HomeMy WebLinkAbout2026-10-13 City Commission Meeting Agenda Packet
ANY PERSON WHO DECIDES TO APPEAL ANY DECISION MADE WITH REGARD TO ANY MATTER CONSIDERED AT THIS
MEETING OR HEARING WILL NEED A RECORD OF THE PROCEEDING, AND FOR SUCH PURPOSE MAY NEED TO ENSURE
THAT A VERBATIM RECORD OF THE PROCEEDING IS MADE WHICH RECORD INCLUDES THE TESTIMONY AND EVIDENCE
UPON WHICH THE APPEAL IS TO BE BASED.
LOBBYIST REGISTRATION IS REQUIRED. PRIOR TO ENGAGING IN ANY LOBBYING ACTIVITIES, WHETHER OR NOT
COMPENSATION IS PAID OR RECEIVED IN CONNECTION WITH THOSE ACTIVITIES, EACH LOBBYIST SHALL FILE WITH THE
CITY CLERK AN ANNUAL REGISTRATION STATEMENT AND PAY AN ANNUAL TWO HUNDRED FIFTY DOLLARS ($250.00)
REGISTRATION FEE FOR EACH PRINCIPAL OR EMPLOYER. REGISTRATION FORMS ARE AVAILABLE ON THE CITY WEBSITE:
WWW.DANIABEACHFL.GOV. (ORDINANCE #2012-019; AMENDED BY ORDINANCE #2019-019)
IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT, PERSONS NEEDING ASSISTANCE TO PARTICIPATE IN
ANY OF THESE PROCEEDINGS SHOULD CONTACT THE CITY CLERK'S OFFICE, 100 W. DANIA BEACH BOULEVARD, DANIA
BEACH, FL 33004, (954) 924-6800 EXTENSION 3624, AT LEAST 48 HOURS PRIOR TO THE MEETING.
IN CONSIDERATION OF OTHERS, WE ASK THAT YOU:
A. PLEASE TURN CELL PHONES OFF, OR PLACE ON VIBRATE. IF YOU MUST MAKE A CALL, PLEASE STEP OUT INTO THE
ATRIUM, IN ORDER NOT TO INTERRUPT THE MEETING.
B. IF YOU MUST SPEAK TO SOMEONE IN THE AUDIENCE, PLEASE SPEAK SOFTLY OR GO OUT INTO THE ATRIUM, IN
ORDER NOT TO INTERRUPT THE MEETING.
DECORUM POLICY FOR MEETINGS OF THE CITY COMMISSION
OF THE CITY OF DANIA BEACH, FLORIDA:
INDIVIDUALS WHO WISH TO MAKE ANY “CITIZEN’S COMMENTS” UNDER THAT PORTION OF THE CITY COMMISSION
AGENDA, OR WHO OTHERWISE WANT TO ADDRESS THE CITY COMMISSION, MUST FIRST BE REGISTERED WITH THE CITY
CLERK (FORMS ARE AVAILABLE OUTSIDE OF THE CITY COMMISSION CHAMBERS AND MUST BE GIVEN TO THE CLERK
BEFORE THE MEETING). OTHERS WHO WANT TO ADDRESS THE COMMISSION ON ANY MATTERS MUST FIRST BE
RECOGNIZED BY THE MAYOR. ALL SUCH PERSONS MUST USE THE PODIUM IN THE COMMISSION CHAMBER. NO MORE
THAN ONE PERSON AT A TIME MAY ADDRESS THE COMMISSION FROM THE PODIUM. COMMENTS ARE ONLY TO BE MADE
TO THE CITY COMMISSION AND ARE NOT TO BE DIRECTED TO THE AUDIENCE OR CITY STAFF.
NO INDIVIDUAL SHALL MAKE ANY SLANDEROUS OR UNDULY REPETITIVE REMARKS OR ENGAGE IN ANY OTHER
FORM OF BEHAVIOR THAT DISRUPTS OR IMPEDES THE ORDERLY CONDUCT OF THE MEETING, AS DETERMINED BY THE
MAYOR.
THE MAYOR OFTEN ALLOWS APPLAUSE DURING CEREMONIAL OR CELEBRATORY PORTIONS OF THE MEETING, SUCH
AS PROCLAMATIONS, PRESENTATIONS, AWARDS, OR PUBLIC SAFETY RECOGNITIONS, AS THESE ARE NOT ACTION ITEMS
ARE INTENDED TO HONOR INDIVIDUALS OR EVENTS. HOWEVER, TO SAFEGUARD AN ORDERLY MEETING AND TO
PRECLUDE INTIMIDATION OF SPEAKERS ON AGENDA ITEMS, OR DESIGNATED PUBLIC COMMENTS, THE MAYOR
ORDINARILY PRECLUDES CLAPPING, APPLAUDING, HECKLING OR VERBAL OUTBURSTS DURING THESE PORTIONS OF THE
AGENDA.
BASED UPON THE FOREGOING, NO INDIVIDUAL MAY SPEAK DIRECTLY TO OR ADDRESS THE MAYOR, CITY
COMMISSIONER OR CITY STAFF: COMMENTS ARE TO BE ONLY DIRECTED TO THE COMMISSION AS A WHOLE. NO
CLAPPING, APPLAUDING, HECKLING OR VERBAL OUTBURSTS IN SUPPORT OF OR OPPOSITION TO A SPEAKER OR HIS OR
HER REMARKS SHALL BE PERMITTED. NO SIGNS OR PLACARDS SHALL BE PERMITTED IN THE COMMISSION CHAMBER.
IF ANY PERSON’S CONDUCT AS DETERMINED BY THE MAYOR IS FOUND TO BE DISRUPTIVE OR INTERFERES WITH
THE ORDERLY CONDUCT OF THE MEETING, THE PERSON MAY BE ASKED BY THE MAYOR TO LEAVE THE COMMISSION
CHAMBERS; IF THE PERSON DOES NOT LEAVE AND THE CONDUCT PERSISTS, THE CITY POLICE DEPARTMENT WILL BE
REQUESTED TO ESCORT THE INDIVIDUAL FROM THE CITY COMMISSION CHAMBERS.
ALL CELLULAR TELEPHONES ARE TO BE SILENCED DURING THE MEETING. ALL PERSONS EXITING THE
COMMISSION CHAMBER SHALL DO SO QUIETLY. (RESOLUTION #2026-025)
1. CALL TO ORDER/ROLL CALL
Agenda – Dania Beach City Commission
2 of 6
2. MOMENT OF SILENCE AND PLEDGE OF ALLEGIANCE
3. PRESENTATIONS AND SPECIAL EVENT APPROVALS
1. Request for Proclamation Approvals:
- Ms. Alice George - 100th Birthday - Sponsored by Commissioner Lewellen
- National E-Waste Day, October 14, 2026 - Sponsored by Mayor Davis
2. Children Services Council of Broward County — Sponsored by Mayor Davis
4. PROCLAMATIONS
1. Cybersecurity Awareness Month - IT Division
2. National Breast Cancer Awareness Month — October 2026 — Sponsored by Mayor
Davis
3. Domestic Violence Awareness Month — October 2026 — Sponsored by Mayor Davis
4. National Community Planning Month - Community Development
5. ADMINISTRATIVE REPORTS
1. City Manager
2. City Attorney
3. City Clerk - Reminders:
- October 27, 2026 City Commission Meeting - 7 p.m.
- November 10, 2026 - CRA Meeting - 6 p.m.
- November 10, 2026 City Commission Meeting - 7 p.m.
6. PUBLIC SAFETY REPORTS
7. CITIZENS' COMMENTS
Addressing the Commission: A thirty (30) minute "Citizen Comments" period shall be designated on the agenda for citizens and
interested persons to speak on matters whether or not scheduled on that day's agenda. Individuals wishing to speak on a matter
not included on the "Public Hearing" section of the agenda, which matter pertains to an item before the City Commission which
requires a decision of the City Commission, may do so by signing in and submitting a form to that effect with the City Clerk prior
to the meeting. Speakers at Public Hearings shall also submit such a form. Each speaker shall be limited to 3 minutes for his or
her comments. If more than ten (10) speakers express a desire to speak, the Commission shall determine on a meeting by meeting
basis whether to (a) extend the time allotted for citizen comments to accommodate all speakers, or (b) whether to limit the number
of speakers or amount of time per speaker. A speaker's time shall not be transferable to another speaker.
8. CONSENT AGENDA
1. Minutes:
Agenda – Dania Beach City Commission
3 of 6
- September 14, 2026 City Commission Meeting Minutes
- September 24, 2026 City Commission Meeting Minutes
2. Travel Requests: None
3. Retroactive Approval — Request for Discretionary Fund Use of $200 in support of
Dania Dolphins Homecoming — Sponsored by Commissioner Ryan
4. Request for Discretionary Fund Use of $5150 to Support "Serving Joy - Dania Beach
Gives Back" — November 17, 2026 - Sponsored by Commissioner Rimoli
5. Request for Discretionary Fund Use of $350 to Support — American Legion Post 304,
Permit Fee — Sponsored by Commissioner Ryan
6. RESOLUTION NO. 2026-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING A FOURTH AMENDMENT TO THE AGREEMENT
BETWEEN THE CITY OF DANIA BEACH, FLORIDA, AND TYLER
TECHNOLOGIES, INC. TO AUTHORIZE REIMBURSEMENT FOR ELECTRONIC
PAYMENT SERVICE FEES; PROVIDING FOR CONFLICTS; AND PROVIDING
FOR AN EFFECTIVE DATE. (Finance)
7. RESOLUTION NO. 2026-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE CITY COMMISSION TO ENTER INTO AN
EXTENSION AND MODIFICATION OF THE EMPLOYMENT AGREEMENT
WITH THE CITY ATTORNEY; PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE. (Sponsored by Commissioner Rimoli)
9. BIDS AND REQUESTS FOR PROPOSALS
1. RESOLUTION NO. 2026-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE AWARD OF INVITATION TO BID (ITB) NO.
26-009, “FIRE STATION NO. 1 WIND RETROFIT PROJECT,” TO S3S
CONSTRUCTION INC. IN AN AMOUNT NOT TO EXCEED ONE MILLION
EIGHTY-FOUR THOUSAND THREE HUNDRED THIRTY DOLLARS AND FIFTY
CENTS ($1,084,330.50); AUTHORIZING THE PROPER CITY OFFICIALS TO
EXECUTE AN AGREEMENT FOR SERVICES WITH S3S CONSTRUCTION INC.;
AND TO EXCEED THE ANNUAL SINGLE-VENDOR PURCHASING
THRESHOLD OF FIFTY THOUSAND DOLLARS ($50,000.00); PROVIDING FOR
Agenda – Dania Beach City Commission
4 of 6
FUNDING; PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN
EFFECTIVE DATE. (Public Services)
2. RESOLUTION NO. 2026-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE AWARD OF INVITATION TO BID (ITB) NO. 26-
019, “OCEAN PARK PARKING PHASE 1” TO THE STOUT GROUP, LLC, IN THE
AMOUNT OF TWO HUNDRED TWENTY-TWO THOUSAND, ONE HUNDRED
SEVENTY-EIGHT DOLLARS ($222,178.00), AND AUTHORIZING THE CITY TO
EXCEED THE ANNUAL SINGLE-VENDOR PURCHASING THRESHOLD OF
FIFTY THOUSAND DOLLARS ($50,000.00); PROVIDING FOR FUNDING;
PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE
DATE. (Public Services)
10. QUASI-JUDICIAL & PUBLIC HEARING ITEMS
1. RESOLUTION NO. 2026-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, APPROVING THE “PORT 1850, LLC PLAT” (PL-029-24) SUBMITTED
BY PORT 1850 LLC, FOR THE PROPERTY LOCATED AT 1850 NE 7 AVENUE,
IN THE CITY OF DANIA BEACH, FLORIDA; PROVIDING FOR CONFLICTS;
FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Community Development)
2. RESOLUTION NO. 2026-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, APPROVING THE PORT 1850 LLC SITE PLAN (SP-078-22)
SUBMITTED BY THE OWNER, PORT 1850 LLC, FOR THE PROPERTY
LOCATED AT 1850 NE 7 AVENUE IN THE CITY OF DANIA BEACH, FLORIDA;
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE
DATE. (Community Development)
11. FIRST READING ORDINANCES: None
First reading ordinances under this section are not subject to public hearing and may be taken all at once, unless pulled by the
City Commission. A public hearing and discussion will take place at second reading of all ordinances within its respective section
of the agenda.
12. SECOND READING ORDINANCES
1. ORDINANCE NO. 2026-_____
Agenda – Dania Beach City Commission
5 of 6
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE EXPENDITURE OF CITY FUNDS
EXCEEDING ONE MILLION DOLLARS ($1,000,000.00), AND REQUIRES A 4/5
VOTE OF THE CITY COMMISSION, TO FUND THE FIRE STATION NO. 1 WIND
RETROFIT PROJECT, ITB NO. 26-009; PROVIDING FOR CODIFICATION,
PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND
FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Public Services)
2. ORDINANCE NO. 2026-_____
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AMENDING CHAPTER 2, “ADMINISTRATION”, ARTICLE 1,
“IN GENERAL”, TO CREATE SECTION 2-18, ENTITLED “MINIMUM
QUALIFICATIONS OF BOARD MEMBERS”; PROVIDING FOR CONFLICTS;
PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE
DATE. (Sponsored by Commissioner Lewellen)
13. DISCUSSION AND POSSIBLE ACTION
1. RESOLUTION NO. 2026-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, SELECTING SHORES ART CONSERVATION FOR ART
MAINTENANCE SERVICES; AND AUTHORIZING THE PROPER CITY
OFFICIALS TO ENTER INTO A MAINTENANCE AND REPAIR AGREEMENT
FOR THE “LET LOVE GUIDE YOUR WAY” PUBLIC ART SCULPTURE BY
LLOYD GORADESKY LOCATED IN THE ART PARK AT CITY HALL;
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE
DATE.(Community Development)
2. Request to Sponsor — Dania Beach Chamber of Commerce — Pretty in Pink & Pearls
Breast Cancer Awareness Event - $1000 — October 14, 2026 — Sponsored by Mayor
Davis
14. APPOINTMENTS
1. Dania Beach Housing Authority Board - Mayor Davis
Education Advisory Board - Mayor Davis
and (1) Alternate Member
Green Advisory Board - (2) Alternate Members
Marine Advisory Board - (1) Alternate Members
Agenda – Dania Beach City Commission
6 of 6
15. COMMISSION COMMENTS
16. ADJOURNMENT
CITY OF DANIA BEACH
OFFICE OF THE CITY MANGER
100 West Dania Beach Blvd ∙ Dania Beach, FL 33004 ∙ (954) 924-6800 ∙ (954) 921-2604 (fax)
MEMORANDUM
Date: October 13, 2026
To: Mayor Joyce L. Davis
Vice Mayor Marco A. Salvino, Sr.
Commissioner Lori Lewellen
Commissioner Luis Rimoli
Commissioner A. J. Ryan IV
From: Candido Sosa-Cruz, ICMA-CM, City Manager
Subject: Manager’s Report
Dania After Dark – Oktoberfest
Dania After Dark returns with its Oktoberfest celebration on Saturday, October 10 from 6:00 p.m. to
9:00 p.m. at City Hall. This year’s event will expand onto Dania Beach Boulevard between the Nyberg-
Swanson House and City Hall and will incorporate National Night Out activities in partnership with the
Broward Sheriff’s Office.
The expanded event footprint will include a secondary stage featuring family-friendly competitions,
entertainment and community activities. To safely accommodate setup, programming and event
operations, Dania Beach Boulevard will be closed from 12:00 p.m. to 10:30 p.m.
One City at a Time
On Saturday, October 17th, from 10:00 a.m. to 2:00 p.m., Memorial Healthcare System, in partnership
with the City of Dania Beach, will host One City at a Time at C.W. Thomas Park. This community health
and resource event will connect residents with mobile health services, screenings, health education,
information regarding primary and pediatric care and a variety of local community resources.
Additional family activities will include bounce houses, a game truck and food distribution. Participants
will be encouraged to complete the indoor health and resource portion of the event before proceeding
to the food distribution area.
Living Healthy Workshop
The City is partnering with the YMCA to offer a free six-week Living Healthy workshop for Dania Beach
residents. This interactive program is designed to provide participants with practical tools to better
manage chronic health conditions, strengthen physical and emotional well-being, reduce pain
symptoms, evaluate treatment options and improve communication with healthcare providers and
family members.
Classes are being offered at Frost Park on Mondays from 10:00 a.m. to 12:00 p.m. and at P.J. Meli Park
on Fridays from 10:00 a.m. to 12:00 p.m. from October 2 through November 9.
BSO Law Enforcement
The Broward Sheriff’s Office continues to maintain a proactive operational presence along the Federal
Highway corridor to address illegal prostitution activity, suspected drug transactions and related quality-
of-life concerns. Law enforcement personnel continue coordinating targeted enforcement efforts,
developing intelligence and working with partner agencies to address recurring activity in the area.
During the past week, four individuals were arrested in connection with illegal prostitution activity.
BSO personnel have also continued targeted traffic enforcement along the Griffin Road and Federal
Highway corridors in response to traffic-related complaints. These efforts are focused on addressing
violations, improving roadway safety and maintaining a visible enforcement presence in areas where
recurring concerns have been identified.
Public Services Department
Streets Division
The Streets Division is preparing for several upcoming milling and resurfacing projects throughout the
City, including:
• SE 2nd Street from SE 2nd Avenue to SE 3rd Avenue
• SE 1st Terrace between SE 2nd Avenue and SE 2nd Court
• SE 2nd Court between SE 2nd Street and SE 1st Street
• SW 3rd Street between J.A. Ely Boulevard and Phippen Waiters Road
• SW 3rd Place between J.A. Ely Boulevard and Phippen Waiters Road
• SW 4th Street between J.A. Ely Boulevard and Phippen Waiters Road
• Intersection of Dania Beach Boulevard and NW 1st Avenue
• Intersection of Dania Beach Boulevard and SW 1st Avenue
In addition, the City plans to install three speed humps along SE 5th Avenue between SE 11th Terrace
and SE 3rd Street within the coming weeks.
The Department is also preparing to install a new flashing pedestrian crosswalk system at SE 11th
Terrace and SE 5th Avenue. Staff are currently obtaining cost estimates for the replacement system.
Landscape Division
The Landscape Division continues to address maintenance, beautification, drainage and visibility
concerns throughout the City. Current work includes cutting and removing invasive trees and cleaning
drainage infrastructure along SW 31st Avenue.
Along SW 4th Avenue, crews are trimming shrubs, removing invasive vegetation, installing additional
irrigation and planting new trees in vacant areas. These improvements are intended to enhance the
appearance of the corridor while improving visibility and reducing concealed areas that have
contributed to recurring concerns regarding unauthorized encampments.
Beginning this week, crews will also commence a significant tree-maintenance initiative in College
Gardens which will include trimming more than 400 trees throughout the neighborhood.
Griffin Marine Boat Ramp
The City has officially been awarded grant funding through the Florida Inland Navigation District (FIND)
for the Griffin Marine Boat Ramp Project.
This award represents an important step toward advancing improvements at this recreational asset. The
City is currently awaiting receipt of the formal grant agreement from FIND and will proceed with the
next required steps upon its execution.
Public Services Director Invited to Denmark Water Technology Fact-Finding Delegation
Our Public Services Director has been invited to participate in an official Water Technology Fact-Finding
Delegation to Denmark from October 18th through October 24, 2026, hosted through the Danish Water
Technology Alliance. The delegation will bring together water and infrastructure professionals from the
United States and Denmark to exchange knowledge and best practices relating to water and wastewater
technologies, utility operations, sustainability, digitalization, automation, asset management and
infrastructure resilience.
The invitation is particularly meaningful for Dania Beach because the subject matter directly aligns with
the work and long-term priorities of our Public Services Department while also reflecting the City’s
historic connection to its Danish heritage. Our Public Services Director will represent the City during the
delegation with the objective of identifying practical technologies, operational approaches, professional
partnerships and proven strategies that may benefit Dania Beach as we continue strengthening our
water, wastewater, resiliency, sustainability and infrastructure programs.
Importantly, the delegation is being funded by the Danish Government at no cost to the City of Dania
Beach.
City of Dania Beach
Hearing Agenda Report
Pending
Cases
09-03-2026
10-08-2026
Report Date:
Hearing Date:
Page
1
of
5
Case # Status Hearing Type Property Address Cited Party Default Inspector
2025-00001639 Active H-EXTENSION - Extension
Hearing
4934 SW 44 TER FORN HENRY
SANTANA ARLETIS
Andre Smith
2026-00000196 Active H-EXTENSION - Extension
Hearing
35 SW 4 ST MARIE V AUGUSTIN Andre Smith
2026-00000694 Active H-FIRST HEARING - First
Hearing
4357 SW 50 ST MARIA M NOTARI REV LIV TR
NOTARI, MARIA M TRSTE
Alberto Chavarria
2026-00000739 Active H-FIRST HEARING - First
Hearing
5504 SW 44 AVE LUNA NUNEZ & JOSE JULIAN
Alberto Chavarria
2026-00000749 Active H-FIRST HEARING - First
Hearing
5219 SW 43 TER MCCAMBRIDGE ALASTAIR SHAWN
IZHAKI NADAV & HAMO GAL
Alberto Chavarria
2026-00000756 Active H-FIRST HEARING - First
Hearing
5930 SW 36 TER B'NAI SEPHARDIM SHAARE SHALOM OF
HOLLYWOOD INC
Alberto Chavarria
2026-00000910 Active H-FIRST HEARING - First
Hearing
4880 SW 41 AVE R H P T INVESTMENT LLC
Alberto Chavarria
2024-00000884 Active H-CONFIRMATION -
Confirmation Hearing
109 NW 6 AVE HOLLYWOOD-94 LLC Anson Westberry
2026-00000707 Active H-RECURRING - Recurring
Hearing
405 SE 4 ST FERNANDEZ, ANGELA
FERNANDEZ, TERESA
Anson Westberry
2026-00000724 Active H-FIRST HEARING - First
Hearing
131 SE 3 AVE 401 COUTURE, ISABELLE
TURCOTTE, STEPHANE
Anson Westberry
2026-00000743 Active H-FIRST HEARING - First
Hearing
242 E DANIA BEACH BLVD 242 EDB LLC Anson Westberry
2026-00000772 Active H-FIRST HEARING - First
Hearing
401 E SHERIDAN ST SUSO 5 SHERIDAN LP
% SLATE ASSET MANAGEMENT LP
Anson Westberry
2026-00000789 Active H-FIRST HEARING - First
Hearing
601 NW 7 ST AGUIAR CORONA INVESTMENT LLC
Anson Westberry
City of Dania Beach
Hearing Agenda Report
Pending
Cases
09-03-2026
10-08-2026
Report Date:
Hearing Date:
Page
2
of
5
2026-00000822 Active H-FIRST HEARING - First
Hearing
50 E DANIA BEACH BLVD SIGNATURE INVESTMENT HOLDINGS II LLC
Anson Westberry
2026-00000827 Active H-FIRST HEARING - First
Hearing
50 SE 6 ST JC&A HOLDINGS OF FUQUAY VARINA LLC
Anson Westberry
2026-00000858 Active H-RECURRING - Recurring
Hearing
401 SE 5 ST HUAMAN ACHATA, NEMESIO Anson Westberry
2026-00000859 Active H-FIRST HEARING - First
Hearing
237 SE PARK ST A-D Z LENDING LLC Anson Westberry
2026-00000894 Active H-FIRST HEARING - First
Hearing
242 E DANIA BEACH BLVD 242 EDB LLC
Anson Westberry
2026-00000924 Active H-FIRST HEARING - First
Hearing
26 SE 1 AVE KODNER INVESTMENT HOLDINGS LLC
Anson Westberry
2026-00000940 Active H-FIRST HEARING - First
Hearing
8 SE 12 ST EMERY KEVIN
CLARK JENNA
Anson Westberry
2026-00001035 Active H-REPEAT HEARING -
Repeat Hearing
414 SE 5 ST MORALES,EUGENIA GARAY,RANDOLPH Anson Westberry
2026-00001054 Active H-RECURRING - Recurring
Hearing
401 SE 5 ST HUAMAN ACHATA, NEMESIO Anson Westberry50
2026-00000063 Active H-EXTENSION - Extension
Hearing
NW 14 AVE ADELE BESNER TR BESNER, HANNA S TRSTEE Luciano Nibbs
2026-00000725 Active H-FIRST HEARING - First
Hearing
693 NW 12 AVE SACCO, FRANK Luciano Nibbs
2026-00000762 Active H-FIRST HEARING - First
Hearing
229 NW 4 AVE JOSEPH MICHAEL LAROSA Luciano Nibbs
2026-00000763 Active H-FIRST HEARING - First
Hearing
225 NW 4 AVE STINA S GIBSON Luciano Nibbs
City of Dania Beach
Hearing Agenda Report
Pending
Cases
09-03-2026
10-08-2026
Report Date:
Hearing Date:
Page
3
of
5
2026-00000791 Active H-FIRST HEARING - First
Hearing
104 NW 5 AVE FALLAD, JORGE M & VELEZ, MARIA A Luciano Nibbs
2026-00000810 Active H-FIRST HEARING - First
Hearing
475 W DANIA BEACH BLVD RONJEAN CORPORATION Luciano Nibbs
2026-00000836 Active H-FIRST HEARING - First
Hearing
23 NW 1 ST SOUTH FLORIDA HAITIAN EVANGELICAL
BAPTIST CHURCH INC
Luciano Nibbs
2026-00000865 Active H-FIRST HEARING - First
Hearing
222 NW 1 AVE MANCUSI JOSEPH A % CALIFORNIA DREAM
INN
Luciano Nibbs
2026-00000868 Active H-FIRST HEARING - First
Hearing
113 NW 1 AVE DANIA PHOENIX CORP
Luciano Nibbs
2026-00000904 Active H-FIRST HEARING - First
Hearing
23 NW 1 ST SOUTH FLORIDA HAITIAN EVANGELICAL
BAPTIST CHURCH INC
Luciano Nibbs
2026-00000951 Active H-FIRST HEARING - First
Hearing
790 NW 1 ST 790 PROPERTIES LLC
Luciano Nibbs
2026-00000790 Active H-FIRST HEARING - First
Hearing
4424 SW 27 AVE YOURY H/E & NADIA ANGEL Marisa Lee
2026-00000838 Active H-FIRST HEARING - First
Hearing
2165 SW 47 ST KRESPI YITZCHAK OFER Marisa Lee
2026-00000857 Active H-FIRST HEARING - First
Hearing
4717 SW 28 AVE ALDICK,ABDEL R & ALDICK,GHADA
Marisa Lee
2026-00000886 Active H-FIRST HEARING - First
Hearing
3060 SW 47 ST ELIZABETH J HEATH
Marisa Lee
2026-00000916 Active H-FIRST HEARING - First
Hearing
3371 SW 44 ST THOMAS WILLIAM CLAY Marisa Lee
City of Dania Beach
Hearing Agenda Report
Pending
Cases
09-03-2026
10-08-2026
Report Date:
Hearing Date:
Page
4
of
5
2026-00000920 Active H-FIRST HEARING - First
Hearing
4406 SW 35 AVE TY HOANG LIV TR / TY HOANG TRSTEE Marisa Lee
2026-00000923 Active H-FIRST HEARING - First
Hearing
3251 SW 44 ST 104 RODRIGUEZ,MILAGROS Marisa Lee
2024-00001046 Active H-MONEY JUDGMENT -
Money Judgement Hearing
3463 GRIFFIN RD C LOT GRIFFIN HARBOUR LLC
Michelle Shahryar
2024-00001051 Active H-MONEY JUDGMENT -
Money Judgement Hearing
SW 34 TER GRIFFIN HARBOUR LLC
Michelle Shahryar
2024-00001531 Active H-MONEY JUDGMENT -
Money Judgement Hearing
3463 GRIFFIN RD C LOT GRIFFIN HARBOR LLC Michelle Shahryar
2025-00001879 Active H-EXTENSION - Extension
Hearing
2650-2694 SW 36 ST MSG PORT 95 LLC Michelle Shahryar
2026-00000792 Active H-FIRST HEARING - First
Hearing
22 SW 6 ST 22 DANIA REAL ESTATE TR MONGOMERY,
DAVID TRSTEE
Michelle Shahryar
2026-00000887 Active H-FIRST HEARING - First
Hearing
340 S FEDERAL HIGHWAY SHREE-RAM MOTEL INC Michelle Shahryar
2026-00000889 Active H-FIRST HEARING - First
Hearing
SW 1 AVE SHREE-RAM MOTEL INC
Michelle Shahryar
2026-00000938 Active H-FIRST HEARING - First
Hearing
4723 SW 34 TER PEREZ, SKY H/E GUR, MAYA
Michelle Shahryar
2026-00000947 Active H-REPEAT HEARING -
Repeat Hearing
224 NW 13 CT CAMILO GOMEZ, JUAN Michelle Shahryar
2026-00001015 Active H-RECURRING - Recurring
Hearing
1469 NW 10 ST RXI INVESTMENT GROUP LLC
Michelle Shahryar
2025-00001734 Active H-ABATEMENT - Abatement
Hearing
320 E DANIA BEACH BLVD SORMI LLC Windy Damis
City of Dania Beach
Hearing Agenda Report
Pending
Cases
09-03-2026
10-08-2026
Report Date:
Hearing Date:
Page
5
of
5
2026-00000170 Active H-EXTENSION - Extension
Hearing
3051 INLET DR THERRIEN, YOLAND & WOO, AMMY Windy Damis
2026-00000341 Active H-EXTENSION - Extension
Hearing
2360 SW 51 CT JENNY GRANADOS & RICHARDO MARULANDA Windy Damis
2026-00000807 Active H-FIRST HEARING - First
Hearing
2600 SW 55 ST ELIZABETH & OPHER LEVY
Windy Damis
2026-00000818 Active H-FIRST HEARING - First
Hearing
5716 PARK RD YARIV OVADIA & DANIT PORAT
Windy Damis
2026-00000844 Active H-FIRST HEARING - First
Hearing
5040 SW 27 AVE DWYER,MARY JANE & DWYER,RICHARD
Windy Damis
2026-00000849 Active H-FIRST HEARING - First
Hearing
4896 SW 28 TER TWIN HARBORS PROPERTY MGT LLC
Windy Damis
2026-00000879 Active H-RECURRING - Recurring
Hearing
4896 SW 28 TER TWIN HARBORS PROPERTY MGT LLC
Windy Damis
2026-00000895 Active H-FIRST HEARING - First
Hearing
5311 SW 30 TER LUIS R VERAS
Windy Damis
2026-00000988 Active H-FIRST HEARING - First
Hearing
SW 32 AVE OAKBRIDGE PROP OWNERS ASSN INC % THE
MT PROFESSIONAL GROUP
Windy Damis
Disclaimer: This document contains a draft agenda. Topics, discussion order, and timing are subject to change and should not be considered final.
1. CALL TO ORDER/ROLL CALL
Mayor Davis called the meeting to order at 7:02 p.m.
Present:
Mayor Joyce L. Davis
Vice-Mayor Marco A. Salvino, Sr.
Commissioner Lori Lewellen
Commissioner Luis Rimoli
Commissioner A. J. Ryan IV
City Manager Candido Sosa-Cruz, ICMA-CM
City Attorney Eve Boutsis
Deputy City Clerk Erin McClendon
2. MOMENT OF SILENCE AND PLEDGE OF ALLEGIANCE
Mayor Davis called for a moment of silence followed by the Pledge of Allegiance to the United
States Flag.
City Attorney Boutsis read the Statement of Decorum.
3. BUDGET PUBLIC HEARING ITEMS
City Attorney Boutsis read the statement for Ad Valorum taxes.
Chief Financial Officer Yeimy Guzman provided a PowerPoint Presentation on the Budget
Public Hearing Items and noted that the Property Appraiser’s office is present in the atrium in the
event anyone would like to speak to them.
3.1 RESOLUTION NO. 2026-___
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, RELATING TO THE IMPOSITION OF FIRE RESCUE ASSESSMENTS AND
Minutes of Regular Meeting 2
PROVISION OF FIRE PROTECTION SERVICES, FACILITIES, AND PROGRAMS IN THE
CITY OF DANIA BEACH, FLORIDA; RATIFYING, CONFIRMING, AND
SUPPLEMENTING RESOLUTION NO. 2026-094; REIMPOSING FIRE RESCUE
ASSESSMENTS WITH UPDATED ASSESSMENT RATES AGAINST ASSESSED
PROPERTY LOCATED WITHIN THE CITY OF DANIA BEACH FOR THE FISCAL YEAR
BEGINNING OCTOBER 1, 2026; APPROVING THE RATES OF ASSESSMENT;
APPROVING THE FINAL ASSESSMENT ROLL; PROVIDING FOR A PUBLIC HEARING;
PROVIDING FOR EFFECT OF ADOPTION OF RESOLUTION; PROVIDING FOR
CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE
DATE. (Finance)
City Attorney Boutsis read the title of the resolution into the record.
Mayor Davis opened the floor to public comments and the following spoke:
- Shawn DeRosa – 408 SE 5th Street
Commissioner Lewellen made a motion to approve the resolution. The motion was
seconded by Vice Mayor Salvino which carried unanimously on voice vote.
3.2 RESOLUTION NO. 2026-___
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, RELATING TO THE PROVISION OF SOLID WASTE SERVICE
ASSESSMENTS IN THE CITY OF DANIA BEACH, FLORIDA; RE-IMPOSING SOLID
WASTE SERVICE ASSESSMENTS AGAINST ASSESSED PROPERTY LOCATED
WITHIN THE BOUNDARIES OF THE CITY OF DANIA BEACH FOR THE FISCAL YEAR
BEGINNING OCTOBER 1, 2026; APPROVING THE RATE OF ASSESSMENT;
APPROVING THE ASSESSMENT ROLL; PROVIDING FOR A PUBLIC HEARING;
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
(Finance)
City Attorney Boutsis read the title of the resolution into the record.
Mayor Davis opened the floor to public comments and there were none.
Vice Mayor Salvino made a motion to approve the resolution. The motion was seconded by
Commissioner Lewellen which carried unanimously on voice vote.
3.3 RESOLUTION NO. 2026-___
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, RELATING TO THE PROVISION OF STORMWATER MANAGEMENT
SERVICES IN THE CITY OF DANIA BEACH, FLORIDA; IMPOSING AND RE-IMPOSING
STORMWATER ASSESSMENTS AGAINST PROPERTY LOCATED WITHIN THE CITY
OF DANIA BEACH FOR THE FISCAL YEAR BEGINNING OCTOBER 1, 2026;
APPROVING THE RATE OF ASSESSMENT; APPROVING THE ASSESSMENT ROLL;
Minutes of Regular Meeting 3
PROVIDING FOR A PUBLIC HEARING; PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE. (Finance)
Commissioner Lewellen made a motion to approve the resolution. The motion was
seconded by Vice Mayor Salvino which carried unanimously on voice vote.
(Finance)
Vice Mayor Salvino made a motion to approve the resolution. The motion was seconded by
Commissioner Lewellen which carried unanimously on voice vote.
(Finance)
th Street
Commissioner Lewellen made a motion to approve the resolution. The motion was
seconded by Commissioner Rimoli which carried unanimously on voice vote.
Minutes of Regular Meeting 4
4.1 Request for Proclamation Approval:
• HR Professionals Day (September 26, 2026)
This item was taken after item 14.2
There was consensus from the Commission to approve the proclamation.
5.1 Hispanic Heritage Month – September 2026 – Sponsored by Commissioner Lewellen
Commissioner Lewellen read the proclamation into the record and will be presenting the
proclamation to Arnaldo Suarez at the Casino.
5.2 Hunger Action Month – September 2026 – Sponsored by Commissioner Rimoli
Commissioner Rimoli read the proclamation into the record and presented it to Allyson Vaulx of
Feeding South Florida.
5.3 National Diaper Need Awareness Week – September 14-20, 2026 – Sponsored by
Mayor Davis
Mayor Davis read the proclamation into the record and presented it to Denise Bartley Hinds who
is present on behalf of the Greater Fort Lauderdale Diaper Bank.
6.1 City Manager
City Manager Sosa-Cruz provided his administrative report and touched on the following:
- September 11th Memorial Ceremony
- Thank you to Captain Tarala and Chief Pellecer for their service to the community
- Opening of Invitation to Bid for Chester Byrd Park construction
- Opening of the concession stand at C.W. Thomas Park
- Update on the City Clerk’s office
- Update on Finance Department
- BSO Back to School plan
- BSO Operation Medicine Cabinet and Shred-a-thon
- Core meeting scheduled for September 16, 2026 6:00 p.m. at C.W. Thomas Park
- Happy 99th Birthday to Mr. William “Frisky” Green
City Manager Sosa-Cruz requested Commission approval for a $5000.00 adjustment related to
the motorcycle show as the city recently received invoices. He explained that funds are available
Minutes of Regular Meeting 5
within the parks department to cover the additional amount and the fiscal year 2027 budget has
been adjusted accordingly.
7. PUBLIC SAFETY REPORTS
narcotics‑related arrests near the Happy Family market following ongoing
resident complaints; the apprehension of a burglary suspect after a multi‑agency pursuit; and a
high‑risk narcotics search warrant at the Deluxe Inn targeting cocaine sales. Captain Tarala
emphasized continued proactive enforcement along Federal Highway and other areas in response
to steady community complaints.
th commemoration and spoke about the upcoming annual Fill the Truck Toy
Drive that will begin at the Light Up Dania Beach event and continue at Five Below the Friday
after Thanksgiving.
Minutes of Regular Meeting 6
Mayor Davis echoed City Manager Sosa‑Cruz’s comments on the September 11th ceremony,
noting it was the city’s largest and most well‑attended observance to date. She also commended
Fire Rescue after witnessing their professional response to a serious incident at the Ladies Let’s
Go Fishing event and expressed her gratitude for their skill and training.
8. CITIZENS’ COMMENTS
th St.
nd Avenue
th Terrace
9. CONSENT AGENDA
Commissioner Lewellen made a motion to approve the consent agenda minus item 9.20.
The motion was seconded by Vice Mayor Salvino which carried unanimously on voice vote.
Approved under consent agenda.
(Public Services)
Approved under consent agenda.
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, APPROVING CHANGE ORDER NO. 01 IN THE AMOUNT OF ONE HUNDRED
EIGHTY-THREE THOUSAND THREE HUNDRED NINETY-NINE DOLLARS AND
Minutes of Regular Meeting 7
EIGHTY-THREE CENTS ($183,399.83) TO THE AGREEMENT WITH RIC-MAN
CONSTRUCTION FLORIDA, INC. FOR THE SOUTHEAST DRAINAGE RETROFIT
PROJECT – PHASE 2; AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE
ORDER NO. 01; PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE
DATE. (Public Services)
Approved under consent agenda.
(Community Development)
Approved under consent agenda.
Approved under consent agenda.
(Public Services)
Approved under consent agenda.
Minutes of Regular Meeting 8
(Information
Technology)
Approved under consent agenda.
(Information Technology)
Approved under consent agenda.
(Information
Technology)
Approved under consent agenda.
RESOLUTION NO. 2026-___
Minutes of Regular Meeting 9
PAYMENT SERVICE FEES; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING
FOR AN EFFECTIVE DATE. (Parks & Recreation)
9.12 RESOLUTION NO. 2026-___
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING A SECOND AMENDMENT TO THE MARINA
MANAGEMENT AGREEMENT BETWEEN THE CITY OF DANIA BEACH, FLORIDA,
AND US MARINA GROUP, LLC TO AUTHORIZE REIMBURSEMENT FOR
ELECTRONIC PAYMENT SERVICE FEES; PROVIDING FOR CONFLICTS; AND
PROVIDING FOR AN EFFECTIVE DATE. (Parks & Recreation)
9.13 RESOLUTION NO. 2026-___
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, ADOPTING THE AMENDED PARKS AND RECREATION SCHEDULE OF
FEES AND CHARGES FOR SENIOR PROGRAMMING, THE MARINA, AND SUMMER
CAMP PROGRAMMING; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR
AN EFFECTIVE DATE. (Parks & Recreation)
9.14 RESOLUTION NO. 2026-___
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE APPROPRIATE OFFICALS TO EXECUTE A SECOND
AMENDMENT TO THE AGREEMENT WITH BRIGHT WHEELER GROUP LLC,
FORMERLY KNOWN AS HZIP LLC, A FLORIDA LIMITED LIABILITY COMPANY, TO
REFLECT A CORPORATE NAME CHANGE; PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE. (Parks & Recreation)
9.15 RESOLUTION NO. 2026-___
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AMENDING THE CITY COMMISSION “DISCRETIONARY FUNDS USE
POLICY” TO COMBINE THE DISCRETIONARY FUND AND THE COMMUNITY GRANT
POLICY INTO ONE PROGRAM; PROVIDING FOR CONFLICTS; AND PROVIDING FOR
AN EFFECTIVE DATE. (Finance)
9.16 RESOLUTION NO. 2026-___
Minutes of Regular Meeting 10
(City Manager)
Approved under consent agenda
(City Manager)
Approved under consent agenda
SIXTY‑TWO
THOUSAND FIVE HUNDRED DOLLARS ($62,500.00) FOR FISCAL YEAR 2026–27;
PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE. (City
Manager)
Approved under consent agenda
__
26‑020, ENTITLED “PLANNING
CONSULTING SERVICES (POOL)”; AUTHORIZING THE CITY TO EXCEED THE
$50,000.00 SINGLE‑VENDOR ANNUAL THRESHOLD FOR THE DURATION OF THE
Minutes of Regular Meeting 11
CONTRACT PERIOD; PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN
EFFECTIVE DATE. (Community Development)
Approved under consent agenda
RESOLUTION NO. 2026-___
(Sponsored by Commissioner Ryan)
Vice Mayor Salvino made a motion to approve the item. The motion was seconded by
Commissioner Rimoli which carried unanimously on voice vote.
Sponsored by Mayor Davis
Approved under consent agenda
10. BIDS AND REQUESTS FOR PROPOSALS
Minutes of Regular Meeting 12
26‑014,
“CITY HALL WIND MITIGATION (RE‑BID),” TO KOHN CONSTRUCTION AND
DEVELOPMENT LLC IN AN AMOUNT NOT TO EXCEED FOUR HUNDRED
SEVENTY‑SEVEN THOUSAND SEVEN HUNDRED FORTY‑TWO DOLLARS AND
TWENTY‑EIGHT CENTS ($477,742.28) AND AUTHORIZING THE PROPER CITY
OFFICIALS TO EXECUTE AN AGREEMENT WHICH WILL EXCEED THE ANNUAL
VENDOR THRESHOLD OF FIFTY THOUSAND DOLLARS ($50,000.00); PROVIDING
FOR FUNDING; PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE
DATE. (Public Services)
Commissioner Rimoli made a motion to approve the item. The motion was seconded by
Commissioner Lewellen which carried unanimously on voice vote.
11. QUASI-JUDICIAL HEARINGS
12‑473‑14
AND AUTHORIZING THE EXPENDITURE OF FUNDS IN EXCESS OF $50,000.00;
PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE (City
Attorney/BSO)
This item was heard with item 13.4.
th Terrace
after‑school programs, parks, churches, and senior groups. He further noted that BSO
Minutes of Regular Meeting 13
officers and firefighters regularly engage with the community through events, education, and
visibility at activities like football games. He stressed that these integration efforts are not new
and have been ongoing for years.
15‑mph school
zone sign exists on Southeast 11th Terrace, no such signage is posted when vehicles turn toward
the school from Southeast Fifth Avenue, resulting in cars traveling 30–40 mph. He supported any
no‑cost measures to improve child safety and prevent potential injuries or fatalities.
Commissioner Lewellen made a motion to approve both item 11.1 and item 13.4. The
motion was seconded by Commissioner Rimoli which carried 4-1 with Commissioner
Rimoli, Commissioner Lewellen, Vice Mayor Salvino and Mayor Davis voting yes
Commissioner Ryan voting no.
12. FIRST READING ORDINANCES
30‑4,
ENTITLED “DUTIES AND POWERS”, TO AUTHORIZE THE DIRECTOR TO DELEGATE
TREE PLANTING AND MAINTENANCE; AND AMENDING ARTICLE III, “STREET
DIVISION”, AT SECTION 30‑9, ENTITLED “ESTABLISHED”, IN ORDER TO CLARIFY
THAT THE STREET DIVISION IS TO SUPERVISE AND MAINTAIN ALL PUBLIC
TREES; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND
PROVIDING FOR AN EFFECTIVE DATE. (Community Development)
Commissioner Rimoli made a motion to approve the ordinance on first reading. The
motion was seconded by Commissioner Lewellen which carried unanimously on voice vote.
Minutes of Regular Meeting 14
2‑18, ENTITLED “MINIMUM QUALIFICATIONS OF BOARD
MEMBERS”; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND
PROVIDING FOR AN EFFECTIVE DATE. (Sponsored by Commissioner Lewllen)
Commissioner Ryan made a motion to approve the ordinance on first reading as amended,
the motion was seconded by Commissioner Lewellen which carried unanimously on voice
vote.
13. SECOND READING ORDINANCES
(Public Services)
th St.
st, the city will be able to address that for Dania Beach Blvd.
Minutes of Regular Meeting 15
Vice Mayor Salvino made a motion to approve the ordinance on second reading. The
motion was seconded by Commissioner Rimoli which carried unanimously on voice vote.
(Parks & Recreation)
Commissioner Rimoli made a motion to approve the ordinance on second reading. The
motion was seconded by Commissioner Lewellen which carried unanimously on voice vote.
(Finance)
Commissioner Lewellen made a motion to approve the ordinance on second reading. The
motion was seconded by Vice Mayor Salvino which carried unanimously on voice vote.
(City Attorney)
This item was taken and voted upon with item 11.1.
Minutes of Regular Meeting 16
Sponsored
by Commissioner Lewellen)
Commissioner Ryan made a motion to approve the ordinance as amended to remove the
10-year public service requirement and require an individual to be deceased to have a
facility named in their honor, while maintaining the provisions regarding qualifying
financial contributions. Commissioner Lewellen seconded the motion.
The motion failed 3-2 on roll call vote with Mayor Davis, Vice Mayor Salvino and
Commissioner Rimoli voting no and Commissioner Lewellen and Commissioner Ryan
voting yes.
Vice Mayor Salvino made a motion to approve the ordinance with the amendment to
remove the 10-year public service requirement. The motion was seconded by
Commissioner Rimoli which carried 5-0 on roll call vote.
14. DISCUSSION AND POSSIBLE ACTION
Minutes of Regular Meeting 17
(Community Development)
Commissioner Ryan made a motion to approve the ordinance on second reading. The
motion was seconded by Commissioner Rimoli which carried unanimously on voice vote.
This item heard after item 3.5.
Minutes of Regular Meeting 18
Commissioner Lewellen made a motion to approve the ordinance on second reading. The
motion was seconded by Vice Mayor Salvino which carried unanimously on voice vote.
15. APPOINTMENTS
16. COMMISSION COMMENTS
Minutes of Regular Meeting 19
public attacks on staff, noting that any complaints should be submitted through proper
administrative channels such as email or phone.
two‑tour Vietnam veteran and long‑time local
resident and recognized him for his service and citizenship.
budget‑related staffing
reductions and explained prior staffing increases were to address permitting and inspection
demands during increased building. He highlighted responsiveness to resident inquiries and
commended staff for their professionalism. He praised Mayor Davis for active representation of
the City. He stated that he was not upset with anyone and encouraged everyone to ensure their
information was accurate and to work together to keep discussions calm and constructive.
17. ADJOURNMENT
Minutes of Regular Meeting 20
ERIN MCCLENDON JOYCE L. DAVIS
1. CALL TO ORDER/ROLL CALL
Mayor Davis called the meeting to order at 7:00 p.m.
Present:
Mayor Joyce L. Davis
Vice-Mayor Marco A. Salvino, Sr.
Commissioner Lori Lewellen
Commissioner Luis Rimoli
Commissioner A. J. Ryan IV
City Manager Candido Sosa-Cruz, ICMA-CM
City Attorney Eve Boutsis
City Clerk Elora Riera, MMC
2. MOMENT OF SILENCE AND PLEDGE OF ALLEGIANCE
Mayor Davis called for a moment of silence followed by the Pledge of Allegiance to the United
States Flag.
City Attorney Boutsis read the Statement of Decorum.
3. BUDGET PUBLIC HEARING ITEMS
3.1 RESOLUTION NO. 2026-___
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AS REQUIRED BY THE CITY CHARTER AND SECTION 200.065, FLORIDA
STATUTES, APPROVING THE PROPOSED MILLAGE RATE NECESSARY TO BE
LEVIED FOR THE FISCAL YEAR 2026-2027 FOR OPERATING PURPOSES;
ESTABLISHING THE DEBT MILLAGE APPROVED BY THE ELECTORATE;
PROVIDING FOR A PUBLIC HEARING WHEN AND WHERE OBJECTIONS MAY BE
HEARD AND QUESTIONS CONCERNING THE SAME WILL BE ANSWERED;
Minutes of Regular Meeting 2
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
(Finance)
City Attorney Boutsis read the title of the resolution into the record and read the statement for
Ad Valorum rates.
The mayor opened the floor to public comments and the following spoke:
- Shawn DeRosa – 408 SE 5th Street
- James Beaver – 351 SE 7th Street
- Robert Kirchgraber – 2725 Treasure Cove Cir.
City Manager Sosa Cruz addressed some of the comments made during public comments. He
explained that the city’s budget was reduced by 13%, amounting to $20 million less than the
previous year, achieved through eliminating 13 positions, cutting special events, reducing
commission discretionary funding, and halting all new vehicle purchases and new hires. These
reductions were consistently presented throughout the budget process. He commented that Dania
Beach is not a wealthy city but a small, financially well‑managed one with strong reserves,
stability, and a dedicated team prepared for emergencies and committed to serving residents.
Commissioner Ryan made a motion to approve the resolution. The motion was seconded by
Commissioner Lewellen which carried unanimously on voice vote.
3.2 RESOLUTION NO. 2026-___
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AS REQUIRED BY THE CITY CHARTER AND SECTION 200.065, FLORIDA
STATUTES, APPROVING THE CITY'S FINAL ANNUAL BUDGET FOR THE FISCAL
YEAR 2026-2027; PROVIDING FOR A PUBLIC HEARING WHEN OBJECTIONS WILL BE
HEARD AND QUESTIONS CONCERNING THE BUDGET WILL BE ANSWERED;
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
(Finance)
Commissioner Lewellen made a motion to approve the resolution. The motion was
seconded by Commissioner Ryan which carried unanimously on voice vote.
4. PRESENTATIONS AND SPECIAL EVENT APPROVALS
4.1 Advisory Board Reports:
- Education Advisory Board
There was consensus to add the Marine Advisory Board report to the agenda.
Minutes of Regular Meeting 3
Board members Diana Fahmie, Monique Bourgery and Serena Bravo provided a report on
what the Education Advisory Board is working on and requested assistance with a letter from
the City to be able to provide businesses for donations for teachers.
Stacy Brown from the Marine Advisory Board reported on possible ideas to implement on
the waterways and marinas.
4.2 Request for Proclamation Approval:
- Cybersecurity Awareness Month - IT Division
- National Breast Cancer Awareness Month — October 2026 — Sponsored by Mayor Davis
- Domestic Violence Awareness Month – October 2026 – Sponsored by Mayor Davis
- National Community Planning Month - October 2026 - Community Development
- Fire Prevention Week - October 4-10, 2026
- United International College – 25th Anniversary – Sponsored by Mayor Davis
There was consensus from the Commission to approve the proclamations.
4.3 Special Event Application Approval: Memorial Healthcare Systems & Dania Beach,
One City at a Time (Parks and Recreation)
Deputy Director of Parks and Recreation Franky Lazo introduced the item.
There was consensus to approve the application.
4.4 Special Event Application Approval: Lululemon Run Club, 2026-2027 Event Series
(Parks and Recreation)
Deputy Director of Parks and Recreation Franky Lazo introduced the item.
There was consensus to approve the application.
4.5 Brownfields Job Training in Dania Beach — Sponsored by Commissioner Rimoli
Commissioner Rimoli introduced the item.
Ms. Alexandra Hughes provided an overview of the job training program for Dania Beach
residents.
4.6 American Legion Boys State Program – Report by Participants – Sponsored by
Commissioner Ryan
Commissioner Ryan introduced the item and asked the boys who attended Boys State to
introduce themselves and talk about what they learned.
5. PROCLAMATIONS
5.1 HR Professionals Day
Minutes of Regular Meeting 4
This item was taken after item 3.2.
5.3 Fire Prevention Week — October 4-10, 2026
6. ADMINISTRATIVE REPORTS
Minutes of Regular Meeting 5
- Dania Beach Art Week will take place September 27th through October 3rd and will
feature exhibitions, workshops, demonstrations, interactive experiences, and a gallery
hop. A complimentary shuttle from the City Hall parking garage will be available.
- October Fest scheduled for Saturday, October 10, from 6:00 p.m. to 9:00 p.m. The free,
family-friendly event will include live music, food vendors, a pumpkin patch, children’s
activities, contests, and entertainment.
5.2 City Attorney
City Attorney Boutsis had nothing to report.
5.3 City Clerk - Reminders
City Clerk Riera reminded the Commission of the following upcoming meetings:
- October 13, 2026 - CRA Board Meeting - 6 p.m.
- October 13, 2026 - City Commission Meeting - 7 p.m.
- October 27, 2026 - City Commission Meeting - 7 p.m.
7. PUBLIC SAFETY REPORTS
Captain Tarala thanked the Commission for the approval of the budget and continued support of
the Broward Sheriffs Office. He reported on the different crime related incidents and
enforcement that took place over the last few weeks.
8. CITIZENS’ COMMENTS
The following spoke under citizens’ comments:
- Serena Bravo – 85 Gulfstream Rd.
- Shawn DeRosa – 408 SE 5th St.
- Robert Kirchgraber – 2725 Treasure Cove Cir.
9. CONSENT AGENDA
Commissioner Ryan made a motion to approve the consent agenda. The motion was
seconded by Commissioner Lewellen which carried unanimously on voice vote.
9.1 Minutes: August 25, 2026 Regular City Commission Meeting
Approved under consent agenda.
9.2 Travel Requests: None.
9.3 RESOLUTION NO. 2026-___
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE APPROPRIATION OF REVENUES AND
Minutes of Regular Meeting 6
EXPENDITURES WITHIN THE PUBLIC ART FUND FOR FISCAL YEAR 2026‑27;
PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE.
(Community Development)
Approved under consent agenda.
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING A FIRST AMENDMENT TO IPS GROUP INC. AGREEMENT
BETWEEN THE CITY OF DANIA BEACH, FLORIDA AND IPS GROUP INC., TO
AUTHORIZE REIMBURSEMENT FOR ELECTRONIC PAYMENT SERVICE FEES;
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
(Community Development)
Approved under consent agenda.
Approved under consent agenda.
Approved under consent agenda.
Approved under consent agenda.
Minutes of Regular Meeting 7
PROPER CITY OFFICIALS TO EXECUTE THE ILA; PROVIDING FOR CONFLICTS;
FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Public Services)
Approved under consent agenda.
10. BIDS AND REQUESTS FOR PROPOSALS
11. QUASI-JUDICIAL HEARINGS
12. FIRST READING ORDINANCES
Commissioner Rimoli made a motion to approve the ordinance. The motion was seconded
by Commissioner Lewellen which carried unanimously on voice vote.
13. SECOND READING ORDINANCES
Minutes of Regular Meeting 8
Commissioner Lewellen made a motion to approve the ordinance on second reading. The
motion was seconded by Commissioner Rimoli which carried unanimously on voice vote.
14. DISCUSSION AND POSSIBLE ACTION
15. APPOINTMENTS
Mayor’s Appointment
16. COMMISSION COMMENTS
Minutes of Regular Meeting 9
16.2 Commissioner Rimoli
th and he is requesting approval for $700 from his
contingency funds to provide decorations for the event. The event is before the next meeting, and
he said he would have the paperwork prepared to place on the next agenda retroactively. There
was consensus to approve his request.
17. ADJOURNMENT
Recipient:
Request Sponsor:
Brief description of Recipient's mission/commitment to the City of Dania Beach:
Description of how the funds will be used/deliverables:
REVIEW FOR VERIFICATION OF FUNDS. PAYMENT WILL BE RELEASED AFTER COMMISSION APPROVAL.
Legal Finance City Manager
PLEASE ATTACH ALL DOCUMENTATION NECESSARY TO SUPPORT THE REQUEST
Submitted by:Date of submission:
Agenda Date:
Request Amount:
City of Dania Beach
Use Request Form
Request Date:
City Commission Discretionary Funds
Recipient:
Request Sponsor:
Brief description of Recipient's mission/commitment to the City of Dania Beach:
Description of how the funds will be used/deliverables:
REVIEW FOR VERIFICATION OF FUNDS. PAYMENT WILL BE RELEASED AFTER COMMISSION APPROVAL.
Legal Finance City Manager
PLEASE ATTACH ALL DOCUMENTATION NECESSARY TO SUPPORT THE REQUEST
Submitted by:Date of submission:
Agenda Date:
Request Amount:
City of Dania Beach
Use Request Form
Request Date:
City Commission Discretionary Funds
DATE:10/2/26
INVOICE #DEV-1304
FOR:FY27_ShareFood
DUE DATE:11/2/26
Feeding South Florida
2501 SW 32 Terrace
Pembroke, Park, FL 33023
Bill To:
Attn: City of Dania Beach
Attn: Maxine Singh
Chief of Staff to the Mayor and City Commission
100 W Dania Beach Blvd, Dania Beach, FL 33004
msingh@daniabeachfl.gov
Phone: 954.924.6800, x3607
DESCRIPTION AMOUNT
Share Food. Share Joy. Thanksgiving Distribution $10,000
$ 10,000.00
INVOICE
Make all checks payable Feeding South Florida. Thank you.
"Serving Joy" 300 families (turkeys/sides)
City of Dania Beach Parks & Recreation
Department
100 W Dania Beach Boulevard
Dania Beach, FL 33004
954-924-6800
aifedi@daniabeachfl.gov
https://daniabeachfl.gov/273/Parks-Recreation
Registration/Payment Receipt 114124220
09/03/2026 09:41 AM
Account Information
Maxine Singh
100 W Dania Beach Blvd
Dania Beach, FL 33004
Received By
Tyrone Cornileus at Special Events
Item Balance Due Amount Paid
Special Event Application 31 days (Non-profit $150.00 $0.00
Change in Balance $150.00
Account Balance
(As of 09/03/2026 09:41 AM)$234.00
Transaction Notes
Serving Joy Food Drive 11.17.2026
Recipient:
Request Sponsor:
Brief description of Recipient's mission/commitment to the City of Dania Beach:
Description of how the funds will be used/deliverables:
REVIEW FOR VERIFICATION OF FUNDS. PAYMENT WILL BE RELEASED AFTER COMMISSION APPROVAL.
Legal Finance City Manager
PLEASE ATTACH ALL DOCUMENTATION NECESSARY TO SUPPORT THE REQUEST
Submitted by:Date of submission:
Agenda Date:
Request Amount:
City of Dania Beach
Use Request Form
Request Date:
City Commission Discretionary Funds
BUILDING SAFETY INSPECTION PROGRAM
SUBMITTAL FORM
_____________________________________________________________________________________________________________________
Property Owner’s Name: ________________________ Phone #: __________________________
Address: ___________________________ City: ________________ State: ______ Zip: ________
Email: _________________________________________________________________
_____________________________________________________________________________________________
Description of Work: Initial Building Safety Inspection 10 Year Re-Inspection
(Check one)
Job Address: ______________________ Present Use: ________________________________
_____________________________________________________________________________________________
Engineer/Architect: _____________________________________________________________
Reg #: _________________________________ Phone #: _______________________________
Address: ________________________ City: ___________________ State: ______ Zip: _______
_____________________________________________________________________________________________
Each building is required to submit a Submittal Package that include the following documents:
o Completed Submittal Form
o Building Safety Inspection Form – Structural Report
o Building Safety Inspection Form – Electrical Report
o Payment of $350.00 (per building)
Please make check payable to City of Dania Beach
BUILDING OFFICIAL USE ONLY
Report complete, repairs not required per report
Repairs required per report. New report updated by architect/engineer must be
submitted within 180 days when repairs are complete.
Permit(s) required for repairs
Permit(s) not required for repairs
_____________________________
Date Accepted
_____________________________
Accepted by
American Legion 954-921-7532
41 NE 1st Court Dania Beach FL 33004
admin@adminamericanlegionpost304.org
Same as above Americna Legion Post 304
Gibson M Jones AIA / Michael Bassford P.E.
AR-0015447 / PE #57390 (954)-648-5840/954-478-3929
3307432804Lighthouse Point Orlando
FLFLP.O. Box 516592320 Brix Street
City of Dania Beach
Finance Memorandum
DATE: 10/13/2026
TO: Mayor and Commissioners
FROM: Candido Sosa-Cruz, ICMA-CM, City Manager
VIA: Yeimy Guzman, CPA, Chief Financial Officer
SUBJECT: A Resolution of the City Commission authorizing a Fifth Amendment to Tyler
Technologies, Inc, to authorize reimbursement for electronic payment service fees.
Request:
The Finance Department is requesting the adoption of a resolution authorizing the request for
approval of a contract amendment with Tyler Technologies to incorporate recently adopted
provisions authorizing the City to recover electronic payment processing costs by assessing a fee
on eligible transactions.
Background:
On August 25, 2026, the City Commission approved an ordinance authorizing the city to assess
electronic payment processing surcharges. The purpose of this surcharge is to ensure the city
recovers payment-processing expenses, rather than absorbing these costs. The surcharge is
strictly limited to actual or reasonably estimated processing costs and is not intended to generate
additional City revenue.
To implement the surcharge, each applicable vendor agreement must be amended. This
amendment allows the City to collect the authorized surcharge on eligible transactions and
ensures that vendor systems comply with payment-card rules and legal requirements.
Upon approval, staff will finalize vendor configurations, conduct testing, prepare customer-
facing disclosures, and coordinate implementation in accordance with Commission-approved
guidelines.
Budgetary Impact
The amendment allows the city to recover electronic payment processing costs rather than
absorbing them, resulting in meaningful savings for the city.
Recommendation
Staff recommend approval of the contract amendment with Tyler Technologies, Inc. to authorize
the implementation of the electronic payment processing surcharge. This amendment is
necessary for compliance with the City’s ordinance and ensures proper cost recovery while
maintaining transparency, customer disclosure, and payment‑processor compliance requirements.
RESOLUTION NO. 2026-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING A FOURTH AMENDMENT TO THE
AGREEMENT BETWEEN THE CITY OF DANIA BEACH, FLORIDA, AND
TYLER TECHNOLOGIES, INC., TO AUTHORIZE REIMBURSEMENT FOR
ELECTRONIC PAYMENT SERVICE FEES; PROVIDING FOR CONFLICTS;
AND PROVIDING FOR AN EFFECTIVE DATE.
the City and Tyler Technologies, Inc. entered into an Agreement dated and
effective May 26, 2020 (the “Original Agreement”); and
the Agreement authorizes the Contractor to manage the day-to-day
operations of the City transactions, including the collection of City-established charges as the
City’s agent and the use of credit cards and online payments as preferred methods of payment; and
the City desires to establish a contractual framework under which an
electronic payment service fee may be collected on eligible City transactions, subject to applicable
law, payment-card requirements, and the City’s written direction; and
the City adopted an ordinance creating a provision relating to “Electronic
Payment Processing Surcharges” to authorize the City to recover electronic payment processing
costs as authorized by section 215.322(5), Florida Statutes, so that the City can remain whole in
its fees; and
the Parties desire to amend the Agreement to authorize electronic payment
service fees.
That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
That City approves the appropriate officials to execute the Fourth
amendment to the agreement between the City of Dania Beach and Tyler Technologies, Inc., which
amendment is attached and incorporated by reference as Exhibit A to this resolution.
That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
That this Resolution shall be effective 10 days after passage.
2 RESOLUTION #2026-_____
PASSED AND ADOPTED on __________________, 2026.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
Tyler Payment Processing Amendment
AMENDMENT
This amendment ("Amendment") is effective as of the date of signature of the last party to sign as
indicated below ("Amendment Effective Date"), by and between Tyler Technologies, Inc. with offices at One
Tyler Drive, Yarmouth, Maine 04096 ("Tyler") and the City of Dania Beach, Florida, with offices at 100 West
Dania Beach Boulevard, Dania Beach, Florida 33004 ("Client").
WHEREAS, Tyler and Client are parties to an agreement dated May 29, 2020 ("Agreement"); and
WHEREAS, Tyler and Client desire to amend the terms of the Agreement as provided herein.
NOW THEREFORE, in consideration of the mutual promises hereinafter contained, Tyler and Client agree as
follows:
1. Section G(22) of the Agreement is deleted in its entirety and replaced with the following: To the extent
permitted by applicable law, you will indemnify and hold harmless us and our agents, officials, and
employees from and against any and all third-party claims, losses, liabilities, damages, costs, and
expenses (including reasonable attorney's fees and costs) for personal injury or property damage to the
extent caused by your gross negligence or willful misconduct; or (b) your violation of a law applicable
to your performance under this Agreement. We will notify you promptly in writing of the claim and will
give you sole control over its defense or settlement. We agree to provide you with reasonable assistance,
cooperation, and information in defending the claim at your expense. Tyler understands and agrees that
as a Florida municipality, the Client is entitled to the protection of the sovereign immunity statutes (see
F.S. 768.28) and law of the State of Florida.
2. The pricing set forth in Exhibit 1 to this Amendment replaces all New World ERP related Tyler
Payments pricing currently included under the Agreement, to reflect Client’s desire to transition from
absorbing certain transaction fees to passing them on to the end user at the time of the transaction. For
the avoidance of doubt, Utility Billing transaction fees shall remain absorbed by the Client and are listed
in Exhibit 1 for reference purposes only.
3. This Amendment shall be governed by and construed in accordance with the terms and conditions of the
Agreement. Notwithstanding the foregoing, as stated in Exhibit 1 your use of Tyler Payments is subject
to the Payment Processing License and Services Agreement set out at
https://www.tylertech.com/terms/payment-card-processing-agreement (for the purposes of this
Amendment, the “PPLSA”).
4. The PPLSA is modified as follows:
a. Section 4(b) is deleted in its entirety and replaced with the following: By giving written notice
to Merchant of at least ninety (90) calendar days, Tyler may change Merchant’s fees, charges
and discounts resulting from (i) changes in Association fees (such as interchange, assessments
and other charges); (ii) changes in pricing by any third party provider of a product or service
used by Merchant; or (iii) other market adjustment. Such new prices shall be applicable as of
the effective date established by the Association or third party provider, or as of any later date
specified in Tyler’s notice to Merchant. In addition, Tyler may update pricing for rental of
Equipment by giving written notice to Merchant at the end of any initial rental term or when
such Equipment is upgraded to a newer model or replaced in accordance with the pricing set
forth on Tyler’s then-current Order Form. No corresponding change to a customer-paid fee shall
be implemented before expiration of the ninety-day notice period unless the City authorizes
earlier implementation.
Tyler Payment Processing Amendment
b. Section 10(b) is deleted in its entirety and replaced with the following: Except as prohibited by
applicable law, Merchant shall indemnify and hold harmless Tyler from and against any claim
or action related to Merchant’s violation of applicable law and/or Association Rules, including,
without limitation, any Merchant election to apply custom fee structures, customer surcharges
or other customer-paid fees. Notwithstanding the foregoing, the City’s obligations under this
subsection shall apply only to the extent, if any, that the City has legal authority under Florida
law to provide such indemnification. Nothing in this subsection, the Amendment, or the
PPLSA shall be construed as an expansion of the City’s liability beyond that established or
permitted by applicable law.
5. Except as expressly indicated in this Amendment, all other terms and conditions of the Agreement shall
remain in full force and effect.IN WITNESS WHEREOF, the parties hereto have executed this Amendment as
of the dates set forth below.
SIGNATURES ON THE FOLLOWING PAGES
Tyler Payment Processing Amendment
IN WITNESS OF THE FOREGOING, the parties have set their hand and seal the day and
year first written above.
CITY OF DANIA BEACH, FLORIDA,
a Florida municipal corporation
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO LEGAL FORM
AND CORRECTNESS
EVE A. BOUTSIS, CITY ATTORNEY CANDIDO SOSA-CRUZ, ICMA-CM
CITY MANAGER
DATE:
Tyler Payment Processing Amendment
CONTRACTOR:
WITNESSES:
Tyler Technologies, Inc., a foreign corporation
registered to conduct business in Florida
SIGNATURE SIGNATURE
PRINT Name PRINT Name
SIGNATURE Title
DATE:
PRINT Name
STATE OF
COUNTY OF
The foregoing instrument was acknowledged before me by means of ☐ physical presence or ☐
online notarization, on , 2026, by _______________ (name),
_______________________ (title), of Tyler Technologies, Inc., a foreign corporation registered to
conduct business in Florida, who is personally known to me or has produced
as identification.
NOTARY PUBLIC
My Commission Expires: State of
Tyler Payment Processing Amendment
Tyler Payment Processing Amendment
Tyler Payment Processing Amendment
Tyler Payment Processing Amendment
Tyler Payment Processing Amendment
City of Dania Beach
City Attorney Memorandum
DATE: 10/13/2026
TO: Mayor and Commissioners
FROM: Eve A. Boutsis, City Attorney
VIA: Candido Sosa-Cruz, ICMA-CM, City Manager
SUBJECT: Employment Agreement Extension of City Attorney
Request:
To execute the agreement extension for City Attorney, Eve Boutsis.
Background:
I was hired as the Assistant City Attorney on March 3, 2020. On January 4, 2022, I was
promoted to City Attorney.The agreement was extended on July 11, 2024, and the current
expires on January 3, 2030. I have requested an extension of my contract through September 30,
2034.
Minor modifications were made to the form of the agreement to be consistent with the terms
relating to the City Manager. Specifically, these changes provide the same evaluation process for
both charter officers, on an annual basis in June, if requested by the City Commission.
Duplicative language was removed, and a general clean-up of the provisions was completed.
A new request is included in the agreement, which is to require a 4/5 vote for termination of the
attorney for convenience. A 3/5 vote would remain for termination for cause. The 4/5 vote
request is to be consistent with the Manager’s contract. The 4/5 vote requirement for the City
Manager is contained in the charter. The charter is silent as to the City Attorney. However, as
there are only two charter officers, the request is to have the same type of vote relating to
termination for the two officers who report to the City Commission. Prior to Mr. Chen’s
employment, the former CRA director, had a 4/5 vote requirement for termination for
convenience.
Budgetary Impact
There will be no budgetary impact of this item.
Recommendation
Adopt the resolution and authorize execution of the agreement extension.
RESOLUTION NO. 2026-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE CITY COMMISSION TO ENTER
INTO AN EXTENSION AND MODIFICATION OF THE EMPLOYMENT
AGREEMENT WITH THE CITY ATTORNEY; PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, Eve Boutsis was hired as the Assistant City Attorney for Dania Beach on
March 3, 2020; and
WHEREAS, on January 4, 2022, Ms. Boutsis was promoted to City Attorney and has
served dutifully since then; and
WHEREAS, on July 11, 2024, Ms. Boutsis’ agreement was extended to January 3, 2030;
and
WHEREAS, the City Attorney is requesting an extension of her contract through
September 30, 2034; and
WHEREAS, although the agreement can be terminable early at the discretion and
convenience of the City Commission, the City Attorney is seeking assurance of continuity; and
WHEREAS, minor modifications were made to the form of the agreement to be
consistent with the terms relating to the City Manager as to evaluations, so that evaluations be
conducted in June, prior to the budget process, at the request of the City Commission, and
clarifying that the process for evaluations to be consistent with the manager’s process; and
WHEREAS, the proposed agreement contains a new request to provide a 4/5 vote to
terminate the services of the attorney for convenience; and
WHEREAS, a 3/5 vote would only be required if the termination of the City Attorney’s
services is for cause; and
WHEREAS, this request would be consistent with the Manager’s contract; and
WHEREAS, as there are only two charter officers the request is to have the same type of
vote relating to termination, as is provided for the City Manager.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the City Commission authorizes the proper City Officials to
execute the contract with Ms. Eve Boutsis, a copy of which Extension Agreement is attached
as Exhibit “A” and is incorporated by reference into this Resolution.
RESOLUTION #2026-_____ 2
Section 2. That all resolutions or parts of resolutions in conflict with this
Resolution are repealed to the extent of such conflict.
Section 3. That this Resolution shall be in force and take effect immediately upon
its passage and adoption.
PASSED AND ADOPTED on __________________, 2026.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
JOYCE L. DAVIS
CITY CLERK MAYOR
EMPLOYMENT AGREEMENT EXTENSION
THIS EMPLOYMENT AGREEMENT EXTENSION (this “Extension Agreement”) is
made and entered into on _________________________, 2026, between the City of Dania Beach
(the “City”) and Eve Boutsis, the City Attorney (the “Attorney”).
WHEREAS, on January 4, 2022, Ms. Boutsis was promoted to City Attorney and has
served dutifully since then; and
WHEREAS, on July 11, 2024, Ms. Boutsis’ agreement was extended to January 3, 2030;
and
WHEREAS, the City Attorney is requesting an extension of her contract through
September 30, 2034; and
WHEREAS, the proposed agreement contains a new request to provide a 4/5 vote to
terminate the services of the attorney for convenience; and
NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which
are acknowledged, the parties agree as follows:
TERMS
1. Employment. The City employs the Employee as its City Attorney under the following
terms and conditions.
2. Term.
2.1 The Cit Attorney has a contract through January 3, 2030, and the City would like
to extend and modify the contract through September 30, 2034, unless earlier terminated as
provided in this Agreement. All the terms contained herein include the terms from the prior
employment agreement, and all modifications contained herein.
2.2 No later than ninety (90) days prior to expiration of this Agreement, unless this
Agreement is terminated earlier as provided in this Agreement, the City Commission
(“Commission”) shall notify the Attorney of its intention to either enter into a new agreement or
to allow this Agreement to expire. If the Commission intends to let this Agreement expire, the
Attorney may resign from her position with two weeks 30 days prior written notice and shall be
entitled to receive any accrued unused annual leave, sick leave and personal days. In the event
this Agreement expires due to the Commission’s failure to act and Attorney is ready, willing and
able to continue with her employment as Attorney, the Commission agrees to continue providing
the Attorney with her regular bi-weekly salary and benefits as provided in this Extension
Agreement, until otherwise notified by the Commission.
2
3. Duties.
The Attorney shall perform the duties and exercise the powers of City Attorney as
prescribed by state law and as provided in the City Charter, including but not limited to the
following:
3.1 Be responsible for the appointment, supervision and removal of employees within
the Office of the City Attorney;
3.2 Provide legal advice to all departments, boards or agencies;
3.3 Review and revise all resolutions, contracts, agreements, leases, and other legal
documents;
3.4 Attend all Commission meetings except when excused by the Commission and
shall participate in discussion but not have the right to vote;
3.5 Provide guidance to the Mayor and City Commission as it relates to state laws,
ethics, and all other applicable rules and regulations affecting the elected officials and the City, at
large;
3.6 See that all laws, provisions of the Charter and acts of the Commission, subject to
enforcement and administration by her or by officers subject to her direction and supervision, are
faithfully executed;
3.7 Prepare and submit to the Commission a proposed annual budget for the office of
the City Attorney;
3.8 Prepare other reports as the Commission may require concerning the legal issues
facing the operation of City departments, offices, boards and agencies;
3.9 Keep the Commission fully advised as to the financial condition and future needs
of the City and make such recommendations to the Commission concerning the affairs of the City
as she deems to be in the best interests of the City;
3.10 Before any ordinance so proposed shall be submitted to the City Commission, it
shall be first approved as to its form by the Attorney whose duty it shall be to draft such proposed
ordinance in proper legal language, if called upon so to do, and to render such other service to
persons desiring to propose such ordinance as shall be necessary to make the same proper for
consideration by the City Commission;
3.11 The Attorney, or her designee, shall present the City's case at formal hearings and
shall have prosecutorial discretion, including, but not limited to, the right to negotiate a plea
with a violator and present that plea to the magistrate for approval, to recommend the disposition
3
of a case to the magistrate, and to decline to prosecute a case, similar to the discretion exercised
by the state attorney in criminal cases. In no case shall the Attorney, or her designee, serve as
attorney for the magistrate and at the same time present the city's cases to the magistrate.
3.12 The Attorney shall be required to take such legal steps as may be necessary to
enforce the terms and conditions imposed in favor of the city or its inhabitants in any public
utility franchise are faithfully kept and performed.
3.13 Review and revise contracts, deeds and other documents to ensure that the City is
in the best position possible, as authorized by the Commission; and
3.14 Perform such other duties as are specified in the Charter and as may be required by
the Commission.
4. Hours of Work. The Attorney agrees to remain in the exclusive full-time employment of the
City and shall not accept any other employment during the term of this Extension Agreement. The
Attorney further agrees to devote that amount of time and energy which is reasonably necessary for the
Attorney to faithfully perform her duties under this Extension Agreement. Notwithstanding the
foregoing, with the prior consent of the Commission, the Attorney, from time to time, may engage in
teaching opportunities so long as such opportunities are not for compensation and do not conflict with or
affect her ability to perform her duties under this Extension Agreement.
5. Compensation.
5.1 Salary. The annual salary of the Attorney shall be $274,486.95, which is payable in
installments at the same time and manner, as other employees of the City are paid. Any increase
in the annual base salary other than as provided in Section 5.2 shall be in the sole discretion of
the City Commission. Any increase in the annual base salary other than as provided in Section 5.2
shall be in the sole discretion of the City Commission, and only after the annual performance
evaluations provided for under Section 6 of this Extension Agreement.
Annual Salary Adjustments. The Attorney’s salary shall increase to reflect an annual cost of
living adjustment at the same rate and effective time as the cost of living adjustment provided
be adjusted annually at the beginning of each fiscal year at the same time and manner other
employees during the term of this Agreement.
5.2 The Attorney will receive a monthly expense allowance consistent with that
paid to the City Manager and other Department Heads, to be paid in the same manner as
Department Directors.
5.3 The Attorney’s salary will be increased to reflect an annual cost of living
adjustment at the same rate and effective time as the cost-of-living adjustment that is next
provided to AFSCME bargaining unit employees.
4
6. Performance Evaluation.
6.1 An evaluation of the Attorney shall be conducted annually each June in advance of the
adoption of the annual operating budget and the initiative and discretion of the City Commission. March
(consistent with the time period, evaluation period for the City Manager) in advance of the adoption of
the annual operating budget. Any such review and evaluation shall be conducted in accordance with
criteria developed by the Human Resources Department and the goals established by the Commission.
Criteria may be added or deleted as the Commission may from time to time decide. Should an elected
official choose to evaluate the Attorney, the evaluation may be conducted orally or in writing and
presented individually to the Attorney. Once the evaluation is shared with the Attorney, the Attorney
will be provided with the opportunity to respond orally or in writing. Any written evaluation will be
sent to Human Resources for inclusion in the Attorney’s personnel file. Failure to conduct an evaluation
will not preclude or prevent the If any such evaluation is not conducted, the Attorney from receiving
will still receive the salary adjustment specified in Paragraph 5.2, above.
6.2 Subsequent to each evaluation of Attorney's performance, but prior to the beginning
of each fiscal year, the Commission may (in consultation with the Attorney) define such goals and
performance objectives, in writing, which they determine necessary for the proper operation of the
office.
6.2 Subsequent to each evaluation of Attorney's performance, but prior to the beginning of
each fiscal year, the Commission may (in consultation with the Attorney) define such goals and
performance objectives, in writing, which they determine necessary for the proper legal operation of the
City and in attainment of the Commission's policy objectives and may further establish a relative priority
among those various goals and objectives, and the proper operation of the office. Any such goals and
performance objectives may generally be attainable within the time limitations as specified and within
the annual operating and capital budgets and appropriations provided.
7 Automobile and Electronics, Etc.
7.1 The City shall provide the Attorney with an automobile allowance of six hundred dollars
($600.00) per month ($7,200.00) annually) to be paid on a bi-weekly pay period at the same time and in
the same manner as other employees, which is intended to cover the Attorney’s automobile related
expenses during her employment as City Attorney.
7.2 The City shall provide the City Attorney with a monthly cellphone and data stipend (City
Attorney shall use her personal cell phone but will receive a stipend towards the phone and data usage) of
one hundred twenty five dollars ($125.00) per month ($1,500.00 annually) to be paid on a bi-weekly pay
period basis at the same time and in the same manner as other employees and such devices shall be
connected to the City’s computer network.
7.3 The City shall provide the City Attorney the benefits provided to Senior Directors as
provided in the City’s Personnel Policy Manual (PPM).
5
7.4 The Attorney will receive a monthly expense allowance consistent with that paid to the
Attorney and other Department Heads, to be paid in the same manner as Department Directors.
8 Insurance. The City shall provide the Attorney with comprehensive medical, vision, and
dental insurance, and life insurance, and to participate in those plans in the same manner and amounts
are to be paid as are provided to Department Heads of the City. The Attorney shall select such coverage
from the insurance plan provided to all City employees. The City also shall provide the Attorney with
life insurance and long-term disability insurance coverage in the same manner and amounts as provided
by the City to other general employees of the City and pay the related cost of the premiums.
9 Retirement Benefits. The Attorney shall be enrolled by the City in the Florida Retirement
System’s (“FRS”) Senior Management Service Class and the City shall be responsible for paying the
mandatory City Employer contributions into FRS for the Senior Management Service Class. In addition,
the City will pay the rate of one- and one-half percent (1.5%) of the required three percent (3) employee
contribution to the plan on behalf of the City Attorney. The Attorney will pay the remaining one- and one-
half percent (1.5%) of the employee contribution. The City Attorney will be entitled to participate in the
City’s 457 Deferred Compensation plan at the same level of benefits afforded to all other City employees.
The election to participate must be made at the time of hire and the Attorney will be required to contribute
the required Employee Contribution in order to receive the City match which is currently a maximum of
1.8% of pay. which is currently provided for all employees, which is three (3) percent of pay.
10 Annual Leave, Sick Leave and Personal Days. The Attorney shall be entitled to the following
annual leave:
10.1 Twenty-one (21) days of annual vacation leave. Vacation time will be earned in
accordance with Senior Level Department Heads pursuant to the PPM.
10.2 Twelve (12) days of annual sick leave.
10.3 Four (4) days of annual personal leave.
10.4 8 hours of safety day.
Vacation leave shall continue to accrue at the rate of 8.62 hours per pay period and sick leave will
accrue at the rate of eight (8) hours per month in the same manner as is applicable to all other City
employees. If additional dates of authorized leave are provided to employees (i.e. bereavement leave,
floating holiday or any other policy change) the City Manager shall automatically be entitled to the
same benefit
11 Termination by City and Severance Pay.
11.1 In accordance with the Charter, the Attorney shall serve at the pleasure of the
Commission. Nothing in this Extension Agreement shall prevent, limit, or otherwise interfere with
6
the right of the Commission to terminate the services of the Attorney at any time during a regular
or special City Commission meeting. The Attorney may be removed from office for cause by a
majority vote of the city commission; if removed without cause, a four-fifths (⅘) vote is required.
11.2 Termination without cause. (4/5 vote) The City Attorney may be terminated upon
30 days’ notice without cause. If the Attorney is terminated without cause, the Attorney shall
receive a lump sum severance salary equal to twenty (20) weeks of her regular base salary and
shall continue to pay the premiums for twenty (20) weeks of paid medical, dental and vision
insurance after the effective date of her termination. The Attorney shall be entitled to receive
payment of any accrued unused vacation leave, sick leave, personal days, or other authorized and
accrued days off. The City’s obligation to pay for medical, vision and dental insurance shall cease
upon Attorney’s ability to participate in another group plan offered by any subsequent employer.
The City shall not provide the Attorney with any other benefit or reimbursement (except as
specifically set forth in this paragraph) beyond the date of her termination. All severance payments
(excluding the continuation of medical, vision, and dental insurance benefits) shall be paid to the
Attorney bi-weekly upon her next regular pay period after termination. Upon payment of the
severance payment specified in this Section 11.2, and the medical, vison and dental insurance, and
life insurance benefits provided for in this Extension Agreement, the City shall have no further
contractual financial obligations to the Attorney. The severance payment shall constitute
stipulated and liquidated damages and the maximum amount of financial liability for which the
City may be liable in the event of termination for breach of contract. Termination by the
Commission under this Section or any other provisions of this Extension Agreement shall not
cause the Attorney to forfeit any vested benefits under the Defined Contribution Plan.
11.3 Termination for cause. (3/5 vote) In the event the Attorney is terminated for
misconduct as defined in Section 443.036(30), Florida Statutes, the City shall have no obligation
to pay the Attorney any compensation, severance pay, medical, vision, and dental insurance or
other benefits under this Extension Agreement, including any unused accrued vacation leave, sick
leave and personal days. Misconduct includes but is not limited to: (i) gross negligence in the
performance of her duties; (ii) conviction of a felony; (iii) gross insubordination; (iv) willful
neglect of duty; or (v) adjudicated violation of the Florida Code of Ethics for Public Officers and
Employees, the Broward Conflict of Interest and Code of Ethics, the City Charter, or the City’s
Code of Ordinances.
11.4 If the Attorney is unable to perform her duties as specified in Section 3 of this
Extension Agreement for a period of thirty (30) consecutive days or sixty (60) non-consecutive
days during any one-year period for any reason other than approved Family Medical Leave Act
(“FMLA”) absence, the Commission may terminate this Extension Agreement. If the Attorney
takes FMLA-approved leave and exhausts her statutorily protected FMLA-approved leave in any
one-year period, the Commission may terminate this Extension Agreement. If this Extension
Agreement is terminated under this Section, the Attorney shall not be entitled to severance pay or
any other benefits under the terms of this Extension Agreement except for payment of accrued
unused leave (vacation, sick and personal leave).
7
12 Termination of Extension Agreement by Attorney.
12.1 In the event that the Attorney resigns during the term of this Extension Agreement,
the Attorney shall provide the City with ninety (90) days’ advance written notice, unless the parties
agree in writing to a different period of time. In the event of resignation by the Attorney under
this Section, the Attorney shall not be entitled to receive any severance or medical, vision or dental
insurance benefits; however, she shall be entitled to receive payment of any accrued unused
vacation leave, sick leave and personal days.
12.2 In the event that the Attorney resigns with less than ninety (90) days’ advance
written notice, the City Commission may elect to terminate the Attorney immediately or allow the
Attorney to continue to serve until the date specified in the Attorney’s resignation. In the event of
a resignation or termination under this paragraph, notwithstanding any other provisions of this
Extension Agreement, the Attorney shall not be entitled to receive any compensation, severance
payment, any accrued unused vacation leave, sick leave, and personal days unless the City
Commission authorizes payment of same.
13 Professional Development.
13.1 Subject to City policy and state law, the City agrees to pay the reasonable professional
dues and subscriptions of the Attorney necessary for her continuation and participation as a member in
national, regional, state and local professional associations and organizations necessary and desirable
for her continued professional participation, growth and advancement, and for the good of the City.
The Attorney shall not hold office in any local, state, regional or national professional association or
organization without prior written approval of the Commission.
13.2 Subject to City policy and state law, the City agrees to pay the travel and reasonable per
diem expenses of the Attorney for travel to one national and one state association conferences per year.
The Attorney may, with the advance written approval of the City Commission, attend additional national
or state conferences, or both.
14 Notice. Notices pursuant to this Extension Agreement shall be given by hand delivery or by
certified mail through United States Postal Service delivery, addressed as follows:
City: Mayor and Members of the City Commission
City of Dania Beach
100 W Dania Beach Blvd
Dania Beach, FL 33004
City Attorney: Eve Boutsis, City Attorney
100 W. Dania Beach Boulevard
Dania Beach, Florida 33004
15 Real Estate Investments Prohibited. Without the Commission’s written approval, the
Attorney shall not directly or indirectly invest in real estate within the City, except for her primary
residence.
8
16 Other Terms and Conditions.
16.1.1 If any provision, or any portion of a provision contained in this Extension Agreement is
held to be unconstitutional, illegal, invalid, or unenforceable, the remainder of this
Extension Agreement, or any portion of it, shall not be affected and shall remain in full force and
effect.
16.2 The waiver by either party of a breach of any provision of this Extension Agreement by
the other shall not operate or be construed as a waiver of any subsequent breach by that party.
16.3 The rights and obligations in this Extension Agreement are personal in nature and cannot
be transferred by the Attorney.
16.4 This Extension Agreement contains the entire agreement of the parties. It shall not
be changed or amended unless by an amendment in writing signed by the parties.
16.5 In the event of any litigation which arises out of, pertains to, or relates to this
Extension Agreement, or the breach of it, or the standard of performance required in it,
each party shall bear its own attorney fees and costs.
16.6 This Extension Agreement shall be governed by Florida law and any litigation which
may arise from this Extension Agreement shall be filed and litigated in Broward County,
Florida. The parties waive the right to a jury trial.
SIGNATURES ON THE FOLLOWING PAGES
9
IN WITNESS OF THE FOREGOING, the parties have executed this Extension
Agreement, in duplicate, on the day and year first written above.
CITY:
ATTEST: CITY OF DANIA BEACH, FLORIDA
a Florida Municipal Corporation
ELORA REIRA JOYCE L. DAVIS
CITY CLERK MAYOR
Dated: _____________, 2026.
APPROVED FOR FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
10
WITNESSES: CITY ATTORNEY:
Signature EVE A. BOUTSIS
PRINT Name DATE
Signature
PRINT Name
STATE OF FLORIDA)
COUNTY OF BROWARD)
The foregoing instrument was acknowledged before me by means of ☐ physical presence
or ☐ online notarization, on ______________________, 2026, by Eve A. Boutsis, who is
personally known to me or has produced identification __________________________________.
Notary Public, State of Florida
My Commission Expires:
Print Name
City of Dania Beach
Public Services Memorandum
DATE: 10/13/2026
TO: Mayor and Commissioners
FROM: Candido Sosa-Cruz, ICMA-CM, City Manager
VIA: Oscar Vasquez, Public Services Director
Carlos Escalante, Public Services Deputy Director
SUBJECT: AUTHORIZATION TO AWARD ITB NO.26-009 "FIRE STATION NO. 1
WIND RETROFIT PROJECT" AND ENTER INTO AN AGREEMENT
WITH S3S CONSTRUCTION INC.
Request:
The Public Services Department (PSD) requests approval to award Invitation to bid ITB No. 26-
009, "Fire Station No. 1 Wind Retrofit Project," to S3S Construction Inc. as the next available
lowest responsive and responsible bidder and enter into an agreement.
Background:
The City of Dania Beach advertised ITB No. 26-009, "Fire Station No. 1 Wind Retrofit Project,"
to obtain the services of a qualified contractor to perform wind mitigation improvements at Fire
Station No. 1, located at 116 West Dania Beach Boulevard, Dania Beach, Florida.
The project is funded through the Hazard Mitigation Grant Program (HMGP) DR-4337-285-R,
as approved by the Florida Division of Emergency Management (FDEM) and the Federal
Emergency Management Agency (FEMA). The purpose of the project is to improve the
resiliency of Fire Station No. 1 by reducing potential damage from hurricanes and other severe
weather events while ensuring the facility remains operational during emergency situations.
The work includes structural, electrical, civil, and site improvements necessary to harden the
facility against extreme wind events. The project includes replacement of exterior doors, roll-up
bay doors, roofing, louvers, and roof access components; construction of a new concrete
generator slab; installation of the City-furnished 250-kW diesel emergency generator, automatic
transfer switch (ATS), annunciator, and associated electrical equipment; demolition of the
existing generator system; underground electrical work; grounding improvements; utility
coordination with Florida Power & Light (FPL); testing and commissioning; fire alarm
integration; HVAC control modifications; crane operations; restoration of all disturbed areas;
and all labor, equipment, permits, inspections, testing, and related work necessary to provide a
complete and fully operational wind mitigation project.
Bids were publicly opened on July 24, 2026, and five firms submitted proposals as follows:
Respondent Total Bid Amount
Di Pompeo Construction Inc. $ 982,342.99
S3S Construction Inc. $1,084,330.50
West Construction Inc. $1,087,311.67
Vercetti Enterprise LLC $1,133,722.77
Tadeos Engineering LLC $1,136,520.08
Following Procurement's review for responsiveness and the Engineer of Record's technical
evaluation, Di Pompeo Construction Inc. was determined to be the lowest responsive and
responsible bidder. However, the City and Di Pompeo Construction Inc. were unable to reach an
agreement on the contract. Therefore, the City did not proceed with an award to Di Pompeo
Construction Inc. and is proceeding with S3S Construction Inc., the next available lowest bidder,
in the amount of $1,084,330.50.
Budgetary Impact
Funding for this project will be appropriated from Grant fund 103-22-65-522-63-10 in the
amount of $1,084,330.50. This project is fully funded through the FDEM grant. Upon approval,
funding will be reallocated from CSLIP Cycle 9 Project Account No. 301-15-05-515-31-10 in
the amount of $314,810.00, EOC Project Account No. 301-22-04-522-31-10 in the amount of
$108,696.00, and from Community Shuttle Account No. 001-39-01-539-31-60 in the amount of
$5,253.21.
Recommendation
PSD recommends approval to award ITB No. 26-009, "Fire Station No. 1 Wind Retrofit Project,"
to S3S Construction Inc. and enter into an agreement in the amount of $1,084,330.50.
RESOLUTION NO. 2026-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE AWARD OF INVITATION TO BID
(ITB) NO. 26‑009, “FIRE STATION NO. 1 WIND RETROFIT PROJECT,” TO
S3S CONSTRUCTION INC. IN AN AMOUNT NOT TO EXCEED ONE
MILLION EIGHTY‑FOUR THOUSAND THREE HUNDRED THIRTY
DOLLARS AND FIFTY CENTS ($1,084,330.50); AUTHORIZING THE
PROPER CITY OFFICIALS TO EXECUTE AN AGREEMENT FOR
SERVICES WITH S3S CONSTRUCTION INC.; AND TO EXCEED THE
ANNUAL SINGLE‑VENDOR PURCHASING THRESHOLD OF FIFTY
THOUSAND DOLLARS ($50,000.00); PROVIDING FOR FUNDING;
PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE
DATE.
the Dania Beach Code of Ordinances, Chapter 2, Article 1, Section 2-10,
“Monetary thresholds for certain purchases and payment disbursement authorizations”,
Subsection (a), sets the monetary threshold at Fifty Thousand Dollars ($50,000.00) for a vendor
each fiscal year; and
Fire Station No. 1 serves as a critical emergency response facility for the
City of Dania Beach and must remain operational before, during, and after severe weather events
and other emergencies; and
the City developed the Fire Station No. 1 Wind Retrofit Project to improve
the resiliency of the facility by implementing wind mitigation measures designed to reduce
damage from hurricanes and other severe weather events; and
the project includes structural, electrical, civil, and site improvements,
including replacement of exterior doors, roll-up bay doors, roofing, louvers, roof access
components, construction of a new concrete generator slab, installation of the City-furnished 250-
kW diesel emergency generator, automatic transfer switch (ATS), annunciator, associated
electrical equipment, utility coordination, testing and commissioning, and all related work
necessary to provide a complete and operational wind retrofit project; and
the City publicly advertised Invitation to Bid (ITB) No. 26-009, "Fire
Station No. 1 Wind Retrofit Project," in accordance with the City's procurement requirements;
and
bids were publicly opened on July 24, 2026, and five (5) responsive bids
were received; and
Procurement completed its review for responsiveness, and the Engineer of
Record reviewed the technical qualifications and bid submissions; and
RESOLUTION #2026-_____ 2
WHEREAS, Di Pompeo Construction Inc. submitted the lowest responsive and
responsible bid in the amount of $982,342.99; and
WHEREAS, the City and Di Pompeo Construction Inc. were unable to reach an
agreement on the contract, and the City therefore did not proceed with an award to Di Pompeo
Construction Inc.; and
WHEREAS, S3S Construction Inc. submitted the next available lowest bid in the amount
of $1,084,330.50, and the Public Services Department recommends award of ITB No. 26-009 to
S3S Construction Inc. and approval of the Construction Agreement for completion of the Fire
Station No. 1 Wind Retrofit Project; and
WHEREAS, the total project authorization shall not exceed $1,192,763.55; and
WHEREAS, funding for this project will be appropriated from Grant Account No. 103-
18-65-519-63-10. This project is fully funded through the FDEM grant.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2. That the City Commission hereby authorizes the award of Invitation to Bid
(ITB) No. 26-009, "Fire Station No. 1 Wind Retrofit Project," to S3S Construction Inc. in the
amount of $1,084,330.50, which will exceed the annual vendor threshold of $50,000.00.
Section 3. That the City Commission hereby approves the Construction Agreement
between the City of Dania Beach and S3S Construction Inc. completion of Fire Station No. 1
Wind Retrofit Project.
Section 4. That the total project authorization, including a 10 percent contingency,
shall not exceed $1,084,330.50.
Section 5. That funding for this project will be appropriated from the Grant Fund
Account No. 103-22-65-522-63-10 in the amount of $1,084,330.50.
Section 6. That funding will be reallocated from CSLIP Cycle 9 Project Account No.
301-15-05-515-31-10 in the amount of $314,810.00, EOC Project Account No. 301-22-04-522-
31-10 in the amount of $108,696.00, and from Community Shuttle Account No. 001-39-01-539-
31-60 in the amount of $5,253.21.
RESOLUTION #2026-_____ 3
Section 7. That the City Manager, or designee, is hereby authorized to take all
administrative actions reasonably necessary to implement the bid award authorized herein, and
authorize the appropriate City officials to execute the agreement.
Section 8. That the use of contingency funds in the amount of $98,575.50 may be
approved by the City Manager through written request by the Public Services Department upon
receipt of written change orders from the vendor.
Section 9. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 10. That this Resolution shall become effective immediately after adoption.
PASSED AND ADOPTED on __________________, 2026.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
1
CONSTRUCTION AGREEMENT
FIRE STATION NO. 1 WIND RETROFIT PROJECT
ITB NO. 26-009 | HMGP PROJECT NO. DR-4337-285-R
This Construction Agreement (the “Agreement”) is entered into by and between the City of Dania
Beach, Florida, a Florida municipal corporation (the “City” or “Owner”), and DiPompeo
Construction Corporation, a Florida profit corporation, Document No. P93000054441 (the
“Contractor”). The City and Contractor may each be called a “Party” and together the “Parties.”
RECITALS
A. Fire Station No. 1, located at 116 West Dania Beach Boulevard, is an essential public-safety
facility that must remain capable of supporting fire-rescue operations during hurricanes, utility
outages and other emergencies.
B. The City developed the Fire Station No. 1 Wind Retrofit Project to harden the facility against
extreme wind events and complete the structural, roofing, electrical, civil and site improvements
necessary to provide a complete, resilient and operational facility and emergency-power system.
C. The City publicly advertised Invitation to Bid No. 26-009, “Fire Station No. 1 Wind Retrofit
Project,” in accordance with the City’s procurement requirements.
D. Bids were publicly opened on July 24, 2026, and, following review by the City’s Procurement
Division and Engineer of Record, Contractor was determined to be the lowest responsive and
responsible bidder, with a total bid of $982,342.99, inclusive of a $21,484.00 permitting allowance
and an $89,303.90 contingency.
E. By Resolution No. 2026-____, adopted August 25, 2026, the City Commission awarded ITB
No. 26-009 to Contractor in the amount of $982,342.99, approved this Agreement, and authorized
its execution by the appropriate City officials.
F. The Project is funded in whole or in part through the Hazard Mitigation Grant Program, Project
No. DR-4337-285-R, as approved by the Florida Division of Emergency Management and the
Federal Emergency Management Agency, and Contractor acknowledges that the Work is subject
to the applicable grant requirements incorporated into the Contract Documents.
G. Contractor represents that it is qualified, licensed, adequately staffed and financially able to
perform the Work, has examined the Contract Documents and Project Site, and has included in its
Contract Sum all labor, supervision, materials, equipment, coordination, temporary facilities,
testing, permits, overhead, profit and incidentals necessary for a complete and operational Project.
H. Contractor represents that it is qualified, licensed, adequately staffed and financially able to
perform the Work, has examined the Contract Documents and Project Site, and has included in its
Contract Sum all labor, supervision, materials, equipment, coordination, temporary facilities,
testing, permits, overhead, profit and incidentals necessary for a complete and operational Project.
2
NOW, THEREFORE, for good and valuable consideration, the Parties agree as follows:
ARTICLE 1
DEFINITIONS AND CONTRACT DOCUMENTS
1.1 Definitions.
(a) “Change Order” means a written instrument signed by the City Manager or other official
possessing lawful authority and by Contractor that adjusts the Contract Sum, Contract Time, or
both. No oral direction, field condition, meeting note, email, submittal review, inspection, or
course of conduct is a Change Order.
(b) “City Representative” means the City employee or consultant identified in the Notice to
Proceed or later designated in writing. The City Representative may administer and inspect the
Work but may not amend this Agreement or authorize additional compensation or time unless
separately vested with that authority.
(c) “Contract Documents” means this executed Agreement; approved Change Orders; written
addenda; the Special Conditions; the General Conditions and federal requirements in the ITB; the
technical specifications; plans and drawings; the Scope of Work incorporated by reference as
Exhibit A; Contractor’s accepted price schedule incorporated by reference as Exhibit B; the federal
and grant provisions incorporated by reference as Exhibit C; only those additional portions of
Contractor’s bid expressly accepted by the City; and the Notice to Proceed. Contractor terms,
exclusions, qualifications, assumptions or boilerplate are excluded unless expressly stated in a
signed Change Order.
(d) “Final Completion” means completion of all Work, correction of all punch-list items, delivery
and City acceptance of all closeout documents, releases, warranties, training, manuals, as-builts
and required approvals, and satisfaction of all other conditions for final payment.
(e) “Substantial Completion” means the stage at which the Work is complete, code-compliant,
commissioned, approved for intended use by authorities having jurisdiction, and capable of safe
and uninterrupted operation for the City, except for minor punch-list items that do not impair
operation, safety, security or access.
(f) “Work” means everything required by the Contract Documents to deliver a complete, tested,
commissioned, code-compliant and fully operational wind-retrofitted fire station and emergency-
power system, together with a fully restored Project Site, whether or not every incidental item is
specifically identified.
1.2 Order of precedence.
In a conflict, the more stringent requirement and the requirement producing the more complete,
safe and functional Project controls, subject to the following order:
3
(1) executed Change Orders;
(2) this Agreement;
(3) written addenda, in reverse chronological order;
(4) Special Conditions;
(5) General Conditions and federal requirements;
(6) technical specifications;
(7) plans and drawings;
(8) scope of work;
(9) City-issued bid forms; and
(10) Contractor’s accepted price schedule.
Contractor shall promptly request a written interpretation before proceeding with affected Work.
Contractor’s failure to do so waives any claim based on the conflict to the extent it could have
been avoided.
1.3 Entire agreement; no reliance.
The Contract Documents are the entire agreement. Contractor acknowledges that it has not relied
on any oral statement, estimate, schedule, representation or promise not stated in the Contract
Documents. No purchase order, invoice, proposal, website term or shrink-wrap, click-wrap or
similar term modifies the Contract Documents.
ARTICLE 2
SCOPE AND STANDARD OF PERFORMANCE
2.1 General scope.
Contractor shall furnish all labor, supervision, materials, consumables, tools, equipment,
temporary facilities, transportation, rigging, cranes, protection, testing, documentation and
incidentals required to complete the Fire Station No. 1 wind retrofit, including removal of the
existing generator system; roofing and roof-drain work; replacement of exterior personnel doors,
roll-up bay doors and louvers; roof-access and mechanical-equipment improvements; construction
of the generator slab; and installation, integration, testing and commissioning of the City-
purchased 250-kW diesel generator, fuel tank, automatic transfer switches, annunciator and
associated equipment.
The Work includes structural, electrical, civil and site work; temporary emergency power;
demolition; underground utility verification; FPL coordination; fire-alarm integration; HVAC
control modifications and delay timers; concrete and soil testing; permitting and inspections;
restoration; training; and closeout, all as detailed in the Contract Documents.
4
2.2 Complete and functional Work.
Contractor’s obligation is for a complete result. Work reasonably inferable from, incidental to, or
necessary to produce the intended result is included in the Contract Sum even if omitted from an
individual drawing, specification or bid line.
Contractor shall not exploit an error, omission or ambiguity and shall immediately notify the
City of any discovered discrepancy.
2.3 Standard of care and compliance.
Contractor shall perform diligently, safely and in a good and workmanlike manner, using properly
licensed and qualified personnel, in accordance with the Contract Documents, manufacturer
requirements, approved submittals, applicable codes, the Florida Building Code, National
Electrical Code, OSHA requirements, permit conditions, grant requirements and all applicable
federal, state, county and City laws.
Where requirements differ, Contractor shall comply with the more stringent requirement unless
the City directs otherwise in writing.
2.4 City-furnished equipment.
Contractor shall coordinate pickup or delivery from the manufacturer’s yard, inspect equipment
upon transfer, document condition, provide secure storage and weather protection, and assume
care, custody and control until Final Completion.
Contractor shall promptly report concealed or apparent damage and shall be responsible for loss
or damage caused by its handling, storage, installation, testing or failure to protect.
City-furnished equipment does not reduce Contractor’s responsibility for correct installation,
integration and operation, but Contractor is not responsible for an inherent manufacturing defect
that could not reasonably have been detected before installation and was not caused or worsened
by Contractor.
If delivery of City-furnished equipment is delayed through no fault of Contractor, Contractor shall
promptly notify the City, continue all unaffected Work, and resequence and coordinate the Work
to minimize any schedule impact. Contractor is entitled only to an extension equal to the actual,
documented critical-path delay that could not reasonably have been avoided through resequencing,
mitigation or performance of other Work. Any extension must be authorized by written Change
Order. Contractor is not entitled to additional compensation arising from the delayed delivery
unless the City expressly approves the compensation in a written Change Order.
5
2.5 Operational continuity.
Fire Station No. 1 is an occupied, continuously operating essential public-safety facility.
Contractor shall maintain safe access, security, life-safety systems, fire-rescue response capability
and continuous emergency-power capability throughout the Work.
Power interruptions, access restrictions or other impacts to fire-rescue operations shall occur only
at times approved in writing by the City Representative and Fire-Rescue, after Contractor submits
and obtains approval of a detailed outage, continuity and restoration plan.
Contractor shall provide at least seven (7) calendar days’ written notice unless the City approves
a shorter period. No approval relieves Contractor of responsibility for sequencing, safety,
temporary power or restoration.
Contractor shall provide, deliver, install, connect, fuel, operate, monitor, test, maintain, repair and
remove the temporary generator and all associated equipment necessary to maintain uninterrupted
emergency power throughout construction. Associated equipment includes all temporary fuel
tanks, cables, connections, transfer equipment, grounding, protection, barriers and other
components necessary for a safe, code-compliant and fully operational temporary emergency-
power system.
Before interrupting the existing emergency-power system, Contractor shall submit and obtain City
approval of a temporary-power, monitoring and emergency-response plan. Contractor shall
maintain sufficient fuel and qualified personnel and shall promptly respond to and correct any
failure or interruption. The temporary system shall remain operational until Final Completion
unless the City authorizes its earlier removal in writing after the permanent emergency-power
system has been successfully tested, commissioned and accepted for operation.
All costs associated with the temporary emergency-power system are included in the Contract
Sum. A failure of the temporary system caused by Contractor or its equipment does not entitle
Contractor to additional compensation or an extension of the Contract Time.
ARTICLE 3
CONTRACT SUM AND PRICING
3.1 Contract Sum.
Subject to additions and deductions authorized by written Change Order, the maximum amount
payable is NINE HUNDRED EIGHTY-TWO THOUSAND THREE HUNDRED FORTY-TWO
DOLLARS AND NINETY-NINE CENTS ($982,342.99), inclusive of the permitting allowance
and contingency stated below.
The Contract Sum is not a guaranteed payment. Lump-sum items are payable based on accepted
progress, and unit-price items are payable only for actual quantities incorporated into the Work
and accepted by the City at the unit prices in Exhibit B.
6
Contractor bears any cost exceeding the Contract Sum unless first authorized by a Change Order.
3.2 Included costs; firm pricing.
Pricing includes all labor, supervision, materials, equipment, delivery, unloading, storage, crane
and rigging operations, temporary power, after-hours work required by the Contract Documents,
testing, fees, taxes not legally chargeable to the City, overhead, profit, insurance, bonds, escalation,
coordination, waste disposal and all other costs.
Contractor is not entitled to an adjustment for market changes, labor or material escalation, supply-
chain conditions, subcontractor pricing, ordinary weather, site access, quantities reasonably
estimable from the Contract Documents, or matters that Contractor knew or should have known
before bidding.
3.3 Permitting allowance.
The $21,484.00 permitting allowance may be used only for actual, documented permit and
governmental review fees approved by the City.
No overhead, profit or markup applies. Unused allowance remains City funds and reduces the final
Contract Sum. Costs above the allowance require prior written authorization by Change Order.
3.4 Contingency.
The $89,303.90 contingency is a City-controlled reserve and is not part of Contractor’s earned
compensation. Contractor may use contingency funds only for additional or changed Work
expressly authorized in advance by written Change Order. The City has no obligation to expend
any portion of the contingency, and any unused amount remains City funds and reduces the final
Contract Sum. Contractor has no claim for overhead, profit, anticipated profit or other
compensation on unused contingency.
3.5 No tax.
The City is exempt from Florida sales and use tax. Contractor shall not include taxes from which
the City is exempt and shall use the City’s exemption documentation only for this Project and only
as legally permitted.
ARTICLE 4
CONTRACT TIME, SCHEDULE AND DELAY
4.1 Time is of the essence.
Time is of the essence. Contractor shall commence only upon the City’s written Notice to Proceed
and within seven (7) calendar days after the commencement date stated therein. Costs incurred
before the Notice to Proceed are at Contractor’s sole risk, except documented bond and insurance
costs if the City terminates for convenience before commencement.
7
4.2 Completion deadlines.
Contractor shall achieve Substantial Completion within one hundred fifty (150) days after the
commencement date stated in the City’s Notice to Proceed and shall achieve Final Completion
within one hundred eighty (180) days after that commencement date, subject only to adjustments
authorized in accordance with the Contract Documents.
4.3 Baseline and updates.
Within ten (10) calendar days after execution, and before the Notice to Proceed, Contractor shall
submit a detailed critical-path schedule showing procurement, City-purchased equipment
coordination, submittals, permits, outages, temporary power, FPL activities, inspections, testing,
commissioning, punch list and closeout.
Contractor shall update the schedule at least monthly and with each payment application.
Acceptance of a schedule does not alter the Contract Time or shift responsibility to the City.
4.4 Excusable delay and notice.
Contractor is entitled to a day-for-day extension of the Contract Time only for the actual,
documented critical-path delay caused solely by an unforeseeable event beyond Contractor’s
control and not caused or contributed to by Contractor or its subcontractors.
Contractor shall provide written notice describing the event, anticipated impact and mitigation
measures within five (5) days after the event begins and shall submit a fully documented request
for an extension within ten (10) days after the impact can reasonably be quantified. Contractor
shall continuously mitigate the delay and provide supporting schedule updates requested by the
City.
Extensions for excusable delay shall not exceed thirty (30) days in the aggregate unless the City
Manager approves additional time in writing. If an excusable delay continues beyond thirty (30)
days, the City may terminate the Agreement for convenience without liability for anticipated profit,
extended overhead or other costs attributable to unperformed Work.
Concurrent delay is not compensable. Ordinary weather and reasonably foreseeable procurement
or supply-chain conditions do not constitute excusable delay. No extension is effective unless
authorized by written Change Order.
4.5 No damages for delay.
Except to the extent prohibited by law, Contractor’s sole remedy for an excusable delay is a
reasonable extension of time.
Contractor waives claims for delay, disruption, acceleration, loss of productivity, extended
overhead, standby or other time-related compensation, except for a delay caused solely by the
8
City’s active interference, bad faith, fraud, concealment of a material fact, or other circumstance
for which a no-damages-for-delay clause is unenforceable under Florida law.
4.6 Liquidated damages.
The Parties acknowledge that untimely completion will disrupt essential City operations and cause
administrative, inspection, project-management, temporary-power and other costs that are difficult
to determine precisely.
Contractor shall pay liquidated damages of ONE THOUSAND DOLLARS ($1,000.00) per
calendar day for each day Substantial Completion is late and FIVE HUNDRED DOLLARS
($500.00) per calendar day for each day after the Substantial Completion deadline that Final
Completion is late.
These amounts are agreed estimates of loss, not penalties, and may be deducted from amounts due.
Liquidated damages do not limit recovery for separate damages arising from defective work, third-
party claims, property damage, indemnity obligations, fraud, willful misconduct, or abandonment.
4.7 Recovery schedule.
If progress falls behind the accepted schedule or threatens a milestone, Contractor shall, without
additional cost, submit and implement a recovery plan, add labor or shifts, resequence work,
expedite materials and take other measures necessary to recover.
The City’s review, approval or acceptance of a recovery plan does not constitute a representation
that the plan will succeed, relieve Contractor of responsibility for the adequacy of the plan, or
modify the Contract Time or Contractor’s liability for delay.
ARTICLE 5
ADMINISTRATION, PERSONNEL AND SUBCONTRACTORS
5.1 Contractor control.
Contractor is solely responsible for construction means, methods, techniques, sequences,
procedures, Contractor coordination and safety. City review, inspection, testing, approval or
presence does not supervise personnel or relieve Contractor of responsibility for the Work.
5.2 Superintendent and key personnel.
Contractor shall maintain a competent and qualified superintendent at the Site whenever Work is
performed. The superintendent shall be authorized to act on Contractor’s behalf and shall be able
to communicate effectively with the City Representative, emergency personnel, inspectors,
subcontractors and others involved in the Work.
Key personnel identified in Contractor’s bid may not be replaced without the City’s prior written
approval. The City may require removal of any person who is unsafe, unqualified, disruptive,
9
violates City policy applicable to the Site, or otherwise impairs the Project. Replacement shall not
increase cost or time.
5.3 Subcontractors.
Within ten (10) calendar days after execution, Contractor shall submit a complete subcontractor
and supplier list. The City may reasonably object to a proposed subcontractor.
Contractor remains fully responsible for all acts, omissions, quality, safety and compliance of
subcontractors and suppliers as if performed by Contractor.
Every subcontract shall incorporate applicable Contract Documents, public-records, audit,
insurance, federal, E-Verify and flow-down requirements. No subcontract creates privity with the
City.
5.4 Independent contractor; no authority.
Contractor is an independent contractor and not an employee, agent, partner or joint venturer of
the City. Contractor has no authority to bind the City or incur obligations in the City’s name.
Contractor is solely responsible for employment taxes, wages, benefits and personnel direction.
ARTICLE 6
SITE CONDITIONS, PROTECTION AND COORDINATION
6.1 Site examination and utilities.
Contractor acknowledges that, before submitting its bid, it examined the Contract Documents and
Project Site and satisfied itself concerning the conditions affecting the Work, including access,
staging, occupied operations, existing improvements, utilities, subsurface work shown in the
Contract Documents and other conditions that were visible, disclosed, reasonably inferable, or
discoverable through a reasonable pre-bid investigation.
Contractor accepts responsibility for such conditions and waives any claim for additional
compensation or time arising from its failure to conduct an adequate investigation, verify
dimensions or quantities, review available information, or account for conditions that Contractor
knew or reasonably should have known before submitting its bid.
Before excavation or intrusive work, Contractor shall coordinate Sunshine 811 and any necessary
private utility locating, trace and field-verify underground utilities, pothole to verify potential
conflicts, and protect existing facilities. Utility information furnished by the City is for
Contractor’s assistance and does not relieve Contractor of its independent verification obligations.
Contractor shall bear all costs arising from its failure to perform the required investigation,
verification or protection.
10
6.2 Differing concealed conditions.
Subject to Contractor’s investigation and verification obligations under Section 6.1, if Contractor
encounters a concealed physical condition that materially differs from the conditions indicated in
the Contract Documents and could not reasonably have been discovered through the investigation
required by Section 6.1, Contractor shall immediately stop only the affected portion of the Work,
protect the condition from disturbance, continue all unaffected Work, and provide written notice
to the City before disturbing the condition and no later than two (2) days after discovery.
The notice shall describe the condition, explain why it was not reasonably discoverable before
bidding, identify the affected Work, and provide Contractor’s preliminary assessment of the
anticipated cost and critical-path schedule impact. Contractor shall preserve the condition for
inspection and provide all information requested by the City.
Contractor bears the burden of establishing that the condition was concealed, materially different,
not reasonably discoverable, and the direct cause of an unavoidable increase in cost or critical-path
delay. No adjustment to the Contract Sum or Contract Time is authorized unless the City
determines that the requirements of this Section have been satisfied and approves the adjustment
by written Change Order. Any adjustment shall be limited to the reasonable, actual and
documented direct cost and critical-path delay necessarily caused by the condition.
Contractor shall mitigate all resulting cost and delay. Failure to provide timely notice, preserve the
condition, continue unaffected Work, or comply with Section 6.1 is a waiver of the claim to the
extent the City is prejudiced or the claimed impact could have been avoided.
6.3 Protection and restoration.
Contractor shall protect City property, adjoining property, utilities, landscaping, pavements,
sidewalks and improvements; keep the Site secure, orderly and free of debris; and repair damage
caused by the Work to original or better condition.
The City may correct an unsafe condition or unrepaired damage after notice when practicable and
deduct the cost. Contractor shall remove waste lawfully and provide disposal records upon request.
Contractor shall continuously protect the facility and the Work from weather and shall maintain
the facility in a watertight condition throughout construction. Contractor shall furnish, install,
inspect, maintain, repair and remove all temporary roofing, coverings, enclosures, flashing,
drainage and other weather-protection measures necessary to prevent water intrusion and damage.
Contractor shall not open or remove any portion of the roof or exterior building envelope unless
adequate temporary weather protection is in place or can be completely installed before the end of
the workday or the onset of adverse weather, whichever occurs first. Contractor shall continuously
monitor weather conditions and shall immediately secure and protect the facility when rain, wind
or other adverse weather is anticipated.
11
Temporary weather protection shall be planned and maintained so that Fire Station No. 1 remains
fully operational and capable of supporting uninterrupted fire-rescue operations throughout the
roof replacement.
Contractor is responsible for all water intrusion and resulting damage, remediation, testing, repair,
operational disruption, cost and delay caused by inadequate, defective or improperly maintained
temporary weather protection or by Contractor’s failure to timely secure the facility. These
obligations do not increase the Contract Sum or Contract Time.
6.4 Hazardous materials.
Contractor shall not bring hazardous materials to the Site except in lawful quantities necessary for
the Work and with safety data sheets.
Upon encountering suspected pre-existing hazardous material not identified in the Contract
Documents, Contractor shall stop affected Work, secure the area and notify the City.
Contractor is responsible for spills, releases and contamination introduced, disturbed contrary to
instructions, or caused by Contractor, including response, reporting and remediation costs.
6.5 Security and public access.
Contractor shall comply with City security procedures, identification requirements and restrictions
on access to nonpublic areas of the Site. Contractor shall secure tools, keys and access credentials,
prevent unauthorized entry, and immediately report any security incident.
Contractor and its personnel shall comply with all applicable federal and Florida laws concerning
weapons and firearms. Nothing in this Agreement prohibits lawful possession or storage of a
firearm, including lawful storage in a private motor vehicle, or possession by an authorized law-
enforcement or security officer.
Illegal drugs and alcohol are prohibited at the Site. Photographs, recordings, publicity and use of
the City’s name, seal or logo require the City’s prior written approval, except for documentation
reasonably necessary to perform the Work or comply with law.
ARTICLE 7
PERMITS, SUBMITTALS, TESTING AND ACCEPTANCE
7.1 Permits and inspections.
Unless the Contract Documents expressly assign responsibility for a particular permit, inspection
or approval to the City, Contractor shall obtain and maintain all permits required for the Work;
schedule and coordinate all required inspections; obtain all necessary approvals from authorities
having jurisdiction; and close out all permits before Final Completion.
12
Contractor shall provide the City with copies of all permits, inspection reports, approvals and
permit-closeout documents. Contractor shall not cover, conceal or proceed with Work that requires
inspection until the required inspection has been completed and approval to proceed has been
obtained.
Contractor is responsible for all reinspection, retesting, corrective-work and related costs resulting
from defective or nonconforming Work, a failed inspection, premature concealment of Work, or
Contractor’s failure to properly schedule or coordinate an inspection.
7.2 Submittals.
Contractor shall prepare and submit all shop drawings, product data, samples, schedules,
coordination drawings and other submittals required by the Contract Documents sufficiently in
advance to permit review without delaying the Work.
Before submission, Contractor shall review, approve and stamp each submittal and verify its
accuracy, completeness, dimensions, quantities, field conditions, installation requirements and
coordination with other portions of the Work. The City may reject or return incomplete, inaccurate
or uncoordinated submittals without review. Contractor shall promptly correct and resubmit
rejected submittals at no additional cost or extension of time.
Contractor shall not fabricate, purchase or install Work requiring a submittal until the applicable
submittal has been reviewed. Work performed before review is at Contractor’s sole risk.
City or design-professional review is limited to general conformance with the Contract Documents
and does not relieve Contractor of responsibility for errors, omissions, dimensions, quantities, field
verification, coordination, construction means and methods, safety or performance.
Contractor shall specifically identify in writing every proposed deviation from the Contract
Documents when submitting it for review. Review of a submittal does not approve an unidentified
deviation or authorize an adjustment to the Contract Sum or Contract Time. Any such adjustment
requires a written Change Order.
7.3 Testing and commissioning.
Contractor shall provide all specified tests, including concrete cylinder and soil-density testing,
manufacturer start-up, load-bank or operational testing as required, ATS and annunciator testing,
fire-alarm integration, HVAC sequencing and grounding verification.
Testing shall be witnessed when requested. Failed tests shall be repeated after correction at
Contractor’s cost.
The system is not accepted until testing, commissioning and training are complete and written
reports are delivered.
13
7.4 Defective work.
The City may reject any Work that is defective, damaged, unsafe, improperly performed,
inadequately documented, or not in conformance with the Contract Documents, whether
discovered before or after payment, inspection, testing, occupancy or use.
Upon written notice from the City, Contractor shall promptly investigate the condition and, within
the time specified by the City, uncover, remove, correct, replace and retest the rejected Work.
Contractor shall also repair any damage to other Work or property resulting from the defective
Work or its correction. All resulting labor, materials, testing, inspection, design-professional,
permit and other costs shall be borne by Contractor without an increase in the Contract Sum or
Contract Time.
If Contractor fails to begin and diligently complete the required correction within the time
specified by the City, or immediately when an unsafe or emergency condition exists, the City may
take reasonable corrective action itself or through others. Contractor shall reimburse the City for
all resulting costs, or the City may deduct those costs from amounts otherwise due to Contractor.
The City’s correction of defective or nonconforming Work does not relieve Contractor or its surety
of responsibility for the Work, waive any warranty or other remedy, or constitute acceptance of
the defective condition. Contractor shall continue all unaffected Work while corrective action is
pending.
7.5 No acceptance by payment or use.
Inspection, payment, partial occupancy, operation, issuance of a certificate, or failure to discover
a defect does not constitute acceptance, waive a requirement or relieve Contractor or surety.
Acceptance occurs only by the City’s written determination of Substantial Completion or Final
Completion, as applicable.
ARTICLE 8
CHANGES AND CLAIMS
8.1 Written authorization required.
The City may order additions, deletions or revisions within the general scope of the Work by
written Change Order or Construction Change Directive signed by the City Manager or other City
official possessing lawful authority.
A Change Order shall be signed by the City and Contractor. A Construction Change Directive may
be issued by the City when the Parties have not agreed on the adjustment to the Contract Sum or
Contract Time. Contractor shall promptly proceed with the directed Work while preserving its
right to submit a claim in accordance with this Article.
14
Contractor shall not perform changed or extra Work without prior written authorization from an
authorized City official. Work performed without such authorization is at Contractor’s sole risk
and shall be deemed included in the Contract Sum.
No oral direction, field instruction, meeting note, email, submittal review, inspection, payment,
course of conduct or direction from an unauthorized person constitutes approval of additional
compensation or time.
8.2 Pricing changes.
The price of changed Work shall be determined in the following order:
1. Applicable unit prices established in Exhibit B;
2. A mutually agreed lump-sum amount supported by an itemized proposal; or
3. If directed by the City, actual and documented allowable costs incurred on a time-and-
material basis, subject to a not-to-exceed amount established by the City.
Allowable costs are limited to the reasonable, actual and documented cost of labor directly
performing the changed Work, materials incorporated into the Work, equipment actually used, and
approved subcontractor work. Labor costs shall be based on actual wages plus legally required
payroll taxes and insurance. Equipment charges shall not exceed the lower of Contractor’s actual
cost or customary local rental rates.
The following are included in Contractor’s markup and are not separately reimbursable: home-
office and field overhead, supervision not directly performing the changed Work, estimating,
scheduling, administrative personnel, small tools, vehicles, phones, computers, temporary
facilities, insurance, bonds, financing, legal and accounting expenses, inefficiency, loss of
productivity and other indirect costs.
The aggregate markup for all overhead and profit, including all Contractor, subcontractor and
lower-tier markups, shall not exceed ten percent (10%) of the allowable direct cost of the changed
Work. The ten-percent (10%) limitation is cumulative, applies regardless of the number of
contracting tiers, and may not be increased or circumvented through multiple or successive
markups. No markup is permitted on permit fees, taxes, insurance or bond premiums, or on another
markup. Deductive changes shall include a corresponding reduction for overhead and profit
calculated on the same basis.
Contractor shall submit quotations, invoices, payroll records, time sheets, equipment records,
subcontractor proposals and any other supporting documentation requested by the City.
Unsupported costs are not payable. The City may audit all records supporting changed Work.
For time-and-material Work, Contractor shall submit daily records identifying labor, materials and
equipment used. The City Representative’s signature verifies only that the identified resources
were present and does not establish entitlement, compensability, price or an extension of time.
Contractor shall not exceed a City-established not-to-exceed amount without prior written
authorization.
15
8.3 Claims and waiver.
As a condition precedent to any claim for additional compensation or time, Contractor shall
provide written notice to the City within five (5) days after the event giving rise to the claim and
before proceeding with the affected Work when reasonably practicable.
Contractor shall submit a fully documented claim within fifteen (15) days after the event or after
its impact can reasonably be determined. The claim must identify:
1. The contractual and factual basis for the claim;
2. The amount claimed and a detailed calculation;
3. The effect on the critical path and Contract Time;
4. The measures taken to avoid or mitigate the claimed impact; and
5. All supporting schedules, records, invoices, payroll information and other documentation.
Failure to comply with these notice and documentation requirements waives the claim to the extent
the City is prejudiced, or the claimed impact could have been avoided. Contractor shall continue
performing the Work while a claim is being reviewed or disputed.
8.4 No authority by design professional or inspector.
No architect, engineer, consultant, inspector, project manager, City Representative or field
representative may modify the Contract Sum or Contract Time unless that person has been
expressly authorized in writing to do so on behalf of the City.
Contractor proceeds at its own risk if it relies on contrary direction from an unauthorized person.
ARTICLE 9
PAYMENT, RETAINAGE AND CLOSEOUT
9.1 Schedule of values and payment applications.
Before submitting its first payment application, Contractor shall provide a complete and
balanced schedule of values acceptable to the City and consistent with the accepted price
schedule in Exhibit B.
Not than once each month, Contractor may submit an itemized payment application showing:
1. Actual Work completed and accepted;
2. Actual quantities of unit-price Work incorporated into the Project;
3. Approved stored materials, if any;
4. The amount previously paid and currently requested;
5. Retainage and other deductions; and
6. The remaining Contract Sum.
16
Each payment application shall include the updated Project schedule, applicable inspection and
testing documentation, properly executed releases from Contractor and all subcontractors and
suppliers included in the current and previous payment applications, and any additional supporting
records required by the City or Contract Documents.
Submission of a payment application constitutes Contractor’s certification that the Work covered
by the application has been performed in accordance with the Contract Documents, that prior
payments have been properly applied, and that title to Work for which payment is requested will
pass to the City free of liens, claims, security interests and encumbrances.
9.2 Review and payment.
The City shall review and pay approved amounts in accordance with the Florida Local
Government Prompt Payment Act, Part VII of Chapter 218, Florida Statutes.
The City’s review or payment of an application does not constitute acceptance of the Work,
approval of quantities not actually incorporated into the Project, or a waiver of defective or
nonconforming Work.
Payment is subject to lawful appropriation and applicable grant requirements. The City shall not
use delays by a grantor to withhold an otherwise due and properly approved payment unless
permitted by law and disclosed in the Contract Documents.
9.3 Retainage.
The City shall retain five percent (5%) from progress payments, subject to Section 218.735, Florida
Statutes.
At fifty percent (50%) completion, the City will not withhold more than five percent (5%) retainage
and may reduce or release retainage as permitted by law. The City may continue to withhold
amounts reasonably necessary to protect against:
1. Defective, incomplete or nonconforming Work;
2. Filed or reasonably anticipated claims;
3. Failure to pay subcontractors or suppliers;
4. Damage to the City or another contractor;
5. An insufficient unpaid Contract balance;
6. Failure to maintain the Project schedule;
7. Accrued or anticipated liquidated damages;
8. Missing closeout, grant or payment documentation; and
9. Any other material breach of the Contract Documents.
17
9.4 Stored materials.
Payment for stored materials is within the City’s discretion and requires prior written approval.
Contractor shall provide proof of purchase and ownership, invoices, insurance, secure and
segregated storage, identification of the materials for this Project, inspection access and any
consent of surety requested by the City.
Off-site storage requires prior City approval of the location and additional documentation
requested by the City. Risk of loss, theft or damage remains with Contractor notwithstanding
payment by the City.
9.5 Conditions to final payment.
Final payment is conditioned upon Final Completion and the City’s receipt and acceptance of all
required closeout documents, including:
1. A final payment application;
2. Contractor’s final payment affidavit;
3. Unconditional final releases from Contractor and all subcontractors and suppliers;
4. Consent of surety to final payment;
5. Final inspections, approvals and permit closeout;
6. As-built drawings in the formats required by the City;
7. Operation and maintenance manuals;
8. Testing and commissioning reports;
9. Training records;
10. Spare parts, special tools, keys and access credentials;
11. Warranty documents registered in the City’s name;
12. Proof of lawful waste disposal;
13. Required federal and grant records; and
14. Any other closeout item required by the Contract Documents.
Acceptance of final payment waives Contractor’s claims except a claim specifically identified in
writing and expressly accepted by the City for reservation before final payment.
9.6 Setoff and withholding.
The City may withhold or set off amounts reasonably necessary to protect against defective Work,
third-party claims, failure to pay subcontractors or suppliers, property damage, liquidated
damages, an insufficient unpaid Contract balance, schedule default, missing records, overpayment
or any other breach of the Contract Documents.
After notice when reasonably practicable, the City may pay a claimant, correct defective Work,
cure a default or satisfy another obligation for which Contractor is responsible and deduct all
resulting costs from amounts otherwise due.
18
ARTICLE 10
BONDS, LIENS AND TITLE
10.1 Performance and payment bonds.
Within fourteen (14) days after notice of award and before execution of this Agreement or
commencement of the Work, Contractor shall furnish separate performance and payment bonds,
each in the full amount of the Contract Sum, on forms acceptable to the City.
Each bond shall be issued by a surety authorized to transact business in Florida, acceptable to the
City, and shall comply with Section 255.05, Florida Statutes.
The bonds shall remain effective through Final Completion and the correction of all warranty
obligations. Contractor shall increase the bond amounts to reflect increases in the Contract Sum.
The City will pay only an actual, documented additional bond premium expressly approved as part
of the applicable Change Order.
10.2 Public property; claims.
No construction lien or other encumbrance may attach to City property. Contractor shall keep the
Project, Work and City property free from liens and encumbrances arising from labor, services,
materials or equipment furnished for the Project.
Before commencing Work, Contractor shall record the payment bond in the public records of
Broward County as required by Section 255.05, Florida Statutes, and provide the City with a
certified copy of the recorded bond. The City is not required to make payment until it receives the
certified copy.
Upon receiving a lien, notice of nonpayment, payment-bond claim or other demand arising from
the Work, Contractor shall promptly notify the City and surety and shall satisfy, discharge, bond
off or otherwise resolve the matter within ten (10) days. Contractor shall provide the City with
documentation establishing the resolution.
If Contractor fails to timely resolve the matter, the City may withhold sufficient funds, notify or
make demand upon the surety, bond off or discharge an improper lien or encumbrance, or resolve
the claim as reasonably necessary to protect the City. Contractor shall reimburse the City for all
resulting payments, costs and reasonable attorneys’ fees, or the City may deduct those amounts
from sums otherwise due.
Nothing in this Section limits a claimant’s lawful rights against the payment bond under Section
255.05, Florida Statutes, or makes the City responsible for Contractor’s payment obligations.
19
10.3 Title and risk of loss.
Title to materials and equipment for which the City has paid passes to the City upon payment.
Contractor warrants that the City receives good title free of liens, security interests and
encumbrances.
Risk of loss, theft or damage remains with Contractor until Final Completion and written
acceptance by the City, regardless of whether the City has paid for the affected Work, materials or
equipment.
ARTICLE 11
INSURANCE
11.1 Required insurance.
Contractor shall obtain and maintain all insurance coverages, limits, endorsements and other
requirements specified in Section 2.23 of ITB No. 26-009, which is incorporated into this
Agreement by reference.
Contractor shall not commence or continue Work until the required insurance has been submitted
to and approved by the City’s Risk Manager. Contractor shall maintain the required coverage
throughout performance of the Work and any applicable completed-operations and warranty
periods.
11.2 Evidence of coverage.
Contractor shall provide certificates of insurance and all endorsements required by the Contract
Documents. Certificate language alone does not satisfy a requirement for an endorsement.
Contractor shall provide updated evidence of coverage before expiration of any policy and shall
promptly notify the City of any cancellation, nonrenewal or material reduction in coverage.
11.3 Subcontractors.
Contractor shall require each subcontractor to maintain insurance appropriate to its Work and
meeting all applicable requirements of the Contract Documents.
Contractor shall obtain and review each subcontractor’s certificates of insurance and required
endorsements before the subcontractor begins Work and shall maintain those documents
throughout the subcontractor’s performance. Upon request, Contractor shall promptly provide
copies to the City.
Contractor is responsible for ensuring its subcontractors’ compliance with all insurance
requirements. A subcontractor’s failure to maintain required insurance does not relieve Contractor
of any obligation or liability under the Contract Documents.
20
11.4 Lapse in coverage.
Contractor and its subcontractors shall not perform Work while any required insurance is not in
effect. A lapse in required coverage constitutes a material breach. Any resulting delay is
nonexcusable and does not entitle Contractor to additional compensation or an extension of the
Contract Time.
ARTICLE 12
INDEMNIFICATION AND RESPONSIBILITY FOR LOSS
12.1 Indemnification.
To the fullest extent permitted by Section 725.06, Florida Statutes, Contractor shall indemnify and
hold harmless the City and its elected and appointed officials, officers, employees and agents from
liabilities, damages, losses and costs, including reasonable attorneys’ fees, to the extent caused by
the negligence, recklessness or intentional wrongful misconduct of Contractor or any person
employed or utilized by Contractor in performing the Contract Documents.
Contractor’s indemnification obligations are not limited by the availability or amount of insurance,
workers’ compensation benefits, or the Contract Sum. These obligations survive completion, final
payment and termination of the Agreement.
12.2 Defense and claims handling.
For any claim within the scope of Contractor’s indemnification obligations, Contractor shall
promptly assume and fund the defense using counsel reasonably acceptable to the City. The City
may participate in the defense with counsel of its choosing.
Contractor shall not settle any claim in a manner that imposes liability, an admission, a
nonmonetary obligation or a restriction upon the City without the City’s prior written consent.
Nothing in the Contract Documents requires the City to indemnify Contractor or any other person
or constitutes a waiver of the City’s sovereign immunity.
12.3 Property damage and personal injury.
Contractor is responsible for bodily injury, death, theft, loss and property damage caused by or
arising from the Work, Contractor-controlled Site conditions, or the acts or omissions of
Contractor, its subcontractors, suppliers or persons for whom Contractor is responsible.
Contractor shall immediately report any accident, injury, death, property damage, theft, utility
strike, spill or other material incident to the City. Contractor shall preserve relevant evidence and
cooperate with the City, applicable authorities and insurers in investigating and responding to the
incident.
21
ARTICLE 13
WARRANTY AND CORRECTION
13.1 General warranty.
Contractor warrants that all materials and equipment furnished for the Project will be new and of
good quality unless the Contract Documents expressly permit otherwise; that the Work will be free
from defects; that the Work will conform to the Contract Documents; and that the completed
system will perform its intended functions.
In addition to any longer manufacturer or specified warranty, Contractor shall correct defective or
nonconforming Work discovered within two (2) years after Substantial Completion. If corrective
Work is completed after Substantial Completion, the two-year correction period for that Work
begins upon completion and acceptance of the correction.
The correction period does not limit any longer warranty, other contractual remedy, or applicable
statute of limitations or repose.
13.2 Manufacturer and supplier warranties.
Contractor shall obtain, register and assign to the City all manufacturer, supplier and subcontractor
warranties applicable to the Work. Unless the City approves otherwise, those warranties shall
commence no earlier than Substantial Completion.
Contractor shall administer warranty claims on the City’s behalf and provide all labor, access,
removal, shipping, reinstallation, testing and coordination required for the City to receive the full
benefit of the warranties.
13.3 Warranty response.
For an emergency or failure affecting safety, essential operations or property, Contractor shall
respond within two (2) hours after notice and mobilize corrective action within four (4) hours.
For a nonemergency warranty matter, Contractor shall begin corrective action within two (2)
business days after notice and shall diligently proceed until the correction is completed.
If Contractor fails to respond or correct the condition within the required time, the City may
perform or arrange the corrective Work and recover all resulting costs from Contractor without
waiving any warranty or other remedy.
ARTICLE 14
TERMINATION, SUSPENSION AND CITY REMEDIES
14.1 Termination for cause.
The City may terminate all or any portion of the Work for cause if Contractor:
22
1. Fails to supply sufficient qualified workers, materials or equipment;
2. Fails to commence or diligently prosecute the Work;
3. Performs defective, nonconforming or unsafe Work;
4. Fails to pay subcontractors or suppliers;
5. Violates applicable law, grant requirements or the Contract Documents;
6. Fails to maintain a required license, bond or insurance coverage;
7. Becomes insolvent, makes an assignment for the benefit of creditors, or is the subject of
bankruptcy or receivership proceedings that materially impair performance;
8. Makes a material misrepresentation to the City;
9. Abandons the Project; or
10. Otherwise materially breaches the Contract Documents.
Except in the case of abandonment, fraud, an immediate safety emergency, loss of required
insurance or bond coverage, or failure to timely commence the Work, the City shall provide written
notice identifying the default and allow Contractor five (5) days to cure or to begin and diligently
pursue a cure acceptable to the City.
14.2 Remedies following default.
Following Contractor’s default, the City may:
1. Exclude Contractor from the Site;
2. Take possession of materials and equipment for which the City has paid;
3. Accept assignment of subcontracts and purchase orders;
4. Make demand upon the performance or payment bond;
5. Complete or correct the Work through others;
6. Withhold and set off amounts otherwise due;
7. Recover excess completion costs, design-professional fees, inspection costs,
administrative costs, liquidated damages and other direct damages caused by the default;
and
8. Exercise any other remedy available under the Contract Documents or law.
If a termination for cause is later determined to have been improper, the termination shall be treated
as a termination for convenience, and Contractor’s recovery shall be limited to the compensation
permitted under Section 14.3.
14.3 Termination for convenience.
The City may terminate all or any portion of the Agreement without cause upon thirty (30) days’
written notice or on an earlier date stated in the notice.
Upon receipt of the notice, Contractor shall:
1. Stop the Work as directed;
2. Protect completed and partially completed Work;
3. Cancel or assign commitments as directed by the City;
23
4. Mitigate all termination costs;
5. Deliver all City-owned or City-paid materials, equipment and Project records; and
6. Cooperate in an orderly transition of the Work.
The City shall pay Contractor for accepted Work properly performed through the effective
termination date, reasonable documented demobilization costs, and unavoidable cancellation
charges approved by the City, less prior payments, retainage and applicable offsets.
Contractor is not entitled to anticipated profit, unabsorbed overhead, lost opportunity,
consequential damages, or profit on Work not performed.
14.4 Suspension.
The City may suspend all or any portion of the Work for convenience, Contractor default, safety,
operational necessity, funding requirements or any other reasonable cause.
Contractor shall stop the affected Work as directed, protect the Work and Site, continue unaffected
Work, and mitigate the cost and schedule impact.
A suspension for convenience that solely causes a critical-path delay may support an extension
under Article 4. Contractor is not entitled to additional compensation except when the no-damages-
for-delay provision is unenforceable under Florida law.
14.5 Nonexclusive remedies.
The City’s rights and remedies are cumulative. The City’s failure or delay in enforcing a
requirement does not constitute a waiver.
The City may recover reasonable attorneys’ fees and costs incurred to enforce Contractor’s
indemnification, public-records, audit, lien-discharge, confidentiality, grant-compliance and
payment obligations, and as otherwise permitted by law.
ARTICLE 15
PUBLIC RECORDS, AUDIT AND GRANT RECORDS
15.1 Public records.
Contractor shall comply with Chapter 119, Florida Statutes, and Section 119.0701, Florida
Statutes.
Contractor shall:
1. Keep and maintain public records required to perform the Agreement;
2. Upon request from the City’s custodian of public records, provide the City with a copy of
requested records or allow the records to be inspected or copied within a reasonable time
at a cost that does not exceed the amount provided by law;
24
3. Ensure that public records exempt or confidential and exempt from disclosure are not
disclosed except as authorized by law for the duration of the Agreement and after
completion or termination if Contractor retains the records;
4. Upon completion or termination, transfer to the City, at no cost, all public records in
Contractor’s possession or keep and maintain the records as required by law; and
5. Provide electronic records in a format compatible with the City’s information-technology
systems.
IF CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER
119, FLORIDA STATUTES, TO CONTRACTOR’S DUTY TO PROVIDE PUBLIC
RECORDS RELATING TO THIS AGREEMENT, CONTRACTOR SHALL CONTACT THE
CITY’S CUSTODIAN OF PUBLIC RECORDS:
ELORA RIERA, CITY CLERK
CITY OF DANIA BEACH
100 WEST DANIA BEACH BOULEVARD
DANIA BEACH, FLORIDA 33004
TELEPHONE: 954-924-6800
EMAIL: ERIERA@DANIABEACHFL.GOV
15.2 Records retention and audit access.
Contractor shall maintain complete, accurate and separately identifiable Project records, including
accounting, payroll, procurement, subcontract, schedule, correspondence, change-order, testing,
inspection and payment records.
Contractor shall retain the records for at least five (5) years after final payment or for any longer
period required by applicable law, grant requirements, audit, claim or litigation.
The City, the applicable grantor, the Federal Emergency Management Agency, the Florida
Division of Emergency Management, the United States Department of Homeland Security, the
Inspector General, the Comptroller General and their authorized representatives may inspect, copy
and audit Project records and interview Contractor personnel during reasonable times.
Unsupported or disallowed costs are not payable and, if previously paid, shall be reimbursed to
the City.
15.3 Cooperation and access.
Contractor shall provide timely access to the Site, Work, records and personnel for inspection,
monitoring and audit.
Contractor shall cooperate with all lawful reviews and investigations, timely respond to findings
attributable to Contractor, correct identified deficiencies, and reimburse the City for costs
disallowed because of Contractor’s act, omission or failure to maintain adequate documentation.
25
Contractor shall include the applicable public-records, retention, audit and access requirements in
every subcontract and purchase order. These obligations survive completion, final payment and
termination of the Agreement.
ARTICLE 16
FEDERAL AND STATE COMPLIANCE
16.1 Federal funding requirements.
Contractor acknowledges that federal disaster-assistance funds may finance all or a portion of the
Project.
Contractor shall comply with all applicable federal requirements incorporated into the Contract
Documents, including the requirements contained in ITB No. 26-009, applicable provisions of 2
C.F.R. Part 200 and Appendix II, Federal Emergency Management Agency requirements, and the
federal provisions contained in Exhibit C.
Contractor shall include all required federal provisions in its subcontracts and purchase orders and
is responsible for compliance by its subcontractors and lower-tier entities.
If a federal requirement is legally inapplicable to the Project, its inclusion does not make it
applicable. Contractor shall nevertheless provide the information and cooperation necessary for
the City or applicable grantor to determine whether a requirement applies.
16.2 Suspension and debarment.
Contractor certifies that neither Contractor nor any of its principals or affiliates is suspended,
debarred, excluded or otherwise ineligible to participate in a covered federal transaction.
Contractor shall comply with 2 C.F.R. Part 180, Subpart C, and 2 C.F.R. Part 3000, Subpart C,
and shall verify the eligibility of subcontractors and other participants in lower-tier covered
transactions.
Contractor shall immediately notify the City if Contractor or any principal, affiliate, subcontractor
or lower-tier participant becomes suspended, debarred, excluded or otherwise ineligible during
performance of the Agreement.
A false certification or failure to provide notice constitutes a material breach.
16.3 Lobbying.
Contractor shall submit all certifications and disclosures required by the Byrd Anti-Lobbying
Amendment, 31 U.S.C. § 1352.
Contractor certifies that it has not used and will not use federally appropriated funds to pay any
person or organization for influencing or attempting to influence an officer or employee of a
26
federal agency, Member of Congress, congressional officer or employee, or employee of a
Member of Congress in connection with a covered federal award.
Contractor shall disclose lobbying performed with nonfederal funds and shall obtain and forward
all required lower-tier certifications and disclosures.
16.4 E-Verify.
Contractor shall register with and use the E-Verify system for all newly hired employees as
required by Section 448.095, Florida Statutes.
Contractor shall obtain and retain the affidavits required by law from each subcontractor and shall
provide proof of compliance to the City upon request.
If the City has a good-faith belief that Contractor knowingly violated Section 448.09(1), Florida
Statutes, the City shall terminate the Agreement as required by law. If the City has a good-faith
belief that a subcontractor knowingly violated the law but Contractor otherwise complied,
Contractor shall immediately terminate the subcontract as required by law.
16.5 Public entity crimes and statutory eligibility.
Contractor certifies that it is eligible to contract with the City under Section 287.133, Florida
Statutes, and is not prohibited from contracting under Sections 287.134, 287.135 or 215.473,
Florida Statutes, as applicable.
Contractor shall immediately notify the City of any change in its eligibility or certification. The
City may terminate the Agreement for a false certification or statutory disqualification.
16.6 Human-trafficking affidavit.
Before execution of the Agreement, Contractor shall provide the affidavit required by Section
787.06, Florida Statutes, signed by an officer or authorized representative, attesting that Contractor
does not use coercion for labor or services.
The affidavit is incorporated into the Agreement by reference. A materially false attestation
constitutes a material breach and grounds for termination and referral to the appropriate authorities.
16.7 Licenses, registrations and taxes.
Contractor and its subcontractors shall obtain and maintain all licenses, registrations, certifications
and authorizations required to perform their respective portions of the Work and shall remain in
good standing throughout the Project.
Contractor is solely responsible for all taxes, assessments, unemployment contributions and other
governmental obligations attributable to its business, personnel and performance of the Work,
except taxes from which the City is legally exempt.
27
ARTICLE 17
CONFIDENTIALITY, DATA AND INTELLECTUAL PROPERTY
17.1 Protected information.
Contractor shall use nonpublic City information, building-security information, access credentials
and critical-infrastructure information solely to perform the Work.
Contractor shall restrict access to personnel who require the information to perform the Work and
shall employ reasonable administrative, technical and physical safeguards against unauthorized
access, use, loss or disclosure.
Contractor shall immediately notify the City of any actual or suspected loss, unauthorized access,
disclosure or security incident involving City information or systems and shall cooperate with the
City’s investigation and response.
Contractor shall not place nonpublic City information into a publicly available or consumer
artificial-intelligence system or use City information to train or improve an artificial-intelligence
model.
Nothing in this Section authorizes Contractor to withhold a nonexempt public record or otherwise
limits the application of Florida public-records law.
17.2 Project documents.
To the extent Contractor creates Project-specific schedules, reports, as-built drawings,
photographs, test results, commissioning data, manuals or other deliverables, the City owns the
copies delivered under the Agreement and may use, reproduce, modify and disclose them for City
purposes.
Contractor retains ownership of its pre-existing proprietary tools, methods and materials but grants
the City a perpetual, irrevocable, royalty-free license to use, reproduce and modify them to the
extent incorporated into a Project deliverable or reasonably necessary to operate, maintain, repair
or modify the Project.
Contractor warrants that Project deliverables will not infringe a patent, copyright, trade secret or
other proprietary right of a third party.
17.3 Publicity and City marks.
Contractor shall not issue publicity concerning the Project, advertise the contract award, or use the
City’s name, seal, logo or photographs of secure or nonpublic areas without the City’s prior written
approval.
28
This restriction does not prohibit a truthful disclosure required by law or the inclusion of basic
Project information in a contractor qualification statement after Final Completion, provided
Contractor does not imply City endorsement.
ARTICLE 18
DISPUTES, GOVERNING LAW AND SOVEREIGN IMMUNITY
18.1 Good-faith resolution and continued performance.
Contractor shall first submit a dispute to the City Representative for review. If unresolved,
Contractor may submit the dispute to the Public Services Director and then to the City Manager.
Pending resolution of a dispute, Contractor shall continue timely performance of the Work, and
the City shall continue to pay undisputed amounts properly due.
This dispute-review process does not extend a contractual notice or claim deadline and does not
limit the City’s remedies.
18.2 Governing law and venue.
Florida law governs the Contract Documents without regard to conflict-of-law principles.
Exclusive venue for any action arising from or relating to the Contract Documents lies in the state
courts located in Broward County, Florida, or, if federal jurisdiction exists, in the United States
District Court for the Southern District of Florida.
Contractor waives any objection based upon venue or forum non conveniens.
18.3 Jury-trial waiver.
TO THE EXTENT PERMITTED BY LAW, EACH PARTY KNOWINGLY AND
VOLUNTARILY WAIVES TRIAL BY JURY IN ANY ACTION ARISING FROM OR
RELATING TO THE CONTRACT DOCUMENTS.
18.4 Sovereign immunity.
Nothing in the Contract Documents waives or alters the City’s sovereign immunity or the
limitations established by Section 768.28, Florida Statutes.
No provision creates liability beyond that provided by law, and no obligation by the City to
indemnify Contractor or another person shall be implied.
29
18.5 Consequential damages.
To the extent permitted by law, Contractor waives claims against the City for lost profits on
other work, loss of financing, loss of business opportunity, special, incidental, punitive or
consequential damages.
This waiver does not limit the City’s right to recover damages from Contractor.
ARTICLE 19
MISCELLANEOUS
19.1 Notices.
Formal notices required by the Contract Documents shall be in writing and delivered by personal
delivery, nationally recognized overnight-delivery service, certified United States mail with
return receipt requested, or email with confirmation of receipt.
Notice is effective upon confirmed delivery to the following:
To the City:
City Manager
City of Dania Beach
100 West Dania Beach Boulevard
Dania Beach, Florida 33004
With a copy to:
City Attorney
City of Dania Beach
100 West Dania Beach Boulevard
Dania Beach, Florida 33004
To Contractor:
DiPompeo Construction Corporation
2301 NW 33rd Court, Unit 102
Pompano Beach, Florida 33069
Attention: John DiPompeo, Jr., President and CEO
Project communications sent to the City Representative do not replace formal notice to the City
Manager when formal notice is required.
30
19.2 Assignment.
Contractor shall not assign, transfer, delegate or encumber the Agreement, its payment rights or
its claims without the City’s prior written consent.
An unauthorized assignment is void. The City may assign the Agreement to a governmental
successor or funding entity upon written notice to Contractor.
19.3 Appropriation and authority.
The City’s obligations are subject to lawful appropriation.
No City employee, officer, representative or consultant may bind the City beyond that person’s
lawfully delegated authority. Contractor is charged with knowledge of applicable authority and
may rely only upon a written instrument executed by an authorized City official.
19.4 No third-party beneficiaries.
The Contract Documents are solely for the benefit of the City and Contractor and create no right
or benefit in a subcontractor, supplier, surety, grantor, employee or other third party, except for
rights expressly created by a statutory bond or applicable law.
19.5 Severability and interpretation.
If any provision of the Contract Documents is determined to be invalid or unenforceable, the
provision shall be enforced to the maximum extent permitted by law, and the remaining provisions
remain effective.
Headings are for convenience only. The term “including” means “including without limitation.”
The singular includes the plural when appropriate.
The Parties acknowledge that the Agreement was reviewed by both Parties. No presumption or
rule of construction shall apply against a Party based upon authorship of the Agreement.
Obligations that by their nature extend beyond completion, final payment or termination survive.
19.6 Amendment and waiver.
An amendment or waiver is effective only in a written instrument executed by an authorized
representative of the Party against whom it is enforced.
A waiver on one occasion is not a continuing waiver. City review, approval, payment or failure to
enforce a requirement does not waive compliance unless the City expressly identifies the waived
requirement in writing.
31
19.7 Counterparts and electronic signatures.
The Agreement may be executed in counterparts, each of which is treated as an original and all of
which together constitute one instrument.
Legally valid electronic signatures have the same force and effect as original signatures.
19.8 Authority and representations.
Each person signing the Agreement represents that he or she has authority to bind the identified
Party.
Contractor represents that its legal name, organizational status, addresses, licenses and other
information provided to the City are accurate and that no undisclosed restriction prevents
Contractor from performing the Agreement.
SIGNATURES ON THE FOLLOWING PAGES
32
IN WITNESS OF THE FOREGOING, the parties have set their hand and seal the day
and year first written above.
CITY OF DANIA BEACH, FLORIDA,
a Florida municipal corporation
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO LEGAL FORM
AND CORRECTNESS
EVE A. BOUTSIS, CITY ATTORNEY CANDIDO SOSA-CRUZ, ICMA-CM
CITY MANAGER
33
CONTRACTOR:
WITNESSES:
DIPOMPEO CONSTRUCTION
CORPORATION, a Florida corporation
SIGNATURE SIGNATURE
PRINT Name PRINT Name
SIGNATURE Title
PRINT Name
STATE OF FLORIDA
COUNTY OF BROWARD
The foregoing instrument was acknowledged before me by means of ☐ physical presence
or ☐ online notarization, on , 2026, by _______________ (name),
_______________________ (title), of DIPOMPEO CONSTRUCTION CORPORATION, a
Florida corporation, who is personally known to me or has produced
as identification.
NOTARY PUBLIC
My Commission Expires: State of Florida
34
EXHIBIT A
SCOPE OF WORK
The Scope of Work for the Fire Station No. 1 Wind Retrofit Project contained in ITB No. 26-
009, together with the applicable plans, technical specifications and addenda, is incorporated into
the Agreement by reference.
35
EXHIBIT B
CONTRACTOR’S ACCEPTED PRICE SCHEDULE
DiPompeo Construction Corporation’s accepted bid and three-page price schedule submitted in
response to ITB No. 26-009 are incorporated into the Agreement by reference, including all
accepted unit prices, the total Contract Sum of $982,342.99, the $21,484.00 permitting allowance,
and the $89,303.90 City-controlled contingency.
Any terms, qualifications, assumptions, exceptions or conditions included in Contractor’s bid that
were not expressly accepted by the City are excluded.
36
EXHIBIT C
FEDERAL AND GRANT REQUIREMENTS
The federal requirements contained in ITB No. 26-009 and the applicable requirements of Hazard
Mitigation Grant Program Project No. DR-4337-285-R are incorporated into the Agreement by
reference, including all applicable Federal Emergency Management Agency and Florida Division
of Emergency Management requirements and the applicable provisions of 2 C.F.R. Part 200 and
Appendix II.
City of Dania Beach
Public Services Memorandum
DATE: 10/13/2026
TO: Mayor and Commissioners
FROM: Candido Sosa-Cruz, ICMA-CM, City Manager
VIA: Oscar Vasquez, Public Services Director
Carlos Escalante, Public Services Deputy Director
SUBJECT: AUTHORIZATION TO AWARD ITB NO. 26-019 “OCEAN PARK
PARKING PHASE 1” TO STOUT GROUP, LLC.
Request:
The Public Services Department (PSD) requests approval to award Invitation to bid ITB No. 26-
019, “Ocean Park Parking Phase 1” to Stout Group, LLC. As the lowest responsive bidder.
Background:
The City of Dania Beach identified a need to increase parking capacity at Ocean Park due to
increased use of the beach and surrounding recreational amenities. The Ocean Park Parking –
Phase 1 Project was developed to provide additional parking capacity, improve public access and
traffic circulation, and support the continued use of Ocean Park as an important public
recreational facility. The project will provide fifteen (15) additional parking spaces within the
existing Ocean Park parking area.
The City advertised ITB No. 26-019, “Ocean Park Parking – Phase 1,” to obtain the services of a
qualified contractor to complete the proposed parking improvements. The project scope includes
demolition and removal of existing asphalt pavement, concrete sidewalk, curb, signs, and other
site features; construction of new asphalt pavement, concrete sidewalk, Type “D” curb, curb
transitions, parking space striping, concrete wheel stops, and signage; relocation of the existing
monument sign and landscaping rocks; and associated site grading and restoration. The project
also includes drainage improvements, landscaping and irrigation, erosion control, maintenance of
traffic, subgrade stabilization, limerock base, geogrid, sod installation, directional boring, and all
associated labor, materials, equipment, permitting, and incidental work necessary to complete the
project.
Bids were publicly opened on August 26, 2026, and eight (8) firms submitted proposals as
follows:
Respondent Total Bid Amount
The Stout Group, LLC $201,980.00
Homestead Concrete & Drainage $284,630.00
MBR Construction, Inc. $312,626.80
Florida Blacktop, Inc. $325,687.50
Pabon Engineering, Inc. $365,000.00
Metro Express Inc. $493,999.00
Janice M. Riley, Inc. DBA The Paving Lady $532,957.44
Team Contracting, Inc. $669,732.00
Following Procurement's review for responsiveness and the Engineer of Record’s technical
evaluation, The Stout Group, LLC was determined to be the lowest responsive and responsible
bidder and is recommended for award.
Budgetary Impact
Funding for this project will be appropriated from Account No. 415-45-02-545-63-95 in the
amount of $222,178.00. The base bid submitted by The Stout Group, LLC. Is $201,980.00 with
an additional $20,198.00 for a ten percent contingency, the total project cost is $222,178.00.
Recommendation
PSD recommends approval to award ITB No. 26-019, “Ocean Park Parking Phase 1” to The
Stout Group, LLC. In the amount of $222,178.00.
RESOLUTION NO. 2026-_____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE AWARD OF INVITATION TO BID
(ITB) NO. 26-019, “OCEAN PARK PARKING PHASE 1” TO THE STOUT
GROUP, LLC, IN THE AMOUNT OF TWO HUNDRED TWENTY‑TWO
THOUSAND, ONE HUNDRED SEVENTY‑EIGHT DOLLARS ($222,178.00),
AND AUTHORIZING THE CITY TO EXCEED THE ANNUAL
SINGLE‑VENDOR PURCHASING THRESHOLD OF FIFTY THOUSAND
DOLLARS ($50,000.00); PROVIDING FOR FUNDING; PROVIDING FOR
CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE.
the City of Dania Beach identified a need to increase parking capacity at
Ocean Park due to increased use of the beach and surrounding recreational amenities; and
the City developed the Ocean Park Parking Phase 1 Project to provide
additional parking capacity, improve public access and traffic circulation, and support the
continued use of Ocean Park as an important public recreational facility; and
the project includes the construction of fifteen (15) additional parking spaces
and associated site improvements, including demolition and removal of existing asphalt pavement,
concrete sidewalk, curb, signs, and other site features; construction of new asphalt pavement,
concrete sidewalk, Type "D" curb, curb transitions, parking space striping, concrete wheel stops,
and signage; relocation of the existing monument sign and landscaping rocks; and associated site
grading and restoration; and
, the project further includes drainage improvements, landscaping and
irrigation, erosion control, maintenance of traffic, subgrade stabilization, limerock base, geogrid,
sod installation, directional boring, and all related labor, materials, equipment, permitting, and
incidental work necessary to provide a complete and functional parking improvement project; and
, the City publicly advertised Invitation to Bid (ITB) No. 26-019, "Ocean Park
Parking Phase 1," in accordance with the City's procurement requirements; and
, bids were publicly opened on August 26, 2026, and eight (8) bids were
received; and
, Procurement completed its review for responsiveness, and the Engineer of
Record reviewed the technical qualifications and bid submissions; and
, The Stout Group, LLC submitted the lowest responsive and responsible bid
in the amount of $201,980.00; and
2 RESOLUTION #2026-_____
WHEREAS, the Public Services Department has reviewed the bid results and determined
that The Stout Group, LLC is the lowest responsive and responsible bidder and recommends award
of ITB No. 26-019 to the City Commission; and
WHEREAS, the Public Services Department further recommends approval of the
Construction Agreement between the City of Dania Beach and The Stout Group, LLC for
completion of the Ocean Park Parking Phase 1 Project; and
WHEREAS, due to the nature of the work, the Public Services Department recommends
establishing an Owner's Contingency equal to ten percent (10%) of the base contract amount in the
amount of $20,198.00; and
WHEREAS, the total project authorization, including the base contract amount and
Owner's Contingency, shall not exceed $222,178.00; and
WHEREAS, funding for this project is available from Account No. 415-45-02-545-63-95
in the amount of $222,178.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2. That the City Commission hereby authorizes the award of Invitation to Bid
(ITB) No. 26-019, "Ocean Park Parking Phase 1," to The Stout Group, LLC in the amount of
$201,980.00.
Section 3. That the total project authorization, including ten percent (10%) Owner's
Contingency, shall not exceed $222,178.00.
Section 4. That funding for this project will be appropriated from Account No. 415-
45-02-545-63-95 in the amount of $222,178.00.
Section 5. That the City Manager, or designee, is hereby authorized to take all
administrative actions reasonably necessary to implement the bid award authorized herein;
however, execution of the Construction Agreement shall be subject to subsequent approval by the
City Commission.
Section 6. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 7. That this Resolution shall become effective ten (10) days after adoption.
3 RESOLUTION #2026-_____
PASSED AND ADOPTED on __________________, 2026.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
City of Dania Beach
Community Development Memorandum
DATE: 10/13/2026
TO: Mayor and Commissioners
FROM: Candido Sosa-Cruz, ICMA-CM, City Manager
VIA: Eleanor Norena, CFM, Deputy City Manager
Corinne Lajoie, MURP, AICP, Director
Shanesa Miranda, Deputy Director
Claudia Viviana Batista, Planning & Zoning Manager
SUBJECT: PL-029-24: The applicant, Port 1850 LLC, requests approval of a plat for the
property located at 1850 NE 7 Ave.
Request:
PLAT APPROVAL
To plat the property to allow the development of 63,000 square feet of industrial use.
Property Information:
EXISTING ZONING: General Industrial (IG)
LAND USE DESIGNATION: Employment Center
SITE ACREAGE: 5.11 acres (222,733 SF) GROSS
EXISTING USE: Vacant
VIOLATIONS ON THE PROPERTY: No open violations on the property
Background:
The subject property is a 5.11-acre vacant site located east of the Hollywood/Fort Lauderdale
International Airport. Access to the property will be provided through a recorded easement, 30
feet wide (NISA Plat P.B. 147 PG, 14, B.C.R.), located on the property west of the subject
parcel, identified with the address of 1900 NE 7 Avenue.
Three and a half (3.5) acres of the site have an Environmentally Sensitive Land (ESL)
designation overlayed on the property as designated by the Broward County Land Use map
adopted in 1989 and last updated on January 28, 2020. The applicant proposed an amendment to
remove approximately three and a half (3.5) acres of the overall 21.0 acres ESL Site 97/Map
Label 136 from the Natural Resource Map Series Environmental Sensitive Lands Map. The
request was reviewed by several Broward County agencies and received approval by the
Planning Council on May 22, 2025. The request proceeded to first reading before the Broward
County Board of County Commissioners and received approval on August 21, 2025, at first
reading. Further, the request was moved for second reading at the County Commission level on
March 3, 2026, and was denied.
Due to recent county changes, the ESL overlayed designation restriction is no longer applicable.
Although the Broward County Board of County Commissioners held a hearing to deny the map
amendment, the County Attorney and the Department heads for Platting, Zoning, and
Environmental Permitting advise that the current process for obtaining County plat approval is
for the applicant to complete an Environmental Impact Report (EIR).
That EIR is utilized by Broward County Environmental Permitting Division to determine any
environmental impacts or conditions. The EIR is used in conjunction with Broward County
Ordinances, Chapter 27, to regulate/permit an application as it relates to environmental impacts.
These processes occur after review by the City. Should the EIR or Chapter 27 review require a
conservation easement of land, then the applicant may be required to amend its applications for
City plat approval and site plan approval. Therefore, due to all these changes in Broward County
regulations, the application can proceed to seek agencies’ approvals, provided the development
ultimately obtains all licenses and permits from the relevant agencies.
The plat request will allow the property to develop an industrial warehouse for industrial use. A
Site Plan application has also been submitted for this property to construct a 62,340 square foot
warehouse and is on this agenda for consideration as a separate item.
COMMUNITY OUTREACH
On September 12, 2025, Ed Stacker, Esq., on behalf of the applicant, sent notices to property
owners within 1,000 feet of the subject property notifying them of the proposed development and
inviting the community to participate in the virtual community meeting regarding the proposed
development to discuss details of the project. The community meeting was held on September
23, 2025, via Zoom. Four (4) representatives of the project, Planning staff from the City, and
more than 36 members of the community attended the meeting, including Commissioner
Lewellen and Mayor Davis. Several residents expressed concerns about the environmental
impact and the existing species on site that will be endangered and suffer from the proposed
project. Others voiced their concern about the irreparable loss once the mangroves are removed.
Several objections were received from the community prior to the item being scheduled for the
October 28, 2025, City Commission meeting, where the city formally opposed the applicant’s
request at the county level.
DEVELOPMENT REVIEW COMMITTEE (DRC)
The plat was reviewed by staff at the DRC meetings held on August 29, 2024, and January 23,
2025, which included personnel from the BSO Fire, the City’s Flood Plain consultant, the City’s
engineering consultant, and the Community Development Department’s Planning and Zoning
Division. The DRC comments are listed as conditions of approval in the plat resolution and
provided below.
1. Broward County approval of the plat is required prior to issuance of a building and right-
of-way permit. Provide Broward County plat approval. (Engineering)
Comprehensive Plan
This application supports the Comprehensive Plan by furthering the following goals:
Future Land Use Element
▪ Policy 1.1.5.1 Encourage development to enhance the tax base of the community.
▪ Policy 1.1.1.5 Future industrial land uses shall be located with access to major
transportation facilities, including highways, airports, and railroads, and seaports.
▪ Policy 1.1.1.6 In order to ensure sufficient amounts of industrial land are available to
meet Dania Beach's future needs, those lands enjoying a future land use industrial
designation on the Future Dania Beach Land Use Plan Map shall not be utilized for
non-industrial purposes, except where in conformance with the Industrial Permitted
Use subsection of the Plan Implementation Requirements section of the Dania Beach
Land Use Plan.
Conservation Element
▪ Policy 6.1.4.5 The City shall require that wetlands within any new development be
preserved or mitigated within any new development or mitigated in accordance with
the Broward County Department of Planning and Environmental Regulations by
coordinating with the Broward County Department of Planning and Environmental
Protection during review of proposed site plans for new development involving
potential impacts to existing natural resource areas.
▪ Policy 6.1.4.11 The City of Dania Beach shall distribute land uses in a manner that
avoids or minimizes, to the greatest degree extent possible, the adverse effects and
impacts on wetlands. Those future land uses identified in the table provided below as
being incompatible with the protection and conservation of wetland functions shall be
directed away from wetlands, or when incompatible land uses are allowed to occur,
shall be mitigated, or enhanced, or both, to compensate for the loss of wetland
functions.
CONSERVATION ELEMENT
Compatibility of Future Land Uses
Relative to Wetland Class
Wetland Class Future Land Use Compatibility
Wetlands wither Wetlands
Benefit Index (WBI)
value 0.8
Future Land Use Element Map
Series, except for Conservation, are
incompatible
Wetlands with a WBI
value less than 0.80 All
compensation requirements of
SOURCE: Broward County Department of Natural Resource Protection
(May 2003); and Broward County Code of Ordinances,
Chapter 27 Article XI, Aquatic and Wetland Resource Protection
Staff Analysis
The request to plat the property located at 1850 NE 7 Avenue meets the platting review criteria
established by the City’s Land Development Code. It is consistent with the City’s
Comprehensive Plan, including the Future Land Use designation, which identifies the property as
an Employment Center.The platting of this property will allow the applicant to develop the site
with a warehouse, a permitted use by right, expanding the City’s tax base. The property is
accessed from NE 7 Avenue across the property to the east, 1900 NE 7 Avenue, which is
established by a perpetual access agreement on the NISA PLAT for the property to the west,
identified as 1900 NE 7 Ave.
Recent regulatory changes in Broward County have removed the ESL overlay restriction.
Despite the Board of County Commissioners' hearing regarding the map amendment, County
staff, including the County Attorney and department heads, advise that plat approval is now
contingent upon the submission of an Environmental Impact Report (EIR).
Because this plat was received before the State Legislature changes, it must follow the
previously established approval process requiring public hearing; therefore, the plat does not
become effective until it is recorded after approval by the Broward County Board of County
Commissioners.
Previous Action
This application was last heard on August 25, 2026, by the City Commission. Due to lack of
motion, no action was taken requiring the application to be reheard.
Budgetary Impact
Approval of the Plat will enable development of this site, expanding the City’s tax roll and the
collection of applicable impact and building fees.
Recommendation
Recent regulatory changes in Broward County have removed the ESL overlay restriction.
Following the Board of County Commissioners' hearing regarding the map amendment, County
staff, including the County Attorney and department heads, advise that plat approval is now
contingent upon the submission of an Environmental Impact Report (EIR).
The EIR, used alongside Broward County Code Chapter 27, serves as the basis for
environmental permitting. As this review takes place after the City evaluation, the applicant is
advised that any required conservation easements may trigger the need for amended City site
plans or plat approvals. Given this framework, the application is clear to move forward, subject
to obtaining all final agency permits. Therefore, the Community Development Department
recommends approval of the resolution for the Plat, provided that the remaining DRC comment
is made as a condition of approval and must be addressed prior to the issuance of a building
permit.
RESOLUTION NO. 2026-
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, APPROVING THE “PORT 1850, LLC PLAT” (PL-029-24)
SUBMITTED BY PORT 1850 LLC, FOR THE PROPERTY LOCATED AT 1850
NE 7 AVENUE, IN THE CITY OF DANIA BEACH, FLORIDA; PROVIDING
FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
pursuant to Chapter 28, the Land Development Code (the “LDC”) Part 6
“Development Review Procedures And Requirements,” Article 640, “Plats” of the City Code of
Ordinances (the “City Code”), the Applicant, property owner, PORT 1850 LLC, a Florida limited
liability company (the “Applicant”), applied to the City of Dania Beach (the “City”) for approval
of the “Port 1850, LLC Plat” (PL-029-24) for the property located at 1850 NE 7 Avenue, with the
attached legally described on Exhibit “A”, which document is incorporated by reference into this
resolution; and
the Applicant is requesting approval of the proposed “NSU Industrial Plat”
(PL-029-24) to permit the future development of the subject property pursuant to and consistent
with the attached plat provided as Exhibit “B”, which document is incorporated by reference into
this resolution; and
, LDC Section 640-50 states that the City Commission may approve the “Port
1850 LLC Plat” based on its determination that the Applicant has demonstrated that the criteria
identified in the City Code have been satisfied; and
, staff has reviewed the proposed request and finds that it remains consistent
with the concurrency standards established for the Plat, and therefore recommends approval; and
the City’s Staff Report analyzes the applicant’s request based on the plat
criteria and supports the Applicant’s request and is incorporated by reference herein as the City’s
findings of fact; and
, the Applicant has provided sufficient justification demonstrating compliance
with the approval criteria to meet the requirements of the Code; and
, the City Commission conducted a duly noticed public hearing in accordance
with Article 610 of the LDC; and
, the City Commission finds that the Plat (PL-029-24) request is consistent
with the LDC and Comprehensive Plan;
2 RESOLUTION #2026-
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the foregoing “WHEREAS” clauses are ratified and confirmed as
being true and correct, and they are made a specific part of this Resolution.
Section 2. That this certain application (PL-029-24) for the “Port 1850, LLC Plat” is
approved.
Section 3. That the issuance of a development permit by a municipality does not in
any way create any right on the part of an applicant to obtain a permit from a state or federal agency
and does not create any liability on the part of the municipality for the issuance of the permit if the
applicant fails to obtain requisite approvals or does not fulfill the obligations imposed by a state
or federal agency, or undertakes actions that result in a violation of state or federal law.
Section 4. Pursuant to Section 640-80 “Expiration of Plats,” of the Land Development
Code, the plat (PL-029-24), the City Commission approval of the plat shall be deemed to have
expired when the plat has expired under the Broward County Land Development Code.
Section 5. That the approvals granted by this Resolution are subject to the Applicants’
compliance with the following condition:
1. Broward County approval of the Plat is required prior to issuance of a Building and
Right-of-Way permit. Provide Broward County Plat approval. (Engineering)
Section 6. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 7. That this Resolution shall take effect ten (10) days after passage and
adoption.
On 2026.
Motion by second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____
Commissioner Luis Rimoli ____
Commissioner Archibald J. Ryan IV ____
Vice Mayor Marco Salvino _ ____
Mayor Joyce L. Davis ____
3 RESOLUTION #2026-
ATTEST:
JOYCE L. DAVIS
4 RESOLUTION #2026-
EXHIBIT “A”
THE SOUTH ONE-HALF (S 1/2) OF THE NORTHEAST ONE-QUARTER (NE 1/4) OF THE
SOUTHEAST ONE-QUARTER (SE 1/4) OF THE NORTHWEST ONE-QUARTER (NW 1/4)
OF SECTION 26, TOWNSHIP 50 SOUTH, RANGE 42 EAST, TOGETHER WITH AN
EASEMENT FOR ROAD PURPOSES OVER THE WEST 30 FEET OF THE NORTH ONE-
HALF (N 1/2) OF THE NORTHEAST ONE-QUARTER (NE 1/4) OF THE SOUTHEAST ONE-
QUARTER (SE 1/4) OF THE NORTHWEST ONE-QUARTER (NW 1/4) OF SECTION 26,
TOWNSHIP 50 SOUTH, RANGE 42 EAST, SAID LANDS LYING, BEING AND SITUATE IN
BROWARD COUNTY, FLORIDA, MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGIN AT THE SOUTHEAST CORNER OF PARCEL "B" OF NISA PLAT, ACOORDING TO
THE PLAT THEREOF, AS RCORDED IN PLAT BOOK 147, PAGE 14, OF THE PUBLIC
RECORDS OF BROWARD COUNTY, FLORIDA;
THENCE NORTH 02°08'27" WEST, ALONG THE EAST LINE OF SAID PARCEL "B", A
DISTANCE OF 336.08 FEET TO THE NORTHEAST CORNER OF SAID PARCEL "B" AND
THE NORTH LINE OF THE SOUTH 1/2 OF THE N.E. 1/4 OF THE S.E. 1/4 OF THE N.W. 1/4
OF SECTION 26, TOWNSHIP 50 SOUTH, RANGE 42 EAST;
THENCE NORTH 88°08'32" EAST, A DISTANCE OF 662.69 FEET, ALONG SAID NORTH
LINE TO THE EAST LINE OF THE SOUTH 1/2 OF THE N.E. 1/4 OF THE S.E. 1/4 OF THE
N.W. 1/4 OF SAID SECTION 26;
THENCE SOUTH 02°12'08" EAST, ALONG SAID EAST LINE, A DISTANCE OF 335.96
FEET TO THE SOUTH LINE OF THE SOUTH 1/2 OF THE N.E. 1/4 OF THE S.E. 1/4 OF THE
N.W. 1/4 OF SAID SECTION 26;
THENCE SOUTH 88°07'55" WEST, ALONG SAID SOUTH LINE, A DISTANCE OF 663.05
FEET TO THE POINT OF BEGINNING.
SAID LANDS SITUATE, LYING AND BEING IN BROWARD COUNTY, FLORIDA AND
CONTAINING 5.11 ACRES (222,733 SQUARE FEET), MORE OR LESS.
5 RESOLUTION #2026-
EXHIBIT “B”
ACKNOWLEDGMENT:
THIS IS TO CERTIFY THAT THE PLAT SHOWN HEREON IS A TRUE AND CORRECT REPRESENTATION OF THE LAND
RECENTLY SURVEYED AND PLATTED UNDER MY DIRECTION AND SUPERVISION, THAT THE SURVEY DATA
COMPLIES WITH ALL APPLICABLE REQUIREMENTS IF CHAPTER 177, FLORIDA STATUTES, AND CHAPTER 5J-17,
FLORIDA ADMINISTRATIVE CODE, AND THAT PERMANENT REFERENCE MONUMENTS ("P.R.M.S") WERE SET IN
ACCORDANCE WITH SAID CHAPTER 177.
BY: ___________________________________ ______________
JAVIER DE LA ROCHA, P.S.M. DATE
LICENSE NO. 6080
STATE OF FLORIDA
ECS LAND SURVEYORS, INC.
3460 FAIRLANE FARMS ROAD, SUITE 6
WELLINGTON, FL 33414
CERTIFICATE OF AUTHORIZATION NO. 7551
THIS PLAT IS APPROVED AND ACCEPTED FOR RECORDS THIS ______ DAY OF ________________________, 2024.
BY: _________________________________ DIRECTOR / DESIGNEE
THE SOUTH ONE-HALF (S 1/2) OF THE NORTHEAST ONE-QUARTER (NE 1/4) OF THE SOUTHEAST ONE-QUARTER (SE
1/4) OF THE NORTHWEST ONE-QUARTER (NW 1/4) OF SECTION 26, TOWNSHIP 50 SOUTH, RANGE 42 EAST,
TOGETHER WITH AN EASEMENT FOR ROAD PURPOSES OVER THE WEST 30 FEET OF THE NORTH ONE-HALF (N 1/2)
OF THE NORTHEAST ONE-QUARTER (NE 1/4) OF THE SOUTHEAST ONE-QUARTER (SE 1/4) OF THE NORTHWEST
ONE-QUARTER (NW 1/4) OF SECTION 26, TOWNSHIP 50 SOUTH, RANGE 42 EAST, SAID LANDS LYING, BEING AND
SITUATE IN BROWARD COUNTY, FLORIDA, MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGIN AT THE SOUTHEAST CORNER OF PARCEL "B" OF NISA PLAT, ACOORDING TO THE PLAT THEREOF, AS
RCORDED IN PLAT BOOK 147, PAGE 14, OF THE PUBLIC RECORDS OF BROWARD COUNTY, FLORIDA;
THENCE NORTH 02°08'27" WEST, ALONG THE EAST LINE OF SAID PARCEL "B", A DISTANCE OF 336.08 FEET TO THE
NORTHEAST CORNER OF SAID PARCEL "B" AND THE NORTH LINE OF THE SOUTH 1
2 OF THE N.E. 1
4 OF THE S.E. 1
4 OF
THE N.W. 1
4 OF SECTION 26, TOWNSHIP 50 SOUTH, RANGE 42 EAST;
THENCE NORTH 88°08'32" EAST, A DISTANCE OF 662.69 FEET, ALONG SAID NORTH LINE TO THE EAST LINE OF THE
SOUTH 1
2 OF THE N.E. 14 OF THE S.E. 14 OF THE N.W. 14 OF SAID SECTION 26;
THENCE SOUTH 02°12'08" EAST, ALONG SAID EAST LINE, A DISTANCE OF 335.96 FEET TO THE SOUTH LINE OF THE
SOUTH 12 OF THE N.E. 14 OF THE S.E. 14 OF THE N.W. 14 OF SAID SECTION 26;
THENCE SOUTH 88°07'55" WEST, ALONG SAID SOUTH LINE, A DISTANCE OF 663.05 FEET TO THE POINT OF
BEGINNING.
SAID LANDS SITUATE, LYING AND BEING IN BROWARD COUNTY, FLORIDA AND CONTAINING 5.11 ACRES (222,733
SQUARE FEET), MORE OR LESS.
BROWARD COUNTY RESILIENT ENVIRONMENT DEPARTMENT
DEDICATION:
SURVEYOR'S CERTIFICATION:
CITY CLERK CITY ENGINEER
STATE OF FLORIDA
COUNTY OF BROWARD
THE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME BY MEANS OF [X] PHYSICAL PRESENCE OR [ ]
ONLINE NOTARIZATION, THIS ______ DAY OF ________________________, 2024,
BY ________________________________________________________________________________,
WHO IS [ ] PERSONALLY KNOWN TO ME OR HAS PRODUCED _______________ AS IDENTIFICATION.
WITNESS: MY HAND AND OFFICIAL SEAL THIS ______ DAY OF ________________________, 2024,
MY COMMISSION EXPIRES: ________________ _________________________________
NOTARY PUBLIC - STATE OF FLORIDA
COMMISSION NUMBER: ____________________
_________________________________
PRINT NAME
PORT 1850 LLC
A SUBDIVISION OF A PORTION OF
THE SOUTH ONE-HALF (S 1/2) OF THE NORTHEAST ONE-QUARTER (NE 1/4) OF THE
THE SOUTHEAST ONE-QUARTER (SE 1/4) OF THE NORTHWEST ONE-QUARTER (NW 1/4)
OF SECTION 26, TOWNSHIP 50 SOUTH, RANGE 42 EAST
CITY OF DANIA BEACH, BROWARD COUNTY, FLORIDA
MARCH 2026
COUNTY ENGINEER
THIS INSTRUMENT PREPARED BY:
L.B. 7551
3460 FAIRLANE FARMS ROAD, SUITE 6, WELLINGTON, FL. 33414
TELEPHONE NO. 561-314-0769 FAX NO. 561-314-0770
LEGAL DESCRIPTION:
KNOW ALL MEN BY THESE PRESENTS: THAT PORT 1850, LLC, A FLORIDA LIMITED LIABILITY COMPANY, OWNER OF
THE LANDS DESCRIBED AND SHOWN AS INCLUDED IN THIS PLAT, HAS CAUSED SAID LANDS TO BE SURVEYED AND
PLATTED AS SHOWN HEREON, SAID PLAT TO BE KNOWN AS "PORT 1850 LLC". THE LANDS SHOWN HEREON ARE
WITHIN THE CITY OF DANIA BEACH GENERAL INDUSTRIAL DISTRICT (I-G).
IN WITNESS WHEREOF:
THAT PORT 1850, LLC, A FLORIDA LIMITED LIABILITY COMPANY, HAS CAUSED SAID LANDS THESE PRESENTS TO BE
SIGNED FOR AND ON ITS BEHALF BY SHLOMO MELLOUL, ITS MANAGER IN THE PRESENCE OF THESE TWO
WITNESSES, ON THIS ______ DAY OF __________________, 2024.
_________________________ PORT 1850, LLC
WITNESS A FLORIDA LIMITED LIABILITY COMPANY
_________________________
PRINT NAME BY: _________________________
______________ ____________________________
WITNESS SHLOMO MELLOUL, MANAGER
_________________________
PRINT NAME
SS
THIS PLAT HAS BEEN REVIEWED FOR CONFORMITY WITH CHAPTER 177, FLORIDA STATUTES AND IS APPROVED
AND ACCEPTED FOR RECORDATION.
BY: _________________________ ____________ BY: _________________________ ____________
ROBERTO CHAVEZ DATE RICHARD TORNESE DATE
PROFESSIONAL SURVEYOR AND MAPPER DIRECTOR
FLORIDA REGISTRATION NO. LS 7280 PROFESSIONAL ENGINEER
FLORIDA REGISTRATION NO. 40263
BROWARD COUNTY HIGHWAY CONSTRUCTION AND ENGINEERING DIVISION
THIS IS TO CERTIFY THAT THE BROWARD COUNTY PLANNING COUNCIL APPROVES THIS PLAT SUBJECT TO ITS
COMPLIANCE WITH DEDICATION OF RIGHT-OF-WAY FOR TRAFFIC WAYS THIS ______ DAY OF
________________________, 2024
BY: _________________________________
CHAIRPERSON
THIS PLAT COMPLIES WITH THE APPROVAL OF THE BROWARD COUNTY PLANNING COUNCIL OF THE ABOVE DATE
AND IS APPROVED AND ACCEPTED FOR RECORD THIS ______ DAY OF ________________________, 2024.
BY:_________________________________
EXECUTIVE DIRECTOR OR DESIGNEE
BROWARD COUNTY PLANNING COUNCIL
THIS IS TO CERTIFY THAT THIS PLAT COMPLIES WITH THE PROVISIONS OF CHAPTER 177, FLORIDA STATUTES, AND
WAS ACCEPTED FOR RECORD BY THE BOARD OF COUNTY COMMISSIONERS OF BROWARD COUNTY, FLORIDA THIS
______ DAY OF ________________________, 2024.
BY: ____________________________ ____________
MAYOR - COUNTY COMMISSION DATE
BROWARD COUNTY FINANCE & ADMINISTRATIVE SERVICES DEPARTMENT
COUNTY RECORDS DIVISION - MINUTES SECTION
THIS IS TO CERTIFY THAT THIS PLAT HAS BEEN APPROVED AND ACCEPTED BY THE CITY OF DANIA BEACH,
FLORIDA, BY RESOLUTION NO. ________________ ADOPTED THIS ______ DAY OF ________________________, 2024.
CONCURRENCY/IMPACT FEES FOR THE CONSTRUCTION, EXPANSION, AND/OR CONVERSION OF A BUILDING WITHIN
THIS PLAT SHALL BE PAID ON THE DATE OF BUILDING PERMIT ISSUANCE.
ATTEST: _________________________________ APPROVED:_________________________________
CITY CLERK: ELORA RIERA, MMC MAYOR: JOYCE L. DAVIS
CITY OF DANIA BEACH, CITY COMMISSION
THIS IS TO CERTIFY THAT THIS PLAT HAS BEEN APPROVED AND ACCEPTED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT OF THE CITY OF DANIA BEACH, FLORIDA, THIS ______ DAY OF ________________________, 2024.
BY: _________________________________
NAME:_________________________________
DIRECTOR/DESIGNEE
CITY OF DANIA BEACH - COMMUNITY DEVELOPMENT DEPARTMENT
THIS PLAT IS HEREBY APPROVED FOR RECORD THIS ______ DAY OF ________________________, 2024.
BY: _________________________________
NAME: _______________________________
CITY ENGINEER
CITY OF DANIA BEACH - CITY ENGINEER
COUNTY SURVEYOR
PLATTING SURVEYOR
JAVIER DE LA ROCHA, P.S.M.
NW 1/4 OF SECTION 26-50-42
NW CORNER OF
SECTION 26-50-42
N 1/4 CORNER OF
SECTION 26-50-42
E 1/4 CORNER OF
SECTION 26-50-42 CENTER OF
SECTION 26-50-42
PORT 1850 LLC
LOCATION MAP
NOT TO SCALE
PARCEL "A"
1. THIS PLAT IS RESTRICTED TO 63,000 SQUARE FEET OF INDUSTRIAL USE.
2. THIS NOTE IS REQUIRED BY CHAPTER 5, ARTICLE IX, BROWARD COUNTY
CODE OF ORDINANCES, AND MAY BE AMENDED BY APPROVAL OF THE
BROWARD COUNTY BOARD OF COUNTY COMMISSIONERS. THE NOTATION
AND ANY AMENDMENTS THERETO ARE SOLELY INDICATING THE
APPROVED DEVELOPMENT LEVEL FOR PROPERTY LOCATED WITHIN THE
PLAT AND DO NOT OPERATE AS A RESTRICTION IN FAVOR OF ANY
PROPERTY OWNER INCLUDING AN OWNER OR OWNERS OF PROPERTY
WITHIN THIS PLAT WHO TOOK TITLE TO THE PROPERTY WITH REFERENCE
TO THIS PLAT.
3. ANY STRUCTURE WITHIN THIS PLAT MUST COMPLY WITH SECTION 2.1.f.,
DEVELOPMENT REVIEW REQUIREMENTS, OF THE BROWARD COUNTY
LAND USE PLAN, REGARDING HAZARDS TO AIR NAVIGATION.
4. NOTICE: THIS PLAT, AS RECORDED IN ITS GRAPHIC FORM, IS THE
OFFICIAL DEPICTION OF THE SUBDIVIDED LANDS DESCRIBED HEREIN AND
WILL IN NO CIRCUMSTANCES BE SUPPLANTED IN AUTHORITY BY ANY
OTHER GRAPHIC OR DIGITAL FORM OF THE PLAT. THERE MAY BE
ADDITIONAL RESTRICTIONS THAT ARE NOT RECORDED ON THIS PLAT
THAT MAY BE FOUND IN THE PUBLIC RECORDS OF THIS COUNTY.
5. THE BEARINGS SHOWN HEREON ARE BASED ON A GRID BEARING OF
S 88°07'56" W, ALONG A CALCULATED LINE FROM A FOUND 5/8" IRON ROD
& CAP, L.B. 6448 AT THE SOUTHWEST CORNER OF PARCEL "B", "NISA
PLAT", RECORDED IN PLAT BOOK 147, PAGE 14, OF THE PUBLIC RECORDS
OF BROWARD COUNTY, TO A FOUND IRON ROD, NO CAP AT THE
SOUTHEAST CORNER OF SAID PARCEL "B".
6. THE HORIZONTAL COORDINATES SHOWN HEREON ARE BASED ON THE
FLORIDA STATE PLANE COORDINATE SYSTEM (EAST ZONE), NORTH
AMERICAN DATUM 1983/2011 ADJUSTMENT (N.A.D. 83/2011) REFERENCED
TO THE FLORIDA PERMANENT REFERENCE NETWORK (FPRN) MAINTAINED
BY THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT).
7. THE FOLLOWING NOTE IS REQUIRED BY THE BROWARD COUNTY
SURVEYOR PURSUANT TO CHAPTER 177.091, SUBSECTION (28), FLORIDA
STATUTES: PLATTED UTILITY EASEMENTS ARE ALSO EASEMENTS FOR
THE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND OPERATION OF
CABLE TELEVISION SERVICES; PROVIDED, HOWEVER, NO SUCH
CONSTRUCTION, INSTALLATION, MAINTENANCE, AND OPERATION OF
CABLE TELEVISION SERVICES SHALL INTERFERE WITH THE FACILITIES
AND SERVICES OF AN ELECTRIC, TELEPHONE, GAS, OR OTHER PUBLIC
UTILITY. IN THE EVENT A CABLE TELEVISION COMPANY DAMAGES THE
FACILITIES OF A PUBLIC UTILITY, IT SHALL BE SOLELY RESPONSIBLE FOR
THE DAMAGES. THIS NOTE DOES NOT APPLY TO PRIVATE EASEMENTS
GRANTED TO OR OBTAINED BY A PARTICULAR ELECTRIC, TELEPHONE,
GAS, OR OTHER PUBLIC UTILITY. SUCH CONSTRUCTION, INSTALLATION,
MAINTENANCE, AND OPERATION SHALL COMPLY WITH THE NATIONAL
ELECTRIC SAFETY CODE AS ADOPTED BY THE FLORIDA PUBLIC SERVICE
COMMISSION.
8. ALL UTILITIES FOR DISTRIBUTION OF ELECTRICITY, TELEPHONE AND
CABLE MUST BE BURIED UNDERGROUND.
NOTES:
BROWARD COUNTY RECORDSB.C.R.
PAGEPG.
PLAT BOOKP.B.
LEGEND:
BREAK IN LINE SCALE
CENTERLINECL
PERMANENT REFERENCE MONUMENTP.R.M.
LICENSED BUSINESSL.B.
OFFICIAL RECORDS BOOKO.R.B.
TELEPHONE NO. 561-314-0769 FAX NO. 561-314-0770
3460 FAIRLANE FARMS ROAD, SUITE 6, WELLINGTON, FL. 33414
L.B. 7551
PERMANENT CONTROL POINTP.C.P.
SET 4"X4" CONCRETE MONUMENT STAMPED "P.R.M. L.B. 7551"
UNLESS OTHERWISE SPECIFIED
PERMANENT CONTROL POINT
PORT 1850 LLCTHIS INSTRUMENT PREPARED BY:
A SUBDIVISION OF A PORTION OF
THE SOUTH ONE-HALF (S 1/2) OF THE NORTHEAST ONE-QUARTER (NE 1/4) OF THE
THE SOUTHEAST ONE-QUARTER (SE 1/4) OF THE NORTHWEST ONE-QUARTER (NW 1/4)
OF SECTION 26, TOWNSHIP 50 SOUTH, RANGE 42 EAST
CITY OF DANIA BEACH, BROWARD COUNTY, FLORIDA
MARCH 2026
EASTING COORDINATESE:
NORTHING COORDINATESN:
MUNICIPAL LIMITS
QUARTER SECTION CORNER
Public Works and Environmental Services Department
HOUSING AND URBAN PLANNING DIVISION
1 N. University Drive, Box 102 | Plantation, FL 33324 | 954-357-6634 | Fax 954-357-6521
Broward County Board of County Commissioners
Mark D. Bogen • Alexandra P. Davis • Lamar P. Fisher • Beam Furr • Steve Geller • Robert McKinzie • Nan H. Rich • Hazelle P. Rogers • Michael Udine
www.broward.org
September 30, 2026
Gabe Detina
The Chappell Group Inc.
714 East McNab Road
Pompano Beach, FL 33060
Plat: Port 1850 LLC (003-MP-25)
Subject: 2nd Round of Staff Comments on Environmental Impact Report Application
Dear Mr. Detina:
As required by Section 5-182.8 of the Broward County Land Development Code, the Environmental
Impact Report (EIR) application submitted on August 21, 2026, has been circulated to the appropriate
review agencies.
At this time, we cannot proceed with preparing the EIR. The applicant must provide written responses
to the review comments along with any requested supplemental documentation on or before October
9, 2026. The comments submitted by the review agencies are as follows.
Agency Review Comments:
Aquatic and Wetland Resources and Tree Preservation
• Previous comments have not been addressed.
• Port 1850, LLC has an Environmental Resource License application (DF20-1121) for
impacts to mangrove wetlands submitted in 2020, a Surface Water Management License
application (L2026-132) submitted in 2026 for the proposed upland development and a
Florida Department of Environmental Protection Environmental Resource Permit (06-
3681840-002) submitted in 2026 under review by our Division. We will be reviewing all
three applications together. A joint request for additional information necessary to
complete the applications was sent to the applicant on 6-25-2026, see attached. A
response has not been received to date.
• There are references in the documents to mitigation in the form of a 1.29-acre
enhancement/ preservation and the purchase of mitigation credits to offset the impacts
to 2.92 acres of wetlands. Other than that, there is not a lot of detail on any mitigation.
• In reviewing their [Monitoring and Maintenance] plan, it states that “The proposed
wetland impacts will be sufficiently offset through the preservation/enhancement of
wetlands on site”. The application remains under review, and it has not been determined
whether the proposed mitigation is sufficient to offset the proposed impacts.
• Additional wildlife survey information has been submitted by the public which is under
review. This information indicates site usage by Wood Storks, Ibis, Tricolored Herons and
other species.
• For additional information, please contact Linda Sunderland, Environmental Program
Supervisor, at lsunderland@broward.org.
Surface Water Management
• Application No. L2026-132 is under review for the proposed project for Surface Water
Management Licensing.
If you have any questions, please contact Nataly Miguez at (954) 357-6623 or by e-mail at
namiguez@broward.org.
Sincerely,
Jennifer Lu-Chong, AICP
Planning Section Supervisor
Housing and Urban Planning Division
Attachments
Cc: Review Agencies
name add city state zip zip 4
2150 NE 7 AVE LLC
2150 NE 7 AVE LLC
1600 NE 7TH AVENUE LLC
MGMT 1200 17 ST STE 2900 DENVER CO 80202
BRIDGE POINT DANIA 161 LLC
PLANTATION FL 33324 2020
CITY OF DANIA BEACH
CUBESMART LP
HERTZ REALTY CORPATTN: TAX DEPT
PORT 1850 LLC
OK 73102
We are inviting you to attend a virtual community meeting to discuss a pending Application for Site Plan
Approval (NSU Industrial - SP-078-22) and an Application for Plat Approval (PL-029-24) which have
been submitted to the City of Dania Beach and relate to that certain property located at 1850 NE 7th
Avenue, Dania Beach, FL. This meeting is being held to discuss the development proposed for the
property identified in the location map below. All interested parties are encouraged to participate in this
virtual meeting. Representatives of the applicant and the project team will be available during the
meeting to present the proposed plan and address questions. Additionally, more than one elected
official may appear at the community meeting and should disclose their attendance at said meeting
once the City Commission is to hear the quasi-judicial items.
VIRTUAL COMMUNITY MEETING DETAILS
Meeting Date & Time: TUESDAY, SEPTEMBER 23, 2025, 6:00 PM – 7:00 PM
To participate, you must register before 3:00 p.m. on September 23, 2025. Instructions provided below.
If you have specific questions regarding the proposed development that you would like answered during
the community meeting, we request that you send them to Edwin J. Stacker via e-mail to
estacker@shutts.com in advance of the meeting.
REGISTRATION
Register in advance for this meeting:https://shutts.zoom.us/meeting/register/BSJQHzEVScqYCKzlomfXHA
You will then receive the login information for the meeting.
Virtual Community Meeting Invitation
INSTRUCTIONS FOR ZOOM MEETING
In order see and hear our presentation you will need a computer, laptop or tablet and speakers.
Download Zoom on your device using https://zoom.us/support/download. When you join the meeting,
you will be in Listen Only mode. You will be able to “ask” questions during the presentation by using
the In Meeting Chat function.
If you do not have the equipment listed above, you can also call into the meeting to hear the
presentation and ask questions. Please use the following link to view the list of the zoom international
numbers: Zoom International Dial-in Numbers - Zoom
From:Batista, Viviana Claudia
To:Norena, Eleanor; Lajoie, Corinne
Subject:NSU Community Outreach
Date:Tuesday, September 23, 2025 7:35:00 PM
Attachments:image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
image009.png
image010.png
The meeting ran from 6:00 p.m. to 7:30 p.m. More than 36 people attended the community
outreach, including Commissioner Lewellen and Mayor Davis. Representative Ed Stacker
provided some background on the property regarding the adjacent owners as well as the use of
the property. The site will go through several environmental processes, including the Army
Corps of Engineers, as well as the County Environmental Department will be issuing a license
to develop the site.
Felipe Grau, with the architect team, explained the main concept of the project. Michael, from
the engineering team, explained how the site will be filled and how it will meet all
drainage requirements.
Tina, from the Chappel Group, explained the environmental survey conducted at the site and
the amount of wetland impacted. 1.29 acres are projected to be preserved. Once the
environmental analysis is conducted, mitigation off-site is provided. A conservation easement
has been delineated to demonstrate how much mitigation the project will provide.
Once all the team members provided the information about the project, the attorney allowed
the public to speak.
1. Sergei Kelly from the Florida Keepers had a question about the amount of opposition the
project has received. The attorney representing this application explained that this item
went through the County review for the LAPC (Land Use plan amendment), which is in
place to modify the records at the County. Probably the item will be considered for
review by November.
2. Filomena Wright asked about the impact of the deep injection on the aquifer and the
credit purchase for the mangrove mitigation. Michael Carr from the engineering team
explained how the deep injection worked. About the credits, the attorney representing
the item explained that at the County Planning Council, he was required to record a
conservation easement of 1.3 acres in perpetuity to protect the mangroves. The
mitigation credits are about doing an assessment of the area and scoring it. The County
will be present at the evaluation of the site, and then take from the mitigation bank (might
be for planting species).
3. Dean Fraser mentioned there is an endangered species living in that area that should be
considered. He is concerned about the amount of development taking over the
mangroves; he considers that the mitigation is not enough for the amount of
environmental impact.
4. Staci Sherwood had questions about why the need to build on wetlands and more
warehouses, in addition, has a question about the landlocked access. Who will build the
road to access the site, and who will maintain it?
5. Christopher Calvano made a comment about how this area was ever zoned for industrial
when it should have been preserved as a conservation area. This area is for migrating
birds. Born and raised in South Florida, he has seen the changes in the city and a ripple
effect in the area. Mangroves cannot be rebuilt! The county should never have facilitated
this area to be developed.
6. Missy Williams, the lady who runs the Monkey Sanctuary, asked about the wildlife
assessment of the site, including the vegetation and animals in the area. She voiced her
concern about not accepting the fact that the applicant is going through the permit to
endanger the species and the existing mangroves at the site.
7. Mayor Davis explained that elected officials had not spoken at the meeting because it
would be a violation of Sunshine Laws; however, all city representatives were paying
attention to the residents’ concerns.
8. BrendaLee Chalifour interjected, explaining the impact this project will bring to the area.
Parcels sold at protected areas are supposed to be protected, not to be developed.
There is no financial benefit to this, and every single resident will fight back.
9. Kate G asked if the environmental reports are available for the public to review and how
those reports are being considered for the final decision.
The public had a lot of opposition about this item, and will be present at the meeting voicing
their concerns and observing how the votes go when the item is ready for the public hearing.
Claudia Viviana Batista , Planning & Zoning Manager
cbatista@daniabeachfl.gov | daniabeachfl.gov
100 W Dania Beach Blvd, Dania Beach , FL , 33004
Phone: 954.924.6805, x3654
R.I.S.E. ‑ RESPECT, INTEGRITY AND STANDARD OF EXCELLENCE
Please note: Florida has a very broad public records law. Most written communications, including emails, to or from City officials regarding City business
are public records and may be subject to public disclosure.
From:Norena, Eleanor
To:Lajoie, Corinne; Batista, Viviana Claudia; Sosa-Cruz, Candido
Subject:FW: Opposition to Proposed Warehouse Development on Mangrove Land in Dania Beach
Date:Monday, October 13, 2025 9:14:00 AM
Attachments:image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
image009.png
image010.png
FYI
Eleanor Norena , CFM , Community Development Director
enorena@daniabeachfl.gov | daniabeachfl.gov
100 W Dania Beach Blvd, Dania Beach , FL , 33004
Phone: 954.924.6805, x3645
R.I.S.E. ‑ RESPECT, INTEGRITY AND STANDARD OF EXCELLENCE
Please note: Florida has a very broad public records law. Most written communications, including emails, to or from City officials regarding City business are
public records and may be subject to public disclosure.
From: Shantel J <sjairam343@gmail.com>
Sent: Friday, October 10, 2025 4:17 PM
To: Norena, Eleanor <enorena@daniabeachfl.gov>; Davis, Joyce <jdavis@daniabeachfl.gov>; Salvino,
Marco <msalvino@daniabeachfl.gov>; Lewellen, Lori <llewellen@daniabeachfl.gov>;
irimoli@daniabeachfl.gov; Ryan, A. J. <AJRyan@daniabeachfl.gov>
Subject: Opposition to Proposed Warehouse Development on Mangrove Land in Dania Beach
CAUTION: This email originated from outside the City of Dania Beach. Do not click
links or open attachments unless you recognize the sender and expect the content.
Dear Mayor, Commissioners, and Members of the Dania Beach City Commission, My name is Shantel Jairam, and I am writing as a concerned resident of Broward County to express my firm opposition to the proposed warehouse development planned on mangrove-covered land in Dania Beach. Ma
i
This message needs your attention
This is a personal email address.
This is their first email to your company.
Mark Safe Report
CGBANNERINDICATOR
Dear Mayor, Commissioners, and Members of the Dania Beach City Commission,
Powered by Mimecast
My name is Shantel Jairam, and I am writing as a concerned resident of Broward County to
express my firm opposition to the proposed warehouse development planned on mangrove-
covered land in Dania Beach.
Mangroves are one of Florida’s most vital natural defenses against flooding, storm surge, and
coastal erosion. They act as living infrastructure—filtering pollutants from the water,
sequestering carbon, and providing critical habitat for fish, birds, and marine life. Once
destroyed, these ecosystems cannot easily be replaced.
Building a warehouse on this site would not only result in the loss of these ecological benefits,
but would also increase long-term vulnerability for surrounding neighborhoods. The removal
of mangroves and the paving of flood-absorbent land would heighten stormwater runoff and
flood risk—costs that would ultimately fall on residents and taxpayers.
Additionally, the proposed site sits within an environmentally sensitive area where
development directly conflicts with the City’s and County’s resilience and sustainability goals.
At a time when Broward County is investing heavily in coastal resilience, it would be
counterproductive to approve a project that undermines those very efforts.
I urge the Commission to deny approval of this project and instead explore alternative uses
for the site that preserve its ecological value—such as conservation, restoration, or low-impact
public use that aligns with Dania Beach’s identity as a coastal community rooted in balance
between growth and nature.
Protecting this mangrove habitat is not only an environmental issue—it’s an economic and
social one. Once these natural buffers are gone, they’re gone for good.
Thank you for your consideration and for your continued commitment to responsible
stewardship of our shared coastal resources.
Sincerely,
Shantel Jairam
--
Shantel Jairam
+1(954) 980 - 3206
Campaign No.146883
Today's Date 22 Sep 2026
P.O. Number
Sales Rep Walters, Dustin
bill-to
City of Dania Beach- City Clerk's Office
100 W. Dania Beach Blvd
Dania Beach, FL 33004-3699
Tel: 954 924-6800
Account No: 105628
advertiser
City of Dania Beach- City Clerk's Office
100 W. Dania Beach Blvd
Dania Beach, FL 33004-3699
Tel: 954 924-6800
Account No: 105628
Campaign Summary
Description PL-029-24 SP-078-22 Port 1850 LLC -
Ad
Start Date 9/29/2026
End Date 9/29/2026
Currency
Cost Summary
Gross Amount $308.99
Agency Commission $0.00
Net Amount $308.99
Estimated Tax $0.00
Total $308.99
Package Details
Description Start Date Price
Notice of Public Meeting 9/29/2026 308.99
Package Component Detail Start Date
Public Notices 9/29/2026
Affidavit 9/29/2026
Sun Sentinel Classified 9/29/2026
Page 1 of 3
Preview - Content may appear in color online but may be printed in black and white.
Page 2 of 3
This Insertion Order Form forms part of the Agreement by and between Customer and Tribune Publishing Company ("Company"), and is governed
by the terms and conditions set forth in Company's Business Terms of Service (available at https://www.tribpub.com/central-terms-of-service/ ) (the
"Business Terms") and the Data Processing Addendum (the "DPA") The Business Terms, DPA, and this Insertion Order are collectively referred to
as the "Agreement." The Business Terms and DPA constitute integral parts of this Insertion Order and are hereby incorporated into this Insertion
Order by this reference. Capitalized Terms not otherwise defined in this Insertion Order have the same meanings as that ascribed to them in
Business Terms. In the event of any ambiguity, conflict, or inconsistency between any of the Business Terms, this Insertion Order, and the DPA, the
following order of precedence shall govern for purposes of resolving any such ambiguity, conflict, or inconsistency: (1) this Insertion Order, (2) the
DPA, if applicable, and (3) the Business Terms.
Page 3 of 3
City of Dania Beach
Community Development Memorandum
DATE: 10/13/2026
TO: Mayor and Commissioners
FROM: Candido Sosa-Cruz, ICMA-CM, City Manager
VIA: Eleanor Norena, CFM, Deputy City Manager
Corinne Lajoie, MURP, AICP, Director
Shanesa Miranda, Deputy Director
Claudia Viviana Batista, Planning and Zoning Manager
SUBJECT: SP-078-22: The applicant and property owner, Port 1850 LLC, requests approval of
a Site Plan to allow the construction of a 62,340-square-foot warehouse industrial
development on the property located at 1850 NE 7 Avenue.
Request:
SITE PLAN APPROVAL
The applicant is requesting Site Plan approval for the construction of a 62,340-square-foot
warehouse, including 16 loading bays and 71 parking spaces.
Property Information:
EXISTING ZONING: General Industrial (IG)
LAND USE DESIGNATION: Employment Center
SITE ACREAGE: 5.11 acres (222,733 SF) GROSS
EXISTING USE: Vacant
VIOLATIONS ON THE PROPERTY: No open violations on the property
Background:
The subject property is a 5.11-acre vacant site and is located east of the Hollywood/Fort
Lauderdale International Airport. Access to the property will be through a recorded easement
(NISA Plat P.B. 147 PG, 14, B.C.R.), 30 feet wide, through the property located west of the
subject parcel, identified with the address of 1900 NE 7 Avenue.
Three and a half (3.5) acres of the site have an Environmentally Sensitive Land (ESL)
designation overlayed on the property as designated by the Broward County Land Use map
adopted in 1989 and last updated on January 28, 2020. The applicant proposed an amendment to
remove approximately three and a half (3.5) acres of the overall 21.0 acres ESL Site 97/Map
Label 136 from the Natural Resource Map Series Environmental Sensitive Lands Map. The
request was reviewed by several Broward County agencies and received approval by the
Planning Council on May 22, 2025. The request moved forward for first reading by the Broward
County Board of County Commissioners and received approval on August 21, 2025, at first
reading. Further, the request was moved for second reading at the County Commission level on
March 3, 2026, and was denied.
Due to recent county changes to the ESL overlayed designation restriction is no longer
applicable. Although the Broward County Board of County Commissioners held a hearing to
deny the map amendment, the County Attorney and the Department heads for Platting, Zoning,
and Environmental Permitting advise that the current process for obtaining County plat approval
is for the applicant to complete an Environmental Impact Report (EIR).
The EIR is utilized by the Broward County Environmental Permitting Division to determine any
environmental impacts or conditions. The EIR is used in conjunction with Broward County
Ordinances, Chapter 27, to regulate/permit an application as it relates to environmental impacts.
These processes occur after review by the City. Should the EIR, or Chapter 27 review require a
conservation easement of land, then the applicant may be required to amend its applications for
City plat and site plan approval. Therefore, due to all these changes in Broward County
regulations, the application can proceed to seek agencies’ approvals, provided the development
ultimately obtains all licenses and permits from the relevant agencies.
A Plat application has also been submitted for this property and is on this agenda for
consideration as a separate item.
Site Plan
The existing project site consists of mangrove wetlands with an area of disturbed uplands on the
west side. The proposed new development will consist of filling in 2.92 acres to accommodate a
62,340 square feet warehouse, including sixteen (16) loading bays and seventy-one (71) parking
spaces.
Wildlife Protection
The City’s Land Development Code, Article 250, requires that any development of any existing
natural land area in excess of one-half (1/2) acre must provide for the avoidance of impacts to or
the safe capture and relocation of any wildlife species protected by federal or state law in
accordance with relevant regulations. The applicant provided a Cumulative Impact Analysis
report demonstrating that the existing wetland has been degraded and that its habitat value is
rapidly diminishing due to the invasion of exotic vegetation. In addition, the applicant conducted
several informal surveys of rare, threatened, or species of special concern as listed by the Florida
Department of Agriculture and the Florida Fish and Wildlife Conservation Commission
(FFWCC) have been conducted on this property, and no wildlife was observed as identified in a
report conducted by The Chappell Group dated August 2023.
Further, the applicant has engaged E Sciences, a local environmental, engineering, and
ecological consulting firm, to conduct a Florida Bonneted Bat (FBB) Limited Roost Survey. The
results of the report dated November 2020 demonstrate that the consulting firm conducted a
survey within the forested area immediately surrounding the interior pond, and the densely
forested site contained no adjacent open areas for Florida Bonneted Bat colonies, as the trees in
the area were unsuitable for FBB roosting per USFWS guidelines. No bats and cavities were
observed. In summary, the report identified stopping work if encountering FBB during
construction.
The LDC identifies that the city may require proof of compliance with federal, state, county, and
city wildlife protection measures prior to issuance of building permits, as well as prior to
issuance of certificates of occupancy.
Resiliency
The City’s Code of Ordinance requires a Stormwater Management Plan to be submitted and
approved prior to issuance of a building permit. A stormwater management plan is mandatory for
all projects that change the surface to be impervious or alter pervious areas, regardless of City
Commission approval. Post-development runoff must not exceed pre-development runoff rates
for a 25-year storm event. The City's current drainage level of service is to retain the first inch of
rainfall on-site and maintain predevelopment runoff rates for a 25-year storm event. The City
enforces a "General Requirements" stormwater management plan, including an "interim design
standard" specifying groundwater and surface water levels before a design event.
The applicant provided a Stormwater Management Report. According to the report, development
of the subject parcel would result in thirty-six percent (36%) pervious area. The subject parcel
meets the twenty percent (20%) pervious requirement for industrial development in the General
Industrial (IG) district per Code Section 205-10(D).
The applicant is proposing to install drainage improvements with the installation of exfiltration
trenches, drainage wells, and a minor swale. Further, the applicant includes a Mitigation Work
Plan for onsite preservation, which includes enhancement of 1.29 acres of wetlands,
approximately 31% of the wetlands on site, with annual evaluation of measurable success
criteria, vegetation control, data collection, monitoring frequency, and reporting protocols for a
period of five (5) years and maintained in perpetuity. Lastly, the applicant will purchase 1.24
debits of saltwater credits from the Everglades Mitigation Bank for off-site mitigation.
Traffic Study
The applicant has engaged with Langan to perform trip generation analysis for the proposed
development. The results of the trip generation analysis confirmed that the proposed use is
expected to generate no more than thirty-four (34) peak-hour trips. The City Engineer accepted
the findings in the report.
Community Outreach
On September 12, 2025, Ed Stacker, Esq., on behalf of the applicant, sent notices to properties
within 1,000 feet of the subject property notifying them of the proposed development and
inviting the community to participate in the virtual community meeting regarding the proposed
development to discuss details of the project. The community meeting was held on September
23, 2025, via Zoom. Four (4) representatives of the project, Planning staff from the City, and
more than 36 members of the community attended the meeting, including Commissioner
Lewellen and Mayor Davis. Several residents had concerns about the environmental impact and
the existing species on site that will be endangered and suffer from the proposed project. Some
others voiced their concern about the irreparable loss once the mangroves are removed. In
addition, several objections were received from the community prior to the item being scheduled
at the October 28, 2025, City Commission meeting, where the city formally opposed the
applicant’s request at the county level.
Development Review Committee (DRC)
The Site Plan was reviewed by staff at the DRC meetings held on October 25, 2022, September
22, 2023, July 10, 2025, and September 15, 2025, which included personnel from the BSO Fire,
the City’s Flood Plain consultant, the City’s engineering consultant, and the Community
Development Department’s Planning and Zoning Division. The DRC comments are listed as
conditions of approval in the plat resolution and provided below.
1. Disposition Plan: A tree survey and disposition plan has been provided, but remains to be
verified. To do so, the City requires a stamped, approved permit or jurisdictional
determination exhibit from the County, which is the agency with jurisdiction to determine
the line between the upland portion of the property that the City regulates, and the
wetland portion of the property that the County regulates. Until this is provided, final tree
removal mitigation requirements cannot be verified. A copy of the County’s approved
wetland delineation is required prior to building permit or tree removal license issuance.
(Landscape)
2. Landscape Plan: The provided landscape plan contains excess trees for mitigation, but
based on Comment 1, mitigation requirements are undetermined at this time. A revised
landscape plan with an updated landscape data table and approved mitigation calculations
will be required for building permit and tree removal license issuance. (Landscape)
3. Any road cuts for utilities, curb cuts, and/or others with the City ROW shall be restored
to full lane width for a 50' minimum length centered on the proposed cut (if applicable).
(Engineering)
4. Additional comments may apply and will need to be addressed prior to Building Permit
approval. (Engineering)
5. Provide Maintenance of Traffic (MOT) Plan by a licensed General
Contractor/Professional Engineer in the State of Florida (If applicable). (Engineering)
6. In accordance with the City Code of Ordinances in Article 415. SIDEWALKS AND
SWALES, Owner is responsible for the construction of sidewalks/swales within the road
ROW when buildings are constructed or substantially improved. (Engineering)
7. Detail and complete engineering plans will be required prior to Building and R/W permit
approval. (Engineering)
8. Provide a utility piping conflict details plan, along with documentation to demonstrate the
acceptability of the separation between water, sanitary, stormwater service lines, etc.
(Engineering)
9. Show all existing and proposed utilities on the landscaping plans for potential conflicts.
(Engineering)
10. Provide ADA parking, access/driveway, and sidewalks /ramps, including dimensions in
accordance with Chapter 553 of the Florida Statutes. "Accessibility of Handicapped
Persons" and the latest edition of "Accessibility Requirements Manual" by the
Department of Community Affairs, Florida Board Building Codes and Standards, and in
accordance with the Americans with Disability Act (ADA). (Engineering)
11. Provide regulatory agencies' approval documentation and Permits/Licenses (as
applicable) as part of the final submittal, prior to issuance of the Building Permit
(Broward County Surface Water License, Broward County Wastewater Permit, Florida
Department of Environmental Protection, FDOT, BC Environmental, BC Aviation,
BCTED, etc.). Also, include Utility / Right of Way Permits from City, Broward County,
and State Roads as applicable. (Engineering)
12. Must get approval for mitigation of wetlands from the County and COE for reclaiming
mangrove swamp land for commercial use. (Engineering)
13. Get allocation for water demand & sewer from utilities. (Engineering)
14. Drainage report submitted in Tier 2 must have a specific site percolation test for
exfiltration trenches. (Engineering)
15. Drainage wells must obtain a permit from the County prior to permit issuance.
(Engineering)
16. Additional comments may be issued and must be addressed before permit approval.
(Traffic)
17. Provide final approval from the Florida Department of Environmental Protection (FDEP)
and Broward County Public Works and Environmental Services Department. The
Environmental Resource Permit (ERP) was delegated from FDEP to the county, so the
county is processing both the ERP and the Environmental Resource License under
application No. DF20-1121. The FDEP is processing the State 404 Permit under
application no. 06- 0396518-002-SFI.) before permit issuance. (Planning)
18. The developer is required to participate in the City’s Public Art program by payment into
the City’s Public Art fund or through payment and installation of public art. The amount
of the Public Art Fund contribution is dependent on the value of the construction, which
will be established at the time of building permit submittal per Code Sec. 811-70.
(Planning)
19. Provide the estimated construction value for development so that impact fees may be
determined. (Planning).
20. For all projects resulting in the buildout of the site, such that construction staging cannot
occur on site, the applicant must obtain Staging Plan approval by the Community
Development Director prior to issuance of a building permit. The Staging Plan must
include, but is not limited to, the location of equipment and material during construction.
(Planning)
21. For all projects resulting in the buildout of the site, such that construction staging cannot
occur on site, the applicant must obtain Maintenance of Traffic Plan approval by the City
Engineer for the period of construction prior to issuance of a building permit. (Planning)
22. Per Code Sec.8-7 Commercial properties under construction are required to provide
security to fencing with screening showing project rendering covering at least 75% of the
length of the fence along an arterial or state right-of-way & 25% for local roads and must
include name and intended use of the project, project rendering, project website address,
and owner or agent, the telephone number for the owner or agent, and the name and an
emergency contact telephone number of the general contractor. Provide screen details
with the next submittal. The City Commission must approve the use of the City Logo.
(Planning).
23. Must provide a recorded copy of the Plat before permit issuance (Planning)
24. Must obtain approval of the Environmental Impact Report (EIR) from County agencies
before Certificate of Occupancy (CO). If the County Plat, the EIR, or Environmental
Permits required in Broward County Ordinances, Chapter 27 requires a conservation
easement or other requirement that would affect the City’s Plat approval or City’s Site
Plan approval, the Applicant shall be required to seek modification of either the City plat
approval or site plan approval, as may be applicable before seeking a Temporary
Certificate of Occupancy (TCO) or CO. (Planning)
25. Provide proof of wildlife protection compliance with federal, state, county, and city
wildlife protection measures prior to issuance of building permits. (Planning)
26. If an encounter with a Florida Bonneted Bat (FBB) occurs during construction or at any
time, stopping work must occur, and the Florida Fish and Wildlife Conservation
Commission (FFWCC) must be notified. (Planning)
Comprehensive Plan
This application supports the Comprehensive Plan by furthering the following goals:
Future Land Use Element
▪ Policy 1.1.5.1 Encourage development to enhance the tax base of the community.
▪ Policy 1.1.1.5 Future industrial land uses shall be located with access to major
transportation facilities, including highways, airports, and railroads, and seaports.
▪ Policy 1.1.1.6 In order to ensure sufficient amounts of industrial land are available to
meet Dania Beach's future needs, those lands enjoying a future land use industrial
designation on the Future Dania Beach Land Use Plan Map shall not be utilized for
non-industrial purposes, except where in conformance with the Industrial Permitted
Use subsection of the Plan Implementation Requirements section of the Dania Beach
Land Use Plan.
Conservation Element
▪ Policy 6.1.4.5 The City shall require that wetlands within any new development be
preserved or mitigated within any new development or mitigated in accordance with
the Broward County Department of Planning and Environmental regulations by
coordinating with the Broward County Department of Planning and Environmental
Protection during review of proposed site plans for new development involving
potential impacts to existing natural resource areas.
▪ Policy 6.1.4.11 The City of Dania Beach shall distribute land uses in a manner that
avoids or minimizes, to the greatest degree extent possible, the adverse effects and
impacts on wetlands. Those future land uses identified in the table provided below as
being incompatible with the protection and conservation of wetland functions shall be
directed away from wetlands, or when incompatible land uses are allowed to occur,
shall be mitigated, or enhanced, or both, to compensate for the loss of wetland
functions.
CONSERVATION ELEMENT
Compatibility of Future Land Uses
Relative to Wetland Class
Wetland Class Future Land Use Compatibility
Wetlands wither Wetlands
Benefit Index (WBI)
value 0.8
Future Land Use Element Map
Series, except for Conservation, are
incompatible.
Wetlands with a WBI
value less than 0.80 All
compensation requirements of
Chapter 27, Article XI, Broward
County Code of Ordinances are
satisfied.
SOURCE: Broward County Department of Natural Resource Protection
(May 2003); and Broward County Code of Ordinances,
Chapter 27 Article XI, Aquatic and Wetland Resource Protection
Staff Analysis
The applicant is proposing to develop the property located at 1850 NE 7 Avenue with a new
62,340 square feet warehouse with parking and loading areas. The applicant is proposing to
install drainage improvements with the installation of exfiltration trenches, drainage wells, and a
minor swale. The project, with the conditions of approval, meets the regulations established by
the Land Development Code and is consistent with the City’s Comprehensive Plan, including the
Future Land Use designation, which identifies the property as an Employment Center.
The proposed warehouse development is a permitted use by right. The applicant is proposing to
mitigate as identified in a Mitigation Work Plan for onsite preservation. The proposed mitigation
includes enhancement of 1.29 acres of wetlands (approximately 31% of the wetlands on site)
with annual evaluation of measurable success criteria, vegetation control, data collection,
monitoring frequency, and reporting protocols for a period of five (5) years and maintained in
perpetuity. In addition, the applicant will purchase 1.24 debits of saltwater credits from the
Everglades Mitigation Bank for additional off-site mitigation.
In addition to these initiatives, the applicant is required to coordinate with applicable Broward
County Agencies for the submittal and approval of all their environmental analysis to meet the
Environmental Impact Report (EIR) standards and approval by the County.
Further, the applicant has engaged the services of The Chappell Group and E Sciences to conduct
wildlife protection surveys. As identified in a report conducted by The Chappell Group dated
August 2023, no wildlife was observed. The Florida Bonneted Bat Limited Roost Survey
conducted by E Sciences, a report dated November 2020, demonstrated that no bats and cavities
were observed. In summary, the report identified stopping work if encountering FBB during
construction. Conditions of approval have been included in the resolution to meet this
requirement.
Previous Action
This application was last heard on August 25, 2026, by the City Commission. Due to lack of
motion, no action was taken requiring the application to be reheard.
Budgetary Impact
Approval of the Site Plan will enable this site to be developed, expanding the City’s tax roll and
collection of applicable impact fees as described in this staff report, as well as building permit
fees.
Recommendation
Recent regulatory changes in Broward County have removed the ESL overlay restriction.
Despite the Board of County Commissioners' hearing regarding the map amendment, County
staff—including the County Attorney and department heads—advise that plat approval is now
contingent upon the submission of an Environmental Impact Report (EIR).
The EIR used, alongside Broward County Code Chapter 27, serves as the basis for
environmental permitting. As this review takes place after the City evaluation, the applicant is
advised that any required conservation easements may trigger the need for amended City site
plans or plat approvals. Given this framework, the application is clear to move forward, subject
to obtaining all final agency permits. Therefore, the Community Development Department is
recommending approval of the resolution for the Site Plan, provided that the remaining DRC
comments are made as conditions of approval and must be addressed prior to the issuance of a
building permit, and further provided plat approval is recorded.
RESOLUTION NO. 2026-___
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, APPROVING THE PORT 1850 LLC SITE PLAN (SP-078-
22) SUBMITTED BY THE OWNER, PORT 1850 LLC, FOR PROPERTY
LOCATED AT 1850 NE 7 AVENUE IN THE CITY OF DANIA BEACH,
FLORIDA; PROVIDING FOR CONFLICTS; FURTHER,PROVIDING FOR AN
EFFECTIVE DATE.
, pursuant to Chapter 28, entitled, “Land Development Code” (”LDC”) of Part
6, entitled, “Development Review Procedures and Requirements,” of Article 635, entitled, “Site
Plans” of the City Code of Ordinances provides that site plan approval is required as a condition
to the issuance of a building permit prior to the commencement of construction; and
, Port 1850 LLC (the “Applicant”) is requesting site plan approval (SP-078-
22) for the proposed construction of a 62,340 square foot industrial development at 1850 NE 7
Ave, as legally described in Exhibit “A”, a copy of which is made a part of and incorporated into
this Resolution by this reference; and
the Applicant is requesting site plan approval for the proposed construction
of a 62,340 square foot industrial building (SP-078-22) as referenced in Exhibit “B”, a copy of
which is made a part of and incorporated into this Resolution by this reference; and
, the Applicant has provided sufficient justification demonstrating compliance
with the approval criteria to meet the requirements of the Code; and
, the City’s Staff Report analyzes the Applicant’s request based on the criteria
and supports the Applicant’s request and is incorporated by reference herein as the City’s findings
of fact; and
, the City Commission conducted a duly noticed public hearing in accordance
with Article 610 of the LDC; and
, the City Commission finds that the approval of the Site Plan (SP-078-22) is
consistent with the City’s Land Development Code and Comprehensive Plan and will protect the
health, safety, and welfare of the residents of the City, and further the purpose, goals, objectives,
and policies of the Comprehensive Plan; and
2 RESOLUTION #2026-
WHEREAS, the City Commission approves the proposed Site Plan (SP-078-22) to permit
the future development of the subject property pursuant to and consistent with the attached Site
Plan, which is consistent with the City’s Comprehensive Plan and Land Development Regulations;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the foregoing “WHEREAS” clauses are ratified and confirmed as
being true and correct, and they are made a part of and incorporated into this resolution by
reference.
Section 2. That pursuant to Chapter 28 “Land Development Code,” Part 6
“Development Review Procedures and Requirements,” Article 635 “Site Plan,” the following Site
Plan (SP-078-22), attached as Exhibit “B”, is approved.
Section 3. That the approvals granted by this Resolution are subject to the Applicant’s
compliance with the following conditions:
1. Disposition Plan: A tree survey and disposition plan has been provided, but remains to be
verified. To do so, the City requires a stamped, approved permit or jurisdictional
determination exhibit from the County, which is the agency with jurisdiction to determine
the line between the upland portion of the property that the City regulates, and the wetland
portion of the property that the County regulates. Until this is provided, final tree removal
mitigation requirements cannot be verified. A copy of the County’s approved wetland
delineation is required prior to building permit or tree removal license issuance.
(Landscape)
2. Landscape Plan: The provided landscape plan contains excess trees for mitigation, but
based on Comment 1, mitigation requirements are undetermined at this time. A revised
landscape plan with an updated landscape data table and approved mitigation calculations
will be required for building permit and tree removal license issuance. (Landscape)
3. Any road cuts for utilities, curb cuts, and/or others with the City ROW shall be restored to
full lane width for a 50' minimum length centered on the proposed cut (if applicable).
(Engineering)
4. Additional comments may apply and will need to be addressed prior to Building Permit
approval. (Engineering)
5. Provide Maintenance of Traffic (MOT) Plan by a licensed General Contractor/Professional
Engineer in the State of Florida (If applicable). (Engineering)
6. In accordance with the City Code of Ordinances in Article 415. SIDEWALKS AND
SWALES, Owner is responsible for the construction of sidewalks/swales within the road
ROW when buildings are constructed or substantially improved. (Engineering)
7. Detail and complete engineering plans will be required prior to Building and R/W permit
approval. (Engineering)
3 RESOLUTION #2026-
8. Provide a utility piping conflict details plan, along with documentation to demonstrate the
acceptability of the separation between water, sanitary, stormwater service lines, etc.
(Engineering)
9. Show all existing and proposed utilities on the landscaping plans for potential conflicts.
(Engineering)
10. Provide ADA parking, access/driveway, and sidewalks /ramps, including dimensions in
accordance with Chapter 553 of the Florida Statutes. "Accessibility of Handicapped
Persons" and the latest edition of "Accessibility Requirements Manual" by the Department
of Community Affairs, Florida Board Building Codes and Standards, and in accordance
with the Americans with Disability Act (ADA). (Engineering)
11. Provide regulatory agencies' approval documentation and Permits/Licenses (as applicable)
as part of the final submittal, prior to issuance of the Building Permit (Broward County
Surface Water License, Broward County Wastewater Permit, Florida Department of
Environmental Protection, FDOT, BC Environmental, BC Aviation, BCTED, etc.). Also,
include Utility / Right of Way Permits from City, Broward County, and State Roads as
applicable. (Engineering)
12. Must get approval for mitigation of wetlands from the County and COE for reclaiming
mangrove swamp land for commercial use. (Engineering)
13. Get allocation for water demand & sewer from utilities. (Engineering)
14. Drainage report submitted in Tier 2 must have a specific site percolation test for exfiltration
trenches. (Engineering)
15. Drainage wells must obtain a permit from the County prior to permit issuance.
(Engineering)
16. Additional comments may be issued and must be addressed before permit approval.
(Traffic)
17. Provide final approval from the Florida Department of Environmental Protection (FDEP)
and Broward County Public Works and Environmental Services Department. The
Environmental Resource Permit (ERP) was delegated from FDEP to the county, so the
county is processing both the ERP and the Environmental Resource License under
application No. DF20-1121. The FDEP is processing the State 404 Permit under
application no. 06- 0396518-002-SFI.) before permit issuance. (Planning)
18. The developer is required to participate in the City’s Public Art program by payment into
the City’s Public Art fund or through payment and installation of public art. The amount
of the Public Art Fund contribution is dependent on the value of the construction, which
will be established at the time of building permit submittal per Code Sec. 811-70.
(Planning)
19. Provide the estimated construction value for development so that impact fees may be
determined. (Planning).
20. For all projects resulting in the buildout of the site, such that construction staging cannot
occur on site, the applicant must obtain Staging Plan approval by the Community
Development Director prior to issuance of a building permit. The Staging Plan must
include, but is not limited to, the location of equipment and material during construction.
(Planning)
21. For all projects resulting in the buildout of the site, such that construction staging cannot
occur on site, the applicant must obtain Maintenance of Traffic Plan approval by the City
Engineer for the period of construction prior to issuance of a building permit. (Planning)
4 RESOLUTION #2026-
22. Per Code Sec.8-7 Commercial properties under construction are required to provide
security to fencing with screening showing project rendering covering at least 75% of the
length of the fence along an arterial or state right-of-way & 25% for local roads and must
include name and intended use of the project, project rendering, project website address,
and owner or agent, the telephone number for the owner or agent, and the name and an
emergency contact telephone number of the general contractor. Provide screen details with
the next submittal. The City Commission must approve the use of the City Logo.
(Planning).
23. Must obtain plat approval from both the City and County before permit issuance (Planning)
24. Must obtain approval of the Environmental Impact Report (EIR) from County agencies
before Certificate of Occupancy (CO). If the County Plat, the EIR, or Environmental
Permits required in Broward County Ordinances, Chapter 27 requires a conservation
easement or other requirement that would affect the City’s Plat approval or City’s Site Plan
approval, the Applicant shall be required to seek modification of either the City plat
approval or site plan approval, as may be applicable before seeking a Temporary Certificate
of Occupancy (TCO) or CO. (Planning)
Section 4. That pursuant to LDC Section 635-100 “Expiration of Site Plans,” the Site
Plan (SP-078-22) approval shall automatically expire and become null and void unless the
Applicant commences with the construction of the improvements shown on the Site Plan, within
eighteen (18) months from the date of this Resolution.
Section 5. That the issuance of a development order by a municipality does not in any
way create any right on the part of an Applicant to obtain a permit from a state or federal agency,
and does not create any liability on the part of the municipality for issuance of the development
order if the Applicant fails to obtain requisite approvals or does not fulfill the obligations imposed
by a state or federal agency, or undertakes actions that result in a violation of state or federal law.
Section 6. That the associated Department Planning and Zoning Division Staff Report
prepared for the above Application is incorporated into this Resolution as findings of fact.
Section 7. That all resolutions or parts of resolutions in conflict with this Resolution are
repealed to the extent of such conflict.
Section 8. That this Resolution shall be effective 10 days after passage.
SIGNATURES ON THE FOLLOWING PAGE
5 RESOLUTION #2026-
PASSED AND ADOPTED on __________________, 2026.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
THE SOUTH ONE-HALF (S 1/2) OF THE NORTHEAST ONE-QUARTER (NE 1/4) OF THE
SOUTHEAST ONE-QUARTER (SE 1/4) OF THE NORTHWEST ONE-QUARTER (NW 1/4) OF
SECTION 26, TOWNSHIP 50 SOUTH, RANGE 42 EAST, TOGETHER WITH AN EASEMENT FOR
ROAD PURPOSES OVER THE WEST 30 FEET OF THE NORTH ONE-HALF (N 1/2) OF THE
NORTHEAST ONE-QUARTER (NE 1/4) OF THE SOUTHEAST ONE-QUARTER (SE 1/4) OF THE
NORTHWEST ONE-QUARTER (NW 1/4) OF SECTION 26, TOWNSHIP 50 SOUTH, RANGE 42
EAST, SAID LANDS LYING, BEING AND SITUATE IN BROWARD COUNTY, FLORIDA, MORE
PARTICULARLY DESCRIBED AS FOLLOWS:
BEGIN AT THE SOUTHEAST CORNER OF PARCEL "B" OF NISA PLAT, ACOORDING TO THE
PLAT THEREOF, AS RCORDED IN PLAT BOOK 147, PAGE 14, OF THE PUBLIC RECORDS OF
BROWARD COUNTY, FLORIDA;
THENCE NORTH 02°08'27" WEST, ALONG THE EAST LINE OF SAID PARCEL "B", A DISTANCE
OF 336.08 FEET TO THE NORTHEAST CORNER OF SAID PARCEL "B" AND THE NORTH LINE
OF THE SOUTH 1/2 OF THE N.E. 1/4 OF THE S.E. 1/4 OF THE N.W. 1/4 OF SECTION 26, TOWNSHIP
50 SOUTH, RANGE 42 EAST;
THENCE NORTH 88°08'32" EAST, A DISTANCE OF 662.69 FEET, ALONG SAID NORTH LINE TO
THE EAST LINE OF THE SOUTH 1/2 OF THE N.E. 1/4 OF THE S.E. 1/4 OF THE N.W. 1/4 OF SAID
SECTION 26;
THENCE SOUTH 02°12'08" EAST, ALONG SAID EAST LINE, A DISTANCE OF 335.96 FEET TO
THE SOUTH LINE OF THE SOUTH 1/2 OF THE N.E. 1/4 OF THE S.E. 1/4 OF THE N.W. 1/4 OF SAID
SECTION 26;
THENCE SOUTH 88°07'55" WEST, ALONG SAID SOUTH LINE, A DISTANCE OF 663.05 FEET TO
THE POINT OF BEGINNING.
SAID LANDS SITUATE, LYING AND BEING IN BROWARD COUNTY, FLORIDA, AND
CONTAINING 5.11 ACRES (222,733 SQUARE FEET), MORE OR LESS.
7 RESOLUTION #2026-
EXHIBIT B
!"#
!
" $$
# #%& #
'''
() ') !*!
+ !*+$$$
,
$
+"(-
&+&".
(/+
.
0/-
&1.
&/2
2/ ) 3) ,
+,
$ 4$
5676896:;<8=>9;:
?@AB>;C:D=7;>E;
F=>6=G;=5DHI8JK
6F=LLBBM
8J5
=:6J>
9N;:5D
95=8;?OPQABO
9;5:6J>
QRH:JS
>
9D6<AB9K=>T;
MQ;
IJ8
6J
>EUG
;KVABMQWQRWBBWBBQ?
6>F;XJI
9D;;:9
567689D;;:9GY8=>T=
>
0((
2/
("-&Z
&/2
"#
"
/[
(-0((
"#
%
(
2(-.2/
(.2 Z("&+&".
&/2
"#$
&
(Z.2
"#
%
-
. &2%.2 -.&2.%(
Z.2
"#
Z
-(&\&2.-]
&&
]Z.2
"#
Z
.[(\(
2
Z.2
"#3
%
.
-).%(
-"^"&-".
&/2
Z.2
"#3
+
&-(
-"^"&-".
&/2
Z.2
"#
/&(-/
&/2
.2 ( &\(
2
"/2
-/
"#
]Z&"."-/
("
&/2
"#,
&
( (
.&
"#, #"#,
_
.
(-.2 (_(
- (
.&
``
\`"*Z(
`a `
Z" b c` !
`!!
c
bZ a2
-
$$Z/
!"#
!
"
# #$% #
&&&
'( &( !)!
* !)*
+
*"',
%*%"-
'.*
-
/.,
%0-
%.1
1. (2 3(2 +2
*+
4
5676
89
:
;
<=>?>@AB=C?DAAEF>G>@CHHI?>GEAF
CEF?ACHAFDIJ>K=CAHLCMMNOPQRE
@=AFC@ACFSCKAE@@R@=A?ACH
OM>E@AFLRT>A?RU@=>?FRKVBA
E@CMA
ER@KRE?>FAMAF?>GEAFCEF?ACHAF
CEF@=A?>GEC@VMABV
?@DAWAM>U>AF
RECEIAHAK@MRE>KKRT>A?QXYZ[\]^_`a\
b\cdedZf
hijhijk
hijhijkXl
!
"
"
"
#
$
"
"
"
#
"
"
"
#
"
"
"
#
"
"
"
%&
"
&$
"
"
!
$
2Y373)*4Y(7?**A<3B3)(;;>73BA*<
(A<7*(;*<?>Z39Y(*;F(88L[JCDA
)Y*<()*(<\(9*A))D)Y*7*(;
[83A)*<FD]3*7D^)Y37<D9E4*
A)(8*
AD)9DA73<*8*<73BA*<(A<7*(;*<
(A<)Y*73BA()E8*4E
7)?*:*83^3*<
DA(A>*;*9)8DA399D]3*7C[8D\*9)U(4*
O*:373DA
H-0H-05
H-0H-05
!"#
!
" $$%&&&'%&(%)%&(*+
#
,,,
-. ,. !/!
0 !/0
1
0"-2
303"4
-50
4
652
374
358
8599.:
.:1:
01
;
<<
=<"/>-
<? <
>" @ A< !
<!!
A
@> ?8
2
9
9
!"#
!
"
# #"$
#
%%%
&' %' !(!
) !()
*
)"&+
,),"-
&.)
-
/.+
,0-
,.1
1. '2 3'2 *2
)*
4
567879:;6<8=::>?7@79<AAB87@>:?
<>?8:<A:?=BC7D6<:AE<FFGHIJK>
96:?<9:<?L<D:>99K96:8:<A
HF7>9:?EKM7:8KN9678?KDO;:
>9<F:
>K9DK>87?:F:?87@>:?<>?8:<A:?
<>?96:87@><9OF:;O
89=:P:F7N7:?
K><>B:A:D9FK>7DDKM7:8JQRSTUVWXYZU
[U\]^]S_
abcabcd
abcabcdQe
!N"&
"#
N&
.0
+"1"**-
&"10+
0+
&*+
.-
O"(N*
5'';
P92
30
N
+
+Q(0
3
N
&*
P'"0+
53R"&
3S
N"&
+3(4#
0
'
03
(30&"+'+
&"10+
0+
&*+
0+
N
&"104'
#4
&
.
)'"S"+
30
0-
*('30"(
(3R"&2
P'3Q(
D#
>)"&"30
E
E
!"#$
!
" %%
# #"& #
'''
() ') !*!
+ !*+%%%
%
+"(,
-+-".
(/+
.
0/,
-1.
-/2
2/$$ )3 )3 3
+
% 4%
5678
9
:;9<=>?8=
59?=@ABA
C9
DEC
DFA9A?=@ABA
C9
8A
=@<:;9<=>?8=
59?=@ABA
C9
GG
HG"*&(
GI G
&" J KG !
G!!
K
J& I2
,
%%$
%%$&/
!"#
!
" $$
# #"% #
&&&
'( &( !)!
* !)*$$$
+
$
*"',
-*-".
'/*
.
0/,
-1.
-/2
2/33 ( ( +
*+
$ 4$
567879:;6<8=::>?7@79<AAB87@>:?
<>?8:<A:?=BC7D6<:AE<FFGHIJK>
96:?<9:<?L<D:>99K96:8:<A
HF7>9:?EKM7:8KN9678?KDO;:
>9<F:
>K9DK>87?:F:?87@>:?<>?8:<A:?
<>?96:87@><9OF:;O
89=:P:F7N7:?
K><>B:A:D9FK>7DDKM7:8JQRSTUVWXYZU
[U\]^]S_
abcabcd
abcabcdQe
!"#
!
" $$
##"% #
&&&
'( &( !)!
* !)*$$$
+
$
*"',
-*-".
'/*
.
0/,
-1.
-/2
2/33( (+
*+
$ 4 $
567879:;6<8=::>?7@79<AAB87@>:?
<>?8:<A:?=BC7D6<:AE<FFGHIJK>
96:?<9:<?L<D:>99K96:8:<A
HF7>9:?EKM7:8KN9678?KDO;:
>9<F:
>K9DK>87?:F:?87@>:?<>?8:<A:?
<>?96:87@><9OF:;O
89=:P:F7N7:?
K><>B:A:D9FK>7DDKM7:8JHFKL:D9Q<;:
R:P787K>
TUVTUVW
TUVTUVWHX
!
!
"
!#
"!"
#$
!#
"
%
!
"
&
'
(
!
"
)
"
*
!
*
'
(
"
'
!
+
,
*
,(&
!
*
"
"-
'
"
"
.!
"!"
#$
!#
"
/
.!
!
#
!
.!
!
*
(
"
*
.!
"0
""*
#(!
*'0!
1
!
''
"
0
#
(
'
""*
#(
'
2
"
#
(
!'#
!
!
,
(#
,
#
#
,
!'
!
"
*
"
!
*(
!
,
#
"
#
(#
.!
'
!'!'
,
3
"
(
#
4
'
5#
!#
66
!
*((
6
,
!
&
#
!
"*!
#!"
!'
!
"
"
!!
*
!
"*
!
"
!"
"
#
!(
"
*'
"
"
(
!
#
,'
,(
%
*
!
!
)
"
"
!
'
'
!#
"
#
"
*
#
(
"
"
*
.!
"
"
!#0
#"#!!"
"*
+
"
!
"
!
"
*
!
!$
!
789:;<:=7>:
8;?79;:@
AB8
<;@CA;7B8
:8;@D8A:
<79;?:8A:
PwQUQGHRwFU]HH_ZQ`QGFYY\UQ`_HZ
F_ZUHFYHZ]\xQWwFHYdFVVkyhab_
GwHZFGHFZzFWH_GGbGwHUHFY
yVQ_GHZdb{QHUb|GwQUZbWcRH
_GFVH
_bGWb_UQZHVHZUQ`_HZF_ZUHFYHZ
F_ZGwHUQ`_FGcVHRc
UG]HXHVQ|QHZ
b_F_\HYHWGVb_QWWb{QHUayVbzHWGtFRH
nHXQUQb_
gKNgKNS
gKNgKNS
!"#
!$$%&&&'%&(%)%&(*+ "
,,,
-.,. /
0 /0111
#
1
0!-2
+0+!3
-40
3
542
+63
+47
74 .8 9.8 #8
0#
1 :1
;;
<;!/=-
;>;
=!?@;
;
@
?=>7
2
11
11=4
cdef eghi djf khhl menegjoop fenlhm
jlm fhjohm kp qerdjho sjttu vwx yl
gdh mjgh jmzjrhlg gy gdh fhjo
vtelghm sy{ehf y| gdef myr}ih
lg jth
lyg rylfemhthm fenlhm jlm fhjohm
jlm gdh fenljg}th i}
fg kh ~hte|ehm
yl jlp hohrgtyler ry{ehfx€ ‚ƒ„… †‡ˆƒ
‰ƒŠ‹Œ‹
‘ ‘’
‘ ‘’“
!"#
!$$
" "! "
%%%
&'%' (
) ()$$$
#
$
)!&*
+)+!,
&-)
,
.-*
+/,
+-0
0-11 '2 '2 #2
)#
$ 3$
44
54!(6&
474
6!894
4
9
8670
*
$$1
$$16-
!"#$
!$$
" "! "
%%%
&'%' (
) ()$$$
#
$
)!&*
+)+!,
&-)
,
.-*
+/,
+-0
0-11 '2 '2 #2
)#
$ 3$
4
55
65!(7&
585
7!9:5
5
:
9780
*
$$1
$$17-
)*+*,-./*.--0*./102.3*./9,2..*./20):*7-)740-;
$<
;$<
=
<
>
> ; ; ? @ A
;>
;$
@
;
;
$
; ;?>
;
@$?
<
(BCDC
?
&HFIEF<==
((JJK# LG&=K$L
$
$$=@$>
((J
# ? "
; "
B
("
>
B(
?
<UVJ%#
##
%"?
?
((
@ "#
E W GEXY
Z
!EZ[
$EZ
-,-)70*)2,
@
?\
,2.36)29-20):*7-)7
@ ?
$(#$ ? "
"(
"(
U%BV%(J%#
I!!]XY
'I'GHF'^G$EZ
aba
5c
``ad`
?
; "B
<UVBJBB
F!Z
X[
G G Fe!'&F $EZ
>
)*+*,-./*.--0
$ $
##
%"
@ "#
"(
%B((#(
ZE
X!
G^ G$EZ
J#
?
<#
?
&Z[
Z
J
J#$#
J#$(
J($#
J$#
A
? ?
<
A
&Z[
Z
J#
J(
>
J
JB#
J
?
J
J
>
;>
?@
?
J#
?@
?
J
JB
>
>
>
J%
J%#
J%(
?
<#
&Z[
Z
J#
A
J(
J
JB
?
<B
?>
f
"
$
@
"?
"#
>
g
UV%B(
Xe
&^ $EZ
#
#
#
?
A
14*,3*./3-92075-
.7h
;
;
<
<
; "
;?
><((
;?
>
$
?? <((
;?
>
$
<((
<((
?;
><((
?;
>
=
<((
U
?
# (#(
##
;
?
;
?
$
>
<((
>
;
<((
;
?;
<B(J(JJ(#
@# %JJ(( #J( ##JJ(( (Ji}~€ ‚ƒmrƒ
„}
…o~†~‡€ ˆ‰~†}‚Šˆi}~€ ‚ƒmrƒ„}
…
ol‹Œl i}~€ ‚ƒmrƒ„}
…Ž
‚
€ ~‘~}’ muvzvuŒuuuuuv“|”m•oomy–
p —€
’}s€
˜ƒ„Š
ŽŒ ™š
o€‡}‹|u|yquzqvuvx‹|›‹u›œuzšuuš
!"#$## %
&
&'