HomeMy WebLinkAboutR-2026-149 Stout Group LLC Agreement - Ocean Park Paving (#26-019)RESOLUTION NO. 2026-149
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICALS TO
EXECUTE AN AGREEMENT WITH THE STOUT GROUP, LLC FOR THE
CONSTRUCTION OF INVITATION TO BID (ITB) NO. 26-019, “OCEAN
PARK PARKING – PHASE 1” IN THE AMOUNT NOT TO EXCEED TWO
HUNDRED THIRTY SEVEN THOUSAND ONE HUNDRED SEVENTY
EIGHT DOLLARS ($237,178.00); PROVIDING FOR CONFLICTS; AND
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City of Dania Beach is undertaking the Ocean Park Parking – Phase 1
Project to improve public access and parking availability at Ocean Park; and
WHEREAS, the project will provide fifteen (15) additional parking spaces and associated
site improvements, including paving, drainage, sidewalks, curbing, signage, landscaping,
irrigation, and related site work; and
WHEREAS, the City has completed the procurement process for ITB No. 26-019, “Ocean
Park Parking – Phase 1,” and has determined that The Stout Group, LLC is qualified to perform the
required construction services; and
WHEREAS, the Public Services Department recommends that the City enter into an
agreement with The Stout Group, LLC for the construction of the Ocean Park Parking – Phase 1
Project in an amount not to exceed Two Hundred Sixteen Thousand Nine Hundred Eighty Dollars
($216,980.00) which includes construction cost of $201,980.00 and permitting allowance of
$15,000.00; and
WHEREAS, due to the nature of the work, the Public Services Department recommends
establishing an Owner's Contingency in the amount of Twenty Thousand One Hundred Ninety-
Eight Dollars ($20,198.00) to address unforeseen conditions and minor changes that may arise
during construction; and
WHEREAS, funding for the project is available from Ocean Park Account No. 415-45-02-
545-63-95; and
WHEREAS, the City finds that entering into an agreement with The Stout Group, LLC will
facilitate completion of the Ocean Park Parking – Phase 1 Project.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
2 RESOLUTION #2026-149
Section 1. That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2. That the City Commission hereby authorizes the proper City officials to
execute an agreement with The Stout Group, LLC for the construction of ITB No. 26-019, “Ocean
Park Parking – Phase 1,” in an amount not to exceed Two Hundred Sixteen Thousand Nine
Hundred Eighty Dollars ($216,980.00) , which includes construction cost of $201,980.00 and
permitting allowance of $15,000.00, the agreement is attached hereto and incorporated herein as
Exhibit “A.”
Section 3. That the City Commission hereby authorizes an Owner's Contingency in the
amount of Twenty Thousand One Hundred Ninety-Eight Dollars ($20,198.00), resulting in a total
project authorization of Two Hundred Thirty-Seven Thousand One Hundred Seventy-Eight
Dollars ($237,178.00).
Section 4. That funding for the project will be appropriated from Ocean Park Account
No. 415-45-02-545-63-95 in an amount not to exceed $237,178.00.
Section 5. That the City Manager, or designee, is hereby authorized to take all
administrative actions reasonably necessary to implement the agreement authorized herein.
Section 6. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 7. That this Resolution shall become effective 10 days after passage.
PASSED AND ADOPTED on October 27, 2026.
Motion by Commissioner Lewellen second by Commissioner Rimoli.
FINAL VOTE ON ADOPTION: Unanimous X
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
SIGNATURES ON THE FOLLOWING PAGE
3 RESOLUTION #2026-149
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
1
Construction Agreement
Ocean Park Parking – Phase 1
Invitation to Bid No. 26-019
This Construction Agreement (the “Agreement”) is entered into as of the date of the last
signature below by and between the CITY OF DANIA BEACH, FLORIDA, a Florida municipal
corporation, whose address is 100 West Dania Beach Boulevard, Dania Beach, Florida 33004
(the “City” or “Owner”), and THE STOUT GROUP, LLC, whose address is 10850 NW 138th
Street, Bay 3, Hialeah Gardens, Florida 33018 (the “Contractor”).
Recitals
WHEREAS, the City issued Invitation to Bid No. 26-019 for the Ocean Park Parking –
Phase 1 Project (the “ITB”);
WHEREAS, Contractor submitted the lowest responsive and responsible Bid in the amount
of Two Hundred One Thousand Nine Hundred Eighty Dollars ($201,980.00);
WHEREAS, Contractor represents that it is qualified, properly licensed, sufficiently
staffed, and able to complete the Work in accordance with the Contract Documents; and
WHEREAS, the City Commission authorized award of ITB No. 26-019 and this
Agreement to Contractor, subject to the terms stated below.
NOW, THEREFORE, in consideration of the mutual promises and obligations stated in the
Contract Documents, the parties agree as follows:
Article 1
Contract Documents and Order of Precedence
1.1 Contract Documents. The Contract consists of this Agreement; all properly executed
amendments and Change Orders; the Notice to Proceed; the City’s ITB, including its General
Terms and Conditions, Special Conditions, Scope of Work, Bid Form, plans, drawings, technical
specifications, attachments, and all Addenda; the Performance Bond and Payment Bond;
Contractor’s accepted Bid and required post-award submissions; and other documents expressly
incorporated by this Agreement (collectively, the “Contract Documents”).
1.2 Order of Precedence. If the Contract Documents conflict, the following order controls:
1. Executed amendments and Change Orders, with the most recent controlling;
2. This Agreement;
3. Addenda, with the most recent controlling;
4. The Special Conditions;
5. The Scope of Work and Bid Form;
6. The General Terms and Conditions;
2
7. The technical specifications;
8. The drawings;
9. The Performance Bond and Payment Bond; and
10. Contractor’s accepted Bid.
Detailed or more stringent requirements control over general or less stringent requirements when
reasonably reconcilable. In the event of a conflict involving dimensions, quantities, materials,
methods, or other technical requirements, Contractor shall not proceed based solely on the
provision that would result in the greater quantity, higher quality, or higher cost. Contractor shall
promptly request a written interpretation from the City before proceeding with the affected Work
and shall not exploit an ambiguity, conflict, error, or omission in the Contract Documents.
1.3 Entire Work. The Contract Documents are complementary. Work shown or described in one
Contract Document and reasonably inferable as necessary for a complete, functional, code-
compliant, and warrantable Project is included in the Work even if not repeated elsewhere.
1.4 Bid Review and Contract Acceptance. Contractor acknowledges that it has reviewed and
accepted this Agreement before execution. Qualifications, exceptions, supplemental terms, or
proposed changes submitted by Contractor do not modify the Contract unless expressly accepted
in a written amendment executed by the City.
1.5 Definitions. Capitalized terms used but not separately defined in this Agreement have the
meanings assigned to them elsewhere in the Contract Documents.
“Business Day” means a day other than Saturday, Sunday, or a City-observed holiday.
“Work” means all construction and related services, labor, materials, equipment, supervision,
coordination, testing, documentation, and other obligations required by the Contract Documents.
“Contract Time” means the periods established for Substantial Completion and Final Completion,
as properly adjusted by written Change Order.
1.6 Contractor’s Accepted Bid. Contractor’s accepted Bid is incorporated only to establish the
accepted pricing, proposed personnel, qualifications, representations, and other commitments that
supplement the City’s requirements. Any qualification, exception, exclusion, limitation,
assumption, or additional term contained in Contractor’s Bid is ineffective unless expressly
accepted in this Agreement or in a written amendment executed by the City.
Article 2
Scope of Work
2.1 General Scope. Contractor shall furnish all labor, supervision, materials, equipment, tools,
temporary facilities, temporary protection, transportation, disposal, permits, inspections, testing,
bonds, insurance, warranties, coordination, documentation, and incidentals necessary to complete
the Ocean Park Parking – Phase 1 Project at Ocean Park in Dania Beach, Florida, in strict
accordance with the Contract Documents.
3
2.2 Included Work. Without limiting the Contract Documents, the Work includes:
1. Demolition and lawful disposal of existing asphalt pavement, concrete sidewalk, curb,
signs, and other site features identified in the Contract Documents;
2. Construction of new asphalt pavement, concrete sidewalk, Type “D” curb, curb transitions,
parking-space striping, concrete wheel stops, and signage;
3. Construction and completion of fifteen (15) additional parking spaces;
4. Relocation of the existing monument sign, other signs, and landscaping rocks as shown in
the Contract Documents;
5. Site grading, fill, subgrade stabilization, limerock base, geogrid, milling, paving, and
restoration;
6. Drainage improvements, including the drainage structures and related work shown in the
Contract Documents;
7. Landscaping, irrigation, sod, and restoration;
8. Erosion control, maintenance of traffic, temporary fencing, and protection of public access;
9. Directional boring and related utility work shown in the Contract Documents;
10. Permitting, testing, inspections, Project closeout, and final cleaning; and
11. All associated labor, materials, equipment, supervision, coordination, and incidental work
necessary to deliver a complete and functional Project.
2.3 Contractor Review. Contractor acknowledges that, before submitting its Bid, it examined the
Contract Documents and Project Site and investigated visible and reasonably discoverable
conditions, access, staging, storage, utilities, ongoing public use, and other Project constraints.
Contractor further acknowledges that it included in the Contract Price all costs necessary to
complete the Work. Contractor’s failure to perform the required examination or investigation does
not entitle Contractor to additional compensation or Contract Time.
2.4 Estimated Quantities and Scope Adjustments. Quantities identified in the Contract
Documents are estimates provided for bidding, evaluation, measurement, or allowance purposes.
Contractor shall complete the entire Work required by the Contract Documents for the Contract
Price, subject only to additions, deletions, or other adjustments authorized in writing under Article
7.
When the Contract Documents establish a unit price for an item, payment for that item shall be
based on the actual quantity of Work authorized, properly performed, and accepted by the City,
multiplied by the applicable unit price. The City may increase, decrease, or eliminate estimated
quantities without invalidating the Contract. Any adjustment to the Contract Price or Contract Time
must be authorized in accordance with Article 7. Contractor is not entitled to anticipated profit,
unabsorbed overhead, or other damages arising solely from a reduction or elimination of an
estimated quantity.
2.5 Performance Standard. Contractor shall perform the Work in a good and workmanlike
manner using qualified personnel and materials suitable for their intended purposes. Contractor
shall deliver complete, code-compliant, fully functional, properly drained, and warrantable parking
and site improvements that are fit for their intended use and satisfy the Contract Documents.
4
2.6 Incidental Work. Items reasonably necessary to complete, connect, coordinate, protect, test,
or make the Work functional and warrantable are included in the Contract Price even if not
separately identified as a Bid item. Contractor is not entitled to additional compensation merely
because a necessary incidental item is not separately listed in the Bid Schedule.
Article 3
Contract Time and Scheduling
3.1 Commencement. Contract Time begins on the date stated in the City’s written Notice to
Proceed. Contractor shall not begin physical Work before the Notice to Proceed. Contractor shall
commence the Work within the period stated in the ITB or, if the ITB does not state a period,
within seven (7) calendar days after the date stated in the Notice to Proceed, unless the City directs
otherwise in writing.
Costs incurred before the Notice to Proceed are incurred at Contractor’s risk. Notwithstanding the
foregoing, if the City terminates the Contract for convenience before commencement of the Work,
the City may reimburse Contractor for documented, noncancelable costs for required performance
and payment bonds and insurance, but only to the extent expressly approved by the City.
3.2 Milestones. Contractor shall achieve:
1. Substantial Completion within one hundred fifty (150) calendar days after the date stated
in the Notice to Proceed; and
2. Final Completion within one hundred eighty (180) calendar days after the date stated in the
Notice to Proceed.
These deadlines are subject only to written adjustments authorized in accordance with the Contract
Documents. Time is of the essence.
3.3 Construction Schedule. Within ten (10) calendar days after execution of the Agreement, and
in all events before commencement of physical Work, Contractor shall submit for the City’s review
and acceptance a detailed construction schedule identifying:
1. Submittals and approvals;
2. Material procurement and delivery;
3. Mobilization;
4. Work-area and construction sequencing;
5. Inspections and testing;
6. Weather contingencies and site-protection measures;
7. Activities affecting City operations or public access;
8. Substantial Completion; and
9. Final Completion.
Contractor shall update the schedule monthly and whenever actual progress materially departs
from the accepted schedule. The City’s review or acceptance of a schedule does not alter
5
Contractor’s obligations, relieve Contractor of responsibility for sequencing and timely
completion, or transfer scheduling responsibility to the City.
3.4 Recovery Schedule. If Contractor falls behind the accepted schedule for reasons not excused
under the Contract Documents, Contractor shall, without additional compensation, submit a
recovery schedule acceptable to the City and take all measures necessary to restore timely progress.
Corrective measures may include additional labor, shifts, supervision, equipment, expedited
delivery, or resequencing of the Work.
3.5 Coordination and Schedule Changes. Contractor shall coordinate its schedule with City
operations and provide reasonable advance notice of activities affecting vehicular or pedestrian
access, parking, utilities, nearby recreational use, public services, or the use of Ocean Park.
Contractor shall not materially alter the accepted sequence or schedule without prior written notice
to and acceptance by the City. The City’s acceptance of a schedule change does not constitute an
extension of Contract Time or authorization for additional compensation unless expressly stated
in a written Change Order.
3.6 Schedule Float. Float identified in the construction schedule is available to the Project and is
not exclusively for the benefit of either party. Contractor is not entitled to an extension of Contract
Time unless an excusable delay affects the critical path and delays a contractual completion
milestone.
Article 4
Contract Price
4.1 Contract Price. Subject only to additions and deductions authorized in accordance with the
Contract Documents, the total amount payable to Contractor for completion of the Work shall not
exceed Two Hundred One Thousand Nine Hundred Eighty Dollars ($201,980.00) (the “Contract
Price”).
The Contract Price is based on Contractor’s accepted Bid and Bid Schedule attached as Exhibit A.
Lump-sum items shall be paid at the applicable lump-sum prices stated in the Bid Schedule. Unit-
price items shall be paid based on the actual quantities of Work authorized, properly performed,
measured, and accepted by the City, multiplied by the applicable unit prices stated in the Bid
Schedule.
The Contract Price is a maximum authorization and does not guarantee that Contractor will receive
the full amount. The City is obligated to pay only for Work properly performed and accepted in
accordance with the Contract Documents.
4.2 Measurement of Quantities. Quantities for unit-price Work shall be measured using the units
and methods stated in the Contract Documents. If the Contract Documents do not state a
measurement method, the City shall determine the applicable method using generally accepted
construction-measurement practices.
6
Contractor shall provide the City a reasonable opportunity to observe and verify measurements
before the affected Work is covered, removed, or otherwise becomes unavailable for inspection.
Contractor shall maintain and provide supporting records, including field measurements, delivery
tickets, weight tickets, calculations, photographs, and other documentation reasonably necessary
to verify quantities.
If Contractor proceeds without providing the City a reasonable opportunity to verify a quantity,
the City may determine the payable quantity from the best information reasonably available. The
City’s determination is subject to the claims procedures stated in the Contract Documents.
4.3 Estimated Quantities and Unit Prices. Quantities stated in the Bid Schedule are estimates
and are not guaranteed. The City may increase, decrease, or eliminate an estimated quantity
without invalidating the Contract, subject to the written-authorization requirements of Article 7.
The unit prices stated in the Bid Schedule constitute complete compensation for the applicable
Work and remain firm throughout the Contract Time, unless an adjustment is expressly authorized
by a written Change Order. Each unit price includes all labor, materials, equipment, supervision,
overhead, profit, taxes applicable to Contractor, insurance, bonds, transportation, disposal, testing,
temporary protection, and incidentals necessary to complete the applicable item.
Contractor is not entitled to anticipated profit, unabsorbed overhead, loss of business opportunity,
or other damages arising solely from the reduction or elimination of an estimated quantity. If a
quantity change is so substantial that continued application of the stated unit price would be
inequitable, either party may request an equitable adjustment under Article 7, but Contractor shall
not suspend or delay the Work while the request is being evaluated.
4.4 Complete Compensation. The Contract Price includes all costs necessary to complete the
Work, including labor, materials, equipment, tools, supervision, project management, overhead,
profit, freight, taxes applicable to Contractor, permit fees, inspections, testing, bonds, insurance,
safety measures, maintenance of traffic, erosion control, temporary facilities, temporary
protection, transportation, disposal, cleanup, Project closeout, warranties, and incidental Work,
except only costs expressly identified in the Contract Documents as payable separately by the City.
Contractor shall not be entitled to additional compensation for:
1. A cost reasonably foreseeable from the Contract Documents, required Site investigation,
or nature and location of the Work;
2. Work reasonably inferable as necessary to provide a complete, functional, code-compliant,
and warrantable Project;
3. An error, omission, or inconsistency in Contractor’s estimate, takeoff, Bid, or allocation of
the Contract Price;
4. Increases in the cost of labor, materials, equipment, fuel, transportation, insurance, or other
inputs, except to the extent an adjustment is expressly authorized by the Contract
Documents or a written Change Order; or
5. Work performed without the written authorization required by Article 7.
7
4.5 Owner’s Contingency. The City Commission has separately authorized an Owner’s
Contingency in the amount of Twenty Thousand One Hundred Ninety-Eight Dollars ($20,198.00).
The Owner’s Contingency is not part of the Contract Price, is not included in Contractor’s award,
and does not create a right to payment.
The Owner’s Contingency may be used only for additional or changed Work authorized in advance
by a written Change Order or other written instrument permitted by Article 7. Contractor shall not
include the Owner’s Contingency in its Schedule of Values, Applications for Payment, anticipated
revenue, or calculation of percentage completion unless and until the applicable amount is added
to the Contract Price through authorized written action.
Use of any portion of the Owner’s Contingency is subject to available funding and all applicable
City approval requirements. Any unused portion remains the City’s property and requires no
deductive Change Order.
4.6 No Price Escalation. Except when expressly authorized by the Contract Documents or a
written Change Order, Contractor assumes the risk of increases in the cost or availability of labor,
materials, equipment, fuel, transportation, subcontractors, insurance, bonds, and other items
necessary to complete the Work.
Contractor shall take reasonable measures to obtain materials and equipment in a timely manner
and mitigate foreseeable price and availability risks. A price increase, market fluctuation, supply-
chain condition, or shortage does not, by itself, entitle Contractor to additional compensation.
4.7 Taxes. The City is exempt from Florida sales and use taxes. Contractor is responsible for taxes,
assessments, duties, and charges imposed on Contractor, its purchases, its personnel, or its
operations.
The City may elect to make direct purchases of materials or equipment when lawful and financially
advantageous. A direct purchase shall be documented by an equitable deductive Change Order or
other written Contract adjustment. A direct purchase does not relieve Contractor of responsibility
for:
1. Identifying materials and equipment in sufficient time for procurement;
2. Coordinating specifications, quantities, delivery, storage, and installation;
3. Inspecting delivered materials and promptly reporting deficiencies;
4. Protecting materials and equipment following delivery;
5. Proper installation and integration into the Work;
6. Compliance with the Contract Documents; or
7. Applicable warranties and correction obligations.
Contractor shall credit the City for all taxes, markups, overhead, profit, and other costs avoided
because of a direct purchase.
8
4.8 Adjustments to Contract Price. The Contract Price may be increased or decreased only in
accordance with Article 7 and applicable City approval requirements. An oral instruction, field
discussion, meeting minute, email, invoice, payment, or course of dealing does not authorize an
adjustment unless it constitutes a written directive expressly permitted by Article 7 and is issued
by a person authorized to bind the City.
Contractor proceeds at its own risk if it performs additional or changed Work without the required
written authorization, except for emergency protective action permitted by Section 7.7.
Article 5
Payment
5.1 Schedule of Values. Before submitting its first Application for Payment, Contractor shall
submit a detailed Schedule of Values allocating the Contract Price among the principal portions of
the Work. The Schedule of Values shall:
1. Be consistent with the Bid Schedule;
2. Separately identify each lump-sum and unit-price item;
3. Identify labor, materials, equipment, mobilization, demobilization, closeout, and other
major components of the Work;
4. Allocate sufficient value to Project closeout and Final Completion;
5. Avoid front-loading or disproportionate allocation of costs; and
6. Include supporting information reasonably required by the City to evaluate the proposed
allocation.
The City’s acceptance of the Schedule of Values is solely for payment administration. Acceptance
does not modify the Contract Price, approve an improper allocation, establish the value of
defective or incomplete Work, or limit the City’s right to evaluate the actual value of properly
completed Work.
The Owner’s Contingency shall not be included in the Schedule of Values unless and until an
amount is added to the Contract Price through an authorized written Change Order.
5.2 Applications for Payment. Contractor may submit one Application for Payment per month
for Work properly completed and materials properly stored during the applicable payment period.
Each Application for Payment shall:
1. Be based on the accepted Schedule of Values and applicable Bid Schedule unit prices;
2. Identify the percentage and value of each lump-sum item completed;
3. Identify the actual quantity, applicable unit price, and extended value of each unit-price
item completed;
4. Identify materials properly stored at the Project Site or another location approved in writing
by the City;
5. Deduct retainage, prior payments, rejected Work, and other amounts properly withheld;
6. Separately identify approved Change Orders and the value of changed Work completed
during the payment period;
9
7. Include an updated construction schedule and current progress photographs;
8. Include Contractor’s certification that the Work covered by the Application for Payment
was performed in accordance with the Contract Documents;
9. Include partial releases or waivers of claims from Contractor and each subcontractor or
supplier whose Work was included in a prior Application for Payment, to the extent
permitted by applicable law;
10. Include invoices, delivery tickets, weight tickets, field measurements, testing
documentation, payroll information when required, and other records reasonably necessary
to substantiate the amount requested; and
11. Include any other certification or documentation required by the Contract Documents or
applicable law.
An Application for Payment is not complete until Contractor provides all information reasonably
required to evaluate the amount requested.
5.3 Submission and Receipt of Payment Requests. The City shall identify in this Agreement or
by separate written notice the agent, employee, facility, or office to which Contractor must submit
Applications for Payment. If provided separately, the City shall furnish the notice no later than ten
(10) days after the contract award or Notice to Proceed, as required by Section 218.735, Florida
Statutes.
Submission to another City employee or department does not commence the statutory payment
period unless the City expressly accepts the submission as properly delivered. A properly
submitted Application for Payment shall be date-stamped or otherwise recorded as received in
accordance with applicable law.
5.4 Materials Stored but Not Incorporated. The City may, but is not required to, pay for
materials or equipment properly stored but not yet incorporated into the Work. As a condition of
payment, Contractor shall provide evidence satisfactory to the City that:
1. The materials or equipment are specifically identified for the Project;
2. They comply with the Contract Documents;
3. They are properly stored, protected, insured, and segregated from materials intended for
other projects;
4. The storage location has been approved in writing by the City if the materials are stored
off-site;
5. Title will pass to the City free and clear of liens, security interests, and encumbrances upon
payment;
6. The surety consents to the payment if requested by the City; and
7. Contractor remains responsible for delivery, protection, installation, replacement, and
completion.
Payment for stored materials does not transfer risk of loss to the City or constitute acceptance of
the materials or equipment.
10
5.5 Review, Rejection, and Payment. The City shall review and process complete Applications
for Payment in accordance with the Florida Local Government Prompt Payment Act, Sections
218.70 through 218.80, Florida Statutes.
If an Application for Payment does not comply with the Contract Documents, the City may reject
it in whole or in part by written notice identifying the deficiency and the action necessary to make
the request proper. A corrected Application for Payment shall be processed within the period
required by applicable law.
The City shall timely pay all undisputed amounts. The City may correct mathematical errors, adjust
unsupported quantities, and reduce an Application for Payment to reflect the actual value of Work
properly completed and accepted.
Payment does not:
1. Constitute acceptance of defective, incomplete, or nonconforming Work;
2. Waive a Contract requirement;
3. Approve an unauthorized change;
4. Confirm the accuracy of a quantity or percentage of completion;
5. Transfer risk of loss to the City; or
6. Relieve Contractor or its surety of any obligation.
5.6 Retainage. Subject to Sections 218.735 and 255.078, Florida Statutes, the City may withhold
five percent (5%) from each progress payment as retainage.
The City may withhold retainage at a lower rate, incrementally reduce the rate, or release all or a
portion of retainage when authorized by law and determined appropriate by the City. A reduction
or early release of retainage does not constitute acceptance of the Work, waive any Contract
requirement, or relieve Contractor or its surety of any obligation.
If the City releases retainage attributable to labor, services, or materials furnished by a
subcontractor or supplier, Contractor shall timely remit the applicable retainage to that
subcontractor or supplier as required by law.
The City is not required to release an amount subject to a good-faith written dispute, a claim under
Section 255.05, Florida Statutes, or another lawful basis for withholding payment.
5.7 Grounds for Withholding Payment. The City may withhold or reduce payment to the extent
reasonably necessary to protect the City from loss arising from:
1. Defective, incomplete, or nonconforming Work;
2. A disputed or unsupported quantity, percentage of completion, unit-price calculation, or
other charge;
3. Claims, liens, bond claims, or reasonable evidence that such claims may be asserted;
4. Contractor’s failure to pay subcontractors, suppliers, laborers, or other persons properly
entitled to payment;
11
5. Damage to the City, the Project, public property, or the property of another person;
6. Contractor’s failure to maintain required bonds, insurance, licenses, permits, or approvals;
7. Accrued liquidated damages or other amounts due to the City;
8. Reasonable evidence that the remaining Work cannot be completed for the unpaid balance
of the Contract Price;
9. Reasonable evidence that Contractor will not complete the Work within the Contract Time;
10. Contractor’s failure to provide required schedules, records, certifications, testing
documentation, releases, or closeout materials;
11. Contractor’s failure to comply with a material requirement of the Contract Documents; or
12. A right of setoff available to the City.
The City shall not withhold more than is reasonably necessary to protect against the identified loss.
When the basis for withholding has been cured or resolved to the City’s reasonable satisfaction,
the City shall release the applicable amount in accordance with law.
5.8 Mobilization Payments. Payment for mobilization shall be made in accordance with the Bid
Schedule and other Contract Documents. Contractor’s request for payment must reflect the actual
mobilization Work completed and be supported by documentation reasonably required by the City.
Cumulative payment for mobilization shall not exceed the Fifteen Thousand Dollars ($15,000.00)
stated in Contractor’s accepted Bid. Payment of the mobilization item does not constitute
acceptance of any other portion of the Work.
5.9 Payment to Subcontractors and Suppliers. Contractor shall pay subcontractors and suppliers
within the periods required by Section 218.735(6), Florida Statutes, after receiving payment from
the City for their labor, services, or materials.
If Contractor disputes an amount claimed by a subcontractor or supplier, Contractor shall provide
written notice identifying the disputed amount and the action required to cure the dispute.
Contractor shall timely pay all undisputed amounts.
Upon request, Contractor shall provide evidence of payment to subcontractors and suppliers. If the
City reasonably determines that a subcontractor or supplier has not been paid, the City may take
lawful protective measures, including issuance of a joint check. Exercise of such a measure does
not create a contractual relationship between the City and the subcontractor or supplier.
5.10 Substantial Completion and Completion List. When Contractor considers the Work
substantially complete, Contractor shall notify the City in writing and submit:
1. A proposed list of incomplete or corrective items;
2. The estimated cost to complete each item;
3. Supporting documentation reasonably necessary to evaluate the proposed cost; and
4. A proposed date for completing all remaining Work.
The City and Contractor shall inspect the Work and cooperate in developing and reviewing a single
list of items required to render the Work complete, satisfactory, and acceptable. The City shall
develop and review the list within thirty (30) calendar days after Substantial Completion and shall
12
deliver the list to Contractor no later than five (5) calendar days after it has been developed and
reviewed.
Failure to include corrective or incomplete Work on the list does not relieve Contractor of its
responsibility to complete all Work required by the Contract Documents.
Final Completion shall occur no earlier than thirty (30) calendar days after delivery of the
completion list. If the City fails to deliver the list within the required period, Contract Time shall
be extended to the extent required by Section 218.735(7), Florida Statutes.
5.11 Release of Retainage and Remaining Balance. Within twenty (20) business days after the
completion list is created, the City shall pay the remaining Contract balance, including retainage
previously withheld, less an amount equal to one hundred fifty percent (150%) of the estimated
cost to complete the items on the list and any other amount lawfully withheld.
After completing all listed items, Contractor may submit a payment request for the remaining
amount. If a good-faith dispute exists concerning whether one or more listed items have been
completed, the City may continue to withhold up to one hundred fifty percent (150%) of the
estimated cost to complete the disputed items.
Warranty obligations, latent defects, corrective items identified after preparation of the completion
list, and other obligations that survive payment remain Contractor’s responsibility. Payment of the
remaining balance or retainage does not waive those obligations, but payment may not be withheld
on a basis prohibited by Section 218.735, Florida Statutes.
5.12 Final Completion and Final Payment. Final Completion occurs when:
1. All Work and completion-list items have been completed and accepted;
2. Defective and nonconforming Work has been corrected;
3. Final inspections, testing, and governmental approvals have been completed;
4. Final cleaning and Site restoration have been completed;
5. Temporary facilities, equipment, waste, and surplus materials have been removed;
6. Contractor has submitted all required closeout documents; and
7. All other conditions for Final Completion stated in the Contract Documents have been
satisfied.
As a condition of final payment, Contractor shall provide:
1. A final release of claims and Contractor’s final payment affidavit;
2. Final releases or waivers from subcontractors and suppliers, to the extent permitted by law;
3. Consent of surety to final payment;
4. Record drawings and approved submittals;
5. Final inspection, testing, permit, and approval documentation;
6. Product information and maintenance instructions;
7. Manufacturer and Contractor warranties issued or registered in the City’s name;
8. Final cost, quantity, payment, and closeout documentation;
13
9. Keys, access devices, manuals, and other City property, if applicable; and
10. Other closeout materials required by the Contract Documents.
Contractor’s failure to provide a required closeout item may cause that item to be included on the
completion list and valued at the reasonable cost of obtaining or completing it, subject to applicable
law.
Contractor’s acceptance of final payment constitutes a waiver of claims against the City arising
from the Contract, except claims specifically identified in writing before final payment.
Final payment does not waive the City’s rights concerning defective Work, latent defects,
warranties, indemnification, fraud, audit findings, public records, or other obligations that survive
completion.
Article 6
Bonds and Insurance
6.1 Performance and Payment Bond. Within fourteen (14) calendar days after notice of award,
and in all events before execution of this Agreement or commencement of the Work, Contractor
shall furnish a payment and performance bond in the full amount of the Contract Price.
The bond shall:
1. Be executed on the form included in the ITB or another form approved by the City;
2. Name the City as obligee and owner;
3. Identify Contractor as principal;
4. Identify ITB No. 26-019 and the Ocean Park Parking – Phase 1 Project;
5. Be issued by a surety insurer authorized and qualified to transact business in Florida;
6. Comply with Section 255.05, Florida Statutes, and all other applicable requirements;
7. Be conditioned on Contractor’s complete and timely performance of the Contract and
prompt payment of persons furnishing labor, services, or materials for the Work;
8. Remain effective through completion, final payment, correction of defective Work, and the
applicable warranty period; and
9. Include riders or other evidence reflecting any authorized increase in the Contract Price
when required by the bond, surety, or applicable law.
The bond does not limit Contractor’s liability or the City’s remedies under the Contract
Documents.
6.2 Recording and Delivery of Bond. Before commencing the Work, Contractor shall record the
payment and performance bond in the public records of Broward County and provide the City with
a certified copy of the recorded bond.
The City is not required to make a payment to Contractor until Contractor has provided the certified
copy required by this Section. Contractor is not entitled to additional compensation or an extension
of Contract Time arising from its failure to timely execute, record, or deliver the bond.
14
6.3 Surety Qualifications. The surety shall satisfy the qualifications stated in the ITB and
applicable law. Upon request, Contractor shall provide evidence of the surety’s authorization,
financial capacity, power of attorney, and continued qualification.
The City may reject a proposed surety that does not satisfy the Contract Documents or applicable
law. The City may not require Contractor to obtain the bond from a particular agent or bonding
company.
If the surety becomes insolvent, unauthorized, disqualified, or otherwise unable to satisfy its
obligations, Contractor shall promptly furnish a replacement bond from an acceptable surety at no
additional cost to the City.
6.4 Changes and Notice to Surety. Contractor shall provide the surety with copies of material
amendments, Change Orders, extensions of Contract Time, and other notices required by the bond
or applicable law.
Contractor shall obtain a bond rider or written surety consent when required because of an increase
in the Contract Price, extension of Contract Time, or material change in the Work. Any required
rider or consent shall be provided to the City before Contractor performs the affected changed
Work, unless the City authorizes otherwise in writing.
Contractor’s failure to notify the surety does not impair the City’s rights against Contractor and
does not impair the City’s rights against the surety except to the extent applicable law requires a
different result.
6.5 No Impairment of Bond Rights. Contractor shall not agree to a bond endorsement, limitation,
exclusion, or condition that conflicts with Section 255.05, Florida Statutes, or materially restricts
the City’s rights without the City’s prior written approval.
A Change Order, extension, payment, partial occupancy, inspection, acceptance of a portion of the
Work, or failure by the City to identify defective Work does not release Contractor or the surety
from an obligation under the bond or Contract Documents.
6.6 Insurance Requirements. Before commencing the Work, Contractor shall obtain and
maintain all insurance required by the ITB and the other Contract Documents. Required coverage
shall remain in effect throughout performance of the Work and for any completed-operations,
correction, or warranty period required by the Contract Documents.
If the insurance requirements in the Contract Documents conflict, the requirement providing the
greater protection to the City controls unless the City approves otherwise in writing.
The insurance requirements establish minimum protection and do not:
1. Limit Contractor’s duties, indemnification obligations, or liability;
2. Establish the extent of Contractor’s liability;
3. Waive any immunity or limitation available to the City; or
15
4. Relieve Contractor of responsibility for a loss within a deductible, self-insured retention,
exclusion, or amount exceeding a policy limit.
Contractor is responsible for all premiums, deductibles, and self-insured retentions associated with
the required insurance.
6.7 Compliance with ITB Insurance Requirements. Contractor shall obtain, maintain, and
comply with all insurance coverage, limits, endorsements, additional-insured requirements, notice
requirements, and other insurance obligations stated in the ITB. The ITB’s insurance requirements
are incorporated into this Agreement by reference and constitute material obligations of
Contractor.
Contractor shall maintain the required insurance throughout performance of the Work and for any
completed-operations, correction, or warranty period required by the ITB or other Contract
Documents. Contractor shall not commence or continue the Work unless all required insurance
remains in effect.
Contractor’s compliance with the ITB’s insurance requirements does not limit Contractor’s
liability, indemnification obligations, or responsibility for losses within a deductible or self-insured
retention, excluded from coverage, or exceeding an available policy limit.
6.8 Evidence of Coverage. Contractor shall provide certificates of insurance and all endorsements
required by the ITB before execution of the Agreement or commencement of the Work, whichever
occurs first.
Certificates of insurance alone do not amend, extend, or alter policy coverage and do not relieve
Contractor from providing required endorsements or other evidence of compliance. Upon request,
Contractor shall provide certified copies of policies, declarations, endorsements, or other
documentation reasonably necessary to verify coverage.
The City’s review, approval, or failure to identify a deficiency in Contractor’s insurance does not
waive a Contract requirement or relieve Contractor of responsibility for maintaining the required
coverage.
6.9 Subcontractor Insurance. Contractor shall require each subcontractor to maintain insurance
appropriate to its Work and satisfying the types, limits, and endorsements required by the ITB and
other Contract Documents to the extent applicable to that subcontractor’s operations.
Contractor shall obtain and retain certificates of insurance and required endorsements from its
subcontractors and provide them to the City upon request. Contractor shall not permit a
subcontractor to commence or continue Work unless the required insurance remains in effect.
Contractor remains fully responsible for the acts and omissions of its subcontractors. The City’s
review or approval of subcontractor insurance does not relieve Contractor of responsibility for the
subcontractor or its Work.
16
6.10 Lapse or Deficiency in Coverage. Contractor shall not commence or continue Work unless
all required bonds and insurance remain in effect.
If a required bond or insurance policy expires, lapses, is canceled, becomes materially deficient,
or otherwise fails to comply with the Contract Documents, the City may:
1. Suspend the affected Work;
2. Withhold payment;
3. Require Contractor to obtain replacement coverage;
4. Obtain protective coverage and deduct the reasonable cost from amounts due to Contractor,
if commercially practicable;
5. Exercise its rights against Contractor or the surety; or
6. Treat the failure as a material default.
A suspension resulting from Contractor’s failure to maintain required bonds or insurance does not
entitle Contractor to additional compensation or an extension of Contract Time.
6.11 No Waiver or Limitation. Payment of insurance proceeds, acceptance of a bond, or recovery
against a surety does not waive another remedy available to the City or reduce Contractor’s
responsibility for the Work.
Contractor is responsible for losses within deductibles or self-insured retentions, losses excluded
from coverage, and losses exceeding available policy or bond limits to the extent Contractor is
otherwise responsible under the Contract Documents or applicable law.
Because the Contract Price is $201,980, it exceeds the $200,000 ceiling below which a city may
elect to waive the statutory payment and performance bond. The bond must equal the Contract
Price, must be recorded in Broward County, and a certified copy must be delivered before Work
begins or the City makes payment.
Article 7
Changes in the Work
7.1 City’s Authority to Order Changes. The City may order additions, deletions, revisions,
substitutions, quantity adjustments, or other changes within the general scope of the Contract. A
change does not invalidate the Contract or release Contractor or the surety from their obligations.
Contractor shall not proceed with changed or additional Work unless authorized by:
1. A written Change Order executed by authorized representatives of the City and Contractor;
or
2. A written Construction Change Directive issued by a City representative authorized to bind
the City.
17
Except for emergency protective action permitted by Section 7.7, Contractor proceeds at its own
risk if it performs changed or additional Work without the written authorization required by this
Article.
7.2 Change Orders. A Change Order is a written instrument executed by authorized
representatives of the City and Contractor that identifies:
1. The addition, deletion, revision, substitution, quantity adjustment, or other change in the
Work;
2. The adjustment, if any, to the Contract Price;
3. The adjustment, if any, to the Contract Time or a completion milestone;
4. The source of funding, when required by City procedures;
5. The effect on the construction schedule and critical path;
6. Any modification to the Contract Documents; and
7. Any other conditions applicable to the changed Work.
A Change Order is effective only after all approvals required by the City’s Charter, Code,
purchasing procedures, Commission authorization, and other applicable law have been obtained.
The City’s authorization of an Owner’s Contingency does not authorize Contractor to perform
additional or changed Work and does not eliminate the requirement for an approved written
Change Order or Construction Change Directive.
7.3 Contractor Change Proposals. Within seven (7) calendar days after the City’s written
request, unless the City allows a different period, Contractor shall submit a complete proposal for
a proposed change.
The proposal shall identify:
1. The proposed change and its factual and contractual basis;
2. Labor classifications, hours, wage rates, and labor burdens;
3. Materials, quantities, unit prices, actual costs, and supplier quotations;
4. Equipment and applicable rates;
5. Subcontractor and supplier proposals;
6. Taxes, bond costs, and insurance costs attributable to the change;
7. Proposed overhead and profit;
8. Credits, rebates, refunds, discounts, salvage value, and avoided costs;
9. The effect on the accepted construction schedule and critical path;
10. Measures available to avoid or mitigate added cost or delay; and
11. Any requested adjustment to the Contract Price or Contract Time.
Contractor shall provide additional supporting documentation reasonably requested by the City.
The City’s request for a proposal does not authorize Contractor to proceed with the proposed
change. For a price quote relating to a change order requested or issued by the City, the City shall
approve or deny the price quote and provide written notice within the period required by Section
18
218.755, Florida Statutes. Nothing in this Article waives or alters the rights or consequences
established by that statute.
7.4 Pricing of Changes. Adjustments to the Contract Price shall be determined by one or more of
the following methods:
1. Applicable unit prices established in the Bid Schedule or other Contract Documents;
2. A mutually accepted lump sum;
3. Documented time and materials subject to a City-approved not-to-exceed amount; or
4. Actual, reasonable, and necessary cost, together with markups expressly permitted by the
Contract Documents.
Contractor shall disclose and credit the City for rebates, refunds, discounts, credits, salvage value,
avoided costs, and other amounts that reduce the cost of the change.
If a change deletes Work, the deductive adjustment shall include the labor, materials, equipment,
supervision, overhead, profit, taxes, insurance, bond costs, and other costs avoided because of the
deletion.
Contractor is not entitled to additional compensation for correcting defective Work, complying
with an existing Contract requirement, performing Work reasonably inferable from the Contract
Documents, or addressing a condition for which Contractor is responsible.
7.5 Construction Change Directive. If the parties do not agree on the price or time associated
with a necessary change, the City may issue a written Construction Change Directive requiring
Contractor to proceed with the changed Work.
The Construction Change Directive shall describe the change and identify the method by which
the adjustment, if any, will be determined. Contractor shall:
1. Proceed diligently with the directed Work;
2. Maintain complete contemporaneous records of labor, materials, equipment, subcontractor
costs, quantities, and schedule effects;
3. Segregate costs associated with the directed Work from costs of the original Work;
4. Provide daily records or other documentation requested by the City; and
5. Continue performing all unaffected Work.
The City will determine an equitable adjustment in accordance with the Contract Documents.
Contractor’s disagreement with the adjustment does not excuse or delay performance.
7.6 Notice of Claims for Additional Compensation or Time. If Contractor believes that an
instruction, event, condition, omission, quantity adjustment, or other circumstance entitles it to
additional compensation or Contract Time, Contractor shall provide written notice to the City
within seven (7) calendar days after Contractor knew or reasonably should have known of the
circumstance and before performing the affected additional Work.
19
The notice shall identify:
1. The event or condition giving rise to the claim;
2. The Contract provision supporting the claim;
3. The estimated additional cost;
4. The anticipated effect on the schedule and critical path;
5. The measures being taken to avoid or mitigate cost and delay; and
6. The written direction requested from the City.
Within twenty-one (21) calendar days after the initial notice, Contractor shall submit complete
supporting documentation unless the City approves additional time in writing.
Failure to provide timely notice and documentation waives the claim to the extent the City is
prejudiced by the failure. The City’s actual or constructive knowledge of the underlying event does
not excuse Contractor from complying with the notice requirements unless the City expressly
waives compliance in writing.
7.7 Emergency Work. In an emergency threatening life, safety, the Work, public or private
property, utilities, public access, or the environment, Contractor shall take immediate reasonable
action to prevent or minimize injury or damage and shall notify the City as soon as practicable.
Contractor shall limit emergency action to measures reasonably necessary to address the
immediate threat. As soon as practicable, Contractor shall provide written documentation
describing:
1. The emergency;
2. The action taken;
3. The labor, materials, and equipment used;
4. The cost incurred; and
5. Any anticipated effect on the Contract Time.
Emergency action does not automatically entitle Contractor to additional compensation or Contract
Time. Any requested adjustment remains subject to this Article and Article 13.
7.8 Minor Changes. The City may authorize minor changes that:
1. Do not materially alter the scope or character of the Work;
2. Do not affect the Contract Price or Contract Time; and
3. Are consistent with the intent of the Contract Documents.
Contractor shall promptly perform an authorized minor change. If Contractor reasonably believes
that a requested minor change will affect the Contract Price or Contract Time, Contractor shall
provide written notice before proceeding. Failure to provide notice before proceeding waives the
requested adjustment to the extent the City is prejudiced.
20
7.9 Unauthorized Work. Work performed beyond the requirements of the Contract Documents
without the written authorization required by this Article is performed at Contractor’s risk.
The City is not obligated to pay for unauthorized Work and may require Contractor to remove or
correct it at Contractor’s expense. The City’s inspection, observation, knowledge, use, or payment
of another portion of the Work does not constitute authorization or acceptance of unauthorized
Work.
7.10 Continuing Performance. Pending resolution of a change, pricing issue, or claim, Contractor
shall continue performing the Work diligently and in accordance with the City’s written direction.
The City shall continue paying undisputed amounts properly due under the Contract.
Continued performance does not waive either party’s properly preserved claim, defense, or
contractual right.
7.11 No Modification by Unauthorized Communications. A field discussion, oral instruction,
meeting minute, email, text message, request for information response, submittal review, payment,
invoice, schedule review, or communication from unauthorized personnel does not modify the
Contract Price, Contract Time, or scope of the Work.
Contractor is responsible for confirming that any person directing a change has authority to bind
the City and that the change has received all approvals required by this Article.
Article 8
Contractor Responsibilities
8.1 Supervision and Personnel. Contractor is solely responsible for construction means, methods,
techniques, sequences, procedures, coordination, and supervision. Contractor shall provide
sufficient qualified, experienced, and properly licensed personnel to perform the Work safely and
within the Contract Time.
Contractor shall employ a competent superintendent who is authorized to act for Contractor and
shall remain in responsible charge whenever Work is being performed. Contractor shall promptly
remove any person the City reasonably determines is unsafe, unqualified, disruptive, or otherwise
detrimental to the Project or public. Removal does not entitle Contractor to additional
compensation or Contract Time.
8.2 Permits and Legal Compliance. Contractor shall obtain and pay for all permits, licenses,
inspections, approvals, and governmental fees required to complete the Work unless the Contract
Documents expressly provide otherwise.
Contractor shall comply with applicable federal, state, county, and City laws, codes, ordinances,
regulations, permit conditions, accessibility requirements, environmental requirements, and
industry standards. Contractor shall promptly notify the City of an apparent conflict between a
legal requirement and the Contract Documents before proceeding with the affected Work.
21
8.3 Submittals and Field Verification. Contractor shall timely prepare, review, coordinate, and
submit all shop drawings, product data, samples, mix designs, schedules, certifications, and other
submittals required by the Contract Documents.
Contractor shall verify dimensions, quantities, elevations, grades, utilities, drainage patterns,
irrigation components, access conditions, and other relevant field conditions before beginning
affected Work or ordering materials. Contractor shall promptly notify the City in writing of a
concealed condition or material discrepancy before disturbing the condition.
The City’s or Engineer’s review of a submittal does not relieve Contractor of responsibility for
errors, omissions, dimensions, quantities, code compliance, field verification, coordination, means
and methods, or performance.
8.4 Hazardous Materials. Contractor is not responsible for the existence of preexisting hazardous
materials that were not introduced by Contractor. Upon encountering a suspected hazardous
material, Contractor shall immediately stop the affected Work, secure the area, avoid disturbing or
spreading the material, and notify the City.
Contractor is responsible for any hazardous material introduced by Contractor and for any release,
disturbance, spread, or worsening of a hazardous condition to the extent caused by Contractor’s
negligence, willful misconduct, violation of applicable law, or failure to comply with required
notice, stop-work, containment, or safety procedures.
Contractor is not responsible for an unavoidable incidental disturbance resulting solely from the
proper performance of the Work when Contractor could not reasonably have known of the
hazardous condition and promptly complied with this Section. Any adjustment to the Contract
Price or Contract Time is subject to Articles 7 and 13.
8.5 Protection and Restoration. Contractor shall protect persons, the Work, Ocean Park, existing
pavement, sidewalks, curbs, drainage facilities, signs, landscaping, irrigation, utilities, adjoining
property, and other existing improvements from damage arising from the Work.
Contractor shall promptly repair or replace damage caused by Contractor, its subcontractors,
suppliers, or anyone for whom Contractor is responsible. Restoration shall be completed to the
City’s reasonable satisfaction and at no additional cost to the City.
8.6 Utilities and Existing Systems. Before performing Work that may affect an existing utility,
drainage facility, irrigation system, underground improvement, or other existing system,
Contractor shall verify its location and condition and coordinate the affected Work with the City
and utility owner.
Contractor shall not interrupt utilities, public access, park operations, or City services without the
City’s prior written authorization, except when immediate action is necessary to protect life or
property. Contractor shall immediately report damage to an existing utility or system and is
responsible for repair costs to the extent caused by Contractor or anyone for whom Contractor is
responsible.
22
8.7 Maintenance of Traffic, Public Access, and Environmental Controls. Contractor shall
maintain safe vehicular, pedestrian, emergency, and ADA-accessible routes as required by the
Contract Documents and applicable law.
Contractor shall implement and maintain required traffic-control, erosion-control, sediment-
control, stormwater, dust-control, and spill-prevention measures. Contractor shall not close a
roadway, parking area, sidewalk, park entrance, or other public-access point without the City’s
prior written authorization, except in an emergency.
8.8 Cleaning and Waste Removal. Contractor shall keep the Project Site and surrounding areas
reasonably clean, orderly, and free from waste, debris, mud, dust, and unsafe conditions.
Contractor shall regularly remove waste and lawfully dispose of it off-site.
If Contractor fails to maintain the Site after notice, the City may perform or procure the required
cleanup and deduct the reasonable cost from amounts due to Contractor.
8.9 Title and Risk of Loss. Contractor warrants that the City will receive good title, free of liens,
security interests, and encumbrances, to all materials and equipment incorporated into the Work
or for which the City has paid.
Risk of loss, theft, destruction, or damage remains with Contractor until Final Completion and
written acceptance by the City, regardless of payment or transfer of title. Risk of loss for a
separately identifiable portion of the Work shifts to the City only when the City accepts that portion
in writing and takes exclusive possession and control of it.
8.10 Project Records. Contractor shall maintain current Project records, including the Contract
Documents, approved submittals, permits, inspection and testing records, daily reports, schedules,
quantity documentation, progress photographs, change documentation, and record drawings.
Contractor shall make the records available to the City and its authorized representatives upon
request.
Article 9
Project Site, Public Access, and Safety
9.1 Active Public Site. Contractor acknowledges that Ocean Park and surrounding public areas
may remain open and in use during the Work unless the City directs otherwise in writing.
Contractor shall plan, sequence, and perform the Work to minimize interference with City
operations, park activities, neighboring properties, traffic, and public access.
Contractor shall coordinate activities affecting entrances, exits, parking, sidewalks, utilities,
emergency access, or recreational use with the City sufficiently in advance to permit reasonable
operational planning.
23
9.2 Site Control and Public Protection. Contractor shall secure and control its work areas and
protect City personnel, park users, pedestrians, motorists, emergency responders, and the public
from hazards arising from the Work.
Contractor shall provide and maintain appropriate fencing, barriers, warning signs, lighting,
channelizing devices, temporary routes, and other protective measures required by the Contract
Documents or reasonably necessary for public safety.
Contractor shall not leave an excavation, uneven surface, construction material, equipment, or
other hazardous condition accessible to the public when the Site is unattended.
9.3 Access and Closures. Contractor shall maintain required fire lanes, emergency access,
pedestrian routes, vehicular access, and ADA-accessible routes throughout the Work.
A temporary closure or restriction may occur only when reasonably necessary for the Work and
approved in advance by the City, except in an emergency. Contractor shall:
1. Provide reasonable advance notice;
2. Install appropriate barriers, signs, and alternative routes;
3. Coordinate the closure with affected City operations;
4. Comply with applicable accessibility and life-safety requirements; and
5. Restore access as soon as reasonably practicable.
The City’s approval of a closure does not entitle Contractor to additional compensation or Contract
Time unless expressly stated in a written Change Order.
9.4 Safety Responsibilities. Contractor shall initiate, maintain, and supervise all safety
precautions and programs associated with the Work. Contractor shall comply with:
1. The Occupational Safety and Health Act and applicable OSHA regulations;
2. Applicable Florida workplace-safety and workers’ compensation requirements;
3. Applicable traffic-control, fire, electrical, building, and life-safety requirements;
4. The safety requirements of the Contract Documents; and
5. Reasonable Site-specific safety requirements communicated by the City that do not conflict
with applicable law or transfer Contractor’s safety responsibility to the City.
Contractor shall designate a qualified person responsible for Project safety and shall conduct
appropriate safety meetings, inspections, and training.
The City’s observation of the Work, review of a safety plan, identification of an unsafe condition,
or failure to identify an unsafe condition does not relieve Contractor of its safety obligations.
9.5 Imminent Danger and Unsafe Conditions. Contractor shall immediately stop affected Work
when Contractor knows or reasonably should know that continued performance presents an
imminent danger to persons or property.
24
Contractor shall promptly:
1. Secure the affected area;
2. Notify the City;
3. Take reasonable corrective and protective measures; and
4. Resume the affected Work only after the dangerous condition has been corrected.
The City may direct Contractor to suspend affected Work when the City reasonably determines
that an unsafe condition exists. A safety suspension caused by Contractor or anyone for whom
Contractor is responsible does not entitle Contractor to additional compensation or Contract Time.
9.6 Work Hours. Unless the ITB, applicable law, or the City’s written authorization provides
otherwise, Work may be performed Monday through Saturday between 7:00 a.m. and 5:00 p.m.
Contractor shall coordinate particularly noisy, disruptive, or access-restricting activities with the
City in advance. The City may reasonably restrict Work hours or sequencing to protect public
safety, maintain access, or reduce material disruption.
Approval of work outside the stated hours does not entitle Contractor to additional compensation
unless expressly authorized by written Change Order.
9.7 Incident Reporting. Contractor shall immediately report any serious injury, utility
interruption, fire, flooding, property damage, environmental release, public-safety event, or other
significant incident arising from the Work.
Contractor shall provide a written incident report within twenty-four (24) hours, unless the City
approves another reasonable period. The report shall identify:
1. The date, time, and location of the incident;
2. The known circumstances and apparent cause;
3. Persons or property affected;
4. Immediate protective or corrective measures taken; and
5. Measures proposed to prevent recurrence.
Reporting an incident does not constitute an admission of liability.
Article 10
Subcontractors and Suppliers
10.1 Contractor’s Responsibility. Contractor is fully responsible for the acts, omissions,
performance, safety, conduct, and payment of its subcontractors, suppliers, and all persons or
entities directly or indirectly employed or utilized by them.
Subcontracting any portion of the Work does not relieve Contractor of an obligation under the
Contract Documents. The City’s review, approval, or failure to object to a subcontractor or supplier
25
does not create a contractual relationship with that entity or reduce Contractor’s responsibility for
its performance.
10.2 Identification and Substitution. Contractor shall identify its major subcontractors and
suppliers in its Bid or after award as required by the ITB.
Contractor shall not substitute a listed subcontractor whose qualifications were material to the
award without the City’s prior written approval. The City will not unreasonably withhold approval
of a qualified proposed substitute.
A proposed substitution shall not:
1. Reduce the quality or scope of the Work;
2. Delay completion;
3. Increase the Contract Price;
4. Impair a required warranty, bond, or insurance obligation; or
5. Violate the ITB, procurement requirements, or applicable law.
Unless otherwise authorized by written Change Order, Contractor is responsible for costs and
delays arising from a substitution requested by Contractor.
10.3 Objection to Subcontractor. The City may reasonably object to a proposed or existing
subcontractor or supplier based on documented concerns regarding qualifications, licensing,
safety, integrity, financial responsibility, performance, insurance, debarment, or compliance with
the Contract Documents.
If the City objects before the applicable subcontract is executed, Contractor shall propose a
qualified replacement. If the City objects after execution for a reason Contractor knew or
reasonably should have known, Contractor is not entitled to an adjustment.
If the objection is based solely on information not reasonably available to Contractor and is not
attributable to Contractor, any requested adjustment to the Contract Price or Contract Time is
subject to Articles 7 and 13.
10.4 Subcontract Requirements. Contractor shall incorporate applicable provisions of the
Contract Documents into each subcontract and purchase order, including requirements concerning:
1. Scope, quality, schedule, and warranties;
2. Licensing and legal compliance;
3. Insurance and indemnification;
4. Safety and public-access protection;
5. Public records and records retention;
6. Audit and access to records;
7. E-Verify and employment eligibility;
8. Prompt payment; and
9. Correction of defective Work.
26
Contractor shall require subcontractors to impose applicable requirements on lower-tier
subcontractors and suppliers.
10.5 Payment to Subcontractors and Suppliers. Contractor shall pay subcontractors and
suppliers within the periods required by Section 218.735(6), Florida Statutes, after receiving
payment from the City for their labor, services, or materials.
Contractor may dispute an amount in good faith if it provides the affected subcontractor or supplier
written notice identifying:
1. The amount disputed;
2. The basis for the dispute; and
3. The action required to cure the dispute.
Contractor shall timely pay all undisputed amounts. Upon request, Contractor shall provide the
City reasonable evidence of payment.
10.6 Subcontractor and Supplier Claims. A subcontractor or supplier has no contractual right to
payment directly from the City. Contractor shall defend and resolve claims arising from its failure
to pay subcontractors or suppliers and shall keep the Project and City property free from claims
arising through Contractor.
Nothing in this Section limits rights a claimant may have under Contractor’s payment bond or
Section 255.05, Florida Statutes.
If the City reasonably determines that a subcontractor or supplier has not been paid, the City may
take a lawful protective measure, including withholding an appropriate amount or issuing a joint
check when permitted. Exercise of such a measure does not create a contractual relationship
between the City and the subcontractor or supplier.
Article 11
Inspection, Acceptance, and Correction of Work
11.1 Access to the Work. Contractor shall provide the City, Engineer, inspectors, testing agencies,
and other authorized governmental representatives reasonable access to the Work, Project Site,
materials, equipment, records, and relevant off-site fabrication or storage locations.
Contractor shall provide safe access and reasonable assistance for inspections, testing, observation,
and verification of quantities. The City’s exercise of access rights does not transfer responsibility
for construction means, methods, safety, or performance to the City.
11.2 Inspections and Testing. Contractor shall arrange and pay for inspections and testing
assigned to Contractor by the Contract Documents or applicable law. The City may perform or
obtain additional inspections or testing.
27
If additional inspection or testing reveals that the Work complies with the Contract Documents,
the City shall bear the reasonable cost unless the Contract Documents provide otherwise.
If additional inspection or testing reveals defective or nonconforming Work, Contractor shall pay
the reasonable cost of the inspection or testing and all related correction and retesting. Contractor
shall not be entitled to additional compensation or Contract Time arising from inspection, testing,
correction, or retesting of defective or nonconforming Work.
11.3 Work Covered Before Inspection. Contractor shall not cover or conceal Work that the
Contract Documents, permits, or applicable law require to be inspected or tested before covering.
If Contractor covers Work before a required inspection or test, Contractor shall, upon the City’s
request:
1. Uncover the affected Work;
2. Provide access for inspection or testing;
3. Correct defective or nonconforming Work;
4. Restore the affected area; and
5. Bear all associated costs and delays.
If the City requests examination of covered Work that was not required to be inspected before
covering, Contractor shall uncover and restore the Work. The City shall authorize an equitable
adjustment under Article 7 if the Work is found to comply with the Contract Documents. If the
Work is defective or nonconforming, Contractor shall bear the cost without adjustment.
11.4 Rejection and Correction of Work. The City may reject Work that is defective, incomplete,
damaged, improperly installed, or otherwise inconsistent with the Contract Documents.
Contractor shall promptly remove, correct, replace, or reperform rejected Work at its expense and
shall pay the reasonable cost of related inspection, testing, professional services, removal,
restoration, and repair.
The City shall provide reasonable notice describing the basis for rejection, except when immediate
action is reasonably necessary to protect persons, property, public access, the environment, or the
Work.
11.5 Contractor’s Failure to Correct. If Contractor fails to begin and diligently continue
correction within the period stated in the City’s notice, the City may:
1. Correct or remove the defective Work;
2. Engage another contractor to perform the correction;
3. Store or dispose of removed materials;
4. Withhold payment;
5. Deduct the reasonable resulting cost from amounts due or to become due to Contractor; or
6. Exercise other remedies available under the Contract Documents.
28
The City shall provide advance notice when reasonably practicable. Immediate notice is sufficient
in an emergency or when prompt action is reasonably necessary to protect persons, property, public
access, or the Work.
11.6 Acceptance of Nonconforming Work. The City may, but is not required to, accept Work
that does not fully conform to the Contract Documents.
If the City accepts nonconforming Work, Contractor shall provide an equitable credit reflecting
the diminished value, reasonable correction cost, reduced useful life, warranty effect, professional
costs, and other reasonably anticipated consequences.
Acceptance must be stated in a written instrument executed by a person authorized to bind the
City. Payment, inspection, use, occupancy, or failure to reject Work does not constitute acceptance
of nonconforming Work.
11.7 Substantial Completion. Substantial Completion occurs when the Work is sufficiently
complete in accordance with the Contract Documents so that the City can safely use the completed
parking improvements for their intended purpose and when:
1. The parking, paving, drainage, irrigation, landscaping, signage, and related improvements
are operational and functional;
2. Required inspections and approvals necessary for use have been obtained;
3. Maintenance-of-traffic and public-access restrictions have been removed except as
reasonably necessary to complete minor remaining Work;
4. Required testing necessary for use has been completed;
5. The Project Site is safe, clean, and suitable for public use; and
6. Only minor incomplete or corrective items remain.
When Contractor considers the Work substantially complete, Contractor shall notify the City in
writing and provide its proposed completion list and estimated cost to complete each item as
required by Section 5.10.
The City shall inspect the Work and determine whether Substantial Completion has been achieved.
The City’s determination shall be documented in writing and shall identify the date of Substantial
Completion and any conditions applicable to the City’s use of the Work.
11.8 Final Completion. Final Completion occurs when:
1. All Work and completion-list items have been completed and accepted;
2. Defective and nonconforming Work has been corrected;
3. Final inspections, testing, and governmental approvals have been completed;
4. Final cleaning, restoration, and demobilization have been completed;
5. Temporary facilities, equipment, waste, and surplus materials have been removed;
6. Record drawings, warranties, releases, affidavits, and other required closeout documents
have been delivered; and
29
7. Contractor has satisfied all other requirements for Final Completion stated in the Contract
Documents.
The City shall determine and document the date of Final Completion. Final Completion does not
waive warranty obligations, latent defects, indemnification duties, public-records obligations, or
other requirements that survive completion.
11.9 Partial Use or Occupancy. The City may use or occupy a completed or partially completed
portion of the Work before Final Completion if the City and Contractor reasonably agree on the
condition of that portion and the responsibilities for security, maintenance, utilities, insurance, and
correction.
The City’s use or occupancy does not constitute acceptance of defective or nonconforming Work,
establish Substantial Completion of the entire Project, or relieve Contractor of an obligation under
the Contract Documents.
11.10 No Waiver by Inspection or Payment. Inspection, testing, observation, approval of a
submittal, certification of payment, payment, use, or failure to discover defective Work does not
relieve Contractor of responsibility for compliance with the Contract Documents.
The City’s rights concerning defective Work, warranties, indemnification, and obligations that
survive completion are not waived by final payment or acceptance.
Article 12
Warranties
12.1 General Warranty. Contractor warrants that:
1. Materials and equipment furnished under the Contract are new and of good quality unless
the Contract Documents expressly permit otherwise;
2. The Work is free from defects in materials and workmanship;
3. The Work conforms to the Contract Documents;
4. Products and systems are properly installed and suitable for their intended purposes; and
5. The completed Work is functional, code-compliant, suitable for its intended use, and
warrantable.
These warranties are in addition to all other warranties and remedies available under the Contract
Documents or applicable law.
12.2 Correction Period. Unless a longer period is required by the Contract Documents or a
manufacturer’s warranty, Contractor shall correct Work found to be defective or nonconforming
within one (1) year after Substantial Completion.
If a separately completed portion of the Work is accepted in writing and placed into service before
overall Substantial Completion, the correction period for that portion begins on the date stated in
the City’s written acceptance.
30
Corrected or replaced Work shall be warranted for the longer of:
1. The unexpired portion of the original correction period; or
2. One (1) year after the correction or replacement is completed and accepted by the City.
This Section does not extend a manufacturer’s warranty beyond its stated term unless the
manufacturer agrees otherwise.
12.3 Manufacturer and Supplier Warranties. Contractor shall obtain and deliver all
manufacturer and supplier warranties required by the technical specifications or other Contract
Documents.
All warranties shall be issued or registered in the City’s name, when available, and for the City’s
benefit. Contractor shall satisfy all inspection, documentation, payment, registration, and
installation requirements necessary to obtain the required warranties.
Contractor shall assign or otherwise transfer to the City all manufacturer and supplier warranties
applicable to the Work. If a warranty cannot legally be assigned, Contractor shall enforce it for the
City’s benefit.
Manufacturer and supplier warranties do not replace, reduce, or limit Contractor’s obligations
under the Contract Documents.
12.4 Warranty Documents. Before Final Completion, Contractor shall deliver complete warranty
documents identifying:
1. The warranted products, materials, and systems;
2. The commencement and expiration dates;
3. The scope of coverage;
4. Procedures and contact information for requesting service;
5. Required maintenance, if any; and
6. Applicable exclusions or limitations.
Contractor shall not accept a warranty exclusion or limitation inconsistent with the Contract
Documents without the City’s prior written approval. Delivery or acceptance of a warranty
containing an unauthorized exclusion or limitation does not modify the Contract or relieve
Contractor of its obligations.
12.5 Notice and Correction. Upon receiving notice of defective or nonconforming Work,
Contractor shall promptly investigate and correct the condition.
Contractor shall:
1. Respond immediately to an emergency involving life safety, active flooding, utility failure,
traffic danger, or risk of material property damage;
31
2. Begin correction of a nonemergency condition within two (2) business days after notice,
unless the City approves a different reasonable period; and
3. Diligently continue correction until completed.
The parties may agree to a different response period when reasonably necessary because of
weather, material availability, manufacturer participation, or the nature of the correction, provided
Contractor implements appropriate temporary protective measures.
12.6 City Correction of Warranty Work. If Contractor fails to timely respond or diligently
correct a covered condition, the City may perform or procure the correction and recover its
reasonable costs from Contractor.
The City may act without advance notice when immediate action is reasonably necessary to protect
persons, maintain safe public access, prevent flooding, avoid material property damage, or
maintain essential City operations. The City shall provide Contractor notice as soon as reasonably
practicable.
Corrective work performed by the City or another contractor does not void Contractor’s warranty
unless Contractor demonstrates that the third-party work caused the condition for which warranty
coverage is sought. Contractor’s responsibility shall be reduced only to the extent the third-party
work caused or increased the claimed defect or damage.
12.7 Warranty Exclusions. Contractor’s warranty obligations do not apply to damage or defects
to the extent caused by:
1. Abuse or misuse occurring after the City takes possession of the Work;
2. Alterations or modifications not performed by Contractor or persons for whom Contractor
is responsible;
3. Improper or insufficient maintenance by the City after Contractor has provided all required
maintenance instructions;
4. Improper operation by the City after Contractor has provided all required operating
instructions; or
5. Normal wear and tear under ordinary use.
An exclusion applies only to the extent the identified condition caused or contributed to the
claimed damage or defect. Contractor remains responsible to the extent defective Work, failure to
provide required instructions, or another breach of the Contract Documents caused or contributed
to the condition.
12.8 Survival. Warranty and correction obligations survive inspection, acceptance, use, payment,
Final Completion, and termination of the Contract.
Expiration of the correction period does not eliminate liability for latent defects, fraud, indemnified
claims, or a longer warranty or remedy available under the Contract Documents or applicable law.
32
Article 13
Delays, Extensions of Time, and Liquidated Damages
13.1 Time Is of the Essence. Time is of the essence in Contractor’s performance of the Work.
Contractor shall plan, staff, coordinate, and prosecute the Work diligently to achieve Substantial
Completion and Final Completion within the Contract Time.
13.2 Contractor-Caused Delay. Contractor is responsible for delay caused by:
• Contractor or anyone for whom Contractor is responsible;
• Failure to provide sufficient labor, supervision, materials, or equipment;
• Defective or nonconforming Work;
• Failure to obtain or timely pursue permits, approvals, submittals, or inspections assigned
to Contractor;
• Failure of a subcontractor or supplier to perform, except to the extent the underlying event
independently qualifies as an excusable delay;
• Failure to coordinate the Work;
• Failure to maintain required bonds, insurance, licenses, or approvals;
• Failure to comply with applicable law or the Contract Documents; or
• Another condition within Contractor’s reasonable control.
A Contractor-caused delay does not entitle Contractor to additional compensation or Contract
Time.
13.3 Excusable Delay. Contractor may receive an extension of Contract Time to the extent that
Contractor demonstrates that:
• The delaying event was beyond Contractor’s reasonable control;
• Contractor did not cause or materially contribute to the event;
• The event could not reasonably have been anticipated, avoided, or mitigated;
• The event delayed an activity on the then-current critical path;
• Contractor provided the notices and documentation required by the Contract Documents;
and
• Contractor diligently attempted to mitigate the delay and continued unaffected Work.
An excusable delay may include an act or omission of the City, a City-directed change, an
unusually severe weather event, a declared emergency, a governmental action not caused by
Contractor, or another unavoidable event satisfying the requirements above.
13.4 Weather Delay. The Contract Time includes weather conditions reasonably anticipated for
South Florida during the scheduled period of construction.
33
Contractor may receive a time extension for unusually severe weather only if Contractor
establishes through contemporaneous Project records and reliable weather data that:
• The conditions were materially more severe or prolonged than reasonably anticipated;
• The conditions prevented performance of critical-path Work despite reasonable protective
and mitigation measures; and
• Contractor could not reasonably resequence the Work or perform other critical activities.
Weather-sensitive requirements for paving, concrete, landscaping, or other exterior Work do not,
by themselves, establish entitlement to an extension.
13.5 Material and Labor Availability. Ordinary labor shortages, price increases, market
conditions, transportation delays, and material procurement difficulties are Contractor’s
responsibility.
Contractor may request a time extension for an extraordinary industry-wide shortage or disruption
only if it was not reasonably foreseeable when Contractor submitted its Bid, was beyond the
control of Contractor and its suppliers, could not reasonably have been avoided through timely
procurement or an approved substitute, and caused a documented critical-path delay.
No price adjustment is due solely because labor, material, transportation, or equipment costs
increased after submission of the Bid.
13.6 Notice of Delay. Contractor shall provide the City written notice within seven (7) calendar
days after Contractor first knew or reasonably should have known of an event that may delay the
Work.
The notice shall identify:
• The delaying event and its cause;
• The affected activities;
• The anticipated effect on the critical path;
• The estimated duration;
• Measures being taken to avoid or mitigate the delay; and
• Any requested adjustment to the Contract Time or Contract Price.
Contractor shall provide updated information as the effects of the event become known and submit
complete supporting documentation within twenty-one (21) calendar days after the initial notice,
unless the City approves additional time.
Failure to provide timely notice and documentation waives the request to the extent the City is
prejudiced by the failure.
13.7 Concurrent Delay. If an excusable delay occurs concurrently with a delay caused by
Contractor, Contractor is entitled to an extension of Contract Time only to the extent Contractor
establishes that the excusable delay independently affected the critical path.
34
Concurrent delay is not compensable. The parties shall reasonably apportion nonconcurrent delay
when the effects can be reliably separated.
13.8 Extensions of Contract Time. An extension of Contract Time is effective only when
authorized by written Change Order. The City’s review of a schedule, acknowledgment of a delay,
permission to continue working after a completion deadline, or failure to assess liquidated damages
immediately does not constitute an extension or waiver.
Contractor shall continue performing unaffected Work while a request for extension is under
review.
13.9 No Damages for Delay. Except as expressly provided in a written Change Order or to the
extent this limitation is unenforceable under Florida law, an extension of Contract Time is
Contractor’s sole remedy for delay, disruption, interference, acceleration, resequencing, or
suspension.
This limitation does not bar recovery of documented, reasonable, and direct additional costs to the
extent caused solely by the City’s fraud, bad faith, active interference, knowing concealment of a
material condition, abandonment of the Contract, or another basis for which enforcement of a no-
damages-for-delay provision is prohibited by Florida law.
Contractor is not entitled to consequential damages, lost profits, loss of business opportunity,
financing costs, or damages arising from Contractor-caused or concurrent delay. Any compensable
adjustment remains subject to the notice, documentation, mitigation, and Change Order
requirements of the Contract Documents.
13.10 Liquidated Damages. The parties acknowledge that the City will incur administrative costs,
professional fees, operational disruption, loss of use, inconvenience, and other damages if
Contractor fails to complete the Work within the Contract Time. Because those damages would be
difficult to determine precisely, the parties agree that the amounts stated below are reasonable
estimates of the City’s anticipated damages and are not penalties.
If Contractor fails to achieve Substantial Completion within the required Contract Time,
Contractor shall owe the City liquidated damages of Five Hundred Dollars ($500.00) for each
calendar day beginning on the required Substantial Completion date and continuing through the
date Substantial Completion is achieved.
If Contractor fails to achieve Final Completion within the required Contract Time, Contractor shall
owe the City liquidated damages of Five Hundred Dollars ($500.00) for each calendar day
beginning on the required Final Completion date and continuing through the date Final Completion
is achieved.
Liquidated damages for failure to achieve Substantial Completion and Final Completion shall not
overlap for the same calendar day. Contract Time shall be extended when required by Section
218.735(7), Florida Statutes, because of late delivery of the completion list, and liquidated
damages shall not be assessed for a period attributable to a required statutory extension.
35
13.11 Recovery of Liquidated Damages. The City may deduct accrued liquidated damages from
amounts due or to become due to Contractor or may recover them from Contractor and the surety.
Liquidated damages are the City’s agreed remedy for damages arising solely from late completion.
They do not limit the City’s right to recover damages arising from separate breaches, including
defective Work, property damage, flooding or water damage, indemnified claims, fraud,
abandonment, or increased completion costs following termination.
The City shall not receive a double recovery for the same damage.
Article 14
Indemnification
14.1 Statutory Construction Indemnification. To the fullest extent permitted by Section
725.06(2), Florida Statutes, Contractor shall indemnify and hold harmless the City and its officers
and employees from liabilities, damages, losses, and costs, including reasonable attorneys’ fees,
to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of
Contractor or persons employed or utilized by Contractor in the performance of the Contract.
This indemnification is limited to the scope permitted for a public-agency construction contract
under Section 725.06, Florida Statutes. It does not require Contractor to indemnify the City for the
City’s own negligence, gross negligence, willful misconduct, or statutory violations except to the
extent permitted by applicable law.
14.2 Persons Employed or Utilized by Contractor. For purposes of this Article, persons
employed or utilized by Contractor include Contractor’s employees, subcontractors, sub-
subcontractors, suppliers, materialmen, consultants, agents, and other persons or entities for whom
Contractor is legally responsible.
14.3 Defense Costs and Mixed Claims. Contractor’s obligation includes reasonable attorneys’
fees and litigation costs recoverable under Section 725.06(2), Florida Statutes, to the extent the
claim, liability, damage, or loss was caused by conduct for which Contractor is responsible under
Section 14.1.
If a claim alleges conduct attributable both to Contractor and to the City, the City may control its
own defense. Contractor is responsible for defense costs only to the extent attributable to the
negligence, recklessness, or intentional wrongful misconduct of Contractor or persons employed
or utilized by Contractor.
Nothing in this Article creates an independent duty to defend the City beyond the indemnification
permitted by Section 725.06, Florida Statutes.
14.4 Notice and Cooperation. The City shall provide Contractor reasonable notice of a claim for
which indemnification may be sought, except that delayed notice relieves Contractor of its
obligations only to the extent Contractor is materially prejudiced by the delay.
36
The parties shall reasonably cooperate in investigating and responding to the claim. Contractor
shall not settle a claim in a manner that admits wrongdoing by the City, imposes an obligation on
the City, or fails to provide the City a complete release without the City’s prior written consent.
The City shall not unreasonably withhold consent to a settlement that fully protects the City and
requires no payment or admission by the City.
14.5 Liens and Payment Claims. Contractor shall indemnify and hold harmless the City from
liens, bond claims, and payment demands arising from Contractor’s failure to pay persons or
entities furnishing labor, services, materials, or equipment for the Work.
This Section does not require Contractor to indemnify the City for the City’s failure to pay an
undisputed amount properly due to Contractor under the Contract Documents.
14.6 Intellectual Property. Contractor shall indemnify and hold harmless the City from claims
that a product, process, material, equipment item, or construction method selected or furnished by
Contractor infringes a patent, copyright, trademark, or other intellectual-property right.
Contractor is not responsible for infringement arising solely from a proprietary design specified
by the City when Contractor neither knew nor reasonably should have known of the infringement.
Contractor shall promptly notify the City if it becomes aware of a potential infringement involving
a City-specified design.
14.7 No City Indemnification. Nothing in the Contract Documents requires the City to indemnify,
defend, or hold harmless Contractor or another person or entity.
14.8 Sovereign Immunity. The City retains all sovereign-immunity, liability, and personal-
liability protections and limitations stated in Article 21, including those arising under Section
768.28, Florida Statutes.
14.9 Survival. Contractor’s indemnification obligations survive completion, final payment,
acceptance, and termination of the Contract.
Article 15
Default and Termination
15.1 Contractor Default. Contractor is in default if Contractor:
• Fails to commence or prosecute the Work diligently;
• Fails to provide sufficient qualified labor, supervision, materials, or equipment;
• Fails to achieve required progress or completion;
• Performs defective or nonconforming Work and fails to correct it;
• Fails to pay subcontractors, suppliers, or workers;
• Abandons the Work;
• Fails to maintain required licenses, permits, bonds, or insurance;
• Violates a material safety, legal, or Contract requirement;
• Makes a material misrepresentation concerning the Contract or Work;
37
• Becomes insolvent, makes an assignment for the benefit of creditors, or becomes subject
to a bankruptcy or receivership proceeding that materially impairs performance;
• Fails to provide required records, schedules, certifications, or closeout documentation; or
• Otherwise materially breaches the Contract Documents.
15.2 Notice and Opportunity to Cure. Except as provided in Section 15.3, the City shall provide
written notice describing the default and allow Contractor five (5) calendar days after receipt to
cure the default or, if the default cannot reasonably be fully cured within five days, to:
• Begin the cure within the five-day period;
• Submit a written corrective-action plan acceptable to the City; and
• Diligently continue the cure to completion within a reasonable period approved by the City.
The City will not unreasonably reject a corrective-action plan that adequately protects the City,
maintains Project progress, and provides a reliable cure date.
15.3 Immediate Protective Action. The City may take immediate protective action, suspend
affected Work, or terminate Contractor’s right to proceed without allowing an additional cure
period when:
• Contractor abandons the Work;
• A condition presents an imminent threat to persons, the Project Site, the Work, or other
property;
• Contractor allows required insurance or bonds to lapse;
• Contractor engages in fraud, criminal conduct, or an intentional material misrepresentation;
• Contractor repeatedly commits substantially similar defaults after prior notice;
• Contractor’s default is not reasonably capable of cure; or
• Immediate action is reasonably necessary to preserve available funding or comply with a
governmental directive.
When practicable, the City shall provide Contractor notice before acting. Otherwise, notice shall
be provided as soon as reasonably practicable.
15.4 City Remedies. If Contractor fails to cure a default as required, the City may, without waiving
other rights:
• Withhold payment;
• Supplement Contractor’s workforce, supervision, materials, or equipment;
• Correct defective or nonconforming Work;
• Take possession of materials and equipment purchased for incorporation into the Work and
paid for by the City;
• Require assignment of subcontracts that are assignable and accepted by the City;
• Exclude Contractor from all or part of the Project Site;
• Terminate Contractor’s right to proceed with all or part of the Work;
• Complete the Work by means the City considers appropriate;
• Recover increased completion costs, professional fees, and other damages;
38
• Exercise rights under the Performance Bond; and
• Exercise any other remedy available under the Contract Documents or applicable law.
The City shall exercise its remedies reasonably and take commercially reasonable measures to
mitigate avoidable completion costs.
15.5 Surety Notice. When Contractor’s Performance Bond requires notice to or participation by
the surety before termination or completion, the City shall comply with the applicable bond
procedures.
Nothing in this Section expands the surety’s rights beyond the Performance Bond or limits the
City’s right to take immediate protective action necessary to protect persons, property, the Project
Site, or the Work.
15.6 Wrongful Termination for Cause. If a termination for cause is finally determined to have
been improper, the termination shall be treated as a termination for convenience under Section
15.7. Contractor’s recovery shall be limited to the compensation permitted for a termination for
convenience, except to the extent applicable law requires otherwise.
15.7 Termination for Convenience. The City may terminate the Contract, in whole or in part, for
convenience upon thirty (30) calendar days’ written notice to Contractor, or upon a shorter period
agreed to by Contractor.
Upon receipt of notice, Contractor shall:
• Stop the terminated Work on the effective date stated in the notice;
• Continue any portion of the Work not terminated;
• Protect and preserve completed and partially completed Work;
• Terminate or assign subcontracts and purchase orders as directed by the City;
• Take reasonable steps to minimize termination costs;
• Deliver materials, equipment, records, submittals, warranties, and other Project property
for which the City has paid or agrees to pay; and
• Cooperate in an orderly transition of the Work.
15.8 Compensation Following Termination for Convenience. Following a termination for
convenience, the City shall pay Contractor for:
• Work properly performed and accepted through the effective date of termination;
• Properly stored materials and equipment meeting the requirements of Section 5.4 that the
City elects to accept;
• Reasonable, documented demobilization costs;
• Reasonable, documented costs of terminating noncancelable subcontracts and purchase
orders that Contractor could not avoid through diligent mitigation; and
• Other amounts expressly approved by the City in writing.
39
Contractor is not entitled to anticipatory profit, profit on unperformed Work, unabsorbed home-
office overhead, consequential damages, lost business opportunity, or damages based on the
unperformed portion of the Contract.
Payment is subject to prior payments, retainage permitted by law, credits, setoffs, and amounts
otherwise due to the City.
15.9 Nonappropriation and Loss of Funding. The City’s obligations are subject to lawful
appropriation and the availability of funds. The City may suspend, reduce, or terminate the
Contract if appropriated funds or available funds are unavailable, withdrawn, reduced, delayed, or
disallowed.
The City shall provide Contractor notice as soon as reasonably practicable. Contractor shall be
compensated in accordance with Section 15.8 for accepted Work performed before the effective
date of the suspension, reduction, or termination.
The City shall not characterize a funding-related termination as a Contractor default unless an act
or omission of Contractor caused or materially contributed to the loss or disallowance of funding.
15.10 Contractor Obligations Following Termination. Termination does not relieve Contractor
of responsibility for:
• Work performed before termination;
• Defective or nonconforming Work;
• Payment of subcontractors and suppliers;
• Warranties applicable to completed Work;
• Indemnification;
• Delivery of Project records and public records;
• Audit and legal compliance; or
• Obligations that by their nature survive termination.
Article 16
Suspension of Work
16.1 Suspension by the City. The City may direct Contractor in writing to suspend, delay, or
interrupt all or part of the Work for a period the City determines appropriate for:
• Protection of persons, property, the Project Site, or the Work;
• Contractor’s failure to comply with the Contract Documents;
• Coordination with City operations or other work;
• Inspection, testing, permitting, or governmental review;
• Unanticipated conditions;
• Weather or emergency conditions;
• Funding or funding-related issues; or
• The City’s convenience.
40
Contractor shall stop the affected Work as directed, continue unaffected Work, and protect and
preserve the Work during the suspension.
16.2 Contractor-Caused Suspension. Contractor is not entitled to additional compensation or
Contract Time for a suspension caused by Contractor, a subcontractor, a supplier, or another person
for whom Contractor is responsible.
Contractor shall promptly correct the condition causing the suspension and resume Work when
authorized by the City.
16.3 City-Caused Suspension. If a suspension is caused solely by the City’s convenience and is
not attributable to Contractor, weather, safety, funding, permitting, governmental action, or
another risk allocated to Contractor under the Contract Documents, Contractor may request:
• A reasonable extension of Contract Time for demonstrated critical-path delay; and
• An equitable adjustment for reasonable, documented, and unavoidable direct costs caused
by the suspension.
Any adjustment is subject to Articles 7 and 13, including notice, documentation, mitigation,
concurrent-delay, and no-damages-for-delay requirements.
Contractor is not entitled to profit on suspension costs, consequential damages, lost profits, or costs
that Contractor reasonably could have avoided.
16.4 Prolonged Suspension. If the City suspends all or substantially all of the Work for more than
sixty (60) consecutive calendar days for reasons not attributable to Contractor, Contractor may
request that the City authorize resumption, reduce the affected scope, or terminate the suspended
portion for convenience.
Within fifteen (15) calendar days after receiving Contractor’s written request, the City shall notify
Contractor whether the Work will resume, be reduced, remain suspended for an additional period
agreed to by Contractor, or be terminated for convenience.
If the City does not provide such notice within the fifteen-day period, Contractor may treat the
suspended portion as terminated for convenience under Section 15.7. A funding-related suspension
is also subject to Section 15.9.
This Section does not apply to a suspension caused by Contractor, an emergency, a legal
prohibition, or a governmental order that prevents the City from authorizing resumption or
termination.
16.5 Contractor Suspension for Imminent Danger. Contractor may suspend affected Work
when reasonably necessary to address an imminent threat to life, safety, or material property
damage. Contractor shall immediately notify the City, protect the Work, and resume performance
when the danger has been addressed.
41
Contractor may not suspend Work solely because of a payment or contractual dispute except to
the extent expressly authorized by applicable law.
16.6 Resumption of Work. When the City directs Contractor to resume suspended Work,
Contractor shall do so promptly and shall submit any necessary revised schedule or recovery plan.
Resumption does not waive a properly preserved request for adjustment or the City’s rights
concerning the cause of the suspension.
Article 17
Records, Public Records, and Audit
17.1 Project Records. Contractor shall create and maintain complete, accurate, and auditable
records relating to the Contract and Work, including:
• Accounting and cost records;
• Project-related payroll and personnel records required by applicable law or the Contract
Documents;
• Subcontracts and purchase orders;
• Invoices, receipts, delivery records, and proof of payment;
• Change proposals and supporting cost documentation;
• Daily reports, schedules, photographs, and material Project correspondence;
• Inspection, testing, and quality-control records;
• Permits, licenses, approvals, and product documentation;
• Insurance and bond records;
• Payment and closeout documentation; and
• Other records required by the Contract Documents or applicable law.
Records shall be maintained in an organized manner that permits costs, quantities, payments, and
Contract compliance to be reasonably verified.
17.2 Records Retention. Contractor shall retain Project records for at least five (5) years after
final payment, termination, or Project closeout, whichever occurs later, or for any longer period
required by:
• Applicable federal, state, or local law;
• Applicable audit and records-retention requirements;
• 2 C.F.R. part 200, if federal funding requirements apply to the Project;
• An audit, claim, investigation, litigation, or public-records request initiated before
expiration of the retention period; or
• Written notice from the City identifying a longer legally applicable period.
If an audit, claim, investigation, litigation, or public-records matter remains pending, Contractor
shall retain the affected records until final resolution.
42
17.3 Access and Audit. Upon reasonable notice, Contractor shall provide the City, its auditors,
and governmental representatives authorized by applicable law reasonable access to Project
records and the Project Site for inspection, copying, monitoring, and audit.
Access shall be provided during normal business hours, except when immediate access is
reasonably necessary to address an emergency, active investigation, or funding deadline.
Contractor shall require its subcontractors and suppliers to maintain and provide access to records
applicable to their portions of the Work.
17.4 Audit Findings. If an audit determines that Contractor was overpaid, charged an unallowable
cost, failed to provide required supporting documentation, or caused a cost to be disallowed by a
funding agency, Contractor shall reimburse the City to the extent the finding results from
Contractor’s act, omission, inaccurate certification, unsupported charge, or failure to comply with
the Contract Documents.
Contractor shall be given a reasonable opportunity to provide additional documentation and
respond to a preliminary finding before the City makes a final contractual determination, unless
immediate action is required by a funding agency or applicable law.
The City remains responsible for a disallowance caused solely by the City’s act, omission, or
funding decision.
17.5 Florida Public Records Law. Contractor shall comply with Chapter 119, Florida Statutes,
and Section 119.0701, Florida Statutes, to the extent applicable to Contractor’s performance on
behalf of the City.
Contractor shall:
• Keep and maintain public records required by the City to perform the Contract;
• Upon request from the City’s custodian of public records, provide the City with a copy of
requested records or allow the records to be inspected or copied within a reasonable time
and at a cost that does not exceed the amount provided by Chapter 119, Florida Statutes,
or as otherwise provided by law;
• Ensure that public records that are exempt or confidential and exempt from public-records
disclosure are not disclosed except as authorized by law for the duration of the Contract
and following completion or termination if Contractor does not transfer the records to the
City;
• Upon completion or termination of the Contract, transfer to the City, at no cost, all public
records in Contractor’s possession or keep and maintain the public records required by the
City to perform the Contract; and
• If Contractor transfers all public records to the City, destroy any duplicate public records
that are exempt or confidential and exempt from public-records disclosure requirements.
If Contractor keeps and maintains public records following completion or termination, Contractor
shall meet all applicable requirements for retaining public records. All electronically stored records
43
must be provided to the City, upon request, in a format compatible with the City’s information-
technology systems.
17.6 Public Records Requests. A public-records request relating to the Contract must be made
directly to the City. If Contractor receives such a request, Contractor shall promptly forward it to
the City’s custodian of public records and coordinate with the City concerning the response.
Contractor shall not independently determine that a record is exempt or confidential without
notifying the City. Contractor remains responsible for protecting records made confidential or
exempt by law.
17.7 Statutory Notice.
IF CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF
CHAPTER 119, FLORIDA STATUTES, TO CONTRACTOR’S DUTY TO PROVIDE
PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CITY’S
CUSTODIAN OF PUBLIC RECORDS AT:
ELORA RIERA, MMC, CITY CLERK
CITY OF DANIA BEACH
100 WEST DANIA BEACH BOULEVARD
DANIA BEACH, FLORIDA 33004
TELEPHONE: (954) 924-6800
EMAIL: ERIERA@DANIABEACHFL.GOV
17.8 Enforcement. Contractor’s failure to comply with applicable public-records requirements
constitutes a material breach. Before terminating the Contract for a curable public-records
violation, the City shall provide the notice and opportunity to cure required by Section 119.0701,
Florida Statutes.
Contractor is responsible for reasonable costs and attorneys’ fees imposed on the City to the extent
resulting from Contractor’s unlawful refusal to provide public records, subject to the requirements
and remedies established by applicable law.
Article 18
Federal Funding Requirements
18.1 Conditional Application. If any portion of the Project is funded or reimbursed with federal
financial assistance, Contractor shall comply with the federal requirements applicable to that
funding and included in the ITB or other Contract Documents.
Federal requirements do not apply solely because they are referenced in this Article. They apply
only to the extent required by the applicable funding source, federal law, regulation, grant award,
or funding-agency directive.
18.2 Notice of Federal Funding. The City shall notify Contractor in writing if federal funding
requirements not otherwise identified in the Contract Documents become applicable to the Work.
44
If the City imposes a material federal requirement after execution of the Contract that was not
included in the ITB or reasonably ascertainable when Contractor submitted its Bid, any resulting
adjustment to the Contract Price or Contract Time must be addressed through a written Change
Order, except to the extent the requirement arises from Contractor’s conduct or was otherwise
applicable by law.
18.3 Federal Contract Provisions. When applicable, Contractor shall comply with the federal
contract provisions included in the ITB, including any requirements concerning:
• Equal employment opportunity;
• Suspension and debarment;
• Lobbying;
• Domestic preferences or required use of domestic products;
• Access to records and audit;
• Environmental compliance;
• Rights to inventions or materials;
• Contract termination; and
• Other requirements imposed by the applicable federal funding program.
Contractor shall include applicable federal requirements in its subcontracts and purchase orders
when required by law, the funding award, or the Contract Documents.
18.4 Conflict. If an applicable federal funding requirement conflicts with another provision of the
Contract Documents, Contractor shall promptly notify the City before proceeding with the affected
Work. The applicable federal requirement controls only to the extent necessary to maintain
compliance with the funding source and applicable law.
Article 19
Legal Compliance, Ethics, and Eligibility
19.1 General Compliance. Contractor shall comply with all federal, state, county, and City laws,
ordinances, codes, regulations, permit conditions, and lawful governmental requirements
applicable to Contractor or the Work.
Contractor shall promptly notify the City if it becomes aware that a requirement of the Contract
Documents conflicts with applicable law. Contractor shall not knowingly perform Work in
violation of law while awaiting direction.
19.2 Licenses and Authority. Contractor represents that it is properly organized, authorized to
transact business in Florida when required, and properly licensed to perform the Work.
Contractor shall maintain all licenses, registrations, certificates of competency, and business tax
receipts required for the Work throughout the Contract. Contractor shall ensure that its
subcontractors and individual trades maintain the licenses required for their portions of the Work.
45
19.3 Public Entity Crimes. Contractor represents that neither Contractor nor an affiliate is
prohibited from transacting business with the City under Section 287.133, Florida Statutes.
A person or affiliate placed on the convicted vendor list following conviction for a public entity
crime may not submit a bid, perform Work, or transact business with a public entity to the extent
and during the period prohibited by Section 287.133, Florida Statutes.
Contractor shall promptly notify the City if Contractor or an affiliate becomes subject to a statutory
disqualification during the Contract.
19.4 Discriminatory Vendors. Contractor represents that it is not prohibited from contracting
with the City because of placement on the discriminatory vendor list under Section 287.134,
Florida Statutes.
Contractor shall promptly notify the City of any change in status. The City may exercise any
remedy authorized by law if Contractor becomes ineligible.
19.5 Scrutinized Companies and Boycott of Israel. Contractor shall provide the certification
required by Section 287.135, Florida Statutes, that Contractor is not participating in a boycott of
Israel.
The additional restrictions and certifications concerning scrutinized business operations in Sudan,
Iran, Cuba, or Syria apply only to the extent required by Section 287.135 based on the Contract
amount and Contractor’s status.
The City may terminate the Contract if Contractor submits a false certification or becomes subject
to termination under Section 287.135, Florida Statutes, after providing any notice and opportunity
to respond required by law.
19.6 Foreign Countries of Concern. Section 287.138, Florida Statutes, applies only if the
Contract or a subsequent change in the Work gives Contractor access to an individual’s personal
identifying information.
Contractor shall provide an affidavit under Section 287.138 only if such access is authorized or
required. Nothing in the Contract authorizes Contractor to access City information systems or
personal identifying information unless the City gives prior written authorization.
19.7 Human-Trafficking Affidavit. At execution, renewal, or extension of the Contract,
Contractor shall provide the affidavit required by Section 787.06(14), Florida Statutes. The
affidavit must be signed under penalty of perjury by an authorized officer or representative and
attest that Contractor does not use coercion for labor or services as defined by that statute.
19.8 E-Verify. Contractor shall register with and use the E-Verify system as required by Section
448.095, Florida Statutes.
46
Contractor shall:
• Verify employment eligibility as required by law;
• Require each subcontractor to provide the affidavit required by Section 448.095, Florida
Statutes;
• Retain subcontractor affidavits for the period required by law;
• Provide reasonable evidence of compliance upon the City’s request; and
• Take action concerning a noncompliant subcontractor as required by law.
The City and Contractor shall exercise any termination rights arising from an E-Verify violation
in the manner required by Section 448.095, Florida Statutes.
19.9 Ethics, Gifts, and Conflicts of Interest. Contractor shall comply with applicable City,
Broward County, state, and federal ethics, gift, lobbying, and conflict-of-interest laws.
Contractor shall not offer, give, solicit, or accept anything of value for the purpose of improperly
influencing a public officer or employee, obtaining preferential treatment, or securing an improper
advantage concerning the Contract.
Contractor shall promptly disclose any actual or potential conflict of interest involving Contractor,
a subcontractor, or a person with authority over the Contract. Disclosure does not automatically
disqualify Contractor, but Contractor shall implement reasonable measures required by the City to
address the conflict.
19.10 Accuracy of Representations. Contractor’s Bid, affidavits, certifications, and disclosures
are continuing representations. Contractor shall promptly correct a representation that becomes
materially inaccurate.
An immaterial error that Contractor made in good faith and promptly corrects does not constitute
default. A knowing or material false statement may constitute default and may be referred to the
appropriate authority.
19.11 Independent Contractor. Contractor is an independent contractor and is solely responsible
for directing and compensating its personnel and for applicable employment taxes, benefits, and
workers’ compensation obligations.
Nothing in the Contract creates an employment, agency, partnership, joint venture, fiduciary, or
other relationship between the City and Contractor. Contractor has no authority to bind the City.
Article 20
Claims, Dispute Resolution, Governing Law, and Venue
20.1 Notice of Claim. A party asserting a claim arising from the Contract shall provide written
notice describing the factual and contractual basis of the claim, the relief requested, and available
supporting documentation.
47
Contractor claims for additional compensation or Contract Time remain subject to the more
specific notice and documentation requirements of Articles 7 and 13.
20.2 City Review. The City shall review a properly submitted claim and provide a written response
within a reasonable period based on the claim’s complexity and the information provided.
The City may request additional documentation reasonably necessary to evaluate the claim.
Contractor shall be given a reasonable opportunity to respond before the City makes a final
contractual determination.
A final contractual determination does not prevent either party from pursuing the remedies
available under this Article or applicable law.
20.3 Good-Faith Negotiation. Before filing litigation, authorized representatives of the parties
shall meet and attempt in good faith to resolve the dispute.
Either party may request the meeting in writing. Unless the parties agree otherwise, the meeting
shall occur within fifteen (15) calendar days after the request and may be conducted in person or
by remote conference.
This Section does not prevent either party from seeking immediate injunctive or other judicial
relief when necessary to protect persons or property, preserve a statutory or contractual deadline,
enforce public-records obligations, or prevent material prejudice.
20.4 Payment Disputes. Payment disputes shall be administered consistently with the Florida
Local Government Prompt Payment Act, including Section 218.735(4), Florida Statutes.
The City shall timely pay undisputed portions of a payment request. Contractor shall continue
performing undisputed Work while a payment dispute is pending, except to the extent Contractor
has a statutory right to suspend performance.
20.5 Continuing Performance. Pending resolution of a claim or dispute, Contractor shall continue
diligent performance in accordance with the Contract Documents and the City’s written directions.
The City shall continue performing its undisputed obligations. Continued performance does not
waive either party’s properly preserved claim or defense.
20.6 Governing Law. The Contract shall be governed by and interpreted in accordance with the
laws of the State of Florida, without regard to conflict-of-laws principles.
20.7 Venue and Jurisdiction. Exclusive venue for any action or proceeding arising from or
relating to the Contract shall lie in a court of competent jurisdiction in Broward County, Florida.
If federal subject-matter jurisdiction exists, exclusive venue shall lie in the United States District
Court for the Southern District of Florida.
Each party consents to the personal jurisdiction of those courts.
48
20.8 No Arbitration. The Contract is not subject to binding arbitration unless the City
Commission and Contractor subsequently authorize arbitration in a written amendment executed
in accordance with applicable law.
20.9 Waiver of Jury Trial.
TO THE FULLEST EXTENT PERMITTED BY LAW, EACH PARTY KNOWINGLY
AND VOLUNTARILY WAIVES TRIAL BY JURY IN ANY ACTION OR PROCEEDING
ARISING OUT OF OR RELATING TO THE CONTRACT DOCUMENTS. THE
PARTIES ACKNOWLEDGE THAT THIS WAIVER IS A MATERIAL TERM OF THE
CONTRACT.
20.10 Attorneys’ Fees and Costs. Except when a Contract provision or applicable law expressly
provides otherwise, each party shall bear its own attorneys’ fees and costs arising from a dispute.
Nothing in this Section limits attorneys’ fees recoverable as part of Contractor’s indemnification
obligations under Article 14 or fees and costs awarded under applicable public-records or other
law.
20.11 Preservation of Claims Requirements. Nothing in this Article waives a statutory condition
precedent, notice requirement, administrative remedy, filing deadline, or limitation period
applicable to a claim against the City.
Article 21
Sovereign Immunity and Limitations of City Liability
21.1 Preservation of Sovereign Immunity. Nothing in the Contract Documents shall be
interpreted as a waiver of the City’s sovereign immunity or as consent by the City to liability
beyond the limitations established by Section 768.28, Florida Statutes, with respect to tort or other
claims to which sovereign immunity applies.
Nothing in the Contract Documents:
• Creates a noncontractual cause of action against the City that would not otherwise exist;
• Waives a defense, immunity, condition precedent, or limitation available to the City under
applicable law;
• Expands any monetary limitation applicable to the City’s liability;
• Authorizes an award of punitive damages or prejudgment interest against the City when
prohibited by law; or
• Constitutes consent by the City to indemnify, defend, or hold harmless Contractor or
another person or entity.
21.2 Contractual Obligations. Section 21.1 does not relieve the City of its express payment and
performance obligations under the Contract Documents. The City remains responsible for amounts
properly due for accepted Work, subject to lawful appropriation, available funding, withholding,
retainage, setoff, and the other provisions of the Contract.
49
21.3 No Personal Liability. No City commissioner, officer, employee, representative, or agent
shall have personal liability for the City’s obligations under the Contract.
Nothing in this Section alters the standards governing individual liability under Section 768.28(9),
Florida Statutes.
21.4 Survival. The protections and limitations stated in this Article survive completion, final
payment, and termination of the Contract.
Article 22
Notices and Project Communications
22.1 Formal Notices. Formal notices concerning default, termination, indemnification,
assignment, claims, disputes, or other material legal rights under the Contract shall be in writing
and delivered by:
• Personal delivery;
• Nationally recognized overnight delivery service;
• Certified United States mail, return receipt requested; or
• Email to the applicable address designated in this Article.
Notice by personal delivery, overnight delivery service, or certified mail is effective upon actual
receipt. A notice refused by the intended recipient is effective on the date delivery was refused.
Notice by email is effective when the recipient acknowledges receipt. If receipt is not
acknowledged by the end of the next business day, the sender shall deliver the notice by one of the
other methods authorized above.
A notice of default or termination transmitted by email shall also be sent by personal delivery,
overnight delivery service, or certified mail no later than the next business day. Failure to send the
additional copy does not invalidate the notice if actual receipt of the email is acknowledged.
22.2 Project Notices and Communications. Routine Project communications, submittals,
requests for information, schedule updates, change proposals, payment documentation, and
notices concerning delay, concealed conditions, safety, or other Project matters may be
transmitted through the City’s designated electronic Project-management system or by email to
the representatives designated by the parties.
A Project communication does not amend the Contract or authorize additional compensation or
Contract Time unless it expressly satisfies Article 7 and is issued or executed by a person
authorized to bind the City.
22.3 Notice to the City. Formal notice to the City shall be delivered to:
50
City of Dania Beach
Candido Sosa-Cruz, City Manager
100 West Dania Beach Boulevard
Dania Beach, Florida 33004
Email: csosacruz@daniabeachfl.gov
With a copy to:
Eve A. Boutsis, City Attorney
City of Dania Beach
100 West Dania Beach Boulevard
Dania Beach, Florida 33004
Email: eboutsis@daniabeachfl.gov
A copy provided to the City Attorney does not replace delivery to the City Manager.
22.4 Notice to Contractor. Formal notice to Contractor shall be delivered to:
The Stout Group, LLC
Attn: Jose M. Sanchez, Manager
10850 NW 138th Street, Bay 3
Hialeah Gardens, Florida 33018
Email: jsanchez@thestoutgroup.com
22.5 Changes in Contact Information. A party may change its notice address, representative, or
email address by providing notice in accordance with this Article.
The change is effective upon receipt and does not require a formal amendment to the Contract.
22.6 Emergency Communications. Either party may use telephone, text message, or email to
communicate an emergency involving life, safety, flooding or water damage, interruption of City
operations, or risk of material property damage.
The communicating party shall provide written confirmation as soon as reasonably practicable.
Emergency communication does not authorize a change in the Contract Price or Contract Time
unless subsequently documented in accordance with Article 7.
Article 23
Miscellaneous Provisions
23.1 Assignment by Contractor. Contractor shall not assign, transfer, delegate, or otherwise
dispose of the Contract, any material Contract duty, or Contractor’s right to payment without the
City’s prior written consent.
The City will not unreasonably withhold consent to an assignment that:
51
• Does not impair Project performance;
• Does not increase the City’s cost or risk;
• Is made to a qualified and financially responsible entity;
• Does not violate procurement, bond, or legal requirements; and
• Is approved by Contractor’s surety when required.
An unauthorized assignment is voidable by the City. The City’s consent does not release
Contractor or the surety unless the City expressly agrees to the release in writing.
23.2 Assignment by the City. The City may assign the Contract to another governmental entity
or governmental successor responsible for the Project upon written notice to Contractor, provided
the assignment does not materially impair Contractor’s right to payment for properly performed
Work.
Any other assignment by the City requires Contractor’s consent, which shall not be unreasonably
withheld.
23.3 Amendments. The Contract may be amended only by a written instrument executed by
authorized representatives of both parties and approved in accordance with applicable City law
and procedures.
An email, meeting minute, field discussion, purchase order, invoice, course of dealing, or
communication from unauthorized personnel does not amend the Contract.
This Section does not limit the City’s authority to issue a Construction Change Directive, minor
change, suspension, or other written direction expressly authorized by the Contract Documents.
23.4 Authority to Execute. Each person signing the Agreement represents that the person has
authority to execute the Agreement and bind the party on whose behalf the person signs.
Contractor shall provide evidence of signing authority upon the City’s reasonable request.
23.5 No Waiver. A waiver is effective only if stated in writing by the party granting the waiver.
A waiver applies only to the specific circumstance identified and does not constitute a continuing
waiver.
A party’s failure or delay in enforcing a Contract requirement does not waive that requirement or
another right. Payment, inspection, occupancy, use, or acceptance of a portion of the Work does
not waive the City’s rights concerning defective Work, warranties, indemnification, or surviving
obligations.
23.6 Cumulative Remedies. Except when the Contract expressly identifies a remedy as exclusive,
the parties’ rights and remedies are cumulative.
The exercise of one remedy does not prevent exercise of another remedy, but a party may not
obtain a double recovery for the same loss.
52
23.7 Severability. If a court of competent jurisdiction determines that a Contract provision is
invalid or unenforceable, the provision shall be enforced to the maximum extent permitted by law.
If the invalid provision cannot be enforced in part, it shall be severed, and the remaining provisions
shall remain effective unless severance would materially defeat the essential purpose of the
Contract.
The parties shall reasonably cooperate to replace a severed provision with a lawful provision that
most closely reflects the original intent.
23.8 No Third-Party Beneficiaries. Except for rights expressly granted to the surety or
governmental audit and funding authorities, the Contract is intended solely for the benefit of the
City and Contractor.
The Contract does not create a contractual right or cause of action in a subcontractor, supplier,
employee, consultant, member of the public, or other third party.
23.9 No City Endorsement. Contractor shall not use the City’s name, seal, logo, or the existence
of the Contract in a manner that states or implies City sponsorship, approval, or endorsement
without the City’s prior written consent.
After Final Completion, Contractor may factually identify the City and Project in a list of
completed projects and may use nonconfidential Project photographs lawfully obtained by
Contractor, provided Contractor does not use the City’s seal or logo or imply City endorsement.
23.10 Interpretation. The Contract Documents shall be interpreted as a whole and to give
reasonable effect to all provisions.
Headings are for convenience and do not limit substantive provisions. “Including” means
“including without limitation.” The singular includes the plural when appropriate, and references
to a person include an entity when the context permits.
The Contract shall not be construed against a party solely because that party or its counsel prepared
or proposed a provision.
23.11 Compliance with Deadlines. If a Contract deadline falls on a Saturday, Sunday, or City-
observed holiday, the deadline extends to the next Business Day unless:
• The deadline concerns emergency action, safety, water protection, or protection of
property;
• The Contract expressly requires performance on a calendar-day basis; or
• Applicable law requires a different result.
This Section does not convert a calendar-day completion period into a business-day period.
53
23.12 Further Assurances. Each party shall execute documents and take reasonable actions
necessary to carry out the Contract, provided that no further assurance materially expands that
party’s obligations or modifies the Contract without an authorized written amendment.
23.13 Survival. Provisions concerning payment, correction of Work, warranties, indemnification,
records, public records, audit, legal compliance, ownership, dispute resolution, sovereign
immunity, and other obligations that by their nature extend beyond completion survive final
payment and termination.
23.14 Counterparts and Electronic Signatures. The Agreement may be executed in
counterparts, each of which is deemed an original and all of which together constitute one
instrument. Electronic signatures and electronic copies have the same force and effect as original
signatures to the extent permitted by Chapter 668, Florida Statutes, and other applicable law.
23.15 Entire Agreement. The Contract Documents constitute the complete agreement between
the City and Contractor concerning the Project and supersede prior and contemporaneous
discussions, negotiations, representations, and communications concerning the same subject.
Contractor acknowledges that it has not relied on a representation or promise that is not contained
in the Contract Documents.
23.16 Effective Date. The Agreement becomes effective on the date it is fully executed by both
parties and approved as required by City law. Contractor shall not commence physical Work until
the City issues a written Notice to Proceed.
SIGNATURES ON THE FOLLOWING PAGES
54
IN WITNESS OF THE FOREGOING, the parties have set their hands and seals the day
and year first above written.
CITY:
ATTEST: CITY OF DANIA BEACH, FLORIDA
a Florida Municipal Corporation
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
CANDIDO SOSA-CRUZ, ICMA-CM
CITY MANAGER
APPROVED FOR FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
55
CONTRACTOR:
The Stout Group, LLC
a Florida limited liability company
WITNESSES:
SIGNATURE SIGNATURE
PRINT Name PRINT Name
SIGNATURE Title
PRINT Name
STATE OF FLORIDA
COUNTY OF MIAMI-DADE
The foregoing instrument was acknowledged before me by means of ☐ physical presence
or ☐ online notarization, on _________ , 2026, by______________________, as
__________________ (title) of The Stout Group, LLC, a Florida corporation. He/She is personally
known to me or has produced ____________ as identification.
NOTARY PUBLIC
My Commission Expires: State of Florida
56
Exhibit A
Accepted Bid Form and Bid Schedule
!"%
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b>6,07QO02(<GAA =L ?G;AAL/*)03O+)79)32+,,N6):*(2(QO((,326^3 &F TU ?@F;AA
!"" !""#"
$
%&
'()* +) ,
()* ) ,
-).#) /$
%
$&
%2
3,
4
567-
8 3% , ""!""9-
# 3 !""AB;C=>?
#
%
)!
28
-
37" D # "!""
%
)
!
28
'4
(2/" D # "!""
%-6
'/" %9 1"!""
386
5
'1,
35.
""/0" %9 "!"" %&
%E
'