HomeMy WebLinkAboutR-2026-147 ITB 26-019 - Ocean Park Paving Bid AwardRESOLUTION NO. 2026-147
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE AWARD OF INVITATION TO BID
(ITB) NO. 26-019, “OCEAN PARK PARKING PHASE 1” TO THE STOUT
GROUP, LLC, IN THE AMOUNT OF TWO HUNDRED TWENTY‑TWO
THOUSAND, ONE HUNDRED SEVENTY‑EIGHT DOLLARS ($222,178.00),
AND AUTHORIZING THE CITY TO EXCEED THE ANNUAL
SINGLE‑VENDOR PURCHASING THRESHOLD OF FIFTY THOUSAND
DOLLARS ($50,000.00); PROVIDING FOR FUNDING; PROVIDING FOR
CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City of Dania Beach identified a need to increase parking capacity at
Ocean Park due to increased use of the beach and surrounding recreational amenities; and
WHEREAS, the City developed the Ocean Park Parking Phase 1 Project to provide
additional parking capacity, improve public access and traffic circulation, and support the
continued use of Ocean Park as an important public recreational facility; and
WHEREAS, the project includes the construction of fifteen (15) additional parking spaces
and associated site improvements, including demolition and removal of existing asphalt pavement,
concrete sidewalk, curb, signs, and other site features; construction of new asphalt pavement,
concrete sidewalk, Type "D" curb, curb transitions, parking space striping, concrete wheel stops,
and signage; relocation of the existing monument sign and landscaping rocks; and associated site
grading and restoration; and
WHEREAS, the project further includes drainage improvements, landscaping and
irrigation, erosion control, maintenance of traffic, subgrade stabilization, limerock base, geogrid,
sod installation, directional boring, and all related labor, materials, equipment, permitting, and
incidental work necessary to provide a complete and functional parking improvement project; and
WHEREAS, the City publicly advertised Invitation to Bid (ITB) No. 26-019, "Ocean Park
Parking Phase 1," in accordance with the City's procurement requirements; and
WHEREAS, bids were publicly opened on August 26, 2026, and eight (8) bids were
received; and
WHEREAS, Procurement completed its review for responsiveness, and the Engineer of
Record reviewed the technical qualifications and bid submissions; and
WHEREAS, The Stout Group, LLC submitted the lowest responsive and responsible bid
in the amount of $201,980.00; and
2 RESOLUTION #2026-147
WHEREAS, the Public Services Department has reviewed the bid results and determined
that The Stout Group, LLC is the lowest responsive and responsible bidder and recommends award
of ITB No. 26-019 to the City Commission; and
WHEREAS, the Public Services Department further recommends approval of the
Construction Agreement between the City of Dania Beach and The Stout Group, LLC for
completion of the Ocean Park Parking Phase 1 Project; and
WHEREAS, due to the nature of the work, the Public Services Department recommends
establishing an Owner's Contingency equal to ten percent (10%) of the base contract amount in the
amount of $20,198.00; and
WHEREAS, the total project authorization, including the base contract amount and
Owner's Contingency, shall not exceed $222,178.00; and
WHEREAS, funding for this project is available from Account No. 415-45-02-545-63-95
in the amount of $222,178.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2. That the City Commission hereby authorizes the award of Invitation to Bid
(ITB) No. 26-019, "Ocean Park Parking Phase 1," to The Stout Group, LLC in the amount of
$201,980.00.
Section 3. That the total project authorization, including ten percent (10%) Owner's
Contingency, shall not exceed $222,178.00.
Section 4. That funding for this project will be appropriated from Account No. 415-
45-02-545-63-95 in the amount of $222,178.00.
Section 5. That the City Manager, or designee, is hereby authorized to take all
administrative actions reasonably necessary to implement the bid award authorized herein;
however, execution of the Construction Agreement shall be subject to subsequent approval by the
City Commission.
Section 6. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 7. That this Resolution shall become effective ten (10) days after adoption.
3 RESOLUTION #2026-147
PASSED AND ADOPTED on October 13, 2026.
Motion by Commissioner Ryan second by Commissioner Rimoli.
FINAL VOTE ON ADOPTION: Unanimous X
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY