Loading...
HomeMy WebLinkAboutItem 3.2 FDOT Standalone Landscape ProjectFDOT Standalone Landscape Project State Road (S.R.) 9 / I-95 from Hollywood Blvd. to Davie Blvd. FPID #409354-4 I-95 from Hollywood Blvd. to Davie Blvd. Project Location: -The project is located along I -95 (SR 9) from Hollywood Blvd to Davie Blvd, predominantly within the I -95 right of way. -Project Length – 7.84 Miles -Limits of interest for the City of Dania Beach include: -Stirling Road Interchange (North Half, split with City of Hollywood) -Griffin Road Interchange (Entire Interchange) I-95 from Hollywood Blvd. to Davie Blvd. Dania Beach Maintenance Locations: I-95 from Hollywood Blvd. to Davie Blvd. Project Overview: -Project to follow the roadway construction associated with the I - 95 Express Lanes Phase 3C Project. -Standalone Landscape Project programmed/funded to provide landscape restoration within the interchanges and buffering along the I-95 corridor. Primary focus of the landscaping within the interchanges is to restore removed and relocated landscaping. -Landscape and irrigation (if proposed) installation within the arterial medians and elevated landscaping with the interchanges is dependent on execution of Maintenance Memorandum of Agreement (MMOA) with the local agency. -The Landscape Design Concepts are provided on the following slides. I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Stirling Rd. Arterial and Interchange I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Stirling Rd. Arterial and Interchange I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Stirling Rd. Arterial and Interchange I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Griffin Rd. Arterial and Interchange I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Griffin Rd. Arterial and Interchange I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Griffin Rd. Arterial and Interchange I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Griffin Rd. Arterial and Interchange I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Griffin Rd. Arterial and Interchange I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Plant Palette I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Plant Palette – Trees & Shrubs QV - Live Oak BS – Gumbo Limbo FS – Floss SilkPO – Sycamore CSP – Kapok TreeAG – Pond Apple ZF – Cardboard Palm CI – Cocoplum I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Plant Palette – Palms CH - European Fan Palm VM – Single MontgomerySR - Saw Palmetto HV – Spindle Palm VM2 – Double Montgomery PEA – Solitaire Palm I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Existing Maintenance Map - Stirling I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Existing Maintenance Map - Stirling I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Existing Maintenance Map - Stirling I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Proposed Maintenance Map - Stirling I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Existing Maintenance Map - Griffin I-95 from Hollywood Blvd. to Davie Blvd. Design Concepts: Proposed Maintenance Map - Griffin US-1 from Silver Beach Rd to Palmetto Dr Next Steps: -As stated, the project requires maintenance commitments from Dania Beach to move forward with installation within the arterial medians and additional enhancements at the interchanges. -The MMOA (Maintenance Agreement) has been developed and is pending City/Council execution. Thank You Questions or comments? Greg Jett, PE FDOT Project Manager Aaron Wilbur, PLA Consultant Project Manager