1, 2025
CURRENT RENEWAL
Ameriflex Ameriflex
$0 $0
Setup Fee(s)N/A N/A
$170 $170
Daily Daily
Online, Email, Fax, Mail Online, Email, Fax, Mail
$5 $5
Included; Cost Dependent on Location Included; Cost Dependent on Location
Enrollment Kits (Paper, Electronic)Electronic Electronic
Web Administration Included Included
Reporting Capabilities
Reporting on a Monthly Basis; Standard
reporting includes: - Card Generation
Report - Payroll Deduction Report -
Enrollment Report - Reconciliation Account
Balance Report - Transaction Report
Reporting on a Monthly Basis; Standard
reporting includes: - Card Generation
Report - Payroll Deduction Report -
Enrollment Report - Reconciliation Account
Balance Report - Transaction Report
Section 125 Document Fee Included Included
Non-Discrimination Testing Included Included
Run-Out N/A N/A
Dedicated Account Representative N/A N/A
Monthly Premium EE's
Ongoing Ongoing
PEPM Rate (Full Purpose FSA)*17 $4.95 $4.95
PEPM Rate (Limited Purpose FSA)*1 $4.95 $4.95
Monthly Premium 18 $89 $89
$1,239 $1,239
$ Change N/A $0
% Change N/A 0.0%
*$60 Minimum.
**Includes Annual Renewal Fee.
*$60 Minimum.
**Includes Annual Renewal Fee.
Enrollment Meetings (In-Person)
Rate Guarantee
Annual Premium**
Debit Card Fee
Annual Renewal Fee
Processing of Reimbursements (Weekly, Daily)
Claims Submission Method
Mailed Account Statements (Per Paper Invoice)
9
City of Dania Beach
Health Savings Account Evaluation
Effective Date: October 1, 2025
CURRENT RENEWAL
General Information Ameriflex Ameriflex
Administration fee if paid by account holder $1.95 $1.95
Administration fee if paid by employer $1.95 $1.95
Account setup fee $0.00 $0.00
Debit card daily spending limit $5,000.00 $5,000.00
Debit card additional/replacement cost $0.00 $0.00
Brokerage account fees $0.00 $0.00
Excess contribution adjustments $0.00 $0.00
Fee to Transfer N/A N/A
Minimum balance $0.00 $0.00
Interest rate (subject to change)Interest rates change frequently but this
information is available upon request.
Interest rates change frequently but this information is
available upon request.
Account closure fee $25.00 $25.00
Wire transfer Y Y
Investment fund options Y Y
Investment threshold $1,000.00 $1,000.00
Customer service phone number 888-868-3539 888-868-3539
Web address MyAmeriflex.com MyAmeriflex.com
Location Texas Texas
Banking N/A N/A
HSA access at ATMs? (Y/N)Y Y
HSA access at bank branches? (Y/N)Y Y
HSA paper checks? (Y/N)Y Y
HSA website for employers? (Y/N)Y Y
Online employee enrollment? (Y/N)Y Y
HSA website for account holders? (Y/N)Y Y
Run-Out N/A N/A
Rate Guarantee Ongoing Ongoing
10
City of Dania Beach
Employee Assistance Program Evaluation
Effective Date: October 1, 2025
CURRENT RENEWAL
Managed Care Concepts Managed Care Concepts
Eligibility
All Employees & Family Members All Employees & Family Members
Services Included in Pricing
Number of Sessions per Issue Eight (8)Eight (8)
Included Included
Included Included
Included Included
Program Features Included in Pricing
Included Included
Included Included
Employee Communication Materials Included Included
Utilization Reporting Frequency Included Included
Emotional/Psychological Problems Included Included
Family/Relationship Problems Included Included
Alcohol/Drug Abuse Problems Included Included
Legal/Financial Problems Included Included
Underperforming Employee Problems Included Included
Monthly Premium EE's
Ongoing Ongoing
PEPM Rate 175 $2.00 $2.00
$350 $350
$4,200 $4,200
$ Change N/A $0
% Change N/A 0.0%
Wellness Seminars
Eligibility Criteria
Unlimited Telephonic Consultation
On-Site/Virtual Training Hours
Online Services
Management Referrals
Rate Guarantee
Monthly Premium
Annual Premium
Assessment, Consultation and Referral Specialty
Included in Pricing
11
City of Dania Beach
FMLA & Absence Management Evaluation
Effective Date: October 1, 2025
CURRENT RENEWAL
Work & Well Work & Well
40-60 days 40-60 days
$2,495.00 $2,495.00
Included - Dedicated Case Manager, Client
Leave Specialist and Account Manager
Included - Dedicated Case Manager, Client
Leave Specialist and Account Manager
$200 - Up to 55 cases $200 - Up to 55 cases
Included Included
Employee contacts Work & Well and HR can
monitor through portal.
Employee contacts Work & Well and HR can
monitor through portal.
HR can call or open a claim through the portal.HR can call or open a claim through the portal.
Included Included
Included Included
Included Included
Included Included
Included Included
Included Included
Included Included
Included Included
Included Included
Included Included
Included Included
Included Included
Included Included
Included Included
Included - R&C travel expenses may apply.Included - R&C travel expenses may apply.
Included Included
Included Included
Included Included
Included Included
If the number of cases >55 per year, an
overage charge of $250.00/case will apply.
If the number of cases >55 per year, an
overage charge of $250.00/case will apply.
Monthly Premium EE's
Year 1 of 3: Expires 9/30/2027 Year 2 of 3: Expires 9/30/2027
PEPM Rate 175 $1.79 $1.79
$313 $313
$3,759 $3,759
Daily Absence Tracking (Included or Additional Fee)
ADA Administration and Tracking (Included or Additional
Fee)
Non-FML Medical Tracking (Included or Additional Fee)
Other Fees (if applicable)
Clinical Review Process
Review Policy and Procedure
HR Staff, Mgr and Supervisor Training / Support
In-person Trainings
IVR System (24/7)
Implementation Timeline
Dedicated/Assigned Case Manager
Claim Take-Over & Manage Process
Technology Platform
Implementation Fee (if applicable)
Annual Premium
Intake Process/Submission
Employer Process for Intake/Submission
Verify Eligibility Requirements Process
Rate Guarantee
Monthly Premium
Employee Correspondence (Approval / Denial) and
Tracking
Intermittent Leave Tracking Process
Return to Work Coordination
Return to Work ADA Review / Accommodations
Coordinate with Worker's Compensation
Coordinate with Disability
Compliance
Hold Harmless / Indemnification Clause
Eligibility (Electronic) Data Feeds
Reporting of Approval / Denial Timeframe
12
City of Dania Beach
ID Theft Plan Evaluation
Effective Date: October 1, 2025
CURRENT RENEWAL
ID Theft IDX
IDX Complete
IDX
IDX Complete
Service
Concierge Support Included Included
Alerts Included Included
Mobile App Included Included
Monitoring
3B Credit Monitoring/Report Included Included
Credit Lock Included Included
CyberScan Dark Web Included Included
Court Record Included Included
Payday Loans Included Included
Social Security Trace Included Included
Privacy Protection
Social Media Included Included
Password Dectective/Manager Included Included
Tracking Blocker Included Included
Safe Wifi Included Included
ID Theft Event Coverage
Personal Expense $1M $1M
Lawyer Expert Coverage $1M $1M
Recovery
Unlimited Assistance from Recovery Specialists Included Included
Complete Recovery Included Included
Limited Power of Attorney Included Included
Dedicated Recovery Specialist Included Included
Pre-Existing Conditions Covered Included Included
Lost Wallet Included Included
Rate Guarantee Expires 9/30/2025 Year 1 of 2: Expires 9/30/2027
Monthly Premium (ER Paid)EE
Employee Only 170 $6.21 $6.21
Monthly Premium $1,056 $1,056
Annual Premium $12,668 $12,668
Buy-Up EE Paid Option (Monthly)
ER Paid IDX Complete Individual to IDX Complete Family $16.29 $16.29
13
City of Dania Beach
Pet Insurance RFP Evaluation
Effective Date: October 1, 2025
CURRENT RENEWAL
General Information MetLife MetLife
Deductible Annual deductible options: $0 - $750 (in $50 increments); $1,000; $1,250; $1,500;
$2,000; $2,500.
Annual deductible options: $0 - $750 (in $50 increments); $1,000; $1,250; $1,500;
$2,000; $2,500.
Maximum Annual Benefit Annual benefit limits from $500, $1,000 - $25,000 in $1,000 increments. Unlimited
annual limit plans are also available.
Annual benefit limits from $500, $1,000 - $25,000 in $1,000 increments. Unlimited
annual limit plans are also available.
Reimbursement Reimbursement Options: 90%; 80%; 70%; 50%.Reimbursement Options: 90%; 80%; 70%; 50%.
Wellness Exams Included with Preventive Care Rider.Included with Preventive Care Rider.
Preventive Dental Cleanings Included with Preventive Care Rider.Included with Preventive Care Rider.
Vaccinations Included with Preventive Care Rider.Included with Preventive Care Rider.
Spay/Neuter
Spay/Neuter is not included in their Accident and Illness plan. However, if related
to an illness, a spay/neuter procedure can be covered. Spay/Neuter is covered
under the preventative care benefit. Pregnancy is included in our Accident and
Illness plan. However, pregnancy for breeding is not included.
Spay/Neuter is not included in their Accident and Illness plan. However, if related
to an illness, a spay/neuter procedure can be covered. Spay/Neuter is covered
under the preventative care benefit. Pregnancy is included in our Accident and
Illness plan. However, pregnancy for breeding is not included.
Routine Blood Tests Included with Preventive Care Rider.Included with Preventive Care Rider.
X-Rays, MRIs and CT Scans Included Included
Serious/Chronic Illnesses, Including
Cancer and Diabetes Included Included
Surgeries and Hospitalization Included Included
Injuries, Including Cuts, Sprains and
Broke Bones Included Included
Hereditary and Congenital Conditions Included Included
Prescription Medications and
Therapeutic Diets Included Included
Heart-Worm Testing and Prevention Included with Preventive Care Rider.Included with Preventive Care Rider.
Flea and Tick Prevention Included with Preventive Care Rider.Included with Preventive Care Rider.
Waiting Period for Eligibility An employee only has to be an active employee of the company, not actively at
work.
An employee only has to be an active employee of the company, not actively at
work.
Pre-Existing Conditions
The lookback period is anything diagnosed or treated prior to the end of the
waiting period. If member had prior coverage with another provider, pre-existing
conditions wouldn't apply if those conditions were covered by prior provider.
The lookback period is anything diagnosed or treated prior to the end of the
waiting period. If member had prior coverage with another provider, pre-existing
conditions wouldn't apply if those conditions were covered by prior provider.
Minimum Participation Requirement None None
Rates Rates Vary Dependent on Breed, Age of Pet, Zip Code and Plan Design Selected.Rates Vary Dependent on Breed, Age of Pet, Zip Code and Plan Design Selected.
14
City of Dania Beach
6-Year Medical Plan Year Annual Premium Trend
$3
,
4
8
3
,
4
2
0
$3
,
3
3
1
,
8
8
5
$2
,
9
9
8
,
7
0
1
$2
,
9
9
8
,
7
0
1
$2
,
9
6
2
,
7
1
5
$2
,
7
9
6
,
8
0
0
$3
,
3
2
8
,
0
3
8
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
$3,500,000
$4,000,000
2019-2020 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2026
Recommendation
Total Annual Premium Based on Current Enrollment (2019-2025)
Average Premium Inc at 2.69% / Yr Linear (Average Premium Inc at 2.69% / Yr)
1
City of Dania Beach
6-Year Medical Plan Year Annual Employee Premium
$2
3
9
,
4
9
0
.
9
1
$2
1
5
,
5
4
2
.
6
2
$2
1
5
,
5
4
2
.
6
2
$2
1
2
,
9
5
6
.
4
2
$2
0
1
,
0
3
0
.
4
3
$2
3
9
,
7
0
2
.
9
8
$1
2
6
,
8
7
3
.
8
4
$1
1
4
,
1
8
6
.
3
8
$1
1
4
,
1
8
6
.
3
8
$1
1
2
,
8
1
5
.
9
2
$1
0
6
,
4
9
8
.
3
8
$1
2
6
,
4
9
1
.
7
6
$2
8
0
,
5
7
9
.
2
7
$2
5
2
,
5
2
1
.
6
6
$2
5
2
,
5
2
1
.
6
6
$2
4
9
,
4
9
1
.
0
9
$2
3
5
,
5
1
9
.
1
5
$2
7
9
,
9
3
3
.
6
6
$-
$50,000.00
$100,000.00
$150,000.00
$200,000.00
$250,000.00
$300,000.00
2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2026
Recommendation
Annual Employee Premium by Tier (2020-2025)
Employee Only Employee + 1 Employee + Family
2
City of Dania Beach
Parks & Recreation Memorandum
DATE: 7/8/2025
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Cassi Waren, CPRP, Director of Parks and Recreation
SUBJECT: Authorization to execute an agreement for the Construction Manager at Risk
Services for Pre-Construction Management of the PJ Meli Aquatic Complex park
improvements, 2901 SW 52nd St.
Request:
The Parks and Recreation Department is requesting the adoption of a resolution authorizing the
execution of an agreement with Burkhardt Construction, Inc. for the Construction Management
at Risk Services for RFQ 25-011 for construction management of the new construction at PJ
Meli Aquatic Complex, 2901 SW 52nd St in the amount of Eighty-Eight Thousand Six Hundred
and Sixty Dollars ($88,660.00) with a mutually agreed upon Guaranteed Maximum Price
(“GMP”) to provided once the design is complete and establishing the process for construction
services once the GMP is approved; and to exceed the annual vendor expenditure threshold of
fifty thousand dollars ($50,000.00).
Background:
The City of Dania Beach adopted the Parks Master Plan in 2019. This Parks Master Plan
includes the new construction of CW Thomas Park, PJ Meli Aquatic Complex, Chester Byrd
Park and Frost Park.
On May 18, 2021, during the Parks Master Plan Workshop, the City Commission approved the
funding needed for the adopted Parks Master Plan in 2019. The first project of the Parks Master
Plan was the new construction of CW Thomas Park which is underway and schedule to be
complete in January 2026. The next project is the new construction of the PJ Meli Aquatic
Complex which is currently in the design phase of the project.
On Tuesday, June 24, 2025, the City Commission adopted resolution 2025-094 which provided
for the proper City Officials to begin contract negotiations with the topped ranked firm of RFQ
25-011, Burkhardt Construction, Inc.
Administration has agreed to Pre-Construction Services with Burkhardt Construction, Inc. in the
amount of Eighty-Eight Thousand Six Hundred and Sixty Dollars ($88,660.00). The Guaranteed
Maximum Price (GMP) will then be mutually agreed upon when the design is complete and
brought before City Commission as an amendment to the attached agreement at that time.
Budgetary Impact
The funding for the Construction Manager at Risk Pre-Construction Services is available in the
Parks Masterplan Construction Fund and shall be appropriated to Professional Services account
number 302-72-08-572-31-10.
Recommendation
It is recommended that the City Commission adopt the resolution authorizing the execution of an
agreement with Burkhardt Construction, Inc. for the Construction Management at Risk Services
for RFQ 25-011 for construction management of the new construction at PJ Meli Aquatic
Complex, 2901 SW 52nd St in the amount of Eighty-Eight Thousand Six Hundred and Sixty
Dollars ($88,660.00) with a mutually agreed upon Guaranteed Maximum Price (“GMP”) to
provided once the design is complete and establishing the process for construction services once
the GMP is approved; and to exceed the annual vendor expenditure threshold of fifty thousand
dollars ($50,000.00).
RESOLUTION NO. 2025-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING EXECUTION OF AN AGREEMENT
PURSUANT TO CITY REQUEST FOR QUALIFICATIONS (“RFQ”) NO. 25-
011 ENTITLED, “CONSTRUCTION MANAGEMENT AT RISK SERVICES”
FOR CONSTRUCTION MANAGEMENT SERVICES RELATED TO NEW
CONSTRUCTION AT P.J. MELI AQUATIC COMPLEX TO BURKHARDT
CONSTRUCTION, INC., IN THE AMOUNT OF EIGHTY EIGHT THOUSAND
SIX HUNDRED AND SIXTY DOLLARS ($88,660.00) FOR PRE-
CONSTRUCTION SERVICES, WITH A MUTUALLY AGREED UPON
GUARANTEED MAXIMUM PRICE (“GMP”) TO BE PROVIDED ONCE THE
DESIGN REACHES COMPLETION AND ESTABLISHING THE PROCESS
FOR CONSTRUCTION SERVICES ONCE GMP IS APPROVED; AND TO
EXCEED AN ANNUAL VENDOR EXPENDITURE THRESHOLD OF FIFTY
THOUSAND DOLLARS ($50,000.00); PROVIDING FOR CONFLICTS;
FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, pursuant to Resolution No. 2025-094 adopted on June 24, 2025, the City
Commission authorized the City Administration to begin contract negotiations with the top ranked
firm, Burkhardt Construction, Inc., related to RFQ No. 2025-011 entitled “Construction
Management at Risk Services” for PJ Meli Aquatic Complex Park Improvements; and
WHEREAS, the City Administration recommends approval of the Agreement which is
attached as “Exhibit A”, and is made a part of and incorporated into this Resolution by this
reference, in the amount of Eighty-Eight Thousand Six Hundred and Sixty Dollars ($88,660.00)
for Pre-Construction Services, and the structure for development the mutually agree upon GMP,
upon completion of the design; and
WHEREAS, this expenditure will exceed the annual Fifty Thousand Dollars ($50,000.00)
City purchase threshold for a single vendor, requiring City Commission approval.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1.That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2.That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
2 RESOLUTION #2025-_____
Section 3.That the proper City officials are authorized to execute an Agreement with
Burkhardt Construction, Inc. for the Construction Manager at Risk Services for the PJ Meli
Aquatics Center Park Improvements in the amount of Eighty-Eight Thousand Six Hundred and
Sixty Dollars ($88,660.00) for Pre-Construction Services, which amount will exceed the annual
vendor threshold of $50,000.00 and to approve the structure for developing the mutually agreed
upon GMP, upon completion of the design.
Section 4.The funding for the Construction Manager at Risk is available with the
Parks Masterplan Construction Fund and shall be appropriated to Profession Services account
Number 302-72-08-572-31-10.
Section 5.That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 6.That this Resolution shall be effective 10 days after passage.
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
1
CONSTRUCTION MANAGER-AT-RISK CONTRACT
This Contract made and entered into this _______ day of _______________, 2025 between
The City of Dania Beach, a political subdivision of the State of Florida ("Owner"), located at 100
West Dania Beach Boulevard, Dania Beach, Florida 33004, and Burkhardt Construction, Inc.
(“Construction Manager or CM”), a Florida Corporation, having its principal office located at 1400
Alabama Avenue, West Palm Beach, Florida 33401.
WITNESSETH:
WHEREAS, the City of Dania Beach has approved using the Construction Manager at Risk
approach for the project identified in the Request for Qualifications 25-011 ("RFQ"), and
specifically the Scope of Services identified in Article 3 of the RFQ (the “Project"); and
WHEREAS, the Construction Manager has been selected to provide construction
management services for the Project; and
WHEREAS, the City desires to engage the services of the Construction Manager to
provide management of the necessary construction, design, and preconstruction services
(collectively referred to as the “Services”) subject to the terms and conditions set forth in this
Contract and any agreement incorporated into this Contract by reference; and
NOW, THEREFORE, for and in consideration of the mutual promises, covenants and
agreements set forth herein, and for other good and valuable consideration, the receipt and
sufficiency of which are herein acknowledged, the Owner and the Construction Manager agree as
follows:
ARTICLE 1
CONSTRUCTION MANAGER’S SERVICES
AND RESPONSIBILITIES
1.1 GENERALLY
The Construction Manager (CM) is the Owner’s fiduciary responsible for undertaking
all necessary action contemplated under this Contract to (a) establish during the design phase a
Guaranteed Maximum Price (GMP) to construct the Project (construction management) and (b)
ensure timely and quality completion of the project at a cost within the GMP (general contracting).
“Construction Manager” or “CM” as used in this Agreement means Construction
Manager at Risk (CM at Risk).
1.1.1 The intent of this Agreement is that the Construction Manager shall (a) provide all
of those services, furnish any required materials and labor, and enter into and cause to be performed
all Trade Contracts necessary to achieve complete, correct and timely completion of the complete
construction of the Project in accordance with the Contract Documents (the “Work”) and (b)
warrant all of such Work and services as provided herein.
2
1.1.2 The Construction Manager covenants with the Owner to further the interests of the
Owner by furnishing the Construction Manager’s best skill and judgment in cooperation with the
Architect. The Construction Manager agrees to furnish business administration and management
services and to perform in an expeditious and economical manner consistent with the interests of
the Owner.
1.1.3 The Contract Documents ("Contract Documents") consist of this Contract, the
General Conditions, and the following Exhibits, all hereto attached and made a part hereof:
A List of Drawings, Specifications, and Addenda issued prior to execution of this
Contract (incorporated herein by reference)
B Certificate of Insurance- Worker's Compensation and Liability Coverage
C Project Construction Budget/Schedule of Values (GMP)
D Payment and Performance Bonds
E Project Schedule
F Solicitation and Construction Manager’s Response Documents.
1.1.4. By executing this Agreement, the Construction Manager makes the following
express representations and warranties to the Owner:
(a) The Construction Manager is professionally qualified to act as a construction
manager for the Project and has, and shall maintain, any and all licenses, permits or other
authorizations necessary to act as a construction manager for the Project;
(b) The Construction Manager has become familiar with the Project site and the
local conditions under which the Project is to be designed, constructed and operated; and,
(c) The Construction Manager assumes full responsibility to the Owner for the
improper acts and omissions of its consultants, the Trade Contractors, or others employed
or retained by it in connection with the Project.
(d) The Construction Manager accepts the relationship of trust and confidence
established with the Owner by this Contract, and covenants with the Owner to furnish the
Construction Manager's best skill and judgment in furthering the interests of the Owner,
and to cooperate with the Owner and Architect in furthering the interests of the Owner.
(e) The Construction Manager agrees to furnish efficient business administration
and supervision; to furnish at all times an adequate supply of workers and materials; and
to use Construction Manager's best efforts to perform and complete the Project in an
expeditious and economical manner consistent with the interests of the Owner.
1.1.5 Construction Manager understands and agrees that a material inducement for the
Owner entering into this Contract, following a competitive award process authorized under Florida
law, was Construction Manager's representations about its expertise in the scheduling, sequencing
and construction of the Project, as well as its superior familiarity with the unique local conditions
3
and geography of the City of Dania Beach, Florida, and the jobsite area. Construction Manager
understands that time is of the essence in connection with the performance of the Work set forth
in this Contract, and that even a minor breach of its terms may have a substantial, adverse impact
upon the Owner, adjacent merchants, and the seasonal nature of City of Dania Beach's economy,
including the lifestyles of its residents and visitors. Accordingly, Construction Manager hereby
affirms that the foregoing is true and correct, and that all anticipated costs to achieve the schedule
and design intent have been included in the Guaranteed Maximum Price ("GMP") for the Project.
1.1.6 Terms used in the Contract shall have the following meanings:
1.6.1 "Owner" means The City of Dania Beach, Florida, or "City," and the terms may be used
interchangeably;
1.6.2 "Design Professional" shall mean Architect, Engineer and other licensed Design
Professionals engaged by the City;
1.6.3 "Subcontractor" means Trade Contractor, and the terms may be used interchangeably;
1.6.4 "Contract Sum" means Guaranteed Maximum Price ("GMP"), and the terms may be used
interchangeably;
1.6.5 "Construction Team" means Owner, Architect and Construction Manager; and
1.6.6 "Work" means the totality of the obligations, including construction and other services,
imposed on the Construction Manager by the Contract Documents, whether completed or partially
completed, and including all labor, materials, equipment, services, fees, expertise and incidentals
provided or to be provided by the Construction Manager to fulfill the Construction Manager's
obligations.
NOTHING CONTAINED HEREIN SHALL IN ANY MANNER WHATSOEVER
SUPERSEDE, LIMIT OR RESTRICT ANY OTHER REPRESENTATION OR WARRANTY
SET FORTH ELSEWHERE IN THE CONTRACT DOCUMENTS.
ARTICLE 2
CONSTRUCTION MANAGER'S BASIC SERVICES
2.0 The Construction Manager's Basic Services under this Contract include Preconstruction
Phase services, as addressed below, and Construction Phase services.
2.1 Preconstruction Phase Services.
2.1 The Preconstruction Phase. It is the intent of the Construction Manager at Risk project
delivery system to engage the Construction Manager as an active participant in the design process
working with the Owner and Architect/Engineer in achieving a mutually agreed upon project
budget and project scope. The Construction Manager shall:
4
2.1.1 Provide preconstruction deliverables consisting of constructability review, staging and
maintenance of traffic approaches, together with a Guaranteed Maximum Price ("GMP") proposal,
and other items as the parties deem warranted. The Construction Manager shall advise on site use
and improvements, selection of materials, building systems and equipment and methods of Project
delivery. Provide recommendations on relative feasibility of construction methods, availability of
materials and labor, time requirements for procurement, installation and construction, and factors
related to cost including, but not limited to, cost of alternative designs or materials, preliminary
budgets and possible economies as detailed in Subparagraphs 2.1.2 through 2.1.8 below, including
the schedule and a detailed cost estimate.
2.1.2 Review designs during their development. Proactively advise the Architect with regard to
the most effective approach for designing the project regarding issues of onsite use and
improvements, selection of materials, building systems and equipment. Provide recommendations
on relative feasibility of construction methods, compliance with applicable laws, codes, design
standards, and ordinance, availability of materials and labor, time requirements for procurement,
installation and construction and factors related to cost including, but not limited to, costs of
alternative designs or materials, preliminary budgets and possible economies, while maintaining
the Owner's design objectives.
2.1.3 Provide, for the Architect/Engineer's and the Owner's review and acceptance, a Project
Schedule that coordinates and integrates the Construction Manager's services, the
Architect/Engineer's services and the Owner's responsibilities with anticipated construction
schedules. The Construction Manager shall update this schedule periodically, as required.
2.1.4 Prepare for the Owner's approval a detailed estimate of Construction Cost, as defined in
Article 8 herein, developed by using estimating techniques which anticipate the various elements
of the Project, and based on design documents prepared by the Architect/Engineer. Update and
refine the estimate at 30%, 60% and 90% Construction Documents, or as otherwise mutually
agreed upon by the parties. Advise the Owner and the Architect/Engineer if it appears that the
Construction Cost may exceed the Project budget. Make recommendations for corrective action.
2.1.5 Coordinate Contract Documents by consulting with the Owner and the Architect/Engineer
regarding Drawings and Specifications as they are being prepared, and recommending alternative
solutions whenever design details affect construction feasibility, cost or schedules.
2.1.6 The Construction Manager agrees that time is of the essence in maintaining the project
schedule. In an effort to achieve the project schedule, the Architect/Engineer will rely upon the
input and recommendations of the Construction Manager in preparing the project documents,
recognizing that cost is one of a number of issues which will influence the selection of building
components and systems.
2.1.7 It is incumbent upon the Construction Manager to advise the Architect/Engineer of
recommended building components and systems before the design professionals have
comprehensively documented the materials, systems and equipment within the project.
5
2.1.8 Develop a Project Construction Schedule providing for all major elements such as phasing
of construction and times of commencement and completion required of each Trade Contractor.
Provide the Project Construction Schedule for each set of bidding documents. Review the drawings
and specifications and make recommendations as required to provide that (1) the Work of the
separate Trade Contractors is coordinated, (2) all requirements for the Project have been assigned
to the appropriate separate Trade Contract, (3) the likelihood of disputes has been minimized, and
(4) develop a plan for the phasing of construction if phasing is required.
2.1.8.1 Establish a schedule for the purchase of materials and equipment requiring long lead time
procurement and coordinate the schedule with the early preparation of portions of the Contract
Documents by the Architect/Engineer. Expedite and coordinate delivery of these purchases.
2.1.9 Provide an analysis of the types and quantities of labor required for the Project and review
the availability of appropriate categories of labor required for critical phases. Develop bidding
packages designed to minimize adverse effects of labor shortages.
2.1.10 Make recommendations for pre-qualification criteria for bidders and develop bidders'
interest in the Project. Establish bidding schedules. Provide the Project Construction Schedule for
each set of Bidding Documents.
2.1.11 With the Architect’s assistance, receive bids, prepare bid analyses and make
recommendations to the Owner concerning the qualifications of Trade Contractors or rejection of
bids.
2.1.12 Schedule and conduct monthly meetings of the Construction Team and prepare and
distribute minutes.
2.1.13 Based upon Drawings and Specifications produced by the Architect/Engineer, develop a
GMP proposal(s) at 90% Construction Documents, or as otherwise mutually agreed upon by the
parties, including, a Project Construction Schedule, itemized by Trade Contract, for phases of
Work as required by the Owner. If the documents as prepared by the Architect/Engineer are not
adequate for the development of a Guaranteed Maximum Price, the Construction Manager shall
notify the Owner immediately, prior to developing the GMP. All assumptions made by the
Construction Manager in the development of the GMP shall be specifically listed in the GMP
proposals, and the GMP will not be adjusted due to assumptions made by the Construction
Manager, but not included in the GMP proposal.
2.1.13.1 If the GMP proposal is accepted, in writing, by the Owner, it will become an Amendment
to this Contract which will establish the GMP and Contract Time for the Work. A Public
Construction Bond acceptable to Owner must be executed simultaneously with the GMP
Amendment.
2.1.13.2 If the GMP proposal is not accepted by the Owner, the Owner shall notify the
Construction Manager in writing. The Construction Manager shall then recommend adjustments
to the Work through value engineering. The Construction Team and Owner will discuss and
negotiate these recommendations for no more than sixty (60) calendar days, unless an extension is
6
granted in writing by the Owner. If an acceptable GMP is not developed, negotiations may be
terminated, and the Owner may initiate negotiations with another Construction Manager or solicit
the work.
2.2 Construction Phase Services.
Unless otherwise authorized by the Owner, in writing, all Work shall be performed under
Trade Contracts with the Construction Manager. The Construction Manager shall not bid on any
of the Trade Contractor Work, or perform such Work with its own forces, without prior written
notification and consent of the Owner. During the Construction Phase of the Project, the
Construction Manager shall perform the following services.
2.2.1 Administer the Construction Phase as provided herein and in the General Conditions of the
Contract.
2.2.2 Commence the Work within ten (10) calendar days after receipt of a written Notice to
proceed from the Owner.
2.2.3 With respect to work to be subcontracted by Construction Manager: a) Develop procedures
that are reasonably acceptable to the Owner for the prequalification of Trade Contractors; b)
Develop Trade Contractor interest in the Project, and conduct pre-bid conferences with interested
bidders to review the documents; c) Take competitive bids on the Work of the various Trade
Contractors or, if specifically authorized by the Owner, in writing, negotiate for the performance
of that Work; d) Construction Manager may require bidders to submit bid bonds or other bid
security acceptable to the Construction Manager as a prerequisite to bidding on the Work; e)
Analyze and evaluate the results of the various bids and their relationship to budgeted and
estimated amounts, and prepare for review with the Owner and Architect bid tabulation analysis
and such other support data as necessary to properly compare the various bids and their
responsiveness to the desired scope of Work; f) Review the scope of Work in detail with apparent
low responsive bidders to determine that their bids are complete but do not include duplicate scope
items; g) Maintain records of all pre-award interviews with apparent low bidders; h) Promptly
award and execute Trade Contracts with approved Trade Contractors; i) Provide copies of fully
executed Trade Contracts, insurance certificates, and bonds, to the Owner.
2.2.4 With respect to the scheduling, sequencing, and coordination of the Work: a) Manage,
schedule and coordinate the Work, including the Work of the Trade Contractors, and coordinate
the Work with the activities and responsibilities of the Owner, Architect and Construction Manager
in order to complete the Project in accordance with the Owner's objectives of cost, time, and
quality as set forth in the Contract Documents; b) Develop and maintain a program, acceptable to
the Owner and Architect, to assure quality control of the Work; c) Supervise the Work of all Trade
Contractors so that the work conforms to the requirements of the plans and specifications; d)
Provide instructions to each Trade Contractor when its Work does not conform to the requirements
of the plans and specifications so that the work conforms to the requirements of the plans and
specifications, and continue to manage each Subcontractor to ensure that corrections are made in
7
a timely manner so as to not affect the progress of the Work; e) Should disagreement occur between
the Construction Manager and the Architect over acceptability of Work and conformance with the
requirements of the specifications and plans, the Owner shall be the final judge of performance
and acceptability, and the Owner's decision thereon shall be final and binding.
2.2.5 Maintain exclusively for this Project adequate, competent staff at the Project site to
coordinate and direct the Work and progress of the Trade Contractors on the Project. The
Construction Manager shall maintain sufficient off-site support staff, and competent staff at the
Project site authorized to act on behalf of the Construction Manager to coordinate, inspect and
provide general direction of the work and progress of the Subcontractors and shall provide no less
than those personnel during the respective phases of construction that are set forth in Exhibit "F"
to this Contract. Construction Manager shall not change any of those persons named in Exhibit
“F” unless mutually agreed to by the Owner and Construction Manager, in writing. In such case,
the Owner shall have the right of approval of the qualifications of replacement personnel. All of
the Construction Manager's on-site management and supervisory personnel shall be consistent
with the solicitation response that preceded the execution of this Contract and shall not be removed
or replaced without the Owner's written consent. The Owner shall have the right to direct the
Construction Manager to remove or replace any on-site personnel whose performance becomes
unsatisfactory to the Owner. In such event, the Construction Manager shall promptly replace such
personnel, without entitlement to additional compensation or additional time for the replacement.
2.2.5.1 Establish and maintain a) on-site organization and lines of authority in order to carry out
the overall plans of the Construction Team; b) Identify an on-site staff member to represent the
Construction Manager, on a daily basis, with authority to negotiate Change Orders and contract
modifications on behalf of the Construction Manager; c) Make available such executive
personnel as necessary to execute Change Orders or other contract modifications on behalf of the
Construction Manager so as not to delay the progress of the Work.
2.2.6 Establish and maintain a) procedures for coordination among the Owner, Architect, Trade
Contractors and Construction Manager with respect to all aspects of the Work; b) Implement such
procedures, incorporate them into a Project resource manual, and distribute manuals to the
Construction Team.
2.2.6.1 Require of the various Trade Contractors such Coordination Drawings as may be necessary
to properly coordinate the Work among the Trade Contractors.
2.2.6.2 In collaboration with the Architect, establish and implement procedures for tracking and
expediting the processing of shop drawings, samples, Requests for Information ("RFI"), and other
submittals as required by the General Conditions of the Contract.
2.2.7 Schedule and conduct weekly or more frequent progress meetings with Trade Contractors
to review such matters as job procedures, job safety, construction progress, schedule, shop drawing
status and other information as necessary. Construction Manager shall provide prior notice to
Owner and Architect of all such meetings and prepare and distribute minutes. Additionally,
Construction Manager shall schedule and attend Team meetings with the Architect and Owner.
8
2.2.8 Review the Project schedule with the various Trade Contractors and review, or expand, the
level of detail to incorporate specific Trade Contractor input consistent with the overall completion
requirements. Construction Manager shall regularly monitor and update the Project Schedule and
various sub-networks as construction progresses, identify potential variances between scheduled
and probable completion dates, review schedule for Work not started, or incomplete, and make
adjustments in the schedule to meet the scheduled completion date. Construction Manager shall
provide summary reports of each monitoring and document all changes in schedule and prepare
regular schedule updates and reporting which shall be included as part of the monthly Project
report outlined in Subparagraph 2.2.16 herein.
2.2.9 Determine the adequacy of the Trade Contractors' personnel and equipment, and the
availability of materials and supplies to meet the schedule. In consultation with the Owner and the
Architect, take necessary corrective actions when requirements of a Trade Contract or a Trade
Contract Schedule are not being met.
2.2.10 If applicable, whenever Owner-Furnished Contractor-Installed ("OFCI") materials or
equipment are shipped to the Project site, the Construction Manager shall notify the Owner and
shall be responsible for their inspection, proper storage, and incorporation into the Work, provided
the scope of the OFCI work is included within the Guaranteed Maximum Price.
2.2.11 Develop and maintain an effective system of Project cost control which is satisfactory to
the Owner. Revise and refine the initially approved Project Construction budget, incorporate
approved changes as they occur, and develop cash flow reports and forecasts as needed. Identify
variances between actual and budgeted or estimated costs and advise Owner and Architect
whenever projected costs exceed budgets or estimates. Cost Control reports shall be included as
part of the monthly Project report outlined in Subparagraph 2.3.16 herein.
2.2.12 Maintain a system of accounting satisfactory to Owner and consistent with generally
accepted construction accounting principles. The Construction Manager shall preserve all
accounting records for a period of four (4) years after final acceptance of the Work or as otherwise
requested in writing by the Owner. The Owner, or the Owner's auditors shall have access to all
such accounting records, supporting documentation, correspondence, subcontracts, purchase
orders, and other things relating to this Contract, at any time during regular business hours, both
throughout the performance of the Work, and for a period of four (4) years after final payment of
the Work.
2.2.13 Develop and implement a system for the preparation, review and processing of Change
Orders. Without assuming any of the Architect's responsibilities for, among other things, design,
recommend necessary or desirable changes to the Owner and the Architect, review requests for
changes and submit recommendations to the Owner and Architect.
2.2.13.l When requested by the Owner or Architect, promptly prepare and submit informal
estimates of probable cost for changes proposed in the Work including similar estimates from the
Trade Contractors. If directed by the Owner, promptly secure formal written Change Order
Proposals from such Trade Contractors.
9
2.2.14 Be responsible for initiating, maintaining and supervising effective safety programs and
require similar programs of the Trade Contractors and Sub-subcontractors. The OSHA guidelines
shall serve as the basis for the construction safety program. If the Owner implements an Owner
Provided Insurance Program as provided for in Article 11, the Construction Manager shall
cooperate with the safety representatives of the Owner's Insurance Administrator and/or the
Owner's insurance carrier(s) in the course of construction site inspections and in all other matters
related to job safety and accident prevention.
2.2.14.1 Promptly notify the Owner and, where applicable, the Owner's Insurance
Administrator, in writing, upon receiving notice of filing of any charge of non-compliance from
OSHA, or upon receiving notification that a federal or state inspector shall visit or is visiting the
Project site.
2.2.14.2 At progress meetings with Trade Contractors, conduct a review of job safety and
accident prevention, and prepare minutes of such meetings that will be available to the Owner's
Representative on request. The minutes of job safety and accident prevention portion of such
progress meetings shall be made available to the Owner's Insurance Administrator, where
applicable, upon request.
2.2.14.3 Designate a full-time staff member as the Project safety director who shall oversee
job safety and accident prevention for the Construction Manager, Trade Contractors and Sub-
subcontractors involved in the Work, in addition to any other responsibilities assigned to such staff
member.
2.2.15 Make provisions for Project security acceptable to the Owner, to protect the Project site
and materials stored off-site, or on-site, against theft, vandalism, fire and accidents, damage, or
injury to person(s) or property, etc., as required by job and location conditions.
2.2.16 Record the progress of the Project. Submit written monthly progress reports to the Owner
and the Engineer including information on the Trade Contractors' Work, the percentage of
completion, current estimating, computerized updated monthly Critical Path Method scheduling
and Project accounting reports, including Estimated Time to Completion and Estimated Cost to
Complete. Keep a daily log available to the Owner and the Architect. Report and record such
additional information related to construction as may be requested by the Owner.
2.2. 17 When the Construction Manager considers each Trade Contractor’s Work or a designated
portion thereof Substantially Complete, the Construction Manager shall prepare for the Architect
a list of incomplete or unsatisfactory items and a schedule for their completion. The Construction
Manager shall assist the Architect in conducting inspections for Substantial and Final Completion.
After the Architect certifies the Date of Substantial Completion of the Work, the Construction
Manager shall coordinate the correction and completion of the Work and shall be fully responsible
for same.
2.2.18 The Construction Manager shall be responsible for the removal, encapsulation,
transportation and disposal of any hazardous material, including, without limitation, lead-based
paint, and any asbestos or asbestos-related products as may be required in connection with the
10
Work. Hazardous material, described by federal guidelines brought by the Construction Manager
or the Trade Contractors shall remain their responsibility for proper disposal. Any hazardous
material not specifically shown on the documents, or which was not discovered or should have
been discovered during performance of the Pre-Construction Agreement, shall be considered a
concealed condition and may become the responsibility of the Construction Manager in a Change
Order to increase the Guaranteed Maximum· Price for any additional costs incurred in connection
therewith. Such Change Order shall be submitted in as timely a manner as is reasonably possible
after discovery of the concealed condition, as more particularly set forth in the General Conditions.
Owner is not aware of any hazardous materials located on the Project site.
2.2.19 Following the Architect’s issuance of a Certificate of Substantial Completion for the
Project or designated portion thereof evaluates the completion of the Work of the Trade
Contractors and make recommendations to the Architect when Work is ready for final inspection.
Assist the Architect in conducting final inspections. Secure and transmit to the Owner required
guarantees, affidavits, releases, bonds and waivers. Deliver all keys, manuals, record drawings and
maintenance stocks to the Owner.
2.2.20 The Construction Manager shall prepare a complete Project Manual to the Owner’s
satisfaction.
ARTICLE 3
ADDITIONAL SERVICES
3.1 Upon the mutual agreement of the Owner and the Construction Manager, and upon written
authorization from the Owner, the Construction Manager shall provide additional services that are
beyond the scope of the Basic Services described in Article 2 herein. The Construction Manager
shall be compensated for such additional services by Change Order to be negotiated by the Owner
and the Construction Manager at the time of the additional service request, as set forth in the
General Conditions.
ARTICLE 4
OWNER'S RESPONSIBILITIES
4.1 The Owner will designate a representative to act in its behalf. This representative, or his/her
designee will receive progress reports of the Work from the Construction Manager, serve as liaison
with the Construction Manager and the Architect, receive and process communications and
paperwork, and represent the Owner in the day-to-day conduct of the Project. The Construction
Manager will be notified in writing of the representative and of his/her designee, or any changes
thereto.
4.2 The Owner shall retain an Architect whose services, duties and responsibilities shall be
described in the agreement between the Owner and the Architect. A copy of the Owner Architect
Agreement will be furnished to the Construction Manager upon request.
4.3 If the Owner observes or otherwise becomes aware of any fault or defect in the Contract
Documents or the Project or any nonconformance with the Contract Documents, reasonable notice
11
thereof shall be given by the Owner to the Construction Manager and the Architect.
Notwithstanding this provision, nothing herein shall relieve the Construction Manager from any
obligations set forth in this Agreement. Likewise, if the Construction Manager observes or
otherwise becomes aware of any fault or defect in the Contract Documents or the Project or of any
nonconformance with the Contract Documents, reasonable notice thereof shall be given by the
Construction Manager to the Owner and the Architect.
ARTICLE 5
SCHEDULE
5.1 Preconstruction Phase. The Construction Manager shall complete the performance of
Preconstruction Phase Services not later than September 30, 2026, following issuance of written
notice to proceed from the Owner and Guaranteed Maximum Price Proposal within ninety (90)
calendar days after the Architect/Engineer documents (at 90% completion) have been made
available to the Construction Manager.
5.2 Construction Phase. The performance of the Work under the Construction Phase of this
Contract shall be substantially completed by the Construction Manager on or before the date as
later set forth in the GMP Amendment, time being of the essence in this Contract.
5.3 The Construction Manager agrees to complete the Work in accordance with the agreed
upon substantial completion date set forth in Exhibit "E,” which exhibit will be attached to this
Agreement, after the determination of the GMP. The Construction Manager acknowledges that
time is of the essence throughout this Contract, and that failure to complete the Project within the
time set forth in the approved schedule will result in substantial damages to the Owner that are
impossible to precisely ascertain. Upon failure of the Construction Manager to substantially
complete the Project within the specified period of time, plus approved time extensions,
Construction Manager shall pay to the Owner, as liquidated damages and not as a penalty, the sum
of one thousand dollars ($1,000.00) for each calendar day in excess of the established substantial
contract completion date, plus approved time extensions. After achieving substantial completion,
as more particularly addressed in GC 71 and its several subparts, should Construction Manager
fail to complete the remaining Work within the time specified for final completion in Exhibit "E,",
plus approved time extensions, if any, and after providing Construction Manager with seven (7)
calendar days advance written notice, Owner shall have the right to complete the work through
other means, and the costs therefore shall be set-off against retainage remaining in the contract
balances, which, if insufficient, the balance shall be paid to Owner by Construction Manager, or
its performance bond Surety.
5.4 The Owner may direct the Construction Manager to expedite the Work by whatever means
the Construction Manager may use, including, without limitation, increasing staffing or working
overtime to bring the Work back within the agreed construction schedule. If expediting the Work
is required due to reasons within the control or responsibility of the Construction Manager, then
the additional costs incurred shall be chargeable to the Cost of the Work as part of, and subject to
the GMP. If the expediting of the Work is required due to reasons outside the control or
responsibility of the Construction Manager, then in such event, the additional costs incurred shall
12
be the subject of an appropriate adjustment by Change Order, as elsewhere provided for in the
General Conditions.
5.5 The Owner shall have the right to occupy, or use, any portion of the Work prior to
completion of the Project. If use or occupancy ahead of schedule affects the cost of the Project or
the schedule for the Work, the Construction Manager shall so notify the Owner, in writing, and
the use or occupancy will be treated as a Change to the Work in accordance with Article 9, herein.
ARTICLE 6
GUARANTEED MAXIMUM PRICE
6.1 The "Guaranteed Maximum Price" (GMP), also referred to as the Contract Sum, includes
Cost of the Work required complete construction of the Project in accordance with such drawings
and specifications. Said Guaranteed Maximum Price shall include the following: (a) The cost of
all labor, equipment, material and supplies necessary for, or utilized in, construction of the Project
whether performed or furnished by the Construction Manager, the Trade Contractors, vendors,
suppliers or others; (b) the General Conditions costs as set forth in the Construction Manager’s
proposal to the Owner and as accepted by the Owner; and, (c) the Construction Manager’s fee as
set forth in the Construction Manager’s proposal to the Owner and as accepted by the Owner. It is
the intent of this provision that the Guaranteed Maximum Price shall include the complete and
total cost of constructing the Project in accordance with all requirements of the Contract
Documents. The GMP is guaranteed by the Construction Manager not to exceed the amount
established herein, subject to additions and deductions by Change Order as provided for elsewhere
in this Contract. Costs which would cause the GMP to be exceeded shall be paid by the
Construction Manager without recourse or reimbursement by the Owner.
6.1.1 The Construction Manager's Fixed Fee for performance of the Work shall be set forth in the
GMP Amendment.
6.2 The GMP will only include those taxes in the Cost of the Work which are legally enacted
at the time the GMP is established.
6.3 If and only in the event that this Project is substantially complete within the scheduled
substantial completion date, as may be adjusted as provided for elsewhere herein, the following
shared savings provisions shall apply: Upon final completion of the Work, if the total cost of the
Work (excluding any unused portion of the Contingency Fund) is less than the Guaranteed
Maximum Price, taking into account any adjustments made during the term of this Contract, as
provided for elsewhere herein, the Owner and Construction Manager will be entitled to share this
savings, as follows: Construction Manager will receive an amount equal to 50% of the difference
between the actual cost of the Work and the final GMP amount (excluding any unused portion of
the Contingency Fund), not to exceed, in any event, three percent (3%) of the adjusted GMP
amount (excluding any unused portion of the Contingency Fund). Construction Manager's portion
of these shared savings will be added to Contractor's Fee and included in Construction Manager's
Final Payment. Liquidated damages, if any, are different from, and are not a part of, this
calculation.
13
6.4 The GMP shall include an agreed upon sum as the "Construction Contingency Fund"
which may be utilized, upon written approval beforehand by Owner, which approval shall not be
unreasonably denied, for the purpose of defraying the expenses due to unforeseen circumstances
relating to construction such as, but not necessarily limited to, increases in Subcontractor
costs due to insolvency, correction of defective work (provided that such defective Work was not
caused by the negligence or failure to fulfill a specific responsibility of the Construction Manager),
and only to the extent that the costs therefore are not recoverable by Construction Manager
from insurance, sureties, Subcontractors or suppliers, through commercially reasonable efforts),
overtime ordered by the Owner to improve the schedule but not to make up for lost time due to
Construction Manager's delays, field issues/conditions which were not anticipated and which
result in documented costs to the Work, Owner Furnished/Contractor Installed ("OFCI") material
or OFCI equipment failures, and any other cost agreed to mutually by the parties, in writing. The
Contractor shall furnish documentation evidencing expenditures charged to this Contingency prior
to the release of funds by the Owner. The necessary documentation, and the sufficiency thereof,
required for using the Construction Contingency fund shall be reasonably determined by the
Owner. The Design Professional shall verify the actual costs, if requested by Owner.
6.5 Without limiting the reasons for Owner denying a request for funding from the
Construction Contingency, and by way of illustration only, the Construction Contingency shall not
be used for a) design errors or omissions; b) Construction Manager/Sub- Contractor mistakes in
the fabrication, installation, or erection of the Work; c) liquidated damages; and d) any costs and
expenses in the event that this Contract is terminated for cause, as elsewhere provided for herein.
6.6 The GMP shall be reduced by the amount of the Contingency fund, if any, remaining at the
time of Final Completion of the Project.
6.7 Within sixty (60) days after receipt from the Construction Manager of the Guaranteed
Maximum Price, the Owner may reject same and may, in its discretion, terminate this Agreement
for convenience. Notwithstanding any other provision of this Agreement, in the event of such
termination, the Owner shall pay the Construction Manager the lump sum of $50,000.00 which
shall constitute the full and complete compensation due Construction Manager of every kind and
nature, for work performed, or expenses incurred, prior to such termination.
6.8 By execution of this Contract, the Construction Manager certifies that all factual unit costs
supporting the fees specified in this Contract are accurate, complete and current at the time of
negotiations; and that any other factual unit costs that may be furnished the Owner in the future to
support any additional fees that may be authorized will also be accurate and complete. The fees
specified in this Contract and any additional fees that may be authorized in the future shall be
adjusted to exclude any significant sums by which the Owner determines the fee was increased
due to inaccurate, incomplete, or non-current factual unit costs.
6.9 Adjustments to the GMP will be made as described in the Conditions of the Contract.
14
6.10 Absent rejection of the Guaranteed Maximum Price by the Owner within the time set forth
in Paragraph 6.7 hereinabove, the Guaranteed Maximum Price shall constitute an agreement by
the Construction Manager to construct the Project in strict accordance with all requirements of the
Contract Documents for a sum not to exceed the Guaranteed Maximum Price.
ARTICLE 7
PAYMENTS TO CONSTRUCTION MANAGER
7.1 In consideration of the performance of the Contract, the Owner agrees to pay the
Construction Manager, as compensation for its services as set forth below:
7.1.1 For preconstruction services, the total sum amount of $88,660.00 to be paid in the amounts
specified at the satisfactory completion of the following phases:
Preconstruction Progress Meetings $19,320.00
Constructability Reviews / Value Engineering and Cost Estimates $24,160.00
Traffic Control Plan and Public Outreach $ 2,320.00
Preconstruction Scheduling $ 6,960.00
Guaranteed Maximum Price Development $35,900.00
TOTAL: $88,660.00
7.1.1.1 Upon receipt of the Notice to Proceed after the creation of the GMP, the Construction
Manager shall begin providing the indemnification described in the Conditions of the Contract, as
part of the fee established for the first phase of preconstruction services.
7.1.2 Upon acceptance of the GMP, the amount established in the GMP Amendment to this
Contract, which includes the Construction Manager's fee and Lump Sum General Conditions as
described in Paragraph 7.2 and the Cost of the Work as described in Article 8, to be paid monthly
as described in the General Conditions of the Contract.
7.1.2.1 As required by Section 287.0585, F.S., within seven working days from receipt of payment
from the Owner, the Construction Manager shall pay each Trade Contractor out of the amount paid
to the Construction Manager on account of such Trade Contractor's Work, the amount to which
said Trade Contractor is entitled reflecting the percentage actually retained, if any, from payments
to the Construction Manager on account of said Trade Contractor's Work. The Construction
Manager shall, by appropriate Contract with each Trade Contractor, require each Trade Contractor
to make payments to its subcontractors in a similar manner.
7.1.3 Pay requests for preconstruction services and for construction shall be documented in
accordance with the General Conditions.
7.2 Construction Manager's Lump Sum General Conditions during the Construction Phase
includes, without limitation, the following:
15
7.2.1 The cost of its home or branch office employees or consultants not at the Project site,
including the cost of all benefits, insurance, and taxes attributable to wages and salaries and other
company overhead expenses for said home office employees.
7.2.2 The cost of its field employees identified in Subparagraph 2.2.5 herein, or their approved
replacements, including the cost of all benefits, insurance, and taxes attributable to wages and
salaries for said field employees.
7.2.3 General operating expenses of the Construction Manager's principal and branch offices
other than the field office.
7.2.4 Any part of the Construction Manager's capital expenses, including interest on the
Construction Manager's capital employed for the Work.
7.2.5 Overhead and profit, or general expenses of any kind, except as may be expressly included
in Article 8, herein, as Cost of the Work.
7.2.6 All travel and per diem costs of Construction Manager's employees and consultants.
7.2.7 Those services set forth in Article 2.2.
7.2.8 Expenses such as long distance telephone calls, telephone service at the site, postage, office
supplies, expressage, and similar items in connection with the Work.
7.2.9 Cost of equipment such as laptops, cameras, radios, computers, cell phones, copiers,
telephones, dictating units, trailers, vehicles and furniture purchased or rented by the Construction
Manager.
7.2.10 Administration of direct tax savings purchase program.
7.2.11 All costs incurred during the guarantee period after construction.
7.3 Adjustments in the Lump Sum General Conditions associated with compensable Changes
in the Work, or compensable delays, shall be made as described in the General Conditions of the
Contract, and in strict accordance therewith.
ARTICLE 8
COST OF THE WORK
8.1 The term "Cost of the Work" shall mean direct construction costs, including Lump Sum
General Conditions as more specifically addressed in 7.2 et. seq. above, and in 8.1.2 below,
incurred specifically in and about the performance of the Work, and paid or incurred by the
Construction Manager, less any reimbursement for scrap value and cash or trade discounts, subject
to Article 10, herein. Excluding those individuals included in the Lump Sum General Conditions,
8.1.2 below, the term "wages" used herein shall include the straight time and overtime pay
authorized in writing by the Owner, and the cost of associated employee benefits. Excluding those
16
individuals included in the Lump Sum General Conditions, employee benefits include, but are not
limited to, unemployment taxes, social security taxes, compensated absences, and other mandatory
and customary contributions and fringe benefits insofar as such costs are based on wages, salaries,
or other remuneration paid to employees of the Construction Manager, excluding bonuses.
Employee benefits do not include Workers' Compensation insurance when such insurance is
provided by the Owner in accordance with Article 11.
8.1.1 Subject at all times to the amount of the GMP, the Owner agrees to pay the Construction
Manager for the reimbursable Costs of the Work as defined in Article 8, herein, and its subparts,
through completion of the Work, plus the Construction Manager's Fixed Fee.
8.1.2 For Construction Phase services, as more particularly set forth in Article 2.2 and its
subparts, above, and further including those line items in Exhibit "C" designated as Lump Sum
General Conditions, the Construction Manager shall be paid a lump sum amount (included in the
GMP and as set forth in the GMP Amendment, in installments, as provided for elsewhere in these
Contract Documents, which amount is subject to the Contract audit provisions for the limited
purposes of verifying the Construction Manager's warrants and representations set forth in Article
6.7 above. This Lump Sum General Conditions amount preempts, disables and governs those
reimbursable Costs of the Work set forth in Article 7.2, et. seq. and this Article 8, and its subparts.
In the event that those specified reimbursables conflict with, or are subsumed by this Lump Sum
General Conditions, it is the intention of the parties that the Lump Sum will not be adjusted for
any reasons whatsoever during the Construction Phase, except and solely for compensable Change
Orders and compensable delays, if any, that increase the GMP, and extend the contract completion
date in excess of thirty (30) calendar days, in the aggregate, beyond the agreed Substantial
Completion date set forth in the GMP Amendment. In the event that the Lump Sum is exceeded
by actual costs for such items incurred by the Construction Manager, there shall be no entitlement
to reimbursement from the Owner by way of Change Order, Claims, requests for equitable
adjustments, or from the Construction Contingency.
8.2 Cost of the Work includes, and is limited to, actual documented expenditure for the
following cost items (all subparts below shall be preceded by the phrase "Except and to the extent
governed by 8.1.2 above ... ":
8.2.1 Subject to prior written approval by the Owner, wages paid for labor in the direct employ
of the Construction Manager at the construction site other than those provided under Paragraph
7.2, herein, as a part of the Construction Manager's Fixed Fee in the performance of the Work
under applicable collective bargaining agreements, or under a salary or wage schedule agreed upon
by the Owner and Construction Manager, and including benefits, if any, as may be payable with
respect thereto.
8.2.2 The cost of all materials, supplies and equipment incorporated into the Work or stored on
site, including cost of transportation and storage thereof. At the Owner's sole discretion, the Owner
may make payment for materials, supplies and/or equipment stored off-site and bonded.
8.2.3 Payments made by the Construction Manager to Trade Contractors for their Work
performed pursuant to Trade Contracts with the Construction Manager.
17
8.2.4 Cost of the premiums for all insurance or bonds including Trade Contractor bonds which
the Construction Manager is required to procure by this Contract, or other insurance or bonds
subsequently deemed necessary by the Construction Manager, and agreed upon by the Owner, in
writing. The cost of insurance for the Construction Manager, Trade Contractors, and Sub-
subcontractors at any tier in the Work shall be excluded for any insurance to be provided by the
Owner in accordance with Article 11 herein.
8.2.5 Sales, use, gross receipt, or similar taxes related to the Work imposed by any governmental
authority and for which the Construction Manager is liable.
8.2.6 Building and operating permit fees, inspection and filing fees, sewer and water fees, and
deposits lost for causes other than the Construction Manager's own negligence.
8.2.7 Cost of removal and disposal of all debris including clean-up and trash removal.
8.2.8 Cost incurred due to an emergency affecting the safety of persons and/or property.
8.2.9 Subject to prior written approval by Owner, which shall not be unreasonably withheld,
legal costs reasonably, and properly, resulting from prosecution of the Work for the Owner
provided, however, that they are not the result of the Construction Manager's own negligence or
malfeasance. Legal costs incurred in connection with disputes solely between the Construction
Manager and the Owner or incurred in connection with disputes solely between the Construction
Manager and Trade Contractors are the responsibility of the Construction Manager and shall not
be included in the Cost of the Work.
8.2.10 Cost to the Construction Manager of temporary electric power, lighting, water, sanitary
facilities, and heat required for the performance of the Work, or required to protect the Work from
weather damage.
8.2.11 Cost to the Construction Manager of temporary safety-related protection including
barricades and safety equipment, temporary roads and parking, dust control, pest control,
installation and operation of temporary hoists, scaffolds, ladders and runways, and temporary
Project signs and costs of permits and fees pursuant to the General Conditions of the Contract.
8.2.12 Cost of watchmen or similar security services, if approved in writing by Owner.
8.2.13 Cost of surveys, measurements and layout work reasonably required for the execution of
the Work or the requirements of the Contract.
8.2.14 Cost of preparation of shop drawings, coordination plans, photographs, or as-built
documents not included in Trade Contracts.
8.2.15 All costs for reproduction of documents to directly benefit the Work.
18
8.2.16 Costs directly, properly, and reasonably incurred in the performance of the Work and not
included in the Construction Manager's Fee as set forth in Paragraph 7.2, herein.
8.2.17 Testing laboratory costs, except relating to defective or non-conforming work for which
reimbursement is otherwise excluded by the Contract Documents.
8.2.18 Deposits lost for causes other than Construction Manager's or any Trade Contractor's
negligence or failure to fulfill a specific responsibility to the Owner under the Contract Documents.
8.2.19 Cost, including transportation and maintenance, of all materials, supplies, equipment,
temporary facilities and hand tools not owned by the workmen that are employed or consumed in
the performance of the Work.
8.2.20 Rental charges of all necessary machinery and equipment, including hand tools used in the
performance of the Work, whether rented from the Construction Manager (upon prior written
approval of the Owner, at the standard rate paid at the place of the Project) or others, including
installation, repairs and replacements, dismantling, removal, costs of lubrication, transportation
and delivery costs thereof.
8.2.21 Costs associated with setting up and demobilizing tool sheds, Project field offices,
temporary fences, temporary roads, and temporary fire protection.
8.2.22 In repairing or correcting damaged or nonconforming Work executed by the Construction
Manager or the Construction Manager's Subcontractors or suppliers, provided that such damage
or non-conforming work was not caused by the negligence or failure to fulfill a specific
responsibility to the Owner as set forth in this Contract Documents, and only to the extent that the
cost of repair or correction is not recoverable by the Construction Manager from insurance,
sureties, Subcontractors or suppliers, through commercially reasonable efforts.
8.3 Costs not to be reimbursed include:
8.3.1 Those costs enumerated in Article 7.2.1 through 7.2.11 above, and as set forth in the
Contract Documents as to be borne at the expense of the Construction Manager.
8.3.2 Salaries and other compensation of the Construction Manager's personnel stationed at
Construction Manager's principal office or offices other than the site office;
8.3.3 Expenses of the Construction Manager's principal office and offices other than the site
office;
8.3.4 Overhead and general expenses, except as may be expressly included in Article 7 and 8.1
through 8.2.22 above;
8.3.5 The Construction Manager's capital expenses, including interest on the Construction
Manager's capital employed for the Work;
19
8.3.6 Any cost not specifically and expressly described as reimbursable in Section 8.1through
8.2.22;
8.3.7 Costs, other than costs included in Change Orders approved by the Owner, that would
cause the Guaranteed Maximum Price to be exceeded;
8.3.8 Costs resulting from failure of the Construction Manager or any subcontractor to procure
and maintain insurance by the Contract Documents;
8.3.9 Amounts due by Construction Manager for federal and state income and franchise taxes,
and the costs of licenses, fees, taxes, and other charges of a similar nature, required to be obtained
or maintained by Construction Manager for the general conduct of its business;
8.3.10 Costs to replace or pay for lost or stolen machinery or equipment or materials, but only if
not covered by Builder's Risk Insurance. Construction Manager may seek to recover replacement
cost from insurance, sureties, Subcontractors, suppliers, or other such third parties;
8.3.11 The cost for any legal, accounting or other professional services except to the extent
provided for in the reimbursable costs of the Work, except as may be provided for elsewhere in
this Contract;
8.3.12 Penalties, fines, or costs imposed by governmental authorities in connection with, or
resulting from any violations for noncompliance with laws, regulations, codes, ordinances, or
directives by the Construction Manager or any subcontractor, except if the result of specific and
written directive by the Owner;
8.3.13 Costs of any insurance deductibles for coverage furnished and paid by Construction
Manager or any Subcontractor and losses or expenses for which the Construction Manager or any
Subcontractor is compensated by insurance. In the event that Construction Manager furnishes
Builders' Risk Insurance, the agreed deductible shall be deemed reimbursable from the
Contingency Fund, but only to the extent the loss was not caused by the negligence of the
Construction Manager or those for whom Construction Manager is vicariously liable.
8.3.14 Costs associated with the Construction Manager's failure to obtain any and all permits in a
timely manner, including, without limitation, the costs of any delays resulting therefrom, unless
attributable to Owner's Design Professionals.
8.3.15 Costs of accelerating the Work to the extent caused by the negligence or default of the
Construction Manager or any subcontractor of any tier, unless otherwise expressly provided for
elsewhere in this Contract and in strict accordance therewith;
8.3.16 Overtime costs required to the extent caused by the Construction Manager or any
subcontractor of any tier, unless otherwise expressly provided for elsewhere in this Contract and
in strict accordance with the requirements therein;
8.3.17 Project incentive bonuses, except as approved by the Owner in writing;
20
8.3.18 Bonuses, profit sharing, incentive compensation and any other discretionary payments paid
to anyone hired by the Construction Manager or paid to any Subcontractor or vendor shall not be
deemed a Cost of the Work without Owner's prior written approval;
8.3.19 Any and all costs and or cost overruns, including schedule related costs, resulting from the
default and/or termination of a bonded subcontractor and/or material supplier by Construction
Manager, unless not commercially viable to commence legal action against the surety for the
bonded subcontractor or material supplier, as approved by the Owner, in writing, and then
reimbursable only out of the Contingency Fund.
8.3.20 Any cost not specifically and expressly described in Article 8.2 and its subparts, above.
8.3.21 Costs, other than costs included in Change Orders approved by the Owner, in writing, that
would cause the GMP to be exceeded.
8.3.22 Costs exceeding the Lump Sum General Conditions, as set forth in Article 8.1.2 above.
ARTICLE 9
CHANGES IN THE WORK
9.1 Changes in the Work within the general scope of the Contract Documents, consisting of
additions, deletions, revisions or any combination thereof, may be ordered by the Owner by written
Change Order without invalidating this Agreement. Changes in the Work consistent with the intent
of the design documents and not affecting the Contract Time, the Construction Manager’s
compensation, or the Contract Price of any Trade Contract may be ordered by the Architect by a
written Field Order. In the event the Construction Manager takes exception to any Field Order
issued by the Architect, the Construction Manager shall submit any claim for an extension of the
Contract Time or adjustment to the Contract Price. The Construction Manager shall then proceed
with the work directed in the Field Order and any change in the Contract Price resulting from same
shall be determined in accordance with the provisions of Paragraph 9.4 herein below. The
Construction Manager shall cause such changes ordered by the Owner or the Architect to be
performed by the Trade Contractors, and the Construction Manager shall proceed diligently to
provide all services necessary in connection with any changes and same shall be accomplished in
strict accordance with the terms and conditions of the Contract Documents.
9.2 The Construction Manager shall maintain, and cause the Trade Contractors to maintain,
separate records reflecting costs, savings, and impacts related to any ordered change in the Work
until the adjustment in the Contract Time or the Contract Price, if any, have been agreed upon as
evidenced by a Change Order executed by both parties. The Construction Manager shall make
such records available to the Owner or Architect upon request.
9.3 “Change Order” shall mean a written order to the Construction Manager executed by the
Owner and the Architect, issued after execution of this Agreement, authorizing and directing a
change in the Work or an adjustment in the Contract Price or the Contract Time, or any
21
combination thereof. The Contract Price and the Contract Time may be changed only by Change
Order. The execution of a Change Order by the Construction Manager shall constitute conclusive
evidence of the Construction Manager’s agreement to the ordered changes in the Work, this
Agreement as thus amended, and the adjustments to the Contract Price and the Contract Time, if
any.
ARTICLE 10
DISCOUNTS
10.1 All quantity discounts shall accrue to the Owner if (i) before making the payment, the
Contractor included them in an Application for Payment and received payment therefor from the
Owner, or (ii) the Owner has deposited funds with the Contractor with which to make payments;
otherwise, cash discounts shall accrue to the Contractor. All trade discounts, rebates and refunds,
and all returns from the sale of surplus materials and equipment shall be credited to the Owner as
a deduction from the Cost of the Work.
ARTICLE 11
INSURANCE
11.1 The Construction Manager shall provide insurance as required in this Agreement:
11.1.1 Commercial General Liability
A. Limits of Liability (Minimum)
• Bodily Injury & Property Damage Liability
• Each Occurrence $5,000,000
• Policy Aggregate (Per Project) $10,000,000
• Personal & Advertising Injury $ 5,000,000
• Products & Completed Operations $10,000,000
B. Endorsements Required – Include in body of COI and/or Description of Operations
• Annual Aggregate shall apply “Per Project/Job”
• Waiver of Subrogation in favor of the City
• Insurance shall apply on a primary and non-contributory basis
• “The City of Dania Beach, Florida” included as named “Additional
Insured”
• Additional Insured status is included for Products completed operations
coverage for a period of no less than five (5) years following the completion
of the Work or Project;
11.1.2 Business Automobile Liability
A. Limits of Liability (Minimum)
• Bodily Injury and Property Damage
• Combined Single Limit $5,000,000
• Any Auto/Owned Autos or Scheduled Autos
• Including Hired and Non- Owned Autos
22
Endorsements Required - Include in body of COI and/or Description of Operations
• City of Dania Beach included as an Additional Insured
11.1.3 Workers’ Compensation / Employers’ Liability
A. Workers Compensation Limits: Statutory - State of Florida
B. Employers Liability Limits:
• $500,000 for bodily injury caused by an accident, each accident
• $500,000 for bodily injury caused by disease, each employee
• $500,000 for bodily injury caused by disease, policy limit
Workers Compensation must be provided for all persons fulfilling this contract, whether
employed, contracted, temporary or subcontracted.
Contractor(s) must be in compliance with all applicable state and federal workers’ compensation
laws, including US Longshore and Harbor Workers Compensation Act, Jones Act (maritime),
Federal Employers Liability Act (railroad), etc.
In no event shall Vendor be permitted to utilize in the execution of this agreement, the following:
i) any employee, subcontractor or subcontractor employee that is exempted or
purported to be exempt from Workers’ Compensation insurance coverage;
or
ii) any employee, subcontractor or subcontractor employees who will be
covered by an employee leasing arrangement.
11.1.4 Professional Liability/Errors & Omissions
Any licensed design professional work such as that provided by architects, engineers, etc. shall
maintain professional liability or malpractice or errors or omissions insurance with limits of
$2,000,000 per occurrence.
Limits of Liability
Each Claim $1,000,000
Policy Aggregate $1,000,000
If claims made, retro Date applies prior to contract inception.
Coverage is to be maintained and applicable for a minimum of three (3) years following
contract completion.
23
11.1.5 Contractors Pollution & Remediation Liability Insurance:
Insurance shall include bodily injury, property damage, defense, and cleanup as a result of
pollution conditions arising from contractors’ operations. This insurance shall be maintained for
at least five years after completion of the construction and acceptance of any project covered by
this Agreement. If claims made coverage is provided, retro date must apply prior to contract
inception. City is included as Additional Insured.
Limits of Liability
Each Occurrence $2,000,000
Policy Aggregate $4,000,000
11.1.6 Umbrella/Excess Liability (Excess Follow Form) can be utilized to provide the required
limits. Coverage shall be “following form” and shall not be more restrictive than the
underlying insurance policy coverages, including all special endorsements and City as
Additional Insured status. Umbrella should include Employer’s Liability.
11.1.7 Builder’s Risk (Property coverage)
Coverage must be afforded in an amount not less than 100% of the total project cost, including
soft costs, with a deductible of no more than $25,000 each claim. Except, Named Windstorm and
Flood Deductibles, if any, must be specifically disclosed to the City. Coverage form shall include,
but not be limited to:
• All Risk Coverage including Flood and Windstorm with no coinsurance clause
• Storage and transport of materials, equipment, supplies of any kind whatsoever to be used
on or incidental to the project
• Equipment Breakdown to include cold testing of all mechanized, pressurized, or electrical
equipment
• Coverage for materials or equipment stored at the project site, while in transit, or while
stored at a temporary location.
• Replacement Cost basis
• Policy shall insure the interests of the owner, contractor, and subcontractors in the property
against all risk of physical loss and damage and name the City as a LOSS PAYEE.
• Waiver of Occupancy Clause Endorsement, enabling the City to occupy the facility under
construction/renovation during the activity.
• This insurance shall remain in effect until the work is completed and the property has been
accepted by the City.
24
Safety and loss control shall be exercised at all times by the Contractor for the protection of all
persons, employees, and property. Any hazardous conditions must be promptly identified,
reported, and action taken to mitigate as soon as possible.
Notice of claims/accidents/incidents associated with this agreement shall be reported to the
Contractor’s insurance company and to the City’s Risk Management department as soon as
practical.
The Contractor has the sole responsibility for all insurance premiums and shall be fully and solely
responsible for any costs or expenses as a result of a coverage deductible, co-insurance penalty, or
self-insured retention; including any loss not covered because of the operation of such deductible,
co-insurance penalty, self-insured retention, or coverage exclusion or limitation.
11.1.8 Other Conditions Required:
Subcontractors’ Compliance: It is the responsibility of the contractor to ensure that all
subcontractors comply with all insurance requirements.
Cancellation Requirements: Required insurance shall always be maintained during which the
vendor is on City premises. The above policies shall provide the City of Dania Beach with 10 days’
written notice of cancellation or material change from the insurer. If the policies do not contain
such a provision, it is the responsibility of the Contractor to provide such notice.
Notice Requirements: If an insurable incident occurs while vendor is engaged in a City project,
notification to the City is required.
Insurance Carrier Financial Stability Requirements:
Insurance must be provided by companies authorized to do business in the State of Florida. City
reserves the right but not the obligation to reject any insurer providing coverage due to poor or
deteriorating financial condition
The Company must be rated no less than “A-” as to management, and no less than “Class VII” as
to financial strength, by the latest edition of Best Insurance Guide published by A.M. best
Company, or its equivalent. All policies or certificates of insurance are subject to review and
verification by Risk Management. If a company is downgraded during the agreement term,
Vendor shall notify the City.
Certificates of Insurance/Verification of Coverage: Proof of the required insurance must reflect
all required insurance above will be furnished by Vendor to the City of Dania Beach Human
Resources Department by Certificate of Insurance within five (5) days of notification of award.
All certificates (and any required documents) must be received and approved by Human Resources
before any work commences to permit Vendor time to remedy any deficiencies.
Valid Certificates verifying coverage is in force as required above must be on file with the City at
all times during contract. If the policies renew during the term of the Contract, updated Certificates
25
verifying coverage is in force shall be submitted to the City within ten (10) days of expiration.
Contractor and/or any Subcontractor shall not perform or continue to work pursuant to this
agreement, unless all coverages remain in full force and effect; work delay is subject to provisions
in this agreement. If vendor fails to provide proof of insurance within seven (7) days of City’s
receipt of notice at any time during this agreement, the City shall have the right to consider the
agreement breached, and therefore terminated.
A copy of Additional Insured Endorsement or other endorsements may be attached to the
Certificate.
11.1.9 Description of Operations section of COI: Confirm coverage required is documented in
the body of the Certificate of Insurance, and also in the Description of Operations.
Additionally, include Job, Event, Contract, or Agreement number.
Notice of Cancellation can be included here.
Notices/ Certificate Holder: City of Dania Beach,
Attention Human Resources/Risk Management
100 West Dania Beach Boulevard
Dania Beach, FL 33004
The City of Dania Beach, Florida reserves the right to review/revise, reject or accept any
required policies of insurance, including limits, coverages or endorsements, herein throughout
the term of this contract.
ARTICLE 12
CONFLICTS
12.1 In the event of conflicts, the interpretation of the Contract Documents, as addressed in the
General Conditions, will be governed by this Order of Precedence:
a) Modifications, which shall for purposes of this Contract be defined as (1) a written
amendment to the Contract signed by both parties, including the GMP Amendment; (2) a
Change Order; (3) a Construction Change Directive; or, (4) a written order for a minor
change in the Work issued by the Design Professional;
b) This Contract and its several Exhibits;
c) Addenda, with those of later dated having precedence over those of earlier date;
d) Any Supplementary Conditions;
e) The General Conditions of this CM @ Risk Contract;
f) Drawings;
26
g) Specifications;
h) Other documents specifically enumerated in the Contract as part of the Contract
Documents.
ARTICLE 13
PUBLIC RECORDS
13.1 Notwithstanding any other provision in this Contract, any action taken by Owner in
compliance with, or in a good faith attempt to comply with, the requirements of Chapter 119,
Florida Statutes, shall not constitute a breach of this Contract. If Contractor is acting on behalf of
Owner as provided in Section 119.0701, Florida Statutes, Contractor shall:
13.1.1 Keep and maintain public records required by Owner to perform the services under
this Contract;
13.1.2 Upon request from Owner, provide Owner with a copy of the requested records
or allow the records to be inspected or copied within a reasonable time and at a cost that
does not exceed that provided in Chapter 119, Florida Statutes, or as otherwise provided
by Applicable Law;
13.1.3 Ensure that public records that are exempt or confidential and exempt from public
record requirements are not disclosed except as authorized by Applicable Law for the
duration of this Contract and after completion or termination of this Contract if the records
are not transferred to Owner; and
13.1.4 Upon completion or termination of this Contract, transfer to Owner, at no cost, all
public records in possession of Contractor or keep and maintain public records required by
Owner to perform the services. If Contractor transfers the records to Owner, Contractor
shall destroy any duplicate public records that are exempt or confidential and exempt. If
Contractor keeps and maintains public records, Contractor shall meet all requirements of
Applicable Law for retaining public records. All records stored electronically must be
provided to Owner upon request in a format that is compatible with the information
technology systems of Owner.
ARTICLE 14
GOVERNING LAW AND VENUE
14.1 This Agreement shall be governed by and construed under the laws of the State of Florida.
The exclusive venue for any lawsuit arising from, related to, or in connection with this
Agreement shall be in the state courts of the Seventeenth Judicial Circuit in and for Broward
County, Florida.
27
ARTICLE 15
INDEMNIFICATION
15.1 To the fullest extent permitted by law, Construction Manager agrees to defend, indemnify,
and hold the City, its officers, agents, and employees, harmless from and against any and all
liabilities, demands, claims, suits, losses, damages, causes of action, fines or judgments, including
costs, attorneys’, witnesses’, and expert witnesses’ fees, and expenses incident thereto, relating to,
arising out of, or resulting from: (i) the services provided by the Construction Manager, its
contractors, subcontractors, agents, employees, or personnel under this Contract; (ii) any negligent
acts, errors, mistakes or omissions by Construction Manager, its contractors, subcontractors,
agents, employees, or, personnel; and (iii) Construction Manager, its contractors, subcontractors,
agents, employees, or personnel failure to comply with or fulfill the obligations established by this
Contract.
15.2 The Construction Manager will update the City during the course of the litigation to timely
notify the City of any issues that may involve the independent negligence of the City that is not
covered by this indemnification.
15.3 The City assumes no liability for actions of Construction Manager and will not indemnify or
hold Construction Manager or any third party harmless for claims based on this Contract or use of
Construction Manager provided supplies or services.
15.4 Nothing contained herein shall be construed as a waiver of any immunity from or limitation
of liability the City (Owner) may be entitled to under the doctrine of sovereign immunity or section
768.28, Florida Statutes.
15.5 This article shall survive the termination of this Contract.
ARTICLE 16
MISCELLANEOUS PROVISIONS
16.1 The Owner and the Construction Manager, respectively bind themselves, their partners,
successors, assigns and legal representatives to the other party to this Agreement, and to the
partners, successors, assigns and legal representatives of such other party with respect to all
covenants of this Agreement. The Construction Manager shall not assign, sublet or transfer any
interest in this Agreement without the written consent of the Owner.
16.2 This Agreement represents the entire and integrated agreement between the Owner and the
Construction Manager and supersedes all prior negotiations, representations or agreements, either
written or oral. This Agreement may be amended only by written instrument signed by both the
Owner and the Construction Manager.
16.3 The captions of paragraphs in this Agreement are for convenience only and shall not be
considered or referred to in resolving questions of interpretation or construction.
16.4 No delay or omission by either of the parties hereto in exercising any right or power accruing
upon the non-compliance or failure of performance by the other party hereto of any of the
28
provisions of this Agreement shall impair any such right or power or be construed to be a waiver
thereof. A waiver by either of the parties hereto of any of the covenants, conditions or agreements
hereof to be performed by the other party hereto shall not be construed to be a waiver of any
subsequent breach thereof or of any other covenant, condition or agreement herein contained.
16.5 This Agreement shall be binding upon and inure to the benefit of the parties hereto and their
respective permitted assigns and successors.
16.6 Owner hereby expressly reserves the right from time to time to designate by notice to
Construction Manager one or more representatives to act partially or wholly for Owner in
connection with the performance of Owner’s obligations hereunder. Construction Manager shall
act only upon instructions from such representatives unless otherwise specifically notified to the
contrary.
16.7 Records of Construction Manager’s costs, reimbursable expenses pertaining to the Project
and payments shall be available to Owner or its authorized representative during business hours
and shall be retained for four years after final Payment or abandonment of the Project, unless
Owner otherwise instructs Construction Manager in writing.
16.8 All notices, consents, approvals, demands, requests or other communications provided for or
permitted to be given under any of the provisions of this Agreement shall be in writing and shall
be deemed to have been duly given or served when delivered by hand delivery or when deposited
in the U.S. mail by registered or certified mail, return receipt requested, postage prepaid, and
addressed as follows:
AS TO OWNER
Ana M. Garcia, ICMA-CM, City Manager
City of Dania Beach
100 W. Dania Beach Blvd.
Dania Beach, FL 33004
with a copy to:
Eve A. Boutsis, City Attorney
City of Dania Beach
100 W. Dania Beach Blvd.
Dania Beach, FL 33004
AS TO CONTRACTOR
Burkhardt Construction, Inc.
1400 Alabama Avenue
West Palm Beach, Florida 33401
29
16.9 If any provision of this Agreement is determined to be illegal, invalid or unenforceable, such
provision shall be deemed struck here from and all remaining provisions of the Agreement shall
remain binding upon the parties. If any provision is struck under this Section, there will be added
in lieu thereof, by written agreement between the parties, a provision as similar in terms to such
struck provision as its possible which is legal, valid and enforceable.
16.11 Each Attachment referred to in this Agreement forms an essential part of this Agreement
and each such Attachment is incorporated by this reference.
16.12 Key personnel assigned to City projects by the Construction Manager shall not be removed
from the project until alternate personnel acceptable to the City are approved in writing by the
City.
16.13 The language in this Contract shall be construed according to its customary meaning within
the Florida building industry. Whenever used, the singular shall include the plural, the plural the
singular, and the use of any gender shall be applicable to all genders.
16.14 The title of all work, completed portions of the project and in the course of construction,
and of all materials on account of which payment has been made shall be in the Owner.
16.15 The Parties are acting herein solely as independent contractors. Nothing herein contained
will create or be construed as creating a partnership, joint venture, or agency relationship between
the Parties. Each Party acknowledges and agrees that it neither has nor will give the appearance or
impression of having any legal authority to bind or commit the other Party in any way. Each Party
will be solely responsible for all wages, income taxes, worker’s compensation, and any other
requirements for all personnel it supplies in connection with this Contract.
SPACE LEFT INTENTIONALLY BLANK
30
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed
the day and year hereinabove written.
CITY:
ATTEST: CITY OF DANIA BEACH, FLORIDA
a Florida Municipal Corporation
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO LEGAL FORM
AND CORRECTNESS:
EVE A. BOUTSIS ANA M. GARCIA, ICMA-CM
CITY ATTORNEY CITY MANAGER
Dated: _____________, 2025
31
“CONTRACTOR”
Burkhardt Construction, Inc.
Witnesses:
By:
______________________________ Signature
______________________________
(Print or Type Name) Print Name
______________________________
Title
___________________________________
(Print or Type Name)
STATE OF _________________
COUNTY OF _______________
The foregoing instrument was acknowledged before me by means of ☐ physical presence
or ☐ online notarization, on this ____ day of ______________________, 2025, by
_____________________ as ___________________ of Burkhardt Construction, Inc., a Florida
corporation, authorized to conduct business in Florida on behalf of the corporation. He is
personally known to me or who has produced
(type of identification) as identification.
NOTARY’S SEAL: NOTARY PUBLIC, STATE OF FLORIDA
(Name of Acknowledger Typed, Printed or Stamped)
Commission Number
CITY OF DANIA BEACH, FLORIDA
CONSTRUCTION MANAGER AT RISK SERVICES
FOR PJ MELI AQUATIC COMPLEX
CITY REQUEST FOR QUALIFICATIONS (“RFQ”) NO. 25-011 Prepared by: City of Dania Beach, Florida 100 W. Dania Beach Boulevard Dania Beach, Florida 33004
April 3, 2025
CITY OF DANIA BEACH, FLORIDA REQUEST FOR QUALIFICATIONS “Construction Manager at Risk Services for PJ Meli Aquatic Complex” RFQ 25-011
TO ALL BIDDERS: PLEASE TAKE NOTE OF THE FOLLOWING REVISIONS, ADDITIONS,DELETIONS, CLARIFICATIONS, ETC. RELATIVE TO SOLICITATION, WHICH IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS SHALL BECOME A OF AND HAVE PRECEDENCE OVER ANYTHING SHOWN OR DESCRIBED OTHERWISE. 1. Attachment-(I) has been updated to reflect the correct Location Map for PJ Meli
Aquatic Complex.
CITY OF DANIA BEACH, FLORIDA
CONSTRUCTION MANAGER AT RISK SERVICES
FOR PJ MELI AQUATIC COMPLEX
CITY REQUEST FOR QUALIFICATIONS (“RFQ”) NO. 25-011 Prepared by: City of Dania Beach, Florida 100 W. Dania Beach Boulevard Dania Beach, Florida 33004
April 4, 2025
CITY OF DANIA BEACH, FLORIDA REQUEST FOR QUALIFICATIONS
“Construction Manager at Risk Services for PJ Meli Aquatic Complex” RFQ 25-011
TO ALL BIDDERS: PLEASE TAKE NOTE OF THE FOLLOWING REVISIONS, ADDITIONS,DELETIONS, CLARIFICATIONS, ETC. RELATIVE TO SOLICITATION, WHICH IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS SHALL BECOME A OF AND HAVE PRECEDENCE OVER ANYTHING SHOWN OR DESCRIBED OTHERWISE. 1. Section 4.2 Proposal Requirements under subsection (B) Relevant Experience: States
that the form for the submission of the information is attached as Exhibit “A”. Please
note that the Exhibit “F” should be utilized to list all references and Exhibit “A” should only be used to list the Proposer Qualifications Statement.
For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/daniabeachfl
City of Dania Beach
25-011
CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI
AQUATIC COMPLEX
RELEASE DATE: March 18, 2025
RESPONSE DEADLINE: April 11, 2025, 10:00 am
Please refer to the project timeline in this document for all important deadlines.
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
2
Table Of Contents
1. NOTICE TO PROPOSERS
2. OVERVIEW
3. SCOPE OF SERVICES
4. SUBMISSION REQUIREMENTS
5. EVALUATION CRITERIA AND PROCEDURES
6. INSURANCE REQUIREMENTS
7. TERMS AND CONDITIONS
8. Vendor Questionnaire
Attachments:
A - EXHIBIT_“A”_Proposers_Qualification_Statement
B -
EXHIBIT_“B”_City_of_Dania_Beach_Florida_Sworn_Statement_Under_287.133_3A_Florida_Statute
s_Public_Entity_Crimes
C - EXHIBIT_“C”_-_Non_Collusion_Affidavit
D - EXHIBIT_“D”_Drug-Free_Workplace_Certification_Form
E - EXHIBIT_“E”_Acknowledgment_of_Addenda
F - EXHIBIT_“F”_Reference_List
G - EXHIBIT_“G”_Certification_to_Accuracy_of_Proposal
H - EXHIBIT_“H”_Affidavit_of_Compliance_with_Anti-Human_Trafficking_Laws
I - Location Map PJ Meli Aquatic Complex
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
3
1. NOTICE TO PROPOSERS
CITY OF DANIA BEACH, FLORIDA
REQUEST FOR QUALIFIATIONS (“RFQ”) FOR
CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
25-011
NOTICE IS GIVEN that the City of Dania Beach, Florida (the “City”) will be accepting sealed Proposals
for CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX, 25-
011”.
Proposals will be accepted on the City's e-Procurement Portal at
https://procurement.opengov.com/portal/daniabeachfl until Friday, April 11, 2025, at 10:00 am. Proposals
received after this time will be rejected.
All submissions will remain confidential and exempt from public record disclosure requirements until the
response opening is conducted.
PROJECT DOCUMENTS
Documents may be obtained from
https://procurement.opengov.com/portal/daniabeachfl/projects/144283.
All Proposers are advised that the City has not authorized the use of the City seal or logo by individuals
or entities responding to City bids.
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
4
2. OVERVIEW
The City of Dania Beach (“City”) is soliciting Proposals from interested persons, firms, or both for the
provision of the services described in this RFQ. Through a Request for Qualifications process described in this
document, persons and firms interested in assisting the City in provision of such services must prepare and
submit a qualifications packet in accordance with the procedure and schedule in this RFQ. The City will review
submittals only from those persons and firms that submit a Request for Qualifications packet which includes all
the information required to be included as described in the RFQ.
In order to be considered, persons, consulting firms or team joint ventures must demonstrate specific experience
and capabilities in all related areas for which they seek to perform work as described. Consultants should also
be familiar with the standards, practices, requirements, and applicable ordinances of the City of Dania Beach.
The City intends to select a Construction Management at Risk (CMAR) firm(s) capable of providing
management services necessary to complete the improvements within the City as outlined in this RFQ. The
selected CMAR firm(s) may be responsible for both preconstruction and construction phases of this project
and/or may be responsible for only the construction phase, depending on the determination of the City. The
selected CMAR firm(s) will be responsible for the successful, timely, and economical completion of this
project. The CMAR firm may retain necessary design professionals under the process provided in Florida
Statute Section 287.055. The types of services required may include, but shall not be limited to:
A. Preconstruction:
1. Review and coordination of the proposed work that the architect, engineer, and/or the City prepare
for the project, within the existing site conditions.
2. Submit to the architect, engineer, and City for consideration appropriate cost and savings programs
(value engineering), suitability of materials and equipment, and schedule of construction.
3. Competitive bidding and contracting assistance for trade subcontractors.
4. Calculate and provide a Guaranteed Maximum Price (GMP) for the project or each phase of the
project.
5. Provide a preliminary construction schedule.
6. Attend all meetings as required to facilitate the project.
B. Construction: GMP shall be established for the project and shall be negotiated prior to the
commencement of any contracted work. The types of services required may include, but shall not be
limited to, the following:
1. Provide Performance and Payment Bonds for the full value of the GMP for each phase of the project.
2. Monitor Minority/Women and Small Business Enterprises participation (M/WBE, SBE) for the
project or phases of the project.
3. Monitor compliance with the City's Code of Ordinances, City's Purchasing guidelines, and City's
goals for this project.
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
5
4. Apply for, obtain, coordinate, and pay for all permits, inspections, and tests. Ensure the successful,
timely, and economical completion of the project or phases of the project.
5. Coordinate and ensure compliance with all contract and insurance requirements.
6. Create, maintain, and present an overall construction schedule and Schedule of Values for the project
or phases of the project.
7. Coordinate Construction Management Services, including but not limited to:
Regular job site meetings.
Maintaining and updating schedules.
Overseeing quality assurances.
Maintaining and providing copies of all contract documents.
Ensuring compliance with all safety programs.
Coordination of all construction.
Coordination of all onsite administration.
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
6
3. SCOPE OF SERVICES
3.1. SCOPE OF SERVICES
The scope of services is a general guide to the work the City expects to be performed by the CMAR and is not a complete
listing of all services that may be required or desired. The CMAR services include, but are not limited to:
• Working with professional design team during the design stages. CMAR will be tasked to review plans at 30%, 60%,
90% and 100% to ensure constructability, adequacy of materials and pricing, preparation of project schedules,
conducting feasibility analyses, assisting with site plans and/or design alternative and recommendations, and
preliminary cost estimates leading to a Guaranteed Maximum Price (GMP). CMAR shall help identify any design
restrictions that could affect the overall design and intent of the project.
• Preparation of a detailed cost estimate at the 30%, 60% and 90% design phase intervals to confirm initial budget
allocations and/or to seek City’s advice before proceeding with next level and final designs phases. The CMAR will be
responsible for cost controls throughout the design and construction project except for design and construction
elements added or deleted by an expressed City directive.
• CMAR shall participate in presentations to elected officials, advisory boards, staff, and the public.
• CMAR shall work with design team members to prepare all required bidding and construction documents for final
permitting.
• CMAR will prepare bidding packages and secure no less than three (3) proposals for work not conducted by their own
work forces.
• Attendance at City Commission, Advisory Committee meetings, and public meetings will be required.
• CMAR firm(s) and/or any subcontractors must have previous experience in infrastructure projects and must be properly
licensed and bonded to provide services as outlined above. Bonding shall be equal to 100% of the anticipated
construction costs. Firms must have previous municipal experience.
A. TASKS/DELIVERABLES
Firms will provide plans at various intervals for City staff review. Due to the requirement that the Contractor(s) be readily
available for meetings, discussions, and tours within the affected areas of responsibility, it will be necessary for any Qualifier to
have an office physically located within the tri-county areas of Miami-Dade, Broward, or Palm Beach County. This office must
be an active facility from which services are routinely provided and not solely a post office box or other type of mail drop, nor
can it be the office of simply a representative agent. The City reserves the right to inspect any facility designated by the
Qualifier to ensure that it complies with this section. Should the City be unable to identify qualified providers within the tri-
county area, the City may at its sole discretion elect to negotiate with firms that are not based out of Miami-Dade, Broward or
Palm Beach County, or re-advertise this solicitation and seek a new pool of applicants.
Upon successful competitive negotiations with the selected CMAR Firm(s), an agreement shall be prepared reflecting the
agreed upon direct costs and unit prices and outlining the duties of the CMAR described therein. Thereafter, the CMAR shall be
required to compile and submit a proposal with a GMP (GMP may include agreed upon contingencies and allowances) and a
separate guaranteed completion date for each grouping of substantially similar construction, rehabilitation, or renovation
activities as defined by the City, but shall not commence construction on any project until receipt of a Notice to Proceed (NTP)
approved by the City based on the GMP and completion date.
3.2. PROJECT LOCATION
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
7
The City of Dania Beach adopted a Parks Master Plan in 2019. The next project of this master plan is the new construction of PJ
Meli Aquatic Comlex located at 2901 Southwest 52nd Street, Dania Beach, FL 33312.
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
8
4. SUBMISSION REQUIREMENTS
4.1. POSTPONEMENT AND EXTENSION OF DATE FOR SUBMITTING PROPOSALS
The City reserves the right to postpone and extend the date for the receipt of Proposals and will give ample
notice of any such postponement and extension to each known prospective Proposers.
4.2. PROPOSAL REQUIREMENTS
Proposers shall, as a minimum, include the following information with the submittal of its Proposal:
A. Business Structure: Provide a description of the general capabilities of the Proposer, including
information relating to the total size and staffing, professional staff, resources, and clerical support;
Provide résumés of all key personnel who may be assigned to perform the requested services.
B. Relevant Experience: Provide a list of five (5) similar contracts for services within the last five (5)
years provided to other municipalities, together with current contact names and telephone numbers with
each municipality; contact persons must be able to speak about the performance of the Proposer. The
form for the submission of the information is attached as Exhibit “A” and is made a part of and is
incorporated into this RFQ by this reference.
C. Litigation: Provide a listing of all lawsuits or proceedings involving the Proposer within the past ten
(10) years, including case names and numbers, courts, nature of the actions and disposition or status of
each case.
D. Equal Opportunity Statement: A statement that the Proposer is an equal opportunity employer and
that it does not and will not discriminate against any person, employee, or applicant for employment on
account of age, race, creed, religion, color, sex, sexual orientation, disability, national origin, marital
status, or political affiliation.
E. Minority/Women’s Participation: The City of Dania Beach, in accordance with the requirements as
stated in U.S. Code of Federal Regulations, 2 CFR 200.321, encourages the active participation of
minority businesses, women‘s business enterprises and labor surplus area firms as a part of any
agreement whenever possible. The Proposer must take affirmative steps and if subcontracts are to be let
through a Proposer, the subcontractor is required to also take the affirmative steps listed below:
1. Small and minority businesses and women's business enterprises are solicited whenever they are
potential sources.
2. Total requirements are to be divided, when economically feasible, into smaller tasks or quantities to
permit maximum participation by small and minority businesses, and women's business enterprises.
3. Delivery schedules, where the requirement permits are to be established which encourage
participation by small and minority businesses, and women's business enterprises.
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
9
4. Services and assistance, as appropriate, are to be used, which is provided by such organizations as
the Small Business Administration and the Minority Business Development Agency of the
Department of Commerce.
F. Copies of all licenses, certificates of competency or other documentation required by federal, state, or
local laws, statutes or regulations are required to be submitted as evidence of the authority to perform
the services described in the RFQ.
G. All Proposals must include preliminary certificates of insurance verifying all general insurance
requirements.
H. All Proposals must be signed by a representative who is authorized to contractually bind the Proposer
4.3. MINIMUM QUALIFICATION REQUIREMENTS
In order for a Proposal to be considered by the City, Proposers shall demonstrate in their Proposals compliance
with the following minimum requirements:
A. Proposers must be currently certified, licensed and authorized to work in the State of Florida to services
as sought by this RFQ;
B. Experience working with government agencies;
C. Currently insured and meeting City insurance requirements with insurance certificates provided that
state the name of the Proposer, current street address of the business and the type of work for which a
Business Tax Receipt is issued as well as all additional insurance requirements, including required
endorsements.
The City shall not consider Proposals that fail to demonstrate compliance with the above requirements. The
selected Proposer(s) shall maintain and keep in force insurance throughout the life of any contract, and all
renewals and extensions, if any, pertaining or related to the requirements specified in this Section. Failure of
the Proposer to comply with these requirements will be sufficient grounds for the City to declare the Contract in
default and subject the contract to possible termination by the City.
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
10
5. EVALUATION CRITERIA AND PROCEDURES
The City will consider Proposers that are responsive and responsible by providing accurate information as
delineated in Section 4, Submittal Requirements.
All submitted Proposals will be evaluated based on the information provided that is responsive to this
RFQ. Evaluation criteria will include, but not be limited to, the ability of professional personnel; past
performance; willingness to meet time and budget requirements; location; recent, current, and projected
workloads of the firms.
The scoring of the Proposals by the Bid Review Committee will be based on a point total and not a percentage
factor. The Bid Review Committee will evaluate and rank the Proposals received on the basis of the criteria and
available points indicated below:
CRITERIA MAXIMUM POINTS
Firm Qualifications: Qualifications of the firm; number of years firm has been in
business; references/past performance; recent, current, and projected workloads
40
Experience and Qualification of Assigned Staff: Staff’s experience, qualifications, and
technical capabilities
30
Approach and Delivery of Services: Understanding the scope of work, ability to comply
with the full scope of work, technical soundness of Proposal
25
Woman or Minority Business Enterprise: Current certification must be provided with
response .
5
TOTAL MAXIMUM POINTS 100
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
11
6. INSURANCE REQUIREMENTS
6.1. INSURANCE COVERAGE
INSURANCE COVERAGE: A selected Proposer shall not commence services under an Agreement until it has
obtained all insurance required under this paragraph and as required by the Agreement, and not until such time
that the coverages are approved by the Risk Manager of the City. The Proposer shall not allow any employee of
Proposer or any subcontractor to commence services on any subcontract until the subcontractor and all
coverages required of any subcontractor have been obtained and approved by the Risk Manager of the City. In
addition, the Proposer shall be responsible for any and all policy deductibles and self-insured retentions.
VENDOR and their subcontractors, to the extent reasonably applicable to their respective scope of work,
provided that, VENDOR shall be responsible for any uninsured claims subject to the limitation of liability
hereunder and to the extent directly attributable to City’s failure to require such coverage, shall procure and
maintain from the date of start of Construction for the duration of the term of the Agreement, insurance
coverage compliant with the requirements set forth in this Section, together with any additional insurance
required by applicable federal, state, or local laws and regulations, against claims for injuries to persons or
damages to property which may arise from or in connection with the performance of the work hereunder by the
VENDOR, its agents, representatives, employees, or subcontractors.
The following are requirements that must be met regarding the Proposer’s delivery of Certificates of Insurance
for all coverages required in the Agreement and Proposal Documents:
If VENDOR maintains broader coverage and/or higher limits than the minimums shown below for all policies,
the City requires and shall be entitled to the broader coverage and/or higher limits maintained by the VENDOR.
Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be
available to the City to the extent necessary to cover any actual damages suffered by the City.
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
12
A. Commercial General Liability
• Limits of Liability (Minimum)
• Bodily Injury & Property Damage Liability
• Each Occurrence $1,000,000
• Policy Aggregate $2,000,000
• Personal & Advertising Injury $1,000,000
• Products & Completed Operations $1,000,000
Endorsements Required – Include in body of COI and/or Description of Operations
• Annual Aggregate shall apply “Per Project/Job” if available
• Waiver of Subrogation in favor of the City, if available
• Insurance shall apply on a primary and non-contributory basis
• “The City of Dania Beach, Florida” is included as “Additional Insured”
• If Vendor’s Insurance includes coverage for with an “As Required By Written Agreement/Contract”
provision, then the following must be in place to establish such written agreement and trigger coverage:
• An executed written contract between the City and Vendor including these requirements; OR
Statement on a Purchase Order or Invoice or other attachment thereof which includes the following
verbiage:
Vendor will provide proof of General Liability insurance with Limits of
$1,000,000 Per Occurrence/$2,000,000 General Aggregate. City is included
as Additional Insured.
B. Business Automobile Liability
• Limits of Liability (Minimum)
• Bodily Injury and Property Damage
• Combined Single Limit $1,000,000
• Any Auto/Owned Autos or Scheduled Autos
• Including Hired and Non- Owned Autos
• Any One Accident
C. Workers’ Compensation / Employers’ Liability
Workers Compensation Limits: Statutory - State of Florida
Waiver of Subrogation in favor of City, if available
Employers Liability Limits:
• $100,000 for bodily injury caused by an accident, each accident
• $100,000 for bodily injury caused by disease, each employee
• $500,000 for bodily injury caused by disease, policy limit
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
13
Workers Compensation must be provided for all persons fulfilling this contract, whether employed,
contracted, temporary or subcontracted.
Contractor(s) must be in compliance with all applicable state and federal workers’ compensation laws,
including US Longshore and Harbor Workers Compensation Act, Jones Act (maritime), Federal
Employers Liability Act (railroad), etc.
In no event shall Vendor be permitted to utilize in the execution of this agreement, the following:
• any employee, subcontractor or subcontractor employee that is exempted or purported to be
exempt from Workers’ Compensation insurance coverage; or
• any employee, subcontractor or subcontractor employees who will be covered by an
employee leasing arrangement.
Other Conditions Required:
Subcontractors’ Compliance: It is the responsibility of the contractor to ensure that all subcontractors comply
with all insurance requirements.
Cancellation Requirements: Required insurance shall always be maintained while vendor is on or utilizing
City premises. The above policies shall provide the City of Dania Beach with 10 days’ written notice of
cancellation or material change from the insurer. If the policies do not contain such a provision, it is the
responsibility of the Contractor to provide such notice.
Notice Requirements: If an insurable incident occurs while vendor is engaged in a City project, notification to
the City is required.
Insurance Carrier Financial Stability Requirements:
Insurance must be provided by companies authorized to do business in the State of Florida. City reserves the
right but not the obligation to reject any insurer providing coverage due to poor or deteriorating financial
condition.
The Company must be rated no less than “A-” as to management, and no less than “Class VII” as to financial
strength, by the latest edition of Best Insurance Guide published by A.M. best Company, or its equivalent. All
policies or certificates of insurance are subject to review and verification by Risk Management. If a company is
downgraded during the agreement term, Vendor shall notify the City.
Certificates of Insurance/Verification of Coverage: Proof of the required insurance must reflect all required
insurance above will be furnished by Vendor to the City of Dania Beach Human Resources Department by
Certificate of Insurance within 5 days of notification of award. All certificates (and any required documents)
must be received and approved by Human Resources before any work commences to permit Vendor time to
remedy any deficiencies.
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
14
Valid Certificates verifying coverage is in force as required above must be on file with the City at all times
during contract. If the policies renew during the term of the Contract, updated Certificates verifying coverage is
in force shall be submitted to the City within 10 days of expiration. Contractor and/or any Subcontractor shall
not perform or continue to work pursuant to this agreement, unless all coverages remain in full force and effect;
work delay is subject to provisions in this agreement. If vendor fails to provide proof of insurance within 7 days
of City’s receipt of notice at any time during this agreement, the City shall have the right to consider the
agreement breached, and therefore terminated.
A copy of Additional Insured Endorsement or other endorsements may be attached to the Certificate.
Notices/ Certificate Holder:
City of Dania Beach
100 West Dania Beach Boulevard
Dania Beach, FL 33004
Email: Wayne Fletcher
wfletcher@daniabeachfl.gov
The City of Dania Beach, Florida reserves the right to review/revise, reject or accept any required policies of
insurance, including limits, coverages or endorsements, herein at the time of the insurance submission.
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
15
7. TERMS AND CONDITIONS
7.1. INTERPRETATIONS
Any interpretations, clarifications or additional information not disclosed in this RFQ and determined to be
necessary by the City in response to Proposer’s questions will be issued by means of addendum or addenda,
which addendum or addenda will be posted to the City's e-Procurement Portal at
https://procurement.opengov.com/portal/daniabeachfl, for all interested persons identified by the City as having
received the RFQ. The Proposers are required to check the site to see if there has been any addendum or
addenda posted regarding this RFQ. Only questions answered and information supplied by means of such
Addendum or Addenda will be considered as binding. Oral interpretations, clarifications or other information
will have no legal and binding effect.
A. All questions requiring clarification or interpretation of the RFQ documents shall be made in writing and
shall be delivered to the City by Friday, April 4, 202510:00 am.
B. Any modification or interpretation of the RFQ documents lies within the sole and exclusive judgment of
the City or its Consultant, if so authorized by City, and shall be made in writing in the form of an
Addendum or Addenda to all those who or which are recorded by the City, as having obtained a
complete set of the RFQ documents.
C. Interpretations or modifications of the RFQ documents made in any manner other than an Addendum or
Addenda issued by the City shall not be binding. All updates, clarifications, or modifications to the
RFQ shall be issued via written Addendum or addenda and shall be provided to all Proposers.
D. A Proposer, prior to submitting its Response, shall ascertain in writing that it has received any
Addendum or all Addenda issued for the services.
E. Costs for those matters not questioned and not addressed in an Addendum or Addenda shall be the
responsibility of the Proposer, and Proposer shall be responsible to include such costs in the RFQ.
7.2. PUBLIC RECORDS
A. Proposer agrees to keep and maintain public records in Proposer’s possession or control in connection
with Proposer’s performance under the Agreement. Proposer additionally agrees to comply specifically
with the provisions of Section 119.0701, Florida Statutes. Proposer shall ensure that public records that
are exempt or confidential and exempt from public records disclosure requirements are not disclosed,
except as authorized by law, for the duration of the Agreement, and following completion of the
Agreement until the records are transferred to the City.
B. Upon request from the City custodian of public records, Proposer shall provide the City with a copy of
the requested records or allow the records to be inspected or copied within a reasonable time at a cost
that does not exceed the cost provided by Chapter 119, Florida Statutes, or as otherwise provided by
law.
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
16
C. Unless otherwise provided by law, any and all records, including but not limited to reports, surveys, and
other data and documents provided or created in connection with the Agreement are and shall remain the
property of the City.
D. Upon completion of the Agreement or in the event of termination by either party, any and all public
records relating to the Agreement in the possession of the Proposer shall be delivered by the Proposer to
the City Manager, at no cost to the City, within seven (7) days. All such records stored electronically by
Proposer shall be delivered to the City in a format that is compatible with the City’s information
technology systems. Once the public records have been delivered upon completion or termination of the
Agreement, the Proposer shall destroy any and all duplicate public records that are exempt or
confidential and exempt from public records disclosure requirements.
E. Any compensation due to Proposer shall be withheld until all records are received as provided in this
RFQ.
F. Proposer’s failure or refusal to comply with the provisions of this section shall result in the immediate
termination of the Agreement by the City.
G. Section 119.0701(2)(a), Florida StatutesIF THE PROPOSER HAS QUESTIONS REGARDING
THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE PROPOSER’S
DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THE CONTRACT, THE
PROPOSER MUST CONTACT THE CITY CUSTODIAN OF PUBLIC RECORDS. Custodian of
Records: ELORA RIERA, MMCMailing Address: 100 W. Dania Beach
Boulevard Dania Beach, Florida 33004 Telephone
number: 954-924-9800, Ext. 3623Email: eriera@daniabeachfl.gov
7.3. RESPONSE PROTEST PROCEDURE
A. After a Notice of Recommendation to Award a contract is posted, any actual or prospective Proposer in
connection with the pending award of the Contract, or any element of the process leading to the award
of the Contract may protest to the City Manager. A protest must be filed by 5:00 P.M. on the third (3rd)
Business Day after posting of the Notice of Award (excluding the day that the Notice is posted) or any
right to protest is waived. The protest must be in writing, must identify the name and address of the
protester, and must include a factual summary of, and the basis for, the protest. Filing shall be
considered complete when the written protest, together with an RFQ Protest w are both timely received
by the City Manager’s Office. No RFQ Protest shall be accepted unless it complies with the
requirements of this Section.
B. An RFQ Protest Bond is intended to compensate the City for the expenses of administering the
protest. If the protest is decided in the protester's favor, the entire deposit shall be returned to the
protester. If the protest is not decided in the protester's favor, the deposit shall be retained by the
City. The deposit shall be in the form of a cashier's check. The amount of the RFQ Protest Bond shall
be Five Thousand Dollars ($5,000.00).
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
17
C. Prior to any decision being rendered under this section with respect to a Proposal protest, the City
Manager and the City Attorney, or their respective designees, shall certify whether the submission of the
Proposer to the Proposal in question is responsive. The parties to the protest shall be bound by the
determination of the City Manager and the City Attorney with regard to the issue of responsiveness.
D. Protest Committee: The Protest Committee shall have the authority to review, settle, and resolve all
protests. Members of the Protest Committee will be appointed by the City Manager. If the Protest
Committee determines that the pending award of a contract or any element of the process leading to the
award involved a significant violation of law, applicable rule or regulation, all steps necessary and
proper to correct the violation shall be taken. If the Protest Committee determines that the protest has
merit, the City Manager shall direct all appropriate steps be taken to remedy it.
1. The decision shall specifically state the reasons for the action taken and inform the protestor of its
right to challenge the decision. Any person aggrieved by any action or decision of the Protest
Committee, with regard to any decision rendered under this section may appeal the decision to the
City Commission for a hearing. The City Commission will hear the appeal and render a final
decision.
E. In the event of a timely protest, the City Manager shall stay the award of the Contract, unless after
consulting with the City Attorney and a representative from the City’s Department for which the
services are being obtained, the City Manager then determines that the award of the contract is necessary
without delay to protect the substantial interests of the City. The continuation of the award process
under these circumstances shall not preempt or otherwise affect the protest.
F. The institution and filing of a protest under this provision is an administrative remedy that shall be
employed prior to the institution and filing of any civil action against the City concerning the subject
matter of the protest.
7.4. CONE OF SILENCE
A. Definitions: “Cone of Silence,” as used in this RFQ means a prohibition on any communication
between:
o a potential vendor, service provider, proposer, lobbyist, or consultant, and
o a City Commission member, City’s professional staff including, but not limited to, the City Manager
and her staff, or any member of the City’s Bid Review Committee.
B. Restriction; Notice: A Cone of Silence shall be imposed upon this RFQ upon the advertisement of the
RFQ. At the time of imposition of the Cone of Silence, the City Manager or designee shall provide for
public notice of the Cone of Silence by posting a notice at the City Hall.
C. Termination of Cone of Silence: The Cone of Silence shall terminate at the beginning of the City
Commission (whether a regular or special meeting) at which the City Manager makes a written
recommendation of award to the City Commission. However, if the City Commission refers the City
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
18
Manager’s recommendation back to the City Manager or staff for further review, the Cone of Silence
shall be re-imposed until such time as the City Manager makes a subsequent written recommendation.
D. Exceptions to Applicability: The provisions of this section shall not apply to:
o Communication with the City RFQ representative;
o Oral communications at pre-proposal conferences;
o Oral presentations before the Bid Review Committee;
o Public presentations made to the City Commission members during any duly noticed public meeting;
o Communications regarding the RFQ between a potential vendor, service provider, proposer, lobbyist
or consultant and the City’s Procurement Administrator or City employee designated as responsible
for administering the procurement process for the RFQ, provided the communication is limited
strictly to matters of process or procedure already contained in the corresponding solicitation
document;
o Communications with the City Attorney and his staff;
o Duly noticed site visits to determine the competency of a Proposer regarding the RFQ during the
time period between the opening of Proposals and the time the City Manager makes a written
recommendation;
o Any emergency procurement of goods or services pursuant to City Code;
o Proposals to the City’s request for clarification or additional information
o Communications to enable City staff to seek and obtain industry comment or perform market
research, provided all related communications between a potential vendor, service provider,
proposer, lobbyist, or consultant and any member of the City’s professional staff including, but not
limited to, the City Manager and staff are in writing or are made at a duly noticed public meeting .
E.
F. Penalties: Violation of this section by a Proposer or other listed person shall render any RFQ award or
contract to the Proposer voidable by the City Commission or City Manager. Any person who violates a
provision of this section may be prohibited from serving on the City Bid Review Committee. In addition
to any other penalty provided in this RFQ, violation of any provision of this section by a City employee
may subject the employee to disciplinary action.
Please contact the City Attorney for any questions concerning “Cone of Silence” compliance.
Request For Qualification #25-011 Title: CONSTRUCTION MANAGER AT RISK SERVICES FOR PJ MELI AQUATIC COMPLEX
19
8. Vendor Questionnaire
1. Have you uploaded your firms proposal documents, required supporting attachments and submission
requirements listed in Section 4.2 & 4.3?*
If no, please use this section in OpenGov to upload your firm's proposal, supporting attachments and
submission documents listed in sections 4.2 and 4.3. Please upload documents as one combined PDF
*Response required
2. Have you uploaded your firms' financials?*
If no, please use this section to upload your financial documents.
*Response required
515 Palm StreetWest Palm Beach, Florida 33401(561) 659-1400Fax (561) 659-1402
Vincent G. Burkhardt President
June 30, 2025
City of Dania Beach
100 W Dania Beach Blvd
Dania Beach, FL 33004-3643
Attn: Mrs. Cassi Waren, Director – Parks and Recreation
RE: Scope and fee proposal for pre-construction services RFQ NO. 25-011
Construction Manager at Risk (CMAR) for P.J. Meli Aquatic Complex
Dear Mrs. Warren,
Burkhardt Construction, Inc., acting as Construction Manager at Risk (CMAR), is pleased to
provide the attached scope and fee proposal to the City of Dania Beach (Owner) for pre-
construction services for P. J. Meli Aquatic Complex described in RFQ No. 25-011.
Burkhardt Construction, Inc. preconstruction services are composed of the following:
SCOPE OF WORK
1.Pre-construction Progress Meetings
2.Constructability Reviews / Value Engineering and Cost Estimates
3.Traffic Control Plan and Public Outreach
4.Pre-construction Scheduling
5.Guaranteed Maximum Price Development
Please feel free to contact me directly should you have any questions regarding any of the
information included in this letter or the attached scope of work and services.
Respectfully submitted,
Burkhardt Construction, Inc.
Marc R. Kleisley
Vice President
515 Palm StreetWest Palm Beach, Florida 33401(561) 659-1400Fax (561) 659-1402
Task 1: Pre-Construction Progress Meetings:
(A) The CMAR shall participate in design team progress meetings attended by the CM,
Designer, Owner, and others as requested. The CMAR shall provide agendas and
produce meeting notes from each meeting documenting the issues of the Project,
assigning responsibilities for issue resolution and tracking timelines for issue resolution.
CMAR shall provide meeting minutes after every progress meeting for the Owner and
design team to review and accept.
The CMAR anticipates fifteen (15) meetings
(B) This task will include the CMAR participating in community meetings, Commission
meetings and Development Review Committee meetings throughout the design process
as required by the Owner. These meetings shall include the introduction of the project
team, who & how to contact team individuals, discussion of the project
sequences/phasing, project timelines and additional details as requested by the Owner.
The CMAR anticipates two (2) meetings.
(C) Permit Tracking and Coordination – This task involves tracking permits for building,
zoning, environmental, engineering, etc. and coordinating with City or agencies for
approvals. Also, ensuring subcontractors comply with permit requirements.
Task 1 – $ 19,320.00
Task 2: Constructability Review / Value Engineering and Cost Estimates:
The CMAR will conduct document design reviews at 30% Construction Documents
(CD’s) and 60% CD’s. CMAR shall work with the designer to provide alternatives and design
solutions that are cost effective, value added and provide risk mitigation during construction.
The CMAR shall provide construction expertise in development of the construction
documents to provide optimal phasing and sequencing of the construction work to stay within
budget and schedule. CMAR shall perform a constructability analysis to identify defects,
omissions, and recommendations for alternatives, value engineering for all phases of the Project.
The constructability analysis shall include a review of: accessibility, construction methods,
assembly, installation, material handling, expandability, phasing and other construction phase
activities, and shall be delivered to Owner as a written document. CMAR shall also identify and
help resolve other issues that might affect the aesthetics and longevity of the final work product
and to mitigate logistical construction constraints.
Cost estimates will be performed at Conceptual plans, this is called the 30% CD’s and
60% CD’s to help determine the budget and to keep the project on track.
Task 2 – $ 24,160.00
515 Palm StreetWest Palm Beach, Florida 33401(561) 659-1400Fax (561) 659-1402
Task 3: Traffic Control Plan and Public Outreach:
CMAR shall develop, for approval by the City, a community plan to minimize the
construction impacts to residents, businesses, vehicular traffic and pedestrians, the public and
surrounding projects, in this active urban environment. This plan shall include methods of
outreach and information flow and communication between the Construction Team, businesses,
school representatives and/or neighborhood associations impacted by each project phase.
The CMAR will develop a traffic control plan which will provide coordinated adequate
accessibility to businesses along the corridor. The Traffic Control Plan shall address typical rush
hour traffic, school traffic and provide for construction sequencing that will optimize the
coordinated construction schedule along the work corridor.
Task 3 – $ 2,320.00
Task 4: Pre-Construction Scheduling:
The CMAR shall develop a master Pre-Construction Phase Bar Chart schedule
incorporating design development, permitting, plan review, cost estimate preparation, guaranteed
maximum price preparation, submittal review and approval, long lead item identification and
procurement, kickoff informational meeting, project ground-breaking, coordinated construction
sequencing, staging, and the overall construction schedule for the Project.
Task 4 – $ 6,960.00
Task 5: Guaranteed Maximum Price (GMP) Development:
This scope consists of the CMAR preparing the Guaranteed Maximum Price and the final
construction budget based on the 100% construction documents provided by the Owner/Design
Team. The GMP shall consist of detailed line items for all major work to be performed. The GMP
will follow the same format as the cost estimates. The following activities will take place, but will
not be limited to:
A. Public Advertisement: The CMAR will place an ad in a south Florida newspaper.
Each ad will run for ten days over two consecutive weekends as a public notice to
subcontractors to pre-qualify with the CMAR. Ads can be run in additional
newspapers at the Owner’s request as well.
B. Subcontractor Pre-Qualification: The CMAR will use a pre-qualification
questionnaire to qualify subcontractors who wish to bid on the projects. The
questionnaire has subcontractors address items like bonding capacity, insurance
515 Palm StreetWest Palm Beach, Florida 33401(561) 659-1400Fax (561) 659-1402
requirements, current schedule of work on hand, how many full time employees the
firm has working for it, and other items that the CMAR feels are necessary to have a
good subcontracting pool with which to issue bid packages. The CMAR will also
respond to any questions the subcontractors have about prequalifying. The CMAR
will then create a list of prequalified bidders and review them with the team to
determine if a larger pool is required.
C. Bid Package Preparation: The CMAR will conduct quantity surveys on the 100%
construction plans using the same procedures used in the cost estimates to form
scopes of work for each trade. These quantities are an in-house product used as an
independent verification for use in analyzing subcontractor bids. These quantities will
be put in an Excel spreadsheet and distributed to the qualified subcontractors as the
bid form with the Invitation to Bid and Instructions to Bidders. The bid packages that
will be developed will be tailored to the market of prospective bidders.
D. Issuance of Bid Packages:. The CMAR will issue bid packages to all qualified
subcontractors that will include the Invitation to Bid, Instructions to Bidders and the
bid form. The CMAR will conduct pre-bid meetings with prequalified subcontractors
and conduct pre-bid tours of the project site, if necessary, Any questions that arise
during the bidding phase will be answered in an addendum that will be sent to all
bidding subcontractors. A date will be set to receive bids from all subs. This date will
be firm and any subcontractor who submits after this date will be disqualified.
E. Analyzing of Subcontractor Bids: After the CMAR receives all qualified bids (i.e.
The bidding subcontractor responds on time with a complete bid) they will then begin
analyzing and comparing the subcontractor bids. The CMAR will first be sure that all
bids received are complete and that they acknowledge any and all addenda. Then the
CMAR will set up a bid comparison spreadsheet to compare which subcontractors
are low in their scope of work. The CMAR will conduct post bid meetings with
individual subcontractors to confirm scope coverage and where necessary, create a
scope coordination matrix to avoid any overlap of scope. After preparing and
analyzing the comparison spreadsheets, the CMAR will prepare a recommendation
for the apparent low bidder in each scope of work.
F. Preparation of the Guaranteed Maximum Price (GMP): After going through all these
steps, the CMAR will compile the GMP for the Owner. Included in this GMP will be
the CMAR’s general conditions, construction phase management team, profit and
contingency. The CMAR will calculate the amount of savings the City can expect
from Owner Direct Purchase.
515 Palm StreetWest Palm Beach, Florida 33401(561) 659-1400Fax (561) 659-1402
The aforementioned information shall be presented to the Owner along with all supporting
documentation (bid advertisements, bid packages, quantity surveys, subcontract bids, vendor
quotes, spread sheet analysis, CMAR recommendations, line-item direct construction costs,
general conditions, construction phase management team, CMAR fee, contingency, exceptions
and clarifications, and plan log) shall be bound and submitted to the Owner for review,
discussion, and approval.
Once approved, the GMP shall become the basis of the construction phase of the contract and
shall be documented as an amendment to the base Contract.
Task 5 – $ 35,900.00
TOTAL PRE-CONSTRUCTION SERVICES FEE ALL TASKS 1 THROUGH 5:
$ 88,660.00
All tasks and fees include supplies, presentation materials, equipment, personnel, travel, and
related costs associated with performing the services described.
Presentation and acceptance, by the Owner, of a mutually acceptable GMP shall conclude
preconstruction services.
We have attached our current hourly rates for your use should additional or alternative pre-
construction services be requested. Additional pre-construction services scope and fee proposals
for other services shall be prepared and submitted by the CMAR as requested by the Owner.
Thank you for the opportunity to submit this pre-construction services proposal. If you have any
questions on this proposal, please contact us at (561) 659-1400.
Respectfully,
Burkhardt Construction, Inc.
Marc R. Kleisley
Vice President
515 Palm StreetWest Palm Beach, Florida 33401(561) 659-1400Fax (561) 659-1402
City of Dania Beach
Scope and fee proposal for pre-construction services
RFQ No. 25-011
Construction Manager at Risk (CMAR)
for Construction of P.J. Meli Aquatic Complex
Hourly Rates for Additional Requested
Pre-Construction Services
Name Position Rate
Vincent G. Burkhardt President $325.00
Sharon H. Burkhardt Secretary/C.P.A. $215.00
Marc R. Kleisley Vice President/Proj. Principal $215.00
Anthony Sabatino Senior Project Manager $160.00
Bill Zammit Snr. Vertical Project Manager $160.00
Adam Rossmell Project Manager $125.00
CJ Rhody Project Manager $125.00
Brandon Rhodes Project Manager $125.00
Kevin Brennen Project Manager $125.00
Nicholas Fasulo Project Manager $125.00
Ruben Almazan Const. Field Mgr. $105.00
Bob Woods Const. Field Mgr. $105.00
Mike Vazquez Const. Field Mgr. $105.00
Karl T. Kaminski Utilities Const. Field Mgr. $105.00
Hemant Tank Estimator/Cost Engineer $100.00
` Resident/Merchant Outreach $100.00
Sarah B. Hoadley Accounting Manager/M.B.A. $ 95.00
Katy Pantaleon Accounting $ 85.00
Rina Jorges Admin. Ass’t/Clerical $ 55.00
Crystal Caldwell Admin. Ass’t/Clerical $ 55.00
City of Dania Beach
Finance Memorandum
DATE: 7/8/2025
TO: Honorable Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Yeimy Guzman, Chief Financial Officer
SUBJECT: Non-ad valorem assessment rates for Fire Protection Services for the Fiscal Year
beginning October 1, 2025, and ending September 30, 2026.
Request:
Approval of a preliminary resolution establishing non-ad valorem assessment rates for Fire
Protection Services for the Fiscal Year beginning October 1, 2025, and ending September 30,
2026.
Background:
Since fiscal year 1997-1998, the City has levied an annual assessment to fund a portion of the
costs for its Fire Protection Services. The budget and the City’s call data were reviewed by the
City’s rate consultant to provide the assessment rates for the upcoming fiscal year. No EMS costs
are funded with revenue from the special assessment.
The attached Preliminary Assessment Resolution sets forth the proposed assessment rates for the
Fiscal Year 2025-2026. It also provides for a public hearing for the adoption of the final
assessment roll on Monday, September 15, 2025, and notice of such hearing. The September 15th
meeting is noticed through the annual TRIM (Truth in Millage) notices forwarded by the
Broward County Property Appraiser’s Office to all property owners, as well as published notice
by the City Clerk. State law requires the City to conduct a public hearing to levy the special
assessment, with no less than twenty (20) days’ notice of the public hearing.
The City utilizes a consultant to prepare the annual methodology report, and the methodology
used for the 2025-26 special assessment is the same as the previous year. A review was
conducted in 2021 that resulted in a minor change in the methodology. The apportionment of
costs was modified to provide for a more equitable sharing of costs among commercial and
warehouse properties, especially those with higher square footage. This methodology accurately
reflects the nature of Fire Protection Services provided by the City, including both call volume
and property type.
The City has undergone substantial multifamily and commercial development in recent years and
is well-positioned for further growth. This expansion has led to an increased demand for fire
services, accompanied by rising costs for these services and necessary investments in fire
personnel and equipment. Development efforts continue to shape the property base, while call
volume impacts the annual apportionment of calls. Lastly, the recommended rates will recover
100% of assessable fire services costs. As a result, some property owners will experience a
modest increase in Fire Protection Services assessment rates in FY2025/26, while others will see
a decrease, as detailed in the following table:
Category FY2025
Rate
FY2026
Rate
Difference %
Change
Acreage $85.23 $72.87 (12.36) -14.5%
Commercial $0.4213 $0.4177 (0.0036) -.08%
Residential $241.05 $270.76 29.71 12.3%
Warehouse/Industrial $0.0488 $0.0513 .0025 .05%
The residential assessment rate increased by $29.71 (12.3%) to $270.76 per residential unit,
while the rate for acreage decreased by $12.36 (14.5%). The commercial rate decreased slightly,
while the warehouse/industrial rate increased very slightly due to a shift in call volume.
Budgetary Impact
According to the consultant’s methodology report, the maximum Fire Services assessable costs
are estimated to be $8,963,913. Finance recommends assessing for 100% of assessable fire
services costs, resulting in a net budgeted levy of $8,605,356. The remaining costs of the Fire
Protection budget, and all costs of EMS, will be funded by sources other than the special
assessment.
Recommendation
Recommend that the City Commission adopt the preliminary resolution establishing the
estimated non-ad valorem assessment rate for Fire Protection Services for the Fiscal Year
beginning October 1, 2025, and ending September 30, 2026.
RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, RELATING TO THE IMPOSITION OF FIRE RESCUE
ASSESSMENTS AND THE PROVISION OF FIRE SERVICES,
FACILITIES AND PROGRAMS WITHIN THE CITY OF DANIA BEACH,
FLORIDA; PROVIDING AUTHORITY; PROVIDING FOR PROVISION
AND FUNDING OF FIRE SERVICES; PROVIDING FOR IMPOSITION
AND COLLECTION OF SUCH ASSESSMENTS; PROVIDING
LEGISLATIVE DETERMINATIONS OF SPECIAL BENEFIT AND FAIR
APPORTIONMENT; PROVIDING UPDATED ASSESSMENT
CALCULATIONS; ESTABLISHING PRELIMINARY NOT-TO-EXCEED
ASSESSMENT RATES FOR FIRE ASSESSMENTS TO PROVIDE FOR
THE PROVISION OF FIRE SERVICES, FACILITIES AND PROGRAMS
FOR THE FISCAL YEAR BEGINNING OCTOBER 1, 2025; DIRECTING
THE PREPARATION OF A PRELIMINARY ASSESSMENT ROLL;
AUTHORIZING A PUBLIC HEARING AND DIRECTING THE
PROVISION OF MAILED AND PUBLISHED NOTICE OF SUCH
HEARING; PROVIDING FOR CONFLICTS; PROVIDING FOR
SEVERABILITY; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, in July of 1996, the City of Dania Beach ("City") implemented a Fire
Rescue Assessment to provide a portion of the funding for the City's fire rescue services
and facilities with the adoption of Ordinance No. 10-96, subsequently codified as Chapter
23, Article VIII of the City of Dania Beach Code of Ordinances (the "Fire Assessment
Ordinance"), and imposed fire rescue assessments for Fiscal Year 1997-1998 with the
adoption of Resolution No. 63-96 also referred to as Resolution No. 1996-063 (the 'Initial
Assessment Resolution") and Resolution No. 72-96 also referred to as Resolution No. 1996-
72 (the "Final Assessment Resolution", and together with the Initial Assessment Resolution,
the "Initial Resolutions"); and
WHEREAS, the Fire Assessment Ordinance sets forth the process for annual
administration of the Fire Rescue Assessments which includes adoption of (i) a Preliminary
Rate Resolution describing the method of assessing fire rescue costs against Assessed
Property located within the City, directing the preparation of an Assessment Roll, authorizing
a public hearing and directing the provision of notice of such hearing, and (ii) an Annual Rate
Resolution adopting the final assessment rates and directing billing and collection of the Fire
Rescue Assessments for the forthcoming Fiscal Year; and
2 RESOLUTION #2025-______
WHEREAS, in each year subsequent to 1996, the City has adopted the annual
resolutions required by the Fire Assessment Ordinance for annual imposition and collection
of the Fire Rescue Assessments; and
WHEREAS, to facilitate the understanding of the public and simplify the
administration of the Fire Rescue Assessments, the City adopted Resolution No. 2017-084
and Resolution No. 2017-105 (collectively, the "2017 Resolutions") which superseded and
supplanted all prior resolutions adopted pursuant to the Fire Assessment Ordinance without
affecting the validity or effectiveness of any of the Fire Rescue Assessments adopted and
imposed by such prior resolutions; and
WHEREAS, in each year subsequent to 2017, the City has adopted Preliminary Rate
Resolutions and Annual Rate Resolutions in accordance with the requirements of the Fire
Assessment Ordinance (such resolutions, together with the 2017 Resolutions, are referred
to herein as the "Prior Assessment Resolutions"); and
WHEREAS, the City engaged the rate consulting firm Raftelis Financial Consultants,
Inc. ("Raftelis") to prepare a study updating the data and methodology used by the City to
calculate the Fire Rescue Assessment imposed against each property; and
WHEREAS, a copy of the FY 2026 Fire Services Assessment Study prepared by Raftelis
(the "2025 Methodology Study") is attached hereto as Exhibit A; and
WHEREAS, the City Commission of the City of Dania Beach, Florida, deems it to be in
the best interest of the citizens and residents of the City of Dania Beach to adopt this Preliminary
Rate Resolution to begin the process of imposing Fire Rescue Assessments and approving and
certifying the Assessment roll for the Fiscal Year commencing October 1, 2025 ("Fiscal Year
2025-26").
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. Authority. This Resolution is adopted pursuant to the provisions of the Fire
Rescue Assessment Ordinance, the Prior Assessment Resolutions, Florida Statutes 166.021, 166.041
and 197.3632, and other applicable provisions of law.
Section 2. Definitions, Purpose and Findings. Capitalized terms not otherwise
defined herein shall have the meanings assigned in the Fire Assessment Ordinance and Prior
Assessment Resolutions. This Resolution constitutes the Preliminary Rate Resolution for Fiscal
Year 2025-26 which initiates the annual process for updating the Assessment Roll. This
3 RESOLUTION #2025-______
Resolution ratifies, confirms and supplements the Fire Assessment Ordinance and Prior
Assessment Resolutions. The recital clauses set forth above are incorporated herein as the
legislative finding of the City Commission. All recitals and legislative findings concerning
the special benefit conveyed by fire rescue services and facilities and the fair and reasonable
apportionment of the Fire Rescue Assessments set forth in the Fire Assessment Ordinance
and Prior Assessment Resolutions are specifically ratified, confirmed and incorporated in
this Resolution.
Section 3. Provision and Funding of Fire Services. Upon the imposition of Fire
Rescue Assessments for fire services, facilities, or programs against Assessed Property located
within the City, the City shall provide fire services to such Assessed Property. A portion of the
cost to provide such fire services, facilities, or programs shall be funded from proceeds of the
Fire Rescue Assessments. The remaining costs required to provide fire services, facilities, or
programs shall be funded by lawfully available City revenues other than Fire Rescue Assessment
proceeds. No emergency medical services ("EMS") costs are included in the Fire Rescue
Assessment, and EMS costs shall not be funded by Fire Rescue Assessment proceeds. It is
ascertained, determined, and declared by this Resolution that each parcel of Assessed Property located
within the City will be benefited by the City's provision of fire services, facilities, or programs in an
amount not less than the Fire Rescue Assessment imposed against such parcel, computed in the
manner as set forth in this Preliminary Rate Resolution.
Section 4. Imposition and Computation of Fire Rescue Assessments. The 2026
Methodology Study describing the method of apportioning the Fire Rescue Assessments among
Assessed Property, a copy of which is attached hereto as Exhibit A, is hereby approved, adopted
and incorporated herein by reference. Fire Rescue Assessments for Fiscal Year 2025-26 shall be
imposed against all Assessed Property based on the apportionment methodology for the Fire
Rescue Assessment approved by the Prior Assessment Resolutions as updated in the 2026
Methodology Study using the Fire Class Codes and Fire Basis data maintained by the Broward
County Property Appraiser for each Assessed Property.
Section 5. Legislative Determinations of Special Benefit and Fair
Apportionment. Adoption of this Resolution constitutes a legislative determination that all
parcels assessed derive a special benefit from the provision of fire rescue services, facilities and
programs, and that the Fire Assessed Costs are apportioned fairly and reasonably among Assessed
Properties, consistent with the 2026 Methodology Study and the legislative declarations,
4 RESOLUTION #2025-______
determinations and findings as set forth in the Fire Assessment Ordinance and Prior Assessment
Resolutions.
Section 6. Determination of Fire Assessed Costs; Establishment of Proposed
Not-to-Exceed Fire Rescue Assessment Rates. The Fire Assessed Cost to be assessed and
apportioned among Assessed Property for Fiscal Year 2025-26 is $ 8,963,913 which
represents 100% of the City's fire-related costs for Fiscal Year 2025-26 which are eligible
for funding through the Fire Rescue Assessments. The remainder of such Fiscal Year budget
for fire rescue services, facilities, and programs shall be funded from lawfully available City
revenue other than Fire Rescue Assessment proceeds. The proposed Not-to-Exceed Fire
Rescue Assessment Rates to generate the Fire Assessed Cost for such Fiscal Year are
presented below. The approval of the Proposed Fire Rescue Assessment Rate Schedule by
the adoption of this Preliminary Rate Resolution determines the maximum amount of the
Fire Assessed Cost and the maximum, or not-to-exceed, rates that may be imposed and
collected for the upcoming fiscal year.
PROPOSED NOT-TO-EXCEED FIRE RESCUE ASSESSMENT RATES
FOR FISCAL YEAR 2025-26
PROPERTY USE
CATEGORIES
RATE BASIS RATE
Residential Per Dwelling Unit $ 270.76
Acreage/Vacant Per Acre $ 72.87
Commercial Per Square Foot $ 0.4177
Industrial/Warehouse Per Square Foot $ 0.0513
Section 7. Preliminary Assessment Roll. The City Manager or designee is
directed to prepare, or cause to be prepared, an updated Preliminary Assessment Roll for
Fiscal Year 2025-26, in the manner provided in the Fire Assessment Ordinance and this
Resolution. The updated Assessment Roll shall include all Assessed Properties within the
Fire Class Code categories and incorporate the Proposed Rates referenced in Section 6 above.
Any property uses or classifications which were exempted from payment of the Fire Rescue
Assessments by the Prior Assessment Resolutions shall be exempted from the Fire Rescue
Assessments for Fiscal Year 2025-26. The City Manager or designee shall apportion the
estimated Fire Assessed Cost to be recovered through Fire Rescue Assessments in the manner
5 RESOLUTION #2025-______
approved and adopted in this Resolution. A copy of this Preliminary Rate Resolution, the
Fire Assessment Ordinance, the Prior Assessment Resolutions, the 2026 Methodology Study,
documentation related to the estimated amount of the Fire Assessed Cost to be recovered
through the imposition of Fire Rescue Assessments, and the updated preliminary Assessment
Roll shall be maintained on file in the office of the City Clerk and open to public inspection.
The foregoing shall not be construed to require that the updated Preliminary Assessment Roll
proposed for Fiscal Year 2025-26 be in printed form if the amount of the Fire Rescue
Assessment for each parcel of Assessed Property can be determined by the use of a computer
terminal available to the public.
It is ascertained, determined, and declared by this Resolution that the method of
determining the Fire Rescue Assessments for fire services as set forth in this Preliminary Rate
Resolution is a fair and reasonable method of apportioning the Fire Assessed Cost among
parcels of Assessed Property located within the City.
Section 8. Authorization of Public Hearing. There is established a public
hearing to be held at 7:00 p.m. on September 15, 2025, in the City of Dania Beach City
Commission Chamber, 100 West Dania Beach Boulevard, Dania Beach, Florida, at which
time the City Commission will receive and consider any comments on the Fire Rescue
Assessments. At the conclusion of such public hearing, the City Commission will consider
adoption of the Annual Rate Resolution for Fiscal Year 2025-26 imposing the Fire Rescue
Assessments for such Fiscal Year, approving and certifying the final Assessment Roll, and
providing for collection of the assessments on the same bill as ad valorem taxes. Adoption of
the Annual Rate Resolution after the public hearing and approval of the final Assessment Roll
shall be the final adjudication of the issues presented therein (including, but not limited to,
the determination of special benefit and fair apportionment, the method of apportionment, the
Fire Rescue Assessment rates, the final Assessment Roll and the levy, collection and lien of
the Fire Rescue Assessments), unless proper steps shall be initiated in a court of competent
jurisdiction to secure relief within 20 days from the adoption of the Annual Rate Resolution.
Section 9. Notice of Publication. The City Clerk shall publish a notice of the
public hearing authorized by Section 8 of this Preliminary Rate Resolution in the manner
and time provided in Section 23-98 of the Ordinance.
6 RESOLUTION #2025-______
Section 10. Notice by Mail. The Director of Finance shall provide information on the
public hearing and the proposed not-to-exceed rates to the Broward County Property Appraiser's
Office to be included in the TRIM (Truth in Millage) Notice to serve as first class notice as
required by the Fire Assessment Ordinance.
Section 11. Application of Assessment Proceeds. Proceeds derived by the City from
the Fire Rescue Assessments will be utilized for the provision of fire services, facilities, and
programs and will not be used for any EMS costs or services. In the event there is any unexpended
or uncommitted assessment revenue remaining at the end of the Fiscal Year, such balance shall
be carried forward and used only to fund fire services, facilities, and programs.
Section 12. Conflict. That all resolutions or parts of resolutions in conflict with this
Resolution are superseded and supplanted to the extent of such conflict.
Section 13. Severability. That if any clause, section, other part or application of this
Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part
or application, it shall not affect the validity of the remaining portions or applications of this
Resolution.
Section 14. Effective Date. That this Resolution shall be in force and take effect
immediately upon its passage and adoption.
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by __________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
SIGNATURES ON THE FOLLOWING PAGE
7 RESOLUTION #2025-______
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
8 RESOLUTION #2025-______
EXHIBIT A
FY 2025-2026 Fire Services Assessment Study
(“2026 Methodology Study”)
Dated June 06, 2025
Prepared by Raftelis Financial Consultants
CITY OF DANIA BEACH
FY 2026 Fire Services
Assessment Study
DRAFT REPORT / June 6, 2025
341 N. Maitland Avenue, Suite 300, Maitland, FL 32751
www.raftelis.com
June 6, 2025
Yeimy Guzman
Chief Financial Officer
City of Dania Beach
100 W Dania Beach Blvd
Dania Beach, FL 33004
Subject: FY 2026 Fire Services Assessment Study
Dear Ms. Guzman:
Raftelis Financial Consultants, Inc. (Raftelis) is pleased to present this Draft Report of the FY 2026 Fire Services
Assessment Study that we have conducted for the City of Dania Beach. This report presents the analysis of the
study for consideration and adoption of the initial resolution hearing. Please review and provide us with any
comments, requests for revisions, or additional scenarios. Upon receipt of any requested changes, we will issue a
Final Draft for review, followed by the Final Report for your records.
We appreciate the opportunity to be of service to the City and would like to thank the City staff for their valuable
assistance and cooperation throughout the course of this study.
Respectfully Submitted,
Raftelis Financial Consultants, Inc.
Joe Williams
Senior Manager
Erick van Malssen
Senior Consultant
City of Dania Beach / FY 2026 Fire Services Assessment Study
Contents
EXECUTIVE SUMMARY .................................................................... 1
Introduction ...........................................................................................................................1
Study Procedures ..................................................................................................................1
Summary of Study Results ...................................................................................................1
Full (100%) Cost Recovery Rate Calculation ............................................................................. 1
Partial Cost Recovery Rate Calculation – Revenue Neutral Rates ............................................ 2
Section 1 – Introduction ................................................................... 4
Background ...........................................................................................................................4
Methodology ..........................................................................................................................4
Section 2 – Fire Services Costs ....................................................... 7
Fire and Rescue Service Allocation .....................................................................................7
Calculation of the Net Revenue Requirement .....................................................................8
Section 3 – Calculation of the Fire Assessment ........................... 10
Assessment Property Classifications ............................................................................... 10
Calls For Service Analysis ................................................................................................. 12
Apportionment of the Net Revenue Requirement ............................................................ 13
Fire Assessment Rate Calculation ..................................................................................... 13
Full (100%) Cost Recovery Rate Calculation ........................................................................... 13
Partial Cost Recovery Rate Calculation – Revenue Neutral Rate Target Scenario .................. 14
Consideration of Fair Apportionment of Assessment ..................................................... 15
Section 4 – Summary of Recommendations .................................. 17
Section 5 – Appendix A .................................................................. 18
City of Dania Beach / FY 2026 Fire Services Assessment Study
List of Tables and Figures
Table ES 1 – FY 2026 Assessment Rate Calculation – Full (100%) Cost Recovery ................................. 2
Table ES 2 – Net Billed and Estimated Collected Revenue – Full (100%) Cost Recovery ........................ 2
Table ES 3 – FY 2026 Assessment Rate Calculation – Revenue Neutral Rate Target Scenario -
$8,126,500 Net Revenue (94.44% Cost Recovery) .................................................................................. 3
Table ES 4 – Revenue Neutral Rate Target Scenario - Net Billed and Estimated Collected Revenue
(includes deduction of exemptions) - $8,126,500 Target Revenue ........................................................... 3
Table 1 – Current FY 2024 Fire Assessment Rates ................................................................................. 4
Table 2 – Allocation of Personnel between Fire and Rescue ................................................................... 8
Table 3 – Calculation and Projection of the Net Revenue Requirement ................................................... 9
Table 4 – Identified Units by BCPA Fire Class Category ........................................................................ 11
Table 5 – Fire Call Allocation to Real Property, by Property Type .......................................................... 12
Table 6 – Allocation of FY 2026 Net Revenue Requirement .................................................................. 13
Table 7 – FY 2026 Assessment Rate Calculation – Full (100%) Cost Recovery .................................... 13
Table 8 – Net Billed and Estimated Collected Revenue – Full (100%) Cost Recovery ........................... 14
Table 9 – FY 2026 Assessment Rate Calculation – Revenue Neutral Rate Target Scenario - $8,126,500
Net Revenue (94.44% Cost Recovery) .................................................................................................. 14
Table 10 - Revenue Neutral Rate Target Scenario - Net Billed and Estimated Collected Revenue
(includes deduction of exemptions) - $8,126,500 Target Revenue ......................................................... 15
City of Dania Beach / FY 2026 Fire Services Assessment Study 1
EXECUTIVE SUMMARY
Introduction
The City of Dania Beach (“the City”) has annually levied and collected a Non-Ad Valorem Fire Assessment
against benefitted properties within the City to fund the provision of fire services beginning Fiscal Year (FY) 1997.
The City annually considers the continuance of the Fire Assessment program and the amount to be funded for Fire
Services. This study intends to update the Fire Assessment program using current property, cost, and calls for
service data. The calls for service data used to provide the basis of Fire Service cost allocation to property types can
change over time, therefore periodic updates to the Fire Assessment calculations are required to accurately and
fairly reflect current allocation parameters to benefited properties.
In accordance with Florida Law, the costs associated with providing Fire Services and facilities must be reasonably
apportioned to the properties that receive a benefit from Fire Service in proportion to the benefit received.
Therefore, the recommended Fire Assessments calculated in this study were developed such that the costs incurred
by the City in providing Fire Service will be recovered through assessments to properties in proportion to the
benefit received by the demand for service as reflected in the calls for service from each respective property class.
Study Procedures
The study first identifies the full Fire Services cost requirements for FY 2026 that recognizes the high level of
service traditionally provided by Broward Sherrif’s Office (BSO) and the City. This was accomplished by first
allocating the full FY 2026 Proposed Fire Department budget between Fire Services and Emergency Medical
Services (EMS) as required by Florida state statute. We also projected annual cost requirements for providing Fire
Services in each year of a multi-year projection period from FY 2026 through FY 2030. This was accomplished
through interactive work sessions with City staff to confirm allocation parameters, cost escalation rates, and the
projected capital improvement plan.
The FY 2026 Fire Service Net Revenue Requirement identified in the budget allocation and projection process was
then apportioned to each property class based upon National Fire Incident Reporting System (NIFRS) calls for
service data provided by the BSO. Current Fire Rescue Non-Ad Valorem Assessment Roll and Property data
provided by the Broward County Property Appraiser was used as the primary data source for assigning assessment
units to each parcel. Property classifications were based upon the currently assigned Fire Class Codes for each
parcel as maintained on the Property Appraiser’s database. Once the allocation to property classes was complete,
the Fire Assessment rate structure was developed and specific Fire Assessment rates for each property class were
developed.
Summary of Study Results
Full (100%) Cost Recovery Rate Calculation
To calculate the FY 2026 Fire Assessments, we utilized the apportioned costs and total units per property
classification as discussed in detail in subsequent sections of this report. The amount of assessable costs allocable to
each property class was divided by the number of assessment units identified in each property class to compute the
City of Dania Beach / FY 2026 Fire Services Assessment Study 2
Fire Assessment to be imposed against each parcel. Table ES 1 below presents the calculated FY 2026 Assessment
Rates at full (100%) cost recovery, as well as a comparison of the existing FY 2026 Assessment Rates:
Table ES 1 – FY 2026 Assessment Rate Calculation – Full (100%) Cost Recovery
While the full cost FY 2026 Net Revenue Requirement is apportioned to all properties, the actual revenue realized
will be less because exempted property is included in the apportionment but cannot be billed/assessed. In
addition, a 96% budget adjustment factor was used to calculate the estimated net collected revenue after accounting
for early payment discounts to the assessment bills. Table ES 2 below presents the estimated net billed and
estimated assessment revenue at full (100%) cost recovery.
Table ES 2 – Net Billed and Estimated Collected Revenue – Full (100%) Cost Recovery
Partial Cost Recovery Rate Calculation – Revenue Neutral Rates
The City has requested Raftelis to calculate the assessments with the latest call and property data, targeting the
same revenue that would be generated with the current adopted (FY 2025) rates. The Broward County Property
Appraiser’s data shows that the current adopted rates would generate $8,465,100 (rounded) in billed assessment
revenues. With the 96% budgetary adjustment/discount applied, the current rates would collect an estimated
$8,126,500 (rounded) in net revenues. To accomplish the revenue target, the full cost NRR was reduced to
94.44% of the total potential costs. Table ES 3 below presents the rate calculations for this revenue target, while
Table ES 4 shows the calculation of the target revenue.
BCPA Category
Description
BCPA
Code
Call
Allocation %
Allocated FY
2026 NRR
Allocated
Units Unit Type
FY 2026 -
Calculated
Rates per Unit
FY 2025 -
Current Rates
per Unit
Acreage (Vacant)A 0.54%52,880$ 726 Acre 72.87$ 85.23$
Commercial C 39.99%3,937,175$ 9,424,503 Sq Ft 0.4177$ 0.4213$
Residential R 50.93%5,014,009$ 18,518 Dwelling Unit 270.76$ 241.05$
Warehouse/Industrial W 3.47%341,318$ 6,650,500 Sq Ft 0.0513$ 0.0488$
Government, Exempt X 4.30%423,042$ 645,248 Sq Ft 0.6556$ N/A
Not For Profit, Exempt Y 0.78%76,917$ 446,157 Sq Ft 0.1723$ N/A
100.00%9,845,342$
BCPA Category
Description
BCPA
Code
Allocated
Assessment
Less:
Exemptions
Total Billed
Assessment
Acreage (Vacant)A 52,880$ (2,856)$ 50,025$
Commercial C 3,937,175$ (133,606)$ 3,803,569$
Residential R 5,014,009$ (242,406)$ 4,771,603$
Warehouse/Industrial W 341,318$ (2,602)$ 338,716$
Government, Exempt X 423,042$ (423,042)$ -$
Not For Profit, Exempt Y 76,917$ (76,917)$ -$
9,845,342$ (881,429)$ 8,963,913$
Budgetary Adjustment/Discount 96%
FY 2026 Estimated Collected Revenue 8,605,356$
City of Dania Beach / FY 2026 Fire Services Assessment Study 3
Table ES 3 – FY 2026 Assessment Rate Calculation – Revenue Neutral Rate Target Scenario -
$8,126,500 Net Revenue (94.44% Cost Recovery)
Table ES 4 – Revenue Neutral Rate Target Scenario - Net Billed and Estimated Collected Revenue
(includes deduction of exemptions) - $8,126,500 Target Revenue
BCPA Category
Description
BCPA
Code
Call
Allocation %
Allocated FY
2026 NRR
Allocated
Units Unit Type
FY 2026 -
Calculated
Rates per Unit
FY 2025 -
Current Rates
per Unit
Acreage (Vacant)A 0.54%49,940$ 726 Acre 68.82$ 85.23$
Commercial C 39.99%3,718,268$ 9,424,503 Sq Ft 0.3945$ 0.4213$
Residential R 50.93%4,735,231$ 18,518 Dwelling Unit 255.70$ 241.05$
Warehouse/Industrial W 3.47%322,341$ 6,650,500 Sq Ft 0.0484$ 0.0488$
Government, Exempt X 4.30%399,521$ 645,248 Sq Ft 0.6191$ N/A
Not For Profit, Exempt Y 0.78%72,640$ 446,157 Sq Ft 0.1628$ N/A
100.00%9,297,941$
BCPA Category
Description
BCPA
Code
Allocated
Assessment
Less:
Exemptions
Total Billed
Assessment
Acreage (Vacant)A 49,940$ (2,696)$ 47,244$
Commercial C 3,718,268$ (125,958)$ 3,592,310$
Residential R 4,735,231$ (229,029)$ 4,506,201$
Warehouse/Industrial W 322,341$ (2,773)$ 319,568$
Government, Exempt X 399,521$ (399,521)$ -$
Not For Profit, Exempt Y 72,640$ (72,640)$ -$
9,297,941$ (832,617)$ 8,465,324$
Budgetary Adjustment/Discount 96%
FY 2026 Estimated Collected Revenue 8,126,711$
City of Dania Beach / FY 2026 Fire Services Assessment Study 4
Section 1 – Introduction
Background
The City of Dania Beach (“the City”) has annually levied and collected a Non-Ad Valorem Fire Assessment
against benefitted properties within the City to fund the provision of fire services beginning Fiscal Year 1997. The
City annually considers the continuance of the Fire Assessment program and the amount to be funded for Fire
Services. This study intends to update the Fire Assessment program using current property, cost and calls for
service data. The City’s current FY 2025 Fire Assessment rates by property class are presented in Table 1 below.
These rates produced an estimated net collections of approximately $7.5 million upon issuance in FY 2025.
Table 1 – Current FY 2024 Fire Assessment Rates
The calls for service data used to provide the basis of Fire Service cost allocation to property types can change over
time, therefore periodic updates to the Fire Assessment calculations are required to accurately and fairly reflect
current allocation parameters to benefited properties.
The term “Fire Services” as used in this study refers to the twenty-four hours per day, seven days per week service
for fire suppression provided to City properties. The City has previously determined that the owners of property
benefited by the proposed Fire Services should share in funding these services by imposition of non-ad valorem
assessments. The City can fund through assessments up to 100% of the net Fire Services assessable costs,
estimated to be $9,845,342 in fiscal year 2026, as detailed in subsequent sections of this report. The City contracts
with the Broward Sheriff’s Office (BSO) for Fire Rescue Services and it also has legacy pension and other City
costs that must continue to be funded in addition to those pension costs charged by BSO.
Methodology
The development of a Non-Ad Valorem Assessment to fund Fire Services requires that the services and facilities
for which properties are to be assessed confer a special benefit upon the property burdened by the special
assessment. Simply stated, there must be a logical relationship between the services and facilities provided and the
benefit to real property assessed.
In addition to the special benefit requirement, the costs associated with providing the services and facilities must be
reasonably apportioned to the properties that receive a benefit from Fire Service in proportion to the benefit
received. Therefore, the recommended Fire Assessments calculated in this study were developed such that the
costs incurred by the City in providing Fire Service will be recovered through assessments to properties in
proportion to the benefit received by the demand for service as reflected in the calls for service from each respective
property class.
BCPA Category
Description
Current Rates
per Unit Unit Type
Acreage (Vacant)85.23$ Acre
Commercial 0.4213$ Sq Ft
Residential 241.05$ Dwelling Unit
Warehouse/Industrial 0.0488$ Sq Ft
City of Dania Beach / FY 2026 Fire Services Assessment Study 5
This part of the report describes the assessment methodology used to develop the Fire Assessments. The first
section discusses relevant Florida Law regarding Special Non-Ad Valorem Assessments, followed by sections
discussing how Florida Law has been applied to the determination of special benefit and the apportionment of the
annual revenue requirements of the Fire Assessment to benefitting properties.
SUMMARY OF RELEVANT FLORIDA LAW GOVERNING SPECIAL ASSESSMENTS
This section discusses relevant Florida Law regarding special non-ad valorem assessments as it relates to the City’s
proposed Fire Assessment program. The discussion covers how Florida law relates to special benefit and
proportional benefit.
Special non-ad valorem assessments are a revenue source available to local governments in Florida to fund capital
improvements as well as operations and maintenance expenses for essential services such as roads, drainage, Fire
Services, utilities, etc. Florida case law has established two requirements for the imposition of a non-ad valorem
special assessment. These two requirements have become known as the “two-pronged test”. They are 1) the
property assessed must derive a special benefit from the improvement, service or facilities provided, and 2) the
assessment must be fairly and reasonably apportioned among the properties that receive the special benefit.
In considering special benefit, the following question must be considered, “Can a special benefit be derived from
Fire Service by all properties within the City to meet the first prong of the two pronged test, even if all properties
are not improved and/or do not receive calls for service?”. The answer is yes, based in part upon the Florida
Supreme Court determination in Fire District No. 1 of Polk County v. Jenkins, a sufficient special benefit is derived by
the availability of fire services to justify the imposition of the special assessment. Also, in Meyer v. City of Oakland
Park, the Court upheld a sewer assessment on both improved and unimproved property, stating that the benefit
need not be direct or immediate but must be substantial, certain and capable of being realized within a reasonable
time. Also, In City of Hallandale v. Meekins, the Court indicated that the proper measure of benefits accruing to
property from the assessed improvement was not limited to the existing use of the property, but extended to any
future use which could reasonably be made.
PROPORTIONAL BENEFIT
It is well settled under Florida law that local governments are afforded great latitude regarding legislative
determinations of special benefit and reasonable apportionment of costs (as evidenced by the Florida Supreme
Court finding in City of Boca Raton v. State of Florida), that the apportionment of benefits is a legislative function, and
that legislative determinations as to benefit and apportionment will be upheld unless the determination is arbitrary
– that is, if reasonable persons may differ as to whether the land assessed was benefitted by the local improvement,
the findings of the City officials must be sustained. In City of Boca Raton v. State of Florida, the Florida Supreme
Court also determined that the manner of the assessment is immaterial and may vary, as long as the amount of the
assessment for each tract is not in excess of the proportional benefits as compared to other assessments on other
tracts. Accordingly, while any number of methodologies may be available for a given service or improvement, the
community imposing the assessment is at liberty to select the methodology which provides the best fit in terms of
local needs and circumstances.
SPECIAL BENEFIT – THE FIRST PRONG OF THE TWO-PRONGED TEST
Based upon discussions with City staff about the extent and nature of the Fire Services provided, we have
concluded that all parcels within the City receive a special benefit from the Fire Services provided by BSO. In
considering special benefit, it is important to consider that BSO maintains its Fire resources at a level that provides
City of Dania Beach / FY 2026 Fire Services Assessment Study 6
a response readiness condition to respond to calls for service throughout the City at relatively equal levels of
service. When needed, responses are made to calls for service without discrimination as to the property type, size,
location within the City, or any other factors specific to the property requiring the service. In addition, Vacant
lands not used actively in the production of agricultural products and services have Fire Services provided to them,
and the City has determined that Fire Services provided to those lands derive benefit to them, due to the urbanized
nature of the City.
As such, all properties receive a special benefit from the mere availability of Fire Services. Such benefit is
independent of, and realized even in the absence of, a call or need for actual service. The benefits include:
• Continuous availability of immediate response to fire.
• Provision of first responder medical aid to protect the life and safety of occupants.
• Enhanced property value, marketability of and/or ability to develop property.
• Lowering the cost of Fire Insurance by the presence of a professional and comprehensive Fire Service
• Protection against the spread of fire to neighboring parcels, thereby limiting and containing liability.
• Increased use and enjoyment of the parcel derived from continual and immediately available comprehensive
fire protection service should the need arise.
• Enhanced marketability and value of the parcel when compared to a similarly configured parcel for which
fire protection services are unavailable.
Therefore, the first prong of the two-pronged test (the property burdened by the assessment must derive a special
benefit from the service provided by the assessment) is met because all properties in the City receive a special
benefit from the City-wide Fire Service provided by BSO.
FAIR APPORTIONMENT – THE SECOND PRONG OF THE TWO-PRONGED TEST
In considering the assessment methodology, the second prong of the two-pronged test requires that the costs of the
assessment must be fairly and reasonably apportioned among the properties that receive the special benefit. The
Fire Services apportionment methodology used in this study allocates assessable costs based on the demand for
Fire Services by classes of real property use as identified on the real property assessment roll prepared for the levy
of ad valorem taxes. First, the assessable Fire Services costs are allocated among real property use categories based
upon the historical demand for these services (cost apportionment). This demand is identified by examining the
past three years of fire incident/calls for service data as reported by BSO to the State Fire Marshal’s office. Second,
the costs attributed to each property class are apportioned among the parcels on a per dwelling unit basis for
Residential uses, a square footage basis for non-residential uses, and a per acre basis for vacant parcels (parcel
apportionment). Further discussion of the consideration of fair apportionment is continued after the presentation
of source data, methodology and assessment rate calculation in subsequent sections of this report.
City of Dania Beach / FY 2026 Fire Services Assessment Study 7
Section 2 – Fire Services Costs
Fire and Rescue Service Allocation
Florida case law requires that the imposition of a special assessment for Fire Services only be used to fund Fire
Services and first response rescue services. A Fire Assessment may not fund Emergency Medical Services (EMS),
including transportation (Florida Supreme Court opinion in City of North Lauderdale v. SMM Properties -825 So.2d 343
Fla. 2002).
The City utilizes personnel who are certified firefighters that may also be qualified medical personnel. Personnel
assigned to medical units may also be called upon to assist in firefighting duties. Because emergency medical
services are not services for which the City can assess property, costs for those services cannot be included in the
total fire services costs to determine the allowable assessed costs. Mutual aid services provided by other Fire
Departments do not cost the City anything and those calls accordingly are not considered in this assessment.
BSO provides the City with an annual “Consideration” budget that becomes the contract cost for the ensuing fiscal
year. The budget is for fire, rescue, inspection, and administrative costs of providing fire rescue services.
Additionally, the City has costs in addition to its contract with BSO. When BSO took over fire rescue operations
from the City, it was left with significant legacy pension costs related to its former employees that still must be
funded. Similarly, the City must fund those employees share of the City’s other post-employment benefits
(generally retiree medical costs). The City must also pay for the costs of administering the assessment itself. These
costs include legal and professional fees, notification fees from the property appraiser’s office, advertising, and
discounts allowed on early payments of property tax bills. Of the sum of these costs, only those costs directly
attributable or allocated to fire services can be included in the assessment.
The remaining costs relate to the combined fire and EMS and must be allocated between the operations of those
two services. While there are many ways to allocate the costs of these services, we have chosen to allocate them in
proportion to the staffing of full-time equivalents (FTEs) by their function and shift assignment per apparatus. Fire
Services budgets are largely driven by personnel costs. Fire costs are largely driven by insuring standby availability
in the event of a fire. Similarly, EMS costs are largely driven by insuring standby availability in the event of a
medical emergency. Although calls for service are used to allocate the Fire Services costs to the property classes
(which is discussed in a later section of this report), calls for service are not a good basis for allocation between Fire
Services and EMS because of the standby nature of those services which require a constant employ of personnel
and facilities to be ready to respond.
Accordingly, we believe that the fairest apportionment method is one that utilizes a personnel assignment-based
allocation. As of FY 2026, BSO operates two fire suppression apparatus vehicles (Quints) and three rescue
vehicles. The Quints each require three personnel each shift. Each rescue unit now maintains three personnel per
shift. Each unit requires three sets of personnel by shift, therefore FTEs for each apparatus are multiplied by three
times the personnel assignment per shift. BSO maintains one Fire Prevention Officer, and five Fire Safety
Inspectors, all fully allocated to Fire Services. Finally, the District Fire Chief and Administrative Assistant are
allocated to Fire and Rescue by the weighted results of the directly allocated personnel. Table 2 below presents the
results of the personnel allocation.
City of Dania Beach / FY 2026 Fire Services Assessment Study 8
Table 2 – Allocation of Personnel between Fire and Rescue
Calculation of the Net Revenue Requirement
To calculate the Fire Services Net Revenue Requirement (NRR) for FY 2026 and beyond, the proposed
FY 2026 BSO budget as well as other City costs for Fire Services were projected using cost escalation factors
identified by City Staff. In each year of the projection period, offsetting revenues from other sources were deducted
from the expenditure requirements so that the full complement of dedicated Fire revenues is not double recovered.
A 4% allowance (i.e. assumed reduction in fee revenues) for early payment/statutory discounts was included to
determine the annual net revenue requirements to be recovered by the fire assessment fees. The projection of Fire
Services Net Revenue Requirement for FY 2026 – FY 2030 is presented in Table 3. The Net Revenue Requirement
in FY 2026 through FY 2030 represents 100% Cost Recovery or Maximum Allocated costs for the annual
assessments as calculated herein. The maximum allocated cost for the FY 2026 Fire Assessment is $9,845,342
Assignment/Position
Full Time
Equivalents Fire Rescue Allocation
Quint 1 9 9 Direct Fire
Quint 17 9 9 Direct Fire
Rescue 1 9 9 Direct Rescue
Rescue 1 9 9 Direct Rescue
Rescue 17 9 9 Direct Rescue
Fire Prevention Officer 1 1 Direct Fire
Fire Safety Inspectors 5 5 Direct Fire
District Fire Chief 1 0.47 0.53 Weighted
Administrative Assistant 1 0.47 0.53 Weighted
Total 53 24.94 28.06
Fire/Rescue Allocation 47.06%52.94%
City of Dania Beach / FY 2026 Fire Services Assessment Study 9
Table 3 – Calculation and Projection of the Net Revenue Requirement
FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
Annual
Escalation
Factor
Expenditures
Broward Sheriff's Office 20,663,351$ 21,593,202$ 22,564,896$ 23,580,316$ 24,641,430$ 4.50%
City Fire Costs 1,247,000$ 1,303,115$ 1,361,755$ 1,423,034$ 1,487,071$ 4.50%
Other City Operating Expenses 5,000$ 5,000$ 5,000$ 5,000$ 5,000$ 0.00%
Property Appraiser and Tax Collector Fees 7,896$ 8,133$ 8,377$ 8,628$ 8,887$ 3.00%
Advertisements 6,500$ 6,500$ 6,500$ 6,500$ 6,500$ 0.00%
Legal and Professional Fees 6,000$ 6,000$ 6,000$ 6,000$ 6,000$ 0.00%
Consultant Costs - Assessment Updates 35,000$ 35,000$ 35,000$ 35,000$ 35,000$
Total Expenditures 21,935,747$ 22,921,950$ 23,952,528$ 25,029,479$ 26,154,888$
Less: Direct EMS Costs (130,000)$ (135,850)$ (141,963)$ (148,352)$ (155,027)$ 4.50%
Total Net Fire Costs Before Allocation 21,805,747$ 22,786,100$ 23,810,565$ 24,881,127$ 25,999,861$
% Allocated to Fire (1)47.06%47.06%47.06%47.06%47.06%
Assessable Fire Costs 10,261,528$ 10,722,870$ 11,204,972$ 11,708,766$ 12,235,229$
Less: Attributed Revenues
Hazmat Permit Fees (10,000)$ (10,000)$ (10,000)$ (10,000)$ (10,000)$ 0.00%
Fire Inspection Fees (800,000)$ (828,000)$ (856,980)$ (886,974)$ (918,018)$ 3.50%
Total Attributed Revenues (810,000)$ (838,000)$ (866,980)$ (896,974)$ (928,018)$
Net Assessable Fire Costs 9,451,528$ 9,884,870$ 10,337,992$ 10,811,791$ 11,307,210$
Plus: Assessment Discounts (4%)393,814$ 411,870$ 430,750$ 450,491$ 471,134$
Net Revenue Requirement 9,845,342$ 10,296,740$ 10,768,741$ 11,262,283$ 11,778,344$
(1) - Refer to Table 2 for Allocation calculation
City of Dania Beach / FY 2026 Fire Services Assessment Study 10
Section 3 – Calculation of the Fire Assessment
Assessment Property Classifications
Using the Broward County Property Appraisers (BCPA) tax roll data, benefited parcels were identified using
the various categories of land use codes within that data set. Additionally, and to keep the proposed
apportionment categories as close to the existing categories as possible, we relied upon the Fire Class codes
currently maintained by the BCPA. The BCPA has previously identified and coded the improved properties by
type and assigned each parcel an appropriate Fire Class Code. We reviewed consistency in this data, and it was
determined to be of high accuracy. This data has also undergone considerable review over time through prior
studies. The Fire Class codes used are as follows:
• Residential (“R”) This includes all residential dwelling units, be they single family, multifamily, mobile
homes, or mobile home lots. This includes separate or attached guest houses or “granny flats” or
anything considered a residential dwelling unit.
• Commercial (“C”) This includes all property used for commercial activity, except where otherwise
identified by its own Fire Class code and includes office and retail uses. It also includes recreational
vehicle lots converted to commercial square footage as provided by statute.
• Government (“X”) This includes any property owned by a federal, state, or local government.
• Special (“S”, and generally mixed use) This includes property that has more than one use or
improvement that contains more than one Fire Class code. An example might be a parcel which
contained both a warehouse and an office use. Each use will be assigned the cost for that use.
• Vacant Acreage Parcels Not Developed (“A”) This includes land that does not contain any
improvement or structure but excludes property classified as agricultural.
• Warehouse/Industrial (“W”) This includes manufacturing and processing sites, storage units (whether
for commercial or non-commercial purposes), and warehousing sites.
• Miscellaneous (“Y”) This includes properties that are used for Charitable, Educational, Literary,
Scientific, or Religious organizations, or other properties defined under Florida Statutes. These
properties may be assessed or may be excluded by the City from year-to- year.
It should also be noted that properties that can sometimes be exempt from this assessment (e.g., church-owned
residential properties, portions of warehouses used for exempt purposes, portions of office buildings used for
exempt purposes) remain classified as “R”, “C”, “W”, etc. and are included in the assessment calculations, but
are not assessed if the City has excluded them from the assessment levy. In addition, all Residential, Vacant,
Commercial or Warehouse units for parcels categorized as “X” or “Y” are assigned to the relevant assessment
types for allocation and rate calculation, even though the parcels are exempt ultimately not billed. For example,
if a property is shown to contain a single-family residential dwelling (“R”) but is owned by a Church (“Y”), it’s
dwelling unit will be allocated to the Residential rate calculation, but the parcel will not be billed the assessment.
Again, these codes are used by BCPA to assist them in the administration of their rolls, and we believe them to
be highly accurate at the parcel level.
City of Dania Beach / FY 2026 Fire Services Assessment Study 11
Each BCPA parcel for the City also has, in addition to a Fire Class code, a Fire Basis element, which indicates
the number of applicable billing units located on the parcel. For example, a single-family residential dwelling
unit would have a Fire Basis element of “1”, indicating that the fixed residential assessment rate would be
multiplied by “1” to arrive at an assessment amount and a duplex residential dwelling unit would have a Fire
Basis element of “2”, indicating that the fixed residential assessment rate would be multiplied by “2” to arrive
at an assessment amount, and so on. Commercial, Warehouse/Industrial, and Not-for-profit are based upon
the square footage of buildings on the property. The sum of all structures of similar fire class are added together
to determine the total square footage for each fire class on each parcel. Acreage is based upon the number or
fraction of an acre for the parcel. The Fire Class code “S”, Special, generally includes mixed-use parcels that
have mixed assessment rates applied to them. The sum of each category (e.g., “Residential”, “Commercial”,
etc.) are added together within this coding. The Fire Basis element code in this Fire Class code in this category
indicates the amount of the assessment for that Fire Class code. The BCPA handles mixed-use parcels as
exceptions and manually calculates the assessment based upon the particular mix of uses that exist on those
parcels.
Mobile Home parks are assessed whether or not a lot/space is occupied. Each mobile home lot/space is
assessed a residential assessment rate. The commercial component of a mobile home park may include a
calculation based on the total of any commercial structures located on the parcel plus an assigned commercial
structure size of the minimum square footage of 1,200 square feet that is mandated by the Department of Health
under Chapter 64E-15.002(3), Florida Administrative Code for Recreational Vehicle Park spaces and a square
footage of 500 square feet for tent spaces inside Recreational Vehicle Parks, also as mandated by Chapter 64E-
15.002(3), Florida Administrative Code. The City does not have any parks that have only recreational vehicles.
Mobile home parks are mixed-use parcels.
There were 14,301 unique parcels or folio numbers within the City of Dania Beach fire assessment district
provided to us by the BCPA in June 2025. Among these individual parcels are non-assessable, fully excluded
parcels such as residential multi-family common areas, submerged lands, lake bottoms, right of ways, etc. For
all real property used in the allocation of the NRR, the unit counts by BCPA Fire Class category code and use
code counts appear below:
Table 4 – Identified Units by BCPA Fire Class Category
The City may not ultimately assess all the properties within these fire class categories for Fire Services as the City
traditionally has exempted some uses (e.g., non-profits, houses of worship, and other properties also exempt from
property taxes) of property from the fire assessment. Commercial, Warehouse/Industrial, and, if levied, Not-for-
BCPA Category
Description
BCPA
Code
Allocated
Units Unit Type
Acreage (Vacant)A 726 Acres
Commercial C 9,424,503 Sq Ft
Residential R 18,518 Dwelling Units
Warehouse/Industrial W 6,650,500 Sq Ft
Government, Exempt X 645,248 Sq Ft
Not For Profit, Exempt Y 446,157 Sq Ft
City of Dania Beach / FY 2026 Fire Services Assessment Study 12
profit parcels are assessed based on square footage of the structures by fire class on each parcel. The costs
associated with any exempt parcels have not been reallocated to the remaining non-exempt parcels and those costs
are assumed by other sources of City revenue.
Calls For Service Analysis
The costs identified in this study are apportioned to property categories based upon an analysis of the calls for
service data provided by BSO. The call/incident data identified the number and type of calls made by City Fire
and EMS vehicles for three fiscal-years beginning October 1, 2021 (FY 2022) – September 30, 2024 (FY 2024).
The call/incident data is extracted from the National Fire Incident Reporting System (NIFRS).
The data field containing the type of call/incident was used to separate calls determined to be Fire Services, and
those determined to be EMS or other non-Fire calls. Only Fire Services calls were used for the apportionment of
the Fire Assessments. Schedule 1 of Appendix A presents the full list of unique call/incident types in the data set
provided by BSO, and the identification of incident type as being either Fire or EMS for the assessment
calculations. Certain call types were considered Non-Fire related such as cancelled calls, false alarms or erroneous
records. We also excluded from the call data calls to property that was located outside of the City limits or served
for fire rescue by other entities, such as the Fort Lauderdale/Hollywood International Airport or Port Everglades.
The call data represented 20,884 calls over the three fiscal-year time period. Of these calls, 2,190 were identified by
incident type as Fire related.
Beyond identifying the call/incident type, we then allocated the Fire calls using property types as coded in the call
data. Schedule 2 of Appendix A presents each unique property use code in the NIFRS data, and the application of
the property categories to each code as utilized in this study. Of the 2,190 calls identified as Fire related, 2,048 were
calls to real property and specific property uses. The remaining 142 calls were to non-real property or non-specific
property and were therefore excluded from the apportionment analysis.
The remaining 2,048 calls were assigned to the assessment property classifications. Table 5 below illustrates the
assignment of calls to the property categories identified in the previous subsection. The percentages identified in the
Fire Calls to Real Property are used to allocate the FY 2026 Net Revenue Requirement to each property class.
Table 5 – Fire Call Allocation to Real Property, by Property Type
All Eligible Calls - Real
Property
BCPA
Code
3-Year
Call Total
% of
Total
Acreage, Vacant, Lot A 11 0.54%
Commercial C 819 39.99%
Residential R 1,043 50.93%
Warehouse/Industrial W 71 3.47%
Government X 88 4.30%
Not For Profit Y 16 0.78%
2,048 100.00%
City of Dania Beach / FY 2026 Fire Services Assessment Study 13
Apportionment of the Net Revenue Requirement
The next step in the Fire Assessment calculation is to allocate the FY 2026 Net Revenue Requirement amongst
the property classes. This is done by utilizing the allocations of Fire calls to real property as identified in the
previous section. Featured below, Table 6 contains the apportionment of the FY 2026 Net Revenue
Requirement to the identified property classes.
Table 6 – Allocation of FY 2026 Net Revenue Requirement
Fire Assessment Rate Calculation
Full (100%) Cost Recovery Rate Calculation
To calculate the FY 2026 Fire Assessments, we utilized the apportioned costs and total units per property
classification as identified in the previous sections of this report. The amount of assessable costs allocable to each
property class was divided by the number of assessment units identified in each property class to compute the Fire
Assessment to be imposed against each parcel. Table 7 below presents the calculated FY 2026 Assessment Rates at
full (100%) cost recovery, as well as a comparison of the existing FY 2025 Assessment Rates:
Table 7 – FY 2026 Assessment Rate Calculation – Full (100%) Cost Recovery
While the full cost FY 2026 Net Revenue Requirement is apportioned to all properties, the actual revenue realized
will be less because exempted property is included in the apportionment but cannot be billed/assessed. In addition,
BCPA Category
Description
BCPA
Code
Call
Allocation %
Allocated FY
2026 NRR
Acreage (Vacant)A 0.54%52,880$
Commercial C 39.99%3,937,175$
Residential R 50.93%5,014,009$
Warehouse/Industrial W 3.47%341,318$
Government, Exempt X 4.30%423,042$
Not For Profit, Exempt Y 0.78%76,917$
Total:100.00%9,845,342$
BCPA Category
Description
BCPA
Code
Call
Allocation %
Allocated FY
2026 NRR
Allocated
Units Unit Type
FY 2026 -
Calculated
Rates per Unit
FY 2025 -
Current Rates
per Unit
Acreage (Vacant)A 0.54%52,880$ 726 Acre 72.87$ 85.23$
Commercial C 39.99%3,937,175$ 9,424,503 Sq Ft 0.4177$ 0.4213$
Residential R 50.93%5,014,009$ 18,518 Dwelling Unit 270.76$ 241.05$
Warehouse/Industrial W 3.47%341,318$ 6,650,500 Sq Ft 0.0513$ 0.0488$
Government, Exempt X 4.30%423,042$ 645,248 Sq Ft 0.6556$ N/A
Not For Profit, Exempt Y 0.78%76,917$ 446,157 Sq Ft 0.1723$ N/A
City of Dania Beach / FY 2026 Fire Services Assessment Study 14
a 96% budget adjustment factor was used to calculate the estimated net collected revenue after accounting for early
payment discounts to the assessment bills. Table 8 below presents the estimated net billed and estimated
assessment revenue at full (100%) cost recovery.
Table 8 – Net Billed and Estimated Collected Revenue – Full (100%) Cost Recovery
Partial Cost Recovery Rate Calculation – Revenue Neutral Rate Target
Scenario
The City has requested Raftelis to calculate the assessments with the latest call and property data, targeting the
same revenue that would be generated with the current adopted (FY 2025) rates. The Broward County Property
Appraiser’s data shows that the current adopted rates would generate $8,465,100 (rounded) in billed assessment
revenues. With the 96% budgetary adjustment/discount applied, the current rates would collect an estimated
$8,126,500 (rounded) in net revenues. To accomplish the revenue target, the full cost NRR was reduced to
94.44% of the total potential costs. Table 9 below presents the rate calculations for this revenue target, while
Table 10 shows the calculation of the target revenue.
Table 9 – FY 2026 Assessment Rate Calculation – Revenue Neutral Rate Target Scenario -
$8,126,500 Net Revenue (94.44% Cost Recovery)
BCPA Category
Description
BCPA
Code
Allocated
Assessment
Less:
Exemptions
Total Billed
Assessment
Acreage (Vacant)A 52,880$ (2,856)$ 50,025$
Commercial C 3,937,175$ (133,606)$ 3,803,569$
Residential R 5,014,009$ (242,406)$ 4,771,603$
Warehouse/Industrial W 341,318$ (2,602)$ 338,716$
Government, Exempt X 423,042$ (423,042)$ -$
Not For Profit, Exempt Y 76,917$ (76,917)$ -$
9,845,342$ (881,429)$ 8,963,913$
Budgetary Adjustment/Discount 96%
FY 2026 Estimated Collected Revenue 8,605,356$
BCPA Category
Description
BCPA
Code
Call
Allocation %
Allocated FY
2026 NRR
Allocated
Units Unit Type
FY 2026 -
Calculated
Rates per Unit
FY 2025 -
Current Rates
per Unit
Acreage (Vacant)A 0.54%49,940$ 726 Acre 68.82$ 85.23$
Commercial C 39.99%3,718,268$ 9,424,503 Sq Ft 0.3945$ 0.4213$
Residential R 50.93%4,735,231$ 18,518 Dwelling Unit 255.70$ 241.05$
Warehouse/Industrial W 3.47%322,341$ 6,650,500 Sq Ft 0.0484$ 0.0488$
Government, Exempt X 4.30%399,521$ 645,248 Sq Ft 0.6191$ N/A
Not For Profit, Exempt Y 0.78%72,640$ 446,157 Sq Ft 0.1628$ N/A
100.00%9,297,941$
City of Dania Beach / FY 2026 Fire Services Assessment Study 15
Table 10 - Revenue Neutral Rate Target Scenario - Net Billed and Estimated Collected Revenue
(includes deduction of exemptions) - $8,126,500 Target Revenue
Consideration of Fair Apportionment of Assessment
While there can be many ways to fairly apportion the costs of the fire services to benefited properties, we note the
following:
Apportioning costs among classifications of property based upon the historical demand for fire rescue services is a
fair and reasonable method because it reflects the property uses' potential fire risk based upon building use and is a
reasonable proxy for the firefighters training and experience, quantity and size of apparatus, and other special
firefighting equipment that must be available in accordance with the City’s standards and practices. It is fair and
reasonable to allocate costs to any particular non-residential structure without any limit to the square footage of a
structure as large buildings require more resources and more value of property benefits from fire protection. It is
fair and reasonable to not consider the flow capacity of fire apparatus as a limiting factor to fire protection as larger
buildings will have fire flows provided independent of the apparatus cumulative pumping capacity. The amount of
personnel engaged in firefighting increases with building size and personnel costs are the largest costs in fire
protection. Buildings cannot be permitted for construction if a local government cannot provide adequate fire
protection at the time they are ready for occupancy. Accordingly, we have removed tranches from earlier studies
and have determined that limits on the size of structures may shift the cost burden to owners of smaller structures.
Apportioning costs among classifications of property (Fire Class code) based upon both historical demand for fire
rescue services is fair and reasonable and proportional to the special benefit received and will ensure that no
property is assessed an amount greater than the special benefit received.
Apportioning costs to unimproved properties is fair and reasonable as fire call data demonstrates that there are calls
to those properties that are not infrequent. Fires on unimproved properties can spread to other parcels, both
improved and unimproved, and in an urban environment, uncontrolled or unaddressed fires can cause significant
damage. Property owners can be held responsible for fires on their property that spread to other parcels.
The fire rescue incident reports (NFIRS) are the most reliable data available to determine the potential demand for
fire services from property use and to determine the benefit to property use resulting from the demand for fire
services to protect and serve buildings and land located within assessed property and their intended occupants.
There exist sufficient fire incident reports that document the historical demand for fire services from assessed
property within the property use categories. The relative demand that has been determined for each property use
BCPA Category
Description
BCPA
Code
Allocated
Assessment
Less:
Exemptions
Total Billed
Assessment
Acreage (Vacant)A 49,940$ (2,696)$ 47,244$
Commercial C 3,718,268$ (125,958)$ 3,592,310$
Residential R 4,735,231$ (229,029)$ 4,506,201$
Warehouse/Industrial W 322,341$ (2,773)$ 319,568$
Government, Exempt X 399,521$ (399,521)$ -$
Not For Profit, Exempt Y 72,640$ (72,640)$ -$
9,297,941$ (832,617)$ 8,465,324$
Budgetary Adjustment/Discount 96%
FY 2026 Estimated Collected Revenue 8,126,711$
City of Dania Beach / FY 2026 Fire Services Assessment Study 16
category by an examination of such fire incident reports is consistent with the experience of the City. Therefore, the
use of the relative percentages that were determined by an examination of fire rescue incident reports is a fair and
reasonable method to apportion the fire services assessed costs among the property use categories (Fire Class
codes).
Neither the size nor the value of the residential property determines the scope of the required fire response by the
City. The potential demand for fire services is driven by the existence of a dwelling unit.
Apportioning the percentage of the fire services assessed costs relating to the relative demand for fire services
attributable to residential property on a per dwelling unit basis (Fire Basis) is required to avoid cost inefficiency and
unnecessary administration and is a fair and reasonable method of parcel apportionment based upon historical call
data.
The separation of non-residential property buildings by actual square footage (Fire Basis) is fair and reasonable for
the purpose of parcel apportionment for the relative demand because the demand for fire service is determined and
measured by the actual square footage of structures and improvements within benefited parcels. The greater the
building area, the greater the potential for a large fire and the greater the amount of firefighting resources that must
be available in the event of a fire in a structure of that building’s size. It is fair and reasonable to correlate a
building’s benefit directly to a building’s size, without limit.
Based upon the historical demand for fire protection services, the percentages of the City’s total fire protection
assessable costs attributable to vacant non-agricultural properties were calculated. The costs attributable to parcels
were divided by the number of acres (Fire Basis) associated with parcels in the Acreage category to compute the
fire assessment rate per acre. An acreage charge is a fair and reasonable allocation for vacant non-agricultural
properties.
For residential parcels that contain non-residential buildings, non-residential improvements located on the parcel
were treated according to their non-residential property use category and size to compute the parcel’s non-
residential fire protection assessment. This assessment was then added to the parcel’s residential fire services
assessment. For non-residential parcels that contain a residence, the number of dwelling units by type located on
the parcel was multiplied by the rate per dwelling unit to compute the parcel’s residential fire services assessment.
This assessment was then added to the parcel’s non-residential fire services assessment. For agricultural parcels that
contain a residence or non-residential building, the parcel was assessed for the actual number of dwelling units by
type located on the parcel and/or the appropriate assessment for the non-residential building square footage. The
property used for agricultural purposes was not assessed.
We believe that the apportionment methodology prepared here is fair and reasonable and benefits the property that
will be assessed and that it fits the particular properties in and nature of the City of Dania Beach.
City of Dania Beach / FY 2026 Fire Services Assessment Study 17
Section 4 – Summary of Recommendations
Based upon the results of the analysis presented herein, we recommend the following:
1. We recommend the Assessment Rates presented herein to be adopted by the City for FY 2026 at or below
the full cost recovery calculation.
2. We recommend the City continue its policy of evaluating the fire assessment rates on an annual basis and
adjusting the assessment rates to reflect increases in the cost of Fire Service.
3. We recommend the City to continue to update the fire assessment rates annually to keep pace with ongoing
changes in costs, call allocations and property demographics.
City of Dania Beach / FY 2026 Fire Services Assessment Study 18
Section 5 – Appendix A
Schedule 1 – NFIRS Call Data Call/Incident Type Categorizations
Schedule 2 – NFIRS Call Data Property Use Categorizations
City of Dania Beach FY 2026 Fire Services Assessment Study
NFIRS Type Code NFIRS Type Description Included? Call Type
111 Building fire Y Fire Services
113 Cooking fire, confined to container Y Fire Services
121 Fire in mobile home used as fixed residence Y Fire Services
122 Fire in motor home, camper, recreational vehicle Y Fire Services
131 Passenger vehicle fire Y Fire Services
138 Off-road vehicle or heavy equipment fire Y Fire Services
151 Outside rubbish, trash or waste fire Y Fire Services
154 Dumpster or other outside trash receptacle fire Y Fire Services
161 Outside storage fire Y Fire Services
221 Overpressure rupture of air or gas pipe/pipeline Y Fire Services
321 EMS call, excluding vehicle accident with injury N EMS/Rescue/Other
322 Motor vehicle accident with injuries N EMS/Rescue/Other
323 Motor vehicle/pedestrian accident (MV Ped)N EMS/Rescue/Other
324 Motor vehicle accident with no injuries.N EMS/Rescue/Other
341 Search for person on land N EMS/Rescue/Other
342 Search for person in water N EMS/Rescue/Other
353 Removal of victim(s) from stalled elevator Y Fire Services
357 Extrication of victim(s) from machinery N EMS/Rescue/Other
372 Trapped by power lines N EMS/Rescue/Other
411 Gasoline or other flammable liquid spill Y Fire Services
412 Gas leak (natural gas or LPG)Y Fire Services
413 Oil or other combustible liquid spill Y Fire Services
421 Chemical hazard (no spill or leak)Y Fire Services
422 Chemical spill or leak Y Fire Services
424 Carbon monoxide incident Y Fire Services
442 Overheated motor Y Fire Services
444 Power line down Y Fire Services
445 Arcing, shorted electrical equipment Y Fire Services
451 Biological hazard, confirmed or suspected Y Fire Services
463 Vehicle accident, general cleanup N EMS/Rescue/Other
511 Lock-out N EMS/Rescue/Other
531 Smoke or odor removal Y Fire Services
541 Animal problem N EMS/Rescue/Other
542 Animal rescue N EMS/Rescue/Other
550 Public service assistance, other N EMS/Rescue/Other
551 Assist police or other governmental agency N EMS/Rescue/Other
552 Police matter N EMS/Rescue/Other
553 Public service N EMS/Rescue/Other
555 Defective elevator, no occupants Y Fire Services
561 Unauthorized burning Y Fire Services
611 Dispatched & canceled en route N EMS/Rescue/Other
621 Wrong location N EMS/Rescue/Other
622 No incident found on arrival at dispatch address N EMS/Rescue/Other
631 Authorized controlled burning Y Fire Services
700 False alarm or false call, other Y Fire Services
710 Malicious, mischievous false call, other Y Fire Services
711 Municipal alarm system, malicious false alarm Y Fire Services
713 Telephone, malicious false alarm Y Fire Services
715 Local alarm system, malicious false alarm Y Fire Services
Schedule 1 - NFIRS Call Data Call/Incident Type Categorizations
Raftelis, Inc.
City of Dania Beach FY 2026 Fire Services Assessment Study
NFIRS Type Code NFIRS Type Description Included? Call Type
Schedule 1 - NFIRS Call Data Call/Incident Type Categorizations
721 Bomb scare - no bomb Y Fire Services
731 Sprinkler activation due to malfunction Y Fire Services
733 Smoke detector activation due to malfunction Y Fire Services
734 Heat detector activation due to malfunction Y Fire Services
735 Alarm system sounded due to malfunction Y Fire Services
736 CO detector activation due to malfunction Y Fire Services
741 Sprinkler activation, no fire - unintentional Y Fire Services
743 Smoke detector activation, no fire - unintentional Y Fire Services
744 Detector activation, no fire - unintentional Y Fire Services
745 Alarm system activation, no fire - unintentional Y Fire Services
746 Carbon monoxide detector activation, no CO Y Fire Services
812 Flood assessment Y Fire Services
813 Wind storm, tornado/hurricane assessment Y Fire Services
814 Lightning strike (no fire)Y Fire Services
815 Severe weather or natural disaster standby Y Fire Services
911 Citizen complaint Y Fire Services
1121 Fire in structure (contents only)Y Fire Services
1321 Commercial vehicle fire Y Fire Services
1341 Watercraft fire Y Fire Services
1411 Natural vegetation fire (trees, grass, brush)Y Fire Services
2411 Explosion only (no fire)Y Fire Services
3111 Decontamination unit response Y Fire Services
3311 Subject Locked IN (locked vehicle or secure area)Y Fire Services
3511 TRT - Building/Structure Collapse (with victims)Y Fire Services
3651 Boater/Watercraft in distress Y Fire Services
3811 EMS Standby/Detail N EMS/Rescue/Other
4611 Structure weakened or collapsed (No Victims)Y Fire Services
5221 Water Leak/Problem Y Fire Services
5501 Radiological Survey Y Fire Services
5541 Lift/Elderly Assist N EMS/Rescue/Other
6001 DELETE CALL N EMS/Rescue/Other
6511 Smoke Investigation (visual or smell of smoke)Y Fire Services
6711 Hazmat - Investigation, no hazards found Y Fire Services
7151 Malicious false alarm, Pull station activated Y Fire Services
7451 Medical alarm - unintentional N EMS/Rescue/Other
Raftelis, Inc.
City of Dania Beach FY 2026 Fire Services Assessment Study
NFIRS Property Use
Code NFIRS Property Use Description BCPA Fire Description
111 Bowling establishment Commercial
113 Electronic amusement center Commercial
116 Swimming facility: indoor or outdoor Commercial
120 Variable-use amusement, recreation places, other Commercial
121 Ballroom, gymnasium Commercial
122 Convention center, exhibition hall Commercial
123 Stadium, arena Commercial
124 Playground Commercial
129 Amusement center: indoor/outdoor Commercial
130 Places of worship, funeral parlors, other Not For Profit
131 Church, mosque, synagogue, temple, chapel Not For Profit
140 Clubs, other Commercial
141 Athletic/health club Commercial
142 Clubhouse Commercial
144 Casino, gambling clubs Commercial
150 Public or government, other Government
151 Library Government
152 Museum Government
160 Eating, drinking places, other Commercial
161 Restaurant or cafeteria Commercial
162 Bar or nightclub Commercial
170 Passenger terminal, other Commercial
171 Airport passenger terminal Commercial
173 Bus station Commercial
174 Rapid transit station Commercial
180 Studio/theater, other Commercial
181 Live performance theater Commercial
183 Movie theater Commercial
211 Preschool Government
213 Elementary school, including kindergarten Government
215 High school/junior high school/middle school Government
241 Adult education center, college classroom Not For Profit
254 Day care, in commercial property Commercial
311 24-hour care Nursing homes, 4 or more persons Residential
321 Mental retardation/development disability facility Not For Profit
322 Alcohol or substance abuse recovery center Not For Profit
331 Hospital - medical or psychiatric Commercial
341 Clinic, clinic-type infirmary Commercial
342 Doctor, dentist or oral surgeon office Commercial
343 Hemodialysis unit Commercial
361 Jail, prison (not juvenile) Government
363 Reformatory, juvenile detention center Government
365 Police station Government
419 1 or 2 family dwelling Residential
429 Multifamily dwelling Residential
439 Boarding/rooming house, residential hotels Residential
449 Hotel/motel, commercial Commercial
459 Residential board and care Residential
511 Convenience store Commercial
519 Food and beverage sales, grocery store Commercial
529 Textile, wearing apparel sales Commercial
539 Household goods, sales, repairs Commercial
549 Specialty shop Commercial
557 Personal service, including barber & beauty shops Commercial
559 Recreational, hobby, home repair sales, pet store Commercial
564 Laundry, dry cleaning Commercial
569 Professional supplies, services Commercial
571 Service station, gas station Commercial
579 Motor vehicle or boat sales, services, repair Commercial
581 Department or discount store Commercial
592 Bank Commercial
593 Office: veterinary or research Commercial
596 Post office or mailing firms Commercial
599 Business office Commercial
614 Steam or heat-generating plant Warehouse/Industrial
615 Electric-generating plant Warehouse/Industrial
629 Laboratory or science laboratory Commercial
631 Defense, military installation Government
635 Computer center Commercial
642 Electrical distribution Warehouse/Industrial
644 Gas distribution, gas pipeline Warehouse/Industrial
647 Water utility Warehouse/Industrial
Schedule 2 – NFIRS Call Data Property Use Categorizations
Raftelis, Inc.
City of Dania Beach FY 2026 Fire Services Assessment Study
NFIRS Property Use
Code NFIRS Property Use Description BCPA Fire Description
Schedule 2 – NFIRS Call Data Property Use Categorizations
648 Sanitation utility Warehouse/Industrial
655 Crops or orchard Acreage, Vacant, Lot
807 Outside material storage area Warehouse/Industrial
881 Parking garage, (detached residential garage) Residential
882 Parking garage, general vehicle Not-Real-Property, No Benefit, Excluded, Mutual Aid or Undetermined
888 Fire station Government
891 Warehouse Warehouse/Industrial
898 Dock, marina, pier, wharf Commercial
899 Residential or self-storage units Warehouse/Industrial
926 Outbuilding, protective shelter Not-Real-Property, No Benefit, Excluded, Mutual Aid or Undetermined
931 Open land or field Acreage, Vacant, Lot
935 Campsite with utilities Commercial
936 Vacant lot Acreage, Vacant, Lot
937 Beach Not-Real-Property, No Benefit, Excluded, Mutual Aid or Undetermined
941 Open ocean, sea or tidal waters Not-Real-Property, No Benefit, Excluded, Mutual Aid or Undetermined
946 Lake, river, stream Not-Real-Property, No Benefit, Excluded, Mutual Aid or Undetermined
951 Railroad right-of-way Commercial
952 Railroad yard Commercial
961 Highway or divided highway Not-Real-Property, No Benefit, Excluded, Mutual Aid or Undetermined
962 Residential street, road or residential driveway Residential
963 Street or road in commercial area Commercial
965 Vehicle parking area Not-Real-Property, No Benefit, Excluded, Mutual Aid or Undetermined
974 Aircraft loading area Not-Real-Property, No Benefit, Excluded, Mutual Aid or Undetermined
981 Construction site Commercial
982 Oil or gas field Warehouse/Industrial
983 Pipeline, power line or other utility right-of-way Not-Real-Property, No Benefit, Excluded, Mutual Aid or Undetermined
984 Industrial plant yard - area Warehouse/Industrial
Raftelis, Inc.
City of Dania Beach
Finance Memorandum
DATE: 7/8/2025
TO: Honorable Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Yeimy Guzman, Chief Financial Officer
SUBJECT: Non-ad valorem assessment rates for Residential Solid Waste Services for the
Fiscal Year beginning October 1, 2025 and ending September 30, 2026.
Request:
Approval of the preliminary resolution establishing estimated non-ad valorem assessment rates
for Residential Solid Waste Services for the Fiscal Year beginning October 1, 2025, and ending
September 30, 2026.
Background:
The City levies an annual assessment to fund costs for Residential Solid Waste Services. The
annual assessment provides a special benefit to real property, using a methodology that fairly
apportions the cost of the assessed service among benefited properties.
The City’s collection and disposal service provider, Waste Management, has provided
preliminary rates effective October 1, 2025, for Residential Solid Waste Collection Services. The
City Administration recommends an increase in the assessment rate of $22.32 per unit for the
fiscal year to a total assessment of $412.32 per residential unit.
The City operates a Residential Solid Waste Collection Special Revenue Fund to account for all
Solid Waste activities. The assessment rate adopted each year ensures that this function is self-
sustaining and, over time, accumulates a reserve balance that can be used toward additional trash
collection, new trash/recycling containers, community outreach programs, and infrastructure
improvements. The proposed assessment rate will provide for optimal operation of the solid
waste collection function, while ensuring adequate resources are available for the needs
mentioned above.
The attached Preliminary Assessment Resolution sets forth the proposed assessment rates for the
Fiscal Year 2025-2026. It also provides for a public hearing for the adoption of the final
assessment roll for Monday, September 15th, 2025, and for notice for such hearing. The
September 15th meeting is noticed through the annual TRIM (Truth in Millage) notices
forwarded by the Broward County Property Appraiser’s Office to all property owners, as well as
published notice by the City Clerk. State law requires the City to conduct a public hearing to
levy the special assessment, with no less than twenty (20) days’ notice of the public hearing.
Budgetary Impact
The recommended annual Residential Solid Waste Services Assessment of $412.32 is intended
to fund approximately $2.989 million of the City’s Solid Waste function, with a gross levy of
$3.129 million.
Recommendation
Recommend that the City Commission adopt the preliminary resolution establishing the
estimated non-ad valorem assessment rate for Residential Solid Waste Services for the Fiscal
Year beginning October 1, 2025, and ending September 30, 2026.
RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, RELATING TO THE COLLECTION AND DISPOSAL OF
SOLID WASTE IN THE CITY OF DANIA BEACH, FLORIDA;
ESTABLISHING THE NOT TO EXCEED ASSESSMENT RATE FOR SOLID
WASTE SERVICE ASSESSMENTS AGAINST ASSESSED PROPERTY
LOCATED WITHIN BOUNDARIES OF THE CITY OF DANIA BEACH, FOR
THE FISCAL YEAR BEGINNING OCTOBER 1, 2025; DIRECTING THE
PREPARATION OF AN ASSESSMENT ROLL; AUTHORIZING A PUBLIC
HEARING AND DIRECTING THAT NOTICE OF THE HEARING BE
ISSUED; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN
EFFECTIVE DATE.
WHEREAS, the City of Dania Beach, Florida, enacted Ordinance No. 09-96 (the
"Ordinance"), which authorizes the re-imposition of annual Solid Waste Service Assessments for
Solid Waste collection and disposal services, facilities, or programs against certain Assessed
Property within the City; and
WHEREAS, the imposition of a Solid Waste Service Assessment for Solid Waste
collection and disposal services, facilities or programs has proven to be an equitable and efficient
method of allocating and apportioning Solid Waste Costs among parcels of Assessed Property
located in those incorporated areas of the City annexed pursuant to Chapter 90-483, Laws of
Florida (the "Griffin Road Annexation Area") and annexed pursuant to Chapter 2000-474, Laws
of Florida (collectively referred to as the "Solid Waste Assessment Area"); and
WHEREAS, on December 9, 2008, the City passed Resolution No. 2008-221 amending
Resolution No. 64-96 to use the uniform method of collecting solid waste assessments for all
properties located within the boundaries of the City of Dania Beach; and
WHEREAS, the City Commission desires to impose an annual Solid Waste collection
and disposal assessment program within the boundaries of the City of Dania Beach, using the
property tax bill (the “Ad Valorem” tax bill) collection method for the Fiscal Year beginning on
October 1, 2025.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1.That the above “Whereas” clauses are ratified and confirmed, and
they are made a part of and incorporated into this Resolution by this reference.
RESOLUTION #2025-______2
Section 2. Authority. That this Resolution is adopted pursuant to the provisions of
the Solid Waste Service Assessment Ordinance (Ordinance No. 09-96); the Initial Assessment
Resolution (Resolution No. 64-96); the Resolution amending Resolution No. 64-96 (Resolution
No. 2008-221); the Final Assessment Resolution (Resolution No. 71-96); Sections 166.021 and
166.041, Florida Statutes, and other applicable provisions of law.
Section 3. Purpose and Definitions. That this Resolution constitutes the Preliminary
Rate Resolution as defined in the Ordinance which initiates the annual process for updating the
Assessment Roll and directs the re-imposition of Solid Waste Service Assessments for the Fiscal
Year beginning October 1, 2025. All capitalized words and terms not otherwise defined in this
Resolution shall have the meanings set forth in the Ordinance, the Initial Assessment Resolution
and the Final Assessment Resolution. Unless the context indicates otherwise, words using the
singular number include the plural number, and vice versa.
Section 4. Provision and Funding of Solid Waste Services. That upon the
imposition of Solid Waste Service Assessments for Solid Waste collection and disposal against
Assessed Property located within the boundaries of the City of Dania Beach, the City shall
provide Solid Waste collection and disposal services to such Assessed Property. It is ascertained,
determined, and declared that each parcel of Assessed Property located within the City of Dania
Beach will benefit by the City's provision of Solid Waste collection and disposal services in an
amount not less than the Solid Waste Service Assessment imposed against such parcel, computed
in the manner set forth in this Preliminary Rate Resolution.
Section 5. Legislative Determinations of Special Benefit and Fair Appointment.
That the legislative determinations of special benefit and fair apportionment embodied in the
Ordinance, the Initial Assessment Resolution, and the Final Assessment Resolution are affirmed
and incorporated in this Resolution by reference.
Section 6. Establishment of Annual Solid Waste Service Assessment Rate. That
for the Fiscal Year beginning October 1, 2025, Solid Waste Service Assessments for Solid Waste
collection and disposal services, facilities, and programs are to be re-imposed, and the Solid
Waste Cost shall be allocated among all parcels of Assessed Property, as deemed necessary by
the City of Dania Beach. A rate of assessment not to exceed $412.32 for each dwelling unit is
established.
RESOLUTION #2025-______3
Section 7.The City Manager is directed to prepare, or cause to be prepared, an
updated Assessment Roll for the Fiscal Year beginning October 1, 2025, in the manner provided
in the Ordinance. The updated Assessment Roll shall contain the following: (1) a summary
description of all Assessed Property within the Solid Waste Assessment Area; (2) the name and
address of the owner of record of each parcel as shown on the Tax Roll; and (3) the amount of
the Solid Waste Service Assessment for Solid Waste collection and disposal services. Copies of
this Preliminary Rate Resolution, the Ordinance, the Initial Assessment Resolution, the Final
Assessment Resolution, and the updated Assessment Roll are maintained on file in the office of
the City Clerk and are open to public inspection. The foregoing shall not be construed to require
that the updated Assessment Roll be in printed form if the amount of the Solid Waste Service
Assessment for each parcel of property can be determined by use of a computer terminal
available to the public. The Solid Waste Service Assessment for each parcel of Assessed
Property shall be computed by multiplying the assessment rate by the number of Dwelling Units
on such parcel.
It is ascertained, determined, and declared that the foregoing method of determining the
Solid Waste Service Assessments for Solid Waste collection and disposal services is a fair and
reasonable method of apportioning the Solid Waste Cost among parcels of Assessed Property.
Section 8. Authorization of Public Hearing. That there is established a public
hearing to be held at 7:00 p.m. on September 15, 2025, in the City of Dania Beach City
Commission Chamber, 100 West Dania Beach Boulevard, Dania Beach, Florida, per the meeting
agenda or the TRIM notice mailed by the Property Appraiser, at which time the City
Commission will receive and consider any comments on the Solid Waste Service Assessments
from the public and affected property owners and consider re-imposing the Solid Waste Service
Assessments for the Fiscal Year beginning October 1, 2025, and collecting such assessments on
the same bill as ad valorem taxes.
Section 9. Notice of Publication. That the City Clerk shall publish a notice of the
public hearing authorized by Section 7 of this Preliminary Rate Resolution in the manner and
time provided in Sections 2.04 and 2.08 of the Ordinance. The notice shall be published no later
than August 23, 2025, in substantially the form attached to this Resolution.
RESOLUTION #2025-______4
Section 10. Notice by Mail. That the Chief Financial Officer shall provide
information on the public hearing and the “not to exceed” rate to the Broward County Property
Appraiser’s Office to be included in the TRIM (Truth in Millage) Notice which will serve as first
class notice as required by the Ordinance, no later than August 4, 2025.
Section 11. Severability. That if any clause, section, other part or application of this
Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part
or application, it shall not affect the validity of the remaining portions or applications of this
Resolution.
Section 12. Conflict. That all resolutions or parts of resolutions in conflict with this
Resolution are repealed to the extent of such conflict.
Section 13.That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 14.That this Resolution shall become effective upon its passage and adoption.
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
SIGNATURES ON THE FOLLOWING PAGE
RESOLUTION #2025-______5
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
RESOLUTION #2025-______6
SOLID WASTE SERVICE ASSESSMENTS
Notice is given that the City Commission of the City of Dania Beach will conduct a
public hearing to consider re-imposing Solid Waste Service Assessments for the Fiscal Year
beginning October 1, 2025, against certain improved residential properties located within those
incorporated areas of the City of Dania Beach.
The solid waste service assessments will be computed by multiplying the number of
dwelling units on each parcel by the rate of assessment. The rate of assessment for the upcoming
fiscal year shall be $412.32. Unimproved properties, mobile home parks, apartments with four
or more dwelling units, condominiums, or commercial properties are not subject to the solid
waste service assessment.
Copies of the Solid Waste Service Assessment Ordinance (Ordinance No. 9-96), the
Initial Assessment Resolution (Resolution No. 64-96), the Final Assessment Resolution
(Resolution No. 71-96), the Preliminary Rate Resolution initiating the annual process of updating
the Assessment Roll and re-imposing the Solid Waste Service Assessments, and the updated
Assessment Roll for the upcoming fiscal year are available for inspection at the City Clerk’s
office.
If you have any questions, please contact the City's Department of Finance at (954)
924-6800 Ext. 3674, Monday through Friday between 9:00 a.m. and 4:00 p.m.
The above special assessments will be collected on the ad valorem tax bill (the “Property
tax” bill) to be mailed in November 2025, as authorized by Section 197.3632, Florida Statutes.
Failure to pay the assessments will cause a tax certificate to be issued against the property, which
may result in a loss of title (ownership) of one’s real property. These special assessment
programs proved to be successful last year in fairly and efficiently providing a much-needed
alternative funding and collection approach for these vital and essential services.
A PUBLIC HEARING WILL BE HELD AT 7:00 P.M. ON SEPTEMBER 15, 2025, IN
THE CITY OF DANIA BEACH CITY COMMISSION CHAMBER AT 100 WEST DANIA
BEACH BOULEVARD, DANIA BEACH, FLORIDA, PER THE MEETING AGENDA OR
THE TRIM NOTICE MAILED BY THE PROPERTY APPRAISER, FOR THE PURPOSE OF
RECEIVING PUBLIC COMMENT ON ALL OF THE PROPOSED ASSESSMENTS. All
affected property owners have a right to appear at the hearing, to speak at the hearing, and to file
written objections with the City Commission within twenty (20) days of this notice. If a person
RESOLUTION #2025-______7
decides to appeal any decision made by the City Commission with respect to any matter
considered at the hearing, such person will need a record of the proceedings and may need to
ensure that a verbatim record is made, including the testimony and evidence upon which the
appeal is to be made. In accordance with the Americans with Disabilities Act, persons needing
special accommodation or an interpreter to participate in this proceeding should contact the City
Clerk’s office at (954) 924-6800 Ext. 3623, at least two (2) days prior to the date of the hearing.
CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA
City of Dania Beach
Finance Memorandum
DATE: 7/8/2025
TO: Honorable Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Yeimy Guzman, Chief Financial Officer
SUBJECT: Non-ad valorem assessment rate for Stormwater Utility Services for the Fiscal Year
beginning October 1, 2025, and ending September 30, 2026.
Request:
The Finance Department requests approval of a Resolution establishing the preliminary non-ad
Valorem assessment rate for the provision of Stormwater services, facilities, and programs for
the Fiscal Year beginning October 1, 2025, and ending September 30, 2026.
Background:
The City levies an annual assessment to fund the costs of its Stormwater Utility Services. In
developing the assessment, it was initially determined that the median single-family residence in
the City includes 1,720 square feet of impervious surface on a median lot size of 6,500 square
feet, which is defined as one "equivalent residential unit" or "ERU" and has an impervious factor
of 0.26. The City determined that all Single-Family Parcels within the Stormwater Service Area
are likely to have a similar impact on the Stormwater system and therefore, it is fair and
reasonable to assign one (1) ERU to each Single-Family Parcel. Each ERU is currently assessed
at $120 annually.
The City Administration is proposing no change to the assessment, as currently this rate is both
necessary and appropriate to finance operations of the Stormwater division, providing the ability
to adequately finance all necessary projects, and allowing for the appropriate level of reserves in
the Stormwater Fund.
The attached Preliminary Assessment Resolution sets forth the proposed assessment rate for
Fiscal Year 2025-2026 and provides for a public hearing for the adoption of the final assessment
roll for Monday, September 15th, 2025, and for notice for such hearing. The September 15th
meeting is noticed through the annual TRIM (Truth in Millage) notices forwarded by the
Broward County Property Appraiser’s Office to all property owners, as well as published notice
by the City Clerk. State law requires the City to conduct a public hearing to levy the special
assessment, with no less than twenty (20) days’ notice of the public hearing.
Budgetary Impact
The recommended annual Stormwater Special Assessment of $120.00 is intended to fund
approximately $5.731 million of the City’s Stormwater Fund budget, with a gross levy of $6
million.
Recommendation
Recommend that the City Commission adopt the preliminary resolution establishing the
estimated non-ad valorem assessment rate for Stormwater Utility Services for the Fiscal Year
beginning October 1, 2025, and ending September 30, 2026.
RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, RELATING TO THE PROVISION OF STORMWATER
SERVICES, FACILITIES AND PROGRAMS WITHIN THE CITY OF DANIA
BEACH, FLORIDA; ESTABLISHING THE NOT TO EXCEED ASSESSMENT
RATE FOR STORMWATER ASSESSMENTS FOR THE FISCAL YEAR
BEGINNING OCTOBER 1, 2025; DIRECTING THE PREPARATION OF
RESPECTIVE ASSESSMENT ROLL; AUTHORIZING A PUBLIC HEARING
AND DIRECTING THE PROVISION OF NOTICE OF SUCH HEARING;
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN
EFFECTIVE DATE.
WHEREAS, the City of Dania Beach, Florida, implemented a recurring annual
Stormwater Assessment Program to provide funding for the City’s stormwater services and
facilities; and
WHEREAS, the City Public Services Department has developed a program for
improving stormwater services within the City that entails a combination of financing
mechanisms, including debt, grants, and pay-as-you-go financing that result in substantial facility
improvements, as well as debt repayment costs in the coming years; and
WHEREAS, the current annual Stormwater Assessment rate of $120.00 per equivalent
residential unit (ERU) provides adequately for the cost of the City’s current operating,
maintenance, and minor capital improvements, and that these costs require continued annual
funding; and
WHEREAS, the City Commission deems it to be in the best interest of the citizens and
residents of the City of Dania Beach to adopt this Preliminary Rate Resolution establishing
proposed fees for stormwater assessments.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1.That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2.That the Preliminary Stormwater Assessment rate for the fiscal year
beginning October 1, 2025, is established at an equivalent residential unit rate (“ERU”) of
$120.00.
Section 3.That the City Manager is directed to prepare, or cause to be prepared, an
updated Assessment Roll for the Fiscal Year commencing October 1, 2025.
RESOLUTION #2025-______2
Section 4.That there is established a public hearing to be held at 7:00 p.m. on
September 15, 2025, in the City of Dania Beach City Commission Chamber, 100 West Dania
Beach Boulevard, Dania Beach, Florida, 33004, per the meeting agenda or the TRIM notice
mailed by the Property Appraiser, at which time the City Commission will receive and consider
any comments on the Stormwater Assessments from the public and affected property owners,
consider imposing Stormwater Assessments for the Fiscal Year beginning October 1, 2025, and
the collection of such assessments on the same bill as ad valorem taxes.
Section 5.That the City Clerk shall publish a notice of the public hearing in the local
newspaper. The notice shall be published no later than August 23, 2025, in substantially the
form attached.
Section 6.That the Chief Financial Officer shall provide information on the public
hearing and the “not to exceed” rate to the Broward County Property Appraiser’s Office to be
included in the TRIM (Truth in Millage) Notice to serve as first class notice as required by the
Ordinance no later than August 4, 2025.
Section 7.That proceeds derived by the City from the Stormwater Assessments will
be utilized for the provision of stormwater services, facilities, and programs. In the event there is
any fund balance remaining at the end of the Fiscal Year, such balance shall be carried forward
and used only to fund stormwater services, facilities, and programs.
Section 8.That, in accordance with City Code Section 27-304 entitled “Stormwater
Assessments Authorization”, the City Administration is authorized to administratively modify or
adjust specific parcel ERU values to reflect the parcel-specific findings, whether recommended
by a Professional Engineer or other consultant retained by the City, or in the event that
adjustment to the assessment units is deemed to be necessary by the City while reviewing the
assessment roll.
Section 9.That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 10.That if any clause, section, other part or application of this Resolution is
held by any court of competent jurisdiction to be unconstitutional or invalid, in part or
application, it shall not affect the validity of the remaining portions or applications of this
resolution.
Section 11.That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
RESOLUTION #2025-______3
Section 12.That this Resolution shall be in force and take effect immediately upon its
passage and adoption.
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
RESOLUTION #2025-______4
STORMWATER SPECIAL ASSESSMENTS
Notice is given that the City Commission of the City of Dania Beach will conduct a
public hearing to consider re-imposition of stormwater assessments for the provision of
stormwater management services within the City of Dania Beach for the Fiscal Year beginning
October 1, 2025.
The stormwater assessments are based on two components – the impervious area of the
property and the percentage of impervious area as compared to the median single-family home.
Both variables are required to determine the appropriate amount of stormwater runoff generated
by impervious surface on each parcel of property. Impervious surfaces include rooftops, patios,
driveways, parking lots and similar areas. The City has determined that the median single-family
residence in the City includes 1,720 square feet of impervious surface on a median lot size of
6,500 square feet, which is defined as one "equivalent residential unit" or "ERU" and has an
impervious factor of 0.26. The annual stormwater assessment rate for the upcoming fiscal year
will be $120.00 for each ERU. Since verifying the impervious surface for each single-family
residence in the City is a practical impossibility, all single-family residences have been assigned
one ERU. Mobile homes on owner-occupied lots in mobile home parks have been assigned one-
half ERU. All other properties have been calculated individually as follows:
•For condominiums, the total impervious area (TIA) is calculated for the condominium
community, including parking and association property. The total area (TA) encompassed
by the development is determined as follows:
((TIA/1720) x (TIA/(0.26 x TA))/number of units in complex;
•While vacant property has no impervious area, it may still contribute to the City’s
stormwater system, so the assessment is based on the total area (TA). As a result, vacant
property assessments are calculated without the operating component as follows: 0.2 x
TA/6500;
•For mobile home parks, the typical mobile home, driveway, pad and ancillary activities
constitute 1300 square feet. Therefore, the total impervious area (TIA) for mobile home
parks was determined by multiplying the number of potential mobile homes by 1300.
The formula is: (1300 x No of MHs/1720) x (TIA/(0.26 x TA); and
•For all other property uses the total impervious area (TIA) is calculated for the property,
including parking. The total area (TA) encompassed by the development is also
calculated. The assessment is determined as follows: (TIA/1720) x (TIA/(0.26 x TA).
RESOLUTION #2025-______5
A credit system has been developed for those properties that retain stormwater on site.
The policy grants an eighty (80) percent credit to those properties. Properties that cannot benefit
in any way from the City’s stormwater program are granted 100 percent credits.
Copies of the Stormwater Utility Ordinance (Ordinance No. 13-96), the Initial
Stormwater Assessment Resolution (Resolution No. 73-96), the Final Stormwater Assessment
Resolution (Resolution No. 73-96, as amended by Resolution No. 103-96, and Resolution 116-
96), the Preliminary Rate Resolution initiating the annual process of updating the Assessment
Roll and re-imposing the Stormwater Assessments, the proposed amendments to the Stormwater
Ordinance and the updated Stormwater Assessment Roll for the upcoming fiscal year are
available for inspection at the City Clerk’s office.
If you have any questions, please contact the City's Department of Finance at (954)
924-6800 Ext. 3674 between 9:00 a.m. and 4:00 p.m. The above special assessments will be
collected on the ad valorem tax bill (the “Property tax” bill) to be mailed in November 2025, as
authorized by Section 197.3632, Florida Statutes. Failure to pay the assessments will cause a tax
certificate to be issued against the property, which may result in a loss of title (ownership) of
one’s real property. These special assessment programs proved to be successful last year in
fairly and efficiently providing a much-needed alternative funding and collection approach for
these vital and essential services.
A PUBLIC HEARING WILL BE HELD AT 7:00 P.M. ON SEPTEMBER 15, 2025, IN THE
CITY OF DANIA BEACH CITY COMMISSION CHAMBER, 100 WEST DANIA BEACH
BOULEVARD, DANIA BEACH, FLORIDA, PER THE MEETING AGENDA OR THE TRIM
NOTICE MAILED BY THE PROPERTY APPRAISER, FOR THE PURPOSE OF
RECEIVING PUBLIC COMMENT ON ALL OF THE PROPOSED ASSESSMENTS. All
affected property owners have a right to appear at the hearing, to speak at the hearing, and to file
written objections with the City Commission within twenty (20) days of this notice. If a person
decides to appeal any decision made by the City Commission with respect to any matter
considered at the hearing, such person will need a record of the proceedings and may need to
ensure that a verbatim record is made, including the testimony and evidence upon which the
appeal is to be made. In accordance with the Americans with Disabilities Act, persons needing
special accommodation or an interpreter to participate in this proceeding should contact the City
Clerk’s office at (954) 924-6800 Ext. 3623, at least two days prior to the date of the hearing.
City of Dania Beach
Finance Memorandum
DATE: 7/8/2025
TO: Honorable Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Yeimy Guzman, Chief Financial Officer
SUBJECT: Approval of a resolution adopting proposed millage rates for the Fiscal Year
beginning October 1, 2025, and ending September 30, 2026, and setting the date,
time, and place of the first Budget Public Hearing.
Request:
In accordance with Part lll, Article 3, Section 4(g) of the City of Dania Beach Charter, the
operating budget for the City’s operations for Fiscal Year 2025-26 has been prepared and
submitted. The City Administration requests approval of a resolution adopting proposed millage
rates for the Fiscal Year beginning October 1, 2025, and ending September 30, 2026, and setting
the date, time, and place of the first Budget Public Hearing.
Background:
Prior to August, the City must establish the maximum millage rates to appear on the Truth in
Millage (TRIM) notices mailed by the Broward County Property Appraiser in August to all
property owners. These rates may be decreased but not increased in September at the final public
budget hearing without additional first-class mail notification. The July 1st total taxable value of
$7,914,270,357 reflects an overall increase of 13.59% over the final 2024 value. The
recommended rates reflect no change in the current operating millage and the voted debt millage.
For the required millage and budget public hearing dates, the City Administration recommends
September 15th, 2025, and September 25th, 2025. On September 15th, the City will also adopt
its non-ad valorem assessment rates, which will be discussed as separate agenda items. Further,
the September 15th public hearings will be incorporated into the regular City Commission
meeting agenda, while the September 25th public hearings will be the only items considered at
that meeting.
Budgetary Impact
Adoption of the following proposed millage rates will provide the required funding for the
operations and debt service of the City of Dania Beach for the Fiscal Year ending September 30,
2026:
Operating: 5.9998 (no change)
Debt Service: .0985 (no change)
Total combined millage levy: 6.0983
This results in a gross combined ad valorem levy of $47,484,039 and net budgeted revenue of
$45,347,257.
Recommendation
Recommend that the City Commission adopt the resolution approving the proposed millage rates
and set the date, time, and location of the first Public Hearing to consider the proposed millage
rates and the tentative budget.
CERTIFICATION OF TAXABLE VALUE
DR-420
R. 5/12
Rule 12D-16.002
Florida Administrative Code
Effective 11/12
Year :County :
Principal Authority :Taxing Authority :
SECTION I : COMPLETED BY PROPERTY APPRAISER
1.Current year taxable value of real property for operating purposes $(1)
2.Current year taxable value of personal property for operating purposes $(2)
3.(3)Current year taxable value of centrally assessed property for operating purposes $
4.(4)Current year gross taxable value for operating purposes (Line 1 plus Line 2 plus Line 3)$
5.(5)
Current year net new taxable value (Add new construction, additions, rehabilitative
improvements increasing assessed value by at least 100%, annexations, and tangible
personal property value over 115% of the previous year's value. Subtract deletions.)
$
6.(6)Current year adjusted taxable value (Line 4 minus Line 5)$
7.(7)$Prior year FINAL gross taxable value from prior year applicable Form DR-403 series
8.(8)Does the taxing authority include tax increment financing areas? If yes, enter number
of worksheets (DR-420TIF) attached. If none, enter 0
Number
9.(9)
NumberDoes the taxing authority levy a voted debt service millage or a millage voted for 2
years or less under s. 9(b), Article VII, State Constitution? If yes, enter the number of
DR-420DEBT, Certification of Voted Debt Millage formsattached. If none, enter 0
SIGN
HERE
Property Appraiser Certification I certify the taxable values above are correct to the best of my knowledge.
Date :
SECTION II : COMPLETED BY TAXING AUTHORITY
If this portion of the form is not completed in FULL your taxing authority will be denied TRIM certification and
possibly lose its millage levy privilege for the tax year. If any line is not applicable, enter -0-.
10.Prior year operating millage levy (If prior year millage was adjusted then use adjusted
millage from Form DR-422)(10)per $1,000
11.(11)Prior year ad valorem proceeds (Line 7 multiplied by Line 10, divided by 1,000)$
12.(12)$Amount, if any, paid or applied in prior year as a consequence of an obligation measured by a
dedicated increment value (Sum of either Lines 6c or Line 7a for all DR-420TIF forms)
13.
14.
(13)
(14)
Adjusted prior year ad valorem proceeds (Line 11 minus Line 12)$
$Dedicated increment value, if any (Sum of either Line 6b or Line 7e for all DR-420TIF forms)
15.(15)$Adjusted current year taxable value (Line 6 minus Line 14)
16.Current year rolled-back rate (Line 13 divided by Line 15, multiplied by 1,000) per $1000 (16)
17.(17)per $1000Current year proposed operating millage rate
18.(18)
$
Total taxes to be levied at proposed millage rate (Line 17 multiplied by Line 4, divided
by 1,000)
Continued on page 2
YES NO
YES NO
Signature of Property Appraiser:
2025 Broward
City of Dania Beach City of Dania Beach - Operating
6,522,164,756
1,384,936,928
7,168,673
7,914,270,357
527,027,168
7,387,243,189
6,967,406,926
4 0
4 1
Electronically Certified by Property Appraiser 6/27/2025 3:10:01 PM
5.9998
41,803,048
-0-
41,803,048
-0-
7,387,243,189
5.6588
5.9998
47,484,039
DR-420
R. 5/12
Page 2
19.TYPE of principal authority (check one)County Independent Special District
(19)
Municipality Water Management District
(20)20.
Applicable taxing authority (check one)Principal Authority Dependent Special District
MSTU Water Management District Basin
21.(21)Is millage levied in more than one county? (check one)Yes No
DEPENDENT SPECIAL DISTRICTS AND MSTUs STOP HERE - SIGN AND SUBMIT
22. (22)$
Enter the total adjusted prior year ad valorem proceeds of the principal authority, all
dependent special districts, and MSTUs levying a millage. (The sum of Line 13 from all DR-420
forms)
23.Current year aggregate rolled-back rate (Line 22 divided by Line 15, multiplied by 1,000)(23)per $1,000
24.(24)$Current year aggregate rolled-back taxes (Line 4 multiplied by Line 23, divided by 1,000)
25.(25)$
Enter total of all operating ad valorem taxes proposed to be levied by the principal
taxing authority, all dependent districts, and MSTUs, if any. (The sum of Line 18 from all
DR-420 forms)
(26)Current year proposed aggregate millage rate (Line 25 divided by Line 4, multiplied
by 1,000)per $1,000
(27)Current year proposed rate as a percent change of rolled-back rate (Line 26 divided by
Line 23, minus 1, multiplied by 100)%
S
I
G
N
H
E
R
E
Taxing Authority Certification
I certify the millages and rates are correct to the best of my knowledge.
The millages comply with the provisions of s. 200.065 and the provisions of
either s. 200.071 or s. 200.081, F.S.
Date :
Title :Contact Name and Contact Title :
Mailing Address :Physical Address :
City, State, Zip :Phone Number :Fax Number :
Instructions on page 3
First public
budget hearing
Date :Time :Place :
27.
26.
Signature of Chief Administrative Officer :
4
4
4
41,803,048
5.6588
44,785,273
47,484,039
5.9998
6.03
9/15/2025 7:00 PM EST 100 West Dania Beach Blvd Dania Beach 33004
DR-420
R. 5/12
Page 3
CERTIFICATION OF TAXABLE VALUE
INSTRUCTIONS
“Principal Authority” is a county, municipality, or independent special district (including water management districts).
“Taxing Authority” is the entity levying the millage. This includes the principal authority, any special district dependent to the
principal authority, any county municipal service taxing unit (MSTU), and water management district basins.
Each taxing authority must submit to their property appraiser a DR-420 and the following forms, as applicable:
· DR-420TIF, Tax Increment Adjustment Worksheet
· DR-420DEBT, Certification of Voted Debt Millage
· DR-420MM-P, Maximum Millage Levy Calculation - Preliminary Disclosure
Section I: Property Appraiser
Use this DR-420 form for all taxing authorities except school
districts. Complete Section I, Lines 1 through 9, for each county,
municipality, independent special district, dependent special
district, MSTU, and multicounty taxing authority. Enter only
taxable values that apply to the taxing authority indicated. Use a
separate form for the principal authority and each dependent
district, MSTU and water management district basin.
Line 8
Complete a DR-420TIF for each taxing authority making
payments to a redevelopment trust fund under Section 163.387
(2)(a), Florida Statutes or by an ordinance, resolution or
agreement to fund a project or to finance essential infrastructure.
Check "Yes" if the taxing authority makes payments to a
redevelopment trust fund. Enter the number of DR-420TIF forms
attached for the taxing authority on Line 8. Enter 0 if none.
Line 9
Complete a DR-420DEBT for each taxing authority levying either
a voted debt service millage (s.12, Article VII, State Constitution)
or a levy voted for two years or less (s. 9(b), Article VII, State
Constitution).
Check “Yes” if the taxing authority levies either a voted debt
service millage or a levy voted for 2 years or less (s. 9(b), Article
VII, State Constitution). These levies do not include levies
approved by a voter referendum not required by the State
Constitution. Complete and attach DR-420DEBT. Do not
complete a separate DR-420 for these levies.
Send a copy to each taxing authority and keep a copy. When the
taxing authority returns the DR-420 and the accompanying forms,
immediately send the original to:
Florida Department of Revenue
Property Tax Oversight - TRIM Section
P. O. Box 3000
Tallahassee, Florida 32315-3000
Section II: Taxing Authority
Complete Section II. Keep one copy, return the original and
one copy to your property appraiser with the applicable
DR-420TIF, DR-420DEBT, and DR-420MM-P within 35 days
of certification. Send one copy to the tax collector. “Dependent
special district” (ss. 200.001(8)(d) and 189.403(2), F.S.)
means a special district that meets at least one of the
following criteria:
z The membership of its governing body is identical to that of
the governing body of a single county or a single
municipality.
z All members of its governing body are appointed by the
governing body of a single county or a single
municipality.
z During their unexpired terms, members of the special
district's governing body are subject to removal at will by
the governing body of a single county or a single
municipality.
z The district has a budget that requires approval through an
affirmative vote or can be vetoed by the governing body
of a single county or a single municipality.
"Independent special district” (ss. 200.001(8)(e) and 189.403
(3), F.S.) means a special district that is not a dependent
special district as defined above. A district that includes more
than one county is an independent special district unless the
district lies wholly within the boundaries of a single
municipality.
“Non-voted millage” is any millage not defined as a “voted
millage” in s. 200.001(8)(f), F.S.
Lines 12 and 14
Adjust the calculation of the rolled-back rate for tax increment
values and payment amounts. See the instructions for
DR-420TIF. On Lines 12 and 14, carry forward values from
the DR-420TIF forms.
Line 24
Include only those levies derived from millage rates.
All TRIM forms for taxing authorities are available on our website at
http://floridarevenue.com/property/Pages/TRIM.aspx
DR-420DEBT
R. 6/10
Rule 12D-16.002
Florida Administrative Code
Effective 11/12
Year :County :
Principal Authority :Taxing Authority :
Levy Description :
1.
SECTION I: COMPLETED BY PROPERTY APPRAISER
Current year taxable value of real property for operating purposes (1)$
2.Current year taxable value of personal property for operating purposes $(2)
3.Current year taxable value of centrally assessed property for operating purposes $(3)
4.Current year gross taxable value for operating purposes (Line 1 plus Line 2 plus Line 3)(4)$
SIGN
HERE
Property Appraiser Certification I certify the taxable values above are correct to the best of my knowledge.
Signature of Property Appraiser :Date :
SECTION II: COMPLETED BY TAXING AUTHORITY
5.Current year proposed voted debt millage rate per $1,000 (5)
6.Current year proposed millage voted for 2 years or less under s. 9(b) Article VII, State
Constitution per $1,000 (6)
S
I
G
N
H
E
R
E
Taxing Authority Certification I certify the proposed millages and rates are correct to the best of my knowledge.
Signature of Chief Administrative Officer :Date :
Title :Contact Name and Contact Title :
Mailing Address :Physical Address :
City, State, Zip :Phone Number :
CERTIFICATION OF VOTED DEBT MILLAGE
Fax Number :
INSTRUCTIONS
Property appraisers must complete and sign Section I of this form with the DR-420, Certification of Taxable Value, and DR-420S,
Certification of School Taxable Value, and provide it to all taxing authorities levying a
- Voted debt service millage levied under Section 12, Article VII of the State Constitution or
- Millage voted for two years or less under s. 9(b), Article VII of the State Constitution
Section I: Property Appraiser
Use a separate DR-420DEBT for each voted debt service millage that's levied
by a taxing authority. The property appraiser should check the Yes box on
Line 9 of DR-420, Certification of Taxable Value, or Line 8 of DR-420S,
Certification of School Taxable Value. The property appraiser should provide
the levy description and complete Section I, Lines 1 through 4 of this form, for
each voted debt service millage levied.
Enter only taxable values that apply to the voted debt service millage
indicated.
Sign, date, and forward the form to the taxing authority with the DR-420.
Section II: Taxing Authority
Each taxing authority levying a voted debt service millage requiring this form
must provide the proposed voted debt millage rate on Line 5.
If a DR-420DEBT wasn't received for any
- Voted debt service millages or
- Millages voted for two years or less
contact the property appraiser as soon as possible and request a
DR-420DEBT.
Sign, date, and return the form to your property appraiser with the
DR-420 or DR-420S.
All TRIM forms for taxing authorities are available on our website at http://floridarevenue.com/property/Pages/TRIM.aspx
2025 Broward
City of Dania Beach City of Dania Beach - Voted, Debt
City of Dania Beach - Voted, Debt
6,522,164,756
1,384,936,928
7,168,673
7,914,270,357
Electronically Certified by Property Appraiser 6/27/2025 3:10:01 PM
0.0985
MAXIMUM MILLAGE LEVY CALCULATION
35(/,0,1$5<',6&/2685(
For municipal governments, counties, and special districts
DR-420MM1
R. 5/12
Rule 12D-16.002
Florida Administrative Code
Effective 11/12
County :Year :
Taxing Authority :
1.(1)Is your taxing authority a municipality or independent special district that has levied
ad valorem taxes for less than 5 years?Yes No
IF YES, STOP HERE. SIGN AND SUBMIT. You are not subject to a millage limitation.
2.(2)per $1,000Current year rolled-back rate from Current Year Form DR-420, Line 16
3.per $1,000 (3)
4.(4)per $1,000Prior year operating millage rate from Current Year Form DR-420, Line 10
If Line 4 is equal to or greater than Line 3, skip to Line 11.If less, continue to Line 5.
Adjust rolled-back rate based on prior year majority-vote maximum millage rate
5.(5)Prior year final gross taxable value from Current Year Form DR-420, Line 7 $
6.(6)$Prior year maximum ad valorem proceeds with majority vote
(Line 3 multiplied by Line 5 divided by 1,000)
7.(7)$Amount, if any, paid or applied in prior year as a consequence of an obligation
measured by a dedicated increment value from Current Year Form DR-420 Line 12
8.(8)Adjusted prior year ad valorem proceeds with majority vote (Line 6 minus Line 7)$
9.Adjusted current year taxable value from Current Year form DR-420 Line 15 $(9)
10.Adjusted current year rolled-back rate (Line 8 divided by Line 9, multiplied by 1,000)per $1,000 (10)
Calculate maximum millage levy
11.(11)Rolled-back rate to be used for maximum millage levy calculation
(Enter Line 10 if adjusted or else enter Line 2)per $1,000
12.Adjustment for change in per capita Florida personal income (See Line 12 Instructions)(12)
13.Majority vote maximum millage rate allowed (Line 11 multiplied by Line 12)(13)per $1,000
14.Two-thirds vote maximum millage rate allowed (Multiply Line 13 by 1.10)per $1,000 (14)
15.Current year adopted millage rate per $1,000 (15)
16.(16)Minimum vote required to levy adopted millage: (Check one)
a. Majority vote of the governing body: Check here if Line 15 is less than or equal to Line 13. The maximum millage rate is equal
to the majority vote maximum rate. Enter Line 13 on Line 17.
b. Two-thirds vote of governing body: Check here if Line 15 is less than or equal to Line 14, but greater than Line 13. The
maximum millage rate is equal to adopted rate. Enter Line 15 on Line 17.
c. Unanimous vote of the governing body, or 3/4 vote if nine members or more: Check here if Line 15 is greater than Line 14.
The maximum millage rate is equal to the adopted rate. Enter Line 15 on Line 17.
d. Referendum: The maximum millage rate is equal to the adopted rate. Enter Line 15 on Line 17.
17.The selection on Line 16 allows a maximum millage rate of
(Enter rate indicated by choice on Line 16).(17)
18.(18)Current year gross taxable value from Current Year Form DR-420, Line 4 $
Continued on page 2
per $1,000
1SJPSZFBSNBYJNVNNJMMBHFSBUFXJUIBNBKPSJUZWPUFGSPN'PSN%3..
-JOF
Principal Authority :
2025 Broward
City of Dania Beach City of Dania Beach - Operating
4
5.6588
6.0399
5.9998
6,967,406,926
42,082,441
0
42,082,441
7,387,243,189
5.6966
5.6966
1.0451
5.9535
6.5489
5.9998
4
5.9535
7,914,270,357
R. 5/12
Page 2
19.Current year adopted taxes (Line 15 multiplied by Line 18, divided by 1,000).(19)$
20.(20)Total taxes levied at the maximum millage rate (Line 17 multiplied by Line 18, divided
by 1,000).$
DEPENDENT SPECIAL DISTRICTS AND MSTUs STOP HERE. SIGN AND SUBMIT.
21.Enter the current year adopted taxes of all dependent special districts & MSTUs levying
a millage . (The sum of all Lines 19 from each district's Form DR-420MM1)$(21)
22.Total current year adopted taxes (Line 19 plus Line 21).(22)$
Total Maximum Taxes
23.(23)Enter the taxes at the maximum millage of all dependent special districts & MSTUs
levying a millage (The sum of all Lines 20 from each district's Form DR-420MM1).$
24.Total taxes at maximum millage rate (Line 20 plus Line 23).(24)$
Total Maximum Versus Total Taxes Levied
25.Are total current year adopted taxes on Line 22 equal to or less than total taxes at the
maximum millage rate on Line 24? (Check one)YES NO (25)
S
I
G
N
H
E
R
E
Taxing Authority Certification
I certify the millages and rates are correct to the best of my knowledge. The millages
comply with the provisions of s. 200.065 and the provisions of either s. 200.071 or s.
200.081, F.S.
Signature of Chief Administrative Officer :Date :
Title :Contact Name and Contact Title :
Mailing Address :Physical Address :
City, State, Zip :Phone Number :Fax Number :
Complete and submit this form to the Department of Revenue with the completed
DR-487, Certification of Compliance, within 30 days of the final hearing.
Instructions on page 3
Taxing Authority :DR-420..1
City of Dania Beach - Operating
47,484,039
47,117,609
0
47,484,039
0
47,117,609
4
MAXIMUM MILLAGE LEVY CALCULATION
PRELIMINARY DISCLOSURE
INSTRUCTIONS
DR-420MM-P
R. 5/12
Page 3
General Instructions
Each of the following taxing authorities must
complete a DR-420MM-P.
ͻ County
ͻ Municipality
ͻ Special district dependent to a county or
municipality
ͻ County MSTU
ͻIndependent special district, including water
management districts
ͻ Water management district basin
Voting requirements for millages adopted by a
two-thirds or a unanimous vote are based on the
full membership of the governing body, not on
the number of members present at the time of
the vote.
This form calculates the maximum tax levy for
202ϰ allowed under s. 200.065(5), F.S. Counties
and municipalities, including dependent special
districts and MSTUs, which adopt a tax levy at the
final hearing higher than allowed under s.
200.065, F.S., may be subject to the loss of their
half-cent sales tax distribution.
DR-420MM-P shows the preliminary maximum
millages and taxes levied based on your
proposed adoption vote. Each taxing authority
must complete, sign, and submit this form to
their property appraiser with their completed
DR-420, Certification of Taxable Value.
The vote at the final hearing and the resulting
maximum may change. After the final hearing,
each taxing authority will file a final Form
DR-420MM, Maximum Millage Levy Calculation
Final Disclosure, with Form DR-487, Certification
of Compliance, with the Department of Revenue.
Specific tax year references in this form are
updated each year by the Department.
Line Instructions
Lines 5-10
Only taxing authorities that levied a 202ϯ millage rate less
than their maximum majority vote rate must complete these
lines. The adjusted rolled-back rate on Line 10 is the rate
that would have been levied if the maximum vote rate for
2022 had been adopted. If these lines are completed, enter
the adjusted rate on Line 11.
Line 12
This line is entered by the Department of Revenue. The
same adjustment factor is used statewide by all taxing
authorities. It is based on the change in per capita Florida
personal income (s. 200.001(8)(i), F.S.), which Florida Law
requires the Office of Economic and Demographic Research
to report each year.
Lines 13 and 14
Millage rates are the maximum that could be levied with a
majority or two-thirds vote of the full membership of the
governing body. With a unanimous vote of the full
membership (three-fourths vote of the full membership if
the governing body has nine or more members) or a
referendum, the maximum millage rate that can be levied is
the taxing authority’s statutory or constitutional cap.
Line 16
Check the box for the minimum vote necessary at the final
hearing to levy your adopted millage rate.
Line 17
Enter the millage rate indicated by the box checked in Line
16. If the proposed millage rate is equal to or less than the
majority vote maximum millage rate, enter the majority vote
maximum. If a two-thirds vote, a unanimous vote, or a
referendum is required, enter the proposed millage rate. For
a millage requiring more than a majority vote, the proposed
millage rate must be entered on Line 17, rather than the
maximum rate, so that the comparisons on Lines 21 through
25 are accurate.
All TRIM forms for taxing authorities are available on our website at
http://floridarevenue.com/property/Pages/Forms.aspx
CITY OF DANIA BEACH
FY 2026 Fire Services
Assessment Study
FINAL REPORT / June 27, 2025
341 N. Maitland Avenue, Suite 300, Maitland, FL 32751
www.raftelis.com
June 27, 2025
Yeimy Guzman
Chief Financial Officer
City of Dania Beach
100 W Dania Beach Blvd
Dania Beach, FL 33004
Subject: FY 2026 Fire Services Assessment Study
Dear Ms. Guzman:
Raftelis Financial Consultants, Inc. (Raftelis) is pleased to present this Final Report of the FY 2026 Fire Services
Assessment Study that we have conducted for the City of Dania Beach. This report presents the analysis of the
study for consideration and adoption of the Fiscal Year 2025-26 Fire Assessment Rates.
We appreciate the opportunity to be of service to the City and would like to thank the City staff for their valuable
assistance and cooperation throughout the course of this study.
Respectfully Submitted,
Raftelis Financial Consultants, Inc.
Joe Williams
Senior Manager
Erick van Malssen
Senior Consultant
City of Dania Beach / FY 2026 Fire Services Assessment Study
Contents
EXECUTIVE SUMMARY .................................................................... 1
Introduction ...........................................................................................................................1
Study Procedures ..................................................................................................................1
Summary of Study Results ...................................................................................................1
Full (100%) Cost Recovery Rate Calculation ............................................................................. 1
Partial Cost Recovery Rate Calculation – Revenue Neutral Rates ............................................ 2
Section 1 – Introduction ................................................................... 4
Background ...........................................................................................................................4
Methodology ..........................................................................................................................4
Section 2 – Fire Services Costs ....................................................... 7
Fire and Rescue Service Allocation .....................................................................................7
Calculation of the Net Revenue Requirement .....................................................................8
Section 3 – Calculation of the Fire Assessment ........................... 10
Assessment Property Classifications ............................................................................... 10
Calls For Service Analysis ................................................................................................. 12
Apportionment of the Net Revenue Requirement ............................................................ 13
Fire Assessment Rate Calculation ..................................................................................... 13
Full (100%) Cost Recovery Rate Calculation ........................................................................... 13
Partial Cost Recovery Rate Calculation – Revenue Neutral Rate Target Scenario .................. 14
Consideration of Fair Apportionment of Assessment ..................................................... 15
Section 4 – Summary of Recommendations .................................. 17
Section 5 – Appendix A .................................................................. 18
City of Dania Beach / FY 2026 Fire Services Assessment Study
List of Tables and Figures
Table ES 1 – FY 2026 Assessment Rate Calculation – Full (100%) Cost Recovery ................................. 2
Table ES 2 – Net Billed and Estimated Collected Revenue – Full (100%) Cost Recovery ........................ 2
Table ES 3 – FY 2026 Assessment Rate Calculation – Revenue Neutral Rate Target Scenario -
$8,126,500 Net Revenue (94.44% Cost Recovery) .................................................................................. 3
Table ES 4 – Revenue Neutral Rate Target Scenario - Net Billed and Estimated Collected Revenue
(includes deduction of exemptions) - $8,126,500 Target Revenue ........................................................... 3
Table 1 – Current FY 2024 Fire Assessment Rates ................................................................................. 4
Table 2 – Allocation of Personnel between Fire and Rescue ................................................................... 8
Table 3 – Calculation and Projection of the Net Revenue Requirement ................................................... 9
Table 4 – Identified Units by BCPA Fire Class Category ........................................................................ 11
Table 5 – Fire Call Allocation to Real Property, by Property Type .......................................................... 12
Table 6 – Allocation of FY 2026 Net Revenue Requirement .................................................................. 13
Table 7 – FY 2026 Assessment Rate Calculation – Full (100%) Cost Recovery .................................... 13
Table 8 – Net Billed and Estimated Collected Revenue – Full (100%) Cost Recovery ........................... 14
Table 9 – FY 2026 Assessment Rate Calculation – Revenue Neutral Rate Target Scenario - $8,126,500
Net Revenue (94.44% Cost Recovery) .................................................................................................. 14
Table 10 - Revenue Neutral Rate Target Scenario - Net Billed and Estimated Collected Revenue
(includes deduction of exemptions) - $8,126,500 Target Revenue ......................................................... 15
City of Dania Beach / FY 2026 Fire Services Assessment Study 1
EXECUTIVE SUMMARY
Introduction
The City of Dania Beach (“the City”) has annually levied and collected a Non-Ad Valorem Fire Assessment
against benefitted properties within the City to fund the provision of fire services beginning Fiscal Year (FY) 1997.
The City annually considers the continuance of the Fire Assessment program and the amount to be funded for Fire
Services. This study intends to update the Fire Assessment program using current property, cost, and calls for
service data. The calls for service data used to provide the basis of Fire Service cost allocation to property types can
change over time, therefore periodic updates to the Fire Assessment calculations are required to accurately and
fairly reflect current allocation parameters to benefited properties.
In accordance with Florida Law, the costs associated with providing Fire Services and facilities must be reasonably
apportioned to the properties that receive a benefit from Fire Service in proportion to the benefit received.
Therefore, the recommended Fire Assessments calculated in this study were developed such that the costs incurred
by the City in providing Fire Service will be recovered through assessments to properties in proportion to the
benefit received by the demand for service as reflected in the calls for service from each respective property class.
Study Procedures
The study first identifies the full Fire Services cost requirements for FY 2026 that recognizes the high level of
service traditionally provided by Broward Sherrif’s Office (BSO) and the City. This was accomplished by first
allocating the full FY 2026 Proposed Fire Department budget between Fire Services and Emergency Medical
Services (EMS) as required by Florida state statute. We also projected annual cost requirements for providing Fire
Services in each year of a multi-year projection period from FY 2026 through FY 2030. This was accomplished
through interactive work sessions with City staff to confirm allocation parameters, cost escalation rates, and the
projected capital improvement plan.
The FY 2026 Fire Service Net Revenue Requirement identified in the budget allocation and projection process was
then apportioned to each property class based upon National Fire Incident Reporting System (NIFRS) calls for
service data provided by the BSO. Current Fire Rescue Non-Ad Valorem Assessment Roll and Property data
provided by the Broward County Property Appraiser was used as the primary data source for assigning assessment
units to each parcel. Property classifications were based upon the currently assigned Fire Class Codes for each
parcel as maintained on the Property Appraiser’s database. Once the allocation to property classes was complete,
the Fire Assessment rate structure was developed and specific Fire Assessment rates for each property class were
developed.
Summary of Study Results
Full (100%) Cost Recovery Rate Calculation
To calculate the FY 2026 Fire Assessments, we utilized the apportioned costs and total units per property
classification as discussed in detail in subsequent sections of this report. The amount of assessable costs allocable to
each property class was divided by the number of assessment units identified in each property class to compute the
City of Dania Beach / FY 2026 Fire Services Assessment Study 2
Fire Assessment to be imposed against each parcel. Table ES 1 below presents the calculated FY 2026 Assessment
Rates at full (100%) cost recovery, as well as a comparison of the existing FY 2026 Assessment Rates:
Table ES 1 – FY 2026 Assessment Rate Calculation – Full (100%) Cost Recovery
While the full cost FY 2026 Net Revenue Requirement is apportioned to all properties, the actual revenue realized
will be less because exempted property is included in the apportionment but cannot be billed/assessed. In
addition, a 96% budget adjustment factor was used to calculate the estimated net collected revenue after accounting
for early payment discounts to the assessment bills. Table ES 2 below presents the estimated net billed and
estimated assessment revenue at full (100%) cost recovery.
Table ES 2 – Net Billed and Estimated Collected Revenue – Full (100%) Cost Recovery
Partial Cost Recovery Rate Calculation – Revenue Neutral Rates
The City has requested Raftelis to calculate the assessments with the latest call and property data, targeting the
same revenue that would be generated with the current adopted (FY 2025) rates. The Broward County Property
Appraiser’s data shows that the current adopted rates would generate $8,465,100 (rounded) in billed assessment
revenues. With the 96% budgetary adjustment/discount applied, the current rates would collect an estimated
$8,126,500 (rounded) in net revenues. To accomplish the revenue target, the full cost NRR was reduced to
94.44% of the total potential costs. Table ES 3 below presents the rate calculations for this revenue target, while
Table ES 4 shows the calculation of the target revenue.
BCPA Category
Description
BCPA
Code
Call
Allocation %
Allocated FY
2026 NRR
Allocated
Units Unit Type
FY 2026 -
Calculated
Rates per Unit
FY 2025 -
Current Rates
per Unit
Acreage (Vacant)A 0.54%52,880$ 726 Acre 72.87$ 85.23$
Commercial C 39.99%3,937,175$ 9,424,503 Sq Ft 0.4177$ 0.4213$
Residential R 50.93%5,014,009$ 18,518 Dwelling Unit 270.76$ 241.05$
Warehouse/Industrial W 3.47%341,318$ 6,650,500 Sq Ft 0.0513$ 0.0488$
Government, Exempt X 4.30%423,042$ 645,248 Sq Ft 0.6556$ N/A
Not For Profit, Exempt Y 0.78%76,917$ 446,157 Sq Ft 0.1723$ N/A
100.00%9,845,342$
BCPA Category
Description
BCPA
Code
Allocated
Assessment
Less:
Exemptions
Total Billed
Assessment
Acreage (Vacant)A 52,880$ (2,856)$ 50,025$
Commercial C 3,937,175$ (133,606)$ 3,803,569$
Residential R 5,014,009$ (242,406)$ 4,771,603$
Warehouse/Industrial W 341,318$ (2,602)$ 338,716$
Government, Exempt X 423,042$ (423,042)$ -$
Not For Profit, Exempt Y 76,917$ (76,917)$ -$
9,845,342$ (881,429)$ 8,963,913$
Budgetary Adjustment/Discount 96%
FY 2026 Estimated Collected Revenue 8,605,356$
City of Dania Beach / FY 2026 Fire Services Assessment Study 3
Table ES 3 – FY 2026 Assessment Rate Calculation – Revenue Neutral Rate Target Scenario -
$8,126,500 Net Revenue (94.44% Cost Recovery)
Table ES 4 – Revenue Neutral Rate Target Scenario - Net Billed and Estimated Collected Revenue
(includes deduction of exemptions) - $8,126,500 Target Revenue
BCPA Category
Description
BCPA
Code
Call
Allocation %
Allocated FY
2026 NRR
Allocated
Units Unit Type
FY 2026 -
Calculated
Rates per Unit
FY 2025 -
Current Rates
per Unit
Acreage (Vacant)A 0.54%49,940$ 726 Acre 68.82$ 85.23$
Commercial C 39.99%3,718,268$ 9,424,503 Sq Ft 0.3945$ 0.4213$
Residential R 50.93%4,735,231$ 18,518 Dwelling Unit 255.70$ 241.05$
Warehouse/Industrial W 3.47%322,341$ 6,650,500 Sq Ft 0.0484$ 0.0488$
Government, Exempt X 4.30%399,521$ 645,248 Sq Ft 0.6191$ N/A
Not For Profit, Exempt Y 0.78%72,640$ 446,157 Sq Ft 0.1628$ N/A
100.00%9,297,941$
BCPA Category
Description
BCPA
Code
Allocated
Assessment
Less:
Exemptions
Total Billed
Assessment
Acreage (Vacant)A 49,940$ (2,696)$ 47,244$
Commercial C 3,718,268$ (125,958)$ 3,592,310$
Residential R 4,735,231$ (229,029)$ 4,506,201$
Warehouse/Industrial W 322,341$ (2,773)$ 319,568$
Government, Exempt X 399,521$ (399,521)$ -$
Not For Profit, Exempt Y 72,640$ (72,640)$ -$
9,297,941$ (832,617)$ 8,465,324$
Budgetary Adjustment/Discount 96%
FY 2026 Estimated Collected Revenue 8,126,711$
City of Dania Beach / FY 2026 Fire Services Assessment Study 4
Section 1 – Introduction
Background
The City of Dania Beach (“the City”) has annually levied and collected a Non-Ad Valorem Fire Assessment
against benefitted properties within the City to fund the provision of fire services beginning Fiscal Year 1997. The
City annually considers the continuance of the Fire Assessment program and the amount to be funded for Fire
Services. This study intends to update the Fire Assessment program using current property, cost and calls for
service data. The City’s current FY 2025 Fire Assessment rates by property class are presented in Table 1 below.
These rates produced an estimated net collections of approximately $7.5 million upon issuance in FY 2025.
Table 1 – Current FY 2024 Fire Assessment Rates
The calls for service data used to provide the basis of Fire Service cost allocation to property types can change over
time, therefore periodic updates to the Fire Assessment calculations are required to accurately and fairly reflect
current allocation parameters to benefited properties.
The term “Fire Services” as used in this study refers to the twenty-four hours per day, seven days per week service
for fire suppression provided to City properties. The City has previously determined that the owners of property
benefited by the proposed Fire Services should share in funding these services by imposition of non-ad valorem
assessments. The City can fund through assessments up to 100% of the net Fire Services assessable costs,
estimated to be $9,845,342 in fiscal year 2026, as detailed in subsequent sections of this report. The City contracts
with the Broward Sheriff’s Office (BSO) for Fire Rescue Services and it also has legacy pension and other City
costs that must continue to be funded in addition to those pension costs charged by BSO.
Methodology
The development of a Non-Ad Valorem Assessment to fund Fire Services requires that the services and facilities
for which properties are to be assessed confer a special benefit upon the property burdened by the special
assessment. Simply stated, there must be a logical relationship between the services and facilities provided and the
benefit to real property assessed.
In addition to the special benefit requirement, the costs associated with providing the services and facilities must be
reasonably apportioned to the properties that receive a benefit from Fire Service in proportion to the benefit
received. Therefore, the recommended Fire Assessments calculated in this study were developed such that the
costs incurred by the City in providing Fire Service will be recovered through assessments to properties in
proportion to the benefit received by the demand for service as reflected in the calls for service from each respective
property class.
BCPA Category
Description
Current Rates
per Unit Unit Type
Acreage (Vacant)85.23$ Acre
Commercial 0.4213$ Sq Ft
Residential 241.05$ Dwelling Unit
Warehouse/Industrial 0.0488$ Sq Ft
City of Dania Beach / FY 2026 Fire Services Assessment Study 5
This part of the report describes the assessment methodology used to develop the Fire Assessments. The first
section discusses relevant Florida Law regarding Special Non-Ad Valorem Assessments, followed by sections
discussing how Florida Law has been applied to the determination of special benefit and the apportionment of the
annual revenue requirements of the Fire Assessment to benefitting properties.
SUMMARY OF RELEVANT FLORIDA LAW GOVERNING SPECIAL ASSESSMENTS
This section discusses relevant Florida Law regarding special non-ad valorem assessments as it relates to the City’s
proposed Fire Assessment program. The discussion covers how Florida law relates to special benefit and
proportional benefit.
Special non-ad valorem assessments are a revenue source available to local governments in Florida to fund capital
improvements as well as operations and maintenance expenses for essential services such as roads, drainage, Fire
Services, utilities, etc. Florida case law has established two requirements for the imposition of a non-ad valorem
special assessment. These two requirements have become known as the “two-pronged test”. They are 1) the
property assessed must derive a special benefit from the improvement, service or facilities provided, and 2) the
assessment must be fairly and reasonably apportioned among the properties that receive the special benefit.
In considering special benefit, the following question must be considered, “Can a special benefit be derived from
Fire Service by all properties within the City to meet the first prong of the two pronged test, even if all properties
are not improved and/or do not receive calls for service?”. The answer is yes, based in part upon the Florida
Supreme Court determination in Fire District No. 1 of Polk County v. Jenkins, a sufficient special benefit is derived by
the availability of fire services to justify the imposition of the special assessment. Also, in Meyer v. City of Oakland
Park, the Court upheld a sewer assessment on both improved and unimproved property, stating that the benefit
need not be direct or immediate but must be substantial, certain and capable of being realized within a reasonable
time. Also, In City of Hallandale v. Meekins, the Court indicated that the proper measure of benefits accruing to
property from the assessed improvement was not limited to the existing use of the property, but extended to any
future use which could reasonably be made.
PROPORTIONAL BENEFIT
It is well settled under Florida law that local governments are afforded great latitude regarding legislative
determinations of special benefit and reasonable apportionment of costs (as evidenced by the Florida Supreme
Court finding in City of Boca Raton v. State of Florida), that the apportionment of benefits is a legislative function, and
that legislative determinations as to benefit and apportionment will be upheld unless the determination is arbitrary
– that is, if reasonable persons may differ as to whether the land assessed was benefitted by the local improvement,
the findings of the City officials must be sustained. In City of Boca Raton v. State of Florida, the Florida Supreme
Court also determined that the manner of the assessment is immaterial and may vary, as long as the amount of the
assessment for each tract is not in excess of the proportional benefits as compared to other assessments on other
tracts. Accordingly, while any number of methodologies may be available for a given service or improvement, the
community imposing the assessment is at liberty to select the methodology which provides the best fit in terms of
local needs and circumstances.
SPECIAL BENEFIT – THE FIRST PRONG OF THE TWO-PRONGED TEST
Based upon discussions with City staff about the extent and nature of the Fire Services provided, we have
concluded that all parcels within the City receive a special benefit from the Fire Services provided by BSO. In
considering special benefit, it is important to consider that BSO maintains its Fire resources at a level that provides
City of Dania Beach / FY 2026 Fire Services Assessment Study 6
a response readiness condition to respond to calls for service throughout the City at relatively equal levels of
service. When needed, responses are made to calls for service without discrimination as to the property type, size,
location within the City, or any other factors specific to the property requiring the service. In addition, Vacant
lands not used actively in the production of agricultural products and services have Fire Services provided to them,
and the City has determined that Fire Services provided to those lands derive benefit to them, due to the urbanized
nature of the City.
As such, all properties receive a special benefit from the mere availability of Fire Services. Such benefit is
independent of, and realized even in the absence of, a call or need for actual service. The benefits include:
• Continuous availability of immediate response to fire.
• Provision of first responder medical aid to protect the life and safety of occupants.
• Enhanced property value, marketability of and/or ability to develop property.
• Lowering the cost of Fire Insurance by the presence of a professional and comprehensive Fire Service
• Protection against the spread of fire to neighboring parcels, thereby limiting and containing liability.
• Increased use and enjoyment of the parcel derived from continual and immediately available comprehensive
fire protection service should the need arise.
• Enhanced marketability and value of the parcel when compared to a similarly configured parcel for which
fire protection services are unavailable.
Therefore, the first prong of the two-pronged test (the property burdened by the assessment must derive a special
benefit from the service provided by the assessment) is met because all properties in the City receive a special
benefit from the City-wide Fire Service provided by BSO.
FAIR APPORTIONMENT – THE SECOND PRONG OF THE TWO-PRONGED TEST
In considering the assessment methodology, the second prong of the two-pronged test requires that the costs of the
assessment must be fairly and reasonably apportioned among the properties that receive the special benefit. The
Fire Services apportionment methodology used in this study allocates assessable costs based on the demand for
Fire Services by classes of real property use as identified on the real property assessment roll prepared for the levy
of ad valorem taxes. First, the assessable Fire Services costs are allocated among real property use categories based
upon the historical demand for these services (cost apportionment). This demand is identified by examining the
past three years of fire incident/calls for service data as reported by BSO to the State Fire Marshal’s office. Second,
the costs attributed to each property class are apportioned among the parcels on a per dwelling unit basis for
Residential uses, a square footage basis for non-residential uses, and a per acre basis for vacant parcels (parcel
apportionment). Further discussion of the consideration of fair apportionment is continued after the presentation
of source data, methodology and assessment rate calculation in subsequent sections of this report.
City of Dania Beach / FY 2026 Fire Services Assessment Study 7
Section 2 – Fire Services Costs
Fire and Rescue Service Allocation
Florida case law requires that the imposition of a special assessment for Fire Services only be used to fund Fire
Services and first response rescue services. A Fire Assessment may not fund Emergency Medical Services (EMS),
including transportation (Florida Supreme Court opinion in City of North Lauderdale v. SMM Properties -825 So.2d 343
Fla. 2002).
The City utilizes personnel who are certified firefighters that may also be qualified medical personnel. Personnel
assigned to medical units may also be called upon to assist in firefighting duties. Because emergency medical
services are not services for which the City can assess property, costs for those services cannot be included in the
total fire services costs to determine the allowable assessed costs. Mutual aid services provided by other Fire
Departments do not cost the City anything and those calls accordingly are not considered in this assessment.
BSO provides the City with an annual “Consideration” budget that becomes the contract cost for the ensuing fiscal
year. The budget is for fire, rescue, inspection, and administrative costs of providing fire rescue services.
Additionally, the City has costs in addition to its contract with BSO. When BSO took over fire rescue operations
from the City, it was left with significant legacy pension costs related to its former employees that still must be
funded. Similarly, the City must fund those employees share of the City’s other post-employment benefits
(generally retiree medical costs). The City must also pay for the costs of administering the assessment itself. These
costs include legal and professional fees, notification fees from the property appraiser’s office, advertising, and
discounts allowed on early payments of property tax bills. Of the sum of these costs, only those costs directly
attributable or allocated to fire services can be included in the assessment.
The remaining costs relate to the combined fire and EMS and must be allocated between the operations of those
two services. While there are many ways to allocate the costs of these services, we have chosen to allocate them in
proportion to the staffing of full-time equivalents (FTEs) by their function and shift assignment per apparatus. Fire
Services budgets are largely driven by personnel costs. Fire costs are largely driven by insuring standby availability
in the event of a fire. Similarly, EMS costs are largely driven by insuring standby availability in the event of a
medical emergency. Although calls for service are used to allocate the Fire Services costs to the property classes
(which is discussed in a later section of this report), calls for service are not a good basis for allocation between Fire
Services and EMS because of the standby nature of those services which require a constant employ of personnel
and facilities to be ready to respond.
Accordingly, we believe that the fairest apportionment method is one that utilizes a personnel assignment-based
allocation. As of FY 2026, BSO operates two fire suppression apparatus vehicles (Quints) and three rescue
vehicles. The Quints each require three personnel each shift. Each rescue unit now maintains three personnel per
shift. Each unit requires three sets of personnel by shift, therefore FTEs for each apparatus are multiplied by three
times the personnel assignment per shift. BSO maintains one Fire Prevention Officer, and five Fire Safety
Inspectors, all fully allocated to Fire Services. Finally, the District Fire Chief and Administrative Assistant are
allocated to Fire and Rescue by the weighted results of the directly allocated personnel. Table 2 below presents the
results of the personnel allocation.
City of Dania Beach / FY 2026 Fire Services Assessment Study 8
Table 2 – Allocation of Personnel between Fire and Rescue
Calculation of the Net Revenue Requirement
To calculate the Fire Services Net Revenue Requirement (NRR) for FY 2026 and beyond, the proposed
FY 2026 BSO budget as well as other City costs for Fire Services were projected using cost escalation factors
identified by City Staff. In each year of the projection period, offsetting revenues from other sources were deducted
from the expenditure requirements so that the full complement of dedicated Fire revenues is not double recovered.
A 4% allowance (i.e. assumed reduction in fee revenues) for early payment/statutory discounts was included to
determine the annual net revenue requirements to be recovered by the fire assessment fees. The projection of Fire
Services Net Revenue Requirement for FY 2026 – FY 2030 is presented in Table 3. The Net Revenue Requirement
in FY 2026 through FY 2030 represents 100% Cost Recovery or Maximum Allocated costs for the annual
assessments as calculated herein. The maximum allocated cost for the FY 2026 Fire Assessment is $9,845,342
Assignment/Position
Full Time
Equivalents Fire Rescue Allocation
Quint 1 9 9 Direct Fire
Quint 17 9 9 Direct Fire
Rescue 1 9 9 Direct Rescue
Rescue 1 9 9 Direct Rescue
Rescue 17 9 9 Direct Rescue
Fire Prevention Officer 1 1 Direct Fire
Fire Safety Inspectors 5 5 Direct Fire
District Fire Chief 1 0.47 0.53 Weighted
Administrative Assistant 1 0.47 0.53 Weighted
Total 53 24.94 28.06
Fire/Rescue Allocation 47.06%52.94%
City of Dania Beach / FY 2026 Fire Services Assessment Study 9
Table 3 – Calculation and Projection of the Net Revenue Requirement
FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
Annual
Escalation
Factor
Expenditures
Broward Sheriff's Office 20,663,351$ 21,593,202$ 22,564,896$ 23,580,316$ 24,641,430$ 4.50%
City Fire Costs 1,247,000$ 1,303,115$ 1,361,755$ 1,423,034$ 1,487,071$ 4.50%
Other City Operating Expenses 5,000$ 5,000$ 5,000$ 5,000$ 5,000$ 0.00%
Property Appraiser and Tax Collector Fees 7,896$ 8,133$ 8,377$ 8,628$ 8,887$ 3.00%
Advertisements 6,500$ 6,500$ 6,500$ 6,500$ 6,500$ 0.00%
Legal and Professional Fees 6,000$ 6,000$ 6,000$ 6,000$ 6,000$ 0.00%
Consultant Costs - Assessment Updates 35,000$ 35,000$ 35,000$ 35,000$ 35,000$
Total Expenditures 21,935,747$ 22,921,950$ 23,952,528$ 25,029,479$ 26,154,888$
Less: Direct EMS Costs (130,000)$ (135,850)$ (141,963)$ (148,352)$ (155,027)$ 4.50%
Total Net Fire Costs Before Allocation 21,805,747$ 22,786,100$ 23,810,565$ 24,881,127$ 25,999,861$
% Allocated to Fire (1)47.06%47.06%47.06%47.06%47.06%
Assessable Fire Costs 10,261,528$ 10,722,870$ 11,204,972$ 11,708,766$ 12,235,229$
Less: Attributed Revenues
Hazmat Permit Fees (10,000)$ (10,000)$ (10,000)$ (10,000)$ (10,000)$ 0.00%
Fire Inspection Fees (800,000)$ (828,000)$ (856,980)$ (886,974)$ (918,018)$ 3.50%
Total Attributed Revenues (810,000)$ (838,000)$ (866,980)$ (896,974)$ (928,018)$
Net Assessable Fire Costs 9,451,528$ 9,884,870$ 10,337,992$ 10,811,791$ 11,307,210$
Plus: Assessment Discounts (4%)393,814$ 411,870$ 430,750$ 450,491$ 471,134$
Net Revenue Requirement 9,845,342$ 10,296,740$ 10,768,741$ 11,262,283$ 11,778,344$
(1) - Refer to Table 2 for Allocation calculation
City of Dania Beach / FY 2026 Fire Services Assessment Study 10
Section 3 – Calculation of the Fire Assessment
Assessment Property Classifications
Using the Broward County Property Appraisers (BCPA) tax roll data, benefited parcels were identified using
the various categories of land use codes within that data set. Additionally, and to keep the proposed
apportionment categories as close to the existing categories as possible, we relied upon the Fire Class codes
currently maintained by the BCPA. The BCPA has previously identified and coded the improved properties by
type and assigned each parcel an appropriate Fire Class Code. We reviewed consistency in this data, and it was
determined to be of high accuracy. This data has also undergone considerable review over time through prior
studies. The Fire Class codes used are as follows:
• Residential (“R”) This includes all residential dwelling units, be they single family, multifamily, mobile
homes, or mobile home lots. This includes separate or attached guest houses or “granny flats” or
anything considered a residential dwelling unit.
• Commercial (“C”) This includes all property used for commercial activity, except where otherwise
identified by its own Fire Class code and includes office and retail uses. It also includes recreational
vehicle lots converted to commercial square footage as provided by statute.
• Government (“X”) This includes any property owned by a federal, state, or local government.
• Special (“S”, and generally mixed use) This includes property that has more than one use or
improvement that contains more than one Fire Class code. An example might be a parcel which
contained both a warehouse and an office use. Each use will be assigned the cost for that use.
• Vacant Acreage Parcels Not Developed (“A”) This includes land that does not contain any
improvement or structure but excludes property classified as agricultural.
• Warehouse/Industrial (“W”) This includes manufacturing and processing sites, storage units (whether
for commercial or non-commercial purposes), and warehousing sites.
• Miscellaneous (“Y”) This includes properties that are used for Charitable, Educational, Literary,
Scientific, or Religious organizations, or other properties defined under Florida Statutes. These
properties may be assessed or may be excluded by the City from year-to- year.
It should also be noted that properties that can sometimes be exempt from this assessment (e.g., church-owned
residential properties, portions of warehouses used for exempt purposes, portions of office buildings used for
exempt purposes) remain classified as “R”, “C”, “W”, etc. and are included in the assessment calculations, but
are not assessed if the City has excluded them from the assessment levy. In addition, all Residential, Vacant,
Commercial or Warehouse units for parcels categorized as “X” or “Y” are assigned to the relevant assessment
types for allocation and rate calculation, even though the parcels are exempt ultimately not billed. For example,
if a property is shown to contain a single-family residential dwelling (“R”) but is owned by a Church (“Y”), it’s
dwelling unit will be allocated to the Residential rate calculation, but the parcel will not be billed the assessment.
Again, these codes are used by BCPA to assist them in the administration of their rolls, and we believe them to
be highly accurate at the parcel level.
City of Dania Beach / FY 2026 Fire Services Assessment Study 11
Each BCPA parcel for the City also has, in addition to a Fire Class code, a Fire Basis element, which indicates
the number of applicable billing units located on the parcel. For example, a single-family residential dwelling
unit would have a Fire Basis element of “1”, indicating that the fixed residential assessment rate would be
multiplied by “1” to arrive at an assessment amount and a duplex residential dwelling unit would have a Fire
Basis element of “2”, indicating that the fixed residential assessment rate would be multiplied by “2” to arrive
at an assessment amount, and so on. Commercial, Warehouse/Industrial, and Not-for-profit are based upon
the square footage of buildings on the property. The sum of all structures of similar fire class are added together
to determine the total square footage for each fire class on each parcel. Acreage is based upon the number or
fraction of an acre for the parcel. The Fire Class code “S”, Special, generally includes mixed-use parcels that
have mixed assessment rates applied to them. The sum of each category (e.g., “Residential”, “Commercial”,
etc.) are added together within this coding. The Fire Basis element code in this Fire Class code in this category
indicates the amount of the assessment for that Fire Class code. The BCPA handles mixed-use parcels as
exceptions and manually calculates the assessment based upon the particular mix of uses that exist on those
parcels.
Mobile Home parks are assessed whether or not a lot/space is occupied. Each mobile home lot/space is
assessed a residential assessment rate. The commercial component of a mobile home park may include a
calculation based on the total of any commercial structures located on the parcel plus an assigned commercial
structure size of the minimum square footage of 1,200 square feet that is mandated by the Department of Health
under Chapter 64E-15.002(3), Florida Administrative Code for Recreational Vehicle Park spaces and a square
footage of 500 square feet for tent spaces inside Recreational Vehicle Parks, also as mandated by Chapter 64E-
15.002(3), Florida Administrative Code. The City does not have any parks that have only recreational vehicles.
Mobile home parks are mixed-use parcels.
There were 14,301 unique parcels or folio numbers within the City of Dania Beach fire assessment district
provided to us by the BCPA in June 2025. Among these individual parcels are non-assessable, fully excluded
parcels such as residential multi-family common areas, submerged lands, lake bottoms, right of ways, etc. For
all real property used in the allocation of the NRR, the unit counts by BCPA Fire Class category code and use
code counts appear below:
Table 4 – Identified Units by BCPA Fire Class Category
The City may not ultimately assess all the properties within these fire class categories for Fire Services as the City
traditionally has exempted some uses (e.g., non-profits, houses of worship, and other properties also exempt from
property taxes) of property from the fire assessment. Commercial, Warehouse/Industrial, and, if levied, Not-for-
BCPA Category
Description
BCPA
Code
Allocated
Units Unit Type
Acreage (Vacant)A 726 Acres
Commercial C 9,424,503 Sq Ft
Residential R 18,518 Dwelling Units
Warehouse/Industrial W 6,650,500 Sq Ft
Government, Exempt X 645,248 Sq Ft
Not For Profit, Exempt Y 446,157 Sq Ft
City of Dania Beach / FY 2026 Fire Services Assessment Study 12
profit parcels are assessed based on square footage of the structures by fire class on each parcel. The costs
associated with any exempt parcels have not been reallocated to the remaining non-exempt parcels and those costs
are assumed by other sources of City revenue.
Calls For Service Analysis
The costs identified in this study are apportioned to property categories based upon an analysis of the calls for
service data provided by BSO. The call/incident data identified the number and type of calls made by City Fire
and EMS vehicles for three fiscal-years beginning October 1, 2021 (FY 2022) – September 30, 2024 (FY 2024).
The call/incident data is extracted from the National Fire Incident Reporting System (NIFRS).
The data field containing the type of call/incident was used to separate calls determined to be Fire Services, and
those determined to be EMS or other non-Fire calls. Only Fire Services calls were used for the apportionment of
the Fire Assessments. Schedule 1 of Appendix A presents the full list of unique call/incident types in the data set
provided by BSO, and the identification of incident type as being either Fire or EMS for the assessment
calculations. Certain call types were considered Non-Fire related such as cancelled calls, false alarms or erroneous
records. We also excluded from the call data calls to property that was located outside of the City limits or served
for fire rescue by other entities, such as the Fort Lauderdale/Hollywood International Airport or Port Everglades.
The call data represented 20,884 calls over the three fiscal-year time period. Of these calls, 2,190 were identified by
incident type as Fire related.
Beyond identifying the call/incident type, we then allocated the Fire calls using property types as coded in the call
data. Schedule 2 of Appendix A presents each unique property use code in the NIFRS data, and the application of
the property categories to each code as utilized in this study. Of the 2,190 calls identified as Fire related, 2,048 were
calls to real property and specific property uses. The remaining 142 calls were to non-real property or non-specific
property and were therefore excluded from the apportionment analysis.
The remaining 2,048 calls were assigned to the assessment property classifications. Table 5 below illustrates the
assignment of calls to the property categories identified in the previous subsection. The percentages identified in the
Fire Calls to Real Property are used to allocate the FY 2026 Net Revenue Requirement to each property class.
Table 5 – Fire Call Allocation to Real Property, by Property Type
All Eligible Calls - Real
Property
BCPA
Code
3-Year
Call Total
% of
Total
Acreage, Vacant, Lot A 11 0.54%
Commercial C 819 39.99%
Residential R 1,043 50.93%
Warehouse/Industrial W 71 3.47%
Government X 88 4.30%
Not For Profit Y 16 0.78%
2,048 100.00%
City of Dania Beach / FY 2026 Fire Services Assessment Study 13
Apportionment of the Net Revenue Requirement
The next step in the Fire Assessment calculation is to allocate the FY 2026 Net Revenue Requirement amongst
the property classes. This is done by utilizing the allocations of Fire calls to real property as identified in the
previous section. Featured below, Table 6 contains the apportionment of the FY 2026 Net Revenue
Requirement to the identified property classes.
Table 6 – Allocation of FY 2026 Net Revenue Requirement
Fire Assessment Rate Calculation
Full (100%) Cost Recovery Rate Calculation
To calculate the FY 2026 Fire Assessments, we utilized the apportioned costs and total units per property
classification as identified in the previous sections of this report. The amount of assessable costs allocable to each
property class was divided by the number of assessment units identified in each property class to compute the Fire
Assessment to be imposed against each parcel. Table 7 below presents the calculated FY 2026 Assessment Rates at
full (100%) cost recovery, as well as a comparison of the existing FY 2025 Assessment Rates:
Table 7 – FY 2026 Assessment Rate Calculation – Full (100%) Cost Recovery
While the full cost FY 2026 Net Revenue Requirement is apportioned to all properties, the actual revenue realized
will be less because exempted property is included in the apportionment but cannot be billed/assessed. In addition,
BCPA Category
Description
BCPA
Code
Call
Allocation %
Allocated FY
2026 NRR
Acreage (Vacant)A 0.54%52,880$
Commercial C 39.99%3,937,175$
Residential R 50.93%5,014,009$
Warehouse/Industrial W 3.47%341,318$
Government, Exempt X 4.30%423,042$
Not For Profit, Exempt Y 0.78%76,917$
Total:100.00%9,845,342$
BCPA Category
Description
BCPA
Code
Call
Allocation %
Allocated FY
2026 NRR
Allocated
Units Unit Type
FY 2026 -
Calculated
Rates per Unit
FY 2025 -
Current Rates
per Unit
Acreage (Vacant)A 0.54%52,880$ 726 Acre 72.87$ 85.23$
Commercial C 39.99%3,937,175$ 9,424,503 Sq Ft 0.4177$ 0.4213$
Residential R 50.93%5,014,009$ 18,518 Dwelling Unit 270.76$ 241.05$
Warehouse/Industrial W 3.47%341,318$ 6,650,500 Sq Ft 0.0513$ 0.0488$
Government, Exempt X 4.30%423,042$ 645,248 Sq Ft 0.6556$ N/A
Not For Profit, Exempt Y 0.78%76,917$ 446,157 Sq Ft 0.1723$ N/A
City of Dania Beach / FY 2026 Fire Services Assessment Study 14
a 96% budget adjustment factor was used to calculate the estimated net collected revenue after accounting for early
payment discounts to the assessment bills. Table 8 below presents the estimated net billed and estimated
assessment revenue at full (100%) cost recovery.
Table 8 – Net Billed and Estimated Collected Revenue – Full (100%) Cost Recovery
Partial Cost Recovery Rate Calculation – Revenue Neutral Rate Target
Scenario
The City has requested Raftelis to calculate the assessments with the latest call and property data, targeting the
same revenue that would be generated with the current adopted (FY 2025) rates. The Broward County Property
Appraiser’s data shows that the current adopted rates would generate $8,465,100 (rounded) in billed assessment
revenues. With the 96% budgetary adjustment/discount applied, the current rates would collect an estimated
$8,126,500 (rounded) in net revenues. To accomplish the revenue target, the full cost NRR was reduced to
94.44% of the total potential costs. Table 9 below presents the rate calculations for this revenue target, while
Table 10 shows the calculation of the target revenue.
Table 9 – FY 2026 Assessment Rate Calculation – Revenue Neutral Rate Target Scenario -
$8,126,500 Net Revenue (94.44% Cost Recovery)
BCPA Category
Description
BCPA
Code
Allocated
Assessment
Less:
Exemptions
Total Billed
Assessment
Acreage (Vacant)A 52,880$ (2,856)$ 50,025$
Commercial C 3,937,175$ (133,606)$ 3,803,569$
Residential R 5,014,009$ (242,406)$ 4,771,603$
Warehouse/Industrial W 341,318$ (2,602)$ 338,716$
Government, Exempt X 423,042$ (423,042)$ -$
Not For Profit, Exempt Y 76,917$ (76,917)$ -$
9,845,342$ (881,429)$ 8,963,913$
Budgetary Adjustment/Discount 96%
FY 2026 Estimated Collected Revenue 8,605,356$
BCPA Category
Description
BCPA
Code
Call
Allocation %
Allocated FY
2026 NRR
Allocated
Units Unit Type
FY 2026 -
Calculated
Rates per Unit
FY 2025 -
Current Rates
per Unit
Acreage (Vacant)A 0.54%49,940$ 726 Acre 68.82$ 85.23$
Commercial C 39.99%3,718,268$ 9,424,503 Sq Ft 0.3945$ 0.4213$
Residential R 50.93%4,735,231$ 18,518 Dwelling Unit 255.70$ 241.05$
Warehouse/Industrial W 3.47%322,341$ 6,650,500 Sq Ft 0.0484$ 0.0488$
Government, Exempt X 4.30%399,521$ 645,248 Sq Ft 0.6191$ N/A
Not For Profit, Exempt Y 0.78%72,640$ 446,157 Sq Ft 0.1628$ N/A
100.00%9,297,941$
City of Dania Beach / FY 2026 Fire Services Assessment Study 15
Table 10 - Revenue Neutral Rate Target Scenario - Net Billed and Estimated Collected Revenue
(includes deduction of exemptions) - $8,126,500 Target Revenue
Consideration of Fair Apportionment of Assessment
While there can be many ways to fairly apportion the costs of the fire services to benefited properties, we note the
following:
Apportioning costs among classifications of property based upon the historical demand for fire rescue services is a
fair and reasonable method because it reflects the property uses' potential fire risk based upon building use and is a
reasonable proxy for the firefighters training and experience, quantity and size of apparatus, and other special
firefighting equipment that must be available in accordance with the City’s standards and practices. It is fair and
reasonable to allocate costs to any particular non-residential structure without any limit to the square footage of a
structure as large buildings require more resources and more value of property benefits from fire protection. It is
fair and reasonable to not consider the flow capacity of fire apparatus as a limiting factor to fire protection as larger
buildings will have fire flows provided independent of the apparatus cumulative pumping capacity. The amount of
personnel engaged in firefighting increases with building size and personnel costs are the largest costs in fire
protection. Buildings cannot be permitted for construction if a local government cannot provide adequate fire
protection at the time they are ready for occupancy. Accordingly, we have removed tranches from earlier studies
and have determined that limits on the size of structures may shift the cost burden to owners of smaller structures.
Apportioning costs among classifications of property (Fire Class code) based upon both historical demand for fire
rescue services is fair and reasonable and proportional to the special benefit received and will ensure that no
property is assessed an amount greater than the special benefit received.
Apportioning costs to unimproved properties is fair and reasonable as fire call data demonstrates that there are calls
to those properties that are not infrequent. Fires on unimproved properties can spread to other parcels, both
improved and unimproved, and in an urban environment, uncontrolled or unaddressed fires can cause significant
damage. Property owners can be held responsible for fires on their property that spread to other parcels.
The fire rescue incident reports (NFIRS) are the most reliable data available to determine the potential demand for
fire services from property use and to determine the benefit to property use resulting from the demand for fire
services to protect and serve buildings and land located within assessed property and their intended occupants.
There exist sufficient fire incident reports that document the historical demand for fire services from assessed
property within the property use categories. The relative demand that has been determined for each property use
BCPA Category
Description
BCPA
Code
Allocated
Assessment
Less:
Exemptions
Total Billed
Assessment
Acreage (Vacant)A 49,940$ (2,696)$ 47,244$
Commercial C 3,718,268$ (125,958)$ 3,592,310$
Residential R 4,735,231$ (229,029)$ 4,506,201$
Warehouse/Industrial W 322,341$ (2,773)$ 319,568$
Government, Exempt X 399,521$ (399,521)$ -$
Not For Profit, Exempt Y 72,640$ (72,640)$ -$
9,297,941$ (832,617)$ 8,465,324$
Budgetary Adjustment/Discount 96%
FY 2026 Estimated Collected Revenue 8,126,711$
City of Dania Beach / FY 2026 Fire Services Assessment Study 16
category by an examination of such fire incident reports is consistent with the experience of the City. Therefore, the
use of the relative percentages that were determined by an examination of fire rescue incident reports is a fair and
reasonable method to apportion the fire services assessed costs among the property use categories (Fire Class
codes).
Neither the size nor the value of the residential property determines the scope of the required fire response by the
City. The potential demand for fire services is driven by the existence of a dwelling unit.
Apportioning the percentage of the fire services assessed costs relating to the relative demand for fire services
attributable to residential property on a per dwelling unit basis (Fire Basis) is required to avoid cost inefficiency and
unnecessary administration and is a fair and reasonable method of parcel apportionment based upon historical call
data.
The separation of non-residential property buildings by actual square footage (Fire Basis) is fair and reasonable for
the purpose of parcel apportionment for the relative demand because the demand for fire service is determined and
measured by the actual square footage of structures and improvements within benefited parcels. The greater the
building area, the greater the potential for a large fire and the greater the amount of firefighting resources that must
be available in the event of a fire in a structure of that building’s size. It is fair and reasonable to correlate a
building’s benefit directly to a building’s size, without limit.
Based upon the historical demand for fire protection services, the percentages of the City’s total fire protection
assessable costs attributable to vacant non-agricultural properties were calculated. The costs attributable to parcels
were divided by the number of acres (Fire Basis) associated with parcels in the Acreage category to compute the
fire assessment rate per acre. An acreage charge is a fair and reasonable allocation for vacant non-agricultural
properties.
For residential parcels that contain non-residential buildings, non-residential improvements located on the parcel
were treated according to their non-residential property use category and size to compute the parcel’s non-
residential fire protection assessment. This assessment was then added to the parcel’s residential fire services
assessment. For non-residential parcels that contain a residence, the number of dwelling units by type located on
the parcel was multiplied by the rate per dwelling unit to compute the parcel’s residential fire services assessment.
This assessment was then added to the parcel’s non-residential fire services assessment. For agricultural parcels that
contain a residence or non-residential building, the parcel was assessed for the actual number of dwelling units by
type located on the parcel and/or the appropriate assessment for the non-residential building square footage. The
property used for agricultural purposes was not assessed.
We believe that the apportionment methodology prepared here is fair and reasonable and benefits the property that
will be assessed and that it fits the particular properties in and nature of the City of Dania Beach.
City of Dania Beach / FY 2026 Fire Services Assessment Study 17
Section 4 – Summary of Recommendations
Based upon the results of the analysis presented herein, we recommend the following:
1. We recommend the Assessment Rates presented herein to be adopted by the City for FY 2026 at or below
the full cost recovery calculation.
2. We recommend the City continue its policy of evaluating the fire assessment rates on an annual basis and
adjusting the assessment rates to reflect increases in the cost of Fire Service.
3. We recommend the City to continue to update the fire assessment rates annually to keep pace with ongoing
changes in costs, call allocations and property demographics.
City of Dania Beach / FY 2026 Fire Services Assessment Study 18
Section 5 – Appendix A
Schedule 1 – NFIRS Call Data Call/Incident Type Categorizations
Schedule 2 – NFIRS Call Data Property Use Categorizations
RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AS REQUIRED BY THE CITY CHARTER AND
SECTION 200.065, FLORIDA STATUTES, APPROVING THE PROPOSED
MILLAGE RATE NECESSARY TO BE LEVIED FOR THE FISCAL YEAR
2025-2026 FOR OPERATING PURPOSES; ESTABLISHING THE DEBT
MILLAGE RATE AS APPROVED BY THE ELECTORATE; PROVIDING
FOR A PUBLIC HEARING TO HEAR OBJECTIONS AND QUESTIONS
CONCERNING THE MILLAGE RATE, AND AT WHICH MEETING THE
QUESTIONS AND CONCERNS WILL BE ANSWERED; PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City Charter (Part VII, Article 1, Section 2) of the City of Dania Beach,
Florida, and state law (Florida Statutes, Section 200.065) require that the City Commission shall,
by resolution, adopt an annual budget, determine the amount of millage necessary to be levied
and publish the budget so adopted, together with a notice stating the time and place where
objections and questions may be heard; and
WHEREAS, the City Manager of the City of Dania Beach, Florida, has prepared and
submitted to the City Commission an annual report covering the operation of the City and has set
forth in it an estimate of the expenditures and revenues of the City for the ensuing year,
beginning October 1, 2025, and ending September 30, 2026, with sufficient copies of such report
and estimate being on file in the office of the City Clerk so that any interested party may obtain
copies upon request; and
WHEREAS, pursuant to the referendum approved by the voters of the City in the March
2005 General Election, the issuance of General Obligation bonds in an amount not to exceed
$10,300,000.00 was authorized; and
WHEREAS, the City has issued General Obligation Bonds in the total amount of
$10,300,000.00, and for Fiscal Year 2025-2026, the City will be levying a debt millage equal to
0.0985 mills towards the payment of principal and interest; and
WHEREAS, the City Manager has presented to the City Commission detailed
information supporting the estimate, affording the City Commission a comprehensive
understanding of the City Government budget and funding for the ensuing period, including
expenditures for corresponding items during the last two fiscal years, and any increase and
RESOLUTION #2025-______2
decrease in financial demands for the ensuing year, as compared with corresponding
appropriations for the last (prior) fiscal year; and
WHEREAS, the City Commission has met and considered the City Manager’s annual
report and estimate for the ensuing year; has determined and fixed the amount necessary to carry
on the government of the City for the ensuing year; has prepared a tentative budget setting forth
the amounts necessary to be raised for the various departments of the City; and has appropriated
the necessary amounts to the various departments of the City, considering the applicable funds
on hand and the estimated departmental revenues; and
WHEREAS, the City Commission, in order to produce a sufficient sum to fund the
tentative budget, it is recommended that a provisional millage of 5.9998 mills be levied against
ad valorem valuation of property subject to taxation in the City of Dania Beach; and
WHEREAS, the “rolled back rate” as computed in accordance with the provisions of
Section 200.065(1), Florida Statutes, is 5.6588 mills.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1.That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2.That the proposed tentative operating millage necessary to be levied
against ad valorem valuation of property subject to taxation in the City of Dania Beach to
produce a sufficient sum, which, together with departmental revenue, will be adequate to pay the
appropriations made in the tentative budget, is as follows:
FOR OPERATING BUDGET:
(GENERAL MUNICIPAL MILLAGE) 5.9998 MILLS
Section 3.That the proposed millage rate is a 6.03% increase from the rolled-back
rate, as computed in accordance with the provisions of Section 200.065(1), Florida Statutes.
Section 4.That the voted debt service millage rate is 0.0985 mills, as established in
accordance with the provisions of law pursuant to Chapter 200, Florida Statutes.
Section 5.That the City’s aggregate tentative millage rate is 6.0983 (a combined total
Millage of 5.9998 Mills for operating and 0.0985 mills for debt service).
RESOLUTION #2025-______3
Section 6.That the City Commission of the City of Dania Beach will meet on
September 15, 2025, at 7:00 p.m. in the City of Dania Beach City Commission Chamber, at 100
West Dania Beach Boulevard, Dania Beach, Florida for the purpose of considering and adopting
the above stated millage rate and answering questions concerning same. The City Manager shall
specify the purposes for which ad valorem tax revenues are being increased, if any, over the
“rolled back rate”.
Section 7.That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 8.That this Resolution shall take effect and be in force immediately upon its
passage and adoption.
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
City of Dania Beach
Finance Memorandum
DATE: 7/8/2025
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Yeimy Guzman, Chief Financial Officer
SUBJECT: A resolution authorizing the issuance of Capital Improvement Revenue Note, Series
2025, to finance the purchase and other costs related to the property located at 400
S. Federal Highway, and approving TD Public Finance, LLC., as the most
responsive responder to the financing RFP
Request:
The Finance Department requests approval of a resolution authorizing the issuance of Capital
Improvement Revenue Note, Series 2025, to finance the purchase and other costs related to the
property located at 400 S. Federal Highway, and approving TD Public Finance LLC., as the most
responsive responder to the financing RFP.
Background:
In April 2025, the City Commission approved the acquisition of the property located at 400 S.
Federal Highway (the “Project”). The objective is to finance this purchase and the associated
costs necessary to render the property operational. In partnership with the Florida Municipal
Loan Council and the Public Resources Advisory Group, the City issued a request for proposals
for a Capital Improvement Revenue Note, Series 2025 (the “Note”).
On May 20, 2025, the City issued the Request for Proposals (RFP) for a loan not to exceed Three
Million One Hundred Thousand Dollars ($3,100,000.00) to support the Project's financing needs.
Subsequently, on June 10, 2025, the City received loan proposals from the following lenders:
• Truist Bank
• TD Public Finance, LLC
• JPMorgan Chase Bank
• Webster Bank
TD Public Finance LLC was identified as the most responsive proposer, offering a competitive
interest rate of 4.07%. The Note will be issued in the amount of Three Million One Hundred
Thousand Dollars, ($3,100,000.00).
Budgetary Impact
The Note shall be secured by a covenant to budget and appropriate from legally available non-ad
valorem revenues of the City. The annual debt service is approximately Three Hundred Seventy-
Eight Thousand Dollars ($378,000) for the life of the Note, with interest due semi-annually in
October and April at the rate of 4.07%, and principal due each October.
There are no principal payments due until fiscal year 2027, and the total debt service for
FY2025-26 is approximately Ninety Thousand Seventy-One Dollars and Thirty-Six Cents
($90,071.36) and will be incorporated into the budget proposal. The final principal payment is
due in October 2035.
Recommendation
Finance recommends that the City Commission approve the award of the note and the financing
proposal bid to TD Public Finance, LLC as the most responsive responder to the financing RFP.
RESOLUTION NO. 2025-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA AUTHORIZING THE ISSUANCE OF ITS CAPITAL
IMPROVEMENT REVENUE NOTE, SERIES 2025 EVIDENCED BY A LOAN
IN AN AMOUNT NOT TO EXCEED $3,100,000 FROM TD PUBLIC
FINANCE LLC TO THE CITY TO ACQUIRE, CONSTRUCT, RENOVATE,
AND EQUIP CERTAIN CAPITAL PROJECTS, AS DESCRIBED HEREIN;
AUTHORIZING THE NEGOTIATED SALE OF SUCH NOTE TO TD PUBLIC
FINANCE LLC PURSUANT TO THE TERMS AND CONDITIONS OF A
LOAN AGREEMENT BY AND AMONG THE FLORIDA MUNICIPAL LOAN
COUNCIL, CITY OF DANIA BEACH, FLORIDA, AND TD PUBLIC
FINANCE LLC; APPROVING THE FORM OF AND AUTHORIZING THE
EXECUTION AND DELIVERY OF THE LOAN AGREEMENT; MAKING
CERTAIN OTHER COVENANTS AND AGREEMENTS IN CONNECTION
WITH THE ISSUANCE OF SUCH NOTE; PROVIDING FOR
SEVERABILITY; FURTHER, PROVIDING AN EFFECTIVE DATE.
WHEREAS, participating governmental units have created the Florida Municipal Loan
Council (the "Council") pursuant to a certain Interlocal Agreement and pursuant to Chapter 163,
Part I, Florida Statutes, for the purpose of issuing its bonds to make loans to participating
governmental units for qualified projects; and
WHEREAS, the City of Dania Beach, Florida (the "Issuer”), a municipal corporation, is
duly created and existing pursuant to the Constitution and laws of the State of Florida (the
"State"); and
WHEREAS, there is a substantial need for the continued preservation of the welfare and
convenience of the Issuer and its citizens to finance the acquisition of approximately 0.43 acres
of land located at 400 South Federal Highway, Dania Beach, Florida, along with a 4.052 square
foot historically designated structure (collectively, the "Project"); and
WHEREAS, the Issuer has determined that financing the Project through a financing
program through the Council, which regularly undertakes projects requiring significant debt
financing within the State, would provide for low-cost financing of the Project through
administrative support and access to experience and knowledge in accessing the capital markets;
and
WHEREAS, the Issuer has determined that it is in the best interest of the Issuer and the
citizens to issue its City of Dania Beach, Florida Capital Improvement Revenue Note, Series
2025 (the "Note"), pursuant to a Loan Agreement, by and among the Issuer, the Council, and TD
2 RESOLUTION #2025-_____
Public Finance LLC (the "Lender"), in substantially the form attached hereto as Exhibit A (the
"Loan Agreement"), to finance the costs of the Project and to pay the transaction costs associated
with the issuance of the Note; and
WHEREAS, debt service on the Note and any other amounts due under the Loan
Agreement will be secured by a covenant to budget and appropriate legally available non-ad
valorem revenues of the Issuer (the "Non-Ad Valorem Revenues"), as further described in this
Resolution and in the Loan Agreement; and
WHEREAS, the Non-Ad Valorem Revenues are estimated to be sufficient to pay all
principal of and interest on the Note, as the same becomes due, and to make all other deposits or
payments required by this Resolution and the Loan Agreement; and
WHEREAS, the Issuer received proposals from a number of financial institutions in
response to the Issuer's request for proposals, dated May 20, 2025; and
WHEREAS, it is determined that it is necessary and desirable and in the best interest of
the Issuer to authorize the Mayor, or his or her duly authorized designee, to accept the proposal
from the Lender to extend credit to the Issuer by obtaining a loan evidenced by the Note upon the
terms and conditions set forth in, this Resolution, the Loan Agreement, and in the term sheet,
dated June 10, 2025, submitted by the Lender with respect to the Note, a copy of which is
attached hereto as Exhibit B; and
WHEREAS, due to the present volatility of the market for tax-exempt obligations such
as the Note and the complexity of the transactions relating to the Note, including the duration of
the Note and the relatively small size of the principal amount of the Note, it is in the best interest
of the Issuer that the Note be issued on a negotiated basis to the Lender; and
WHEREAS, the Issuer will be provided all applicable disclosure information by the
Lender as required by Section 218.385, Florida Statutes; and
WHEREAS, the Note shall not constitute a general obligation, or a pledge of the faith,
credit, or taxing power of the Issuer, the State, or any political subdivision thereof, within the
meaning of any constitutional or statutory provisions. Neither the State, nor any political
subdivision thereof, nor the Issuer shall be obligated to (i) exercise its ad valorem taxing power
in any form on any real or personal property of or in the Issuer to pay the principal of and interest
on the Note, or any other amounts due under the Loan Agreement, or (ii) to pay the same from
any other funds of the Issuer except from the Non-Ad Valorem Revenues budgeted and
3 RESOLUTION #2025-_____
appropriated and deposited to the debt service fund established in the Loan Agreement, all in the
manner provided in this Resolution and the Loan Agreement. The Note shall not constitute a lien
on any property owned or situated within the limits of the Issuer.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
SECTION 1. ADOPTION OF REPRESENTATIONS. The foregoing Whereas
paragraphs are hereby ratified and confirmed as being true, and the same are hereby made a
specific part of this Resolution.
SECTION 2. AUTHORITY. This Resolution is adopted pursuant to Chapter 166,
Florida Statutes, the Charter of the Issuer, and other applicable provisions of law.
SECTION 3. AUTHORIZATION OF THE PROJECT. The Issuer does hereby
authorize the Project.
SECTION 4. LOAN AMOUNT. The principal amount of the Loan to the Issuer
evidenced by the Loan Agreement shall not exceed $3,100,000. The Loan shall be made as a
tax-exempt borrowing, which shall include, but is not limited to, the costs of issuance incurred
by the Issuer, the Lender and the Council, administrative fees of the Florida League of Cities,
Inc., and other ongoing costs, and shall bear interest and shall be repayable according to the
terms and conditions set forth in the Loan Agreement.
SECTION 5. APPROVAL AND DELIVERY OF LOAN AGREEMENT. To
provide for the security of the Note and to express the contract among the parties to the Loan
Agreement, the Mayor, as attested by the City Clerk, and approved as to form and correctness by
the City Attorney, or their duly authorized designee, are hereby authorized and directed to
execute and deliver the Loan Agreement to evidence the Loan and to undertake all actions in
respect to the Loan Agreement, which is in substantially the form attached hereto as Exhibit A
with such changes, amendments, modifications, deletions, and additions as may be approved by
the Mayor, the City Clerk, or their duly authorized designee, the execution thereof being
conclusive evidence of such approval.
SECTION 6. AUTHORIZATION OF THE NOTE. Subject and pursuant to the
provisions of this Resolution, and the terms and provisions of the Loan Agreement, an obligation
of the Issuer to be designated as "City of Dania Beach, Florida Capital Improvement Revenue
Note, Series 2025" is hereby authorized to be issued, which Note shall evidence amounts
4 RESOLUTION #2025-_____
outstanding under the Loan Agreement and will be repaid in accordance with the terms of the
Loan Agreement. The proceeds of the Note shall be used for the principal purpose of financing
all or a portion of the costs of the Project and financing certain costs of issuance incurred with
respect to the Loan, which such costs shall include costs of issuance incurred by the Issuer, the
Lender, and the Council.
SECTION 7. DESCRIPTION OF THE NOTE.
(A) The Note is to be issued as a single, fully registered note in a principal amount of
$3,100,000; shall be dated its date of delivery and shall mature not later than October 1, 2035
(the "Maturity Date"). The Note shall bear a fixed interest rate of 4.07% per annum, subject to
adjustment as provided therein, and interest shall be payable on each April 1 and October 1,
commencing not earlier than October 1, 2025, and thereafter until the principal amount of the
Note has been paid. Interest shall be calculated on the basis of a 360-day year consisting of 12
months of 30 days each. Principal shall be payable annually on October 1, commencing on
October 1, 2026, and thereafter, through and including, the Maturity Date.
(B) The Note shall be subject to optional prepayment as set forth in the Loan
Agreement.
SECTION 8. EXECUTION OF THE NOTE. The Note shall be executed in the name
of the Issuer with the manual signature of the Mayor, and the official seal of the Issuer shall be
imprinted thereon, attested, countersigned, and authenticated with the manual or facsimile
signature of the City Clerk, and approved as to form and legal sufficiency by the City Attorney,
if necessary. In case any one or more of the officers who shall have signed or sealed the Note
shall cease to be such officer of the Issuer before the Note so signed and sealed has been actually
sold and delivered, such Note may nevertheless be sold and delivered as herein provided and
may be issued as if the person who signed or sealed such Note had not ceased to hold such
office. The Note may be signed and sealed on behalf of the Issuer by such person who at the
actual time of the execution of such Note shall hold the proper office of the Issuer, although, at
the date of such Note, such person may not have held such office or may not have been so
authorized.
5 RESOLUTION #2025-_____
SECTION 9. FORM OF THE NOTE. The text of the Note shall be in substantially the
form set forth on Exhibit C of the Loan Agreement with such changes, amendments,
modifications, deletions, and additions as may be approved by the Mayor, upon consultation with
the City Attorney, the execution thereof being conclusive evidence of such approval.
SECTION 10. NEGOTIATED SALE OF THE NOTE.
(A) Due to the present volatility of the market for tax-exempt obligations such as the
Note and the complexity of the transactions relating to the Note, including the duration of the
Note and the relatively small size of the principal amount of the Note, it is in the best interest of
the Issuer that the Note be issued on a negotiated basis to the Lender.
(B) Prior to the issuance of the Note, the Issuer shall receive from the Lender a
Lender's Certificate, substantially in the form attached hereto as Exhibit C and a Disclosure
Letter containing the information required by section 218.385, Florida Statutes, substantially in
the form attached hereto as Exhibit D.
SECTION 11. PAYMENT OF THE NOTE; LIMITED OBLIGATION.
(A) The principal of and interest on the Note shall be secured by a covenant to budget
and appropriate legally available Non-Ad Valorem Revenues in accordance with this Resolution
and the Loan Agreement.
(B) THE FULL FAITH AND CREDIT OF THE ISSUER, THE STATE, OR ANY
POLITICAL SUBDIVISION THEREOF, ARE NOT PLEDGED TO THE PAYMENT OF THE
PRINCIPAL OF AND INTEREST ON THE NOTE, AND ALL OTHER AMOUNTS DUE
UNDER THE LOAN AGREEMENT, AND HOLDERS SHALL NEVER HAVE THE RIGHT
TO REQUIRE OR COMPEL THE EXERCISE OF ANY TAXING POWER OF THE ISSUER,
THE STATE, OR ANY POLITICAL SUBDIVISION THEREOF, TO THE PAYMENT OF
SUCH PRINCIPAL OR INTEREST, OR ALL OTHER AMOUNTS DUE UNDER THE LOAN
AGREEMENT. THE NOTE AND THE OBLIGATION EVIDENCED THEREBY SHALL
NOT CONSTITUTE A LIEN UPON ANY PROPERTY OF THE ISSUER AND SHALL BE
PAYABLE FROM AND SECURED SOLELY BY THE NON-AD VALOREM REVENUES
ACTUALLY BUDGETED, APPROPRIATED, AND DEPOSITED INTO A DEBT SERVICE
FUND ESTABLISHED FOR SUCH PURPOSE, ALL IN THE MANNER AND TO THE
EXTENT DESCRIBED IN THIS RESOLUTION AND THE LOAN AGREEMENT. THE
NOTE SHALL NOT BE OR CONSTITUTE A GENERAL OBLIGATION OR
6 RESOLUTION #2025-_____
INDEBTEDNESS OF THE ISSUER AS "BONDS" WITHIN THE MEANING OF ANY
CONSTITUTIONAL OR STATUTORY PROVISION.
SECTION 12. OTHER INSTRUMENTS. The Mayor, the City Clerk, the City
Manager, the City Chief Financial Officer, the City Attorney, and other officers, attorneys, and
other agents and employees of the Issuer are hereby authorized to perform all acts and things
required of them by this Resolution and the Loan Agreement or desirable or consistent with the
requirements thereof and hereof, for the full, punctual, and complete performance of all of the
terms, covenants, and agreements contained in the Note, this Resolution, and the Loan
Agreement, and they are hereby authorized to execute and deliver all documents which shall be
required by Note Counsel, the Financial Advisor, or the Council to effectuate the issuance of the
Note. All action taken to date by the officers, attorneys, and any other agents and employees of
the Issuer in furtherance of the issuance of the Note is hereby approved, confirmed, and ratified.
SECTION 13. REPEAL OF RESOLUTIONS IN CONFLICT. All resolutions
or parts of resolutions in conflict herewith are hereby repealed to the extent of such conflict.
SECTION 14. SEVERABILITY CLAUSE. If any phrase, clause, sentence,
paragraph, or section of this Resolution is for any reason held invalid or unconstitutional by the
judgment or decree of a court of competent jurisdiction, such invalidity or unconstitutionality
shall not affect the validity of the remaining phrases, clauses, sentences, paragraphs, or sections
of this Resolution.
SECTION 15. EFFECTIVE DATE. This Resolution shall take effect
immediately upon its adoption.
SIGNATURES ON THE FOLLOWING PAGE
7 RESOLUTION #2025-_____
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
EXHIBIT A
FORM OF LOAN AGREEMENT
EXHIBIT B
TERM SHEET
C-1
EXHIBIT C
FORM OF LENDER CERTIFICATE
City of Dania Beach
100 W. Dania Beach Boulevard
Dania Beach, Florida 33004
Re: $3,100,000 City of Dania Beach, Florida Capital Improvement Revenue Note,
Series 2025, dated July 14, 2025 (the "Loan Obligation")
Ladies and Gentlemen:
TD Public Finance LLC (the "Lender") is extending credit to the City of Dania Beach,
Florida (the "Issuer"), evidenced by the Loan Obligation to hold for its own account to maturity
or earlier prepayment and has no present intent to distribute or sell any interest therein or portion
thereof other than to an affiliate of the Lender, provided that the Lender retains the right at any
time to dispose of the Loan Obligation or any interest therein or portion thereof, but agrees that
any such sale, transfer, or distribution by the Lender shall be made in accordance with applicable
law and the provisions of the Loan Obligation. The Lender acknowledges that no CUSIP
numbers be obtained and that the Loan Obligation not be made DTC eligible. No inference
should be drawn that the Lender, in the acceptance of the Loan Obligation, is relying on Bryant
Miller Olive P.A., Note Counsel, or Eve A. Boutsis, Esq., City Attorney, as to any such matters
other than the legal opinions rendered by Note Counsel and by the City Attorney.
The Lender is a lender that regularly extends credit by making loans in the form of state
and local government obligations; has knowledge and experience in financial and business
matters that make it capable of evaluating the Issuer, the Loan Obligation, and the risks
associated with the making of such loan; and has the ability to bear the economic risk of
extending the credit evidenced by the Loan Obligation.
The Lender acknowledges that it is (a) a "qualified institutional buyer" as defined in Rule
144A promulgated by the Securities and Exchange Commission pursuant to the Securities Act of
1933, as amended (the "Securities Act"), or (b) an "accredited investor" as defined in Section
501(a)(1), (2), (3) or (7) of Regulation D promulgated under the Securities Act.
The Lender has conducted its own investigation of the financial condition of the Issuer
and of the security for the payment of the principal of and interest on the Loan Obligation, and
has obtained such information regarding the Loan Obligation, the Issuer, and its operations,
financial condition, and financial prospects as the Lender deems necessary to make an informed
credit decision with respect to the making of the loan evidenced by the Loan Obligation.
The Lender acknowledges that (a) the Loan Obligation (i) has not been registered under
the Securities Act of 1933, as amended, (ii) has not been registered or otherwise qualified for
sale under the securities laws of any state, (iii) will not be listed on any securities exchange, and
(iv) will carry no rating from any rating agency; and (b) there is no established market for the
C-2
Loan Obligation and that none is likely to develop. The Lender acknowledges that Resolution
No. 25-__, adopted by the Issuer on July 8, 2025, and the Loan Agreement, dated as of July 1,
2025, by and among the Florida Municipal Loan Council (the "Council"), the Issuer, and the
Lender, are not being qualified under the Trust Indenture Act of 1939, as amended. The Lender
acknowledges that (a) the making of the loan evidenced by the Loan Obligation is not intended
to be subject to the requirements of Rule 15c2-12 promulgated under the Securities Exchange
Act of 1934, as amended, and (b) the Issuer has not prepared or caused to be prepared, any
official statement, private placement memorandum or other offering document, or other
disclosure document.
The Lender is not acting as a fiduciary for the Issuer or in the capacity of broker, dealer,
placement agent, municipal securities underwriter, municipal advisor, or fiduciary in connection
with its making of the loan evidenced by the Loan Obligation. The Lender has not acted as an
agent or served as the Issuer's municipal advisor (as defined in Section 15B of the Securities and
Exchange Act of 1934). The Lender has no fiduciary duty to the Issuer and is entering into an
arm's length transaction involving extending credit to the Issuer evidenced by the Loan
Obligation. The Lender has not provided, and will not provide, financial, legal (including
securities law), tax, accounting, or other advice to or on behalf of the Issuer (including to any
financial advisor or any placement agent engaged by the Issuer) with respect to the structuring,
issuance, sale, or delivery of the Loan Obligation. The Lender expresses no view regarding the
legal sufficiency of its representations for purposes of compliance with any legal requirements
applicable to any other party, including but not limited to the Issuer or its financial advisor or
placement agent.
The Lender also acknowledges that neither the Council nor Public Resources Advisory
Group (the "Financial Advisor"), are acting as a broker or dealer with respect to the Loan
Obligation nor is the loan being distributed as a security or otherwise marketed by the Council.
The Lender acknowledges that the Financial Advisor is relying on the representations
contained herein for purposes of the Municipal Advisor's determination (i) that this transaction
meets the requirements for being a qualified exception for purposes of MSRB Rule G-34, and (ii)
that the Municipal Advisor is excepted and released from the requirement to request a CUSIP
assignment on behalf of the Issuer pursuant to MSRB Rule G-34 for the Loan Obligation.
[Remainder of page intentionally left blank]
DATED this ______th day of July, 2025.
TD PUBLIC FINANCE LLC
By:
Name: Lance Aylsworth
Title: Vice President
Senior Relationship Manager
D-1
EXHIBIT D
FORM OF DISCLOSURE LETTER
The undersigned, on behalf of TD Public Finance LLC (the "Lender"), proposes to
negotiate with the City of Dania Beach, Florida (the "Issuer") for the extension of credit to the
Issuer through the private purchase of the Issuer's $3,100,000 City of Dania Beach, Florida
Capital Improvement Revenue Note, Series 2025 (the "Note"). Prior to the award of the Note, the
following information is hereby furnished to the Issuer:
1. Set forth below is an itemized list of the nature and estimated amounts of
expenses to be incurred for services rendered to the Lender in connection with the issuance of the
Note:
Holland & Knight LLP, Lender's Counsel
$8,500.00
2. (a) The Issuer shall pay an origination fee in the amount of $3,100 to the
Lender. No other fee, bonus, or other compensation is estimated to be paid by the Lender in
connection with the issuance of the Note to any person not regularly employed or retained by the
Lender (including any "finder" as defined in Section 218.386(1)(a), Florida Statutes), except as
specifically enumerated as expenses to be incurred by the Lender, as set forth in paragraph 1.
above.
(b) No person has entered into an understanding with the Lender, or to the
knowledge of the Lender, with the Issuer, for any paid or promised compensation or valuable
consideration, directly or indirectly, expressly or implied, to act solely as an intermediary
between the Issuer and the Lender or to exercise or attempt to exercise any influence to effect
any transaction in connection with the Note.
3. The amount of the underwriting spread expected to be realized by the Lender is
$0.00.
4. The management fee to be charged by the Lender is $0.00.
5. The origination fee to be charged by the Lender is $3,100.00.
6. Truth-in-Bonding Statement:
The Issuer is proposing to issue the Note in the principal amount of $3,100,000 to finance
the costs of certain capital improvements as described in Resolution No. 25-___ (the
"Resolution") and the Loan Agreement, dated as of July 1, 2025, by and among the Issuer, the
Lender, and the Florida Municipal Loan Council (the "Loan Agreement").
Based solely on calculations provided by Public Resources Advisory Group, the Note is
expected to be repaid over a period of approximately 10 years. At a forecasted interest rate of
D-2
4.07%, total interest paid over the life of the Note is estimated to be approximately $762,335.78.
The source of repayment or security for the Note is a covenant to budget and appropriate Non-
Ad Valorem Revenues (as defined in the Loan Agreement). Issuance of the Note is estimated to
result in an annual average of approximately $378,145.47 of the Non-Ad Valorem Revenues not
being available to finance the other services of the Issuer during the life of the Note for
approximately 10.21 years. This paragraph is provided pursuant to section 218.385, Florida
Statutes, is for informational purposes only, and shall not affect or control the actual terms and
conditions of the Note.
6. The name and address of the Lender is as follows:
TD Public Finance LLC
255 Alhambra Circle
Coral Gables, Florida 33134
Attention: ______________
This Disclosure Letter is provided for the sole purpose of complying with Section
218.385, Florida Statutes, as amended, and does not change the terms of and is not evidence of
the terms of the Note. It is the understanding of the Lender that the Issuer has not requested any
further disclosure from the Lender.
IN WITNESS WHEREOF, the undersigned has executed this Disclosure Letter on behalf
of the Lender this 14th day of July, 2025.
TD PUBLIC FINANCE LLC
By:
Name: Lance Aylsworth
Title: Vice President
Senior Relationship Manager
TD Bank, N.A,
255 Alhambra Circle
Coral Gables, FL 33134
Tel: 786-306-7404
Lance.Aylsworth@td.com
June 10, 2025 (updated)
Sent via email to: Mickey Johnston, PRAG (mjohnston@pragadvisors.com) & Rodney Walton, Florida League of Cities, Inc. (rwalton@flcities.com)
RE: City of Dania Beach, Florida RFP $3,100,000 Special Obligation Non-Ad Valorem Revenue Bond, Series 2025
Dear Messrs. Johnston and Walton:
In response to the above referenced RFP for City of Dania Beach, Florida (the "City"), TD Bank, N.A. (the “Bank”)
through its wholly owned subsidiary TD Public Finance LLC (the "Purchaser" or the "Bank"), is pleased to submit the following proposal to the City.
The structure of the proposed Credit Accommodation is outlined in the attached term sheet which provides a
statement of suggested terms, but under no circumstance shall such statement be construed as a complete summarization of terms necessary for consummation of the proposed Credit Accommodation. PLEASE NOTE
THIS PROPOSAL IS SUBJECT TO FORMAL CREDIT REVIEW AND UNDERWRITING IN ACCORDANCE WITH THE BANK’S INTERNAL POLICY AND NOTHING HEREIN SHALL CONSTITUTE A BINDING
COMMITMENT TO LEND. Further, we expressly advise you that the Bank has not approved the Credit Accommodation. The Bank shall not be liable to the City or any other person for any losses, damages or
consequential damages which may result from the City’s reliance upon this proposal letter or the proposed Credit Accommodation, the proposed term sheet or any transaction contemplated hereby.
This letter is delivered to you on the condition that its existence and its contents will not be disclosed without our prior written approval, except (i) as may be required to be disclosed in any legal proceeding or (ii) as may otherwise be required by law and on a confidential and “need to know” basis, to your directors, officers,
employees, advisors, and agents.
The Bank’s Loan Proposal is subject to acceptance by the City and is contingent upon a Loan Closing with mutually acceptable documents between the City and Bank on an estimated closing date of July 14, 2025, unless otherwise negotiated between the Parties.
Accepted on this __ day of ________, 2025: Very truly yours, TD Public Finance LLC City of Dania Beach, Florida (A subsidiary of TD Bank, N.A.)
By:_______________________________ By: .
Lance Aylsworth
VP / Senior Relationship Manager
Name:____________________________
Title:______________________________
Choose either:
10yr Term Prepayment option type: ____ Closed or ____ Open after 3rd yr. principal payment.
Page 2
Summary of Terms and Conditions
For Discussion Purposes Only City of Dania Beach, Florida
June 10, 2025 Aggregate amount of all Credit Facility options shall not exceed $3,100,000.
(Direct Purchase Bank Loan) Direct Purchase Option Borrower: City of Dania Beach, Florida (the “Borrower”). Bond Purchaser: TD Public Finance LLC (the "Purchaser"). (A wholly owned subsidiary of TD Bank, N.A.) Credit Facility: Direct Purchase of Tax-Exempt Bonds (the "Bond") to be purchased by the Purchaser pursuant to the terms of a Continuing Covenant Agreement between the Borrower and the Purchaser or acceptable Supplemental Resolution (the "DP Credit Facility"). Amount(s): Aggregate amount of the Bonds shall not exceed $3,100,000. Purpose: The DP Credit Facility proceeds to (i) fund the acquisition and related improvements of approximately 0.43 acres of uninhabited land located at 400 South Federal Highway, Dania Beach, along with a 4,052 square foot historically designated structure on the parcel with the goal of restoring the structure for meetings, events, or possibly as a museum (the “Project”), and (ii) fund costs of issuance related to the DP Credit Facility. Repayment: Principal payable annually on October 1, beginning October 1, 2026. Interest payable beginning October 1, 2025; Interest payment frequency semiannually. Term: 10yr Bond – 10.25yrs (maturity October 1, 2035) Interest Rate: The following fixed rate options are offered: 10yr Bond - Tax-Exempt Fixed Rate Option Tax-exempt fixed rate of interest as detailed below based on the listed term option. Term (Years) Interest Rate* 10yrs – Closed w/ no prepayment penalty annually up to 25% of principal balance. (see Closed Prepayment below)
4.03%
10yrs – Open – no prepayment penalty following 3rd year. (see Open Prepayment below)
4.15%
Formula: Closed tax-exempt fixed rate of interest to be determined by taking the prevailing 10-10 years structure of Reg. Federal Home Loan Bank (FHLB) Boston Amortizing Advances (4.59% as of end of day on 6/10/2025) plus 0.51% (51 basis points) and multiplying its sum by the tax-exempt factor of 79%. The FHLB Interest Rate is provided in the website link below: https://www.fhlbboston.com/fhlbank-boston/rates#/amortizing Borrower can elect to have an "Open" (no prepayment penalty at any time after 3yr Lock-Out) prepayment structure associated with this Loan by adding a premium of 12 basis points to the quoted proposed Closed Rate. * The fixed rates are provided as an indication of the rates as of 6/10/25 and are subject to change based on changes in market rates based on the formula above prior to the earlier to occur of (i) the closing date or (ii) the date on which the Bank and the Borrower enter a Rate Lock (preferably with 24-hour notification). Rate Lock can be entered into and held through expected closing date (+/- 30 days) once Bank/Purchaser has been selected/recommended as "Winning Bidder Selected" and repayment structure (nominal amount, prepayment option selected, and amortization schedule) is in near final form (within 5% deviation). There will be no Rate Lock Agreement other than correspondence (email, conference call, or otherwise) between Bank and authorized party of Borrower.
Page 3
Prepayment: Closed Prepayment: Anytime on an annual basis with thirty (30) days prior written notice, a prepayment up to 25% of the principal balance October 1st of each year can be made to the Bonds without penalty. At the time of any full or partial prepayment exceeding 25% of the principal balance annually, a “Yield Maintenance Fee” in
an amount computed as follows will apply:
This Note may be prepaid on any Business Day in whole or in part upon thirty (30) days prior written notice to the Purchaser. In the event of any prepayment of this Note above 25% of principal balance annually, whether by
voluntary prepayment, acceleration, or otherwise, the Borrower shall, at the option of the Purchaser, pay a "fixed rate prepayment charge" equal to the greater of (i) 1.00% of the principal balance being prepaid multiplied by the
"Remaining Term," as hereinafter defined, in years or (ii) a "Yield Maintenance Fee" in an amount computed as follows:
The current cost of funds, specifically the bond equivalent yield for United States Treasury securities (bills on a discounted basis shall be converted to a bond equivalent yield) with a maturity date closest to the "Remaining Term",
shall be subtracted from the “Stated Interest Rate”. If the result is zero or a negative number, there shall be no Yield Maintenance Fee due and payable. If the result is a positive number, then the resulting percentage shall be multiplied by the amount being prepaid times the number of days in the "Remaining Term" and divided by 360. The resulting amount is the "fixed prepayment charge" due to the Bank upon prepayment of the principal of this Bond plus any
accrued interest due as of the prepayment date and is expressed in the following calculation: Yield Maintenance Fee = [Amount Being Prepaid x (Stated Interest Rate - Current Cost of Funds) x Days in the
Remaining Term/360 days] + any accrued interest due "Remaining Term." "Remaining Term" as used herein shall mean the earlier of (a) the Mandatory Tender Date or (b) to the Final Maturity of the Note. Open Prepayment: After the 3rd year anniversary (3yr Lock-Out), the Bonds may be prepaid at any time in whole or in part without prepayment penalty upon thirty (30) days prior written notice. Borrower can elect to have an
"Open" prepayment penalty associated with this Loan by adding a premium of 12 basis points to the quoted proposed Closed Rate.
Late Fee: If any payment due to the Bank is more than fifteen (15) days overdue, a late charge payment of six percent (6%)
of the overdue payment shall be assessed. Security: The DP Credit Facility will be secured by a Covenant to Budget and Appropriate from legally available Non-Ad Valorem Revenues of the City. Financial Covenants: The Credit Facility shall include the following financial covenants: 1) Anti-Dilution Test of 150%, as mentioned in RFP. Financial Reporting: The Credit Facility shall include the following reporting requirements:
Types of Report(s) Frequency Due Date
Audited Financial Statements Annual Within 270 days of Borrower's
Fiscal Year End.
Annual Budget Annual As soon as available or not more than 60 days of
Borrower's fiscal year end.
The Bank reserves the right to request additional financial information to supplement or verify certain financial assumptions and/or verify the creditworthiness of the Borrower.
Representations And Warranties: The Credit Facility shall include Representations and Warranties appropriate for facilities of this type, size, and purpose and generally consistent with the Borrower's existing facilities, including, but not limited to, the following:
no material adverse change, true and accurate financial statements, no material litigation, requisite insurance, enforceability, no events of default, government consents, solvency, compliance with tax law and maintenance of
tax-exempt status, compliance with environmental law and full disclosure of environmental matters.
Page 4
Other Covenants: In addition to the terms and conditions outlined herein, the Credit Facility will contain affirmative and negative
covenants appropriate for a borrower and a financing of this type and generally consistent with the Borrower's existing credit, liquidity and direct purchase facilities and such covenants shall include: no material amendments to,
or terminations or substitutions to, the transaction documents. Events of Default: The Credit Facility shall include, but will not be limited to, the following Events of Default: (1) Breach of representation or warranties.
(2) Violation of covenants. (3) Bankruptcy or insolvency.
(4) Payment default. Other Conditions: Closing of the Purchaser’s Credit Facility shall be contingent on the following conditions:
1. Documents for the tax-exempt facility will include taxability language (including retroactive interest, penalties and other fees and costs associated therewith) allowing for a higher taxable facility rate should the IRS deem the
facilities to be a taxable facility solely due to events associated with action or inaction of Borrower. 2. Borrower covenants and agrees that documents will include language stipulating that the facilities and all existing
and future obligations secured by Covenant to Budget & Appropriate shall be on parity without preference to be given to any particular issuance.
3. If the Borrower provides more restrictive covenants or additional rights and remedies to any other parity bondholder or lender, then the Bank shall have the same covenants, rights and remedies. To the extent any other bondholder or
lender exercises acceleration rights, the Bank shall also have the ability to accelerate. 4. Borrower agrees to provide any supporting document that may be required so the Bank can qualify the Facility.
5. Borrower shall maintain a Public Debt Rating throughout the life of the loan. Withdrawal or suspension shall be an Event of Default. During the life of the Loan, a minimum Public Debt Rating (PDR) of Baa1/BBB+/BBB+ to the Covenant to Budget and Appropriate Debt issued by the City. A downgrade below these levels will result in an Event of Default.
6. No Material Adverse Change to the Borrower. 7. The implementation of certain terms, conditions, covenants, or other non-material changes to the proposed Credit
Accommodation required as part of the Bank’s formal credit approval shall be deemed an approval in substantially the form outlined in this proposed Credit Accommodation. 8. Other covenants, limitations, and requirements consistent with financings of this type. 9. All standard representations, warranties, rights, and remedies in the event of default acceptable to the bank.
10. All legal matters and documentation to be executed in connection with the contemplated proposed Credit Accommodation shall be satisfactory in form and substance to the Bank and counsel to the Bank. 11. The Bank shall not be required to enter into the proposed Credit Accommodation until the completion of all due diligence inquiries, receipt of approvals from all requisite parties and the execution and receipt of all necessary
documentation reasonably acceptable to the Bank and its counsel. Furthermore, certain assumptions are made for this proposal which, if altered, could affect the overall credit approval and or terms of the proposed Credit
Accommodation. 12. Any other conditions the Purchaser may reasonably require. Default Rate: The “default rate of interest” shall be six (6) percentage points in excess of the Prime Rate as quoted in the Wall
Street Journal, with Prime Floor of 3%. No Advisory or Fiduciary Role: The Borrower acknowledges and agrees that: (i) the transaction contemplated by this Term Sheet is an arm’s length, commercial transaction between the Borrower and Purchaser in which Purchaser is acting solely as a principal and
is not acting as a municipal advisor, financial advisor or fiduciary to the Borrower; (ii) the Purchaser has not assumed any advisory or fiduciary responsibility to the Borrower with respect to the transaction contemplated hereby and the
discussions, undertakings and procedures leading thereto (irrespective of whether the Purchaser has provided other services or is currently providing other services to the Borrower on other matters); (iii) the only obligations the
Purchaser has to the Borrower with respect to the transaction contemplated hereby expressly are set forth in this Term Sheet; and (iv) the Borrower has consulted its own legal, accounting, tax, financial and other advisors, as
applicable, to the extent it has deemed appropriate.
Page 5
Fees and Expenses: The Borrower(s) shall pay to the Bank or Purchaser on demand all costs and expenses (including, without limitation, reasonable attorneys’ fees and disbursements, court costs, litigation, and other expenses) incurred or paid by the
Bank or Purchaser in connection with the preparation, review, administration, and enforcement of all documents related to the Credit Facilities, regardless of whether this transaction closes.
The Purchaser expects to utilize Michael Wiener at Holland & Knight LLP as counsel to represent the Purchaser
and review the applicable Credit Facility documents drafted by Bond Counsel. For the Credit Facility, legal fees are estimated at $8,500.00 plus disbursements, if applicable, and paid by the Borrower whether or not Loan closes.
Bank Counsel:
Michael Wiener, Partner Holland & Knight LLP
100 North Tampa Street, Suite 4100 | Tampa, Florida 33602 Phone 863.499.5362 | Fax 813.229.0134
michael.wiener@hklaw.com | www.hklaw.com
Bank origination fee: $3,100.00. Governing Law: State of Florida. Waiver of Jury Trial: The Borrower shall waive its right to a trial by jury.
Confidentiality: These Summary of Terms and Conditions contain confidential and proprietary structuring and pricing information.
Except for disclosure on a confidential basis to your accountants, attorneys and other professional advisors retained by you in connection with the Bonds or as may be required by law, the contents of this proposal may not be disclosed
in whole or in part to any other person or entity without our prior written consent, provided that nothing herein shall restrict disclosure of information relating to the tax structure or tax treatment of the proposed Bonds.
Patriot Act Notice: The Purchaser is subject to the requirements of the USA Patriot Act (Title III of Pub. L. 107-56) (signed into law October 26, 2001)) (the “Act”) and hereby notifies the Borrower that pursuant to the requirements of the Act, it is
required to obtain, verify and record information that identifies the Borrower, which information includes the name and address of the Borrower and other information that will allow the Purchaser to identify the Borrower in
accordance with the Act.
These Summary of Terms and Conditions are provided for discussion purposes only, are not binding on any party, and therefore, do not constitute a commitment to lend by the Purchaser. The Summary of Terms and Conditions are intended to be merely a summary of the
provisions by which the Purchaser has contemplated the proposed financing, and, therefore, do not include all of the terms and conditions that would be included in definitive documentation required by the Purchaser to execute the proposed transaction.
Consequently, the terms proposed herein are provided for the purpose of discussion for a period of 30 days following the date of this letter, unless otherwise extended in writing by the Purchaser. Any extension of credit is subject to final credit approval through the
Purchaser’s normal approval process. If credit is offered in the future, the required terms and conditions will be made in writing and may differ substantially from those contained in this proposal.
Page 6
#859942v2
BMO Draft #2
6/24/2025
LOAN AGREEMENT
by and among
TD PUBLIC FINANCE LLC
FLORIDA MUNICIPAL LOAN COUNCIL,
and
CITY OF DANIA BEACH, FLORIDA
Dated as of July 1, 2025
CITY OF DANIA BEACH, FLORIDA
CAPITAL IMPROVEMENT REVENUE NOTE, SERIES 2025
This Instrument Prepared By:
JoLinda Herring, Esquire
Bryant Miller Olive P.A.
SunTrust International Center
1 SE 3rd Avenue, Suite 2200
Miami, Florida 33131
and
Jason M. Breth, Esquire
Bryant Miller Olive P.A.
1545 Raymond Diehl Road, Suite 300
Tallahassee, Florida 32308
#859942v2
TABLE OF CONTENTS
Page
ARTICLE I DEFINITIONS .....................................................................................................................2
SECTION 1.01. DEFINITIONS.........................................................................................................................2
SECTION 1.02. USES OF PHRASES................................................................................................................8
ARTICLE II REPRESENTATIONS, WARRANTIES, AND COVENANTS OF ISSUER ...........8
SECTION 2.01. REPRESENTATIONS, WARRANTIES, AND COVENANTS.......................................8
SECTION 2.02. COVENANTS OF THE ISSUER........................................................................................12
SECTION 2.03. ISSUER PAYMENTS............................................................................................................20
ARTICLE III THE LOAN AND THE NOTE......................................................................................21
SECTION 3.01. ISSUANCE OF THE NOTE AND THE LOAN..............................................................21
SECTION 3.02. EVIDENCE OF LOAN........................................................................................................21
SECTION 3.03. PURCHASE OF NOTE........................................................................................................21
SECTION 3.04. DESCRIPTION OF THE NOTE.........................................................................................21
SECTION 3.05. LOAN FOR PURPOSE OF FINANCING THE PROJECT. ..........................................21
ARTICLE IV LOAN TERM AND LOAN CLOSING REQUIREMENTS ....................................22
SECTION 4.01. COMMENCEMENT OF LOAN TERM...........................................................................22
SECTION 4.02. TERMINATION OF LOAN TERM...................................................................................22
SECTION 4.03. LOAN CLOSING SUBMISSIONS.....................................................................................22
SECTION 4.04. ADMINISTRATION FEE....................................................................................................23
ARTICLE V LOAN REPAYMENTS....................................................................................................23
SECTION 5.01. PAYMENT OF BASIC PAYMENTS.................................................................................23
SECTION 5.02. PAYMENT OF ADDITIONAL PAYMENTS..................................................................23
SECTION 5.03. OBLIGATIONS OF ISSUER UNCONDITIONAL.........................................................24
SECTION 5.04. PREPAYMENT.....................................................................................................................25
ARTICLE VI DEFEASANCE ................................................................................................................25
SECTION 6.01. DEFEASANCE OF THE LOAN AGREEMENT AND THE NOTE...........................25
ARTICLE VII ASSIGNMENT AND PAYMENT BY THIRD PARTIES......................................26
SECTION 7.01. ASSIGNMENT OF LOAN AGREEMENT......................................................................26
SECTION 7.02. NO PARTNERSHIP, ETC...................................................................................................26
ARTICLE VIII EVENTS OF DEFAULT AND REMEDIES ............................................................26
SECTION 8.01. EVENTS OF DEFAULT DEFINED...................................................................................26
SECTION 8.02. NOTICE OF DEFAULT.......................................................................................................28
SECTION 8.03. REMEDIES ON DEFAULT.................................................................................................28
ii
#859942v2
SECTION 8.04. NO REMEDY EXCLUSIVE; WAIVER, NOTICE...........................................................29
SECTION 8.05. APPLICATION OF MONEYS...........................................................................................29
ARTICLE IX MISCELLANEOUS.........................................................................................................29
SECTION 9.01. NOTICES................................................................................................................................29
SECTION 9.02. BINDING EFFECT...............................................................................................................30
SECTION 9.03. SEVERABILITY.....................................................................................................................30
SECTION 9.04. AMENDMENTS, CHANGES, AND MODIFICATIONS.............................................30
SECTION 9.05. EXECUTION IN COUNTERPARTS.................................................................................30
SECTION 9.06. APPLICABLE LAW; VENUE. ...........................................................................................30
SECTION 9.07. BENEFIT OF NOTEHOLDER............................................................................................30
SECTION 9.08. CONSENTS AND APPROVALS......................................................................................31
SECTION 9.09. IMMUNITY OF OFFICERS, EMPLOYEES, AND MEMBERS OF COUNCIL AND
ISSUER. 31
SECTION 9.10. CAPTIONS. ...........................................................................................................................31
SECTION 9.11. NO PECUNIARY LIABILITY OF COUNCIL.................................................................31
SECTION 9.12. PAYMENTS DUE ON HOLIDAYS..................................................................................31
SECTION 9.13. CALCULATIONS.................................................................................................................31
SECTION 9.14. TIME OF PAYMENT...........................................................................................................31
SECTION 9.15. WAIVER OF JURY TRIAL..................................................................................................31
EXHIBIT A: USE OF LOAN PROCEEDS
EXHIBIT B: OPINION OF ISSUER'S COUNSEL
EXHIBIT C: FORM OF NOTE
#859942v2
LOAN AGREEMENT
This Loan Agreement (the "Loan Agreement"), dated as of July 1, 2025, and entered into
among TD PUBLIC FINANCE LLC, and its successors and assigns (the "Lender"), the FLORIDA
MUNICIPAL LOAN COUNCIL (the "Council"), a separate legal entity and public body
corporate and politic duly created and existing under the Constitution and laws of the State,
and the CITY OF DANIA BEACH, FLORIDA (the "Issuer"), a duly constituted municipality
under the laws of the State.
W I T N E S S E T H:
WHEREAS, capitalized terms used in these recitals and not otherwise defined shall have
the meanings specified in Article I of this Loan Agreement; and
WHEREAS, the Council is a separate legal entity and public body corporate and politic
duly created and existing under the laws of the State organized and existing under and by
virtue of the Interlocal Agreement by and among, initially, the City of DeLand, Florida, the City
of Rockledge, Florida, and the City of Stuart, Florida, as amended and supplemented, together
with the additional governmental entities who become members of the Council, in accordance
with Chapter 163, Part I, Florida Statutes, as amended; and
WHEREAS, the Council has determined that the public interest will best be served and
that the purposes of the Interlocal Act can be more advantageously obtained by the Council's
administering a financing program within the State whereby funds are provided by a qualified
lending institution and loaned directly to the participating local government to finance,
refinance, or reimburse the costs of qualifying projects and secured by a debt obligation issued
by the participating local government; and
WHEREAS, the Issuer is authorized under and pursuant to the Act and the Resolution
to participate in the Program, enter into this Loan Agreement, and issue the Note for the
purposes set forth herein; and
WHEREAS, pursuant to the authority of the Act, the Council desires to assist the Issuer
in participating in the Program to provide a loan evidenced by the Note issued by the Issuer in
an amount necessary to enable the Issuer to finance or reimburse the Costs of the Project; and
WHEREAS, pursuant to the authority of the Act and the Resolution, the Issuer desires to
issue the Note and borrow such amount subject to the terms and conditions of and for the
purposes set forth in this Loan Agreement; and
WHEREAS, the Issuer has determined that it is necessary, desirable, and in the best
interests of the Issuer and its citizens, visitors, property owners, and workers, and to serve a
public purpose that the Project be financed and completed; and
2
WHEREAS, the Issuer has determined that the lending of funds by the Lender to the
Issuer pursuant to the terms of this Loan Agreement will assist in the development and
maintenance of the public welfare of the residents of the State and the areas served by the
Issuer, and shall serve a public purpose by improving the health and living conditions, and
providing adequate governmental services, facilities, and programs and will promote the most
efficient and economical development of such services, facilities, and programs in the State and
the areas served by the Issuer; and
WHEREAS, the Issuer has determined that a covenant to budget and appropriate Non-
Ad Valorem Revenues shall secure the Issuer's payment obligations under this Loan Agreement
and the Note; and
WHEREAS, neither the Issuer nor the State or any political subdivision thereof, shall in
any way be obligated to pay the principal of or interest on the Note, except that the Note shall
be payable by the Issuer and secured solely from the funds and revenues pledged under and
pursuant to this Loan Agreement, as the same shall become due, and the issuance of the Note
hereunder shall not directly, indirectly, or contingently obligate the Issuer, the State, or any
political subdivision or municipal corporation thereof to levy or pledge any form of ad valorem
taxation for their payment; and
WHEREAS, the Lender is willing to extend credit to the Issuer by paying a purchase
price for the Note as set forth herein in order to provide the funds to finance the Loan.
NOW, THEREFORE, for and in consideration of the premises hereinafter contained, the
parties hereto agree as follows:
ARTICLE I
DEFINITIONS
SECTION 1.01. DEFINITIONS.
Unless the context or use indicates another meaning or intent, the following words and
terms as used in this Loan Agreement shall have the following meanings, and any other
hereinafter defined words and terms, shall have the meanings as therein defined.
"Accountant" means the independent certified public accountant or firm of independent
certified public accountants employed by the Issuer under the provisions of this Loan
Agreement to perform and carry out the duties imposed on the Accountant by this Loan
Agreement.
3
"Act" means, collectively, to the extent applicable to the Issuer, Article VIII, Section 2 of
the Florida Constitution; Chapter 166, Florida Statutes; the Charter of the Issuer; and other
applicable provisions of law, each as amended.
"Additional Payments" means payments required by Section 5.02 hereof.
"Adjusted Essential Expenditures" means essential expenditures for general government
and public safety as shown in the Borrower's audited financial statements less any revenues
derived from ad valorem taxation on real and personal property that are legally available to pay
for such expenditures.
"Administration Fee" means the fee by that name described in Section 4.04 hereof.
"Audit" means the audited financial statements of the Issuer.
"Authorized Representative" means, when used pertaining to the Council, the Chairman
of the Council, and such other designated members, agents, or representatives as may hereafter
be selected by Council resolution; and, when used with reference to the Issuer, means the
Person performing the functions of the Mayor or Mayor Pro Tem thereof or other officer
authorized to exercise the powers and perform the duties of the Mayor; and, when used with
reference to an act or document, also means any other Person authorized by resolution or
ordinance to perform such act or sign such document.
"Balloon Indebtedness" means Debt, 25% or more of the original principal of which
matures during any one Fiscal Year.
"Basic Payments" means the payments denominated as such in Section 5.01 hereof.
"Business Day" means any day of the year which is not a Saturday or Sunday or a day on
which banking institutions located in New York, New York or the State are required or
authorized to remain closed.
"Certificate" of the Council means, respectively, a written certificate, statement, request,
requisition, or order signed in the name of the Council by its Chairman, Program
Administrator, or such other Person as may be designated and authorized to sign for the
Council; or of the Issuer means, respectively, a written certificate, statement, request,
requisition, or order signed in the name of the Issuer by its Mayor or Vice Mayor, or such other
Person as may be designated and authorized to sign for the Issuer. Any such instrument and
supporting opinions or representations, if any, may, but need not, be combined in a single
instrument with any other instrument, opinion, or representation, and the two or more so
combined shall be read and construed as a single instrument.
4
"City Clerk" means the City Clerk of the Issuer or assistant, deputy, or interim City Clerk
of the Issuer, or such other Person as may be duly authorized by the City Commission to act on
his or her behalf.
"City Commission" means the governing body of the Issuer.
"City Manager" means the City Manager of the Issuer or any assistant or deputy City
Manager of the Issuer, or such other Person as may be duly authorized by the City Commission
to act on his or her behalf.
"Closing" means the closing of the Loan pursuant to this Loan Agreement.
"Closing Memorandum" means the Closing Memorandum for the Note, dated July 14,
2025, and providing the details for the delivery of the Note, the receipt and application of the
proceeds of the Note and other moneys, and the costs of issuance to be paid with respect to the
Note.
"Code" means the Internal Revenue Code of 1986, as amended, from time to time,
including, when appropriate, the statutory predecessor thereof, or any applicable
corresponding provisions of any future laws of the United States of America relating to federal
income taxation, and except as otherwise provided herein or required by the context hereof,
includes interpretations thereof contained or set forth in the applicable regulations of the
Department of the Treasury (including applicable final or temporary regulations and also
including regulations issued pursuant to the statutory predecessor of the Code, the applicable
rulings of the Internal Revenue Service (including published Revenue Rulings and private letter
rulings), and applicable court decisions).
"Costs" means all or a portion of the costs of undertaking the Project including, but not
limited to: the purchase price of any project acquired; the cost of constructing or acquiring
improvements; the cost of construction, extension, or enlargement; the cost of all lands,
properties, rights, easements and franchises acquired; the cost of all machinery and equipment,
financing charges, interest during construction; and, if deemed advisable, for one year after
completion of construction, cost of investigations, audits, and engineering and legal services;
and all other expenses necessary or incident to determining the feasibility or practicability of
such acquisition or construction, administrative expense, and such other expenses as may be
necessary or incident to the financing herein authorized and to the acquisition or construction,
of a project and the placing of the same in operation. Any obligation or expense incurred by the
Issuer prior to the issuance of notes for engineering studies and for estimates of cost and of
revenues, and for other technical, financial, or legal services in connection with the acquisition
or construction of any project, may be regarded as a part of the cost of such project.
"Council" means the Florida Municipal Loan Council.
5
"Counsel" means an attorney duly admitted to practice law before the highest court of
the State and, without limitation, may include legal counsel for either the Council, the Lender,
or the Issuer.
"Debt" means at any date (without duplication) all of the following to the extent that
they are guaranteed or secured by or payable in whole or in part from any Non-Ad Valorem
Revenues (a) all obligations of the Issuer for borrowed money or evidenced by bonds,
debentures, notes, or other similar instruments; (b) all obligations of the Issuer to pay the
deferred purchase price of property or services, except trade accounts payable under normal
trade terms and which arise in the ordinary course of business; (c) all obligations of the Issuer as
lessee under capitalized leases; (d) all indebtedness of other Persons to the extent guaranteed
by, or secured by, the Non-Ad Valorem Revenues of the Issuer; and (e) any obligation of the
Issuer for borrowed money or evidenced by bonds, debentures, notes, or other similar
instruments where the security provided by the Non-Ad Valorem Revenues is not the primary
security for the obligation or is a backup pledge for the obligation; provided, however, if with
respect to any obligation contemplated in (d) or (e) above, such obligation shall not be
considered "Debt" for purposes of this Loan Agreement unless the Issuer has actually used
Non-Ad Valorem Revenues to satisfy such obligation during the immediately preceding Fiscal
Year or reasonably expects to use Non-Ad Valorem Revenues to satisfy such obligation in the
current or immediately succeeding Fiscal Year. After an obligation is considered "Debt" as a
result of the proviso set forth in the immediately preceding sentence, it shall continue to be
considered "Debt" until the Issuer has not used any Non-Ad Valorem Revenues to satisfy such
obligation for two consecutive Fiscal Years.
"Debt Service Fund" means the special fund of the Issuer designated "City of Dania
Beach, Florida Capital Improvement Revenue Note, Series 2025 Debt Service Fund" established
pursuant to Section 2.02(b) hereof.
"Default" means an event or condition the occurrence of which would, with the lapse of
time or the giving of notice or both, become an Event of Default.
“Default Rate” means six percent (6.0%) plus the Prime Rate as quoted in the Wall Street
Journal, with such Prime Rate having a floor of three percent (3.0%).
"Event of Default" shall have the meaning ascribed to such term in Section 8.01 of this
Loan Agreement.
"Fiscal Year" means the period commencing on October 1 of each year and continuing
through the next succeeding September 30, or such other period as may be prescribed by law.
"Governmental Funds" means all of the "governmental funds" of the Issuer as described
and identified in the Audit.
6
"Governmental Funds Revenues" means total revenues of the Issuer derived from any
source whatsoever and that are allocated to and accounted for in the Governmental Funds.
"Governmental Obligations" means (i) non-callable direct obligations of the United
States of America ("Treasuries"), (ii) evidences of ownership of proportionate interests in future
interest and principal payments on Treasuries held by a bank or trust company as custodian,
under which the owner of the investment is the real party in interest and has the right to
proceed directly and individually against the obligor and the underlying Treasuries are not
available to any Person claiming through the custodian or to whom the custodian may be
obligated, or (iii) any combination of the foregoing.
"Interest Account" means the separate account in the Debt Service Fund established
pursuant to Section 2.02(b) hereof.
"Interest Payment Date" means April 1 and October 1 of each year, commencing October
1, 2025.
"Interlocal Act" means Chapter 163, Part I, Florida Statutes.
"Interlocal Agreement" means that certain Interlocal Agreement originally dated as of
December 1, 1998, initially by and among the City of Stuart, Florida, the City of Rockledge,
Florida, and the City of DeLand, Florida, together with the additional governmental entities
who become members of the Council, all as amended and supplemented from time to time.
"Issuer" means the City of Dania Beach, Florida, a Florida municipal corporation.
"Loan" means the Loan made by the Lender to the Issuer from proceeds of the Note in
order to finance or reimburse the Costs of the Project in the amount specified in Section 3.01
herein.
"Loan Agreement" means this Loan Agreement and any amendments and supplements
hereto.
"Loan Repayments" means the payments of principal and interest and other payments
payable by the Issuer pursuant to the provisions of this Loan Agreement, including, without
limitation, Additional Payments.
"Loan Term" means the term of the Loan provided for in Article IV of this Loan
Agreement.
"Maturity Date" means October 1, 2035.
"Maximum Rate" means the maximum rate allowed by the laws of the State of Florida.
7
"Mayor" means the Mayor of the Issuer, or in his or her absence or inability to act, the
Mayor Pro Tem of the Issuer or such other Person as may be duly authorized by the City
Commission to act on his or her behalf.
"Net Non-Ad Valorem Revenues Available For Debt Service" means the Non-Ad
Valorem Revenues minus Adjusted Essential Expenditures.
"Non-Ad Valorem Revenues" means all revenues of the Issuer derived from any source
whatsoever other than revenues generated from ad valorem taxation on real or personal
property, and which are legally available to make the Loan Repayments.
"Note" means the $3,100,000 City of Dania Beach, Florida Capital Improvement Revenue
Note, Series 2025.
"Note Counsel" means Bryant Miller Olive P.A. or any other attorney at law or firm of
attorneys, of nationally recognized standing in matters pertaining to the exclusion from gross
income for federal income tax purposes of interest on obligations issued by states and political
subdivisions, and duly admitted to practice law before the highest court of any state of the
United States of America.
"Noteholder," "Holder," "holder of the Note," "Owner," "owner of the Note," "Lender," or
any similar term, when used with reference to the Note, means any Person who shall be the
registered owner of the outstanding Note as provided in the registration books of the Issuer.
The initial Noteholder shall be the Lender.
"Permitted Investments" means any investments authorized pursuant to the laws of the
State and the Issuer's written investment policy, if any.
"Person" means an individual, a corporation, a partnership, an association, a trust, or
any other entity or organization including a government or political subdivision or an agency or
instrumentality thereof.
"Principal Account" means the separate account in the Debt Service Fund established
pursuant to Section 2.02(b) hereof.
"Principal Payment Date" means October 1, 2026, and thereafter each October 1 through
and including the Maturity Date.
"Program" means the Council's program whereby funds are provided by a qualified
lending institution and loaned directly to the participating local government to finance,
refinance, or reimburse the costs of qualifying projects and secured by a debt obligation issued
by the participating local government.
8
"Program Administrator" means the Florida League of Cities, Inc., a non-profit Florida
corporation.
"Project" means the governmental undertaking approved by the City Commission, as
more specifically detailed on Exhibit A hereof, and as may be amended from time to time in
accordance with this Loan Agreement.
"Project Fund" means the special fund of the Issuer designated "City of Dania Beach,
Florida Capital Improvement Revenue Note, Series 2025, Project Fund" established pursuant to
Section 2.02(b) hereof.
"Resolution" means the resolution authorizing the issuance of the Note, adopted by the
Issuer on July 8, 2025, as may be amended and supplemented from time to time, or its successor
in function.
"State" means the State of Florida.
SECTION 1.02. USES OF PHRASES.
Words of the masculine gender shall be deemed and construed to include correlative
words of the feminine and neuter genders. Unless the context shall otherwise indicate, the
words "Note," "Noteholder," "Owner," and "Person" shall include the plural as well as the
singular number. All references herein to specific sections of the Code refer to such sections of
the Code and all successor or replacement provisions thereto.
ARTICLE II
REPRESENTATIONS, WARRANTIES, AND COVENANTS OF ISSUER
SECTION 2.01. REPRESENTATIONS, WARRANTIES, AND COVENANTS.
The Issuer represents, warrants, and covenants on the date hereof for the benefit of the Lender
as follows:
(a) Organization and Authority. The Issuer:
(1) is a duly organized and validly existing municipality of the State;
and
(2) has all requisite power and authority to own and operate its
properties, to undertake, finance, or be reimbursed for the Project, to covenant to
budget and appropriate the Non-Ad Valorem Revenues to the repayment of the
9
Note and the other obligations of the Issuer hereunder, and to carry on its
activities as now conducted and as presently proposed to be conducted.
(b) Full Disclosure. There is no fact that the Issuer knows of which has not
been specifically disclosed in writing to the Lender that materially and adversely affects
or, except for pending or proposed legislation or regulations that are a matter of general
public information affecting the State municipalities generally, that will materially
adversely affect the properties, activities, prospects, or condition (financial or otherwise)
of the Issuer or the ability of the Issuer to repay the Note or to perform its obligations
under this Loan Agreement.
The Audit, including, but not limited to the Audit for the Fiscal Year ended
September 30, 2024, financial statements, balance sheets, and any other written
statement furnished by the Issuer to the Lender were prepared in accordance with
Generally Accepted Accounting Principles and do not contain any untrue statement of a
material fact or omit to state a material fact necessary to make the statements contained
therein or herein not misleading. There is no fact known to the Issuer which the Issuer
has not disclosed to the Lender in writing which materially adversely affects or is likely
to materially adversely affect the financial condition of the Issuer, or its ability to make
the payments under this Loan Agreement when and as the same become due and
payable.
(c) Pending Litigation. There are no proceedings pending, or to the
knowledge of the Issuer threatened, against or affecting the Issuer, except as specifically
described in writing to the Lender, in any court or before any governmental authority or
arbitration board or tribunal that, if adversely determined, would materially and
adversely affect the properties, prospects, or condition (financial or otherwise) of the
Issuer, or the existence or powers or ability of the Issuer to enter into and perform its
obligations under this Loan Agreement.
(d) Borrowing Legal and Authorized. The execution and delivery of this
Loan Agreement and the consummation of the transactions provided for in this Loan
Agreement and compliance by the Issuer with the provisions of this Loan Agreement:
(1) are within the powers of the Issuer and have been duly and
effectively authorized by all necessary action on the part of the Issuer; and
(2) do not and will not (i) conflict with or result in any material
breach of any of the terms, conditions, or provisions of, or constitute a default
under, or result in the creation or imposition of any lien, charge, or encumbrance
upon any property or assets of the Issuer pursuant to any indenture, loan
agreement, or other agreement or instrument (other than this Loan Agreement)
or restriction to which the Issuer is a party or by which the Issuer, its properties,
10
or operations are bound as of the date of this Loan Agreement; or (ii) with the
giving of notice or the passage of time or both, constitute a breach or default or
so result in the creation or imposition of any lien, charge, or encumbrance, which
breach, default, lien, charge, or encumbrance (described in (i) or (ii)) could
materially and adversely affect the validity or the enforceability of this Loan
Agreement or the Issuer's ability to perform fully its obligations under this Loan
Agreement, nor does such action or inaction result in any violation of the
provisions of the Act, the Resolution, or any laws, ordinances, governmental
rules or regulations, or court orders to which the Issuer, its properties, or
operations may be bound.
(e) No Defaults. No Event of Default or Default has occurred or exists. The
Issuer is not in violation in any material respect, and has not received notice of any
claimed violation (except such violations as (1) heretofore have been specifically
disclosed in writing to, and have been in writing specifically consented to, by the Lender
and (2) do not, and shall not, have any material adverse effect on the transactions herein
contemplated and the compliance by the Issuer with the terms hereof), of any terms of
any agreement or other instrument to which it is a party or by which it, its properties, or
its operations may be bound, which may materially adversely affect the ability of the
Issuer to perform hereunder.
(f) Governmental Consents. The Issuer has obtained, or expects to obtain
when required, all permits, approvals, and findings of non-reviewability required as of
the date hereof by any governmental body or officer for the acquisition, construction,
installation, rehabilitation, improvement, and/or equipping of the Project, including, but
not limited to, construction and renovation work necessary for such acquisition,
construction, installation, rehabilitation, improvement, and/or equipping, the financing
thereof or the reimbursement of the Issuer therefor, or the use of the Project, and, prior
to or after entering into the Loan, the Issuer will obtain all other such permits, approvals,
and findings as may be necessary for the foregoing and for the Loan and the proper
application thereof. The Issuer has complied with or will comply with all applicable
provisions of law requiring any notification, declaration, filing, or registration with any
agency or other governmental body or officer in connection with the acquisition,
construction, installation, rehabilitation, improvement, and/or equipping of the Project,
including, but not limited to, construction and renovation work necessary for such
acquisition, construction, installation, rehabilitation, improvement, equipping,
financing, or reimbursement thereof, or reimbursement of the Issuer therefor. Any such
acquisition, construction, installation, rehabilitation, improvement, equipping,
financing, or reimbursement contemplated in this Loan Agreement is consistent with,
and does not violate or conflict with, the terms of any such agency or other
governmental consent, order, or other action which is applicable thereto. No further
consent, approval, or authorization of, or filing, registration, or qualification with, any
governmental authority is required on the part of the Issuer as a condition to the
11
execution and delivery of this Loan Agreement, or to amounts becoming outstanding
hereunder.
(g) Compliance with Law. The Issuer is in compliance with all laws,
ordinances, and governmental rules and regulations to which it is subject, and which are
material to its properties, operations, finances, or status as a municipal corporation or
subdivision of the State. The Issuer will take all reasonable legal action within its control
in order to maintain its existence as a municipal corporation of the State, and shall not
voluntarily dissolve.
(h) Use of Proceeds.
(1) The Issuer deems it necessary, desirable, and in the best financial
interest of the Issuer to finance the Project. The financing of the Project in the
manner herein provided is hereby authorized.
(2) The Issuer will apply the proceeds of the Loan from the Lender for
(i) the financing of the Costs of the Project as set forth in Exhibit A hereto; and (ii)
paying the transaction costs associated with the issuance of the Note.
Simultaneously with the Closing of the Loan, a portion of the proceeds of the
Loan will, at the Issuer's request and instruction as provided in Section 3.05
herein, be deposited into the Project Fund.
(3) If any component of the Project listed in Exhibit A is not paid for
out of the proceeds of the Loan at the Closing of the Loan, the Issuer shall, as
quickly as reasonably possible, with due diligence, use the remainder of the
proceeds of the Loan listed in Exhibit A and any investment earnings thereon to
pay the Costs of the Project. All such proceeds of the Loan shall be expended
prior to July 14, 2028; provided, however, such time limit may be extended by
the written consent of the Lender with notice to the Council, and provided
further, the Issuer must obtain an opinion of Note Counsel to the effect that such
extension of such time limit will not adversely affect the validity of the Note or
tax-exempt status of the Note. The Issuer may amend Exhibit A to provide for
the financing of different or additional Project if the Issuer, after the date hereof,
deems it to not be in the interest of the Issuer to acquire, construct, install,
rehabilitate, improve, and/or equip of any item of the Project or the Costs of the
Project prove to be less than the amounts listed on Exhibit A and the investment
earnings thereon, without the consent of the Lender or the Council (but with
notice thereto); provided, however, the Issuer must obtain an opinion of Note
Counsel to the effect that such an amendment and the completion of the revised
Project will not adversely affect the validity of the Note or tax-exempt status of
the Note regarding the amended Exhibit A.
12
(4) The Issuer will be responsible for repaying, through the Loan
Repayments, the Note issued to fund the Loan, including the portion of the Note
issued to fund any transaction costs associated with the issuance of the Note.
(5) The Issuer covenants that it will make no use of the proceeds of
the Note that are in its control at any time during the term of the Note, which
would cause the Note to be an "Arbitrage Bond" within the meaning of Section
148 of the Code.
(6) The Issuer covenants that it shall neither take any action nor fail to
take any action or to the extent that it may do so, permit any other party to take
any action which, if either taken or not taken, would adversely affect the
exclusion from gross income for Federal income tax purposes of interest on the
Note.
(i) Project. All items constituting the Project are permitted to be financed or
reimbursed with the proceeds of the Note and the Loan pursuant to the Act.
SECTION 2.02. COVENANTS OF THE ISSUER. The Issuer makes the following
covenants and representations as of the date first above written and such covenants shall
continue in full force and effect during the Loan Term:
(a) Security for the Loan and Loan Repayments. Subject to the provisions of
Section 2.02(n) hereof, the Issuer covenants and agrees to appropriate in its annual
budget, by amendment, if required, and to deposit or credit to the Debt Service Fund to
pay, when due under this Loan Agreement, directly to the Lender, amounts of Non-Ad
Valorem Revenues of the Issuer sufficient to satisfy and timely make the Loan
Repayments as required under this Loan Agreement. Such covenant is subject in all
respects to the payment of obligations secured by a pledge of such Non-Ad Valorem
Revenues heretofore or hereafter entered into. Such covenant and agreement on the part
of the Issuer to budget and appropriate such amounts of Non-Ad Valorem Revenues
shall be cumulative and shall be payable on parity without preference, and shall
continue until such Non-Ad Valorem Revenues or other legally available revenues in
amounts sufficient to make all required Loan Repayments, including delinquent Loan
Repayments, shall have been budgeted, appropriated, and actually paid to the Lender.
The Issuer further acknowledges and agrees that the obligations of the Issuer to include
the amount of any deficiency in Loan Repayments in each of its annual budgets and to
pay such deficiencies from Non-Ad Valorem Revenues may be enforced in a court of
competent jurisdiction in accordance with the remedies set forth herein.
Notwithstanding the foregoing or any provision of this Loan Agreement to the contrary,
the Issuer does not covenant to maintain any services or programs now maintained by
the Issuer which generate Non-Ad Valorem Revenues or to maintain the charges it
presently collects for any such services or programs.
13
(b) Funds and Accounts.
(1) The Issuer hereby covenants and agrees to establish a separate
fund to be known as the "City of Dania Beach, Florida Capital Improvement
Revenue Note, Series 2025 Debt Service Fund." The Issuer hereby covenants and
agrees to maintain in the Debt Service Fund the following accounts: the "Interest
Account" and the "Principal Account." The Issuer hereby covenants and agrees to
establish a separate fund to be known as the "City of Dania Beach, Florida
Capital Improvement Revenue Note, Series 2025 Project Fund." Moneys in the
aforementioned funds and accounts, until applied in accordance with the
provisions hereof, shall be subject to a lien and charge in favor of the Noteholder
and for the further security of the Noteholder. The Project Fund and the Debt
Service Fund shall constitute trust funds for State law purposes to secure the
Noteholder, and shall at all times be kept separate and distinct from all other
funds and accounts of the Issuer and used only as herein provided.
(2) The Issuer shall at any time and from time to time appoint one or
more qualified depositories to hold, for the benefit of the Noteholder, any one or
more of the funds and accounts established hereby. Such depository or
depositories shall perform at the direction of the Issuer the duties of the Issuer in
depositing, transferring, and disbursing moneys to and from each of such funds
and accounts as herein set forth, and all records of such depository in performing
such duties shall be open at all reasonable times to inspection by the Issuer and
its agents and employees.
(3) The Project Fund and the Debt Service Fund shall be continuously
secured in the manner by which the deposit of public funds is authorized to be
secured by the laws of the State and the investment policy of the Issuer. Moneys
on deposit in the Project Fund and the Debt Service Fund may be invested and
reinvested in Permitted Investments maturing no later than the date on which
the moneys therein will be needed. Any and all income received by the Issuer
from the investment of moneys in the Project Fund and the Debt Service Fund
shall be retained in such respective fund and accounts unless otherwise required
by applicable law. Nothing contained in this Loan Agreement shall prevent any
Permitted Investments acquired as investments of or security for funds and
accounts held under this Loan Agreement from being issued or held in book-
entry form on the books of the Department of the Treasury of the United States.
(4) The moneys required to be accounted for in each of the foregoing
funds and accounts may be deposited in a single bank account, and funds
allocated to the various funds and accounts may be invested in a common
investment pool, provided that adequate accounting records are maintained to
14
reflect and control the restricted allocation of the moneys on deposit therein and
such investments for the various purposes of such funds and accounts as herein
provided. The designation and establishment of the various funds and accounts
shall not be construed to require the establishment of any completely
independent, self-balancing funds as such term is commonly defined and used in
governmental accounting, but rather is intended solely to constitute an
earmarking of certain revenues for certain purposes and to establish certain
priorities for application of such revenues as herein provided.
(c) Project Fund.
(1) The Project Fund created pursuant to Section 2.02(b) of this Loan
Agreement shall be used only for payment of the Costs of the Project. Moneys in
the Project Fund, until applied in payment of any item of the Costs of the Project,
in the manner hereinafter provided, shall be held in trust by the Issuer and shall
be subject to a lien and charge in favor of the Noteholder and for the further
security of such Noteholder.
(2) Any funds on deposit in the Project Fund that, in the opinion of
the Issuer, are not immediately necessary for expenditure, as herein provided,
may be invested and reinvested in Permitted Investments which shall mature or
be redeemable at face value not later than the dates on which such funds are
needed. All income derived from investment of funds in the Project Fund shall
be used to pay Costs of the Project, as provided herein.
(3) Any payments for any damages of whatever kind received by the
Issuer as a result of the negligence or breach of contract or warranty by any
contractor, subcontractor, supplier, or design professional working on or
supplying goods or services for the Project, and all insurance proceeds received
with respect to damages to such Project during the acquisition, construction,
installation, rehabilitation, improvement, and/or equipping of the Project, shall
be deposited into the Project Fund to ensure proper completion of the Project.
(4) The Issuer covenants to commence the acquisition, construction,
installation, rehabilitation, improvement, and/or equipping of the Project
promptly upon delivery of the Note and to thereafter work with due diligence to
complete the Project. Except as otherwise provided in Section 2.01(h)(3) herein,
upon completion of the Project, any amounts then remaining in the Project Fund
and not reserved by the Issuer for the payment of any remaining part of Costs of
the Project, shall be used to prepay the Note in the manner that such Note is to be
prepaid under the terms of this Loan Agreement, or to pay principal of or
interest on the Note, as such becomes due.
15
(5) Upon the occurrence of an Event of Default hereunder, to the
extent there are no other funds available under this Loan Agreement, the moneys
in the Project Fund shall be applied to the payment of the Note.
(d) Flow of Funds. Pursuant to Section 2.02(a) of this Loan Agreement, Non-
Ad Valorem Revenues shall be deposited or credited at least five Business Days prior to
the applicable due date, in the following manner and in the following order of priority:
(1) First, the Issuer shall deposit into or credit to the Interest Account
of the Debt Service Fund the sum which, together with the balance in such
Interest Account, shall equal the interest coming due on the Note accrued and
unpaid and to accrue on such Interest Payment Date. Moneys in the Interest
Account shall be used to pay interest on the Note, as and when the same become
due, whether by prepayment or otherwise, and for no other purpose.
(2) Next, the Issuer shall deposit into or credit to the Principal
Account of the Debt Service Fund the sum which, together with the balance in
such Principal Account, shall equal the principal coming due on the Note on the
next Principal Payment Date. Moneys in the Principal Account shall be used to
pay the principal of the Note, as and when the same shall become due, whether
by prepayment or otherwise, and for no other purpose.
(e) Anti-Dilution Test.
(1) During such time as the Loan is outstanding hereunder, as a
condition to the Borrower issuing any additional Debt, the Issuer shall certify to
the Council and the Lender that the average annual Net Non-Ad Valorem
Revenues Available For Debt Service for the two prior Fiscal Years equals at least
150% of the maximum annual debt service on all Debt, including the maximum
annual debt service on the Debt proposed to be issued. The calculations required
by this section shall be determined using the average of actual receipts for the
prior two fiscal years based on the most recent available audited financial
statements of the Issuer.
(2) For purposes of the covenants contained in this Section 2.02(e),
maximum annual debt service on the Debt means, (i) with respect to the Debt
that bears interest at a fixed interest rate, the actual maximum annual debt
service, and, with respect to the Debt which bears interest at a variable interest
rate, maximum annual debt service on such Debt shall be determined assuming
that interest accrues on such Debt at the current "Bond Buyer Revenue Bond
Index" as published in The Bond Buyer no more than two weeks prior to any such
calculation; provided, however, if any Debt, whether bearing interest at a fixed
or variable interest rate, constitutes Balloon Indebtedness, maximum annual debt
16
service on such Debt shall be determined assuming such Debt is amortized over
25 years on an approximately level debt service basis, and (ii) with respect to
Debt that is a revolving line of credit, the maximum annual debt service for such
indebtedness shall be deemed to be fully drawn and amortized over a five-year
period, assuming level debt service based on the fixed interest rate on such loan
or the assumptions for variable rate indebtedness.
(3) For purposes of the covenants contained in this Section 2.02(e), if
the Debt is also payable from additional revenues that are not legally available to
pay debt service on the Loan, the maximum annual debt service on such Debt
shall be discounted by the amount that will be covered by such additional
revenues.
(4) In the event additional Debt is issued for the purpose of refunding
any Debt then outstanding, the conditions of this Section 2.02(e) shall not apply,
provided that the issuance of such additional Debt shall not result in an increase
of the debt service on the applicable Debt in any Fiscal Year ending on or before
the maturity date of the Note.
(5) Notwithstanding anything herein to the contrary, the provisions
of this Section 2.02(e) may be amended, supplemented, or waived from time to
time with the prior written consent of the Lender.
(f) Delivery of Information to the Lender. Beginning with the Fiscal Year
ended September 30, 2025, the Issuer will provide the Noteholder with a copy of the
Audit within 270 days of the end of its Fiscal Year. In addition, the Issuer will provide
the Noteholder with (i) a copy of its final annual budget for each Fiscal Year within 60
days of adoption thereof by its City Commission and (ii) such other financial or public
information as the Noteholder may from time to time reasonably request. The Issuer
further agrees that it will permit the Noteholder or its agents and representatives to
inspect the Issuer's books and records and make extracts therefrom at the Noteholder's
own expense during regular business hours and in a manner which will not disrupt
normal business operations of the Issuer. So long as the Lender or its affiliate is the
Owner of the Note, the Issuer may deliver the Audit and annual budget in electronic
PDF format.
(g) Information. The Issuer's chief financial officer or other staff of the Issuer
shall discuss the Issuer's financial matters with the Lender or its representatives at all
reasonable times at the office of the Issuer, and provide the Lender with copies of any
documents reasonably requested by the Lender unless such documents or material are
protected or privileged from disclosure under applicable State law.
17
(h) Further Assurance. The Issuer shall execute and deliver to the Lender and
the Council all such documents and instruments and do all such other acts and things as
may be reasonably necessary to enable the Lender and the Council to exercise and
enforce their respective rights under this Loan Agreement and the Note and to realize
thereon, and record and file and re-record and re-file all such documents and
instruments, at such time or times, in such manner, and at such place or places, all as
may be reasonably necessary or required by the Lender to validate, preserve, and
protect the Lender's security under this Loan Agreement.
(i) Keeping of Records and Books of Account. The Issuer shall keep or cause
to be kept proper records and books of account, in which correct and complete entries
will be made in accordance with generally accepted accounting principles, consistently
applied (except for changes concurred in by the Issuer's independent auditors) reflecting
all of its financial transactions.
(j) Payment of Taxes, Etc. The Issuer shall pay all legally contracted
obligations when due and shall pay all taxes, assessments, and governmental charges or
levies imposed upon it or upon its income or profits, or upon any properties belonging
to it, prior to the date on which penalties attach thereto, and all lawful claims, which, if
unpaid, might become a lien or charge upon any of its properties, provided that it shall
not be required to pay any such tax, assessment, charge, levy, or claim which is being
contested in good faith and by appropriate proceedings, which shall operate to stay the
enforcement thereof.
(k) Compliance with Laws, Etc. The Issuer shall comply with the
requirements of all applicable laws, the terms of all grants, rules, regulations, and lawful
orders of any governmental authority, non-compliance with which would, singularly or
in the aggregate, materially adversely affect its business, properties, earnings, prospects,
or credit, unless the same shall be contested by it in good faith and by appropriate
proceedings which shall operate to stay the enforcement thereof.
(l) Tax-Exempt Status of the Note.
(1) The Issuer understands that it is the intention hereof that the
interest on the Note not be included within the gross income of the Holder
thereof for federal income tax purposes.
(2) In furtherance thereof, the Issuer agrees that it will take all action
within its control which is necessary in order for the interest on the Note to
remain excludable from gross income for federal income taxation purposes, and
shall refrain from taking any action which results in such interest on the Note
becoming includable in gross income.
18
(3) The Issuer further covenants that, to the extent it has control over
the proceeds of the Note, it will not take any action or fail to take any action with
respect to the investment of the proceeds of the Note, with respect to the
payments derived from the Note or hereunder or with respect to the issuance of
other obligations, which action or failure to act may cause the Note to be an
"arbitrage bond" within the meaning of such term as used in Section 148 of the
Code. In furtherance of the covenant contained in the preceding sentence, the
Issuer agrees to comply with the Tax Certificate as to Arbitrage and the
provisions of Section 141 through 150 of the Code, including the letter of
instruction attached as an exhibit thereto, delivered by Note Counsel to the
Issuer simultaneously with the issuance of the Note, as such letter may be
amended from time to time, as a source of guidelines for achieving compliance
with the Code. The covenants of the Issuer contained in this Section 2.02(l) shall
survive the termination of this Loan Agreement.
(m) Reporting Requirements. The Issuer agrees to provide along with its
Audit described in Section 2.02(f) above, a certificate of the chief financial officer of the
Issuer stating that the Issuer is in compliance with the terms and conditions of this Loan
Agreement, or, specifying the nature of any noncompliance and the remedial action
taken or proposed to be taken to cure such noncompliance.
(n) Limited Obligation. Anything in this Loan Agreement to the contrary
notwithstanding, it is understood and agreed that all obligations of the Issuer hereunder
shall be payable only from Non-Ad Valorem Revenues budgeted and appropriated as
provided for hereunder and nothing herein shall be deemed to pledge ad valorem
taxation revenues or to permit or constitute a mortgage or lien upon any assets or
property owned by the Issuer and no Noteholder or any other Person, including the
Council or the Lender, may compel the levy of ad valorem taxes on real or personal
property within the boundaries of the Issuer. The obligations hereunder do not
constitute an indebtedness of the Issuer within the meaning of any constitutional,
statutory, or charter provision or limitation, and neither the Lender, the Council, the
Noteholder, nor any other Person shall have the right to compel the exercise of the ad
valorem taxing power of the Issuer or taxation of any real or personal property therein
for the payment by the Issuer of its obligations hereunder. Except to the extent expressly
set forth in this Loan Agreement, this Loan Agreement and the obligations of the Issuer
hereunder shall not be construed as a limitation on the ability of the Issuer to pledge or
covenant to pledge the Non-Ad Valorem Revenues or any revenues or taxes of the
Issuer for other legally permissible purposes. Notwithstanding any provisions of this
Loan Agreement or the Note to the contrary, the Issuer shall never be obligated to
maintain or continue any of the activities of the Issuer which generate user service
charges, regulatory fees, or any Non-Ad Valorem Revenues or the rates for such services
or regulatory fees. Neither this Loan Agreement nor the obligations of the Issuer
hereunder shall be construed as a pledge of or a lien on all or any legally available Non-
19
Ad Valorem Revenues of the Issuer, but shall be payable solely as provided in Section
2.02(a) hereof and is subject in all respects to the provisions of Section 166.241, Florida
Statutes, and is subject, further, to the payment of services and programs which are for
essential public purposes affecting the health, welfare, and safety of the inhabitants of
the Issuer.
(o) Other Conditions. The Council, the Lender, and the Issuer mutually agree
and understand that the amounts available to be budgeted and appropriated to make
Loan Repayments hereunder are subject to the obligation of the Issuer to provide
essential services; however, the Issuer's obligation to make Loan Repayments is
cumulative and would carry over from Fiscal Year to Fiscal Year.
(p) Indemnity.
(1) To the full extent permitted under the laws of the State, the Issuer
will pay, and will protect, indemnify, save, and hold harmless, the Council, each
member, officer, commissioner, employee, and agent of the Council, and each
other Person, if any, who has the power, directly or indirectly, to direct or cause
the direction of the management and policies of the Council, harmless from and
against, any and all liabilities, losses, damages, costs, and expenses (including
reasonable attorneys' fees, costs, and expenses), suits, claims, and judgments of
whatsoever kind and nature (including those in any manner directly or indirectly
arising or resulting from, out of, or in connection with, any injury to, or death of,
any Person or any damage to property resulting from the use or operation of the
Project) in any manner arising out of or in connection with the failure to act of
the Issuer, its successors and assigns, or the agents, contractors, employees,
licensees, or otherwise of the Issuer or its successors and assigns in connection
with, the Project financed with the proceeds of the Loan, or the breach or
violation of any agreement, covenant, representation, or warranty of the Issuer
set forth in this Loan Agreement or any document delivered pursuant hereto or
thereto or in connection herewith or therewith. Such indemnification shall not
apply to any actions caused by the gross negligence or willful misconduct of the
party seeking such indemnification.
(2) Such indemnity shall not be restricted in any way by any
limitation on the amount or type of damages, compensation, or benefits payable
under any workers' compensation acts, disability benefit acts, or other employee
benefits acts or any other similar laws but may be limited by State law relating to
the ability of governmental units to indemnify parties for the actions of such
governmental units, including but not limited to Section 768.28, Florida Statutes.
(3) An indemnified Person shall promptly notify the Issuer in writing
of any claim or action brought against it, in respect of which indemnity may be
20
sought against the Issuer, setting forth, to the extent reasonably practicable under
the circumstances, the particulars of such claim or action, and the Issuer will
promptly assume the defense thereof with its in-house counsel or, at its election,
the employment of competent outside counsel reasonably satisfactory to such
indemnified Person and the payment of all expenses.
(4) An indemnified Person may employ separate counsel with respect
to any such claim or action and participate in the defense thereof, but, except as
provided herein, the fees and expenses of such separate counsel shall not be
payable by the Issuer unless such employment has been specifically authorized
by the Issuer, which such authorization shall not be unreasonably withheld, or
unless such employment was occasioned by conflicts of interest between and
among indemnified Persons and/or the Issuer. If the Issuer shall fail to assume
the defense of any action as required hereunder, or, within a reasonable time
after commencement of such action, to retain outside counsel, if it so elects or if it
becomes necessary due to conflict, reasonably satisfactory to the indemnified
Person, the fees, costs, and expenses of counsel to such indemnified Person
hereunder shall be paid by the Issuer.
(5) The provisions of this Section 2.02(q) shall survive the termination
of this Loan Agreement.
(q) Insurance. The Issuer shall bear all risk or loss or damage to the Project
and shall be responsible for keeping the Project insured with companies reasonably
satisfactory to and for such reasonable amounts as reasonably required by the Lender.
The Lender must be named as loss payee and additional insured as applicable on all
such insurance policies. Evidence of such insurance must be reasonably satisfactory to
the Lender. Notwithstanding the foregoing, the Issuer shall not be required to maintain
insurance with respect to the Project for which insurance shall not be available at
reasonable cost.
SECTION 2.03. ISSUER PAYMENTS. Prior to or on each Interest Payment Date
and Principal Payment Date, the Issuer shall withdraw from the appropriate account of the
Debt Service Fund sufficient moneys to pay the Loan Repayments and shall pay directly to the
Lender such Loan Repayments.
21
ARTICLE III
THE LOAN AND THE NOTE
SECTION 3.01. ISSUANCE OF THE NOTE AND THE LOAN. The Issuer hereby
agrees to borrow the sum of $3,100,000 from the Lender. The amounts advanced to the Issuer
net of the costs of the initial issuance are to be used by the Issuer for the purposes of financing
the Costs of the Project.
SECTION 3.02. EVIDENCE OF LOAN. The Issuer's obligation hereunder to
repay amounts advanced pursuant to Section 3.01, together with interest thereon, and other
payments required under this Loan Agreement, shall be evidenced by this Loan Agreement and
the Note.
SECTION 3.03. PURCHASE OF NOTE. The Lender agrees to extend credit to the
Issuer by making the Loan to the Issuer and purchasing the Note to evidence such Loan at the
price equal to the principal amount of the Note, which amount is hereby to be used to fund the
Loan to the Issuer.
SECTION 3.04. DESCRIPTION OF THE NOTE; INTEREST RATE ON NOTE.
The Note shall have the terms set forth in the form of Note attached hereto as Exhibit C. The
Issuer hereby approves the form of the Note attached and agrees hereby to issue the Note to the
Lender. There is hereby pledged and assigned all amounts payable by the Issuer as Loan
Repayments to the Lender as security for the payment of the Note. The interest rate on the Note
shall be subject to adjustment upon an Event of Default to the Default Rate and upon a
Determination of Taxability to the Taxable Rate, each as defined in the Note.
SECTION 3.05. LOAN FOR PURPOSE OF FINANCING THE PROJECT. The
proceeds received from the Loan as evidenced by the Note in the amount of $3,100,000 shall be
applied by the Issuer as follows:
(a) $47,650.00, representing a portion of the proceeds of the Note shall be
applied to pay costs of issuance of the Note in accordance with the Closing
Memorandum; and
(b) $3,052,350.00, representing a portion of the proceeds of the Note shall be
deposited in the Project Fund and applied to pay Costs of the Project.
22
ARTICLE IV
LOAN TERM AND LOAN CLOSING REQUIREMENTS
SECTION 4.01. COMMENCEMENT OF LOAN TERM. The Issuer's obligations
under this Loan Agreement shall commence upon Closing, unless otherwise provided in this
Loan Agreement.
SECTION 4.02. TERMINATION OF LOAN TERM. The Issuer's obligations
under this Loan Agreement shall terminate after payment in full of all amounts due on the Note
and under this Loan Agreement; provided, however, that all covenants and all obligations
provided hereunder specified to so survive (including the obligation of the Issuer to pay the
rebate obligations owed on the Note, if any) shall survive the termination of this Loan
Agreement and the payment in full of principal and interest hereunder. If required by the
Issuer, upon termination of the Loan Term as provided above, the Lender shall deliver, or cause
to be delivered, to the Issuer an acknowledgment thereof. The Lender shall return to the Issuer
the cancelled Note in a reasonable amount of time after payment in full of principal of and
interest on the Note. The foregoing sentence shall survive the termination of this Loan
Agreement and the Loan Term.
SECTION 4.03. LOAN CLOSING SUBMISSIONS. Concurrently with the
execution and delivery of this Loan Agreement, the Issuer is providing to the Lender the
following documents each dated the date of such execution and delivery unless otherwise
provided below:
(a) a certified copy of the Resolution;
(b) an opinion of the Issuer's Counsel to the effect that the Loan Agreement is
a valid and binding obligation of the Issuer and opining to such other matters as may be
reasonably required by Note Counsel and the Lender and acceptable to Issuer's Counsel
and in substantially the form of Exhibit B attached hereto;
(c) a certificate of the officials of the Issuer to the effect that the
representations and warranties of the Issuer are true and correct;
(d) an executed and authenticated Note;
(e) this executed Loan Agreement;
(f) a certificate of the Issuer, in form and substance satisfactory to Note
Counsel, stating (1) the estimated dates and the amounts of projected expenditures for
the Project, and (2) that it is reasonably anticipated by the Issuer that the Loan proceeds
will be fully advanced therefor and expended by the Issuer prior to July 14, 2028, and
23
that the projected expenditures are based on the reasonable expectations of the Issuer
having due regard for its capital needs and the revenues available for the repayment
thereof;
(g) a standard opinion of Note Counsel (addressed for reliance by and to the
Council, the Lender, and the Issuer) to the effect that: (1) the Loan Agreement and the
Note are authorized and enforceable, (2) the Note is authorized under the Act and the
Resolution authorizing this Loan Agreement, (3) the interest on the Note is excludable
from gross income for purposes of federal income taxation; (4) the Note is exempt from
registration under the Securities Act of 1933, as amended, and (5) the Loan Agreement
and the Resolution are exempt from qualification under the Trust Indenture Act of 1939,
as amended; and
(h) such other certificates, documents, opinions, and information as the
Council, the Lender, or Note Counsel may require.
SECTION 4.04. ADMINISTRATION FEE. In further consideration for the
Council's assistance in connection with the Loan, the Issuer hereby agrees to pay the Council a
one-time administration fee to be collected from the Issuer at the rate of 1/10 of 1% (0.001) of the
amount of the Loan with a minimum fee of $7,500 and a maximum fee of $25,000 with respect to
the Loan. Such administration fee is included in the costs of issuance of the Note set forth in
Section 3.05(a) herein.
SECTION 4.05. ORIGINATION FEE. In further consideration for the Loan, the
Issuer hereby agrees to pay the Lender an origination fee of $3,100. [Such
origination fee is included in the costs of issuance of the Note set forth in Section
3.05(a) herein.]
24
ARTICLE V
LOAN REPAYMENTS
SECTION 5.01. PAYMENT OF BASIC PAYMENTS. The Issuer shall pay all Basic
Payments in lawful money of the United States of America to the Noteholder, as payment on
the Note on the dates and in the amounts required hereunder and under the Note. No such
Basic Payments shall be in an amount such that interest on the Loan is in excess of the
Maximum Rate. The Basic Payments consist of the principal of and interest on the Note. The
Basic Payments shall be paid by the Issuer directly to the Lender by wire transfer in accordance
with written instructions delivered by the Lender to the Issuer, or by such other medium
acceptable to the Issuer and to the Lender, from the appropriate accounts in the Debt Service
Fund at the times such amounts are due on the Note, as set forth in the Note, and under this
Loan Agreement.
SECTION 5.02. PAYMENT OF ADDITIONAL PAYMENTS. In addition to the
Basic Payments which are set forth in Section 5.01 hereof, the Issuer agrees to pay in lawful
money of the United States of America, on demand of the Council or the Lender, as applicable,
all reasonable fees and expenses relating to this Loan Agreement, including, but not limited to,
the following Additional Payments:
(a) the fees and disbursements of legal counsel utilized by the Council and
the Lender in connection with the Note, the Loan, this Loan Agreement, and the
enforcement thereof;
(b) extraordinary fees and expenses of the Council and the Lender following
an Event of Default hereunder;
(c) all other out-of-pocket expenses of the Council and the Lender in
connection with the Note, the Loan, this Loan Agreement, and the enforcement thereof,
including, but not limited to, all fees and expenses related to the prepayment and
defeasance of the Loan and the Note;
(d) all taxes (including any recording, documentary stamp taxes, intangible
taxes, and filing fees) in connection with the execution and delivery of this Loan
Agreement and/or the Note, and all expenses, including reasonable attorneys' fees,
relating to any amendments, waivers, consents, or collection or enforcement
proceedings pursuant to the provisions hereof;
(e) any amounts owed by the Issuer to the United States of America as rebate
obligations on the Note, which obligation shall survive the termination of this Loan
Agreement; however, neither the Council nor the Lender will perform arbitrage rebate
calculations on the Note, and the Issuer will be responsible for conducting such
25
arbitrage rebate calculations and paying such amounts owed directly to the United
States of America; and
(f) (1) any and all losses, damages, expenses (including reasonable legal and
other fees and expenses), liabilities, or claims (or actions in respect thereof), to which the
Council may become subject under any federal or state securities laws, federal, or state
tax laws, or other statutory law or at common law or otherwise, and (2) any and all fees
and expenses of any inquiries or audits by any regulatory agencies, all as caused by or
arising out of or based upon this Loan Agreement, the Loan, the Note, the issuance of
the Note, or the use of the proceeds of the Note.
SECTION 5.03. OBLIGATIONS OF ISSUER UNCONDITIONAL. Subject in all
respects to the provisions of this Loan Agreement, the obligations of the Issuer to make the
Loan Repayments required hereunder and to perform and observe the other agreements on its
part contained herein, shall be absolute and unconditional, and shall not be abated, rebated, set-
off, reduced, abrogated, terminated, waived, diminished, postponed, or otherwise modified in
any manner or to any extent whatsoever, while the Note remains outstanding or any Loan
Repayments remain unpaid, regardless of any contingency, act of God, event, or cause
whatsoever. The Issuer shall pay in full the Loan Repayments and all other payments required
hereunder, regardless of any rights of set-off, recoupment, abatement, or counterclaim that the
Issuer might otherwise have against the Council, the Lender, or any other party or parties.
SECTION 5.04. PREPAYMENT. On October 1, 2028 and thereafter, the Note shall
be subject to prepayment, in whole, or in part, at the option of the Issuer upon at least 30 days'
prior written notice to the Noteholder, by paying to the Noteholder the outstanding principal
amount of the Note, to be prepaid, together with the unpaid interest accrued to the date of such
prepayment.
ARTICLE VI
DEFEASANCE
SECTION 6.01. DEFEASANCE OF THE LOAN AGREEMENT AND THE
NOTE.
(a) This Loan Agreement shall continue to be obligatory and binding upon
the Issuer in the performance of the obligations imposed by this Loan Agreement and
the repayment of all sums due by the Issuer under this Loan Agreement shall continue
to be secured by this Loan Agreement as provided herein until all of the indebtedness
and all of the payments required to be made by the Issuer shall be fully paid to the
Council and the Lender, as provided herein, including any fees and expenses in
connection with such repayment, if any.
26
(b) If, at any time, the Issuer shall have paid, or shall have made provision
for payment of, the principal amount and interest on the Note and shall have paid all
amounts due under the Note and this Loan Agreement, then, and in that event, the
covenant regarding the Non-Ad Valorem Revenues for the benefit of the Noteholder
shall be no longer in effect and all future obligations of the Issuer under this Loan
Agreement shall cease; provided, however, that all covenants and all obligations
provided hereunder specified to so survive (including the obligation of the Issuer to pay
the rebate obligations owed on the Note) shall survive the termination of this Loan
Agreement and the payment in full of principal of and interest on the Note. For
purposes of the preceding sentence, in order for the Issuer to have made "provision for
payment," the Issuer shall have deposited sufficient cash and/or Governmental
Obligations in irrevocable trust with a banking institution or trust company, for the sole
benefit of the Lender in respect to which such cash and/or Governmental Obligations,
the principal and interest on which will be sufficient (as reflected in an Accountant's
verification report provided to the Lender by the Issuer) to make timely payment of the
principal of and interest on the Note.
(c) Prior to the defeasance of the Note becoming effective, the Noteholder
shall receive a defeasance opinion of Note Counsel to the effect that the Note has been
defeased in accordance with this Loan Agreement.
ARTICLE VII
ASSIGNMENT AND PAYMENT BY THIRD PARTIES
SECTION 7.01. ASSIGNMENT OF LOAN AGREEMENT.
(a) This Loan Agreement may not be assigned by the Issuer for any reason without
the express prior written consent of the Lender with notice to the Council.
(b) The Note may be assigned by the Lender in accordance with the terms thereof,
and such assignment shall, without further action, be deemed to assign the Lender's interest
under this Loan Agreement.
SECTION 7.02. NO PARTNERSHIP, ETC. The relationship between the Lender
and the Issuer are solely those of lender and borrower. Neither the Council nor the Lender has
any fiduciary or other special relationship with or duty to the Issuer and none is created by the
Note documents or Loan documents. Nothing contained in the Note documents or Loan
documents, and no action taken or omitted pursuant to the Note documents or Loan
documents, is intended or shall be construed to create any partnership, joint venture
association, or special relationship between or among the Issuer, the Lender, and the Council or
any of them or in any way make the Council or the Lender a co-principal with the Issuer with
reference to the Note, the Loan, or otherwise. In no event shall the Council's or Lender's rights
27
and interests under the Note documents or Loan documents be construed to give the Council or
the Lender the right to control, or to be deemed to indicate that the Council or the Lender is in
control of, the business, properties, management, or operations of the Issuer.
ARTICLE VIII
EVENTS OF DEFAULT AND REMEDIES
SECTION 8.01. EVENTS OF DEFAULT DEFINED. The following shall be
"Events of Default" under this Loan Agreement and the term "Event of Default" shall mean
(except where the context clearly indicates otherwise), whenever it is used in this Loan
Agreement, any one or more of the following events:
(a) failure by the Issuer to timely pay any Loan Repayment, when due, so
long as the Note is outstanding;
(b) failure by the Issuer to timely pay any other payment required to be paid
hereunder on the date on which it is due and payable, provided the Issuer has prior
written notice of any such payments being due;
(c) failure by the Issuer to observe and perform any covenant, condition, or
agreement (other than a failure under Section 8.01(a)), on its part to be observed or
performed under this Loan Agreement, for a period of thirty (30) days after the earlier of
either: (i) the Issuer should have provided notice to the Lender pursuant to Section 8.02
or (ii) written notice of the failure is given to the Issuer (as provided in Section 9.01 of
this Loan Agreement), unless the Council or the Lender, as applicable, shall agree in
writing to an extension of such time prior to its expiration; provided, however, if the
failure stated in the notice can be wholly cured within a period of time not materially
detrimental to the rights of the Council or the Lender, as applicable, but cannot
reasonably be cured within the applicable thirty (30) day period, the Council or the
Lender will not unreasonably withhold their consent to an extension of such time if
corrective action is instituted by the Issuer within the applicable period and diligently
pursued until the failure is corrected; such time not to exceed a total of sixty (60) days
from the date of the original failure to perform any covenant, condition or agreement.
(d) any warranty, representation, or other statement by the Issuer or by an
officer or agent of the Issuer contained in this Loan Agreement or in any instrument
furnished in compliance with or in reference to this Loan Agreement, is false or
misleading in any material respect when made;
(e) a petition is filed against the Issuer under any bankruptcy,
reorganization, arrangement, insolvency, readjustment of debt, dissolution, or
28
liquidation law of any jurisdiction, whether now or hereafter in effect, and is not
dismissed within sixty (60) days of such filing;
(f) the Issuer files a petition in voluntary bankruptcy or seeking relief under
any provision of any bankruptcy, reorganization, arrangement, insolvency,
readjustment of debt, dissolution, or liquidation law of any jurisdiction, whether now or
hereafter in effect, or consents to the filing of any petition against it under such law;
(g) the Issuer admits insolvency or bankruptcy or its inability to pay its debts
as they become due or is generally not paying its debts as such debts become due, or
becomes insolvent or bankrupt or makes an assignment for the benefit of creditors, or a
custodian (including without limitation a receiver, liquidator, or trustee) of the Issuer or
any of its property is appointed by court order or takes possession thereof and such
order remains in effect or such possession continues for more than sixty (60) days;
(h) default under any agreement to which the Issuer is a party evidencing,
securing, or otherwise respecting any Debt if, as a result thereof, such indebtedness is in
whole or in part declared due and payable prior to its stated maturity;
(i) any material provision of this Loan Agreement shall at any time for any
reason cease to be valid and binding on the Issuer, or shall be declared to be null and
void, or the validity or enforceability of this Loan Agreement shall be contested by the
Issuer or any governmental agency or authority, or if the Issuer shall deny any further
liability or obligation under this Loan Agreement;
(j) final judgment for the payment of money in the amount of $250,000 or
more is rendered against the Issuer, and the payment of which would materially
adversely affect the Issuer's ability to meet its obligations hereunder (it being agreed
that, if insurance or adequate reserves are available to make such payment, such
judgment would not materially affect the Issuer's ability to meet its obligations
hereunder) and at any time after ninety (90) days from the entry thereof, unless
otherwise provided in the final judgment, (1) such judgment shall not have been
discharged, or (2) the Issuer shall not have taken and be diligently prosecuting an appeal
therefrom or from the order, decree or process upon which or pursuant to which such
judgment shall have been granted or entered, and have caused the execution of or levy
under such judgment, order, decree, or process of the enforcement thereof to have been
stayed pending determination of such appeal, provided that such execution and levy
would materially adversely affect the Issuer's ability to meet its obligations hereunder;
or (3) it has not been determined by a court of competent jurisdiction from which appeal
may not be taken or from which appeal has been taken but has been finally denied that
the Issuer is not obligated with respect to such judgment pursuant to the provisions of
Chapter 768, Florida Statutes or other applicable law; or
29
(k) Moody’s Investors Service, Inc., Standard & Poor’s Global Ratings, or
Fitch Ratings downgrades below Baa1/BBB+/BBB+ (without regard to credit
enhancement), respectively, or suspends or withdraws (i) the credit rating of any
indebtedness issued by the Issuer and payable from and secured solely by a covenant to
budget and appropriate Non-Ad Valorem Revenues or (ii) the Issuer’s public debt credit
rating.
SECTION 8.02. NOTICE OF DEFAULT. The Issuer agrees to give the Lender and
the Council written notice within 10 days if any petition, assignment, appointment, or
possession referred to in Section 8.01(e), 8.01(f), and 8.01(g) is filed by or against the Issuer or of
the occurrence of any other event or condition which constitutes an Event of Default, or an
event that would with the passage of time constitute an Event of Default, immediately upon
becoming aware of the existence thereof.
SECTION 8.03. REMEDIES ON DEFAULT. Whenever any Event of Default
referred to in Section 8.01 hereof shall have happened and be continuing, the Council or the
Lender shall have all remedies provided by law, and shall, in addition to any other remedies
herein or by law provided, have the right, at its or their option without any further demand or
notice, except as otherwise provided for in this Loan Agreement, to take whatever other action
at law or in equity which may appear necessary or desirable to collect amounts then due to it
and thereafter to become due hereunder or to enforce any other of its or their rights hereunder
including the right of set off against and apply all funds of the Issuer held on deposit with or
under the control of the Lender to the payment of any obligations of the Issuer under any of the
Loan documents; provided, however, the Council shall only have the right to take such action
as it deems necessary to collect amounts then due or to become due to the Council.
In the Event of Default, the rate of interest on the Note shall be the Default Rate.
SECTION 8.04. NO REMEDY EXCLUSIVE; WAIVER, NOTICE. No remedy
herein conferred upon or reserved to the Council or the Lender is intended to be exclusive and
every such remedy shall be cumulative and shall be in addition to every other remedy given
under this Loan Agreement or now or hereafter existing at law or in equity. No delay or
omission to exercise any right, remedy or power shall be construed to be a waiver thereof, but
any such right, remedy or power may be exercised from time to time and as often as may be
deemed expedient. In order to entitle the Council or the Lender to exercise any remedy reserved
to it in this Article VIII, it shall not be necessary to give any notice other than such written notice
as provided in this Article VIII.
SECTION 8.05. APPLICATION OF MONEYS. Any moneys collected by the
Council or the Lender pursuant to Section 8.03 hereof shall be applied (a) first, to pay interest
due on the Loan, (b) second, to pay principal due on the Loan, (c) third, to pay any other
amounts due hereunder, including, but not limited to, any attorney's fees, costs or expenses, or
30
other expenses owed by the Issuer pursuant to Section 5.02(a), (b), and (c) hereof; and (d)
fourth, to pay interest and principal on the Loan and other amounts payable hereunder but
which are not due, as they become due (in the same order, as to amounts which come due
simultaneously, as in (a) through (c) in this Section 8.05).
ARTICLE IX
MISCELLANEOUS
SECTION 9.01. NOTICES. All notices, certificates, or other communication
hereunder shall be sufficiently given and shall be deemed given when hand delivered or mailed
by certified mail, postage prepaid, return receipt requested, to the parties at the following
addresses:
Council: Florida Municipal Loan Council
c/o Florida League of Cities, Inc.
301 South Bronough Street, Suite 300
Tallahassee, Florida 32301
Lender: TD Public Finance LLC
255 Alhambra Circle
Coral Gables, Florida 33134
Attention: ________________
Issuer: City of Dania Beach, Florida
100 W. Dania Beach Boulevard
Dania Beach, FL 33004
Attention: Chief Financial Officer
with a copy to: City Attorney
Any of the above parties may, by notice in writing given to the others, designate any
further or different addresses to which subsequent notices, certificates or other communications
shall be sent.
SECTION 9.02. BINDING EFFECT. This Loan Agreement shall inure to the
benefit of the Lender, the Council, and the Issuer, and shall be binding upon the Lender, the
Council, and the Issuer, and their respective successors and assigns.
SECTION 9.03. SEVERABILITY. In the event any provision of this Loan
Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such
holding shall not invalidate or render unenforceable any other provision hereof.
31
SECTION 9.04. AMENDMENTS, CHANGES, AND MODIFICATIONS. This
Loan Agreement may be amended or supplemented from time to time only by a writing duly
executed by the Issuer and the Lender; provided, however, any such amendment affecting the
rights or obligations of the Council shall not be effective unless it shall have been consented to
in writing by the Council.
SECTION 9.05. EXECUTION IN COUNTERPARTS. This Loan Agreement may
be simultaneously executed in several counterparts, each of which, when so executed and
delivered, shall be an original and all of which shall constitute but one and the same instrument.
SECTION 9.06. APPLICABLE LAW; VENUE. This Loan Agreement shall be
governed by and construed in accordance with the laws of the State without regard to conflict
of law principles. Venue of any action relating to the Loan shall be in Okaloosa County, Florida.
SECTION 9.07. BENEFIT OF NOTEHOLDER. This Loan Agreement is executed
in part to induce the purchase by the Lender of the Note. Accordingly, all covenants,
agreements, and representations on the part of the Issuer, as set forth in this Loan Agreement,
are hereby declared to be for the benefit of the Noteholder from time to time of the Note. Any
opinion of Note Counsel required to be obtained by the Issuer under the provisions of this Loan
Agreement shall also be addressed to and delivered to the Lender.
SECTION 9.08. CONSENTS AND APPROVALS. Whenever the written consent
or approval of the Council shall be required under the provisions of this Loan Agreement, such
consent or approval may be given by an Authorized Representative of the Council or such other
additional Persons provided by law or by rules, regulations, or resolutions of the Council.
SECTION 9.09. IMMUNITY OF OFFICERS, EMPLOYEES, AND MEMBERS OF
COUNCIL AND ISSUER. No recourse shall be had for the payment of the principal of or
interest hereunder or for any claim based thereon or upon any representation, obligation,
covenant, or agreement in this Loan Agreement against any past, present, or future official
officer, member, counsel, counsel's firm, employee, director, or agent, as such, of the Council or
the Issuer, either directly or through the Council or the Issuer, or respectively, any successor
public or private corporation thereto under any rule of law or equity, statute, or constitution or
by the enforcement of any assessment or penalty or otherwise, and all such liability of any such
officers, members, counsels, employees, directors, or agents as such is hereby expressly waived
and released as a condition of and consideration for the execution of this Loan Agreement.
SECTION 9.10. CAPTIONS. The captions or headings in this Loan Agreement are
for convenience only and in no way define, limit or describe the scope or intent of any
provisions of sections of this Loan Agreement.
SECTION 9.11. NO PECUNIARY LIABILITY OF COUNCIL. The Council shall
not in any way be obligated to pay the principal of or interest on the Note, and the issuance of
32
the Note by the Issuer shall not directly, indirectly, or contingently obligate the Council to levy
or pledge any form of ad valorem taxation for its payment.
SECTION 9.12. PAYMENTS DUE ON HOLIDAYS. If the date for making any
payment or the last date for performance of any act or the exercise of any right, as provided in
this Loan Agreement, shall be other than on a Business Day, such payments may be made or act
performed or right exercised on the next succeeding Business Day with the same force and
effect as if done on the nominal date provided in this Loan Agreement; provided, however, that
any interest due shall accrue until paid.
SECTION 9.13. CALCULATIONS. Interest shall be computed on the basis of
twelve 30-day months and a 360-day year.
SECTION 9.14. TIME OF PAYMENT. Any Loan Repayment or other payment
hereunder which is received by the Lender after 2:00 p.m. (Eastern Time) on any day shall be
deemed received on the following Business Day.
SECTION 9.15. WAIVER OF JURY TRIAL. EACH OF THE COUNCIL, THE
LENDER, AND THE ISSUER HEREBY WAIVES TRIAL BY JURY IN ANY ACTION OR
PROCEEDING ARISING OUT OF OR RELATED TO THIS LOAN AGREEMENT. EACH OF
THE COUNCIL, THE LENDER, AND THE ISSUER HEREBY KNOWINGLY, VOLUNTARILY
AND INTENTIONALLY WAIVES ANY RIGHTS IT MAY HAVE TO A TRIAL BY JURY IN
RESPECT OF ANY LITIGATION (WHETHER AS CLAIM, COUNTER-CLAIM, AFFIRMATIVE
DEFENSE OR OTHERWISE) BASED HEREON, OR ARISING OUT OF, UNDER OR IN
CONNECTION WITH, THIS LOAN AGREEMENT, OR ANY COURSE OF CONDUCT,
COURSE OF DEALINGS, STATEMENTS (WHETHER ORAL OR WRITTEN) OR ACTIONS OF
THE COUNCIL, THE LENDER, AND THE ISSUER. EACH OF THE COUNCIL, THE LENDER,
AND THE ISSUER ACKNOWLEDGES AND AGREES THAT IT HAS RECEIVED FULL AND
SUFFICIENT CONSIDERATION FOR THIS PROVISION AND RECOGNIZES AND AGREES
THAT THIS PROVISION IS A MATERIAL INDUCEMENT FOR OTHER PARTIES HERETO
TO ENTER INTO THIS LOAN AGREEMENT. EACH OF THE COUNCIL, THE LENDER, AND
THE ISSUER REPRESENTS AND ACKNOWLEDGES THAT IT HAS REVIEWED THIS
PROVISION WITH ITS LEGAL COUNSEL AND THAT IT HAS KNOWINGLY AND
VOLUNTARILY WAIVED ANY JURY TRIAL RIGHTS IT MAY HAVE FOLLOWING
CONSULTATION WITH SUCH LEGAL COUNSEL.
9.16 NO ADVISORY OR FIDUCIARY RELATIONSHIP. In connection with all
aspects of each transaction contemplated hereunder (including in connection with any
amendment, waiver or other modification hereof or of any other documents related hereto), the
Issuer acknowledges and agrees, that: (a) (i) it has consulted its own legal, accounting,
regulatory and tax advisors to the extent it has deemed appropriate, (ii) it is capable of
evaluating, and understands and accepts, the terms, risks and conditions of the transactions
contemplated hereby and any other loan documents, (iii) each Lender is not acting as a
33
municipal advisor or financial advisor to the Issuer and (iv) neither Lender has a fiduciary duty
pursuant to Section 15B of the Securities Exchange Act to the Issuer with respect to the
transactions contemplated hereby and the discussions, undertakings and procedures leading
thereto (irrespective of whether the Lender has provided other services or is currently
providing other services to the Issuer on other matters); (b) (i) each Lender is and has been
acting solely as a principal in an arm's length commercial lending transaction and has not been,
is not, and will not be acting as an advisor, agent or fiduciary, for the Issuer, or any other person
and (ii) neither Lender has any obligation to the Issuer, with respect to the transactions
contemplated hereby except those obligations expressly set forth herein and in the other loan
documents; (c) notwithstanding anything herein to the contrary, it is the intention of the Issuer
and each Lender that the loan documents represent a commercial loan transaction not involving
the issuance and sale of a municipal security, and that any bond, note or other debt instrument
that may be delivered to a Lender is delivered solely to evidence the repayment obligations of
the Issuer under the loan document; and (d) each Lender may be engaged in a broad range of
transactions that involve interests that differ from those of the Issuer, and neither Lender has
any obligation to disclose any of such interests to the Issuer. To the fullest extent permitted by
law, the Issuer hereby waives and releases any claims that it may have against each Lender with
respect to any breach or alleged breach of agency or fiduciary duty in connection with any
aspect of any transactions contemplated hereby. If the Issuer would like a municipal advisor in
this transaction that has legal fiduciary duties to the Issuer, the Issuer is free to engage a
municipal advisor to serve in that capacity. The transactions contemplated herein and the Note
are delivered, pursuant to and in reliance upon the bank exemption and/or the institutional
buyer exemption provided under the municipal advisor rules of the Securities and Exchange
Commission, Rule 15Ba1-1 et seq, to the extent that such rules apply to the transactions
contemplated hereunder.
9.17 PATRIOT ACT NOTICE. The Lender hereby notifies the Issuer that pursuant
to the requirements of the USA PATRIOT Act (Title III of Pub. L. 107-56 signed into law
October 26, 2001) (the 'Patriot Act') it is required to obtain, verify and record
information that identifies the Issuer, which information includes the name and address
of the Issuer and other information that will allow the Lender to identify the Issuer in
accordance with the Patriot Act.
[Remainder of page intentionally left blank]
#859942v2
S-1
IN WITNESS WHEREOF, the Council has caused this Loan Agreement to be executed in
its corporate name with its corporate seal hereunto affixed and attested by its duly authorized
officers, the Issuer has caused this Loan Agreement to be executed in its name with its seal
hereunto affixed and attached by its duly authorized officers, and the Lender has caused this
Loan Agreement to be executed in its corporate name by its duly authorized officer. All of the
above occurred as of the date first above written.
FLORIDA MUNICIPAL LOAN COUNCIL
(SEAL)
By:
Name: Isaac Salver
Title: Chairman
ATTEST:
By:
Name: Jeannie Garner
Title: Executive Director/CEO
#859942v2
S-2
TD PUBLIC FINANCE LLC
By: ______
Name: Lance Aylsworth
Title: Vice President
Senior Relationship Manager
#859942v2
S-3
CITY OF DANIA BEACH, FLORIDA
(SEAL)
By:
Name: Joyce L. Davis
Title: Mayor
ATTESTED BY:
By:
Name: Elora Riera, MMC
Title: City Clerk
APPROVED AS TO FORM AND CORRECTNESS:
By:
Name: Eve A. Boutsis
Title: City Attorney
#859942v2
A-1
EXHIBIT A
CITY OF DANIA BEACH, FLORIDA
USE OF LOAN PROCEEDS
PROJECT TOTAL AMOUNT TO BE FINANCED
Acquisition of approximately 0.43 acres of
land located at 400 South Federal Highway,
Dania Beach, Florida, along with a 4.052
square foot historically designated structure
$3,100,000
#859942v2
B-1
EXHIBIT B
OPINION OF ISSUER'S COUNSEL
[Letterhead of Counsel to Issuer]
July 14, 2025
Florida Municipal Loan Council
c/o Florida League of Cities, Inc.
301 South Bronough Street
Tallahassee, Florida 32301
Bryant Miller Olive P.A.
1 SE 3rd Avenue, Suite 2200
Miami, Florida 33131
TD Public Finance LLC
255 Alhambra Circle
Coral Gables, Florida 33134
Re: $3,100,000 City of Dania Beach, Florida Capital Improvement Revenue Note,
Series 2025 (the "Note")
Ladies and Gentlemen:
I am the City Attorney to the City of Dania Beach, Florida (the "Issuer"), and have been
requested by the Issuer to give this opinion in connection with the Issuer's financing all or a
portion of the Costs of the Project, each as defined in the Loan Agreement, dated as July 1, 2025
(the "Loan Agreement"), by and among the Florida Municipal Loan Council (the "Council"), the
Issuer, and TD Public Finance LLC (the "Lender"). The Note is issued by the Issuer pursuant to
Chapter 166, Part II, Florida Statutes; the Charter of the Issuer, and other applicable provisions
of law, each as amended (collectively, the "Act"); and the resolution authorizing the issuance of
the Note, adopted by the City Commission of the Issuer on July 8, 2025 (the "Resolution"). All
terms not otherwise defined herein shall have the meanings ascribed thereto in the Loan
Agreement.
In rendering this opinion, we have examined such proceedings and records of the Issuer
and made such inquiry of officials of the Issuer as we deem necessary. Based on such review,
and such other considerations of law and fact, as we believe to be relevant, we are of the
opinion that:
#859942v2
B-2
(a) The Issuer is a municipality duly organized and validly existing under
the Constitution and laws of the State of Florida. The Issuer has the legal right and all
requisite power and authority to acquire and construct the Project, to issue the Note, to
enter into the Loan Agreement, to covenant to budget and appropriate Non-Ad Valorem
Revenues to the payment of the Note, to adopt the Resolution, and to consummate the
transactions contemplated thereby and otherwise to carry on its activities and own its
property.
(b) On July 8, 2025, the Resolution was duly adopted by the Issuer at a duly
called public meeting following proper public notice, at which a legal quorum was
present and acting throughout, is in full force and effect, and has not been amended,
supplemented, or repealed as of the date hereof.
(c) The Issuer has duly authorized the acquisition and construction of the
Project, duly adopted the Resolution, and authorized, executed, and delivered the Loan
Agreement and the Note, and such instruments are legal and binding obligations of the
Issuer enforceable against the Issuer in accordance with their terms, except to the extent
that the enforceability thereof may be subject to bankruptcy, insolvency, reorganization,
moratorium, or other similar laws affecting creditors' rights heretofore or hereafter
enacted and that their enforcement may be subject to the exercise of judicial discretion in
accordance with general principles of equity, and to the sovereign police powers of the
State of Florida and the constitutional powers of the United States of America.
(d) The execution and delivery of the Resolution, the Loan Agreement, and
the Note; the consummation of the transactions contemplated thereby; the acquisition
and construction of the Project; and the fulfillment of or compliance with the terms and
conditions of the Resolution, the Loan Agreement, and the Note does not and will not
conflict with or result in a material breach of or default under any of the terms,
conditions, or provisions of any agreement, contract, or other instrument, or law,
ordinance, regulation, or judicial or other governmental order, to which the Issuer is
now a party or it or its properties is otherwise subject or bound, and the Issuer is not
otherwise in violation of any of the foregoing in a manner material to the transactions
contemplated by the Resolution, the Loan Agreement, or the Note.
(e) There is no litigation or legal or governmental action, proceeding,
inquiry, or investigation pending or, to the best of our knowledge, threatened by
governmental authorities or to which the Issuer is a party or of which any property of
the Issuer is subject, in any court or before any governmental authority or arbitration
board or tribunal that, if determined adversely to the Issuer, would individually or in
the aggregate materially and adversely affect the validity or the enforceability of the
Resolution, the Loan Agreement, the Note, the rights to the officers of the Issuer to their
respective offices, the pledge of the Non-Ad Valorem Revenues, the excludability of
#859942v2
B-3
interest from federal income tax on the Note, or materially and adversely affect the
properties, prospects, or condition (financial or otherwise) of the Issuer, or the existence
or powers or ability of the Issuer to enter into and perform its obligations under the
Resolution, the Loan Agreement, or the Note.
(f) All approvals, consents, waivers, authorizations, and orders of any
governmental authority or agency having jurisdiction in any matter which would
constitute a condition precedent to the performance by the Issuer of its obligations under
the Resolution, the Loan Agreement, or the Note have been obtained and are in full force
and effect and the Issuer has complied with all conditions precedent to the issuance of
the Note contained in the resolutions and ordinances of the Issuer, in particular the
Resolution.
The addressees hereof and their successors and assigns are entitled to rely on this
opinion.
Very truly yours,
By: ____________________________________
#859942v2
C-1
EXHIBIT C
FORM OF NOTE
ANY OWNER SHALL, PRIOR TO BECOMING AN OWNER, EXECUTE A LENDER'S
CERTIFICATE IN THE FORM ATTACHED TO THE NOTE RESOLUTION (HEREIN
DEFINED) CERTIFYING, AMONG OTHER THINGS, THAT SUCH OWNER IS A
"QUALIFIED INSTITUTIONAL BUYER" AS SUCH TERM IS DEFINED IN RULE 144A OF THE
SECURITIES ACT OF 1933, AS AMENDED, OR AN "ACCREDITED INVESTOR" AS SUCH
TERM IS DEFINED IN THE SECURITIES ACT OF 1933, AS AMENDED, AND REGULATION
D THEREUNDER.
R-1 $3,100,000
CITY OF DANIA BEACH, FLORIDA
CAPITAL IMPROVEMENT REVENUE NOTE, SERIES 2025
RATE OF INTEREST
4.07% (subject to adjustment
as set forth herein)
MATURITY DATE
October 1, 2035
DATE OF ISSUE
July 14, 2025
KNOW ALL MEN BY THESE PRESENTS that the City of Dania Beach, Florida (the
"Issuer"), for value received, hereby promises to pay from the sources hereinafter provided, to
the order of TD Public Finance LLC, or its registered assigns (hereinafter, the "Owner"), the
principal sum of THREE MILLION ONE HUNDRED THOUSAND DOLLARS ($3,100,000), in
the amounts and on the dates described below, together with interest on the principal balance at
a fixed rate of 4.07%, subject to adjustment as set forth herein (the “Interest Rate”), payable
semi-annually on each April 1 and October 1 (each, an "Interest Payment Date"), commencing
October 1, 2025. Interest shall be calculated on the basis of twelve 30-day months and a 360-day
year. Principal on this Note is payable pursuant to the principal installment schedule attached
hereto as Schedule I.
On or before each Interest Payment Date and Principal Payment Date (each as defined in
the hereinafter defined Loan Agreement), as applicable, the principal of and interest on this
Note are payable in lawful money of the United States of America by wire transfer in
accordance with written instructions delivered by the Owner to the Issuer, or by such other
medium acceptable to the Issuer and to the Owner. The Note shall not be required to be
presented for prepayment or principal installment payments.
In the event of a Determination of Taxability (as defined herein), the Interest Rate
payable on this Note shall be subject to a full gross up modification, at the rate of ____5.15% (the
"Taxable Rate"), effective retroactively to the date on which such Determination of Taxability
#859942v2
C-2
was made. In addition, upon a Determination of Taxability, the Issuer agrees to pay to the
Owner subject to such Determination of Taxability the Additional Amount (as defined herein)
upon demand.
"Additional Amount" shall mean (a) the difference between (1) interest on this Note for
the period commencing on the date on which the interest on this Note ceased to be excludable
from gross income for federal income tax purposes and ending on the earlier of the date this
Note ceased to be outstanding or such adjustment is no longer applicable to this Note (the
"Taxable Period") at a rate per annum equal to the Taxable Rate, and (2) the aggregate amount
of interest paid on this Note for the Taxable Period under the provisions of this Note without
considering the Determination of Taxability, plus (b) any penalties and interest paid or payable
by such Owner to the Internal Revenue Service by reason of such Determination of Taxability.
"Determination of Taxability" shall mean a final decree or judgment of any federal court
or a final action of the Internal Revenue Service or of the United States Treasury Department
determining that any interest payable on this Note is includable in the gross income of the
Owner. No such decree or action shall be considered final for the purposes of this paragraph
unless the Issuer has been given written notice thereof and, if it is so desired by the Issuer and is
legally permissible, the Issuer has been afforded the opportunity to contest the same, at its own
expense, either directly or in the name of the Owner and until the conclusion of any appellate
review, if sought.
During the period in which an Event of Default shall have occurred and is continuing
hereunder, this Note shall bear interest equal to 6.00% in excess of the Prime Rate as quoted in
the Wall Street Journal (provided, however, the Prime Rate shall have a floor of 3.00%) (the
"Default Rate")
Additionally, if any Loan Repayment is paid later than fifteen (15) days after the date
due, such payment shall incur an additional late fee of six percent (6.0%) on the overdue
payment.
The Owner shall provide to the Issuer such documentation to evidence any adjustment
to the Interest Rate and the calculations made in connection therewith. All calculations and
determinations by the Owner of the amounts payable pursuant to the Interest Rate adjustment
provisions or of any element thereof, if made in accordance with its then standard procedures
for so calculating and determining such amounts, shall be conclusive absent manifest arithmetic
error.
On October 1, 2028 and any Interest Payment Date thereafter, this Note shall be subject
to prepayment, in whole, or in part, at the option of the Issuer upon at least 30 days' prior
written notice to the Noteholder, by paying to the Noteholder the outstanding principal amount
of this Note to be prepaid, together with the unpaid interest accrued to the date of such
#859942v2
C-3
prepayment. Partial prepayments shall be allocated to such principal payments in inverse order
of maturity treating scheduled amortization payments as maturities.
If any date for the payment of principal hereof and interest hereon or the taking of any
action hereunder shall fall on a day which is not a Business Day (as defined in the hereinafter
defined Loan Agreement), the payment due or action to be taken on such date shall be due on
the next succeeding day which is a Business Day, but the Issuer shall not receive credit for the
payment until it is actually received by the Owner.
This Note is issued to finance all or a portion of the Costs of the Project under the
authority of and in full compliance with Chapter 166, Part II, Florida Statutes; the Charter of the
Issuer, and other applicable provisions of law, each as amended (collectively, the "Act"); the
resolution authorizing the issuance of the Note, adopted by the City Commission on July 8,
2025; and pursuant to a Loan Agreement by and among the Owner, the Issuer, and the Council,
dated as of July 1, 2025 (the "Loan Agreement"), to which reference should be made to ascertain
those terms and conditions. All capitalized undefined terms used herein shall have the
meanings ascribed to such terms in the Loan Agreement.
This Note and the interest thereon are payable from and secured solely by a covenant to
budget and appropriate Non-Ad Valorem Revenues, as defined and described in the Resolution
and the Loan Agreement, all in the manner provided in, and subject to the terms and conditions
of the Resolution and the Loan Agreement.
THIS NOTE SHALL NOT BE OR CONSTITUTE A GENERAL OBLIGATION OR
INDEBTEDNESS OF THE ISSUER AS "BONDS" WITHIN THE MEANING OF ARTICLE VII,
SECTION 12 OF THE FLORIDA CONSTITUTION, BUT SHALL BE PAYABLE FROM AND
SECURED SOLELY BY BUDGETED AND APPROPRIATED NON-AD VALOREM REVENUES
IN ACCORDANCE WITH THE TERMS OF THE RESOLUTION AND THE LOAN
AGREEMENT. NO OWNER OF THIS NOTE SHALL EVER HAVE THE RIGHT TO COMPEL
THE EXERCISE OF ANY AD VALOREM TAXING POWER TO PAY THIS NOTE, OR BE
ENTITLED TO PAYMENT OF THIS NOTE FROM ANY FUNDS OF THE ISSUER EXCEPT
FROM BUDGETED AND APPROPRIATED NON-AD VALOREM REVENUES AS DESCRIBED
THE RESOLUTION AND THE LOAN AGREEMENT.
The transfer of this Note may be registered only upon the books kept for the registration
of this Note and registration of transfer thereof upon surrender thereof to the Issuer together
with an assignment duly executed by the Owner or its attorney or legal representative in the
form of the assignment set forth in this Note; provided, however, that this Note may be
transferred only in whole and not in part and only to (i) an affiliate of the Owner or (ii) banks,
insurance companies, trusts, custodians or other financial institutions and their affiliates, that
executes and delivers to the Issuer a Lender Certificate substantially in the form attached as
Exhibit C to the Resolution. Nothing herein shall limit the right of the Owner or its assignees to
sell or assign participation interests in this Note to one or more entities listed in (i) or (ii) of this
#859942v2
C-4
paragraph. In the case of any such registration of transfer, the Issuer shall execute and deliver in
exchange for this Note a new Note registered in the name of the transferee. In all cases in which
this Note shall be transferred hereunder, the Issuer shall execute and deliver at the earliest
practicable time a new Note in accordance with the provisions of this paragraph. The Issuer
may make a charge for every such registration of transfer of this Note sufficient to reimburse it
for any tax or other governmental charges required to be paid (other than a tax or other
governmental charge imposed by the Issuer) with respect to such registration of transfer, but no
other charge shall be made for registering the transfer.
Neither the members of the City Commission nor any Person executing this Note shall
be liable personally hereon or be subject to any personal liability or accountability by reason of
the issuance hereof.
The Issuer has entered into certain additional covenants with the Owner of this Note, for
the terms of which reference is made to the Loan Agreement.
It is hereby certified and recited that all acts, conditions, and things required by the Act
to be performed, to exist and to happen precedent to and in connection with the issuance of this
Note, have been performed, exist and have happened in regular and due form and time as so
required.
[Remainder of page intentionally left blank]
#859942v2
C-5
IN WITNESS WHEREOF, the City of Dania Beach, a Florida municipal corporation, has
issued this Note and has caused the same to be signed by the Mayor and countersigned and
attested to by the City Clerk and approved as to form and legal sufficiency by the City Attorney
and its seal to be affixed, impressed, imprinted, lithographed, or reproduced hereon, all as of
the 14th day of July, 2025.
CITY OF DANIA BEACH, FLORIDA
(SEAL)
By:
Name: Joyce L. Davis
Title: Mayor
ATTESTED BY:
By:
Name: Elora Riera, MMC
Title: City Clerk
APPROVED AS TO FORM AND CORRECTNESS:
By:
Name: Eve A. Boutsis
Title: City Attorney
#859942v2
C-6
CERTIFICATE OF AUTHENTICATION
Dated: July ___, 2025
This is the Note described in the within defined Loan Agreement and this Note is hereby
duly authenticated and registered.
CITY OF DANIA BEACH, FLORIDA
By:
Name: Elora Riera
Title: City Clerk
#859942v2
C-7
ASSIGNMENT
FOR VALUE RECEIVED, the undersigned sells, assigns, and transfers unto
_______________________________________________________________________________________.
[Insert Name, Address, Social Security or Other Identifying Number of Assignee]
the within note and does hereby irrevocably constitute and appoint ____________________ as
attorneys to register the transfer of the said note on the books kept for registration thereof with
full power of substitution in the premises.
Dated: _________________________
Signature Guaranteed:
NOTICE: Signature(s) must be
guaranteed by a member firm of the New
York Stock Exchange or a commercial bank or
trust company.
NOTICE: The signature to this assignment
must correspond with the name of the Owner
as it appears upon the face of the within note in
every particular, without alteration or
enlargement or any change whatever and the
Social Security or other identifying number of
such assignee must be supplied.
The following abbreviations, when used in the inscription on the face of the within note,
shall be construed as though they were written out in full according to applicable laws or
regulations:
TEN COM -- as tenants in common
TEN ENT -- as tenants by the entireties
JT TEN -- as joint tenants with right of survivorship and not as tenants in common
UNIF TRANS MIN ACT -- ________________________________________________
(Cust.)
Custodian for
under Uniform Transfer to Minors Act of _____________________________________
(State)
Additional abbreviations may also be used though not in the list above.
#859942v2
C-8
SCHEDULE I
PRINCIPAL INSTALLMENT SCHEDULE
Payment Date Principal
10/1/2026 $257,365
10/1/2027 267,840
10/1/2028 278,741
10/1/2029 290,085
10/1/2030 301,892
10/1/2031 314,179
10/1/2032 326,966
10/1/2033 340,274
10/1/2034 354,123
10/1/2035 368,535
$3,100,000
City of Dania Beach
Public Services Memorandum
DATE: 7/8/2025
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Fernando J. Rodiguez, Public Services Director
Sean Schutten, Public Services Deputy Director
SUBJECT: APPROVAL OF THE WGI , INC. (WGI) PROPOSAL FOR STRUCTURAL
EVALUATION, DESIGN AND CONSTRUCTION SERVICES FOR THE
DANIA BEACH PIER
Request:
The Public Services Department (PSD) requests approval for a proposal from WGI professional
engineering and construction services required for the Dania Beach Pier’s undercarriage
structure’s assessment and repair in the amount of $211,000.
Background:
During a recent refurbishing of the entire pier’s surface deck, railings, and lighting, concrete
deterioration along the undercarriage concrete structure was identified. To properly address this
situation, the services of an experienced engineering firm who has previously worked with PSD
on the pier were sought. WGI worked with PSD to develop a comprehensive engineering and
construction services proposal that will entail the following key components:
Pier, bait shop, and Quarterdeck Restaurant structural assessment above and below the water
line.
Construction documents preparation for the structural repairs.
Wetland permitting (includes Broward County and Florida Department of Environmental
Projection coastal construction permitting).
Bid assistance
Construction Phase Services to include meeting attendance, shop drawings, plans interpretation,
specifications, RFI assistance, and field progress observations.
Contingency services for both pile repair permitting and installation of an additional structural
member for pier deck board replacements.
Upon completion and review of the construction documents, PSD with work with the
Procurement Division and WGI to complete the bid process for the work.
Budgetary Impact
Funding for this proposal will be appropriated from the “Prof. Services General” Account No.
415-72-15-572-31-10 in the amount of $211,000. Upon approval of this request, a budget
transfer will be processed from the Pier Operation “Infrastructure Improvements other than
Bldgs.” Account No. 415-72-15-572-63-10 into the Pier Operation “Prof. Services General”
Account No. 415-72-15-572-31-10.
Recommendation
PSD recommends approval of the attached proposal from WGI, Inc.
RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO
AUTHORIZE PROFESSIONAL ENGINEERING DESIGN AND
CONSTRUCTION SERVICES PROVIDED BY WGI, INC., FOR THE DANIA
BEACH PIER STRUCTURAL EVALUATION, ENGINEERING DESIGN AND
CONSTRUCTION PHASE SERVICES IN THE AMOUNT OF TWO HUNDRED
ELEVEN THOUSAND DOLLARS ($211,000.00); PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, during the recent completion of the Dania Beach Pier’s surface deck and
railing refurbishing, deterioration in sections of the concrete undercarriage was identified; and
WHEREAS, the Public Services Department (PSD) sought a proposal from WGI, Inc., an
experienced structural engineering firm that has previously worked on the pier; and
WHEREAS, with input from PSD staff, WGI provided a comprehensive proposal for
engineering design and construction services that will provide a thorough structural condition
assessment, provide design drawings, specifications and bid documents, as well as bidding
assistance and construction services; and
WHEREAS, the City has an existing Continuing Services Agreement for Professional
Engineering Services through RFQ 20-005 with WGI, Inc. and finds them qualified to perform the
required services; and
WHEREAS, the Public Services Department recommends approval of WGI’s proposal,
which proposal is attached as Exhibit “A” and incorporated into this Resolution by this reference.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1.That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2.That the City Commission authorizes the proper City officials to proceed
with WGI for design and construction services for the Dania Beach pier’s undercarriage structure’s
assessment and repair.
2 RESOLUTION #2025-______
Section 3.That funding for professional engineering and design services in the amount
of Two Hundred Eleven Thousand Dollars ($211,000) will be appropriated from the “Prof.
Services General” Account No. 415-72-15-572-31-10. Upon approval of this request, a budget
transfer will be processed from the Pier Operation “Infrastructure Improvements other than Bldgs.”
Account No. 415-72-15-572-63-10 into the Pier Operation “Prof. Services General” Account No.
415-72-15-572-31-10.
Section 4.That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 5.That this Resolution shall be effective 10 days after passage.
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
City of Dania Beach
Public Services Memorandum
DATE: 7/8/2025
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Fernando J. Rodriguez, Public Services Director
Sean Schutten, Deputy Public Services Director
SUBJECT: AUTHORIZATION TO ENTER TO AN AGREEMENT WITH U.S. WATER
SERVICE CORPORATION DBA ROCHA CONTROLS CORPORATION
FOR “CALIBRATIONS AND REPAIRS OF FLOW METERS AND
RELATED DEVICES”
Request:
The Public Services Department (PSD) is requesting the City Commission's approval to enter
into an agreement with U.S. Service Corporation DBA Rocha Controls Corporation (RCC) for
“Calibrations and Repairs of Flow Meters and Related Devices” and to authorize exceeding the
single vendor annual expenditure of $50,000 for the term of the contract period.
Background:
On June 24, 2025 the City Commission awarded Invitation to Bid (ITB) No. 25-013
“Calibrations and Repairs of Flow Meters and Related Devices” to U.S. Water Services
Corporation DBA Rocha Controls via Resolution 2025-093. This important service is required
year-round by the water treatment plant, and includes flow meter calibrations, repairs for
electronic controls for gravity filters, wiring high service pumps, lime softening feed systems, lift
station panels and more. At this time PSD will need to work with the City’s procurement staff
and RCC to enter into an agreement for these services.
Budgetary Impact
The projected cost for the coming year is $75,000. Funding for this contract will be appropriated
from the Water Plant “Repair & Maint. Services Equipment” Account No. 401-33-03-533-46-10
in the amount $50,000, and the Sewer “Repair & Maint. Services Utilities” Account No. 402-35-
02-535-46-70, in the amount of $25,000.
Recommendation
PSD recommends approval to enter into an agreement with U.S. Water Services Corporation
DBA Rocha Controls for “Calibrations and Repairs of Flow Meters and Related Devices” and to
authorize exceeding the annual single-vendor $50,000 expenditure threshold.
RESOLUTION NO. 2025-XXX
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE EXECUTION OF AN AGREEMENT
WITH U.S. WATER SERVICES CORPORATION D/B/A ROCHA CONTROLS,
FOR CALIBRATIONS AND REPAIRS OF FLOW METERS AND RELATED
DEVICES; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN
EFFECTIVE DATE.
WHEREAS, the water treatment plant and water distribution departments have various
electrical controls and components that are relied upon to keep daily operation running
smoothly. Services performed to these include flow meter calibrations, repairs for electronic
controls for gravity filters, wiring high service pumps, lime softening feed systems, lift station
panels and more. All these functions are crucial components to ensure operations for both the
water plant and distribution lift stations avoid any problems; and
WHEREAS, the City Commission of the City of Dania Beach approved Resolution
2021-003, authorizing the Public Services Department (PSD) to issue ITB No. 25-013 for the
“Calibrations and Repairs of Flow Meters and Related Devices”; and
WHEREAS, on May 20, 2025, the City received two (2) responses to ITB No. 25-013
“Calibrations and Repairs of Flow Meters and Related Devices”, shown below:
1) U.S. Water Services Corporation DBA Rocha Controls.
2) Universal Controls Instrument Services; and
WHEREAS, on June 24, 2025, the City Commission adopted Resolution No. 2025-093,
authorizing the award of ITB No. 25-013 to U.S. Water Services Corporation DBA Rocha
Controls;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF
THE CITY OF DANIA BEACH, FLORIDA:
Section 1.That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2.That the City Commission authorizes the proper City officials to execute
an agreement, which Agreement is attached as Exhibit “A” and incorporated into this
Resolution by this reference, with U.S. Water Services Corporation DBA Rocha Controls for
“Calibrations and Repairs of Flow Meters and Related Devices.
2 RESOLUTION #2025
Section 3.That funding will be appropriated from the Water Fund/Repair and
Maintenance Services Equipment Account Number 401-33-03-533-46-10 and 402-35-02-535-
46-70 for a total combined amount of Seventy-Five Thousand Dollars ($75,000.00).
Section 4.That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 5.That this Resolution shall be effective 10 days after passage.
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Archibald J. Ryan IV ____ ____
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
1
AGREEMENT THIS IS AN AGREEMENT (the “Agreement”) entered into on ______________, 2025,
between the CITY of Dania Beach, Florida, a Florida municipal corporation, (the “CITY”) with an address of 100 West Dania Beach Boulevard, Dania Beach, Florida 33004, and U.S. Water Services Corporation D/B/A Rocha Controls, (“Contractor”) a Florida Corporation with a mailing address 5025 W Rio Vista Avenue, Tampa, Florida 33634, for services related to Invitation to Bid (“ITB”) No. 25-013, entitled, “Calibrations and Repairs of Flow Meters and Related Devices”.
W I T N E S S E T H: In consideration of the mutual covenants, terms and conditions contained in this Agreement, and for other good and valuable consideration, the adequacy and receipt of which are
acknowledged, the parties agree as follows: ARTICLE 1 PREAMBLE
In order to establish the background, context and form of reference for this Agreement and to generally express the objectives, and intentions of the respective parties herein, the following statements, representations and explanations shall be accepted as predicates for the undertakings and
commitments included within the provisions which follow and may be relied upon by the parties as
essential elements of the mutual considerations upon which this Agreement is based. 1.1 On April 29, 2025, the CITY advertised its notice to bidders of the CITY's desire to hire a CONTRACTOR to provide calibration and service of all types and models of flow meters as more
particularly described ITB No. 25-013 “Calibrations and Repairs of Flow Meters and Related
Devices” 25-013, attached hereto and incorporated as Exhibit "A" 1.2 On May 20, 2025, the bids were opened at Dania Beach CITY Hall, 100 Dania Beach Boulevard, Northwest Conference Room.
1.3 On June 24, 2025, the CITY awarded the bid to Contractor and authorized CITY officials to execute a contract consistent with the terms and conditions set forth herein. ARTICLE 2
SERVICES AND RESPONSIBILITIES
2.1 Contractor hereby agrees to provide the services which include but are not limited to repair,
modification, maintenance and/or replacement of related instrumentation and/or calibration and
certification of flow meters and related devices within the CITY’s Water Treatment Plant, Well Fields
and Field Operation’s distribution and wastewater transmission systems. All these functions are
crucial components to ensure operations for both the water plant and distribution lift stations. The
2
scope of services as more particularly described in Exhibit "A" and Contractor's response thereto,
attached hereto and made a part hereof as Exhibit "B". Contractor agrees to do everything required
by this Agreement, the Sealed Bid Package, Addenda to this Agreement, and Commission award
complete with proposal form. In the event of any conflicts between this Agreement, Exhibit A and
Exhibit B, this Agreement shall prevail, followed by Exhibit A.
2.2 Contractor shall furnish all services, labor, equipment, and materials necessary and as may be
required in the performance of this Agreement, except as otherwise specifically provided for herein, and all work performed under this Agreement shall be done in a professional manner. 2.3 Contractor hereby represents to CITY, with full knowledge that CITY is relying upon these
representations when entering into this Agreement with Contractor, that Contractor has the
professional expertise, experience and manpower to perform the services to be provided by Contractor pursuant to the terms of this Agreement. 2.4 Contractor assumes professional and technical responsibility for the performance of its
services to be provided hereunder in accordance with recognized professional standards of good
engineering practices. If within one year following completion of its services, such services fail to meet the aforesaid standards, and the CITY promptly advises the Contractor thereof in writing, Contractor shall re-perform such deficient services without charge to the CITY.
2.5 Contractor shall not utilize the services of any sub-Contractor without the prior written
approval of CITY. ARTICLE 3 TERM AND TERMINATION
3.1 The term of this Agreement shall be for two (2) years, commencing on the date the Agreement is signed by all parties. This Agreement may be renewed for up to three (3) additional one (1) year terms, subject to the written consent and agreement between the Parties.
3.2 Termination of Agreement for Convenience. It is expressly understood and agreed that the
CITY may terminate this Agreement at any time for any reason or no reason at all by giving the Contractor notice by certified mail, return receipt requested, directed to the principal office of the Contractor, thirty (30) days in advance of the termination date. In the event that the Agreement is terminated pursuant to this provision, the Contractor shall be entitled to be compensated for the
services rendered from the effective date of execution of the Agreement up to the date of receipt
of Notice of termination. Such compensation shall be based on the percentage of work completed, as fairly and reasonably determined by CITY after conferring with Contractor. 3.3 Termination of Agreement for Cause. If CITY elects to terminate the Agreement for cause,
CITY will provide Contractor with twenty (20) days’ advance written notice to the Contractor. If
Contractor promptly cures the matter giving rise to the cause within that time, this Agreement shall continue. If not timely cured, the Agreement will stand terminated and the CITY will pay Contractor for work completed less any costs, expenses and damages incurred by CITY as a result
3
of such termination. If a court of competent jurisdiction determines that the termination was not authorized under the circumstances then the termination shall be deemed to be a termination for
convenience.
ARTICLE 4 COMPENSATION AND METHOD OF PAYMENT
Payment for Services. CITY agrees to pay Contractor a fee or fees as determined based upon the scope of work identified by the CITY to provide services related to the specified project. There will be a not-to-exceed amount of Seventy-Five Thousand Dollars ($75,000.00) per year for the term of this Agreement. No travel and meal costs will be reimbursable. Prior to seeking any
services outside of Contractor’s scope and pricing as identified in Exhibits “A” and “B”, as “Costs
not included with proposal”, Contractor shall adhere to the foregoing: 4.1. Any necessary additional work, as determined by CITY, which is not covered by the scope of service, shall not be undertaken without a written amendment to authorize the Work
Order executed by both parties in advance of any new or additional work.
4.2. Contractor shall submit its invoices in the format and with supporting documentation as may be required by the CITY.
4.3. The CITY shall pay Contractor monthly for services rendered within thirty (30)
calendar days from date of approval of each of Contractor’s invoices by the CITY Manager. If any errors or omissions are discovered in any invoice, CITY will inform the Contractor and request revised copies of all such documents. If any disagreement arises as to payment of any portion of an invoice, CITY agrees to pay all undisputed portions, and the parties agree to cooperate by
promptly conferring to resolve the disputed portion.
4.4. Any invoice which is not timely paid as prescribed above will be subject to the accrual of interest at the statutory rate prescribed by applicable Florida law.
ARTICLE 5 CHANGES TO SCOPE OF WORK AND ADDITIONAL WORK 5.1 CITY or Contractor may request changes that would increase, decrease, or otherwise modify the Scope of Services, as described in Exhibit "A," to be provided under this Agreement as described
in Article 2 of this Agreement. Such changes or additional services must be in accordance with the
provisions of the Code of Ordinances of the CITY, and must be contained in a written amendment, executed by the parties hereto, with the same formality, equality and dignity herewith prior to any deviation from the terms of this Agreement, including the initiation of any additional or extra work.
5.2 In no event will the Contractor be compensated for any work which has not been described
in a separate written agreement executed by the parties hereto.
4
ARTICLE 6 INDEMNIFICATION
The Contractor shall, in addition to any other obligation, indemnify the CITY and to the fullest extent permitted by law, indemnify and hold harmless the CITY, including its elected officials, and employees from and against claims, actions, liabilities, losses (including economic losses), or costs arising out of any actual or alleged:
6.1 bodily injury, sickness, disease or death, or injury to or destruction of tangible property including the loss of use resulting from, or any other damage or loss arising out of or resulting or claimed to have resulted in whole or in part from any actual or alleged negligent act, error or omission of the Contractor or its subcontractors, anyone directly or indirectly employed
by any of them, or anyone for whose acts any of them may be liable in the performance of the
work; 6.2 violation of law, statute, ordinance, governmental administrative order, rule, regulation, or infringement of patent, copyright or trademark rights by Contractor or its
subcontractors in the performance of the work;
6.3 liens, claims, actions made by the Contractor or its subcontractors or other party performing the work;
6.4 claims related to collection practices or any actions of a contradictory nature
pursuant to Contract or in an attempt to collect monies due or claimed to be due to the CITY. 6.5 The parties recognize that various provisions of this Agreement, including but not
necessarily limited to this Section, provide for indemnification by the Contractor and that Florida
Statutes §725.06 requires a specific consideration be given therefor. The parties therefore agree that the sum of Ten Dollars and 00/100 ($10.00), receipt of which is hereby acknowledged, is the specific consideration for such indemnities, and the providing of such indemnities is deemed to be part of the specifications with respect to the services to be provided by Contractor. Furthermore, the parties
understand and agree that the covenants and representations relating to this indemnification provision
shall serve the term of this Agreement and continue in full force and effect as to the party's responsibility to indemnify. ARTICLE 7
INSURANCE
7.1 Insurance Required Before Commencement of Work: The Contractor shall not commence Work under the Agreement until the Contractor has obtained all insurance required under this Section, and not until such time that the coverages are approved by the Risk Manager
of the CITY. The Contractor shall not allow any employee of Contractor or any Subcontractor to
commence Work on any subcontract until the Subcontractor and all Coverages required of any Subcontractor have been obtained and approved by the Risk Manager of the CITY. In addition, Contractor shall be responsible for any and all policy deductibles and self-insured retentions.
5
7.2 Insurance Requirements: Coverages shall be in force until all Work required to be
performed under the terms of the Agreement, including any applicable warranty period, is
satisfactorily completed as evidenced by the formal written acceptance by the CITY. In the event insurance certificates provided to CITY indicate that the insurance shall terminate and lapse during the period of the Agreement, including any applicable warranty period, then in that event, the Contractor shall furnish, at least thirty (30) days prior to the expiration of the date of such
insurance, a renewed Certificate of Insurance as proof that equal and like coverages for the balance
of the period of the Agreement, including any extension of it, and including any applicable warranty period, is in effect. THE CONTRACTOR AND ANY SUBCONTRACTOR SHALL NOT PERFORM OR CONTINUE WORK PURSUANT TO THE AGREEMENT, UNLESS ALL COVERAGES REMAIN IN FULL FORCE AND EFFECT. ANY DELAY IN THE
WORK CAUSED BY A LAPSE IN COVERAGE SHALL BE NON-EXCUSABLE, SHALL NOT BE GROUNDS FOR A TIME EXTENSION, AND WILL BE SUBJECT TO ANY OTHER APPLICABLE PROVISIONS DESCRIBED IN THE AGREEMENT OR ELSEWHERE IN THE BID DOCUMENTS CONCERNING CONTRACTOR DELAY.
7.3 Required Minimum Coverages: The below coverages are minimum limit
requirements. Umbrella or Excess Liability policies are acceptable to provide the total required liability limits, as long as the Risk Manager of the CITY reviews and approves in writing the insurance limits on each of the policies. The CITY must approve any changes to these specifications and has the right to review and amend coverage requirements. The Contractor shall
be held responsible for any modifications, deviations, or omissions in these insurance
requirements. Contractor shall be responsible for any deductible amounts. 7.4 GENERAL LIABILITY INSURANCE is to include bodily injury, broad form property damage, products/completed operations, blanket contractual liability, and personal/advertising
injury with limits of no less than One Million Dollars ($1,000,000.00) per occurrence, and Two
Million Dollars ($2,000,000.00) annual aggregate. 7.5 SPECIAL PROVISIONS AS TO GENERAL LIABILITY INSURANCE (to be confirmed on or attached to the Official Certificate of Insurance):
a. Annual Aggregate shall apply “Per Job”; b. “The City of Dania Beach, Florida” is added as a named “Additional Insured”; c. Additional Insured status is included for Products completed operations coverage for a period of no less than five (5) years following the completion of the Work or
Project;
d. Additional insured coverage shall be no more restrictive than Insurance Services Office (ISO) form CG 2037 (07 04); e. Contractor’s insurance shall be primary and non-contributory; f. Waiver of Subrogation in favor of the CITY;
g. 30 Days’ Notice of Cancellation or modification to CITY (if not available on the
insurance policies, then Contractor has responsibility for notification); and h. Copy of Additional Insured Endorsement or other endorsements may be attached to the Certificate.
6
7.6 WORKERS’ COMPENSATION INSURANCE must be provided for all persons
fulfilling this agreement whether employed, contracted, temporary, or subcontracted for the life of
the agreement, including any applicable warranty period(s), and it is to apply to all “statutory employees” of Contractor (as that phrase is defined by Chapter 440, Florida Statutes), in compliance with the “Workers’ Compensation Law" of the State of Florida and all applicable federal laws, for the benefit of the Contractor, its employees, and Subcontractors.
7.7 In the case any work is sublet as otherwise addressed in the Agreement or Bid Documents, the Contractor shall require any Subcontractors similarly to provide Workers’ Compensation Insurance for all of the latter’s employees, in addition to any coverage afforded by the Contractor, by furnishing Statutory Limits Part A, and no less than One Million Dollars ($1,000,000.00)
Employers’ Liability Limits Part B.
7.8 IN NO EVENT SHALL THE CONTRACTOR BE PERMITTED TO UTILIZE IN THE PROSECUTION OF THE WORK, THE FOLLOWING:
A) ANY EMPLOYEE, SUBCONTRACTOR OR SUBCONTRACTOR EMPLOYEE WHO IS EXEMPTED OR PURPORTED TO BE EXEMPT FROM WORKERS’ COMPENSATION INSURANCE COVERAGE; OR
B) ANY EMPLOYEE, SUBCONTRACTOR OR SUBCONTRACTOR EMPLOYEES WHO WILL BE COVERED BY AN EMPLOYEE
LEASING ARRANGEMENT. 7.9 SPECIAL PROVISIONS AS TO WORKERS’ COMPENSATION INSURANCE (to be confirmed on or attached to the Official Certificate of Insurance) :
A) 30 Days’ Notice of Cancellation or Modification to CITY (if not available on
the insurance policies, then Contractor has responsibility for notification); and
B) Waiver of Subrogation. 7.10 AUTOMOBILE LIABILITY INSURANCE shall be maintained with combined single
limits of no less than One Million Dollars ($1,000,000.00), to include coverage for owned, hired,
and non-owned vehicles. 7.11 SPECIAL PROVISIONS AS TO AUTOMOBILE LIABILITY INSURANCE (to be confirmed on or attached to the Official Certificate of Insurance):
a) “The City of Dania Beach” is added as a named “Additional Insured”;
b) 30 Days’ Notice of Cancellation or modification to CITY (if not available on the insurance policies, then Contractor has responsibility for notification); and
c) Waiver of Subrogation.
7.12 Proof of Insurance: The following are requirements that must be met regarding the
Bidder’s delivery of Certificates of Insurance for all coverages required in the Agreement and Bid Documents:
7
7.12.1 “Official” Certificates of Insurance must be delivered to the CITY Clerk’s office and Risk Manager of the CITY. If the “Official” certificates are not delivered before or on the
fourteenth (14th) Business Day after the issuance by the CITY of the “Notice of Intent to Award”,
then the CITY has the right to consider the awarded Agreement to the successful Bidder as void and to negotiate a contract with the next lowest responsive and responsible Bidder. “Special Provisions”, as referenced below under each type of insurance requirement shall be fully confirmed on or attached to the “Official” certificates.
7.12.2 All Certificates of Insurance must clearly identify the contract to which they pertain, including a brief description of the subject matter of the contract. The certificates shall contain a provision that coverage afforded under the policies will not be canceled until at least thirty (30) days’ prior written notice has been given to CITY. If this coverage is not provided,
then Contractor is responsible for such notice to CITY. Insurance policies for required coverages
shall be issued by companies authorized to do business under the laws of the State of Florida and any such companies’ financial ratings must be no less than A-VII in the latest edition of the “BEST’S KEY RATING GUIDE”, published by A.M. Best Guide. In the event that the insurance carrier’s rating shall drop, the insurance carrier shall immediately notify the CITY in writing.
ARTICLE 8 INDEPENDENT CONTRACTOR 8.1 This Agreement does not create an employee/employer relationship between the
parties. It is the intent of the parties that the Contractor is an independent Contractor under this
Agreement and not the CITY's employee for all purposes, including but not limited to, the application of the Fair Labor Standards Act minimum wage and overtime payments, Federal Insurance Contribution Act, the Social Security Act, the Federal Unemployment Tax Act, the provisions of the Internal Revenue Code, the State Workers' Compensation Act, and the State unemployment insurance
law. The Contractor shall retain sole and absolute discretion in the judgment of the manner and means
of carrying out Contractor's activities and responsibilities hereunder provided, further that administrative procedures applicable to services rendered under this Agreement shall be those of Contractor, which policies of Contractor shall not conflict with CITY, State, H.U.D., or United States policies, rules or regulations relating to the use of Contractor's Funds provided for herein. The
Contractor agrees that it is a separate and independent enterprise from the CITY, that it has full
opportunity to find other business, that it has made its own investment in its business, and that it will utilize a high level of skill necessary to perform the work. This Agreement shall not be construed as creating any joint employment relationship between the Contractor and the CITY and the CITY will not be liable for any obligation incurred by Contractor, including but not limited to unpaid minimum
wages and/or overtime premiums.
ARTICLE 9 GOVERNING LAW, VENUE, FEES
9.1 This Agreement shall be governed by the laws of the State of Florida as now and
hereafter in force. The venue for actions arising out of this agreement shall be in Broward County, Florida.
8
9.2 All claims, counterclaims, disputes and other matters in question between CITY and Contractor arising out of, relating to or pertaining to this Agreement, or the breach of it, or the
services of it, or the standard of performance required in it, shall be addressed by resort to non-
binding mediation as authorized under the laws and rules of Florida; provided, however, that in the event of any dispute between the parties, the parties agree to first negotiate with each other for a resolution of the matter or matters in dispute and, upon failure of such negotiations to resolve the dispute, the parties shall resort to mediation.
9.3 If mediation is unsuccessful, any such matter may be determined by litigation in a court of competent jurisdiction for any legal action arising out of or pertaining to this Agreement shall be the Circuit Court for the Seventeenth Judicial Circuit in and for Broward County, Florida, or the federal District Court in the Southern District of the United States. Each party further agrees
that venue of any action to enforce this Agreement shall be in Broward County, Florida. In any
litigation, the parties agree to each waive any trial by jury of any and all issues. In the event of any litigation which arises out of, pertains to, or relates to this Agreement, or the breach of it, or the standard of performance required in it, the prevailing party shall be entitled to recover reasonable attorney fees from the non-prevailing party.
9.4 Operations During Dispute. In the event that a dispute, if any, arises between the CITY and the Contractor relating to this Agreement, or its performance or compensation, the Contractor agrees to continue to render service in full compliance with all terms and conditions of this Agreement as required by the CITY.
ARTICLE 10 PUBLIC RECORDS 10.1 Contractor shall maintain books, records, documents and other evidence directly
pertinent to performance of work under this Agreement in accordance with generally accepted
accounting principles and practices. The Contractor shall also maintain the financial information and data used by the Contractor in the preparation of support of any claim for reimbursement for any out-of-pocket expense or cost. The CITY shall have access to such books, records, documents and other evidence for inspection, audit and copying during normal business hours. The
Contractor will provide proper facilities for such access and inspection. Audits conducted under
this section shall observe generally accepted auditing standards and established procedures and guidelines of the CITY. The Florida Public Records Act, Chapter 119 of the Florida Statutes, may have application to records or documents pertaining to this Agreement and Contractor acknowledges that such laws have possible application and agrees to comply with all such laws.
10.2 Upon request from the CITY custodian of public records, Contractor shall provide the CITY with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided by Chapter 119, Florida Statutes, or as otherwise provided by law.
10.3 Unless otherwise provided by law, any and all records, including but not limited to reports, surveys, and other data and documents provided or created in connection with this Agreement are and shall remain the property of the CITY.
9
10.4 Upon completion of this Agreement or in the event of termination by either party,
any and all public records relating to the Agreement in the possession of the Contractor shall be
delivered by the Contractor to the City Manager, at no cost to the CITY, within seven (7) days. All such records stored electronically by Contractor shall be delivered to the CITY in a format that is compatible with the CITY’s information technology systems. Once the public records have been delivered upon completion or termination of this Agreement, the Contractor shall destroy any
and all duplicate public records that are exempt or confidential and exempt from public records
disclosure requirements. 10.5 Any compensation due to Contractor shall be withheld until all records are received as provided in this Agreement.
10.6 Contractor’s failure or refusal to comply with the provisions of this section shall result in the immediate termination of this Agreement by the CITY. Section 119.0701(2)(a), Florida Statutes IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS. Custodian of Records: ELORA RIERA, CITY CLERK Mailing Address: 100 W. Dania Beach Boulevard Dania Beach, Florida 33004
Telephone number: 954-924-9800, Ext. 3623 Email: eriera@daniabeachfl.gov ARTICLE 11 NOTICES
11. Notices. Except as provided above, whenever either party desires to give notice to the other, it must be given by written notice, sent by certified U.S. mail, with return receipt requested, addressed to the party for whom it is intended, at the place last specified and the place for giving of notice in compliance with the provisions of this paragraph. For the present, the parties designate the following as the respective persons and places for giving of notice:
10
CITY: Ana M. Garcia, ICMA-CM, CITY Manager CITY of Dania Beach, Florida
100 West Dania Beach Boulevard
Dania Beach, Florida 33004 With a copy to: Eve A. Boutsis, CITY Attorney CITY of Dania Beach
100 West Dania Beach Boulevard
Dania Beach, Florida 33004 Contractor: Frank Kalan, Vice President Rocha Controls, a U.S. Water Services Company
5025 W Rio Vista Avenue
Tampa, Florida 33634
ARTICLE 12 SCRUTINIZED COMPANIES -- 287.135 AND 215.473 The Contractor certifies that it and any of its affiliates are not scrutinized companies as identified in Section 287.135, F.S. In addition, Contractor agrees to observe the requirements of Section 287.135,
F.S., for applicable sub-agreements entered into for the performance of work under this Agreement.
Pursuant to Section 287.135, F.S., the CITY may immediately terminate this Agreement for cause if the Contractor, its affiliates, or its subcontractors are found to have submitted a false certification; or if the Contractor, its affiliates, or its subcontractors are placed on any applicable scrutinized companies list or engaged in prohibited contracting activity during the term of the Agreement. As
provided in Subsection 287.135(8), F.S., if federal law ceases to authorize these contracting
prohibitions, then they shall become inoperative. ARTICLE 13 E-VERIFY
A. Registration Requirement; Termination. Pursuant to Section 448.095, Florida Statutes, effective January 1, 2021, Contractors, shall register with and use the E-verify system in order to verify the work authorization status of all newly hired employees. Contractor shall register for and utilize the U.S. Department of Homeland Security’s E-Verify System to verify the employment
eligibility of:
(i) All persons employed by a Contractor to perform employment duties within Florida during the term of the contract; and
(ii) All persons (including sub vendors/consultants/subcontractors) assigned by Contractor to
perform work pursuant to the contract with the City of Dania Beach. The Contractor acknowledges
and agrees that registration and use of the U.S. Department of Homeland Security’s E-Verify System during the term of the contract is a condition of the contract with the City of Dania Beach; and
11
(iii) The Contractor shall comply with the provisions of Section 448.095, Fla. Stat., "Employment Eligibility," as amended from time to time. This includes but is not limited to
registration and utilization of the E-Verify System to verify the work authorization status of all
newly hired employees. Contractor shall also require all subcontractors to provide an affidavit attesting that the subcontractor does not employ, contract with, or subcontract with, an unauthorized alien. The Contractor shall maintain a copy of such affidavit for the duration of the contract. Failure to comply will lead to termination of this Contract, or if a subcontractor
knowingly violates the statute, the subcontract must be terminated immediately. Any challenge to
termination under this provision must be filed in the Circuit Court no later than twenty (20) calendar days after the date of termination. Termination of this Contract under this Section is not a breach of contract and may not be considered as such. If this contract is terminated for a violation of the statute by the Contractor, the Contractor may not be awarded a public contract for a period
of one (1) year after the date of termination.
ARTICLE 14 SOVEREIGN IMMUNITY
14.1 Contractor acknowledges that the Florida Doctrine on Sovereign Immunity bars all claims by Contractor against the CITY other than claims arising out of this Agreement. Specifically, the Contractor acknowledges that it cannot and will not assert any claims against the CITY, unless the claim is based upon a breach by the CITY of this Agreement. Further, the
Contractor recognizes the CITY is a sovereign with regulatory authority that it exercises for the
health, safety, and welfare of the public. This Agreement in no way estops or affects the CITY' s exercise of that regulatory authority. In addition, the CITY retains the full extent of its sovereign immunity in relation to the exercise of its regulatory authority. The Contractor acknowledges that it has no right and will not make claim based upon any of the following:
a. Claims based upon any alleged breach by the CITY of implied warranties or representations not specifically set forth in this Agreement, as the parties stipulate that there are no such implied warranties or representations of the CITY. All obligations of the CITY are only as set forth in this Agreement;
b. Claims based upon negligence or any tort arising out of this Agreement; c. Claims upon alleged acts or inaction by the CITY, its commissioners, attorneys, administrators, Consultants, agents, or any Contractor employee; and
d. Claims based upon an alleged waiver of any of the terms of this Agreement unless such waiver is in writing and signed by an authorized representative for the Contractor and the CITY.
12
ARTICLE 15 MISCELLANEOUS
15.1 Ownership of Documents. Reports, surveys, plans, studies and other data provided in connection with this Agreement are and shall remain the property of CITY whether or not the project for which they are made is completed. CITY hereby agrees to use Contractor’s work product for its intended purposes.
15.2 Records. The Contractor shall maintain accurate and complete financial records of its activities and operations relating to this Agreement in accordance with generally accepted accounting principles. Contractor shall maintain adequate records to justify all charges and costs incurred in performing the services for at least three (3) years after completion of this Agreement.
Contractor agrees that Contractor, or its authorized representatives, shall have access to and the
right to examine, audit, excerpt, copy or transcribe any pertinent transaction, activity, or records relating to this Agreement during normal business hours. 15.3 Assignments; Amendments. This Agreement, and any interests herein, shall not be
assigned, transferred or otherwise encumbered, under any circumstances, by Contractor without the
prior written consent of CITY. For purposes of this Agreement, any change of ownership of Contractor shall constitute an assignment which requires CITY approval. However, this Agreement shall run to the benefit of CITY and its successors and assigns.
It is further agreed that no modification, amendment, or alteration in the terms or conditions
contained herein shall be effective unless contained in a written document executed with the same formality and of equal dignity herewith. 15.4 No Contingent Fees. Contractor warrants that it has not employed or retained any
company or person, other than a bona fide employee working solely for Contractor to solicit or secure
this Agreement, and that it has not paid or agreed to pay any person, company, corporation, individual or firm, other than a bona fide employee working solely for Contractor any fee, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of this Agreement. For the breach or violation of this provision, CITY shall have the right to terminate the
Agreement without liability at its discretion, to deduct from the contract price, or otherwise recover
the full amount of such fee, commission, percentage, gift or consideration. 15.6 Binding Authority. Each person signing this Agreement on behalf of either party individually warrants that he or she has full legal power to execute this Agreement on behalf of the
party for whom he or she is signing, and to bind and obligate such party with respect to all provisions
contained in this Agreement. 15.7 Headings. Headings herein are for convenience of reference only and shall not be considered in any interpretation of this Agreement.
15.8 Exhibits. Each Exhibit referred to in this Agreement forms an essential part of this Agreement. The exhibits if not physically attached should be treated as part of this Agreement and are incorporated herein by reference.
13
15.9 Severability. If any provision of this Agreement or application thereof to any person or situation shall to any extent, be held invalid or unenforceable, the remainder of this Agreement,
and the application of such provisions to persons or situations other than those as to which it shall
have been held invalid or unenforceable shall not be affected thereby, and shall continue in full force and effect, and be enforced to the fullest extent permitted by law. 15.10 Extent of Agreement. This Agreement represents the entire and integrated agreement
between the CITY and the Contractor and supersedes all prior negotiations, representations or
agreements, either written or oral. 15.11 Legal Representation. It is acknowledged that each party was represented by counsel in the preparation of and contributed equally to the terms and conditions of this Agreement
and, accordingly, the rule that a contract shall be interpreted strictly against the party preparing same
shall not apply herein due to the joint contributions of both parties. 15.12 Counterparts and Execution. This Agreement may be executed in multiple originals or counterparts, each of which shall be deemed to be an original and together shall constitute
one and the same agreement. Execution and delivery of this Agreement by the Parties shall be legally
binding, valid and effective upon delivery of the executed documents to the other party through facsimile transmission, email, or other electronic delivery. 15.13 Safety. The Contractor shall be responsible for initiating, maintaining and
supervising all safety precautions and programs in connection with the Project Work. The
Contractor shall comply with the rules and regulations of the Florida Department of Commerce regarding industrial safety (Florida Statutes, Section 440.56) and with the standards set forth in the federal Occupational Safety and Health Act of 1970 (OSHA), and its amendments.
The Contractor certifies that all materials and equipment to be supplied for the Project will
meet all federal and state requirements, including but not limited to, the Occupational Safety and Health Act (OSHA). `
15.14 Warranty. The Contractor shall warrant to the CITY that materials and
equipment furnished under the agreement will be of good quality and new and all work will be free from defects, and that the work will conform to the terms and conditions of the agreement. Work not conforming to those terms and conditions, including substitutions not properly approved and authorized may be considered defective. The Contractor's warranty may
exclude damage or defect caused by abuse, modifications not executed by the Contractor, improper
or insufficient CITY maintenance, improper operation, or normal wear and tear under normal usage. The Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. All manufacturers’ product warranties shall be registered in the CITY’s name and for its sole benefit.
14
IN WITNESS OF THE FOREGOING, the parties have set their hands and seals the day
and year first above written. CITY: ATTEST: CITY OF DANIA BEACH, FLORIDA
a Florida Municipal Corporation ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
ANA M. GARCIA, ICMA-CM
CITY MANAGER
Dated: _____________, 2025
APPROVED FOR FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
15
CONTRACTOR: U.S. Water Services Corporation DBA
Rocha Controls WITNESSES:
SIGNATURE SIGNATURE
PRINT Name PRINT Name
SIGNATURE Title PRINT Name
STATE OF FLORIDA
COUNTY OF ____________________________
The foregoing instrument was acknowledged before me by means of ☐ physical presence
or ☐ online notarization, on ______ , 20__, by ________________________,
as __________________________ of ______________________, a Florida ______________.
He/She is personally known to me or has produced ____________
as identification.
NOTARY PUBLIC My Commission Expires: State of Florida
1
CITY OF DANIA BEACH, FLORIDA
Calibrations and Repairs of Flow Meters and Related Devices
CITY INVITATION TO BID (“ITB”) NO. 25-013
Prepared by:
City of Dania Beach, Florida
100 W. Dania Beach Boulevard
Dania Beach, FL 33004
Tuesday, April 29, 2025
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
2
Table of Contents
1. NOTICE TO BIDDERS
2. GENERAL TERMS & CONDITIONS
3. SPECIAL CONDITIONS
4. SCOPE OF WORK
5. BID FORM
6. BIDDER SUBMISSIONS
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
3
1. NOTICE TO BIDDERS
CITY OF DANIA BEACH, FLORIDA
INVITATION TO BID FOR
"Calibrations and Repairs of Flow Meters and Related Devices"
25-013
NOTICE IS GIVEN that the City of Dania Beach, Florida (the “City” or “Owner”) will be accepting sealed
Bids for its “Calibrations and Repairs of Flow Meters and Related Devices, 25-013”.
Bids will be accepted on the City's e-Procurement Portal at
https://procurement.opengov.com/portal/daniabeachfl until Tuesday, May 20, 2025, at 10:00 am. Bids received
after this time will be rejected.
All submissions will remain confidential and exempt from public record disclosure requirements until the
response opening is conducted.
PROJECT DOCUMENTS
Documents may be obtained from
https://procurement.opengov.com/portal/daniabeachfl/projects/152866.
Bids must be submitted electronically on the City's e-Procurement Portal at
https://procurement.opengov.com/portal/daniabeachfl, the City’s designated electronic bidding system.
All bid prices shall be guaranteed firm for a minimum of one hundred twenty (120) calendar days after the
submission of the bid. No bidder may withdraw a bid within ninety (90) calendar days after the bid opening
date.
Pursuant to Florida law, all Bids are exempt public records until thirty (30) days after opening, or award of bid,
whichever is sooner. In the event presentations are necessary, all non-presenting bidders will be required to exit
the room during the presentations of each of the other bidders as portions of selection committee meetings at
which presentations are made are exempt from Florida’s public meeting laws.
Bids will be publicly opened and read aloud immediately after the submission deadline on the Bid due date
referenced above using RingCentral meeting software, in the presence of the City Clerk or designee on the
above stated date. Award of a contract will be made at a subsequent City Commission meeting
All bidders are advised that the City has not authorized the use of the City seal or logo by individuals or
entities responding to City bids. Bidders shall demonstrate successful performance of projects of a similar
magnitude, scope and value as this project.
The City Commission of the City of Dania Beach reserves the right to reject any and all bids, to waive any
informality in a bid and to make an award in the best interests of the City, as Owner.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
4
CITY OF DANIA BEACH, FLORIDA
Published on: Tuesday, April 29, 2025
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
5
2. GENERAL TERMS & CONDITIONS
2.1 NO BIDS OR PROPOSALS
If a Bidder or Offeror does not intend to bid or submit a proposal, please indicate the reason, such as insufficient
time to respond, do not offer product or service, unable to meet specifications, schedule would not permit, or
any other reason.
2.2 CAUSES FOR REJECTION OF A BID OR PROPOSAL
A. No bid or proposal will be considered or accepted that, in the opinion of the City, is informal or
unbalanced, or contains inadequate or unreasonable prices for any items; each item must carry its own
proportion of the cost as nearly as is practicable. However, the City shall be under no obligation to
investigate the correctness of any bid or proposal, and the Bidder or Offeror by signing the bid or
proposal shall be deemed to have verified that no errors appear in the bid or proposal as submitted. Any
alterations, erasures, interlineations or failures of a bid or proposal to contain all items called for in the
solicitation may result in rejection of the bid or proposal.
B. If any Bidder or Offeror violates any provision in the solicitation, such Bidder or Offeror may be
disqualified from performing the Project Work, or from furnishing the requested services for which the
bid or proposal was submitted, and the Bidder or Offeror may be further disqualified from bidding or
submitting proposals on any future bids or proposals for work, for goods, or for services for the City.
2.3 GENERAL CONDITIONS
A. Purpose: The purpose of the Invitation to Bid is to establish between the City and the Contractor an
agreement to perform the project work.
B. Documentation: Bidder shall submit in its bid the following:
1. Evidence that the Bidder is certified and licensed to perform the required services in the State of
Florida. The successful Bidder must be in compliance with all applicable laws and regulations.
2. A statement stating the number of years the Contractor has been a qualified provider of the requested
services; and
3. A complete Bidder’s Questionnaire: it is made a part of and is incorporated into the ITB by this
reference.
C. Bidder Expenses: Bidders are solely responsible for their own expenses in preparing and submitting
Bids, and for any meetings, negotiations or discussions with the City or its representatives and
consultants, relating to or arising from this ITB. The City and its representatives, agents, consultants and
advisors shall not be liable to any Bidder for any claims, whether for costs, expenses, losses or damages,
or loss of anticipated profits, or for any other matter whatsoever, incurred by any Bidder in preparing
and submitting a Bid, or participating in negotiations for a contract, or any other activity related to or
arising out of this ITB.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
6
D. No Contract: By submitting a Bid and participating in the process as outlined in this ITB, Bidders
expressly agree that no contract of any kind is formed under or arises from this ITB prior to the
complete signing by both parties of a formal written contract.
E. Conflict of Interest: Bidders shall disclose any potential conflicts of interest and existing business
relationships they may have with the City. If requested by the City, a Bidder should provide all pertinent
information regarding ownership of the entity within forty-eight (48) hours of the City’s request.
F. General Conditions: The agreement to be awarded will be subject to the provisions of the United States
Constitution, Florida laws, statutes and ordinances of the United States of America, the State of Florida,
Broward County and the City of Dania Beach.
2.4 SPECIAL CONDITIONS
A. Any and all Special Conditions contained in the solicitation that may be in variance or conflict with the
General Conditions shall have precedence over the General Conditions. If no changes or deletions to
General Conditions are made in the Special Conditions, then the General Conditions shall prevail in
their entirety.
B. The solicitation, Bidder Submissions, Specifications, Attachments, Addendum or Addenda, the legal
advertisement of the solicitation and any other pertinent documents form a part of the solicitation, and
ultimately, the agreement; all of the documents are made a part of and are incorporated into the
solicitation and the awarded agreement.
2.5 PUBLIC ENTITY CRIMES STATEMENT
A person or affiliate who, or which has been placed on the State of Florida convicted vendor list following a
conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a
public entity, may not submit a bid or proposal on a contract with a public entity for the construction or repair of
a public building or public work, may not submit bids or proposals on leases of real property to a public entity,
may not be awarded or perform work as a Contractor, supplier, subcontractor or consultant under an agreement
with any public entity, and may not transact business with any public entity in excess of the threshold amount
provided in Section 287.017 F. S. for CATEGORY TWO, which is $35,000.00, for a period of thirty-six (36)
months from the date of being placed on the convicted vendor list. A form to that effect, as mentioned above,
must be submitted by the Bidder or Offeror. A copy of the Sworn Statement on Public Entities Crimes can be
found in the attachments; a copy is made a part of and is incorporated into the solicitation by this reference.
2.6 PRICES, TERMS ARE TO BE FIRM
A. The Bidder or Offeror warrants by virtue of its Bid or proposal that the prices, terms and conditions
contained in the solicitation shall be firm for a period of no less than one hundred twenty (120) calendar
days from the date of the solicitation opening.
B. The bid or proposal prices shall include all permit fees, royalties, license fees, taxes and other costs
arising from the use of the materials and equipment in any way involved in the Project Work, as well as
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
7
all costs of packaging, transporting and delivery of any materials and equipment to the designated
location within the City, and the site cleanup.
C. The City may require the addition or deletion of services from the Contractor if the requirements and
needs of the City change, in City’s sole opinion. This may entail additional services and additional
locations. The Contractor shall provide the City with costs for these additional services and additional
locations or both, based upon the cost structure utilized in establishing the pricing for listed locations in
initially contracted areas. Deletion of locations, services, or both shall be handled in the same manner as
described above. If the costs offered are not acceptable to the City, the City reserves the right to procure
the additional services from one or more other Contractors.
2.7 PROTECTION OF PROPERTY
A. The successful Bidder or Offeror shall at all times guard against damage or loss to City property or
property of other persons, vendors or Contractors and shall be responsible for replacing or repairing any
such damage or loss. The Contractor will be required to report any such damages immediately to the
City’s representative in charge of the Project. The successful Bidder or Offeror shall ensure that the area
in which the sidewalks are being replaced that pedestrians, and the general public are not injured nor
have access to the area (safety screening) in which work is proceeding.
B. The City reserves the right to repair any damages created by the Contractor and to deduct the
appropriate amount from any payment due to the Contractor. In all cases, the decision of the City is
final.
2.8 TRASH
Contractor shall be responsible for the daily removal of trash and debris from the Project work sites and upon
completion of the Project Work.
2.9 INSTRUCTIONS TO BIDDERS
Taxes: The City is exempt from any taxes related to the requested services, which may otherwise be imposed
by the state or federal government. This exemption does not transmit to suppliers in their purchases of goods or
services, used in work or goods supplied to the City. The Contractor shall pay all applicable sales, consumer,
use and other similar taxes required by law. The Contractor is responsible for reviewing the pertinent state
statutes involving the sales tax and complying with all requirements.
2.10 RETENTION OF RECORDS AND RIGHT TO ACCESS
The successful Bidder or Offeror shall preserve and make available all financial records, supporting documents,
statistical records, and any other documents pertinent to the agreement for a period of three (3) years after
termination or conclusion of the agreement, or if an audit has been initiated and audit findings have not been
resolved at the end of these three (3) years, the records shall be retained by the City until resolution of audit
finding.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
8
2.11 NON-COLLUSION STATEMENT
By submitting a bid or proposal, the Bidder or Offeror affirms that the bid or proposal is without previous
understanding, agreement, or connection with any person, business, or corporation and that the bid or proposal
is in all respects fair, and made without collusion or fraud. The Non-Collusion Affidavit form must be executed
by the Bidder or Offeror; a copy of the form can be found in the Bidders Submissions; it is made a part of and is
incorporated into the solicitation by this reference.
2.12 MINIMUM AND MANDATORY TECHNICAL SPECIFICATIONS
The technical specifications may include items that are considered minimum, mandatory, or required. If any
Bidder or Offeror is unable to provide these items, and feels that the technical specifications are overly
restrictive, the Bidder or Offeror must notify the City of Dania Beach in writing immediately. Such notification
must be received by the City prior to the deadline contained in the solicitation, for questions of a material
nature, at least ten (10) calendar days prior to the solicitation opening date. If no such notification is received
prior to that deadline, the City will consider the technical specifications to be acceptable to the Bidder or
Offeror.
2.13 PUBLIC RECORDS
A. Bid or Proposal Submissions Shall Become City Property: All submissions become the property of
the City and will not be returned to the Bidder or Offeror. The City will hold all submissions in
confidence unless otherwise required by law.
B. Contractor’s Obligations: Bidders or Offerors should be aware the City is a “public body” as defined
in Florida Statutes, Section 119.011(2) and that it is subject to Florida Statutes, Section 119.0701(2) (a),
and the related provisions of the Florida Public Records Law. If awarded this project, the following will
apply:
1. Documents to Be City Property: Unless otherwise provided by law, any and all records, including
but not limited to reports, surveys, and other data and documents provided or created in connection
with the contract are and shall remain the property of the City.
2. Maintenance of Records: Bidder or Offeror agrees to keep and maintain public records in Bidder’s
or Offeror's possession or control in connection with Bidder’s or Offeror's performance under the
contract. Bidder or Offeror additionally agrees to comply specifically with the provisions of Section
119.0701, Florida Statutes. Bidder or Offeror shall ensure that public records that are exempt or
confidential and exempt from public records disclosure requirements are not disclosed, except as
authorized by law, for the duration of the contract, and following completion of the contract until the
records are transferred to the City.
3. Response to Public Records Requests: Upon request from the City custodian of public records,
Bidder or Offeror shall provide the City with a copy of the requested records or allow the records to
be inspected or copied within a reasonable time at a cost that does not exceed the cost provided by
Chapter 119, Florida Statutes, or as otherwise provided by law.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
9
4. Delivery of Records: Upon completion of the contract or in the event of termination by either party,
any and all public records relating to the contract in the possession of the Bidder or Offeror shall be
delivered by the Bidder or Offeror to the City Manager, at no cost to the City, within seven (7) days.
All such records stored electronically by Bidder or Offeror shall be delivered to the City in a format
that is compatible with the City’s information technology systems. Once the public records have
been delivered upon completion or termination of the contract, the Bidder or Offeror shall destroy
any and all duplicate public records that are exempt or confidential and exempt from public records
disclosure requirements. Any compensation due to Bidder or Offeror shall be withheld until all
records are received as provided in this solicitation.
5. Failure to Comply: Bidder’s or Offeror's failure or refusal to comply with the provisions of this
section shall result in the immediate termination of the contract by the City.
C. Florida Public Records Law: Pursuant to Section 119.0701(2) (a), Florida Statutes:
IF THE BIDDER OR OFFEROR HAS QUESTIONS REGARDING THE APPLICATION OF
CHAPTER 119, FLORIDA STATUTES, TO THE BIDDER’S OR OFFEROR'S DUTY TO PROVIDE
PUBLIC RECORDS RELATING TO THE CONTRACT, THE BIDDER OR OFFEROR MUST
CONTACT THE CITY CUSTODIAN OF PUBLIC RECORDS.
Custodian of Records: Elora Riera, City Clerk
Mailing Address: 100 W. Dania Beach Boulevard, Dania Beach, Florida 33004
Telephone number: 954-924-6800, Ext. 3623
Email: eriera@daniabeachfl.gov
2.14 SUCCESSORS AND ASSIGNS
The City and Contractor, respectively, will bind themselves, their partners, successors, assigns and legal
representatives to the agreement. Neither party to the agreement shall assign or subcontract it or any portion of
it, without the advance written consent of the other.
2.15 QUALIFICATION OF BIDDERS OR OFFERORS
A. Bidders’ or Offeror's Qualifications: The Bidder or Offeror shall complete the Questionnaire Section,
along with any other evidence of satisfactory experience and ability to perform the proposed Work. The
failure of Bidder or Offeror to demonstrate successful performance of projects of a similar magnitude,
scope and value as this project may be deemed to be grounds for declaring the Bidder or Offeror to be
non-responsible.
B. Certified Financial Statement: If requested by the Owner, the Bidder or Offeror shall submit a
certified financial statement, prepared within thirty (30) days of submission of the bid, indicating current
financial resources, liabilities, capital equipment, and financial history performance.
C. Disqualification: A Bidder or Offeror shall be disqualified and its unopened Bid or Proposal shall be
rejected by the City for any one or more of the following reasons:
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
10
1. Reason to believe that collusion exists among the Bidders or Offerors.
2. The Bidder or Offeror is or has been involved directly or indirectly in litigation or arbitration against
the Owner within the past ten (10) years.
3. The Bidder or Offeror has defaulted on any previous contract with the Owner within the past ten
(10) years or is in arrears on an existing contract.
4. The submittal of more than one Bid or Proposal from an individual, firm, partnership, corporation or
association under the same or different names. All such parties shall be disqualified.
5. Untimely bids or proposal shall be automatically and absolutely disqualified and returned unopened.
Excuses for the untimely submittal shall not be accepted. The time of bid or proposal receipt
documented by the City Clerk’s office shall determine the timeliness of the Bid or Proposal.
D. Non-responsible Bidder or Offeror : A Bidder or Offeror may be determined by the Owner to be
“non-responsible” once Bids or Proposals are opened, and a Bid or Proposal may be rejected for any one
or more of (but not limited to) the following reasons:
Determination of a lack of competency as may be revealed by qualification statements, financial
statements, experience records or other information disclosed to Owner by other sources.
The Bidder's or Offeror's uncompleted or pending workload on other projects, which in the judgment of
the Owner may cause detrimental impact on timely completion of the Work.
The appearance of an unbalanced Bid or Proposal, as determined by the Owner.
If the Bidder or Offeror makes one or more false statements or provides false information in connection
with any portion of the bidding documents.
If the Bidder or Offeror fails to demonstrate successful performance and completion of projects of a
similar magnitude, scope or value as this project.
E. Non-responsive Bidder or Offeror : A Bidder or Offeror may be deemed to be non-responsive and a
Bid or Proposal may be rejected for any of, but not limited to, the following reasons:
1. If the Bidder or Offeror fails to submit a complete Bid or Proposal, including but not limited to,
submitting evidence of all insurance coverages required by the Bid or Proposal and the Contract
Documents.
2. If the Bidder or Offeror fails in any way to abide by any of the provisions of the Contract
Documents.
2.16 CONTRACTOR'S RELATION TO THE CITY - INDEPENDENT CONTRACTOR
It is expressly agreed upon and understood that the Contractor will be in all respects an independent contractor
as to the Project Work, and that the Contractor is in no respect an agent or employee of the City. The agreement
will specify the Project Work to be done by the Contractor, but the method to be employed to accomplish the
work shall be the responsibility of the Contractor, unless otherwise provided in writing in the agreement.
Contractor and its employees are not entitled to any of the benefits that the City provides for City employees.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
11
2.17 EMPLOYEES OF THE CONTRACTOR
A. Contractors shall only designate employees who are sufficiently skilled to provide the required services
specified in the solicitation. Any person employed to provide the services who fails, refuses or neglects
to obey the instructions of the City's representative in anything relating to these services, or who appears
to be disorderly, insubordinate, or incompetent shall upon the order of City's representative, be
immediately relieved by the Contractor from the Project Work. Any interference with, or any abusive or
threatening conduct toward any City representative, its assistants or inspectors by the Contractor, its
employees or agents, or any member of the public shall be grounds for the City to terminate the
agreement and re-let the work. The Contractor shall furnish all labor, materials, supplies and equipment
necessary to properly maintain all Project Work areas in an acceptable and safe condition.
B. Contractor agrees that it and its officers shall be held fully responsible, except as otherwise prohibited
by law, for all acts of their employees while in their employ.
2.18 AVAILABILITY OF FUNDS
The obligations of the City under the awarded agreement will be subject to the availability of funds.
2.19 LICENSES, PERMITS, AND FEES
In accordance with the Public Bid Disclosure Act, Section 218.80, Florida Statutes, each license, permit, or fee
a Contractor will have to pay the City before or during the work, items or services to be provided or the
percentage method or unit method of all licenses, permits, and fees required by the City and payable to the City
by virtue of the work, items, or services as part of the agreement are as follows:
A. Contractor shall have and maintain during the term of the agreement any and all appropriate City
licenses, fees (and business tax receipts, if applicable), which shall be paid in full in accordance with the
City's fee structure for such items. THERE WILL NOT BE ANY PERCENTAGE REDUCTION
OR WAIVING OF CITY LICENSES, FEES (OR BUSINESS TAX RECEIPTS, IF
APPLICABLE).
B. During the performance of the agreement, there may be times when the Contractor will be required to
obtain a permit for such work, or in connection with the items or services. It is the responsibility of the
Contractor to ensure that it has the appropriate permits as may become necessary during the
performance of the work. Any fees related to the required permits in connection with the agreement will
be the sole responsibility of the Contractor.
C. Licenses, permits, and fees may be required by Broward County, the state of Florida or the federal
government.
D. City will reimburse permit fee costs related to dewatering and National Pollutant Discharge Elimination
System (NPDES).
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
12
2.20 TERMINATION OF AGREEMENT
If the successful Bidder or Offeror who or which is awarded the contract fails to provide the services, or shall in
any other manner commit a breach of the agreement and fails to remedy the same within five (5) calendar days
after receipt of written notice from the City, the City may terminate the agreement resulting from the solicitation
without any further notice to the Contractor. City representatives will review the construction services
periodically to assure that the requirements of the agreement are being met. If any work is unsatisfactory, the
Contractor shall be contacted, and the discrepancies corrected at no additional cost to the City. If deficiencies
are not corrected within five (5) working days, the City may, at its option, perform the required services or
contract to have them performed and deduct the cost of those services from the agreement cost.
2.21 TERMINATION OF AGREEMENT FOR CAUSE
If, through any cause, the Contractor shall fail to fulfill in a timely and proper manner its obligations under the
agreement, or if the Contractor shall violate any of the provisions of the agreement, the City may upon written
notice to the Contractor, terminate the right of the Contractor to proceed under the agreement, or as to such part
or parts of the agreement for which there has been a default, and may hold the Contractor liable for any
damages caused to the City by reason of such default and termination. In the event of such default and
termination, any completed services performed by the Contractor under the agreement shall, at the option of the
City become the City's property and the Contractor shall be entitled to receive equitable compensation for any
work completed to the satisfaction of the City. The Contractor, however, shall not be relieved of liability to the
City for damages sustained by the City by reason of any breach of the agreement by the Contractor, and the City
may withhold any payments to the Contractor for the purpose of set-off until such time as the amount of
damages due to the City from the Contractor can be determined. The City reserves the right to terminate the
agreement upon thirty (30) calendar days’ written notice, without cause.
2.22 INDEMNIFICATION AND HOLD HARMLESS PROVISIONS
A. The selected Contractor shall, in addition to any other obligation to indemnify the City and to the fullest
extent permitted by law, protect, defend, indemnify and hold harmless the City, including its agents,
elected officials and employees from and against all claims, actions, liabilities, losses (including
economic losses), or costs arising out of any actual or alleged:
1. bodily injury, sickness, disease or death, or injury to or destruction of tangible property, including
the loss of use resulting therefrom, or any other damage or loss arising out of or resulting or claimed
to have resulted in whole or in part from any actual or alleged act or omission of the Contractor,
anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may
be liable in the performance of the work;
2. any violation of law, statute, ordinance, governmental administrative order, rule, regulation, or
infringement of patent rights by Contractor in the performance of the work;
3. liens, claims, actions made by the Contractor or other party performing the work; and
4. claims of whatsoever nature related to collection practices or any actions of a contradictory nature
pursuant to the Agreement or in an attempt to collect monies due or claimed to be due to the City.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
13
B. Indemnification for Construction Contracts. In the event that the performance of services under the
Contract is deemed to be a “construction contract” pursuant to §725.06, Florida Statutes, as it may be
amended from time to time, the following indemnification shall apply:
1. To the fullest extent permitted by Chapter 725, Florida Statutes, as it may be amended, the
Contractor agrees to indemnify and hold harmless the Owner, its officers, employees, and assigns
from liabilities, damages, losses, and costs including, but not limited to reasonable attorney fees, to
the extent caused by the negligence, recklessness, or intentionally wrongful misconduct of the
Contractor and persons employed or utilized by the Contractor in the performance of the provisions
in the Contract Documents.
2.23 INSURANCE REQUIREMENTS
A. Insurance Required Before Commencement of Work: The Contractor shall not commence Work
under the Agreement until Contractor has obtained all insurance required under this Section, and not
until such time that the coverages are approved by the Risk Manager of the City. The Contractor shall
not allow any employee of Contractor or any Subcontractor to commence Work on any subcontract until
the Subcontractor and all Coverages required of any Subcontractor have been obtained and approved by
the Risk Manager of the City. In addition, Contractor shall be responsible for any and all policy
deductibles and self-insured retentions.
B. Insurance Requirements: Coverages shall be in force until all Work required to be performed under
the terms of the Agreement, including any applicable warranty period, is satisfactorily completed as
evidenced by the formal written acceptance by the City. In the event insurance certificates provided to
City indicate that the insurance shall terminate and lapse during the period of the Agreement, including
any applicable warranty period, then in that event, the Contractor shall furnish, at least thirty (30) days
prior to the expiration of the date of such insurance, a renewed Certificate of Insurance as proof that
equal and like coverages for the balance of the period of the Agreement, including any extension of it,
and including any applicable warranty period, is in effect. THE CONTRACTOR AND ANY
SUBCONTRACTOR SHALL NOT PERFORM OR CONTINUE WORK PURSUANT TO THE
AGREEMENT, UNLESS ALL COVERAGES REMAIN IN FULL FORCE AND EFFECT. ANY
DELAY IN THE WORK CAUSED BY A LAPSE IN COVERAGE SHALL BE NON-
EXCUSABLE, SHALL NOT BE GROUNDS FOR A TIME EXTENSION, AND WILL BE
SUBJECT TO ANY OTHER APPLICABLE PROVISIONS DESCRIBED IN THE
AGREEMENT OR ELSEWHERE IN THE SOLICITATION DOCUMENTS CONCERNING
CONTRACTOR DELAY.
C. Required Minimum Coverages: The below coverages are minimum limit requirements. Umbrella or
Excess Liability policies are acceptable to provide the total required liability limits, as long as the Risk
Manager of the City reviews and approves in writing the insurance limits on each of the policies. The
City must approve any changes to these specifications and has the right to review and amend coverage
requirements. The CONTRACTOR shall be held responsible for any modifications, deviations, or
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
14
omissions in these insurance requirements. CONTRACTOR shall be responsible for any deductible
amounts.
D. GENERAL LIABILITY INSURANCE is to include bodily injury, broad form property damage,
products/completed operations, blanket contractual liability, and personal/advertising injury with limits
of no less than One Million Dollars ($1,000,000.00) per occurrence, and Two Million Dollars
($2,000,000.00) annual aggregate.
E. SPECIAL PROVISIONS AS TO GENERAL LIABILITY INSURANCE (to be confirmed on or
attached to the Official Certificate of Insurance):
1. Annual Aggregate shall apply “Per Job”;
2. “The City of Dania Beach, Florida” is added as a named “Additional Insured”;
3. Additional Insured status is included for Products completed operations coverage for a period of no
less than five (5) years following the completion of the Work or Project;
4. Additional insured coverage shall be no more restrictive than Insurance Services Office (ISO) form
CG 2037 (07 04);
5. Contractor’s insurance shall be primary and non-contributory;
6. Waiver of Subrogation in favor of the City;
7. 30 Days’ Notice of Cancellation or modification to City (if not available on the insurance policies,
then Contractor has responsibility for notification); and
8. Copy of Additional Insured Endorsement or other endorsements may be attached to the Certificate.
F. WORKERS’ COMPENSATION INSURANCE must be provided for all persons fulfilling this
agreement whether employed, contracted, temporary, or subcontracted for the life of the agreement,
including any applicable warranty period(s), and it is to apply to all “statutory employees” of Contractor
(as that phrase is defined by Chapter 440, Florida Statutes), in compliance with the “Workers’
Compensation Law" of the State of Florida and all applicable federal laws, for the benefit of the
Contractor, its employees, and Subcontractors.
G. In the case any work is sublet as otherwise addressed in the Agreement or Solicitation Documents, the
Contractor shall require any Subcontractors similarly to provide Workers’ Compensation Insurance for
all of the latter’s employees, in addition to any coverage afforded by the Contractor, by furnishing
Statutory Limits Part A, and no less than One Million Dollars ($1,000,000.00) Employers’ Liability
Limits Part B.
H. IN NO EVENT SHALL THE CONTRACTOR BE PERMITTED TO UTILIZE IN THE
PROSECUTION OF THE WORK, THE FOLLOWING:
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
15
1. ANY EMPLOYEE, SUBCONTRACTOR OR SUBCONTRACTOR EMPLOYEE WHO IS
EXEMPTED OR PURPORTED TO BE EXEMPT FROM WORKERS’ COMPENSATION
INSURANCE COVERAGE; OR
2. ANY EMPLOYEE, SUBCONTRACTOR OR SUBCONTRACTOR EMPLOYEES WHO
WILL BE COVERED BY AN EMPLOYEE LEASING ARRANGEMENT.
I. SPECIAL PROVISIONS AS TO WORKERS’ COMPENSATION INSURANCE (to be confirmed
on or attached to the Official Certificate of Insurance):
1. 30 Days’ Notice of Cancellation or Modification to City (if not available on the insurance policies,
then Contractor has responsibility for notification); and
2. Waiver of Subrogation.
J. AUTOMOBILE LIABILITY INSURANCE shall be maintained with combined single limits of no
less than One Million Dollars ($1,000,000.00), to include coverage for owned, hired, and non-owned
vehicles.
K. SPECIAL PROVISIONS AS TO AUTOMOBILE LIABILITY INSURANCE (to be confirmed on
or attached to the Official Certificate of Insurance):
1. “The City of Dania Beach” is added as a named “Additional Insured”;
2. 30 Days’ Notice of Cancellation or modification to City (if not available on the insurance policies,
then Contractor has responsibility for notification); and
3. Waiver of Subrogation.
L. Proof of Insurance: The following are requirements that must be met regarding the Bidder’s or
Offeror's delivery of Certificates of Insurance for all coverages required in the Agreement and
Solicitation Documents:
1. “Preliminary” certificate means that certificates of insurance verifying all general insurance
requirements (as noted below) must be included with Bid or Proposal at submittal on the date and
time of the Bid or Proposal opening. If the “preliminary” certificates are not included with a Bid or
Proposal submittal, then the City has the right to consider the submitted Bid or Proposal as non-
responsive on the date and time of the Bid or Proposal opening. “Preliminary” Certificates may be
issued without documentation of all “Special Provisions”. However, Contractor does understand that
all provisions, including “Special Provisions” noted below are expected to be fully documented on
or attached to the “Official” Certificates of Insurance as described below.
2. “Official” Certificates of Insurance must be delivered to the City Clerk’s office and Risk Manager of
the City. If the “Official” certificates are not delivered before or on the fourteenth (14th) Business
Day after the issuance by the City of the “Notice of Intent to Award”, then the City has the right to
consider the awarded Agreement to the successful Bidder or Offeror as void and to negotiate a
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
16
contract with the next lowest responsive and responsible Bidder or Offeror. “Special Provisions”, as
referenced below under each type of insurance requirement shall be fully confirmed on or attached
to the “Official” certificates.
3. All Certificates of Insurance must clearly identify the contract to which they pertain, including a
brief description of the subject matter of the contract. The certificates shall contain a provision that
coverage afforded under the policies will not be canceled until at least thirty (30) days’ prior written
notice has been given to City. If this coverage is not provided, then Contractor is responsible for
such notice to City. Insurance policies for required coverages shall be issued by companies
authorized to do business under the laws of the State of Florida and any such companies’ financial
ratings must be no less than A-VII in the latest edition of the “BEST’S KEY RATING GUIDE”,
published by A.M. Best Guide. In the event that the insurance carrier’s rating shall drop, the
insurance carrier shall immediately notify the City in writing.
2.24 SAFETY
A. The successful Bidder or Offeror shall be responsible for initiating, maintaining and supervising all
safety precautions and programs in connection with the Project Work. The successful Bidder or Offeror
shall comply with the rules and regulations of the Florida Department of Commerce regarding industrial
safety (Florida Statutes, Section 440.56) and with the standards set forth in the federal Occupational
Safety and Health Act of 1970 (OSHA), and its amendments.
B. Bidder or Offeror, by submitting a bid or proposal, certifies that all materials and equipment to be
supplied for the Project will meet all federal and state requirements, including but not limited to, the
Occupational Safety and Health Act (OSHA).
2.25 WARRANTY
The Contractor shall warrant to the City that materials and equipment furnished under the agreement will be of
good quality and new unless otherwise required or permitted by the Contract Documents; that the Work will be
free from defects, and that the Work will conform to the terms and conditions of the agreement. Work not
conforming to those terms and conditions, including substitutions not properly approved and authorized may be
considered defective. The Contractor's warranty may exclude damage or defect caused by abuse, modifications
not executed by the Contractor, improper or insufficient City maintenance, improper operation, or normal wear
and tear under normal usage. The Contractor shall furnish satisfactory evidence as to the kind and quality of
materials and equipment. All manufacturers’ product warranties shall be registered in the City’s name and for
its sole benefit.
2.26 RESPONSIBLE BIDDER OR OFFEROR
No bid or proposal will be accepted from, nor will any agreement be awarded to, any person or entity who or
which is in arrears to the City of Dania Beach upon any debt or agreement, who or which is in default as surety
or otherwise upon any obligation to the City, who is deemed irresponsible or unreliable by the City, or who or
which has been found guilty or convicted of a Public Entity crime in any federal or state trial court of record.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
17
2.27 PROHIBITION AGAINST CONSIDERING SOCIAL, POLITICAL OR IDEOLOGICAL
INTERESTS IN GOVERNMENT CONTRACTING
Bidders or Offerors are hereby notified of the provisions of section 287.05701, Florida Statutes, as amended,
that the City will not request documentation of or consider a Bidder's or Offeror's social, political, or ideological
interests when determining if the Bidder or Offeror is a responsible Bidder or Offeror. Bidders or Offerors are
further notified that the City's governing body may not give preference to a Bidder or Offeror based on the
Bidder's or Offeror's social, political, or ideological interests.
2.28 CONTRACTOR'S FINANCIAL/EXPERIENCE RECORD
The City shall have the right to investigate the financial condition and experience record of the Bidder or
Offeror, and determine to its satisfaction the competency of the Bidder or Offeror to undertake the requested
services in the solicitation.
2.29 SOLICITATION PROTEST PROCEDURE
A. After a Notice of Intent to Award a contract is posted, any actual or prospective Bidder or Offeror
claiming to be aggrieved in connection with the pending award of the Contract or any element of the
process leading to the award of the Contract may protest to the City Manager. A protest must be filed by
5:00 PM on the third (3rd) Business Day after posting of the Notice of Award (excluding the day that
the Notice is posted) or any right to protest is waived. The protest must be in writing, must identify the
name and address of the protester, and must include a factual summary of, and the basis for, the protest.
Filing shall be considered complete when the protest and a Bid Protest Bond are timely received by the
City Manager’s Office.
B. A Bid Protest Bond shall accompany the written protest, to compensate City for the expenses of
administering the protest. If the protest is decided in the protester's favor, the entire deposit shall be
returned to the protester. If the protest is not decided in the protester's favor, the deposit shall be retained
by the City. The deposit shall be in the form of a cashier's check, and shall be the one percent (1%) of
the amount of the pending award to the initial successful Bidder or five thousand ($5,000.00) dollars,
whichever is less.
C. The Protest Committee shall have the authority to review, settle, and resolve all protests. Members of
the Protest Committee will be appointed by the City Manager. If the Protest Committee determines that
the pending award of a contract or any element of the process leading to the award involved a significant
violation of law, applicable rule or regulation, all steps necessary and proper to correct the violation
shall be taken. If the Protest Committee determines that the protest has merit, the City Manager shall
direct that all appropriate steps are to be taken to remedy it.
D. In the event of a timely protest, the City Manager shall stay the award of the Contract unless, after
consulting with the City Attorney and a representative from the City’s Department for which the
services are being obtained, the City Manager determines that the award of the Contract without delay is
necessary to protect the substantial interests of the City. The continuation of the bid award process under
these circumstances shall not preempt or otherwise affect the protest.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
18
2.30 LITIGATION
A. In addition to any other provision of this solicitation, the City may, in its absolute discretion, reject a Bid
or Proposal if the Bidder or Offeror, or any officer or director of the Bidder or Offeror submitting the
Bid or Proposal, is or has been engaged directly or indirectly in legal action against the City, its elected
or appointed officers, representatives or employees in relation to any matter.
B. In determining whether or not to reject a Bid or Proposal under this section, the City will consider
whether the litigation is likely to affect the Bidder’s or Offeror's ability to work with the City, its
consultants and representatives and whether the City’s experience with the Bidder or Offeror indicates
that there is a risk that the City will incur increased staff and legal costs in the administration of the
contract if it is awarded to the Bidder or Offeror.
C. A contract with the successful Bidder or Offeror will include the following:
GOVERNING LAW; CONSENT TO JURISDICTION. The law of the State of Florida shall govern the
contract. The contract is not subject to arbitration. THE PARTIES EXPRESSLY WAIVE ALL
RIGHTS TO TRIAL BY JURY FOR ANY DISPUTES ARISING FROM, OR IN ANY WAY
CONNECTED WITH THIS AGREEMENT. THE PARTIES UNDERSTAND AND AGREE
THAT THIS WAIVER IS A MATERIAL CONTRACT TERM.
D. All claims, counterclaims, disputes and other matters in question between City and the Contractor
arising out of, relating to or pertaining to the Contract, the breach of it, the services of it, or the standard
of performance required in it, are to be addressed by resort to non-binding mediation as authorized under
the laws and rules of Florida; provided, however, that in the event of any dispute between the parties, the
parties agree to first negotiate with each other for a resolution of the matter or matters in dispute and,
upon failure of such negotiations to resolve the dispute, the parties shall resort to mediation. If mediation
is unsuccessful, any such matter may be determined by litigation in a court of competent jurisdiction in
Broward County, Florida, or the Federal District Court of the Southern District of Florida and
appropriate appellate courts for such venue and jurisdiction. If City or Contractor incurs any expense in
enforcing the terms of the Contractor, whether suit is brought or not, each party shall bear its own costs
and expenses including, but not limited to, court costs and reasonable attorney fees.
2.31 CONTRACT AWARD AND EXECUTION
A. Bid or Proposal Opening and Evaluation: The City will publicly open and announce all bids or
proposals it receives by total amount in accordance with the terms of the advertisement. The City will
verify all bidders or offerors have properly submitted and executed all required solicitation documents
and forms; review all bids or proposals for accuracy; prepare a tabulation of the bids showing the item
details and total bid for all responsible bids; check for conformance of all bids or proposals to the
engineer's estimate; evaluate unbalanced bid or proposal items; confirm the bid tabulations; and provide
a recommendation for award of bid or proposal or recommendation for re-advertisement, if appropriate,
to the City Commission.
B. Rejection of Bids or Proposals: The City may reject bids or proposals in the following circumstances:
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
19
1. where the low bid differs from the engineer's estimate by an unreasonable amount (reasonable
conformance pursuant to 23 CFR 635.114(c))
2. where obvious unbalancing of unit prices has occurred, or
3. where competition is considered to be inadequate relative to the size, type, and location of the
project.
C. Prohibition of Negotiations with Contractors or Bidders or Offerors: Negotiations with contractors
are not permitted during the advertisement, award, or execution period of the contracting process.
D. Contract Award and Execution: The City will enter into a contract with the lowest priced and the most
responsive and responsible bidder. If the City is unable to come to terms with the lowest priced and the
most responsive and responsible bidder, the City shall initiate the award process with the next lower
priced most responsive and responsible bidder, and so on, until a contract is executed. The initial
contract period shall be for two (2) years. In addition, contingent upon budget approval, the City
reserves the right to renew the contract for three (3) additional one (1) year periods, under the same
terms, conditions, and specifications by written notification by the City to the contractor.
The city is under no obligation to accept any Bid submitted. The City reserves the right in its sole
discretion to waive informalities in, or, at any time in the process and to reject any or all Bids at any
time.
All costs incurred in the preparation and presentation of any Bid shall be wholly absorbed by the Bidder.
All supporting documentation and manuals submitted with any Bid will become the property of the City
of Dania Beach unless otherwise requested by the Bidder at the time of submission.
2.32 CONE OF SILENCE
A. Cone of Silence: Definitions: “Cone of Silence,” as used in this solicitation, means a prohibition on any
communication regarding a particular Request for Proposal (“RFP”), Request for Qualification (“RFQ”)
or Invitation to Bid (“ITB”), between:
1. a potential vendor, service provider, Bidder or Offeror, bidder, lobbyist, or consultant, and:
2. a City Commission member, City’s professional staff including, but not limited to, the City Manager
and her staff, or any member of the City’s Selection Committee.
Restriction; Notice: A Cone of Silence shall be imposed upon this solicitation upon the advertisement of the
solicitation. At the time of imposition of the Cone of Silence, the City Manager or designee shall provide for
public notice of the Cone of Silence by posting a notice at City Hall. The City Manager shall issue a written
notice as to the Cone of Silence to the affected departments, file a copy of such notice with the City Clerk, with
a copy to each City Commissioner, and shall include in any public solicitation for goods or services a statement
disclosing the requirements of this section.
Termination of Cone of Silence: The Cone of Silence shall terminate at the beginning of the City Commission
meeting (whether a regular or special meeting) at which the City Manager makes a written recommendation of
award to the City Commission. However, if the City Commission refers the City Manager’s recommendation
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
20
back to the City Manager or staff for further review, the Cone of Silence shall be re-imposed until such time as
the City Manager makes a subsequent written recommendation.
Exceptions to Applicability: The provisions of this section shall not apply to:
1. Oral communications at pre-bid or pre-proposal conferences;
2. Oral presentations before the Selection Committee;
3. Public presentations made to the City Commission members during any duly noticed public meeting;
4. Communications in writing at any time with any City employee, unless specifically prohibited by the
solicitation. The Bidder or Offeror shall file a copy of any written communication with the City
Clerk. The City Clerk shall make copies available to any person upon request;
5. Communications regarding the solicitation between a potential vendor, service provider, Bidder or
Offeror, lobbyist or consultant and the City’s Procurement and Contract Services Agent or City
employee designated as responsible for administering the procurement process for the solicitation,
provided the communication is limited strictly to matters of process or procedure already contained
in the corresponding solicitation document;
6. Communications with the City Attorney and his staff;
7. Duly noticed site visits to determine the competency of a Bidder or Offeror regarding the solicitation
during the time period between the opening of Bids or Proposals and the time the City Manager
makes a written recommendation;
8. Any emergency procurement of goods or services pursuant to City Code;
9. Responses to the City’s request for clarification or additional information;
10. Contract negotiations during any duly noticed public meeting;
11. Communications to enable City staff to seek and obtain industry comment or perform market
research, provided all related communications between a potential vendor, service provider, Bidder
or Offeror, lobbyist, or consultant and any member of the City’s professional staff including, but not
limited to, the City Manager and his staff are in writing or are made at a duly noticed public meeting.
Penalties: Violation of this section by a particular Bidder or Offeror shall render any solicitation award or
contract to the Bidder or Offeror voidable by the City Commission or City Manager. Any person who violates a
provision of this section may be prohibited from serving on a City selection or evaluation committee. In
addition to any other penalty provided in this solicitation, violation of any provision of this section by a City
employee may subject the employee to disciplinary action.
Please contact the City Attorney for any questions concerning “Cone of Silence” compliance.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
21
3. SPECIAL CONDITIONS
3.1 INTERPRETATION AND CLARIFICATION OF BIDDING DOCUMENTS
A. All questions requiring interpretation or clarification of the bidding documents shall be submitted to the
project’s Q&A in the portal by NO VALUE at NO VALUE. Questions received after this time will not
be addressed.
B. For information pertaining to this ITB, Bidders shall submit questions to the portal. Such contact shall
be for clarification purposes only. Material changes, if any, to the scope of services or Proposal
procedures will be transmitted only by written addendum.
C. Interpretations or modifications of the bidding documents made in any manner other than Addendum or
Addenda issued by the City shall not be binding and shall have no effect.
D. The Bidder, prior to submitting a bid, shall acknowledge any Addendum or Addenda issued by the City
for this Project.
E. Costs for those matters not questioned and not addressed in an Addendum or Addenda, shall be the
responsibility of the Bidder, and Bidder shall be responsible to include such costs within the submitted
Bid.
F. Bidders shall use the Bid Document Forms furnished in the ITB.
G. In the event of a mathematical error in the extension of any unit price, or addition of total price, the unit
price shall prevail.
H. Insurance Coverage: Bidders who are responding to the Invitation to Bid (“ITB”) MUST comply with
all of the Insurance Requirements specified in the General Terms and Conditions of the Bid Documents
and the Agreement upon award to the successful Bidder.
3.2 BID SECURITY
A. Bid Security: Simultaneously with the delivery of an executed Bid to the Owner, the Bidder shall
furnish to the Owner a Bid Security in the amount of 5% of the proposed pricing as security for the
faithful execution of an Agreement with the Owner in the event of a bid award by the City Commission.
B. Bid security may be in the form of a cashier's check payable to the City of Dania Beach and drawn on a
Florida bank, or a Bid Bond (see attachments) issued by a surety meeting the qualifications stated in
these Instructions to Bidders. Cashier’s checks must be received by the Procurement Division before the
bid submission deadline at the address noted on the title page. Bonds shall be submitted on the forms
provided by the Owner. Bonds shall be returned subsequent to award of the Agreement by the City
Commission and execution by the successful Bidder and the appropriate City officials. If the Bidder fails
to submit the required executed agreement within fourteen (14) calendar days after an award, the Bidder
agrees that the City may retain the bid security deposit as the City’s liquidated damages.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
22
C. Failure of the successful Bidder to execute an Agreement, to furnish Performance and Payment Bonds
when required, and to furnish Certificates of Insurance in the minimum amounts specified in the Bid
shall be just cause for the rescission of the agreement award and the retention of the Bid Security deposit
by the Owner. Such retention shall be considered not as a penalty, but as liquidation of the claims of the
Owner for damages it sustained, which are not otherwise readily ascertainable. Award may then be
made to the next ranked Bidder, or all Bids may be rejected.
3.3 QUALIFICATION OF BIDDERS
A. Bidders’ Qualifications: The Bidder shall complete the Bidders’ Questionnaire Section, along with any
other evidence of satisfactory experience and ability to perform the proposed Work. The failure of
Bidder to demonstrate successful performance of projects of a similar magnitude, scope and value as this
project may be deemed to be grounds for declaring the Bidder to be non-responsible.
B. Certified Financial Statement: If requested by the Owner, the Bidder shall submit a certified financial
statement, prepared within thirty (30) days of submission of the bid, indicating current financial
resources, liabilities, capital equipment, and financial history performance.
C. Disqualification: A Bidder shall be disqualified and its unopened Bid shall be rejected by the City for
any one or more of the following reasons:
1. Reason to believe that collusion exists among the Bidders.
2. The Bidder is or has been involved directly or indirectly in litigation or arbitration against the Owner
within the past ten (10) years.
3. The Bidder has defaulted on any previous contract with the Owner within the past ten (10) years or
is in arrears on an existing contract.
4. The submittal of more than one Bid from an individual, firm, partnership, corporation or association
under the same or different names. All such parties shall be disqualified.
5. Untimely bids shall be automatically and absolutely disqualified and returned unopened. Excuses for
the untimely submittal shall not be accepted. The time of bid receipt documented by the City Clerk’s
office shall determine the timeliness of the Bid.
D. Non-responsible Bidder: A Bidder may be determined by the Owner to be “non-responsible” once Bids
are opened, and a Bid may be rejected for any one or more of (but not limited to) the following reasons:
Determination of a lack of competency as may be revealed by qualification statements, financial
statements, experience records or other information disclosed to Owner by other sources.
The Bidder's uncompleted or pending workload on other projects, which in the judgment of the Owner
may cause detrimental impact on timely completion of the Work.
The appearance of an unbalanced Bid, as determined by the Owner.
If the Bidder makes one or more false statements or provides false information in connection with any
portion of the bidding documents.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
23
If the Bidder fails to demonstrate successful performance and completion of projects of a similar
magnitude, scope or value as this project.
E. Non-responsive Bidder: A Bidder may be deemed to be non-responsive and a Bid may be rejected for
any of, but not limited to, the following reasons:
1. If the Bidder fails to submit a complete Bid, including but not limited to, submitting evidence of all
insurance coverages required by the Bid and the Contract Documents.
2. If the Bidder fails in any way to abide by any of the provisions of the Contract Documents.
3.4 BILLING PROCEDURE
The preferred method for invoices is to send via email to ap@daniabeachfl.gov. A copy may also be mailed to
City Hall.
City of Dania Beach Finance Department
Attn: Accounts Payable
100 West Dania Beach Boulevard
Dania Beach, Florida 33004
with a copy to:
City of Dania Beach Public Services Department
Attn: Fernando Rodriguez
100 West Dania Beach Boulevard
Dania Beach, Florida 33004
The City will pay to the Contractor for the faithful performance of the Contract, in lawful money of the United
States, and subject to adjustments as provided in the Contract Documents, the amounts equal to the sum of the
unit, lump sum price or both established for each separately identified work item, times the estimated quantity
of that item, as indicated in the Schedule of Prices.
As provided in the Bid, the quantities entered in the Schedule of Prices for each item of work is an estimate only
and the final Contract amount and the total payment made to the Contractor will be based on the actual number
of units of each work item incorporated in the Work of the Contract. It is understood that the unit prices quoted
or established for work items will be used for computing the amount to be paid to the Contractor, based on the
quantities actually constructed as determined by the applicable measurement and payment portion of the
Specifications.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
24
4. SCOPE OF WORK
4.1 SCOPE
A. The City of Dania Beach, Florida (the “City” or “Owner”), is actively seeking bids from qualified
Contractors (the “Contractor”), for a project known as “Calibrations and Repairs of Flow Meters and
Related Devices”. Services required include repair, modification, maintenance and/or replacement of
related instrumentation and/or calibration and certification of flow meters and related devices within the
City’s Water Treatment Plant, Well Fields and Field Operation’s distribution and wastewater
transmission systems.
B. By submitting a bid, the Bidder acknowledges that he, she, or it is familiar with the scope of services
prior to submitting a bid. Failure of a Bidder to be familiar with the requirements of the Project Work
does not relieve the Contractor of the responsibility for completion of all required services for the
Project.
C. It shall also be the Bidder's responsibility to visit the proposed Project Site to become thoroughly
familiar with the nature and extent of the Work to be performed and all local existing site conditions,
and to make his or her own estimate of the facilities and difficulties attending the execution of the Work;
no allowance shall be made by the Owner for the Bidder's failure to do so.
D. Bids will be considered if submitted by qualified Contractors who or which have experience, including
similar previous work in the provision of the requested services. Contractors offering full service will
receive the highest consideration.
E. Applicants should include the following items in the submitted Bid:
1. Letter of Transmittal.
2. Anticipated timeline to begin delivery of services.
3. A breakdown of the costs for the delivery of services described above.
4. Résumés of key personnel who will actually be assigned to the Project Work and a description of the
role of each person within the company.
5. NOTE: The City expects those personnel listed to be those who will be actually performing the
Project Work. Substitutions (Contractors only) will be permitted only upon written approval of the
City’s representative or designee who is in charge of the Project.
6. A list of five (5) similar projects performed in South Florida (see the BIDDER SUBMISSIONS) and
it includes the following information:
a. Name of each entity for which the work was performed.
b. Brief description of the scope of work.
c. Amount of initial contract award; and
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
25
d. Name of contact person and contact information with the entity who can knowledgeably discuss
your company’s performance.
7. Indication that the Contractor can provide increased levels of service (additional hours) at the same
cost per hour; and
8. Any other information that the Contractor feels is relevant to assist the City in evaluating
Contractor’s qualifications.
9. The City intends to award an agreement to the lowest, responsive, responsible Bidder for the
requested services specified in the ITB, taking into consideration experience, staffing, equipment,
materials, references and past performance. The City reserves the right to reject any and all bids, to
waive any informality in a bid and to make an award in the best interests of the City. In case of
disputes in the award of the agreement, the decision of the City shall be final and binding on both
parties.
10. If the Bidder to whom or to which an award is made fails to enter into an agreement, the award may
be annulled and the agreement offered to the next most qualified Bidder or to the Bidder which
offered the next lowest, responsive and responsible bid in the opinion of the City. THE
CONTRACTOR AND ANY SUBCONTRACTOR(S) SHALL NOT COMMENCE WORK ON
THE PROJECT UNTIL AN AGREEMENT HAS BEEN FULLY EXECUTED BY BOTH
PARTIES.
4.2 Important Instructions for Electronic Submittals
The City of Dania Beach is accepting electronic bid submissions. Bidders shall create a FREE account with
OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed
account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit
the electronic bid.
4.3 Scope of Work or Project Details
A. Contractor will complete additional calibration services as requested by Public Services Department staff.
B. Response Time: Normal service request events must not exceed twenty-four (24) hours from the time of notification.
Emergency service request events must not exceed two (2) hours from time of notification.
C. Contractor will be supplied with the name(s) and telephone number(s) of the appropriate contact person(s) for the City
under the resulting agreement/contract. Contractor will be required to report to the specified City contact person prior
to performing any work required by the scope of services.
D. Whenever possible, Contractor shall utilize City-owned stocked parts and materials, as necessary to perform needed
service. If City-owned and stocked parts are not available,
E. Contractor shall provide parts and materials, which will be of first-rate quality.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
26
F. The Contractor shall maintain a reasonable stock of parts and materials available on a twenty-four (24) hour basis
sufficient to satisfy the anticipated demands of this agreement/contract.
G. All parts removed from service will be returned to the City's authorized staff. Contractor will be responsible for the
disposal of any non-repairable parts.
H. Contractor shall provide all labor, and tools necessary to perform calibration and instrumentation repair or/and
replacement services by Contractor or Contractor sub-contractor, as approved by the City.
I. To prevent injury to City staff, all equipment and tools, used by Contractor or sub-contractor, must be properly put
away when Contractor is not present. Any debris created as a result of the maintenance/repair service/replacement shall
be removed by Contractor at the end of each business day.
J. If repairs are no longer viable nor cost effective, replacement and installation can be provided at the City’s sole
discretion and acceptance of quote. The quote must include description of proposed replacement equipment with
make/model number, cost, estimated shipping, any warranty information and estimated time for delivery.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
27
5. BID FORM
Line Item Description Position Quantity Unit of
Measure Unit Cost Total
1 Cost per hour for work
completed during
regular work times, M-
F
Lead
Technician 1 Each
2 Cost per hour for work
completed during all
other times other than
above
Lead
Technician 1 Each
3 Cost per hour for work
completed during
regular work times, M-
F,
Technician 2 1 Each
4 Cost per hour for work
completed during all
other times other than
above
Technician 2 1 Each
Additional Cost
5 Proposers cost of
materials, multiplied by
mark-up for profit,
overhead, etc.
(Example $4,000 x 1.1
- $4,400.00)
Parts Mark-
up 1 Each
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
28
6. BIDDER SUBMISSIONS
1 BIDDER QUALIFICATIONS
Note: Information requested in the ITB and submitted by the Bidders will be analyzed by the City of Dania
Beach and will be a factor considered in awarding any resulting contract. The purpose is to ensure that the
successful Bidders in the sole opinion of the City of Dania Beach can sufficiently and efficiently perform all the
required services in a timely and satisfactory manner as will be required by the subject contract. If there are any
terms or conditions that are in conflict, the most stringent requirement shall apply.
1.1 Authorized representative contact information?*
Please include the name, title, phone and email of the authorized representative
*Response required
1.2 Entity type?*
☐ Corporation
☐ Partnership
☐ Individual
☐ Other (specify below)
*Response required
1.3 If you selected other please specify:
1.4 If you selected corporation please enter date of incorporation and state in which incorporated:
1.5 If an out-of-state Corporation or entity, must be currently authorized to do business in Florida by the Office
of the Florida Secretary of State
☐ Please confirm
1.6 Please include the name and title of Principal Officers and the date they were elected:*
*Response required
1.7 How many years has your organization been in business?*
Enter years
*Response required
1.8 The length of time (continuous) in business in Florida:*
Enter years
*Response required
1.9 Please upload a copy of a county or municipal Business Tax Receipt*
*Response required
1.10 Please upload the Resumes of key personnel who will be assigned to Project Work and a description of the
role of each person within the company*
*Response required
1.11 Have you ever failed to complete any work awarded to you?*
☐ Yes
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
29
☐ No
*Response required
When equals "Yes"
1.11.1 If yes, please explain below*
*Response required
1.12 Within the last five years, has any officer or partner of your organization ever been an officer or partner of
another organization that failed to complete an Agreement?*
☐ Yes
☐ No
*Response required
When equals "Yes"
1.12.1 If yes, please explain below*
*Response required
1.13 Within the last five years, have you ever had a performance, payment or bid bond called?*
☐ Yes
☐ No
*Response required
When equals "Yes"
1.13.1 If yes, please explain below*
*Response required
1.14 Have you, any officer or partner of your organization, or the organization been involved in any litigation or
arbitration against the City?*
☐ Yes
☐ No
*Response required
When equals "Yes"
1.14.1 If yes, please explain below*
*Response required
1.15 Within the last five years, have you, any officer or partner of your organization, or the organization or
parent company or its subsidiaries been involved in any litigation or arbitration against any other
Florida public entity?*
☐ Yes
☐ No
*Response required
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
30
When equals "Yes"
1.15.1 If yes, please explain below*
*Response required
1.16 Within the last five years, have you, any officer or partner of your organization, or the organization or
parent company or its subsidiaries been involved in any litigation or arbitration against any private
entity for an amount greater than $100,000?*
☐ Yes
☐ No
*Response required
When equals "Yes"
1.16.1 If yes, please explain below*
*Response required
1.17 Has your organization or any of its partners, officers, or key personnel, or its subsidiaries or parent
company been charged or indicted for any criminal activity within the last five years?*
☐ Yes
☐ No
*Response required
When equals "Yes"
1.17.1 If yes, please explain below*
*Response required
1.18 Has your organization or any of its partners, officers, or key personnel, or its subsidiaries or parent
company been convicted or fined for any criminal activity within the last five years?*
☐ Yes
☐ No
*Response required
When equals "Yes"
1.18.1 If yes, please explain below*
*Response required
1.19 Within the last five years, have you, any officer or partner of your organization, or the organization been
investigated by any local, state, or federal law enforcement agency, criminal justice agency or
inspector general office?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
31
1.19.1 If yes, please explain below*
*Response required
1.20 Within the last five years, have you, any officer or partner of your organization, or the organization
communicated with any local, state, or federal law enforcement agency, criminal justice agency or
inspector general office relating to goods or services provided or performed for any governmental
entity?*
☐ Yes
☐ No
*Response required
When equals "Yes"
1.20.1 If yes, please explain below*
*Response required
1.21 Within the last five years, have there been any reports or audits relating to you, any officer or partner of
your organization, or the organization issued by any local, state, or federal law enforcement agency,
criminal justice agency or inspector general office.*
☐ Yes
☐ No
*Response required
When equals "Yes"
1.21.1 If yes, please explain below*
*Response required
1.22 Within the last five years, have you, any officer or partner of your organization, or the organization failed
to disclose or made misrepresentations to any governmental entity regarding conflicts of interest or
potential or apparent conflicts of interest?*
☐ Yes
☐ No
*Response required
When equals "Yes"
1.22.1 If yes, please explain below*
*Response required
2 Commercial/Government References
Provide a list of at least five commercial or government references that the successful Bidder has supplied
service/commodities meeting the requirements of the City of Dania Beach specifications, within the last five (5)
years
2.1 Reference 1*
Please include:
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
32
Project Title
Address
Owner & Owner's Telephone Number
Contract Value
Percent Complete and Completion Date
*Response required
2.2 Reference 2*
Please include:
Project Title
Address
Owner & Owner's Telephone Number
Contract Value
Percent Complete and Completion Date
*Response required
2.3 Reference 3*
Please include:
Project Title
Address
Owner & Owner's Telephone Number
Contract Value
Percent Complete and Completion Date
*Response required
2.4 Reference 4*
Please include:
Project Title
Address
Owner & Owner's Telephone Number
Contract Value
Percent Complete and Completion Date
*Response required
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
33
2.5 Reference 5*
Please include:
Project Title
Address
Owner & Owner's Telephone Number
Contract Value
Percent Complete and Completion Date
*Response required
3 BIDDER'S QUESTIONNAIRE
The undersigned guarantees the truth and accuracy of all statements and answers contained below:
3.1 List below all pertinent information and data that would indicate the ability of your organization and
management personnel to perform satisfactorily.*
*Response required
3.2 Have you personally completed a plan for performance of the work?*
*Response required
3.3 Have you ever failed to complete work awarded to you?*
☐ Yes
☐ No
*Response required
When equals "Yes"
3.3.1 If so, when, where and why?*
*Response required
3.4 What equipment do you own that is available for work?
3.5 Has your company ever been debarred or held in default in Broward, Miami-Dade, or Palm Beach Counties
or elsewhere by any other governmental entity?*
*Response required
3.6 How many employees (Contractors only) will be assigned to perform the services?*
*Response required
3.7 How many supervisors will be assigned to perform the services?*
*Response required
3.8 Will personnel be part of a regular crew assigned to perform the services? *
☐ Yes
☐ No
*Response required
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
34
3.9 Will you be able to provide service for emergency situations? *
☐ Yes
☐ No
*Response required
When equals "Yes"
3.9.1 If so, how much notice is required?*
*Response required
3.10 What equipment do you own that is available to complete the Project?*
EVERY PIECE OF EQUIPMENT MUST HAVE ORIGINAL FACTORY GUARDS AND SHIELDS
INSTALLED AND FUNCTIONING AT THE TIME OF WORK.
*Response required
3.11 Please attach copies of any licenses, awards, certificates, etc., that you may have.
4 REQUIRED FORMS
4.1 DRUG-FREE WORKPLACE CERTIFICATION*
Whenever two (2) or more bids/Bids, which are equal with respect to price, quality, and service, are received by
the CITY OF DANIA BEACH for the procurement of commodities or contractual services, a bid/Bid received
from a business that certifies that it has implemented a drug-free workplace program shall be given preference
in the award process. In order to have a drug-free workplace program, a business shall:
A. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing,
possession or use of controlled substances is prohibited in the workplace and specifying the actions that
will be taken against employees for violations of such prohibition.
B. Inform employees about the dangers of drug abuse in the workplace, the business’s policy of
maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee
assistance programs, and the penalties that may be imposed upon employees for drug abuse violations.
C. Give each employee engaged in providing the commodities or contractual services that are under bid a
copy of the statement specified in number (1).
D. In the statement specified in number (1), notify the employees that as a condition for working on the
commodities or contractual services that are under bid, the employee will abide by the terms of the
statement and will notify the employer of any conviction on or plea of guilty or no contest to any
violation of Chapter 893, Florida Statutes or of any controlled substance law of the United States or any
singular state, for a violation occurring in the workplace no later than five (5) days after such conviction.
E. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation
program if such is available in the employee’s community by any employee who is so convicted.
F. Make a good faith effort to continue to maintain a drug-free workplace through implementation of
Section 287.087, Florida Statutes.
Calibrations and Repairs of Flow Meters and Related Devices Invitation To Bid (“ITB”) No. 25-013
35
By confirming I certify that said Company has implemented a drug-free workplace program, which meets the
requirements of Section 287.087, Florida Statutes, which are identified in letters (A) through (F) above.
☐ Please confirm
*Response required
4.2 Affidavit of Compliance with Anti-Human Trafficking Laws*
Please download the below documents, complete and have notarized. An online notarization option will be
provided for you when responding.
• Anti-Human_Trafficking_Exhi...
*Response required
4.3 Sworn Statement Under 287.133 3A Florida Statutes Public Entity Crimes*
Please download the below documents, complete, and upload.
• EXHIBIT_“B”_City_of_Dania_B...
*Response required
4.4 Non-Collusion Affidavit*
Please download the below documents, complete, and upload.
• EXHIBIT_“C”_-_Non_Collusion...
*Response required
4.5 Independence Affidavit*
Please download the below documents, complete, and upload.
City of Dania Beach
Public Services Memorandum
DATE: 7/8/2025
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Fernando J. Rodriguez, Public Services Director
Sean Schutten, Public Services Deputy Director
SUBJECT: AUTHORIZATION TO EXECUTE AN AGREEMENT WITH RIC-MAN
INC. FOR THE SE DRAINAGE RETROFIT PROJECT PHASE II
Request:
The Public Services Department (PSD) requests City Commission approval to authorize the
execution of a construction agreement with Ric-Man Inc. for the SE Drainage Retrofit Project -
Phase II.
Background:
On April 4, 2025, the City issued Invitation to Bid ITB-2025-012 for the SE Drainage Retrofit
Project Phase II. On May 9, 2025, three bids were received:
Ric-Man Inc. $17,950,449.55
David Mancini and Sons $20,540,673.00
Man Con Inc. . $21,290,286.50
After reviewing the bids and references, Ric-Man Inc. was identified as the lowest responsive
and responsible bidder.
The City Commission previously authorized the necessary expenditure exceeding $1,000,000.00
during the second reading held on June 10, 2025. In addition, the City Commission authorized
the award of ITB-2025-012 to Ric-Man Construction Florida, Inc. on June 10th with Resolution
No. 2025-084. As the next step, approval is required to formally execute the agreement with the
selected contractor.
Budgetary Impact
The SE Drainage Retrofit Project Phase II will not exceed an amount of $19,754,494.51, which
includes a 10% contingency in the amount of $1,795,044.96. Funding will be appropriated from
the Stormwater Account Number 303-38-14-538-63-10 in the amount not to exceed
$19,754,494.51
Recommendation
It is recommended that the City Commission authorize the City Manager to execute the
agreement with Ric-Man Inc. in the amount of $19,754,494.51 for the SE Drainage Retrofit
Project Phase II.
RESOLUTION NO. 2025-____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE EXECUTION OF AN
AGREEMENT WITH RIC-MAN INC. FOR THE SOUTHEAST DRAINAGE
RETROFIT PROJECT PHASE II, IN AN AMOUNT NOT TO EXCEED
NINETEEN MILLION SEVEN HUNDRED FIFTY-FOUR THOUSAND FOUR
HUNDRED NINETY-FOUR DOLLARS AND FIFTY-ONE CENTS
($19,754,494.51); WHICH INCLUDES A TEN PERCENT (10%)
CONTINGENCY; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING
FOR AN EFFECTIVE DATE.
WHEREAS, the City Commission authorized the SE Drainage Retrofit Project Phase II
(Project), along with other neighborhood drainage projects, to address chronic flooding; and
WHEREAS, the Public Services Department issued ITB No. 2025-012 for construction
of the Project on April 4, 2025, and received three responses below on May 9, 2025:
1. Ric-Man Inc.: $17,950,449.55
2. David Mancini and Sons: $20,540,673.00
3. Man Con Inc.: $21,290,286.50
WHEREAS, Ric-Man Inc. was determined to be the lowest responsive and responsible
bidder, and
WHEREAS, the City Commission passed Resolution 2024-084 authorizing the award
of ITB No. 2025-012 to Ric-man Construction Florida, Inc. in the amount of $19,754,494.51,
which includes a 10% contingency in the amount of $1,795,044.96.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF
THE CITY OF DANIA BEACH, FLORIDA:
Section 1.That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2.That the City Commission authorizes the proper City officials to execute
a contract with Ric-Man Inc, , for the SE Drainage Retrofit Project Phase II in an amount not to
exceed Nineteen Millon Seven Hundred Fifty-Four Thousand Four Hundred Forty-Nine Dollars
and Fifty-One Cents ($19,754,494.51), which Agreement is attached as Exhibit “A” and
incorporated into this Resolution by this reference.
2 RESOLUTION #2025-_____
Section 3.Funding shall be appropriated from the Stormwater Account Number
303-38-14-538-63-10 in the amount not to exceed $19,754,494.51.
Section 4.That use of the Contingency funding in the amount of $1,795,044.96 may
be approved by the City Manager through written request by the Public Services Department
upon receipt of written change orders from the vendor.
Section 5.All resolutions or parts of resolutions in conflict herewith are hereby
repealed to the extent of such conflict.
Section 6.That this Resolution shall be effective 10 days after passage.
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
ITB Contract #25-012 Page i
CONTRACT BETWEEN THE MUNICIPALITY CITY OF DANIA BEACH AND
RIC-MAN CONSTRUCTION FLORIDA, INC. FOR SOUTHEAST DRAINAGE RETROFIT PROJECT,
PHASE II
BID/CONTRACT NO.: ITB 25-012
Table of Contents
SUMMARY OF TERMS AND CONDITIONS .................................................................................... 1
CONTRACT .................................................................................................................................... 3
RECITALS ...................................................................................................................................... 3
ARTICLE 1 DEFINITIONS ............................................................................................................ 3
ARTICLE 2 SCOPE OF WORK ..................................................................................................... 5
ARTICLE 3 CONTRACT TIME ..................................................................................................... 6
ARTICLE 4 CONTRACT SUM ...................................................................................................... 7
ARTICLE 5 PROGRESS PAYMENTS ............................................................................................ 8
ARTICLE 6 ACCEPTANCE AND FINAL PAYMENT ..................................................................... 10
ARTICLE 7 REPRESENTATIONS AND WARRANTIES ................................................................ 11
ARTICLE 8 MISCELLANEOUS ................................................................................................... 13
CONTRACT SUPPLEMENT ........................................................................................................... 20
GENERAL CONDITIONS ............................................................................................................... 21
ARTICLE 1 CONTRACT DOCUMENTS ...................................................................................... 21
ARTICLE 2 INTENTION OF COUNTY ........................................................................................ 21
ARTICLE 3 PRELIMINARY MATTERS ........................................................................................ 21
ARTICLE 4 PERFORMANCE BOND AND PAYMENT BOND ...................................................... 23
ARTICLE 5 QUALIFICATION OF SURETY .................................................................................. 23
ARTICLE 6 INDEMNIFICATION ................................................................................................ 24
ARTICLE 7 INSURANCE REQUIREMENTS ................................................................................ 25
ARTICLE 8 LABOR AND MATERIALS ........................................................................................ 29
ARTICLE 9 ROYALTIES AND PATENTS ..................................................................................... 29
ARTICLE 10 WEATHER .............................................................................................................. 30
ARTICLE 11 PERMITS, LICENSES, AND IMPACT FEES ................................................................ 30
ARTICLE 12 RESOLUTION OF DISPUTES ................................................................................... 30
ARTICLE 13 INSPECTION OF WORK .......................................................................................... 31
ARTICLE 14 SUPERINTENDENCE AND SUPERVISION ................................................................ 32
ARTICLE 15 COUNTY’S RIGHT TO TERMINATE CONTRACT ...................................................... 33
ITB Contract #25-012 Page ii
ARTICLE 16 SUSPENSION OF WORK ......................................................................................... 35
ARTICLE 17 PROJECT RECORDS AND RIGHT TO AUDIT ............................................................ 35
ARTICLE 18 RIGHTS OF VARIOUS INTERESTS ........................................................................... 37
ARTICLE 19 EXPLOSIVES ........................................................................................................... 37
ARTICLE 20 DIFFERING SITE CONDITIONS ................................................................................ 37
ARTICLE 21 PLANS AND WORKING DRAWINGS ....................................................................... 38
ARTICLE 22 CONTRACTOR TO CHECK PLANS, SPECIFICATIONS, AND DATA ............................ 38
ARTICLE 23 CONTRACTOR’S RESPONSIBILITY FOR DAMAGES AND ACCIDENTS ..................... 38
ARTICLE 24 WARRANTY............................................................................................................ 38
ARTICLE 25 SUPPLEMENTARY DRAWINGS ............................................................................... 39
ARTICLE 26 DEFECTIVE WORK .................................................................................................. 39
ARTICLE 27 TAXES .................................................................................................................... 40
ARTICLE 28 SUBCONTRACTS .................................................................................................... 40
ARTICLE 29 SEPARATE CONTRACTS ......................................................................................... 40
ARTICLE 30 USE OF COMPLETED PORTIONS ............................................................................ 41
ARTICLE 31 LANDS OF WORK ................................................................................................... 42
ARTICLE 32 LEGAL RESTRICTIONS AND TRAFFIC PROVISIONS ................................................. 42
ARTICLE 33 LOCATION AND DAMAGE TO EXISTING FACILITIES, EQUIPMENT, OR UTILITIES .. 42
ARTICLE 34 VALUE ENGINEERING ............................................................................................ 43
ARTICLE 35 PAYMENT BY COUNTY FOR TESTS......................................................................... 43
ARTICLE 36 CHANGE IN THE WORK OR TERMS OF CONTRACT ............................................... 43
ARTICLE 37 FIELD ORDERS AND SUPPLEMENTAL INSTRUCTIONS ........................................... 44
ARTICLE 38 CHANGE ORDERS .................................................................................................. 44
ARTICLE 39 VALUE OF CHANGE ORDER WORK ........................................................................ 45
ARTICLE 40 NOTIFICATION AND CLAIM FOR CHANGE OF CONTRACT TIME OR CONTRACT
PRICE ..................................................................................................................... 48
ARTICLE 41 NO DAMAGES FOR DELAY ..................................................................................... 48
ARTICLE 42 EXCUSABLE DELAY; COMPENSABLE; NON-COMPENSABLE .................................. 49
ARTICLE 43 SUBSTANTIAL COMPLETION ................................................................................. 50
ARTICLE 44 NO INTEREST ......................................................................................................... 51
ARTICLE 45 SHOP DRAWINGS .................................................................................................. 51
ARTICLE 46 FIELD LAYOUT OF THE WORK AND RECORD DRAWINGS ..................................... 53
ARTICLE 47 SAFETY AND PROTECTION .................................................................................... 53
ITB Contract #25-012 Page iii
ARTICLE 48 FINAL BILL OF MATERIALS ..................................................................................... 54
ARTICLE 49 PROJECT SIGN ....................................................................................................... 54
ARTICLE 50 CLEANING UP; COUNTY’S RIGHT TO CLEAN UP .................................................... 54
ARTICLE 51 HURRICANE PRECAUTIONS ................................................................................... 54
ARTICLE 52 REMOVAL OF EQUIPMENT .................................................................................... 55
ARTICLE 53 DOMESTIC PARTNERSHIP REQUIREMENT ............................................................ 55
ARTICLE 54 EQUAL EMPLOYMENT OPPORTUNITY AND CBE/SBE COMPLIANCE..................... 55
ARTICLE 55 PUBLIC RECORDS ................................................................................................... 55
SUPPLEMENTAL GENERAL CONDITIONS .................................................................................... 58
SUPPLEMENTAL WAGE REQUIREMENTS ................................................................................... 58
FORM 1: PERFORMANCE BOND................................................................................................. 60
FORM 2: PAYMENT BOND.......................................................................................................... 62
FORM 3: CERTIFICATE AS TO CORPORATE PRINCIPAL ............................................................... 65
FORM 4: FORM OF CERTIFICATE AND AFFIDAVIT FOR BONDS $500,000.00 OR LESS .............. 66
FORM 5: UNCONDITIONAL LETTER OF CREDIT (PERFORMANCE AND PAYMENT GUARANTY)
FORM ......................................................................................................................................... 68
FORM 6: MONTHLY (CBE/SBE) UTILIZATION REPORT .............................................................. 70
FORM 7: FINAL (CBE/SBE) UTILIZATION REPORT ...........................................................................
FORM 8B: STATEMENT OF COMPLIANCE (DAVIS-BACON ACT) ............................................... 712
FORM 9: CERTIFICATION OF PAYMENTS TO SUBCONTRACTORS ............................................ 723
FORM 10: CERTIFICATION OF SUBSTANTIAL COMPLETION……………………………………………74
FORM 11: FINAL CERTIFICATE OF PAYMENT ........................................................................... 756
FORM 12: FORM OF FINAL RECEIPT ......................................................................................... 767
ITB/Contract #25-012
ITB Contract #25-012 Page 1 of 78
CONTRACT BETWEEN THE CITY OF DANIA BEACH AND RIC-MAN CONSTRUCTION FLORIDA,
INC. FOR SOUTHEAST DRAINAGE RETROFIT PROJECT, PHASE II
BID/CONTRACT NO.: ITB 25-012
Project Title: Southeast Drainage Retrofit Project, Phase II
Location: City of Dania Beach
RLI Number:
Contract Number: ITB 25-012
Project Number:
SUMMARY OF TERMS AND CONDITIONS
Contractor: Ric-Man Construction Florida, Inc.
Contractor Address: 3100 SW 15th Street
Deerfield Beach, FL
Federal Identification No.: 20-1309732
Contract Administrator: Michael Fischer, Executive Vice President
Contract Administrator
Address:
3100 SW 15th Street
Deerfield Beach, Florida 33442
Consultant:
Consultant Address:
Article Description Instructions/Unit(s)
3.2 Substantial Completion 548 Days after the Project
Initiation Date in NTP
3.2 Final Completion 30 Days after Substantial
Completion
3.3 [If applicable] Liquidated Damages for each
calendar day after time specified in Notice to
Proceed
$500.00 per day
3.3 Liquidated Damages for each calendar day after
time specified for Substantial Completion
$500.00 per day
3.3 Liquidated Damages for each calendar day after
time specified for Final Completion
$500.00 per day
3.3 [If applicable] Liquidated Damages for each
calendar day after time specified for interim
Milestones (or phase):
Interim Milestone #1
0 per day
Interim Milestone #2
ITB/Contract #25-012
ITB Contract #25-012 Page 2 of 78
Article Description Instructions/Unit(s)
[Milestones 1, 2, 3, etc.: Division 1, Section
_____]
$0 per day
Interim Milestone #3
$0 per day
5.2 Will Materials and equipment be stored at the
Project site?
X Yes
___ No
8.1 Is this Contract subject to Florida Department of
Transportation (“FDOT”) provisions?
___ Yes
__X_ No
8.4 The Parties designate the following as the
respective places for giving of notice:
For Municipality:
Ana M. Garcia, ICMA – CM
City Manager
100 W. Dania Beach Blvd.
Dania Beach, FL 33004
For Contractor:
Chris Mancini
3100 SW 15 St.
Deerfield Beach, Florida 33442
christopherm@ric-manfl.com
8.22 and
8.23
Select the sources of funding that apply to this
Project:
__x_ Federal funding
__x_ State funding
___ County funding
__x_ Municipality funding
42
(General
Conditions)
Compensable Excusable Delay for each calendar
day beyond the Contract Time.
$500.00 per day
54
(General
Conditions)
County Business Enterprise (CBE) or Small
Business Enterprise (SBE) commitment
As awarded0 %
ITB/Contract #25-012
ITB Contract #25-012 Page 3 of 78
CONTRACT
This construction contract (“Contract”) is between the City of Dania Beach, a municipality
of the State of Florida (“Municipality”), and Ric-Man Construction Florida, Inc., a corporation
(“Contractor”) (each a “Party” and collectively referred to as the “Parties”).
RECITALS
WHEREAS, the Public Services Department engaged WSP USA, Inc. to provide engineering
services to design, survey, permit, bidding support, and design services during construction for
the Southeast Drainage Retrofit Project; and
WHEREAS, due to the project’s scope and magnitude, it was divided into two separate
construction phases; and
WHEREAS, the City issued ITB No. 2025-014 for “Southeast Drainage and Retrofit Project,
Phase II (the “Project”); and
WHEREAS, on June 10, 2025, pursuant to Resolution No. 2025-___, the City Commission
approved the bid award recommendation to Ric-Man Construction Florida, Inc.
Now, therefore, for good and valuable consideration, the receipt and sufficiency of
which are hereby acknowledged, the Parties agree as follows:
ARTICLE 1 DEFINITIONS
Whenever the following terms appear in the Contract Documents, the intent and meaning shall
be interpreted as follows:
1.1. Applicable Law means all applicable laws, codes, advisory circulars, rules, regulations,
or ordinances of any federal, state, county, municipal, or other governmental entity, including as
may be amended from time to time.
1.2. Bidder means an entity or individual submitting a bid for this Project, acting directly or
through a duly authorized representative.
1.3. Board means the governing body of Municipality, its successors and assigns.
1.4. Code means the Broward County Code of Ordinances.
1.5. Change Order means a written document ordering a change in the Contract Price or
Contract Time or a material change in the Work.
ITB/Contract #25-012
ITB Contract #25-012 Page 4 of 78
1.6. Consultant means the architect or engineer who has contracted with Municipality or who
is an employee of Municipality and provides professional services for this Project.
1.7. Contract Administrator means ____________ or such other person designated by
Fernando Rodriguez, in writing.
1.8. Contract Documents means the official documents setting forth bidding information,
requirements, and contractual obligations for the Project and includes Articles 1 through 8 of this
Contract, the Contract Supplement, the General Conditions, the Supplemental General
Conditions, the Scope of Work, Invitation to Bid, Addenda, Standard Instructions for Vendors,
Special Instructions for Vendors, Plans, Drawings, Exhibits, General Requirements, Technical
Specifications, Bid Forms, Record of Award by Board, Bonds, Notice of Award, Notice(s) to
Proceed, Supplements, Representations and Certifications, Certificates, Project Forms, Closeout
Forms, Purchase Order(s), Change Order(s), Field Order(s), Special Provisions, BIM and Electronic
Media Submittal Requirements, and any additional documents the submission of which is
required by this Project.
1.9. Contract Price means the amount established in the bid submittal and award by the
Board, as may be amended by Change Order.
1.10. Contract Time means the time between commencement and completion of the Work,
including any milestone dates thereof, established in Article 3 of this Contract, as may be
amended by Change Order.
1.11. Contractor means the person, firm, or corporation identified in this Contract as the Party
with whom Municipality has contracted and who is responsible for the acceptable performance
of the Work and for the payment of all legal debts or other obligations pertaining to the Work.
All references in the Contract Documents to third parties under contract or control of Contractor
shall be deemed to be a reference to Contractor.
1.12. County means Broward County, a political subdivision of the State of Florida and
representatives authorized by the Board of County Commissioners or the Broward County
Charter to act on behalf of County.
1.13. County Business Enterprise or CBE means a small business certified as meeting the
applicable requirements of the Broward County Business Opportunity Act of 2012, Section 1-81,
of the Code.
1.14. Field Order means a written order of minor changes in the Work that does not involve a
change in the Contract Price or Contract Time.
1.15. Final Completion means the date certified by Consultant in the Final Certificate of
Payment as the date upon which all conditions and requirements of any permits and regulatory
agencies have been satisfied; any documents required by the Contract Documents have been
received by Consultant; any other documents required to be provided by Contractor have been
ITB/Contract #25-012
ITB Contract #25-012 Page 5 of 78
received by Consultant; and to the best of Consultant’s knowledge, information and belief, the
Work has been fully completed in accordance with the terms and conditions of the Contract
Documents.
1.16. Materials means physical items incorporated in this Project or used or consumed in the
performance of the Work.
1.17. Municipality Manager means the official appointed by the Municipality who directs the
administration of the Municipality.
1.18. Notice(s) to Proceed means a written notice to Contractor authorizing the
commencement of the activities identified in the notice or as described in the Contract
Documents.
1.19. OESBD means Broward County’s Office of Economic and Small Business Development.
1.20. Plans or Drawings means the official graphic representations of this Project.
1.21. Purchasing Director means Municipality’s Procurement Administrator or designee
authorized to execute Work Authorizations.
1.22. Project means the construction project described in the Contract Documents, including
the Work described therein.
1.23. Project Initiation Date means the date upon which the Contract Time commences.
1.24. Punch List means a document developed by Consultant and the Contract Administrator
and provided to Contractor simultaneously with, or within thirty (30) to forty-five (45) calendar
days after, the issuance of a Certificate of Substantial Completion or Partial Substantial
Completion, that lists Work that Contractor has yet to complete or that does not conform to the
Contract Documents and that Contractor must complete or correct, as indicated in the
document, to satisfy the requirements of this Contract for Final Completion and to make the
Work satisfactory and acceptable.
1.25. Small Business Enterprise or SBE means an entity certified as meeting the applicable
requirements of the Broward County Business Opportunity Act of 2012, Section 1-81, of the
Code.
1.26. Subcontractor means any person, firm or corporation, including subconsultants, having a
direct contract with Contractor, regardless of tier, to perform all or any portion of the Work
described in the Contract Documents, including one who furnishes material worked to a special
design according to the Contract Documents, but does not include one who merely furnishes
Materials not so worked.
ITB/Contract #25-012
ITB Contract #25-012 Page 6 of 78
1.27. Substantial Completion means that date, as certified in writing by Consultant and as
finally determined by Contract Administrator in the Contract Administrator’s sole discretion, on
which the Work, or a portion thereof, is at a level of completion in substantial compliance with
the Contract Documents such that all conditions of permits and regulatory agencies have been
satisfied and Municipality or its designee can enjoy use or occupancy and can use or operate it in
all respects for its intended purpose. A Certificate of Occupancy (or a Temporary Certificate of
Occupancy (TCO) or other alternate municipal/county authorization for limited or conditional
occupancy acceptable to the Contract Administrator) must be issued for Substantial Completion
to be achieved; however, the issuance of a Certificate of Occupancy will not, by itself, constitute
the achievement or date of Substantial Completion.
1.28. Surety means the surety company or individual that is bound by the performance bond
and payment bond with and for Contractor that is primarily liable for satisfactory performance
of the Work, and which surety company or individual is responsible for Contractor’s satisfactory
performance of the Work under this Contract and for the payment of all debts and other
obligations pertaining thereto in accordance with Section 255.05, Florida Statutes.
1.29. Work means the construction and other services required by the Contract Documents,
whether completed or partially completed, and includes all labor, materials, equipment, and
services provided or to be provided by Contractor to fulfill Contractor’s obligations. The Work
may constitute the whole or a part of the Project.
ARTICLE 2 SCOPE OF WORK
Contractor hereby agrees to furnish all of the labor, materials, equipment, services, and
incidentals necessary to perform all Work described in the Contract Documents for the Project.
ARTICLE 3 CONTRACT TIME
3.1. Contractor shall be instructed to commence the Work by written instruction in the form
of a Purchase Order issued by Municipality’s Purchasing Director and two or more Notices to
Proceed issued by the Contract Administrator. The first Notice to Proceed and Purchase Order
will not be issued until Contractor submits to Municipality all required documents and after
execution of this Contract by both Parties. Preliminary Work, including submission of a project
schedule, schedule of values, submittals, submittal schedule, and other documents required for
permitting, and performance of Work that does not require permits, shall commence within ten
(10) days after the date of the first Notice to Proceed. Contractor shall have ten (10) days after
receipt of signed and sealed contract Drawings from Consultant to apply for construction permits
to the applicable permitting authority. Issuance of all permits by the permitting authority shall
be a condition precedent to the issuance of a second Notice to Proceed for additional Work.
Except for the reimbursement of permit application fees, impact fees, and performance and
payment bond premiums as may be provided for in the Contract Documents, Contractor shall not
be entitled to compensation of any kind during the permitting process. The Work to be
ITB/Contract #25-012
ITB Contract #25-012 Page 7 of 78
performed pursuant to the second Notice to Proceed shall commence within ten (10) days after
the Project Initiation Date specified in the second Notice to Proceed.
3.2. Time is of the essence for Contractor’s performance under this Contract. Contractor must
obtain Substantial Completion of the Work within five hundred forty(540) days after the Project
Initiation Date specified in the second Notice to Proceed, and Final Completion within thirty (30)
days after Substantial Completion.
3.3. Upon failure of Contractor to obtain Substantial Completion within the deadline stated in
Section 3.2, as extended by any approved time extensions, Contractor shall pay to Municipality
the sum of $500.00for each day after the deadline for Substantial Completion, as extended by
any approved time extensions, until Substantial Completion is obtained. After Substantial
Completion, should Contractor fail to complete the remaining Work and obtain Final Completion
within the deadline stated in Section 3.2, as extended by approved time extensions thereof,
Contractor shall pay to Municipality the sum of $500.00 for each day after the deadline for Final
Completion, as extended by any approved extensions, until Final Completion is obtained. These
amounts are not penalties but are liquidated damages to Municipality for its inability to obtain
full beneficial occupancy and/or use of the Project. Liquidated damages are hereby fixed and
agreed upon between the Parties based on (1) a mutual recognition of the impossibility of
precisely ascertaining the amount of damages that will be sustained by Municipality as a
consequence of Contractor’s failure to timely obtain Substantial Completion, Final Completion,
or both; and (2) both Parties’ desire to obviate any question or dispute concerning the amount
of said damages and the cost and effect of the failure of Contractor to achieve Substantial
Completion, Final Completion, or both, on time. These liquidated damages shall apply separately
to each portion of the Project for which a deadline for Substantial Completion, Final Completion,
or both, is given. Liquidated damages do not address costs incurred by Municipality or
Consultant: (a) due to an audit conducted pursuant to Article 17 of the General Conditions; or (b)
in having Consultant administer the construction of the Project beyond the deadlines for
Substantial Completion, Final Completion, or both. Contractor is separately responsible to
Municipality for the actual costs referenced in (a) or (b) above, pursuant to Section 3.5.
3.4. Municipality may, but is not obligated to, deduct liquidated damages from monies due to
Contractor for the Work under this Contract or as much thereof as Municipality may, in its sole
discretion, deem just and reasonable.
ARTICLE 4 CONTRACT SUM
4.1. X This is a Unit Price Contract:*
4.1.1. Municipality shall pay to Contractor the amounts determined for the total number
of each of the units of Work completed at the unit price stated in the Contract Price. The
number of units contained in Contractor’s bid is an estimate only, and final payment shall
be made for the actual number of units incorporated in or made necessary by the Work.
ITB/Contract #25-012
ITB Contract #25-012 Page 8 of 78
4.1.2. Payment shall be made at the unit prices applicable to each integral part of the
Work. These prices shall be full compensation to Contractor for all costs, including
overhead and profit, associated with Contractor’s completion of all Work in full
conformity with the requirements as stated or shown, or both, in the Contract
Documents. The cost of any item of Work not covered by a specific Contract unit price
shall be included in the Contract unit price or lump sum price to which the item is most
applicable.
4.2. X This is a Lump Sum Contract:*
4.2.1. Municipality shall pay Contractor the Contract Price for the performance of the
Work described in the Contract Documents.
4.2.2. Payment shall be at the lump sum price stated in this Contract. This price shall be
full compensation for all costs, including overhead and profit, associated with completion
of all Work in full conformity with the requirements as stated or shown, or both, in the
Contract Documents. The cost of any item of Work not covered by a specific Contract
lump sum should be included in the lump sum price to which the item is most applicable.
*Note: Only the subsections in the Contract Documents corresponding to any checked box in
this Article 4 will apply to this Contract. Some Projects include both unit prices and lump sums,
in which case both subsections shall apply as appropriate depending upon the type of Work being
performed by Contractor and approved by Municipality.
ARTICLE 5 PROGRESS PAYMENTS
5.1. Contractor may make an application for payment (“Application for Payment”), at intervals
of not more than once a month, for Work completed on the Project during the preceding interval.
Contractor shall, where the Project involves CBE or SBE Subcontractors, make Application for
Payment, at monthly intervals, for Work completed on the Project by such Subcontractors during
the proceeding monthly interval. Contractor’s Applications for payment must show a complete
breakdown of the Project components, the quantities completed during the applicable interval,
and the amount of payment sought, together with such supporting evidence as may be required
by Consultant or Contract Administrator. At a minimum, Contractor shall submit with each
Application for Payment: an updated progress schedule acceptable to Consultant as required by
the Contract Documents; a Certification of Payments to Subcontractors Form (Form 9); a
statement indicating the cumulative amount of CBE or SBE participation to date; and a release of
claims relative to the Work that was the subject of any previous Applications for Payment or
consent of surety relative to the Work that is the subject of the Application for Payment. If
Contractor has not made payment to a Subcontractor, the Certification of Payments to
Subcontractors Form shall be accompanied by a copy of the notification sent to each
Subcontractor (listed in Item 2 of the Form) to whom payment has not been made, explaining
the good cause why payment was not made. When applicable, each Application for Payment
shall be accompanied by a completed Statement of Wage Compliance Form (Form 8A or 8B).
ITB/Contract #25-012
ITB Contract #25-012 Page 9 of 78
Each Application for Payment shall be submitted in triplicate to Consultant for approval as
follows:
Alvaro Cortes, Project Manager, 1201 Stirling Road, Dania Beach, Florida 33004
All Applications for Payment shall be stamped as received on the date on which they are
delivered in the manner specified above. Payments of Applications for Payment shall be subject
to approval as specified herein, and, if approved, payment for the undisputed portion(s) of the
Application for Payment shall be due twenty (20) business days after the date on which the
Application for Payment is stamped received. At the end of the twenty- (20) business days,
Contractor may send the Contract Administrator an overdue notice. If the Application for
Payment is not rejected within four (4) business days after delivery of the overdue notice, the
Application for Payment shall be deemed accepted, excepting any portions that Municipality
determines to be fraudulent or misleading. If the Application for Payment does not meet the
requirements of this Contract, Municipality shall reject the Application for Payment within
twenty (20) business days after the date stamped received and said rejection shall specify each
deficiency and the action necessary by Contractor to cure each deficiency. If Contractor submits
a request that corrects each deficiency, the corrected Application for Payment must be paid or
rejected within ten (10) business days after the corrected Application for Payment is stamped as
received. Any dispute between Municipality and Contractor shall be communicated in writing
and resolved pursuant to the dispute resolution procedure set forth in Article 12 of the General
Conditions.
5.2. Prior to issuance of the Punch List, Municipality may withhold retainage on each progress
payment as set forth in Section 255.078, Florida Statutes, as may be amended during this
Contract. Any reduction in retainage below the maximum amount set forth in Section 255.078,
Florida Statutes, shall be at the sole discretion of the Contract Administrator, as may be
recommended by Consultant. Any interest earned on retainage shall accrue to the benefit of
Municipality.
If the Summary of Terms and Conditions indicates that Materials and equipment will be stored
at the Project site, as payment for such storage, Contractor shall receive payment equal to ninety
percent (90%) of the invoiced amount of the Materials and equipment in the manner set forth in
this paragraph. The invoiced amount shall be based on the value of all acceptable Materials and
equipment not yet incorporated in the Work but delivered and suitably stored at the Project site
and scheduled for installation on-site within thirty (30) days after the date of the Application for
Payment. Copies of the supplier’s invoices for the Materials and equipment shall be included
with the Application for Payment.
5.3. Notwithstanding any provision of this Contract to the contrary, Municipality may withhold
payment, in whole or in part, in accordance with Applicable Law, as a consequence of
Contractor’s material breach of any obligation under the Contract Documents, or to such extent
as may be necessary to protect itself from loss on account of:
5.3.1 Inadequate or defective Work not remedied.
ITB/Contract #25-012
ITB Contract #25-012 Page 10 of 78
5.3.2 Claims filed or reasonable evidence indicating probable filing of claims by other
parties against Contractor or Municipality relating to Contractor’s performance.
5.3.3 Failure of Contractor to make payments properly to Subcontractors or for material
or labor.
5.3.4 Damage to another contractor not remedied.
5.3.5 Liquidated damages and costs incurred by Consultant for extended construction
administration.
5.3.6 Failure of Contractor to provide any document(s) required by the Contract
Documents.
When the above grounds are removed or resolved to the satisfaction of the Contract
Administrator, any applicable withheld payment shall be made to the extent otherwise due.
ARTICLE 6 ACCEPTANCE AND FINAL PAYMENT
6.1. Consultant shall conduct an inspection within ten (10) days after receipt of written notice
from Contractor that all Work described in the Punch List has been completed and the Work is
ready for final inspection and acceptance. A Final Certificate of Payment (Form 11) for the Work,
or the applicable phase thereof, shall be issued if Consultant and Contract Administrator find
that: (a) the Work is acceptable; (b) the requisite documents have been submitted; (c) the
requirements of the Contract Documents are fully satisfied; and (d) all conditions of the permits
and regulatory agencies have been met. Such Final Certificate of Payment (Form 11) shall be
issued by Consultant, under its signature, stating that the applicable requirements of the Contract
Documents have been performed and that the Work is ready for acceptance under the terms and
conditions of the Contract Documents.
6.2. Before issuance of the Final Certificate for Payment, Contractor shall deliver to Consultant
the following final payment package: a complete release of all claims arising out of this Contract,
or receipts in full in lieu thereof; an affidavit certifying that all suppliers and Subcontractors have
been paid in full and that all other indebtedness and financial obligations connected with the
applicable Work have been paid, or, in the alternative, a consent of the Surety to final payment
on Contractor’s behalf; the final corrected as-built Drawings; the final bill of Materials, if
required, and the final Application for Payment. This final payment package must include the
certification document titled Final List of Non-Certified Subcontractors and Suppliers (Form 13),
which must be signed and notarized by Contractor. A list of all noncertified Subcontractors and
suppliers used must be attached to this certified document.
6.3. If, after Substantial Completion, Final Completion is materially delayed through no fault
of Contractor, and Consultant so certifies, Municipality shall, upon certification of Consultant,
and without terminating this Contract, make payment of the balance due for any portion of the
ITB/Contract #25-012
ITB Contract #25-012 Page 11 of 78
Work fully completed and accepted. Such payment shall be made under the terms and conditions
governing final payment, but it shall not constitute a waiver of any claims by Municipality.
6.4. Final payment shall be made only after the Board or Municipality’s Purchasing Director,
as applicable, has reviewed a written evaluation of the performance of Contractor prepared by
the Contract Administrator and has approved the final payment. The acceptance of final
payment shall constitute a waiver of all claims by Contractor, except those previously made in
strict accordance with the provisions of the General Conditions and identified by Contractor as
unsettled at the time of the application for final payment.
ARTICLE 7 REPRESENTATIONS AND WARRANTIES
7.1. Representation of Authority. Contractor represents and warrants that this Contract
constitutes the legal, valid, binding, and enforceable obligation of Contractor, and that neither
the execution nor performance of this Contract constitutes a breach of any agreement that
Contractor has with any third party or violates Applicable Law. Contractor further represents and
warrants that execution of this Contract is within Contractor’s legal powers, and each individual
executing this Contract on behalf of Contractor is duly authorized by all necessary and
appropriate action to do so on behalf of Contractor and does so with full legal authority.
7.2. Solicitation Representations. Contractor represents and warrants that all statements and
representations made in Contractor’s proposal, bid, or other supporting documents submitted
to Municipality in connection with the solicitation, negotiation, or award of this Contract,
including during the procurement or evaluation process, were true and correct when made and
are true and correct as of the date Contractor executes this Contract, unless otherwise expressly
disclosed in writing by Contractor.
7.3. Contingency Fee. Contractor represents and warrants that it has not employed or
retained any person or entity, other than a bona fide employee working solely for Contractor, to
solicit or secure this Contract, and that it has not paid or agreed to pay any person or entity, other
than a bona fide employee working solely for Contractor, any fee, commission, percentage, gift,
or other consideration contingent upon or resulting from the award or making of this Contract.
7.4. Public Entity Crimes. Contractor represents that it is familiar with the requirements and
prohibitions of the Public Entity Crime Act, Section 287.133, Florida Statutes, and represents that
its entry into this Contract will not violate that Act. In addition to the foregoing, Contractor
further represents that there has been no determination that it committed a “public entity crime”
as defined by Section 287.133, Florida Statutes, and that it has not been formally charged with
committing an act defined as a “public entity crime,” regardless of the amount of money involved
or whether Contractor has been placed on the convicted vendor list.
7.5. Discriminatory Vendor and Scrutinized Companies List; Countries of Concern. Contractor
represents that it has not been placed on the discriminatory vendor list as provided in Section
287.134, Florida Statutes, and that it is not a “scrutinized company” pursuant to Sections 215.473
ITB/Contract #25-012
ITB Contract #25-012 Page 12 of 78
or 215.4725, Florida Statutes. Contractor further represents that it is not, and for the duration
of the Contract will not be, ineligible to contract with Municipality on any of the grounds stated
in Section 287.135, Florida Statutes. Contractor represents that it is, and for the duration of this
Contract will remain, in compliance with Section 286.101, Florida Statutes.
7.6. Claims Against Contractor. Contractor represents and warrants that there is no action or
proceeding, at law or in equity, before any court, mediator, arbitrator, governmental or other
board or official, pending or, to the knowledge of Contractor, threatened against or affecting
Contractor, the outcome of which may (a) affect the validity or enforceability of this Contract,
(b) materially and adversely affect the authority or ability of Contractor to perform its obligations
under this Contract, or (c) have a material and adverse effect on the consolidated financial
condition or results of operations of Contractor or on the ability of Contractor to conduct its
business as presently conducted or as proposed or contemplated to be conducted.
7.7. Verification of Employment Eligibility. Contractor represents that Contractor and each
Subcontractor have registered with and use the E-Verify system maintained by the United States
Department of Homeland Security to verify the work authorization status of all newly hired
employees in compliance with the requirements of Section 448.095, Florida Statutes, and that
entry into this Contract will not violate that statute. If Contractor violates this section,
Municipality may immediately terminate this Contract for cause and Contractor shall be liable for
all costs incurred by Municipality due to the termination.
7.8. Warranty of Performance. Contractor represents and warrants that it possesses the
knowledge, skill, experience, and financial capability required to perform and provide all Work
and that each person and entity that will perform or provide Work is duly qualified to perform
such Work by all appropriate governmental authorities, where required, and is sufficiently
experienced and skilled in the area(s) for which such person or entity will render such Work.
Contractor represents and warrants that the Work shall be performed in a skillful and respectful
manner, and that the quality of all such Work shall equal or exceed prevailing industry standards
for such Work.
7.9. Truth-In-Negotiation Representation. Contractor’s compensation under this Contract is
based upon its representations to Municipality, and Contractor certifies that the wage rates,
factual unit costs, and other information supplied to substantiate Contractor’s compensation,
including without limitation those made by Contractor during the negotiation of this Contract,
are accurate, complete, and current as of the date Contractor executes this Contract.
Contractor’s compensation may be reduced by Municipality, in its sole discretion, to correct any
inaccurate, incomplete, or noncurrent information provided to Municipality as the basis for
Contractor’s compensation in this Contract.
7.10. Prohibited Telecommunications Equipment. Contractor represents and certifies that
Contractor and all Subcontractors do not use any equipment, system, or service that uses covered
telecommunications equipment or services as a substantial or essential component of any
system, or as critical technology as part of any system, as such terms are used in 48 CFR §§
ITB/Contract #25-012
ITB Contract #25-012 Page 13 of 78
52.204-24 through 52.204-26. Contractor represents and certifies that Contractor and its
Subcontractors shall not provide or use such covered telecommunications equipment, system,
or services at any time during the term of this Contract.
7.11. Entities of Foreign Concern. The provisions of this section apply only if Contractor or any
Subcontractor will have access to an individual’s personal identifying information under this
Contract. Contractor represents and certifies: (a) Contractor is not owned by the government of
a foreign country of concern; (b) the government of a foreign country of concern does not have
a controlling interest in Contractor; and (c) Contractor is not organized under the laws of and
does not have its principal place of business in a foreign country of concern. On or before the
Effective Date, Contractor and any Subcontractor that will have access to personal identifying
information shall submit to Municipality executed affidavit(s) under penalty of perjury, in a form
approved by Municipality attesting that the entity does not meet any of the criteria in Section
287.138(2), Florida Statutes. Compliance with the requirements of this section is included in the
requirements of a proper Application for Payment for purposes of Article 5. Terms used in this
section that are not otherwise defined in this Contract shall have the meanings ascribed to such
terms in Section 287.138, Florida Statutes.
7.12. Breach of Representations. Contractor acknowledges that Municipality is materially
relying on the representations, warranties, and certifications of Contractor stated in this article.
Municipality shall be entitled to exercise any or all of the following remedies if any such
representation, warranty, or certification is untrue: (a) recovery of damages incurred; (b)
termination of this Contract without any further liability to Contractor; (c) set off from any
amounts due Contractor the full amount of any damage incurred; and (d) debarment of
Contractor.
ARTICLE 8 MISCELLANEOUS
8.1. Contract Documents and Priority of Provisions. If there is any conflict between the terms
contained in this Contract and those contained in a Contract Supplement, the terms of such
Contract Supplement shall prevail. Furthermore, if there is any conflict between the terms of the
General Conditions included in this Contract and those contained in any General Supplemental
Provisions, the terms of such General Supplemental Provisions shall prevail. In addition, anything
shown on the Drawings and not mentioned in the specifications or mentioned in the
specifications and not shown on the Drawings, shall have the same effect as if shown or
mentioned respectively in both. In the event of a conflict among the Contract Documents,
Contractor shall provide the latest, most stringent, and more technical requirement(s), including,
but not limited to, the requirements setting forth the better quality or greater quantity.
Notwithstanding the forgoing, if this Contract is identified in the Summary of Terms and
Conditions as being subject to Florida Department of Transportation (“FDOT”) provisions, the
following priority of provisions shall apply in the event of a conflict:
First Priority: Approved Change Orders, Addendums, or Amendments
ITB/Contract #25-012
ITB Contract #25-012 Page 14 of 78
Second Priority: Technical Specifications
Third Priority: Supplemental Conditions or Special Terms
Fourth Priority: General Terms and Conditions
Fifth Priority: Contract
Sixth Priority: Solicitation documents
Seventh Priority: Contractor’s response to solicitation documents
8.2. Independent Contractor. Contractor is an independent contractor under this Contract.
Work provided by Contractor (and all Subcontractors) pursuant to this Contract shall be subject
to the supervision of Contractor. In providing such services, neither Contractor nor its agents
shall act as officers, employees, or agents of Municipality. This Contract shall not constitute or
make the Parties a partnership or joint venture.
8.3. Third-Party Beneficiaries. Except for Broward County to the extent expressly identified
herein, neither Contractor nor Municipality intends to primarily or directly benefit a third party
by entering into this Contract. Therefore, the Parties agree that, other than Broward County,
there are no third-party beneficiaries to this Contract (other than Consultant, and only to the
extent this Contract expressly provides Consultant with specific rights or remedies).
8.4. Notices. Unless otherwise stated herein, for notice to a Party to be effective under this
Contract, notice must be sent via U.S. first-class mail, hand delivery, or commercial overnight
delivery, each with a contemporaneous copy via email, to the addresses listed below and shall
be effective upon mailing or hand delivery (provided the contemporaneous email is also sent).
Addresses may be changed by the applicable Party giving notice of such change in accordance
with this section.
For Municipality:
Ana M. Garcia, ICMA-CM, City Manager
100 W. Dania Beach Blvd.
Dania Beach, FL 33004
agarcia@daniabeachfl.gov
For Contractor:
Chris Mancini
3100 SW 15th Street
Deerfield Beach, FL 33442]
E-mail: christopherm@ric-manfl.com
8.5. Assignment. Neither this Contract nor any interest herein or proceeds hereof shall be
assigned, transferred, or encumbered without the written consent of the other party, and
Contractor shall not subcontract any portion of the Work required by this Contract except as
authorized by Article 28 of the General Conditions. Any attempted assignment, transfer,
encumbrance, or subcontract in violation of this section shall be void and ineffective, and shall
ITB/Contract #25-012
ITB Contract #25-012 Page 15 of 78
constitute a breach of this Contract. Municipality reserves the right to condition its approval of
any assignment, transfer, encumbrance, or subcontract upon further due diligence and an
additional fee paid to Municipality to reasonably compensate it for the performance of any such
due diligence.
8.6. Materiality and Waiver of Breach. Each requirement, duty, and obligation set forth in this
Contract was bargained for at arm’s-length and is agreed to by the Parties. Each requirement,
duty, and obligation set forth herein is substantial and important to the formation of this Contract
and is, therefore, a material term.
8.7. No Waiver. Municipality’s failure to enforce any provision of this Contract shall not be
deemed a waiver of its right or power to enforce such provision or a modification of this Contract.
The failure to assert a breach of a provision of this Contract shall not be deemed a waiver of such
breach or of any subsequent breach, nor shall it be construed to be a modification of the terms
of this Contract.
8.8. Severability. If any part of this Contract is found to be unenforceable by a court of
competent jurisdiction, that part shall be deemed severed from this Contract and the balance of
this Contract shall remain in full force and effect.
8.9. Law, Jurisdiction, Venue, Waiver of Jury Trial. This Contract shall be interpreted and
construed in accordance with and governed by the laws of the State of Florida. Jurisdiction of
any controversies or legal problems arising out of this Contract, and any action involving the
enforcement or interpretation of any rights hereunder, shall be exclusively in the state courts of
the Seventeenth Judicial Circuit in Broward County, Florida, and venue for such litigation shall be
exclusively in such state courts, forsaking any other jurisdiction that either party may claim by
virtue of its residency or other jurisdictional device. EACH PARTY HEREBY EACH EXPRESSLY
WAIVES ANY RIGHTS IT MAY HAVE TO A TRIAL BY JURY OF ANY CIVIL LITIGATION RELATED TO
THIS CONTRACT. IF A PARTY FAILS TO WITHDRAW A DEMAND FOR A JURY TRIAL AFTER
WRITTEN NOTICE BY THE OTHER PARTY, THE PARTY MAKING THE DEMAND FOR JURY TRIAL
SHALL BE LIABLE FOR REASONABLE ATTORNEYS’ FEES AND COSTS OF THE OTHER PARTY TO
CONTEST THE DEMAND FOR JURY TRIAL, AND SUCH AMOUNTS SHALL BE AWARDED BY THE
COURT IN ADJUDICATING THE MOTION. CONTRACTOR, PURSUANT TO ARTICLE 28 OF THE
GENERAL CONDITIONS, SHALL SPECIFICALLY BIND ALL SUBCONTRACTORS TO THE PROVISIONS
OF THIS SECTION.
8.10. Amendments. Unless otherwise expressly authorized herein, no modification,
amendment, or alteration of any portion of this Contract shall be effective unless contained in a
written document executed with the same or similar formality as this Contract by duly authorized
representatives of Municipality and Contractor.
8.11. Prior Agreements. The Contract is the final and complete understanding of the Parties
regarding the subject matter of this Contract and supersedes all prior and contemporaneous
negotiations and discussions regarding same. All commitments, agreements, and
ITB/Contract #25-012
ITB Contract #25-012 Page 16 of 78
understandings of the Parties concerning the subject matter of this Contract or the Contract
Documents are contained herein.
8.12. Compliance with Laws. Contractor and the Work must comply with all Applicable Law,
including, but not limited to, the Americans with Disabilities Act, 42 U.S.C. § 12101, Section 504
of the Rehabilitation Act of 1973, and the requirements of any applicable grant agreements.
8.13. Federally Funded Contracts. Contractor certifies and represents that it will comply with
the Municipality’s Federally Funded Contract Requirements to the extent they apply attached
hereto and incorporated herein as Exhibit C.
8.14. Interpretation. The titles and headings in the Contract Documents are for reference
purposes only and shall not in any way affect the meaning or interpretation of this Contract. All
personal pronouns shall include any other gender, and the singular shall include the plural, and
vice versa, unless the context otherwise requires. Terms such as “herein” refer to the Contract
as a whole and not to any particular sentence, paragraph, or section where they appear, unless
the context otherwise requires. Whenever reference is made to a section or article, such
reference is to the section or article as a whole, including the subsections thereof, unless the
reference is made to a particular subsection or subparagraph of such section or article. Any
reference to “days” means calendar days, unless otherwise expressly stated. Any reference to
approval by Municipality shall require approval in writing, unless otherwise expressly stated.
8.15. Sovereign Immunity. Except to the extent sovereign immunity may be deemed to be
waived by entering into this Contract, nothing herein is intended to serve as a waiver of sovereign
immunity by Municipality nor shall anything included herein be construed as consent by
Municipality to be sued by third parties in any matter arising out of this Contract.
8.16. Polystyrene Products Ban. Contractor shall not sell or provide for use on County property
expanded polystyrene products or food service articles (e.g., Styrofoam), unencapsulated
expanded polystyrene products, or single-use plastic straws or stirrers, as set forth in more detail
in Section 27.173, Broward County Administrative Code.
8.16. Drug-Free Workplace. If required under Section 21.23(f), Broward County Administrative
Code, or Section 287.087, Florida Statutes, Contractor certifies that it has and will maintain a
drug-free workplace program throughout the duration of this Contract.
8.17. Regulatory Capacity. Notwithstanding the fact that Municipality is a political subdivision
with certain regulatory authority, Municipality’s performance under this Contract is as a Party to
this Contract and not in its regulatory capacity. If Municipality exercises its regulatory authority,
the exercise of such authority and the enforcement of Applicable Law shall have occurred
pursuant to Municipality’s regulatory authority as a governmental body separate and apart from
this Contract, and shall not be attributable in any manner to Municipality as a party to this
Contract.
ITB/Contract #25-012
ITB Contract #25-012 Page 17 of 78
8.18. Incorporation by Reference. Any and all Recital clauses stated above are true and correct
and are incorporated in this Contract by reference. The attached Exhibits are incorporated into
and made a part of this Contract.
8.19. Fiscal Year. The continuation of this Contract beyond the end of any Municipality fiscal
year is subject to both the appropriation and the availability of funds pursuant to Chapter 129
and, if applicable, Chapter 212, Florida Statutes.
8.20. Counterparts and Multiple Originals. This Contract may be executed in multiple originals,
and may be executed in counterparts, whether signed physically or electronically, each of which
shall be deemed to be an original, but all of which, taken together, shall constitute one and the
same agreement.
Special Funding Requirements. If the Summary of Terms and Conditions indicates there is any
federal or state funding applicable to this Contract, Contractor certifies and represents that it will
comply with the Special Funding Requirements attached as Exhibit C and D.
8.21.
(The remainder of this page is intentionally left blank.)
ITB/Contract #25-012
ITB Contract #25-012 Page 18 of 78
IN WITNESS WHEREOF, the Parties hereto have made and executed this Agreement:
MUNICIPALITY, CITY OF DANIA BEACH through its Board, signing by and through its Mayor or
Vice-Mayor authorized to execute same by Board action on the ______ day of ____________,
20____, and CONTRACTOR, signing by and through its _____________________, duly authorized
to execute same.
MUNICIPALITY
ATTEST:
_______________________________
ELORA RIERA, MMC
CITY CLERK
By:
JOYCE L. DAVIS, MAYOR
By: __
ANA M. GARCIA, ICMA-CM, CITY MANAGER,
I HEREBY CERTIFY that I have approved this Agreement as to form and legal sufficiency subject to execution by the parties:
EVE A. BOUTSIS, CITY ATTORNEY
ITB/Contract #25-012
ITB Contract #25-012 Page 19 of 78
CONTRACT BETWEEN THE MUNICIPALITY CITY OF DANIA BEACH AND RIC-MAN
CONSTRUCTION FLORIDA, INC.
FOR SOUTHEAST DRAINAGE RETROFIT PROJECT, PHASE II
BID/CONTRACT NO.: ITB 25-012
CONTRACTOR: WITNESSES: RIC-MAN CONSTRUCTION FLORIDA, INC., a Florida corporation
SIGNATURE SIGNATURE
_________________________ PRINT Name PRINT Name _________________________ SIGNATURE Title
_________________________ Date: PRINT Name
STATE OF FLORIDA) COUNTY OF )
The foregoing instrument was acknowledged before me by means of ☐ physical presence
or ☐ online notarization, on __ ,2025 by ____________________________ as
___________________ of Ric-Man Construction Florida, Inc., a Florida corporation. He/she is personally known to me or has produced as identification. My Commission Expires: Notary Public, State of Florida
Print Name
ITB/Contract #25-012
ITB Contract #25-012 Page 20 of 78
CONTRACT SUPPLEMENT
[DELETE THIS PAGE IF NOT APPLICABLE]
The following deviations are incorporated herein and made a part of this Contract, revising the
respective article and section as noted below.
Coding: Words in strikethrough type are deletions from existing text. Words in underlined text
are additions to existing text.
ITB/Contract #25-012
ITB Contract #25-012 Page 21 of 78
GENERAL CONDITIONS
ARTICLE 1 CONTRACT DOCUMENTS
1.1 The Contract Documents shall be followed in strict accordance as to Work, performance,
material(s), and dimensions except when Consultant may authorize, in writing, an exception.
1.2 Dimensions given in figures shall predominate over scaled measurements from the
Drawings; however, any discrepancies regarding figures must be resolved by Consultant prior to
applicable Work commencing. Contractor shall not proceed when in doubt as to any dimension
or measurement, but shall seek clarification from Consultant.
ARTICLE 2 INTENTION OF MUNICIPALITY
Municipality intends to describe in this Contract a functionally complete Project (or part thereof)
to be constructed in accordance with this Contract and in accordance with all codes and
regulations governing construction of the Project. The Work is a description of Contractor’s
obligations and responsibilities and is deemed to include preliminary considerations and
prerequisites, as well as all labor, materials, equipment, and tasks, that are such an inseparable
part of the Work described that exclusion of them from the Work would render performance by
Contractor impractical, illogical, or unconscionable, and shall be supplied by Contractor whether
or not specifically called for. When words that have a well-known technical or trade meaning are
used to describe Work, materials, or equipment, such words shall be interpreted in accordance
with that meaning, unless specified otherwise herein. Reference to standard specifications,
manuals, or codes of any technical society, organization, or association, or to the laws or
regulations of any governmental authority, whether such reference be specific or by implication,
shall mean the latest standard specification, manual, code, laws, or regulations in effect at the
time of opening of bids for the Project. Contractor shall comply with such specifications,
manuals, codes, laws, or regulations. Municipality will have no duties other than those duties
and obligations expressly set forth within this Contract.
ARTICLE 3 PRELIMINARY MATTERS
3.1. At least five (5) days prior to the pre-construction meeting described in Section 3.2,
Contractor shall submit to Consultant for Consultant’s review and acceptance:
3.1.1. A progress schedule in the indicated form:
Bar Chart
Modified Critical Path Method (“CPM”)
X CPM
Computerized CPM
ITB/Contract #25-012
ITB Contract #25-012 Page 22 of 78
(CPM is interpreted to be generally as outlined in the Association of General Contractors
(“AGC”) publication, “The Use of CPM in Construction.”)
The progress schedule shall indicate the start and completion dates of the various stages
of the Work, and shall show an activity network for the planning and execution of the
Work. Included with the progress schedule shall be a narrative description of the progress
schedule. The progress schedule must be updated monthly by Contractor, submitted as
part of each Application for Payment, and must be acceptable to Consultant.
3.1.2. A preliminary schedule of shop drawing submissions; and
3.1.3. In a lump sum contract or in a contract that includes lump sum bid items of Work,
a preliminary schedule of values for all of the Work that includes quantities and prices of
items aggregating the Contract Price, in as much detail as may be requested by County in
writing, and that subdivides the Work into component parts in sufficient detail to serve
as the basis for progress payments during construction.
In addition, after award but prior to the submission of the progress schedule, Consultant,
Contract Administrator, and Contractor shall meet with all utility owners and secure from them
a schedule of utility relocation; provided, however, that neither Consultant nor Municipality shall
be responsible for the nonperformance by the utility owners.
3.2. At a time specified by Consultant, but before Contractor starts the Work at the Project
site, a conference attended by Contractor, Consultant, and others as deemed appropriate by
Contract Administrator, will be held to discuss the schedules referred to in Section 3.1; to discuss
procedures for handling shop drawings and other submittals and for processing Applications for
Payment; and to establish a working understanding among the Parties as to the Work.
3.3. Within thirty-five (35) days after the Project Initiation Date set forth in the applicable
Notice to Proceed, a conference attended by Contractor, Consultant, and others, as appropriate,
will be held to finalize the schedules submitted in accordance with Section 3.1. Within forty-five
(45) days after the Project Initiation Date set forth in the applicable Notice to Proceed, Contractor
shall revise the original schedule submittal to address all review comments from the progress
schedule review conference and resubmit a revised progress schedule to Consultant for review.
Consultant’s acceptance of the finalized progress schedule shall only be with respect to the
orderly progression of the Work to completion within the Contract Time, but such acceptance
shall not constitute acceptance by Municipality or Consultant of the means or methods of
construction or of the sequencing or scheduling of the Work. Such acceptance will not impose
on Consultant or Municipality responsibility for the progress or scheduling of the Work, or
otherwise relieve Contractor from full responsibility therefor. The finalized schedule of shop
drawing submissions must be acceptable to Consultant as providing a workable arrangement for
processing such submissions. The finalized schedule of values must be acceptable to Consultant
as to form and substance.
ITB/Contract #25-012
ITB Contract #25-012 Page 23 of 78
ARTICLE 4 PERFORMANCE BOND AND PAYMENT BOND
4.1. Within ten (10) days after being notified of the award, Contractor shall furnish a
Performance Bond and a Payment Bond containing all the provisions of the Performance Bond
(Form 1) and Payment Bond (Form 2). Each Bond shall be in the amount of one hundred percent
(100%) of the Contract Price guaranteeing to Municipality the completion and performance of
the Work covered in such Contract as well as full payment of all suppliers, laborers, and
Subcontractors employed pursuant to this Project. Each bond shall be with a surety company
that is qualified pursuant to Article 5. Each Bond must name “Broward County” as an additional
obligee.
4.2 Each bond shall continue in effect for one (1) year after Final Completion and acceptance
of the Work with liability equal to one hundred percent (100%) of the Contract Price, or an
additional bond provided to ensure that Contractor will, upon notification by Municipality,
correct any defective or faulty Work or Materials that appear within one (1) year after Final
Completion of this Contract.
4.3. Pursuant to the requirements of Section 255.05, Florida Statutes, Contractor shall ensure
that the bond(s) referenced above shall be recorded in the Official Records of Broward County
and provide Municipality with evidence of such recording.
4.4. In lieu of a Performance Bond and a Payment Bond, Contractor may furnish alternate
forms of security in the form of cash, money order, certified check, cashier’s check, or
unconditional letter of credit. Such alternate forms of security shall be subject to the approval
of Municipality and for same purpose, and shall be subject to the same conditions as those
applicable above, and shall be held by Municipality for one (1) year after completion and
acceptance of the Work.
ARTICLE 5 QUALIFICATION OF SURETY
5.1 For all Bid Bonds, Performance Bonds, and Payment Bonds over Five Hundred Thousand
Dollars ($500,000.00):
5.1.1. Each bond must be executed by a surety company of recognized standing,
authorized to do business in the State of Florida as surety, having a resident agent in the
State of Florida, and having been in business with a record of successful continuous
operation for at least the past five (5) years.
5.1.2. The surety company shall hold a current Certificate of Authority as acceptable
surety on federal bonds in accordance with United States Department of Treasury Circular
570, Current Revisions. If the amount of the Bond exceeds the underwriting limitation
set forth in the circular, in order to qualify as a proper surety herein, the net retention of
the surety company shall not exceed the underwriting limitation in the circular, and the
excess risks must be protected by coinsurance, reinsurance, or other methods in
accordance with Treasury Circular 297, Revised (31 C.F.R. §§ 223.10, 223.11). Further,
ITB/Contract #25-012
ITB Contract #25-012 Page 24 of 78
the surety company shall provide Municipality with evidence satisfactory to Municipality
that such excess risk has been protected in an acceptable manner.
5.1.3. A surety company that is rejected by Municipality may be substituted by the
Bidder or proposer with a surety company acceptable to Municipality, but only if the bid
amount does not increase.
5.1.4. All bonds shall be written through surety insurers authorized to do business in the
State of Florida as surety, with the following qualifications according to the latest edition
of Best’s Insurance Guide, published by AM Best Company, Oldwick, New Jersey:
Amount of Bond Municipality Policy Holder’s Ratings
Strength/Financial Size
$500,001 to $1,500,000 A/ III
$1,500,001 to $2,500,000 A/ VI
$2,500,001 to $5,000,000 A/ VII
$5,000,001 to $10,000,000 A/ VIII
Over $10,000,000 A/ IX
5.2. For projects that do not exceed Five Hundred Thousand Dollars ($500,000.00),
Municipality may accept a Bid Bond, Performance Bond, or Payment Bond from a surety company
that has twice the minimum surplus and capital required by the Florida Office of Insurance
Regulation at the time the solicitation is issued, if the surety company is otherwise in compliance
with the provisions of the Florida Insurance Code, and if the surety company holds a currently
valid Certificate of Authority issued by the United States Department of the Treasury under
Sections 9304 to 9308 of Title 31 of the United States Code. The Certificate and Affidavit (Form
4) so certifying should be submitted with the Bid Bond, Performance Bond, or Payment Bond.
5.3. More stringent requirements of any grantor agency may be set forth within the
Supplemental Conditions. If there are no more stringent requirements, the provisions of this
article shall apply.
ARTICLE 6 INDEMNIFICATION
Contractor shall indemnify and hold harmless Municipality and its current, past, and future
officers and employees (collectively, “Indemnified Party”), from liabilities, damages, losses, and
costs, including, but not limited to, reasonable attorneys’ fees (collectively, a “Claim”), to the
extent caused by the negligence, recklessness, or intentional wrongful misconduct of Contractor
or persons employed or utilized by Contractor in the performance of this Contract, including but
not limited to Contractor’s Subcontractors, sub-subcontractors, materialmen, or agents of any
tier, or any of their respective employees. To the extent considered necessary by Contract
Administrator and Municipality Attorney, any sums due Contractor under this Contract may be
retained by Municipality until all of Municipality’s claims for indemnification pursuant to this
Contract have been settled or otherwise resolved, and any amount withheld shall not be subject
ITB/Contract #25-012
ITB Contract #25-012 Page 25 of 78
to payment of interest by Municipality. These indemnifications shall survive the term of this
Contract.
ARTICLE 7 INSURANCE REQUIREMENTS
7.1. The specific insurance coverage requirements for this project are identified in the
Minimum Insurance Requirements, below. For purposes of this article, the term “Municipality”
shall include Municipality and its members, officials, officers, and employees.
7.2. For the duration of the Contract, Contractor shall, at its sole expense, maintain at least
the minimum limits of insurance coverage designated in the Contract Documents (inclusive of
any amount provided by an umbrella or excess policy) in accordance with the terms and
conditions stated in this article. If Contractor maintains broader coverage or higher limits than
the insurance requirements stated in this, Article 7 .Municipality shall be entitled to all such
broader coverages and higher limits. Municipality reserves the right at any time to review and
adjust the limits and types of coverage required under this article.
7.3. Contractor shall maintain insurance coverage against claims relating to any act or
omission by Contractor, its agents, representatives, employees, or Subcontractors in connection
with the Contract. All required insurance under this article shall provide primary coverage, list
Municipality as an additional insured, and shall not require contribution from any Municipality
insurance, self-insurance or otherwise. All insurance held by Municipality, as well as
Municipality’s self-insurance, shall be in excess of and shall not contribute to the required
insurance provided by Contractor. Unless prohibited by the applicable policy, Contractor waives
any right to subrogation that any of Contractor’s insurers may acquire against Municipality, and
agrees to obtain same in an endorsement on all lines of insurance required of Contractor under
this article including any excess or umbrella policies.
7.4. All required insurance policies must be placed with insurers or surplus line carriers
authorized to conduct business in the State of Florida with an A.M. Best rating of A- or better and
a financial size category class VII or greater, unless otherwise approved by County’s Risk
Management Division in writing.
7.5. Contractor shall declare in writing any self-insured retentions or deductibles over the
limit(s) prescribed in this Article 7, and shall submit same to Municipality, at least fifteen (15)
days prior to the effective date of the Contract or commencement of the Work for Municipality’s
written approval of such retentions or deductibles. Contractor shall be solely responsible for and
shall pay any deductible or self-insured retention applicable to any claim against Municipality.
Municipality may, at any time, require Contractor to purchase coverage with a lower retention
or provide proof of ability to pay losses and related investigations, claim administration, and
defense expenses within the retention. Contractor agrees that any deductible or self-insured
ITB/Contract #25-012
ITB Contract #25-012 Page 26 of 78
retention may be satisfied by either the named insured or Municipality, if so elected by
Municipality, and Contractor agrees to obtain same in endorsements to the required policies.
7.6. To the extent insurance requirements are designated in the Minimum Insurance
Requirements, the applicable policies shall comply with the following:
7.6.1. Commercial General Liability Insurance. Policy shall be no more restrictive than
that provided by the latest edition of the standard Commercial General Liability Form
(Form CG 00 01) as filed for use in the State of Florida by the Insurance Services Office
(ISO), with the exception of endorsements specifically required by ISO or the State of
Florida, and liability arising out of: Mold, fungus, or bacteria; Terrorism; Silica, asbestos
or lead; Sexual molestation; and Architects and engineers professional liability, unless
coverage for professional liability is specifically required by this Contract. Municipality,
Consultant, and Broward County shall be included on the policy (and any excess or
umbrella policy) as “Additional Insureds” on a form no more restrictive than ISO form CG
20 10 (Additional Insured – Owners, Lessees, or Contractor).
7.6.2. Contractor shall maintain products or completed work coverage for a minimum of
three (3) years from the date of the final completion of the Work, unless otherwise stated
in the Insurance Requirements Exhibit. In that case, the term specified in the Insurance
Requirements shall govern the duration of the coverage required by this paragraph.
7.6.3. Business Automobile Liability Insurance. Policy shall be no more restrictive than
that provided by Section II (Liability Coverage) of the most recent version of the standard
Business Auto Policy (ISO Form CA 00 01) without any restrictive endorsements, including
coverage for liability contractually assumed, and shall cover all owned, non-owned, and
hired autos used in connection with the performance of Work under this Contract.
Municipality and Consultant shall be included on the policy (and any excess or umbrella
policy) as “Additional Insureds.”
7.6.4. Workers’ Compensation/Employer’s Liability Insurance. Such insurance shall be
no more restrictive than that provided by the latest edition of the standard Workers’
Compensation Policy, as filed for use in Florida by the National Council on Compensation
Insurance (NCCI), with the exception of endorsements required by NCCI or the State of
Florida. The policy must be endorsed to waive the insurer’s right to subrogate against
Municipality in the manner which would result from the attachment of the NCCI form
“Waiver of our Right to Recover from Others Endorsement” (Advisory Form WC 00 03 13)
with Municipality scheduled thereon. Where appropriate, coverage shall be included to
the extent required by Applicable Law, including, but not limited to, the Federal
Employer’s Liability Act, the Jones Act, and the Longshoreman and Harbor Workers’
Compensation Act.
If Contractor provides all or a portion of the Workers’ Compensation/Employer’s Liability
insurance required herein via a professional employer organization (“PEO”) or employee
ITB/Contract #25-012
ITB Contract #25-012 Page 27 of 78
leasing company, any such Workers’ Compensation/Employer’s Liability insurance
provided will only be deemed acceptable solely for the purposes of insuring Contractor’s
enrolled employees. In addition, and notwithstanding the foregoing, in order to
adequately protect Municipality against injuries to uninsured employees of
Subcontractors and non-enrolled employees of Contractor, Contractor must still procure,
maintain, and furnish Municipality with evidence of a stand-alone separate Workers’
Compensation/Employer’s Liability insurance policy issued with Contractor as an
additional insured, and complying with all requirements for Contractor provided Workers’
Compensation contained in the Contract Documents. It is permissible for Contractor to
exclude payroll of leased employees from such separate Workers’
Compensation/Employer’s Liability insurance policy.
7.6.5. Professional Liability Insurance. Such insurance shall cover Contractor for those
sources of liability arising out of the rendering or failure to render professional services in
the performance of the services required in this Contract.
7.6.6. Cyber Liability, or Technology Errors and Omissions Insurance. Coverage is
required for any system connected to, and, or accessible from the internet. Coverage
may be included as part of the required Professional Liability Insurance. Such policy shall
cover, at a minimum, the following: Data Loss and System Damage Liability; Security
Liability; Privacy Liability; Privacy/Security Breach Response coverage, including
Notification Expenses.
7.6.7. Environmental Pollution Liability. Such insurance shall include clean-up costs and
provide coverage to Contractor for liability resulting from pollution or other
environmental impairment arising out of, or in connection with, Work performed under
this Contract, or which arises out of, or in connection with this Contract, including
coverage for clean-up of pollution conditions and third-party bodily injury and property
damage arising from pollution conditions. Such insurance shall also include
Transportation Coverage and Non-Owned Disposal Sites coverage. Should policy provide
coverage on a claims-made basis, the coverage shall be in force and effect to respond to
all claims reported within at least three (3) years following the period for which coverage
is required, unless a longer period is indicated in the Minimum Insurance Requirements,
and which claims would have been covered had the coverage been provided on an
occurrence basis.
7.6.8. Property Insurance, Builder’s Risk, or Installation Floater. Such insurance shall be
in force and evidenced to Municipality as a condition precedent to the Notice to Proceed
for construction. Coverage shall be “All Risks,” Completed Value form with a deductible
not to exceed $10,000 for each claim for all perils except wind and flood. For the perils
of wind and flood, Contractor shall maintain a deductible that is commercially feasible but
which does not exceed five percent (5%) of the “values at risk at the time of loss” unless
otherwise approved by Municipality.
ITB/Contract #25-012
ITB Contract #25-012 Page 28 of 78
Sublimits: With respect to coverage for the peril of wind, the policy shall not be subject
to any sublimit less than $50,000,000 per occurrence. With respect to the peril of Flood,
the policy shall not be subject to any sublimit less than $10,000,000 per occurrence. Any
sublimit for wind or flood lower than those identified in the foregoing must be approved
by Municipality.
Waiver of Occupancy Clause or Warranty-Policy must be specifically endorsed to
eliminate any “Occupancy Clause” or similar warranty or representation that the
building(s), addition(s) or structure(s) in the course of construction shall not be occupied
without specific endorsement of the policy. The policy must be endorsed to provide that
the Builder’s Risk coverage will continue to apply until final acceptance of the building(s),
addition(s) or structure(s) by Municipality.
Municipality reserves the right to purchase or provide property insurance covering the
materials, equipment and supplies that are intended for specific installation in the Project
while such materials, equipment and supplies are located at the Project site (this coverage
will be specifically to cover property under construction or similar coverage), in transit,
and while temporarily located away from the Project site for the purpose of repair,
adjustment or storage at the risk of one (1) of the insured parties. This coverage will not
cover any of Contractor’s or Subcontractors’ tools, equipment, machinery or provide any
business interruption or time element coverage to the contractors. If Municipality elects
to purchase property insurance or provide for coverage under its existing insurance for
this Project, then in that case, the insurance required to be carried by Contractor may be
modified to account for the insurance being provided by Municipality, at Municipality’s
discretion. Such modification may also include execution of Waiver of Subrogation
documentation. If a claim with respect to this Project is made upon Municipality’s
insurance policy, Contractor shall be responsible for up to the first $50,000 of the
deductible amount for such claim.
7.7. On or before the effective date of the Contract, or at least fifteen (15) days prior to
commencement of the Work, as requested by Municipality, Contractor shall provide Municipality
with a copy of all Certificates of Insurance or other documentation sufficient to demonstrate the
insurance coverage required in this article.
7.8. Contractor shall ensure that all insurance coverages required by this article remain in full
force and effect without any lapse in coverage for the duration of this Contract and until all
performance required by Contractor has been completed, as determined by Contract
Administrator. Contractor shall provide notice to Municipality of any cancellation or modification
of any required policy at least thirty (30) days prior to the effective date of cancellation or
modification, and at least ten (10) days prior to the effective date of any cancellation due to
nonpayment, and shall concurrently provide Municipality with a copy of its updated Certificates
of Insurance evidencing continuation of the required coverage(s).
ITB/Contract #25-012
ITB Contract #25-012 Page 29 of 78
7.9. If and to the extent requested by Municipality, Contractor shall provide to Municipality
complete, certified copies of all required insurance policies and all required endorsements within
thirty (30) days after Municipality’s request.
7.10. Contractor shall ensure that City of Dania Beach, 100 W. Dania Beach Blvd., Dania Beach
Florida, 33004” “Broward County, 115 S. Andrews Avenue, Fort Lauderdale, Florida 33301” and
Consultant are listed and endorsed as additional insureds on all policies required under this
article. Municipality shall be listed as Certificate Holder.
7.11. Contractor shall require each Subcontractor to maintain insurance coverage that
adequately covers the Work provided by that Subcontractor on substantially the same insurance
terms and conditions required of Contractor under this article. Contractor shall ensure that all
such Subcontractors comply with these requirements and that Municipality, “Broward County,”
and Consultant are named as additional insureds under the Subcontractors’ applicable insurance
policies. If Contractor or any Subcontractor fails to maintain the insurance required by the
Contract Documents, Municipality may pay any costs of premiums necessary to maintain the
required coverage and deduct such costs from any payment otherwise due to Contractor.
Contractor shall not permit any Subcontractor to provide Work or any other services under the
Contract unless and until the requirements of this section are satisfied. If requested by Municipality,
Contractor shall provide, within one (1) business day, evidence of each Subcontractor’s compliance
with this article.
7.12. If any of the policies required under this article provide claims-made coverage: (1) any
retroactive date must be prior to the effective date of the Contract; (2) the required coverage
must be maintained after termination or expiration of the Contract for at least the duration
stated in Exhibit _A_; and (3) if coverage is canceled or nonrenewed and is not replaced with
another claims-made policy form with a retroactive date prior to the effective date of the
Contract, Contractor must obtain and maintain “extended reporting” coverage that applies after
termination or expiration of the Contract for at least the duration stated in Exhibit A.
ARTICLE 8 LABOR AND MATERIALS
8.1 Unless otherwise provided herein, Contractor shall provide and pay for all Materials,
labor, water, tools, equipment, light, power, transportation, and other facilities and services
necessary for the proper execution and completion of the Work, whether temporary or
permanent, and whether or not incorporated or to be incorporated in the Work.
8.2 Contractor shall at all times enforce strict discipline and good order among its employees
and Subcontractors at the Project site, and shall not employ any unfit person or anyone not
skilled in the Work to which they are assigned.
ARTICLE 9 ROYALTIES AND PATENTS
All fees, royalties, and claims for any invention, or pretended inventions, or patent of any article,
material, arrangement, appliance, or method that may be used upon or in any manner be
ITB/Contract #25-012
ITB Contract #25-012 Page 30 of 78
connected with the construction of the Work or appurtenances, are hereby included in the prices
stipulated in this Contract for said Work.
ARTICLE 10 WEATHER
Extensions to the Contract Time for delays caused by the effects of inclement weather shall be
submitted as a request for a change in the Contract Time pursuant to Article 40. Time extensions
are justified only when rain, other inclement weather conditions, or related adverse soil
conditions result in Contractor being unable to work at least fifty percent (50%) of the normal
workday on controlling items of Work identified on the accepted schedule or updates to that
schedule.
ARTICLE 11 PERMITS, LICENSES, AND IMPACT FEES
11.1. Except as otherwise provided within the Special Instructions for Vendors, Contractor shall
secure and pay for all necessary permits and licenses required for the Work pursuant to
Applicable Law. Contractor shall be reimbursed for only the actual amount of the permit fees
levied by the permitting authority and paid by the Contractor as evidenced by an invoice or other
acceptable documentation issued by the permitting authority. Reimbursement to Contractor
shall be on a pass-through basis and shall not include profit or overhead of Contractor.
Contractor shall have and maintain appropriate Certificate(s) of Competency, valid for the Work
to be performed and valid for the jurisdiction in which the Work is to be performed, for all
persons working on the Project for whom a Certificate of Competency is required.
11.2. Municipality shall directly pay for all impact fees levied by any governmental entity with
jurisdiction.
ARTICLE 12 RESOLUTION OF DISPUTES
12.1. To prevent all disputes and litigation, the Parties agree that Consultant shall decide all
questions, claims, difficulties, and disputes of whatever nature that may arise relative to the
technical interpretation of the Contract Documents or fulfillment of the Contract as to the
character, quality, amount, and value of any Work done or materials furnished, or proposed to
be done or furnished, under or by reason of the Contract Documents, and Consultant’s decisions
of all claims, questions, difficulties, and disputes shall be final and binding to the extent provided
in Section 12.2. Any claim, question, difficulty, or dispute that cannot be resolved by agreement
of the Contract Administrator and Contractor shall be submitted to Consultant in writing within
five (5) days after the date of impasse. Unless a different period of time is set forth in this
Contract, Consultant shall notify the Contract Administrator and Contractor in writing of
Consultant’s decision within fourteen (14) days after the date of the receipt of the claim,
question, difficulty, or dispute, unless Consultant requires additional time to gather information
or allow the Parties to provide additional information. Except for disputes directly related to the
promptness of payment as set forth in Section 5.1 of the Contract, all nontechnical administrative
disputes shall be determined by the Contract Administrator pursuant to the time periods
ITB/Contract #25-012
ITB Contract #25-012 Page 31 of 78
provided herein. During the pendency of any dispute and after a determination thereof,
Contractor, Consultant, and Contract Administrator shall act in good faith to mitigate any
potential damages, including utilization of construction schedule changes and alternative means
of construction.
12.2. If the determination of a dispute under this article is unacceptable to either party, the
party objecting to the determination must notify the other party in writing within ten (10) days
of receipt of the written determination. The notice must state the basis of the objection and
must be accompanied by a statement that any Contract Time or Contract Price adjustment
claimed is the entire adjustment to which the objecting party has reason to believe it is entitled
to as a result of the determination. Within sixty (60) days after Final Completion of the Work,
the Parties shall participate in mediation to address all objections to any determinations and to
attempt to prevent litigation. Neither party shall commence litigation prior to the expiration of
the sixty (60) day mediation period. The mediator shall be mutually agreed upon by the Parties.
Should any objection not be resolved in mediation, the Parties retain all their legal rights and
remedies provided under State law. A PARTY SPECIFICALLY WAIVES ALL OF ITS RIGHTS,
INCLUDING, BUT NOT LIMITED TO, CLAIMS FOR CONTRACT TIME AND CONTRACT PRICE
ADJUSTMENTS PROVIDED IN THE CONTRACT, INCLUDING ITS RIGHTS AND REMEDIES UNDER
STATE LAW, IF SAID PARTY FAILS TO COMPLY IN STRICT ACCORDANCE WITH THE
REQUIREMENTS OF THIS ARTICLE.
12.3. In any lawsuit or legal proceeding arising under this Contract, Contractor hereby waives
any claim or defense based on facts or evidentiary materials of which Contractor had knowledge
but were not presented for consideration during the resolution of disputes process set forth in
Sections 12.1 and 12.2 above.
12.4. This article shall survive any dispute or litigation between the Parties, or expiration or
termination of this Contract for any reason, and Contractor expressly acknowledges and agrees
to be bound by this article throughout the course of any dispute or litigation with Municipality.
ARTICLE 13 INSPECTION OF WORK
13.1. Consultant and Municipality shall at all times have access to the Work, and Contractor
shall provide proper facilities for such access and for inspecting, measuring, and testing.
13.1.1. Should the Contract Documents, Consultant’s instructions, or Applicable Law
require any of the Work to be specially tested or approved, Contractor shall give
Consultant timely notice of readiness of the Work for testing. If the testing or approval is
to be made by an authority other than Municipality, timely notice shall be given of the
date fixed for such testing. Testing shall be performed promptly, and, where practicable,
at the source of supply. If any of the Work is covered up without approval or consent of
ITB/Contract #25-012
ITB Contract #25-012 Page 32 of 78
Consultant, it must, if required by Consultant, be uncovered for examination and properly
restored at Contractor’s expense.
13.1.2. Reexamination of any of the Work may be ordered by Consultant with prior
written approval by the Contract Administrator, and if so ordered, the Work must be
uncovered by Contractor. If such Work is found to be in accordance with this Contract,
Municipality shall pay the cost of reexamination and replacement by means of a Change
Order. If such Work is not in accordance with this Contract, Contractor shall pay such
cost.
13.2. Inspectors shall have no authority to permit deviations from, or to relax or waive, any of
the provisions of the Contract Documents, or to delay the Project by failure to inspect the
materials and Work with reasonable promptness, without the written permission or instruction
of Consultant.
13.3. The payment of any compensation, the giving of any gratuity, or the granting of any favor,
of any character or form, by Contractor to any inspector, directly or indirectly, is strictly
prohibited, and any such act on the part of Contractor will constitute a breach of this Contract.
ARTICLE 14 SUPERINTENDENCE AND SUPERVISION
14.1. Municipality’s instructions are to be given through Consultant, which instructions
Contractor must strictly and promptly follow in every case. Contractor shall keep on the Project
a full-time, competent, English-speaking superintendent and any necessary assistants, all of
whom must be satisfactory to Consultant. The superintendent shall not be changed except with
the written consent of Consultant, unless the superintendent proves to be unsatisfactory to
Contractor and ceases to be in its employ. The superintendent shall represent Contractor; all
instructions given to the superintendent shall be as binding as if given to Contractor, and will be
confirmed in writing by Consultant upon the written request of Contractor. Contractor shall
provide efficient supervision of the Work, using its best skill and attention.
14.2. On a daily basis, Contractor’s superintendent shall record, at a minimum, the following
information in a bound log: the day; date; weather conditions and how any weather condition
affected progress of the Work; time of commencement of Work for the day; the Work being
performed; materials, labor, personnel, equipment and Subcontractors at the Project site;
visitors to the Project site, including representatives of Municipality, Consultant, or regulatory
representatives; any event that caused or contributed a delay to the critical path of the Project;
any special or unusual conditions or occurrences encountered; and the time of termination of
Work for the day. All information shall be recorded in the daily log in ink, unless otherwise
approved by Consultant. The daily log shall be kept on or accessible from the Project site and
shall be available at all times for inspection and copying by Municipality and Consultant.
14.3. The Contract Administrator, Contractor, and Consultant shall meet at least every two (2)
weeks (or as otherwise determined by the Contract Administrator) during the course of the Work
ITB/Contract #25-012
ITB Contract #25-012 Page 33 of 78
to review and agree upon the Work performed to date and to establish the controlling items of
Work for the next two (2) weeks. Consultant shall publish, keep, and distribute minutes and any
comments thereto of each such meeting.
14.4. If Contractor, in the course of performing the Work, finds any discrepancy between this
Contract and the physical conditions of the locality, or any errors, omissions, or discrepancies in
this Contract, it shall be Contractor’s duty to immediately inform Consultant, in writing, and
Consultant will promptly review same. Any Work done after such discovery, until authorized, will
be done at Contractor’s sole risk, without entitlement to reimbursement or compensation.
14.5. Contractor shall supervise and direct the Work competently and efficiently, devoting such
attention thereto and applying such skills and expertise as may be necessary to perform the Work
in accordance with this Contract. Contractor shall be solely responsible for the means, methods,
techniques, sequences, and procedures of construction.
ARTICLE 15 MUNICIPALITY’S RIGHT TO TERMINATE CONTRACT
15.1. The Contract Administrator may give notice in writing to Contractor and its Surety of
delay, neglect, or default, specifying the same with a notice to cure, upon the occurrence of any
of the following:
15.1.1. Contractor fails to begin the Work within fifteen (15) days after the Project
Initiation Date;
15.1.2. Contractor fails to perform the Work with sufficient workers, equipment, or
materials to ensure the prompt completion of the Work;
15.1.3. Contractor performs the Work unsuitably or causes it to be rejected as defective
and unsuitable;
15.1.4. Contractor discontinues performance of the Work in contravention of the
accepted schedule;
15.1.5. Contractor fails to perform any material term set forth in this Contract;
15.1.6. Contractor becomes insolvent or declared bankrupt, commits any act of
bankruptcy or insolvency, or makes an assignment for the benefit of creditors; or
15.1.7. From any other cause whatsoever, Contractor fails to carry on the Work in an
acceptable manner.
15.2. If Contractor, within a period of ten (10) days after such notice, does not proceed to cure
in accordance therewith, then Municipality’s awarding authority for this Contract may, upon
written certification from Consultant of the fact of such delay, neglect, or default and
Contractor’s failure to comply with such notice, terminate the services of Contractor, exclude
ITB/Contract #25-012
ITB Contract #25-012 Page 34 of 78
Contractor from the Project site and take the performance of the Work out of the hands of
Contractor, and appropriate or use any or all materials and equipment on the Project site as may
be suitable and acceptable. In such case, Contractor shall not be entitled to receive any further
payment until the Project is completed. In addition, Municipality may enter into an agreement
for the completion of the Project according to the terms and provisions of this Contract, use such
other methods as in the Contract Administrator’s sole opinion shall be required for the
completion of the Project according to the terms and provisions of this Contract, or use such
other methods as in the Contract Administrator’s sole opinion shall be required for the
completion of the Project in an acceptable manner. All damages, costs, and charges incurred by
Municipality, together with the costs of completing the Project, shall be deducted from any
monies due or which may become due to Contractor. If the damages and expenses so incurred
by Municipality shall exceed the unpaid balance, Contractor shall be liable and shall pay to
Municipality the amount of said excess.
15.3. If Municipality erroneously, improperly, or unjustifiably terminates for cause, such
termination shall be deemed a termination for convenience and the rights and obligations of
Municipality and Contractor shall be the same as if the termination had been exercised pursuant
to the Termination for Convenience clause as set forth in Section 15.4 below.
15.4. This Contract may be terminated for convenience, for any reason or no reason, in writing
by Municipality with at least ten (10) days’ advance written notice to Contractorof intent to
terminate and the date on which such termination becomes effective. If Contract is terminated
by Municipality pursuant to this section, Contractor shall be paid for all Work properly executed
and actual expenses incurred prior to termination in addition to termination settlement costs
reasonably incurred by Contractor relating to commitments that had become firm prior to the
termination. Payment sh all include reasonable profit for Work and services performed as limited
by Article 39 hereof. All actual expenses incurred shall have sufficient back-up documentation to
verify that such expenses were actually incurred by Contractor. No payment shall be made for
profit for Work and services that Contractor has not performed. Contractor acknowledges that
it has received good, valuable, and sufficient consideration for Municipality’s right to terminate
this Contract for convenience including in the form of Municipality’s obligation to provide
advance notice to Contractor of such termination in accordance with this Section 15.4.
15.5. Upon receipt of a notice of termination pursuant to Sections 15.2, 15.4, or 15.6,
Contractor shall promptly discontinue all affected Work unless the notice of termination directs
otherwise, and shall deliver or otherwise make available to Municipality all data, drawings,
specifications, reports, estimates, summaries, and such other information as may have been
required by this Contract whether completed or in process.
15.6. This Contract may also be terminated by the Board:
15.6.1. If Contractor is a “scrutinized company” pursuant to Sections 215.473 or
215.4725, Florida Statutes, if Contractor is placed on a “discriminatory vendor list”
pursuant to Section 287.134, Florida Statutes, or if Contractor is otherwise ineligible to
ITB/Contract #25-012
ITB Contract #25-012 Page 35 of 78
transact business with County or Municipality under Applicable Law or provides a false
certification submitted pursuant to Section 287.135, Florida Statutes.
ARTICLE 16 SUSPENSION OF WORK
Contractor shall carry on the Work and adhere to the progress schedule during all disputes or
disagreements with Municipality. No Work shall be delayed or postponed pending resolution of
any disputes or disagreements except as Contractor and Municipality may otherwise agree in
writing. Suspension of Work by Contractor during any dispute or disagreement with Municipality
shall entitle Municipality to terminate this Contract for cause.
ARTICLE 17 PROJECT RECORDS AND RIGHT TO AUDIT
17.1 Audit Rights and Retention of Records. Contractor and all Subcontractors shall preserve
all Contract Records (as defined below) for a minimum period of three (3) years after expiration
or termination of this Contract or until resolution of any audit findings, whichever is longer. This
article shall survive any dispute or litigation between the Parties, and Contractor expressly
acknowledges and agrees to be bound by this article throughout the course of any dispute or
litigation with Municipality. Contract Records shall, upon reasonable notice, be open to
inspection and subject to audit and reproduction during normal business hours. Audits and
inspections pursuant to this article may be performed by any representative of Municipality
(including any outside representative engaged by either entity). Municipality may conduct audits
or inspections at any time during the term of this Contract and for a period of three (3) years
after the expiration or termination of this Contract (or longer if required by Applicable Law,
Municipality).
17.2 Municipality shall have the right to audit, review, examine, inspect, analyze, and make
copies of all Contract Records at a location within Broward County, Florida. Contractor hereby
grants Municipality the right to conduct such audit or review at Contractor’s place of business, if
deemed appropriate by Municipality, with seventy-two (72) hours’ advance notice. Contractor
agrees to provide adequate and appropriate workspace for such review. Contractor shall provide
Municipality with reasonable access to Contractor’s facilities, and Municipality shall be allowed
to interview all current or former employees to discuss matters pertinent to the performance of
this Contract. Contractor shall make all Contract Records available electronically in common file
formats or via remote access if, and to the extent, requested by Municipality.
17.3 Contract Records include any and all information, materials and data of every kind and
character, including without limitation, records, books, papers, documents, subscriptions,
recordings, agreements, purchase orders, leases, contracts, commitments, arrangements, notes,
daily diaries, drawings, receipts, vouchers and memoranda, and any and all other documents that
pertain to rights, duties, obligations, or performance under this Contract. Contract Records
include hard copy and electronic records, written policies and procedures, time sheets, payroll
records and registers, cancelled payroll checks, estimating work sheets, correspondence, invoices
and related payment documentation, general ledgers, insurance rebates and dividends, and any
ITB/Contract #25-012
ITB Contract #25-012 Page 36 of 78
other records pertaining to rights, duties, obligations or performance under this Contract,
whether by Contractor or Subcontractors, or otherwise necessary to adequately permit
evaluation and verification of any or all of the following:
a) Compliance with Contract
b) Compliance with Municipality’s code of ethics
c) Compliance with Contract provisions regarding the pricing of Change Orders
d) Accuracy of Contractor representations regarding the pricing of invoices
e) Accuracy of Contractor representations related to claims submitted by Contractor
including Subcontractors, or any of its other payees.
In addition to the normal documentation Contractor typically furnishes to Municipality, in order
to facilitate efficient use of Municipality resources when reviewing or auditing Contractor’s
billings and related reimbursable cost records, Contractor agrees to furnish (upon request) the
following types of information in the specified computer readable file format(s):
Type of Record File format
Monthly Job Cost Detail .pdf and Excel
Detailed Job Cost History to Date .pdf and Excel
Monthly Labor Distribution detail (if not already separately detailed in the
Job Cost Detail) .pdf and Excel
Total Job to Date Labor Distribution detail (if not already included in
the detailed Job Cost History to date) .pdf and Excel
Employee Timesheets documenting time worked by all individuals
who charge reimbursable time to the project .pdf
Daily Foreman Reports listing names and hours and tasks of personnel
who worked on the project .pdf
Daily Superintendent Reports .pdf
Detailed Subcontract Status Reports (showing original subcontract
value, approved subcontract change orders, Subcontractor invoices,
payment to Subcontractors, etc.
.pdf and Excel
Copies of Executed Subcontracts with all Subcontractors .pdf
Copies of all executed Change Orders issued to Subcontractors .pdf
Copies of all documentation supporting all reimbursable job costs
(Subcontractor payment applications, vendor invoices, internal cost
charges, etc.)
.pdf
.
17.4 Any incomplete or incorrect entry in such books, records, and accounts shall be a basis
for Municipality’s disallowance and recovery of any payment reliant upon such entry.
ITB/Contract #25-012
ITB Contract #25-012 Page 37 of 78
17.5 If an audit inspection or examination reveals overpricing or overcharges to Municipality
of any nature by Contractor or its Subcontractors in excess of five percent (5%) of the total
contract billings reviewed, in addition to adjusting for the overcharges, Contractor shall pay the
reasonable cost of the audit. Any adjustments or payments due as a result of any such audit or
inspection shall be made within thirty (30) days after presentation of the audit findings to
Contractor.
17.6 Contractor shall, by written contract, require all Subcontractors to agree to the
requirements and obligations of this Article 17.
ARTICLE 18 RIGHTS OF VARIOUS INTERESTS
Whenever work being done by Municipality’s forces or by other contractors is contiguous to or
within the limits of Work covered by this Contract, the respective rights of the various interests
involved shall be established by the Contract Administrator to secure the completion of the
various portions of the Work in general harmony.
ARTICLE 19 EXPLOSIVES
When the use of explosives is necessary in performance of the Work, Contractor shall exercise
the utmost care in the handling and usage of such explosives for the protection of life and
property. All explosives shall be stored in a safe manner in storage clearly marked “Dangerous-
Explosives,” and shall be placed in the care of competent watchmen. When the use of explosives
becomes necessary, Contractor shall furnish to Municipality proof of insurance coverage,
adequately providing public liability and property damage insurance as a rider attached to its
regular policies, unless otherwise included in the policies themselves.
ARTICLE 20 DIFFERING SITE CONDITIONS
If during the course of the Work Contractor encounters (1) subsurface or concealed conditions
at the Project site that differ materially from those shown in the Contract Documents and from
those ordinarily encountered and generally recognized as inherent in work of the character called
for in this Contract; or (2) unknown physical conditions of the Project site, of an unusual nature,
which differ materially from that ordinarily encountered and generally recognized as inherent in
work of the character called for in this Contract, then Contractor, without disturbing the
conditions and before performing any Work affected by such conditions, shall, within twenty-
four (24) hours of their discovery, notify Contract Administrator and Consultant in writing of the
existence of the aforesaid conditions. Consultant and Contract Administrator shall, within two
(2) business days after receipt of Contractor’s written notice, investigate the site conditions
identified by Contractor. If, in the sole opinion of Contract Administrator, the conditions do
materially so differ and cause an increase or decrease in Contractor’s cost of, or the time required
for, the performance of any part of the Work, whether or not charged as a result of the
conditions, Contract Administrator may recommend an equitable adjustment to the Contract
Price, or the Contract Time, or both. If Contract Administrator and Contractor cannot agree on
ITB/Contract #25-012
ITB Contract #25-012 Page 38 of 78
an adjustment in the Contract Price or Contract Time, the adjustment shall be referred to
Consultant for determination in accordance with the provisions of Article 12. No request by
Contractor for an equitable adjustment to this Contract under this provision shall be allowed
unless Contractor has given written notice to Contract Administrator in strict accordance with
the provisions of this article. No request for an equitable adjustment or change to the Contract
Price or Contract Time for differing site conditions shall be allowed if made after the date
certified by Contract Administrator as the date of Substantial Completion.
ARTICLE 21 PLANS AND WORKING DRAWINGS
Municipality, through Consultant, shall have the right to modify the details of the plans and
specifications and to supplement the plans and specifications with additional plans, drawings, or
additional information as the Work proceeds, all of which shall be considered as part of this
Contract. In case of disagreement between the written and graphic portions of this Contract, the
written portion shall govern.
ARTICLE 22 CONTRACTOR TO CHECK PLANS, SPECIFICATIONS, AND DATA
Contractor shall verify all dimensions, quantities, and details shown on the plans, specifications
or other data received from Consultant, and shall notify Consultant of all errors, omissions, or
discrepancies found therein within three (3) days after discovery. Contractor will not be allowed
to take advantage of any error, omission, or discrepancy to stop or delay Work, because
Consultant will advise Contractor how to proceed to avoid stoppage or delay of Work. Contractor
shall not be liable for damages resulting from errors, omissions, or discrepancies in this Contract
unless Contractor recognized such error, omission, or discrepancy, and failed to report it to
Consultant.
ARTICLE 23 CONTRACTOR’S RESPONSIBILITY FOR DAMAGES AND ACCIDENTS
23.1. Contractor shall accept full responsibility for the Work against all loss or damage of
whatsoever nature sustained until final acceptance by Municipality, and shall promptly repair any
damage done from any cause whatsoever, except as provided in Article 30.
23.2. Contractor shall be responsible for all Materials, equipment and supplies pertaining to
the Project. If any such Materials, equipment or supplies are lost, stolen, damaged, or destroyed
prior to final acceptance by Municipality, Contractor shall replace same without cost to
Municipality, except as provided in Article 30.
ARTICLE 24 WARRANTY
Contractor warrants to Municipality that all Materials and equipment furnished under this
Contract will be new unless otherwise specified and that all of the Work will be of good quality,
free from faults and defects, and in conformance with this Contract. All Work not conforming to
these requirements, including substitutions not properly approved and authorized, may be
ITB/Contract #25-012
ITB Contract #25-012 Page 39 of 78
considered defective. If required by Consultant, Contractor shall furnish satisfactory evidence as
to the kind and quality of Materials and equipment. This warranty is not limited by the provisions
of Article 26 herein.
ARTICLE 25 SUPPLEMENTARY DRAWINGS
25.1. When, in the opinion of Consultant, it becomes necessary to explain the Work to be done
more fully, or to illustrate the Work further, or to show any changes that may be required,
supplementary drawings, with specifications pertaining thereto, will be prepared by Consultant.
25.2. The supplementary drawings shall be binding upon Contractor with the same force as this
Contract. Where such supplementary drawings require either less or more than the original
quantities of Work, appropriate adjustments shall be made by Change Order.
ARTICLE 26 DEFECTIVE WORK
26.1. Consultant has the authority to reject or disapprove Work that Consultant finds to be
defective. If required by Consultant, Contractor shall promptly either correct all defective Work
or remove such defective Work and replace it with non-defective Work. Contractor shall bear all
direct, indirect, and consequential costs of such removal or corrections including cost of testing
laboratories and personnel.
26.2. Should Contractor fail or refuse to remove or correct any defective Work or to make any
necessary repairs in accordance with the requirements of this Contract within the time indicated
in writing by Consultant, Municipality shall have the authority to cause the defective Work to be
removed or corrected, or make such repairs as may be necessary, at Contractor’s expense. Any
expense incurred by Municipality in making such removals, corrections, or repairs, shall, at
Municipality’s election, be paid for out of any monies due or which may become due to
Contractor or charged against the Performance Bond. In the event of failure of Contractor to
make all necessary repairs promptly and fully, Municipality may declare Contractor in default.
26.3. If, within one (1) year after Substantial Completion or such longer period of time as may
be prescribed by the terms of any applicable special warranty required by this Contract, or by any
specific provision of this Contract, any of the Work is found to be defective or not in accordance
with this Contract, Contractor, after receipt of written notice from Municipality, shall promptly
correct such defective or nonconforming Work within the time specified by Municipality, without
cost to Municipality. Nothing contained herein shall be construed to establish a period of
limitation with respect to any other obligation that Contractor might have under this Contract,
including, but not limited to, Article 24 hereof and any claim regarding latent defects.
26.4. Failure to reject any defective Work or material shall not in any way prevent later
rejection when such defect is discovered, nor shall such failure obligate Municipality to final
acceptance.
ITB/Contract #25-012
ITB Contract #25-012 Page 40 of 78
ARTICLE 27 TAXES
Contractor shall pay all applicable sales, consumer, use, and other taxes required by Applicable
Law. Contractor is responsible for reviewing the pertinent state statutes involving state taxes
and complying with all their requirements.
ARTICLE 28 SUBCONTRACTS
28.1. Each Subcontractor must possess certificates of competency and licenses required by
Applicable Law. Contractor shall notify the Contract Administrator and Consultant of any change
in Subcontractors.
28.2. Contractor shall not employ any Subcontractor against whom Municipality or Consultant
may have an objection. Contractor shall not be required to employ any Subcontractor against
whom Contractor has a reasonable objection.
28.3. Contractor shall be fully responsible for all acts and omissions of its Subcontractors,
persons directly or indirectly employed by its Subcontractors, and persons for whose acts any of
its Subcontractors may be liable to the same extent that Contractor is responsible for the acts
and omissions of persons directly employed by it. Nothing in this Contract shall create any
contractual relationship between any Subcontractor and Municipality or any obligation on the
part of Municipality to pay or to see the payment of any monies due any Subcontractor.
Municipality or Consultant may furnish to any Subcontractor evidence of amounts paid to
Contractor on account of specific Work performed.
28.4. Contractor shall bind specifically every Subcontractor to the applicable terms and
conditions of this Contract for the benefit of Municipality.
28.5. X Contractor shall perform the Work with its own organization, amounting to not less
than twenty-five percent (25%) of the Contract Price.
ARTICLE 29 SEPARATE CONTRACTS
29.1. Municipality has the right to enter into contracts with other parties in connection with
this Project. Contractor shall afford such other parties reasonable opportunity for the
introduction and storage of their materials and the execution of their work, and shall properly
connect and coordinate this Work with theirs.
29.2. If any part of Contractor’s Work depends for proper execution or results on the work of
any third parties, Contractor shall inspect and promptly report to Consultant any defects in such
work that render it unsuitable for such proper execution and results of Contractor’s Work.
Contractor’s failure to so inspect and report shall constitute an acceptance of the third party’s
work as fit and proper for the performance of Contractor’s Work, except as to defects which may
develop in the third parties’ work after the execution of Contractor’s Work.
ITB/Contract #25-012
ITB Contract #25-012 Page 41 of 78
29.3. Contractor shall conduct its operations and take all reasonable steps to coordinate the
prosecution of the Work so as to not interfere with or impact any other contractor on the site.
Should such interference or impact occur, Contractor shall indemnify Municipality from any
liability to the affected contractor related to such interference or impact.
29.4. To ensure the proper execution of subsequent Work, Contractor shall inspect the Work
already in place and shall immediately report to Consultant any discrepancy between the
executed Work and the requirements of this Contract.
ARTICLE 30 USE OF COMPLETED PORTIONS
30.1. Municipality has the right at its sole option to take possession of and use any completed
or partially completed portions of the Project (“Designated Area”). Such possession and use shall
not be deemed an acceptance of any of the Work not completed in accordance with this Contract.
If such possession and use increase the cost of or delays the Work, Contractor shall be entitled
to reasonable extra compensation or reasonable extension of time or both, as recommended by
Consultant and approved by Municipality.
30.2. If Municipality decides to take possession of any completed or partially completed
portions of the Project, the following shall occur:
30.2.1. Municipality shall give notice to Contractor in writing at least thirty (30) days prior
to Municipality’s intended occupancy of a Designated Area.
30.2.2. Contractor shall complete to the point of Substantial Completion the Designated
Area and request inspection and issuance of a Certificate of Substantial Completion
(007600-1) from Consultant.
30.2.3. Upon Consultant’s issuance of a Certificate of Substantial Completion for the
Designated Area, Municipality will assume full responsibility for maintenance, utilities,
subsequent damages of Municipality and public, adjustment of insurance coverages, and
start of warranty for the Designated Area.
30.2.4. Contractor shall complete all items noted on the Certificate of Substantial
Completion within the time specified by Consultant on the Certificate of Substantial
Completion, and request final inspection and final acceptance of the portion of the Work
occupied. Upon completion of final inspection and receipt of an application for final
payment, Consultant shall issue a Final Certificate of Payment relative to the Designated
Area.
30.2.5. If Municipality decides to occupy or use a portion or portions of the Work prior to
Substantial Completion thereof, such occupancy or use shall not commence prior to a
time mutually agreed upon by Municipality and Contractor and to which the insurance
company or companies providing the property insurance have consented by
endorsement to the policy or policies. Insurance on the unoccupied or unused portion or
ITB/Contract #25-012
ITB Contract #25-012 Page 42 of 78
portions shall not be canceled or lapsed on account of such partial occupancy or use.
Consent of Contractor and of the insurance company or companies to such occupancy or
use shall not be unreasonably withheld.
ARTICLE 31 LANDS OF WORK
31.1. Municipality shall provide, as may be indicated in this Contract, the lands upon which the
Work is to be performed, rights-of-way and easements for access thereto, and such other lands
as are designated by Municipality for the use of Contractor.
31.2. Contractor shall obtain, at Contractor’s own expense and without liability to Municipality,
any additional rights to land and access thereto that may be required for temporary construction
facilities, temporary easements, or for storage of materials. Contractor shall furnish to
Municipality copies of written permission obtained by Contractor from the owners of such land.
ARTICLE 32 LEGAL RESTRICTIONS AND TRAFFIC PROVISIONS
Contractor shall conform to and obey all Applicable Law with regard to labor, hours of work, and
Contractor’s operations. Contractor shall conduct its operations so as not to close any
thoroughfare, nor interfere in any way with traffic on railway, highways, or water, without the
written consent of the proper authorities.
ARTICLE 33 LOCATION AND DAMAGE TO EXISTING FACILITIES, EQUIPMENT, OR UTILITIES
33.1. Utility lines in the Project area have been shown on the Plans. However, Municipality
does not represent or warrant that all lines are shown, or that the ones indicated are in their true
location. Contractor must identify and locate all underground and overhead utility lines or
equipment affecting or affected by the Project. Contractor will not be entitled to any additional
payment due to discrepancies between actual location of utilities and Plan location of utilities.
33.2. Contractor shall notify each utility company with facilities in the Project site, at least thirty
(30) days prior to the start of construction, to arrange for positive underground location,
relocation, or support of its utility where that utility may be in conflict with or endangered by the
Work. The cost of relocation of water mains or other utilities for the convenience of Contractor
shall be paid by Contractor. All charges by utility companies for temporary support of its utilities
shall be paid for by Contractor. All costs of permanent utility relocation to avoid conflict shall be
the responsibility of the utility company involved. Contractor will not be entitled to any
additional payment or extension of time for utility relocations, regardless of reason for
relocation.
33.3. Contractor shall schedule the Work in such a manner that the Work is not delayed by the
utility providers relocating or supporting their utilities. Contractor shall coordinate its activities
with any and all public and private utility providers occupying the right-of-way. Contractor will
not be entitled to any additional compensation or extension of time for any delay associated with
utility relocation or support.
ITB/Contract #25-012
ITB Contract #25-012 Page 43 of 78
33.4. Contractor shall protect all overhead, surface, or underground structures and utilities
from damage or displacement. Contractor will promptly and completely repair all damage to
such structures within a reasonable timewithin the ROW. All damaged utilities must be replaced
or fully repaired to the satisfaction of the utility owner. All repairs are to be inspected by the
utility owner prior to backfilling. Municipality reserves the right to remedy such damage by
making such repairs or causing such repairs to be made at the expense of Contractor.
Municipality’s expense in causing such repairs shall be deducted from Contractor’s next
Application for Payment.
ARTICLE 34 VALUE ENGINEERING
Contractor may request substitution of Materials, articles, pieces of equipment, or any changes
that reduce the Contract Price by making such request to Consultant in writing. Consultant will
be the sole judge of the acceptability of any proposed substitute, and no substitute will be
ordered, installed, used, or initiated without Consultant’s prior written acceptance by a Change
Order or an approved shop drawing. In no event will any substitution accepted by Consultant
result in an increase in the Contract Price or Contract Time. By making a request for substitution,
Contractor agrees to pay directly to Consultant all Consultant’s fees and charges related to
Consultant’s review of the request for substitution, regardless of whether the request for
substitution is accepted by Consultant. Any substitution submitted by Contractor must meet the
form, fit, function, and life cycle criteria of the item proposed to be replaced, and there must be
a reduction in Contract Price including Consultant review fees and charges. Unless otherwise
indicated in the relevant Change Order, a substitution is approved, the net dollar savings shall be
shared equally between Contractor and Municipality and processed as a deductive Change Order.
Municipality may require Contractor to furnish, at Contractor’s expense, a special performance
guarantee or other surety with respect to any substitute approved after award of this Contract.
ARTICLE 35 PAYMENT BY MUNICIPALITY FOR TESTS
Except when otherwise specified in the Contract Documents, the expense of all tests shall be
borne by Municipality and be performed by a testing firm selected by Municipality. Contractor
shall reimburse Municipality the costs of any required test in which the tested Work fails. For
road construction projects, the procedure for making tests required by Municipality will be in
conformance with the most recent edition of the State of Florida, Department of Transportation
Standard Specifications for Road and Bridge Construction.
ARTICLE 36 CHANGE IN THE WORK OR TERMS OF CONTRACT
36.1. Without invalidating this Contract and without notice to any surety, Municipality has the
right to make such increases, decreases, or other changes in the character or quantity of the
Work as may be considered necessary or desirable by Municipality to fully and acceptably
complete the proposed Work in a satisfactory manner. Any extra or additional Work within the
ITB/Contract #25-012
ITB Contract #25-012 Page 44 of 78
scope of this Project must be accomplished by means of appropriate Field Orders and
Supplemental Instructions or Change Orders.
36.2. Any changes to the terms of this Contract must be contained in a written document,
executed by the Parties hereto, with the same formality and of equal dignity as this Contract prior
to the initiation of any Work described in such change. This section shall not prohibit the issuance
of Change Orders executed only by Municipality, as provided in this Contract.
ARTICLE 37 FIELD ORDERS AND SUPPLEMENTAL INSTRUCTIONS
37.1. The Contract Administrator, through Consultant, shall have the right to approve and issue
Field Orders setting forth written interpretations of the intent of this Contract and ordering minor
changes in the Work. Field Orders may not change the Contract Price or the Contract Time.
37.2. Consultant shall have the right to approve and issue Supplemental Instructions setting
forth written orders, instructions, or interpretations concerning the Contract Documents or
performance of the Work. Supplemental Instructions may not change the Contract Price or the
Contract Time.
ARTICLE 38 CHANGE ORDERS
38.1. Changes in the quantity or character of the Work within the scope of the Project that
cannot be accomplished by means of Field Orders or Supplemental Instructions, including all
changes resulting in changes to the Contract Price or the Contract Time, shall be authorized only
by Change Orders approved in advance and issued in accordance with the provisions of the
Municipality’s Procurement Code, as amended from time to time.
38.2. Contractor shall not start work on any changes requiring an increase in the Contract Price
or the Contract Time until a Change Order setting forth the adjustments is approved by
Municipality. Upon receipt of a Change Order, Contractor shall promptly proceed with the Work
set forth in the Change Order.
38.3. If satisfactory adjustment cannot be reached for any item requiring a change in the
Contract Price or Contract Time, and a Change Order has not been issued, Municipality may, at
its sole option, either terminate this Contract as it applies to the items in question and make such
arrangements as Municipality deems necessary to complete the work associated with the
disputed item or submit the matter in dispute to Consultant as set forth in Article 12.
38.4. Under circumstances determined necessary by Municipality, Change Orders may be
issued unilaterally by Municipality. During the pendency of the dispute, and upon receipt of a
Change Order from Municipality, Contractor shall promptly proceed with the change in the Work
involved and advise Consultant and Contract Administrator in writing within seven (7) days after
receipt of the Change Order of Contractor’s agreement or disagreement with the method, if any,
provided in the Change Order for determining the proposed adjustment in the Contract Price or
Contract Time.
ITB/Contract #25-012
ITB Contract #25-012 Page 45 of 78
38.5. On approval of any Contract change increasing the Contract Price, Contractor shall
promptly ensure that the performance bond and payment bond are increased so that each
reflects the total Contract Price as increased. Contractor will promptly provide Municipality such
updated bonds.
ARTICLE 39 VALUE OF CHANGE ORDER WORK
39.1. The value of any Work covered by a Change Order or of any claim for an increase or
decrease in the Contract Price shall be determined in one of the following ways:
39.1.1 If the Work involved is covered by unit prices contained in this Contract, by
application of unit prices to the quantities of items involved, subject to the provisions of
Section 39.7.
39.1.2 By mutual acceptance of a lump sum, which sum Contractor and Municipality
acknowledge contains a component for overhead and profit.
39.1.3 On the basis of the “Cost of Work,” determined as provided in Sections 39.2 and
39.3, plus a Contractor’s fee for overhead and profit as determined in Section 39.4.
39.2. The term “Cost of Work” means the sum of all direct costs necessarily incurred and paid
by Contractor (or, if applicable, Subcontractor) in the proper performance of the Work described
in the Change Order. Except as otherwise may be agreed to in writing by Municipality, such costs
shall be in amounts no higher than those prevailing in the locality of the Project; shall include
only the following items; and shall not include any of the costs itemized in Section 39.3.
39.2.1 Payroll costs for employees in the direct employ of Contractor in the performance
of the Work described in the Change Order under schedules of job classifications agreed
upon by Municipality and Contractor. Payroll costs for employees not employed full time
on the Work covered by the Change Order shall be apportioned on the basis of their time
spent on the Work. Payroll costs shall include, but not be limited to, salaries and wages
plus the cost of fringe benefits, which shall include social security contributions,
unemployment, excise and payroll taxes, workers’ compensation, health and retirement
benefits, bonuses, sick leave, vacation, and holiday pay application thereto. Such
employees shall include field and home office personnel directly employed for this
project, superintendents and foremen at the site. The expenses of performing the Work
after regular working hours, on Sunday or legal holidays, shall be included in the above to
the extent authorized in advance by Municipality.
39.2.2 Cost of all materials and equipment furnished and incorporated in the Work,
including costs of transportation and storage thereof, and manufacturers’ field services
required in connection therewith. All cash discounts shall accrue to Contractor unless
Municipality deposits funds with Contractor to make payments, in which case the cash
discounts shall accrue to Municipality. All trade discounts, rebates and refunds, and all
ITB/Contract #25-012
ITB Contract #25-012 Page 46 of 78
returns from sale of surplus materials and equipment shall accrue to Municipality, and
Contractor shall make provisions so that they may be obtained. Rentals of all construction
equipment and machinery, and the parts thereof, whether rented by Contractor, in
accordance with rental agreements approved by Municipality with the advice of
Consultant, and the costs of transportation, loading, unloading, installation, dismantling
and removal thereof, all in accordance with the terms of said agreements. Municipality
will not be responsible for the cost of the rental of any such equipment, machinery, or
parts when the use thereof is no longer necessary for the Work.
39.2.3 If required by Municipality, Contractor shall obtain competitive bids from
Subcontractors acceptable to Contractor, and shall deliver such bids to Municipality who
will then determine, with the advice of Consultant, which bids will be accepted. If the
subcontract provides that the Subcontractor is to be paid on the basis of Cost of Work
plus a fee, the Subcontractor’s Cost of Work shall be determined in the same manner as
Contractor’s Cost of Work. All Subcontractors shall be subject to the other provisions of
this Contract insofar as applicable.
39.2.4 Cost of special consultants, including, but not limited to, engineers, architects,
testing laboratories, and surveyors employed for services specifically related to the
performance of the work described in the Change Order.
39.2.5 Supplemental costs including the following:
39.2.5.1 All materials, supplies, equipment, machinery, appliances, office and
temporary facilities, including transportation and maintenance thereof, at the site
and hand tools not owned by the workers used in the performance of the Work,
less market value of such items used but not consumed, and which items remain
the property of Contractor.
39.2.5.2 Sales, use, or similar taxes related to the Work, imposed by any
governmental authority, for which Contractor is liable.
39.2.5.3 The cost of utilities, fuel, and sanitary facilities at the site.
39.2.5.4 Cost of premiums for additional bonds and insurance required because
of changes in the Work.
39.3 The term “Cost of Work” shall not include any of the following:
39.3.1 Payroll costs and other compensation of Contractor’s officers, executives,
principals (of partnership and sole proprietorships), general managers, engineers,
architects, , lawyers, auditors, accountants, expediters, timekeepers, clerks and other
personnel employed by Contractor whether at its principal or a branch office, for general
administration of the Work that are not specifically included in the agreed-upon schedule
ITB/Contract #25-012
ITB Contract #25-012 Page 47 of 78
of job classifications referred to in subsection 39.2.1, all of which payroll costs and other
compensation are to be considered administrative costs covered by Contractor’s fee.
39.3.2 Expenses of Contractor’s principal and branch offices other than Contractor’s field
office at the Project site.
39.3.3 Any part of Contractor’s capital expenses, including but not limited to interest on
Contractor’s capital employed for the Work as well as charges against Contractor for
delinquent payments.
39.3.4 Costs due to the negligence or neglect of Contractor, any Subcontractors, or
anyone directly or indirectly employed by any of them or for whose acts any of them may
be liable, including but not limited to, the correction of defective Work, disposal of
materials or equipment wrongly supplied, and repairing or remedying any damage to
property.
39.3.5 Other overhead or general expense costs of any kind.
39.4 Contractor’s fee for overhead and profit shall be determined as follows:
39.4.1 A mutually acceptable fixed fee, or if no fixed fee can be agreed upon;
39.4.2 A fee based on the following percentages of the various portions of the cost of the
Work:
39.4.2.1 For costs incurred under subsections 39.2.1 and 39.2.2, Contractor’s
fee shall not exceed ten percent.15%
39.4.2.2 For costs incurred under subsection 39.2.3, Contractor’s fee shall not
exceed seven and one-half percent (7.5%); and if a subcontract is on the basis of
cost of the work plus a fee, the maximum allowable to the Subcontractor as a fee
for overhead and profit shall not exceed ten percent (10%); and
39.5 The amount of credit to Municipality for any change that results in a net decrease in cost
will be the amount of the actual net decrease. When both additions and credits are involved in
any one change, the combined overhead and profit shall be figured on the basis of the net
increase, if any. Contractor shall not be entitled to claim lost profits for any Work not performed.
39.6 Whenever the cost of any Work is to be determined pursuant to Sections 39.2 and 39.3,
Contractor will submit in a form acceptable to Consultant an itemized cost breakdown together
with the supporting data.
39.7 If the quantity of any item of the Work covered by a unit price is increased or decreased
by more than twenty percent (20%) from the quantity of such Work indicated in this Contract, an
appropriate Change Order shall be issued to adjust the unit price, if warranted.
ITB/Contract #25-012
ITB Contract #25-012 Page 48 of 78
39.8 Whenever a change in the Work is to be based on mutual acceptance of a lump sum,
whether the amount is an addition, credit or no change-in-cost, Contractor shall submit an initial
cost estimate acceptable to Consultant and Contract Administrator.
39.8.1 Such cost estimate shall include a breakdown listing the quantities and unit prices
for materials, labor, equipment, and other items of cost.
39.8.2 Whenever a change involves Contractor and one or more Subcontractors and the
change is an increase in the Contract Price, overhead and profit percentage for Contractor
and each Subcontractor shall be itemized separately.
39.9 Each Change Order must state within the body of the Change Order whether it is based
upon unit price, negotiated lump sum, or “Cost of Work.”
ARTICLE 40 NOTIFICATION AND CLAIM FOR CHANGE OF
CONTRACT TIME OR CONTRACT PRICE
40.1 Any claim for a change in the Contract Time or Contract Price shall be made by written
notice by Contractor to the Contract Administrator and to Consultant within five (5) days of the
commencement of the event giving rise to the claim or Contractor’s knowledge of the claim, and
the notice shall state the general nature and cause of the claim. Thereafter, within twenty (20)
days after the termination of the event giving rise to the claim or Contractor’s knowledge of the
claim, Contractor shall submit written notice of the extent of the claim with supporting
information and documentation to the Contract Administrator and Consultant (hereinafter
“Claim Notice”). The Claim Notice shall include Contractor’s written notarized certification that
the adjustment claimed is the entire adjustment to which Contractor has reason to believe it is
entitled as a result of the occurrence the event giving rise to the claim. If the Contract
Administrator and Contractor cannot resolve a claim for changes in the Contract Time or Contract
Price within twenty (20) days after receipt of the Claim Notice by the Contract Administrator and
Consultant, then Contractor shall submit the claim to Consultant within five (5) days after the
date of impasse in accordance with Article 12 hereof. IT IS EXPRESSLY AND SPECIFICALLY
AGREED THAT ANY AND ALL CLAIMS FOR CHANGES TO THE CONTRACT TIME OR CONTRACT
PRICE SHALL BE WAIVED IF NOT SUBMITTED IN STRICT ACCORDANCE WITH THE
REQUIREMENTS OF THIS SECTION.
40.2 The Contract Time will be extended in an amount equal to time lost on critical Work items
due to delays beyond the control of and through no fault or negligence of Contractor if a claim
for an extension is made in accordance with Section 40.1. Such delays shall include, but not be
limited to, acts, omissions, or neglect by any separate contractor employed by Municipality, fires,
floods, labor disputes, epidemics, abnormal weather conditions or acts of God.
ARTICLE 41 NO DAMAGES FOR DELAY
No claim for damages or any claim, other than for an extension of time, shall be made or asserted
against Municipality by reason of any delays except as provided and as detailed under Article 39
ITB/Contract #25-012
ITB Contract #25-012 Page 49 of 78
above. Contractor shall not be entitled to an increase in the Contract Price or payment or
compensation of any kind from Municipality for direct, indirect, consequential, impact or other
costs, expenses or damages, including but not limited to costs of acceleration or inefficiency,
arising from delay, disruption, interference or hindrance from any cause whatsoever, whether
such delay, disruption, interference or hindrance be reasonable or unreasonable, foreseeable or
unforeseeable, or avoidable or unavoidable. Contractor shall be entitled only to extensions of
the Contract Time as the sole and exclusive remedy for such resulting delay, in accordance with
and to the extent specifically provided above; provided, however, that this provision shall not
preclude recovery of damages by Contractor for actual delays due solely to fraud, bad faith, or
active interference on the part of Municipality or its Consultant.
ARTICLE 42 EXCUSABLE DELAY; COMPENSABLE; NON-COMPENSABLE
42.1 Excusable Delay. Delay that extends the completion of the Work and that is caused by
circumstances beyond the control of Contractor or its Subcontractors, suppliers, or vendors are
Excusable Delay. Contractor is entitled to a time extension of the Contract Time for each day the
Work is delayed due to Excusable Delay. Contractor shall document its claim for any time
extension as provided in Article 40 hereof. Failure of Contractor to comply with Article 40 hereof
as to any particular event of delay shall be deemed conclusively to constitute a waiver,
abandonment, or relinquishment of any and all claims resulting from that particular event of
delay. Excusable Delay may be compensable or non-compensable, as provided below.
42.1.1 Compensable Excusable Delay. Excusable Delay is compensable when (a) the
delay extends the Contract Time; (b) is caused by circumstances beyond the control of
Contractor or its Subcontractors, suppliers, or vendor; and (c) is caused solely by fraud,
bad faith, or active interference on the part of Municipality or its agents. In no event shall
Contractor be compensated for interim delays that do not extend the Contract Time.
Contractor shall be entitled to direct and indirect costs for Compensable Excusable Delay.
Direct costs recoverable by Contractor shall be limited to the actual additional costs
allowed pursuant to Article 39 hereof.
Municipality and Contractor recognize and agree that the amount of Contractor’s precise
actual indirect costs for delay in the performance and completion of the Work is
impossible to determine as of the date of execution of this Contract, and that proof of the
precise amount will be difficult. Therefore, indirect costs recoverable by Contractor shall
be liquidated on a daily basis for each day the Contract Time is delayed due to a
Compensable Excusable Delay. These liquidated indirect costs shall be paid to
compensate Contractor for all indirect costs caused by a Compensable Excusable Delay,
and shall include, but not be limited to, lost profits, all profit on indirect costs, home office
overhead, acceleration, loss of earnings, loss of productivity, loss of bonding capacity, loss
of opportunity and all other indirect costs incurred by Contractor. The amount of
liquidated indirect costs recoverable shall be Five Hundred Dollars ($500.00) per day for
each day this Contract is delayed due to a Compensable Excusable Delay.
ITB/Contract #25-012
ITB Contract #25-012 Page 50 of 78
42.1.2 Non-Compensable Excusable Delay. When Excusable Delay is (a) caused by
circumstances beyond the control of Contractor, its Subcontractors, suppliers, and
vendors; (b) caused by circumstances beyond the control of Municipality or Consultant;
or (c) caused jointly or concurrently by Contractor or its Subcontractors, suppliers, or
vendors and by Municipality or Consultant, then Contractor shall be entitled only to a
time extension and no further compensation for the delay.
ARTICLE 43 SUBSTANTIAL COMPLETION
When Contractor determines in good faith that the Work, or a portion thereof designated by
Municipality pursuant to Article 30 hereof, has reached Substantial Completion, Contractor shall
so notify the Contract Administrator and Consultant in writing. Consultant and the Contract
Administrator shall then promptly inspect the Work. When Consultant, on the basis of such an
inspection, determines that the Work or designated portion thereof is substantially complete, it
will then prepare a Certificate of Substantial Completion (Form 10). The Contract Administrator
shall affix its determination to the Certificate of Substantial Completion, which shall establish the
Date of Substantial Completion. The Certificate of Substantial Completion shall state the
responsibilities of Municipality and Contractor for security, maintenance, heat, utilities, damage
to the Work, and insurance.
The estimated cost of the Project is as follows (select one):
less than $10,000,000. Within thirty (30) calendar days after the issuance of
the Certificate of Substantial Completion, Consultant and the Contract
Administrator shall develop and Contractor shall review the Punch List.
x equal to or greater than $10,000,000. Within forty-five (45) calendar days
after the issuance of the Certificate of Substantial Completion, Consultant and the
Contract Administrator shall develop and Contractor shall review the Punch List.
The Punch List shall describe all Work yet to be completed by Contractor, including the estimated
cost to complete each item of Work on the Punch List, to satisfy the requirements of this Contract
for Final Completion and to make the Work satisfactory and acceptable. The Punch List shall be
provided to Contractor within five (5) days after final development and review. If the final Punch
List is not provided within the stated five (5) days, the Contract Time for completion shall be
extended by the number of days exceeding the five (5) days. The failure to include any items of
corrective Work or remaining Work on such Punch List does not alter the responsibility of
Contractor to complete all Work in accordance with this Contract. Warranties required by this
Contract shall commence on the date of Substantial Completion of the Work or designated
portion thereof unless otherwise provided in the Certificate of Substantial Completion. The
Certificate of Substantial Completion shall be submitted to the Contract Administrator and
Contractor for their written acceptance of the responsibilities assigned to them in the Certificate
of Substantial Completion.
ITB/Contract #25-012
ITB Contract #25-012 Page 51 of 78
The process for developing the estimated cost of each item of Work on the Punch List shall use
the following methodology or methodologies (select all that apply):
Direct costs
X Prorated value of outstanding Work based on Contractor’s original Schedule
of Values
X Unit prices provided in the bid
Labor costs per hour
Per square foot of site area
Per assembly
Historical and current prices for similar work
Industry cost database(s)
Other: __________________________.
ARTICLE 44 NO INTEREST
44.1 Unless prohibited by Applicable Law, Municipality shall not be liable to pay any interest
to Contractor for any reason, whether as prejudgment interest or for any other purpose, and
Contractor waives, rejects, disclaims and surrenders any and all entitlement to interest in
connection with a dispute or claim arising from, related to, or in connection with this Contract.
44.2 If the preceding section is inapplicable or is determined to be invalid or unenforceable by
a court of competent jurisdiction, the annual rate of interest payable by Municipality under this
Contract, whether as prejudgment interest or for any other purpose, shall be, to the full extent
permissible under Applicable Law.
ARTICLE 45 SHOP DRAWINGS
45.1 Contractor shall submit shop drawings as required by the Technical Specifications. The
purpose of the shop drawings is to show the suitability, efficiency, technique of manufacture,
installation requirements, details of the item, and evidence of its compliance or noncompliance
with this Contract.
45.2 Within thirty (30) days after the Project Initiation Date specified in the Notice to Proceed,
Contractor shall submit to Consultant a complete list of preliminary data on items for which shop
drawings are to be submitted and shall identify the critical items. Approval of this list by
ITB/Contract #25-012
ITB Contract #25-012 Page 52 of 78
Consultant shall in no way relieve Contractor from submitting complete shop drawings and
providing all materials and equipment in accordance with this Contract. This procedure is
required in order to expedite final approval of shop drawings.
45.3 After the approval of the list of items required in Section 45.2 above, Contractor shall
promptly request shop drawings from the various manufacturers, fabricators, and suppliers.
45.4 Contractor shall thoroughly review and check the shop drawings, and shall approve each
and every copy by initialing same, and shall transit a letter of approval to Consultant and
Municipality.
45.5 If the shop drawings show or indicate departures from the Contract requirements,
Contractor shall specify such departures and make specific mention thereof in its letter of
transmittal to Consultant and Municipality. Failure to point out such departures shall not relieve
Contractor from its responsibility to comply with this Contract.
45.6 Consultant shall review and approve shop drawings within twenty-one (21) days after the
date received, unless said shop drawings are rejected by Consultant for material reasons.
Consultant’s approval of shop drawings will be general and shall not relieve Contractor of
responsibility for the accuracy of such shop drawings, nor for the proper fitting and construction
of the Work, nor for the furnishing of materials or Work required by this Contract but not
indicated on the shop drawings. No Work called for by Shop Drawings shall be performed until
the said shop drawings have been approved by Consultant. Approval by Consultant shall not
relieve Contractor from responsibility for errors or omissions of any sort on the shop drawings.
45.7 No approval will be given to partial submittals of shop drawings for items that
interconnect or are interdependent where necessary to properly evaluate the design. It is
Contractor’s responsibility to assemble the shop drawings for all such interconnecting or
interdependent items, check such items, and then make one submittal to Consultant along with
Contractor’s comments as to compliance, noncompliance, or features requiring special attention.
45.8 If catalog sheets or prints of manufacturers’ standard drawings are submitted as shop
drawings, any additional information or changes on such drawings shall be typewritten or
lettered in ink.
45.9 Contractor shall submit the number of copies of shop drawings required by Consultant.
Resubmissions of shop drawings shall be made in the same quantity until final approval is
obtained.
45.10 Contractor shall keep one set of shop drawings marked with Consultant’s approval at the
job site at all times.
ITB/Contract #25-012
ITB Contract #25-012 Page 53 of 78
ARTICLE 46 FIELD LAYOUT OF THE WORK AND RECORD DRAWINGS
46.1 The entire responsibility for establishing and maintaining line and grade in the field lies
with Contractor. Contractor shall maintain an accurate and precise record of the location and
elevation of all pipelines, conduits, structures, maintenance access structures, handholes, fittings
and the like, and shall prepare record or “as-built” drawings of the same, which must be sealed
by a Professional Surveyor. Contractor shall deliver these records in good order to Consultant as
the Work is completed. The cost of all such field layout and recording work is included in the bid
prices for the appropriate items. All record drawings shall be made on reproducible paper and
shall be delivered to Consultant prior to, and as a condition of, final payment.
46.2 Contractor shall maintain in a safe place at the Project site one record copy of all
Drawings, Plans, Specifications, Addenda, written amendments, Change Orders, Field Orders and
written interpretations and clarifications in good order and annotated to show all changes made
during construction. These record documents together with all approved samples and a
counterpart of all approved shop drawings shall be available at all times to Consultant for
reference. Upon Final Completion of the Project and prior to Final Payment, these record
documents, samples, and shop drawings shall be delivered to the Contract Administrator.
46.3 Prior to, and as a condition precedent to Final Payment, Contractor shall submit to
Municipality Contractor’s record drawings or as-built drawings acceptable to Consultant.
ARTICLE 47 SAFETY AND PROTECTION
47.1 Contractor shall be solely responsible for initiating, maintaining, and supervising all safety
precautions and programs in connection with the Project. Contractor shall take all necessary
precautions for the safety of, and shall provide the necessary protection to prevent damage,
injury, or loss to:
47.1.1 All employees on the work site and other persons who may be affected thereby;
47.1.2 All the Work and all materials or equipment to be incorporated therein, whether
in storage on or off the Project site; and
47.1.3 Other property at the Project site or adjacent thereto, including trees, shrubs,
lawns, walks, pavements, roadways, structures, and utilities not designated for removal,
relocation, or replacement in the course of construction.
47.2 Contractor shall comply with all Applicable Law of any public body having jurisdiction for
the safety of persons or property or to protect person or property from damage, injury, or loss,
and Contractor shall erect and maintain all necessary safeguards for such safety and protection.
Contractor shall notify owners of adjacent property and utilities when performance of the Work
may affect them. All damage, injury, or loss to any property referred to in subsections 47.1.2 and
47.1.3 above, caused directly or indirectly, in whole or in part, by Contractor, any Subcontractor
or anyone directly or indirectly employed by any of them or anyone for whose acts any of them
ITB/Contract #25-012
ITB Contract #25-012 Page 54 of 78
may be liable, shall be repaired or remedied by Contractor. Contractor’s duties and
responsibilities for the safety and protection of the Work shall continue until such time as all the
Work is completed and Consultant has issued a notice to Municipality and Contractor that the
Work is acceptable except as otherwise provided in Article 30.
47.3 Contractor shall designate a responsible member of its organization at the Project site
whose duty shall be the prevention of accidents. This person shall be Contractor’s
superintendent unless otherwise designated in writing by Contractor to Municipality.
ARTICLE 48 FINAL BILL OF MATERIALS
Contractor shall be required to submit to Municipality and Consultant a final bill of materials with
unit costs for each bid item for supply of materials installed. This shall be an itemized list of all
materials with a unit cost for each material, and the total cost shall be determined on the basis
of the unit costs established for each Contract item.
ARTICLE 49 PROJECT SIGN
Any requirements for a project sign shall be as set forth within the Technical Specifications
section.
ARTICLE 50 CLEANING UP; MUNICIPALITY’S RIGHT TO CLEAN UP
Contractor shall at all times keep the premises free from accumulation of waste materials or
rubbish caused by its operations. At the completion of the Project, Contractor shall remove all
its waste materials and rubbish from and about the Project as well as its tools, construction
equipment, machinery, and surplus materials. If Contractor fails to clean up during the
performance of the Work or at the completion of the Work, Municipality may do so and the cost
thereof shall be charged to Contractor. If a dispute arises between Contractor and separate
contractors of Municipality as to their responsibility for cleaning up, Municipality may clean up
and charge the cost thereof to the contractors responsible as Consultant shall determine to be
appropriate and equitable.
ARTICLE 51 HURRICANE/FLOODING PRECAUTIONS
51.1 During such periods of time as are designated by the National Weather Services as being
a hurricane watch, excessive rain/flooding event or warning, Contractor, shall take all precautions
necessary to secure the Project limits (right of way) from any damage that may be caused by all
threatened storm events, regardless of whether Municipality or Consultant has given notice of
same.
51.2 Compliance with any specific hurricane watch or flood warning, precautions will not
constitute additional work, except as directed by the Municipality.
ITB/Contract #25-012
ITB Contract #25-012 Page 55 of 78
51.3 Suspension of the Work caused by a threatened or actual storm, or flooding event,
regardless of whether Municipality has directed such suspension, will entitle Contractor to
additional Contract Time as non-compensable, excusable delay, and shall not give rise to a claim
for compensable delay.
ARTICLE 52 REMOVAL OF EQUIPMENT
In case of termination of this Contract before completion for any cause whatsoever, Contractor,
if notified to do so by Municipality, shall promptly remove any part or all of Contractor’s
equipment and supplies from the property of Municipality, failing which Municipality shall have
the right to remove such equipment and supplies at the expense of Contractor.
ARTICLE 53 DOMESTIC PARTNERSHIP REQUIREMENT
Unless this Contract is exempt from the provisions of the Broward County Domestic Partnership
Act, Section 16½-157, of the Code (“Act”), or will be paid with State-appropriated funds,
Contractor certifies and represents that it will at all times comply with the provisions of the Act,
and the contract language referenced in the Act is deemed incorporated in this Contract as
though fully set forth in this section. The failure of Contractor to comply shall be a material
breach of this Contract, entitling Municipality to pursue any and all remedies provided under
Applicable Law including, but not limited to (1) retaining all monies due or to become due
Contractor until Contractor complies; (2) termination of this Contract; and (3) suspension or
debarment of Contractor.
ARTICLE 54 EQUAL EMPLOYMENT OPPORTUNITY AND CBE/SBE COMPLIANCE
54.1 Contractor and Subcontractors shall not discriminate on the basis of race, color, sex,
religion, national origin, disability, age, marital status, political affiliation, sexual orientation,
pregnancy, or gender identity and expression in the performance of this Contract, except that
any project assisted by the U.S. Department of Transportation funds shall comply with the
nondiscrimination requirements in 49 C.F.R. Part 26. Contractor shall include the foregoing or
similar language in its contracts with any Subcontractors.
54.2
ARTICLE 55 PUBLIC RECORDS
Notwithstanding any other provision in this Contract, any action taken by Municipality in
compliance with, or in a good faith attempt to comply with, the requirements of Chapter 119,
Florida Statutes, shall not constitute a breach of this Contract. If Contractor is acting on behalf of
Municipality as provided in Section 119.0701, Florida Statutes, Contractor shall:
55.1 Keep and maintain public records required by Municipality to perform the services
under this Contract;
ITB/Contract #25-012
ITB Contract #25-012 Page 56 of 78
55.2 Upon request from Municipality, provide Municipality with a copy of the
requested records or allow the records to be inspected or copied within a reasonable time
and at a cost that does not exceed that provided in Chapter 119, Florida Statutes, or as
otherwise provided by Applicable Law;
55.3 Ensure that public records that are exempt or confidential and exempt from public
record requirements are not disclosed except as authorized by Applicable Law for the
duration of this Contract and after completion or termination of this Contract if the
records are not transferred to Municipality; and
55.4 Upon completion or termination of this Contract, transfer to Municipality, at no
cost, all public records in possession of Contractor or keep and maintain public records
required by Municipality to perform the services. If Contractor transfers the records to
Municipality, Contractor shall destroy any duplicate public records that are exempt or
confidential and exempt. If Contractor keeps and maintains public records, Contractor
shall meet all requirements of Applicable Law for retaining public records. All records
stored electronically must be provided to Municipality upon request in a format that is
compatible with the information technology systems of Municipality.
The failure of Contractor to comply with the provisions of this article shall constitute a material
breach of this Contract entitling Municipality to exercise any remedy provided in this Contract or
under Applicable Law, all of such remedies being cumulative.
If Contractor receives a request for public records regarding this Contract or the Services,
Contractor must immediately notify the Contract Administrator in writing and provide all
requested records to Municipality to enable Municipality to timely respond to the public records
request. Municipality will respond to all such public records requests.
Contractor must separately submit and conspicuously label as “RESTRICTED MATERIAL – DO NOT
PRODUCE” any material (a) that Contractor contends constitutes or contains its trade secrets
under Chapter 688, Florida Statutes, or (b) for which Contractor asserts a right to withhold from
public disclosure as confidential or otherwise exempt from production under Florida public
records laws (including Chapter 119, Florida Statutes) (collectively, “Restricted Material”). In
addition, Contractor must, simultaneous with the submission of any Restricted Material, provide
a sworn declaration or affidavit in a form acceptable to Municipality from a person with personal
knowledge attesting that the Restricted Material constitutes trade secrets or is otherwise exempt
or confidential under Florida public records laws, including citing the applicable Florida statute
and specifying the factual basis for each such claim. Upon request by Municipality, Contractor
must promptly identify the specific applicable statutory section that protects any particular
document. If a third party submits a request to Municipality for records designated by Contractor
as Restricted Material, Municipality shall refrain from disclosing such material unless otherwise
ordered by a court of competent jurisdiction, authorized in writing by Contractor, or the claimed
exemption is waived. Any failure by Contractor to strictly comply with the requirements of this
section shall constitute Contractor’s waiver of Municipality’s obligation to treat the records as
ITB/Contract #25-012
ITB Contract #25-012 Page 57 of 78
Restricted Material. Contractor must indemnify and hold harmless Municipality and its
employees and agents from any and all claims, causes of action, losses, fines, penalties, damages,
judgments, and liabilities of any kind, including attorneys’ fees, litigation expenses, and court
costs, relating to nondisclosure of Restricted Material in response to a third-party request.
IF CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF FLORIDA
STATUTES CHAPTER 119 TO CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS
RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS
AT
City Clerk’s Office
100. W. Dania Beach Blvd.
Dania Beach, Florida 33004
Telephone (954) 924-6800 ext. 3624
Fax (954) 921-2604
eriera@daniabeachfl.gov
(The remainder of this page is intentionally left blank.)
ITB/Contract #25-012
ITB Contract #25-012 Page 58 of 78
SUPPLEMENTAL GENERAL CONDITIONS
SUPPLEMENTAL WAGE REQUIREMENTS
1. Prevailing Wage Rate Ordinance - If the price of this Contract is in excess of
$250,000.00, the following sections shall apply.
1.1. The rate of wages and fringe benefit payments for all laborers, mechanics, and
apprentices shall not be less than those payments for similar skills in classifications of work in a
like construction industry as determined by the Secretary of Labor and as the most recently
published in the Federal Register.
1.2. All mechanics, laborers, and apprentices, employed or working on the site of the
Work, shall be paid in accordance with the above referenced wage rates. Contractor shall post
this section of the Contract (Supplemental Wage Requirements) at the site of the Work in a
prominent place where it can be easily seen by the workers.
1.3. If the Parties cannot agree on the proper classification of a particular class of
laborers or mechanics or apprentices that will be used on the Work site, the Contract
Administrator shall submit the question, together with its recommendation, to the Municipality
Manager for final determination, which shall be binding.
1.4. If the Contract Administrator determines that any laborer or mechanic or
apprentice employed by Contractor or any Subcontractor on the site of the Work has been or is
being paid wages less than the rate of wages required by the Prevailing Wage Ordinance, Section
26-5 of the Broward County Code of Ordinances, as amended, the Contract Administrator may
(1) by written notice to Contractor direct Contractor to terminate the Work or such part of Work
for which there has been a failure to pay said required wages; and (2) contract with another party
to perform the Work or portion thereof to completion. Whereupon, Contractor and its Sureties
shall be liable to Municipality for any and all costs incurred by Municipality to complete such
Work to the extent such costs exceed any amounts that Contractor would be due for
performance of such Work.
1.5. Contractor shall maintain payrolls and basic records relating thereto during the
course of the Work and shall preserve such records for a period of three (3) years thereafter for
all laborers, mechanics, and apprentices working at the site of the Work. Such records shall
contain the name and address of each such employee; the employee’s current classification; rate
of pay (including rates of contributions for, or costs assumed to provide, fringe benefits); daily
and weekly number of hours worked; deductions made; and actual wages paid.
1.6. Contractor shall submit, with each application for payment, a signed and sworn
“Statement of Compliance” (Form 8A) attesting to compliance with the Prevailing Wage
Ordinance, Section 26-5 of the Broward County Code of Ordinances, as amended.
ITB/Contract #25-012
ITB Contract #25-012 Page 59 of 78
1.7. The Contract Administrator may withhold or cause to be withheld from Contractor
so much of the payments requisitioned as may be considered necessary to pay laborers and
mechanics, including apprentices, trainees, and guards employed by Contractor or any
Subcontractor on the Work, the full amount of wages required by this Contract.
1.8. If Contractor or any Subcontractor fails to pay any laborer, mechanic, or
apprentice employed or working on the site of the Work all or part of the wages required by this
Contract, the Contract Administrator may, after written notice to Contractor, take such action as
may be necessary to cause suspension of any further payments or advances until such violations
have ceased.
2. x Federal Grant Projects:
2.1. Because this Project will be funded, in whole or in part, by the United States
government through Federal Emergency Management Agency to as Hazard Mitigation Grant
Program No. 4337-494-R , all Federal assurances applicable to such funding, including any and
all supervening assurances set forth in Rules and Regulations published in Federal Register or
C.F.R., shall apply to this Contract.
2.2. Accordingly, all clauses, terms, or conditions required by federal grantor agency
with respect to the federal funding for this Project are hereby attached and made a part of this
Contract.
ITB/Contract #25-012
ITB Contract #25-012 Page 60 of 78
FORM 1: PERFORMANCE BOND
Project Name: Southeast Drainage Retrofit Project, Phase II
Project Number: BY THIS BOND, We _______________________________________, as
Principal, hereinafter called Contractor, located at __________________________, with a phone
number of __________________, and _______________________________, as Surety, located
at ____________________, with a phone number of ________, under the assigned Bond
Number _____________________, are bound to the Municipality of ______, Florida
(“Municipality”), and Broward County, Florida, as dual Obligees (hereinafter jointly and severally
referred to as “Municipality/County”), in the amount of ____________________________
Dollars ($__________) for the payment whereof Contractor and Surety bind themselves, their
heirs, executors, administrators, successors and assigns, jointly and severally.
WHEREAS, Contractor has by written agreement dated the _______ day of
__________________, 20____, entered into a Contract, Bid/Contract No.ITB 25-012, with
Municipality, the terms of which contract (including the Contract Documents, as those are
defined in the contract) are incorporated by reference herein and made a part hereof as the
“Contract,” which includes any and all provisions for liquidated damages, and other damages
identified.
THE CONDITION OF THIS BOND is that if Contractor:
1) Performs the Contract between Contractor and Municipality for construction of
Southeast Drainage Retrofit Project, Phase , in the time and manner prescribed in the
Contract; and
2) Pays Municipality/County all losses, liquidated damages, expenses, costs and attorneys’
fees including appellate proceedings, that Municipality/County sustains as a result of
default by Contractor under the Contract; and
3) Performs the guaranties of all Work (as defined in the Contract) and materials furnished
under the Contract for the time specified in the Contract, then THIS BOND IS VOID;
OTHERWISE IT REMAINS IN FULL FORCE AND EFFECT.
Whenever Contractor shall be, and is declared by Municipality/County to be, in default under the
Contract with Municipality, having performed its obligations thereunder, the Surety may
promptly remedy the default, or shall promptly:
a) Complete the required performance in accordance with the terms and conditions of the
Contract Documents; or
b) Obtain a bid or bids for completing the Project in accordance with the terms and
conditions of the Contract Documents, and upon determination by Surety of the lowest
responsible Bidder, or, if Municipality/County elects, upon determination by
ITB/Contract #25-012
ITB Contract #25-012 Page 61 of 78
Municipality/County and Surety jointly of the lowest responsible Bidder, arrange for a contract
between such Bidder and Municipality/County on the same terms and conditions as the Contract
Documents unless otherwise agreed by Municipality/County, and shall make available as Work
progresses sufficient funds to pay the cost of completion of the Work required by the Contract
in an amount less but not exceeding the balance of the Contract Price , which amount shall
include other costs and damages for which the Surety may be liable hereunder, the amount set
forth in the first paragraph hereof. The term “balance of the Contract Price,” as used in this
paragraph, shall mean the total amount payable by Municipality to Contractor under the Contract
and any amendments thereto, less the amount properly paid by Municipality to Contractor.
No right of action shall accrue on this bond to or for the use of any person or corporation other
than Municipality/County named herein.
The Surety hereby waives notice of and agrees that any changes in or under the Contract
Documents and compliance or noncompliance with any formalities connected with the Contract
or the changes does not affect Surety’s obligation under this Bond.
Signed and sealed this ______ day of _____________________, 20_____.
ATTEST: CONTRACTOR
_______________________________
Corporate Secretary or other
person authorized to attest
_____________________________
Print Name
(CORPORATE SEAL OR NOTARY)
By: ____________________________
Authorized Signer
_____________________________
Print Name and Title
_____ day of __________, 20___
IN THE PRESENCE OF: SURETY:
Signature
By
Agent and Attorney-in-Fact
(Print Name)
(Print/Type Name)
Signature
Address:
(Street)
(City/State/Zip Code)
Telephone No.:
ITB/Contract #25-012
ITB Contract #25-012 Page 62 of 78
FORM 2: PAYMENT BOND
Project Name: Southeast Drainage Retrofit Project, Phase I
Project Number:DANI-017
KNOW ALL BY THESE PRESENTS:
That we _________________________________, as Principal (hereinafter called
“Contractor”), located at __________________________, with a phone number of
__________________, and _________________________, as Surety, located at
____________________, with a phone number of ________, under the assigned Bond Number
_________________ and pursuant to Section 255.05, Florida Statutes, are bound to the
Municipality of _____, Florida (“Municipality”) and Broward County, Florida (hereinafter jointly
and severally referred to as “Municipality/County”), as dual Obligees, in the amount of
_______________________ Dollars ($____________) for the payment whereof Contractor and
Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally.
WHEREAS, Contractor has by written agreement dated the ___ of __________________,
20______, entered into a Contract, Bid/Contract No. _________, with Municipality for
construction of ______________________ located at _______________________, the terms of
which contract (including the Contract Documents, as those are defined in the contract) are
incorporated by reference herein and made a part hereof as the “Contract.”
THE CONDITION OF THIS BOND is that if Contractor:
1. Pays Municipality/County all losses, damages, expenses, costs and attorneys’ fees includ-
ing appellate proceedings, that Municipality/County sustains because of default by
Contractor under the Contract; and
2. Promptly makes payments to all claimants as defined by Florida Statute
Section 255.05(1) for all labor, materials and supplies used directly or indirectly by
Contractor in the performance of the Contract;
THEN CONTRACTOR’S OBLIGATION SHALL BE VOID; OTHERWISE, IT SHALL REMAIN IN FULL FORCE
AND EFFECT SUBJECT, HOWEVER, TO THE FOLLOWING CONDITIONS:
A. A claimant, except a laborer, who is not in privity with Contractor and who has not
received payment for its labor, materials, or supplies shall, within forty-five (45) days after
beginning to furnish labor, materials, or supplies for the prosecution of the Work (as defined in
the Contract), furnish to Contractor a notice that he or she intends to look to the bond for
protection.
ITB/Contract #25-012
ITB Contract #25-012 Page 63 of 78
B. A claimant who is not in privity with Contractor and who has not received payment for its
labor, materials, or supplies shall, within ninety (90) days after performance of the labor or after
complete delivery of the materials or supplies, deliver to Contractor and to the Surety, written
notice of the performance of the labor or delivery of the materials or supplies and of the
nonpayment.
C. No action for the labor, materials, or supplies may be instituted against Contractor or the
Surety unless the notices stated under the preceding conditions (A) and/or (B), as applicable,
have been given.
D. Any action under this Bond must be instituted in accordance with the Notice and Time
Limitations provisions prescribed in Sections 255.05(2) and 255.05(10), Florida Statutes.
The Surety hereby waives notice of and agrees that any changes in or under the Contract
Documents and compliance or noncompliance with any formalities connected with the Contract
or the changes does not affect the Surety’s obligation under this Bond.
Signed and sealed this ____ day of _________________, 20__.
ATTEST: CONTRACTOR
_______________________________
Corporate Secretary or other
person authorized to attest
_____________________________
Print Name
(CORPORATE SEAL OR NOTARY)
By: ____________________________
Authorized Signer
_____________________________
Print Name and Title
_____ day of __________, 20__
IN THE PRESENCE OF: SURETY:
Signature
By
Agent and Attorney-in-Fact
(Print Name)
(Print/Type Name)
Signature
Address:
(Street)
(City/State/Zip Code)
ITB/Contract #25-012
ITB Contract #25-012 Page 64 of 78
(Print Name)
Telephone No.:
ITB/Contract #25-012
ITB Contract #25-012 Page 65 of 78
FORM 3: CERTIFICATE AS TO CORPORATE PRINCIPAL
CERTIFICATION BY CORPORATE SECRETARY:
I, _________________________________________, certify that I am the Secretary of the
corporation named as Principal in the foregoing Performance and Payment Bonds; that
_________________________, who signed the Bond(s) on behalf of the Principal, was then
_______________ of said corporation; that I know their signature; that their signature thereto
is genuine; and that said Bond(s) was (were) duly signed, sealed and attested to on behalf of said
corporation by authority of its governing body.
Signature: _______________________________________
as Secretary of [Print Name of Principal/Contractor]
(CORPORATE SEAL)
Print Name: _____________________________________
NOTARIZED CERTIFICATION UNDER OATH:
STATE OF
COUNTY OF
Before me, _Name of Notary Public a Notary Public duly commissioned, qualified, and acting,
personally appeared _Name of Principal/Contractor's Authorized Signer , who has duly sworn
under oath (or affirmed) that they are authorized to execute the foregoing Performance and
Payment Bond on behalf of Contractor named therein in favor of County.
Sworn to (or affirmed) and subscribed before me by means of ☐ physical presence or ☐
online notarization, this _____ day of ________________, 20____.
NOTARY PUBLIC:
Signature: _________________________
Print Name: _________________________
(NOTARY SEAL)
My commission expires:
☐ Personally Known or ☐ Produced Identification
Type of Identification Produced: _________________________
ITB/Contract #25-012
ITB Contract #25-012 Page 66 of 78
FORM 4: FORM OF CERTIFICATE AND AFFIDAVIT FOR BONDS $500,000.00 OR LESS
TO: MUNICIPALITY OF CITY OF DANIA BEACH
RE: BID NUMBER: ITB 23-014
BIDDER:
Insert Name
Insert Address
Address Cont'd
Insert Phone Number
AMOUNT OF BOND: _______________________________
SURETY BOND COMPANY:
Insert Name
Insert Address
Address Cont'd
Insert Phone Number This is to
certify that, in accordance with Section 287.0935, Florida Statutes, the insurer named above:
(1) Is licensed to do business in the State of Florida;
(2) Holds a certificate of authority authorizing it to write surety bonds in the State of
Florida;
(3) Has twice the minimum surplus and capital required by the Florida Insurance Code;
(4) Is otherwise in compliance with the provisions of the Florida Insurance Code; and
(5) Currently holds a valid certificate of authority issued by the United States Department
of Treasury under 31 U.S.C. §§ 9304-9308.
_______________________ _______________________________
(Date Signed) Agent and Attorney-in-Fact
(continued on next page)
ITB/Contract #25-012
ITB Contract #25-012 Page 67 of 78
AFFIDAVIT
STATE OF
COUNTY OF
The foregoing instrument was acknowledged before me by means of ☐ physical presence
or ☐ online notarization, this _____ day of ________________, 20___, by
_________________________, Agent and Attorney-in-Fact of ________________________.
NOTARY PUBLIC:
Signature: _________________________
Print Name: _________________________
(NOTARY SEAL)
My commission expires: ☐ Personally Known or ☐ Produced Identification
Type of My commission expires:
Identification Produced: _________________________
ITB/Contract #25-012
ITB Contract #25-012 Page 68 of 78
FORM 5: UNCONDITIONAL LETTER OF CREDIT
(PERFORMANCE AND PAYMENT GUARANTY FORM)
UNCONDITIONAL LETTER OF CREDIT Date of Issue
Issuing Bank’s No.
Beneficiary: Applicant:
Municipality of the City of Dania Beach , Florida Amount: Ana M. Garcia, ICMA-
CM
Municipality Manager (in United States Funds)
100 W. Dania Beach Blvd.
____________________ Expiry:
Dania Beach, Florida 33004 (Date)
Bid/Contract Number ITB 25-012
We hereby authorize you to draw on (Bank, Issuer Name) at (Branch Address) by order of and for
the account of (Contractor, Applicant, Customer) up to an aggregate amount, in United States
Funds, of $(Dollar Amount) available by your drafts at sight, accompanied by: A signed statement
from the Municipality Manager of the Municipality of the City of Dania Beach, Florida, or the
Municipality Manager’s authorized representative that the drawing is due to default in
performance of certain obligations on the part of (Contractor, Applicant, Customer) agreed upon
by and between the Municipality of ______ and (Contractor, Applicant, Customer) pursuant to
the Bid/Contract No. for (Name of Project) and Section 255.05, Florida Statutes. Drafts must be
drawn and negotiated not later than (expiration date). Drafts must bear the clause: “Drawn
under Letter of Credit No. (number), of (Bank Name) dated___________________.”
This Letter of Credit shall be renewed for successive periods of one (1) year each unless we
provide the Municipality Manager with written notice of our intent to terminate the credit herein
extended, which notice must be provided at least thirty (30) days prior to the expiration date of
the original term hereof or any renewed one (1) year term. Notification to Municipality of City
of Dania Beach that this Letter of Credit will expire prior to performance of Contractor’s
obligations will be deemed a default.
This Letter of Credit sets forth in full the terms of our undertaking, and such undertaking shall
not in any way be modified or amplified by reference to any documents, instrument, or
agreement referred to herein or in which this Letter of Credit is referred to or this Letter of Credit
relates, and any such reference shall not be deemed to incorporate herein by reference any
document, instrument, or agreement.
We hereby agree with the drawers, endorsers, and bona fide holders of all drafts drawn under
and in compliance with the terms of this Letter of Credit that such drafts will be duly honored
upon presentation to the drawee.
ITB/Contract #25-012
ITB Contract #25-012 Page 69 of 78
Obligations under this Letter of Credit shall be released one (1) year after the final completion of
the Project by the (Contractor, Applicant, Customer) .
This Credit is subject to the “Uniform Customs and Practice for Documentary Credits,”
International Chamber of Commerce (2007 revision), Publication No. 600 and to the provisions
of Florida law. If a conflict between the Uniform Customs and Practice for Documentary Credits
and Florida law should arise, Florida law shall prevail. If a conflict between the law of another
state or country and Florida law should arise, Florida law shall prevail.
_______________________________
Authorized Signature
ITB/Contract #25-012
ITB Contract #25-012 Page 70 of 78
FORM 6: MONTHLY (CBE/SBE) UTILIZATION REPORT
ITB/Contract #25-012
ITB Contract #25-012 Page 71 of 78
FORM 8B: STATEMENT OF COMPLIANCE (DAVIS-BACON ACT)
No. _______________________________
Contract No. ITB_ 25-012______________________
Project Title Southeast Drainage Retrofit Project, Phase II
The undersigned Contractor hereby swears under penalty of perjury that, during the period
covered by the application for payment to which this statement is attached, all mechanics,
laborers, and apprentices, employed or working on the site of the Project, have been paid at
wage rates, and that the wage rates of payments, contributions, or costs for fringe benefits have
not been less than those required by the Davis-Bacon Act and the applicable conditions of the
Contract.
Dated _____________, 20___ _________________________________
Contractor
By________________________________
(Signature)
By________________________________
(Name and Title)
STATE OF
COUNTY OF
The foregoing instrument was acknowledged before me by means of ☐ physical presence
or ☐ online notarization, this _____ day of ________________, 20___, by
_________________________.
NOTARY PUBLIC:
Signature: _________________________
Print Name: _________________________
(NOTARY SEAL)
My commission expires: ☐ Personally Known or ☐ Produced Identification
Type of Identification Produced: _________________________
ITB/Contract #25-012
ITB Contract #25-012 Page 72 of 78
FORM 9: CERTIFICATION OF PAYMENTS TO SUBCONTRACTORS
Contract No. ITB 25-012
Project Title Southeast Drainage Retrofit Project, Phase II
The undersigned Contractor hereby swears under penalty of perjury that:
1. Contractor has paid all Subcontractors all undisputed contract obligations for labor,
services, or materials provided on this Project within the time period set forth in Sections
218.73 and 218.735, Florida Statutes, as applicable.
2. The following Subcontractors have not been paid because of disputed contractual
obligations; a copy of the notification sent to each, explaining the good cause why
payment has not been made, is attached to this form:
Subcontractor Name and Address Date of Disputed
Invoice
Amount in
Dispute
Dated _____________, 20___ _________________________________
Contractor
By_______________________________
(Signature)
By________________________________
(Name and Title)
STATE OF
COUNTY OF
The foregoing instrument was acknowledged before me by means of ☐ physical presence
or ☐ online notarization, this _____ day of ________________, 20___, by
_________________________.
NOTARY PUBLIC:
Signature: _________________________
Print Name: _________________________
(NOTARY SEAL)
My commission expires: _____________ ☐ Personally Known OR ☐ Produced Identification
Type of Identification Produced: _____________
ITB/Contract #25-012
ITB Contract #25-012 Page 73 of 78
FORM 10: CERTIFICATE OF SUBSTANTIAL COMPLETION
Contract No.ITB 25-012
Project (Name and Address): Southeast Drainage Retrofit Project, Phase II
To (Municipality): City of Dania Beach
Consultant: _______________________________________________________
Contractor: _______________________________________________________
Notice to Proceed Date: _____________________________________________
Consultant: _______________________________________________________
Date of Issuance: ____________________
Project or Designated Portion Shall Include:
______________________________________________________________________________
______________________________________________________________________________
_____________________________________________________________________________
The Work performed under this Contract has been reviewed and found to be substantially
complete and all documents required to be submitted by Contractor under the Contract
Documents have been received and accepted.
The date of Substantial Completion of the Project or portion thereof designated above is
recommended as:
Unless otherwise defined in the contract, the definition of date of Substantial
Completion is that date, as certified in writing by Consultant and as finally
determined by Contract Administrator in its sole discretion, on which the Work,
or a portion thereof, is at a level of completion in substantial compliance with the
Contract Documents, such that all conditions of permits and regulatory agencies
have been satisfied and the Owner or its designee can enjoy use or occupancy and
can use or operate the Project in all respects for its intended purpose. A
Certificate of Occupancy (or a Temporary Certificate of Occupancy or other
alternate municipal/county authorization for limited or conditional occupancy
acceptable to the Contract Administrator) must be issued for Substantial
Completion to be achieved; however, the issuance of a Certificate of Occupancy
or the date thereof does not constitute Substantial Completion.
A Punch List to be completed or corrected that has been prepared by Consultant and approved
by Municipality is attached hereto. The failure to include any items on such list does not alter
the responsibility of Contractor to complete all work in accordance with the Contract Documents.
____________________ _____________________ ________________
Consultant By Date
ITB/Contract #25-012
ITB Contract #25-012 Page 74 of 78
In accordance with the terms of the Contract, Contractor will complete or correct the work on
the Punch List attached hereto within ______________________ from the above date of
Substantial Completion.
________________________ _____________________ ________________
Contractor By Date
Municipality, through the Municipality Manager, has determined the Work or portion thereof
designated by Municipality is substantially complete and will assume full possession thereof at
(time) on (date) .
MUNICIPALITY OF CITY OF DANIA BEACH: _________________________
_________
By Municipality Manager Date
The responsibilities of Municipality and Contractor for security, maintenance, heat, utilities,
damage to the work, and insurance shall be as follows:
ITB/Contract #25-012
ITB Contract #25-012 Page 75 of 78
FORM 11: FINAL CERTIFICATE OF PAYMENT
Contract No. ITB 25-012Project (Name and Address): Southeast Drainage Retrofit Project, Phase
II
To (Municipality): ____________________________________________________
Consultant: _______________________________________________________
Contractor: _______________________________________________________
Notice to Proceed Date: _____________________________________________
Consultant: _______________________________________________________
Date of Issuance: ____________________
All conditions or requirements of any permits or regulatory agencies have been satisfied. The
documents required pursuant to the terms and conditions of the Contract, and the final bill of
materials, if required, have been received and accepted. The Work required by the Contract
Documents has been reviewed and the undersigned certifies that the Work, including minor
corrective work, has been completed in accordance with the provision of the Contract
Documents and is accepted under the terms and conditions thereof.
______________________________ _________________________ ___________
Consultant By Date
Municipality, through its Municipality Manager, accepts the work as fully complete and will
assume full possession thereof at on .
(time) (date)
MUNICIPALITY OF CITY OF DANIA BEACH: _________________________
_________
By Municipality Manager Date
ITB/Contract #25-012
ITB Contract #25-012 Page 76 of 78
FORM 12: FORM OF FINAL RECEIPT
[The following form will be used to show receipt of final payment for this Contract.]
FINAL RECEIPT FOR CONTRACT NO. ITB 25-012
Received this ______ day of ______________________, 20______, from the Municipality of
_____, Florida, the sum of ___________________ Dollars ($____________) as full and final
payment to Contractor for all work and materials for the Project described as:
.......
.......
This sum includes full and final payment for all extra work and material and all incidentals.
Contractor hereby indemnifies and releases the Municipality of _________ from all liens
and claims whatsoever arising out of the Contract and/or Project.
Contractor hereby certifies that all persons doing work upon or furnishing materials or
supplies for the Project have been paid in full. In lieu of this certification regarding payment for
work, materials and supplies, Contractor may submit a consent of surety to final payment in a
form satisfactory to the Municipality of _________.
Contractor further certifies that all taxes imposed by Chapter 212, Florida Statutes (Sales
and Use Tax Act), as amended, have been paid and discharged.
[IF INCORPORATED SIGN BELOW.]
CONTRACTOR
ATTEST: CONTRACTOR NAME
_______________________________
Corporate Secretary or other
person authorized to attest
(CORPORATE SEAL OR NOTARY)
By: ____________________________
Authorized Signer
_____________________________
Print Name and Title
_____ day of __________, 20___
ITB/Contract #25-012
ITB Contract #25-012 Page 77 of 78
[IF NOT INCORPORATED SIGN BELOW.]
CONTRACTOR
WITNESSES:
_______________________________
Witness signature
_______________________________
Print/Type Name
_______________________________
Witness signature
_______________________________
Print/Type Name
_____________________________
Business Name
By: ____________________________
Authorized Signer
_______________________________
Print/Type Name and Title
_____ day of __________, 20___
ITB/Contract #25-012
ITB Contract #25-012 Page 78 of 78
EXHIBIT ___ INSURANCE REQUIREMENTS
Recipient:
Request Sponsor:
Brief description of Recipient's mission/commitment to the City of Dania Beach:
Description of how the funds will be used/deliverables:
REVIEW FOR VERIFICATION OF FUNDS. PAYMENT WILL BE RELEASED AFTER COMMISSION APPROVAL.
Legal
Finance City Manager
PLEASE ATTACH ALL DOCUMENTATION NECESSARY TO SUPPORT THE REQUEST
Submitted by:Date of submission:
Agenda Date:
Request Amount:
City of Dania Beach
Use Request Form
Request Date:
City Commission Discretionary Funds
Mayor Joyce L. Davis 6.30.25 7.8.2025
Mayor Joyce L. Davis
Back to School Beach Clean-Up and Backpack Giveaway
Funds from contingency will be used to purchase branded DB and BCPS lanyards for students
$1287.12
Maxine Singh, Chief of Staff 7.2.25
The Gratefull Thread
10158 NW 47th Street
Sunrise, Fl 33351
954-572-8383
Style#Quantity COST TOTAL
DS75 400 2.90$ 1,160.00$
SET UP 55.00$
SHIPPING 47.12$
ART 25.00$
TOTAL 1,287.12$
HIT PROMO LANYARDS PRINTED WITH BREAKAWAY/JHOOK
Color
LIGHT BLUE
Recipient:
Request Sponsor:
Brief description of Recipient's mission/commitment to the City of Dania Beach:
Description of how the funds will be used/deliverables:
REVIEW FOR VERIFICATION OF FUNDS. PAYMENT WILL BE RELEASED AFTER COMMISSION APPROVAL.
Legal
Finance City Manager
PLEASE ATTACH ALL DOCUMENTATION NECESSARY TO SUPPORT THE REQUEST
Submitted by:Date of submission:
Agenda Date:
Request Amount:
City of Dania Beach
Use Request Form
Request Date:
City Commission Discretionary Funds
American Legion Post 209 6.25.25 7.8.25
Vice Mayor Marco Salvino Sr.$500
Funds from contingency will be used to fund the bus rental, food, drinks. The camp is sponsored by the Elks.
American Legion Post 209 is sending 40 children to the Florida Elks Youth Camp in Umatilla, Florida, June 22-28, 2025.
Maxine Singh, Chief of Staff 7.3.25
City of Dania Beach
Public Services Memorandum
DATE: 7/8/2025
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Fernando J. Rodriguez, Public Services Director
Sean Schutten, Deputy Director/City Engineer
SUBJECT: APPROVAL OF THE KIMLEY HORN AND ASSOCIATES (KHA)
PROPOSAL FOR ENGINEERING DESING AND CONSTRUCTION
SERVICES FOR THE PJ MELI PARK NEIGHBORHOOD DRAINAGE
IMPROVEMENT
Request:
The Public Services Department (PSD) requests approval for a proposal from KHA for
engineering design, bidding assistance and limited construction services for the PJ Meli Park
Neighborhood Drainage Improvement Project (Project) in the amount of $266,275.
Background:
The original scope of this project focused exclusively on the SW 29th Terrace area, and included
SW 31st Avenue, 29th Avenue, and 28th Terrace, all immediately south Griffin Road. Upon
discussing the project scope and details with the Florida Department of Transportation (FDOT),
the agency requested that the proposed system be modeled using drainage software to evaluate
its impact on Griffin Road. Of particular concern is the possible impact of PJ Meli Park’s future
raised elevation, which is part of the facility’s major improvement that will soon get under way.
KHA’s proposal includes hydrologic modeling work to analyze and assess the possible increase
in stormwater runoff to Griffin Road from the park’s new elevation and other post construction
factors. The analysis will also determine any increase in pipe sizing and any other stormwater
system modifications required as a result of the park surrounding area’s changed topography.
Additional services include topographic and subsurface utility surveys, phased bid package
preparation, design submissions, regulatory permitting assistance, and limited construction
oversight for each of the newly phased project areas.
Budgetary Impact
Funding for this proposal will be appropriated from the Stormwater “Prof. Services General”
Account No. 403-38-35-538-31-10 in the amount of $266,275.
Recommendation
The Public Services Department recommends approval of the attached proposal from Kimley-
Horn and Associates, Inc. for professional services related to this critical infrastructure project.
RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO
APPROVE PROFESSIONAL ENGINEERING DESIGN, BIDDING
ASSISTANCE, AND LIMITED CONSTRUCTION SERVICES PROVIDED BY
KIMLEY-HORN AND ASSOCIATES, INC (KHA) FOR THE SW 29TH
TERRACE & PJ MELI PARK DRAINAGE IMPROVEMENT PROJECT IN THE
AMOUNT OF TWO HUNDRED SIXTY-SIX THOUSAND AND TWO
HUNDRED SEVENTY FIVE DOLLARS ($266,275.00); PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City of Dania Beach has identified the need to improve drainage
infrastructure in the SW 29th Terrace area, including SW 31st Avenue, SW 29th Way, SW 29th
Avenue, SW 28th Terrace, and a portion of SW 51st Street, all located south of Griffin Road; and
WHEREAS, coordination with the Florida Department of Transportation (FDOT)
revealed that the proposed stormwater system must be modeled and analyzed to ensure there is no
negative impact on FDOT’s existing drainage infrastructure along Griffin Road; and
WHEREAS, the City has an existing Continuing Services Agreement for Professional
Engineering Services through RFQ 20-005 with Kimley-Horn and Associates, Inc., and finds them
qualified to perform the required services; and
WHEREAS, Kimley-Horn and Associates, Inc. (KHA), submitted a proposal dated June
25, 2025, to perform additional survey, drainage modeling, design, permitting, preparation of
phased bid packages, and limited construction phase services in the total amount of Two Hundred
Sixty-Six Thousand Two Hundred Seventy-Five Dollars ($266,275.00), which is attached as
Exhibit “A”; and
WHEREAS, the Public Services Department recommends that the City Commission
authorize the project with KHA.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1.That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
2 RESOLUTION #2025-______
Section 2.That the City Commission authorizes the proper City officials to execute a
Work Order, issued under the CCNA Continuing Services Contract, with Kimley-Horn and
Associates, Inc. for engineering design, bidding assistance, and limited construction services for
the SW 29 Terrace Drainage Improvements / PJ Meli Park Neighborhood Project.
Section 3.That funding for professional engineering and design services in the amount
of ($266, 275.00) will be appropriated from the Stormwater “Prof. Services General” Account No.
403-38-35-538-31-10.
Section 4.That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 5.That this Resolution shall be effective 10 days after passage.
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
Proposal for Engineering Services
June 25, 2025, Page 1
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
EXHIBIT A – 2025 Update
Project Understanding
The CONSULTANT previously submitted a proposal to the City of Dania Beach for Professional
Engineering Services for the design of the SW 29 Terrace Stormwater Improvements, also
known as the PJ Meli Park Neighborhood Drainage Improvement Project. This project
encompasses stormwater improvements along SW 31st Avenue, SW 29th Terrace, SW 29th
Way, SW 29th Avenue, SW 28th Terrace, and a portion of SW 51st Street, all located south of
Griffin Road.
The primary objective is to enhance stormwater management within these six streets and
establish a connection to the existing Florida Department of Transportation (FDOT) drainage
system along Griffin Road. Following preliminary discussions with FDOT, it was determined that
the proposed system must be modeled using drainage software to evaluate its impact. FDOT
specifically requested an analysis to confirm that the post-design hydraulic grade line of Griffin
Road (SR 818) would not be adversely affected by additional inflow from the side streets.
Preliminary modeling indicated that the existing drainage pipe along Griffin Road would need to
be upsized to avoid negative impacts.
As part of this amendment, the following tasks are included:
1. Survey along Griffin Road (from just west of SW 27th Avenue to just west of SW 31st
Avenue)
2. Additional drainage modeling to assess impacts to FDOT’s system
3. Preparation of drainage plans and profiles for interconnection into the Griffin Road
system, including pipe upsizing
4. Preparation of three (3) additional bid packages. The original scope assumed the project
would be designed, bid, and constructed as a single package. Under this amendment,
the project will be divided into four (4) distinct phases for bidding purposes:
a. Phase 1: Griffin Road (included in the original scope)
b. Phase 2: SW 31st Avenue / SW 29th Terrace
c. Phase 3: SW 29th Way / SW 29th Avenue / SW 51st Street
d. Phase 4: SW 28th Terrace
5. Three additional Bid Packages (original scope was contemplated as a project that would
be designed, bid, and built all in one package). Bid packages are assumed to be.
Phase 1: Griffin Road, Phase 2: SW 31st Avenue/SW 29th Terrace, Phase 3: SW 29th
Way/SW 29th Avenue/SW 51st Street, and Phase 4: SW 28th Terrace.
6. Post-design limited construction phase services for the three (3) additional construction
phases noted above. The original scope included construction phase services for a
single-phase project; this amendment expands those services to support each of the
newly defined phases.
The original bidding and post design scope included one (1) pre-bid meeting and one (1) pre-
construction meeting to cover the entire project and periodic site visits during construction.
Proposal for Engineering Services
June 25, 2025, Page 2
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
Scope of Services
The Scope of Services for the project will be provided by the CONSULTANT and its sub-
consultants’ for surveying and underground subsurface utility verification. No additional
geotechnical investigation work will be included in the scope of services.
Task 1 – Site Investigation Task
Task 1.1 – Topographic Survey
The CONSULTANT will engage a sub-consultant (licensed surveyor) to prepare a topographic
survey for approximately ±2,600 feet x 100 feet wide along Griffin Road (SR 818) from just west
of SW 27th Avenue to just west of SW 31st Avenue. The survey will include the following:
· Obtain sufficient control monumentation, if available, to graphically depict limits of
property. This is not a boundary survey.
· Locate above ground improvements include pavement, curbs, sidewalk, swales, berms,
retention areas and above ground evidence of utilities. Obtain rim elevations and inverts
of sewer and drainage structures (if accessible). Utility locations will include fire
hydrants, water valves, meter boxes, vaults and main irrigation valves. Individual
sprinkler heads are not included.
· Obtain spot elevations on points of location and on approximate 50-foot grid with high
and low points extending 5 feet east and west of existing walks within the limits.
The topographic survey will be in accordance with Standard of Practice as set forth in Chapter
5J-17.05 FAC pursuant to Section 472.027 Florida Statues.
The CONSULTANT will coordinate directly with the surveyor to ensure the appropriate data is
gathered during the completion of the topographic survey. CONSULTANT will review
topographic data upon completion of the survey and provide the comments to the surveyor, if
necessary. CONSULTANT will utilize the AutoCAD version of the topographic survey and
establish the base plans for the project. All work under this task will be billed on a lump sum
basis.
Task 1.2 – Subsurface Utility Verification
The CONSULTANT will retain a subsurface utility engineering consultant to conduct up to 6
utility testholes to confirm the location of any existing underground utilities within the project
limits. The completion of utility testholes will be necessary to avoid conflicts between the
proposed underground improvements and existing underground utility infrastructure within the
public right of way. CONSULTANT will review the utility testhole report upon completion and
provide any comments to the subsurface utility engineering consultant, if necessary.
CONSULTANT will incorporate the existing underground utilities into the base plans for the
project based on the information included within the utility testhole reports. All work under this
task will be billed on a lump sum basis.
Proposal for Engineering Services
June 25, 2025, Page 3
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
Task 1.3 – Document Research/Review
The CONSULTANT will review readily available topographic surveys, atlas/as-built drawings,
design drawings, record drawings, permit documents and/or master plans relevant to the project
limits. CONSULTANT will use this information to determine and verify the configuration of
existing conditions along with limitations on the proposed improvements. CONSULTANT will
also review plat maps for the project areas to confirm the presence of utility easements.
CONSULTANT will contact the Sunshine State One Call Service to determine the existing
utilities which are located in the project area. As necessary, CONSULTANT will coordinate
directly with the utility providers with existing infrastructure within the project area to obtain any
available system maps. CONSULTANT will incorporate the approximate location of the existing
underground utilities into the design plans based on readily available drawings. All work under
this task will be billed on a lump sum basis.
Task 1.4 – Project Site Visits
CONSULTANT will perform necessary site visits to the project area to verify the impact of the
existing conditions on the configuration of the proposed improvements. CONSULTANT will walk
the entire site within the project limits and obtain photographs of potential obstruction and
encroachments that may impact the proposed improvements. CONSULTANT will conduct site
visits to confirm the accuracy of the topographic survey and to identify potential impacts on the
proposed improvements. As necessary, CONSULTANT will conduct site visits throughout the
design process to review the existing conditions. All work under this task will be billed on a lump
sum basis.
Task 2 - 90% Design Documents
CONSULTANT will prepare and submit 90% design documents for the Griffin Road
Improvements to the CITY for review and approval. All work under this task will be billed on a
lump sum basis. The design documents for this task will include the following items:
· Existing Condition Plans
· Stormwater Plans (plan and profile)
· Paving and Grading Plans
· Pavement Markings and Signage Plans
· Relevant Detail Plans
· Bid Tabulations
· Opinion of Probable Cost
CONSULTANT will develop an StormCAD model to conduct a detailed analysis of the project
area. The analysis will evaluate the existing hydraulic grade line elevation and proposed
hydraulic grade line elevations. CONSULTANT will subdivide the project area into multiple
drainage basins to allow for the more detailed analysis of the project area. CONSULTANT will
tabulate the model parameters of the relevant nodes and links within the stormwater model to
reflect the basin boundaries within the project area. CONSULTANT will run the StormCAD
stormwater model to obtain peak flood stages, flood durations, and peak discharges for the
existing conditions within the project area.
Proposal for Engineering Services
June 25, 2025, Page 4
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
CONSULTANT will also utilize the stormwater model to assess the effectiveness of the potential
system improvement. CONSULTANT will utilize this stormwater model during the permitting
phase of the project.
CONSULTANT will coordinate with the Florida Department of Transportation (FDOT) during this
task to collect relevant data about their drainage system.
Task 3 – Regulatory Permitting Assistance
CONSULTANT will prepare permit applications with supporting documentation to the following
jurisdictional regulatory agencies. KHA will address up to two (2) rounds of reasonable comments
for the regulatory agency submittals identified below. Any plan revisions or comments that are
required due to a significant design change by the CITY shall result in an additional service.
1. Broward County Environmental Protection and Growth Management Department
(BCEPGMD)-Surface Water License
2. Broward County Traffic Engineering Division-pavement marking and signage
3. FDOT-Drainage connection
The regulatory agencies typically complete their initial review within 30 calendar days after the
permit submittal. The required permit approvals must be obtained from the regulatory agencies
prior to submitting the 100% Design Documents to the CITY. All work under this task will be
billed on a lump sum basis.
No other agency approvals are included in this scope of services other than those identified
above. KHA does not guarantee the issuance of permits or approvals. If permits are issued for
this project, the conditions and expiration dates are the sole responsibility of the CITY. KHA is not
responsible for extending time limited entitlements or permits. KHA can provide hourly additional
services to file for extensions, if applicable, provided the CITY issues a direct written request for
each requested entitlement, prior to the dates of expiration. The CITY shall provide all permit fees.
Task 4 – 100% Design Documents
CONSULTANT will prepare and submit 100% design documents for SW 29th Terrace
Stormwater Improvements to the CITY for review and approval. All work under this task will be
billed on a lump sum basis. The design documents for this task will include the following items:
· Existing Condition Plans
· Stormwater Plans
· Paving and Grading Plans
· Pavement Markings and Signage Plans
· Landscape Restoration and other Relevant Detail Plans
· Technical Specifications
· Opinion of Probable Cost
· Bid Schedule
CONSULTANT will submit the 100% Design Documents to the CITY for incorporation into the
bidding documents after receipt of all permit approvals.
Proposal for Engineering Services
June 25, 2025, Page 5
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
Task 5 – Bidding Assistance
For clarity Phase 1: Griffin Road bidding services will be performed as part of the original
contract, Phase 2: SW 31st Avenue/SW 29th Terrace, Phase 3: SW 29th Way/SW 29th
Avenue/SW 51st Street, and Phase 4: SW 28th Terrace.
Task 5.1 – Phase 2: SW 31st Avenue/SW 29th Terrace
CONSULTANT will assist the CITY with the preparation of the bid advertisement and bid
documents for Phase 2: SW 31st Avenue/SW 29th Terrace. CONSULTANT will attend the Pre-
BID Meeting and will answer questions and clarifications from potential bidders that are
technical in nature. CONSULTANT will respond to written questions requesting clarification of
the technical documents for this project. The CITY shall be responsible for bid advertisement,
distribution of bid documents to interested bidders, processing all bid submittals, and verification
that each bid submittal meets all Purchasing related requirements. CONSULTANT will complete
this task according to the schedule defined by the CITY for the bidding process.
CONSULTANT will review the final bid results and make a recommendation for bid award.
CONSULTANT will evaluate the qualification and prior project conformance of the low bidder.
CONSULTANT will prepare and submit a bid recommendation letter to the CITY.
CONSULTANT will complete this task according to the schedule defined by the CITY for the
bidding process.
Task 5.2 – Phase 3: SW 29th Way/SW 29th Avenue/SW 51st Street
CONSULTANT will assist the CITY with the preparation of the bid advertisement and bid
documents for Phase 3: SW 29th Way/SW 29th Avenue/SW 51st Street. CONSULTANT will
attend the Pre-BID Meeting and will answer questions and clarifications from potential bidders
that are technical in nature. CONSULTANT will respond to written questions requesting
clarification of the technical documents for this project. The CITY shall be responsible for bid
advertisement, distribution of bid documents to interested bidders, processing all bid submittals,
and verification that each bid submittal meets all Purchasing related requirements.
CONSULTANT will complete this task according to the schedule defined by the CITY for the
bidding process.
CONSULTANT will review the final bid results and make a recommendation for bid award.
CONSULTANT will evaluate the qualification and prior project conformance of the low bidder.
CONSULTANT will prepare and submit a bid recommendation letter to the CITY.
CONSULTANT will complete this task according to the schedule defined by the CITY for the
bidding process.
Task 5.3 – Phase 4: SW 28th Terrace.
CONSULTANT will assist the CITY with the preparation of the bid advertisement and bid
documents for Phase 4: SW 28th Terrace. CONSULTANT will attend the Pre-BID Meeting and
will answer questions and clarifications from potential bidders that are technical in nature.
CONSULTANT will respond to written questions requesting clarification of the technical
documents for this project. The CITY shall be responsible for bid advertisement, distribution of
Proposal for Engineering Services
June 25, 2025, Page 6
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
bid documents to interested bidders, processing all bid submittals, and verification that each bid
submittal meets all Purchasing related requirements. CONSULTANT will complete this task
according to the schedule defined by the CITY for the bidding process.
CONSULTANT will review the final bid results and make a recommendation for bid award.
CONSULTANT will evaluate the qualification and prior project conformance of the low bidder.
CONSULTANT will prepare and submit a bid recommendation letter to the CITY.
CONSULTANT will complete this task according to the schedule defined by the CITY for the
bidding process.
Task 6 – Limited Construction Phase Services
For clarity Phase 1: Griffin Road Limited Construction Phase Services will be performed
as part of the original contract, Phase 2: SW 31st Avenue/SW 29th Terrace, Phase 3: SW
29th Way/SW 29th Avenue/SW 51st Street, and Phase 4: SW 28th Terrace.
Task 6.1 – Phase 2: SW 31st Avenue/SW 29th Terrace
The following scope is based on a six (6) month construction duration and on the post design
hours shown below for this task.
· The CONSULTANT will attend and prepare minutes for a pre-construction meeting. One
meeting will be scheduled for the project.
· The CONSULTANT will review shop drawings, and submittals to determine compliance
with the drawings and specifications and recommend submittal action to the CITY.
· The CONSULTANT shall make periodic site visits for the purpose of determining general
compliance with the approved project drawings, plans, and specifications. Site visits will
be performed by the CONSULTANT’s inspector. Two (2) site visit per month estimated at
three (3) hours per visit. Assume twelve (12) site visits. The CONSULTANT will provide
site reports for each visit.
· The CONSULTANT shall provide written responses to RFIs. Assumes 1 RFI per month.
· The CONSULTANT shall assist the CITY with review of the Contractor’s request for
payments and provide comments and/or recommendations. Assume 6 request for
payment packages. This scope of work does not include assisting the CITY with
preparation or submittal of reimbursement packages associated with the Hazard Mitigation
Grant Program (HMGP) DR-4337-334-R, the Florida Division of Emergency Management,
or the Federal Emergency Management Agency (FEMA).
· Once the Contractors advise that their project is substantially complete, the
CONSULTANT will participate in a substantial completion walk through and prepare a
project punch list.
· Once the Contractors advise that the project punch list is complete, the CONSULTANT
will participate in a final completion walk through to confirm items have been addressed.
· The CONSULTANT will coordinate permit closeout processes for the agencies list in Task
3 above.
The CONSULTANT shall not be responsible for the acts or omissions of any Contractor or
subcontractor, any of the Contractor(s)’ or subcontractor(s)’ agents or employees, or any other
Proposal for Engineering Services
June 25, 2025, Page 7
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
persons (except the CONSULTANT’s own employees and agents) at the site or otherwise
performing any of the Contractor(s)’ work.
All work under this task will be billed on a lump sum basis.
Task 6.2 – Phase 3: SW 29th Way/SW 29th Avenue/SW 51st Street
The following scope is based on a six (6) month construction duration and on the post design
hours shown below for this task.
· The CONSULTANT will attend and prepare minutes for a pre-construction meeting. One
meeting will be scheduled for the project.
· The CONSULTANT will review shop drawings, and submittals to determine compliance
with the drawings and specifications and recommend submittal action to the CITY.
· The CONSULTANT shall make periodic site visits for the purpose of determining general
compliance with the approved project drawings, plans, and specifications. Site visits will
be performed by the CONSULTANT’s inspector. Two (2) site visit per month estimated at
three (3) hours per visit. Assume twelve (12) site visits. The CONSULTANT will provide
site reports for each visit.
· The CONSULTANT shall provide written responses to RFIs. Assumes 1 RFI per month.
· The CONSULTANT shall assist the CITY with review of the Contractor’s request for
payments and provide comments and/or recommendations. Assume 6 request for
payment packages. This scope of work does not include assisting the CITY with
preparation or submittal of reimbursement packages associated with the Hazard Mitigation
Grant Program (HMGP) DR-4337-334-R, the Florida Division of Emergency Management,
or the Federal Emergency Management Agency (FEMA).
· Once the Contractors advise that their project is substantially complete, the
CONSULTANT will participate in a substantial completion walk through and prepare a
project punch list.
· Once the Contractors advise that the project punch list is complete, the CONSULTANT
will participate in a final completion walk through to confirm items have been addressed.
· The CONSULTANT will coordinate permit closeout processes for the agencies list in Task
3 above.
The CONSULTANT shall not be responsible for the acts or omissions of any Contractor or
subcontractor, any of the Contractor(s)’ or subcontractor(s)’ agents or employees, or any other
persons (except the CONSULTANT’s own employees and agents) at the site or otherwise
performing any of the Contractor(s)’ work.
All work under this task will be billed on a lump sum basis.
Task 6.3 – Phase 4: SW 28th Terrace.
The following scope is based on a six (6) month construction duration and on the post design
hours shown below for this task.
· The CONSULTANT will attend and prepare minutes for a pre-construction meeting. One
meeting will be scheduled for the project.
Proposal for Engineering Services
June 25, 2025, Page 8
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
· The CONSULTANT will review shop drawings, and submittals to determine compliance
with the drawings and specifications and recommend submittal action to the CITY.
· The CONSULTANT shall make periodic site visits for the purpose of determining general
compliance with the approved project drawings, plans, and specifications. Site visits will
be performed by the CONSULTANT’s inspector. Two (2) site visit per month estimated at
three (3) hours per visit. Assume twelve (12) site visits. The CONSULTANT will provide
site reports for each visit.
· The CONSULTANT shall provide written responses to RFIs. Assumes 1 RFI per month.
· The CONSULTANT shall assist the CITY with review of the Contractor’s request for
payments and provide comments and/or recommendations. Assume 6 request for
payment packages. This scope of work does not include assisting the CITY with
preparation or submittal of reimbursement packages associated with the Hazard Mitigation
Grant Program (HMGP) DR-4337-334-R, the Florida Division of Emergency Management,
or the Federal Emergency Management Agency (FEMA).
· Once the Contractors advise that their project is substantially complete, the
CONSULTANT will participate in a substantial completion walk through and prepare a
project punch list.
· Once the Contractors advise that the project punch list is complete, the CONSULTANT
will participate in a final completion walk through to confirm items have been addressed.
· The CONSULTANT will coordinate permit closeout processes for the agencies list in Task
3 above.
The CONSULTANT shall not be responsible for the acts or omissions of any Contractor or
subcontractor, any of the Contractor(s)’ or subcontractor(s)’ agents or employees, or any other
persons (except the CONSULTANT’s own employees and agents) at the site or otherwise
performing any of the Contractor(s)’ work.
All work under this task will be billed on a lump sum basis.
Task 7 – Miscellaneous Services
Miscellaneous services as requested by the CITY outside of items defined within the scope
above, including but not limited to additional engineering services, geotechnical services,
environmental services, permitting and additional construction phase services. All work under
this task will be billed on an hourly not to exceed basis.
Task 8 – PJ Meli Park Coordination and analysis
It is our understanding that the CITY has an existing contract with Woolpert for the design of PJ
Meli Park. At the CITY’s request, the CONSULTANT may be asked to coordinate directly with
Woolpert regarding the park improvements. Woolpert is expected to design and implement its
own stormwater management system for the proposed park improvements. However, the CITY
may request the CONSULTANT to evaluate the feasibility of allowing a limited discharge from
the park’s system into the CITY’s neighborhood drainage network. If such coordination is
requested, the CONSULTANT will perform up to two (2) stormwater modeling scenarios
incorporating the additional discharge volume from the park. These models will assess the
potential downstream impacts on pipe sizing within both the CITY’s roadway drainage system
and the adjacent FDOT system.
Proposal for Engineering Services
June 25, 2025, Page 9
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
To avoid rework of the drainage design analysis and preparation of plans, the CITY must
provide the CONSULTANT with the necessary discharge volume information prior to any
modeling efforts. The CONSULTANT assumes Woolpert will be responsible for obtaining the
necessary stormwater permit from the Broward County Surface Water Management Division for
the onsite stormwater volume generated by the park improvements.
Additional Services
The CONSULTANT will provide, as requested and authorized by the CITY, additional services
that may be required above and beyond those described in Tasks 1 through 6. These services
may include but are not limited to such items as the following:
· Attendance at Progress Meetings during construction
· Post Design services beyond the anticipated six (6) month construction duration
· Drainage Well (Gravity or Pressurized) or stormwater pump station design is not
included in scope of services.
· Raising existing roadway elevations is not included in the scope of services.
· Drainage modeling will only be provided for the areas within the Project limits.
· The CITY will provide all required permit fees.
· The selected contractor will be responsible for obtaining any City of Dania Beach
Building Permit required for this project along with all related coordination and
preparation of any backup documentation required for the City of Dania Beach Building
Permit. CONSULTANT will only be responsible for reasonable revisions requested by
the City of Dania Beach Building Department.
· The CITY will provide timely responses to information included within each submittal.
· The CITY shall be responsible for bid advertisement, distribution of bid documents to
interested bidders, processing all bid submittals, and verification that each bid submittal
meets all Purchasing related requirements.
· CONSULTANT will submit monthly invoices, which will be payable by CITY within 25
days.
· The CITY will reimburse CONSULTANT for any document reproduction costs for all
submittals to regulatory agencies.
· Utility relocations not anticipated and therefore excluded from the scope of services.
Performance Schedule
The CONSULTANT shall provide the bidding and post design services based on bid dates,
contract awards and General Contractor schedules.
Method of Compensation
The CONSULTANT will accomplish the services outlined in Tasks 1 through 6 for an additional
Lump Sum Fee of $191,275.00. Task 7 is a Miscellaneous Service amount for additional
professional services if requested and authorized by the CITY. Task 8 is the PJ Meli Park
Coordination and analysis fees if requested and authorized by the CITY. The following task
items represent a breakdown of the proposed lump sum amount for reference:
Proposal for Engineering Services
June 25, 2025, Page 10
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
Task 1 – Site Investigation $38,075.00
Task 2 – 90% Design Documents $39,800.00
Task 3 – Regulatory Permitting Assistance $20,790.00
Task 4 – 100% Design Documents $14,280.00
Task 5 – Bidding Assistance
Task 5.1 – Phase 2: SW 31st Avenue/SW 29th Terrace $3,875.00
Task 5.2 – Phase 3: SW 29th Way/SW 29th Avenue/SW 51st Street $3,875.00
Task 5.3 – Phase 4: SW 28th Terrace $3,875.00
Task 6 – Limited Construction Phase Services
Task 6.1 – Phase 2: SW 31st Avenue/SW 29th Terrace $22,235.00
Task 6.2 – Phase 3: SW 29th Way/SW 29th Avenue/SW 51st Street $22,235.00
Task 6.3 – Phase 4: SW 28th Terrace $22,235.00
Task 7 – Miscellaneous Services $25,000.00
Task 8 – PJ Meli Park Coordination and analysis $50,000.00
Proposed Fee $266,275.00
Closure
The terms and conditions of the City of Dania Beach Request for Qualifications (RFQ) No. 20-
005, City of Dania Beach’s “Continuing Architectural, Surveying, Landscape Architecture and
Engineering Consulting Services”; shall govern this scope of services.
If you concur with the foregoing and wish to direct us to proceed with the aforementioned
services, please issue a Notice to Proceed in writing to the Consultant. Fees and time stated in
this agreement are valid for sixty (60) days after the date of issuance by the Consultant.
We appreciate the opportunity to propose these services to you.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
George Balaban, P.E.
Vice President
City of Dania Beach
Public Services Memorandum
DATE: 7/8/2025
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Fernando J. Rodriguez, Public Services Director
Sean Schutten, Deputy Director/City Engineer
SUBJECT: AUTHORIZATION TO EXECUTE PROFESSIONAL SERVICES
AGREEMENT WITH KIMLEY-HORN AND ASSOCAITES, INC. (KHA)
FOR SW 34TH COURT STORMWATER IMPROVEMENTS
Request:
The Public Services Department (PSD) requests approval for a proposal from KHA for
engineering services related to the SW 34th Court Stormwater Improvements, in an amount not
to exceed $114,395.00.
Background:
The City has identified two stormwater outfalls along SW 34th Court that are either failing or
functionally inadequate and require replacement and improvement. One segment involves the
removal and replacement of a collapsed outfall that is obstructed by sediment and root intrusion.
Additionally, on the opposite side of the County-owned lake near SW 26th Terrace, the City has
determined the need for a new outfall structure and drainage system. The property owner has
provided verbal consent to enter into an easement agreement, allowing the City to install the
necessary infrastructure on private property.
Budgetary Impact
Funding for this proposal will be appropriated from the Public Services “Prof. Services General”
Account No. 403-38-01-538-31-10, in the amount of $114,395.00.
Recommendation
The Public Services Department recommends approval of the attached proposal from Kimley-
Horn and Associates, Inc. for professional services related to this critical infrastructure project.
RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING PROFESSIONAL ENGINEERING
DESIGN, BIDDING ASSISTANCE, AND LIMITED CONSTRUCTION
SERVICES TO BE PROVIDED BY KIMLEY-HORN AND ASSOCIATES, INC
(KHA) FOR THE SW 34TH COURT STORMWATER IMPROVEMENTS
PROJECT, WHICH SERVICES SHALL NOT EXCEED THE AMOUNT OF
ONE HUNDRED FOURTEEN THOUSAND AND THREE HUNDRED NINETY
FIVE DOLLARS ($114,395.00); PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City of Dania Beach has identified critical stormwater infrastructure
improvements needed along SW 34th Court to mitigate flooding and enhance drainage
performance; and
WHEREAS, the proposed project includes the removal and replacement of pipe near the
intersection of SW 24th Avenue, along with the design and installation of a new outfall system
from SW 26th Terrace to a Broward County-owned lake; and
WHEREAS, the City has an existing Continuing Services Agreement for Professional
Engineering Services through RFQ 20-005 with Kimley-Horn and Associates, Inc., and finds them
qualified to perform the required services; and
WHEREAS, Kimley-Horn and Associates, Inc. has submitted a proposal to provide a
complete scope of engineering services for the SW 34th Court Stormwater Improvements Project,
including site investigations, topographic survey, subsurface utility verification, stormwater
modeling and design plans, permitting assistance, bidding support, and limited construction phase
services; and
WHEREAS, the proposal, which is attached as Exhibit “A” and incorporated into this
Resolution by this reference, includes a fixed fee of $104,395.00 for defined lump sum tasks and a
contingency of $10,000.00 for additional miscellaneous services to be performed on an hourly not-
to-exceed basis if requested by the City; and
WHEREAS, the Public Services Department recommends that the City Commission
authorize the project with KHA.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
2 RESOLUTION #2025-______
Section 1.That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2.That the City Commission authorizes the proper City officials to execute a
Work Order, issued under the CCNA Continuing Services Contract, with Kimley-Horn and
Associates, Inc. for engineering design, bidding assistance, and limited construction services for
the SW 34th Court Stormwater Improvements Project.
Section 3.That funding for professional engineering and design services in the amount
of $114,395.00 will be appropriated from the Public Services “Prof. Services General” Account
No. 403-38-01-538-31-10.
Section 4.That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 5.That this Resolution shall be effective 10 days after passage.
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
June 26, 2025
Sean Schutten
Deputy Public Services Director
City of Dania Beach
1201 Stirling Road
Dania Beach, FL 33004
Re: SW 34th Court Stormwater Improvements
Scope of Services for Professional Engineering Design Services
Dear Mr. Schutten:
Kimley-Horn and Associates, Inc., (hereinafter referred to as “CONSULTANT” or “We”), in
connection with the City of Dania Beach’s “Continuing Architectural, Surveying, Landscape
Architecture and Engineering Consulting Services”; RFQ 20-005 is pleased to submit this
proposal to the City of Dania Beach, (hereinafter referred to as “CITY”) to provide professional
services. Our project understanding, scope of services, schedule, and fees are below.
SCOPE OF SERVICES
Kimley-Horn will provide the services specifically set forth below.
PROJECT UNDERSTANDING
The project area is located along SW 34th Court. At the CITY’s request, the CONSULTANT will
remove approximately 150 linear feet of failing 24-inch reinforced concrete pipe (RCP) drainage
outfall near the intersection of SW 24th Avenue and SW 34th Court, identified as Pipe Run #1 in
Figure 1.
Additionally, the CITY proposes the installation of a new drainage outfall pipe extending from
the intersection of SW 26th Terrace and SW 34th Court to the existing Broward County-owned
lake, identified as Pipe Run #2 in Figure 1.
The CONSULTANT will prepare construction documents for the recommended improvements
within the project area. Services will include construction design documents, regulatory
permitting assistance, bidding support, and limited construction phase services, as further
detailed in the following sections of this scope.
June 26, 2025 Page 2
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
Scope of Services
Task 1 – Site Investigation Task
Task 1.1 – Topographic Survey
The CONSULTANT will engage a sub-consultant (licensed surveyor) to prepare a topographic
survey within the subject area along SW 34th Court within the proposed Pipe Run segments
only.
· Obtain sufficient control monumentation, if available, to graphically depict limits of
property. This is not a boundary survey.
· Locate above ground improvements include pavement, curbs, sidewalk, swales, berms,
retention areas and above ground evidence of utilities. Obtain rim elevations and inverts
of sewer and drainage structures. Utility locations will include fire hydrants, water valves,
meter boxes, vaults and main irrigation valves. Individual sprinkler heads are not
included.
· Obtain spot elevations on points of location and on approximate 50-foot grid with high
and low points extending 5 feet east and west of existing walks within the limits.
The topographic survey will be in accordance with Standard of Practice as set forth in Chapter
5J-17.05 FAC pursuant to Section 472.027 Florida Statues.
The CONSULTANT will coordinate directly with the surveyor to ensure the appropriate data is
gathered during the completion of the topographic survey. CONSULTANT will review
topographic data upon completion of the survey and provide the comments to the surveyor, if
necessary. CONSULTANT will utilize the AutoCAD version of the topographic survey and
establish the base plans for the project. All work under this task will be billed on a lump sum
basis.
June 26, 2025 Page 3
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
Two (2) sketch and legal descriptions are included in the scope of services.
Task 1.2 – Subsurface Utility Verification
The CONSULTANT will retain a subsurface utility engineering consultant to conduct up to 3
utility testholes to confirm the location of any existing underground utilities within the project
limits. The completion of utility testholes will be necessary to avoid conflicts between the
proposed underground improvements and existing underground utility infrastructure within the
public right of way. CONSULTANT will review the utility testhole report upon completion and
provide any comments to the subsurface utility engineering consultant, if necessary.
CONSULTANT will incorporate the existing underground utilities into the base plans for the
project based on the information included within the utility testhole reports. All work under this
task will be billed on a lump sum basis.
Task 1.3 – Document Research/Review
The CONSULTANT will review readily available topographic surveys, atlas/as-built drawings,
design drawings, record drawings, permit documents and/or master plans relevant to the project
limits. CONSULTANT will use this information to determine and verify the configuration of
existing conditions along with limitations on the proposed improvements. CONSULTANT will
also review plat maps for the project areas to confirm the presence of utility easements.
CONSULTANT will contact the Sunshine State One Call Service to determine the existing
utilities which are located in the project area. As necessary, CONSULTANT will coordinate
directly with the utility providers with existing infrastructure within the project area to obtain any
available system maps. CONSULTANT will incorporate the approximate location of the existing
underground utilities into the design plans based on readily available drawings. All work under
this task will be billed on a lump sum basis.
Task 1.4 – Project Site Visits
CONSULTANT will perform necessary site visits to the project area to verify the impact of the
existing conditions on the configuration of the proposed improvements. CONSULTANT will walk
the entire site within the project limits and obtain photographs of potential obstruction and
encroachments that may impact the proposed improvements. CONSULTANT will conduct site
visits to confirm the accuracy of the topographic survey and to identify potential impacts on the
proposed improvements. As necessary, CONSULTANT will conduct site visits throughout the
design process to review the existing conditions. All work under this task will be billed on a lump
sum basis.
Task 2 - 90% Design Documents
CONSULTANT will prepare and submit 60% design documents for SW 34th Court Stormwater
Improvements to the CITY for review and approval. All work under this task will be billed on a
lump sum basis. The design documents for this task will include the following items:
· Existing Condition Plans
· Stormwater Plans
June 26, 2025 Page 4
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
· Paving and Grading Plans
· Pavement Markings and Signage Plans (if necessary)
· Relevant Detail Plans
· Opinion of Probable Cost
Based on the best available information, the CONSULTANT will review the existing known
outfalls associated with the County-owned lake to develop a stormwater model for analyzing the
proposed Pipe Run #2. This model will be used to evaluate existing conditions within the project
area, including peak flood stages, flood durations, and peak discharge rates.
The CONSULTANT will also use the model to assess the effectiveness of the proposed system
improvements. This stormwater model will serve as a key tool during the permitting phase of the
project to support regulatory review and approval.
Task 3 – Regulatory Permitting Assistance
KHA will prepare permit applications with supporting documentation to the following jurisdictional
regulatory agencies. KHA will address up to two (2) rounds of reasonable comments for the
regulatory agency submittals identified below. Any plan revisions or comments that are required
due to a significant design change by the CITY shall result in an additional service.
1. Broward County Environmental Protection and Growth Management Department
(BCEPGMD)-Surface Water License
2. City of Dania Beach
The regulatory agencies typically complete their initial review within 30 calendar days after the
permit submittal. The required permit approvals must be obtained from the regulatory agencies
prior to submitting the 100% Design Documents to the CITY. All work under this task will be
billed on a lump sum basis.
No other agency approvals are included in this scope of services other than those identified
above. CONSULTANT does not guarantee the issuance of permits or approvals. If permits are
issued for this project, the conditions and expiration dates are the sole responsibility of the
CONSULTANT. CONSULTANT is not responsible for extending time limited entitlements or
permits. CONSULTANT can provide hourly additional services to file for extensions, if applicable,
provided the CITY issues a direct written request for each requested entitlement, prior to the dates
of expiration. The CITY shall provide all permit fees.
Task 4 – 100% Design Documents
CONSULTANT will prepare and submit 100% design documents for SW 34th Court Stormwater
Improvements to the CITY for review and approval. All work under this task will be billed on a
lump sum basis. The design documents for this task will include the following items:
· Existing Condition Plans
· Stormwater Plans
· Paving and Grading Plans
· Pavement Markings and Signage Plans
June 26, 2025 Page 5
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
· Opinion of Probable Cost
· Bid Schedule
CONSULTANT will submit the 100% Design Documents to the CITY for incorporation into the
bidding documents.
Task 5 – Bidding Assistance
CONSULTANT will assist the CITY with the preparation of the bid advertisement and bid
documents for SW 34th Court Stormwater Improvements. CONSULTANT will attend the Pre-BID
Meeting and will answer questions and clarifications from potential bidders that are technical in
nature. CONSULTANT will respond to written questions requesting clarification of the technical
documents for this project. The CITY shall be responsible for bid advertisement, distribution of
bid documents to interested bidders, processing all bid submittals, and verification that each bid
submittal meets all Purchasing related requirements. CONSULTANT will complete this task
according to the schedule defined by the CITY for the bidding process.
CONSULTANT will review the final bid results and make a recommendation for bid award.
CONSULTANT will evaluate the qualification and prior project conformance of the low bidder.
CONSULTANT will prepare and submit a bid recommendation letter to the CITY.
CONSULTANT will complete this task according to the schedule defined by the CITY for the
bidding process.
Task 6 – Limited Construction Phase Services
The following scope is based on a four (4) month construction duration and on the post design
hours shown below for this task.
· The CONSULTANT will attend and prepare minutes for a pre-construction meeting. One
meeting will be scheduled for the project.
· The CONSULTANT will review shop drawings, and submittals to determine compliance
with the drawings and specifications and recommend submittal action to the CITY.
· The CONSULTANT shall make periodic site visits for the purpose of determining general
compliance with the approved project drawings, plans, and specifications. Site visits will
be performed by the CONSULTANT’s inspector. Two (2) site visit per month estimated at
three (3) hours per visit. Assume up to eight (8) site visits. The CONSULTANT will provide
site reports for each visit.
· The CONSULTANT shall provide written responses to RFIs. Assumes 1 RFI per month.
· The CONSULTANT shall assist the CITY with review of the Contractor’s request for
payments and provide comments and/or recommendations. Assume 4 request for
payment packages. This scope of work does not include assisting the CITY with
preparation or submittal of reimbursement packages associated with the Hazard Mitigation
Grant Program (HMGP) DR-4337-334-R, the Florida Division of Emergency Management,
or the Federal Emergency Management Agency (FEMA).
· Once the Contractors advise that their project is substantially complete, the
CONSULTANT will participate in a substantial completion walk through and prepare a
project punch list.
June 26, 2025 Page 6
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
· Once the Contractors advise that the project punch list is complete, the CONSULTANT
will participate in a final completion walk through to confirm items have been addressed.
· The CONSULTANT will coordinate permit closeout processes for the agencies list in Task
3 above.
The CONSULTANT shall not be responsible for the acts or omissions of any Contractor or
subcontractor, any of the Contractor(s)’ or subcontractor(s)’ agents or employees, or any other
persons (except the CONSULTANT’s own employees and agents) at the site or otherwise
performing any of the Contractor(s)’ work.
All work under this task will be billed on a lump sum basis.
Task 7 – Miscellaneous Services
Miscellaneous services as requested by the CITY outside of items defined within the scope
above, including but not limited to additional engineering services, geotechnical services,
environmental services, permitting and additional construction phase services. All work under
this task will be billed on an hourly not to exceed basis.
Deliverables
CONSULTANT will provide the following deliverables at each submittal:
Design Documents:
· Three (3) half size (11” x 17”) at each submittal
· One (1) digital copy (AutoCAD format) at each submittal
· One (1) digital copy (PDF format) at each submittal
Project Assumptions
· The CITY will provide all available topographic surveys, atlas/as-builts, record drawings,
permit documents, reports and/or master plans relevant to the project area.
· This scope does not include any services required for easement or right-of-way
acquisitions.
· Drainage Well (Gravity or Pressurized) or stormwater pump station design is not included
in scope of services.
· Raising existing roadway elevations is not included in the scope of services.
· Geotechnical services will not be included in the scope of services. If one is needed at a
later date, the miscellaneous budget could be used to obtain one from the subconsultant.
· An ALTA or title abstracted survey will not be included in the scope, only a specific survey
will be included along with 2 separate sketch and legal descriptions for the proposed
crossing through the private property.
· Drainage modeling will only be provided for the known discharge points into the Broward
County lake.
· The CITY will provide all required permit fees.
· The selected contractor will be responsible for obtaining any City of Dania Beach Building
Permit required for this project along with all related coordination and preparation of any
backup documentation required for the City of Dania Beach Building Permit.
June 26, 2025 Page 7
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
CONSULTANT will only be responsible for reasonable revisions requested by the City of
Dania Beach Building Department.
· The CITY will provide timely responses to information included within each submittal.
· The CITY shall be responsible for bid advertisement, distribution of bid documents to
interested bidders, processing all bid submittals, and verification that each bid submittal
meets all Purchasing related requirements.
· CONSULTANT will submit monthly invoices, which will be payable by CITY within 25 days.
· The CITY will reimburse CONSULTANT for any document reproduction costs for all
submittals to regulatory agencies.
· Reimbursable expenses for mileage for any site visits have been included in the lump sum
fees.
· Additional reimbursable expense requested by the CITY outside of the items defined
within scope, such as additional land surveying, geotechnical testing, utility testholes,
laboratory testing, permit fees, shall be invoices as defined in our contract agreement with
the CITY.
PROJECT SCHEDULE
CONSULTANT will start work immediately upon receipt of Notice to Proceed and an official
authorization from the City of Dania Beach.
Method of Compensation
Task Task Description Lump Sum Fees Hourly NTE Fees
1 Site Investigation $29,915 N/A
2 90% Design Documents $29,200 N/A
3 Regulatory Permitting Assistance $12,990 N/A
4 100% Design Documents $14,280 N/A
5 Bidding Assistance $3,875 N/A
6 Limited Construction Phase Services $14,135 N/A
7 Miscellaneous Services N/A $10,000
Subtotal $114,395 $10,000
Total $114,395
June 26, 2025 Page 8
kimley-horn.com 8201 Peters Road, Suite 2200, Plantation, FL 33324 954 535 5100
Closure
The terms and conditions of the City of Dania Beach Request for Qualifications (RFQ) No. 20-
005, City of Dania Beach’s “Continuing Architectural, Surveying, Landscape Architecture and
Engineering Consulting Services”; shall govern this scope of services.
If you concur with the foregoing and wish to direct us to proceed with the aforementioned
services, please issue a Notice to Proceed in writing to the CONSULTANT. Fees and time
stated in this agreement are valid for sixty (60) days after the date of issuance by the
CONSULTANT.
We appreciate the opportunity to propose these services to you.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
George Balaban, P.E.
Vice President
City of Dania Beach
Community Development Memorandum
DATE: 7/8/2025
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Candido Sosa-Cruz, ICMA-CM, Deputy City Manager
Eleanor Norena, CFM, Director
Corinne Lajoie, AICP, Deputy Director
Claudia Viviana Batista, Planning & Zoning Manager
SUBJECT: VA-038-24: The applicant and property owner, SGM Development, Inc., is
requesting a variance to waive the required sidewalk on the property located at
3951 Ravenswood Road.
Request:
To waive the required sidewalk to the west of the property, per Code Section 22-27(A) of the
LDC.
Background:
Property Information:
EXISTING ZONING: Industrial Research Office Marine Airport
Approach (IROM-AA)
LAND USE DESIGNATION: Industrial (I)
SITE ACREAGE: 68,018 SF (1.56 acres)
EXISTING USE: Warehouses
VIOLATIONS ON THE PROPERTY: No open violations on the property.
Background:
The subject property is located west of Ravenswood Road, south of SW 39 Street. It was vacant
for more than 20 years. On November 12, 2019, the applicant received Site Plan approval from
the City Commission to develop three (3) individual buildings, providing a total of 6,000 square
feet of storage, 1,880 square feet of showroom, and 13,533 square feet of service repair.
While the development is completing the construction of the site, the originally approved site
plan conflicts with the Paving, Grading, and Drainage plan prepared by the Civil Engineer. The
area planned for the sidewalks needs to be dedicated to drainage swales and outlet structures to
comply with the requirements of the Broward County Surface Water Department. Approval of
the requested variance to waive the Code of Ordinance requirement allows for the dedication of
the swales for drainage structures approved under the Surface Water Management license issued
on April 9, 2021.
VARIANCE
The Code of Ordinance requires the owner of property abutting public streets to construct,
maintain, and repair sidewalks in front of abutting public streets when a substantial improvement
occurs. This section of the Code intends to create a pedestrian network throughout the city.
The property received approval for the development in 2019, making this Code requirement a
condition of approval. The applicant intends to install sidewalks on the east side of the property
(facing Ravenswood) but requests the variance to waive this requirement on the west side of the
property (facing SW 22nd Ave) since it is a dead end and does not have pedestrian traffic. In
addition, the Broward County DEP has mandated that the swales be dedicated for drainage
structures subsequent to the site plan approval. Public Services supports this request.
Section 625 of the City’s LDC states, that the City Commission or Planning and Zoning Board, if
applicable, shall hold its public hearing and, after consideration of the staff recommendation and
public input, if any, may deny, approve, or approve with conditions the application for variance,
based upon its determination that the request meets the criteria identified in Section 625-40,
which are identified below. For each criterion, the applicant’s justification statement is provided,
as well as the Community Development staff’s findings in italics.
1. “That the requested variance maintains the basic intent and purpose of the subject
regulations, particularly as it affects the stability and appearance of the city.”
Applicant: SW 22nd Avenue is a dead end. The only traffic on this street would be from
Outboard Dynamics. Therefore, there is no purpose in installing a sidewalk to the west of the
property since the property is last on the street. The request to waive the sidewalk requirement is
to accommodate drainage structures. The applicant is proposing to install sidewalks on the east
side of the property facing Ravenswood Road, which has higher traffic and pedestrian activity.
Community Development staff agree with this assessment. The applicant is proposing to build
sidewalks on the east side of the property to meet the basic intent of pedestrian connectivity
where it is really needed.
2. “That the requested variance is otherwise compatible with the surrounding land uses and
would not be detrimental to the community.”
Applicant: The requested variance for waiver of the sidewalk requirements demonstrates
compatibility with surrounding land uses, ensuring it harmonizes well with the existing
community fabric. The property to the north does not have a sidewalk facing SW 22nd Avenue
nor facing SW 39th Street, and the property across to the west is vacant. Since there is no
pedestrian activity to the north or the west side of the property, the installation of sidewalks
would not service anybody and would create a burden since the requirement from the Broward
County DEP is not to have any structures on the swale to allow proper drainage.
Community Development staff finds the request is compatible with the surrounding land uses in
this area. The zoning in the area is industrial.
3. “That the requested variance is consistent with, and in furtherance of, the goals,
objectives, and policies of the adopted Comprehensive Plan, as amended from time to
time, and all other similar plans adopted by the city.”
Applicant: The requested Variance aligns with the Goals, Objectives, and Policies outlined in the
Comprehensive Plan and other relevant city plans. It supports the strategic vision for
development following the Broward County Trafficways Plan by installing sidewalks facing a
collector road and providing a pedestrian network where needed.
Community Development staff confirms that the variance request is in keeping with the Goals,
Objectives, and Policies of the Dania Beach Comprehensive Plan, especially with policies in
Objective I, Policy 6.1.6.1 Conservation Element: Continue to adhere to the standards of the
Broward County Water Management Division and South Florida water Management Division
with regard to drainage.
4. “That the plight of the petitioner is due to unique circumstances of the property or the
petitioner which would render conformity with the strict requirements of the subject
regulations unnecessarily burdensome.”
Applicant: The petitioner's request for a variance is justified due to the unique circumstances of
the Broward County DEP request to accommodate drainage swales. No other structure is allowed
to avoid interference with the drainage system. In addition, if sidewalks were to be installed on
the west of the property, they would not connect to any other road since it is a dead end.
Community Development staff confirms that the circumstances are unique and the request will
render conformity to the surrounding area.
5. “That the variance requested is the minimum variance that is necessary to afford relief to
the petitioner while preserving the character, health, safety, and welfare of the
community.”
Applicant: This is the minimum request that will afford relief from the present situation. The
proposed waiver of the sidewalk installation requirement will allow the installation of proper
drainage systems and create pedestrian connectivity where needed, and is not existent to the east
of the property. Granting this variance upholds the health, safety, and welfare standards of the
neighborhood.
In order for the applicant to build the detached garage, the variance requested is the minimum
variance necessary.
COMMUNITY OUTREACH
On October 16, 2024, the owner sent notices to nearby properties of the subject property
notifying the proposed development. No objections to the project have been received by the City.
COMPREHENSIVE PLAN
This application supports the Comprehensive Plan by furthering the following goals:
Future Land Use Element
• Policy 1.1.5.1 Encourage development to enhance the tax base of the community.
• Policy 2.4.4.6 Continue to improve the community appearance qualities of the new
development, which will enhance and help to preserve existing neighborhoods.
Conservation Element
• Policy 6.1.6.1: Continue to adhere to the standards of the Broward County Water
Management Division and South Florida Water Management Division with regard to
drainage.
Budgetary Impact
N/A
Recommendation
The requested Variance meets the Land Development Code criteria. Therefore, Community
Development is recommending approval of the resolution.
RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, APPROVING THE VARIANCE REQUEST TO WAIVE
THE SIDEWALK INSTALLATION REQUIREMENT OF SECTION 22-27, OF
THE CITY’S CODE ORDINANCES (VA-038-24) SUBMITTED BY THE
APPLICANT/PROPERTY OWNER, SGM DEVELOPMENT, INC., FOR
PROPERTY LOCATED AT 3951 RAVENSWOOD ROAD, IN THE CITY OF
DANIA BEACH, FLORIDA; PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, pursuant to Chapter 28, the Land Development Code (the “LDC”) Part 6
“Development Review Procedures And Requirements,” Article 625, “Variances” of the City Code
of Ordinances (the “City Code”), the property owner, SGM Development, Inc. (the “Applicant”),
applied to the City of Dania Beach (the “City”) for approval of the variance (VA-038-24) for
property located at 3951 Ravenswood Road, legally described on Exhibit “A” and incorporated by
this reference; and
WHEREAS, Chapter 28, Part 6 of the LDC Section 625-40 states that the City
Commission may grant a variance based on its determination that the Applicant has demonstrated
that the criteria identified in the LDC have been satisfied; and
WHEREAS, the Applicant proposes to delete the sidewalk on the west side of the property
along SW 22nd Avenue per section 22-27 of the City’s Code of Ordinance; and
WHEREAS, the Applicant has provided sufficient justification demonstrating compliance
with the approval criteria to meet the requirements of the Code; and
WHEREAS, the City’s Staff Report analyzes the applicant’s request based on the variance
criteria and supports the Applicant’s request and is incorporated by reference herein as the City’s
findings of fact; and
WHEREAS, the City Commission conducted a duly noticed public hearing in accordance
with Article 610 of the LDC; and
WHEREAS, the City Commission found that the Variance (VA-038-24) request is
consistent with the City's Comprehensive Plan and Land Development Code and will protect the
public health, safety, and welfare of the residents of the city, and further the purpose, goals,
objectives, and policies of the Comprehensive Plan.
2 RESOLUTION #2025-______
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1.That the foregoing “WHEREAS” clauses are ratified and confirmed as
being true and correct and they are made a specific part of this Resolution by this reference.
Section 2.That pursuant to Chapter 28, “Land Development Code”, Part 6”
Development Review Procedures and Requirements,” Article 625 “Variances” the variance
application (VA-038-24) is approved consistent with the Site Plan provided in Exhibit “B”.
Section 3. That the Planning & Zoning Division Staff Report prepared for the above
application(s) is incorporated into this resolution as findings of fact.
Section 4.That pursuant to Section 625-500 “Expiration of Variances,” of the Land
Development Code, the variance (VA-038-24) shall automatically expire and become null and
void unless the applicant files a complete building permit application with construction drawings
for the improvements shown on the site plan, within eighteen (18) months from the date of this
Resolution.
Section 5. That the issuance of a development permit by a municipality does not in
any way create any right on the part of an applicant to obtain a permit from a state or federal agency
and does not create any liability on the part of the municipality for the issuance of the permit if the
applicant fails to obtain requisite approvals or does not fulfill the obligations imposed by a state
or federal agency or undertakes actions that result in a violation of state or federal law.
Section 6. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 7.That this Resolution shall take effect ten (10) days after passage and
adoption.
SIGNATURES ON THE FOLLOWING PAGE
3 RESOLUTION #2025-______
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
4 RESOLUTION #2025-______
EXHIBIT “A”
LEGAL DESCRIPTION
"OUTBOARD DYNAMICS" 183-454 B PARCEL A
Outboard Dynamics
Variance Request
Eliminate Sidewalk Along 22nd Ave.
Justification Statement
We justify the request to eliminate the 22nd Ave. Sidewalk as follows
• The area of the proposed sidewalk contains swales and drainage structures
which are required to meet Broward County storm water requirements.
This plan was done and submitted to Broward County prior to the site plan
being revised to show a sidewalk. Broward County had no reason to see the
site plan, just the PGD plans. The City approved 2 conflicting drawings, a
Site Plan with the sidewalk and the civil plans, which never showed the
sidewalk.
• The proposed sidewalk would “dead end” to the south at the edge of the
Outboard Dynamics project. SW 22nd Ave. is a dead end road at the south
side of Outboard Dynamics. It dead ends into an existing building and
cannot be extended. The proposed sidewalk is west of the parking and
would not benefit the building users and would have no benefit to any of
the surrounding buildings, none of which have sidewalks.
• The property to the north of Outboard Dynamics, which extends along SW
22nd Ave. to SW 39th St. has no sidewalk.
2/16/24, 9:18 AM Dania Beach, FL Code of Ordinances
Sec. 625-40. - Variance review criteria; city action.
(1) That the requested variance maintains the basic intent and purpose of the subject
regulations, particularly as it affects the stability and appearance of the city;
Sidewalk will be installed where possible, i.e. along Ravenswood Rd.
(2) That the requested variance is otherwise compatible with the surrounding land uses and
would not be detrimental to the community;
The deleted sidewalk is on the west side of the project along SW 22nd Ave. 22nd
Ave dead ends at the southern side of the project. The existing building directly
north of the project has no sidewalk along 22nd Ave.
(3) That the requested variance is consistent with, and in furtherance of, the goals, objectives and
policies of the adopted Comprehensive Plan, as amended from time to time, and all other
similar plans adopted by the city;
Sidewalk is being installed where possible, i.e along Ravenswood Rd.
(4) That the plight of the petitioner is due to unique circumstances of the property or petitioner
which would render conformity with the strict requirements of the subject regulations
unnecessarily burdensome; and
The area designated for sidewalk as shown on the original approved site plan (done
by the Architect) conflicts with the Paving, Grading & Drainage plan prepared by the
Civil Engineer. The drainage swales and outlets as shown on the Civil plans, (in the
area where the sidewalks are shown on the Site Plan) are necessary for the project
to comply with the requirements of Broward County Surface Water and are as
approved under Surface Water Management License No. SWM2021-016-0, which
was approved by the County on 4-09-2021. The civil plans never showed the
sidewalks along SW 22nd Ave. They are shown only on sheet SP-1. Due to the
Broward County Surface Water requirements, there was never the ability to install
sidewalks along SW 22nd. Ave. A plan was never presented to Broward County
showing sidewalks along SW 22nd Ave.
5. That the variance requested is the minimum variance that is necessary to afford relief to
the petitioner, while preserving the character, health, safety and welfare of the
community.
Petitioner is installing code required sidewalk wherever possible
(B) A request for a variance from Article 505, "Sign Regulations" shall be reviewed based on the
criteria identified in section 505-180.
(C) In granting any variance, the city commission or planning and zoning board, as applicable, may
prescribe conditions and safeguards intended to mitigate potential adverse impacts from the
variance and to ensure that the intent and purpose of the code is maintained. Violation of such
conditions and safeguards shall be deemed a violation of this Code.
(Ord. No. 2010-20, § 2(Exh. A), 9-14-10; Ord. No. 2013-001, § 5, 2-26-13)
1/1
October 16, 2024 Re: Neighbor Outreach Notice Address: 3951 Ravenswood Road City of Dania Beach Petition Number: VA-038-24
Dear Property Owner:
The purpose of this correspondence is to inform you that the property
located at 3951 Ravenswood Road has filed a Variance application to remove the sidewalk on the West side of the property. Please reach out to Stuart Moraitis, SGM Development, Inc, sgmoraitis@bellsouth.net, 954-527-0577, with any questions, concerns, or general input. The variance application can be made available upon request.
Sincerely,
Stuart Moraitis
City of Dania Beach
Community Development Memorandum
DATE: 7/8/2025
TO: Honorable Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Candido Sosa-Cruz, ICMA-CM, Deputy City Manager
Eleanor Norena, CFM, Director
Corinne Lajoie, AICP, Deputy Director
Claudia Viviana Batista, Planning and Zoning Manager
Jessica Mackey, E.I., Planner
SUBJECT: SE-015-23: The applicant, 2750 Griffin Holdings, LLLP, is requesting a Special
Exception to allow outdoor restaurant seating to be located at 2750 Griffin Road.
Request:
SPECIAL EXCEPTION
To allow outdoor restaurant seating where Code Section 110-200 permits outdoor restaurant seating
without a Special Exception as long as it is an accessory use to an indoor restaurant, and provided it is
not adjacent to a residential use or any property located within a residential zoning district.
Background:
PROPERTY INFORMATION:
EXISTING ZONING: Planned Residential Development District (PRD-1)
LAND USE DESIGNATION: Commercial (C)
SITE ACREAGE: 1.79 acres (77,767 Net SF)
EXISTING USE: Mixed-use - Residential and Commercial
BACKGROUND
The subject property, Griffin Living, is a 1.79-acre parcel located on Griffin Road between SW 27th
Terrace and SW 28th Avenue. The property has a mixed-use building with 79 residential rental units,
three of which are vacation rentals, and two commercial establishments with active Business Tax
Receipts on the bottom floor: a UPS store (DULU13 INC), and a full-service restaurant (Puya Urban
Cantina LLC). A convenience store (SPLP Retail Group LLC) was recently issued a Certificate of
Use, however, there is no active Business Tax Receipt for the establishment. An incoming café
(Revivo Café LLC), boutique retail shop (Fringe Boutique Florida), and urgent care facility (MedPro
Urgent Care) will also occupy the first floor; however, no Certificates of Use have been issued for
Revivo and MedPro. Fringe Boutique Florida recently applied for their Business Tax Receipt. The site
is surrounded by multifamily residential to the north, commercial uses to the east and west, and a
single-family residential neighborhood to the south.
The site previously had a building for a restaurant, two smaller commercial buildings surrounded by
parking. A psychic/tarot reading business occupied one of the buildings from 2016 to 2021. Palm
American Grille/Mi Casa Su Casa restaurant had a Variance approved on August 10, 2010 to allow for
the sale of alcohol less than 1000’ from a church (R-2010-123). After the Palm American Grille
restaurant closed, the Cielito Lindo restaurant later occupied the restaurant building from 2017 to 2018.
The site received approval by City Commission on August 25, 2020 for a Rezoning, Plat Note
Amendment, Site Plan, Variance and allocation of seventy-five (75) flex units that were approved
under R-2020-093; O-2020-012; and R-2020-092. The seventy-five (75) flex units increased the
project’s density from four (4) dwelling units to seventy-nine (79). The Rezoning application was to
allow for the property to be rezoned from Community Business District (C-2) and Two-Family
Residential District (RD-8000) to Planned Residential Development District (PRD-1). The Variance
was to allow a five-foot (5’) side setback adjacent to the residential property when the code required a
fifteen-foot (15’) setback per Land Development Code (LDC) Section 250-10 (B).
The site also had two Site Plan Modifications that were administratively approved with conditions on
April 19, 2021, and September 22, 2022, respectively. The second modification was to allow for the
access driveway to comply with the Fire Department access requirements.
The site recently applied for a Site Plan Modification and a Rezoning to include two additional single-
family lots at the south of the property located at 4880 SW 28th Avenue and 4901 SW 27th Terrace.
The Site Plan Modification approval will allow redevelopment of the two residential parcels to have a
community pool, bath house, dog park, and bar-b-que area that will serve as accessory uses and
amenities to the residential units. The Site Plan Modification is undergoing the Development Review
Committee (DRC) review. Once complete, the application will be presented at a public hearing by the
City Commission.
The parking supply was reviewed by the city staff. There are 121 on-site parking spaces. On August
29, 2024, a Shared Parking Easement Agreement was made between 2750 Griffin Living, LLLP and
SDS Development & Trust, LLC at 2600-2620 Griffin Road, the property to the east where the Dollar
Tree is located. The agreement states that the SDS Property has an excess of twenty-two (22) parking
spaces, which is the be shared with the subject property. This brings the total available parking spaces
to 143 parking spaces.
Parking requirements for existing and incoming uses were evaluated by staff and are listed in Table 1.
Based on Certificates of Use, Business Tax Receipts, and building permit records, it was determined
that 139 parking spaces are required per LDC 265-50. Parking reductions for mixed-use buildings were
applied per LDC Section 265-90, which determined that a total of 139 minimum parking spaces are
required.
Table 1: Griffin Living Establishments and Parking Requirements
Parking reductions for mixed-use
development (per LDC Section 265-90)
Weekday Weekend
Business
Name
(Use
Category)
Sq ft /
#
Units /
CSA
Code Ratios Minimum
Parking
Required LDC
265-50
Night
Midnight
to
6 a.m.
Day
9
a.m.
to
Evening
6 p.m.
to
Mid-
Day
9
a.m.
to
Evening
6 p.m.
to
Mid-
6
p.m.
night 6
p.m.
night
Residential
(one-
bedroom
multi-family)
79
units
One and one-
half (1.5) per
dwelling unit
79 79.0 79.0 79.0 79.0 79.0
Incoming
MedPro
Urgent Care
(Medical
Office)
3,751.0
SF
One (1) per
two hundred
(200) SF
18.8 0.9 18.8 0.9 0.9 0.9
UPS
(Copy/
printing
shop)
1,201.7
SF
Copy/printing
shop: One (1)
per two
hundred
(250) SF
4.8 0.2 4.8 0.2 0.2 0.2
SPLF Retail
Group LLC
(Convenience
store)
925.0
SF
One (1) per
two hundred
fifty (250) SF
3.7 3.7 3.7 3.7 3.7 3.7
Puya Urban
Cantina
(Restaurants,
full-service)
1454.0
CSA
One (1) per
forty (40) sf
of CSA
including
open-air
seating
36.4 3.6 25.4 36.4 25.4 36.4
Incoming
Revivo Café
(Restaurant,
take out)
500
SF*
One (1) per
75 SF of
CSA
6.7 0.7 4.7 6.7 4.7 6.7
Incoming
Fringe
Boutique
Florida
(Retail under
40k sq of
GFA)
802.0
SF
One (1) per
three hundred
(300) SF
3.0 0.2 2.1 2.1 3.0 2.1
TOTAL** 153 89 139 129 118 129
Spaces Provided (121 on-site; 22 off-
site):
143 spaces provided
Note: Uses are based on Certificate of Use, BTR and Building Permit records as of 6/16/25
*Source: Permit #2024-00001904
**Total spaces are rounded up per LDC Section 265-50
SPECIAL EXCEPTION
The applicant is proposing to operate outdoor dining at the window/bar area of the Puya Urban Cantina
restaurant, facing Griffin Road, resulting in a total of 1,454 SF of Customer Service Area. There are 16
seats proposed The City’s LDC, Section 110-200, permits outdoor restaurant seating without a Special
Exception approval as long as it is an accessory use to an indoor restaurant containing at least five
hundred (500) square feet of gross floor area, and provided it is not adjacent to a residential use or any
property located within a residential zoning district. There are two residential parcels adjacent to the
south side of the property, thereby requiring a Special Exception. The nearest residential uses to the
proposed outdoor dining area are multifamily properties that are approximately 115 feet north of
Griffin Road.
Section 630-50(A) of the City’s LDC states that the Planning and Zoning Board or City Commission,
as applicable, shall review the application to determine whether the Special Exception use complies
with the below criteria and may deny, approve, or approve the application with conditions. In issuing
its decision to grant a Special Exception, the City may place more restrictive requirements and
conditions on applicants than are provided in the code when the conditions are based upon site
considerations and its use, and the potentially resulting impacts upon the surrounding area or zoning
district where the subject property is located. Below are the criteria identified in LDC Section 630-50
(A), along with the applicant’s justification and staff’s analysis in italics.
1. That the use is permitted as a Special Exception use as set forth in the use regulations of Part 1
of this code.
Applicant: The outdoor seating and dining are permitted as a Special Exception use. Section 110-200
allows outdoor dining as an accessory use to an indoor restaurant that contains at least 500 square feet
of gross floor area. The restaurant in question has over 500 square feet of gross floor area. However,
because the property on which the restaurant is located is zoned PRD-1 and there are other residential
properties adjacent to the PRD-1 Zoning a Special Exception is required.
Community Development staff confirm that outdoor dining is permitted as a Special Exception use in
the LDC. The criterion is met.
2. That the use will not cause a detrimental impact to the value of existing contiguous uses, uses
in the general area, and to the zoning district where it is to be located.
Applicant: The proposed outdoor dining use will not cause a detrimental impact to the value of
contiguous uses or to the Zoning District. The restaurant is located on the first floor of the Griffin
Living project. This means that the restaurant is fronting and is closest to Griffin Road. The properties
to the east and west of the Griffin Living Project are zoned C-2, Commercial uses. Those are the
properties that are immediately adjacent, separated by a road, from the outdoor seating area. The
residential properties that are near the actual use are behind the Griffin Living building. As a result, the
building on the property will sufficiently buffer any residential use from the outdoor dining use.
In addition, Section 110-200 of the Code mandates that music shall not be permitted to be performed
or amplified within outdoor seating areas, and the Applicant/Owner is aware of this requirement. Being
adjacent to Griffin Road with the existing building serving as a buffer means that there will be no
detrimental impact to the value of existing contiguous uses.
The restaurant is established and the use already exists. The criterion is met.
3. That the use will be compatible with the existing uses on contiguous property, with uses in the
general area and zoning district where the use is to be located and compatible with the general
character of the area, considering population density, design, scale and orientation of structures
to the area, property values and existing similar uses or zoning.
Applicant: The use is compatible with the existing zoning on contiguous property and will also be
compatible with the general character of the area. The property on which the proposed outdoor seating
area is a mixed-use development that specifically allows a restaurant use. The proposed Special
Exception is purely for the accessory outdoor seating area. Thus, in this case the outdoor dining area by
its very nature is compatible with the existing uses.
In addition to the above, the outdoor dining area is proposed to be along Griffin Road. This is
compatible with the existing uses because the frontage of Griffin Road in the surrounding area is all
commercial zoning, which allows restaurant use. The general goal is to have a commercial and
pedestrian-friendly throughfare along Griffin Road, a major arterial in the City, and having an outdoor
seating area, which is accessory to a restaurant, will promote the general character of the area.
The restaurant is established, therefore the use is compatible with the existing uses on contiguous
property, general areas and zoning district. The criterion is met.
4. That adequate landscaping and screening are provided to buffer adjacent uses from potential
incompatibilities.
Applicant: There is landscaping to screen and buffer the use from Griffin Road. In addition, the overall
development has sufficient landscaping to buffer the project from other potential incompatibilities.
Significantly, the outdoor dining area is located adjacent to Griffin Road, which means the existing
building provides more than sufficient screening to provide a buffer between the outdoor dining area
and any adjacent uses or any potential incompatibilities.
The Community Development Department agrees that landscaping and screening have been provided
to buffer the outdoor dining from the residential uses north of the property. However, the existing
conditions meet code requirements, and the existing building separates the outdoor dining from the
neighborhood south of the property. The criterion is met.
5. That adequate parking and loading is provided, and ingress and egress is so designed as to
cause minimum interference with traffic on abutting streets.
Applicant: The Griffin Living site has adequate parking and loading to accommodate the accessory
outdoor dining area, as the parking meets the requirements of the Code. In addition, the ingress and
egress were approved as part of the original Griffin Living project approval and was approved by
FDOT. The existing driveways and means of ingress and egress are not proposed to be modified as
part of this request, as the outdoor dining area is accessory to the main restaurant use.
The Community Development staff agree that while the parking supply in conjunction with the off-site
parking agreement meets the LDC, parking and traffic concerns raised by residents indicate that the
shared parking agreement with the property at 2600-2620 Griffin Road is not functioning as intended
and adequate parking has not been provided.
At the community outreach meeting, residents expressed concerns about restaurant customers parking
on their swales and the need to stand outside of their properties to direct customers to the off-site
parking location at Dollar Tree. Staff have requested the applicant to provide wayfinding signs
directing customers to find additional parking at the Dollar Tree site and vice versa, which the
application has agreed to do. The criterion is met.
6. That the use will not have a detrimental environmental impact upon contiguous properties and
upon properties located in the general area or an environmental impact inconsistent with the
health, safety, and welfare of the community.
Applicant: The use will not have a detrimental environmental impact on any adjacent or contiguous
property. The existing grease traps at the restaurant are sufficient to handle the outdoor accessory
dining use, but the grease trap, the use will have no other environmental impacts as the use does not
involve any environmental contaminants or materials.
The Community Development staff agree with this statement. The restaurant use is established and
meets LDC. The criterion is met.
7. That the use will not have a detrimental effect on vehicular or pedestrian traffic, or parking
conditions, and will not result in the generation or creation of traffic inconsistent with the
health, safety, and welfare of the community.
Applicant: The use will not have a detrimental effect on vehicular or pedestrian traffic or parking
conditions and will not generate or create traffic inconsistent with the welfare of the community. The
accessory use of outdoor dining is located on the patio area of the Griffin Living project and will not
have any impact on pedestrian movement or vehicular movement, especially since the patio area is far
enough away from the roadway. In addition, the location of the accessory outdoor dining has no impact
on pedestrian or vehicular movement, as the parking and location of the facility remain consistent with
the indoor use. The traffic which could be deemed to be generated from this outdoor use is included as
part of the plat and thus is already accounted for and will not cause any issues within the community.
In addition, the site has adequate parking to address this accessory use.
The Community Development staff do not agree that the addition of the outdoor use will not have a
detrimental impact on vehicular traffic or parking conditions based on traffic and parking concerns
raised by residents with the current intensity of uses. As previously stated, residents at the community
outreach meeting complained about customers parking on their swales and the need to stand outside of
their properties to direct customers to the off-site parking location. Staff have requested the applicant
to provide wayfinding signs directing customers to find additional parking at the Dollar Tree site and
vice versa, which the applicant has agreed to do.
Regarding pedestrian traffic, the location of the outdoor dining would not interfere or obstruct the
sidewalk located along Griffin Road as the bar stools along the bar area window are completely within
the walkway that is on site. Pedestrian access will occur via the parking lot at Griffin Living and the
public sidewalk along Griffin Road that connects to the Dollar Tree site. No complaints were received
regarding the increase in pedestrian activity. One resident noted that she enjoys seeing the increase in
foot traffic in the area, therefore health, safety, and welfare of the community would not be negatively
impacted. An increase in use intensity has the potential to exacerbate traffic and parking issues being
experienced by neighboring residents. The criterion is met.
8. That the use will not utilize turning movements in relation to its access to public roads or
intersections, or its location in relation to other structures or proposed structures on or near the
site that would be hazardous or a nuisance.
Applicant: There are no turning movements that would be hazardous or a nuisance. The special
exception is for an accessory outdoor dining. The overall project has been reviewed by a traffic
engineer and by FDOT. The parking for the use is in the rear of the property which will utilize already
existing means of ingress and egress. Since there are no new turning movements required for this use
nor is there any need for changes to be made to ingress and egress the proposed use will not create any
turning movements or access to public roads that would be either hazardous or a nuisance.
Community Development staff agree with this statement. The existing restaurant use and the existing
traffic circulation was were approved as the site plan meets LDC. The criterion is met.
9. That the use will not have a detrimental effect on the future development of contiguous
properties or the general area, according to the comprehensive plan.
Applicant: The use will not have a detrimental effect on the future development of contiguous
properties. There is no impact that accessory outdoor dining would have on the development of any
future development, this is especially the case since there is not a distance separation requirement for
accessory outdoor dining uses.
Community Development staff agree with this statement. The criterion is met.
10. That the use will not result in the creation of incompatible noise, lights, vibrations, fumes,
odors, dust or physical activities, taking into account existing uses, uses located on contiguous
properties, uses in the general area and the zoning in the vicinity due to its nature, duration,
direction or character.
Applicant: The use will not result in the creation of incompatible noise, lights, or any other noxious or
nuisance uses. The outdoor dining is located adjacent to Griffin Road, and thus any lights or customer
noise will be buffered by either the roadway or the existing building. In addition, the City Code
prohibits amplified music in the outdoor dining area. This means that any noise, lights, or other type of
activities will not impact any adjacent property.
Community Development staff agree with this statement. The outdoor dining area is a small strip of
outdoor dining directly adjacent to the building and a major arterial. The criterion is met.
11. That the use will not overburden existing public services and facilities.
Applicant: The accessory outdoor dining use will not overburden existing services and facilities. There
is more than enough capacity for both water and sewer for the accessory dining, and no additional
items (such as grease traps) need to be included in the building plans to accommodate the use.
Furthermore, the area of the accessory outdoor seating is minor, such that de minimum trips are
generated from the use, thereby meaning that roadway concurrency is also satisfied. This is especially
the case as the accessory outdoor dining is compliant with the plat note for the Griffin Living Plat.
Community Development staff agree with this statement. The criterion is met.
Community Outreach
The applicant conducted a community meeting on Tuesday, June 3, 2025, at the PJ Meli Community
Center. Eighteen (18) residents attended. Residents were provided two 8.5x11” sheets that included
the site plan and a location map. The applicant explained the three (3) ongoing applications for the site:
the Special Exception for outdoor dining to be heard at the July City Commission meeting. The Special
Exception application would need to be approved by the City Commission per Land Development
Code. The outdoor dining would occur along Griffin Road, and not in the rear or on the sides of the
buildings. The following were major topics that were discussed, some of which pertained to the Site
Plan Modification application:
• Several residents complained that the site plan provided on the 8.5”x11” sheets were too small
for them to see. Rod said he would email it to the residents.
• Overflow parking was a major concern for several residents. The applicant explained the
Shared Parking Easement Agreement with the Dollar Tree site. One resident said there is a
shortage of parking at the Dollar Tree and some debate occurred on the nights that the sites
are busiest. Residents noted congestion and the use of side streets like SW 27th Terrace and SW
26th Terrace because one cannot turn on Griffin to go west. They also said there isn’t enough
room for the parked vehicles to turn around at the concrete parking lot on 4901 SW 27t Terrace
site, a property that is owned by the Griffin Living that is being used as a study room for a
Rabbi according to the representative. One resident complained about several cars parked in
front of the 4901 SW 27th Terrace and wanted the area enclosed to prevent parking from
occurring there. Another asked whether the gravel parking lot on 4880 SW 28th Avenue would
be used for parking on the site and the applicant indicated that it would not be because that
location would be the dog park.
• Delivery trucks for the Dollar Tree sometimes block Griffin Road. Amazon and UPS deliveries
sometimes block the local roads for deliveries.
• The applicant indicated the development would have a shuttle from the Dollar Tree to Griffin
Living. One resident asked whether the shuttle would use local streets since vehicles cannot go
west on Griffin Road.
• Complaints were made about noise from a recent event that took place at 4901 SW 27th
Terrace as well as noise from drums and processions. Residents were assured that these events
will not recur. The applicant said the building is used as a study room for a rabbi and the
existing structure would be a bathhouse with changing rooms and lockers. One resident asked
if there would be a large gathering space inside the building and the applicant indicated there
would not be.
• There were also concerns about public use of the bathhouse/temple, but the applicant
emphasized these are not intended for public or rental use as they would be accessory use to
the residents in the building.
• Some residents believe flooding has worsened since the Griffin Living development. One
resident said that the rainwater from the roof goes to the street.
• One resident asked if the proposed pool lights would be on at night and the applicant indicated
they would be off by 9 PM.
• A discussion regarding the increase in traffic on local streets, speeding vehicles on Griffin
Road, the need for traffic signals to go west on Griffin Road, and traffic calming with speed
tables came up.
Following the meeting, staff received emails from two residents raising concerns about overflow
parking in their neighborhood as well as parking that is occurring in front of the concrete area at 4901
SW 27th Terrace. One resident provided photos of vehicles parked on the swales and said that. One
resident had concerns about the speed tables obstructing their access to Griffin Road.
A detailed summary from the applicant as well as correspondence from residents is provided as
backup.
Comprehensive Plan
This application supports the Comprehensive Plan by furthering the following goals:
Future Land Use Element
• Policy 1.1.5.1 Encourage development to enhance the tax base of the community.
• Policy 1.1.5.5 Commercial, office, employment center, and industrial land uses will be
identified in accordance with the Comprehensive Plan.
• Policy 1.1.10.2 The permitted uses of the Comprehensive Plan shall permit the mixing of land
uses consistent with land development regulations.
Budgetary Impact
Approval of the Special Exception requires a separate Certificate of Use and Business Tax Receipt and
will expand the City’s tax roll.
Recommendation
The requested Special Exception meets the Special Exception Criteria. Therefore, the Community
Development staff are recommending approval of this request provided signage is posted on site
identifying location of additional parking.
1 RESOLUTION #2025-______
RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, PURSUANT TO THE CRITERIA OF SECTION 630-50,
ENTITLED “SPECIAL EXCEPTION USE DEVELOPMENT STANDARDS”,
TO APPROVE THE APPLICANT’S REQUEST FOR A SPECIAL EXCEPTION
(SE-033-024) TO ALLOW OUTDOOR DINING ASSOCIATED WITH AN
EXISTING RESTAURANT, SUBMITTED BY APPLICANT, 2750 GRIFFIN
LIVING, LLLP, FOR PROPERTY LOCATED AT 2750 GRIFFIN ROAD
BEACH, FLORIDA; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING
FOR AN EFFECTIVE DATE.
WHEREAS, Chapter 28, “Land Development Code” (the “LDC”), Part 6, entitled
“Development Review Procedures and Requirements,” Article 630-50, entitled “Special
Exception” of the City Code of Ordinances (the “City Code”) provides that a Special Exception
approval is required as a condition to allow for outdoor dining; and
WHEREAS, 2750 Griffin Holdings, LLLP (the “Applicant”) has requested a Special
Exception Approval (SE-033-24) to allow the Puya Urban Cantina LLC, to have accessory outdoor
dining on the property legal described in Exhibit “A”, and
WHEREAS, the Applicant has provided sufficient justification demonstrating compliance
with the approval criteria to meet the requirements of the Code; and
WHEREAS, the City’s Staff Report analyzes the applicant’s request based on the special
exception criteria and supports the Applicant’s request and is incorporated by reference herein as
the City’s findings of fact; and
WHEREAS, the City Commission conducted a duly noticed public hearing in accordance
with Article 610 of the LDC; and
WHEREAS, the City Commission finds that the approval of the Special Exception (SE-
033-24) is consistent with the City’s Land Development Code and Comprehensive Plan and Land
Development Code and will protect the public health, safety, and welfare of the residents of the
City, and further the purpose, goals, objectives, and policies of the Comprehensive Plan.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the foregoing “WHEREAS” clauses are ratified and confirmed as
being true and correct, and they are made a part of and incorporated into this Resolution by this
reference.
Section 2. That pursuant to Chapter 28 “Land Development Regulations,” Part 6
“Development Review Procedures and Requirements,” Section 630-50, entitled “Special
Exception Use Development Standards” the following Special Exception (SE-033-24), attached
as Exhibit “B,” which is made a part of and incorporated into this Resolution by this reference, is
approved.
Section 3. That the associated Planning & Zoning Division Staff Report prepared for
the above application(s) is/are incorporated into this resolution as findings of fact.
Section 4. That pursuant to Section 630-70 “Expiration of Special Exception” of the
Land Development Code, the Special Exception (SE-033-24) approval shall automatically expire
and become null and void unless the Applicant files all development approval applications within
eighteen (18) months from the date of this Resolution.
Section 5. That the issuance of a development permit by a municipality does not in any
way create any right on the part of an Applicant to obtain a permit from a state or federal agency,
and does not create any liability on the part of the municipality for issuance of the permit if the
Applicant fails to obtain requisite approvals or does not fulfill the obligations imposed by a state
or federal agency, or undertakes actions that result in a violation of state or federal law.
Section 6. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 7. That this Resolution shall take effect ten (10) days after passage and
adoption.
PASSED AND ADOPTED on __________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
3 RESOLUTION #2025-______
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE BOUTSIS
CITY ATTORNEY
EXHIBIT “A”
LEGAL DESCRIPTION
Parcel A, GRIFFIN LIVING, according to the map or plat thereof, as recorded in Plat Book 183,
Page 56 of the Public Records of Broward County, Florida.
5 RESOLUTION #2025-______
EXHIBIT “B”
SPECIAL EXCEPTION
(SE-033-24)
Law Offices COKER & FEINER
Telephone: (954) 761-3636 May 23 , 2025 1404 South Andrews A venue Fort Lauderdale, FL 333 16-1840 Re: Notice of Community Meeting Dear Neighbor: E-mail: rafeiner@coker-feiner.comPlease be advised that this firm represents 2750 Griffin Holdings, LLLP and 2700 Griffin Holdings, LLLP. This letter is to invite you to a community meeting relating to a re-zoning, site plan amendment and for a special exception for the properties located at 2750 Griffin Road, 4901 SW 27th Terrace and 4880 SW 28th Ave. The property is generally located on the south side of Griffin Road between SW 28th Ave. and SW 27th Terrace. A location map for the project is on the back of this letter. 2750 Griffin Holdings and 2700 Griffin Holdings are currently pursuing approvals through the City of Dania Beach to allow a re-zoning from RD-8000 and RS-6000 to PRD-1 (Planned Residential Development District) along with a site plan modification to add a pool, bath house, courtyard area, dog park and other accessory items to the Griffin Living Project as well as a Special Exception to allow outdoor dining at the Griffin Living Project for the Puya Cantina restaurant. As you are the project's neighbors we would like to introduce you to the project, answer any questions you may have and receive your input into the project. We have scheduled a meeting at the following location: Date: Time: Location: June 3, 2025 6:3 0PM PJ Meli Aquatic Complex PJ Meli Community Center 2901 SW 52nd Street Dania Beach, FL 333 12 At the meeting we will also have a copy of the proposed site plan for you to review. Of course, if you have any questions or would like to speak with me, please feel free to call me at the e-mail or phone number above. More than one elected official may appear at the community meeting and should disclose their attendance
at said meeting once the City Commission is to hear the quasi-judicial item. Sincerely, Isl Rod A. Feiner
ROD A. FEINERFor the Firm
1
Mackey, Jessica
From:Alina Bellydance <alinayllanes@gmail.com>
Sent:Friday, June 6, 2025 12:58 PM
To:Rod Feiner
Cc:dedivers@att.net; suejimm@att.net; jnroma@gmail.com; jscully2850@gmail.com;
joel.roberge2@yahoo.com; Mackey, Jessica
Subject:Re: Griffin Living MOD Site Plan
CAUTION: This email originated from outside the City of Dania Beach. Do not click links or open
attachments unless you recognize the sender and expect the content.
i
This message needs your attention
This is a personal email address.
This is their first email to your company.
Mark Safe Report Powered by Mimecast
My biggest concern for 27th Terrace is that parking lot.
It should be closed, since it's only for building residents, there shouldn't be any entrance on 27th
Terrace.
When you first proposed the building, you initially said there would be no access from 27th Terrace. But
you went around that. And the amount of traffic to our alley street has increased .
The other concern is how fast those cars are traveling on griffin rd and you're going to put tables on the
sidewalk obstructing our view out even more. This part should be a concern to you. Since griffin rd is a 45
mile an hour rd. But people are easily traveling at 55 or more. As a resident here for over 10 years, I have
personally heard several multiple car accidents. (I live close to the road) and I always hear the crashes.
Those tables will definitely be obstructive to us exiting onto griffin.
On Thu, Jun 5, 2025, 2:31 PM Rod Feiner <rafeiner@coker-feiner.com> wrote:
Good Afternoon All –
It was a pleasure meeting you at the Community Meeting on Tuesday. As I indicated, we will have another meeting in
July which I will send notice about shortly.
2
Pursuant to your request, attached please find the site plan which shows the area in which the accessory developments
are being proposed and the scope of the accessory developments. As I indicated to you, no new square footage is
proposed for the commercial spaces and no additional units are being proposed.
I did speak to my client and we agree that the pool will be closed at 9 p.m. each night and that would be a condition of
any approval so it was enforceable by the City.
Let me know if you have questions.
Thank you,
Rod
Rod A. Feiner, Esq.
Coker & Feiner
1404 South Andrews Avenue
Fort Lauderdale, Florida 33316
Telephone: (954) 761-3636
Facsimile: (954) 761-1818
rafeiner@coker-feiner.com
This e-mail message and any files transmitted with it are subject to the attorney-client privilege and contain confidential information intended only for the
person(s) to whom this e-mail message was addressed. If you are not the intended recipient of this e-mail, you are hereby notified that any dissemination,
distribution or copying of this communication is prohibited. If you have received this e-mail in error, please notify the sender immediately by either return e-mail
or contacting Rod A. Feiner, Esq., Coker & Feiner, 1404 S. Andrews Ave., Ft. Lauderdale, FL 33316 and destroy the original of this message without making a copy. Thank you.
1
Mackey, Jessica
From:Jen stewart <jen.l.stewart22@gmail.com>
Sent:Thursday, June 12, 2025 11:34 AM
To:Norena, Eleanor
Cc:Lajoie, Corinne; Sosa-Cruz, Candido; Rod Feiner; Mackey, Jessica; Garcia, Ana M.;
Walton, Eric; Urow, Barbara
Subject:Re: Parking for 2750 Griffin Rd is out of control again (Griffin Living)
CAUTION: This email originated from outside the City of Dania Beach. Do not click links or open
attachments unless you recognize the sender and expect the content.
i
This message needs your attention
Some Recipients have never replied to this person.
This is a personal email address.
Mark Safe Report Powered by Mimecast
2
3
On Thu, Jun 12, 2025 at 9:49 AM Norena, Eleanor <enorena@daniabeachfl.gov> wrote:
Good Morning Ms. Stewert,
Thank you for providing this information, we will reach out to the developer so he can address the
parking issues at this site. I will also have code staff monitor this area for illegal parking.
Please provide the pictures your referenced so we can share with the developer as well.
Regards,
Eleanor
Eleanor Norena
,
CFM
,
Community Development Director
enorena@daniabeachfl.gov
|
daniabeachfl.gov
100 W Dania Beach Blvd,
Dania Beach
,
FL
,
33004
Phone: 954.924.6805, x3645
R.I.S.E. - RESPECT, INTEGRITY AND STANDARD OF EXCELLENCE
Please note: Florida has a very broad public records law. Most written communications, including emails, to or from City officials regarding City business are public records and may be
subject to public disclosure.
From: Jen stewart <jen.l.stewart22@gmail.com>
Sent: Wednesday, June 11, 2025 8:54 PM
To: Rod Feiner <rafeiner@coker-feiner.com>; Mackey, Jessica <jmackey@daniabeachfl.gov>; Garcia, Ana M.
<agarcia@daniabeachfl.gov>
Subject: Parking for 2750 is out of control again
CAUTION: This email originated from outside the City of Dania Beach. Do not click links or open
attachments unless you recognize the sender and expect the content.
4
It’s 8:45 pm on Wednesday night and cars are parking on my swale and down the block again. And even
at this hour it doesn’t appear traffic is going to lighten up soon. I have pictures, but they’re dark but will
share if necessary. Clearly the dollar tree lot is not the solution. More cars would be parked here had
my neighbors not been outside to direct other cars away from parking on the street. We can’t stand
guard on our street every night nor should we have to. This has to stop.
name1 name2 add city state zip zip 4
1630 SW 4TH AVE LLC 14731 EDNA WAY DELRAY BEACH FL 33484
2484 SW 10 ST LLC 475 BRICKELL AVE #2813 MIAMI FL 33131
26 RESIDENCE LLC 4031 SW 54 CT DANIA BEACH FL 33314
2700 GRIFFIN HOLDINGS LLLP 2790 STIRLING RD #10 HOLLYWOOD FL 33020
2741HATZ LLC 9180 EQUUS CIR BOYNTON BEACHFL 33472
2750 GRIFFIN HOLDINGS LLLP 2790 STIRLING RD STE 10 HOLLYWOOD FL 33020
2857 LLC 20315 NE 15 CT MIAMI FL 33179
2950 GRIFFIN ROAD LLC% ANGELA SULEYMANOVA 4801 29TH WAY STE 6 FORT LAUDERDALEFL 33312
307-309 DANIA INC 1019 SE 8 CT DEERFIELD BEACHFL 33441
4 WALLS RENTAL LLC 21234 NE 19 CT MIAMI FL 33179
4847 HAGE PROPERTY LLC 1404 SW 33 CT FORT LAUDERDALEFL 33315
4935A SW 27TH LAND TR TRSTE LLC TRSTEE 1901 W COLONIAL DR ORLANDO FL 32804
4941 LLC 7561 POLK ST HOLLYWOOD FL 33024
4950 DANIA LLC 19790 W DIXIE HWY STE 1001 MIAMI FL 33180
ABU-HASHISH,LAWRENCE 4903 WHISPERING WAY FORT LAUDERDALEFL 33312
ADAMS,DAMON J & DONNA LYNN 4924 SW 27 AVE FORT LAUDERDALEFL 33312 6028
ADAMS,DIANE KCASTRO NOVO,PHYLLIS J 2639 SW 50 ST FORT LAUDERDALEFL 33312 6034
ADIAH,STEPHEN 4651 SW 26 TER FORT LAUDERDALEFL 33312 5764
AHEAD OF COMPETITION LLC 4940 SW 28 AVE FORT LAUDERDALEFL 33312
ALDICK,ABDEL R ALDICK,GHADA 4700 SW 55 AVE DAVIE FL 33314
ALEKSANDR OSTROVSKIY TR OSTROVSKIY,ALEKSANDR TRSTEE 12411 OSBORNE ST #86 PACOIMA CA 91331
ALTMAN,CHRISTINA L 2733 SW 47 ST FORT LAUDERDALEFL 33312
ANDREWS,DALE A 4680 SW 27 AVE FORT LAUDERDALEFL 33312 5708
ANGRAND,EDNER & ADELINE 2716 SW 47 ST FORT LAUDERDALEFL 33312
APONTE,ENRIQUE & MARIE ISABEL 2796 SW 46 CT FORT LAUDERDALEFL 33312
AVERY,VIVIAN 4975 SW 28 AVE FORT LAUDERDALEFL 33312
BAEZA,EDWARD 4731 SW 26 TER FORT LAUDERDALEFL 33312
BARNETT,PATRICIA 4650 SW 26 AVE FORT LAUDERDALEFL 33312 5730
BARRERA,RAUL VALLADARES,DANIA ROSA 5479 NW 184 ST MIAMI GARDENS FL 33055
BBS BUILDERS, INC 1760 NW 91 TER PLANTATION FL 33322
BEAUDRY,CHRISTOPHER L 4940 SW 26 AVE FORT LAUDERDALEFL 33312
BELITSIS,DIMITRIOS 4920 SW 28 TER FORT LAUDERDALEFL 33312
BHO18 LLC 3840 N 49 AVE HOLLYWOOD FL 33021
BOGAR,M & JANET 5021 SW 29 AVE FORT LAUDERDALEFL 33312 5813
BOHADANAH,ELI 3950 SW 6 ST FORT LAUDERDALEFL 33312 2632
BOKOBZA,ERIC D & ZOHAR 4821 SW 29 AVE FORT LAUDERDALEFL 33312
BORGIONE,ROMINA P 2732 SW 46 CT FORT LAUDERDALEFL 33312
BORRELLI,DAMARIS DAMARIS BORRELLI REV LIV TR 4631 SW 25 TER FORT LAUDERDALEFL 33312 5725
BOURBEAU,COLLEEN 2780 SW 46 CT FORT LAUDERDALEFL 33312 5638
BRADY,DWIGHT 11400 NW 4 CT PLANTATION FL 33325
BRADY,DWIGHT 1320 SW 88 WAY PEMBROKE PINESFL 33025
BROUWER,ANDREW 4951 SW 27 AVE APT B FORT LAUDERDALEFL 33312 6027
BROWARD COUNTY BOARD OF COUNTY COMMISSIONERS 115 S ANDREWS AVE RM 501-RP FORT LAUDERDALEFL 33301 1801
BROWARD LAND BUYERS LLC 232NW 14 WAY DANIA BEACH FL 33004
BROWN,GREGORY A & JEANNE 4634 SW 28 WAY FORT LAUDERDALEFL 33312 5613
BUBA INVESTMENTS LLC 3728 NW 88 TER HOLLYWOOD FL 33024
BUCASEY,ARON H/E BUCASEY,PERLA 4671 SW 26 TER FORT LAUDERDALEFL 33312
BUNJEVACKI,TIJANA PEREYRA,ANTHONY 2637 SW 50 ST FORT LAUDERDALEFL 33312
CAMARAZA,JOHANA ROSADO 4910 SW 29 AVE FORT LAUDERDALEFL 33312
CAMPUZANO,KATHY SWOOD,RONALD A 5037 SW 28 AVE FORT LAUDERDALEFL 33312 5853
CANGRO,K & NEILA A 4649 SW 28 WAY FORT LAUDERDALEFL 33312 5612
CARDENAS,FATIMA CELENE LISBEY,GILBERTO M 2797 SW 46 CT FORT LAUDERDALEFL 33312
CASHFLOW VENTURES LLC 4700 SW 74 TER DAVIE FL 33314
CASTELLANO,LISA H/E CASTELLANO,WALTER 4901 SW 29 AVE FORT LAUDERDALEFL 33312 5811
CATCHINGS,GLENN ANTHONY 4923 WHISPERING WAY FORT LAUDERDALEFL 33312
CATON,STEVEN 3790 RAMBLEWOOD CT MELBOURNE FL 32934
CEPEK FAMILY HOLDINGS INC 2381 GRIFFIN RD FORT LAUDERDALEFL 33312
CF & A HILL FAMILY LTD 261 SW 13 ST DANIA BEACH FL 33004
CHAMBERLAIN,NANCY 2724 SW 46 PL FORT LAUDERDALEFL 33312 5656
CHESTO,DANIEL & GRACE PO BOX 820461 PEMBROKE PINESFL 33082 0461
CHRISTINE M PROST LIV REV TR DANIELLE AGUIAR LIV REV TR ETAL PO BOX 290484 DAVIE FL 33329
CLAYTON,CHRISTINA E 4830 SW 27 AVE #B FORT LAUDERDALEFL 33312
COLBERT,R B & JANET 4605 SW 27 TER FORT LAUDERDALEFL 33312 5606
COLLINS,BILLY JR H/E GARCIA,EDGAR J 2756 SW 46 PL FORT LAUDERDALEFL 33312 5656
CONGDON,JANE M 5096 SW 28 TER FORT LAUDERDALEFL 33312 5808
CORCHADO,LUIS A 4730 SW 29 TER #B FORT LAUDERDALEFL 33312 5659
CORDELL,THOMAS H/E CORDELL,DAVID H/E & CORDELL,D 4601 SW 27 TER FORT LAUDERDALEFL 33312 5606
CORDERO,LUIS G H/E ZUNIGA,JAVIER E 5010 SW 29 AVE FORT LAUDERDALEFL 33312
CRAWFORD,HERBERT F & DONNA K 4960 SW 29 AVE FORT LAUDERDALEFL 33312 5812
CREO SOLUTIONS LLC 1400 SW 87 AVE PEMBROKE PINESFL 33025 3307
D & S MANAGEMENT LLC 2011 LEE ST HOLLYWOOD FL 33020
DALONZO,DIANA M 2708 SW 46 PL FORT LAUDERDALEFL 33312 5656
DANIA BEACH LAND TR REYES,CARLOS J TRSTEE 396 MALLARD RD WESTON FL 33327
DDCTD CURRENT & FUTURE OWNERS WHISPERING OAKS COMMUNITY ASSN I 4916 WHISPERING WAY FORT LAUDERDALEFL 33312
DDCTD CURRENT & FUTURE OWNERS WHISPERING OAKS COMMUNITY ASSN I 6555 POWERLINE RD STE 105 FORT LAUDERDALEFL 33309 2048
DEL RIO,RAFAEL 2749 SW 47 ST FORT LAUDERDALEFL 33312 5643
DEL VALLE QUINTANA,ADRIANA H/E PIRELA NARANJO,OSCAR DANIEL 2797 SW 47 ST FORT LAUDERDALEFL 33312
DENIS,DONALD 4624 SW 28 AVE FORT LAUDERDALEFL 33312 5608
DEZIEL,ALAIN ARMAND 5020 SW 29 AVE FORT LAUDERDALEFL 33312
DIAMOND,GARY W & MARY LOU 4914 SW 27 AVE FORT LAUDERDALEFL 33312 6028
DIANNE GREENFIELD TR GREENFIELD,DIANNE TRSTEE 5061 SW 27 AVE #1-2 FORT LAUDERDALEFL 33312
DIDIO,ANTHONY P H/E SHERWIN,MARIE ELAINA 4930 SW 26 AVE FORT LAUDERDALEFL 33312 6024
DND MANAGEMENT LLC 1915 SW 21 AVE STE B305 FORT LAUDERDALEFL 33312 3104
DRAGOSLAVIC,GORAN 1800 W BROWARD BLVD FORT LAUDERDALEFL 33312
DROUSKIN,IDAN 10398 SW 18 ST DAVIE FL 33324 7436
DRUSKIN PROPERTIES 1 LLC 2920 SW 46 CT FORT LAUDERDALEFL 33312
DULAR,LISA 5011 SW 29 AVE FORT LAUDERDALEFL 33312 5813
DWYER,RICHARD & DWYER,MARY JANE 4621 SW 42 TER FORT LAUDERDALEFL 33314 4715
EADES,DONNA L 4711 SW 25 TER FORT LAUDERDALEFL 33312 5908
ECHEONA,XOCHIL 691 LAKE BLVD WESTON FL 33326
EG SERVICES LLC 8737 ESTADA CIR COOPER CITY FL 33024
ERNESTO CAMARAZA ALFARO REV TR CAMARAZAALFARO,ERNESTO TRSTEE 13818 SW 152 ST #372 MIAMI FL 33177
ESPANOL,R A & ADORACION M 2631 SW 46 CT FORT LAUDERDALEFL 33312 5745
EVANS,BRENT H/E TOMASSI,PIETRO 5001 SW 27 AVE #1-2 FORT LAUDERDALEFL 33312
EVERRET,LEATHER TR STEE H/ELOVING TR ETAL 2772 SW 47 ST FORT LAUDERDALEFL 33312
FADLON,DAVID 2156 NE 62 ST FORT LAUDERDALEFL 33308
FADLON,OFER FADLON,RONIT 201 ANSIN BLVD UNIT A HALLANDALE BEACHFL 33009
FAY,DAVID 5018 SW 28 AVE #1-2 FORT LAUDERDALEFL 33312 5845
FERREIRA PEREIRA,CHRISTIAN 2765 SW 47 ST FORT LAUDERDALEFL 33312 5843
FIGUEREDO,FAUSTO 625 NE 14 AVE APT 4 FORT LAUDERDALEFL 33304 2853
FKH SFR PROPCO B-HLD LP%FIRST KEY HOMES LLC 600 GALLERIA PKWY STE 300 ATLANTA GA 30067
FLORIDA DEPT OF TRANSPORTATION OFFICE OF RIGHT OF WAY 3400 W COMMERCIAL BLVD FORT LAUDERDALEFL 33309 3421
FORGIE,KIRSTY KIRSTY FORGIE REV TR 5111 SW 27 TER FORT LAUDERDALEFL 33312 6117
FORK,MARY JEAN 4656 SW 28 WAY FORT LAUDERDALEFL 33312 5613
FOSTER,WANDA G 4931 SW 29 WAY FORT LAUDERDALEFL 33312 5823
FRANCOIS,REGINA SAINTIL,LESLEY 4657 SW 28 AVE FORT LAUDERDALEFL 33312
FRANK,SVETLANA 2741 SW 46 CT FORT LAUDERDALEFL 33312
GAL,ADI 6030 HOLLYWOOD BLVD #135 HOLLYWOOD FL 33024
GALLARDO,EUGENIO P 2724 SW 46 CT FORT LAUDERDALEFL 33312
GAMLIEL,AMIR & EDNA 2720 NE 183 ST PH20 AVENTURA FL 33160
GARCIA DIAZ,RUBEN 4830 SW 29 AVE FORT LAUDERDALEFL 33312
GEORGE & ELENA METZKES REV TRMETZKES,ELENA TRSTEES 6383 NW 40 AVE COCONUT CREEKFL 33073
GERNANT,YOLANDA M 2740 SW 46 CT FORT LAUDERDALEFL 33312 5638
GMAX FL LLC 5201 RAVENSWOOD RD #114 FORT LAUDERDALEFL 33312
GONZALEZ,ELSAFERRER,ANJALI 4665 SW 28 AVE FORT LAUDERDALEFL 33312
GONZALEZ,PELEGRIN & ANA 2741 SW 47 ST FORT LAUDERDALEFL 33312 5643
GRAMMER,THOMAS D 4701 SW 25 TER FORT LAUDERDALEFL 33312 5908
GRATE,MARGARET 4721 SW 25 TER FORT LAUDERDALEFL 33312
GRECCO,COOPER NICOLE 4919 WHISPERING WAY DAVIE FL 33312
GRECO,KASSANDRA 4961 SW 29 AVE FORT LAUDERDALEFL 33312
GREENBARG,AARON D AARON GREENBARG REV TR 4927 WHISPERING WAY FORT LAUDERDALEFL 33312
GREENWELL,WENDY ANNE 2725 SW 47 ST FORT LAUDERDALEFL 33312
GUERRERO,BIANCA GUERRERO,LUCRECIA 5071 SW 27 AVE FORT LAUDERDALEFL 33312
GUILLEN,BENEDICTO 4700 SW 25 TER FORT LAUDERDALEFL 33312
HAMMONDS,ROBERT LEE II 4616 SW 28 AVE FORT LAUDERDALEFL 33312
HANNOVER,KYLE 2709 SW 46 CT FORT LAUDERDALEFL 33312 5637
HARLEY,JENNIFER M 4980 SW 29 AVE FORT LAUDERDALEFL 33312 5812
HARPER,CHERRILYN B 5487 NW 95 AVE SUNRISE FL 33351 7731
HERGERT,CONNIA M CONNIA M HERGERT REV TR 4710 SW 25 TER FORT LAUDERDALEFL 33312 5909
HERNANDEZ,FRANK & PADILLA,SILVIA 4944 SW 26 TER FORT LAUDERDALEFL 33312 5938
HERNANDEZ,NICHOLAS HERNANDEZ,RACHEL 2789 SW 46 CT FORT LAUDERDALEFL 33312
HEWITT,ROBERT 2757 SW 46 CT FORT LAUDERDALEFL 33312 5637
HICKS,NANCY L 2709 SW 47 ST FORT LAUDERDALEFL 33312
HOANG,VICTOR QTSAN,MINH L 4930 SW 28 TER FORT LAUDERDALEFL 33312
HOFFMAN,MARTIN J 50 GREENS RD HOLLYWOOD FL 33021 8411
HOLLYWOOD PARK APARTMENTS NORTH LLC 407 POINCIANA DR HALLANDALE BEACHFL 33009
HOLUB,JOHN L & LORRAINE M 4999 SW 27 TER FORT LAUDERDALEFL 33312 5845
HOULE,MARCEL 2773 SW 46 CT FORT LAUDERDALEFL 33312 5637
HOUSTON,BONNIE RUTH 3720 SW 48 CT FORT LAUDERDALEFL 33312
HUSBAND,DAN 480 NW 48 ST FORT LAUDERDALEFL 33309
I B C R LLC 17555 COLLINS AVE #1606 SUNNY ISLES BEACHFL 33160
INGRAM,JOHN B & PAMELA A JOHN & PAMELA INGRAM REV TR 4751 SW 26 TER FORT LAUDERDALEFL 33312 5910
IONITA,ANA MARIA 4903 SW 28 TERR FORT LAUDERDALEFL 33312
ITYA36 LLC 21304 ROCK RIDGE DR BOCA RATON FL 33428
JEAN-MARY,FRITZ 390 NE 154 ST MIAMI FL 33162 5024
JOAN ALICE LEHMAN REV TR LEHMAN,JOAN ALICE TRSTEE 2880 NE 14 ST #913 POMPANO BEACHFL 33062 3659
JOHANSON,JARED 2781 SW 46 CT FORT LAUDERDALEFL 33312
JOHN & ROSINA SMITH REV TR SMITH,JOHN E & ROSINA TRSTEE 750 N OCEAN BLVD 1608 POMPANO BEACHFL 33062
JOHN,SARAMMA VMATHAI,JOHN V 19 WASHINGTON DR LINDENHURST NY 11757
JOHNSON,DARYL DYK,MEGAN VAN 4950 SW 29 WAY FORT LAUDERDALEFL 33312
JONES,CLIFTON & JERLONDA JONES FAM REV TR 4920 SW 29 AVE FORT LAUDERDALEFL 33312 5812
JOSEPHINE D BOVIE REV LIV TR BOVIE,JOSEPHINE D TRSTEE 2695 SW 121 TER DAVIE FL 33330
K & E 2700 LLC 2700 GRIFFIN RD DAVIE FL 33312
K & K GROUP 4885 LLC 8040 VARNA AVE LOS ANGELES CA 91402
KADOCH,AARON HERRERA LOBATON,PAMELA 4731 SW 25 AVE FORT LAUDERDALEFL 33312 5906
KAMER,CLAUDIA & PETER M H/E KAMER,PAUL 4626 SW 27 AVE DANIA BEACH FL 33332
KANJIRATHUMKAL,JIJI KANJIRATHUMKAL,JOHN 4911 SW 28 TER #1-2 FORT LAUDERDALEFL 33312
KARP,HENRY & DEBRA 5081 SW 27 AVE FORT LAUDERDALEFL 33312 6029
KATZ,DAVID 550 NE 172 ST NORTH MIAMI BEACHFL 33162
KEMETHER,DAVID 4480 SW 34 TER FORT LAUDERDALEFL 33312
KEY FAMILY REVOCABLE LIVING TRJEFFREY ALEXANDER TRSTEE 9260 NW 24 PL PEMBROKE PINESFL 33024
KGS FLORIDA LLC 3781 W STATE RD 84 #102 DAVIE FL 33312
KHACHATRYAN,JACOB HAYK 8040 VERNA AVE PANORAMA CITYCA 91402
KHARDAS,BORIS & BETTI 4930 SW 29 AVE FORT LAUDERDALEFL 33312
KOSS,DOREEN 5055 SW 28 AVE FORT LAUDERDALEFL 33312 5853
KRIVOSHAPKIN,OLEG KRIVOSHAPKINA,NADEZHDA 5080 SW 28 AVE FORT LAUDERDALEFL 33312
KYLIE INVESTMENT LLC 702 BREAKWATER TER SEBASTIAN FL 32958
LA ROC,DANA M 2641 SW 46 CT FORT LAUDERDALEFL 33312
LABONTE,ROGER L & JULIA 5070 SW 28 AVE FORT LAUDERDALEFL 33312 5854
LAINEZ,MIRIAM 4907 WHISPERING WAY FORT LAUDERDALEFL 33312
LAMBERT,CARLA L 5030 SW 29 AVE FORT LAUDERDALEFL 33312
LANDRY,THOMAS P 4711 SW 26 TER FORT LAUDERDALEFL 33312
LAWHORN-BENNETT,TAMMIE R 4650 SW 27 AVE FORT LAUDERDALEFL 33312
LAWRENCE,EVELYN 5105 SW 27 TER FORT LAUDERDALEFL 33312
LAWSON,JAMES 4991 SW 27 TER FORT LAUDERDALEFL 33312
LEE,JEFFREY LEE,KIRSTEN LESLIE 412 VENADO DR SANTA BARDARACA 93111
LESMOND,ALDERMAN ROWE N 5072 SW 28 TER FORT LAUDERDALEFL 33312
LILLIAN M BARRON REV TR BARRON,LILLIAN TRSTEE 8541 SW 30 ST DAVIE FL 33328 1807
LISBEY,HILBERTO A & ACELITA L 2772 SW 46 CT FORT LAUDERDALEFL 33312 5638
LLOYD,AARON J RIVARD,TAMMY RAE 4990 SW 29 WAY FORT LAUDERDALEFL 33312 5824
LONESKE,REBECCA 4901 SW 27 AVE FORT LAUDERDALEFL 33312
LOPEZ,MARC ANTHONY DELGADO ORTIZ,DIANAELIZ 4649 SW 28 AVE FORT LAUDERDALEFL 33312 5607
LOZANO,MICHAEL 4971 SW 28 TER #1-2 FORT LAUDERDALEFL 33312
LUCKLY LOTS LLC 1560 NE 205 TER MIAMI FL 33179
M F & VICTORIA A MARRALE REV TRMARRALE,MICHAEL & VICTORIA A TRS 6000 SW 55 ST DAVIE FL 33314
MALIKMO LLC 899 N SUMMIT ST CRESCENT CITY FL 32112
MANCINI,DAWN M 4900 SW 28 AVE FORT LAUDERDALEFL 33312 5852
MARGARET L MILLIGAN REV TR MILLIGAN,MARGARET L TRSTEE 4626 SW 28 WAY FORT LAUDERDALEFL 33312 5613
MARGOLES,GLENN T & JEAN KAHLE 939 TYLER ST HOLLYWOOD FL 33019 1301
MARQUEZ,ASHLEY YOUNG ROSEVEGA,EDGAR B 2855 W COMMERCIAL BLVD #116 FORT LAUDERDALEFL 33309 2974
MARQUEZ,LINA MARIA 4985 SW 27 TER FORT LAUDERDALEFL 33312
MARREN,PAUL J 4981 SW 27 AVE FORT LAUDERDALEFL 33312 6027
MARTINEZ,CARLOS L H/E MARTINEZ,ANIELKA M 5000 SW 29 WAY FORT LAUDERDALEFL 33312 5826
MARY P RICHARDS REV TR RICHARDS,MARY P TRSTEE 3066 BRISTLECONE RD AVON PARK FL 33825
MAYO 23 LLC 10400 NW 30 CT #308 SUNRISE FL 33322
MCEACHIN,ONEIDA H/E MCEACHIN,RYAN 4939 WHISPERING WAY FORT LAUDERDALEFL 33312
MCGOWAN,DENNIS R SAVER,SUSAN T 2725 SW 46 PL FORT LAUDERDALEFL 33312 5655
MCLEAN,DANA LYNNE & ZACHARY E 4710 SW 27 AVE FORT LAUDERDALEFL 33312
MCMAHON,LESLIE & MAJOVSKY,JURAJ 740 ELLIOTT PL COUPEVILLE WA 98239 4014
MEDVEDEVA,ELENA 1835 E HALLANDALE BEACH BLVD HALLANDALE BEACHFL 33009 4619
MEGNAUTH,DEOKUMAR H/E RONNAN,ASHLEY 4761 SW 26 TER FORT LAUDERDALEFL 33312
MEHARRY,ADRIANA 4641 SW 25 TER FORT LAUDERDALEFL 33312 5725
MEKAITTEN,ASSAF 1 FOXFIRE RD APT 1 HOLLYWOOD FL 33021 1729
MENASCHE,MORRIS 570 STONEMONT DR WESTON FL 33326
MESTRES,CIRO JR & MARY 604 RIVERSIDE DR #6B NEW YORK NY 10031
MIJARES,HUMBERTO LUIS FUSTES 2788 SW 47 ST FORT LAUDERDALEFL 33312
MIL PROPERTIES INC 2302 N 37 AVE HOLLYWOOD FL 33021 3603
MILLER,CHRISTIAN 2555 MARATHON LN FORT LAUDERDALEFL 33312
MIRACLE 55 LLC 3291.5 SW 44TH ST FORT LAUDERDALEFL 33312
MOLINO,WILLIAM J 4960 SW 29 WAY FORT LAUDERDALEFL 33312
MORA,CHRISTIAN 1495 SW 28 AVE FORT LAUDERDALEFL 33312 3944
MORA,IVAN SANTIAGO SUAREZ,AMANDA 4884 SW 26 AVE FORT LAUDERDALEFL 33312
MORDEHAY,DORIT 4640 SW 29 TER FORT LAUDERDALEFL 33312
MORDES,JERRY & SUSAN 4836 SW 26 TER FORT LAUDERDALEFL 33312
MORDY 613 INC 4750 SW 27 AVE FORT LAUDERDALEFL 33312
MULDOON,MICHAEL 4610 SW 26 TER FORT LAUDERDALEFL 33312
N & D HOLDING INC 5310 W STATE ROAD 84 FORT LAUDERDALEFL 33314 1240
NADLAN INVESTMENTS LLC 1201 N STATE RD 7 STE 100 LAUDERHILL FL 33313
NANAN,CLYDELONG ISLAND INVESTMENT GROUP LLC 260 NW 14 WAY DANIA BEACH FL 33004
NANCY J CHILDS TR CHILDS,NANCY J TRSTEE 520 FRONT ST MARION MA 02738
NAPO,JACQUELINE 2788 SW 46 CT FORT LAUDERDALEFL 33312 5638
NEASE,ABBY H/E EVANS,CHRISTOPHER 4921 SW 29 AVE FORT LAUDERDALEFL 33312
NELSON-BLAKE,SHERINE C 4670 SW 27 AVE FORT LAUDERDALEFL 33312
NELSON,BONICE S 2740 SW 47 ST FORT LAUDERDALEFL 33312
NEW BHNV DANIA 2 LLC 5430 SW 25 AVE FORT LAUDERDALEFL 33312
NIKOGHOSYAN,LUIZA 4625 SW 27 AVE FORT LAUDERDALEFL 33312
NJARAVELIL,JOHNY 5354 N STERLING RANCH CIR DAVIE FL 33314
NUNEZ,GEORGE 4935 SW 27 TER FORT LAUDERDALEFL 33312 5845
OBYMAKO,MICHAEL H/E YIN,DONGXIAN 2645 SW 49 CT FORT LAUDERDALEFL 33312
OE INVESTMENTS LLC 5373 SW 32 WAY FORT LAUDERDALEFL 33312
ORDONEZ,CARLOS H/E ORDONEZ,GERMAN 2733 SW 46 CT FORT LAUDERDALEFL 33312
OVIEDO,JENNIFER 2621 SW 49 CT FORT LAUDERDALEFL 33312
OWENS,DAVID R 5041 SW 28 TER FORT LAUDERDALEFL 33312 5807
OWINGS,MERI 5081 SW 28 AVE FORT LAUDERDALEFL 33312
PACIFICO,SARAH JANE 4820 SW 29 AVE FORT LAUDERDALEFL 33312 5810
PAOLETTI,VICTORIA 4640 SW 27 AVE FORT LAUDERDALEFL 33312
PARDO,MARIA L 2796 SW 47 ST FORT LAUDERDALEFL 33312
PAUL COHEN REV TR GOLDENBERG,SANDY TRSTEE 20201 E COUNTRY CLUB DR #2703 AVENTURA FL 33180
PERKINS,JANICE M 2779 GRIFFIN RD FORT LAUDERDALEFL 33312
PETRARCA,J C & KATHLEEN A 4661 SW 25 TER FORT LAUDERDALEFL 33312 5725
PETTERSEN,DOLYRES G 4660 SW 27 AVE FORT LAUDERDALEFL 33312
PIERRE'S ROOFING COMPANY 5101 SW 40 AVE DANIA BEACH FL 33314
PLACA,ROBERT JR 4913 SW 27 TER FORT LAUDERDALEFL 33312
POLANCO,LINDA S 5001 SW 29 AVE FORT LAUDERDALEFL 33312 5813
POWMESAMY,DANA LATCHMI H/E POWMESAMY,LEARIE 4911 SW 26 AVE #1-2 FORT LAUDERDALEFL 33312
POZADA,ELIZABETH G H/E POZADA,CARLOMAGNO TOMAS 4688 SW 29 TER #1-2 FORT LAUDERDALEFL 33312
PROLIFIC TECHNOLOGIES LLC 15800 NE 14 CT MAIMI FL 33179
PUERTA,GUILLERMO 2756 SW 47 ST FORT LAUDERDALEFL 33312
RAMIREZ,IRIS 3916 HAYES ST HOLLYWOOD FL 33021
RAMIREZ,LUPITA 2748 SW 46 PL FORT LAUDERDALEFL 33312
RAPPOLI,JAMES & SUSAN J 5019 SW 28 AVE FORT LAUDERDALEFL 33312 5853
RAYMOND LAWRENCE SHORE LIV TR MARIA ROSE SHORE LIV TR 10801 SW 29 PL DAVIE FL 33328
RENAUD,MARJORIE 2717 SW 47 ST FORT LAUDERDALEFL 33312
RICHARDSON,TERRIS 2650 SW 50 ST FORT LAUDERDALEFL 33312
RITCHIE,JOSEPH WILLIAM 2773 SW 47 ST FORT LAUDERDALEFL 33312
RITTER,PATRICK A & SUSAN J 4621 SW 26 TER FORT LAUDERDALEFL 33312 5764
RIVERA,JOSHUA APARICIO CORRAL,JESIKA D OLIVA 2611 SW 50 ST FORT LAUDERDALEFL 33312
ROBERGE,JOEL H/E ROBERGE,EDWARD 4930 SW 27 AVE FORT LAUDERDALEFL 33312
ROBERT E MYERS REV LIV TR MYERS,ROBERT E TRSTEE 3426 ROCKY GAP PLACE COCOA FL 32926
ROBINSON,ROBERTA J 4632 SW 28 AVE FORT LAUDERDALEFL 33312 5608
RODESKY,LARRY & GEORGINA 4891 SW 26 AVE FORT LAUDERDALEFL 33312 5901
RODRIGUEZ,JEFFREY 5050 SW 27 AVE FORT LAUDERDALEFL 33312
RODRIGUEZ,JORGE H/E RENTEL,MARIA E ETAL 4608 SW 28 AVE FORT LAUDERDALEFL 33312 5608
RODRIGUEZ,JUAN CARLOS & LIGIA 2789 SW 47 ST FORT LAUDERDALEFL 33312 5643
RODRIGUEZ,PETER J & ILA G 4954 SW 28 AVE FORT LAUDERDALEFL 33312 5852
ROGER M HARRISON REV TR HARRISON,ROGER M TRSTEE 4970 SW 28 TER FORT LAUDERDALEFL 33312
ROGERS,SUSAN A 5000 SW 29 AVE FORT LAUDERDALEFL 33312 5814
ROS,EDUARDO JR 4721 SW 25 AVE FORT LAUDERDALEFL 33312
ROSENBERGER,BRIAN CARLL H/E ROSENBERGER,LUZ IVETTE 4935 WHISPERING WAY FORT LAUDERDALEFL 33312 5756
ROSS,JOHN V 4911 WHISPERING WAY FORT LAUDERDALEFL 33312
RYLES,DEBBIE L 4921 SW 29 WAY FORT LAUDERDALEFL 33312
SAAVEDRA,MARILYS N & NICHOLAS 4625 SW 28 AVE FORT LAUDERDALEFL 33312
SALAS MONTES,ELBA KATHERINE CHAREM MOUDABBES,MOHAMED Y 4970 SW 29 WAY FORT LAUDERDALEFL 33312 5824
SALAS,JEANETTE ESCOBAR,CARLOS 4911 SW 29 WAY FORT LAUDERDALEFL 33312
SANABRIA,RIGOBERTO 4730 SW 27 AVE FORT LAUDERDALEFL 33312 5903
SANCHEZ,JULIO & MARGARITA 3713 MCKINLEY ST HOLLYWOOD FL 33021
SANDERS,JOHN JOHN SANDERS TR 2631 SW 51 ST FORT LAUDERDALEFL 33312
SARDINA,VIENGSOUK P 4926 SW 27 AVE FORT LAUDERDALEFL 33312
SAWYER,MICHAEL DANE 4911 SW 27 AVE FORT LAUDERDALEFL 33312
SCHEBOVITZ,NIKI 5241 SW 32 AVE FORT LAUDERDALEFL 33312
SCHERRER,LAWRENCE E & DEBORAH M 4980 SW 29 WAY FORT LAUDERDALEFL 33312 5824
SCHONWETTER,SAMUEL R & DAWN L 3189 CLEVELAND ST HOLLYWOOD FL 33021
SCHOTT,DAVID OWEN 2624 SW 49 CT FORT LAUDERDALEFL 33312 6033
SCOTT,ANDREW JOHN 2764 SW 46 CT FORT LAUDERDALEFL 33312 5638
SCULLY,JACQUELINE T 4930 SW 28 AVE FORT LAUDERDALEFL 33312 5852
SDC DEVELOPMENT & TRUST LLC 2900 GRIFFIN RD DAVIE FL 33312
SDS DEVELOPMENT & TRUST LLC 5256 SW 38 AVE FORT LAUDERDALEFL 33312
SHARABI,SHACHAR 2017 S OCEAN DR #606W HALLANDALE BEACHFL 33309
SHESHBESH 5 LLC 2974 GRIFFIN RD UNIT 6 FORT LAUDERDALEFL 33312
SHIGETANI,YUICHI 4999 SW 26 AVE FORT LAUDERDALEFL 33312 6077
SHNICER,EVGENIYA VALERYEVNA 4915 WHISPERING WAY FORT LAUDERDALEFL 33312
SHORT,MONA M 4640 SW 28 WAY FORT LAUDERDALEFL 33312 5613
SIMON,ORESTES MANUEL 200 SW 70 AVE PEMBROKE PINESFL 33023
SIMONE,DEBRA SIMONE,EMMANUEL 4831 SW 29 AVE FORT LAUDERDALEFL 33312
SNI PROPERTIES LLC 2165 VAN BUREN ST #1407 HOLLYWOOD FL 33020
SOT HOUSING LLC 5650 STIRLING RD #4 HOLLYWOOD FL 33021
SRP SUB LLC 1717 MAIN ST #2000 DALLAS TX 75201
STARVISH,RONALD 3881 SW 54 ST FORT LAUDERDALEFL 33312
STEWART,JENNIFER L 4891 SW 28 AVE FORT LAUDERDALEFL 33312
SWANN,SINDY 4930 SW 29 WAY FORT LAUDERDALEFL 33312 5824
TAGGART,THOMAS J 4940 SW 29 WAY FORT LAUDERDALEFL 33312 5824
TALAMO,DIEGO M 4681 SW 26 TER FORT LAUDERDALEFL 33312
TORNESSI,ANDREA FABIANA FERREIRA,ALVARO F 4610 SW 43 AVE DANIA BEACH FL 33314
TREBOL TRTALLIN LLC TRSTEE PO BOX 1720 DANIA BEACH FL 33004
TRIANA,MARIA DEL ROSARIO FERNANDEZ,AMAYA LAZARA MARTINEZ 2717 SW 46 CT FORT LAUDERDALEFL 33312
TRIBOLETTI,DANIEL P DANIEL P TRIBOLETTI REV TR 4891 SW 27 AVE FORT LAUDERDALEFL 33312 5932
TROPICAL ACRES STEAK HOUSE 2500 GRIFFIN ROAD FORT LAUDERDALEFL 33312 5999
TURTLE BAY RESERVE LLC 2724 SW 47 ST DANIA BEACH FL 33004
TWIN HARBORS PROPERTY MGT LLC 3020 SW 187TH TER MIRAMAR FL 33029 5848
UNITARIAN UNIVERSALIST CONGREGATION OF F LAUDERDALE INC 2810 GRIFFIN RD FORT LAUDERDALEFL 33312 5842
VALENCIA,HERNEY M H/E VALENCIA,MELISSA M 4951 SW 29 AVE FORT LAUDERDALEFL 33312 5811
VASQUEZ FAM REV TR VASQUEZ,WILMER & PATRICIA TRSTEE 404 BRIARWOOD CIR HOLLYWOOD FL 33024
VAYNER,SHLOMO 4955 SW 28 AVE FORT LAUDERDALEFL 33312
VAZQUEZ,OSWALDO & JULIA E 6420 ALLEN ST HOLLYWOOD FL 33024
VELEZ,CHRISTOPHER A 9009 GERALD DR # 2128 CHARLOTTE NC 28217 3080
VERA,JOHN A & RICARDA SUAREZ,JOANA 5040 SW 29 AVE FORT LAUDERDALEFL 33312 5814
VERRILLI,SALVATORE 2890 GRIFFIN RD STE 5 FORT LAUDERDALEFL 33312
VIE & FAMILY RENTALS LLC 6579 COBIA CIRCLE BOYNTON BEACHFL 33437
VILLA,MATTHEW P 4641 SW 28 WAY FORT LAUDERDALEFL 33312 5612
WARD,ROBERT G JR 4877 SW 28 TER FORT LAUDERDALEFL 33312 5803
WAREHAM,WILLIAM H/E WAREHAM,ROSANNA 4851 SW 29 AVE FORT LAUDERDALEFL 33312 5809
WEINSTEIN,RONALD MITCHELL 1330 WEST AVE #2911 MIAMI BEACH FL 33139
WELLS,STEVEN L H/E WELLS,ANAYANSI 2716 SW 46 PL FORT LAUDERDALEFL 33312 5656
WESTFALL,CHERYL 4900 SW 29 AVE FORT LAUDERDALEFL 33312 5812
WETTERER,JACQUELINE 4940 SW 29 AVE FORT LAUDERDALEFL 33312
WHISPERING OAKS COMMTY ASSN INC% PROPERTY KEEPERS MGMT LLC 6555 POWERLINE ROAD SUITE 105 FORT LAUDERDALEFL 33309
WHITE,COREY MAURICE JEANLOUIS,MISOUCA CRETCHELL 4900 SW 27 AVE #1-2 FORT LAUDERDALEFL 33312 6028
WICHER,KRZYSZTOF 4881 SW 27 AVE FORT LAUDERDALEFL 33312 5932
WILDRIDGE,ROSE ROSE WILDRIDGE REV TR 2740 SW 46 PL FORT LAUDERDALEFL 33312 5656
WILSON,CAROLYN F 4950 SW 29 AVE FORT LAUDERDALEFL 33312
WINTERS,PAUL D 4950 SW 28 AVE FORT LAUDERDALEFL 33312
YEAA LLC% HYB HOLDING LLC 151 N NOB HILL RD STE 455 PLANTATION FL 33324
YEDIDIM USA INC 872 EAST PLANTATION CIR PLANTATION FL 33324
YONKER,EMILY J 4897 SW 26 AVE FORT LAUDERDALEFL 33312 5901
YOUNG,DONNA J 4941 SW 29 AVE FORT LAUDERDALEFL 33312 5811
ZANA,ALBERTZANA,MOSHE 811 AVENUE W BROOKLYN NY 11233
City of Dania Beach
Community Development Memorandum
DATE: 7/8/2025
TO: Honorable Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Candido Sosa-Cruz, ICMA-CM, Deputy City Manager
Eleanor Norena, CFM, Director
Corinne Lajoie, AICP, Deputy Director
Claudia Viviana Batista, Planning and Zoning Manager
Jessica Mackey, E.I., Planner
SUBJECT: SP-91-06MOD2/VA-021-25: The applicant, Tesla Inc, is requesting a site plan
modification and a variance to convert sixty (60) parking spaces and replace them
with fifty-four (54) electric vehicle (EV) charging spaces for the property located at
2081 Griffin Road.
Request:
VARIANCE
PERIMETER LANDSCAPE BUFFER
To reduce the perimeter landscape buffer to 6’-8” allowing for mechanical and charging
equipment where the minimum required is ten feet (10’) per Land Development Code (LDC)
Section 275-120.
SITE PLAN MODIFICATION
The applicant is requesting a Site Plan modification to remove sixty (60) parking spaces and
replace them with fifty-four (54) electric vehicle charging spaces.
Background:
The subject property is one of three parcels that encompass an 8.1-net acre site plan located at
the northeast corner of Griffin Road and Ravenswood Road, to the west of the CSX Railway.
The addresses of the remaining two parcels are 2061 and 2071 Griffin Road. The properties lie in
the IROM zoning district and are located in the Hotel Overlay District. There are three
businesses on the site: Fairfield Inn & Suites hotel, Homewood Suites by Hilton hotel, and
Wendy’s restaurant. The location of the proposed electric vehicle charging spaces are within the
parcel with the Fairfield Inn & Suites hotel.
Based on aerial photographs, the site was previously used as storage for boats, vehicles and
trailers. The plat for the original site plan, Airport Commerce Center, was approved October 26,
2004 (PL-30-04) (Ordinance #2004-034). The site plan, Airport Commerce Center (SP-91-06),
was for the construction of two hotels and an office building. The site plan was originally
approved October 23, 2007 (R-2007-208) with conditions and with several waivers (WA-30-07)
and variance (VA-31-07) requests that were approved (R-2007-208) (R-2007-207) including:
• To provide 551 parking spaces, whereas the code required 590 parking spaces.
• To reduce the size of the internal and terminal landscape islands to allow 5’-10’ wide
terminal landscape islands, whereas the code required 10’ wide terminal landscape
islands
• For providing 24% pervious area, whereas the minimum was 30% pervious per Chapter
28, Article 29 “Pervious and Imperious Areas”.
• To provide an office building with a 20-foot front yard along Griffin Road, whereas
Chapter 28, Article 18, IROM Section 18.60 required a 62-foot setback.
• To provide an office building with a 10-foot interior side lot line, whereas Chapter 28,
Article 18, IROM Section 18.60 required a 31 ½-foot interior side yard.
• The waivers were granted with the condition that a 7-day/24-hour on-demand hotel
shuttle be provided, and that the entire project was subject to a parking easement
allowing customers to park anywhere on site.
The office building was never constructed, resulting in excess parking on-site today.
A site plan modification (SP-91-06MOD) was approved May 27, 2008 (R-2008-073) for the
purpose of substituting three new entities in the place of Griffin Road Partners LLC, as owners
of the property (i.e., Griffin Road One, LLC; Griffin Road Two, LLC, and Griffin Road Three,
LLC).
The Hotel Overlay District (HO-26-09) for the site was approved August 11, 2009 (O-2009-013)
to encourage coordination between separately developed and owned hotel-oriented projects in
areas servicing the tourism industry to better serve the community needs and providing for
approval of a shared district monument sign. During that time, a variance to allow two (2)
monument signs was approved August 11, 2009 (R-2009-144), whereas the Code allowed for
only one sign, per Chapter 28, “Zoning” Article 22.50.
The site plan was modified a second time to construct a Wendy’s fast-food restaurant at 2071
Griffin Road, in lieu of an office building. The site plan was approved on January 12, 2016 (R-
2016-005) with conditions. One of the conditions included that for the thirty (30) parking spaces
to be provided by the adjacent development, per Section 265-80, entitled Off-Site Parking
Facilities: “a written agreement shall be executed by the parties concerned, approved as to form
by the City Attorney and files with the application for a building permit along with proof of
proper recordation in Broward County Public Records”.
The site plan was accompanied by several special exception and variance requests:
• A special exception was approved to allow fast-food use, per Section 115-40 of the LDC
(SE-81-15) and to allow outdoor seating use in the Industrial-Research-Office-Marina
(IROM) zoning district, per Section 115-40 of the LDC.
• A variance was approved to allow a free-standing fast-food restaurant where the LDC
required fast food services to be part of a building at least fifty thousand (50,000) square
feet in size (VA-83-15)
• A variance was approved to provide a drive-thru, where the LDC did not allow it (LDC
Section 115-50, Condition #63) (VA-84-15).
Variance
PERIMETER LANDSCAPE BUFFER
Per Land Development Code (LDC) Section 275-120, the LDC requires a minimum ten-foot (10-
foot) landscape buffer around the perimeter of a property for all business, commercial and
industrial properties outside of the CRA form-based districts. The applicant is requesting an
additional variance for the site to reduce the required perimeter landscape buffer from ten feet
(10’) to six feet and eight inches (6’-8”) to allow for charging equipment for thirty (30) of the
fifty-four (54) EV charging spaces and an associated transformer. The property is already
developed with the required landscape buffer. The applicant has indicated to meet code
requirements of existing sidewalk widths, parking aisles and parking space dimensions, the
location of the chargers would have to encroach on the perimeter landscape buffer.
The applicant had the option of locating the transformer elsewhere such as an existing parking
space; however, the applicant decided on the perimeter landscape buffer location, which
triggered the variance. The overall site will have an oversupply of 58 parking spaces after the EV
charging spaces would be installed since the previously approved office building was never
constructed.
To support this request, staff requested that the existing hedges adjacent to the switchgear and
transformers be tall enough to screen the mechanical equipment. The existing landscape buffer at
eight (8) feet in height completely screens the equipment from street view.
Section 625 of the City’s Land Development Codes states, the City Commission or Planning and
Zoning Board, if applicable, shall hold its public hearing and, after consideration of the staff
recommendation and public input, if any, may deny, approve, or approve with conditions the
application for variance, based upon its determination that the request meets the criteria
identified in Section 625-40, which are identified below. For each criterion, the applicant’s
justification statement is provided, as well as Community Development staff’s findings in italics.
1. “That the requested variance maintains the basic intent and purpose of the subject
regulations, particularly as it affects the stability and appearance of the city.”
Applicant: The requested variance maintains the basic intent and purpose of the subject
regulations, particularly as it affects the stability and appearance of the city.
Community Development staff agree that the variance maintains the intent and purpose of the
subject regulations. Staff requested hedges that would be tall enough to completely screen the
mechanical equipment (transformer, switchgear) from view. The applicant indicated it is a
challenge procuring plants “in a timely fashion at that quantity and maturity level. Achieving
7’+ height requires years of growth, making large-scale sourcing extremely difficult (if not
nearly impossible) within typical timelines. The proposed cocoplum hedges would be maintained
in a manner to allow them to grow.” Staff consulted with the City’s contracted landscape
architect to determine a typical growth rate for cocoplums and subsequently requested for the
applicant to provide a minimum height of 48” cocoplums at the time of planting, which the
applicant is now proposing.
2. “That the requested variance is otherwise compatible with the surrounding land uses and
would not be detrimental to the community.”
Applicant: The requested variance is otherwise compatible with the surrounding land uses and
would not be detrimental to the community
Community Development staff find that the request is compatible with the sounding land uses in
this area. The zoning adjacent to the area is a mix of commercial and industrial uses.
3. “That the requested variance is consistent with, and in furtherance of, the goals,
objectives and policies of the adopted Comprehensive Plan, as amended from time to
time, and all other similar plans adopted by the city.”
Applicant: The requested variance is consistent with, and in furtherance of, the goals, objectives
and policies of the adopted Comprehensive Plan, as amended from time to time, and all other
similar plans adopted by the city.
Community Development staff confirm that the variance request is in keeping with the Goals,
Objectives, and Policies of the Dania Beach Comprehensive Plan as listed in the following
section.
4. “That the plight of the petitioner is due to unique circumstances of the property or
petitioner which would render conformity with the strict requirements of the subject
regulations unnecessarily burdensome.”
Applicant: The predicament for Tesla, Inc is due to unique circumstances of the property which
would render conformity with the strict requirements of the subject regulations unnecessarily
burdensome.
Community Development staff agree because the site is already developed, adherence to the
subject regulations is unnecessarily burdensome.
5. “That the variance requested is the minimum variance that is necessary to afford relief to
the petitioner, while preserving the character, health, safety and welfare of the
community.”
Applicant: The variance requested is the minimum variance that is necessary to afford relief to
the petitioner, while preserving the character, health, safety and welfare of the community.
Adequate vehicular parking was confirmed for the site and meet the LDC.
Community Development staff confirm that due to the LDC requirements for parking dimensions
[minimum parking dimensions are nine (9) feet in width and eighteen (18) feet in length per
Code Section 265-20A], parking aisles widths [minimum parking aisle width is twenty-four feet
(24’) wide per 265-110 C], and the landscape requirement for vehicular use areas abutting
buildings (Code Section 275-100 E1), the best location for the EV chargers is within the
perimeter landscape buffer and is the minimum variance necessary to afford relief to the
petitioner. The proposed location of the transformer within the permitter landscape buffer,
however, was chosen by the applicant, as nothing prohibits the location of the transformer to be
in a parking space.
Site Plan Modification
The applicant is requesting to modify the previously approved Site Plan Modification to replace
sixty (60) existing parking spaces with fifty-four (54) EV charging spaces. The EV chargers are
intended to be available to the public for payment.
EV charging spaces do not count toward parking requirements. The site has 567 existing parking
spaces, including accessible parking spaces. Since the previously approved office building was
never constructed, the required parking spaces for the existing uses on the site are 449 parking
spaces.
COMMUNITY OUTREACH
Community outreach was requested of the applicant by staff, however, they elected not to
conduct any additional community outreach or meetings. The applicant indicated that due to
political climate surrounding the company, Tesla has a strict public speaking policy, which
makes it difficult for them to accommodate the request. The applicant chose not to provide notice
to the 47 property owners within one thousand (1,000) feet of the property regarding the public
hearing for this item.
RESILIENCY
To effectively provide for the drainage of stormwater, LDC Section 215-130 for impervious area
standards states that the area of land covered by buildings, structures and impervious surfaces
shall not exceed eighty (80) percent for industrial zoning districts. The impervious area for the
entire site will be 76.9% (6.26 acres), including the addition of pervious areas for the chargers
and other mechanical equipment, which total to 1,324 SF (0.03 acres), thereby meeting the code
requirement.
The City’s Code of Ordinance requires a Storm Water Management Plan to be submitted and
approved prior to issuance of a building permit. A stormwater management plan is mandatory for
all projects that change the surface to be impervious or alter pervious areas, regardless of City
Commission approval. Post-development runoff must not exceed predevelopment runoff rates
for a 25-year storm event. The City's current drainage level of service is to retain the first inch of
rainfall on-site and maintain predevelopment runoff rates for a 25-year storm event. The city
enforces a "General Requirements" stormwater management plan, including an "interim design
standard" specifying groundwater and surface water levels before a design event.
Development Review Committee (DRC)
The site plan was reviewed by the DRC on April 25, 2024 and December 26, 2024; the
committee includes personnel from the BSO Fire, Public Services, the City’s landscape
consultant, the City’s engineering consultant, the City’s traffic engineering consultant and the
Community Development Department’s Planning Division. The applicant has several
outstanding staff comments that must be addressed prior to issuance of a building permit, or
otherwise specified time frame, which are provided below. The DRC comments are listed as
conditions of approval in the site plan resolution and are provided below:
1. The project shall monitor the operation of the parking spaces and charging stations to
ensure that vehicle queuing or overflow does not impact internal intersections, Griffin
Road, or Ravenswood Road/Anglers Avenue. If the actual operational impacts exceed
those identified in the Traffic Impact Study, the City may require the implementation of
mitigation measures to address project-related traffic concerns. (Traffic/Engineering).
2. During building permitting, the applicant shall demonstrate that the site meets the intent
of the city code section Ch 27-227 and provide a copy of the BC SWM License.
(Engineering)
3. In the event that the proposed construction causes adverse drainage effects to the
surrounding areas, it is the responsibility of the owner of the development to address the
concerns of the neighbors and provide a solution at the owner’s expense. (Engineering)
4. All ADA areas and routes shall be ADA compliant. (Engineering)
5. Additional comments may apply and will need to be addressed prior to Building Permit
approval. (Engineering);
6. All outside agency permits and approvals are due at the time of building permitting., and
'in accordance with Americans with Disability Act (ADA). (Engineering)
7. A Broward County Stormwater Management License modification may be necessary for
the proposed improvements and shall be provided at the time of building
permitting. (Engineering)
8. STORMWATER PLAN: Per the Dania Beach Code of Ordinances, Chapter 27, Section
27-227 “a stormwater management plan shall be submitted to the city for all projects that
add impervious area or modify pervious area whether or not city commission approval is
required.” Please provide a stormwater management plan for engineering review and
comment. New pervious calculations are required. (Planning and Zoning)
9. The existing 8’ tall hedges along Ravenswood Road in Perimeter Landscape Buffer be
maintained to meet Code Section 511-40 (C): Where hedges are utilized and adequate
space exists, a tiered effect is required. The existing eight-foot (8’) hedge must be
maintained to have a tiered effect.
10. Removal of the storage containers after the expiration of the temporary storage container
permit on August 1, 2025. (Planning and Zoning)
11. All proposed businesses shall apply for a Certificate of Use and Business Tax Receipt
before operating to the public. (Planning and Zoning)
12. The proposed minimum forty-eight-inch (48”) hedges that will screen the mechanical
equipment must be maintained in a manner to allow them to grow so that they completely
screen the mechanical equipment. (Planning and Zoning).
Comprehensive Plan
This application supports the City’s Comprehensive Plan by furthering the following goals,
objectives and policies:
Future Land Use Element
• Policy 1.1.1.2 Provide commercialized activities to serve the residents of the community.
• Objective 1.1.5 Maintain land development regulations, zoning ordinances and other
administrative rules to implement the comprehensive plan.
• Policy 1.1.5.1 Encourage development to enhance the tax base of the community.
• Policy 1.1.8.3 Safe and convenient on site traffic flow shall be provided in accordance
with the Comprehensive Plan and the land development regulations.
• Policy 1.1.8.4 Adequate vehicular parking shall be provided for new development in
accordance with the land development regulations.
Transportation Element
• Objective 3.1.5 The City shall assure, through planning, land use regulation,
intergovernmental coordination, or land acquisition, that transportation improvements are
located so as to not disrupt or adversely impact the City’s residential communities or
adjacent environmentally sensitive lands.
Budgetary Impact
A Certificate of Use and Business Tax Receipt are required. The new business associated with
this Site Plan Modification expands the City’s tax roll.
Recommendation
There appears to be no shortage of parking at the property based on existing uses. The requested
Variance meets the City's criteria, and the Site Plan Modification meets the City’s LDC. The
Community Development Department is recommending approval of the resolution for the
Variance and Site Plan Modification provided, providing that the remaining DRC comments are
made conditions of approval and must be addressed prior to the issuance of a building permit.
RESOLUTION NO. 2025 –______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, APPROVING THE SITE PLAN MODIFICATION (SP-91-
06MOD) AND VARIANCE (VA-021-25) APPLICATIONS TO MODIFY THE
LANDSCAPING REQUIREMENT AND APPROVE ELECTRIC VEHICLE CHARGING SPACES ON THE PROPERTY, SUBMITTED BY THE APPLICANT, TESLA INC., FOR PROPERTIES LOCATED AT 2061, 2071 AND 2081 GRIFFIN ROAD, IN THE CITY OF DANIA BEACH, FLORIDA;
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN
EFFECTIVE DATE. WHEREAS, the Legislature of the State of Florida has, in Chapter 166, Florida Statutes,
conferred upon local governments the authority to adopt regulations designed to promote the
public health, safety, and general welfare of its citizenry; and
WHEREAS, the City Code of Ordinances, Chapter 28, entitled “Land Development Code”
(“LDC”) of Part 6, entitled 'Development Review Procedures and Requirements’ of Article 635,
entitled “Site Plans” of Section 635-80, provides that site plan modifications or deviations are
required prior to commencement of construction; and
WHEREAS, the Applicant has requested a site plan modification and variance at the
properties legally described in Exhibit "A", a copy of which is made a part of and incorporated
into this Resolution by this reference; and
WHEREAS, Griffin Road One LLC., and Tesla Inc. (the “Applicants”), applied to the City
of Dania Beach (the “City”) for approval of a site plan modification (SP-091-06MOD) to convert
sixty (60) existing parking spaces to fifty-four (54) electric vehicle charging spaces as attached as
Exhibit “B”, and is incorporated into this resolution by this reference; and
WHEREAS, Chapter 28, Part 6 of the LDC, Article 625, entitled "Variances," Section 625-
40 states that the City Commission may grant a variance based on its determination that the
petitioner has demonstrated that the necessary criteria identified in the LDC have been satisfied;
and
WHEREAS, the Applicant has requested a Variance to reduce the required perimeter
landscape buffer from ten feet (10’) to six feet and eight inches (6’8”), as required by Section 275-
120 of the LDC, to allow for the installation of electric vehicle chargers and mechanical equipment
associated with the electric vehicle chargers (VA -021-25); and
2 RESOLUTION #2025-______
WHEREAS, the requested variance is consistent with, and in furtherance of, the goals,
objectives, and policies of the adopted Comprehensive Plan, as amended from time to time, and
all other similar plans adopted by the city; and
WHEREAS, the Applicant has provided sufficient justification demonstrating compliance
with the approval criteria to meet the requirements of the Code; and
WHEREAS, the City’s Staff Report analyzes the applicant’s request based on the criteria
and supports the Applicant’s request, and is incorporated by reference herein as the City’s findings
WHEREAS, the City Commission conducted a duly noticed public hearing in accordance
with Article 610 of the LDC; and
WHEREAS, the City Commission finds that approval of the Site Plan Modification (SP-
091-006MOD and Variance (VA-021-25) to permit the future development of the subject property
pursuant to and consistent with the attached site plan provided as Exhibit "B", a copy of which is
made a part of and incorporated into this resolution; and
WHEREAS, the City Commission finds that approval of the Site Plan Modification (SP-
091-006MOD and Variance (VA-021-25) are consistent with the City's Land Development Code
and Comprehensive Plan and will protect the health, safety, and welfare of the residents of the
City, and furthers the purpose, goals, objectives, and policies of the Comprehensive Plan.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the foregoing “WHEREAS” clauses are ratified and confirmed as
being true and correct and that they are made a part of incorporated into this resolution by
reference.
Section 2. That pursuant to Chapter 28 LDC, Part 6 “Development Review Procedures
and Requirements,” Article 635 “Site Plan,” the following Site Plan Modification (SP-091-
06MOD), attached as Exhibit “B”, a copy of which is made a part of and incorporated into this
Resolution by this reference, is approved.
Section 3. That pursuant to Chapter 28, "Land Development Code", Part 6
“Development Review Procedures and Requirements," Article 625 "Variances, the Variance
application (VA-021-25) is approved as consistent with the Site Plan provided in Exhibit "a".
Section 4. That the approvals granted by this Resolution are subject to the Applicant’s
compliance with the following conditions:
3 RESOLUTION #2025-______
1. The project shall monitor the operation of the parking spaces and charging stations to
ensure that vehicle queuing or overflow does not impact internal intersections, Griffin
Road, or Ravenswood Road/Anglers Avenue. If the actual operational impacts exceed
those identified in the Traffic Impact Study, the City may require the implementation of
mitigation measures to address project-related traffic concerns. (Traffic/ Engineering).
2. During building permitting, the applicant shall demonstrate that the site meets the intent
of the city code section Ch 27-227 and provide a copy of the BC SWM License.
(Engineering)
3. In the event that the proposed construction causes adverse drainage effects to the
surrounding areas, it is the responsibility of the owner of the development to address the
concerns of the neighbors and provide a solution at the owner’s expense. (Engineering)
4. All ADA areas and routes shall be ADA compliant. (Engineering)
5. Additional comments may apply and will need to be addressed prior to Building Permit
approval. (Engineering);
6. All outside agency permits and approvals are due at the time of building permitting., and
'in accordance with Americans with Disability Act (ADA). (Engineering)
7. A Broward County Stormwater Management License modification may be necessary for
the proposed improvements and shall be provided at the time of building permitting.
(Engineering)
8. STORMWATER PLAN: Per the Dania Beach Code of Ordinances, Chapter 27, Section
27-227, “a stormwater management plan shall be submitted to the City for all projects that
add impervious area or modify pervious area, whether or not City Commission approval
is required.” Please provide a stormwater management plan for engineering review and
comment. New pervious calculations are required. (Planning and Zoning)
9. The existing eight-foot (8’) tall hedges along Ravenswood Road in the Perimeter
Landscape Buffer be maintained to meet Code Section 511-40 (C): Where hedges are
utilized and adequate space exists, a tiered effect is required. The existing eight-foot (8’)
hedge must be maintained to have a tiered effect. (Planning and Zoning)
10. Removal of the storage containers after the expiration of the temporary storage container
permit. (Planning and Zoning)
11. The developer is required to participate in the City’s Public Art program, as delineated in
Article 811 of the Land Development Code, by payment into the City’s Public Art fund or
through payment and installation of public art. The amount of the Public Art Fund
contribution is dependent on the value of the construction, which will be established at the
time of building permit submittal (Planning and Zoning).
12. All proposed businesses shall apply for a Certificate of Use and Business Tax Receipt
before operating to the public. (Planning and Zoning)
13. The proposed forty-eight-inch (48”) hedges that will screen the mechanical equipment
must be maintained in a manner to allow them to grow so that they completely screen the
mechanical equipment. (Planning and Zoning).
4 RESOLUTION #2025-______
Section 5. That pursuant to LDC Section 635-100 “Expiration of Site Plans,” the Site
Plan Modification (SP-091-06MOD) approval shall automatically expire and become null and
void unless the Applicant commences with construction of the improvements shown on the Site
Plan, within eighteen (18) months from the date of this Resolution.
Section 6. That pursuant to Section 625-500 “Expiration of Variances,” of the Land
Development Code, the variance (VA-001-25) shall automatically expire and become null and void
unless the applicant files a complete building permit application with construction drawings for
the improvements shown on the site plan, within eighteen (18) months from the date of this
Resolution.
Section 7. That the issuance of a development order by a municipality does not in any
way create any right on the part of an Applicant to obtain a permit from a state or federal agency,
and does not create any liability on the part of the municipality on the part the municipality for
issuance of the development order if the Applicant fails to obtain requisite approvals or does not
fulfill the obligations imposed by a state or federal agency, or undertakes actions that result in a
violation of state or federal law.
Section 8. That the associated Planning & Zoning Division Staff Report prepared for
the above application(s) is incorporated into this resolution as findings of fact.
Section 9. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 10. That this resolution shall become effective 10 days after passage.
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
5 RESOLUTION #2025-______
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS CITY ATTORNEY
6 RESOLUTION #2025-______
EXHIBIT A
LEGAL DESCRIPTION
2061 GRIFFIN ROAD, DANIA BEACH:
AIRPORT COMMERCE CENTER 175-38 B PORTION PARCEL A DESC AS BEG AT NE
COR PAR A,SE 373.83 ALG E/L,SW 64.69,NW 188.33,SW 60,SE 141, NE 18,SE 47.46,SW
214.12,NW 173.91,SW 29.64,NW 194,NE 349.01 TO POB AKA:HOTEL TWO PARCEL
2071 GRIFFIN ROAD, DANIA BEACH:
AIRPORT COMMERCE CENTER 175-38 B PORTION PARCEL A,DESC AS COMM AT NE
COR PAR A,SE 373.83 TO POBCONT SE 199.17 ALG E/L,SW 42.05 SW 17.29,NW 51.42,SW
390.44,NW 107.27,SW 145.02,NW 71.33,NE 311.48,NW 50.10,NE 214.12,NW 47.46,SW
18,NW 141,NE 60,SE 188.33,NE 64.69 TO POB AKA:OFFICE PARCEL
2081 GRIFFIN ROAD, DANIA BEACH:
AIRPORT COMMERCE CENTER PLAT 175-38 B PORTION PARCEL A DESC AS COMM
ATNE COR PAR A,SW 349.01 ALG N/L, TO POB,SW 270.89,SE 262.19,SW 101.24,SE
51.18,NE 311.48,NW 224.01,SW 29.64,NW 194 TO POB AKA: HOTEL ONE PARCEL
7 RESOLUTION #2025-______
EXHIBIT B
(SP-091-06MOD)
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
T-1
TITLE SHEET
FORT LAUDERDALE, FL - GRIFFIN RD.
TRT ID: 34112
SITE ADDRESS:
2081 GRIFFIN RD.
FORT LAUDERDALE, FL 33004
SITE
CONTRACTOR SHALL VERIFY ALL PLANS AND EXISTING DIMENSIONS ANDCONDITIONS ON THE JOB SITE AND SHALL IMMEDIATELY NOTIFY THE TESLAREPRESENTATIVE IN WRITING OF DISCREPANCIES BEFORE PROCEEDING WITH THEWORK OR BE RESPONSIBLE FOR SAME.
PROPOSED TESLA EV SITE ADDRESS:2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
PROPERTY OWNER:GRIFFIN ROAD ONE LLC225 NE MIZNER BLVD #430BOCA RATON, FL 33432-4078
PARCEL ID:PARCEL ID: 504228170010
POWER COMPANY:FPLCONTACT: ALONZO RUSSELLPHONE: (954) 717-2096EMAIL: ALONZO.RUSSELL@FPL.COMWORK ORDER: #13660625
COUNTY:BROWARD COUNTY
LATITUDE*:26° 03' 50.9" N
LONGITUDE*:80° 10' 06.1" W*BASED ON GOOGLE EARTH
CONTACT ENGINEER:NATHAN R. KREUSER, P.E.DEWBERRY ENGINEERS INC.(321) 354-9755NKREUSER@DEWBERRY.COM
LANDSCAPE ARCHITECT:MICHAEL URCHUK, RLADEWBERRY ENGINEERS INC.
(321) 354-9744MURCHUK@DEWBERRY.COM
DEVELOPER:TESLA3500 DEER CREEK ROADPALO ALTO, CA 94304GABRIELA ARAQUE
(786)400-7836GARAQUE@TESLA.COM
N N
SITE INFORMATION APPLICABLE CODES
ZONING INFORMATION
DRAWING INDEX
CONTRACTOR NOTE
AERIAL MAP LOCATION MAP
CALL BEFORE YOU DIG
BEFORE SCALING
SITE
SHEET TITLESHT. NO.
TITLE SHEET
DETAILED SITE PLAN
T-1
C-1
EQUIPMENT/PARKING PLAN
C-2
C-3
EXISTING CONDITIONS PLAN
ELECTRICAL ONE-LINE DIAGRAM IE-1
SUNSHINE 811
811 OR (813) 223-0800
CONTRACTOR SHALL COMPLETE INSTALL PER THE SIGNEDAND SEALED SET OF DRAWINGS. ANY NECESSARYDEVIATIONS FROM THE DRAWINGS MUST BE SUBMITTEDTHROUGH AN RFI REQUEST PROCESS WITH ENGINEERINGFOR AN APPROVAL PRIOR TO CONTRACTOR PROCEEDINGWITH A DEVIATION OF THE SIGNED AND SEALED SET OFDRAWINGS.
x INSTALL (2) 480V PAD MOUNTED UTILITY TRANSFORMERSxINSTALL (1) 3000A SWITCHGEARxINSTALL (1) 4000A SWITCHGEARxINSTALL (1) LEVEL 2 CABINETxINSTALL (12) TESLA SUPERCHARGER CABINETSxINSTALL (48) TESLA STANDALONE LEVEL 3 CHARGEPOSTSxINSTALL (6) TESLA LEVEL 2 CHARGERSxINSTALL (4) WASTE MANAGEMENT BINS
PERMITTING JURISDICTION: CITY OF DANIA BEACHAPN: 504228170010
ELECTRICAL ONE-LINE DIAGRAM IIE-2
E-3
ALL WORK SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODESFLORIDA STATE UNIFORM BUILDING & ENERGY CODES, CONSISTENT WITH THE FOLLOWINGCODES:x 2023 FBC-BUILDING, 8TH EDITION - (IBC 2021 WITH AMENDMENTS).x 2023 FBC-ENERGY CONSERVATION, 8TH EDITION (IECC 2021 WITH AMENDMENTS).x 2020 NATIONAL ELECTRIC CODE (NEC).x 8TH EDITION OF THE FLORIDA FIRE PREVENTION CODE.IN THE EVENT OF CONFLICT, THE MOST RESTRICTIVE CODE SHALL PREVAIL.
PROJECT DESCRIPTION
WIND DESIGN DATA:x ULTIMATE WIND SPEED = 156 MPH (PER FBC 8th EDITION SECTION 1620.2)x OCCUPANCY CATEGORY: IxWIND IMPORTANCE FACTOR: I = 1.0xWIND EXPOSURE CATEGORY: CSEISMIC DESIGN DATA:x OCCUPANCY CATEGORY: IxSEISMIC IMPORTANCE FACTOR: I = 1.00xSITE CLASS: D (ASSUMED)x MAPPED SPECTRAL RESPONSE COEFFICIENTS:Ss = 0.05 S1 = 0.022xDESIGN SPECTRAL RESPONSE COEFFICIENTS: SDS = 0.045 SD1 = 0.031xSEISMIC DESIGN CATEGORY: AASSUMED SOIL PROPERTIES:x ALLOWABLE BEARING PRESSURE: 1,500 PSFxALLOWABLE LATERAL BEARING PRESSURE: 100 PSF/FT
STRUCTURAL DESIGN CRITERIA
GENERAL NOTES IGN-1
GENERAL NOTES IIGN-2
CONSTRUCTION DETAILS IC-4
CONSTRUCTION DETAILS IIC-5
CONSTRUCTION DETAILS IIIC-6
CONSTRUCTION DETAILS IVC-7
E-4
E-5
E-6
CONSTRUCTION DETAILS VC-8
ELECTRICAL & UTILITY DETAILS I
ELECTRICAL & UTILITY DETAILS II
G-1 GROUNDING SCHEMATIC & DETAILS
PANEL SCHEDULES
C-1A CONSTRUCTION STAGING PLAN
OVERALL SITE PLANSP-1
EXISTING LANDSCAPE PLANLS-1
PROPOSED LANDSCAPE PLANLS-2
LANDSCAPE DETAILSLS-3
ELECTRICAL & UTILITY DETAILS III
EASEMENT & UTILITY PLANC-3A
CONSTRUCTION DETAILS VIC-9
ZONING DATA PLANSP-2
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:47:57-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
GN-1
GENERAL NOTES I
GENERAL NOTES:SITE WORK NOTES:
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:47:58-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
GN-2
GENERAL NOTES II
REINFORCED CONCRETE NOTES:
ELECTRICAL NOTES:TRAFFIC MANAGEMENT NOTES:
HORIZONTAL DIRECT DRILLING NOTES:
’
“”
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:47:58-04'00'
E
E
WV
WV WV
WV
WV
WV WV
WV
WV
WM
WMWM
WM
WM
WMWM
IV
IV
IV
IV
IV
IVIV IVIV
IVIV
IV
IV
IV
IVIV
IV
IV
IV
IB
IV
COCO CO
CO
CO
CO
CO
IVIV
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
SP-1
EXISTING PARKING REQUIREMENTS
(PREVIOUS APPROVAL)
PROPOSED USE SPACES REQUIRED SPACES PROVIDED
WENDY'SRESTAURANT (1/50 S.F. OF CUSTOMER AREA) 1,562.41 / 50 = 32 43
23 ONSITE(INCLUDING 2 ADA)(1/200 S.F. OF REMAIN GROSS BLDG.AREA)1,863.14 / 200 = 10 (INCLUDING 2 ADA)
(1/200 S.F. OUTDOOR SEATING AREA)64.67 = 200 = 1
PARKING PROVIDED PER LEASE AGREEMENT FROM SITE SURPLUS PARKING
(30 SURPLUSAREA)
BICYCLE PARKING REQUIRED
10% OF PARKING SPACES 43 x 10% = 4.3 SPACES
TOTAL BICYCLE PARKING PROVIDED:5 SPACES
FAIRFIELD INN(157 ROOMS)(1) SP. PER EACH ROOM (1.5 SP x 157 RMS) = 157 RMS
190(INCLUDING 6 ADA)180(INCLUDING 6 ADA)(10) SPACES PER 1,000 S.F. OF FLOORAREA DEVOTED TO BALLROOMS, MEETINGROOMS, RESTAURANTS, LOUNGES, SHOPSAND OTHER ACCESSORY USES
(3,279 S.F./1,000 S.F.)x10 = 33 RMS
HOMEWOODSUITES(124 ROOMS)
(1) SP. PER EACH ROOM (1 SP x 124 RMS) = 124 RMS
216(INCLUDING 7 ADA)147(INCLUDING 8 ADA)(10) SPACES PER 1,000 S.F. OF FLOORAREA DEVOTED TO BALLROOMS, MEETINGROOMS, RESTAURANTS, LOUNGES, SHOPSAND OTHER ACCESSORY USES
(9,167 S.F./1,000 S.F.)x10 = 92 RMS
PARKING LOT TOTAL ADDITIONAL (SURPLUS) PARKING PROVIDED 187
TOTAL PARKING REQUIRED (INCLUDING ADA):449 SPACES
TOTAL ADA PARKING REQUIRED 15 SPACES
TOTAL EXISTING PARKING PROVIDED (INCLUDING ADA):567 SPACE
TOTAL EXISTING ADA PARKING PROVIDED 16 SPACES
TOTAL FINAL PARKING PROVIDED (INCLUDING ADA & EV) 561 SPACES (SEE PROPOSED EV STALL TABLE FOR BREAKDOWN)
TOTAL FINAL ADA PARKING PROVIDED (INCLUDING EV)19 SPACES
PROPOSED EV PARKING STALLS
EXISTING
STALLS TO BE UTILIZED 60 SPACES
PROPOSED
PROPOSED LEVEL 3 STALLS 46 SPACES
PROPOSED LEVEL 3 ADA STALLS 2 SPACES
PROPOSED LEVEL 2 STALLS 5 SPACES
PROPOSED LEVEL 2 ADA STALLS 1 SPACE
TOTAL PROPOSED EV STALLS 54 SPACES
NET STALL CHANGE -6
S4
2
°
5
1
'
1
7
"
W
42
.
0
5
'
S01°39'14"E 199.15'
ANGLERS AVENUE
(PUBLIC R.O.W. VARIES)C-2
1
C-3
1
BOOK 45442, PAGE 343APN: 5042 28 17 0030OWNER: GRIFFIN ROAD THREE LLC
BOOK 45442, PAGE 335APN: 5042 28 17 0010OWNER: GRIFFIN ROAD ONE, LLC
AP
N
:
5
0
4
2
2
8
0
5
0
0
1
0
OW
N
E
R
:
I
N
T
E
R
M
A
R
I
N
E
I
N
C
.
GR
I
F
F
I
N
R
O
A
D
(
S
T
A
T
E
H
I
G
H
W
A
Y
8
1
8
)
(P
U
B
L
I
C
R
.
O
.
W
.
V
A
R
I
E
S
)
N8
7
°
3
1
'
1
4
"
E
2
7
0
.
8
9
'
S01°21'03"E 194.00'N8
8
°
3
9
'
3
3
"
E
29
.
6
4
'
S01°32'33"E 224.01'
S8
8
°
3
9
'
3
1
"
W
18
.
0
0
'
N01°20'28"W 141.00'
N01°36'02"W 262.19'N01°36'02"W51.18'
N01°36'09"W 92.71'
L1
S8
7
°
2
1
'
1
9
"
W
8
6
.
7
1
'
S8
7
°
2
1
'
1
9
"
W
3
9
0
.
4
3
'
N7
9
°
0
8
'
5
6
"
W
51.
4
2
'
S8
7
°
2
1
'
2
2
"
W
17
.
2
9
'
N8
8
°
2
8
'
3
7
"
E
6
4
.
6
9
'
S01°19'45"E 188.33'
N8
8
°
3
9
'
3
1
"
E
6
0
.
0
0
'
N01°31'23"W 47.46'
N8
8
°
2
8
'
3
7
"
E
2
1
4
.
1
2
'
S8
8
°
2
5
'
0
6
"
W
3
1
1
.
4
8
'
N8
7
°
2
1
'
1
9
"
E
1
4
5
.
0
2
'
S01°36'04"E 107.27'
N01°36'02"W 71.33'
S01°36'04"E 119.27'
N05°14'32"E 101.24'
S01°32'38"E 173.91'
S01°32'15"E50.10'
∆=0
°
0
9
'
1
5
"
R=
1
1
3
9
8
.
4
1
'
L=
3
0
.
6
8
'
S8
7
°
2
1
'
1
9
"
W
39
0
.
4
3
'
S01°36'04"E12.00'
APN: 5042 28 01 0190OWNER: SDS DEVELOPMENTAND TRUST LLC
APN: 5042 28 17 0020OWNER: GRIFFIN ROAD TWO LLC
HOMEWOODSUITES
WENDY'SRESTAURANT
FAIRFIELD INN
NOTES:
1. SPACES REQUIRED REFERENCED FROM DANIA BEACH CODE OF ORDINANCES, SEC. 265-50. EXISTING PARKING DATA TAKEN FROM PREVIOUS
SITE PLAN COMPLETED BY CKE GROUP INC., DATED 12/17/15 & CITY OF DANIA BEACH COMMUNITY DEVELOPMENT STAFF REPORT, DATED01/16/16 (SE-123-15/SE-81-15/VA-84-15/SP-80-15). CURRENT PARKING LOT CONFIGURATION AND STALL TOTALS HAVE NOT BEENVERIFIED BY DEWBERRY ENGINEERS AND VALUES INCLUDED IN THIS TABLE ARE FOR REFERENCE ONLY.
Existing ADAStalls (Qty.-2)
Existing ADAStalls (Qty.-3)
Existing ADA
Stalls (Qty.-3)
Existing ADA
Stalls (Qty.-2)
Existing ADAStalls (Qty.-2)
Existing ADA
Stalls (Qty.-2)
Existing ADAStalls (Qty.-2)
OVERALL SITE PLAN
SCALE:1"=80' FOR 11"x17"1"=40' FOR 22"x34"
40'0'80'
1OVERALL SITE PLAN
NOTES:
1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: APORTION OF THE NE 1/4 OF SECTION 9, TOWNSHIP 29SOUTH, RANGE 20 EAST, TALLAHASSEE MERIDIAN, BROWARDCOUNTY, FL BY CLARK LAND SURVEYING, INC. DATED04/04/24.
2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIESSTANDARDS, CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION,FPL WORK ORDER #13660625.
3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHINAREA OF PROPOSED TRENCH & EQUIPMENT SITE AREA. HANDDIG AND RELOCATE AS REQUIRED.
4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILTBAG DURING CONSTRUCTION.
5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS.
6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OFIMPERVIOUS AREA THAT HAS BEEN DETERMINED TO HAVE NOADVERSE AFFECTS ON THE EXISTING STORMWATER SYSTEM.SEE COMPLETED MEMORANDUM BY DEWBERRY ENGINEERS INC.
DATED 06/05/25.
7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PERTESLA DIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CM
FOR STICKER PLACEMENT & HEIGHT.
8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION,AND THE CITY STANDARDS.
9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSEDFOR THIS PROJECT, STALL RESTRIPING ONLY.
APN: 5042 28 01 0192OWNER: BROWARD COUNTY
±8'-6"±12'-8"±6'-8"
SITE DATA
DESCRIPTION QUANTITY
TOTAL SITE AREA 8.14 AC
EXISTING SITE AREAS
IMPERVIOUS AREA 6.23 AC (76.5%)
PERVIOUS AREA 1.91 AC (23.5%)
PROPOSED SITE AREAS
PERVIOUS AREA PROPOSED FORREMOVAL (PER PROJECT PLANS)1,396 S.F. (0.03 AC)
IMPERVIOUS AREA 6.26 AC (76.9%)
PERVIOUS AREA 1.88 AC (23.1%)
CHANGE IN IMPERVIOUS AREA*+0.03 AC (+0.4%)
SITE DATA INCLUDING EXISTING PERVIOUS AND IMPERVIOUS AREASREFERENCED FROM PREVIOUS DRAINAGE CALCULATION REPORT BY ZAMORA &ASSOCIATES, INC. DATED 03/14/08.
* THE PROPOSED PROJECT RESULTS AN AN INCREASE OF IMPERVIOUS AREATHAT HAS BEEN DETERMINED TO HAVE NO ADVERSE AFFECTS ON THEEXISTING STORMWATER SYSTEM. SEE COMPLETED MEMORANDUM BY DEWBERRYENGINEERS INC. DATED 06/05/25.
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:00-04'00'
E
E
WV
WV WV
WV
WV
WV WV
WV
WV
WM
WMWM
WM
WM
WMWM
IV
IV
IVIV
IV
IVIV IVIV
IVIV
IVIV
IV
IVIV
IV
IV
IV
IB
IV
COCOCO
CO
CO
CO
CO
IVIV
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
SP-2
ZONING DATA PLAN
SCALE:1"=120' FOR 11"x17"1"=60' FOR 22"x34"
60'0'120'
1ZONING DATA PLAN
ANGLERS AVENUE
(PUBLIC R.O.W. VARIES)C-2
1
C-3
1
BOOK 45442, PAGE 343APN: 5042 28 17 0030OWNER: GRIFFIN ROAD THREE LLC
BOOK 45442, PAGE 335APN: 5042 28 17 0010OWNER: GRIFFIN ROAD ONE, LLC
AP
N
:
5
0
4
2
2
8
0
5
0
0
1
0
OW
N
E
R
:
I
N
T
E
R
M
A
R
I
N
E
I
N
C
.
GR
I
F
F
I
N
R
O
A
D
(
S
T
A
T
E
H
I
G
H
W
A
Y
81
8
)
(
P
U
B
L
I
C
R
.
O
.
W
.
V
A
R
I
E
S
)
APN: 5042 28 010190OWNER: SDSDEVELOPMENT ANDTRUST LLC
APN: 5042 28 17 0020OWNER: GRIFFIN ROAD TWO LLC
HOMEWOODSUITES
WENDY'SRESTAURANT
FAIRFIELDINN
CITY OF DANIA BEACH ZONING DATA
PARCEL NO.DESCRIPTION
5042-28-17-0010
ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINE, OVERLAY DISTRICT: HO - DISTRICT OVERLAYUSE CODE 39-02 HOTEL - LIMITED SERVICE WITHOUT FOODABBREVIATED LEGAL DESCRIPTION AIRPORT COMMERCE CENTER PLAT 175-38 B PORTION PARCEL A DESC AS COMM AT NE CORPAR A,SW 349.01 ALG N/L, TO POB,SW 270.89,SE 262.19,SW 101.24,SE 51.18,NE 311.48,NW 224.01,SW 29.64,NW 194 TO POBAKA: HOTEL ONE PARCEL.GROSS ACRES: 2.76BLDG. S.F.: 78,143
5042-28-17-0020
ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINE, OVERLAY DISTRICT: HO - DISTRICT OVERLAYUSE CODE 39-02 HOTEL - LIMITED SERVICE WITHOUT FOODABBREVIATED LEGAL DESCRIPTION AIRPORT COMMERCE CENTER 175-38 B PORTION PARCEL A DESC AS BEG AT NE COR PARA,SE 373.83 ALG E/L, SW 64.69,NW 188.33,SW 60,SE 141, NE 18,SE 47.46,SW 214.12,NW 173.91,SW 29.64,NW 194,NE 349.01TO POB AKA:HOTEL TWO PARCEL.GROSS ACRES: 2.62BLDG. S.F.: 99,520
5042-28-17-0030
ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINE, OVERLAY DISTRICT: HO - DISTRICT OVERLAYUSE CODE 22-01 RESTAURANTS - FAST FOOD, FRANCHISEABBREVIATED LEGAL DESCRIPTION AIRPORT COMMERCE CENTER 175-38 B PORTION PARCEL A,DESC AS COMM AT NE COR PARA,SE 373.83 TO POB CONT SE 199.17 ALG E/L,SW 42.05 SW 17.29,NW 51.42,SW 390.44,NW 107.27,SW 145.02,NW 71.33,NE311.48,NW 50.10,NE 214.12,NW 47.46,SW 18,NW 141,NE 60,SE 188.33,NE 64.69 TO POB AKA:OFFICE PARCEL.GROSS ACRES: 2.77BLDG. S.F.: 3,412
5042-28-01-0190
ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINE, OVERLAY DISTRICT: HO - DISTRICT OVERLAYUSE CODE 22-01 RESTAURANTS - FAST FOOD, FRANCHISEABBREVIATED LEGAL DESCRIPTION REED LAND CO SUB 2-32 D 28-50-42 TH PT OF LOT 12 BLK 3 DESC AS E 150 OF W185 OF N 150 OF S 185 OF SEC 28 LESS PARCEL 1 E OF CA #81-7143 FOR RD.GROSS ACRES: 0.39BLDG. S.F.: 1,751
5042-28-01-0192
ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINE, OVERLAY DISTRICT: HO - DISTRICT OVERLAYUSE CODE 94 RIGHT-OF-WAY, STREETS, ROADS, IRRIGATION CHANNEL, DITCH, ETCABBREVIATED LEGAL DESCRIPTION: PLAT OF SECTIONS 28,29,31 & 32 2-32 D 28-50-42 THAT PT OF LOT 12 BLK 3 DESC AS:COMM SW COR OF SW1/4 OF SEC 28, E 676.20,N 65.75 TO POB,W 184.39 NWLY 61.19,W 100,SWLY 37.95,W 109.61,N 119.24,W145,N 490 M/L, W 5,S 490 M/L,E 5,E 145,S 119.24 S 30.76,E 490,N 30.76 TO POB.GROSS ACRES: 0.06BLDG. S.F.: 0
5042-28-01-0200
ZONE: IROM-AA - INDSTRL-RSRCH-OFFICE-MRNE-AA, OVERLAY DISTRICT: HO - DISTRICT OVERLAYUSE CODE 20-12 MARINA-SLIPS / GROUND STORAGEABBREVIATED LEGAL DESCRIPTION: REED LAND CO SUB 2-32 B 28-50-42 PORTION OF TRACT 13 BLK 3 LYING W OF SALR/W LESS S 669 THEREOF TOG WITH W 30 OF S 669 OF TRACT 13 BLK 3 LESS S 35 & LESS PT DESC AS:COMM AT SW COROF SW1/4 OF SAID SEC 28, E 706.1, N 65.75 TO POB, W 30.01, S 30.76, E 30.01, N 30.76 TO POB.GROSS ACRES: 0.63BLDG. S.F.: 15,930
5042-28-05-0010
ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINEUSE CODE 22-11 MARINA - SLIPS / RACK STORAGEABBREVIATED LEGAL DESCRIPTION: RAVENSWOOD RIDGE AMEN 43-5 B THAT PART OF TR A TOGETHER WITH THAT PART OF LOT11 OF REED LAND CO SUB 2-32 D DESC AS BEG SW COR OF TR 11,N 302.54,ELY 260.19,NLY 19.38,NELY 108.61,NELY 103,SLY 71.98,ELY 204.19 TO PT ON E/L OF TR 11,SLY 285.91,WLY 671.87 TO POB,LESS W 35 FOR RD R/W & LESS W 5'THEREOF AKA:SOUTH PARCEL.GROSS ACRES: 4.45BLDG. S.F.: 13,282
5042-28-15-0010
ZONE: C-4 - GENERAL COMMERCIALUSE CODE 48-03 WAREHOUSE - MINI STORAGE (ENCLOSED)ABBREVIATED LEGAL DESCRIPTION: WLA QUINTA PLAT I 147-30 B PARCEL A.GROSS ACRES: 0.93BLDG. S.F.: 137,585
5042-29-06-0060
ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 27-04 GARAGE/AUTO BODY/AUTO PAINT SHOPABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 7 LESS COMM AT SE COR OF SE1/4,NLY 235.34,WLY 52TO POB,NLY 49.99 TO BEG OF CUR, NLY & WLY 39.28,ELY 17 TO BEG OF CUR,ELY & SLY 39.28,SLY 49.99 WLY 17 TO POBBLK 1.GROSS ACRES: 0.22BLDG. S.F.: 3,006
5042-29-06-0070
ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 27-04 GARAGE/AUTO BODY/AUTO PAINT SHOPABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 8 LESS RD AS DESC IN PARCEL #79-W,CA 82-9401BLK 1.GROSS ACRES: 0.23BLDG. S.F.: 1,231
5042-29-06-0080
ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 26-02 SERVICE STATION (WITH SMALL CONVENIENCE STORE)ABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 9 LESS RD AS DESC IN PARCEL NO 78-W OF C A82-10815 BLK 1.GROSS ACRES: 0.28BLDG. S.F.: 924
5042-29-06-0180
ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 48-01 WAREHOUSINGABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 7 BLK 2.GROSS ACRES: 0.24BLDG. S.F.: 2,857
5042-29-06-0190
ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 17-01 OFFICE BUILDING - NON PROFESSIONAL, 1 STORYABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 8 BLK 2.GROSS ACRES: 0.24BLDG. S.F.: 3,367
5042-29-06-0200
ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 48-01 WAREHOUSINGABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 9 BLK 2.GROSS ACRES: 0.24BLDG. S.F.: 2,400
5042-29-06-0210
ZONE: C-2 - COMMUNITY BUSINESSUSE CODE 12-01 MIXED STORE OR OFFICE AND RESIDENTIALABBREVIATED LEGAL DESCRIPTION: WEST DANIA HEIGHTS 23-49 B LOT 10 LESS COMM SE COR OF SE1/4 SEC 29-50-42,NLY435.47, WLY 46.45 TO POB,SWLY 46.56, SLY 3.91 TO P/C,SLY & WLY ARC DIST 39.26,NE 17 TO P/C,ELY & NLY ARC DIST39.26,NLY 50.13, SWLY 11.45 TO POB BLK 2.GROSS ACRES: 0.23BLDG. S.F.: 1,736
5042-29-33-0010
ZONE: IROM - INDUSTRIAL-RSRCH-OFFICE-MARINEUSE CODE 48-09 WAREHOUSE - FLEXABBREVIATED LEGAL DESCRIPTION: THE DON TRACT 113-44 B PARCEL A,B.GROSS ACRES: 9.03BLDG. S.F.: 142,079NOTES:
1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: APORTION OF THE NE 1/4 OF SECTION 9, TOWNSHIP 29SOUTH, RANGE 20 EAST, TALLAHASSEE MERIDIAN, BROWARDCOUNTY, FL BY CLARK LAND SURVEYING, INC. DATED04/04/24.
2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIESSTANDARDS, CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION,FPL WORK ORDER #13660625.
3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHINAREA OF PROPOSED TRENCH & EQUIPMENT SITE AREA. HANDDIG AND RELOCATE AS REQUIRED.
4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILTBAG DURING CONSTRUCTION.
5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS.
6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OFIMPERVIOUS AREA THAT HAS BEEN DETERMINED TO HAVE NOADVERSE AFFECTS ON THE EXISTING STORMWATER SYSTEM.SEE COMPLETED MEMORANDUM BY DEWBERRY ENGINEERS INC.DATED 06/05/25.
7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PER
TESLA DIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CMFOR STICKER PLACEMENT & HEIGHT.
8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION,AND THE CITY STANDARDS.
9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSEDFOR THIS PROJECT, STALL RESTRIPING ONLY.
APN: 5042 28 01 0192OWNER: BROWARD COUNTY
APN: 5042 29 33 0010OWNER: G&I IX 2200 SW LLC
APN: 5042 29 06 0180OWNER: BLUESTARMARINE HOLDINGS LLC
APN: 5042 29 06 0190OWNER: BLUESTARMARINE HOLDINGS LLC
APN: 5042 29 06 0200OWNER: POINTER FAM REVLIV TR, POINTER, DEAN A TRS
APN: 5042 29 06 0210OWNER: SAHRIFEH, NASER & JEAN
APN: 5042 29 06 0060OWNER: POINTER FAM REV LIVTR, POINTER, DEAN A TRS
APN: 5042 29 06 0070OWNER: C & L SUNSHINEENTERPRISES INC
APN: 5042 29 06 0080OWNER: GRIFFIN PROPERTYINVESTMENT LLC
APN: 5042 28 01 0200OWNER: 2051 GRIFFIN ROAD LLC
APN: 5042 28 15 0010OWNER: TKG-STORAGEMART PARTNERS PORTFOLIO LLC
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:01-04'00'
E
EM
IV
WV
WM
IB
CO
E
E
WV
WV WV
WV
WV
WV WV
WV
WV
WM
WMWM
WM
WM
WMWM
IV
IV
IV
IV
IV
IVIV IVIV
IVIV
IV
IV
IV
IVIV
IV
IV
IV
IB
IV
COCO CO
CO
CO
CO
CO
IVIV SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
C-1
SCALE:1"=60' FOR 11"x17"1"=30' FOR 22"x34"
30'0'60'
1DETAILED SITE PLAN
LEGEND
BOOK 45442, PAGE 343
APN: 5042 28 17 0030OWNER: GRIFFIN ROAD THREE LLC
BOOK 45442, PAGE 335
APN: 5042 28 17 0010OWNER: GRIFFIN ROAD ONE, LLC
AP
N
:
5
0
4
2
2
8
0
5
0
0
1
0
OW
N
E
R
:
I
N
T
E
R
M
A
R
I
N
E
I
N
C
.
N8
7
°
3
1
'
1
4
"
E
2
7
0
.
8
9
'
S01°21'03"E 194.00'N8
8
°
3
9
'
3
3
"
E
29
.
6
4
'
S01°32'33"E 224.01'
N01°36'02"W 262.19'N01°36'02"W51.18'
N01°36'09"W 92.71'
L1
S8
7
°
2
1
'
1
9
"
W
8
6
.
7
1
'
S8
7
°
2
1
'
1
9
"
W
3
9
0
.
4
3
'
S8
8
°
2
5
'
0
6
"
W
3
1
1
.
4
8
'
N8
7
°
2
1
'
1
9
"
E
1
4
5
.
0
2
'
S01°36'04"E 107.27'
N01°36'02"W 71.33'
S01°36'04"E 119.27'
N05°14'32"E 101.24'
S01°32'38"E 173.91'S01°32'15"E 50.10'
∆=0
°
0
9
'
1
5
"
R=
1
1
3
9
8
.
4
1
'
L=
3
0
.
6
8
'
S8
7
°
2
1
'
1
9
"
W
39
0
.
4
3
'
ExistingBuilding
ANGLERS AVENUE
(PUBLIC R.O.W. VARIES)
GR
I
F
F
I
N
R
O
A
D
(
S
T
A
T
E
H
I
G
H
W
A
Y
8
1
8
)
(P
U
B
L
I
C
R
.
O
.
W
.
V
A
R
I
E
S
)
Existing Underground
Electric Line (Typ.)
Existing StormInlet (Typ.)
Existing Wheelstop(Typ.)
Existing UtilityPole (Typ.)
Existing Shrub(Typ.)
Existing Tree(Typ.)
Existing Light
Post (Typ.)
Existing StormDrain (Typ.)
9
9
9
9
8
9
8
9
9
9
8
9
9
8
9
8
9
9 1010 10
10
10
10
9
9
10
10
11
10
9
9
10
10
8
8
9
9
9
8
9
98
10
9
9
9
9
8
10
10
10
10
10
1010
10
99
9
9 9
9
9
9
9
9
9
10
9
9
9
9
C-2
1
C-3
1
DETAILED SITE PLAN
30'-0" UTILITYEASEMENT
20'-0" BUILDINGSETBACK
30'-0" UTILITYEASEMENT
10'-0" ELECTRICEASEMENT
40'-0"
ACCESS
EASEMENT
10'-0" ELECTRICEASEMENT
EQUIPMENT SHIPPED BY TESLA
EQUIPMENT QTY
GRAY 4" STANDARD DEEP MOUNTCRASHCORE BOLLARD 5
GRAY MINI OFFSET EV FLEX REBOUNDINGBOLLARD 50
V3.5 CABINET (4 POST)12
ACCESSIBLE USE LAST SIGN 3
V4 POST 48
GEN 3 TESLA 24FT 6
CABINET FUSE 12
ARUBA ACCESS POINT 5
4" SUPERFLEX CONDUIT (FT)1,542'
4" SUPERFLEX STRAIGHT COUPLER 20
4" DURALINE CONDUIT (FT)9,201'
4" ADAPTER - DURALINE TO PVC 96
4" COUPLER - DURALINE TO DURALINE 25
Existing Fence Gate(TO REMAIN)
Existing Fence
(TO REMAIN)
Existing Concrete Wall &Lattice Fence (6'-2" High)(TO REMAIN)
NOTES:
1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A PORTION OFTHE NE 1/4 OF SECTION 9, TOWNSHIP 29 SOUTH, RANGE 20 EAST,TALLAHASSEE MERIDIAN, BROWARD COUNTY, FL BY CLARK LANDSURVEYING, INC. DATED 04/04/24.
2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIES STANDARDS,CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION, FPL WORK ORDER#13660625.
3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREAOF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG ANDRELOCATE AS REQUIRED.
4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILT BAGDURING CONSTRUCTION.
5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS.
6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OF IMPERVIOUSAREA THAT HAS BEEN DETERMINED TO HAVE NO ADVERSE AFFECTSON THE EXISTING STORMWATER SYSTEM. SEE COMPLETEDMEMORANDUM BY DEWBERRY ENGINEERS INC. DATED 06/05/25.
7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PER TESLADIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CM FORSTICKER PLACEMENT & HEIGHT.
8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION, AND THECITY STANDARDS.
9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSED FORTHIS PROJECT, STALL RESTRIPING ONLY.
10. RELOCATE SIX (6) EXISTING WHEELSTOPS TO THE SOUTHWESTSTALLS IN THE PARKING LOT .
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:02-04'00'
E
WV
IVIV IVIV
IVIV
IV
IV
CO
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
C-1A
CONSTRUCTION STAGING
PLAN
Existing Light
Post (Typ.)
Existing Sign(Typ.)Existing Water
Valve (Typ.)
Existing FireHydrant (Typ.)
Existing Utility
Pole (Typ.)
ExistingTrash Area
Existing StormInlet (Typ.)(SEE NOTE 4)
Existing Tree
(Typ.)
Existing Fence(Typ.)
Existing Hedge
Row (Typ.)
Existing Storm
Drain (Typ.)
Existing Unknown
Manhole (Typ.)
Existing ParkingStriping (Typ.)
CONSTRUCTION FENCING
LEGEND
CONSTRUCTION PARKING
CONSTRUCTION DEBRIS STAGING AREA
EQUIPMENT STAGING AREA
SCALE:1"=30' FOR 11"x17"1"=15' FOR 22"x34"
15'0'30'
1CONSTRUCTION STAGING PLAN
CONSTRUCTIONFENCING
EQUIPMENT STAGING AREA
CONSTRUCTION DEBRISSTAGING AREA
CONSTRUCTIONPARKING
CONSTRUCTIONPARKING
Existing Fence (Typ.)
ANGLERS AVENUE
(PUBLIC R.O.W. VARIES)
NOTES:
1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A PORTION OFTHE NE 1/4 OF SECTION 9, TOWNSHIP 29 SOUTH, RANGE 20 EAST,TALLAHASSEE MERIDIAN, BROWARD COUNTY, FL BY CLARK LANDSURVEYING, INC. DATED 04/04/24.
2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIES STANDARDS,CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION, FPL WORK ORDER#13660625.
3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREAOF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG ANDRELOCATE AS REQUIRED.
4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILT BAGDURING CONSTRUCTION.
5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS.
6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OF IMPERVIOUSAREA THAT HAS BEEN DETERMINED TO HAVE NO ADVERSE AFFECTSON THE EXISTING STORMWATER SYSTEM. SEE COMPLETEDMEMORANDUM BY DEWBERRY ENGINEERS INC. DATED 06/05/25.
7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PER TESLADIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CM FORSTICKER PLACEMENT & HEIGHT.
8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION, AND THECITY STANDARDS.
9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSED FORTHIS PROJECT, STALL RESTRIPING ONLY.
10. RELOCATE SIX (6) EXISTING WHEELSTOPS TO THE SOUTHWESTSTALLS IN THE PARKING LOT .
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:03-04'00'
E
WV
IVIV IVIV
IVIV
IV
IV
CO
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
C-2
EXISTING CONDITIONSPLAN
9'-0"±(TYP.)
17
'
-
8
"
(T
y
p
.
)
Existing Light
Post (Typ.)
N01°36'02"W 262.19'
N01°36'02"W51.18'
N05°14'32"E 101.24'
8
9
9
8
9
9 10
10 10
10
10
9
9
10
10
11
10
9
10
10
8
8
S8
8
°
2
5
'
0
6
"
W
3
1
1
.
4
8
'
Existing Palm
Tree (Typ.)(TO BE RELOCATEDAS NECESSARY)
Existing IrrigationValve (Typ.)(TO BE RELOCATED
AS NECESSARY)
Existing Sign(Typ.)
Existing WaterValve (Typ.)
Existing FireHydrant (Typ.)
Existing Utility
Pole (Typ.)
24
'
-
2
"
Existing Wheelstop (Typ.)(TO BE REMOVED)(TYP.-34) (SEE NOTE 10)
Existing ParkingStriping (Typ.)
(TO BE MODIFIED)
ExistingTrash AreaExisting Conc. Curb(TO BE REMOVED)(±90 L.F.)
Existing StormInlet (Typ.)
(SEE NOTE 4)
Existing Fence
(Typ.)
Existing Hedge
Row (Typ.)
Existing Storm
Drain (Typ.)
Existing Unknown
Manhole (Typ.)
Existing Conc. Curb(TO BE REMOVED)(±55 L.F.)
Existing ParkingStriping (Typ.)(TO BE MODIFIED)Existing ParkingStriping (Typ.)
(TO BE MODIFIED)
Existing Parking
Striping (Typ.)(TO BE MODIFIED)
SCALE:1"=30' FOR 11"x17"1"=15' FOR 22"x34"
15'0'30'
1EXISTING CONDITIONS PLAN
Existing LandscapeArea(TO BE REMOVED)(±195 S.F.)
Existing Asphalt Area(TO BE REMOVED)(±127 SF TOTAL)
Existing Asphalt Area
(TO BE REMOVED)(±158 SF)
24'-0"
ANGLERS AVENUE
(PUBLIC R.O.W. VARIES)
1.6%1.
8
%
LEGEND
EXISTING ASPHALTTO BE REMOVED
EXISTING LANDSCAPINGTO BE REMOVED
Existing Deciduous
Tree (Typ.)(TO BE RELOCATEDAS NECESSARY)
Existing Conc. Curb(TO BE REMOVED)(±63 L.F.)
Existing Conc. Curb(TO BE REMOVED)
(±90 L.F.)
Existing Conc. Curb
(TO BE REMOVED)(±90 L.F.)
Existing Conc. Curb
(TO BE REMOVED)(±35 L.F.)
Existing LandscapeArea
(TO BE REMOVED)(±108 S.F.)
Existing LandscapeArea(TO BE REMOVED)(±153 S.F.)
Existing LandscapeArea(TO BE REMOVED)(±192 S.F.)
Existing LandscapeArea
(TO BE REMOVED)(±80 S.F.)
21'-0"
9'-
0
"
8'-10"
8'-10"
8'-
1
0
"
40'-9"
4'-
0
"
37'-2"
3'-10"53'-9"
Existing Landscape Area(TO BE REMOVED)
(±78 S.F.)Existing Landscape Area
(TO BE REMOVED)(±189 S.F.)
Existing Asphalt Area(TO BE REMOVED)(±64 SF)
±55'-0"
±4'-3"±5'-0"
±64'-0"±91'-0"±91'-0"
Existing Landscape Area(TO BE REMOVED)(±78 S.F.)
Existing Landscape Area(TO BE REMOVED)(±179 S.F.)
Existing
HotelPool
ExistingHotel HotTub
Existing Concrete Wall &
Lattice Fence (6'-2" High)
(TO REMAIN)
5'-
1
0
"
17'-7"
±36'-0"
2'-
4
"
1'-
1
0
"
1'-
8
"
1'-
8
"
31"(TYP.)
11
'
-
0
"
(TY
P
.
)
3'-
9
"
(TY
P
.
)
1'-6"
15'-2"
8'-
1
0
"
7'-
8
"
26'-8"
1'-2"
±5'-0"
±5'-0"
NOTES:
1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A PORTION OFTHE NE 1/4 OF SECTION 9, TOWNSHIP 29 SOUTH, RANGE 20 EAST,TALLAHASSEE MERIDIAN, BROWARD COUNTY, FL BY CLARK LANDSURVEYING, INC. DATED 04/04/24.
2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIES STANDARDS,CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION, FPL WORK ORDER#13660625.
3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREAOF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG ANDRELOCATE AS REQUIRED.
4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILT BAGDURING CONSTRUCTION.
5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS.
6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OF IMPERVIOUSAREA THAT HAS BEEN DETERMINED TO HAVE NO ADVERSE AFFECTSON THE EXISTING STORMWATER SYSTEM. SEE COMPLETEDMEMORANDUM BY DEWBERRY ENGINEERS INC. DATED 06/05/25.
7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PER TESLADIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CM FORSTICKER PLACEMENT & HEIGHT.
8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION, AND THECITY STANDARDS.
9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSED FORTHIS PROJECT, STALL RESTRIPING ONLY.
10. RELOCATE SIX (6) EXISTING WHEELSTOPS TO THE SOUTHWESTSTALLS IN THE PARKING LOT .
0.5%
2.0
%2.0
%
1.4%9'-0"±(TYP.)
Existing LandscapeArea(TO BE REMOVED)(±72 S.F.)
Existing Trash Can &Concrete Foundation (Typ.-3)(TO BE REMOVED)
Existing Palm Tree(TO BE RELOCATED)(TYP.)LS-1
1
3'-0"Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:04-04'00'
E
WV
IVIV IVIV
IVIV
IV
IV
CO
IVIV
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
C-3
EQUIPMENT/PARKINGPLAN
SCALE:1"=30' FOR 11"x17"1"=15' FOR 22"x34"
15'0'30'
1EQUIPMENT/PARKING PLAN PARKING STALL SCHEDULE
DESCRIPTION QUANTITY
EXISTING STALLS (TO BE UTILIZED)60
PROPOSED TESLA LEVEL 3 STALLS 46
PROPOSED TESLA LEVEL 3 ADA STALLS 2
PROPOSED TESLA LEVEL 2 STALLS 5
PROPOSED TESLA LEVEL 2 ADA STALL 1
NET PARKING STALL CHANGE -6
3A4A3B3C3D
N01°36'02"W 262.19'
N01°36'02"W
51.18'
N05°14'32"E 101.24'
9
10
10
S8
8
°
2
5
'
0
6
"
W
31
1
.
4
8
'
PROPOSED UNDERGROUNDELECTRICAL CONDUCTOR ROUTEDTO PROPOSED CHARGE POSTS
1A1B1C1D4B4C4D5A
7A
5B5C5D
7B 7C 7D 8A 9B8B8C8D 9C 9D
6'-0"(TYP.-2)
11C
3'-
0
"
3
11D 12A 12C12B
TESLA LEVEL 2 CHARGE POST **#
LEGEND
TESLA LEVEL 3 CHARGE POST *
#
12'-0"
(TYP.)
4'-6"(TYP.)
#
6 5 4 2
7
#
8 9
10 11 12
9'-0"±(TYP.)
6'-6"12'-0"
1
2
#UTILITY TRANSFORMER #
16'-2"
9'-0"(TYP.)
18
'
-
0
"
(T
Y
P
.
)
24
'
-
0
"
18
'
-
0
"
(T
Y
P
.
)
1.6%
V4 CABLE TERMINUS
CONCRETE
ANGLERS AVENUE
(PUBLIC R.O.W. VARIES)
0.5%
1.6
%
2.
0
%
1.4%
±55'-0"
1.8
%
24'-0"
Existing StormInlet (Typ.)
(SEE NOTE 4)
Existing Light
Post (Typ.)
Existing StormDrain (Typ.)
Existing Fence(Typ.)Existing WaterValve (Typ.)
Existing Fire
Hydrant (Typ.)Existing UtilityPole (Typ.)
ExistingTrash Area
Existing UnknownManhole (Typ.)
Existing HedgeRow (Typ.)
PROPOSED CONCRETE
CURB (±63 LF)
PROPOSED 26" WIDECURB W/ INTEGRATEDTESLA LEVEL 3 CHARGEPOST
PROPOSED GREENPARKING STRIPING
(TYP.)
PROPOSED 4000A277/480V SWITCHGEARMOUNTED ON CONC. PAD #1PROPOSED WASTEMANAGEMENT BIN(TYP.-4)
PROPOSED 480V PAD MOUNTEDUTILITY TRANSFORMER (TYP.-2)
(SIZED BY UTILITY)
PROPOSED SUPERCHARGER CABINETMOUNTED ON 21'-0"x9'-0"CONCRETE PAD #2 (TYP.-6)
PROPOSED SIGN POST WITHACCESSIBLE SIGNAGE (TYP.)
PROPOSED RELOCATEDIRRIGATION VALVE (TYP.-2)
PROPOSED DISABLED ACCESSSTRIPING AISLE & STALL(TYP.) (SEE NOTE 5)
PROPOSED 18" WIDE CURB
W/INTEGRATED DUAL-STALLLEVEL 2 CHARGE PEDESTAL
(TYP.-2)
PROPOSED 7.3M CHARGECABLE FOR ADA POST
PROPOSED DISABLED ACCESSSTRIPING AISLE & STALL(TYP.) (SEE NOTE 5)
PROPOSED McCUECRASH COREBOLLARD (TYP.-5)
PROPOSED SIGN POST WITHACCESSIBLE SIGNAGE (TYP.-1)
ADA 30"x48" CLEARFLOOR SPACE (TYP.)
PROPOSED LANDSCAPESCREENING AROUND EQUIPMENT
(TYP.)
PROPOSED EPO BUTTON #2 WITHEMERGENCY "POWER-OFF" SIGNAGEMOUNTED TO PROPOSED POST
PROPOSED EPO BUTTON #1 WITHEMERGENCY "POWER-OFF" SIGNAGEMOUNTED TO PROPOSED POST
PROPOSED 3000A SWITCHGEAR
MOUNTED ON CONC. PAD #2
PROPOSED SINGLE-STALLLEVEL 2 CHARGEPEDESTAL (TYP.-2)
PROPOSED LANDSCAPE SCREENINGAROUND EQUIPMENT (TYP.)
C-5
4
C-7
1
C-4
2
C-6
4
C-7
7 E-4
2
C-6
1-3
E-4
3
E-5
1
C-7
4
C-7
2
C-7
8
C-5
4
C-7
1
LS-2
1
E-2
1
E-1
1
C-5
1-2
LS-2
1
1
12456
7'-6"7'-6"
20'-9"
18
'
-
0
"
(T
Y
P
.
)
18
'
-
0
"
(T
Y
P
.
)
±5'-0"
13'-2"
3'-0"
18
'
-
0
"
(TY
P
.
)
2A2B2C2D6A6B6C6D
10B 10C 10D 11A 11B
24
'
-
0
"
±5'-0"
4'-6"(TYP.)
3
C-5
1-2
PROPOSED 31" WIDE FOUNDATION FLUSH
WITH GRADE W/INTEGRATED TESLA LEVEL 3CHARGE POST (TYP.-5, 10 CHARGE POST)C-4
3
±4'-3"
ExistingHotelPool Existing HotelHot Tub
Existing Concrete Fence Wall
& Lattice Fence (6'-2" High)(TO REMAIN)
53'-10"37'-2"
4'-
5
"
(T
Y
P
.
)
C-3
2
9A 10A
12D
21'-0"7'-
8
"
9'-
0
"
RELOCATED 5.5" TALLWHEEL STOPS (TYP.-6)(SEE NOTE 10)30'-1"
PROPOSED SUPERCHARGER CABINET
MOUNTED ON 40'-9"x4'-0" (APPROX.)CONCRETE PAD #1 (TYP.-6)C-6
1-3
TESLA LEVEL 3 CHARGE POST *
TESLA LEVEL 2 CHARGE POST **
TESLA SUPERCHARGER CABINET
TESLA SWITCHGEAR
TRANSFORMER
REBOUNDING MINI BOLLARD
TRASH RECEPTACLE
McCUE CRASH CORE BOLLARD
SIGN POST WITH ACCESSIBLE SIGNAGE
PROPOSEDSIDEWALKEXPANSION(±72 S.F.)C-7
5
6'-0"
(TYP.-2)12'-0"(TYP.)
18
'
-
0
"
(
T
Y
P
.
)
2'-3"(TYP.)
4'-
5
"
6'-0"(TYP.)
SCALE:1"=10' FOR 11"x17"1"=5' FOR 22"x34"
5'0'10'
2ACCESIBLE STALL LAYOUTS
18
'
-
0
"
(T
Y
P
.
)
ADA 30"x48" CLEARFLOOR SPACE (TYP.)
PROPOSEDCONCRETE LANDING
6'-6"(TYP.)
SCALE:1"=10' FOR 11"x17"1"=5' FOR 22"x34"
5'0'10'
3REGULAR STALL LAYOUTS
TESLA 'STAR-POINT'
SUPERCHARGER CABINET #
TESLA 'STAR-CENTER'SUPERCHARGER CABINET #
EPO BUTTON WITHEMERGENCY "POWER-OFF"
10
'
-
0
"
(T
Y
P
.
)
PROPOSED GREENPARKING STRIPING(TYP.)
PROPOSED McCUEMINI REBOUNDINGBOLLARD (TYP.)C-7
3
10'-9"(TYP.)
PROPOSED 31" WIDEFOUNDATION FLUSH WITHGRADE W/INTEGRATED TESLALEVEL 3 CHARGE POST (TYP.)C-4
3
9C
9D
C-3
3
PROPOSEDLANDSCAPINGLS-2
1
PROPOSED DIRECTIONAL STICKER (SHOWN ASTYPICAL PER SET OF CHARGE POSTS)(TYP.-STALLS 9A THROUGH 11B) (SEE NOTE 7)
18
'
-
0
"
(TY
P
.
)
10'-2"(TYP.)
9'-0"(TYP.)
18
'
-
0
"
(TY
P
.
)
PROPOSED 18" WIDE CURBW/ INTEGRATED TESLALEVEL 2 CHARGE POST
PROPOSED DUAL-STALLLEVEL 2 CHARGEPEDESTAL
C-5
1
C-5
1-2
C-3
3
CHARGE FROM THIS SIDE / DO NOTCHARGE FROM THIS SIDE STICKER TOBE PLACED AT ALL POSTS
±5'-0"
±5'-0"38'-7"
10"
PROPOSED SIGN POSTWITH ACCESSIBLE
SIGNAGE (TYP.-2)C-5
4
C-7
1
C-8
1
* LEVEL 3 POST ADDS APPROXIMATELY 100 TO 200+MILES OF RANGE PER 30 MINUTES OF CHARGING.
** LEVEL 2 POST ADDS APPROXIMATELY 25 MILES OFRANGE PER HOUR OF CHARGING.
NOTES:
1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A PORTION OFTHE NE 1/4 OF SECTION 9, TOWNSHIP 29 SOUTH, RANGE 20 EAST,TALLAHASSEE MERIDIAN, BROWARD COUNTY, FL BY CLARK LANDSURVEYING, INC. DATED 04/04/24.
2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIES STANDARDS,CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION, FPL WORK ORDER#13660625.
3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREAOF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG ANDRELOCATE AS REQUIRED.
4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILT BAGDURING CONSTRUCTION.
5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS.
6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OF IMPERVIOUSAREA THAT HAS BEEN DETERMINED TO HAVE NO ADVERSE AFFECTSON THE EXISTING STORMWATER SYSTEM. SEE COMPLETEDMEMORANDUM BY DEWBERRY ENGINEERS INC. DATED 06/05/25.
7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PER TESLADIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CM FORSTICKER PLACEMENT & HEIGHT.
8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION, AND THECITY STANDARDS.
9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSED FORTHIS PROJECT, STALL RESTRIPING ONLY.
10. RELOCATE SIX (6) EXISTING WHEELSTOPS TO THE SOUTHWESTSTALLS IN THE PARKING LOT .
C-8
1
12'-0"(TYP.)
1.6%
1.8
%
ADA 30"x48" CLEAR
FLOOR SPACE (TYP.)
PROPOSED 18" WIDE CURBW/ INTEGRATED TESLALEVEL 2 CHARGE POST
PROPOSEDSINGLE-STALL LEVEL 2CHARGE PEDESTAL
C-5
1
C-5
1-2
PROPOSED DISABLED ACCESSSTRIPING AISLE & STALL(TYP.) (SEE NOTE 5)
PROPOSED SIGN POSTWITH ACCESSIBLESIGNAGE (TYP.)C-5
4
C-7
1
C-8
1
C-8
1
ELEV: ±7.73
ELEV:±7.75
ELEV:±7.92
ELEV: ±8.01
ELEV: ±8.32
ELEV: ±8.29
ELEV: ±8.12
ELEV:±8.10
ELEV:±8.08
ELEV:±7.79
2'-3"(TYP.)
ELEV: ±8.89
ELEV: ±8.76
ELEV: ±9.18
ELEV: ±8.57
ELEV: ±8.89
ELEV: ±9.07
0.5%
1.6
%
2.0%
1.6
%
0.3%
2.0
%1.7
%
1.5%
0.3%
2.0
%
6'-0"(TYP.)
±5'-0"
10
'
-
0
"
(T
Y
P
.
)
±8
'
-
6
"
±6
'
-
8
"
PROPOSED LEVEL 2 SWITCHGEARMOUNTED ON CONC. PAD #1 E-4
4
PROPOSED McCUEMINI REBOUNDING
BOLLARD (TYP.)C-7
3
5'-
6
"
PROPOSED 4" TALL
WHEEL STOPS (TYP.-10)C-5
5
2'-0"(TYP.)
±1
2
'
-
8
"
PROPOSED H-FRAME FOR TELCO BOX E-5
3
TELCO FRAME
10'-8"
PROPOSED UTILITY BOLLARDS(PER UTILITY SPEC)
PROPOSED SUPERCHARGERON CONCRETE FOUNDATION(TYP.-2)C-4
1
EXISTING RELOCATEDPALM TREELS-1
1
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:06-04'00'
E
WV
IVIV IVIV
IVIV
IV
IV
CO
IVIV
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
C-3A
EASEMENT &
UTILITY PLAN
SCALE:1"=30' FOR 11"x17"1"=15' FOR 22"x34"
15'0'30'
1EASEMENT & UTILITY PLAN
N01°36'02"W 262.19'
N01°36'02"W
51.18'
S8
8
°
2
5
'
0
6
"
W
3
1
1
.
4
8
'
LEGEND
ELECTRIC UTILITY EASEMENT
WATER UTILITY EASEMENT
10'-0"ELECTRICEASEMENT
ANGLERS AVENUE
(PUBLIC R.O.W. VARIES)
Existing Underground
Water Line (Typ.)
Existing OverheadElectric Line (Typ.)
Existing Underground
Storm Line (Typ.)Existing StormInlet (Typ.)
(SEE NOTE 4)
Existing DeciduousTree (Typ.)(TO REMAIN)
Existing Light
Post (Typ.)
Existing Storm
Drain (Typ.)
Existing Fence
(Typ.)Existing Water
Valve (Typ.)
Existing FireHydrant (Typ.)
Existing Utility
Pole (Typ.)
ExistingTrash Area
Existing Water Line. ApproximateLocation, Based On MapProvided By Broward County
Existing UndergroundElectric Line (Typ.)
Existing UnknownManhole (Typ.)
Existing HedgeRow (Typ.)
Existing Sewer Line. ApproximateLocation, Based On MapProvided By Broward County
Existing EasementBoundary (Typ.)
C-7
8
10'-0" APPROXIMATEELECTRIC EASEMENT
10'-0"ELECTRICEASEMENT
15'-0"ELECTRICEASEMENT
25
'
-
0
"
W
A
T
E
R
EA
S
E
M
E
N
T
40'-0" WATEREASEMENT 20
'
-
0
"
W
A
T
E
R
EA
S
E
M
E
N
T
20
'
-
0
"
W
A
T
E
R
EA
S
E
M
E
N
T
10'-0"ELECTRICEASEMENT
30
'
-
0
"
W
A
T
E
R
EA
S
E
M
E
N
T
15'-0"ELECTRICEASEMENT
25'-0"WATEREASEMENT
15'-0"ELECTRICEASEMENT
NOTES:
1. SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A PORTION OFTHE NE 1/4 OF SECTION 9, TOWNSHIP 29 SOUTH, RANGE 20 EAST,TALLAHASSEE MERIDIAN, BROWARD COUNTY, FL BY CLARK LANDSURVEYING, INC. DATED 04/04/24.
2. UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIES STANDARDS,CONFIRM FINAL DESIGN PRIOR TO CONSTRUCTION, FPL WORK ORDER#13660625.
3. IDENTIFY EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREAOF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND DIG ANDRELOCATE AS REQUIRED.
4. EXISTING STORM DRAIN INLETS TO BE COVERED WITH SILT BAGDURING CONSTRUCTION.
5. SLOPES SHOWN ARE BASED ON SURVEY PROVIDED ELEVATIONPOINTS AND LINEAR INTERPOLATION. CONTRACTOR TO CONFIRMADA/ACCESSIBLE STRIPING & ASSOCIATED STALLS HAVE <2%GRADE IN ALL DIRECTIONS.
6. THE PROPOSED PROJECT RESULTS AN AN INCREASE OF IMPERVIOUSAREA THAT HAS BEEN DETERMINED TO HAVE NO ADVERSE AFFECTSON THE EXISTING STORMWATER SYSTEM. SEE COMPLETEDMEMORANDUM BY DEWBERRY ENGINEERS INC. DATED 06/05/25.
7. CONTRACTOR TO PLACE 'CHARGE FROM THIS SIDE' & 'DO NOTCHARGE FROM THIS SIDE' STICKERS AT EACH POST PER TESLADIRECTION. CONTRACTOR TO COORDINATE W/ TESLA CM FORSTICKER PLACEMENT & HEIGHT.
8. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITHMUTCD, BROWARD COUNTY TRAFFIC ENGINEERING DIVISION, AND THECITY STANDARDS.
9. NO RESURFACING OR PAVEMENT RESTORATION IS PROPOSED FORTHIS PROJECT, STALL RESTRIPING ONLY.
10. RELOCATE SIX (6) EXISTING WHEELSTOPS TO THE SOUTHWESTSTALLS IN THE PARKING LOT .
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:07-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
C-4
CONSTRUCTIONDETAILS I
SCALE: N.T.S.1V4 SUPERCHARGER POST CAST-IN-PLACE FOUNDATION DETAIL
NOTES:
1. BACKFILL FOOTING WITH EXCAVATED SOIL COMPACTED TOSAME DENSITY AS UNDISTURBED SOIL.
2. CONTRACTOR TO PROVIDE A MINIMUM OF 6" OF COMPACTEDCRUSHED STONE FOR CAPILLARY BREAK AND CONSTRUCTIONCONTROL UNDER ALL CONCRETE SLABS.
3. CONTRACTOR SHALL IDENTIFY POOR DRAINING SOILS ANDPROVIDE ADDITIONAL COMPACTED, WELL GRADEDCOURSE-GRAINED SOIL BACKFILL TO FROST DEPTH WHEREREQUIRED. CONTRACTOR TO NOTIFY TESLA CM AND ENGINEER.
4. WIND RATING (WITHOUT SIGN & BOLLARD) = 156 MPH
SUPERCHARGER PEDESTAL INSTALLATION NOTE:
WHEN INSTALLED BEHIND CURB, THE TOP OF THEPEDESTAL SHOULD BE FLUSH WITH THE CURB.WHEN INSTALLED IN A PAVEMENT AREA OR BEHINDTHE EDGE OF PAVEMENT, THE TOP OF THEPEDESTAL SHOULD BE FLUSH WITH THE PAVEMENT.
PLAN
6"
1'-6"2'-2"
1'-1"5"
2'-2 3/4"
6'-
4
1
/
2
"
TOP OFCONCRETE
(2) #6 LONGITUDINALBARS TOP & BOTTOM
Existing Grade
(TO REMAIN)
1/4" WIDE X 1" DEEPSAWN OR TOOLED CONTROLJOINT @ 9' O.C.
3/4" CHAMFER
PROPOSED 26" CONCRETECURB W/INTEGRATEDCHARGE POSTS
PROPOSED V4 TESLA CHARGE
POST INTEGRATED W/26"CONCRETE CURB (TYP.)
EXPANSION JOINT(TYP.)
TESLASUPERCHARGERHANDLE
V4 TESLASUPERCHARGER POSTWEIGHT: 200 LBS
1/2"Ø HILTI KWIK BOLT TZ2 SSW/ 3-1/4" EFFECTIVE (3-3/4"NOMINAL) EMBEDMENT (ORAPPROVED EQUIVALENT) (TYP.-4)
TESLASUPERCHARGER POST
CAR SIDE
ExistingAsphaltLevel
#3 TIES @ 12"
(2) #6LONGITUDINALBARS TOP &BOTTOM
6"
1'-0"
OFFSET BOLLARD
OFFSETBOLLARD
3"(TYP.)
ExistingAsphaltLevel
(3) 1/2"Ø HILTI KWIK BOLT
TZ2 SS W/ 2-1/2" EFFECTIVE(3" NOMINAL) EMBEDMENT(OR APPROVED EQUIVALENT)& MIN 5" FROM EDGE OF PAD
5"(MIN.)60
°
BOLLARDANCHORS
3-3/4"
3-3
/
4
"
A
A
SCALE: N.T.S.2V4 SUPERCHARGER POST CAST-IN-PLACE CURB DETAIL
OFFSETBOLLARD
#3 TIES @ 12"
6"
SCALE: N.T.S.
3V4 SUPERCHARGER POST CAST-IN-PLACE STRIP FOUNDATION DETAIL
FRONT VIEW SIDE VIEW "A"
1'-
6
"
6"
6" MIN. COMPACTEDCLASS 2 AGGREGATEBASE
(4) #5 CONTINUOUSREBAR AT T&B
#3 @ 12" O.C.
6"
1'-
6
"
2'-7"A
A
EXPANSION JOINT
Existing ParkingLot Surface(TO REMAIN)
EXPANSION JOINT
Existing ParkingLot Surface
(TO REMAIN)
PREPARED SUBGRADE(95% STANDARD PROCTOR)
3"TYP.
(3) 1/2"Ø HILTI KWIK BOLTTZ2 SS W/ 2-1/2" EFFECTIVE(3" NOMINAL) EMBEDMENT(OR APPROVED EQUIVALENT)& MIN 5" FROM EDGE OF PAD
5"(MIN.)60
°
BOLLARD ANCHORS
3-3/4"
3-3
/
4
"
#3 TIES @12" O.C.
(4) #5 CONTINUOUSREBAR AT T&B
V4 TESLASUPERCHARGER POSTWEIGHT: 200 LBS
TOP VIEW
4'-9"
11'-0"
4'-9"
1'-3 1/2"
2'-
7
"
A
A
McCUE REBOUNDINGMINI BOLLARD W/ GRAYSLIP COVER
2'-2 3/4"
6'-
4
1
/
2
"
TESLASUPERCHARGERHANDLE
V4 TESLASUPERCHARGER POSTWEIGHT: 200 LBS
CAR SIDE
1/2"Ø HILTI KWIK BOLT TZ2
SS W/ 3-3/4" EFFECTIVE
(3-1/4" NOMINAL)EMBEDMENT (OR APPROVEDEQUIVALENT) (TYP.-4)
1'-6"
McCUE REBOUNDINGBOLLARD W/ GRAYSLIP COVER
9-1/2"OPTIONAL REAR
BOLLARD (AS NEEDED)
OPTIONAL REAR BOLLARD(AS NEEDED)6'-
4
1
/
2
"
(SEE NOTE 2, 3, 4)
SIDE ELEVATION
MAXIMUMOBSTRUCTION(SEE NOTE 2)
MAXIMUM GRIP HEIGHT(SEE NOTES 3 & 4)
34
"
SCALE: N.T.S.
GRAB HEIGHT DETAIL
NOTES:
1. DETAIL IS IN REFERENCE TO 2010 ADA STANDARDS OFACCESSIBLE DESIGN.
2. PER 2010 ADA STANDARDS OF ACCESSIBLE DESIGN SECTION308.3.1 & 308.3.2, MAXIMUM OBSTRUCTION TO BE NOLARGER THAN 24 INCHES IN WIDTH AND 34 INCHES INHEIGHT.
3. PER 2010 ADA STANDARDS OF ACCESSIBLE DESIGN SECTION308.3.1 & 308.3.2, THE HIGH SIDE REACH SHALL NOTEXCEED 48 INCHES MAXIMUM FOR A REACH DEPTH OF 10INCHES MAXIMUM.
4. PER 2010 ADA STANDARDS OF ACCESSIBLE DESIGN SECTION308.3.1 & 308.3.2, WHERE THE REACH DEPTH EXCEEDS 10INCHES, THE HIGH SIDE REACH SHALL NOT EXCEED 46INCHES MAXIMUM FOR A REACH DEPTH OF 24 INCHESMAXIMUM.
5. OPERABLE PART OF CABLE HANDLE COMPLIES WITH REACHRANGES PER 2010 ADA STANDARDS OF ACCESSIBLE DESIGNSECTION 309,.
6. PER 2010 ADA STANDARDS OF ACCESSIBLE DESIGN SECTION308.3.2, EXCEPTIONS 2, OPERABLE PARTS OF CABLE HANDLESHALL BE PERMITTED TO BE 54 INCHES MEASURED FROMTHE SURFACE OF THE VEHICULAR WAY WHERE CABLEHANDLES ARE INSTALLED ON EXISTING CURBS.FRONT ELEVATION
48
"
V4 TESLACHARGE POST
MAXIMUM GRIP HEIGHT(SEE NOTES 3 & 4)
4
EXPANSIONJOINT (TYP.)
NATIVE SOIL
PROPOSED OREXISTING PARKINGSURFACE
2'-
0
"
6"
(6) #3 TIES@ 9" O.C.
(4) #6 CONTINUOUSREBAR AT T&B@ 8" O.C.
1" CHAMFER(TYP.)
EXPANSION
JOINT (TYP.)
2'-10"
4'-8"
1'-10"
2'-
9
"
1'-0"
TOP VIEW
1'-8"
CENTER OF STALL
(4) #6 CONTINUOUSREBAR AT T&B@ 8" O.C.
(6) #3 @ 9" O.C.
6"
2'-
0
"
2'-9"
2"
3"
5"(MIN.)60
°
SIDE VIEWFRONT VIEW
FRONT
6" MIN. COMPACTEDCLASS 2AGGREGATE BASE
2'-2 3/4"
TESLASUPERCHARGERHANDLE
V4 TESLASUPERCHARGER POSTWEIGHT: 200 LBS
V4 TESLASUPERCHARGER POSTWEIGHT: 200 LBS
CAR SIDE
BOLLARDANCHORS
3-3/4"
3-3
/
4
"
(3) 1/2"Ø HILTI KWIK BOLT
TZ2 SS W/ 2-1/2" EFFECTIVE(3" NOMINAL) EMBEDMENT (ORAPPROVED EQUIVALENT) AND
MIN 5" FROM EDGE OF PAD
1/2"Ø HILTI KWIK BOLT TZ2
SS W/ 3-3/4" EFFECTIVE(3-1/4" NOMINAL)EMBEDMENT (OR APPROVED
EQUIVALENT) (TYP.-4)
OFFSETBOLLARD
OFFSETBOLLARD
6'-
4
1
/
2
"
6'-
4
1
/
2
"
6'-
4
1
/
2
"
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:08-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
C-5
CONSTRUCTIONDETAILS II
SCALE: N.T.S.
V4 ACCESSIBILITY LAYOUT DETAIL
FINISHGRADE
FINISHGRADE
NOTES:
1. 48" MAX HEIGHT OF SUPERCHARGER HANDLE AT ACCESSIBLECHARGE POSTS FROM SURFACE OF VEHICULAR WAY.
2. DETAIL IS SCHEMATIC IN NATURE. CONTRACTOR TO REFERENCEPLAN SHEETS FOR ALL CURB & CHARGER DIMENSIONS ANDLOCATIONS & REFERENCE CONSTRUCTION DETAILS FORMATERIAL SPECIFICATIONS.
3. CONTRACTOR TO FEATHER CURB/GUTTER TOWARD EXISTINGCURB/GUTTER & MATCH EXISTING GRADE. LENGTH OFTRANSITION WILL VARY BASED ON EXISTING CONDITIONS.MAXIMUM 8% GRADE CHANGE ALONG LENGTH OF CURB.TRANSITION GUTTER GRADE MAXIMUM 5% PER FOOT.
4. CONTRACTOR TO SAW CUT CURB/GUTTER AS NEEDED PER PLAN& DISPOSED OF DEBRIS PROPERLY.
ACCESSIBLE STALL(2% MAX. IN ALL
DIRECTIONS)
ACCESSIBLE AISLE(STRIPING TO MATCHEXISTING SITE)
V4 TESLA SUPERCHARGER POST(PLACE IN AGNOSTIC/CENTER STALL POSITION
& FOUNDATION TO BE FLUSH W/GRADE)
6'-0"
PER
P
L
A
N
PROPOSED CURB(TO MATCH EXISTING)
PROPOSEDCONCRETE LANDING
CONTRACTOR TOSAW CUT EXISTINGCURB/GUTTER
≤2%
A-A
ACCESIBLE STALL
(REGRADED TO 2% MAX.IN ALL DIRECTIONS)(AS NEEDED)
MATCH LANDING &ASPHALT GRADE
2%MAX.
PROPOSEDCONCRETE LANDING
PROPOSED CONCRETECURB/GUTTER
EXISTING GRADE
COMPACTED SUB-GRADEPER DESIGN
SECTION 'A-A'
C-5
6'-0"
12'-0
"
≤2%
3
C-7
4
C-7
5
NUMBER PLACEMENT FOR PEDESTAL INSTRUCTION QR PLACEMENTFOR WALL MOUNTS
SCALE: N.T.S.2LEVEL 2 NUMBER & QR DETAIL
12"
18
"
SCALE: N.T.S. ACCESSIBLE SIGNAGE DETAIL 4
PROPOSED McCUE MINIREBOUNDING BOLLARDC-7
3
PROPOSED SIGN POST WITH
ACCESSIBLE SIGNAGE (TYP.-2)C-5
4
C-7
1
SCALE: N.T.S.1LEVEL 2 GEN 3 CONNECTOR - CAST IN PLACE DETAIL
FRONT VIEW
0.53"Ø
(TYP.-4)
PROPOSED 1/2"Ø HILTIKWIK BOLT TZ2 SS316W/2-1/2" NOMINAL
EMBEDMENT (2'' EFFECTIVEEMBEDMENT) (TYP.-4)(CONFIRM W/TESLA CM)
1'-
6
"
PROPOSED 4000PSI CONCRETE PAD
3/4" CHAMFER
(TYP.)PROPOSED McCUE MINIREBOUNDING BOLLARD (TYP.)
10
"
7"
10
"
7"
6'-
3
3
/
4
'
'
CABLE BRACKET
6''2''
ELONGATEDPEDESTAL
5"
SIDE VIEW MOUNTING PLAN
PLAN VIEW
PROPOSED McCUE MINI
REBOUNDING BOLLARD (TYP.)
OPTIONAL DUAL CHARGER(SEE NOTE 1)
OPTIONALDUALCHARGER(SEE NOTE 1)
6"
18"
3"(TYP.)
#3 TIES @ 12"
(4) #5 LONGITUDINALBARS TOP & BOTTOM
Existing Grade(TO REMAIN)3/4"CHAMFER
EXPANSIONJOINT(TYP.)
ExistingAsphaltLevel
0'-6"
#3 TIES @ 12"
(2) #5 REBAR 10" O.C. EACHDIRECTION (EVENLY SPACED)
(TOP & BOTTOM)
TOP OFCONCRETE1/4" WIDE X 1" DEEPSAWN OR TOOLEDCONTROL JOINT @ 9' O.C.
ExistingAsphaltLevel
6"
#3 TIES @ 12"
NOTE:
1. SEE SHEET C-3 FOR LOCATION OF SINGLE AND DUAL POST LOCATIONS. SINGLE POSTLOCATIONS WILL HAVE THE CHARGER FACING THE STALL. DUAL POST LOCATION SHALLBE ROTATED 90° TO PROVIDED CHARGER ACCESS TO BOTH STALLS.
(3) 1/2"Ø HILTI KWIK BOLTTZ2 SS W/ 2-1/2" EFFECTIVE(3" NOMINAL) EMBEDMENT(OR APPROVED EQUIVALENT)& MIN 5" FROM EDGE OF PAD
5"
(MIN.)6
0
°
BOLLARD ANCHORS3-3/4"
3-3
/
4
"
72"
6"
MANUFACTURER U LINE
H-4608B/WMODEL No
6' RUBBERDESCRIPTION
72"x6"x4"DIMS (LxWxH)
34 LBSWEIGHT
NOTES:
1. INSTALL PER MANUFACTURERSSPECIFICATIONS & TESLASTANDARDS.
2. CONTRACTOR TO SUBSTITUTEPRODUCT AS NEEDED W/TESLA CM APPROVAL.
SCALE: N.T.S.
RUBBER CURB STOP DETAIL
4"
5
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:10-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
C-6
CONSTRUCTIONDETAILS III
SCALE: N.T.S.1TESLA SUPERCHARGER CABINET DETAIL
52.76"
33
.
8
6
"
60
"
49.38"
69
.
9
4
"
89
.
5
0
"
17.81"
49.21"54.72"9.43"
35.83"
88
.
3
2
"
37.80"41.98"
.75"Ø (TYP.-4)
(SEE NOTE 2)
NOTES:
1. SEE NOTE #31 ON SHEET GN-2 FORCABINET NOTES.
2. ANCHOR TO CIP CONCRETE WITH (4)
1/2"Ø HILTI KWIK BOLT TZ2 WITH 3-1/4"EFFECTIVE EMBEDMENT W/OVERSIZEWASHER.
3. ANCHOR TO PRECAST SLAB WITH (4)
5/8"Ø HEAVY HEX BOLT WITH 1-1/2"THREAD LENGTH, ASTM 320 GRADE B AND
LOCK WASHER (OR APPROVED EQUIVALENT)
TESLA SUPERCHARGERENCLOSURE DATA: IP67 - NEMA 4
WEIGHT: 2448 LBS.
MINIMUM CLEARANCE: OVERHEAD: 3'-0"SIDE: 0'-6"FRONT: 5'-0"REAR : 0'-6"
FRONT VIEW SIDE VIEW
TOP VIEW
SERVICE AREA
1'-10"
DC BUS- UP TO (10) 3"CONDUIT (AS NEEDED TOFEED 'STAR-CENTER'MASTER CABINET)DC POST- (4) 4" CONDUIT
AC-(2) 4"CONDUITS
CONDUITOPENING
(6) #5 BARSEQUALLY SPACED
(1) #5 BARS
#5 BARS ATEACH CORNER
(2) #5 BARS
(2) #5 BARS
(4) #5 BARSEQUALLY SPACED(1) #5 BARS
NOTES:
1. SEE CONCRETE NOTES ON SHEET GN-1.
2. DETAIL SHOWN AS TYPICAL FOR (1) V3.5 SUPERCHARGERCABINET. PAD TO BE INCREASED AS NEEDED FORADDITIONAL CABINETS OR ELECTRICAL EQUIPMENT.
3. CONTRACTOR TO PROVIDE A MIN OF 6" OF COMPACTEDCRUSHED STONE FOR CAPILLARY BREAK ANDCONSTRUCTION CONTROL UNDER ALL CONCRETE SLABS.CONTRACTOR SHALL IDENTIFY POOR DRAINING SOILS ANDPROVIDE ADDITIONAL COMPACTED, WELL GRADEDCOURSE-GRAINED SOIL BACKFILL TO FROST DEPTH.CONTRACTOR TO NOTIFY TESLA CM AND ENGINEER.
CAST IN PLACE PLAN
(OPTION#1)
SCALE:3/8"=1' FOR 11"x17"3/4"=1' FOR 22"x34"
0'1'2'3'
2V3.5 CABINET FOUNDATION PLAN
CONDUITOPENING
5'-3"
0'-9"
3'-
6
"
0'-4"
0'-5"
PROPOSED 8" THICK, 4000PSI CONCRETE PAD
3/4" CHAMFER(TYP.- ALL SIDES)
V3.5 METALGUIDE TEMPLATE
PROPOSED 6" CLEANCOMPACTED GRAVEL(SEE NOTE 3)
PROPOSEDGRADE
PREPARED SUBGRADE(95% STANDARD PROCTOR)
PROPOSED 8" CONCRETE PAD(OPTION #1:CAST IN PLACE)(OPTION #2:PRECAST)
0'-8"
COMMUNICATION
CABLE (CAT6)IN 1" CONDUIT
PROPOSED SUPERCHARGERCABINET ANCHOR. SEENOTES ON DETAIL 1/C-6FOR ANCHOR INFORMATION
CAST IN PLACE REBAR
PLAN (OPTION#1)
PRECAST PLAN
(OPTION#2)
5'-3 3/8"
3'-
8
1
/
2
"
2'-
8
1
1
/
1
6
"
9 5/8"
EASED EDGE
R 1/2" ALLOUTSIDE EDGES (4) 5/8"Øx6" LOOPINSERT
8"
PRECAST SECTION
(OPTION#2)
HEBA-T ANCHORFOR LIFTING
V3.5 CONCRETECABINET BASE(P/N 1648207-00-A)
V3.5 CONCRETECABINET BASE(P/N 1648207-00-A)
V3.5 SUPERCHARGERCABINET (2448 LBS.)
3/4" CHAMFER(TYP.- ALL SIDES)
2'-
6
"
1'-9"
1"-2"
CAST IN PLACE
(OPTION#1) & PRECAST
(OPTION#2)
POST COMMUNICATION - (4)1.25" OD DURALINE CABLE
2" CLR
GRADE
SCALE: N.T.S.
3CONCRETE PAD DETAIL
#5 BARS @ 12"O.C. EACH WAY
PROPOSED 8" THICKCONCRETE PAD
SEE TABLE FOR PAD SIZE
3/4" CHAMFER
(TYP.- ALL SIDES)
PROPOSED COMPACTEDCLEAN GRAVEL PREPARED SUBGRADE(95% STANDARD PROCTOR)
4"
M
I
N
8"
6"
NOTES:
1. IF FREE OF ORGANIC OR OTHERDELETERIOUS MATERIAL, EXCAVATEDMATERIAL MAY BE USED FORBACKFILL.
2. IF NOT, PROVIDE CLEAN,COMPACTIBLE MATERIAL. COMPACT IN8" LIFTS. REMOVE ANY LARGE ROCKSPRIOR TO BACKFILLING. CONTRACTORTO VERIFY LOCATION OF EXISTING
U/G UTILITIES PRIOR TO DIGGING.
3. CONCRETE ENCASE CONDUIT WHENTRENCHING UNDER SITE ACCESSROAD.
4. ANY PAVEMENT DAMAGE DURINGCONSTRUCTION SHALL BE REPAIREDOR REPLACED BY THE CONTRACTORTO PRE CONSTRUCTION CONDITIONSOR BETTER.
5. MAINTAIN 12" SEPARATION MIN.BETWEEN AC OR DC CONDUCTORSAND COMMUNICATION CABLES.
6. MAINTAIN 2" SEPARATION MINIMUMBETWEEN OUTER WALLS OFCONDUITS.
7. CONFIRM ALL DEPTHS W/UTILITY &NEC PRIOR TO CONSTRUCTION.
CONCRETE PAD DIMENSIONS
PAD TYPE CONCRETE L W t (THICKNESS)AREAEQUIPMENT PAD #1*4000 PSI 40'-9" 4'-0" 8"179.0 S.F.**
* REFER TO DETAIL 2/C-6 FOR SUPERCHARGER CABINET CONCRETE PAD REINFORCEMENT.
** REFER TO LAYOUT ON C-3 FOR TOTAL DIMENSIONS AS SWITCHGEAR SECTIONS WILL REQUIREA LARGER PAD AREA.
NOTES:
1. SEE CONCRETE NOTES ON SHEET GN-2.
2. SWITCHGEAR ANCHORS SHALL BE: 1/2"Ø HILTI KWIK BOLT TZ2 SS W/ 2-1/2" EFFECTIVE
(3" NOMINAL) EMBEDMENT (OR APPROVED EQUIVALENT) (TYP.-4)
EQUIPMENT PAD #2*4000 PSI 21'-0" 9'-0" 8" 189.0 S.F.
1/4" WIDE X 1" DEEP SAWN ORTOOLED CONTROL JOINT @ 24' MAX
MINIMUM CENTER TO CENTERCONDUIT SPACING
SWITCHGEAR TO CABINETS 7.5" O.C.
DC (BUSS) 7.5" O.C.
SCALE: N.T.S.
TYP. BURIED CONDUIT TRENCH DETAILS
6 ML YELLOW WARNING TAPE
NATIVE SOD
18
"
6"
UNDISTURBED
SOIL (TYP.)
CLEAN GRANULAR BACKFILL, 6"LIFT MAXIMUM, PLATE TAMP
(1/2") 95% COMPACTION MIN.(SEE NOTE 8)
NATIVE BACKFILL
PE
R
U
T
I
L
I
T
Y
&
N
E
C
CONCRETE SIDEWALK (MATCH
EXISTING WHERE NEEDED)
STONE BED (MATCH EXISTING)
ExistingGrade
12"
12"2" MAX
MILL AND REPLACE WITH BITUMINOUSPAVEMENT SURFACE COURSE, (2") I-5
REPLACE EXISTING BASE WITH BITUMINOUSPAVEMENT BASE COURSE, (4") I-2
6" DENSE GRADEDAGGREGATE BASE COURSE
NOTES:
1. IF FREE OF ORGANIC OR OTHER DELETERIOUS MATERIAL, EXCAVATED MATERIAL MAY BE USED FOR BACKFILL.
2. IF NOT, PROVIDE CLEAN, COMPACTIBLE MATERIAL. COMPACT IN 8" LIFTS. REMOVE ANY LARGE ROCKS PRIORTO BACKFILLING. CONTRACTOR TO VERIFY LOCATION OF EXISTING U/G UTILITIES PRIOR TO DIGGING.
3. CONCRETE ENCASE CONDUIT WHEN TRENCHING UNDER SITE ACCESS ROAD.
4. ANY PAVEMENT DAMAGE DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED BY THE CONTRACTORTO PRE CONSTRUCTION CONDITIONS OR BETTER.
5. MAINTAIN 12" SEPARATION MIN. BETWEEN AC OR DC CONDUCTORS AND COMMUNICATION CABLES.
6. MAINTAIN 2" SEPARATION MINIMUM BETWEEN OUTER WALLS OF CONDUITS.
7. CONFIRM ALL DEPTHS W/UTILITY & NEC PRIOR TO CONSTRUCTION.
8. THE USE OF LOW STRENGTH FLUIDIZED THERMAL (SLURRY) BACKFILL WITH MIN 28 DAY COMPRESSIVESTRENGTH OF 150 PSI TO ACHIEVE A MAX RHO 90 MAY BE USED IN LIEU OF COMPACTED BACKFILL.
T.B.D.
6" MIN
PER TABLE HAND TAMPED 1/2"GRANULAR BACKFILL
4" DC POST CONDUIT
(TYP.-CLUSTER OF 16 MAX.)
24" MIN
6" MIN
4
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:11-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
C-7
CONSTRUCTION
DETAILS IV
TOP VIEW
BOTTOM VIEW
CONCRETE SURFACES: ANCHORWITH (4) MANUFACTURERPROVIDED CONCRETE ANCHORSLANDSCAPE AREAS: ANCHOR
WITH (4) MIN. 12" LONGJ-HOOK REBAR ANCHORS
Ø0.5" ANCHOR HOLE
(TYP.)
CONCRETE SLABOR LANDSCAPE
FRONT VIEW
NOTE:TRASH & RECYCLING BINS TO BEPROVIDED BY TESLA
RECYCLE
ONLY USE BLUE BINW/ "RECYCLE" TEXT &SYMBOLS IN LOCATIONSINDICATED ON SITE
PLAN (IF ANY)
SCALE: N.T.S.
WASTE MANAGEMENT BIN DETAIL
11
"
3'-
6
"
2'-4"Ø
8.73"
7
CD CD
SECTION CD-CD
3'-
4
"
5.25"Ø
CONCRETE PIER
9C016 - 4" PLASTIC COVERW/ REFLECTIVE TAPE
3'-
6
"
2'-
0
"
10"
3"
3'-
0
"
4"
SCALE: N.T.S. McCUE CRASH CORE BOLLARD DETAIL
4"Ø 10"Ø
CONCRETEPIER
REBAR CAGEPROVIDED BYMANUFACTURER
2
SOLID SQUARESTOCK SIGN POSTW/ END CAP
3'-
0
"
6'-
0
"
FINISH GRADE
PLAINCONCRETEFOOTING4'-
0
"
1'-0"
EPOXY BEAD BETWEENPOST & SIGN
SCALE: N.T.S. SQUARE SIGN POST DETAIL
CONCRETE EMBEDMENT
3/8" DIA. ALUMINUM SECURITY PINBOLT RIVET W/ 3/4" DIA. DOMEHEAD FLANGE & 0.330" GRIP LENGTH(TOP & BOTTOM) (TYP.)
ACCESSIBLE SIGN C-5
4
5'-
0
"
(M
I
N
.
)
1
3 3/4"
3 3
/
4
"
3
3
/
4
"
3'-
0
"
3 3/8"Ø
2 7/8"
4"
BOLT PATTERN
(3) 5/8" DIA SS HILTI KWIK-BOLTTZ2 WITH 4" MIN EFFECTIVEEMBEDMENT PER ESR-4266
SCALE: N.T.S.3McCUE MINI REBOUNDING BOLLARD
SCALE: N.T.S. CONCRETE CURB DETAIL
NOTES:
1. SAW CUT AREA TO BE REPAIRED/REPLACED. DISPOSE OF DEBRISPROPERLY OFF SITE.
2. INSTALL FORMS AS NECESSARY.
3. COMPACT EXISTING SUBGRADE MATERIAL TO ACHIEVE 95%COMPACTION.
4. CONCRETE TO BE 4000 PSI AIR ENTRAINED CONCRETE.
5. INSTALL CONTROL JOINTS EVERY 10 LINEAR FEET.
7"
6"
PROPOSED PAVEMENT
R=1-1/2"
BATTER 1" ON 6"R=1/4"
20
"
PROPOSED 6" CLEANCOMPACTED GRAVEL
UNDISTURBED ORCOMPACTED FILL
CLEANCOMPACTEDGRANULARBACKFILL
6"
MATCH EXISTINGCONDITIONS
4
CONCRETE SIDEWALK DETAIL
SEE CONSTRUCTION PLAN
5" MIN. THICK CONC.WALK 4,000 PSI MIN.28 DAY STRENGTHWWF 6X6-W2.9XW2.9W2.9XW2.9 2" BELOWTOP SURFACE EXISTINGGRADE
6" MIN. COMPACTEDAGGREGATE BASE, 95%STANDARD PROCTOR
NOTES:
1. SAW CUT AREA TO BE REPAIRED/REPLACED. DISPOSE OFDEBRIS PROPERLY OFF SITE.
2. INSTALL FORMS AS NECESSARY.
3. COMPACT EXISTING SUBGRADE MATERIAL TO ACHIEVE 95%COMPACTION.
4. CONCRETE TO BE 4,000 PSI AIR ENTRAINED CONCRETE.
5. INSTALL CONTROL JOINTS EVERY 10 LINEAR FEET.
5
ASPHALT PAVEMENT DETAIL
SCALE:N.T.S.
2" HOT BIT.PAVEMENTSURFACE COURSE EXISTINGSURFACE
6" MIN. COMPACTED SUBGRADE (100% STD. PROCTOR)
EXISTING BASE
(TYP.)
2% SLOPE
(SEE NOTE 1)
NOTE:
1. MAINTAIN EXISTING DRAINAGE PATTERNS.SLOPE TOWARD EXISTING STORM DRAIN.
SEAL AT SAW CUTSEAM (TYP.)
6
6-8" COMPACTED NCDOT TYPE ABCSTONE (100% STD. PROCTOR)NOTES:
1. THIS TEMPORARY PROTECTION FOR EXISTINGCATCH BASIN INLETS TO BE REMOVED BYCONTRACTOR AFTER COMPLETION OF WORK.
2. DETAIL SIMILAR FOR ROUND INLET.
INSTALLATION DETAIL
1" REBAR FOR BAGREMOVAL FROM INLET
(REBAR NOT INCLUDED)
OVERFLOW
SILTSACKDUMP LOOPS(REBAR NOTINCLUDED)
EXPANSIONRESTRAINT
FOAM
EXISTING GRATE
SCALE: N.T.S.
CATCH BASIN INLET PROTECTION DETAIL 8
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:11-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
C-8
CONSTRUCTION
DETAILS V
SCALE: N.T.S.12023-2024 FDOT STANDARD PLANS INDEX 711-001 - PAVEMENT MARKINGS
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:13-04'00'
E
WV
IV
IVIV IVIV
IVIV
IV
IV
CO
IVIV
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
C-9
CONSTRUCTION
DETAILS VI
FINISHGRADE
EXISTING LIGHT POLE
PROPOSED ARUBAACCESS POINT
PROPOSED ARUBA MOUNT (TYP.)
SCALE: N.T.S.
2ARUBA ACCESS POINT POLE MOUNTING DETAIL
PROPOSED HOSECLAMPS (TYP.-2)(SEE NOTE)
NOTE:
1. ATTACH MOUNT TO EXISTING POLE IN ACCORDANCE WITH MANUFACTURER INSTALLATION INSTRUCTIONS.
12
'
-
0
"
M
I
N
.
1'-6"1'-0"
5'-
0
"
18"Ø, 4000 PSICONCRETE FOOTING
CROWN EACHFOOTING
FINISH GRADE
12
'
-
0
"
M
I
N
.
4" SCH. 40 PIPE(GALV.) WITH PIPE CAP
HOSE CLAMP (TYP.-2)
PROPOSED ARUBAACCESS POINT
PROPOSED ARUBA MOUNT (TYP.)
CONDUIT STRAP EVERY 3' MIN. (TYP.-3)
SCALE: N.T.S.
ARUBA ACCESS POINT POLE MOUNTING DETAIL
1" LIQUID-TIGHT NON-METALLICCONDUIT W/ FITTINGS
3
SCALE:1"=30' FOR 11"x17"1"=15' FOR 22"x34"
15'0'30'
1WI-FI ACCESS COVERAGE PLAN
PROPOSED Wi-Fi ACCESS POINTMOUNTED TO PROPOSED POST
(MOUNT PER MANUFACTURER SPEC)(12'-0" AGL) (TYP.-1)C-9
3
PROPOSED Wi-Fi ACCESS POINT MOUNTED TOEXISTING LIGHT POLE (MOUNT PERMANUFACTURER SPEC) (12'-0" AGL) (TYP.-4)C-9
2
EXISTING LIGHT FIXTURE
80' WI-FI RADIUS
(TYP.-5)
NOTE:
1. ATTACH MOUNT TO PROPOSED POLEIN ACCORDANCE WITH MANUFACTURERINSTALLATION INSTRUCTIONS.
1" LIQUID-TIGHT NON-METALLIC
CONDUIT W/ FITTINGS
CONDUIT STRAP EVERY 3' MIN. (TYP.-3)
LEGEND
ACCESS POINT MOUNTEDON EXISTING LIGHT POLE
ACCESS POINT MOUNTEDON PROPOSED POLE
PROPOSED H-FRAMEFOR TELCO BOX E-5
3
PROPOSED UNDERGROUNDCOMMUNICATION LINE
UNDERGROUNDCOMMUNICATION FIBER LINEUC
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:13-04'00'
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:14-04'00'
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:15-04'00'
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:16-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
E-1
ELECTRICAL ONE-LINEDIAGRAM I
NOTES:
1. CONDUCTOR LENGTHS ARE ESTIMATES ONLY. FINAL CONDUCTOR ROUTING PATH ANDLENGTHS SHALL BE DETERMINED BY THE CONTRACTOR IN THE FILED BASED ONPHYSICAL MEASUREMENTS. CONTRACTOR TO ORDER CONDUCTORS BASED ON FIELD
MEASUREMENTS (MUST BE APPROVED BY TESLA INSTALLATION MANAGER).
2. ALL ELECTRICAL WORK AND RELATED ACTIVITIES PREFORMED ON-SITE SHALL BEDONE IN ACCORDANCE WITH NATIONAL ELECTRIC CODE (NEC) AND UTILITY
COMPANY STANDARDS.
3. NEUTRAL MUST BE INCLUDED FOR PROPER OPERATION OF TESLA SUPERCHARGERS.
4. ALL CONDUCTORS TO RECEIVE ANTI-OXIDATIVE COATING DURING INSTALLATION.
5. ALL EQUIPMENT SHALL BE HOUSED IN LOCKABLE, NEMA 3R ENCLOSURE.
6. USE OF DURALINE FOR SUPERCHARGER TO CHARGE POST DC CONDUITS IS ANAPPROVED ASSEMBLY
7. DC RUN LENGTH MAXIMUM IS 330' INCLUDING BURIED DEPTH. ANY DC RUNLENGTHS OVER THE MAXIMUM SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTIONOF TESLA.
8. UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITHTHE APPROPRIATE UTILITY ENGINEER AT TIME OF PRE CONSTRUCTION MEETING TOENSURE ACCURACY OF INSTALLATION.
9. UTILITY CONDUITS, CONNECTORS, TRANSFORMER PAD & TRANSFORMER FOUNDATIONTO BE INSTALLED PER UTILITY SPECIFICATION. CONFIRM LATEST SPECIFICATIONSPRIOR TO CONSTRUCTION.
10. EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREA OF PROPOSED TRENCH &EQUIPMENT SITE AREA. HAND DIG AND RELOCATE AS REQUIRED.
11. CONTRACTOR RESPONSIBLE FOR ALL TRAFFIC SAFETY MEASURES THROUGHOUTDURATION OF CONSTRUCTION. COORDINATE ANY ACCESS ROAD CLOSURESW/OWNER.
12. CONTRACTOR TO GROUND SYSTEM TO CONCRETE-ENCASED GROUNDING ELECTRODEPER NEC 250.50. GROUNDING RESISTANCE SHALL BE LESS THAN 25Ω PER NEC.CONTRACTOR TO ADD GROUND RODS TO SYSTEM UNTIL PROPER RESISTANCE ISMET.
13. THE DC BUS SHALL BE CONFIGURED IN A RADIAL FASHION WHERE ALLCONDUCTORS ROUTE FROM EACH 'TYPICAL' SUPERCHARGER CABINET, TO THE ONE,'STAR-CENTER' SUPERCHARGER CABINET.
14. USE OF DURALINE FOR SUPERCHARGER TO CHARGE POST DC CONDUITS IS AN
APPROVED ASSEMBLY. (SEE TUV CERTIFICATION ON SHEET E-7).
SCOPE OF WORK BY UTILITY BY CONTRACTOR
PROVIDE & INSTALL PRIMARY CONDUCTORS
PROVIDE & INSTALL PRIMARY TRENCHING &CONDUITS
PROVIDE & INSTALL SECONDARY CONDUCTORS
PROVIDE & INSTALL SECONDARY TRENCHING &CONDUITS
INSTALL UTILITY METER BASE & METER PEDESTAL
PROVIDE & INSTALL TRANSFORMER PAD &ASSOCIATED GROUNDING
X
X
X
X
UTILITY S.O.W. RESPONSIBILITIES
PROVIDE UTILITY TRANSFORMER W/INTERNAL CTs X
INSTALL PRIMARY CONNECTIONS AT TRANSFORMER X
INSTALL SECONDARY CONNECTIONS AT TRANSFORMER X
PROVIDE UTILITY METER BASE & METER PEDESTAL
PROVIDE & INSTALL UTILITY METER X
X
X
X
SERVICE ELECTRICAL CIRCUIT SCHEDULE
NO: FROM TO CONFIGURATION
TRANSFORMER PROPOSED 3000ASWITCHGEAR
[10 SETS](3) 600MCM AL (THWN-2) &
(1) 600MCM AL (THWN-2) NEUT IN 4" PVCCONDUIT
PROPOSED SERVICEEQUIPMENT: PANEL
(600A BREAKER)
PROPOSED TESLASUPERCHARGER
[2 SETS:](3) 500MCM AL (THWN-2)(1) 500MCM AL (THWN-2) NEUT
(1) 2/0 AL EGC* IN 4"
PVC/HDPE CONDUIT**
PROPOSED TESLASUPERCHARGER PROPOSED TESLA POST
[1 SET PER CHARGING POST](4) 600MCM AL (XHHW-2) (1000V),
(1) #2/0 CU EGC, &(1) 1000V V4 LV+COMM CABLE***IN 4" PVC/HDPE**
'STAR CENTER'SUPERCHARGERCABINET DC BUS
DC BUS OF EACHTYPICALSUPERCHARGERCABINET
[2 SETS]
(2) 600MCM AL (XHHW-2)(1) #1/0 CU GROUND &(1) #3/0 AWG AL DC MID 1000V RATEDIN 3" PVC/HDPE**
SITE CONTROLLER SUPERCHARGER (1) SHIELDED 600V CAT6+ IN 1" PVC/HDPE**
PROPOSED ROUTER PROPOSED WIFIANTENNA (1) CAT6 COMM CABLE IN 1" PVC/HDPECONDUIT**
PROPOSED SERVICEBREAKERS PROPOSED EPO (2) #12, (1) #12 G IN 3/4" CONDUIT
PROPOSED 4000ASWITCHGEAR PROPOSED TESLALEVEL 2 ENCLOSURE
[1 SET](4) 600MCM CU &(1) #3 AWG CU GROUND IN 4" CONDUIT
PROPOSED TESLALEVEL 2 ENCLOSURE
PROPOSED TESLALEVEL 2 UNIVERSALVEHICLE CHARGER
[1 SET PER CHARGER](2) #6 AWG CU (THWN-2) &
(1) #10 AWG CU (THWN-2) GROUND IN 1"PVC/HDPE CONDUIT**
* MODIFIED PER NEC 250.64(A)(2)** PER UL 615A AND NEC 253, LISTED HDPE CONDUIT PERMITTED. CONTRACTOR TO CONFIRM USE W/TESLA CM*** 1000V V4 COMM WIRE TO BE ROUTED IN 4" CONDUIT. 1.25" DURALINE CAN BE INSTALLED FOR LONGRUNS (200+ FT)
1
2
3
4
5
6
7
8
9
SCALE: N.T.S.
1SYSTEM ONE-LINE DIAGRAM FOR SWITCHGEAR #1
600A,3P
2 5
PROPOSED VEHICLE CHARGING POSTS(TYP.-4 PER SUPERCHARGER)
4
TYPICALSUPERCHARGERCABINET
#1
A BCD
'STAR CENTER'SUPERCHARGERCABINET
#3
3
A BCD A BCD
SITE MASTERCONTROLLER
FACTORYINSTALLEDWIRING
6
POWER SUPPLY120VAC - 24VDC
FIBERROUTER
15A, 2PFUSE
3AFUSE
3AFUSE
3KVACPT
480V
120V
3000A, 480/277V, 3Ø, 4W, 65KAIC, NEMA 3R SWITCHGEAR MOUNTED ON CONCRETE PAD
4
33
600A,3P 600A,3P 15A,2P
A B C D
3
TYPICALSUPERCHARGERCABINET
#4
600A,3PM14000A/3AF
3000A/3AT100% RATEDW/RELTSWITCH
GR
N
D
NE
U
T
#3/0 AWG BARE CuGROUNDING ELECTRODECONDUCTOR PER NEC250.66(B)
CONCRETE ENCASEDELECTRODE PER NEC250.52(A)(3) OR (2)
#3/0 AWG BARE Cu GROUNDINGELECTRODE CONDUCTOR PERNEC 250.66(A)
600 KCMIL CuPER NEC 250.66
PROPOSED 3000A SERVICEEQUIPMENT 480/277V, 3Ø, 4W,65KAIC, NEMA 3R, LOCKABLE
GROUNDING ELECTRODE5/8"x8'-0" COPPER CLADGROUND ROD INSTALLATIONPER NEC 250.52(A)(5),250.53(A) & 250.68
6'-0"
MIN.SYSTEM GROUNDING RESISTANCESHALL BE LESS THAN 25Ω PER NEC.ADD ADDITIONAL GROUND RODS ASNEEDED TO SYSTEM UNTILRESISTANCE IS MET. COORDINATEWITH VENDOR FOR REQUIRED SYSTEMGROUNDING RESISTANCE BEYOND 25Ω
MAIN BREAKER SECTION
MANUFACTURER-PROVIDEDMAIN BONDING JUMPERPER NEC 250.24(A)(4),250.28(C), 250.8(A)(7)
1
M
UTILITY APPROVEDMETER ENCLOSUREFOR TESLA SERVICE
PROPOSED UTILITYGROUND(PER UTILITY)
PROPOSEDUTILITYTRANSFORMER #1W/INTERNAL CTs
GFPST
EPO #1 TO BEMOUNTED TO POST
7
EPO
7
A B C D
3
TYPICALSUPERCHARGERCABINET
#5
A B C D
3
TYPICALSUPERCHARGERCABINET
#6
TYPICALSUPERCHARGERCABINET
#2
4 4
600A,3P 600A,3P
5AFUSE
PROPOSED WIFIACCESS POINT
4
GROUND PERTESLA STANDARDS
UTILITY FAULTCURRENT
TRANSFORMER: TBDSECONDARY VOLTAGE: 277/480VSECONDARY FAULT CURRENT: TBD
* FINAL FAULT CURRENT INFORMATIONPROVIDED BY FPL
FACTORY INSTALLEDSECONDARY WIRING (BY
MANUFACTURER)
60A2P
10'-0" MAX.DISTANCE
160KVA TRANSFORMER FACTORYINSTALLED BY SWITCHGEARMANUFACTURERPRI: 480V - 3Ø 65kAICSEC: 240V - 3Ø 3W 10kAIC
9
LEVEL 2 ENCLOSURE
LEVEL 2CHARGER#1
60A2P
LEVEL 2CHARGER#2
60A2P
LEVEL 2CHARGER#3
60A2P
LEVEL 2CHARGER#4
8
60A2P
LEVEL 2CHARGER#5
60A2P
LEVEL 2CHARGER#6
400A3P
1.25" CONDUIT FORFIBER CABLE TOSWITCHGEAR #2
600A,3PSPARE
600A,3PSPARE
250A3P
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:16-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
E-2
ELECTRICAL ONE-LINEDIAGRAM II
SCALE: N.T.S.
1SYSTEM ONE-LINE DIAGRAM FOR SWITCHGEAR #2
600A,3P
2 5
PROPOSED VEHICLE CHARGING POSTS(TYP.-4 PER SUPERCHARGER)
4
TYPICALSUPERCHARGERCABINET
#7
A BCD
'STAR CENTER'SUPERCHARGERCABINET
#9
3
A BCD A BCD
SITE MASTERCONTROLLER
FACTORYINSTALLEDWIRING
POWER SUPPLY120VAC - 24VDC
15A, 2PFUSE
3AFUSE
3AFUSE
3KVACPT
480V
120V
3000A, 480/277V, 3Ø, 4W, 65KAIC, NEMA 3R SWITCHGEAR MOUNTED ON CONCRETE PAD
4
33
600A,3P 600A,3P 15A,2P
A B C D
3
TYPICALSUPERCHARGERCABINET
#10
600A,3PM13000A/3AF
3000A/3AT100% RATEDW/RELTSWITCH
GR
N
D
NE
U
T
#3/0 AWG BARE CuGROUNDING ELECTRODECONDUCTOR PER NEC250.66(B)
CONCRETE ENCASEDELECTRODE PER NEC250.52(A)(3) OR (2)
#3/0 AWG BARE Cu GROUNDINGELECTRODE CONDUCTOR PERNEC 250.66(A)
600 KCMIL CuPER NEC 250.66
PROPOSED 3000A SERVICEEQUIPMENT 480/277V, 3Ø, 4W,65KAIC, NEMA 3R, LOCKABLE
GROUNDING ELECTRODE5/8"x8'-0" COPPER CLADGROUND ROD INSTALLATIONPER NEC 250.52(A)(5),250.53(A) & 250.68
6'-0"
MIN.SYSTEM GROUNDING RESISTANCESHALL BE LESS THAN 25Ω PER NEC.ADD ADDITIONAL GROUND RODS ASNEEDED TO SYSTEM UNTILRESISTANCE IS MET. COORDINATEWITH VENDOR FOR REQUIRED SYSTEMGROUNDING RESISTANCE BEYOND 25Ω
MAIN BREAKER SECTION
MANUFACTURER-PROVIDEDMAIN BONDING JUMPERPER NEC 250.24(A)(4),250.28(C), 250.8(A)(7)
1
M
UTILITY APPROVEDMETER ENCLOSUREFOR TESLA SERVICE
PROPOSED UTILITYGROUND(PER UTILITY)
PROPOSEDUTILITYTRANSFORMER #2W/INTERNAL CTs
GFPST
EPO #2 TO BEMOUNTED TO POST
6
EPO
6
A B C D
3
TYPICALSUPERCHARGERCABINET
#11
A B C D
3
TYPICALSUPERCHARGERCABINET
#12
TYPICALSUPERCHARGERCABINET
#8
4 4
600A,3P 600A,3P
5AFUSE
4
GROUND PERTESLA STANDARDS
NOTES:
1. CONDUCTOR LENGTHS ARE ESTIMATES ONLY. FINAL CONDUCTOR ROUTING PATH ANDLENGTHS SHALL BE DETERMINED BY THE CONTRACTOR IN THE FILED BASED ONPHYSICAL MEASUREMENTS. CONTRACTOR TO ORDER CONDUCTORS BASED ON FIELD
MEASUREMENTS (MUST BE APPROVED BY TESLA INSTALLATION MANAGER).
2. ALL ELECTRICAL WORK AND RELATED ACTIVITIES PREFORMED ON-SITE SHALL BEDONE IN ACCORDANCE WITH NATIONAL ELECTRIC CODE (NEC) AND UTILITY
COMPANY STANDARDS.
3. NEUTRAL MUST BE INCLUDED FOR PROPER OPERATION OF TESLA SUPERCHARGERS.
4. ALL CONDUCTORS TO RECEIVE ANTI-OXIDATIVE COATING DURING INSTALLATION.
5. ALL EQUIPMENT SHALL BE HOUSED IN LOCKABLE, NEMA 3R ENCLOSURE.
6. USE OF DURALINE FOR SUPERCHARGER TO CHARGE POST DC CONDUITS IS ANAPPROVED ASSEMBLY
7. DC RUN LENGTH MAXIMUM IS 330' INCLUDING BURIED DEPTH. ANY DC RUNLENGTHS OVER THE MAXIMUM SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTIONOF TESLA.
8. UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITHTHE APPROPRIATE UTILITY ENGINEER AT TIME OF PRE CONSTRUCTION MEETING TOENSURE ACCURACY OF INSTALLATION.
9. UTILITY CONDUITS, CONNECTORS, TRANSFORMER PAD & TRANSFORMER FOUNDATIONTO BE INSTALLED PER UTILITY SPECIFICATION. CONFIRM LATEST SPECIFICATIONSPRIOR TO CONSTRUCTION.
10. EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREA OF PROPOSED TRENCH &EQUIPMENT SITE AREA. HAND DIG AND RELOCATE AS REQUIRED.
11. CONTRACTOR RESPONSIBLE FOR ALL TRAFFIC SAFETY MEASURES THROUGHOUTDURATION OF CONSTRUCTION. COORDINATE ANY ACCESS ROAD CLOSURESW/OWNER.
12. CONTRACTOR TO GROUND SYSTEM TO CONCRETE-ENCASED GROUNDING ELECTRODEPER NEC 250.50. GROUNDING RESISTANCE SHALL BE LESS THAN 25Ω PER NEC.CONTRACTOR TO ADD GROUND RODS TO SYSTEM UNTIL PROPER RESISTANCE ISMET.
13. THE DC BUS SHALL BE CONFIGURED IN A RADIAL FASHION WHERE ALLCONDUCTORS ROUTE FROM EACH 'TYPICAL' SUPERCHARGER CABINET, TO THE ONE,'STAR-CENTER' SUPERCHARGER CABINET.
14. USE OF DURALINE FOR SUPERCHARGER TO CHARGE POST DC CONDUITS IS AN
APPROVED ASSEMBLY. (SEE TUV CERTIFICATION ON SHEET E-7).
SCOPE OF WORK BY UTILITY BY CONTRACTOR
PROVIDE & INSTALL PRIMARY CONDUCTORS
PROVIDE & INSTALL PRIMARY TRENCHING &CONDUITS
PROVIDE & INSTALL SECONDARY CONDUCTORS
PROVIDE & INSTALL SECONDARY TRENCHING &CONDUITS
INSTALL UTILITY METER BASE & METER PEDESTAL
PROVIDE & INSTALL TRANSFORMER PAD &ASSOCIATED GROUNDING
X
X
X
X
UTILITY S.O.W. RESPONSIBILITIES
PROVIDE UTILITY TRANSFORMER W/INTERNAL CTs X
INSTALL PRIMARY CONNECTIONS AT TRANSFORMER X
INSTALL SECONDARY CONNECTIONS AT TRANSFORMER X
PROVIDE UTILITY METER BASE & METER PEDESTAL
PROVIDE & INSTALL UTILITY METER X
X
X
X
SERVICE ELECTRICAL CIRCUIT SCHEDULE
NO: FROM TO CONFIGURATION
TRANSFORMER PROPOSED 3000ASWITCHGEAR
[10 SETS](3) 600MCM AL (THWN-2) &(1) 600MCM AL (THWN-2) NEUT IN 4" PVCCONDUIT
PROPOSED SERVICEEQUIPMENT: PANEL(600A, 80% RATED)
PROPOSED TESLASUPERCHARGER
[2 SETS:]
(3) 500MCM AL (THWN-2)
(1) 500MCM AL (THWN-2) NEUT(1) 2/0 AL EGC* IN 4"PVC/HDPE CONDUIT**
PROPOSED TESLASUPERCHARGER PROPOSED TESLA POST
[1 SET PER CHARGING POST](4) 600MCM AL (XHHW-2) (1000V),(1) #2/0 CU EGC, &(1) 1000V V4 LV+COMM CABLE***
IN 4" PVC/HDPE**
'STAR CENTER'SUPERCHARGERCABINET DC BUS
DC BUS OF EACHTYPICALSUPERCHARGERCABINET
[2 SETS](2) 600MCM AL (XHHW-2)(1) #1/0 CU GROUND &
(1) #3/0 AWG AL DC MID 1000V RATEDIN 3" PVC/HDPE**
SITE CONTROLLER SUPERCHARGER (1) SHIELDED 600V CAT6+ IN 1" PVC/HDPE**
PROPOSED SERVICEBREAKERS PROPOSED EPO (2) #12, (1) #12 G IN 3/4" CONDUIT
PROPOSED ROUTER PROPOSED WIFIANTENNA (1) CAT6 COMM CABLE IN 1" PVC/HDPECONDUIT**
* MODIFIED PER NEC 250.64(A)(2)** PER UL 615A AND NEC 253, LISTED HDPE CONDUIT PERMITTED. CONTRACTOR TO CONFIRM USE W/TESLA CM*** 1000V V4 COMM WIRE TO BE ROUTED IN 4" CONDUIT. 1.25" DURALINE CAN BE INSTALLED FOR LONGRUNS (200+ FT)
1
2
3
4
5
6
7
UTILITY FAULTCURRENT
TRANSFORMER: TBDSECONDARY VOLTAGE: 277/480VSECONDARY FAULT CURRENT: TBD
* FINAL FAULT CURRENT INFORMATIONPROVIDED BY FPL
7
FIBERROUTER
PROPOSED WIFIACCESS POINT
1.25" CONDUIT FORFIBER CABLE TOSWITCHGEAR #1
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:17-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
E-3
PANEL SCHEDULES
SCALE: N.T.S.3LEVEL 2 LOAD SCHEDULE
SCALE: N.T.S.1SWITCHBOARD #1 LOAD SCHEDULE
SCALE: N.T.S.2SWITCHBOARD #2 LOAD SCHEDULE
SERVICE SWITCHBOARD 'SS-TESLA #1' LOAD SCHEDULE
CKT NO.TRIP AMPS DESCRIPTION
KVA KVA DESRIPTION TRIP AMPS CKT NO.A BCA BC
1
600A SUPERCHARGER #1
129.00 - - 129.00 - -
SUPERCHARGER #2 600A
2
3 - 129.00 - - 129.00 -4
5 - - 129.00 - - 129.00 6
7
600A SUPERCHARGER #3
129.00 - - 129.00 - -
SUPERCHARGER #4 600A
8
9 - 129.00 - - 129.00 - 10
11 - - 129.00 - - 129.00 12
13
600A SUPERCHARGER #5
129.00 - - 129.00 - -
SUPERCHARGER #6 600A
14
15 - 129.00 - - 129.00 - 16
17 - - 129.00 - - 129.00 18
19- - ---23.00 --
LEVEL 2 PANEL 250A
20
21- - ----23.00 -22
23- - -----23.00 24
25 15A SITE LIGHTING 0.75 --0.05 --SITE CONTROLLER 15A
26
27 15A CRADLEPOINT WIFI 0.25 ---0.05 -28
TOTAL CONNECTED
PHASE A B C TOTAL
APPARENT POWER 798.1KVA 797.1KVA 797.0KVA 2392.1KVA
CURRENT 2877.2 A
LOADCENTER 'LC-1' LOAD SCHEDULE
CKT NO. TRIP AMPS DESCRIPTION
KVA KVA DESRIPTION TRIP AMPS CKT NO.ABCABC
1 60A G3WC-1 5.76 - - 5.76 - -G3WC-2 60A 2
3 - 5.76 - - 5.76 - 4
5 60A G3WC-3
- - 5.76 - - 5.76 G3WC-4 60A
6
7 5.76 - - 5.76 - - 8
9 60A G3WC-5
-5.76 --5.76 -G3WC-6 60A
10
11 - -5.76 --5.76 12
13- - ------ - -14
15- - ------ - -16
17- - ------ - -18
19- - ------ - -20
TOTAL CONNECTED
PHASE A B C TOTAL
APPARENT POWER 23.0 KVA 23.0 KVA 23.0 KVA 69.1 KVA
CURRENT 166.3 A
SERVICE SWITCHBOARD 'SS-TESLA #2' LOAD SCHEDULE
CKT NO.TRIP AMPS DESCRIPTION
KVA KVA DESRIPTION TRIP AMPS CKT NO.A BCA BC
1
600A SUPERCHARGER #1
129.00 - - 129.00 - -
SUPERCHARGER #2 600A
2
3 - 129.00 - - 129.00 -4
5 - - 129.00 - - 129.00 6
7
600A SUPERCHARGER #3
129.00 - - 129.00 - -
SUPERCHARGER #4 600A
8
9 - 129.00 - - 129.00 - 10
11 - - 129.00 - - 129.00 12
13
600A SUPERCHARGER #5
129.00 - - 129.00 - -
SUPERCHARGER #6 600A
14
15 - 129.00 - - 129.00 - 16
17 - - 129.00 - - 129.00 18
19- - ---0.05 --SITE CONTROLLER 15A
20
21- - ----0.05 -22
TOTAL CONNECTED
PHASE A B C TOTAL
APPARENT POWER 774.1KVA 774.1KVA 774.0KVA 2322.1KVA
CURRENT 2793.1 A
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:19-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
E-4
ELECTRICAL & UTILITYDETAILS I
SECONDARY SERVICE LENGTHS
TRANSFORMER #1 TOSWITCHGEAR #1*:9' 34'
TOTAL LENGTH OF AC AL WIRE**:136'
NUMBER OF WIRE SETS:10
TOTAL LENGTH OF AL WIRE***:1,360'
TRANSFORMER #2 TOSWITCHGEAR #2*:17' 42'
TOTAL LENGTH OF AC AL WIRE**:168'
NUMBER OF WIRE SETS:10
TOTAL LENGTH OF AL WIRE***:1,680'
NOTES:
1. ANY DC RUN OVER 330' SHALL BE BROUGHT TO THE ATTENTIONOF TESLA CM.
* 22 FT IS ADDED TO THE HORIZONTAL RUN LENGTH TOACCOUNT FOR BURIED DEPTH & TRANSITIONS.
** ESTIMATED LENGTH OF DC WIRE = SUM OF ESTIMATED LENGTHX 4 WIRES PER SUPERCHARGER
NOTES:
* AC CONDUCTORS: 25 FT IS ADDED TO THE HORIZONTAL RUNLENGTH TO ACCOUNT FOR BURIED DEPTH & TRANSITIONS.
** ESTIMATED LENGTH OF Al WIRE = SUM OF ESTIMATED LENGTHX 4 WIRES PER SET
*** LENGTH OF AL WIRE PER DISCONNECT =ESTIMATED TOTAL
LENGTH OF AL WIRE X # WIRE SETS
NOTES:
* AC CONDUCTORS: 25 FT IS ADDED TO THE HORIZONTAL RUNLENGTH TO ACCOUNT FOR BURIED DEPTH & TRANSITIONS.
** ESTIMATED LENGTH OF Al WIRE = SUM OF ESTIMATEDLENGTH X 4 WIRES PER SUPERCHARGER
*** LENGTH = LENGTH OF AC AL WIRE PER CONDUIT X # OFCONDUITS
**** TOTAL LENGTH = SUM OF AC LENGTHS
***** TOTAL LENGTH OF EGC = LENGTH X # SETS
SCALE: N.T.S.
1CONDUCTOR LENGTH TABLES
AC SUPERCHARGER LENGTHS
SUPERCHARGER LINEAR LENGTHSWITCHGEAR TOSUPERCHARGER
ESTIMATEDLENGTH*
1 28' 53'
LENGTH OF AC AL WIRE PER CONDUIT**: 212'
TOTAL NUMBER OF CONDUITS: 2
LENGTH OF AC AL WIRE ***: 424'
2 23' 48'
LENGTH OF AC AL WIRE PER CONDUIT**: 192'
TOTAL NUMBER OF CONDUITS: 2
LENGTH OF AC AL WIRE***: 384'
3 18' 43'
LENGTH OF AC AL WIRE PER CONDUIT**: 172'
TOTAL NUMBER OF CONDUITS: 2
LENGTH OF AC AL WIRE***: 344'
4 13' 38'
LENGTH OF AC AL WIRE PER CONDUIT**: 152'
TOTAL NUMBER OF CONDUITS: 2
LENGTH OF AC AL WIRE***: 304'
5 8' 33'
LENGTH OF AC AL WIRE PER CONDUIT**: 132'
TOTAL NUMBER OF CONDUITS: 2
LENGTH OF AC AL WIRE***: 264'
63'28'
LENGTH OF AC AL WIRE PER CONDUIT**:112'
TOTAL NUMBER OF CONDUITS:2
LENGTH OF AC AL WIRE***:224'
7 3' 28'
LENGTH OF AC AL WIRE PER CONDUIT**:112'
TOTAL NUMBER OF CONDUITS:2
LENGTH OF AC AL WIRE***:224'
8 8' 33'
LENGTH OF AC AL WIRE PER CONDUIT**:132'
TOTAL NUMBER OF CONDUITS:2
LENGTH OF AC AL WIRE***:264'
9 13' 38'
LENGTH OF AC AL WIRE PER CONDUIT**:152'
TOTAL NUMBER OF CONDUITS:2
LENGTH OF AC AL WIRE***:304'
10 5' 30'
LENGTH OF AC AL WIRE PER CONDUIT**:120'
TOTAL NUMBER OF CONDUITS:2
LENGTH OF AC AL WIRE***:240'
11 10' 35'
LENGTH OF AC AL WIRE PER CONDUIT**:140'
TOTAL NUMBER OF CONDUITS:2
LENGTH OF AC AL WIRE***:280'
12 15' 40'
LENGTH OF AC AL WIRE PER CONDUIT**:160'
TOTAL NUMBER OF CONDUITS: 2
LENGTH OF AC AL WIRE***: 320'
TOTAL LENGTH OF AC AL WIRE****:3,576'
TOTAL LENGTH OF EGC*****:894'
DC CHARGING POST LENGTHS
SUPERCHARGER CHARGE POST LINEAR LENGTH
ESTIMATED DCWIRE LENGTH*
1
1A 95' 117'
1B 104' 126'
1C 113' 135'
1D 122' 144'
2
2A 126' 148'
2B 135' 157'
2C 144' 166'
2D 159' 181'
3
3A 163' 185'
3B 172' 194'
3C 181' 203'
3D 190' 212'
4
4A 194' 216'
4B 203' 225'
4C 212' 234'
4D 221' 243'
5
5A 226' 248'
5B 241' 263'
5C 250' 272'
5D 259' 281'
6
6A 263' 285'
6B 272' 294'
6C 281' 303'
6D 290' 312'
7
7A 282' 304'
7B 264' 286'
7C 239' 261'
7D 230' 252'
8
8A 228' 250'
8B 219' 241'
8C 210' 232'
8D 188' 210'
9
9A 188' 210'
9B 167' 189'
9C 167' 189'
9D 146' 168'
10
10A 149' 171'
10B 128' 150'
10C 128' 150'
10D 107'129'
11
11A 107'129'
11B 81' 103'
11C 72'94'
11D 63' 85'
12
12A 55'77'
12B 46'68'
12C 37' 59'
12D 28' 50'
CONDUIT LENGTH:9,201'
TOTAL CONDUCTOR LENGTH**:36,804'
TOTAL LENGTH OF #2/0 AWG GND & COMM CABLE**:9,201'
TESLA AC CHARGING POST LENGTHS
CHARGE POST LINEAR LENGTH
ESTIMATED ACWIRE LENGTH*
1 35' 57'
2 35' 57'
3 53' 75'
4 53' 75'
5 68' 90'
6 92' 114'
CONDUIT LENGTH:* 468'
TOTAL CONDUCTOR LENGTH**:1,872'
TOTAL LENGTH OF EGC: 264'
NOTES:
* AC CONDUCTORS: 22 FT IS ADDED TO THE HORIZONTAL RUNLENGTH TO ACCOUNT FOR BURIED DEPTH & TRANSITIONS.
** ESTIMATED LENGTH OF Al WIRE = SUM OF ESTIMATEDLENGTH X 4 WIRES PER SUPERCHARGER
*** TOTAL LENGTH OF EGC = LENGTH X # SETS
PLAN VIEW(DOOR OPEN)FRONT VIEW(SHOWN WITHOUT DOORS)
CONDUIT CONFIGURATIONSECTION
SCALE: N.T.S.3EV-2 MCB SWITCHGEAR NO. 2
PLAN VIEW(DOOR OPEN)FRONT VIEW(SHOWN WITHOUT DOORS)
CONDUIT CONFIGURATIONSECTION
SCALE: N.T.S.2EV-2 MCB SWITCHGEAR NO. 1
SCALE: N.T.S.4EV-2 MCB LEVEL 2 SWITCHGEAR
CONDUIT CONFIGURATIONSECTION
PLAN VIEW(DOOR OPEN)FRONT VIEW(SHOWN WITHOUT DOORS)
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:20-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
E-5
ELECTRICAL & UTILITYDETAILS II
NOTES:
1. CONDUCTOR LENGTHS ARE ESTIMATES ONLY. FINAL CONDUCTOR ROUTING PATH AND LENGTHSSHALL BE DETERMINED BY THE CONTRACTOR IN THE FILED BASED ON PHYSICALMEASUREMENTS. CONTRACTOR TO ORDER CONDUCTORS BASED ON FIELD MEASUREMENTS(MUST BE APPROVED BY TESLA INSTALLATION MANAGER).
2. ALL ELECTRICAL WORK AND RELATED ACTIVITIES PREFORMED ON-SITE SHALL BE DONE INACCORDANCE WITH NATIONAL ELECTRIC CODE (NEC) AND UTILITY COMPANY STANDARDS.
3. ALL CONDUCTORS TO RECEIVE ANTI-OXIDATIVE COATING DURING INSTALLATION.
4. ALL EQUIPMENT SHALL BE HOUSED IN LOCKABLE, NEMA 3R ENCLOSURE.
5. UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITH THEAPPROPRIATE UTILITY ENGINEER AT TIME OF PRE CONSTRUCTION MEETING TO ENSUREACCURACY OF INSTALLATION.
6. UTILITY CONDUITS, CONNECTORS, TRANSFORMER PAD & TRANSFORMER FOUNDATION TO BEINSTALLED PER UTILITY SPECIFICATION. CONFIRM LATEST SPECIFICATIONS PRIOR TOCONSTRUCTION.
7. EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREA OF PROPOSED TRENCH &EQUIPMENT SITE AREA. HAND DIG AND RELOCATE AS REQUIRED.
8. CONTRACTOR RESPONSIBLE FOR ALL TRAFFIC SAFETY MEASURES THROUGHOUT DURATION OFCONSTRUCTION. COORDINATE ANY ACCESS ROAD CLOSURES W/OWNER.
9. CONTRACTOR TO GROUND SYSTEM TO CONCRETE-ENCASED GROUNDING ELECTRODE PER NEC250.50. GROUNDING RESISTANCE SHALL BE LESS THAN 25Ω PER NEC. CONTRACTOR TO ADDGROUND RODS TO SYSTEM UNTIL PROPER RESISTANCE IS MET.
10. CONTRACTOR TO REFERENCE WALL CONNECTOR INSTALLATION MANUAL (PUBLISHED BY TESLA)PRIOR TO CONSTRUCTION.
SCALE: N.T.S.3ELECTRICAL H-FRAME DETAIL
V.I
.
F
.
5'-
0
"
SPACE AS EQUIRED
1'-6"
1'-
0
"
V.I.F.
18"Ø, 4000 PSICONCRETE FOOTING
FINISH GRADE
CROWN EACHFOOTING
NOTES:
1. CONTRACTOR TO INSTALLELECTRICAL & METERINGEQUIPMENT PER UTILITYREQUIREMENTS.
2. CONTRACTOR TO KEEP H-FRAMEHEIGHT AS SHORT AS ALLOWABLEPER NEC REQUIREMENTS & SITECONDITIONS.
P1000T UNISTRUT(TYP.)
1/2" U-BOLT
(GALV.) (TYP.)
3" SCH. (3-1/2" O.D.) 40
PIPE (GALV.) WITH PIPECAP (TYP.-2)
SCALE: N.T.S.4SYSTEM PLACARDS
SERVICE DISCONNECT1 OF 2 DISCONNECTS
PLACE ON SWITCHGEARSERVICE DISCONNECT #1
NOTE:
1. PLACARDS TO BE MADE OF RED PHENOLIC PLASTIC W/ 1" WHITELETTERING. ATTACH PLACARDS USING RIVETS OR SELF-TAPPING SCREWS.
PLACE ON SWITCHGEARSERVICE DISCONNECT #2
SERVICE DISCONNECT2 OF 2 DISCONNECTS
PLACE ON EPO#1
EMERGENCY DISCONNECT1 OF 2, DISCONNECT 2LOCATED BYEAST EQUIPMENT
EMERGENCY DISCONNECT2 OF 2, DISCONNECT 1LOCATED BYWEST EQUIPMENT
PLACE ON EPO#2
TESLA EV SYSTEMDISCONNECT
PLACE ON EACHSERVICE DISCONNECT
SCALE: N.T.S.1TRANSFORMER PAD
SCALE: N.T.S.2POST MOUNTED METER DETAIL
NOTES:
1. SPECIFICATION TAKEN FROM FPL ELECTRIC SERVICE STANDARDS, NOVEMBER 2023.
2. CONTRACTOR TO CONFIRM LATEST SPECIFICATIONS & DESIGN W/UTILITY PRIOR TOCONSTRUCTION OR ORDERING.
3. METER TO BE INSTALLED ON MINIMUM 10'-0" x 0'-6" CONCRETE REINFORCED POST,4'-0" IN GROUND UNLESS OTHERWISE APPROVED BY UTILITY.
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:22-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
E-6
ELECTRICAL & UTILITYDETAILS III
SCALE: N.T.S.1DURALINE CONDUIT TUV CERTIFICATION
NOTES:
1. DURALINE SMOOTH-COR FLEX CONDUIT HAS BEEN CERTIFIED AS ACRITICAL COMPONENT OF THE SUPERCHARGER POST BY TUV.
2. PRODUCT WILL BE USED TO CONNECT THE SUPERCHARGER CABINETTO SUPERCHARGER POST.
3. DURALINE SMOOTH-COR FLEX CONDUIT SHALL NOT BE INSTALLEDWITHIN SUPERCHARGER CABINETS OR POST. CONTRACTOR SHALLTRANSITION SMOOTH-COR FLEXIBLE CONDUIT TO PVC CONDUIT ANDSWEEP PVC CONDUIT INTO THE SUPERCHARGER CABINETS OR POST.
SCALE: N.T.S.3DURALINE TO PVC TRANSITION
DURALINE SMOOTH-CORFLEX CONDUIT(SEE SERVICE ELECTRICALCIRCUIT SCHEDULE ONSHEET E-1 FOR CONDUIT
SIZE AND QUANTITY)
SUPERCHARGERCABINET
90° PVC TRANSITION INTO CHARGE POST(SEE NOTE 2)90° PVC TRANSITION INTO CABINET(SEE NOTE 2)
NOTES:
1. DURALINE SMOOTH-COR FLEX CONDUIT HAS BEENCERTIFIED AS A CRITICAL COMPONENT OF THESUPERCHARGER POST BY TUV. TESTING REPORTSSHOWING HOW THIS PRODUCT MEETS UL STANDARDSARE AVAILABLE UPON REQUEST. PRODUCT WILL BEUSED FOR "DC-POST" CONDUIT RUN.
2. DURALINE SMOOTH-COR FLEX CONDUITS REQUIRETHE USE OF 90° PVC TRANSITIONS AT EACH ENDAND/OR HARD BENDS. CONTRACTOR TO SUPPLYPVC TRANSITIONS TO TESLA EQUIPMENT.
SUPERCHARGERPOST (V4)
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:23-04'00'
SUBMITTALS
APPROVED BY:
CHECKED BY: NRK
NRK
REV. DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -GRIFFIN RD.(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.FORT LAUDERDALE, FL 33004
DRAWN BY: HMP
PROJECT #:50123704
JOB #:50163349
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
3 04/21/25 ISSUED PER ENG. COMMENTS
4 05/01/25 ISSUED PER ZON. COMMENTS
5 05/15/25 ISSUED PER COMMENTS
6 05/23/25 ISSUED PER COMMENTS
7 05/27/25 ISSUED PER LS COMMENTS
8 05/30/25 ISSUED PER COMMENTS
9 06/05/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.800 NORTH MAGNOLIA AVE.SUITE 1000ORLANDO, FL 32803PHONE: 407.843.5120FAX: 407.649.8664FLORIDA C.O.A. #8794
G-1
GROUNDING SCHEMATIC& DETAILS
CADWELD CONNECTIONS(OR APPROVED EQUAL)BURNDY CONNECTIONS(OR APPROVED EQUAL)
PARALLEL HORIZONTALCONDUCTORSPARALLEL THROUGHCONNECTION OF HORIZONTALTYPE PT
THROUGH CABLE TOGROUND RODTHROUGH CABLE TO TOPOF GROUND ROD TYPE GT
HORIZONTAL SPLICESPLICE OF HORIZONTALCABLES
HORIZONTAL STEEL SURFACETO FLAT STEEL SURFACE ORHORIZONTAL PIPE TYPE HS
VERTICAL STEEL SURFACECABLE DOWN AT 45° TOVERTICAL STEEL SURFACEINCLUDING PIPE TYPE VS
VERTICAL PIPECABLE DOWN AT 45° TORANGE OF VERTICALPIPES TYPE VS
"C" CONNECTORHYPRESS TYPE YGHC
BOND JUMPERFIELD FABRICATED GREENSTRANDED INSULATED TYPE2-YA-2
COPPER LUGSTWO HOLE - LONGBARREL LENGTH TYPEYA-2
SCALE: N.T.S.
GROUND CONNECTION DETAILS 2
GRADE
CONCRETE ENCASED ELECTRODE DETAIL
NOTE:
1. REBAR BONDED TOGETHER WITH STEEL TIE WIRES.
PROPOSEDCONCRETE PAD
#3/0 AWG COPPER EQUIPMENTGROUNDING CONDUCTORNON-METALLICPROTECTIVE SLEEVE
LISTED CONNECTION
SCALE: N.T.S.
SEE NOTE 1
3
1GROUNDING SCHEMATIC
SCALE: N.T.S.
GRND
NE
U
T
PANELBOARD
#3/0 Cu PERNEC 250.66
MANUFACTURER-PROVIDED MAINBONDING JUMPER PER NEC250.24(A)(4), 250.28(C),250.8(A)(7)
#3/0 AWG BARE Cu GROUNDINGELECTRODE CONDUCTOR PERNEC 250.66(B)
CONCRETE ENCASEDELECTRODE PER NEC250.52(A)(3) OR (2)
#3/0 AWG BARE Cu GROUNDINGELECTRODE CONDUCTOR PER
NEC 250.66(A)
GROUNDING ELECTRODE 5/8"x8'-0"WITH 12" MIN. DEPTH COPPER CLADGROUND ROD INSTALLATION PERNEC 250.52(A)(5), 250.53(A) &250.68
PROPOSED 4"UNDERGROUNDCONDUIT (TYP.)#2/0 AL EGC OR
#1 AWG CU EGC(PER NEC 250.64(A)(2))(1) #2/0 CU GROUNDING CONDUCTOR
TESLA CHARGING POST(TYP.)
VEHICLE CONNECTOR
(TYP.)
TESLASUPERCHARGER(TYP.)
PROPOSED 4" UNDERGROUNDCONDUIT (TYP.)
FACTORYINSTALLEDGROUND BAR(TYP.)CHASSIS MOUNTGROUND BAR(TYP.)
(1) #1/0 CU GROUNDING
CONDUCTOR (TYP.)
PROPOSED 3"UNDERGROUND CONDUIT(DC BUS) (TYP.)
GROUND LUGTERMINATION DETAIL
6'-0"
MIN.
SYSTEM GROUNDING RESISTANCE SHALLBE LESS THAN 25Ω PER NEC. ADDADDITIONAL GROUND RODS AS NEEDEDTO SYSTEM UNTIL RESISTANCE IS MET.COORDINATE WITH VENDOR FORREQUIRED SYSTEM GROUNDINGRESISTANCE BEYOND 25Ω
PROPOSED 3/4"CONDUIT-EMT (TYP.)
PROPOSED LEVEL 2CHARGE POST (TYP.)
(1) #10 AWGCU EGC (TYP.)
(1) #3 AWGCU EGC
(1) #1/0 AWGCU EGC
REFERENCEGROUNDINGDIAGRAM
G
PANEL LC-1
SEE ITEM NUMBER 3 ONSERVICE ELECTRICAL CIRCUITSCHEDULE FOR ALLOWABLEGROUNDING CONDUCTOR
CHARGE POST A: SEE ITEM NUMBER3 ON SERVICE ELECTRICAL CIRCUITSCHEDULE FOR ALLOWABLEGROUNDING CONDUCTOR
CONTRACTOR SUPPLIED GROUNDINGLUG SIZED PER APPLICABLE
GROUNDING CONDUCTOR (TYP.)
#1/0 COPPER DC BUSGROUNDING CONDUCTOR(TYP.-EACH SUPERCHARGER)
#2/0 AL EGC OR#1 AWG CU EGC(PER NEC 250.64(A)(2))
CHARGE POST C: SEE ITEM NUMBER 3ON SERVICE ELECTRICAL CIRCUITSCHEDULE FOR ALLOWABLEGROUNDING CONDUCTOR
CHARGE POST D: SEE ITEM NUMBER3 ON SERVICE ELECTRICAL CIRCUITSCHEDULE FOR ALLOWABLEGROUNDING CONDUCTOR
CHARGE POST B: SEE ITEM NUMBER3 ON SERVICE ELECTRICAL CIRCUITSCHEDULE FOR ALLOWABLEGROUNDING CONDUCTOR
Nathan R KreuserThis document has been electronically signed and sealed by Nathan Kreuser PE (No. 91003 - State of Florida) on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies2025.06.06 10:48:23-04'00'
Florida Power & Light Company
11/5/2024
Tesla
3500 Deer Creek Rd
Palo Alto, CA 94304
Re: Tesla Fort Lauderdale, FL - Griffin Rd
Thank you for contacting FPL about an installation of superchargers in the utility easement. FPL
has no objection to this installation and recommends easily removable sections at the access
area(s). If access to the easement is necessary for any utility work, the property owner is
responsible for the removal and reinstallation.
Prior to any digging you must contact Sunshine State One Call of Florida. Contact them either
by telephone toll free at 1-800-432-4770 or by e-mail at www.callsunshine.com, forty-eight
hours in advance of construction. Sunshine State One Call of Florida will schedule a locator to
perform the necessary locates for you at no cost.
If I can be of any further assistance, please contact me at 954-717-2096.
Sincerely,
Alonzo Russell
Distribution Engineer
SOLARGY, LLC#1045
Bank of America
3101 Maguire Boulevard, Suite 265, Orlando, Florida 32803 ■ P: (407) 531-5332 ■ F: (407) 531-5331 ■ www.trafficmobility.com
MEMORANDUM
March 18, 2025
Re: Tesla – Ft. Lauderdale – Griffin Road
Traffic Impact Analysis Methodology
Dania Beach, Florida
Project № 25047.01.01
This methodology outlines the approach to the preparation of the proposed Traffic Impact Analysis
(TIA) for the above-mentioned project.
Project Description
The proposed project has 48 Level-3 chargers and 6 Level 2-chargers added to the existing
parking lot of the Fairfield Inn and Suites. The anticipated buildout year for the project is 2025. A
site plan is included in the Attachments. The site is located northeast of the Griffin Road and
Ravenswood Road intersection in the City of Dania Beach, Florida, as shown in Figure 1. Many
of its users will likely be associated with the nearby Ft. Lauderdale-Hollywood International
Airport. The development is proposed to access the network via the two (2) existing access
driveways for the plaza; one (1) right-in/right-out on Griffin Road and one (1) full access driveway
on Ravenswood Road.
Trip Generation
The trip generation analysis was estimated using estimated charging times and electric vehicle
volumes in the area. Level-3 chargers typically take 15-30 minutes to charge; therefore, have the
opportunity to generate more trips. Level-2 charges typically take four hours to charge, and are
anticipated to be primarily used by patrons of the Fairfield Inn and Suites which would not increase
the amount of net trips the site would generate. Tesla estimates that 4,500 Tesla cars travel
through Griffin Road and Anglers Avenue per day. To be conservative, given the charging speed
of the Level-3 chargers and the number of vehicles passing through, each Level-3 charger is
anticipated to charge two vehicles in the PM peak hour. In the AM peak hour electric vehicles
would be more likely to have been charged overnight and would be less likely to stop at the
charging station; therefore, a lower trip generation rate is proposed. A certain amount of the trips
generated by the development is expected to be pass-by trips making a stop at the charging
station on the way to another destination. Gas stations/convenience stores would be a similar
land use and have a pass-by percentage of around 75%. The electric charging stations are not
as abundant as gas stations/convenience stores, so many of the trips require planning
beforehand. To be conservative, a lower pass-by of 25% will be used for the proposed site. The
resulting trip generation analysis is summarized in Table 1.
Colonial Dr
SITE
1-Mile Radius
SITE
Griffin Rd
Ra
v
e
n
s
w
o
o
d
R
d
Not to Scale
N
25047.01.01 Tesla Ft. Lauderdale-Griffin Road Project Location Map Figure 1
Tesla – Ft. Lauderdale – Griffin Road
Traffic Impact Analysis Methodology
Project № 25047.01.01
March 18, 2025
Page 3 of 6
Table 1
Trip Generation Analysis
The development is projected to generate a total of 800 net new external daily trips, of which 54
trips occur during the AM peak hour, and 72 trips occur during the PM peak hour.
Trip Distribution
The developments trips were manually distributed based on prevailing traffic patterns adjacent to
the site. The projected distribution pattern is presented in Figure 2.
Study Area
The TIA will have a study area of a 1-mile radius from the site. This will include all roadway
segments and major intersections. Capacity thresholds, service volumes and adopted level of
service (LOS) standards will be obtained from the Broward Metropolitan Planning Organization
(MPO) 2020 Level of Service Spreadsheet, included in the Attachments.
ITE Daily AM Peak Hour PM Peak Hour
Code Land Use Size Rate Trips Rate Total Enter Exit Rate Total Enter Exit
N/A Level-3 Chargers 48 Stations 22.22 1,067 1.50 72 36 36 2.00 96 48 48
Pass-by Trips (25%)267 18 9 9 24 12 12
Net New Trip Generation 800 54 27 27 72 36 36
Daily Rate Calculated Using a K-factor of 0.09
Pass-by estimated based on ITE Trip Generation Handbook, 3rd Edition
SITE
20%
15%
20%15%
5%
5%
5%
5%
5%
10%
10%
10%
10%
5%10%
10%
10%
20%
20%
5%
5%
25%
Not to Scale
N
Project Trip Distribution Figure 225047.01.01 Tesla Ft. Lauderdale-Griffin Road
Tesla – Ft. Lauderdale – Griffin Road
Traffic Impact Analysis Methodology
Project № 25047.01.01
March 18, 2025
Page 5 of 6
Based on study area analysis, the following roadway segments and intersections will be analyzed
as part of this study:
Study Roadway Segments:
• Old Griffin Road
o Griffin Road to US 1
• Griffin Road
o US 441 to 30th Avenue
o 30th Avenue to Ravenswood Road
o Ravenswood Road to I-95
o I-95 to US 1
• SW 42nd Street
o 30th Avenue to Ravenswood Road
• 30th Avenue
o SR 84 to SW 42nd Street
o SW 42nd Street to Griffin Road
• Ravenswood Road
o SR 84 to SW 36th Street
o SW 36th Street to Griffin Road
o Griffin Road to Stirling Road
Study Intersections:
• Griffin Road and SW 30th Avenue (signalized)
• Griffin Road and Ravenswood Road (signalized)
• Griffin Road and Plaza Entrance (unsignalized)
• Ravenswood Road and Plaza Entrance (unsignalized)
Planned and Programmed Improvements
The City and County Capital Improvement Programs (CIP), the FDOT Work Program, and the
Broward TPO Transportation Improvement Program (TIP) were reviewed to determine if any
improvements are programmed and/or planned in the study area. No improvements were found
within the study area.
Tesla – Ft. Lauderdale – Griffin Road
Traffic Impact Analysis Methodology
Project № 25047.01.01
March 18, 2025
Page 6 of 6
Capacity Analysis
The TIA will include a roadway segment capacity analysis of the PM peak hour for the existing,
background, and buildout conditions. The capacity analysis will be based on the peak hour
directional service volumes from the Broward MPO 2020 Level of Service Spreadsheet. The
intersection capacity analysis will be conducted for both the AM and PM peak hour for the existing,
background, and buildout conditions. The analysis will be based on three-hour field counts,
buildout traffic, Synchro software and the methods of Highway Capacity Manual (HCM).
Projected Traffic
Projected roadway background traffic for the 2025 buildout year will be calculated using the
growth rates derived from the Florida Traffic Online traffic counts or a minimum annual growth
rate of 2%. Projected buildout traffic will be the sum of background traffic and new project trips.
Projected intersection volumes will be calculated using the growth rates of the adjacent roadways.
Report
A TIA report will be prepared for submittal to the City of Dania Beach documenting the analysis,
findings, and recommendations.
ATTACHMENTS
E
EM
IV
WV
WM
IB
CO
E EMEM
E
WV
WV WV
WV
WV
WV WV
WV
WV
WM
WMWM
WM
WM
WMWM
IV
IV
IV
IV
IV
IV IV
IVIV
IV
IV
IV
IV
IV
IV
IV
IV
IB
IV
COCO CO
CO
CO
CO
CO
IVIV
SUBMITTALS
APPROVED BY:
CHECKED BY:DER
NRK
REV.DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -
GRIFFIN RD.
(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.
FORT LAUDERDALE, FL 33004
DRAWN BY:SL
PROJECT #:50123704
JOB #:50163349
3500 DEER CREEK ROAD
PALO ALTO, CA 94304
(650) 681-5000
0 11/01/23 ISSUED FOR S&S
Dewberry Engineers Inc.
800 NORTH MAGNOLIA AVE.
SUITE 1000
ORLANDO, FL 32803
PHONE: 407.843.5120
FAX: 407.649.8664
FLORIDA C.O.A. #8794
C-1
DETAILED SITE PLAN
SCALE:1"=60' FOR 11"x17"
1"=30' FOR 22"x34"
30'0'60'
DETAILED SITE PLAN
LEGEND
NOTES:
1.SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A
PORTION OF THE PROPERTY DESCRIBED IN BOOK 175,
PAGE 38, CITY OF FORT LAUDERDALE, BROWARD COUNTY,
FL BY CLARK LAND SURVEYING, INC. DATED
03/16/2023.
2.UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIES
STANDARDS, CONFIRM FINAL DESIGN PRIOR TO
CONSTRUCTION, FPL WORK ORDER SUPERCHARGERS -
PROJECT #12411906, LEVEL 2 CONNECTORS - PROJECT
#12411939.
3.EXISTING UNDERGROUND UTILITIES LOCATED WITHIN AREA
OF PROPOSED TRENCH & EQUIPMENT SITE AREA. HAND
DIG AND RELOCATE AS REQUIRED.
4.EXISTING STORM DRAIN INLETS TO BE COVERED WITH
SILT BAG DURING CONSTRUCTION.
5.CONTRACTOR TO CONFIRM ADA/ACCESSIBLE STRIPING &
ASSOCIATED STALLS HAVE <2% GRADE IN ALL
DIRECTIONS.
Existing Underground
Water Line (Typ.)
BOOK 45442, PAGE 343
APN: 5042 28 17 0030
OWNER: GRIFFIN ROAD THREE LLC
BOOK 45442, PAGE 335
APN: 5042 28 17 0010
OWNER: GRIFFIN ROAD ONE, LLC
AP
N
:
5
0
4
2
2
8
0
5
0
0
1
0
OW
N
E
R
:
I
N
T
E
R
M
A
R
I
N
E
I
N
C
.
N8
7
°
3
1
'
1
4
"
E
2
7
0
.
8
9
'
S01°21'03"E 194.00'N8
8
°
3
9
'
3
3
"
E
29
.
6
4
'
S01°32'33"E 224.01'
N01°36'02"W 262.19'
N01°36'02"W
51.18'
N01°36'09"W 92.71'
L1
S8
7
°
2
1
'
1
9
"
W
8
6
.
7
1
'
S8
7
°
2
1
'
1
9
"
W
3
9
0
.
4
3
'
S8
8
°
2
5
'
0
6
"
W
3
1
1
.
4
8
'
N8
7
°
2
1
'
1
9
"
E
1
4
5
.
0
2
'
S01°36'04"E 107.27'
N01°36'02"W 71.33'
S01°36'04"E 119.27'
N05°14'32"E 101.24'
S01°32'38"E 173.91'S01°32'15"E 50.10'
Δ=0
°
0
9
'
1
5
"
R=
1
1
3
9
8
.
4
1
'
L=
3
0
.
6
8
'
S8
7
°
2
1
'
1
9
"
W
39
0
.
4
3
'
Existing
Building
ANGLERS AVENUE
(PUBLIC R.O.W. VARIES)
GR
I
F
F
I
N
R
O
A
D
(
S
T
A
T
E
H
I
G
H
W
A
Y
8
1
8
)
(P
U
B
L
I
C
R
.
O
.
W
.
V
A
R
I
E
S
)
Existing Underground
Storm Line (Typ.)
Existing Underground
Sanitary Line (Typ.)
Existing Underground
Electric Line (Typ.)
Existing Overhead
Electric Line (Typ.)
Existing Storm
Inlet (Typ.)
Existing Wheelstop
(Typ.)
Existing Utility
Pole (Typ.)
Existing Shrub
(Typ.)
Existing Tree
(Typ.)
Existing Light
Post (Typ.)
Existing Storm
Drain (Typ.)
9
9
9
9
8
9
8
9
9
9
8
9
9
8
9
8
9
9 10
10 10
10
10
10
9
9
10
10
11
10
9
9
10
10
8
8
9
9
9
8
9
9 8
10
9
9
9
9
8
10
10
10
10
10
1
010
10
9
9
9
9 9
9
9
9
9
9
9
10
9
9
9
9
C-2
1
C-3
1
30'-0" UTILITY
EASEMENT
20'-0" BUILDING
SETBACK
30'-0" UTILITY
EASEMENT
10'-0" ELECTRIC
EASEMENT
40'-0"
ACCESS
EASEMENT
10'-0" APPROXIMATE
ELECTRIC EASEMENT
10'-0"
ELECTRIC EASEMENT 15'-0"
ELECTRIC EASEMENT
12'-0" ROAD
DEDICATION
25'-0" UTILITY
EASEMENT
20'-0" UTILITY
EASEMENT
20'-0" UTILITY
EASEMENT
10'-0" ELECTRIC
EASEMENT
20'-0" UTILITY
EASEMENT
10'-0"
ELECTRIC
EASEMENT
25'-0"
UTILITY
EASEMENT
30'-0" UTILITY
EASEMENT
EQUIPMENT QTY
GRAY STANDARD OFFSET EV FLEX
REBOUNDING BOLLARD 45
GRAY SIGN POST OFFSET EV FLEX
REBOUNDING BOLLARD 3
GRAY 4" STANDARD DEEP MOUNT
CRASHCORE BOLLARD 5
GRAY 4" SIGN POST DEEP MOUNT
CRASHCORE BOLLARD 1
V3.5 CABINET (4 POST)12
DISABLED ACCESS, USE LAST SIGN 4
VAN ACCESSIBLE SIGN 4
CRADLEPOINT ENCLOSURE 2
ARUBA ACCESS POINT KIT 4
V3/V4 POST 48
GEN 3 TESLA 24FT 16
CABINET FUSE 12
4" SUPERFLEX CONDUIT (FT)2522
4" SUPERFLEX STRAIGHT COUPLER 10
4" DURALINE CONDUIT (FT)8853
4" ADAPTER - DURALINE TO PVC 96
4" COUPLER - DURALINE TO DURALINE 10
1.25" DURALINE CONDUIT (FT)8853
1.25" ADAPTER - DURALINE TO PVC 96
1.25" COUPLER - DURALINE TO DURALINE 10
Broward County Broward County
Roadway Capacity and Level of Service AnalysisRoadway Capacity and Level of Service Analysis
Design
ID E/W Roadway Segment Code V/C LOS V/C LOS Code Volume V/C LOS Volume V/C LOSCapacity
APPENDIX B: East / West Roadways Capacity and Level of Service Analysis 2020 & 2045
2020 2020 2045 2045
Daily Conditions Peak Hour Conditions Daily Conditions Peak Hour Conditions
AADT Capacity Volume Capacity Capacity
206 Sheridan St E of US 1 422 27500 39800 0.69 C 2613 3580 0.73 C 422 24200 39800 0.61 C 2299 3580 0.64 C
1012 Stirling Rd E of US 27 264 2200 13320 0.17 C 209 1197 0.17 C 264 7300 13320 0.55 D 694 1197 0.58 D
208 Stirling Rd E of SW 160 Ave 474 5400 35820 0.15 C 513 3222 0.16 C 474 10700 35820 0.30 C 1017 3222 0.32 C
210 Stirling Rd E of I-75 474 5400 35820 0.15 C 513 3222 0.16 C 474 11300 35820 0.32 C 1074 3222 0.33 C
212 Stirling Rd E of SW 148 Ave 264 3700 13320 0.28 C 352 1197 0.29 C 264 9000 13320 0.68 D 855 1197 0.71 D
214 Stirling Rd E of SW 136 Ave 264 3700 13320 0.28 C 352 1197 0.29 C 264 8300 13320 0.62 D 789 1197 0.66 D
216 Stirling Rd E of Flamingo Rd 422 27500 e 37810 r 0.73 C 2613 3401 r 0.77 C 422 23500 37810 r 0.62 C 2233 3401 r 0.66 C
218 Stirling Rd E of Hiatus Rd 422 19800 37810 r 0.52 C 1881 3401 r 0.55 C 422 23600 37810 r 0.62 C 2242 3401 r 0.66 C
220 Stirling Rd E of Palm Ave 422 20400 37810 r 0.54 C 1938 3401 r 0.57 C 422 24800 37810 r 0.66 C 2356 3401 r 0.69 C
222 Stirling Rd E of Douglas Rd 422 27000 37810 r 0.71 C 2565 3401 r 0.75 C 422 49200 37810 r 1.30 F 4674 3401 r 1.37 F
224 Stirling Rd E of University Dr 622 33000 59900 0.55 C 3135 5390 0.58 C 622 43100 59900 0.72 C 4095 5390 0.76 C
226 Stirling Rd E of Davie Rd 622 39500 59900 0.66 C 3753 5390 0.70 C 622 61800 59900 1.03 F 5871 5390 1.09 F
228 Stirling Rd E of N 64 Ave 622 39000 59900 0.65 C 3705 5390 0.69 C 622 61700 59900 1.03 F 5862 5390 1.09 F
230 Stirling Rd E of SR 7 622 31500 59900 0.53 C 2993 5390 0.56 C 622 54400 59900 0.91 C 5168 5390 0.96 C
232 Stirling Rd E of Park Rd 622 42500 59900 0.71 C 4038 5390 0.75 C 622 54800 59900 0.91 C 5206 5390 0.97 C
234 Stirling Rd E of I-95 622 32500 59900 0.54 C 3088 5390 0.57 C 622 45300 59900 0.76 C 4304 5390 0.80 C
236 Dania Bch Blvd E of US 1 622 8900 59900 0.15 C 846 5390 0.16 C 422 41500 39800 1.04 F 3943 3580 1.10 F
238 Dania Bch Blvd E of NE 2 Ave 622 8400 59900 0.14 C 798 5390 0.15 C 622 35000 59900 0.58 C 3325 5390 0.62 C
240 Dania Bch Blvd E of Gulfstream Rd 422 8400 e 39800 0.21 C 798 3580 0.22 C 422 25500 39800 0.64 C 2423 3580 0.68 C
248 Old Griffin Rd S of Griffin Rd 264 5100 13320 0.38 C 485 1197 0.40 C 264 12800 13320 0.96 D 1216 1197 1.02 E
250 Griffin Rd E of US 27 222 6400 16815 r 0.38 C 608 1520 r 0.40 C 222 10500 16815 r 0.62 C 998 1520 r 0.66 C
252 Griffin Rd E of SW 184 Ave 422 15200 37810 r 0.40 C 1444 3401 r 0.42 C 422 23100 37810 r 0.61 C 2195 3401 r 0.65 C
254 Griffin Rd E of SW 172 Ave 422 22000 37810 r 0.58 C 2090 3401 r 0.61 C 422 30700 37810 r 0.81 C 2917 3401 r 0.86 C
256 Griffin Rd E of SW 160 Ave 422 38500 37810 r 1.02 F 3658 3401 r 1.08 F 422 49700 37810 r 1.31 F 4722 3401 r 1.39 F
258 Griffin Rd E of I-75 622 38500 56905 r 0.68 C 3658 5121 r 0.71 C 622 52400 56905 r 0.92 C 4978 5121 r 0.97 C
260 Griffin Rd E of SW 148 Ave 422 27000 37810 r 0.71 C 2565 3401 r 0.75 C 622 40100 56905 r 0.70 C 3810 5121 r 0.74 C
262 Griffin Rd E of SW 136 Ave 422 27000 37810 r 0.71 C 2565 3401 r 0.75 C 622 33000 56905 r 0.58 C 3135 5121 r 0.61 C
264 Griffin Rd E of Flamingo Rd 622 30000 59900 0.50 C 2850 5390 0.53 C 622 39200 59900 0.65 C 3724 5390 0.69 C
266 Griffin Rd E of 118 Ave 622 30000 59900 0.50 C 2850 5390 0.53 C 622 31700 59900 0.53 C 3012 5390 0.56 C
268 Griffin Rd E of Hiatus Rd 622 30000 59900 0.50 C 2850 5390 0.53 C 622 34700 59900 0.58 C 3297 5390 0.61 C
270 Griffin Rd E of SW 100 Ave 622 35500 59900 0.59 C 3373 5390 0.63 C 622 43100 59900 0.72 C 4095 5390 0.76 C
272 Griffin Rd E of SW 90 Ave 622 35500 59900 0.59 C 3373 5390 0.63 C 622 44100 59900 0.74 C 4190 5390 0.78 C
274 Griffin Rd E of Pine Island Rd 622 47000 59900 0.78 C 4465 5390 0.83 C 622 49200 59900 0.82 C 4674 5390 0.87 C
276 Griffin Rd E of University Dr 622 24100 59900 0.40 C 2290 5390 0.42 C 622 34200 59900 0.57 C 3249 5390 0.60 C
278 Griffin Rd E of 76 Ave 622 24100 59900 0.40 C 2290 5390 0.42 C 622 39600 59900 0.66 C 3762 5390 0.70 C
280 Griffin Rd E of Davie Rd 622 35000 59900 0.58 C 3325 5390 0.62 C 622 46200 59900 0.77 C 4389 5390 0.81 C
282 Griffin Rd E of Fla Turnpike 622 34500 59900 0.58 C 3278 5390 0.61 C 622 44800 59900 0.75 C 4256 5390 0.79 C
284 Griffin Rd E of SR 7 622 36000 59900 0.60 C 3420 5390 0.63 C 622 44800 59900 0.75 C 4256 5390 0.79 C
286 Griffin Rd E of I-95 622 18700 59900 0.31 C 1777 5390 0.33 C 622 61700 59900 1.03 F 5862 5390 1.09 F
1014 SW 42 St E of SW 30 Ave 264 3100 13320 0.23 C 295 1197 0.25 C 264 6500 13320 0.49 C 618 1197 0.52 D
e - estimated traffic volumes; capacity - maximum LOS "D" service volume, not actual capacity; r - maximum LOS "D" service volume reduced by 5%B- 4
Broward County Broward County
Roadway Capacity and Level of Service AnalysisRoadway Capacity and Level of Service Analysis
Design Design
ID N/SRoadway Segment Code V/C LOS V/C LOS Code Volume V/C LOS Volume V/C LOS
2045
Peak Hour Conditions
Capacity
2045
APPENDIX C: North / South Roadways Capacity and Level of Service Analysis 2020 & 2045
AADT Capacity Volume Capacity
Daily Conditions Daily Conditions
2020 2020
Peak Hour Conditions
Capacity
589 NW 31 Ave N of Sunrise Blvd 674 32000 53910 0.59 C 3040 4851 0.63 C 674 48200 53910 0.89 C 4579 4851 0.94 C
591 NW 31 Ave N of NW 19 St 674 32500 53910 0.60 C 3088 4851 0.64 C 674 37600 53910 0.70 C 3572 4851 0.74 C
593 NW 31 Ave N of Oakland Pk Blvd 674 24500 53910 0.45 C 2328 4851 0.48 C 674 35800 53910 0.66 C 3401 4851 0.70 C
595 NW 31 Ave N of Commercial Blvd 674 24500 53910 0.45 C 2328 4851 0.48 C 674 35800 53910 0.66 C 3401 4851 0.70 C
597 NW 31 Ave N of Prospect Rd 674 26500 53910 0.49 C 2518 4851 0.52 C 674 62700 53910 1.16 F 5957 4851 1.23 F
599 Lyons Rd N of Cypress Crk Rd 674 25000 53910 0.46 C 2375 4851 0.49 C 674 61600 53910 1.14 F 5852 4851 1.21 F
601 Lyons Rd N of McNab Rd 474 24000 35820 0.67 C 2280 3222 0.71 C 474 50500 35820 1.41 F 4798 3222 1.49 F
1041 Lyons Rd N of Atlantic Blvd 674 17200 53910 0.32 C 1634 4851 0.34 C 674 38500 53910 0.71 C 3658 4851 0.75 C
603 Lyons Rd N of NW 6 Mr 474 17200 35820 0.48 C 1634 3222 0.51 C 474 38500 35820 1.07 F 3658 3222 1.14 F
605 Lyons Rd N of Coconut Crk Pkwy 474 30000 35820 0.84 C 2850 3222 0.88 C 474 36000 35820 1.00 F 3420 3222 1.06 F
607 Lyons Rd N of Copans Rd 474 35500 35820 0.99 D 3373 3222 1.05 F 474 46100 35820 1.29 F 4380 3222 1.36 F
609 Lyons Rd N of Sample Rd 674 32500 53910 0.60 C 3088 4851 0.64 C 674 44400 53910 0.82 C 4218 4851 0.87 C
611 Lyons Rd N of Wiles Rd 674 32500 53910 0.60 C 3088 4851 0.64 C 674 63400 53910 1.18 F 6023 4851 1.24 F
613 Lyons Rd N of Sawgrass Xway 674 32500 53910 0.60 C 3088 4851 0.64 C 674 78800 53910 1.46 F 7486 4851 1.54 F
615 Lyons Rd N of Hillsboro Blvd 674 26500 53910 0.49 C 2518 4851 0.52 C 674 70000 53910 1.30 F 6650 4851 1.37 F
617 Riverland Rd E of SR 7 264 3900 13320 0.29 C 371 1197 0.31 C 264 21700 13320 1.63 F 2062 1197 1.72 F
619 SW 27 Ave N of Davie Blvd 474 14000 35820 0.39 C 1330 3222 0.41 C 474 45800 35820 1.28 F 4351 3222 1.35 F
1087 NW 27 Ave N of Sunrise Blvd 264 9000 13320 0.68 D 855 1197 0.71 D 264 13700 13320 1.03 E 1302 1197 1.09 F
621 SW 30 Ave N of Griffin Rd 264 9300 13320 0.70 D 884 1197 0.74 D 464 23000 29160 0.79 D 2185 2628 0.83 D
1043 SW 30 Ave N of SW 42 St 464 11200 29160 0.38 C 1064 2628 0.40 C 464 39300 29160 1.35 F 3734 2628 1.42 F
623 SW 26 Terr N of SW 32 St 264 5100 13320 0.38 C 485 1197 0.40 C 264 11600 13320 0.87 D 1102 1197 0.92 D
625 Ravenswood Rd N of Stirling Rd 264 14600 13320 1.10 F 1387 1197 1.16 F 464 46100 29160 1.58 F 4380 2628 1.67 F
627 Ravenswood Rd N of Griffin Rd 264 5000 13320 0.38 C 475 1197 0.40 C 464 18600 29160 0.64 D 1767 2628 0.67 D
1053 Ravenswood Rd N of NW 36 ST 264 5000 13320 0.38 C 475 1197 0.40 C 264 8600 13320 0.65 D 817 1197 0.68 D
629 N 29 Ave N of Sheridan St 464 6900 29160 0.24 C 656 2628 0.25 C 464 28300 29160 0.97 D 2689 2628 1.02 E
631 NW 23 Ave N of Sunrise Blvd 364 10100 13986 0.72 D 960 1257 0.76 D 364 16200 13986 1.16 F 1539 1257 1.22 F
633 NW 21 Ave N of NW 19 St 264 10100 13320 0.76 D 960 1197 0.80 D 264 18900 13320 1.42 F 1796 1197 1.50 F
635 NW 21 Ave N of Oakland Pk Blvd 264 16800 13320 1.26 F 1596 1197 1.33 F 464 34100 29160 1.17 F 3240 2628 1.23 F
1089 NW 21 Ave N of Commercial Blvd 264 2500 13320 0.19 C 238 1197 0.20 C 264 10700 13320 0.80 D 1017 1197 0.85 D
637 NW 21/Oaks Dr N of Cypress Crk Rd 264 5400 13320 0.41 C 513 1197 0.43 C 264 12400 13320 0.93 D 1178 1197 0.98 D
639 NW 31 Ave_FTPK N of Atlantic Blvd 422 14300 39800 0.36 C 1359 3580 0.38 C 422 21000 39800 0.53 C 1995 3580 0.56 C
641 Blount Rd N of Coconut Crk Pkwy 264 6500 13320 0.49 C 618 1197 0.52 D 474 16900 35820 0.47 C 1606 3222 0.50 C
643 Blount Rd N of Copans Rd 464 8300 29160 0.28 C 789 2628 0.30 C 464 10500 29160 0.36 C 998 2628 0.38 C
647 NW 15 Ave N of Sunrise Blvd 264 8600 13320 0.65 D 817 1197 0.68 D 264 12300 13320 0.92 D 1169 1197 0.98 D
1153 NW 12 Ave N of Commercial Blvd 464 4200 29160 0.14 C 399 2628 0.15 C 464 2800 29160 0.10 C 266 2628 0.10 C
1091 NW 27 Ave N of Atlantic Blvd 264 9600 13320 0.72 D 912 1197 0.76 D 264 14000 13320 1.05 E 1330 1197 1.11 F
1095 Bryan Rd N of Stirling Rd 264 6400 13320 0.48 C 608 1197 0.51 D 264 9000 13320 0.68 D 855 1197 0.71 D
651 SW 9 Ave N of SR 84 264 4200 13320 0.32 C 399 1197 0.33 C 264 8900 13320 0.67 D 846 1197 0.71 D
653 NW 9 Ave N of Broward Blvd 264 3400 13320 0.26 C 323 1197 0.27 C 264 11500 13320 0.86 D 1093 1197 0.91 D
655 NW 9 Ave N of NW 6 St 264 6800 13320 0.51 D 646 1197 0.54 D 264 12800 13320 0.96 D 1216 1197 1.02 E
e - estimated traffic volumes; capacity - maximum LOS "D" service volume, not actual capacity; r - maximum LOS "D" service volume reduced by 5%B- 22
Tesla Ft. Lauderdale-Griffin Road
Project № 25047.01.01
April 2025
Traffic Impact Analysis
City of Dania Beach
Florida
Prepared for:
Dewberry Engineering Inc
800 North Magnolia Avenue, Suite 1000
Orlando, Florida 32803
Prepared by:
3101 Maguire Boulevard, Suite 265
Orlando, Florida 32803
www.trafficmobility.com
(407) 531-5332
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Executive Summary
EXECUTIVE SUMMARY
Project Information
Name: Tesla Ft. Lauderdale-Griffin Road
Location: Northeast of the Griffin Road and Ravenswood Road/Anglers Avenue
Jurisdiction City of Dania Beach, Florida
Description: 48 Level-3 chargers
Six (6) Level-2 chargers
Access: Two (2) existing access driveways
Findings
Trip Generation: 800 ADT / 54 AM Peak / 72 PM Peak
Adverse Impacts: The transportation network is not projected to become adversely
impacted due to the proposed development.
PROFESSIONAL ENGINEERING CERTIFICATION
I hereby certify that I am a Professional Engineer properly registered in the State of Florida practicing
with Traffic & Mobility Consultants LLC, a corporation authorized to operate as an engineering business,
CA-30024, by the State of Florida Department of Professional Regulation, Board of Professional
Engineers, and that I have prepared or approved the evaluations, findings, opinions, conclusions, or
technical advice attached hereto for:
PROJECT: Tesla Ft. Lauderdale-Griffin Road
LOCATION: City of Dania Beach, Florida
CLIENT: Dewberry Engineering Inc
I hereby acknowledge that the procedures and references used to develop the results contained in these
computations are standard to the professional practice of Transportation Engineering as applied through
professional judgment and experience.
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY
ON THE DATE ADJACENT TO THE SEAL
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED
AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
TRAFFIC & MOBILITY CONSULTANTS LLC
3101 MAGUIRE BOULEVARD, SUITE 265
ORLANDO, FLORIDA 32803
CERTIFICATE OF AUTHORIZATION CA-30024
CHARLOTTE N. DAVIDSON, P.E. № 50725
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Table of Contents i
TABLE OF CONTENTS
Page
1.0 INTRODUCTION ............................................................................................................ 1
2.0 PROJECT TRAFFIC ...................................................................................................... 3
2.1 Trip Generation ........................................................................................................... 3
2.2 Trip Distribution .......................................................................................................... 3
3.0 STUDY AREA ................................................................................................................ 5
3.1 Study Roadways ......................................................................................................... 5
3.2 Study Intersections ..................................................................................................... 6
4.0 TRANSPORTATION IMPROVEMENTS ........................................................................ 7
5.0 TRAFFIC PROJECTIONS .............................................................................................. 8
5.1 Projected Roadway Volumes ...................................................................................... 8
5.2 Projected Intersection Volumes .................................................................................. 8
6.0 CAPACITY ANALYSIS .................................................................................................12
6.1 Roadway Segments.................................................................................................. 12
6.2 Intersections ............................................................................................................. 12
7.0 STUDY CONCLUSIONS ...............................................................................................15
APPENDICES
Appendix A Site Plan/Information
Appendix B Methodology Correspondence
Appendix C Broward County Traffic Counts
Appendix D Growth Rate Trends
Appendix E Traffic Movement Counts & Seasonal Factor
Appendix F Intersection Volume Calculations
Appendix G Synchro Printouts & Signal Timings
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Table of Contents ii
LIST OF TABLES
Table 1 Trip Generation Summary ........................................................................................................ 3
Table 2 Study Segments ....................................................................................................................... 5
Table 3 Study Intersections ................................................................................................................... 6
Table 4 Projected Background Volumes ............................................................................................... 9
Table 5 Segment Analysis................................................................................................................... 13
Table 6 Intersection Analysis .............................................................................................................. 14
LIST OF FIGURES
Figure 1 Site Location Map ................................................................................................................... 2
Figure 2 Trip Distribution Pattern........................................................................................................... 4
Figure 3 AM Peak Intersection Volumes ............................................................................................. 10
Figure 4 PM Peak Intersection Volumes ............................................................................................. 11
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Page 1
1.0 INTRODUCTION
This analysis was prepared in support of a development application for Tesla Ft. Lauderdale-Griffin Road.
The project contains 48 Level-3 chargers and six (6) Level-2 chargers added to the parking lot of the
Fairfield Inn and Suites. The project’s anticipated buildout date is 2025. The site is proposed to have
access via two (2) existing driveways used by the plaza; one (1) right-in/right-out on Griffin Road and one
(1) full access on Ravenswood Road/Anglers Avenue.
The site is located northeast of the Griffin Road and Ravenswood Road intersection, in the City of Dania
Beach, Florida. Figure 1 depicts the site location and the surrounding transportation network. A
conceptual site/development plan depicting the site layout, land uses, and access points is included in
Appendix A.
The analysis was conducted in accordance with a methodology approved by City of Dania Beach. The
approved methodology and pertinent correspondence are included in Appendix B.
Information used in this analysis includes data collected by Traffic & Mobility Consultants, information
provided by the project team, and/or other data and information obtained from the City of Dania Beach,
Broward County, the Institute of Transportation Engineers (ITE), and the Florida Department of
Transportation (FDOT).
Colonial Dr
SITE
1-Mile Radius
SITE
Griffin Rd
Ra
v
e
n
s
w
o
o
d
R
d
Not to Scale
N
25047.01.01 Tesla Ft. Lauderdale-Griffin Road Project Location Map Figure 1
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Page 3
2.0 PROJECT TRAFFIC
2.1 Trip Generation
The trip generation analysis was estimated using estimated charging times and electric vehicle volumes
in the area. Level-3 chargers typically take 15-30 minutes to charge; therefore, have the opportunity to
generate more trips. Level-2 charges typically take four hours to charge and are anticipated to be primarily
used by patrons of the Fairfield Inn and Suites, which would not increase the number of net trips the site
would generate. Tesla estimates that 4,500 Tesla cars travel through Griffin Road and Anglers Avenue
per day. To be conservative, given the charging speed of the Level-3 chargers and the number of vehicles
passing through, each Level-3 charger is anticipated to charge two vehicles in the PM peak hour. In the
AM peak hour electric vehicles would be more likely to have been charged overnight and would be less
likely to stop at the charging station; therefore, a lower trip generation rate is proposed. A certain amount
of the trips generated by the development is expected to be pass-by trips making a stop at the charging
station on the way to another destination. Gas stations/convenience stores would be a similar land use
and have a pass-by percentage of around 75%. The electric charging stations are not as abundant as
gas stations/convenience stores, so many of the trips require planning beforehand. To be conservative,
lower pass-by of 25% will be used for the proposed site. The resulting trip generation analysis is
summarized in Table 1.
Table 1
Trip Generation Summary
The proposed development is projected to generate 800 net external daily trips, of which 54 trips occur
during the AM peak hour and 72 trips occur during the PM peak hour.
2.2 Trip Distribution
The developments trips were manually distributed based on prevailing traffic patterns adjacent to the site.
The projected distribution pattern is presented in Figure 2.
ITE Daily AM Peak Hour PM Peak Hour
Code Land Use Size Rate Trips Rate Total Enter Exit Rate Total Enter Exit
N/A Level-3 Chargers 48 Stations 22.22 1,067 1.50 72 36 36 2.00 96 48 48
Pass-by Trips (25%)267 18 9 9 24 12 12
Net New Trip Generation 800 54 27 27 72 36 36
Daily Rate Calculated Using a K-factor of 0.09
SITE
20%
15%
20%15%
5%
5%
5%
5%
5%
10%
10%
10%
10%
5%10%
10%
10%
20%
20%
5%
5%
25%
Not to Scale
N
Project Trip Distribution Figure 225047.01.01 Tesla Ft. Lauderdale-Griffin Road
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Page 5
3.0 STUDY AREA
3.1 Study Roadways
The study area was established in accordance with the requirements of the City of Dania Beach and the
approved methodology. The impact area includes roadway segments within the project’s 1-mile influence
area. The project’s study area determination is provided in Table 2. The roadway segment information
and characteristics were obtained from the Broward Metropolitan Planning Organization (MPO) 2020
Level of Service Spreadsheet, which is included in Appendix C.
Table 2
Study Segments
Segment Information
Roadway From To
Old Griffin Rd Griffin Rd US 1
Griffin Rd US 441 30th Ave
Griffin Rd 30th Ave Ravenswood Rd
Griffin Rd Ravenswood Rd I-95
Griffin Rd I-95 US 1
SW 42nd St 30th Ave Ravenswood Rd
30th Ave SR 84 SW 42nd St
30th Ave SW 42nd St Griffin Rd
Ravenswood Rd SR 84 SW 36th St
Ravenswood Rd SW 36th St Griffin Rd
Ravenswood Rd Griffin Rd Stirling Rd
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Page 6
3.2 Study Intersections
The study area encompasses major intersections that were identified in the approved methodology.
Additionally, the site is proposed to be served by two (2) existing access points; one right-in/right-out on
Griffin Road and one (1) full access on Ravenswood Road. The study intersections and access points
are presented in Table 3.
Table 3
Study Intersections
Int Intersection Traffic
#Major Road Minor Road Control
1 Griffin Road SW 30th Ave Signal
2 Griffin Road Ravenswood Rd Signal
3 Griffin Road Plaza Entrance Two-Way Stop
4 Ravenswood Rd Plaza Entrance Two-Way Stop
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Page 7
4.0 TRANSPORTATION IMPROVEMENTS
Transportation improvement programs published by City of Dania Beach, Broward TPO Transportation
Improvement Program, and the FDOT Work Program were reviewed to determine if any transportation
improvements that influence the project’s study area are planned or programmed. Improvements that
are funded for construction within three (3) years are considered programmed and will be incorporated
in the analysis. No improvements were found within the study area.
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Page 8
5.0 TRAFFIC PROJECTIONS
5.1 Projected Roadway Volumes
Existing roadway information was obtained from Broward Metropolitan Planning Organization (MPO)
2020 Level of Service Spreadsheet. The information includes roadway segment data, existing traffic
volumes, service volumes, and capacity.
Projected background traffic in the buildout year 2025 was derived by comparing historical growth rate
trends and a minimum annual growth rate of 2%. The five (5) year historical traffic count data was
obtained from the FDOT Traffic Online website. Historical traffic count data and growth trends analysis
worksheets are included in Appendix D. The total projected volumes on the roadway segments include
background traffic and project trips, which are calculated based on the project’s trip generation and
distribution pattern. The total projected traffic volumes by roadway segment are presented in Table 4.
5.2 Projected Intersection Volumes
Existing AM and PM peak hour turning movement volumes were obtained at the study intersections on
April 1, 2025. The counts were obtained during the peak season and did not require seasonal adjustment
based on the FDOT Traffic Online data. The raw turning movement volumes and supporting information
are provided in Appendix E.
Projected background intersection volumes in the buildout year 2025 were calculated by applying the
corresponding growth rates on the adjacent segments to the existing turning volumes at the study
intersections. The total projected intersection volumes include background traffic and project trips, which
are calculated based on the project’s trip generation and assignment at each intersection. Detailed
intersection volume calculations are provided in Appendix F and the resulting existing, background, and
buildout volumes are illustrated in Figures 3 and 4 for the AM and PM peak hour, respectively.
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Page 9
Table 4
Projected Background Volumes
Existing Backg
Segment Information PM Peak Calc Used PM Peak
Roadway From To Vol AGR AGR Vol
Old Griffin Rd Griffin Rd US 1 485 -5.8%2.0%504
Griffin Rd US 441 30th Ave 3,420 -1.5%2.0%3,557
Griffin Rd 30th Ave Ravenswood Rd 3,420 -0.3%2.0%3,557
Griffin Rd Ravenswood Rd I-95 3,420 -0.3%2.0%3,557
Griffin Rd I-95 US 1 1,777 8.6%8.6%2,082
SW 42nd St 30th Ave Ravenswood Rd 295 -5.9%2.0%307
30th Ave SR 84 SW 42nd St 1,064 8.4%8.4%1,244
30th Ave SW 42nd St Griffin Rd 884 -4.2%2.0%919
Ravenswood Rd SR 84 SW 36th St 475 1.1%2.0%494
Ravenswood Rd SW 36th St Griffin Rd 475 -3.3%2.0%494
Ravenswood Rd Griffin Rd Stirling Rd 1,387 1.5%2.0%1,442
M
a
g
u
i
r
e
B
l
v
d
Griffin Rd
30
t
h
Ave
Ra
v
e
n
s
w
o
o
d
R
d
4
321
Legend: Existing + [Pass-by] + (Project) = Total 1 Lanes by movement
Not to Scale
N
AM Peak Intersection Volumes Figure 325047.01.01 Tesla Ft. Lauderdale-Griffin Road
M
a
g
u
i
r
e
B
l
v
d
Griffin Rd
30
t
h
Ave
Ra
v
e
n
s
w
o
o
d
R
d
4
321
Legend: Existing + [Pass-by] + (Project) = Total 1 Lanes by movement
Not to Scale
N
PM Peak Intersection Volumes Figure 425047.01.01 Tesla Ft. Lauderdale-Griffin Road
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Page 12
6.0 CAPACITY ANALYSIS
6.1 Roadway Segments
Roadway segment capacity was analyzed based on the adopted service volumes, capacity, and the
corresponding traffic volumes to determine the resulting LOS, as summarized in Table 5.
The results of the capacity analysis reveal that the roadway segment of Ravenswood Road, from Griffin
Road to Stirling Road, is currently and is projected to continue to operate below its adopted level of
service. The proposed project is projected to have minimal impact. The remaining roadway segments
within the study area currently operate at adequate LOS and are projected to continue to do so at buildout
of the development.
6.2 Intersections
The study intersections were analyzed in accordance with the methods of the Highway Capacity Manual
(HCM) as applied in the Synchro analytical tool. The analysis results for existing and buildout conditions
are summarized in Table 6, which reveals that traffic from the proposed development does not cause
any intersection within the study area to fall below the overall adopted LOS standard. The HCM printouts
and signal timings are included in Appendix G.
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Page 13
Table 5
Segment Analysis
Segment Information Exist LOS Peak Proj PM Peak
Roadway From To Lns Std Cap Vol V/C LOS Vol V/C LOS Dist Vol Vol V/C LOS
Old Griffin Rd Griffin Rd US 1 2 D 1,197 485 0.41 D 504 0.42 D 5%4 508 0.42 D
Griffin Rd US 441 30th Ave 6 D 5,390 3,420 0.63 D 3,557 0.66 D 15%11 3,568 0.66 D
Griffin Rd 30th Ave Ravenswood Rd 6 D 5,390 3,420 0.63 D 3,557 0.66 D 20%14 3,571 0.66 D
Griffin Rd Ravenswood Rd I-95 6 D 5,390 3,420 0.63 D 3,557 0.66 D 60%43 3,600 0.67 D
Griffin Rd I-95 US 1 6 D 5,390 1,777 0.33 D 2,082 0.39 D 25%18 2,100 0.39 D
SW 42nd St 30th Ave Ravenswood Rd 2 D 1,197 295 0.25 D 307 0.26 D 5%4 311 0.26 D
30th Ave SR 84 SW 42nd St 4 D 2,628 1,064 0.40 D 1,244 0.47 D 10%7 1,251 0.48 D
30th Ave SW 42nd St Griffin Rd 4 D 1,197 884 0.74 D 919 0.77 D 5%4 923 0.77 D
Ravenswood Rd SR 84 SW 36th St 2 D 1,197 475 0.40 D 494 0.41 D 5%4 498 0.42 D
Ravenswood Rd SW 36th St Griffin Rd 2 D 1,197 475 0.40 D 494 0.41 D 10%7 501 0.42 D
Ravenswood Rd Griffin Rd Stirling Rd 2 D 1,197 1,387 1.16 F 1,442 1.21 F 10%7 1,449 1.21 F
Buildout
PM Peak
Existing
PM Peak
Background
PM Peak
Project
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Page 14
Table 6
Intersection Analysis
Int Intersection Time EB WB NB SB Overall
#Major Road Minor Road Control Period Scenario Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS
Existing 37.5 D 22.9 C ----57.9 E 35.4 D
Buildout 37.8 D 23.0 C ----57.9 E 35.5 D
Existing 78.6 E 85.3 F ----57.7 E 76.5 E
Buildout 78.4 E 86.5 F ----57.7 E 77.0 E
Existing 45.6 D 51.8 D 79.9 E 43.1 D 53.3 D
Buildout 46.7 D 53.1 D 79.7 E 42.3 D 54.0 D
Existing 54.4 D 58.6 E 63.2 E 46.7 D 56.7 E
Buildout 54.8 D 60.0 E 63.2 E 48.0 D 57.5 E
Existing ------------18.1 C ----
Buildout ------------18.7 C ----
Existing ------------35.9 E ----
Buildout ------------40.9 E ----
Existing 13.8 B 15.4 C 8.1 A 9.2 A ----
Buildout 13.9 B 16.8 C 8.1 A 9.3 A ----
Existing 16.4 C 16.7 C 9.4 A 8.3 A ----
Buildout 16.5 C 20.8 C 9.4 A 8.4 A ----
Average delay expressed in seconds/vehicle
1
2 Griffin Road Signal
AM
PM
PM
Griffin Road Signal
AM
SW 30th Ave
Ravenswood
Rd
4 Ravenswood
Rd TWSC
AM
PM
Plaza Entrance
3 Griffin Road TWSC
AM
PM
Plaza Entrance
Tesla Ft. Lauderdale-Griffin Road
Traffic Impact Analysis
Project № 25047.01.01
Page 15
7.0 STUDY CONCLUSIONS
This traffic analysis was conducted to evaluate the impacts of Tesla Ft. Lauderdale-Griffin Road. The
site is located at the northeast corner of the Griffin Road and Ravenswood Road, in the City of Dania
Beach, Florida. The analysis included a determination of trip generation, a review of transportation
capacity and operations, and a review of the proposed site access plan. The results of the traffic analysis
are summarized as follows:
Summary of Findings
• The proposed development is projected to generate 800 net external daily trips, of which 54 trips
occur during the AM peak hour and 72 trips occur during the PM peak hour.
• A review of roadway capacity conditions reveals that the proposed development is not projected to
adversely impact the roadway network.
• A review of intersection capacity conditions reveals that the proposed development is not projected
to adversely impact the intersection.
APPENDICES
Appendix A
Site Plan/Information
E
EM
IV
WV
WM
IB
CO
E EM
EM
E
WV
WV WV
WV
WV
WV WV
WV
WV
WM
WMWM
WM
WM
WMWM
IV
IV
IV
IV
IV
IVIV IVIV
IVIV
IV
IV
IV
IV
IV
IV
IV
IV
IB
IV
COCO CO
CO
CO
CO
CO
IVIV
SUBMITTALS
APPROVED BY:
CHECKED BY:NRK
NRK
REV.DATE DESCRIPTION
SITE NAME:
FORT LAUDERDALE, FL -
GRIFFIN RD.
(TRT ID: 34112)
SITE ADDRESS:
2081 GRIFFIN RD.
FORT LAUDERDALE, FL 33004
DRAWN BY:HMP
PROJECT #:50123704
JOB #:50163349
3500 DEER CREEK ROAD
PALO ALTO, CA 94304
(650) 681-5000
0 03/21/24 ISSUED FOR S&S
1 10/31/24 ISSUED PER COMMENTS
2 04/11/25 ISSUED PER COMMENTS
Dewberry Engineers Inc.
800 NORTH MAGNOLIA AVE.
SUITE 1000
ORLANDO, FL 32803
PHONE: 407.843.5120
FAX: 407.649.8664
FLORIDA C.O.A. #8794
C-1
SCALE:1"=60' FOR 11"x17"
1"=30' FOR 22"x34"
30'0'60'
1DETAILED SITE PLAN
LEGEND
BOOK 45442, PAGE 343
APN: 5042 28 17 0030
OWNER: GRIFFIN ROAD THREE LLC
BOOK 45442, PAGE 335
APN: 5042 28 17 0010
OWNER: GRIFFIN ROAD ONE, LLC
AP
N
:
5
0
4
2
2
8
0
5
0
0
1
0
OW
N
E
R
:
I
N
T
E
R
M
A
R
I
N
E
I
N
C
.
N8
7
°
3
1
'
1
4
"
E
2
7
0
.
8
9
'
S01°21'03"E 194.00'N8
8
°
3
9
'
3
3
"
E
29
.
6
4
'
S01°32'33"E 224.01'
N01°36'02"W 262.19'
N01°36'02"W
51.18'
N01°36'09"W 92.71'
L1
S8
7
°
2
1
'
1
9
"
W
8
6
.
7
1
'
S8
7
°
2
1
'
1
9
"
W
3
9
0
.
4
3
'
S8
8
°
2
5
'
0
6
"
W
3
1
1
.
4
8
'
N8
7
°
2
1
'
1
9
"
E
1
4
5
.
0
2
'
S01°36'04"E 107.27'
N01°36'02"W 71.33'
S01°36'04"E 119.27'
N05°14'32"E 101.24
'
S01°32'38"E 173.91'S01°32'15"E 50.10'
Δ=0
°
0
9
'
1
5
"
R=
1
1
3
9
8
.
4
1
'
L=
3
0
.
6
8
'
S8
7
°
2
1
'
1
9
"
W
39
0
.
4
3
'
Existing
Building
ANGLERS AVENUE
(PUBLIC R.O.W. VARIES)
GR
I
F
F
I
N
R
O
A
D
(
S
T
A
T
E
H
I
G
H
W
A
Y
8
1
8
)
(P
U
B
L
I
C
R
.
O
.
W
.
V
A
R
I
E
S
)
Existing Underground
Electric Line (Typ.)
Existing Storm
Inlet (Typ.)
Existing Wheelstop
(Typ.)
Existing Utility
Pole (Typ.)
Existing Shrub
(Typ.)
Existing Tree
(Typ.)
Existing Light
Post (Typ.)
Existing Storm
Drain (Typ.)
9
9
9
9
8
9
8
9
9
9
8
9 9
8
9
8
9
9 10
10 10
10
1
0
10
9
9
10
10
11
10
9
9
10
10
8
8
9
9
9
8
9
9 8
10
9
9
9
9
8
10
10
10
10
10
1
0
10
10
9
9
9
9 9
9
9
9
9
9
9
10
9
9
9
9
C-2
1
C-3
1
DETAILED SITE PLAN
30'-0" UTILITY
EASEMENT
20'-0" BUILDING
SETBACK
30'-0" UTILITY
EASEMENT
10'-0" ELECTRIC
EASEMENT
40'-0"
ACCESS
EASEMENT
10'-0" ELECTRIC
EASEMENT
EQUIPMENT SHIPPED BY TESLA
EQUIPMENT QTY
GRAY 4" STANDARD DEEP MOUNT
CRASHCORE BOLLARD 10
GRAY MINI OFFSET EV FLEX REBOUNDING
BOLLARD 48
V3.5 CABINET (4 POST)12
ACCESSIBLE USE LAST SIGN 2
ARUBA ACCESS POINT KIT 3
V4 POST 48
GEN 3 TESLA 24FT 4
CABINET FUSE 12
4" SUPERFLEX CONDUIT (FT)1,234'
4" SUPERFLEX STRAIGHT COUPLER 20
4" DURALINE CONDUIT (FT)894'
4" ADAPTER - DURALINE TO PVC 96
4" COUPLER - DURALINE TO DURALINE 20
Existing Fence Gate
(TO REMAIN)
Existing Fence
(TO REMAIN)
Existing Concrete Wall &
Lattice Fence (6'-2" High)
(TO REMAIN)
NOTES:
1.SITE PLAN BASED ON ENGINEERING DESIGN SURVEY: A
PORTION OF THE PROPERTY DESCRIBED IN BOOK 175,
PAGE 38, CITY OF FORT LAUDERDALE, BROWARD
COUNTY, FL BY CLARK LAND SURVEYING, INC. DATED
03/16/2023.
2.UTILITY CONNECTION TO BE MADE UNDER FPL UTILITIES
STANDARDS, CONFIRM FINAL DESIGN PRIOR TO
CONSTRUCTION, FPL WORK ORDER SUPERCHARGERS -
PROJECT #12411906.
3.EXISTING UNDERGROUND UTILITIES LOCATED WITHIN
AREA OF PROPOSED TRENCH & EQUIPMENT SITE AREA.
HAND DIG AND RELOCATE AS REQUIRED.
4.EXISTING STORM DRAIN INLETS TO BE COVERED WITH
SILT BAG DURING CONSTRUCTION.
5.CONTRACTOR TO CONFIRM ADA/ACCESSIBLE STRIPING &
ASSOCIATED STALLS HAVE <2% GRADE IN ALL
DIRECTIONS.
Appendix B
Methodology Correspondence
3101 Maguire Boulevard, Suite 265, Orlando, Florida 32803 ■ P: (407) 531-5332 ■ F: (407) 531-5331 ■ www.trafficmobility.com
MEMORANDUM
March 18, 2025
Re: Tesla – Ft. Lauderdale – Griffin Road
Traffic Impact Analysis Methodology
Dania Beach, Florida
Project № 25047.01.01
This methodology outlines the approach to the preparation of the proposed Traffic Impact Analysis
(TIA) for the above-mentioned project.
Project Description
The proposed project has 48 Level-3 chargers and 6 Level 2-chargers added to the existing
parking lot of the Fairfield Inn and Suites. The anticipated buildout year for the project is 2025. A
site plan is included in the Attachments. The site is located northeast of the Griffin Road and
Ravenswood Road intersection in the City of Dania Beach, Florida, as shown in Figure 1. Many
of its users will likely be associated with the nearby Ft. Lauderdale-Hollywood International
Airport. The development is proposed to access the network via the two (2) existing access
driveways for the plaza; one (1) right-in/right-out on Griffin Road and one (1) full access driveway
on Ravenswood Road.
Trip Generation
The trip generation analysis was estimated using estimated charging times and electric vehicle
volumes in the area. Level-3 chargers typically take 15-30 minutes to charge; therefore, have the
opportunity to generate more trips. Level-2 charges typically take four hours to charge, and are
anticipated to be primarily used by patrons of the Fairfield Inn and Suites which would not increase
the amount of net trips the site would generate. Tesla estimates that 4,500 Tesla cars travel
through Griffin Road and Anglers Avenue per day. To be conservative, given the charging speed
of the Level-3 chargers and the number of vehicles passing through, each Level-3 charger is
anticipated to charge two vehicles in the PM peak hour. In the AM peak hour electric vehicles
would be more likely to have been charged overnight and would be less likely to stop at the
charging station; therefore, a lower trip generation rate is proposed. A certain amount of the trips
generated by the development is expected to be pass-by trips making a stop at the charging
station on the way to another destination. Gas stations/convenience stores would be a similar
land use and have a pass-by percentage of around 75%. The electric charging stations are not
as abundant as gas stations/convenience stores, so many of the trips require planning
beforehand. To be conservative, a lower pass-by of 25% will be used for the proposed site. The
resulting trip generation analysis is summarized in Table 1.
Colonial Dr
SITE
1-Mile Radius
SITE
Griffin Rd
Ra
v
e
n
s
w
o
o
d
R
d
Not to Scale
N
25047.01.01 Tesla Ft. Lauderdale-Griffin Road Project Location Map Figure 1
Tesla – Ft. Lauderdale – Griffin Road
Traffic Impact Analysis Methodology
Project № 25047.01.01
March 18, 2025
Page 3 of 6
Table 1
Trip Generation Analysis
The development is projected to generate a total of 800 net new external daily trips, of which 54
trips occur during the AM peak hour, and 72 trips occur during the PM peak hour.
Trip Distribution
The developments trips were manually distributed based on prevailing traffic patterns adjacent to
the site. The projected distribution pattern is presented in Figure 2.
Study Area
The TIA will have a study area of a 1-mile radius from the site. This will include all roadway
segments and major intersections. Capacity thresholds, service volumes and adopted level of
service (LOS) standards will be obtained from the Broward Metropolitan Planning Organization
(MPO) 2020 Level of Service Spreadsheet, included in the Attachments.
ITE Daily AM Peak Hour PM Peak Hour
Code Land Use Size Rate Trips Rate Total Enter Exit Rate Total Enter Exit
N/A Level-3 Chargers 48 Stations 22.22 1,067 1.50 72 36 36 2.00 96 48 48
Pass-by Trips (25%)267 18 9 9 24 12 12
Net New Trip Generation 800 54 27 27 72 36 36
Daily Rate Calculated Using a K-factor of 0.09
Pass-by estimated based on ITE Trip Generation Handbook, 3rd Edition
SITE
20%
15%
20%15%
5%
5%
5%
5%
5%
10%
10%
10%
10%
5%10%
10%
10%
20%
20%
5%
5%
25%
Not to Scale
N
Project Trip Distribution Figure 225047.01.01 Tesla Ft. Lauderdale-Griffin Road
Tesla – Ft. Lauderdale – Griffin Road
Traffic Impact Analysis Methodology
Project № 25047.01.01
March 18, 2025
Page 5 of 6
Based on study area analysis, the following roadway segments and intersections will be analyzed
as part of this study:
Study Roadway Segments:
• Old Griffin Road
o Griffin Road to US 1
• Griffin Road
o US 441 to 30th Avenue
o 30th Avenue to Ravenswood Road
o Ravenswood Road to I-95
o I-95 to US 1
• SW 42nd Street
o 30th Avenue to Ravenswood Road
• 30th Avenue
o SR 84 to SW 42nd Street
o SW 42nd Street to Griffin Road
• Ravenswood Road
o SR 84 to SW 36th Street
o SW 36th Street to Griffin Road
o Griffin Road to Stirling Road
Study Intersections:
• Griffin Road and SW 30th Avenue (signalized)
• Griffin Road and Ravenswood Road (signalized)
• Griffin Road and Plaza Entrance (unsignalized)
• Ravenswood Road and Plaza Entrance (unsignalized)
Planned and Programmed Improvements
The City and County Capital Improvement Programs (CIP), the FDOT Work Program, and the
Broward TPO Transportation Improvement Program (TIP) were reviewed to determine if any
improvements are programmed and/or planned in the study area. No improvements were found
within the study area.
Tesla – Ft. Lauderdale – Griffin Road
Traffic Impact Analysis Methodology
Project № 25047.01.01
March 18, 2025
Page 6 of 6
Capacity Analysis
The TIA will include a roadway segment capacity analysis of the PM peak hour for the existing,
background, and buildout conditions. The capacity analysis will be based on the peak hour
directional service volumes from the Broward MPO 2020 Level of Service Spreadsheet. The
intersection capacity analysis will be conducted for both the AM and PM peak hour for the existing,
background, and buildout conditions. The analysis will be based on three-hour field counts,
buildout traffic, Synchro software and the methods of Highway Capacity Manual (HCM).
Projected Traffic
Projected roadway background traffic for the 2025 buildout year will be calculated using the
growth rates derived from the Florida Traffic Online traffic counts or a minimum annual growth
rate of 2%. Projected buildout traffic will be the sum of background traffic and new project trips.
Projected intersection volumes will be calculated using the growth rates of the adjacent roadways.
Report
A TIA report will be prepared for submittal to the City of Dania Beach documenting the analysis,
findings, and recommendations.
Appendix C
Broward County Traffic Counts
Broward County Broward County
Roadway Capacity and Level of Service AnalysisRoadway Capacity and Level of Service Analysis
Design
ID E/W Roadway Segment Code V/C LOS V/C LOS Code Volume V/C LOS Volume V/C LOSCapacity
APPENDIX B: East / West Roadways Capacity and Level of Service Analysis 2020 & 2045
2020 2020 2045 2045
Daily Conditions Peak Hour Conditions Daily Conditions Peak Hour Conditions
AADT Capacity Volume Capacity Capacity
206 Sheridan St E of US 1 422 27500 39800 0.69 C 2613 3580 0.73 C 422 24200 39800 0.61 C 2299 3580 0.64 C
1012 Stirling Rd E of US 27 264 2200 13320 0.17 C 209 1197 0.17 C 264 7300 13320 0.55 D 694 1197 0.58 D
208 Stirling Rd E of SW 160 Ave 474 5400 35820 0.15 C 513 3222 0.16 C 474 10700 35820 0.30 C 1017 3222 0.32 C
210 Stirling Rd E of I-75 474 5400 35820 0.15 C 513 3222 0.16 C 474 11300 35820 0.32 C 1074 3222 0.33 C
212 Stirling Rd E of SW 148 Ave 264 3700 13320 0.28 C 352 1197 0.29 C 264 9000 13320 0.68 D 855 1197 0.71 D
214 Stirling Rd E of SW 136 Ave 264 3700 13320 0.28 C 352 1197 0.29 C 264 8300 13320 0.62 D 789 1197 0.66 D
216 Stirling Rd E of Flamingo Rd 422 27500 e 37810 r 0.73 C 2613 3401 r 0.77 C 422 23500 37810 r 0.62 C 2233 3401 r 0.66 C
218 Stirling Rd E of Hiatus Rd 422 19800 37810 r 0.52 C 1881 3401 r 0.55 C 422 23600 37810 r 0.62 C 2242 3401 r 0.66 C
220 Stirling Rd E of Palm Ave 422 20400 37810 r 0.54 C 1938 3401 r 0.57 C 422 24800 37810 r 0.66 C 2356 3401 r 0.69 C
222 Stirling Rd E of Douglas Rd 422 27000 37810 r 0.71 C 2565 3401 r 0.75 C 422 49200 37810 r 1.30 F 4674 3401 r 1.37 F
224 Stirling Rd E of University Dr 622 33000 59900 0.55 C 3135 5390 0.58 C 622 43100 59900 0.72 C 4095 5390 0.76 C
226 Stirling Rd E of Davie Rd 622 39500 59900 0.66 C 3753 5390 0.70 C 622 61800 59900 1.03 F 5871 5390 1.09 F
228 Stirling Rd E of N 64 Ave 622 39000 59900 0.65 C 3705 5390 0.69 C 622 61700 59900 1.03 F 5862 5390 1.09 F
230 Stirling Rd E of SR 7 622 31500 59900 0.53 C 2993 5390 0.56 C 622 54400 59900 0.91 C 5168 5390 0.96 C
232 Stirling Rd E of Park Rd 622 42500 59900 0.71 C 4038 5390 0.75 C 622 54800 59900 0.91 C 5206 5390 0.97 C
234 Stirling Rd E of I-95 622 32500 59900 0.54 C 3088 5390 0.57 C 622 45300 59900 0.76 C 4304 5390 0.80 C
236 Dania Bch Blvd E of US 1 622 8900 59900 0.15 C 846 5390 0.16 C 422 41500 39800 1.04 F 3943 3580 1.10 F
238 Dania Bch Blvd E of NE 2 Ave 622 8400 59900 0.14 C 798 5390 0.15 C 622 35000 59900 0.58 C 3325 5390 0.62 C
240 Dania Bch Blvd E of Gulfstream Rd 422 8400 e 39800 0.21 C 798 3580 0.22 C 422 25500 39800 0.64 C 2423 3580 0.68 C
248 Old Griffin Rd S of Griffin Rd 264 5100 13320 0.38 C 485 1197 0.40 C 264 12800 13320 0.96 D 1216 1197 1.02 E
250 Griffin Rd E of US 27 222 6400 16815 r 0.38 C 608 1520 r 0.40 C 222 10500 16815 r 0.62 C 998 1520 r 0.66 C
252 Griffin Rd E of SW 184 Ave 422 15200 37810 r 0.40 C 1444 3401 r 0.42 C 422 23100 37810 r 0.61 C 2195 3401 r 0.65 C
254 Griffin Rd E of SW 172 Ave 422 22000 37810 r 0.58 C 2090 3401 r 0.61 C 422 30700 37810 r 0.81 C 2917 3401 r 0.86 C
256 Griffin Rd E of SW 160 Ave 422 38500 37810 r 1.02 F 3658 3401 r 1.08 F 422 49700 37810 r 1.31 F 4722 3401 r 1.39 F
258 Griffin Rd E of I-75 622 38500 56905 r 0.68 C 3658 5121 r 0.71 C 622 52400 56905 r 0.92 C 4978 5121 r 0.97 C
260 Griffin Rd E of SW 148 Ave 422 27000 37810 r 0.71 C 2565 3401 r 0.75 C 622 40100 56905 r 0.70 C 3810 5121 r 0.74 C
262 Griffin Rd E of SW 136 Ave 422 27000 37810 r 0.71 C 2565 3401 r 0.75 C 622 33000 56905 r 0.58 C 3135 5121 r 0.61 C
264 Griffin Rd E of Flamingo Rd 622 30000 59900 0.50 C 2850 5390 0.53 C 622 39200 59900 0.65 C 3724 5390 0.69 C
266 Griffin Rd E of 118 Ave 622 30000 59900 0.50 C 2850 5390 0.53 C 622 31700 59900 0.53 C 3012 5390 0.56 C
268 Griffin Rd E of Hiatus Rd 622 30000 59900 0.50 C 2850 5390 0.53 C 622 34700 59900 0.58 C 3297 5390 0.61 C
270 Griffin Rd E of SW 100 Ave 622 35500 59900 0.59 C 3373 5390 0.63 C 622 43100 59900 0.72 C 4095 5390 0.76 C
272 Griffin Rd E of SW 90 Ave 622 35500 59900 0.59 C 3373 5390 0.63 C 622 44100 59900 0.74 C 4190 5390 0.78 C
274 Griffin Rd E of Pine Island Rd 622 47000 59900 0.78 C 4465 5390 0.83 C 622 49200 59900 0.82 C 4674 5390 0.87 C
276 Griffin Rd E of University Dr 622 24100 59900 0.40 C 2290 5390 0.42 C 622 34200 59900 0.57 C 3249 5390 0.60 C
278 Griffin Rd E of 76 Ave 622 24100 59900 0.40 C 2290 5390 0.42 C 622 39600 59900 0.66 C 3762 5390 0.70 C
280 Griffin Rd E of Davie Rd 622 35000 59900 0.58 C 3325 5390 0.62 C 622 46200 59900 0.77 C 4389 5390 0.81 C
282 Griffin Rd E of Fla Turnpike 622 34500 59900 0.58 C 3278 5390 0.61 C 622 44800 59900 0.75 C 4256 5390 0.79 C
284 Griffin Rd E of SR 7 622 36000 59900 0.60 C 3420 5390 0.63 C 622 44800 59900 0.75 C 4256 5390 0.79 C
286 Griffin Rd E of I-95 622 18700 59900 0.31 C 1777 5390 0.33 C 622 61700 59900 1.03 F 5862 5390 1.09 F
1014 SW 42 St E of SW 30 Ave 264 3100 13320 0.23 C 295 1197 0.25 C 264 6500 13320 0.49 C 618 1197 0.52 D
e - estimated traffic volumes; capacity - maximum LOS "D" service volume, not actual capacity; r - maximum LOS "D" service volume reduced by 5%B- 4
Broward County Broward County
Roadway Capacity and Level of Service AnalysisRoadway Capacity and Level of Service Analysis
Design Design
ID N/SRoadway Segment Code V/C LOS V/C LOS Code Volume V/C LOS Volume V/C LOS
2045
Peak Hour Conditions
Capacity
2045
APPENDIX C: North / South Roadways Capacity and Level of Service Analysis 2020 & 2045
AADT Capacity Volume Capacity
Daily Conditions Daily Conditions
2020 2020
Peak Hour Conditions
Capacity
589 NW 31 Ave N of Sunrise Blvd 674 32000 53910 0.59 C 3040 4851 0.63 C 674 48200 53910 0.89 C 4579 4851 0.94 C
591 NW 31 Ave N of NW 19 St 674 32500 53910 0.60 C 3088 4851 0.64 C 674 37600 53910 0.70 C 3572 4851 0.74 C
593 NW 31 Ave N of Oakland Pk Blvd 674 24500 53910 0.45 C 2328 4851 0.48 C 674 35800 53910 0.66 C 3401 4851 0.70 C
595 NW 31 Ave N of Commercial Blvd 674 24500 53910 0.45 C 2328 4851 0.48 C 674 35800 53910 0.66 C 3401 4851 0.70 C
597 NW 31 Ave N of Prospect Rd 674 26500 53910 0.49 C 2518 4851 0.52 C 674 62700 53910 1.16 F 5957 4851 1.23 F
599 Lyons Rd N of Cypress Crk Rd 674 25000 53910 0.46 C 2375 4851 0.49 C 674 61600 53910 1.14 F 5852 4851 1.21 F
601 Lyons Rd N of McNab Rd 474 24000 35820 0.67 C 2280 3222 0.71 C 474 50500 35820 1.41 F 4798 3222 1.49 F
1041 Lyons Rd N of Atlantic Blvd 674 17200 53910 0.32 C 1634 4851 0.34 C 674 38500 53910 0.71 C 3658 4851 0.75 C
603 Lyons Rd N of NW 6 Mr 474 17200 35820 0.48 C 1634 3222 0.51 C 474 38500 35820 1.07 F 3658 3222 1.14 F
605 Lyons Rd N of Coconut Crk Pkwy 474 30000 35820 0.84 C 2850 3222 0.88 C 474 36000 35820 1.00 F 3420 3222 1.06 F
607 Lyons Rd N of Copans Rd 474 35500 35820 0.99 D 3373 3222 1.05 F 474 46100 35820 1.29 F 4380 3222 1.36 F
609 Lyons Rd N of Sample Rd 674 32500 53910 0.60 C 3088 4851 0.64 C 674 44400 53910 0.82 C 4218 4851 0.87 C
611 Lyons Rd N of Wiles Rd 674 32500 53910 0.60 C 3088 4851 0.64 C 674 63400 53910 1.18 F 6023 4851 1.24 F
613 Lyons Rd N of Sawgrass Xway 674 32500 53910 0.60 C 3088 4851 0.64 C 674 78800 53910 1.46 F 7486 4851 1.54 F
615 Lyons Rd N of Hillsboro Blvd 674 26500 53910 0.49 C 2518 4851 0.52 C 674 70000 53910 1.30 F 6650 4851 1.37 F
617 Riverland Rd E of SR 7 264 3900 13320 0.29 C 371 1197 0.31 C 264 21700 13320 1.63 F 2062 1197 1.72 F
619 SW 27 Ave N of Davie Blvd 474 14000 35820 0.39 C 1330 3222 0.41 C 474 45800 35820 1.28 F 4351 3222 1.35 F
1087 NW 27 Ave N of Sunrise Blvd 264 9000 13320 0.68 D 855 1197 0.71 D 264 13700 13320 1.03 E 1302 1197 1.09 F
621 SW 30 Ave N of Griffin Rd 264 9300 13320 0.70 D 884 1197 0.74 D 464 23000 29160 0.79 D 2185 2628 0.83 D
1043 SW 30 Ave N of SW 42 St 464 11200 29160 0.38 C 1064 2628 0.40 C 464 39300 29160 1.35 F 3734 2628 1.42 F
623 SW 26 Terr N of SW 32 St 264 5100 13320 0.38 C 485 1197 0.40 C 264 11600 13320 0.87 D 1102 1197 0.92 D
625 Ravenswood Rd N of Stirling Rd 264 14600 13320 1.10 F 1387 1197 1.16 F 464 46100 29160 1.58 F 4380 2628 1.67 F
627 Ravenswood Rd N of Griffin Rd 264 5000 13320 0.38 C 475 1197 0.40 C 464 18600 29160 0.64 D 1767 2628 0.67 D
1053 Ravenswood Rd N of NW 36 ST 264 5000 13320 0.38 C 475 1197 0.40 C 264 8600 13320 0.65 D 817 1197 0.68 D
629 N 29 Ave N of Sheridan St 464 6900 29160 0.24 C 656 2628 0.25 C 464 28300 29160 0.97 D 2689 2628 1.02 E
631 NW 23 Ave N of Sunrise Blvd 364 10100 13986 0.72 D 960 1257 0.76 D 364 16200 13986 1.16 F 1539 1257 1.22 F
633 NW 21 Ave N of NW 19 St 264 10100 13320 0.76 D 960 1197 0.80 D 264 18900 13320 1.42 F 1796 1197 1.50 F
635 NW 21 Ave N of Oakland Pk Blvd 264 16800 13320 1.26 F 1596 1197 1.33 F 464 34100 29160 1.17 F 3240 2628 1.23 F
1089 NW 21 Ave N of Commercial Blvd 264 2500 13320 0.19 C 238 1197 0.20 C 264 10700 13320 0.80 D 1017 1197 0.85 D
637 NW 21/Oaks Dr N of Cypress Crk Rd 264 5400 13320 0.41 C 513 1197 0.43 C 264 12400 13320 0.93 D 1178 1197 0.98 D
639 NW 31 Ave_FTPK N of Atlantic Blvd 422 14300 39800 0.36 C 1359 3580 0.38 C 422 21000 39800 0.53 C 1995 3580 0.56 C
641 Blount Rd N of Coconut Crk Pkwy 264 6500 13320 0.49 C 618 1197 0.52 D 474 16900 35820 0.47 C 1606 3222 0.50 C
643 Blount Rd N of Copans Rd 464 8300 29160 0.28 C 789 2628 0.30 C 464 10500 29160 0.36 C 998 2628 0.38 C
647 NW 15 Ave N of Sunrise Blvd 264 8600 13320 0.65 D 817 1197 0.68 D 264 12300 13320 0.92 D 1169 1197 0.98 D
1153 NW 12 Ave N of Commercial Blvd 464 4200 29160 0.14 C 399 2628 0.15 C 464 2800 29160 0.10 C 266 2628 0.10 C
1091 NW 27 Ave N of Atlantic Blvd 264 9600 13320 0.72 D 912 1197 0.76 D 264 14000 13320 1.05 E 1330 1197 1.11 F
1095 Bryan Rd N of Stirling Rd 264 6400 13320 0.48 C 608 1197 0.51 D 264 9000 13320 0.68 D 855 1197 0.71 D
651 SW 9 Ave N of SR 84 264 4200 13320 0.32 C 399 1197 0.33 C 264 8900 13320 0.67 D 846 1197 0.71 D
653 NW 9 Ave N of Broward Blvd 264 3400 13320 0.26 C 323 1197 0.27 C 264 11500 13320 0.86 D 1093 1197 0.91 D
655 NW 9 Ave N of NW 6 St 264 6800 13320 0.51 D 646 1197 0.54 D 264 12800 13320 0.96 D 1216 1197 1.02 E
e - estimated traffic volumes; capacity - maximum LOS "D" service volume, not actual capacity; r - maximum LOS "D" service volume reduced by 5%B- 22
Appendix D
Growth Rate Trends
FLORIDA DEPARTMENT OF TRANSPORTATION
TRANSPORTATION STATISTICS OFFICE
2023 HISTORICAL AADT REPORT
COUNTY: 86 - BROWARD
SITE: 7319 - OLD GRIFFIN RD, W OF US 1
YEAR AADT DIRECTION 1 DIRECTION 2 *K FACTOR D FACTOR T FACTOR
---- ---------- ------------ ------------ --------- -------- --------
2023 12000 C E 6100 W 5900 9.00 57.90 3.00
2022 5000 S E 2800 W 2200 9.00 57.00 5.40
2021 5000 F E 2800 W 2200 9.00 53.80 14.30
2020 5000 C E 2800 W 2200 9.00 53.90 8.80
2019 13700 R E 6700 W 7000 9.00 54.60 5.50
2018 13700 T E 6700 W 7000 9.00 54.50 6.00
2017 13700 S E 6700 W 7000 9.00 51.90 6.20
2016 13700 F E 6700 W 7000 9.00 54.10 2.90
2015 13500 C E 6600 W 6900 9.00 54.00 3.40
2014 5200 X 9.00 54.20 7.40
2013 5200 X 0 0 9.00 53.60 7.60
2012 5200 T 0 0 9.00 52.20 5.90
2011 5200 S 0 0 9.00 52.50 6.30
2010 5200 F 0 0 8.35 52.69 9.30
2009 5200 C E 0 W 0 8.53 53.89 5.30
2008 5100 C E 0 W 0 8.81 54.16 6.50
AADT FLAGS: C = COMPUTED; E = MANUAL ESTIMATE; F = FIRST YEAR ESTIMATE
S = SECOND YEAR ESTIMATE; T = THIRD YEAR ESTIMATE; R = FOURTH YEAR ESTIMATE
V = FIFTH YEAR ESTIMATE; 6 = SIXTH YEAR ESTIMATE; X = UNKNOWN
*K FACTOR: STARTING WITH YEAR 2011 IS STANDARDK, PRIOR YEARS ARE K30 VALUES
FIN#21100
Location 1
Year Count*Trend**
2019 13700 10400
2020 5000 8800
2021 5000 7800
2022 5000 7100
2023 12000 6600
2025 N/A 5800
2026 N/A 5500
2027 N/A 5200
11.65%
-10.75%
-5.79%
2-Apr-25
Trend R-squared:
Compounded Growth Rate (2023 to Design Year):
Printed:
Compounded Annual Historic Growth Rate:
Broward (86)
0
Traffic (ADT/AADT)
2026 Mid-Year Trend
OLD GRIFFIN ROAD
2025 Opening Year Trend
Highway:
Traffic Trends - V03.a
OLD GRIFFIN ROAD -- Griffin Road to US 1 County:
Station #:
Decaying Exponential Growth Option *Axle-Adjusted
2027 Design Year Trend
TRANPLAN Forecasts/Trends
0
2000
4000
6000
8000
10000
12000
14000
16000
2019 2024 2029 2034
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
V
e
h
i
c
l
e
s
/
D
a
y
)
Year
Observed Count Fitted Curve
FLORIDA DEPARTMENT OF TRANSPORTATION
TRANSPORTATION STATISTICS OFFICE
2023 HISTORICAL AADT REPORT
COUNTY: 86 - BROWARD
SITE: 0074 - SR 818 / GRIFFIN RD - E OF SR 7/441
YEAR AADT DIRECTION 1 DIRECTION 2 *K FACTOR D FACTOR T FACTOR
---- ---------- ------------ ------------ --------- -------- --------
2023 31000 C E 15500 W 15500 9.00 57.90 4.80
2022 38000 C E 19000 W 19000 9.00 57.00 4.80
2021 31000 C E 15500 W 15500 9.00 53.80 5.10
2020 36000 F E 18500 W 17500 9.00 53.90 5.10
2019 38000 C E 19500 W 18500 9.00 54.60 5.10
2018 36000 C E 18000 W 18000 9.00 54.50 5.50
2017 35000 C E 17000 W 18000 9.00 51.90 5.50
2016 35500 C E 18000 W 17500 9.00 54.10 5.50
2015 31500 C E 16000 W 15500 9.00 54.00 4.80
2014 31500 C E 16000 W 15500 9.00 54.20 4.80
2013 29000 C E 15000 W 14000 9.00 53.60 4.80
2012 30000 C E 15000 W 15000 9.00 52.20 4.80
2011 31500 C E 14500 W 17000 9.00 52.50 4.80
2010 26500 C E 12500 W 14000 8.35 52.69 4.80
2009 31500 C E 16000 W 15500 8.53 53.89 4.60
2008 37500 C E 19000 W 18500 8.81 54.16 4.60
AADT FLAGS: C = COMPUTED; E = MANUAL ESTIMATE; F = FIRST YEAR ESTIMATE
S = SECOND YEAR ESTIMATE; T = THIRD YEAR ESTIMATE; R = FOURTH YEAR ESTIMATE
V = FIFTH YEAR ESTIMATE; 6 = SIXTH YEAR ESTIMATE; X = UNKNOWN
*K FACTOR: STARTING WITH YEAR 2011 IS STANDARDK, PRIOR YEARS ARE K30 VALUES
FIN#21100
Location 1
Year Count*Trend**
2019 38000 37800
2020 36000 35600
2021 31000 34400
2022 38000 33500
2023 31000 32800
2025 N/A 31700
2026 N/A 31300
2027 N/A 30900
30.74%
-3.48%
-1.48%
2-Apr-25
Trend R-squared:
Compounded Growth Rate (2023 to Design Year):
Printed:
Compounded Annual Historic Growth Rate:
Broward (86)
0
Traffic (ADT/AADT)
2026 Mid-Year Trend
GRIFFIN ROAD
2025 Opening Year Trend
Highway:
Traffic Trends - V03.a
GRIFFIN ROAD -- US 441 to 30th Ave County:
Station #:
Decaying Exponential Growth Option *Axle-Adjusted
2027 Design Year Trend
TRANPLAN Forecasts/Trends
0
5000
10000
15000
20000
25000
30000
35000
40000
2019 2024 2029 2034
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
V
e
h
i
c
l
e
s
/
D
a
y
)
Year
Observed Count Fitted Curve
FLORIDA DEPARTMENT OF TRANSPORTATION
TRANSPORTATION STATISTICS OFFICE
2023 HISTORICAL AADT REPORT
COUNTY: 86 - BROWARD
SITE: 0076 - SR 818 / GRIFFIN RD - W OF SR 9/I 95
YEAR AADT DIRECTION 1 DIRECTION 2 *K FACTOR D FACTOR T FACTOR
---- ---------- ------------ ------------ --------- -------- --------
2023 37500 C E 18500 W 19000 9.00 57.90 4.40
2022 38000 C E 20000 W 18000 9.00 57.00 6.40
2021 30000 C E 15500 W 14500 9.00 53.80 6.00
2020 37000 C E 18500 W 18500 9.00 53.90 5.10
2019 38000 C E 19500 W 18500 9.00 54.60 3.90
2018 35000 C E 18000 W 17000 9.00 54.50 5.70
2017 37000 C E 18000 W 19000 9.00 51.90 4.50
2016 34000 C E 17000 W 17000 9.00 54.10 5.70
2015 32000 C E 16000 W 16000 9.00 54.00 5.80
2014 32000 C E 16000 W 16000 9.00 54.20 7.60
2013 32000 C E 16000 W 16000 9.00 53.60 6.50
2012 33500 C E 17000 W 16500 9.00 52.20 6.00
2011 31500 C E 15000 W 16500 9.00 52.50 5.00
2010 28500 C E 14000 W 14500 8.35 52.69 5.00
2009 30500 C E 15000 W 15500 8.53 53.89 5.10
2008 33500 C E 17500 W 16000 8.81 54.16 4.70
AADT FLAGS: C = COMPUTED; E = MANUAL ESTIMATE; F = FIRST YEAR ESTIMATE
S = SECOND YEAR ESTIMATE; T = THIRD YEAR ESTIMATE; R = FOURTH YEAR ESTIMATE
V = FIFTH YEAR ESTIMATE; 6 = SIXTH YEAR ESTIMATE; X = UNKNOWN
*K FACTOR: STARTING WITH YEAR 2011 IS STANDARDK, PRIOR YEARS ARE K30 VALUES
FIN#21100
Location 1
Year Count*Trend**
2019 38000 36800
2020 37000 36300
2021 30000 36000
2022 38000 35800
2023 37500 35600
2025 N/A 35400
2026 N/A 35300
2027 N/A 35200
1.86%
-0.83%
-0.28%
2-Apr-25
Highway:
Traffic Trends - V03.a
GRIFFIN ROAD -- 30th Ave to I-95 County:
Station #:
Decaying Exponential Growth Option *Axle-Adjusted
2027 Design Year Trend
TRANPLAN Forecasts/TrendsTrend R-squared:
Compounded Growth Rate (2023 to Design Year):
Printed:
Compounded Annual Historic Growth Rate:
Broward (86)
0
Traffic (ADT/AADT)
2026 Mid-Year Trend
GRIFFIN ROAD
2025 Opening Year Trend0
5000
10000
15000
20000
25000
30000
35000
40000
2019 2024 2029 2034
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
V
e
h
i
c
l
e
s
/
D
a
y
)
Year
Observed Count Fitted Curve
FLORIDA DEPARTMENT OF TRANSPORTATION
TRANSPORTATION STATISTICS OFFICE
2023 HISTORICAL AADT REPORT
COUNTY: 86 - BROWARD
SITE: 5299 - SR 818 / GRIFFIN RD - W OF US 1
YEAR AADT DIRECTION 1 DIRECTION 2 *K FACTOR D FACTOR T FACTOR
---- ---------- ------------ ------------ --------- -------- --------
2023 27000 C E 13000 W 14000 9.00 57.90 4.40
2022 23000 C E 11000 W 12000 9.00 57.00 4.80
2021 20900 C E 11500 W 9400 9.00 53.80 4.80
2020 18700 C E 9600 W 9100 9.00 53.90 4.80
2019 19800 C E 9800 W 10000 9.00 54.60 5.40
2018 19800 C E 10500 W 9300 9.00 54.50 5.40
2017 21000 C E 10500 W 10500 9.00 51.90 5.40
2016 18500 C E 9800 W 8700 9.00 54.10 16.00
2015 16100 C E 7800 W 8300 9.00 54.00 16.00
2014 14900 C E 6900 W 8000 9.00 54.20 16.00
2013 15100 C E 8300 W 6800 9.00 53.60 6.50
2012 16800 C E 8800 W 8000 9.00 52.20 6.00
2011 17900 C E 9200 W 8700 9.00 52.50 5.00
2010 17400 C E 8300 W 9100 8.35 52.69 5.00
2009 17700 C E 8800 W 8900 8.53 53.89 5.10
2008 17600 C E 8700 W 8900 8.81 54.16 4.60
AADT FLAGS: C = COMPUTED; E = MANUAL ESTIMATE; F = FIRST YEAR ESTIMATE
S = SECOND YEAR ESTIMATE; T = THIRD YEAR ESTIMATE; R = FOURTH YEAR ESTIMATE
V = FIFTH YEAR ESTIMATE; 6 = SIXTH YEAR ESTIMATE; X = UNKNOWN
*K FACTOR: STARTING WITH YEAR 2011 IS STANDARDK, PRIOR YEARS ARE K30 VALUES
FIN#21100
Location 1
Year Count*Trend**
2019 19800 18400
2020 18700 20000
2021 20900 21700
2022 23000 23600
2023 27000 25600
2025 N/A 30200
2026 N/A 32800
2027 N/A 35600
82.37%
8.61%
8.59%
2-Apr-25
Trend R-squared:
Compounded Growth Rate (2023 to Design Year):
Printed:
Compounded Annual Historic Growth Rate:
Broward (86)
0
Traffic (ADT/AADT)
2026 Mid-Year Trend
GRIFFIN ROAD
2025 Opening Year Trend
Highway:
Traffic Trends - V03.a
GRIFFIN ROAD -- I-95 to US 1 County:
Station #:
Exponential Growth Option *Axle-Adjusted
2027 Design Year Trend
TRANPLAN Forecasts/Trends
0
10000
20000
30000
40000
50000
60000
70000
80000
2019 2024 2029 2034
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
V
e
h
i
c
l
e
s
/
D
a
y
)
Year
Observed Count Fitted Curve
FLORIDA DEPARTMENT OF TRANSPORTATION
TRANSPORTATION STATISTICS OFFICE
2023 HISTORICAL AADT REPORT
COUNTY: 86 - BROWARD
SITE: 9620 - SW 42 ST, E OF SW 30 AVE
YEAR AADT DIRECTION 1 DIRECTION 2 *K FACTOR D FACTOR T FACTOR
---- ---------- ------------ ------------ --------- -------- --------
2023 8000 C E 4200 W 3800 9.00 57.90 3.00
2022 3100 S E 1500 W 1600 9.00 57.00 5.40
2021 3100 F E 1500 W 1600 9.00 53.80 14.30
2020 3100 C E 1500 W 1600 9.00 53.90 8.80
2019 9200 T E 4400 W 4800 9.00 54.60 5.50
2018 9200 S E 4400 W 4800 9.00 54.50 6.00
2017 9200 F E 4400 W 4800 9.00 51.90 6.20
2016 9200 C E 4400 W 4800 9.00 54.10 2.90
2015 3700 V 0 0 9.00 54.00 3.40
2014 3600 R 9.00 54.20 7.40
2013 3600 T 0 0 9.00 53.60 7.60
2012 3600 S 0 0 9.00 52.20 5.90
2011 3600 F 0 0 9.00 52.50 6.30
2010 3600 C E 1800 W 1800 8.35 52.69 9.30
2009 4800 F E 2800 W 2000 8.53 53.89 5.30
2008 5000 C E 2900 W 2100 8.81 54.16 6.50
AADT FLAGS: C = COMPUTED; E = MANUAL ESTIMATE; F = FIRST YEAR ESTIMATE
S = SECOND YEAR ESTIMATE; T = THIRD YEAR ESTIMATE; R = FOURTH YEAR ESTIMATE
V = FIFTH YEAR ESTIMATE; 6 = SIXTH YEAR ESTIMATE; X = UNKNOWN
*K FACTOR: STARTING WITH YEAR 2011 IS STANDARDK, PRIOR YEARS ARE K30 VALUES
FIN#21100
Location 1
Year Count*Trend**
2019 9200 6900
2020 3100 5700
2021 3100 5100
2022 3100 4600
2023 8000 4200
2025 N/A 3700
2026 N/A 3500
2027 N/A 3300
11.71%
-11.67%
-5.85%
2-Apr-25
Highway:
Traffic Trends - V03.a
42ND ST -- 30th Ave to Ravenswood Rd County:
Station #:
Decaying Exponential Growth Option *Axle-Adjusted
2027 Design Year Trend
TRANPLAN Forecasts/TrendsTrend R-squared:
Compounded Growth Rate (2023 to Design Year):
Printed:
Compounded Annual Historic Growth Rate:
Broward (86)
0
Traffic (ADT/AADT)
2026 Mid-Year Trend
42ND ST
2025 Opening Year Trend0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
2019 2024 2029 2034
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
V
e
h
i
c
l
e
s
/
D
a
y
)
Year
Observed Count Fitted Curve
FLORIDA DEPARTMENT OF TRANSPORTATION
TRANSPORTATION STATISTICS OFFICE
2023 HISTORICAL AADT REPORT
COUNTY: 86 - BROWARD
SITE: 9211 - SW 30 AVE., S OF SR 84
YEAR AADT DIRECTION 1 DIRECTION 2 *K FACTOR D FACTOR T FACTOR
---- ---------- ------------ ------------ --------- -------- --------
2023 19900 C N 9900 S 10000 9.00 57.90 3.00
2022 11000 S N 5700 S 5300 9.00 57.00 5.40
2021 11200 F N 5800 S 5400 9.00 53.80 14.30
2020 11200 C N 5800 S 5400 9.00 53.90 8.80
2019 13000 R N 6500 S 6500 9.00 54.60 5.50
2018 13000 T N 6500 S 6500 9.00 54.50 6.00
2017 13000 S N 6500 S 6500 9.00 51.90 6.20
2016 13000 F N 6500 S 6500 9.00 54.10 2.90
2015 12800 C N 6400 S 6400 9.00 54.00 3.40
2014 7900 T N 4000 S 3900 9.00 54.20 7.40
2013 7900 S N 4000 S 3900 9.00 53.60 7.60
2012 7900 F N 4000 S 3900 9.00 52.20 5.90
2011 7900 C N 4000 S 3900 9.00 52.50 6.30
2010 9800 F N 5100 S 4700 8.35 52.69 9.30
2009 9800 C N 5100 S 4700 8.53 53.89 5.30
2008 12100 C N 6100 S 6000 8.81 54.16 6.50
AADT FLAGS: C = COMPUTED; E = MANUAL ESTIMATE; F = FIRST YEAR ESTIMATE
S = SECOND YEAR ESTIMATE; T = THIRD YEAR ESTIMATE; R = FOURTH YEAR ESTIMATE
V = FIFTH YEAR ESTIMATE; 6 = SIXTH YEAR ESTIMATE; X = UNKNOWN
*K FACTOR: STARTING WITH YEAR 2011 IS STANDARDK, PRIOR YEARS ARE K30 VALUES
FIN#21100
Location 1
Year Count*Trend**
2019 13000 10500
2020 11200 11900
2021 11200 13300
2022 11000 14600
2023 19900 16000
2025 N/A 18700
2026 N/A 20100
1,360 2027 N/A 21400
32.03%
13.10%
8.44%
2-Apr-25
Trend R-squared:
Trend Growth Rate (2023 to Design Year):
Printed:
Trend Annual Historic Growth Rate:
Broward (86)
0
Traffic (ADT/AADT)
2026 Mid-Year Trend
30th Ave
2025 Opening Year Trend
Highway:
Traffic Trends - V03.a
30th Ave -- SR 84 to 42nd St County:
Station #:
Straight Line Growth Option *Axle-Adjusted
2027 Design Year Trend
TRANPLAN Forecasts/Trends
** Annual Trend Increase:
0
5000
10000
15000
20000
25000
30000
35000
2019 2024 2029 2034
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
V
e
h
i
c
l
e
s
/
D
a
y
)
Year
Observed Count Fitted Curve
FLORIDA DEPARTMENT OF TRANSPORTATION
TRANSPORTATION STATISTICS OFFICE
2023 HISTORICAL AADT REPORT
COUNTY: 86 - BROWARD
SITE: 9307 - SW 30 AVENUE, N OF GRIFFIN ROAD
YEAR AADT DIRECTION 1 DIRECTION 2 *K FACTOR D FACTOR T FACTOR
---- ---------- ------------ ------------ --------- -------- --------
2023 16600 C N 9000 S 7600 9.00 57.90 3.00
2022 9300 S N 4700 S 4600 9.00 57.00 5.40
2021 9300 F N 4700 S 4600 9.00 53.80 14.30
2020 9300 C N 4700 S 4600 9.00 53.90 8.80
2019 19000 T N 9400 S 9600 9.00 54.60 5.50
2018 19000 S N 9400 S 9600 9.00 54.50 6.00
2017 19000 F N 9400 S 9600 9.00 51.90 6.20
2016 19000 C N 9400 S 9600 9.00 54.10 2.90
2015 7600 V 0 0 9.00 54.00 3.40
2014 7500 R 9.00 54.20 7.40
2013 7400 T 0 0 9.00 53.60 7.60
2012 7400 S 0 0 9.00 52.20 5.90
2011 7400 F 0 0 9.00 52.50 6.30
2010 7400 C N 3800 S 3600 8.35 52.69 9.30
2009 9000 F N 4700 S 4300 8.53 53.89 5.30
2008 9200 C N 4800 S 4400 8.81 54.16 6.50
AADT FLAGS: C = COMPUTED; E = MANUAL ESTIMATE; F = FIRST YEAR ESTIMATE
S = SECOND YEAR ESTIMATE; T = THIRD YEAR ESTIMATE; R = FOURTH YEAR ESTIMATE
V = FIFTH YEAR ESTIMATE; 6 = SIXTH YEAR ESTIMATE; X = UNKNOWN
*K FACTOR: STARTING WITH YEAR 2011 IS STANDARDK, PRIOR YEARS ARE K30 VALUES
FIN#21100
Location 1
Year Count*Trend**
2019 19000 15400
2020 9300 13400
2021 9300 12300
2022 9300 11500
2023 16600 10900
2025 N/A 9900
2026 N/A 9600
2027 N/A 9200
14.17%
-8.28%
-4.15%
2-Apr-25
Trend R-squared:
Compounded Growth Rate (2023 to Design Year):
Printed:
Compounded Annual Historic Growth Rate:
Broward (86)
0
Traffic (ADT/AADT)
2026 Mid-Year Trend
30th Ave
2025 Opening Year Trend
Highway:
Traffic Trends - V03.a
30th Ave -- 42nd St to Griffin Rd County:
Station #:
Decaying Exponential Growth Option *Axle-Adjusted
2027 Design Year Trend
TRANPLAN Forecasts/Trends
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
2019 2024 2029 2034
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
V
e
h
i
c
l
e
s
/
D
a
y
)
Year
Observed Count Fitted Curve
FLORIDA DEPARTMENT OF TRANSPORTATION
TRANSPORTATION STATISTICS OFFICE
2023 HISTORICAL AADT REPORT
COUNTY: 86 - BROWARD
SITE: 7048 - RAVENSWOOD RD, S OF SR 84
YEAR AADT DIRECTION 1 DIRECTION 2 *K FACTOR D FACTOR T FACTOR
---- ---------- ------------ ------------ --------- -------- --------
2023 2300 T N 800 S 1500 9.00 57.90 3.00
2022 2150 S N 750 S 1400 9.00 57.00 5.40
2021 2150 F N 750 S 1400 9.00 53.80 14.30
2020 2150 C N 750 S 1400 9.00 53.90 8.80
2019 13500 T N 7300 S 6200 9.00 54.60 5.50
2018 13500 S N 7300 S 6200 9.00 54.50 6.00
2017 13500 F N 7300 S 6200 9.00 51.90 6.20
2016 13500 C N 7300 S 6200 9.00 54.10 2.90
2015 1800 V 0 0 9.00 54.00 3.40
2014 1800 R 9.00 54.20 7.40
2013 1800 T 0 0 9.00 53.60 7.60
2012 1800 S 0 0 9.00 52.20 5.90
2011 1800 F 0 0 9.00 52.50 6.30
2010 1800 C N 0 S 0 8.35 52.69 9.30
2009 2000 F 0 0 8.53 53.89 5.30
2008 2100 C N 0 S 0 8.81 54.16 6.50
AADT FLAGS: C = COMPUTED; E = MANUAL ESTIMATE; F = FIRST YEAR ESTIMATE
S = SECOND YEAR ESTIMATE; T = THIRD YEAR ESTIMATE; R = FOURTH YEAR ESTIMATE
V = FIFTH YEAR ESTIMATE; 6 = SIXTH YEAR ESTIMATE; X = UNKNOWN
*K FACTOR: STARTING WITH YEAR 2011 IS STANDARDK, PRIOR YEARS ARE K30 VALUES
FIN#21100
Location 1
Year Count*Trend**
2020 2200 2200
2021 2200 2200
2022 2200 2200
2023 2300 2300
2025 N/A 2300
2026 N/A 2400
30 2027 N/A 2400
60.00%
1.52%
1.09%
3-Apr-25
Highway:
Traffic Trends - V03.a
RAVENSWOOD RD -- SR 84 to 36th St County:
Station #:
Straight Line Growth Option *Axle-Adjusted
2027 Design Year Trend
TRANPLAN Forecasts/Trends
** Annual Trend Increase:
Trend R-squared:
Trend Growth Rate (2023 to Design Year):
Printed:
Trend Annual Historic Growth Rate:
Broward (86)
0
Traffic (ADT/AADT)
2026 Mid-Year Trend
RAVENSWOOD RD
2025 Opening Year Trend0
500
1000
1500
2000
2500
3000
2020 2025 2030 2035
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
V
e
h
i
c
l
e
s
/
D
a
y
)
Year
Observed Count Fitted Curve
FLORIDA DEPARTMENT OF TRANSPORTATION
TRANSPORTATION STATISTICS OFFICE
2023 HISTORICAL AADT REPORT
COUNTY: 86 - BROWARD
SITE: 8124 - RAVENSWOOD ROAD, S OF GRIFFIN ROAD (SIS)
YEAR AADT DIRECTION 1 DIRECTION 2 *K FACTOR D FACTOR T FACTOR
---- ---------- ------------ ------------ --------- -------- --------
2023 17800 C N 8600 S 9200 9.00 57.90 4.20
2022 16500 C N 9100 S 7400 9.00 57.00 3.90
2021 15900 C N 7700 S 8200 9.00 53.80 3.30
2020 14600 C N 7900 S 6700 9.00 53.90 4.60
2019 17600 F N 9100 S 8500 9.00 54.60 4.30
2018 17600 C N 9100 S 8500 9.00 54.50 4.30
2017 19200 C N 9300 S 9900 9.00 51.90 3.80
2016 18800 C N 9600 S 9200 9.00 54.10 10.60
2015 18200 C N 9300 S 8900 9.00 54.00 3.60
2014 17700 C N 8500 S 9200 9.00 54.20 7.80
2013 16800 C N 8400 S 8400 9.00 53.60 8.30
2012 15100 C N 7400 S 7700 9.00 52.20 4.30
2011 14700 C N 7500 S 7200 9.00 52.50 9.50
2010 14600 C N 7600 S 7000 8.35 52.69 9.50
2009 13300 C N 6700 S 6600 8.53 53.89 4.50
2008 10200 C N 5100 S 5100 8.81 54.16 10.60
AADT FLAGS: C = COMPUTED; E = MANUAL ESTIMATE; F = FIRST YEAR ESTIMATE
S = SECOND YEAR ESTIMATE; T = THIRD YEAR ESTIMATE; R = FOURTH YEAR ESTIMATE
V = FIFTH YEAR ESTIMATE; 6 = SIXTH YEAR ESTIMATE; X = UNKNOWN
*K FACTOR: STARTING WITH YEAR 2011 IS STANDARDK, PRIOR YEARS ARE K30 VALUES
FIN#21100
Location 1
Year Count*Trend**
2019 7300 6700
2020 5000 5900
2021 5000 5400
2022 5000 5100
2023 5600 4800
2025 N/A 4500
2026 N/A 4300
2027 N/A 4200
51.17%
-8.00%
-3.28%
3-Apr-25
Highway:
Traffic Trends - V03.a
RAVENSWOOD RD -- 36th St to Griffin Rd County:
Station #:
Decaying Exponential Growth Option *Axle-Adjusted
2027 Design Year Trend
TRANPLAN Forecasts/TrendsTrend R-squared:
Compounded Growth Rate (2023 to Design Year):
Printed:
Compounded Annual Historic Growth Rate:
Broward (86)
0
Traffic (ADT/AADT)
2026 Mid-Year Trend
RAVENSWOOD RD
2025 Opening Year Trend0
1000
2000
3000
4000
5000
6000
7000
8000
2019 2024 2029 2034
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
V
e
h
i
c
l
e
s
/
D
a
y
)
Year
Observed Count Fitted Curve
FLORIDA DEPARTMENT OF TRANSPORTATION
TRANSPORTATION STATISTICS OFFICE
2023 HISTORICAL AADT REPORT
COUNTY: 86 - BROWARD
SITE: 9389 - RAVENSWOOD ROAD, N OF SW 42 STREET
YEAR AADT DIRECTION 1 DIRECTION 2 *K FACTOR D FACTOR T FACTOR
---- ---------- ------------ ------------ --------- -------- --------
2023 5600 C N 2900 S 2700 9.00 57.90 3.00
2022 5000 S N 2400 S 2600 9.00 57.00 5.40
2021 5000 F N 2400 S 2600 9.00 53.80 14.30
2020 5000 C N 2400 S 2600 9.00 53.90 8.80
2019 7300 R N 3700 S 3600 9.00 54.60 5.50
2018 7300 T N 3700 S 3600 9.00 54.50 6.00
2017 7300 S N 3700 S 3600 9.00 51.90 6.20
2016 7300 F N 3700 S 3600 9.00 54.10 2.90
2015 7300 C N 3700 S 3600 9.00 54.00 3.40
2014 7000 X 9.00 54.20 7.40
2013 6900 X 0 0 9.00 53.60 7.60
2012 6900 T 0 0 9.00 52.20 5.90
2011 6900 S 0 0 9.00 52.50 6.30
2010 6900 F 0 0 8.35 52.69 9.30
2009 6900 C N 0 S 0 8.53 53.89 5.30
2008 5200 C N 0 S 0 8.81 54.16 6.50
AADT FLAGS: C = COMPUTED; E = MANUAL ESTIMATE; F = FIRST YEAR ESTIMATE
S = SECOND YEAR ESTIMATE; T = THIRD YEAR ESTIMATE; R = FOURTH YEAR ESTIMATE
V = FIFTH YEAR ESTIMATE; 6 = SIXTH YEAR ESTIMATE; X = UNKNOWN
*K FACTOR: STARTING WITH YEAR 2011 IS STANDARDK, PRIOR YEARS ARE K30 VALUES
FIN#21100
Location 1
Year Count*Trend**
2019 17600 16000
2020 14600 16200
2021 15900 16400
2022 16500 16700
2023 17800 16900
2025 N/A 17400
2026 N/A 17700
2027 N/A 17900
8.02%
1.38%
1.45%
3-Apr-25
Highway:
Traffic Trends - V03.a
RAVENSWOOD RD -- Griffin Rd to Stirling Rd County:
Station #:
Exponential Growth Option *Axle-Adjusted
2027 Design Year Trend
TRANPLAN Forecasts/TrendsTrend R-squared:
Compounded Growth Rate (2023 to Design Year):
Printed:
Compounded Annual Historic Growth Rate:
Broward (86)
0
Traffic (ADT/AADT)
2026 Mid-Year Trend
RAVENSWOOD RD
2025 Opening Year Trend0
5000
10000
15000
20000
25000
2019 2024 2029 2034
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
V
e
h
i
c
l
e
s
/
D
a
y
)
Year
Observed Count Fitted Curve
Appendix E
Traffic Movement Counts & Seasonal Factor
File Name : 01 SW 30 at Griffin
Site Code : 00000001
Start Date : 4/1/2025
Page No : 1
Groups Printed- Automobiles - Commercial
SW 30th Ave
Southbound
Griffin Rd
Westbound
N/A
Northbound
Griffin Rd
Eastbound
Start Time Left Thru Right App. Total Uturn Thru Right App. Total Left Thru Right App. Total Uturn Left Thru Right App. Total Int. Total
07:00 AM 20 0 37 57 0 142 44 186 000 00 126 243 0 369 612
07:15 AM 27 0 45 72 0 158 52 210 000 01 143 335 0 479 76107:30 AM 20 0 54 74 1 165 66 232 000 00 175 349 0 524 830
07:45 AM 25 0 44 69 0 173 43 216 000 01 203 360 0 564 849
Total 92 0 180 272 1 638 205 844 0 0 0 0 2 647 1287 0 1936 3052
08:00 AM 29 0 63 92 2 208 55 265 000 02 195 359 0 556 91308:15 AM 27 0 67 94 0 207 55 262 000 00 184 349 0 533 889
08:30 AM 29 0 50 79 1 185 50 236 000 01 177 309 0 487 802
08:45 AM 21 0 55 76 0 259 54 313 000 02 154 307 0 463 852
Total 106 0 235 341 3 859 214 1076 0 0 0 0 5 710 1324 0 2039 3456
09:00 AM 25 0 37 62 1 207 45 253 000 00 134 311 0 445 76009:15 AM 27 0 44 71 0 185 55 240 000 01 116 283 0 400 711
09:30 AM 20 0 36 56 1 225 44 270 000 01 102 285 0 388 714
09:45 AM 15 0 26 41 2 219 37 258 000 00 97 257 0 354 653
Total 87 0 143 230 4 836 181 1021 0 0 0 0 2 449 1136 0 1587 2838
04:00 PM 47 0 196 243 0 325 44 369 000 00 68 228 0 296 908
04:15 PM 44 0 162 206 0 384 29 413 000 00 57 239 0 296 91504:30 PM 59 0 203 262 0 432 37 469 000 01 75 250 0 326 105704:45 PM 68 0 233 301 1 387 36 424 000 00 78 266 0 344 1069
Total 218 0 794 1012 1 1528 146 1675 0 0 0 0 1 278 983 0 1262 3949
05:00 PM 58 0 231 289 0 506 28 534 000 02 106 256 0 364 118705:15 PM 54 0 220 274 3 508 29 540 000 01 104 256 0 361 117505:30 PM 44 0 200 244 0 525 26 551 000 01 106 262 0 369 1164
05:45 PM 52 0 181 233 1 488 28 517 000 00 79 184 0 263 1013
Total 208 0 832 1040 4 2027 111 2142 0 0 0 0 4 395 958 0 1357 4539
06:00 PM 44 0 171 215 0 407 27 434 000 01 94 221 0 316 96506:15 PM 40 0 127 167 2 350 26 378 000 00 88 209 0 297 842
06:30 PM 43 0 118 161 1 358 35 394 000 01 92 202 0 295 850
06:45 PM 37 0 128 165 0 333 27 360 000 00 85 186 0 271 796
Total 164 0 544 708 3 1448 115 1566 0 0 0 0 2 359 818 0 1179 3453
Grand Total 875 0 2728 3603 16 7336 972 8324 000 016 2838 6506 0 9360 21287
Apprch %24.3 0 75.7 0.2 88.1 11.7 000 0.2 30.3 69.5 0
Total %4.1 0 12.8 16.9 0.1 34.5 4.6 39.1 000 00.1 13.3 30.6 0 44
Automobiles 853 0 2657 3510 16 7130 915 8061 0 0 0 0 16 2763 6326 0 9105 20676
% Automobiles 97.5 0 97.4 97.4 100 97.2 94.1 96.8 000 0100 97.4 97.2 0 97.3 97.1
DE TRAFFIC
detraffic.com
(386)341-4186
SW 30th Ave at Griffin Rd
Broward County, Fl
File Name : 01 SW 30 at Griffin
Site Code : 00000001
Start Date : 4/1/2025
Page No : 2
Groups Printed- Automobiles - Commercial
SW 30th Ave
Southbound
Griffin Rd
Westbound
N/A
Northbound
Griffin Rd
Eastbound
Left Thru Right App. Total Uturn Thru Right App. Total Left Thru Right App. Total Uturn Left Thru Right App. Total Int. Total
Commercial 22 0 71 93 0 206 57 263 0 0 0 0 0 75 180 0 255 611
% Commercial 2.5 0 2.6 2.6 0 2.8 5.9 3.2 000 00 2.6 2.8 0 2.7 2.9
DE TRAFFIC
detraffic.com
(386)341-4186
SW 30th Ave at Griffin Rd
Broward County, Fl
File Name : 01 SW 30 at Griffin
Site Code : 00000001
Start Date : 4/1/2025
Page No : 3
SW 30th Ave
Southbound
Griffin Rd
Westbound
N/A
Northbound
Griffin Rd
Eastbound
Start Time Left Thru Right App. Total Uturn Thru Right App. Total Left Thru Right App. Total Uturn Left Thru Right App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 09:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM07:30 AM 20 0 54 74 1 165 66 232 000 00 175 349 0 524 830
07:45 AM 25 0 44 69 0 173 43 216 000 01 203 360 0 564 849
08:00 AM 29 0 63 92 2 208 55 265 000 02 195 359 0 556 913
08:15 AM 27 0 67 94 0 207 55 262 000 00 184 349 0 533 889
Total Volume 101 0 228 329 3 753 219 975 0 0 0 0 3 757 1417 0 2177 3481% App. Total 30.7 0 69.3 0.3 77.2 22.5 0 0 0 0.1 34.8 65.1 0
PHF .871 .000 .851 .875 .375 .905 .830 .920 .000 .000 .000 .000 .375 .932 .984 .000 .965 .953
Automobiles 99 0 215 314 3 718 209 930 000 03 751 1386 0 2140 3384
% Automobiles 98.0 0 94.3 95.4 100 95.4 95.4 95.4 000 0100 99.2 97.8 0 98.3 97.2
Commercial 2013 1503510 45 000 006310 37 97% Commercial 2.0 0 5.7 4.6 0 4.6 4.6 4.6 000 00 0.8 2.2 0 1.7 2.8
DE TRAFFIC
detraffic.com
(386)341-4186
SW 30th Ave at Griffin Rd
Broward County, Fl
File Name : 01 SW 30 at Griffin
Site Code : 00000001
Start Date : 4/1/2025
Page No : 4
SW 30th Ave
G
r
i
f
f
i
n
R
d
G
r
i
f
f
i
n
R
d
N/A
Right
215 13 228 Thru
0 0 0 Left
99 2 101
InOut Total963 314 1277
16 15 31 979 1308 329
Ri
g
h
t
20
9
10
21
9
Th
r
u 71
8
35
75
3
Ut
u
r
n
3 0 3
Ou
t
To
t
a
l
In
14
8
5
9
3
0
2
4
1
5
33
4
5
7
8
15
1
8
2
4
9
3
97
5
Left0 0 0
Thru0 0 0
Right0 0 0
Out TotalIn
3 0 3
0 0 0 3 3 0
Le
f
t
75
4
6
76
0
Th
r
u
13
8
6
31
14
1
7
Rig
h
t
0 0 0
To
t
a
l
Ou
t
In
93
3
2
1
4
0
3
0
7
3
48
3
7
8
5
98
1
3
1
5
8
21
7
7
Peak Hour Begins at 07:30 AM
AutomobilesCommercial
Peak Hour Data
North
DE TRAFFIC
detraffic.com
(386)341-4186
SW 30th Ave at Griffin Rd
Broward County, Fl
File Name : 01 SW 30 at Griffin
Site Code : 00000001
Start Date : 4/1/2025
Page No : 5
SW 30th Ave
Southbound
Griffin Rd
Westbound
N/A
Northbound
Griffin Rd
Eastbound
Start Time Left Thru Right App. Total Uturn Thru Right App. Total Left Thru Right App. Total Uturn Left Thru Right App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM04:45 PM 68 0 233 301 1 387 36 424 000 00 78 266 0 344 106905:00 PM 58 0 231 289 0 506 28 534 000 02 106 256 0 364 1187
05:15 PM 54 0 220 274 3 508 29 540 000 01 104 256 0 361 1175
05:30 PM 44 0 200 244 0 525 26 551 000 01 106 262 0 369 1164
Total Volume 224 0 884 1108 4 1926 119 2049 0 0 0 0 4 394 1040 0 1438 4595% App. Total 20.2 0 79.8 0.2 94 5.8 0 0 0 0.3 27.4 72.3 0 PHF .824 .000 .948 .920 .333 .917 .826 .930 .000 .000 .000 .000 .500 .929 .977 .000 .974 .968
Automobiles 218 0 870 1088 4 1891 111 2006 000 04 368 1010 0 1382 4476
% Automobiles 97.3 0 98.4 98.2 100 98.2 93.3 97.9 000 0100 93.4 97.1 0 96.1 97.4
Commercial 6014 20035 8 43 000 002630 0 56 119% Commercial 2.7 0 1.6 1.8 0 1.8 6.7 2.1 000 00 6.6 2.9 0 3.9 2.6
DE TRAFFIC
detraffic.com
(386)341-4186
SW 30th Ave at Griffin Rd
Broward County, Fl
File Name : 01 SW 30 at Griffin
Site Code : 00000001
Start Date : 4/1/2025
Page No : 6
SW 30th Ave
G
r
i
f
f
i
n
R
d
G
r
i
f
f
i
n
R
d
N/A
Right
870 14 884 Thru
0 0 0 Left
218 6 224
InOut Total483 1088 1571
34 20 54 517 1625 1108
Ri
g
h
t
11
1
8
11
9
Th
r
u
18
9
1
35
19
2
6
Ut
u
r
n
4 0 4
Ou
t
To
t
a
l
In
12
2
8
2
0
0
6
3
2
3
4
36
4
3
7
9
12
6
4
3
3
1
3
20
4
9
Left0 0 0
Thru0 0 0
Right0 0 0
Out TotalIn
4 0 4
0 0 0 4 4 0
Le
f
t
37
2
26
39
8
Th
r
u
10
1
0
30
10
4
0
Rig
h
t
0 0 0
To
t
a
l
Ou
t
In
27
6
1
1
3
8
2
4
1
4
3
49
5
6
1
0
5
28
1
0
4
2
4
8
14
3
8
Peak Hour Begins at 04:45 PM
AutomobilesCommercial
Peak Hour Data
North
DE TRAFFIC
detraffic.com
(386)341-4186
SW 30th Ave at Griffin Rd
Broward County, Fl
File Name : 01 SW 30 at Griffin
Site Code : 00000001
Start Date : 4/1/2025
Page No : 7
Groups Printed- Peds
SW 30th Ave
Southbound
Griffin Rd
Westbound
N/A
Northbound
Griffin Rd
Eastbound
Start Time Left Thru Right Peds App. Total Uturn Thru Right Peds App. Total Left Thru Right Peds App. Total Uturn Left Thru Right Peds App. Total Int. Total
07:15 AM 0000 00000 00000 000001 1 107:30 AM 0001 10000 00000 000000 0 1
07:45 AM 0000 00002 20000 000002 2 4
Total 0 0 0 1 1 0 0 0 2 2 0 0 0 0 0 0 0 0 0 3 3 6
08:00 AM 0000 00000 00000 000001 1 108:15 AM 0000 00001 10000 000000 0 1
08:45 AM 0000 00002 20000 000001 1 3
Total 0 0 0 0 0 0 0 0 3 3 0 0 0 0 0 0 0 0 0 2 2 5
05:00 PM 0000 00001 10000 000000 0 1
05:15 PM 0000 00003 30000 000001 1 4
05:30 PM 0000 00001 10000 000000 0 105:45 PM 0000 00000 00000 000003 3 3Total0000000055000000000449
06:00 PM 0000 00002 20000 000001 1 3
06:30 PM 0000 00000 00000 000002 2 2
Total 0 0 0 0 0 0 0 0 2 2 0 0 0 0 0 0 0 0 0 3 3 5
Grand Total 0001 10 0 0 12 12 0000 0000012 12 25Apprch %000100 000100 0000 0000100 Total %0004 40 0 0 48 48 0000 0000048 48
DE TRAFFIC
detraffic.com
(386)341-4186
SW 30th Ave at Griffin Rd
Broward County, Fl
File Name : 02 Anglers at Griffin
Site Code : 00000002
Start Date : 4/1/2025
Page No : 1
Groups Printed- Automobiles - Commercial
Anglers Ave
Southbound
Griffin Rd
Westbound
Anglers Ave
Northbound
Griffin Rd
Eastbound
Start Time Left Thru Right App. Total Uturn Left Thru Right App. Total Left Thru Right App. Total Uturn Left Thru Right App. Total Int. Total
07:00 AM 22 16 11 49 0 66 140 53 259 35 15 66 116 0 30 173 43 246 670
07:15 AM 28 15 12 55 3 75 149 46 273 43 24 73 140 2 34 265 53 354 82207:30 AM 41 21 15 77 3 85 142 81 311 51 26 81 158 1 42 244 67 354 900
07:45 AM 52 17 18 87 2 75 160 77 314 43 24 105 172 0 51 275 68 394 967
Total 143 69 56 268 8 301 591 257 1157 172 89 325 586 3 157 957 231 1348 3359
08:00 AM 34 15 18 67 5 83 186 65 339 54 16 99 169 2 41 289 66 398 97308:15 AM 44 18 15 77 5 77 206 78 366 43 15 89 147 1 53 262 71 387 977
08:30 AM 38 22 16 76 4 65 197 88 354 35 18 98 151 3 54 243 53 353 934
08:45 AM 30 18 12 60 6 75 239 79 399 51 24 95 170 0 43 248 42 333 962
Total 146 73 61 280 20 300 828 310 1458 183 73 381 637 6 191 1042 232 1471 3846
09:00 AM 27 17 10 54 2 43 207 64 316 43 19 77 139 1 46 263 44 354 86309:15 AM 28 19 13 60 4 51 189 86 330 36 24 80 140 2 34 252 34 322 852
09:30 AM 25 19 10 54 3 44 218 76 341 41 29 81 151 0 46 224 53 323 869
09:45 AM 21 11 13 45 3 44 205 53 305 35 22 64 121 0 33 212 44 289 760
Total 101 66 46 213 12 182 819 279 1292 155 94 302 551 3 159 951 175 1288 3344
04:00 PM 70 27 23 120 0 82 292 46 420 54 28 91 173 1 13 207 43 264 977
04:15 PM 76 27 24 127 2 87 325 52 466 55 37 48 140 0 10 248 41 299 103204:30 PM 88 51 28 167 3 82 329 48 462 100 38 74 212 1 11 259 51 322 116304:45 PM 79 43 36 158 0 141 327 45 513 70 34 86 190 2 13 281 50 346 1207
Total 313 148 111 572 5 392 1273 191 1861 279 137 299 715 4 47 995 185 1231 4379
05:00 PM 71 36 41 148 4 126 442 43 615 60 43 80 183 0 12 263 52 327 127305:15 PM 80 51 25 156 4 119 398 36 557 63 34 71 168 1 15 259 53 328 120905:30 PM 85 43 52 180 5 116 422 47 590 74 44 77 195 0 21 243 57 321 1286
05:45 PM 77 36 42 155 2 111 424 38 575 56 37 66 159 2 13 188 50 253 1142
Total 313 166 160 639 15 472 1686 164 2337 253 158 294 705 3 61 953 212 1229 4910
06:00 PM 59 52 36 147 4 116 359 48 527 45 41 62 148 1 12 224 53 290 111206:15 PM 65 42 28 135 2 107 305 38 452 54 36 70 160 2 18 206 46 272 1019
06:30 PM 57 56 24 137 2 89 311 46 448 43 30 50 123 0 10 190 54 254 962
06:45 PM 53 43 20 116 3 77 291 39 410 36 25 55 116 0 10 183 45 238 880
Total 234 193 108 535 11 389 1266 171 1837 178 132 237 547 3 50 803 198 1054 3973
Grand Total 1250 715 542 2507 71 2036 6463 1372 9942 1220 683 1838 3741 22 665 5701 1233 7621 23811
Apprch %49.9 28.5 21.6 0.7 20.5 65 13.8 32.6 18.3 49.1 0.3 8.7 74.8 16.2
Total %5.2 3 2.3 10.5 0.3 8.6 27.1 5.8 41.8 5.1 2.9 7.7 15.7 0.1 2.8 23.9 5.2 32
Automobiles 1184 697 521 2402 71 1986 6215 1302 9574 1176 672 1773 3621 22 648 5495 1208 7373 22970
% Automobiles 94.7 97.5 96.1 95.8 100 97.5 96.2 94.9 96.3 96.4 98.4 96.5 96.8 100 97.4 96.4 98 96.7 96.5
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Griffin Rd
Broward County, Fl
File Name : 02 Anglers at Griffin
Site Code : 00000002
Start Date : 4/1/2025
Page No : 2
Groups Printed- Automobiles - Commercial
Anglers Ave
Southbound
Griffin Rd
Westbound
Anglers Ave
Northbound
Griffin Rd
Eastbound
Left Thru Right App. Total Uturn Left Thru Right App. Total Left Thru Right App. Total Uturn Left Thru Right App. Total Int. Total
Commercial 66 18 21 105 0 50 248 70 368 44 11 65 120 0 17 206 25 248 841
% Commercial 5.3 2.5 3.9 4.2 0 2.5 3.8 5.1 3.7 3.6 1.6 3.5 3.2 0 2.6 3.6 2 3.3 3.5
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Griffin Rd
Broward County, Fl
File Name : 02 Anglers at Griffin
Site Code : 00000002
Start Date : 4/1/2025
Page No : 3
Anglers Ave
Southbound
Griffin Rd
Westbound
Anglers Ave
Northbound
Griffin Rd
Eastbound
Start Time Left Thru Right App. Total Uturn Left Thru Right App. Total Left Thru Right App. Total Uturn Left Thru Right App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 09:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM07:45 AM 52 17 18 87 2 75 160 77 314 43 24 105 172 0 51 275 68 394 967
08:00 AM 34 15 18 67 5 83 186 65 339 54 16 99 169 2 41 289 66 398 973
08:15 AM 44 18 15 77 5 77 206 78 366 43 15 89 147 1 53 262 71 387 977
08:30 AM 38 22 16 76 4 65 197 88 354 35 18 98 151 3 54 243 53 353 934
Total Volume 168 72 67 307 16 300 749 308 1373 175 73 391 639 6 199 1069 258 1532 3851% App. Total 54.7 23.5 21.8 1.2 21.8 54.6 22.4 27.4 11.4 61.2 0.4 13 69.8 16.8
PHF .808 .818 .931 .882 .800 .904 .909 .875 .938 .810 .760 .931 .929 .500 .921 .925 .908 .962 .985
Automobiles 161 70 64 295 16 297 713 298 1324 171 73 385 629 6 196 1033 254 1489 3737
% Automobiles 95.8 97.2 95.5 96.1 100 99.0 95.2 96.8 96.4 97.7 100 98.5 98.4 100 98.5 96.6 98.4 97.2 97.0
Commercial 723 120 3 36 10 49 406 1003364 43114% Commercial 4.2 2.8 4.5 3.9 0 1.0 4.8 3.2 3.6 2.3 0 1.5 1.6 01.53.41.6 2.8 3.0
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Griffin Rd
Broward County, Fl
File Name : 02 Anglers at Griffin
Site Code : 00000002
Start Date : 4/1/2025
Page No : 4
Anglers Ave
G
r
i
f
f
i
n
R
d
G
r
i
f
f
i
n
R
d
Anglers Ave
Right
64 3 67 Thru
70 2 72 Left
161 7 168
InOut Total573 295 868
13 12 25 586 893 307
Ri
g
h
t
29
8
10
30
8
Th
r
u 71
3
36
74
9
Le
f
t
31
3
3
31
6
Ou
t
To
t
a
l
In
15
7
9
1
3
2
4
2
9
0
3
49
4
9
9
8
16
2
8
3
0
0
1
13
7
3
Left171 4 175
Thru73 0 73
Right385 6 391
Out TotalIn
637 629 1266
9 10 19 646 1285 639
Le
f
t
20
2
3
20
5
Th
r
u
10
3
3
36
10
6
9
Rig
h
t
25
4
4
25
8
To
t
a
l
Ou
t
In
94
8
1
4
8
9
2
4
3
7
43
4
3
8
6
99
1
2
5
2
3
15
3
2
Peak Hour Begins at 07:45 AM
AutomobilesCommercial
Peak Hour Data
North
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Griffin Rd
Broward County, Fl
File Name : 02 Anglers at Griffin
Site Code : 00000002
Start Date : 4/1/2025
Page No : 5
Anglers Ave
Southbound
Griffin Rd
Westbound
Anglers Ave
Northbound
Griffin Rd
Eastbound
Start Time Left Thru Right App. Total Uturn Left Thru Right App. Total Left Thru Right App. Total Uturn Left Thru Right App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM04:45 PM 79 43 36 158 0 141 327 45 513 70 34 86 190 2 13 281 50 346 120705:00 PM 71 36 41 148 4 126 442 43 615 60 43 80 183 0 12 263 52 327 1273
05:15 PM 80 51 25 156 4 119 398 36 557 63 34 71 168 1 15 259 53 328 1209
05:30 PM 85 43 52 180 5 116 422 47 590 74 44 77 195 0 21 243 57 321 1286
Total Volume 315 173 154 642 13 502 1589 171 2275 267 155 314 736 3 61 1046 212 1322 4975% App. Total 49.1 26.9 24 0.6 22.1 69.8 7.5 36.3 21.1 42.7 0.2 4.6 79.1 16 PHF .926 .848 .740 .892 .650 .890 .899 .910 .925 .902 .881 .913 .944 .375 .726 .931 .930 .955 .967
Automobiles 297 169 150 616 13 488 1535 157 2193 257 152 299 708 3 57 1012 207 1279 4796
% Automobiles 94.3 97.7 97.4 96.0 100 97.2 96.6 91.8 96.4 96.3 98.1 95.2 96.2 100 93.4 96.7 97.6 96.7 96.4
Commercial 1844 260145414 8210 3 15 28 04345 43179% Commercial 5.7 2.3 2.6 4.0 0 2.8 3.4 8.2 3.6 3.7 1.9 4.8 3.8 06.63.32.4 3.3 3.6
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Griffin Rd
Broward County, Fl
File Name : 02 Anglers at Griffin
Site Code : 00000002
Start Date : 4/1/2025
Page No : 6
Anglers Ave
G
r
i
f
f
i
n
R
d
G
r
i
f
f
i
n
R
d
Anglers Ave
Right
150 4 154 Thru
169 4 173 Left
297 18 315
InOut Total369 616 985
21 26 47 390 1032 642
Ri
g
h
t
15
7
14
17
1
Th
r
u
15
3
5
54
15
8
9
Le
f
t
50
1
14
51
5
Ou
t
To
t
a
l
In
16
0
8
2
1
9
3
3
8
0
1
67
8
2
1
4
9
16
7
5
3
9
5
0
22
7
5
Left257 10 267
Thru152 3 155
Right299 15 314
Out TotalIn
877 708 1585
23 28 51 900 1636 736
Le
f
t
60
4
64
Th
r
u
10
1
2
34
10
4
6
Rig
h
t
20
7
5
21
2
To
t
a
l
Ou
t
In
19
4
2
1
2
7
9
3
2
2
1
68
4
3
1
1
1
20
1
0
3
3
3
2
13
2
2
Peak Hour Begins at 04:45 PM
AutomobilesCommercial
Peak Hour Data
North
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Griffin Rd
Broward County, Fl
File Name : 02 Anglers at Griffin
Site Code : 00000002
Start Date : 4/1/2025
Page No : 7
Groups Printed- Peds
Anglers Ave
Southbound
Griffin Rd
Westbound
Anglers Ave
Northbound
Griffin Rd
Eastbound
Start Time Left Thru Right Peds App. Total Uturn Left Thru Right Peds App. Total Left Thru Right Peds App. Total Uturn Left Thru Right Peds App. Total Int. Total
07:15 AM 0001 100000 00000 000002 2 3
07:30 AM 0000 000001 10000 000000 0 1
07:45 AM 0000 000000 00000 000001 1 1
Total 0 0 0 1 1 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 3 3 5
08:00 AM 0000 000002 20000 000000 0 2
08:30 AM 0000 000001 10000 000000 0 1
Total 0 0 0 0 0 0 0 0 0 3 3 0 0 0 0 0 0 0 0 0 0 0 3
09:00 AM 0000 000001 10000 000000 0 1
Total 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 1
05:15 PM 0000 000001 10000 000002 2 3
05:30 PM 0001 100000 00001 100001 1 305:45 PM 0000 000003 30000 000000 0 3Total00011000044000110000339
06:00 PM 0000 000002 20000 000001 1 3
06:15 PM 0000 000000 00001 100000 0 106:30 PM 0000 000001 10000 000000 0 1
Total 0 0 0 0 0 0 0 0 0 3 3 0 0 0 1 1 0 0 0 0 1 1 5
Grand Total 0002 2000012 120002 200007 7 23Apprch %0 0 0 100 0000100 000100 0000100 Total %0008.78.7000052.252.20008.78.70 0 0 0 30.4 30.4
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Griffin Rd
Broward County, Fl
File Name : 03 Plaza at griffin
Site Code : 00000003
Start Date : 4/1/2025
Page No : 1
Groups Printed- Automobiles - Commercial
Plaza Entrance
Southbound
Griffin Rd
Westbound
N/A
Northbound
Griffin Rd
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
07:00 AM 002 20 265 2 267 000 00 255 0 255 524
07:15 AM 003 30 281 4 285 000 00 353 0 353 64107:30 AM 004 40 309 4 313 000 00 373 0 373 690
07:45 AM 008 80 301 8 309 000 00 419 0 419 736
Total 0 0 17 17 0 1156 18 1174 0 0 0 0 0 1400 0 1400 2591
08:00 AM 008 80 329 4 333 000 00 438 0 438 77908:15 AM 009 90 368 9 377 000 00 413 0 413 799
08:30 AM 007 70 354 7 361 000 00 388 0 388 756
08:45 AM 0 0 10 10 0 397 9 406 000 00 389 0 389 805
Total 0 0 34 34 0 1448 29 1477 0 0 0 0 0 1628 0 1628 3139
09:00 AM 009 90 329 8 337 000 00 359 0 359 70509:15 AM 008 80 337 12 349 000 00 368 0 368 725
09:30 AM 008 80 344 9 353 000 00 341 0 341 702
09:45 AM 007 70 315 16 331 000 00 311 0 311 649
Total 0 0 32 32 0 1325 45 1370 0 0 0 0 0 1379 0 1379 2781
04:00 PM 008 80 425 8 433 000 00 361 0 361 802
04:15 PM 0 0 11 11 0 457 6 463 000 00 377 0 377 85104:30 PM 0 0 16 16 0 444 13 457 000 00 428 0 428 90104:45 PM 0 0 14 14 0 483 15 498 000 00 443 0 443 955
Total 0 0 49 49 0 1809 42 1851 0 0 0 0 0 1609 0 1609 3509
05:00 PM 0 0 15 15 0 563 11 574 000 00 434 0 434 102305:15 PM 0 0 17 17 0 544 14 558 000 00 419 0 419 99405:30 PM 0 0 13 13 0 585 9 594 000 00 416 0 416 1023
05:45 PM 0 0 18 18 0 573 14 587 000 00 322 0 322 927
Total 0 0 63 63 0 2265 48 2313 0 0 0 0 0 1591 0 1591 3967
06:00 PM 0 0 13 13 0 541 17 558 000 00 344 0 344 91506:15 PM 0 0 10 10 0 478 16 494 000 00 352 0 352 856
06:30 PM 0 0 16 16 0 480 10 490 000 00 315 0 315 821
06:45 PM 0 0 13 13 0 404 8 412 000 00 296 0 296 721
Total 0 0 52 52 0 1903 51 1954 0 0 0 0 0 1307 0 1307 3313
Grand Total 0 0 247 247 0 9906 233 10139 000 00 8914 0 8914 19300
Apprch %0 0 100 097.7 2.3 000 0 100 0
Total %001.3 1.30 51.3 1.2 52.5 000 00 46.2 0 46.2
Automobiles 0 0 247 247 0 9523 223 9746 0 0 0 0 0 8557 0 8557 18550
% Automobiles 0 0 100 100 0 96.1 95.7 96.1 000 0096 0 96 96.1
DE TRAFFIC
detraffic.com
(386)341-4186
Plaza Entrace at Griffin Rd
Broward County, Fl
File Name : 03 Plaza at griffin
Site Code : 00000003
Start Date : 4/1/2025
Page No : 2
Groups Printed- Automobiles - Commercial
Plaza Entrance
Southbound
Griffin Rd
Westbound
N/A
Northbound
Griffin Rd
Eastbound
Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Commercial 0 0 0 0 0 383 10 393 0 0 0 0 0 357 0 357 750
% Commercial 000 003.94.3 3.9 000 0040 4 3.9
DE TRAFFIC
detraffic.com
(386)341-4186
Plaza Entrace at Griffin Rd
Broward County, Fl
File Name : 03 Plaza at griffin
Site Code : 00000003
Start Date : 4/1/2025
Page No : 3
Plaza Entrance
Southbound
Griffin Rd
Westbound
N/A
Northbound
Griffin Rd
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 09:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM08:00 AM 008 80 329 4 333 000 00 438 0 438 779
08:15 AM 009 90 368 9 377 000 00 413 0 413 799
08:30 AM 007 70 354 7 361 000 00 388 0 388 756
08:45 AM 0 0 10 10 0 397 9 406 000 00 389 0 389 805
Total Volume 0 0 34 34 0 1448 29 1477 0 0 0 0 0 1628 0 1628 3139% App. Total 0 0 100 0 98 2 0 0 0 0 100 0
PHF .000 .000 .850 .850 .000 .912 .806 .909 .000 .000 .000 .000 .000 .929 .000 .929 .975
Automobiles 0 0 34 34 0 1392 28 1420 000 00 1574 0 1574 3028
% Automobiles 0 0 100 100 0 96.1 96.6 96.1 000 00 96.7 0 96.7 96.5
Commercial 000 0056 1 57 000 0054 0 54 111% Commercial 000 003.93.4 3.9 000 00 3.3 0 3.3 3.5
DE TRAFFIC
detraffic.com
(386)341-4186
Plaza Entrace at Griffin Rd
Broward County, Fl
File Name : 03 Plaza at griffin
Site Code : 00000003
Start Date : 4/1/2025
Page No : 4
Plaza Entrance
G
r
i
f
f
i
n
R
d
G
r
i
f
f
i
n
R
d
N/A
Right
34 0 34 Thru
0 0 0 Left
0 0 0
InOut Total28 34 62
1 0 1 29 63 34
Ri
g
h
t
28
1
29
Th
r
u
13
9
2
56
14
4
8
Le
f
t
0 0 0
Ou
t
To
t
a
l
In
15
7
4
1
4
2
0
2
9
9
4
54
5
7
1
1
1
16
2
8
3
1
0
5
14
7
7
Left0 0 0
Thru0 0 0
Right0 0 0
Out TotalIn
0 0 0
0 0 0 0 0 0
Le
f
t
0 0 0
Th
r
u
15
7
4
54
16
2
8
Rig
h
t
0 0 0
To
t
a
l
Ou
t
In
14
2
6
1
5
7
4
3
0
0
0
56
5
4
1
1
0
14
8
2
3
1
1
0
16
2
8
Peak Hour Begins at 08:00 AM
AutomobilesCommercial
Peak Hour Data
North
DE TRAFFIC
detraffic.com
(386)341-4186
Plaza Entrace at Griffin Rd
Broward County, Fl
File Name : 03 Plaza at griffin
Site Code : 00000003
Start Date : 4/1/2025
Page No : 5
Plaza Entrance
Southbound
Griffin Rd
Westbound
N/A
Northbound
Griffin Rd
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM04:45 PM 0 0 14 14 0 483 15 498 000 00 443 0 443 95505:00 PM 0 0 15 15 0 563 11 574 000 00 434 0 434 1023
05:15 PM 0 0 17 17 0 544 14 558 000 00 419 0 419 994
05:30 PM 0 0 13 13 0 585 9 594 000 00 416 0 416 1023
Total Volume 0 0 59 59 0 2175 49 2224 0 0 0 0 0 1712 0 1712 3995% App. Total 0 0 100 0 97.8 2.2 0 0 0 0 100 0 PHF .000 .000 .868 .868 .000 .929 .817 .936 .000 .000 .000 .000 .000 .966 .000 .966 .976
Automobiles 0 0 59 59 0 2091 48 2139 000 00 1635 0 1635 3833
% Automobiles 0 0 100 100 0 96.1 98.0 96.2 000 00 95.5 0 95.5 95.9
Commercial 000 0084 1 85 000 0077 0 77 162% Commercial 000 003.92.0 3.8 000 00 4.5 0 4.5 4.1
DE TRAFFIC
detraffic.com
(386)341-4186
Plaza Entrace at Griffin Rd
Broward County, Fl
File Name : 03 Plaza at griffin
Site Code : 00000003
Start Date : 4/1/2025
Page No : 6
Plaza Entrance
G
r
i
f
f
i
n
R
d
G
r
i
f
f
i
n
R
d
N/A
Right
59 0 59 Thru
0 0 0 Left
0 0 0
InOut Total48 59 107
1 0 1 49 108 59
Ri
g
h
t
48
1
49
Th
r
u
20
9
1
84
21
7
5
Le
f
t
0 0 0
Ou
t
To
t
a
l
In
16
3
5
2
1
3
9
3
7
7
4
77
8
5
1
6
2
17
1
2
3
9
3
6
22
2
4
Left0 0 0
Thru0 0 0
Right0 0 0
Out TotalIn
0 0 0
0 0 0 0 0 0
Le
f
t
0 0 0
Th
r
u
16
3
5
77
17
1
2
Rig
h
t
0 0 0
To
t
a
l
Ou
t
In
21
5
0
1
6
3
5
3
7
8
5
84
7
7
1
6
1
22
3
4
3
9
4
6
17
1
2
Peak Hour Begins at 04:45 PM
AutomobilesCommercial
Peak Hour Data
North
DE TRAFFIC
detraffic.com
(386)341-4186
Plaza Entrace at Griffin Rd
Broward County, Fl
File Name : 03 Plaza at griffin
Site Code : 00000003
Start Date : 4/1/2025
Page No : 7
Groups Printed- Peds
Plaza Entrance
Southbound
Griffin Rd
Westbound
N/A
Northbound
Griffin Rd
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
07:15 AM 0000 00002 20000 00000 0 207:30 AM 0000 00001 10000 00000 0 1
07:45 AM 0000 00003 30000 00000 0 3
Total 0 0 0 0 0 0 0 0 6 6 0 0 0 0 0 0 0 0 0 0 6
08:00 AM 0000 00000 00000 00002 2 208:15 AM 0000 00001 10000 00001 1 2
08:45 AM 0000 00002 20000 00003 3 5
Total 0 0 0 0 0 0 0 0 3 3 0 0 0 0 0 0 0 0 6 6 9
09:00 AM 0000 00000 00000 00001 1 109:15 AM 0000 00000 00000 00002 2 2
09:30 AM 0000 00001 10000 00000 0 1
Total 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 3 3 4
04:45 PM 0000 00002 20000 00000 0 2
Total 0 0 0 0 0 0 0 0 2 2 0 0 0 0 0 0 0 0 0 0 2
05:00 PM 0000 00000 00000 00002 2 2
05:15 PM 0000 00002 20000 00001 1 3
05:45 PM 0000 00002 20000 00003 3 5Total0000000044000000006610
06:00 PM 0000 00000 00000 00004 4 4
06:15 PM 0000 00003 30000 00000 0 3
06:30 PM 0000 00002 20000 00002 2 4
Total 0 0 0 0 0 0 0 0 5 5 0 0 0 0 0 0 0 0 6 6 11
Grand Total 0000 000021 210000 000021 21 42
Apprch %0000 000100 0000 0 0 0 100 Total %0000 000050 500000 000050 50
DE TRAFFIC
detraffic.com
(386)341-4186
Plaza Entrace at Griffin Rd
Broward County, Fl
File Name : 04 Ravenswood at SW 46
Site Code : 00000004
Start Date : 4/1/2025
Page No : 1
Groups Printed- Automobiles - Commercial
Anglers Ave
Southbound
Plaza Entrance
Westbound
Anglers Ave
Northbound
SW 46th Ct
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
07:00 AM 145 2 48 303 6389 2 94 103 4152
07:15 AM 353 7 63 104 51 98 6 105 204 617907:30 AM 074 4 78 301 44 136 4 144 201 3229
07:45 AM 188 9 98 403 72 143 5 150 214 7262
Total 5 260 22 287 11 0 11 22 10 466 17 493 7 1 12 20 822
08:00 AM 571 6 82 501 64 118 8 130 202 422208:15 AM 173 2 76 504 94 138 8 150 003 3238
08:30 AM 273 2 77 201 34 139 5 148 413 8236
08:45 AM 560 4 69 202 45 133 4 142 204 6221
Total 13 277 14 304 14 0 8 22 17 528 25 570 8 1 12 21 917
09:00 AM 456 4 64 300 34 117 7 128 105 620109:15 AM 263 2 67 401 52 134 5 141 204 6219
09:30 AM 355 2 60 501 62 130 6 138 003 3207
09:45 AM 448 2 54 702 92 98 3 103 202 4170
Total 13 222 10 245 19 0 4 23 10 479 21 510 5 0 14 19 797
04:00 PM 3 112 2 117 101 2287 9 98 104 5222
04:15 PM 4 131 3 138 302 54 99 7 110 002 225504:30 PM 4 162 2 168 303 63 93 8 104 103 428204:45 PM 2 152 3 157 401 5683 7 96 304 7265
Total 13 557 10 580 11 0 7 18 15 362 31 408 5 0 13 18 1024
05:00 PM 3 142 4 149 203 55 90 5 100 107 826205:15 PM 4 160 3 167 315 9479 8 91 304 727405:30 PM 3 172 4 179 405 96 103 8 117 009 9314
05:45 PM 6 157 3 166 715 136 89 7 102 306 9290
Total 16 631 14 661 16 2 18 36 21 361 28 410 7 0 26 33 1140
06:00 PM 4 141 6 151 704 11587 4 96 215 826606:15 PM 2 134 4 140 508 135 90 5 100 005 5258
06:30 PM 4 141 6 151 504 9480 7 91 106 7258
06:45 PM 2 107 2 111 302 5280 5 87 004 4207
Total 12 523 18 553 20 0 18 38 16 337 21 374 3 1 20 24 989
Grand Total 72 2470 88 2630 91 2 66 159 89 2533 143 2765 35 3 97 135 5689
Apprch %2.7 93.9 3.3 57.2 1.3 41.5 3.2 91.6 5.2 25.9 2.2 71.9
Total %1.3 43.4 1.5 46.2 1.6 0 1.2 2.8 1.6 44.5 2.5 48.6 0.6 0.1 1.7 2.4
Automobiles 66 2377 79 2522 85 2 58 145 82 2433 139 2654 30 3 87 120 5441
% Automobiles 91.7 96.2 89.8 95.9 93.4 100 87.9 91.2 92.1 96.1 97.2 96 85.7 100 89.7 88.9 95.6
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Plaza Entrace
Broward County, Fl
File Name : 04 Ravenswood at SW 46
Site Code : 00000004
Start Date : 4/1/2025
Page No : 2
Groups Printed- Automobiles - Commercial
Anglers Ave
Southbound
Plaza Entrance
Westbound
Anglers Ave
Northbound
SW 46th Ct
Eastbound
Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Commercial 6 93 9 108 6 0 8 14 7 100 4 111 5 0 10 15 248
% Commercial 8.3 3.8 10.2 4.1 6.6 0 12.1 8.8 7.9 3.9 2.8 4 14.3 0 10.3 11.1 4.4
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Plaza Entrace
Broward County, Fl
File Name : 04 Ravenswood at SW 46
Site Code : 00000004
Start Date : 4/1/2025
Page No : 3
Anglers Ave
Southbound
Plaza Entrance
Westbound
Anglers Ave
Northbound
SW 46th Ct
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 09:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM07:45 AM 188 9 98 403 72 143 5 150 214 7262
08:00 AM 571 6 82 501 64 118 8 130 202 4222
08:15 AM 173 2 76 504 94 138 8 150 003 3238
08:30 AM 273 2 77 201 34 139 5 148 413 8236
Total Volume 9 305 19 333 16 0 9 25 14 538 26 578 8 2 12 22 958% App. Total 2.7 91.6 5.7 64 0 36 2.4 93.1 4.5 36.4 9.1 54.5
PHF .450 .866 .528 .849 .800 .000 .563 .694 .875 .941 .813 .963 .500 .500 .750 .688 .914
Automobiles 7 295 16 318 15 0 7 22 13 523 24 560 628 16916
% Automobiles 77.8 96.7 84.2 95.5 93.8 0 77.8 88.0 92.9 97.2 92.3 96.9 75.0 100 66.7 72.7 95.6
Commercial 210 3 15 102 3115 2 18 204 6 42% Commercial 22.2 3.3 15.8 4.5 6.3 0 22.2 12.0 7.1 2.8 7.7 3.1 25.0 0 33.3 27.3 4.4
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Plaza Entrace
Broward County, Fl
File Name : 04 Ravenswood at SW 46
Site Code : 00000004
Start Date : 4/1/2025
Page No : 4
Anglers Ave
S
W
4
6
t
h
C
t
P
l
a
z
a
E
n
t
r
a
n
c
e
Anglers Ave
Right
16 3 19 Thru
295 10 305 Left
7 2 9
InOut Total536 318 854
19 15 34 555 888 333
Ri
g
h
t
7 2 9
Th
r
u
0 0 0
Le
f
t
15
1
16
Ou
t
To
t
a
l
In
33
2
2
5
5
4
3
7
37
6
2
25
Left13 1 14
Thru523 15 538
Right24 2 26
Out TotalIn
318 560 878
15 18 33 333 911 578
Le
f
t
6 2 8
Th
r
u
2 0 2
Rig
h
t
8 4
12
To
t
a
l
Ou
t
In
29
1
6
4
5
4
6
1
0
33
5
5
22
Peak Hour Begins at 07:45 AM
AutomobilesCommercial
Peak Hour Data
North
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Plaza Entrace
Broward County, Fl
File Name : 04 Ravenswood at SW 46
Site Code : 00000004
Start Date : 4/1/2025
Page No : 5
Anglers Ave
Southbound
Plaza Entrance
Westbound
Anglers Ave
Northbound
SW 46th Ct
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 05:15 PM05:15 PM 4 160 3 167 315 9479 8 91 304 727405:30 PM 3 172 4 179 405 96 103 8 117 009 9314
05:45 PM 6 157 3 166 715 136 89 7 102 306 9290
06:00 PM 4 141 6 151 704 11587 4 96 215 8266
Total Volume 17 630 16 663 21 2 19 42 21 358 27 406 8 1 24 33 1144% App. Total 2.6 95 2.4 50 4.8 45.2 5.2 88.2 6.7 24.2 3 72.7 PHF .708 .916 .667 .926 .750 .500 .950 .808 .875 .869 .844 .868 .667 .250 .667 .917 .911
Automobiles 16 606 12 634 19 2 17 38 18 337 26 381 5 1 21 27 1080
% Automobiles 94.1 96.2 75.0 95.6 90.5 100 89.5 90.5 85.7 94.1 96.3 93.8 62.5 100 87.5 81.8 94.4
Commercial 124 4 29 202 4321 1 25 303 6 64% Commercial 5.9 3.8 25.0 4.4 9.5 0 10.5 9.5 14.3 5.9 3.7 6.2 37.5 0 12.5 18.2 5.6
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Plaza Entrace
Broward County, Fl
File Name : 04 Ravenswood at SW 46
Site Code : 00000004
Start Date : 4/1/2025
Page No : 6
Anglers Ave
S
W
4
6
t
h
C
t
P
l
a
z
a
E
n
t
r
a
n
c
e
Anglers Ave
Right
12 4 16 Thru
606 24 630 Left
16 1 17
InOut Total359 634 993
26 29 55 385 1048 663
Ri
g
h
t
17
2
19
Th
r
u
2 0 2
Le
f
t
19
2
21
Ou
t
To
t
a
l
In
43
3
8
8
1
2
4
6
45
8
7
42
Left18 3 21
Thru337 21 358
Right26 1 27
Out TotalIn
646 381 1027
29 25 54 675 1081 406
Le
f
t
5 3 8
Th
r
u
1 0 1
Rig
h
t
21
3
24
To
t
a
l
Ou
t
In
32
2
7
5
9
7
6
1
3
39
7
2
33
Peak Hour Begins at 05:15 PM
AutomobilesCommercial
Peak Hour Data
North
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Plaza Entrace
Broward County, Fl
File Name : 04 Ravenswood at SW 46
Site Code : 00000004
Start Date : 4/1/2025
Page No : 6
Groups Printed- Peds
Anglers Ave
Southbound
Plaza Entrance
Westbound
Anglers Ave
Northbound
SW 46th Ct
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
07:00 AM 0000 00000 00003 30000 0 3
07:15 AM 0000 00000 00001 10000 0 107:30 AM 0001 10000 00000 00000 0 1
07:45 AM 0000 00000 00002 20000 0 2
Total 0 0 0 1 1 0 0 0 0 0 0 0 0 6 6 0 0 0 0 0 7
08:00 AM 0002 20000 00000 00000 0 208:15 AM 0000 00000 00003 30002 2 5
08:30 AM 0001 10000 00000 00001 1 2
08:45 AM 0001 10000 00002 20000 0 3
Total 0 0 0 4 4 0 0 0 0 0 0 0 0 5 5 0 0 0 3 3 12
09:00 AM 0000 00000 00002 20002 2 4
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 0 0 2 2 4
05:15 PM 0000 00000 00002 20000 0 2
05:30 PM 0000 00000 00003 30000 0 3
05:45 PM 0001 10000 00000 00001 1 2
Total 0 0 0 1 1 0 0 0 0 0 0 0 0 5 5 0 0 0 1 1 7
06:00 PM 0000 00000 00004 40000 0 4
06:15 PM 0002 20000 00001 10001 1 4
06:30 PM 0000 00000 00002 20000 0 2
06:45 PM 0001 10000 00000 00000 0 1Total0003300000000770001111
Grand Total 0009 90000 00 0 0 25 25 0007 7 41
Apprch %0 0 0 100 0000 000100 0 0 0 100
Total %00022 220000 00 0 0 61 61 0 0 0 17.1 17.1
DE TRAFFIC
detraffic.com
(386)341-4186
Anglers Ave at Plaza Entrace
Broward County, Fl
Project
Number:
Sheet
Number:9239 Outlook Rock Trl. Windermere Fl. 34786 1
WB ApproachEB Approach
detraffic.com
O25‐10
SB Approach
Broward County
SW 30th Ave
at Griffin Rd
Project
Number:
Sheet
Number:9239 Outlook Rock Trl. Windermere Fl. 34786 2
WB ApproachEB Approach
NB Approach
detraffic.com
O25‐10
SB Approach
Broward County
Anglers Ave
at Griffin Rd
Project
Number:
Sheet
Number:9239 Outlook Rock Trl. Windermere Fl. 34786 3
WB ApproachEB Approach
detraffic.com
O25‐10
SB Approach
Broward County
Plaza Entrance
at Griffin Rd
Project
Number:
Sheet
Number:9239 Outlook Rock Trl. Windermere Fl. 34786 4
WB ApproachEB Approach
NB Approach
detraffic.com
O25‐10
SB Approach
Broward County
Griffin Rd
at Plaza Entrance/SW 46th St
2023 PEAK SEASON FACTOR CATEGORY REPORT - REPORT TYPE: ALL
CATEGORY: 8601 CEN.-W OF US1 TO SR7
MOCF: 0.97
WEEK DATES SF PSCF
================================================================================
1 01/01/2023 - 01/07/2023 1.01 1.04
2 01/08/2023 - 01/14/2023 1.00 1.03
3 01/15/2023 - 01/21/2023 0.99 1.02
* 4 01/22/2023 - 01/28/2023 0.98 1.01
* 5 01/29/2023 - 02/04/2023 0.98 1.01
* 6 02/05/2023 - 02/11/2023 0.97 1.00
* 7 02/12/2023 - 02/18/2023 0.96 0.99
* 8 02/19/2023 - 02/25/2023 0.96 0.99
* 9 02/26/2023 - 03/04/2023 0.96 0.99
*10 03/05/2023 - 03/11/2023 0.96 0.99
*11 03/12/2023 - 03/18/2023 0.96 0.99
*12 03/19/2023 - 03/25/2023 0.97 1.00
*13 03/26/2023 - 04/01/2023 0.98 1.01
*14 04/02/2023 - 04/08/2023 0.99 1.02
*15 04/09/2023 - 04/15/2023 1.00 1.03
*16 04/16/2023 - 04/22/2023 0.99 1.02
17 04/23/2023 - 04/29/2023 0.99 1.02
18 04/30/2023 - 05/06/2023 0.99 1.02
19 05/07/2023 - 05/13/2023 0.99 1.02
20 05/14/2023 - 05/20/2023 0.99 1.02
21 05/21/2023 - 05/27/2023 1.00 1.03
22 05/28/2023 - 06/03/2023 1.00 1.03
23 06/04/2023 - 06/10/2023 1.01 1.04
24 06/11/2023 - 06/17/2023 1.01 1.04
25 06/18/2023 - 06/24/2023 1.02 1.05
26 06/25/2023 - 07/01/2023 1.02 1.05
27 07/02/2023 - 07/08/2023 1.02 1.05
28 07/09/2023 - 07/15/2023 1.02 1.05
29 07/16/2023 - 07/22/2023 1.02 1.05
30 07/23/2023 - 07/29/2023 1.02 1.05
31 07/30/2023 - 08/05/2023 1.02 1.05
32 08/06/2023 - 08/12/2023 1.02 1.05
33 08/13/2023 - 08/19/2023 1.02 1.05
34 08/20/2023 - 08/26/2023 1.03 1.06
35 08/27/2023 - 09/02/2023 1.03 1.06
36 09/03/2023 - 09/09/2023 1.03 1.06
37 09/10/2023 - 09/16/2023 1.03 1.06
38 09/17/2023 - 09/23/2023 1.03 1.06
39 09/24/2023 - 09/30/2023 1.02 1.05
40 10/01/2023 - 10/07/2023 1.02 1.05
41 10/08/2023 - 10/14/2023 1.01 1.04
42 10/15/2023 - 10/21/2023 1.01 1.04
43 10/22/2023 - 10/28/2023 1.01 1.04
44 10/29/2023 - 11/04/2023 1.02 1.05
45 11/05/2023 - 11/11/2023 1.03 1.06
46 11/12/2023 - 11/18/2023 1.04 1.07
47 11/19/2023 - 11/25/2023 1.03 1.06
48 11/26/2023 - 12/02/2023 1.02 1.05
49 12/03/2023 - 12/09/2023 1.02 1.05
50 12/10/2023 - 12/16/2023 1.01 1.04
51 12/17/2023 - 12/23/2023 1.01 1.04
52 12/24/2023 - 12/30/2023 1.00 1.03
53 12/31/2023 - 12/31/2023 0.99 1.02
* PEAK SEASON
09-MAR-2024 18:41:40 830UPD 4_8601_PKSEASON.TXT
Appendix F
Intersection Volume Calculations
Project No.25047.01.01
Intersection VolumesBy3
Factors Pass By Tgen
Analysis Period SF AGR Years Enter Exit Enter Exit Legend
AM Peak 1.00 2.00%0 9 9 27 27 Backg'd + (Project) = Total
Intersection:Griffin Road & SW 30th Ave 1
App Mvmt Lns Raw SF Adjusted GR Redirect Vested Adj Bg'd PBIn PBOut Passby ProjIn ProjOut Project BldOut Volumes
L 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
NB T 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
R 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
L 1 101 1.00 101 1.00 101 0%0%0 5%0%1 102 101 + (1) = 102
SB T 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
R 2 228 1.00 228 1.00 228 0%0%0 0%0%0 228 228L17601.00 760 1.00 760 0%0%0 0%0%0 760 760
EB T 3 1417 1.00 1,417 1.00 1417 0%0%0 15%0%4 1421 1417 + (4) = 1421
R 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0L001.00 0 1.00 0 0%0%0 0%0%0 0
WB T 3 756 1.00 756 1.00 756 0%0%0 0%15%4 760 756 + (4) = 760
R 0 219 1.00 219 1.00 219 0%0%0 0%5%1 220 219 + (1) = 220
Intersection:Griffin Road & Ravenswood Rd 2
ApproachMvmt Lns Raw SF Adjusted GR Redirect Vested Adj Bg'd PBIn PBOut Passby ProjIn ProjOut Project BldOut FormulaL11751.00 175 1.00 175 0%0%0 0%0%0 175 175
NB T 2 73 1.00 73 1.00 73 0%0%0 10%0%3 76 73 + (3) = 76
R 1 391 1.00 391 1.00 391 0%0%0 0%0%0 391 391L11681.00 168 1.00 168 0%0%0 0%60%16 184 168 + (16) = 184
SB T 2 72 1.00 72 1.00 72 0%0%0 0%0%0 72 72
R 1 67 1.00 67 1.00 67 0%0%0 0%0%0 67 67
L 1 205 1.00 205 1.00 205 0%0%0 20%0%5 210 205 + (5) = 210
EB T 3 1069 1.00 1,069 1.00 1069 0%0%0 0%0%0 1069 1069
R 1 258 1.00 258 1.00 258 0%0%0 0%0%0 258 258
L 2 316 1.00 316 1.00 316 0%0%0 0%10%3 319 316 + (3) = 319
WB T 3 749 1.00 749 1.00 749 0%0%0 0%20%5 754 749 + (5) = 754R03081.00 308 1.00 308 0%0%0 0%5%1 309 308 + (1) = 309
Intersection:Griffin Road & Plaza Entrance 3
ApproachMvmt Lns Raw SF Adjusted GR Redirect Vested Adj Bg'd PBIn PBOut Passby ProjIn ProjOut Project BldOut FormulaL001.00 0 1.00 0 0%0%0 0%0%0 0
NB T 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
R 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
L 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
SB T 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
R 1 34 1.00 34 1.00 34 0%35%3 0%35%9 46 34 + [3] + (9) = 46
L 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
EB T 3 1628 1.00 1,628 1.00 1628 0%0%0 0%60%16 1644 1628 + (16) = 1644R001.00 0 1.00 0 0%0%0 0%0%0 0
L 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
WB T 3 1448 1.00 1,448 1.00 1448 0%0%0 0%0%0 1448 1448R1291.00 29 1.00 29 60%0%5 60%0%16 50 29 + [5] + (16) = 50
Intersection:Ravenswood Rd & Plaza Entrance 4
ApproachMvmt Lns Raw SF Adjusted GR Redirect Vested Adj Bg'd PBIn PBOut Passby ProjIn ProjOut Project BldOut Formula
L 1 14 1.00 14 1.00 14 0%0%0 0%0%0 14 14
NB T 1 538 1.00 538 1.00 538 0%0%0 0%5%1 539 538 + (1) = 539R1261.00 26 1.00 26 30%0%3 30%0%8 37 26 + [3] + (8) = 37
L 1 9 1.00 9 1.00 9 10%0%1 10%0%3 13 9 + [1] + (3) = 13
SB T 1 305 1.00 305 1.00 305 0%0%0 0%0%0 305 305R0191.00 19 1.00 19 0%0%0 0%0%0 19 19
L 0 8 1.00 8 1.00 8 0%0%0 0%0%0 8 8
EB T 1 2 1.00 2 1.00 2 0%0%0 0%0%0 2 2R0121.00 12 1.00 12 0%0%0 0%0%0 12 12
L 0 16 1.00 16 1.00 16 0%60%5 0%60%16 37 16 + [5] + (16) = 37
WB T 1 0 1.00 0 1.00 0 0%0%0 0%0%0 0
R 0 9 1.00 9 1.00 9 0%5%1 0%5%2 12 9 + [1] + (2) = 12
IntVol-AM Page 1
Project No.25047.01.01
Intersection VolumesBy1
Factors Pass By Tgen
Analysis Period SF AGR Years Enter Exit Enter Exit Legend
PM Peak 1.00 2.00%0 12 12 36 36 Backg'd + (Project) = Total
Intersection:Griffin Road & SW 30th Ave 1
App Mvmt Lns Raw SF Adjusted GR Redirect Vested Adj Bg'd PBIn PBOut Passby ProjIn ProjOut Project BldOut Formula
L 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
NB T 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
R 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
L 1 224 1.00 224 1.00 224 0%0%0 5%0%2 226 224 + (2) = 226
SB T 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
R 2 884 1.00 884 1.00 884 0%0%0 0%0%0 884 884L13981.00 398 1.00 398 0%0%0 0%0%0 398 398
EB T 3 1040 1.00 1,040 1.00 1040 0%0%0 15%0%5 1045 1040 + (5) = 1045
R 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0L001.00 0 1.00 0 0%0%0 0%0%0 0
WB T 3 1930 1.00 1,930 1.00 1930 0%0%0 0%15%5 1935 1930 + (5) = 1935
R 0 119 1.00 119 1.00 119 0%0%0 0%5%2 121 119 + (2) = 121
Intersection:Griffin Road & Ravenswood Rd 2
ApproachMvmt Lns Raw SF Adjusted GR Redirect Vested Adj Bg'd PBIn PBOut Passby ProjIn ProjOut Project BldOut FormulaL12671.00 267 1.00 267 0%0%0 0%0%0 267 267
NB T 2 155 1.00 155 1.00 155 0%0%0 10%0%4 159 155 + (4) = 159
R 1 314 1.00 314 1.00 314 0%0%0 0%0%0 314 314L13151.00 315 1.00 315 0%0%0 0%60%22 337 315 + (22) = 337
SB T 2 173 1.00 173 1.00 173 0%0%0 0%0%0 173 173
R 1 154 1.00 154 1.00 154 0%0%0 0%0%0 154 154
L 1 64 1.00 64 1.00 64 0%0%0 20%0%7 71 64 + (7) = 71
EB T 3 1046 1.00 1,046 1.00 1046 0%0%0 0%0%0 1046 1046
R 1 212 1.00 212 1.00 212 0%0%0 0%0%0 212 212
L 2 515 1.00 515 1.00 515 0%0%0 0%10%4 519 515 + (4) = 519
WB T 3 1589 1.00 1,589 1.00 1589 0%0%0 0%20%7 1596 1589 + (7) = 1596R01711.00 171 1.00 171 0%0%0 0%5%2 173 171 + (2) = 173
Intersection:Griffin Road & Plaza Entrance 3
ApproachMvmt Lns Raw SF Adjusted GR Redirect Vested Adj Bg'd PBIn PBOut Passby ProjIn ProjOut Project BldOut FormulaL001.00 0 1.00 0 0%0%0 0%0%0 0
NB T 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
R 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
L 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
SB T 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
R 1 59 1.00 59 1.00 59 0%35%4 0%35%13 76 59 + [4] + (13) = 76
L 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
EB T 3 1712 1.00 1,712 1.00 1712 0%0%0 0%60%22 1734 1712 + (22) = 1734R001.00 0 1.00 0 0%0%0 0%0%0 0
L 0 0 1.00 0 1.00 0 0%0%0 0%0%0 0
WB T 3 2175 1.00 2,175 1.00 2175 0%0%0 0%0%0 2175 2175R1491.00 49 1.00 49 60%0%7 60%0%22 78 49 + [7] + (22) = 78
Intersection:Ravenswood Rd & Plaza Entrance 4
ApproachMvmt Lns Raw SF Adjusted GR Redirect Vested Adj Bg'd PBIn PBOut Passby ProjIn ProjOut Project BldOut Formula
L 1 21 1.00 21 1.00 21 0%0%0 0%0%0 21 21
NB T 1 358 1.00 358 1.00 358 0%0%0 0%5%2 360 358 + (2) = 360R1271.00 27 1.00 27 30%0%4 30%0%11 42 27 + [4] + (11) = 42
L 1 17 1.00 17 1.00 17 10%0%1 10%0%3 21 17 + [1] + (3) = 21
SB T 1 630 1.00 630 1.00 630 0%0%0 0%0%0 630 630R0161.00 16 1.00 16 0%0%0 0%0%0 16 16
L 0 8 1.00 8 1.00 8 0%0%0 0%0%0 8 8
EB T 1 1 1.00 1 1.00 1 0%0%0 0%0%0 1 1R0241.00 24 1.00 24 0%0%0 0%0%0 24 24
L 0 21 1.00 21 1.00 21 0%60%7 0%60%22 50 21 + [7] + (22) = 50
WB T 1 2 1.00 2 1.00 2 0%0%0 0%0%0 2 2
R 0 19 1.00 19 1.00 19 0%5%1 0%5%1 21 19 + [1] + (1) = 21
IntVol-PM Page 2
Appendix G
Synchro Printouts & Signal Timings
HCM 7th Signalized Intersection Summary
1: Griffin Rd & 30th Ave
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Existing AM Peak Hour
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 760 1417 756 219 101 228
Future Volume (veh/h) 760 1417 756 219 101 228
Initial Q (Qb), veh 000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1826 1826 1870 1811
Adj Flow Rate, veh/h 800 1492 796 231 106 240
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 225526
Cap, veh/h 709 4048 1827 526 200 303
Arrive On Green 0.26 0.79 0.48 0.48 0.11 0.11
Sat Flow, veh/h 1781 5274 4008 1106 1781 2701
Grp Volume(v), veh/h 800 1492 687 340 106 240
Grp Sat Flow(s),veh/h/ln 1781 1702 1662 1627 1781 1351
Q Serve(g_s), s 33.0 10.8 17.2 17.5 7.1 10.9
Cycle Q Clear(g_c), s 33.0 10.8 17.2 17.5 7.1 10.9
Prop In Lane 1.00 0.68 1.00 1.00
Lane Grp Cap(c), veh/h 709 4048 1579 773 200 303
V/C Ratio(X) 1.13 0.37 0.44 0.44 0.53 0.79
Avail Cap(c_a), veh/h 709 4048 1579 773 481 729
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.89 0.89 1.00 1.00
Uniform Delay (d), s/veh 24.7 3.8 21.9 21.9 52.8 54.5
Incr Delay (d2), s/veh 75.2 0.3 0.8 1.6 2.2 4.7
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 36.2 3.2 6.9 7.0 3.3 3.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 99.9 4.1 22.6 23.5 55.0 59.2
LnGrp LOS F A C C E E
Approach Vol, veh/h 2292 1027 346
Approach Delay, s/veh 37.5 22.9 57.9
Approach LOS D C E
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 40.0 65.9 105.9 20.1
Change Period (Y+Rc), s 7.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 33.0 40.0 80.0 34.0
Max Q Clear Time (g_c+I1), s 35.0 19.5 12.8 12.9
Green Ext Time (p_c), s 0.0 7.3 17.8 1.2
Intersection Summary
HCM 7th Control Delay, s/veh 35.4
HCM 7th LOS D
HCM 7th Signalized Intersection Summary
1: Griffin Rd & 30th Ave
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Buildout AM Peak Hour
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 760 1421 760 220 102 228
Future Volume (veh/h) 760 1421 760 220 102 228
Initial Q (Qb), veh 000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1826 1826 1870 1811
Adj Flow Rate, veh/h 800 1496 800 232 107 240
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 225526
Cap, veh/h 707 4048 1827 526 200 303
Arrive On Green 0.26 0.79 0.48 0.48 0.11 0.11
Sat Flow, veh/h 1781 5274 4009 1106 1781 2701
Grp Volume(v), veh/h 800 1496 691 341 107 240
Grp Sat Flow(s),veh/h/ln 1781 1702 1662 1627 1781 1351
Q Serve(g_s), s 33.0 10.8 17.3 17.6 7.1 10.9
Cycle Q Clear(g_c), s 33.0 10.8 17.3 17.6 7.1 10.9
Prop In Lane 1.00 0.68 1.00 1.00
Lane Grp Cap(c), veh/h 707 4048 1579 773 200 303
V/C Ratio(X) 1.13 0.37 0.44 0.44 0.54 0.79
Avail Cap(c_a), veh/h 707 4048 1579 773 481 729
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.88 0.88 1.00 1.00
Uniform Delay (d), s/veh 24.8 3.8 21.9 22.0 52.8 54.5
Incr Delay (d2), s/veh 76.0 0.3 0.8 1.6 2.2 4.7
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 36.3 3.2 6.9 7.0 3.3 3.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 100.8 4.1 22.7 23.6 55.1 59.2
LnGrp LOS F A C C E E
Approach Vol, veh/h 2296 1032 347
Approach Delay, s/veh 37.8 23.0 57.9
Approach LOS D C E
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 40.0 65.9 105.9 20.1
Change Period (Y+Rc), s 7.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 33.0 40.0 80.0 34.0
Max Q Clear Time (g_c+I1), s 35.0 19.6 12.8 12.9
Green Ext Time (p_c), s 0.0 7.3 17.9 1.2
Intersection Summary
HCM 7th Control Delay, s/veh 35.5
HCM 7th LOS D
HCM 7th Signalized Intersection Summary
1: Griffin Rd & 30th Ave
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Existing PM Peak Hour
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 398 1040 1930 119 224 884
Future Volume (veh/h) 398 1040 1930 119 224 884
Initial Q (Qb), veh 000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1796 1856 1870 1796 1856 1870
Adj Flow Rate, veh/h 410 1072 1990 123 231 911
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 732732
Cap, veh/h 292 2887 1857 114 597 942
Arrive On Green 0.14 0.57 0.38 0.38 0.34 0.34
Sat Flow, veh/h 1711 5233 5086 303 1767 2790
Grp Volume(v), veh/h 410 1072 1375 738 231 911
Grp Sat Flow(s),veh/h/ln 1711 1689 1702 1816 1767 1395
Q Serve(g_s), s 18.0 15.0 49.1 49.1 12.9 41.8
Cycle Q Clear(g_c), s 18.0 15.0 49.1 49.1 12.9 41.8
Prop In Lane 1.00 0.17 1.00 1.00
Lane Grp Cap(c), veh/h 292 2887 1286 686 597 942
V/C Ratio(X) 1.40 0.37 1.07 1.08 0.39 0.97
Avail Cap(c_a), veh/h 292 2887 1286 686 598 944
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.65 0.65 1.00 1.00
Uniform Delay (d), s/veh 42.8 15.2 40.4 40.4 32.8 42.3
Incr Delay (d2), s/veh 200.7 0.4 41.8 50.5 0.4 21.6
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 25.8 5.8 27.7 31.2 5.7 17.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 243.4 15.6 82.2 90.9 33.2 63.9
LnGrp LOS F B F F C E
Approach Vol, veh/h 1482 2113 1142
Approach Delay, s/veh 78.6 85.3 57.7
Approach LOS E F E
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 25.0 55.1 80.1 49.9
Change Period (Y+Rc), s 7.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 18.0 49.0 74.0 44.0
Max Q Clear Time (g_c+I1), s 20.0 51.1 17.0 43.8
Green Ext Time (p_c), s 0.0 0.0 10.3 0.1
Intersection Summary
HCM 7th Control Delay, s/veh 76.5
HCM 7th LOS E
HCM 7th Signalized Intersection Summary
1: Griffin Rd & 30th Ave
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Buildout PM Peak Hour
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 398 1045 1935 121 226 884
Future Volume (veh/h) 398 1045 1935 121 226 884
Initial Q (Qb), veh 000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1796 1856 1870 1796 1856 1870
Adj Flow Rate, veh/h 410 1077 1995 125 233 911
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 732732
Cap, veh/h 292 2887 1856 116 597 942
Arrive On Green 0.14 0.57 0.38 0.38 0.34 0.34
Sat Flow, veh/h 1711 5233 5081 307 1767 2790
Grp Volume(v), veh/h 410 1077 1380 740 233 911
Grp Sat Flow(s),veh/h/ln 1711 1689 1702 1815 1767 1395
Q Serve(g_s), s 18.0 15.1 49.1 49.1 13.1 41.8
Cycle Q Clear(g_c), s 18.0 15.1 49.1 49.1 13.1 41.8
Prop In Lane 1.00 0.17 1.00 1.00
Lane Grp Cap(c), veh/h 292 2887 1286 686 597 942
V/C Ratio(X) 1.40 0.37 1.07 1.08 0.39 0.97
Avail Cap(c_a), veh/h 292 2887 1286 686 598 944
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.64 0.64 1.00 1.00
Uniform Delay (d), s/veh 42.8 15.3 40.4 40.4 32.8 42.3
Incr Delay (d2), s/veh 200.7 0.4 43.0 51.7 0.4 21.6
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 25.8 5.9 27.9 31.4 5.7 17.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 243.4 15.6 83.4 92.1 33.3 63.9
LnGrp LOS F B F F C E
Approach Vol, veh/h 1487 2120 1144
Approach Delay, s/veh 78.4 86.5 57.7
Approach LOS E F E
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 25.0 55.1 80.1 49.9
Change Period (Y+Rc), s 7.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 18.0 49.0 74.0 44.0
Max Q Clear Time (g_c+I1), s 20.0 51.1 17.1 43.8
Green Ext Time (p_c), s 0.0 0.0 10.3 0.1
Intersection Summary
HCM 7th Control Delay, s/veh 77.0
HCM 7th LOS E
HCM 7th Signalized Intersection Summary
2: Griffin Rd & Ravenswood Rd
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Existing AM Peak Hour
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 205 1069 258 316 749 308 175 73 391 168 72 67
Future Volume (veh/h) 205 1069 258 316 749 308 175 73 391 168 72 67
Initial Q (Qb), veh 000000000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1856 1870 1870 1826 1856 1870 1870 1870 1841 1856 1826
Adj Flow Rate, veh/h 207 1080 261 319 757 311 177 74 395 170 73 68
Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99
Percent Heavy Veh, %232253222435
Cap, veh/h 229 1999 626 370 1299 528 490 888 396 408 877 385
Arrive On Green 0.13 0.39 0.39 0.11 0.37 0.37 0.09 0.25 0.25 0.09 0.25 0.25
Sat Flow, veh/h 1781 5066 1585 3456 3479 1415 1781 3554 1585 1753 3526 1547
Grp Volume(v), veh/h 207 1080 261 319 723 345 177 74 395 170 73 68
Grp Sat Flow(s),veh/h/ln1781 1689 1585 1728 1662 1571 1781 1777 1585 1753 1763 1547
Q Serve(g_s), s 18.3 26.2 19.1 14.5 27.9 28.2 11.7 2.6 39.8 11.4 2.5 5.5
Cycle Q Clear(g_c), s 18.3 26.2 19.1 14.5 27.9 28.2 11.7 2.6 39.8 11.4 2.5 5.5
Prop In Lane 1.00 1.00 1.00 0.90 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 229 1999 626 370 1240 586 490 888 396 408 877 385
V/C Ratio(X) 0.90 0.54 0.42 0.86 0.58 0.59 0.36 0.08 1.00 0.42 0.08 0.18
Avail Cap(c_a), veh/h 278 1999 626 497 1240 586 547 888 396 499 947 416
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.93 0.93 0.93 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh68.7 37.3 35.1 70.3 40.2 40.3 39.2 46.0 59.9 39.3 46.1 47.2
Incr Delay (d2), s/veh 25.8 1.0 1.9 11.2 2.0 4.3 0.4 0.0 44.3 0.7 0.0 0.2
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln10.0 11.2 7.8 7.0 11.9 11.7 5.3 1.2 20.9 5.1 1.1 2.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 94.5 38.2 37.0 81.5 42.2 44.6 39.7 46.0 104.3 40.0 46.2 47.5
LnGrp LOS FDDFDDDDFDDD
Approach Vol, veh/h 1548 1387 646 311
Approach Delay, s/veh 45.6 51.8 79.9 43.1
Approach LOS D D E D
Timer - Assigned Phs 1 2 3 4 5678
Phs Duration (G+Y+Rc), s27.6 66.7 19.7 46.0 24.1 70.1 19.9 45.8
Change Period (Y+Rc), s 7.0 7.0 6.0 6.0 7.0 7.0 6.0 6.0
Max Green Setting (Gmax), s25.0 47.0 22.0 40.0 23.0 49.0 19.0 43.0
Max Q Clear Time (g_c+I1), s20.3 30.2 13.4 41.8 16.5 28.2 13.7 7.5
Green Ext Time (p_c), s 0.2 6.9 0.3 0.0 0.6 9.0 0.2 0.7
Intersection Summary
HCM 7th Control Delay, s/veh 53.3
HCM 7th LOS D
HCM 7th Signalized Intersection Summary
2: Griffin Rd & Ravenswood Rd
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Buildout AM Peak Hour
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 210 1069 258 319 754 309 175 76 391 184 72 67
Future Volume (veh/h) 210 1069 258 319 754 309 175 76 391 184 72 67
Initial Q (Qb), veh 000000000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1856 1870 1870 1826 1856 1870 1870 1870 1841 1856 1826
Adj Flow Rate, veh/h 212 1080 261 322 762 312 177 77 395 186 73 68
Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99
Percent Heavy Veh, %232253222435
Cap, veh/h 234 1961 614 373 1267 514 499 888 396 419 900 395
Arrive On Green 0.13 0.39 0.39 0.11 0.36 0.36 0.09 0.25 0.25 0.09 0.26 0.26
Sat Flow, veh/h 1781 5066 1585 3456 3482 1413 1781 3554 1585 1753 3526 1547
Grp Volume(v), veh/h 212 1080 261 322 727 347 177 77 395 186 73 68
Grp Sat Flow(s),veh/h/ln1781 1689 1585 1728 1662 1572 1781 1777 1585 1753 1763 1547
Q Serve(g_s), s 18.8 26.6 19.3 14.7 28.5 28.9 11.7 2.7 39.8 12.5 2.5 5.5
Cycle Q Clear(g_c), s 18.8 26.6 19.3 14.7 28.5 28.9 11.7 2.7 39.8 12.5 2.5 5.5
Prop In Lane 1.00 1.00 1.00 0.90 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 234 1961 614 373 1209 572 499 888 396 419 900 395
V/C Ratio(X) 0.91 0.55 0.43 0.86 0.60 0.61 0.35 0.09 1.00 0.44 0.08 0.17
Avail Cap(c_a), veh/h 278 1961 614 497 1209 572 556 888 396 498 947 416
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.93 0.93 0.93 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh68.5 38.2 36.0 70.2 41.4 41.5 39.1 46.0 59.9 38.7 45.3 46.4
Incr Delay (d2), s/veh 26.7 1.0 2.0 11.5 2.2 4.7 0.4 0.0 44.3 0.7 0.0 0.2
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln10.3 11.3 7.9 7.1 12.2 12.1 5.3 1.2 20.9 5.6 1.1 2.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 95.2 39.2 38.0 81.7 43.6 46.3 39.5 46.0 104.3 39.5 45.3 46.6
LnGrp LOS FDDFDDDDFDDD
Approach Vol, veh/h 1553 1396 649 327
Approach Delay, s/veh 46.7 53.1 79.7 42.3
Approach LOS D D E D
Timer - Assigned Phs 1 2 3 4 5678
Phs Duration (G+Y+Rc), s28.0 65.2 20.8 46.0 24.3 68.9 19.9 46.9
Change Period (Y+Rc), s 7.0 7.0 6.0 6.0 7.0 7.0 6.0 6.0
Max Green Setting (Gmax), s25.0 47.0 22.0 40.0 23.0 49.0 19.0 43.0
Max Q Clear Time (g_c+I1), s20.8 30.9 14.5 41.8 16.7 28.6 13.7 7.5
Green Ext Time (p_c), s 0.2 6.8 0.3 0.0 0.6 8.9 0.2 0.7
Intersection Summary
HCM 7th Control Delay, s/veh 54.0
HCM 7th LOS D
HCM 7th Signalized Intersection Summary
2: Griffin Rd & Ravenswood Rd
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Existing PM Peak Hour
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 64 1046 212 515 1589 171 267 155 314 315 173 154
Future Volume (veh/h) 64 1046 212 515 1589 171 267 155 314 315 173 154
Initial Q (Qb), veh 000000000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1856 1870 1856 1856 1781 1841 1870 1826 1811 1870 1856
Adj Flow Rate, veh/h 66 1078 219 531 1638 176 275 160 324 325 178 159
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, %732338425623
Cap, veh/h 83 1498 469 574 1927 207 485 797 347 469 856 379
Arrive On Green 0.05 0.30 0.30 0.17 0.41 0.41 0.13 0.22 0.22 0.15 0.24 0.24
Sat Flow, veh/h 1711 5066 1585 3428 4645 498 1753 3554 1547 1725 3554 1572
Grp Volume(v), veh/h 66 1078 219 531 1190 624 275 160 324 325 178 159
Grp Sat Flow(s),veh/h/ln1711 1689 1585 1714 1689 1766 1753 1777 1547 1725 1777 1572
Q Serve(g_s), s 6.1 30.5 18.1 24.4 50.9 51.2 19.1 5.9 32.9 23.2 6.4 13.7
Cycle Q Clear(g_c), s 6.1 30.5 18.1 24.4 50.9 51.2 19.1 5.9 32.9 23.2 6.4 13.7
Prop In Lane 1.00 1.00 1.00 0.28 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 83 1498 469 574 1401 733 485 797 347 469 856 379
V/C Ratio(X) 0.80 0.72 0.47 0.92 0.85 0.85 0.57 0.20 0.93 0.69 0.21 0.42
Avail Cap(c_a), veh/h 139 1498 469 600 1401 733 514 888 387 469 888 393
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.94 0.94 0.94 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh75.4 50.4 46.1 65.6 42.3 42.4 39.2 50.4 60.9 38.7 48.5 51.3
Incr Delay (d2), s/veh 15.1 2.8 3.1 19.9 6.6 12.0 1.3 0.1 28.0 4.3 0.1 0.7
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln3.1 13.4 7.6 12.3 22.5 24.8 8.5 2.7 15.6 10.5 2.9 5.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 90.5 53.3 49.2 85.5 48.9 54.3 40.5 50.5 88.8 43.1 48.6 52.0
LnGrp LOS FDDFDDDDFDDD
Approach Vol, veh/h 1363 2345 759 662
Approach Delay, s/veh 54.4 58.6 63.2 46.7
Approach LOS D E E D
Timer - Assigned Phs 1 2 3 4 5678
Phs Duration (G+Y+Rc), s14.7 73.4 30.0 41.9 33.8 54.3 27.4 44.5
Change Period (Y+Rc), s 7.0 7.0 6.0 6.0 7.0 7.0 6.0 6.0
Max Green Setting (Gmax), s13.0 57.0 24.0 40.0 28.0 42.0 24.0 40.0
Max Q Clear Time (g_c+I1), s8.1 53.2 25.2 34.9 26.4 32.5 21.1 15.7
Green Ext Time (p_c), s 0.0 3.3 0.0 1.0 0.4 5.5 0.2 1.6
Intersection Summary
HCM 7th Control Delay, s/veh 56.7
HCM 7th LOS E
Notes
User approved pedestrian interval to be less than phase max green.
HCM 7th Signalized Intersection Summary
2: Griffin Rd & Ravenswood Rd
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Buildout PM Peak Hour
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 71 1046 212 519 1596 173 267 159 314 337 173 154
Future Volume (veh/h) 71 1046 212 519 1596 173 267 159 314 337 173 154
Initial Q (Qb), veh 000000000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1856 1870 1856 1856 1781 1841 1870 1826 1811 1870 1856
Adj Flow Rate, veh/h 73 1078 219 535 1645 178 275 164 324 347 178 159
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, %732338425623
Cap, veh/h 90 1493 467 577 1904 206 485 798 347 468 856 379
Arrive On Green 0.05 0.29 0.29 0.17 0.41 0.41 0.13 0.22 0.22 0.15 0.24 0.24
Sat Flow, veh/h 1711 5066 1585 3428 4641 501 1753 3554 1547 1725 3554 1572
Grp Volume(v), veh/h 73 1078 219 535 1196 627 275 164 324 347 178 159
Grp Sat Flow(s),veh/h/ln1711 1689 1585 1714 1689 1765 1753 1777 1547 1725 1777 1572
Q Serve(g_s), s 6.8 30.5 18.1 24.6 51.7 52.0 19.1 6.0 32.9 24.0 6.4 13.7
Cycle Q Clear(g_c), s 6.8 30.5 18.1 24.6 51.7 52.0 19.1 6.0 32.9 24.0 6.4 13.7
Prop In Lane 1.00 1.00 1.00 0.28 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 90 1493 467 577 1385 724 485 798 347 468 856 379
V/C Ratio(X) 0.81 0.72 0.47 0.93 0.86 0.87 0.57 0.21 0.93 0.74 0.21 0.42
Avail Cap(c_a), veh/h 139 1493 467 600 1385 724 514 888 387 468 888 393
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.94 0.94 0.94 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh75.0 50.6 46.2 65.6 43.1 43.2 39.2 50.4 60.9 39.7 48.5 51.3
Incr Delay (d2), s/veh 16.8 2.9 3.2 20.3 7.3 13.2 1.3 0.1 27.9 6.2 0.1 0.7
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln3.4 13.4 7.6 12.4 23.0 25.3 8.5 2.7 15.6 11.6 2.9 5.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 91.8 53.4 49.3 85.8 50.4 56.3 40.5 50.6 88.8 45.9 48.6 52.0
LnGrp LOS F D D F D E D D F D D D
Approach Vol, veh/h 1370 2358 763 684
Approach Delay, s/veh 54.8 60.0 63.2 48.0
Approach LOS D E E D
Timer - Assigned Phs 1 2 3 4 5678
Phs Duration (G+Y+Rc), s15.5 72.6 30.0 41.9 33.9 54.1 27.4 44.6
Change Period (Y+Rc), s 7.0 7.0 6.0 6.0 7.0 7.0 6.0 6.0
Max Green Setting (Gmax), s13.0 57.0 24.0 40.0 28.0 42.0 24.0 40.0
Max Q Clear Time (g_c+I1), s8.8 54.0 26.0 34.9 26.6 32.5 21.1 15.7
Green Ext Time (p_c), s 0.0 2.6 0.0 1.1 0.3 5.5 0.2 1.6
Intersection Summary
HCM 7th Control Delay, s/veh 57.5
HCM 7th LOS E
Notes
User approved pedestrian interval to be less than phase max green.
HCM 7th TWSC
3: Griffin Rd & Plaza Entrance
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Existing AM Peak Hour
Intersection
Int Delay, s/veh 0.2
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 0 1628 1448 29 0 34
Future Vol, veh/h 0 1628 1448 29 0 34
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 225 - 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 3 4 3 2 2
Mvmt Flow 0 1661 1478 30 0 35
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 - 0 - 739
Stage 1 ------
Stage 2 ------
Critical Hdwy -----7.14
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy -----3.92
Pot Cap-1 Maneuver 0 - - - 0 309
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -----309
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB WB SB
HCM Control Delay, s/v 0 0 18.13
HCM LOS C
Minor Lane/Major Mvmt EBT WBT WBRSBLn1
Capacity (veh/h) - - - 309
HCM Lane V/C Ratio - - - 0.112
HCM Control Delay (s/veh) - - - 18.1
HCM Lane LOS - - - C
HCM 95th %tile Q(veh) - - - 0.4
HCM 7th TWSC
3: Griffin Rd & Plaza Entrance
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Buildout AM Peak Hour
Intersection
Int Delay, s/veh 0.3
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 0 1644 1448 50 0 46
Future Vol, veh/h 0 1644 1448 50 0 46
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 225 - 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 3 4 3 2 2
Mvmt Flow 0 1678 1478 51 0 47
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 - 0 - 739
Stage 1 ------
Stage 2 ------
Critical Hdwy -----7.14
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy -----3.92
Pot Cap-1 Maneuver 0 - - - 0 309
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -----309
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB WB SB
HCM Control Delay, s/v 0 0 18.74
HCM LOS C
Minor Lane/Major Mvmt EBT WBT WBRSBLn1
Capacity (veh/h) - - - 309
HCM Lane V/C Ratio - - - 0.152
HCM Control Delay (s/veh) - - - 18.7
HCM Lane LOS - - - C
HCM 95th %tile Q(veh) - - - 0.5
HCM 7th TWSC
3: Griffin Rd & Plaza Entrance
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Existing PM Peak Hour
Intersection
Int Delay, s/veh 0.5
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 0 1712 2175 49 0 59
Future Vol, veh/h 0 1712 2175 49 0 59
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 225 - 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 5 4 2 2 2
Mvmt Flow 0 1747 2219 50 0 60
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 - 0 - 1110
Stage 1 ------
Stage 2 ------
Critical Hdwy -----7.14
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy -----3.92
Pot Cap-1 Maneuver 0 - - - 0 175
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -----175
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB WB SB
HCM Control Delay, s/v 0 0 35.95
HCM LOS E
Minor Lane/Major Mvmt EBT WBT WBRSBLn1
Capacity (veh/h) - - - 175
HCM Lane V/C Ratio - - - 0.344
HCM Control Delay (s/veh) - - - 35.9
HCM Lane LOS - - - E
HCM 95th %tile Q(veh) - - - 1.4
HCM 7th TWSC
3: Griffin Rd & Plaza Entrance
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Buildout PM Peak Hour
Intersection
Int Delay, s/veh 0.8
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 0 1734 2175 78 0 76
Future Vol, veh/h 0 1734 2175 78 0 76
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 225 - 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 5 4 2 2 2
Mvmt Flow 0 1769 2219 80 0 78
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 - 0 - 1110
Stage 1 ------
Stage 2 ------
Critical Hdwy -----7.14
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy -----3.92
Pot Cap-1 Maneuver 0 - - - 0 175
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -----175
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB WB SB
HCM Control Delay, s/v 0 0 40.93
HCM LOS E
Minor Lane/Major Mvmt EBT WBT WBRSBLn1
Capacity (veh/h) - - - 175
HCM Lane V/C Ratio - - - 0.443
HCM Control Delay (s/veh) - - - 40.9
HCM Lane LOS - - - E
HCM 95th %tile Q(veh) - - - 2
HCM 7th TWSC
4: Ravenswood Rd & Plaza Entrance
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Existing AM Peak Hour
Intersection
Int Delay, s/veh 0.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 8 2 12 16 0 9 14 538 26 9 305 19
Future Vol, veh/h 8 2 12 16 0 9 14 538 26 9 305 19
Conflicting Peds, #/hr000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length ------150-175310--
Veh in Median Storage, # - 1 - - 1 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 25233622273822316
Mvmt Flow 9 2 13 18 0 10 15 591 29 10 335 21
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 987 1016 346 978 998 591 356 0 0 620 0 0
Stage 1 365 365 - 622 622 -------
Stage 2 622 651 - 356 376 -------
Critical Hdwy 7.35 6.52 6.53 7.16 6.52 6.42 4.17 - - 4.32 - -
Critical Hdwy Stg 16.355.52-6.165.52-------
Critical Hdwy Stg 26.355.52-6.165.52-------
Follow-up Hdwy 3.725 4.018 3.597 3.554 4.018 3.498 2.263 - - 2.398 - -
Pot Cap-1 Maneuver 206 238 632 226 244 471 1175 - - 871 - -
Stage 1 609 623 - 468 479 -------
Stage 2 438 465 - 653 616 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 196 232 632 214 238 471 1175 - - 871 - -
Mov Cap-2 Maneuver 308 338 - 335 346 -------
Stage 1 602 616 - 462 473 -------
Stage 2 423 459 - 630 609 -------
Approach EB WB NB SB
HCM Control Delay, s/v13.81 15.39 0.2 0.25
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1175 - - 433 374 871 - -
HCM Lane V/C Ratio 0.013 - - 0.056 0.073 0.011 - -
HCM Control Delay (s/veh) 8.1 - - 13.8 15.4 9.2 - -
HCM Lane LOS A - - B C A - -
HCM 95th %tile Q(veh) 0 - - 0.2 0.2 0 - -
HCM 7th TWSC
4: Ravenswood Rd & Plaza Entrance
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Buildout AM Peak Hour
Intersection
Int Delay, s/veh 1.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 8 2 12 37 0 12 14 539 37 13 305 19
Future Vol, veh/h 8 2 12 37 0 12 14 539 37 13 305 19
Conflicting Peds, #/hr000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length ------150-175310--
Veh in Median Storage, # - 1 - - 1 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 25233622273822316
Mvmt Flow 9 2 13 41 0 13 15 592 41 14 335 21
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 997 1038 346 988 1008 592 356 0 0 633 0 0
Stage 1 374 374 - 623 623 -------
Stage 2 623 664 - 365 385 -------
Critical Hdwy 7.35 6.52 6.53 7.16 6.52 6.42 4.17 - - 4.32 - -
Critical Hdwy Stg 16.355.52-6.165.52-------
Critical Hdwy Stg 26.355.52-6.165.52-------
Follow-up Hdwy 3.725 4.018 3.597 3.554 4.018 3.498 2.263 - - 2.398 - -
Pot Cap-1 Maneuver 202 231 632 222 241 471 1175 - - 861 - -
Stage 1 602 618 - 467 478 -------
Stage 2 437 458 - 646 611 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 191 224 632 210 233 471 1175 - - 861 - -
Mov Cap-2 Maneuver 302 330 - 332 343 -------
Stage 1 592 607 - 461 472 -------
Stage 2 419 452 - 620 601 -------
Approach EB WB NB SB
HCM Control Delay, s/v13.94 16.85 0.19 0.36
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1175 - - 427 357 861 - -
HCM Lane V/C Ratio 0.013 - - 0.057 0.151 0.017 - -
HCM Control Delay (s/veh) 8.1 - - 13.9 16.8 9.3 - -
HCM Lane LOS A - - B C A - -
HCM 95th %tile Q(veh) 0 - - 0.2 0.5 0.1 - -
HCM 7th TWSC
4: Ravenswood Rd & Plaza Entrance
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Existing PM Peak Hour
Intersection
Int Delay, s/veh 1.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 8 1 24 21 2 19 21 358 27 17 630 16
Future Vol, veh/h 8 1 24 21 2 19 21 358 27 17 630 16
Conflicting Peds, #/hr000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length ------150-175310--
Veh in Median Storage, # - 1 - - 1 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 382131021114646425
Mvmt Flow 9 1 26 23 2 21 23 393 30 19 692 18
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1179 1208 701 1170 1187 393 710 0 0 423 0 0
Stage 1 738 738 - 440 440 -------
Stage 2 441 469 - 730 747 -------
Critical Hdwy 7.48 6.52 6.33 7.2 6.52 6.31 4.24 - - 4.16 - -
Critical Hdwy Stg 16.485.52-6.25.52-------
Critical Hdwy Stg 26.485.52-6.25.52-------
Follow-up Hdwy 3.842 4.018 3.417 3.59 4.018 3.399 2.326 - - 2.254 - -
Pot Cap-1 Maneuver 142 183 421 164 188 636 836 - - 1115 - -
Stage 1 358 424 - 581 578 -------
Stage 2 531 561 - 401 420 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 130 175 421 146 180 636 836 - - 1115 - -
Mov Cap-2 Maneuver 243 291 - 257 288 -------
Stage 1 352 417 - 565 562 -------
Stage 2 498 545 - 369 413 -------
Approach EB WB NB SB
HCM Control Delay, s/v16.36 16.68 0.49 0.21
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 836 - - 353 354 1115 - -
HCM Lane V/C Ratio 0.028 - - 0.103 0.13 0.017 - -
HCM Control Delay (s/veh) 9.4 - - 16.4 16.7 8.3 - -
HCM Lane LOS A - - C C A - -
HCM 95th %tile Q(veh) 0.1 - - 0.3 0.4 0.1 - -
HCM 7th TWSC
4: Ravenswood Rd & Plaza Entrance
25047.01.01 Tesla Ft. Lauderdale-Griffin Rd Synchro 12 Report
Buildout PM Peak Hour
Intersection
Int Delay, s/veh 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 8 1 24 50 2 21 21 360 42 21 630 16
Future Vol, veh/h 8 1 24 50 2 21 21 360 42 21 630 16
Conflicting Peds, #/hr000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length ------150-175310--
Veh in Median Storage, # - 1 - - 1 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 382131021114646425
Mvmt Flow 9 1 26 55 2 23 23 396 46 23 692 18
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1190 1235 701 1181 1198 396 710 0 0 442 0 0
Stage 1 747 747 - 442 442 -------
Stage 2 443 488 - 739 756 -------
Critical Hdwy 7.48 6.52 6.33 7.2 6.52 6.31 4.24 - - 4.16 - -
Critical Hdwy Stg 16.485.52-6.25.52-------
Critical Hdwy Stg 26.485.52-6.25.52-------
Follow-up Hdwy 3.842 4.018 3.417 3.59 4.018 3.399 2.326 - - 2.254 - -
Pot Cap-1 Maneuver 140 176 421 161 186 634 836 - - 1097 - -
Stage 1 354 420 - 579 576 -------
Stage 2 530 550 - 397 416 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 127 168 421 143 177 634 836 - - 1097 - -
Mov Cap-2 Maneuver 238 283 - 253 284 -------
Stage 1 347 411 - 563 561 -------
Stage 2 495 535 - 363 407 -------
Approach EB WB NB SB
HCM Control Delay, s/v16.45 20.82 0.47 0.26
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 836 - - 350 307 1097 - -
HCM Lane V/C Ratio 0.028 - - 0.103 0.261 0.021 - -
HCM Control Delay (s/veh) 9.4 - - 16.5 20.8 8.4 - -
HCM Lane LOS A - - C C A - -
HCM 95th %tile Q(veh) 0.1 - - 0.3 1 0.1 - -
Broward County Timing Sheet 4/7/2025 5:32:00 AM
Station : 3105 - Griffin Rd & SW 30 Ave ( Standard File )
Phase 1
(EL)
2
(ET)
3
(SR)
4 5 6 7 8 9 10 11 12 13 14 15 16
Walk 7 7
Ped Clearance 26 32
Min Green 4 10 6 7
Gap Ext 1.5 3 2 3 3 1.5 2.5
Max1 12 50 30 39
Max2
Yellow Clr 5 5 4 4 4 5 4 4 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Red Clr 2 2 2 2 2 2 2 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
Red Revert
Added Initial
Max Initial
Time Before Reduce
Cars Before Reduce
Time To Reduce
Reduce By
Min Gap
Dynamic Max Limit
Dynamic Max Step
Enable ON ON ON ON
Auto Flash Entry ON
Auto Flash Exit ON
Non-Actuated 1
Non-Actuated 2
Lock Call ON ON ON ON ON ON ON ON
Min Recall ON
Max Recall
Ped Recall
Soft Recall
Dual Entry
Sim Gap Enable ON ON ON ON ON ON ON ON
Guar Passage
Rest In Walk ON
Cond Service
Add Init Calc
Preemption
Channel 1 2 3 4 5 6
Lock Input ON ON ON ON ON ON
Override Auto Flash ON ON
Override Higher Preempt ON ON
Flash in Dwell
Link to Preempt
Delay
Min Duration
Min Green 6 6 6 6 6
Min Walk
Ped Clear
Track Green 1
Min Dwell 8 8 8 8 8
Max Presence 180 180 180 180 180
Track Veh 1 9
Track Veh 2
Track Veh 3
Track Veh 4
Dwell Cyc Veh 1 2 3 1
Dwell Cyc Veh 2
Dwell Cyc Veh 3
Dwell Cyc Veh 4
Dwell Cyc Veh 5
Dwell Cyc Veh 6
Dwell Cyc Veh 7
Dwell Cyc Veh 8
Dwell Cyc Veh 9
Dwell Cyc Veh 10
Dwell Cyc Veh 11
Dwell Cyc Veh 12
Dwell Cyc Ped1
Dwell Cyc Ped2
Dwell Cyc Ped3
Preempt LP
Channel 1 2 3 4
Min
Max
Enable
Lock Mode MAX MAX MAX MAX
Coord in Preempt
No Skip
Priority P1
Priority P2
Priority P3
Priority P4
Lock
Headway
Group Lock
Dwell Cyc Ped4
Dwell Cyc Ped5
Dwell Cyc Ped6
Dwell vPed7
Dwell Cyc Ped8
Exit 1 3 1 2
Exit 2
Exit 3
Exit 4
Prepared By Date Implemented
Reviewed By Traffic Engineer
Queue Jump
Free Mode
Alt Table
Broward County Timing Sheet 4/7/2025 5:32:00 AM
Station : 3105 - Griffin Rd & SW 30 Ave ( Standard File )
Coordination
Hour MinuteActionPattern Cycle Offset Split seqnc Short Long Dwell Split
1
Split
2
Split
3
Split
4
Split
5
Split
6
Split
7
Split
8
Split
9
Split
10
Split
11
Split
12
Split
13
Split
14
Split
15
Split
16
Day Plan 1 Easy
25 255
6 2 2 160 10 2 1 10 50 40 46 40 34
9 3 3 160 13 3 1 10 50 25 61 40 34
15 4 4 160 91 4 1 10 50 25 55 50 30
20 3 3 160 13 3 1 10 50 25 61 40 34
Day Plan 2 Easy
25 255
6 100 254
6 30 3 3 160 13 3 1 10 50 25 61 40 34
23 25 255
Day Plan 3 Easy
25 255
6 100 254
6 30 3 3 160 13 3 1 10 50 25 61 40 34
23 25 255
Broward County Timing Sheet 4/7/2025 5:32:00 AM
Station : 3105 - Griffin Rd & SW 30 Ave ( Standard File )
Hour MinuteActionPattern Cycle Offset Split seqnc Short Long Dwell Split 1 Split 2 Split 3 Split 4 Split 5 Split 6 Split 7 Split 8 Split 9 Split 10 Split 11 Split 12 Split 13 Split 14 Split 15 Split 16
Day Plan 4 Easy
Scheduler
Month Day of Weekk Day of Month 1 2 3
Plan J F M A M J J A S O N D S M T W T F S 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 Day Plan
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2
3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3
4 1 1 1 1 1 1 1 2
5 1 1 1 2
6 1 1 1 1 1 1 1 1 1 2
7 1 1 1 2
8 1 1 1 1 1 1 1 2
9 1 1 1 2
10 1 1 1 1 1 1 1 1 1 2
11 1 1 1 1 1 1 1 1 1 2
12 1 1 1 1 1 1 1 1 1 2
13 1 1 1 1 2
14 1 1 1 1 1 1 1 2
15 1 1 1 2
16 1 1 1 1 2
17 1
18 1
19 1
20 1
21 1
22 1
23 1
24 1
25 1
26 1
27 1
28 1
29 1
30 1
31 1
32 1
User Comments:
Broward County Timing Sheet 4/7/2025 5:32:41 AM
Station : 3029 - Griffin Rd & Ravenswood Rd ( Standard File )
Phase 1
(EL)
2
(WT)
3
(SL)
4
(NT)
5
(WL)
6
(ET)
7
(NL)
8
(ST)
9 10 11 12 13 14 15 16
Walk 7 5 7 5
Ped Clearance 23 32 23 35
Min Green 5 12 4 6 5 12 4 6
Gap Ext 1.5 3 1.5 2 1.5 3 1.5 2
Max1 18 50 15 25 20 50 15 25
Max2
Yellow Clr 5 5 4 4 5 5 4 4 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Red Clr 2 2 2 2 2 2 2 2 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
Red Revert
Added Initial
Max Initial
Time Before Reduce
Cars Before Reduce
Time To Reduce
Reduce By
Min Gap
Dynamic Max Limit
Dynamic Max Step
Enable ON ON ON ON ON ON ON ON
Auto Flash Entry ON ON
Auto Flash Exit ON ON
Non-Actuated 1
Non-Actuated 2
Lock Call ON ON ON ON ON ON ON ON ON ON
Min Recall ON ON
Max Recall
Ped Recall
Soft Recall
Dual Entry ON ON
Sim Gap Enable ON ON ON ON ON ON ON ON
Guar Passage
Rest In Walk ON ON
Cond Service
Add Init Calc
Preemption
Channel 1 2 3 4 5 6
Lock Input ON ON ON ON ON ON
Override Auto Flash ON
Override Higher Preempt ON
Flash in Dwell
Link to Preempt
Delay
Min Duration
Min Green 6 6 6 6 6 6
Min Walk
Ped Clear
Track Green
Min Dwell 8 8 8 8 8 8
Max Presence 180 180 180 180 180 180
Track Veh 1
Track Veh 2
Track Veh 3
Track Veh 4
Dwell Cyc Veh 1 4 2 3 2 4 1
Dwell Cyc Veh 2 8 6 8 5 7 6
Dwell Cyc Veh 3
Dwell Cyc Veh 4
Dwell Cyc Veh 5
Dwell Cyc Veh 6
Dwell Cyc Veh 7
Dwell Cyc Veh 8
Dwell Cyc Veh 9
Dwell Cyc Veh 10
Dwell Cyc Veh 11
Dwell Cyc Veh 12
Dwell Cyc Ped1
Dwell Cyc Ped2
Dwell Cyc Ped3
Preempt LP
Channel 1 2 3 4
Min
Max
Enable
Lock Mode MAX MAX MAX MAX
Coord in Preempt
No Skip
Priority P1
Priority P2
Priority P3
Priority P4
Lock
Headway
Group Lock
Dwell Cyc Ped4
Dwell Cyc Ped5
Dwell Cyc Ped6
Dwell vPed7
Dwell Cyc Ped8
Exit 1 1 3 4 2 4 2
Exit 2 5 7 8 6 8 6
Exit 3
Exit 4
Prepared By Date Implemented
Reviewed By Traffic Engineer
Queue Jump
Free Mode
Alt Table
Broward County Timing Sheet 4/7/2025 5:32:41 AM
Station : 3029 - Griffin Rd & Ravenswood Rd ( Standard File )
Coordination
Hour MinuteActionPattern Cycle Offset Split seqnc Short Long Dwell Split
1
Split
2
Split
3
Split
4
Split
5
Split
6
Split
7
Split
8
Split
9
Split
10
Split
11
Split
12
Split
13
Split
14
Split
15
Split
16
Day Plan 1 Easy
100 254
6 2 2 160 118 2 1 10 50 32 54 28 46 30 56 25 49
9 3 3 160 97 3 1 10 50 25 59 30 46 30 54 30 46
15 4 4 160 2 4 1 10 50 20 64 30 46 35 49 30 46
20 3 3 160 97 3 1 10 50 25 59 30 46 30 54 30 46
Day Plan 2 Easy
3 3 160 97 3 1 10 50 25 59 30 46 30 54 30 46
1 100 254
6 30 3 3 160 97 3 1 10 50 25 59 30 46 30 54 30 46
Day Plan 3 Easy
3 3 160 97 3 1 10 50 25 59 30 46 30 54 30 46
1 100 254
6 30 3 3 160 97 3 1 10 50 25 59 30 46 30 54 30 46
23 100 254
Broward County Timing Sheet 4/7/2025 5:32:41 AM
Station : 3029 - Griffin Rd & Ravenswood Rd ( Standard File )
Hour MinuteActionPattern Cycle Offset Split seqnc Short Long Dwell Split 1 Split 2 Split 3 Split 4 Split 5 Split 6 Split 7 Split 8 Split 9 Split 10 Split 11 Split 12 Split 13 Split 14 Split 15 Split 16
Day Plan 4 Easy
Scheduler
Month Day of Weekk Day of Month 1 2 3
Plan J F M A M J J A S O N D S M T W T F S 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 Day Plan
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2
3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3
4 1 1 1 1 1 1 1 2
5 1 1 1 2
6 1 1 1 1 1 1 1 1 1 2
7 1 1 1 2
8 1 1 1 1 1 1 1 2
9 1 1 1 2
10 1 1 1 1 1 1 1 1 1 2
11 1 1 1 1 1 1 1 1 1 2
12 1 1 1 1 1 1 1 1 1 2
13 1 1 1 1 2
14 1 1 1 1 1 1 1 2
15 1 1 1 2
16 1 1 1 1 2
17 1
18 1
19 1
20 1
21 1
22 1
23 1
24 1
25 1
26 1
27 1
28 1
29 1
30 1
31 1
32 1
User Comments:
1
Mackey, Jessica
From:Gabriela Araque <garaque@tesla.com>
Sent:Thursday, May 29, 2025 1:40 PM
To:Mackey, Jessica; sherylblasi@comcast.net; Sal Pira; dlam@ep-hotels.com; Tessa Sanchez;
Diana Slobodian [I]
Cc:Batista, Viviana Claudia; Heidi Henderson; 'Kreuser, Nathan'; Shayne Hastings; David
Hernandez; Lajoie, Corinne
Subject:RE: Tesla Supercharger - Fort Lauderdale - 2081 Griffin Rd, Dania Beach
CAUTION: This email originated from outside the City of Dania Beach. Do not click links or open
attachments unless you recognize the sender and expect the content.
HI Jessica,
Per our conversation regarding to the community meeting, Tesla has a strict public speaking policy, which makes it
difficult for us to accommodate this request. However, members of the community are welcome to attend the
zoning hearing if they wish to provide public comments.
Please advise.
Thanks!
Gabriela Araque
Sr. Design Engineer
3500 Deer Creek Rd, Deerk Creek, CA 94304
E. garaque@tesla.com T. 786.400.7836
The content of this message is the proprietary and confidential property of Tesla Inc, and should be treated as such. If you are not the intended recipient
and have received this message in error, please delete this message from your computer system and notify me immediately by reply e-mail. Any
unauthorized use or distribution of the content of this message is prohibited.
From: Mackey, Jessica <jmackey@daniabeachfl.gov>
Sent: Tuesday, May 27, 2025 2:27 PM
To: Gabriela Araque <garaque@tesla.com>; sherylblasi@comcast.net; Sal Pira <spira@tesla.com>; dlam@ep-hotels.com
Cc: Batista, Viviana Claudia <cbatista@daniabeachfl.gov>; Heidi Henderson <HHenderson@cgasolutions.com>; 'Kreuser,
Nathan' <nkreuser@Dewberry.com>; Shayne Hastings <shastings@tesla.com>; David Hernandez
<davidhernandez@tesla.com>; Lajoie, Corinne <clajoie@daniabeachfl.gov>
Subject: RE: Tesla Supercharger - Fort Lauderdale - 2081 Griffin Rd, Dania Beach
Hi Gabriela,
If you still plan to apply for a variance, then everything is okay and the comment is approved. I wasn’t
sure if you changed course because you cited Code Section 265-189, which previously would have
allowed the location of the ESVE in the landscape buffer.
Thanks for checking.
2
Jessica Mackey
,
Planner
jmackey@daniabeachfl.gov
|
daniabeachfl.gov
100 W Dania Beach Blvd.,
Dania Beach
,
FL
,
33004
Phone: 954.924.6800, x3639
R.I.S.E. - RESPECT, INTEGRITY AND STANDARD OF EXCELLENCE
Please note: Florida has a very broad public records law. Most written communications, including emails, to or from City officials regarding City business are public records and may be
subject to public disclosure.
From: Gabriela Araque <garaque@tesla.com>
Sent: Tuesday, May 27, 2025 2:03 PM
To: Mackey, Jessica <jmackey@daniabeachfl.gov>; sherylblasi@comcast.net; Sal Pira <spira@tesla.com>; dlam@ep-
hotels.com
Cc: Batista, Viviana Claudia <cbatista@daniabeachfl.gov>; Heidi Henderson <HHenderson@cgasolutions.com>; 'Kreuser,
Nathan' <nkreuser@Dewberry.com>; Shayne Hastings <shastings@tesla.com>; David Hernandez
<davidhernandez@tesla.com>; Lajoie, Corinne <clajoie@daniabeachfl.gov>
Subject: Re: Tesla Supercharger - Fort Lauderdale - 2081 Griffin Rd, Dania Beach
CAUTION: This email originated from outside the City of Dania Beach. Do not click links or open
attachments unless you recognize the sender and expect the content.
@dlam@ep-hotels.com, Please see email below and advise.
@'Mackey, Jessica', I am bit confused by your comment below regarding comment #4. We addressed the
landscape buffer, and we are submitting a variance for it. Could you please confirm whether this comment is
approved as is.
As I understand it, the only variance we are requesting is for the landscape buffer. or let me know if there is another
outstanding variance we need to address.
Thanks!
Gabriela Araque
Sr. Design Engineer
3500 Deer Creek Rd, Deerk Creek, CA 94304
E. garaque@tesla.com T. 786.400.7836
3
The content of this message is the proprietary and confidential property of Tesla Inc, and should be treated as such. If you are not the intended recipient
and have received this message in error, please delete this message from your computer system and notify me immediately by reply e-mail. Any
unauthorized use or distribution of the content of this message is prohibited.
From: Mackey, Jessica <jmackey@daniabeachfl.gov>
Sent: Tuesday, May 27, 2025 12:21 PM
To: Gabriela Araque <garaque@tesla.com>; sherylblasi@comcast.net <sherylblasi@comcast.net>; Sal Pira
<spira@tesla.com>
Cc: Batista, Viviana Claudia <cbatista@daniabeachfl.gov>; Heidi Henderson <HHenderson@cgasolutions.com>;
'Kreuser, Nathan' <nkreuser@Dewberry.com>; Shayne Hastings <shastings@tesla.com>; David Hernandez
<davidhernandez@tesla.com>; Lajoie, Corinne <clajoie@daniabeachfl.gov>
Subject: RE: Tesla Supercharger - Fort Lauderdale - 2081 Griffin Rd, Dania Beach
Hi Gabriela,
I visited the site this morning and saw that the fence has been removed, however, the storage containers
have been moved to the northeast corner of the property. The property owner will need to legalize those
containers following Code Sec. 105-90(G)(3), if they wish to use them for storage before the item goes to
public hearing, or remove them completely. That comment still stands.
In addition, it looks like water-weighed bins and caution tape have been installed on the site where the
fence used to be. Is the purpose of the bins/tape to “reserve the site” for the future Tesla project. As of
now, it should be an open parking area, same as all the other parking areas.
I also saw that the owner has installed new concrete pads on several landscape areas within the parking
lots. What is the purpose of the concrete pads and are they intended to remain? Any impervious surface
that is “formally installed” changes pervious calculations as well as landscape calculations, and will
need to be reflected on the site plan modification.
4
Comments #1-3 have been addressed.
Regarding Comment #4, a variance to install concrete pads/mechanical equipment in the permitter
landscape buffer per Code Section 275-120 is still required. As we discussed last week, code sections
that apply specifically to electric vehicle charging stations no longer apply as the state has preempted
local regulations for EV charging stations.
Please let me know what the owner intends to do with the storage containers and concrete pads.
Jessica Mackey
,
Planner
jmackey@daniabeachfl.gov
|
daniabeachfl.gov
100 W Dania Beach Blvd.,
Dania Beach
,
FL
,
33004
Phone: 954.924.6800, x3639
R.I.S.E. - RESPECT, INTEGRITY AND STANDARD OF EXCELLENCE
Please note: Florida has a very broad public records law. Most written communications, including emails, to or from City officials regarding City business are public records and may be
subject to public disclosure.
From: Gabriela Araque <garaque@tesla.com>
Sent: Friday, May 23, 2025 5:28 PM
To: Mackey, Jessica <jmackey@daniabeachfl.gov>; sherylblasi@comcast.net; Sal Pira <spira@tesla.com>
Cc: Batista, Viviana Claudia <cbatista@daniabeachfl.gov>; Heidi Henderson <HHenderson@cgasolutions.com>; 'Kreuser,
Nathan' <nkreuser@Dewberry.com>; Shayne Hastings <shastings@tesla.com>; David Hernandez
<davidhernandez@tesla.com>
Subject: RE: Tesla Supercharger - Fort Lauderdale - 2081 Griffin Rd, Dania Beach
5
CAUTION: This email originated from outside the City of Dania Beach. Do not click links or open
attachments unless you recognize the sender and expect the content.
Understood. I already spoke to the LL, and he is currently reviewing these two items.
Attached is the revised CDs, along our response to the comments noted below in blue.
1. Page SP-2: Per Code Section 635-50, include the zoning of the subject site and adjacent properties.
Must include City of Dania Beach zoning (e.g., IROM, C-2), not the use codes from Broward County
Property Appraiser. Revise the site plan accordingly. Fourth time requested See sheet SP-2, Zoning
Data Table updated to include City of Dania Beach zoning codes as requested.
2. Per Code Section 511-40 (C) , Industrial Design Standards Where hedges are utilized and adequate
space exists, a tiered effect is required. The existing 8’ hedge must be maintained to have a tiered
effect. Second time requested. A variance is required if the code cannot be met. See sheet LS-1 &
LS-2, Existing hedge identified with reference to newly added note 6 stating “Existing hedge shall be
maintained in accordance with code section 511-40 (C) and section 275-90(C)(c). “
3. Per Code Section 275-90 (C)(c), for industrial properties, on a the site of a building providing vehicular
use area, where such area will not be entirely screened visually by an intervening building or structure
from any abutting right-of-way or adjacent property, there shall be provided landscaping between such
area and such abutting right-of-way or property as follows: … a continuous hedge, wall or other durable
landscape barrier shall be placed no closer to the VUA than five (5) feet and shall be maintained at
three (3) feet minimum height, but not higher than five (5) feet above the adjacent VUA and the abutting
property. Second time requested. The existing 8’ hedge must be maintained to meet the height
requirement. A variance is required if the code cannot be met See sheet LS-1 & LS-2, Existing hedge
identified with reference to newly added note 6 stating “Existing hedge shall be maintained in
accordance with code section 511-40 (C) and section 275-90(C)(c). “
4. Proposed location of the concrete pad encroaches in the Perimeter Landscape Buffer per Code Section
275-120. A variance is required. Acknowledged. See sheets LS-1 & LS-2. 10’ Landscape Buffer
dimension shown along with 8’-6” dimension behind concrete pad to landscape buffer boundary.
Proposed concrete pad encroaches approximately 1’-6” into landscape buffer. Additionally, Section
265-189.B.d. states “EVSE must be concealed from the road right-of-way by landscape or other means
and may be permitted in landscape and utility buffers, subject to prior approval of city staff.”
Please let me know if you have any additional questions.
Thanks!
6
Gabriela Araque
Sr. Design Engineer
3500 Deer Creek Rd, Deerk Creek, CA 94304
E. garaque@tesla.com T. 786.400.7836
The content of this message is the proprietary and confidential property of Tesla Inc, and should be treated as such. If you are not the intended recipient
and have received this message in error, please delete this message from your computer system and notify me immediately by reply e-mail. Any
unauthorized use or distribution of the content of this message is prohibited.
From: Mackey, Jessica <jmackey@daniabeachfl.gov>
Sent: Friday, May 23, 2025 3:18 PM
To: sherylblasi@comcast.net; Gabriela Araque <garaque@tesla.com>; Sal Pira <spira@tesla.com>
Cc: Batista, Viviana Claudia <cbatista@daniabeachfl.gov>; Heidi Henderson <HHenderson@cgasolutions.com>; 'Kreuser,
Nathan' <nkreuser@Dewberry.com>; Shayne Hastings <shastings@tesla.com>; David Hernandez
<davidhernandez@tesla.com>
Subject: RE: Tesla Supercharger - Fort Lauderdale - 2081 Griffin Rd, Dania Beach
Hi Sheryl and Gabriela,
All variances must be received concurrently with the site plan modification in process in order to be
reviewed by the City Commission at the same time. If the landlord is the one taking care of the variances
for the landscape requirements previously stated, they must be submitted concurrently. The application
for the concrete pad must be submitted with the final submittal (final plans and all tier 1 comments
addressed).
The application should indicate “Proposed concrete pad for EV charging mechanical equipment encroaches
in the Perimeter Landscape Buffer per Code Section 275-120”.
The public outreach meeting needs to be conducted prior to the item to be heard by the Commission.
Understanding time constraints, I suggest you aim to complete all items for the July 8th City Commission
Meeting. The deadline to submit for this meeting is June 6th.
2051 GRIFFIN ROAD LLC
2550 MIAMI RD FORT LAUDERDALE, FL 33316
2080 GRIFFIN HOLDINGS LLC
4014 CHASE AVE STE 220 MIAMI BEACH, FL 33140
2149 KUSHCH LAND TR
KUSHCH, ALEXANDER & CONNIE TRSTEE
2149 SW 47 ST #1 4
FORT LAUDERDALE, FL 33312
APPLE TEN HOSPITALITY OWNERSHIP
INC
814 E MAIN ST
RICHMOND, VA 23219
AVJ DEVELOPMENT LLC
300 SUNNY ISLES BLVD APT 4-2403
SUNNY ISLES BEACH, FL 33160
BANYAN BAY MARINE CENTER LLC
1815 CORDOVA RD #202
FORT LAUDERDALE, FL 33316
BERTRAM, LAURA BURKE
2249 SW 47 ST
FORT LAUDERDALE, FL 33312
BLUESTAR MARINE HOLDINGS LLC
231 SW 28 ST
FORT LAUDERDALE, FL 33315
BROWARD COUNTY
BOARD OF COUNTY COMMISSIONERS
115 S ANDREWS AVE RM 501-RP
FORT LAUDERDALE, FL 33301
C & L SUNSHINE ENTERPRISES INC
121 SE 1 AVE
DANIA BEACH, FL 33004
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA BEACH, FL 33004
CITY OF DANIA BEACH
PLANNING & ZONING MGR
100 W DANIA BEACH BLVD
DANIA BEACH, FL 33004
CITY OF DANIA BEACH
COMMUNITY DEVELOPMENT ASSIST. DIR.
100 W DANIA BEACH BLVD
DANIA BEACH, FL 33004
CLMIA LLC
4470 ANGLERS AVE
FORT LAUDERDALE, FL 33312
COHEN, ELAN
3375 N COUNTRY CLUB DR #604
MIAMI, FL 33180
COHEN, MIRYAM & ASHER
2233 SW 47 ST
FORT LAUDERDALE, FL 33312
CSX TRANSPORTATION INC
500 WATER ST
JACKSONVILLE, FL 32202
DEER PROPERTIES LLC
601 SWEET BAY AVE
PLANTATION, FL 33324
DEER PROPERTIES LLC
601 SWEET BAY
PLANTATION, FL 33324
DEER PROPERTIES LLC
580 ANSIN BLVD
HALLANDALE BEACH, FL 33009
DERNIER MINUTE INTERESTS, LLC
%BASS PRO OUTDOOR WORLD
2500 E KEARNEY
SPRINGFIELD, MO 65989
EV 2281 LLC
3233 NE 163 ST STE 600
MIAMI, FL 33160
FLL AIRPORT LODGING LLC
3785 NW 82 AVE STE 204
MIAMI, FL 33166
FLORIDA DEPT OF TRANSPORTATION
OFFICE OF RIGHT OF WAY
3400 W COMMERCIAL BLVD
FORT LAUDERDALE, FL 33309
FORT LAUDERDALE COURTYARD LLC
2999 NE 191 ST STE 800
AVENTURA, FL 33180
G&I IX 2200 SW LLC
%RYAN LLC
PO BOX 20197
ATLANTA, GA 30325
GONZALEZ HERNANDEZ, ASMIRIAN H/E
2210 SW 46 CT #1-2
FORT LAUDERDALE, FL 33312
GRIFFIN LKS COMM DEV DISTRICT
% GMS-SF
5385 N NOB HILL RD
SUNRISE, FL 33351
GRIFFIN PROPERTY INVESTMENT LLC
2109 GRIFFIN RD
FORT LAUDERDALE, FL 33312
GRIFFIN ROAD ONE LLC
% ECONOMOS MANAGEMENT INC
225 NE MIZNER BLVD #430
BOCA RATON, FL 33432
GRIFFIN ROAD THREE LLC
% NICHOLAS ECONMOS SR
225 NE MIZNER BLVD
BOCA RATON, FL 33432
GRIFFIN ROAD TWO LLC
% NICHOLAS ECONOMOS SR
225 NE MIZNER BLVD #430
BOCA RATON, FL 33432
HUMANE SOCIETY OF BROWARD COUNTY
ATT: PRESIDENT
2070 GRIFFIN ROAD
FORT LAUDERDALE, FL 33312
INTERMARINE INC
320 N FEDERAL HWY
DANIA BEACH, FL 33004
JOSEPH, MOSES
2270 SW 46 CT
FORT LAUDERDALE, FL 33312
KABESA, SHIMON SHIMI
808 SW 29 ST
FORT LAUDERDALE, FL 33315
KAL 101 LLC
3484 SW 53 CT
FORT LAUDERDALE, FL 33312
KRESPI, YITZCHAK OFER
2165 SW 47 ST #1-2
FORT LAUDERDALE, FL 33312
LA BRANCHE, BERBELIE
2220 SW 46 CT #1-2
FORT LAUDERDALE, FL 33312
LARRIVEE, PAULINE LEVESQUE &
LEVESQUE-DIPASQUO, ANDREE
6410 NW 57 CT
TAMARAC, FL 33321
MELANIE ALSTON HOLDINGS
THREE LLC
11352 W STATE RD 84 #80
DAVIE, FL 33325
POINTER FAM REV LIV TR
POINTER, DEAN A TRS
27125 VILLARRICA DR
PUNTA GORDA, FL 33983
PRICE, ANGELA F
2724 NE 26 AVE
FORT LAUDERDALE, FL 33306
PUBLIC LAND
% CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA BEACH, FL 33004
SAHRIFEH, NASER & JEAN
886 SW 191 LN
PEMBROKE PINES, FL 33029
SDS DEVELOPMENT AND TRUST LLC
5256 SW 38 AVE
FORT LAUDERDALE, FL 33312
SOUTH FLORIDA REGIONAL
TRANSPORTATION AUTHORITY
801 NW 33 ST
POMPANO BEACH, FL 33064
TABIB REV TR
TABIB, BARUCH TRSTEE
PO BOX 816601
HOLLYWOOD, FL 33081
THE VILLAS AT HARBOR ISLES CONDO ASSOC
2317 CLIPPER PL
FORT LAUDERDALE, FL 33312
TKG-STORAGEMART PARTNERS
PORTFOLIO LLC
215 N STADIUM BLVD STE #207
COLUMBIA, MO 65203
WHITE OAK VENTURES CO
2500 E KEARNEY ST
SPRINGFIELD, MO 65898
WILLIAMS, FRANK L III & PATRICIA
2164 SW 47 ST
FORT LAUDERDALE, FL 33312
City of Dania Beach
Community Development Memorandum
DATE: 7/8/2025
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Candido Sosa-Cruz, ICMA-CM, Deputy City Manager
Eleanor Norena, CFM, Director
Corinne Lajoie, AICP, Deputy Director
SUBJECT: TX-039-24: The applicant, the City of Dania Beach is proposing to amend the
City’s Public Art contribution requirements (Second Reading).
Request:
The Community Development Department (“Department”) is requesting an amendment to the
City’s Public Art contribution that is required for all new development.
Background:
On December 10, 2019, the City Commission established the Public Art Fund via Ordinance No.
2019-025. The required contribution for all new development was set at half of one percent (.5
%) of the total value of construction. Developers have the option of paying the entire
contribution into the City’s Public Art Fund or they can install public art on their site as part of
the development project and then only contribute half of the required amount into City’s Public
Art Fund.
This contribution allows governing agencies to establish a Public Art Fund which is allocated for
the purchase, commissioning, and installation of public art in the City of Dania Beach. Public Art
programs are an effective way for cities and counties to foster access to the arts and increase the
aesthetic value of public buildings and public places.
Department staff along with the City’s Public Art consultant researched several local
municipalities that have active Public Art programs. See listed below:
CITY PUBLIC ART
CONTRIBUTION
Lauderhill 1%
Tamarac 1%
Coral Gables 1%
Palm Beach Gardens 1%
Delray Beach 1.5%
Miami Beach 1.5%
Miami Gardens 1.5%
North Miami 1.5%
Pompano Beach 2%
Fort Worth 2%
St. Petersburg 2%
The Department is requesting to amend the Public Art contribution to more accurately reflect the
industry standard by increasing the Public Art fee to one percent (1%) of the total value of
construction. The Department is also proposing to increase the maximum contribution to Five
Hundred Thousand Dollars ($500,000.00).
The appropriate annual budget for the Public Art Advisory Board activities is Two Hundred and
Thirty Thousand dollars ($230,000.00), to include maintenance expenses of Twenty Thousand
Dollars ($20,000.00) to secure the life expectancy of each art piece in the City’s Public Art
Collection.
Below identifies four (4) public art instillations the City has been able to achieve since the PAAB
inception in June of 2022.
Artist Title Object Name/
Concept
Worktype
Value City Cost Installation
YR
Lloyd Goradesky Let Love Guide
Your Way
outdoor sculpture $357,000.00 $175,000.00
2022
Stephano
Bolongaro
Totor Outdoor
sculpture
$45,000.00 $6,000.00 2023
Ernesto Maranje Looking
forward
mural paintings
(visual works)
$65,000.00 $65,000.00 2024
Cey Adams Lead with Love mural paintings
(visual works)
$60,000.00 $20,000.00 2025
These proposed amendments will ensure a continued funding stream for the Public Art Fund is
maintained, ensuring the health of the fund into the future. The Public Art Fund is an essential
component necessary to enable the implementation of the City’s Public Art Plan which aims to
increase the aesthetic value of public places in our community and fosters more access to the arts
for the entire Dania Beach community.
Budgetary Impact
Approval of the text amendment will ensure the financial stability of the Public Art Fund.
Recommendation
Public Art Advisory Board
On September 16, 2024, the Public Art Advisory Board discussed increasing the Public Art fee
to one percent (1%) and unanimously approved the request.
Planning and Zoning Board Recommendation
On June 18, 2025, the Planning and Zoning Board recommended denial to the City Commission
(3:1 vote to deny; Robertson – no to deny, Garnett – recused, Wright – yes to deny, De la Salas –
yes to deny, Rouhe – yes to deny).
City Commission Previous Action
On June 24, 2025, the City Commission approved the item on first reading.
Department Recommendation
The Department recommends approval of the ordinance on second and final reading.
ORDINANCE NO. 2025-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AMENDING THE CITY’S PUBLIC ART FEE IMPOSED
ON DEVELOPMENTS, BY AMENDING CHAPTER 28, ENTITLED THE
“LAND DEVELOPMENT CODE” AT SECTION 811-50, “APPLICATION
PROCEDURES FOR PLACEMENT OF ART ON PRIVATE PROPERTY,” AND
SECTION 811-70. ENTITLED “BUILDING PERMITS”; PROVIDING FOR
CONFLICTS; PROVIDING FOR CODIFICATION; PROVIDING FOR
SEVERABILITY; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City Commission created a Public Art Advisory Board to assist the City
on the use of public art funds and help select artists and art works;
WHEREAS, in 2019, the City Commission adopted the Public Art Process and fees; and
WHEREAS, the fees were set at a half of one percent (.5 percent) for the public art pay
fee based upon total construction costs; and
WHEREAS, the fee for partial public art and partial placement of art on site was set at
one-quarter of one percent (.25%) towards the fund; and an additional of a quarter of one percent
(.25%) toward the on-site artwork based upon total construction costs; and
WHEREAS, the current industry standard is between one and two percent (1% - 2%) for
other public art fee programs in the State of Florida; and
WHEREAS, the Administration recommends increasing the public art fee to one percent
(1%); and the installation of art on private property fee to be a half of a percent (.5%) towards the
fund; and another half of a percent (.5%) towards the public art placement on private property; and
WHEREAS, the maximum payment cap of $250,000 is being increased to $500,000;
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1.That Article 811 entitled the “Public Art Program,” is amended as follows:
2 ORDINANCE #2025-______
CHAPTER 28
LAND DEVELOPMENT CODE
PART 8 – TECHNICAL APPENDIX
* * *
ARTICLE 811. PUBLIC ART PROGRAM
* * *
Sec. 811-50. Application procedures for placement of art on private property.
* * *
(F) A payment of 0.25% one-half of one percent (0.5%) towards the city's public art program to
be deposited by the city in the public art fund; and a payment of 0.25% one-half of one percent
(0.5%) , which is to be held in escrow to ensure that the developer complies with the public
art program requirements for placement of public art on private property as required by section
811-70(2). The city manager is authorized to return escrowed funds to the developer if the
developer has complied with all the requirements of section 811-70(A)(2)(iii).
* * *
Sec. 811-70. Building permits.
(A) Prior to issuance of a final building permit, the applicant or developer for projects subject to
this article shall be required to comply with one of the following:
(1)In-lieu public art fee. Pay one-half of one percent (0.5%) (1.0%) of the cost of the
proposed development project, as an "in lieu" public art fee, with a minimum payment
of five thousand dollars ($5,000.00) and a maximum payment of two five hundred fifty
thousand dollars ($250,000.00 $500,000.00); or
(2)Combination of in-lieu public art fee and placement of art on site. Placement of art on
the site of the development project, which shall have a minimum value of one-quarter
half of one percent (0.25%) (0.5%) of the cost of the proposed development project
combined along with a one-quarter half of one percent (0.25%) (0.5%) payment of an
"in-lieu" public art fee. The owner shall provide documentation to the city that the art
fee has been deposited into an escrow account for said purpose prior to the issuance of a
building permit. Prior to placement on the development site, the art must be approved
by the community development director or designee and conform to the adopted public
art guidelines.
* * *
Section 2.That if any section, clause, sentence or phrase of this Ordinance is for any
reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not
affect the validity of the remaining portions of this Ordinance.
3 ORDINANCE #2025-______
Section 3.That all ordinances or parts of ordinances in conflict with the provisions of
this Ordinance are repealed to the extent of such conflict.
Section 4.It is the intention of the Mayor and City Commission of the City of Dania
Beach, and it is hereby ordained that the provisions of this ordinance shall become and be made a
part of the Code of the City of Dania Beach, Florida. The sections of this ordinance may be
renumbered or re-lettered to accomplish such intention, and the word "ordinance" may be changed
to "section," "article," or other appropriate word.
Section 5. That this ordinance be codified in Municode.com.
Section 6.That this Ordinance shall be effective 10 days after passage on second
reading.
PASSED on first reading on June 24, 2025.
PASSED AND ADOPTED on second reading on ___________________ 2025.
First Reading:
Motion by: Vice Mayor Salvino
Second by: Commissioner Lewellen.
Second Reading:
Motion by: _________________________________
Second by: _________________________________
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
4 ORDINANCE #2025-______
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
Order ID:7831321
Page 1 of 3
6/17/2025 2:25:09 PMPrinted:
GROSS PRICE * :$241.70
* Agency Commission not included
SSC_Notice of Public MeetingPACKAGE NAME:
Product(s): Sun Sentinel, Affidavit, Floridapublicnotices.com, Classified.ss.com_Legal
AdSize(s):2 Column
Run Date(s):Monday, June 23, 2025
Zone:Full Run
Color Spec.B/W
Preview
Order ID:7831321
Page 2 of 3
6/17/2025 2:25:09 PMPrinted:
GROSS PRICE * :$241.70
* Agency Commission not included
SSC_Notice of Public MeetingPACKAGE NAME:
Order ID:7831321
Page 3 of 3
6/17/2025 2:25:09 PMPrinted:
GROSS PRICE * :$241.70
* Agency Commission not included
SSC_Notice of Public MeetingPACKAGE NAME:
To: Key Official
From: Eryn Russell, Florida League of Cities
Date: June 17, 2025
Subject: 2025 Annual Conference Voting Delegate Information
The Florida League of Cities Annual Conference will be held at the Signia by Hilton
Orlando Bonnet Creek in Orlando, Florida, from August 14-16, 2025. This conference will
provide valuable educational opportunities to help Florida’s municipal officials serve their
citizenry more effectively.
We ask that each member municipality sending delegates to the Annual Conference
designate one elected official to serve as its Voting Delegate and cast the
municipality’s votes at the Annual Business Meeting which will be held on Saturday,
August 16, 2025. The Voting Delegate designated by each municipality will vote on all
official business matters brought before the League membership and requiring a vote
during the Business Meeting. Matters such as the election of League leadership, adoption
of resolutions and any other official business matters affecting the League may be voted
on during the Business Meeting.
In accordance with the League’s by-laws, the number of votes allocated to each
municipality is determined based upon population. The League will use the latest
Florida Estimates of Population as published by the University of Florida, Bureau of
Economic and Business Research.
Annual Conference registration materials were sent to each municipality via the League's
e-newsletter and are available online at flcities.com.
If you have any questions about voting delegates, please email erussell@flcities.com.
Voting delegate forms must be received by the League no later than July 31, 2025.
Attachments: Form Designating Voting Delegate
2 of 2
2025 Annual Conference
Florida League of Cities, Inc.
August 14-16, 2025
Orlando, Florida
It is important that each member municipality sending delegates to the Annual
Conference of the Florida League of Cities designate one of its elected officials to cast the
municipality’s votes at the Annual Business Meeting. League By-Laws require each
municipality to select one person to serve as the municipality's Voting Delegate.
Municipalities do not need to adopt a resolution to designate a voting delegate. Instead,
please fill out this form and return it to the League office so that your voting delegate
may be properly identified. Voting delegate forms must be received by the League no
later than July 31, 2025.
Designation of Voting Delegate
Name of Voting Delegate: __________________________________________________
Title: ___________________________________________________________________
Delegate Email: __________________________________________________________
Municipality of: __________________________________________________________
AUTHORIZED BY:
______________________________________________
Name
______________________________________________
Title
Return this form to:
Eryn Russell
Florida League of Cities, Inc.
Post Office Box 1757
Tallahassee, FL 32302-1757
Email: erussell@flcities.com
SPONSORSHIP PROSPECTUS
December 16–17, 2025 West Palm Beach, FL
Why Become a Sponsor?
Overview
The Southeast Florida Regional Climate Change Compact and Palm Beach County are proud to host the
17th Annual Southeast Florida Climate Leadership Summit at the Palm Beach County Convention Center
on December 16–17, 2025. The Compact is a partnership of Palm Beach, Broward, Miami-Dade, and Monroe
counties that helps South Florida continue to thrive while facing shared climate change challenges.
This Summit is a key opportunity for sharing innovative ideas, displaying successful climate initiatives,
and fostering collaboration among leaders from various sectors. Attendees include government officials,
scientists, nonprofit organizations, business leaders, indigenous representatives, academia, youth, media,
community leaders, and international organizations. Their diverse expertise is essential for designing
comprehensive policies, exchanging knowledge, and enhancing regional and global cooperation. The
Summit will highlight impactful projects for immediate implementation, encourage valuable networking and
strategic planning, and leverage collective insights to tackle pressing South Florida climate issues.
Benefits of Sponsorship:
Connect with top experts driving climate adaptation and resilience
across Southeast Florida and be part of groundbreaking change
Expand your network and expose your team to new collaboration opportunities in Southeast Florida
Engage with the Southeast Florida Regional Climate Change Compact community during networking
events, including lunch, refreshment breaks, social functions, and the Welcome Reception
Highlight your products and services in the exhibit area,
positioning your organization as a climate solutions leader
Gain widespread exposure through an extensive promotional campaign leading up to the summit
Sponsorship Opportunities
Not Seeing the Perfect Package? If you are interested in contributing in a way not listed in our sponsorship options,
please contact Hunter Perez. We would be happy to create a custom sponsorship option to best fit your organization.
Benefits at Each Sponsorship Level Diamond
$20,000+
Platinum
$15,000+
Gold
$10,000+
Silver
$5,000+
Bronze
$2,500+
Amount of complimentary registrations to attend the event 5 4 3 2 1
Complimentary tabletop display space in exhibit area 2 Tables
(Preferred
placement)
2 Tables
(Preferred
placement)
1 Table 1 Table 1 Table
Exclusive sponsor of the Welcome Reception
Recognition on sponsor signage during the Welcome Reception
Logo featured on Front Page of Website as a Premium Sponsor
Logo to appear on custom beverage napkin during
Welcome Reception
Logo prominently displayed on a photo backdrop
A brochure insertion in attendee packets
(Printing & delivery costs covered by sponsor)
Exclusive Recognition Page on web site with representative’s photo,
contact listing, electronic brochure, and video
Recognition as a sponsor & the opportunity for a sponsor
representative to join the moderator on stage during the Stretch Break
Recognition on sponsor signage during Group Luncheons
Enhanced ad on event app
Social media shoutout on the PBC Office of Resilience accounts
Acknowledgement at the opening and closing sessions
Recognized in the WHOVA app
Registration list (Post-summit)
Listed in the tabletop directory
Logo displayed on Summit website
Logo displayed on sponsor signage at the conference
Logo displayed in publicity emails
Friends of the Climate Summit ($1,000-2,499)
Your sponsor logo on the conference website and in publicity emails.
Sponsoring at the Summit provides your organization with opportunities to promote products and services to leaders
who are making key decisions about climate resiliency investments throughout South Florida. Sponsor attendees
will meet and collaborate with other visionary leaders who are working to help South Florida continue to thrive while
addressing climate change impacts.
A limited amount of space is available for sponsors confirmed at the Bronze Level and
higher to set up table-top displays in the pre-function and refreshment break area.
• Space is limited. You will be provided with a quantity of 6’ tables based on your level of sponsorship, and up
to two chairs per table.
• Each 6’ table comes with a cube of displayed space equal to 6’ wide by 6’ deep, which includes a 4’ high back
wall of drape behind the table.
• Pop-up banners may be used, as long as they fit within the cube of space (on top of or behind the table).
• If you plan to put pop-up banners behind your table, make sure your graphics department knows important
content should appear at the top of the banner.
• Additional costs may be incurred should you require electricity. Wifi will be provided.
• Display placement is determined by the organizers, unless your sponsorship benefit states otherwise.
• Your table(s) will be identified with a tent card.
• Tabletop displays are meant to serve as a forum to share informational materials.
• A representative does not need to be stationed at the table at all times. The times most effective for attendee
interaction are during early morning refreshments, daily a.m. and p.m. breaks.
• Individuals assisting with setting up the display, but not remaining at the summit, do not need to register.
Otherwise, all display staff and sponsor representatives must be fully registered to attend.
• If you wish to bring informational materials, we expect approximately 950 attendees.
• Displays must be removed promptly at the conclusion of the event, and all items left behind will be discarded.
Sponsor Display Set-up & Removal Times
Move-in Displays:Monday, December 15, 2025 2:00pm–5:00pm
Move-out Displays:Wednesday, December 17, 2025 4:00pm–6:00pm
Important Items to Note:
Sponsor Display Information
Benefits of Sponsorship
1
3
2
4
NETWORKING
As a large climate
conference with a local
focus this event will attract
climate action change
makers and leaders from
across the region.
BUSINESS
GENERATION
Given the large number
of participants from a
wide range of fields,
the summit is a unique
occasion to generate new
business opportunities.
KNOWLEDGE
Attendees will hear
from experts in the field
discussing emerging
topics and regional
initiatives, successes
and challenges.
PROMOTION
Sponsors participating
in the summit will have a
strong local presence in
a major showcase thanks
to the media impact of
the event.
Important Items to Note
• All sponsor representatives (including those receiving
the complimentary registration benefit) need to register
for the event if they wish to attend. Completion of the
sponsorship commitment form does not count as an
event registration.
• Sponsorships will be confirmed on a first-come, first-
served basis and upon receipt of payment, but the
sooner you confirm your support, the sooner your
organization starts being recognized in our publicity
emails and on the web site. Sponsorship payments
must be received by Friday, November 7, 2025 to be
recognized in print.
• All terms of participation are outlined in the
Sponsor Terms of Agreement. Should Acts of God,
natural or public health emergencies preclude this event
from being held in-person, sessions will be held virtually
via Zoom and sponsorships will remain intact.
Become a Sponsor Today!
Thank You Sponsors!
On behalf of the organizers, thank you for taking the extra
step to collaborate with us by becoming a sponsor. This
event would not be possible without your support!
Questions about the Summit?
Hunter Perez | Coordinator | hunterperez@ufl.edu
Kimberly Brand | Registration | kimmer72@ufl.edu
City of Dania Beach
Community Development Memorandum
DATE: 7/8/2025
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Candido Sosa-Cruz, ICMA-CM, Deputy City Manager
Eleanor Norena, CFM, Director
Corinne Lajoie, AICP, Deputy Director
SUBJECT: Selection of a preferred list of artists who responded to the City’s Creative Visions
Call for Artist for implementation of the City’s Public Art Plan goals.
Request:
Selection of a preferred list of artists to the City’s Creative Visions Call for Artist Qualifications
and Concepts for implementation of the City’s Public Art Plan goals.
Background:
On February 1, 2025, the Call for Artist Qualifications and Concepts was published with an
anticipated maximum project budget of $50,0000 per artist project. A total of thirty (30)
submittals were received upon closures of the Call on March 28, 2025. On May 19, 2025, the
Public Art Advisory Board selected eight (8) artists whom they would like to request full
proposals. The eight (8) artists selected are identified below.
The selected artists are presented in alpha order by last name, not priority order.
• Xavier Cortada
• Sonata Kazimieratiene
• Sujin Lim
• Russell Mason
• Nat Mohler
• OSRS Murals
• Timothy Robert
• Jason Tetlak
Staff is requesting detailed proposals from each of the first eight (8) selected artists. Three of the
proposals will be selected by the Public Art Advisory Board (PAAB) for City Commission
approval, which will then move to contracting phase. Staff will advise the PAAB that the
selected artist projects be in different parts of the City, since the genesis of this initiative was to
promote geographic equity of artworks throughout the City. Priority will be given to innovative
and unique temporary public art installations. Each artist will be paid $500 for submittal of their
detailed proposal.
All of the Creative Visions Proposals will be kept for future project considerations.
Budgetary Impact
Shall not exceed $100,000 for the 2024/2025 years. Shall not exceed $100,000 for the 2025/2026
years.
Recommendation
City Commission to approve the preferred list of eight (8) artists to move forward with
requesting proposals.
RESOLUTION NO. 2025-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE CREATION OF A SHORT LIST OF
ARTISTS FROM THE “CREATIVE VISION” CALL TO ARTISTS;
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN
EFFECTIVE DATE.
WHEREAS, on February 1, 2025, the City Commission published the Creative Visions
Call to Artists, to create a list of qualified artists for implementation of the City’s Public Art Plan;
WHEREAS, on March 28, 2025, the open Call to Artist closed thirty (30) artist
applications in response to the open Call to Artists; and
WHEREAS, on May 19, 2025, the Public Art Advisory Board (PAAB) selected the first
eight (8) artists to work with from the thirty (30) artist submissions received; and
WHEREAS, the eight (8) artists selected by the PAAB include:
•Nate Mohler
•Sonata Kazimieratiene
•Sujin Lim
•OSRS Murals
•Jason Tetlak
•Russell Mason
•Timothy Robert
•Xavier Cortada; and
WHEREAS, PAAB requests that the City Commission approve the “short list” of artists;
and
WHEREAS, the shortlisted artists would then be tasked with proposing art pieces
consistent with the City’s Public Art plan, which the PAAB would review and provide
recommendations to the City Commission for two or three art works to be commissioned; and
WHEREAS, final decision on art pieces and contracting will be the decision of the City
Commission;
WHEREAS, the PAAB and the City Administration request that the City Commission
approve the “short list” of artists.
2 RESOLUTION #2025-_____
NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1.That the foregoing “WHEREAS” clauses are ratified and confirmed as
being true and correct, and they are made a specific part of this Resolution.
Section 2. That the City Commission adopts the short list of artists as identified in this
Resolution to work with the PAAB and administration in proposing two to three works of art
consistent with the City’s Public Art plan.
Section 3.That all resolutions or parts of resolutions in conflict with this resolution
are repealed to the extent of such conflict.
Section 4.That this Resolution shall be effective 10 days after passage.
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
___________________________________
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
NATE MOHLER
I believe Dania Beach would be perfect for a temporary installation
series I’m working on called Solar Obelisks—a field of semitransparent
and refractive light sculptures crafted
from recycled plastic, designed to be both visually striking and
environmentally conscious. Each obelisk is 3D printed and embedded
with addressable LEDs and sound, programmed with ambient
light sequences that shift subtly throughout the day. The sculptures are
weatherproof, modular, and self-contained, intended to spark curiosity
and offer a peaceful gathering space. Beyond
aesthetics, the piece celebrates renewable energy and circular design
by integrating solar-powered lighting systems in collaboration with Solar
Punks.
NATE MOHLER
Solar Obelisks
Solar Obelisks are a series of illuminated sculptures that serve as planetary antennas— harvesting solar
power during the day and glowing with stored energy at night. Made from
recycled PLA and fabricated using a large-format robotic arm 3D printer, each obelisk varies in
form, size and style, with a couple crowned by a radiant, Chihuly-inspired “solar flare.” Installed on water,
their reflections create a dynamic interplay of light and water, evoking the presence of unseen cosmic
forces. The work channels the back and forth relationship between earth and sun, human and nature—
echoing ancient monuments that once marked time, light, and spiritual alignment. Born and raised in Los
Angeles, Mohler draws from the legacy of the California Light and Space Movement. Solar Obelisks
reimagine perception through the lens of environmental consciousness and renewable energy. Like James
Turrell and Helen Pashgian before, the project explores how transparent materials and light can elicit
emotion, space, and awareness—but with a contemporary twist: the use of sustainable materials, solar
power, and digital fabrication. These glowing totems become symbols of both technological progress and
ecological reverence—embodying the sun’s radiance as a poetic ritual and a call for planetary reflection.
Culver Current is a permanent public art
Installation located in the Dale Jones Courtyard of Culver City Hall.
“Questions for the Curious Orchard” by Nate
Mohler, is a site-specific public art installation
SONATA
KAZIMIERATIENE
SONATA
I propose a vibrant, collaborative mosaic mural titled "The Ocean in a Drop," inspired by
Rumi’s quote: “You are not a drop in the ocean; you are the entire ocean in a drop.”
This poetic metaphor, paired with the ripple effect concept, lies at the heart of the
design. The mural will celebrate both the uniqueness of the individual and the creative
power of a connected community—mirroring the city’s evolving identity and its
relationship to the natural marine environment.
Project Vision & Flexibility:
This artwork is location-flexible and adaptable in scale and budget, depending on the
final dimensions and site selected. The concept is suitable for any large, publicly visible
exterior wall or facade. It will feature hundreds of hand-crafted ceramic circles made by
local participants. These “drops” will radiate outward like ripples, forming an abstract
oceanic image that evokes unity, movement, and collective expression.
Community Engagement:
A central pillar of this project is deep, inclusive community participation. I will lead a
series of workshops in collaboration with city partners, schools, and local organizations.
Participants of all ages will be invited to design their own ceramic “drop,” imprinting their
stories through texture, symbols, drawings, or patterns. These pieces will be
professionally glazed, fired, and permanently installed as part of the final mural. This
process invites personal reflection, celebrates identity, and fosters civic pride while
creating a legacy artwork that belongs to everyone.
Medium & Site Requirements:
•Material: Kiln-fired ceramic tile and glazes, designed for long-term outdoor durability
•Construction: Hand-built ceramic pieces assembled into a cohesive large-scale
design
•Installation: Secure, weather-resistant mounting suitable for exterior use
The ceramic medium is naturally weatherproof and highly durable. There are no
specific site requirements for the mural beyond a suitable surface for mounting.
However, art lighting would enhance visibility after sunset, highlighting the texture
and depth of the ceramic work and extending the public’s ability to enjoy the piece into
the evening hours.
Why Dania Beach:
This mural aligns with your goals to enhance public spaces, promote artist-led
engagement, and celebrate Dania Beach’s unique coastal identity. It is not just a visual
statement but a participatory experience, rooted in inclusivity, expression, and lasting
connection.
Thank you for considering my proposal. Warm regards,
SUJIN LIM
Sujin Lim Project Statement and Description
For the Creative Visions: Dania Beach Public Art Initiative, I propose a permanent
public sculpture titled Silver Lining with Corals. This work consists of a cloud
shaped human body accompanied by two small coral shaped pieces. The human
form suggests a dreamer thinking, while the coral shapes evoke the beauty of marine
ecosystems, offering a quiet tribute to Dania Beach's natural environment and
cultural spirit.
The installation is designed for a prominent and accessible outdoor location such as
a public park, near a civic building, or along a neighborhood pathway. It is intended
as a long term presence that invites people to sit nearby, reflect, take photos, or
gather around. Fabricated in durable, weather resistant materials, the sculpture will
be built to withstand environmental exposure and continuous public interaction.
Lighting elements may be included to gently illuminate the work at night, enhancing
its visibility and atmosphere.
Community connection is central to this project. Prior to installation, I hope to
collaborate with local organizations, schools, or storytellers to host short workshops
or conversations around memory, dreams, and the sea.
\While the call emphasizes temporary projects, this proposal demonstrates how a
permanent sculpture can achieve similar goals through subtle and enduring
engagement.
OSRS MURALS
OSRS has (2) concepts to propose. The first is a TOURISM SERIES
mural. These follow a formula we have developed that incorporates
large dimensional letters of a location surrounding by imagery that
represents that location. These are a more community engaged mural in
that color schemes and imagery elements can be decided via community
poles/meetings. The second concept is a
CREATIVE AESTHETIC mural. This mural will be based on the creative
look our company has come up with to represent ourselves, “our look”
if you will. This can also contain community engagement elements by
having
community members supply bullet points for us to use in our designing.
We have PDF portfolios to include that represent both concepts. Both
concepts can be made to fit most any wall space, and the bigger the
better.
We do not incorporate any electrical elements into our
murals, so power is not necessary. Our install time is based on the size
of the wall, rarely do we exceed 2-5 day install times given our highly
professional five member install team. The design process is more
significant and carries a 30–90 day window based on back and forth with
community members.
JASON TETLAK
Jason Tetlak
RUSSELL MASON
TIMOTHY ROBERT
XAVIER CORTADA
XAVIER CORTADA- The Underwater: Dania Beach
Through The Underwater: Dania Beach, I propose a participatory, multi-phase public art
activation that spans murals, temporary installations, pop-ups, and a culminating permanent
sculpture—all designed to build environmental awareness and encourage civic engagement
around climate change and sea level rise.
At the heart of the project is a simple but powerful act—displaying one’s elevation above sea
level. Participants will be invited to claim a free, customized Underwater Yard Sign that
displays their home’s or business’s elevation. These elevation markers feature a background
image of one of my original Antarctic Ice Paintings, created using ice and sediment collected
during a National Science Foundation expedition to the South Pole. The signs also include a
QR code, allowing anyone who sees them to scan and instantly access educational resources.
Working in close collaboration with the Cortada Foundation, we will stage temporary pop-up
events across the city under the banner of “Elevation Station” — a mobile education and art-
making hub. These activations can appear at the Dania Beach Pier, Frost Park, and
especially Dania Pointe during events like the Night Market and Family Sundays on the Lawn.
At these events, residents can learn their elevation, personalize their yard sign, get a “HELLO
my elevation is ” sticker, win a limited-edition Underwater t-shirt, and join the citywide
public art intervention. We will also engage local volunteers to work with Dania Beach
businesses—particularly in Dania Pointe—to display elevation signs in their front windows or
green space.
Alongside these distributed markers, we will install Underwater-themed banners along US-1
and other key streets to spark awareness. Finally, the project will culminate in the creation of a
permanent sculpture, crafted from powder-coated aluminum, that memorializes the city’s
current elevation and celebrates those who took part. This public artwork could be placed at
City Hall or Frost Park, and will serve as a lasting educational landmark..
Community Engagement
Community engagement is integral. Our Elevation Station pop-ups
will serve as interactive hubs where residents can learn and
participate, while the yard signs, stickers, and t-shirts act as both
educational tools and visual statements. By decentralizing the artwork
across yards, parks, and businesses, we create a citywide gallery that
makes climate science visible in everyday spaces.
Throughout the project, we will work in collaboration with local
schools, volunteers, and nonprofit partners to ensure inclusive
engagement and broad participation, especially in neighborhoods
not typically included in creative programming.
RESOLUTION NO. 2025-______
A RESOLUTION OF THE CITY COMMISSION OF THE DANIA BEACH,
FLORIDA, PERTAINING TO RESOLUTION 2024-79, WHICH MODIFIED
RESOLUTION 28-85, AND PRESCRIBES RULES OF PROCEDURE FOR
CITY COMMISSION MEETINGS; AMENDING THE RULES TO LIMIT THE
NUMBER OF PRESENTATIONS REQUESTED BY ELECTED OFFICIALS TO
TWO, PER MEETING, WITH NO TIME LIMIT; PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, City staff periodically updates its procedures, working towards best practices
for the expedient, transparent and efficient addressing of City business; and
WHEREAS, The City Commission desires to amend the Rules of Procedure for meetings
so as to limit the number of presentations requested by elected officials from one to two, with no
time limit; and
WHEREAS, the City seeks to create rules relating to presentations during City
Commission meetings.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1.Attached and incorporated by reference as Exhibit 1, are the proposed
amended Rules for City Commission meetings.
Section 2.That all resolutions or parts of resolutions in conflict with this resolution
are repealed to the extent of such conflict
Section 3.That this Resolution shall be effective 10 days after passage.
SIGNATURE PAGE TO FOLLOW
2 RESOLUTION #2025-______
PASSED AND ADOPTED on __________________, 2025.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
3 RESOLUTION #2025-______
EXHIBIT 1
AMENDED RULES FOR CITY COMMISSION MEETINGS
Section 1. AUTHORITY
1.1 Charter: The Charter of the City of Dania Beach provides that: “The Commission shall
prescribe its own rules, regulations and order of business, and shall keep minutes of its
proceedings”. (Part II, Article 7, Section 5) Accordingly, the following rules shall take effect
immediately upon adoption by the City Commission and shall remain in effect until such time as
new rules are adopted by the City Commission.
Section 2. DEFINITIONS
2.1: For the purpose of these rules the word “Mayor” shall include the Vice Mayor and the
Mayor pro tem, when appropriate; the word “Commission” shall mean City Commission; and the
word “City” shall mean the City of Dania Beach, Florida.
Section 3. GENERAL RULES
3.1 Meetings to be Public: All official meetings of the Commission, except where state and
local law allows executive sessions for certain limited topics, shall be public. The minutes of the
proceedings, except those for the said executive sessions, shall be open to public inspection. Public
meetings may include virtual public meetings, with appearances by elected officials and the public
by virtual means. A majority of all members of the City Commission shall constitute a quorum.
3.2 Quorum and Vote: A majority of all members of the City Commission shall constitute
a quorum but a less number may adjourn from day to day and compel the attendance of absent
members in such manner and under such penalties as may be prescribed by ordinance. The
affirmative vote of three (3) members shall be necessary to pass any ordinance on a reading or
adopt a resolution, and the passage of all ordinances and resolutions shall be taken by yeas and
4 RESOLUTION #2025-______
nays and entered upon the minutes. (Part II, Article 7, Section 6, City Charter). The City may
convene a quorum, virtually, as provided under the City Charter and City Code.
3.3 Minutes of Proceedings: An account of all proceedings of the commission shall be kept
by the City Clerk.
3.4 Ordinances and Resolutions Confined to One Subject: Each ordinance or resolution
shall be introduced in writing and shall embrace but one subject and matters properly connected
therewith. The subject shall be clearly stated in the title. (Section 166.041(2), Florida Statutes)
3.5 Right of Floor: Any member desiring to speak shall be recognized by the Mayor and
shall confine his or her remarks to the subject under consideration or to be considered.
3.6 City Manager: The City Manager shall attend all meetings of the Commission unless
excused. The City Manager may make recommendations to the Commission and shall have the
right to take part in all discussions of the Commission but shall have no vote.
3.7 City Attorney: The City Attorney shall attend all meetings of the Commission unless
excused and shall, upon request, give opinions, either written or oral, on questions of law. The City
Attorney shall act as the Commission’s parliamentarian.
3.8 City Clerk: The City Clerk shall attend all meetings of the Commission unless excused
and shall keep the official minutes and perform such other duties as may be required.
3.9 Officers and Employees: Department heads of the City, when there is pertinent business
from their departments on the agenda, shall attend such Commission meetings when requested by
the City Manager. The police chief or a designated subordinate shall attend all Commission
meetings.
3.10 Rules of Order: "Roberts Rules of Order Revised" shall govern the proceedings of the
commission in all cases, unless they are in conflict with these rules.
5 RESOLUTION #2025-______
3.11 Presentations: Each Commissioner presentation should be limited to two
presentations, per Commissioner, per meeting with no time limit as to the presentation. no more
than seven (7) minutes per presentation, and one presentation per meeting. The Administration is
not limited in time or number of presentations but shall taken into consideration the length of the
agenda before scheduling presentations. Waiver of these rules shall require a motion and vote of
the Commission.
3.12 Backup Documents. Consistent with the requirements of Broward County Section
1.07, which provides, that all municipalities shall provide all notices, agendas, and “available” back
up materials at least 48 hours in advance, the City Commission shall require back up on all
presentations, agenda items, discussion items, etc. for the City Commission meetings be provided
in advance, and as part of the agenda back up, or at a minimum, distributed to city commission and
available to the public at least 48 hours in advance of the meeting to which the item is to be
approved, discussed or presented. Failure to provide back up shall result in the item not being
heard, and the item will be rescheduled for a future agenda, once the back up is available. This
requirement can only be waived by a 4/5 vote of the City Commission.
Section 4. TYPES OF MEETINGS
4.1 Regular Meeting: The Commission shall meet in the Commission Chambers for
regular, adjourned and special meetings. The regular Commission meetings are to commence at
7:00 P.M., on the second and fourth Tuesday of each month, unless otherwise specified at least
two (2) weeks in advance.
4.2 Biennial Organizational Meeting: On the first Tuesday following each biennial regular
election, the City Commission shall meet at the usual place for holding the meetings of the
legislative body of the City, at which time the newly elected City Commissioners shall take the
6 RESOLUTION #2025-______
prescribed oaths of office and assume the duties of their respective offices. (Part II, Article 7,
Section 1, City Charter)
4.3 Special Meeting to Seat a New Member: On the first Monday following the election of
a new member, elected at other than a bi-ennial regular election, the Commission shall meet to
receive such new member. (Part II, Article 7, Section 2, City Charter)
4.4 Special Meetings: The Mayor, any two (2) members of the City Commission or the
City Manager may call special meetings of the City Commission upon at least six (6) hours written
notice to each member, the City Manager, City Clerk, and City Attorney, served personally or
delivered electronically via e-mail. The regularity or validity of any proceedings, taken at any
special meeting at which a majority of members of the City Commission and the City Clerk are
present shall not be questioned on account of any omission or irregularity in calling such a special
meeting. The call for a special meeting shall specify the day, the hour and the location of the special
meeting and shall list the subject or subjects to be considered. Only such business may be
transacted at a special meeting as may be listed in the call for said meeting or an incident thereto.
4.5 Adjourned Meetings: Any meeting of the Commission may be adjourned to a later date
and time, provided that no adjournment shall be for a longer period than until the next regular
meeting.
4.6 Workshop Meetings: The Commission may meet informally in workshop meetings
(open to the public) at the call of the Mayor, or any two (2) members of the Commission or City
Manager, to review forthcoming programs of the City, receive progress reports on current
programs or projects, or receive similar information from the City Manager. No vote or polling of
the Commissioners shall be taken at said workshop meetings.
7 RESOLUTION #2025-______
4.7 Emergency Meetings: Emergency meetings may be held on the call of the Mayor, two
(2) members of the Commission or the City Manager whenever there is a public emergency
affecting life, health property or the public peace, and whenever practicable, upon no less than one
(1) hour notice to each member and the public.
4.8 Attendance of Media at Commission Meetings: All official meetings of the City
Commission and its committees shall be open to the media, freely subject to recording by radio,
television and photographic services at any time, provided that such arrangements do not interfere
with the orderly conduct of the meetings.
Section 5. PRESIDING OFFICER
5.1 Running the Meetings: The mayor-commissioner, if present, shall preside at all
meetings of the commission. In the absence of the mayor, the vice mayor shall preside. In the
absence of the mayor and the vice mayor, any member of the city commission may be designated
as mayor pro tem for such meeting. The mayor shall have a vote in the proceedings of the city
commission and shall vote last upon roll call. (Part III, Article 2, Sections 2 & 3(a), City Charter)
5.2 Call to Order: The meetings of the Commission shall be called to order by the Mayor,
or in his or her absence, by the Vice Mayor. In the absence of both the Mayor and the Vice Mayor,
the meeting shall be called to order by the City Clerk for the selection of a Mayor pro tem from
any of the Commissioners present.
5.3 Preservation of Order: The Mayor shall preserve order and decorum; and, confine the
debate of the Commissioners and the public to the question under discussion.
5.4 Points of Order: The Mayor shall determine all points of order, subject to the rights of
any member to appeal to the Commission. If any appeal is taken, the question shall be, "Shall the
decision of the Mayor be sustained?"
8 RESOLUTION #2025-______
5.5 Questions to be Stated: The Mayor shall state all questions submitted for a vote and
announce the result. A roll call vote shall be taken for the adoption of an ordinance or resolution.
A roll call vote may be taken on matters other than ordinances and resolutions upon the request of
any member of the Commission.
5.6 Substitution for Mayor: The Mayor may call on the Vice Mayor to temporarily conduct
the meeting in order to make a motion. Such substitution shall not continue beyond the action on
that motion.
Section 6. ORDER OF BUSINESS AND AGENDA
6.1 Order of Business: The general rule as to the order of business in regular meetings shall
be as follows:
1. Call to Order/Roll Call
2. Moment of Silence and Pledge of Allegiance
3. Presentations and Special Event Approvals
4. Proclamations
5. Administrative Reports
6. Public Safety Reports
7. Citizens’ Comments
8. Consent Agenda
9. Bids and Requests for Proposals
10. Quasi-Judicial Hearings
11. First Reading Ordinances
12. Second Reading Ordinances
13. Discussion and Possible Action
14. Appointments
15. Commission Comments
16. Adjournment
6.2 Agenda: The order of business of each meeting shall be as contained in the agenda
prepared under the direction of the City Manager or his designee. The agenda shall be a listing by
topic of subjects to be considered by the Commission and shall be delivered to members of the
Commission each Thursday preceding the meeting to which it pertains.
9 RESOLUTION #2025-______
6.3 Presentation by Members of Commission: The agenda shall provide a time when the
mayor or any Commissioner may bring before the Commission any business that he/she feels
should be deliberated upon by the Commission. The matters need not be specifically listed on the
agenda, but formal action on such matters shall be deferred until a subsequent Commission
meeting, except that immediate action may be taken upon a vote of a majority of all members of
the Commission present.
6.4 Approval of Minutes: The minutes of a Commission meeting may be approved on the
consent agenda if the City Clerk previously furnished each member with a copy thereof.
Section 7. ORDINANCES, RESOLUTIONS AND MOTIONS
7.1 Form: Ordinances and resolutions shall be presented to the commission in printed or
electronic form.
7.2 City Attorney to Approve: All ordinances and resolutions shall be "Approved as to
Form and Correctness" by the City Attorney. Such approval shall be so indicated by signature on
the last page of the ordinance or resolution once approved and/or adopted by the City Commission,.
7.3 City Manager to Review: All ordinances and resolutions shall be reviewed by the City
Manager. Such review shall be so indicated by recommendation included in the agenda backup
material presented to the Commission.
7.4 Distribution of Ordinances and Resolutions: The city manager or his designee shall
have copies of all proposed ordinances prepared for distribution to all members of the Commission
with the agenda backup material for the Commission meeting at which the ordinance is to be
introduced.
7.5 Ordinances Deferred, Emergencies: Ordinances introduced at a commission meeting
on first reading shall not be finally acted upon no sooner than the next official meeting of the
10 RESOLUTION #2025-______
commission; except that an emergency ordinance may be acted upon on first and second readings
at the same meeting by an affirmative vote of at least two-thirds (four [4] members) of the
commission.
7.6 Reading by Title Only: Upon being introduced, each proposed ordinance shall be read
by title only, unless any member of the Commission requests a full reading of the ordinance.
7. 7 Consideration of Ordinances: Each proposed ordinance shall be read by title or in full
two times. Except in case of a bill for an emergency ordinance, not more than one such reading
shall be on the same day, and at least ten (10) days shall elapse between introduction and final
passage.
7.8 Recording of Votes: The yeas and nays shall be taken upon the passage of all ordinances
and resolutions and entered upon the official record of the Commission. (Section 166.041(4),
Florida Statutes)
7.9 Majority Vote Required: An official vote of a majority of a quorum present is necessary
to pass a motion, except that 2/3 (4 members) of the membership of the Commission is required
to adopt an emergency ordinance.
7.10 Tie Vote: In the event of a tie in votes on any motion, the motion shall fail.
7.11 Numbering Ordinances and Resolutions: Upon passage, a number shall be assigned
to each ordinance or resolution by the City Clerk.
7.12 Ordinance and Resolution Passage Procedure: When passed by the Commission, all
ordinances and resolutions shall be signed by the Mayor and be attested by the City Clerk and it
shall be immediately filed and thereafter preserved in the office of the City Clerk.
7.13 Requests for Ordinances or Legal Opinions: Any member of the City Commission
may request the City Manager to have prepared proposed ordinances with such ordinances to be
11 RESOLUTION #2025-______
placed on the agenda of the next scheduled Commission meeting, provided the ordinance can be
drafted and distributed to members of the Commission in accordance with time schedules set forth
in 7.4 of these rules, Any member of the City Commission may request verbal or written legal
opinions relating to City business from the City Attorney.
7.14 Voting Conflicts: No member of the City Commission may vote in his or her official
capacity upon any measure which insures to his/her special private gain and shall, prior to the vote,
publicly state to the assembly, the nature of his/her interest in the matter from which he/she is
abstaining and within fifteen (15) days after the vote, file a memorandum of voting conflict with
the City Clerk who shall incorporate it into the minutes.
Section 8. CREATION OF COMMITTEES, BOARDS & COMMISSIONS
8.1 Citizen Committees, Boards and Commissions: The Commission may create
committees, boards and commissions to assist in the conduct of the operation of the City
government with such duties as the Commission may specify not inconsistent with the City Charter
or City Code.
8.2 Membership and Selections: Membership and selection of members shall be as
provided by the Commission if not specified by the City Charter or City Code. Any committee,
board or commission so created shall cease to exist upon the accomplishment of the special
purpose for which it was created, or when abolished by a majority vote of the Commission. No
committee so appointed shall have powers other than advisory to the Commission, except as
otherwise specified by the City Charter or City Code. A volunteer membership list shall be
established and distributed to the City Commission to aid in their selection of board, committee
and commission members.
12 RESOLUTION #2025-______
8.3 Removal of Members of Boards, Committees and Commissions: The Commission may
remove any member of any board, committee or commission which it has created or as created by
the City Charter by a vote of at least a majority of the Commission.
Section 9. CITIZEN'S COMMENTS AS AN AGENDA ITEM
9.1 Addressing the Commission: A thirty (30) minute “Citizen Comments” period shall be
designated on the agenda for citizens and interested persons to speak on matters whether or not
scheduled on that day’s agenda. Individuals wishing to speak on a matter not included on the
“Public Hearing” section of the agenda, which matter pertains to an item before the City
Commission which requires a decision of the City Commission, may do so by submitting a form
to that effect with the City Clerk prior to the meeting. Speakers at Public Hearings shall also
submit such a form. Each speaker shall be limited to 3 minutes for his or her comments. If more
than ten (10) speakers express a desire to speak, the Commission shall determine on a meeting by
meeting basis whether to (a) extend the time allotted for citizen comments to accommodate all
speakers, or (b) whether to limit the number of speakers or amount of time per speaker. A
speaker’s time shall not be transferable to another speaker.
Comments may be heard virtually when there is a need for City Hall and the Commission
Chambers to be closed to the public.
There are many airborne illnesses which people can contract by virtue of being in close
contact with one another and therefore, as on ongoing exercise of the general police power and
proprietary authority of the City, the City may from time to time, through the powers granted to
the City Manager, require that certain health measures be implemented, regardless of the existence
of any emergency order(s). Therefore, the City Manager may close Commission Chambers to
public participation and may instead authorize virtual attendance and participation of employees
13 RESOLUTION #2025-______
and the public at large at City Commission meetings. The City Commission may appear virtually
at the public meeting. The City Manager may require visitors to City Hall, whether to individual
departments or to Commission Chambers, to be temperature checked, may require masks to be
worn, and may require social distancing of six (6) feet to be maintained between persons. Failure
to comply with these measures after advance warning will result in a request to leave the premises
and if there is no compliance, removal of the employee or member of the public failing to comply
with the temperature checks, mask requirements, or social distancing may be undertaken.
9.2 Manner of Addressing the Commission - Time Limit: Each person addressing the
Commission shall step up to the microphone, shall give his/her name and address in an audible
tone of voice for the record and, unless further time is granted by the Commission, shall limit
his/her comments to three minutes. All remarks shall be addressed to the Commission as a body
and not to any member thereof. No person other than members of the Commission, City Manager
and the person having the floor shall be permitted to enter into any discussion, either directly or
through the members of the Commission. When requested by any member of the Commission, the
City Manager, City Attorney, as well as staff members, may enter into discussion. No questions
shall be asked by the Commissioners, except through the Mayor.
9.3 Personal and Slanderous Remarks: Any person making personal, impertinent
slanderous remarks, or who shall become boisterous, while addressing the Commission, may be
required to leave the meeting and may be barred by the Mayor from further audience before the
Commission.
9.4 Reading of Protests: Interested persons or their authorized representatives, may address
the Commission for the reading of protests, petitions, or communications relating to any matter
14 RESOLUTION #2025-______
over which the Commission has control when the item is under consideration by the Commission,
if a majority of the Commission present agrees to let them be heard.
9.5 Written Communications: Interested parties or their authorized representatives, may
address the Commission by written communication in regard to any matter concerning the City's
business or over which the Commission has control at any time by direct mail, electronic mail, or
by addressing such communication to the City Clerk who will distribute copies of same to the
Commissioners.
Section 10. SUSPENSION AND AMENDMENT OF THESE RULES
10.1 Suspension of These Rules: Any provision of these rules not governed by the City
Charter, State Statutes or City Code, may be temporarily suspended by a vote of a majority of the
Commission.
10.2 Amendment of These Rules: These rules may be amended or new rules adopted, by a
majority vote of all members of the Commission, provided that the proposed amendments or rules
shall have been introduced into the record at a prior Commission meeting.
City of Dania Beach
City Attorney Memorandum
DATE: 7/8/2025
TO: Mayor and Commissioners
FROM: Eve Boutsis, City Attorney
VIA:
SUBJECT: Access to Construction Site of Gymnasium at CW Thomas Park for Tamara James
Request:
Former Mayor Tamara James is requesting access to the Gymnasium as it is being built.
Enclosed is the form “Construction Site Access Waiver” form to be completed by Former Mayor
James and any other persons going on site. I do not have any information on who will be going
on site.
The City Administration has not authorized persons to visit active construction sites. It is a City
Commission decision to entertain the request.
Background:
N/A
Budgetary Impact
No budgetary impact anticipated. The property would be placed back on the tax rolls.
Recommendation
N/A
WAIVER OF LIABILITY AND RELEASE
The Undersigned has requested to be permitted access to the Construction Sites for the above-named Construction Program. The Undersigned
agrees and represents that he/she is aware that there are ongoing construction activities at the Construction Sites. The Undersigned further agrees
and represents that construction sites are a dangerous environment, including the above-referenced Construction Site, despite the precautions for
safety taken by the City of Dania Beach and its Contractor, its subcontractors, or others performing work at the construction site. In consideration
of being granted the right to access the Construction Sites, the Undersigned has agreed to execute this Waiver of Liability and Release and be bound
by the terms hereof.
WHEREFORE, the Undersigned, for himself and for his personal representatives, heirs, next of kin, and assigns, acknowledges and agrees:
1. The Undersigned acknowledges that he/she fully understands that construction and other activities at the Construction Sites are dangerous and
involve risks of serious injury, death, and/or property damage.
2. To the fullest extent permitted by law, the Undersigned (and on behalf of the Undersigned’s personal representatives, heirs, next of kin, and
assigns) RELEASES, WAIVES AND DISCHARGES, AND COVENANTS NOT TO SUE, the City of Dania, any contractor or subcontractor
or person engaged by any of them to perform any work or services at the Construction Site, and their officers, directors, stockholders, members,
employees, representatives, agents, employees, parents, subsidiaries, sureties, insurance companies, affiliates, partners, joint ventures, attorneys,
predecessors, successors, and assigns (collectively, the “Releasees”) from any and all damages, losses, penalties, liabilities, costs, attorney’s fees
and expenses of any nature, and any demands, claims, suits, and causes of action therefor, arising out of or resulting from the Undersigned’s
presence at the Construction Site.
3. The Undersigned ASSUMES FULL RESPONSIBILITY FOR, AND RISK OF, INJURY TO HIS/HER PERSON OR HIS DEATH or
damage to his/her property, whether caused by the negligence of the Releasees or otherwise, occurring during or as a result of the Undersigned’s
presence at the Construction Site.
4. To the fullest extent permitted by law, the Undersigned shall indemnify, defend and hold harmless the City of Dania Beach any contractor or
subcontractor or person engaged by any of them to perform any work or services at the Construction Site, and their officers, directors, stockholders,
members, employees, representatives, agents, employees, parents, subsidiaries, sureties, insurance companies, affiliates, partners, joint ventures,
attorneys, predecessors, successors, and assigns (collectively, the “Indemnitees”), from and against any and all demands, claims, suits, causes of
action, damages, losses, penalties, liabilities, costs, attorney’s fees and expenses of any nature, arising out of or resulting from the Undersigned’s
presence at the Construction Site. This indemnity obligations shall not be construed to negate, or abridge, or otherwise reduce any other right or
obligation of indemnity which would otherwise exist under law except to the extent that it is caused by the sole negligence of any party indemnified
hereunder in which case this obligation shall not apply relative to such indemnified party.
5. The Undersigned acknowledges that he/she has sole responsibility to evaluate carefully the risks inherent in accessing the Construction Site and
that he/she has fully considered those risks, including, without limitation, dangers posed by willful or negligent conduct of himself/herself and/or
by others.
6. The Undersigned acknowledges and voluntarily assumes full responsibility for, and full risk of, property damage or loss, or bodily, mental, or
personal injury, including death, relating to his/her presence at the Construction Site.
7. The Undersigned agrees that if any portion of this document is held invalid, the remaining provisions shall be binding and continue in full force
and effect.
I have read this Waiver of Liability and Release carefully, understand its significance, and voluntarily agree to all of its terms.
Signed Visitor Name: _________________ Date:_____________________________
Visitor Name (print): __________________________________________________
Full Mailing Address:__________________________________________________
Email Address: _______________________________________________________
Phone ______________________________________________________________
Emergency Contact Person: _____________________________________________
Emergency Contact Phone:
Construction Program: Gymnasium
Construction sites to visit located at CW Thomas Park,
in the City of Dania Beach, Florida, located at
approximately 800 NW 2nd Street, Dania Beach, Florida.
Owner: City of Dania Beach