HomeMy WebLinkAboutR-2026-082 SE Drainage Project Change Order No. 1 - RicManRESOLUTION NO. 2026-082 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, APPROVING CHANGE ORDER NO. 01 IN THE AMOUNT OF ONE HUNDRED EIGHTY-THREE THOUSAND THREE HUNDRED NINETY-NINE DOLLARS AND EIGHTY-THREE CENTS ($183,399.83) TO THE AGREEMENT WITH RIC-MAN CONSTRUCTION FLORIDA, INC. FOR THE SOUTHEAST DRAINAGE RETROFIT PROJECT – PHASE 2; AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 01; PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Commission previously approved the Agreement with Ric-Man Construction Florida, Inc. for the construction of the Southeast Drainage Retrofit Project – Phase 2; and WHEREAS, during construction, unforeseen field conditions, utility conflicts, and operational requirements were encountered that required additional work and modifications to maintain the progress and functionality of the Project; and WHEREAS, Change Order No. 01 includes additional work associated with drainage structure modifications, deep well and injection well system adjustments, bypass installation at Pump Station #02, and related time and material work activities; and WHEREAS, the Project includes a contingency allowance in the amount of Two Million Dollars ($2,000,000.00) to address unforeseen conditions and additional work necessary for successful completion of the Project; and WHEREAS, approval of Change Order No. 01 in the amount of One Hundred Eighty- Three Thousand Three Hundred Ninety-Nine Dollars and Eighty-Three Cents ($183,399.83) will utilize a portion of the available contingency, leaving a remaining contingency balance of One Million Eight Hundred Sixteen Thousand Six Hundred Dollars and Seventeen Cents ($1,816,600.17); and WHEREAS, the City Commission finds that approval of Change Order No. 01 is in the best interest of the City and necessary to ensure completion of the Southeast Drainage Retrofit Project – Phase 2. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: 2 RESOLUTION #2026-082 Section 1. That the above “Whereas” clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That the City Commission hereby approves Change Order No. 01 to the Agreement with Ric-Man Construction Florida, Inc. for the Southeast Drainage Retrofit Project – Phase II in the amount of One Hundred Eighty-Three Thousand Three Hundred Ninety-Nine Dollars and Eighty-Three Cents ($183,399.83). Section 3. That the City Commission acknowledges that, following approval of Change Order No. 01, the remaining available contingency balance for the Project will be One Million Eight Hundred Sixteen Thousand Six Hundred Dollars and Seventeen Cents ($1,816,600.17). Section 4. That the City Manager is hereby authorized to execute Change Order No. 01 and any related documents necessary to implement the intent of this Resolution. Section 5. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 6. That this Resolution shall become effective immediately upon its passage and adoption. PASSED AND ADOPTED June 23, 2026. Motion by Vice Mayor Salvino, second by Commissioner Rimoli. FINAL VOTE ON ADOPTION: Unanimous X Yes No Commissioner Lori Lewellen ____ ____ Commissioner Luis Rimoli ____ ____ Commissioner Archibald J. Ryan IV ____ ____ Vice Mayor Marco Salvino ____ ____ Mayor Joyce L. Davis ____ ____ SIGNATURES TO FOLLOW 3 RESOLUTION #2026-082 ATTEST: ELORA RIERA, MMC JOYCE L. DAVIS CITY CLERK MAYOR APPROVED AS TO FORM AND CORRECTNESS: EVE A. BOUTIS CITY ATTORNEY CITY OF DANIA BEACH CHANGE ORDER Change Order No.: 01 Date: May 4, 2026 Project: SE DRAINAGE PHASE II Project No.: ITB 25-012 Contractor: Ric-Man Construction Florida, Inc. DESCRIPTION OF WORK: REASON: Following is the work included in this Change Order: 1. Modifications of Structures per Opening 2. T&M #1 3. T&M #2 4. T&M #3 5. Deep Well Casing, 24” 6. Stormwater Injection Well Pipe, PVC, 24” 7. T&M #4 8. T&M #5 9. T&M #6 10. Bypass – Pump Station 1. Modifications of Structures per Opening: Field conditions required modifications to 18 structures as detailed on Plan Sheets S-204D, S-204C, S-204B, S-204A, S-207, EX-214, S- 250A, EX-209, and S-203. 2. T&M #1: Unforeseen conflict with an existing 30" storm drainage line (RFI #1) required additional labor and equipment to resolve. 3. T&M #2: Additional unforeseen utility conflicts encountered during excavation. 4. T&M #3 (RFI-10): Extra work required to resolve conditions identified in RFI-10. 5. Deep Well Casing, 24" (100 LF): Subsurface conditions necessitated an additional 100 LF of 24" deep well casing beyond the contract quantity to achieve the required injection well capacity (255 GPM/ft actual vs. 240 GPM/ft design). 6. Stormwater Injection Well Pipe, PVC, 24" (86.5 LF): A discrepancy in the contract drawings (12" pipe mislabeled) resulted in a shortfall of 24" pipe quantity. An additional 86.5 LF was installed and billed under the correct pipe size. 7. T&M #4: An unforeseen concrete mass (abandoned structure/infrastructure) was encountered along the 18" Force Main alignment between IW-19 and IW-20, requiring chipping and removal. 8. T&M #5: A large, unforeseen concrete slab was encountered while installing 18" drainage pipe on SE 5th St. (between structures S-261 and S-263), requiring removal. 9. T&M #6 (RFI #6): An unforeseen condition at the T-connection near S-228 required modification and the installation of a new manhole (Type J-7) to eliminate the undesirable tee connection. 10. Bypass - Pump Station: A bypass connection similar to Phase 1 is required at Pump Station #02 for the Phase 2 force main connection, which was not included in the Phase 2 plans. SE Drainage Project -City of Dania Beach Change Order 01 GRA NTED TIME DUE TO DELAYS IN CRITICAL ACTIVITIES: 13 Calendar Days TOTAL COST OF WORK $183 ,399 .83 Change Order 06 -Cost Breakdown Item Description Qty. Unit Unit Price 1 Modifications of Structures 18 EA $566.3 0 2 T&M#1 1 LS $20,328.24 3 T&M#2 I LS $1,233 .20 4 T&M#3 I LS $7,566.72 5 Deep Well Casing, 24" 100 LF $541.00 6 Stormwater Injection Well 86.5 LF $43 5.00 Pipe, PVC, 24" 7 T&M#4 I LS $6,302.17 8 T&M#5 1 LS $8,333.50 9 T&M#6 I LS $16,709.10 10 Bypass -Pump Station I LS $21,006.00 Requested by: Recommended by: Concurrence: Approved by: Approved by: Approved by: ----------·- - -) _/,-/ / / TOTAL ----�---T-ys_o_n _D_i_P-et-r -i ll_o _____ _ Project Manager - R i c Man Construct i on, Inc. Qgll(,ys"gr.e-dby�sCast'ne'.ras Andres Castineiras !]..:;,.:s.;=:.�.::;��!l:';;��=; ON;2026.05.1113:19.40-04W Adrian Paris i Project Adm i n istrator -CEI Digitally signed by Luis.Soto1@wsp.com ON: CN=Luis.Soto1@wsp.com Luis .Soto 1 @wsp.com.::3:::��=�:�yq����li:, cost5 approved by City. Dare· 20260511 13"5108:04'00' Yeimy Guzman Chi ef F i nancial Off icer Candido Sosa Cruz City Manager - City of Dania Beach Page 2 of 2 Amount $10,193.40 $20,328.24 $1,233.20 $7,566.72 $54,100.00 $37,627.50 $6,302.17 $8,333.50 $16,709.10 $21,006.00 $183,399.83 5/11/26 Date 5/11/2026 Date 5/11/2026 Date Date Date