HomeMy WebLinkAboutR-2026-149 Stout Group LLC Agreement - Ocean Park Paving (#26-019)RESOLUTION NO. 2026-149 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICALS TO EXECUTE AN AGREEMENT WITH THE STOUT GROUP, LLC FOR THE CONSTRUCTION OF INVITATION TO BID (ITB) NO. 26-019, “OCEAN PARK PARKING – PHASE 1” IN THE AMOUNT NOT TO EXCEED TWO HUNDRED THIRTY SEVEN THOUSAND ONE HUNDRED SEVENTY EIGHT DOLLARS ($237,178.00); PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Dania Beach is undertaking the Ocean Park Parking – Phase 1 Project to improve public access and parking availability at Ocean Park; and WHEREAS, the project will provide fifteen (15) additional parking spaces and associated site improvements, including paving, drainage, sidewalks, curbing, signage, landscaping, irrigation, and related site work; and WHEREAS, the City has completed the procurement process for ITB No. 26-019, “Ocean Park Parking – Phase 1,” and has determined that The Stout Group, LLC is qualified to perform the required construction services; and WHEREAS, the Public Services Department recommends that the City enter into an agreement with The Stout Group, LLC for the construction of the Ocean Park Parking – Phase 1 Project in an amount not to exceed Two Hundred Sixteen Thousand Nine Hundred Eighty Dollars ($216,980.00) which includes construction cost of $201,980.00 and permitting allowance of $15,000.00; and WHEREAS, due to the nature of the work, the Public Services Department recommends establishing an Owner's Contingency in the amount of Twenty Thousand One Hundred Ninety- Eight Dollars ($20,198.00) to address unforeseen conditions and minor changes that may arise during construction; and WHEREAS, funding for the project is available from Ocean Park Account No. 415-45-02- 545-63-95; and WHEREAS, the City finds that entering into an agreement with The Stout Group, LLC will facilitate completion of the Ocean Park Parking – Phase 1 Project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: 2 RESOLUTION #2026-149 Section 1. That the above “Whereas” clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That the City Commission hereby authorizes the proper City officials to execute an agreement with The Stout Group, LLC for the construction of ITB No. 26-019, “Ocean Park Parking – Phase 1,” in an amount not to exceed Two Hundred Sixteen Thousand Nine Hundred Eighty Dollars ($216,980.00) , which includes construction cost of $201,980.00 and permitting allowance of $15,000.00, the agreement is attached hereto and incorporated herein as Exhibit “A.” Section 3. That the City Commission hereby authorizes an Owner's Contingency in the amount of Twenty Thousand One Hundred Ninety-Eight Dollars ($20,198.00), resulting in a total project authorization of Two Hundred Thirty-Seven Thousand One Hundred Seventy-Eight Dollars ($237,178.00). Section 4. That funding for the project will be appropriated from Ocean Park Account No. 415-45-02-545-63-95 in an amount not to exceed $237,178.00. Section 5. That the City Manager, or designee, is hereby authorized to take all administrative actions reasonably necessary to implement the agreement authorized herein. Section 6. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 7. That this Resolution shall become effective 10 days after passage. PASSED AND ADOPTED on October 27, 2026. Motion by Commissioner Lewellen second by Commissioner Rimoli. FINAL VOTE ON ADOPTION: Unanimous X Yes No Commissioner Lori Lewellen ____ ____ Commissioner Luis Rimoli ____ ____ Commissioner Archibald J. Ryan IV ____ ____ Vice Mayor Marco Salvino ____ ____ Mayor Joyce L. Davis ____ ____ SIGNATURES ON THE FOLLOWING PAGE 3 RESOLUTION #2026-149 ATTEST: ELORA RIERA, MMC JOYCE L. DAVIS CITY CLERK MAYOR APPROVED AS TO FORM AND CORRECTNESS: EVE A. BOUTSIS CITY ATTORNEY 1 Construction Agreement Ocean Park Parking – Phase 1 Invitation to Bid No. 26-019 This Construction Agreement (the “Agreement”) is entered into as of the date of the last signature below by and between the CITY OF DANIA BEACH, FLORIDA, a Florida municipal corporation, whose address is 100 West Dania Beach Boulevard, Dania Beach, Florida 33004 (the “City” or “Owner”), and THE STOUT GROUP, LLC, whose address is 10850 NW 138th Street, Bay 3, Hialeah Gardens, Florida 33018 (the “Contractor”). Recitals WHEREAS, the City issued Invitation to Bid No. 26-019 for the Ocean Park Parking – Phase 1 Project (the “ITB”); WHEREAS, Contractor submitted the lowest responsive and responsible Bid in the amount of Two Hundred One Thousand Nine Hundred Eighty Dollars ($201,980.00); WHEREAS, Contractor represents that it is qualified, properly licensed, sufficiently staffed, and able to complete the Work in accordance with the Contract Documents; and WHEREAS, the City Commission authorized award of ITB No. 26-019 and this Agreement to Contractor, subject to the terms stated below. NOW, THEREFORE, in consideration of the mutual promises and obligations stated in the Contract Documents, the parties agree as follows: Article 1 Contract Documents and Order of Precedence 1.1 Contract Documents. The Contract consists of this Agreement; all properly executed amendments and Change Orders; the Notice to Proceed; the City’s ITB, including its General Terms and Conditions, Special Conditions, Scope of Work, Bid Form, plans, drawings, technical specifications, attachments, and all Addenda; the Performance Bond and Payment Bond; Contractor’s accepted Bid and required post-award submissions; and other documents expressly incorporated by this Agreement (collectively, the “Contract Documents”). 1.2 Order of Precedence. If the Contract Documents conflict, the following order controls: 1. Executed amendments and Change Orders, with the most recent controlling; 2. This Agreement; 3. Addenda, with the most recent controlling; 4. The Special Conditions; 5. The Scope of Work and Bid Form; 6. The General Terms and Conditions; 2 7. The technical specifications; 8. The drawings; 9. The Performance Bond and Payment Bond; and 10. Contractor’s accepted Bid. Detailed or more stringent requirements control over general or less stringent requirements when reasonably reconcilable. In the event of a conflict involving dimensions, quantities, materials, methods, or other technical requirements, Contractor shall not proceed based solely on the provision that would result in the greater quantity, higher quality, or higher cost. Contractor shall promptly request a written interpretation from the City before proceeding with the affected Work and shall not exploit an ambiguity, conflict, error, or omission in the Contract Documents. 1.3 Entire Work. The Contract Documents are complementary. Work shown or described in one Contract Document and reasonably inferable as necessary for a complete, functional, code- compliant, and warrantable Project is included in the Work even if not repeated elsewhere. 1.4 Bid Review and Contract Acceptance. Contractor acknowledges that it has reviewed and accepted this Agreement before execution. Qualifications, exceptions, supplemental terms, or proposed changes submitted by Contractor do not modify the Contract unless expressly accepted in a written amendment executed by the City. 1.5 Definitions. Capitalized terms used but not separately defined in this Agreement have the meanings assigned to them elsewhere in the Contract Documents. “Business Day” means a day other than Saturday, Sunday, or a City-observed holiday. “Work” means all construction and related services, labor, materials, equipment, supervision, coordination, testing, documentation, and other obligations required by the Contract Documents. “Contract Time” means the periods established for Substantial Completion and Final Completion, as properly adjusted by written Change Order. 1.6 Contractor’s Accepted Bid. Contractor’s accepted Bid is incorporated only to establish the accepted pricing, proposed personnel, qualifications, representations, and other commitments that supplement the City’s requirements. Any qualification, exception, exclusion, limitation, assumption, or additional term contained in Contractor’s Bid is ineffective unless expressly accepted in this Agreement or in a written amendment executed by the City. Article 2 Scope of Work 2.1 General Scope. Contractor shall furnish all labor, supervision, materials, equipment, tools, temporary facilities, temporary protection, transportation, disposal, permits, inspections, testing, bonds, insurance, warranties, coordination, documentation, and incidentals necessary to complete the Ocean Park Parking – Phase 1 Project at Ocean Park in Dania Beach, Florida, in strict accordance with the Contract Documents. 3 2.2 Included Work. Without limiting the Contract Documents, the Work includes: 1. Demolition and lawful disposal of existing asphalt pavement, concrete sidewalk, curb, signs, and other site features identified in the Contract Documents; 2. Construction of new asphalt pavement, concrete sidewalk, Type “D” curb, curb transitions, parking-space striping, concrete wheel stops, and signage; 3. Construction and completion of fifteen (15) additional parking spaces; 4. Relocation of the existing monument sign, other signs, and landscaping rocks as shown in the Contract Documents; 5. Site grading, fill, subgrade stabilization, limerock base, geogrid, milling, paving, and restoration; 6. Drainage improvements, including the drainage structures and related work shown in the Contract Documents; 7. Landscaping, irrigation, sod, and restoration; 8. Erosion control, maintenance of traffic, temporary fencing, and protection of public access; 9. Directional boring and related utility work shown in the Contract Documents; 10. Permitting, testing, inspections, Project closeout, and final cleaning; and 11. All associated labor, materials, equipment, supervision, coordination, and incidental work necessary to deliver a complete and functional Project. 2.3 Contractor Review. Contractor acknowledges that, before submitting its Bid, it examined the Contract Documents and Project Site and investigated visible and reasonably discoverable conditions, access, staging, storage, utilities, ongoing public use, and other Project constraints. Contractor further acknowledges that it included in the Contract Price all costs necessary to complete the Work. Contractor’s failure to perform the required examination or investigation does not entitle Contractor to additional compensation or Contract Time. 2.4 Estimated Quantities and Scope Adjustments. Quantities identified in the Contract Documents are estimates provided for bidding, evaluation, measurement, or allowance purposes. Contractor shall complete the entire Work required by the Contract Documents for the Contract Price, subject only to additions, deletions, or other adjustments authorized in writing under Article 7. When the Contract Documents establish a unit price for an item, payment for that item shall be based on the actual quantity of Work authorized, properly performed, and accepted by the City, multiplied by the applicable unit price. The City may increase, decrease, or eliminate estimated quantities without invalidating the Contract. Any adjustment to the Contract Price or Contract Time must be authorized in accordance with Article 7. Contractor is not entitled to anticipated profit, unabsorbed overhead, or other damages arising solely from a reduction or elimination of an estimated quantity. 2.5 Performance Standard. Contractor shall perform the Work in a good and workmanlike manner using qualified personnel and materials suitable for their intended purposes. Contractor shall deliver complete, code-compliant, fully functional, properly drained, and warrantable parking and site improvements that are fit for their intended use and satisfy the Contract Documents. 4 2.6 Incidental Work. Items reasonably necessary to complete, connect, coordinate, protect, test, or make the Work functional and warrantable are included in the Contract Price even if not separately identified as a Bid item. Contractor is not entitled to additional compensation merely because a necessary incidental item is not separately listed in the Bid Schedule. Article 3 Contract Time and Scheduling 3.1 Commencement. Contract Time begins on the date stated in the City’s written Notice to Proceed. Contractor shall not begin physical Work before the Notice to Proceed. Contractor shall commence the Work within the period stated in the ITB or, if the ITB does not state a period, within seven (7) calendar days after the date stated in the Notice to Proceed, unless the City directs otherwise in writing. Costs incurred before the Notice to Proceed are incurred at Contractor’s risk. Notwithstanding the foregoing, if the City terminates the Contract for convenience before commencement of the Work, the City may reimburse Contractor for documented, noncancelable costs for required performance and payment bonds and insurance, but only to the extent expressly approved by the City. 3.2 Milestones. Contractor shall achieve: 1. Substantial Completion within one hundred fifty (150) calendar days after the date stated in the Notice to Proceed; and 2. Final Completion within one hundred eighty (180) calendar days after the date stated in the Notice to Proceed. These deadlines are subject only to written adjustments authorized in accordance with the Contract Documents. Time is of the essence. 3.3 Construction Schedule. Within ten (10) calendar days after execution of the Agreement, and in all events before commencement of physical Work, Contractor shall submit for the City’s review and acceptance a detailed construction schedule identifying: 1. Submittals and approvals; 2. Material procurement and delivery; 3. Mobilization; 4. Work-area and construction sequencing; 5. Inspections and testing; 6. Weather contingencies and site-protection measures; 7. Activities affecting City operations or public access; 8. Substantial Completion; and 9. Final Completion. Contractor shall update the schedule monthly and whenever actual progress materially departs from the accepted schedule. The City’s review or acceptance of a schedule does not alter 5 Contractor’s obligations, relieve Contractor of responsibility for sequencing and timely completion, or transfer scheduling responsibility to the City. 3.4 Recovery Schedule. If Contractor falls behind the accepted schedule for reasons not excused under the Contract Documents, Contractor shall, without additional compensation, submit a recovery schedule acceptable to the City and take all measures necessary to restore timely progress. Corrective measures may include additional labor, shifts, supervision, equipment, expedited delivery, or resequencing of the Work. 3.5 Coordination and Schedule Changes. Contractor shall coordinate its schedule with City operations and provide reasonable advance notice of activities affecting vehicular or pedestrian access, parking, utilities, nearby recreational use, public services, or the use of Ocean Park. Contractor shall not materially alter the accepted sequence or schedule without prior written notice to and acceptance by the City. The City’s acceptance of a schedule change does not constitute an extension of Contract Time or authorization for additional compensation unless expressly stated in a written Change Order. 3.6 Schedule Float. Float identified in the construction schedule is available to the Project and is not exclusively for the benefit of either party. Contractor is not entitled to an extension of Contract Time unless an excusable delay affects the critical path and delays a contractual completion milestone. Article 4 Contract Price 4.1 Contract Price. Subject only to additions and deductions authorized in accordance with the Contract Documents, the total amount payable to Contractor for completion of the Work shall not exceed Two Hundred One Thousand Nine Hundred Eighty Dollars ($201,980.00) (the “Contract Price”). The Contract Price is based on Contractor’s accepted Bid and Bid Schedule attached as Exhibit A. Lump-sum items shall be paid at the applicable lump-sum prices stated in the Bid Schedule. Unit- price items shall be paid based on the actual quantities of Work authorized, properly performed, measured, and accepted by the City, multiplied by the applicable unit prices stated in the Bid Schedule. The Contract Price is a maximum authorization and does not guarantee that Contractor will receive the full amount. The City is obligated to pay only for Work properly performed and accepted in accordance with the Contract Documents. 4.2 Measurement of Quantities. Quantities for unit-price Work shall be measured using the units and methods stated in the Contract Documents. If the Contract Documents do not state a measurement method, the City shall determine the applicable method using generally accepted construction-measurement practices. 6 Contractor shall provide the City a reasonable opportunity to observe and verify measurements before the affected Work is covered, removed, or otherwise becomes unavailable for inspection. Contractor shall maintain and provide supporting records, including field measurements, delivery tickets, weight tickets, calculations, photographs, and other documentation reasonably necessary to verify quantities. If Contractor proceeds without providing the City a reasonable opportunity to verify a quantity, the City may determine the payable quantity from the best information reasonably available. The City’s determination is subject to the claims procedures stated in the Contract Documents. 4.3 Estimated Quantities and Unit Prices. Quantities stated in the Bid Schedule are estimates and are not guaranteed. The City may increase, decrease, or eliminate an estimated quantity without invalidating the Contract, subject to the written-authorization requirements of Article 7. The unit prices stated in the Bid Schedule constitute complete compensation for the applicable Work and remain firm throughout the Contract Time, unless an adjustment is expressly authorized by a written Change Order. Each unit price includes all labor, materials, equipment, supervision, overhead, profit, taxes applicable to Contractor, insurance, bonds, transportation, disposal, testing, temporary protection, and incidentals necessary to complete the applicable item. Contractor is not entitled to anticipated profit, unabsorbed overhead, loss of business opportunity, or other damages arising solely from the reduction or elimination of an estimated quantity. If a quantity change is so substantial that continued application of the stated unit price would be inequitable, either party may request an equitable adjustment under Article 7, but Contractor shall not suspend or delay the Work while the request is being evaluated. 4.4 Complete Compensation. The Contract Price includes all costs necessary to complete the Work, including labor, materials, equipment, tools, supervision, project management, overhead, profit, freight, taxes applicable to Contractor, permit fees, inspections, testing, bonds, insurance, safety measures, maintenance of traffic, erosion control, temporary facilities, temporary protection, transportation, disposal, cleanup, Project closeout, warranties, and incidental Work, except only costs expressly identified in the Contract Documents as payable separately by the City. Contractor shall not be entitled to additional compensation for: 1. A cost reasonably foreseeable from the Contract Documents, required Site investigation, or nature and location of the Work; 2. Work reasonably inferable as necessary to provide a complete, functional, code-compliant, and warrantable Project; 3. An error, omission, or inconsistency in Contractor’s estimate, takeoff, Bid, or allocation of the Contract Price; 4. Increases in the cost of labor, materials, equipment, fuel, transportation, insurance, or other inputs, except to the extent an adjustment is expressly authorized by the Contract Documents or a written Change Order; or 5. Work performed without the written authorization required by Article 7. 7 4.5 Owner’s Contingency. The City Commission has separately authorized an Owner’s Contingency in the amount of Twenty Thousand One Hundred Ninety-Eight Dollars ($20,198.00). The Owner’s Contingency is not part of the Contract Price, is not included in Contractor’s award, and does not create a right to payment. The Owner’s Contingency may be used only for additional or changed Work authorized in advance by a written Change Order or other written instrument permitted by Article 7. Contractor shall not include the Owner’s Contingency in its Schedule of Values, Applications for Payment, anticipated revenue, or calculation of percentage completion unless and until the applicable amount is added to the Contract Price through authorized written action. Use of any portion of the Owner’s Contingency is subject to available funding and all applicable City approval requirements. Any unused portion remains the City’s property and requires no deductive Change Order. 4.6 No Price Escalation. Except when expressly authorized by the Contract Documents or a written Change Order, Contractor assumes the risk of increases in the cost or availability of labor, materials, equipment, fuel, transportation, subcontractors, insurance, bonds, and other items necessary to complete the Work. Contractor shall take reasonable measures to obtain materials and equipment in a timely manner and mitigate foreseeable price and availability risks. A price increase, market fluctuation, supply- chain condition, or shortage does not, by itself, entitle Contractor to additional compensation. 4.7 Taxes. The City is exempt from Florida sales and use taxes. Contractor is responsible for taxes, assessments, duties, and charges imposed on Contractor, its purchases, its personnel, or its operations. The City may elect to make direct purchases of materials or equipment when lawful and financially advantageous. A direct purchase shall be documented by an equitable deductive Change Order or other written Contract adjustment. A direct purchase does not relieve Contractor of responsibility for: 1. Identifying materials and equipment in sufficient time for procurement; 2. Coordinating specifications, quantities, delivery, storage, and installation; 3. Inspecting delivered materials and promptly reporting deficiencies; 4. Protecting materials and equipment following delivery; 5. Proper installation and integration into the Work; 6. Compliance with the Contract Documents; or 7. Applicable warranties and correction obligations. Contractor shall credit the City for all taxes, markups, overhead, profit, and other costs avoided because of a direct purchase. 8 4.8 Adjustments to Contract Price. The Contract Price may be increased or decreased only in accordance with Article 7 and applicable City approval requirements. An oral instruction, field discussion, meeting minute, email, invoice, payment, or course of dealing does not authorize an adjustment unless it constitutes a written directive expressly permitted by Article 7 and is issued by a person authorized to bind the City. Contractor proceeds at its own risk if it performs additional or changed Work without the required written authorization, except for emergency protective action permitted by Section 7.7. Article 5 Payment 5.1 Schedule of Values. Before submitting its first Application for Payment, Contractor shall submit a detailed Schedule of Values allocating the Contract Price among the principal portions of the Work. The Schedule of Values shall: 1. Be consistent with the Bid Schedule; 2. Separately identify each lump-sum and unit-price item; 3. Identify labor, materials, equipment, mobilization, demobilization, closeout, and other major components of the Work; 4. Allocate sufficient value to Project closeout and Final Completion; 5. Avoid front-loading or disproportionate allocation of costs; and 6. Include supporting information reasonably required by the City to evaluate the proposed allocation. The City’s acceptance of the Schedule of Values is solely for payment administration. Acceptance does not modify the Contract Price, approve an improper allocation, establish the value of defective or incomplete Work, or limit the City’s right to evaluate the actual value of properly completed Work. The Owner’s Contingency shall not be included in the Schedule of Values unless and until an amount is added to the Contract Price through an authorized written Change Order. 5.2 Applications for Payment. Contractor may submit one Application for Payment per month for Work properly completed and materials properly stored during the applicable payment period. Each Application for Payment shall: 1. Be based on the accepted Schedule of Values and applicable Bid Schedule unit prices; 2. Identify the percentage and value of each lump-sum item completed; 3. Identify the actual quantity, applicable unit price, and extended value of each unit-price item completed; 4. Identify materials properly stored at the Project Site or another location approved in writing by the City; 5. Deduct retainage, prior payments, rejected Work, and other amounts properly withheld; 6. Separately identify approved Change Orders and the value of changed Work completed during the payment period; 9 7. Include an updated construction schedule and current progress photographs; 8. Include Contractor’s certification that the Work covered by the Application for Payment was performed in accordance with the Contract Documents; 9. Include partial releases or waivers of claims from Contractor and each subcontractor or supplier whose Work was included in a prior Application for Payment, to the extent permitted by applicable law; 10. Include invoices, delivery tickets, weight tickets, field measurements, testing documentation, payroll information when required, and other records reasonably necessary to substantiate the amount requested; and 11. Include any other certification or documentation required by the Contract Documents or applicable law. An Application for Payment is not complete until Contractor provides all information reasonably required to evaluate the amount requested. 5.3 Submission and Receipt of Payment Requests. The City shall identify in this Agreement or by separate written notice the agent, employee, facility, or office to which Contractor must submit Applications for Payment. If provided separately, the City shall furnish the notice no later than ten (10) days after the contract award or Notice to Proceed, as required by Section 218.735, Florida Statutes. Submission to another City employee or department does not commence the statutory payment period unless the City expressly accepts the submission as properly delivered. A properly submitted Application for Payment shall be date-stamped or otherwise recorded as received in accordance with applicable law. 5.4 Materials Stored but Not Incorporated. The City may, but is not required to, pay for materials or equipment properly stored but not yet incorporated into the Work. As a condition of payment, Contractor shall provide evidence satisfactory to the City that: 1. The materials or equipment are specifically identified for the Project; 2. They comply with the Contract Documents; 3. They are properly stored, protected, insured, and segregated from materials intended for other projects; 4. The storage location has been approved in writing by the City if the materials are stored off-site; 5. Title will pass to the City free and clear of liens, security interests, and encumbrances upon payment; 6. The surety consents to the payment if requested by the City; and 7. Contractor remains responsible for delivery, protection, installation, replacement, and completion. Payment for stored materials does not transfer risk of loss to the City or constitute acceptance of the materials or equipment. 10 5.5 Review, Rejection, and Payment. The City shall review and process complete Applications for Payment in accordance with the Florida Local Government Prompt Payment Act, Sections 218.70 through 218.80, Florida Statutes. If an Application for Payment does not comply with the Contract Documents, the City may reject it in whole or in part by written notice identifying the deficiency and the action necessary to make the request proper. A corrected Application for Payment shall be processed within the period required by applicable law. The City shall timely pay all undisputed amounts. The City may correct mathematical errors, adjust unsupported quantities, and reduce an Application for Payment to reflect the actual value of Work properly completed and accepted. Payment does not: 1. Constitute acceptance of defective, incomplete, or nonconforming Work; 2. Waive a Contract requirement; 3. Approve an unauthorized change; 4. Confirm the accuracy of a quantity or percentage of completion; 5. Transfer risk of loss to the City; or 6. Relieve Contractor or its surety of any obligation. 5.6 Retainage. Subject to Sections 218.735 and 255.078, Florida Statutes, the City may withhold five percent (5%) from each progress payment as retainage. The City may withhold retainage at a lower rate, incrementally reduce the rate, or release all or a portion of retainage when authorized by law and determined appropriate by the City. A reduction or early release of retainage does not constitute acceptance of the Work, waive any Contract requirement, or relieve Contractor or its surety of any obligation. If the City releases retainage attributable to labor, services, or materials furnished by a subcontractor or supplier, Contractor shall timely remit the applicable retainage to that subcontractor or supplier as required by law. The City is not required to release an amount subject to a good-faith written dispute, a claim under Section 255.05, Florida Statutes, or another lawful basis for withholding payment. 5.7 Grounds for Withholding Payment. The City may withhold or reduce payment to the extent reasonably necessary to protect the City from loss arising from: 1. Defective, incomplete, or nonconforming Work; 2. A disputed or unsupported quantity, percentage of completion, unit-price calculation, or other charge; 3. Claims, liens, bond claims, or reasonable evidence that such claims may be asserted; 4. Contractor’s failure to pay subcontractors, suppliers, laborers, or other persons properly entitled to payment; 11 5. Damage to the City, the Project, public property, or the property of another person; 6. Contractor’s failure to maintain required bonds, insurance, licenses, permits, or approvals; 7. Accrued liquidated damages or other amounts due to the City; 8. Reasonable evidence that the remaining Work cannot be completed for the unpaid balance of the Contract Price; 9. Reasonable evidence that Contractor will not complete the Work within the Contract Time; 10. Contractor’s failure to provide required schedules, records, certifications, testing documentation, releases, or closeout materials; 11. Contractor’s failure to comply with a material requirement of the Contract Documents; or 12. A right of setoff available to the City. The City shall not withhold more than is reasonably necessary to protect against the identified loss. When the basis for withholding has been cured or resolved to the City’s reasonable satisfaction, the City shall release the applicable amount in accordance with law. 5.8 Mobilization Payments. Payment for mobilization shall be made in accordance with the Bid Schedule and other Contract Documents. Contractor’s request for payment must reflect the actual mobilization Work completed and be supported by documentation reasonably required by the City. Cumulative payment for mobilization shall not exceed the Fifteen Thousand Dollars ($15,000.00) stated in Contractor’s accepted Bid. Payment of the mobilization item does not constitute acceptance of any other portion of the Work. 5.9 Payment to Subcontractors and Suppliers. Contractor shall pay subcontractors and suppliers within the periods required by Section 218.735(6), Florida Statutes, after receiving payment from the City for their labor, services, or materials. If Contractor disputes an amount claimed by a subcontractor or supplier, Contractor shall provide written notice identifying the disputed amount and the action required to cure the dispute. Contractor shall timely pay all undisputed amounts. Upon request, Contractor shall provide evidence of payment to subcontractors and suppliers. If the City reasonably determines that a subcontractor or supplier has not been paid, the City may take lawful protective measures, including issuance of a joint check. Exercise of such a measure does not create a contractual relationship between the City and the subcontractor or supplier. 5.10 Substantial Completion and Completion List. When Contractor considers the Work substantially complete, Contractor shall notify the City in writing and submit: 1. A proposed list of incomplete or corrective items; 2. The estimated cost to complete each item; 3. Supporting documentation reasonably necessary to evaluate the proposed cost; and 4. A proposed date for completing all remaining Work. The City and Contractor shall inspect the Work and cooperate in developing and reviewing a single list of items required to render the Work complete, satisfactory, and acceptable. The City shall develop and review the list within thirty (30) calendar days after Substantial Completion and shall 12 deliver the list to Contractor no later than five (5) calendar days after it has been developed and reviewed. Failure to include corrective or incomplete Work on the list does not relieve Contractor of its responsibility to complete all Work required by the Contract Documents. Final Completion shall occur no earlier than thirty (30) calendar days after delivery of the completion list. If the City fails to deliver the list within the required period, Contract Time shall be extended to the extent required by Section 218.735(7), Florida Statutes. 5.11 Release of Retainage and Remaining Balance. Within twenty (20) business days after the completion list is created, the City shall pay the remaining Contract balance, including retainage previously withheld, less an amount equal to one hundred fifty percent (150%) of the estimated cost to complete the items on the list and any other amount lawfully withheld. After completing all listed items, Contractor may submit a payment request for the remaining amount. If a good-faith dispute exists concerning whether one or more listed items have been completed, the City may continue to withhold up to one hundred fifty percent (150%) of the estimated cost to complete the disputed items. Warranty obligations, latent defects, corrective items identified after preparation of the completion list, and other obligations that survive payment remain Contractor’s responsibility. Payment of the remaining balance or retainage does not waive those obligations, but payment may not be withheld on a basis prohibited by Section 218.735, Florida Statutes. 5.12 Final Completion and Final Payment. Final Completion occurs when: 1. All Work and completion-list items have been completed and accepted; 2. Defective and nonconforming Work has been corrected; 3. Final inspections, testing, and governmental approvals have been completed; 4. Final cleaning and Site restoration have been completed; 5. Temporary facilities, equipment, waste, and surplus materials have been removed; 6. Contractor has submitted all required closeout documents; and 7. All other conditions for Final Completion stated in the Contract Documents have been satisfied. As a condition of final payment, Contractor shall provide: 1. A final release of claims and Contractor’s final payment affidavit; 2. Final releases or waivers from subcontractors and suppliers, to the extent permitted by law; 3. Consent of surety to final payment; 4. Record drawings and approved submittals; 5. Final inspection, testing, permit, and approval documentation; 6. Product information and maintenance instructions; 7. Manufacturer and Contractor warranties issued or registered in the City’s name; 8. Final cost, quantity, payment, and closeout documentation; 13 9. Keys, access devices, manuals, and other City property, if applicable; and 10. Other closeout materials required by the Contract Documents. Contractor’s failure to provide a required closeout item may cause that item to be included on the completion list and valued at the reasonable cost of obtaining or completing it, subject to applicable law. Contractor’s acceptance of final payment constitutes a waiver of claims against the City arising from the Contract, except claims specifically identified in writing before final payment. Final payment does not waive the City’s rights concerning defective Work, latent defects, warranties, indemnification, fraud, audit findings, public records, or other obligations that survive completion. Article 6 Bonds and Insurance 6.1 Performance and Payment Bond. Within fourteen (14) calendar days after notice of award, and in all events before execution of this Agreement or commencement of the Work, Contractor shall furnish a payment and performance bond in the full amount of the Contract Price. The bond shall: 1. Be executed on the form included in the ITB or another form approved by the City; 2. Name the City as obligee and owner; 3. Identify Contractor as principal; 4. Identify ITB No. 26-019 and the Ocean Park Parking – Phase 1 Project; 5. Be issued by a surety insurer authorized and qualified to transact business in Florida; 6. Comply with Section 255.05, Florida Statutes, and all other applicable requirements; 7. Be conditioned on Contractor’s complete and timely performance of the Contract and prompt payment of persons furnishing labor, services, or materials for the Work; 8. Remain effective through completion, final payment, correction of defective Work, and the applicable warranty period; and 9. Include riders or other evidence reflecting any authorized increase in the Contract Price when required by the bond, surety, or applicable law. The bond does not limit Contractor’s liability or the City’s remedies under the Contract Documents. 6.2 Recording and Delivery of Bond. Before commencing the Work, Contractor shall record the payment and performance bond in the public records of Broward County and provide the City with a certified copy of the recorded bond. The City is not required to make a payment to Contractor until Contractor has provided the certified copy required by this Section. Contractor is not entitled to additional compensation or an extension of Contract Time arising from its failure to timely execute, record, or deliver the bond. 14 6.3 Surety Qualifications. The surety shall satisfy the qualifications stated in the ITB and applicable law. Upon request, Contractor shall provide evidence of the surety’s authorization, financial capacity, power of attorney, and continued qualification. The City may reject a proposed surety that does not satisfy the Contract Documents or applicable law. The City may not require Contractor to obtain the bond from a particular agent or bonding company. If the surety becomes insolvent, unauthorized, disqualified, or otherwise unable to satisfy its obligations, Contractor shall promptly furnish a replacement bond from an acceptable surety at no additional cost to the City. 6.4 Changes and Notice to Surety. Contractor shall provide the surety with copies of material amendments, Change Orders, extensions of Contract Time, and other notices required by the bond or applicable law. Contractor shall obtain a bond rider or written surety consent when required because of an increase in the Contract Price, extension of Contract Time, or material change in the Work. Any required rider or consent shall be provided to the City before Contractor performs the affected changed Work, unless the City authorizes otherwise in writing. Contractor’s failure to notify the surety does not impair the City’s rights against Contractor and does not impair the City’s rights against the surety except to the extent applicable law requires a different result. 6.5 No Impairment of Bond Rights. Contractor shall not agree to a bond endorsement, limitation, exclusion, or condition that conflicts with Section 255.05, Florida Statutes, or materially restricts the City’s rights without the City’s prior written approval. A Change Order, extension, payment, partial occupancy, inspection, acceptance of a portion of the Work, or failure by the City to identify defective Work does not release Contractor or the surety from an obligation under the bond or Contract Documents. 6.6 Insurance Requirements. Before commencing the Work, Contractor shall obtain and maintain all insurance required by the ITB and the other Contract Documents. Required coverage shall remain in effect throughout performance of the Work and for any completed-operations, correction, or warranty period required by the Contract Documents. If the insurance requirements in the Contract Documents conflict, the requirement providing the greater protection to the City controls unless the City approves otherwise in writing. The insurance requirements establish minimum protection and do not: 1. Limit Contractor’s duties, indemnification obligations, or liability; 2. Establish the extent of Contractor’s liability; 3. Waive any immunity or limitation available to the City; or 15 4. Relieve Contractor of responsibility for a loss within a deductible, self-insured retention, exclusion, or amount exceeding a policy limit. Contractor is responsible for all premiums, deductibles, and self-insured retentions associated with the required insurance. 6.7 Compliance with ITB Insurance Requirements. Contractor shall obtain, maintain, and comply with all insurance coverage, limits, endorsements, additional-insured requirements, notice requirements, and other insurance obligations stated in the ITB. The ITB’s insurance requirements are incorporated into this Agreement by reference and constitute material obligations of Contractor. Contractor shall maintain the required insurance throughout performance of the Work and for any completed-operations, correction, or warranty period required by the ITB or other Contract Documents. Contractor shall not commence or continue the Work unless all required insurance remains in effect. Contractor’s compliance with the ITB’s insurance requirements does not limit Contractor’s liability, indemnification obligations, or responsibility for losses within a deductible or self-insured retention, excluded from coverage, or exceeding an available policy limit. 6.8 Evidence of Coverage. Contractor shall provide certificates of insurance and all endorsements required by the ITB before execution of the Agreement or commencement of the Work, whichever occurs first. Certificates of insurance alone do not amend, extend, or alter policy coverage and do not relieve Contractor from providing required endorsements or other evidence of compliance. Upon request, Contractor shall provide certified copies of policies, declarations, endorsements, or other documentation reasonably necessary to verify coverage. The City’s review, approval, or failure to identify a deficiency in Contractor’s insurance does not waive a Contract requirement or relieve Contractor of responsibility for maintaining the required coverage. 6.9 Subcontractor Insurance. Contractor shall require each subcontractor to maintain insurance appropriate to its Work and satisfying the types, limits, and endorsements required by the ITB and other Contract Documents to the extent applicable to that subcontractor’s operations. Contractor shall obtain and retain certificates of insurance and required endorsements from its subcontractors and provide them to the City upon request. Contractor shall not permit a subcontractor to commence or continue Work unless the required insurance remains in effect. Contractor remains fully responsible for the acts and omissions of its subcontractors. The City’s review or approval of subcontractor insurance does not relieve Contractor of responsibility for the subcontractor or its Work. 16 6.10 Lapse or Deficiency in Coverage. Contractor shall not commence or continue Work unless all required bonds and insurance remain in effect. If a required bond or insurance policy expires, lapses, is canceled, becomes materially deficient, or otherwise fails to comply with the Contract Documents, the City may: 1. Suspend the affected Work; 2. Withhold payment; 3. Require Contractor to obtain replacement coverage; 4. Obtain protective coverage and deduct the reasonable cost from amounts due to Contractor, if commercially practicable; 5. Exercise its rights against Contractor or the surety; or 6. Treat the failure as a material default. A suspension resulting from Contractor’s failure to maintain required bonds or insurance does not entitle Contractor to additional compensation or an extension of Contract Time. 6.11 No Waiver or Limitation. Payment of insurance proceeds, acceptance of a bond, or recovery against a surety does not waive another remedy available to the City or reduce Contractor’s responsibility for the Work. Contractor is responsible for losses within deductibles or self-insured retentions, losses excluded from coverage, and losses exceeding available policy or bond limits to the extent Contractor is otherwise responsible under the Contract Documents or applicable law. Because the Contract Price is $201,980, it exceeds the $200,000 ceiling below which a city may elect to waive the statutory payment and performance bond. The bond must equal the Contract Price, must be recorded in Broward County, and a certified copy must be delivered before Work begins or the City makes payment. Article 7 Changes in the Work 7.1 City’s Authority to Order Changes. The City may order additions, deletions, revisions, substitutions, quantity adjustments, or other changes within the general scope of the Contract. A change does not invalidate the Contract or release Contractor or the surety from their obligations. Contractor shall not proceed with changed or additional Work unless authorized by: 1. A written Change Order executed by authorized representatives of the City and Contractor; or 2. A written Construction Change Directive issued by a City representative authorized to bind the City. 17 Except for emergency protective action permitted by Section 7.7, Contractor proceeds at its own risk if it performs changed or additional Work without the written authorization required by this Article. 7.2 Change Orders. A Change Order is a written instrument executed by authorized representatives of the City and Contractor that identifies: 1. The addition, deletion, revision, substitution, quantity adjustment, or other change in the Work; 2. The adjustment, if any, to the Contract Price; 3. The adjustment, if any, to the Contract Time or a completion milestone; 4. The source of funding, when required by City procedures; 5. The effect on the construction schedule and critical path; 6. Any modification to the Contract Documents; and 7. Any other conditions applicable to the changed Work. A Change Order is effective only after all approvals required by the City’s Charter, Code, purchasing procedures, Commission authorization, and other applicable law have been obtained. The City’s authorization of an Owner’s Contingency does not authorize Contractor to perform additional or changed Work and does not eliminate the requirement for an approved written Change Order or Construction Change Directive. 7.3 Contractor Change Proposals. Within seven (7) calendar days after the City’s written request, unless the City allows a different period, Contractor shall submit a complete proposal for a proposed change. The proposal shall identify: 1. The proposed change and its factual and contractual basis; 2. Labor classifications, hours, wage rates, and labor burdens; 3. Materials, quantities, unit prices, actual costs, and supplier quotations; 4. Equipment and applicable rates; 5. Subcontractor and supplier proposals; 6. Taxes, bond costs, and insurance costs attributable to the change; 7. Proposed overhead and profit; 8. Credits, rebates, refunds, discounts, salvage value, and avoided costs; 9. The effect on the accepted construction schedule and critical path; 10. Measures available to avoid or mitigate added cost or delay; and 11. Any requested adjustment to the Contract Price or Contract Time. Contractor shall provide additional supporting documentation reasonably requested by the City. The City’s request for a proposal does not authorize Contractor to proceed with the proposed change. For a price quote relating to a change order requested or issued by the City, the City shall approve or deny the price quote and provide written notice within the period required by Section 18 218.755, Florida Statutes. Nothing in this Article waives or alters the rights or consequences established by that statute. 7.4 Pricing of Changes. Adjustments to the Contract Price shall be determined by one or more of the following methods: 1. Applicable unit prices established in the Bid Schedule or other Contract Documents; 2. A mutually accepted lump sum; 3. Documented time and materials subject to a City-approved not-to-exceed amount; or 4. Actual, reasonable, and necessary cost, together with markups expressly permitted by the Contract Documents. Contractor shall disclose and credit the City for rebates, refunds, discounts, credits, salvage value, avoided costs, and other amounts that reduce the cost of the change. If a change deletes Work, the deductive adjustment shall include the labor, materials, equipment, supervision, overhead, profit, taxes, insurance, bond costs, and other costs avoided because of the deletion. Contractor is not entitled to additional compensation for correcting defective Work, complying with an existing Contract requirement, performing Work reasonably inferable from the Contract Documents, or addressing a condition for which Contractor is responsible. 7.5 Construction Change Directive. If the parties do not agree on the price or time associated with a necessary change, the City may issue a written Construction Change Directive requiring Contractor to proceed with the changed Work. The Construction Change Directive shall describe the change and identify the method by which the adjustment, if any, will be determined. Contractor shall: 1. Proceed diligently with the directed Work; 2. Maintain complete contemporaneous records of labor, materials, equipment, subcontractor costs, quantities, and schedule effects; 3. Segregate costs associated with the directed Work from costs of the original Work; 4. Provide daily records or other documentation requested by the City; and 5. Continue performing all unaffected Work. The City will determine an equitable adjustment in accordance with the Contract Documents. Contractor’s disagreement with the adjustment does not excuse or delay performance. 7.6 Notice of Claims for Additional Compensation or Time. If Contractor believes that an instruction, event, condition, omission, quantity adjustment, or other circumstance entitles it to additional compensation or Contract Time, Contractor shall provide written notice to the City within seven (7) calendar days after Contractor knew or reasonably should have known of the circumstance and before performing the affected additional Work. 19 The notice shall identify: 1. The event or condition giving rise to the claim; 2. The Contract provision supporting the claim; 3. The estimated additional cost; 4. The anticipated effect on the schedule and critical path; 5. The measures being taken to avoid or mitigate cost and delay; and 6. The written direction requested from the City. Within twenty-one (21) calendar days after the initial notice, Contractor shall submit complete supporting documentation unless the City approves additional time in writing. Failure to provide timely notice and documentation waives the claim to the extent the City is prejudiced by the failure. The City’s actual or constructive knowledge of the underlying event does not excuse Contractor from complying with the notice requirements unless the City expressly waives compliance in writing. 7.7 Emergency Work. In an emergency threatening life, safety, the Work, public or private property, utilities, public access, or the environment, Contractor shall take immediate reasonable action to prevent or minimize injury or damage and shall notify the City as soon as practicable. Contractor shall limit emergency action to measures reasonably necessary to address the immediate threat. As soon as practicable, Contractor shall provide written documentation describing: 1. The emergency; 2. The action taken; 3. The labor, materials, and equipment used; 4. The cost incurred; and 5. Any anticipated effect on the Contract Time. Emergency action does not automatically entitle Contractor to additional compensation or Contract Time. Any requested adjustment remains subject to this Article and Article 13. 7.8 Minor Changes. The City may authorize minor changes that: 1. Do not materially alter the scope or character of the Work; 2. Do not affect the Contract Price or Contract Time; and 3. Are consistent with the intent of the Contract Documents. Contractor shall promptly perform an authorized minor change. If Contractor reasonably believes that a requested minor change will affect the Contract Price or Contract Time, Contractor shall provide written notice before proceeding. Failure to provide notice before proceeding waives the requested adjustment to the extent the City is prejudiced. 20 7.9 Unauthorized Work. Work performed beyond the requirements of the Contract Documents without the written authorization required by this Article is performed at Contractor’s risk. The City is not obligated to pay for unauthorized Work and may require Contractor to remove or correct it at Contractor’s expense. The City’s inspection, observation, knowledge, use, or payment of another portion of the Work does not constitute authorization or acceptance of unauthorized Work. 7.10 Continuing Performance. Pending resolution of a change, pricing issue, or claim, Contractor shall continue performing the Work diligently and in accordance with the City’s written direction. The City shall continue paying undisputed amounts properly due under the Contract. Continued performance does not waive either party’s properly preserved claim, defense, or contractual right. 7.11 No Modification by Unauthorized Communications. A field discussion, oral instruction, meeting minute, email, text message, request for information response, submittal review, payment, invoice, schedule review, or communication from unauthorized personnel does not modify the Contract Price, Contract Time, or scope of the Work. Contractor is responsible for confirming that any person directing a change has authority to bind the City and that the change has received all approvals required by this Article. Article 8 Contractor Responsibilities 8.1 Supervision and Personnel. Contractor is solely responsible for construction means, methods, techniques, sequences, procedures, coordination, and supervision. Contractor shall provide sufficient qualified, experienced, and properly licensed personnel to perform the Work safely and within the Contract Time. Contractor shall employ a competent superintendent who is authorized to act for Contractor and shall remain in responsible charge whenever Work is being performed. Contractor shall promptly remove any person the City reasonably determines is unsafe, unqualified, disruptive, or otherwise detrimental to the Project or public. Removal does not entitle Contractor to additional compensation or Contract Time. 8.2 Permits and Legal Compliance. Contractor shall obtain and pay for all permits, licenses, inspections, approvals, and governmental fees required to complete the Work unless the Contract Documents expressly provide otherwise. Contractor shall comply with applicable federal, state, county, and City laws, codes, ordinances, regulations, permit conditions, accessibility requirements, environmental requirements, and industry standards. Contractor shall promptly notify the City of an apparent conflict between a legal requirement and the Contract Documents before proceeding with the affected Work. 21 8.3 Submittals and Field Verification. Contractor shall timely prepare, review, coordinate, and submit all shop drawings, product data, samples, mix designs, schedules, certifications, and other submittals required by the Contract Documents. Contractor shall verify dimensions, quantities, elevations, grades, utilities, drainage patterns, irrigation components, access conditions, and other relevant field conditions before beginning affected Work or ordering materials. Contractor shall promptly notify the City in writing of a concealed condition or material discrepancy before disturbing the condition. The City’s or Engineer’s review of a submittal does not relieve Contractor of responsibility for errors, omissions, dimensions, quantities, code compliance, field verification, coordination, means and methods, or performance. 8.4 Hazardous Materials. Contractor is not responsible for the existence of preexisting hazardous materials that were not introduced by Contractor. Upon encountering a suspected hazardous material, Contractor shall immediately stop the affected Work, secure the area, avoid disturbing or spreading the material, and notify the City. Contractor is responsible for any hazardous material introduced by Contractor and for any release, disturbance, spread, or worsening of a hazardous condition to the extent caused by Contractor’s negligence, willful misconduct, violation of applicable law, or failure to comply with required notice, stop-work, containment, or safety procedures. Contractor is not responsible for an unavoidable incidental disturbance resulting solely from the proper performance of the Work when Contractor could not reasonably have known of the hazardous condition and promptly complied with this Section. Any adjustment to the Contract Price or Contract Time is subject to Articles 7 and 13. 8.5 Protection and Restoration. Contractor shall protect persons, the Work, Ocean Park, existing pavement, sidewalks, curbs, drainage facilities, signs, landscaping, irrigation, utilities, adjoining property, and other existing improvements from damage arising from the Work. Contractor shall promptly repair or replace damage caused by Contractor, its subcontractors, suppliers, or anyone for whom Contractor is responsible. Restoration shall be completed to the City’s reasonable satisfaction and at no additional cost to the City. 8.6 Utilities and Existing Systems. Before performing Work that may affect an existing utility, drainage facility, irrigation system, underground improvement, or other existing system, Contractor shall verify its location and condition and coordinate the affected Work with the City and utility owner. Contractor shall not interrupt utilities, public access, park operations, or City services without the City’s prior written authorization, except when immediate action is necessary to protect life or property. Contractor shall immediately report damage to an existing utility or system and is responsible for repair costs to the extent caused by Contractor or anyone for whom Contractor is responsible. 22 8.7 Maintenance of Traffic, Public Access, and Environmental Controls. Contractor shall maintain safe vehicular, pedestrian, emergency, and ADA-accessible routes as required by the Contract Documents and applicable law. Contractor shall implement and maintain required traffic-control, erosion-control, sediment- control, stormwater, dust-control, and spill-prevention measures. Contractor shall not close a roadway, parking area, sidewalk, park entrance, or other public-access point without the City’s prior written authorization, except in an emergency. 8.8 Cleaning and Waste Removal. Contractor shall keep the Project Site and surrounding areas reasonably clean, orderly, and free from waste, debris, mud, dust, and unsafe conditions. Contractor shall regularly remove waste and lawfully dispose of it off-site. If Contractor fails to maintain the Site after notice, the City may perform or procure the required cleanup and deduct the reasonable cost from amounts due to Contractor. 8.9 Title and Risk of Loss. Contractor warrants that the City will receive good title, free of liens, security interests, and encumbrances, to all materials and equipment incorporated into the Work or for which the City has paid. Risk of loss, theft, destruction, or damage remains with Contractor until Final Completion and written acceptance by the City, regardless of payment or transfer of title. Risk of loss for a separately identifiable portion of the Work shifts to the City only when the City accepts that portion in writing and takes exclusive possession and control of it. 8.10 Project Records. Contractor shall maintain current Project records, including the Contract Documents, approved submittals, permits, inspection and testing records, daily reports, schedules, quantity documentation, progress photographs, change documentation, and record drawings. Contractor shall make the records available to the City and its authorized representatives upon request. Article 9 Project Site, Public Access, and Safety 9.1 Active Public Site. Contractor acknowledges that Ocean Park and surrounding public areas may remain open and in use during the Work unless the City directs otherwise in writing. Contractor shall plan, sequence, and perform the Work to minimize interference with City operations, park activities, neighboring properties, traffic, and public access. Contractor shall coordinate activities affecting entrances, exits, parking, sidewalks, utilities, emergency access, or recreational use with the City sufficiently in advance to permit reasonable operational planning. 23 9.2 Site Control and Public Protection. Contractor shall secure and control its work areas and protect City personnel, park users, pedestrians, motorists, emergency responders, and the public from hazards arising from the Work. Contractor shall provide and maintain appropriate fencing, barriers, warning signs, lighting, channelizing devices, temporary routes, and other protective measures required by the Contract Documents or reasonably necessary for public safety. Contractor shall not leave an excavation, uneven surface, construction material, equipment, or other hazardous condition accessible to the public when the Site is unattended. 9.3 Access and Closures. Contractor shall maintain required fire lanes, emergency access, pedestrian routes, vehicular access, and ADA-accessible routes throughout the Work. A temporary closure or restriction may occur only when reasonably necessary for the Work and approved in advance by the City, except in an emergency. Contractor shall: 1. Provide reasonable advance notice; 2. Install appropriate barriers, signs, and alternative routes; 3. Coordinate the closure with affected City operations; 4. Comply with applicable accessibility and life-safety requirements; and 5. Restore access as soon as reasonably practicable. The City’s approval of a closure does not entitle Contractor to additional compensation or Contract Time unless expressly stated in a written Change Order. 9.4 Safety Responsibilities. Contractor shall initiate, maintain, and supervise all safety precautions and programs associated with the Work. Contractor shall comply with: 1. The Occupational Safety and Health Act and applicable OSHA regulations; 2. Applicable Florida workplace-safety and workers’ compensation requirements; 3. Applicable traffic-control, fire, electrical, building, and life-safety requirements; 4. The safety requirements of the Contract Documents; and 5. Reasonable Site-specific safety requirements communicated by the City that do not conflict with applicable law or transfer Contractor’s safety responsibility to the City. Contractor shall designate a qualified person responsible for Project safety and shall conduct appropriate safety meetings, inspections, and training. The City’s observation of the Work, review of a safety plan, identification of an unsafe condition, or failure to identify an unsafe condition does not relieve Contractor of its safety obligations. 9.5 Imminent Danger and Unsafe Conditions. Contractor shall immediately stop affected Work when Contractor knows or reasonably should know that continued performance presents an imminent danger to persons or property. 24 Contractor shall promptly: 1. Secure the affected area; 2. Notify the City; 3. Take reasonable corrective and protective measures; and 4. Resume the affected Work only after the dangerous condition has been corrected. The City may direct Contractor to suspend affected Work when the City reasonably determines that an unsafe condition exists. A safety suspension caused by Contractor or anyone for whom Contractor is responsible does not entitle Contractor to additional compensation or Contract Time. 9.6 Work Hours. Unless the ITB, applicable law, or the City’s written authorization provides otherwise, Work may be performed Monday through Saturday between 7:00 a.m. and 5:00 p.m. Contractor shall coordinate particularly noisy, disruptive, or access-restricting activities with the City in advance. The City may reasonably restrict Work hours or sequencing to protect public safety, maintain access, or reduce material disruption. Approval of work outside the stated hours does not entitle Contractor to additional compensation unless expressly authorized by written Change Order. 9.7 Incident Reporting. Contractor shall immediately report any serious injury, utility interruption, fire, flooding, property damage, environmental release, public-safety event, or other significant incident arising from the Work. Contractor shall provide a written incident report within twenty-four (24) hours, unless the City approves another reasonable period. The report shall identify: 1. The date, time, and location of the incident; 2. The known circumstances and apparent cause; 3. Persons or property affected; 4. Immediate protective or corrective measures taken; and 5. Measures proposed to prevent recurrence. Reporting an incident does not constitute an admission of liability. Article 10 Subcontractors and Suppliers 10.1 Contractor’s Responsibility. Contractor is fully responsible for the acts, omissions, performance, safety, conduct, and payment of its subcontractors, suppliers, and all persons or entities directly or indirectly employed or utilized by them. Subcontracting any portion of the Work does not relieve Contractor of an obligation under the Contract Documents. The City’s review, approval, or failure to object to a subcontractor or supplier 25 does not create a contractual relationship with that entity or reduce Contractor’s responsibility for its performance. 10.2 Identification and Substitution. Contractor shall identify its major subcontractors and suppliers in its Bid or after award as required by the ITB. Contractor shall not substitute a listed subcontractor whose qualifications were material to the award without the City’s prior written approval. The City will not unreasonably withhold approval of a qualified proposed substitute. A proposed substitution shall not: 1. Reduce the quality or scope of the Work; 2. Delay completion; 3. Increase the Contract Price; 4. Impair a required warranty, bond, or insurance obligation; or 5. Violate the ITB, procurement requirements, or applicable law. Unless otherwise authorized by written Change Order, Contractor is responsible for costs and delays arising from a substitution requested by Contractor. 10.3 Objection to Subcontractor. The City may reasonably object to a proposed or existing subcontractor or supplier based on documented concerns regarding qualifications, licensing, safety, integrity, financial responsibility, performance, insurance, debarment, or compliance with the Contract Documents. If the City objects before the applicable subcontract is executed, Contractor shall propose a qualified replacement. If the City objects after execution for a reason Contractor knew or reasonably should have known, Contractor is not entitled to an adjustment. If the objection is based solely on information not reasonably available to Contractor and is not attributable to Contractor, any requested adjustment to the Contract Price or Contract Time is subject to Articles 7 and 13. 10.4 Subcontract Requirements. Contractor shall incorporate applicable provisions of the Contract Documents into each subcontract and purchase order, including requirements concerning: 1. Scope, quality, schedule, and warranties; 2. Licensing and legal compliance; 3. Insurance and indemnification; 4. Safety and public-access protection; 5. Public records and records retention; 6. Audit and access to records; 7. E-Verify and employment eligibility; 8. Prompt payment; and 9. Correction of defective Work. 26 Contractor shall require subcontractors to impose applicable requirements on lower-tier subcontractors and suppliers. 10.5 Payment to Subcontractors and Suppliers. Contractor shall pay subcontractors and suppliers within the periods required by Section 218.735(6), Florida Statutes, after receiving payment from the City for their labor, services, or materials. Contractor may dispute an amount in good faith if it provides the affected subcontractor or supplier written notice identifying: 1. The amount disputed; 2. The basis for the dispute; and 3. The action required to cure the dispute. Contractor shall timely pay all undisputed amounts. Upon request, Contractor shall provide the City reasonable evidence of payment. 10.6 Subcontractor and Supplier Claims. A subcontractor or supplier has no contractual right to payment directly from the City. Contractor shall defend and resolve claims arising from its failure to pay subcontractors or suppliers and shall keep the Project and City property free from claims arising through Contractor. Nothing in this Section limits rights a claimant may have under Contractor’s payment bond or Section 255.05, Florida Statutes. If the City reasonably determines that a subcontractor or supplier has not been paid, the City may take a lawful protective measure, including withholding an appropriate amount or issuing a joint check when permitted. Exercise of such a measure does not create a contractual relationship between the City and the subcontractor or supplier. Article 11 Inspection, Acceptance, and Correction of Work 11.1 Access to the Work. Contractor shall provide the City, Engineer, inspectors, testing agencies, and other authorized governmental representatives reasonable access to the Work, Project Site, materials, equipment, records, and relevant off-site fabrication or storage locations. Contractor shall provide safe access and reasonable assistance for inspections, testing, observation, and verification of quantities. The City’s exercise of access rights does not transfer responsibility for construction means, methods, safety, or performance to the City. 11.2 Inspections and Testing. Contractor shall arrange and pay for inspections and testing assigned to Contractor by the Contract Documents or applicable law. The City may perform or obtain additional inspections or testing. 27 If additional inspection or testing reveals that the Work complies with the Contract Documents, the City shall bear the reasonable cost unless the Contract Documents provide otherwise. If additional inspection or testing reveals defective or nonconforming Work, Contractor shall pay the reasonable cost of the inspection or testing and all related correction and retesting. Contractor shall not be entitled to additional compensation or Contract Time arising from inspection, testing, correction, or retesting of defective or nonconforming Work. 11.3 Work Covered Before Inspection. Contractor shall not cover or conceal Work that the Contract Documents, permits, or applicable law require to be inspected or tested before covering. If Contractor covers Work before a required inspection or test, Contractor shall, upon the City’s request: 1. Uncover the affected Work; 2. Provide access for inspection or testing; 3. Correct defective or nonconforming Work; 4. Restore the affected area; and 5. Bear all associated costs and delays. If the City requests examination of covered Work that was not required to be inspected before covering, Contractor shall uncover and restore the Work. The City shall authorize an equitable adjustment under Article 7 if the Work is found to comply with the Contract Documents. If the Work is defective or nonconforming, Contractor shall bear the cost without adjustment. 11.4 Rejection and Correction of Work. The City may reject Work that is defective, incomplete, damaged, improperly installed, or otherwise inconsistent with the Contract Documents. Contractor shall promptly remove, correct, replace, or reperform rejected Work at its expense and shall pay the reasonable cost of related inspection, testing, professional services, removal, restoration, and repair. The City shall provide reasonable notice describing the basis for rejection, except when immediate action is reasonably necessary to protect persons, property, public access, the environment, or the Work. 11.5 Contractor’s Failure to Correct. If Contractor fails to begin and diligently continue correction within the period stated in the City’s notice, the City may: 1. Correct or remove the defective Work; 2. Engage another contractor to perform the correction; 3. Store or dispose of removed materials; 4. Withhold payment; 5. Deduct the reasonable resulting cost from amounts due or to become due to Contractor; or 6. Exercise other remedies available under the Contract Documents. 28 The City shall provide advance notice when reasonably practicable. Immediate notice is sufficient in an emergency or when prompt action is reasonably necessary to protect persons, property, public access, or the Work. 11.6 Acceptance of Nonconforming Work. The City may, but is not required to, accept Work that does not fully conform to the Contract Documents. If the City accepts nonconforming Work, Contractor shall provide an equitable credit reflecting the diminished value, reasonable correction cost, reduced useful life, warranty effect, professional costs, and other reasonably anticipated consequences. Acceptance must be stated in a written instrument executed by a person authorized to bind the City. Payment, inspection, use, occupancy, or failure to reject Work does not constitute acceptance of nonconforming Work. 11.7 Substantial Completion. Substantial Completion occurs when the Work is sufficiently complete in accordance with the Contract Documents so that the City can safely use the completed parking improvements for their intended purpose and when: 1. The parking, paving, drainage, irrigation, landscaping, signage, and related improvements are operational and functional; 2. Required inspections and approvals necessary for use have been obtained; 3. Maintenance-of-traffic and public-access restrictions have been removed except as reasonably necessary to complete minor remaining Work; 4. Required testing necessary for use has been completed; 5. The Project Site is safe, clean, and suitable for public use; and 6. Only minor incomplete or corrective items remain. When Contractor considers the Work substantially complete, Contractor shall notify the City in writing and provide its proposed completion list and estimated cost to complete each item as required by Section 5.10. The City shall inspect the Work and determine whether Substantial Completion has been achieved. The City’s determination shall be documented in writing and shall identify the date of Substantial Completion and any conditions applicable to the City’s use of the Work. 11.8 Final Completion. Final Completion occurs when: 1. All Work and completion-list items have been completed and accepted; 2. Defective and nonconforming Work has been corrected; 3. Final inspections, testing, and governmental approvals have been completed; 4. Final cleaning, restoration, and demobilization have been completed; 5. Temporary facilities, equipment, waste, and surplus materials have been removed; 6. Record drawings, warranties, releases, affidavits, and other required closeout documents have been delivered; and 29 7. Contractor has satisfied all other requirements for Final Completion stated in the Contract Documents. The City shall determine and document the date of Final Completion. Final Completion does not waive warranty obligations, latent defects, indemnification duties, public-records obligations, or other requirements that survive completion. 11.9 Partial Use or Occupancy. The City may use or occupy a completed or partially completed portion of the Work before Final Completion if the City and Contractor reasonably agree on the condition of that portion and the responsibilities for security, maintenance, utilities, insurance, and correction. The City’s use or occupancy does not constitute acceptance of defective or nonconforming Work, establish Substantial Completion of the entire Project, or relieve Contractor of an obligation under the Contract Documents. 11.10 No Waiver by Inspection or Payment. Inspection, testing, observation, approval of a submittal, certification of payment, payment, use, or failure to discover defective Work does not relieve Contractor of responsibility for compliance with the Contract Documents. The City’s rights concerning defective Work, warranties, indemnification, and obligations that survive completion are not waived by final payment or acceptance. Article 12 Warranties 12.1 General Warranty. Contractor warrants that: 1. Materials and equipment furnished under the Contract are new and of good quality unless the Contract Documents expressly permit otherwise; 2. The Work is free from defects in materials and workmanship; 3. The Work conforms to the Contract Documents; 4. Products and systems are properly installed and suitable for their intended purposes; and 5. The completed Work is functional, code-compliant, suitable for its intended use, and warrantable. These warranties are in addition to all other warranties and remedies available under the Contract Documents or applicable law. 12.2 Correction Period. Unless a longer period is required by the Contract Documents or a manufacturer’s warranty, Contractor shall correct Work found to be defective or nonconforming within one (1) year after Substantial Completion. If a separately completed portion of the Work is accepted in writing and placed into service before overall Substantial Completion, the correction period for that portion begins on the date stated in the City’s written acceptance. 30 Corrected or replaced Work shall be warranted for the longer of: 1. The unexpired portion of the original correction period; or 2. One (1) year after the correction or replacement is completed and accepted by the City. This Section does not extend a manufacturer’s warranty beyond its stated term unless the manufacturer agrees otherwise. 12.3 Manufacturer and Supplier Warranties. Contractor shall obtain and deliver all manufacturer and supplier warranties required by the technical specifications or other Contract Documents. All warranties shall be issued or registered in the City’s name, when available, and for the City’s benefit. Contractor shall satisfy all inspection, documentation, payment, registration, and installation requirements necessary to obtain the required warranties. Contractor shall assign or otherwise transfer to the City all manufacturer and supplier warranties applicable to the Work. If a warranty cannot legally be assigned, Contractor shall enforce it for the City’s benefit. Manufacturer and supplier warranties do not replace, reduce, or limit Contractor’s obligations under the Contract Documents. 12.4 Warranty Documents. Before Final Completion, Contractor shall deliver complete warranty documents identifying: 1. The warranted products, materials, and systems; 2. The commencement and expiration dates; 3. The scope of coverage; 4. Procedures and contact information for requesting service; 5. Required maintenance, if any; and 6. Applicable exclusions or limitations. Contractor shall not accept a warranty exclusion or limitation inconsistent with the Contract Documents without the City’s prior written approval. Delivery or acceptance of a warranty containing an unauthorized exclusion or limitation does not modify the Contract or relieve Contractor of its obligations. 12.5 Notice and Correction. Upon receiving notice of defective or nonconforming Work, Contractor shall promptly investigate and correct the condition. Contractor shall: 1. Respond immediately to an emergency involving life safety, active flooding, utility failure, traffic danger, or risk of material property damage; 31 2. Begin correction of a nonemergency condition within two (2) business days after notice, unless the City approves a different reasonable period; and 3. Diligently continue correction until completed. The parties may agree to a different response period when reasonably necessary because of weather, material availability, manufacturer participation, or the nature of the correction, provided Contractor implements appropriate temporary protective measures. 12.6 City Correction of Warranty Work. If Contractor fails to timely respond or diligently correct a covered condition, the City may perform or procure the correction and recover its reasonable costs from Contractor. The City may act without advance notice when immediate action is reasonably necessary to protect persons, maintain safe public access, prevent flooding, avoid material property damage, or maintain essential City operations. The City shall provide Contractor notice as soon as reasonably practicable. Corrective work performed by the City or another contractor does not void Contractor’s warranty unless Contractor demonstrates that the third-party work caused the condition for which warranty coverage is sought. Contractor’s responsibility shall be reduced only to the extent the third-party work caused or increased the claimed defect or damage. 12.7 Warranty Exclusions. Contractor’s warranty obligations do not apply to damage or defects to the extent caused by: 1. Abuse or misuse occurring after the City takes possession of the Work; 2. Alterations or modifications not performed by Contractor or persons for whom Contractor is responsible; 3. Improper or insufficient maintenance by the City after Contractor has provided all required maintenance instructions; 4. Improper operation by the City after Contractor has provided all required operating instructions; or 5. Normal wear and tear under ordinary use. An exclusion applies only to the extent the identified condition caused or contributed to the claimed damage or defect. Contractor remains responsible to the extent defective Work, failure to provide required instructions, or another breach of the Contract Documents caused or contributed to the condition. 12.8 Survival. Warranty and correction obligations survive inspection, acceptance, use, payment, Final Completion, and termination of the Contract. Expiration of the correction period does not eliminate liability for latent defects, fraud, indemnified claims, or a longer warranty or remedy available under the Contract Documents or applicable law. 32 Article 13 Delays, Extensions of Time, and Liquidated Damages 13.1 Time Is of the Essence. Time is of the essence in Contractor’s performance of the Work. Contractor shall plan, staff, coordinate, and prosecute the Work diligently to achieve Substantial Completion and Final Completion within the Contract Time. 13.2 Contractor-Caused Delay. Contractor is responsible for delay caused by: • Contractor or anyone for whom Contractor is responsible; • Failure to provide sufficient labor, supervision, materials, or equipment; • Defective or nonconforming Work; • Failure to obtain or timely pursue permits, approvals, submittals, or inspections assigned to Contractor; • Failure of a subcontractor or supplier to perform, except to the extent the underlying event independently qualifies as an excusable delay; • Failure to coordinate the Work; • Failure to maintain required bonds, insurance, licenses, or approvals; • Failure to comply with applicable law or the Contract Documents; or • Another condition within Contractor’s reasonable control. A Contractor-caused delay does not entitle Contractor to additional compensation or Contract Time. 13.3 Excusable Delay. Contractor may receive an extension of Contract Time to the extent that Contractor demonstrates that: • The delaying event was beyond Contractor’s reasonable control; • Contractor did not cause or materially contribute to the event; • The event could not reasonably have been anticipated, avoided, or mitigated; • The event delayed an activity on the then-current critical path; • Contractor provided the notices and documentation required by the Contract Documents; and • Contractor diligently attempted to mitigate the delay and continued unaffected Work. An excusable delay may include an act or omission of the City, a City-directed change, an unusually severe weather event, a declared emergency, a governmental action not caused by Contractor, or another unavoidable event satisfying the requirements above. 13.4 Weather Delay. The Contract Time includes weather conditions reasonably anticipated for South Florida during the scheduled period of construction. 33 Contractor may receive a time extension for unusually severe weather only if Contractor establishes through contemporaneous Project records and reliable weather data that: • The conditions were materially more severe or prolonged than reasonably anticipated; • The conditions prevented performance of critical-path Work despite reasonable protective and mitigation measures; and • Contractor could not reasonably resequence the Work or perform other critical activities. Weather-sensitive requirements for paving, concrete, landscaping, or other exterior Work do not, by themselves, establish entitlement to an extension. 13.5 Material and Labor Availability. Ordinary labor shortages, price increases, market conditions, transportation delays, and material procurement difficulties are Contractor’s responsibility. Contractor may request a time extension for an extraordinary industry-wide shortage or disruption only if it was not reasonably foreseeable when Contractor submitted its Bid, was beyond the control of Contractor and its suppliers, could not reasonably have been avoided through timely procurement or an approved substitute, and caused a documented critical-path delay. No price adjustment is due solely because labor, material, transportation, or equipment costs increased after submission of the Bid. 13.6 Notice of Delay. Contractor shall provide the City written notice within seven (7) calendar days after Contractor first knew or reasonably should have known of an event that may delay the Work. The notice shall identify: • The delaying event and its cause; • The affected activities; • The anticipated effect on the critical path; • The estimated duration; • Measures being taken to avoid or mitigate the delay; and • Any requested adjustment to the Contract Time or Contract Price. Contractor shall provide updated information as the effects of the event become known and submit complete supporting documentation within twenty-one (21) calendar days after the initial notice, unless the City approves additional time. Failure to provide timely notice and documentation waives the request to the extent the City is prejudiced by the failure. 13.7 Concurrent Delay. If an excusable delay occurs concurrently with a delay caused by Contractor, Contractor is entitled to an extension of Contract Time only to the extent Contractor establishes that the excusable delay independently affected the critical path. 34 Concurrent delay is not compensable. The parties shall reasonably apportion nonconcurrent delay when the effects can be reliably separated. 13.8 Extensions of Contract Time. An extension of Contract Time is effective only when authorized by written Change Order. The City’s review of a schedule, acknowledgment of a delay, permission to continue working after a completion deadline, or failure to assess liquidated damages immediately does not constitute an extension or waiver. Contractor shall continue performing unaffected Work while a request for extension is under review. 13.9 No Damages for Delay. Except as expressly provided in a written Change Order or to the extent this limitation is unenforceable under Florida law, an extension of Contract Time is Contractor’s sole remedy for delay, disruption, interference, acceleration, resequencing, or suspension. This limitation does not bar recovery of documented, reasonable, and direct additional costs to the extent caused solely by the City’s fraud, bad faith, active interference, knowing concealment of a material condition, abandonment of the Contract, or another basis for which enforcement of a no- damages-for-delay provision is prohibited by Florida law. Contractor is not entitled to consequential damages, lost profits, loss of business opportunity, financing costs, or damages arising from Contractor-caused or concurrent delay. Any compensable adjustment remains subject to the notice, documentation, mitigation, and Change Order requirements of the Contract Documents. 13.10 Liquidated Damages. The parties acknowledge that the City will incur administrative costs, professional fees, operational disruption, loss of use, inconvenience, and other damages if Contractor fails to complete the Work within the Contract Time. Because those damages would be difficult to determine precisely, the parties agree that the amounts stated below are reasonable estimates of the City’s anticipated damages and are not penalties. If Contractor fails to achieve Substantial Completion within the required Contract Time, Contractor shall owe the City liquidated damages of Five Hundred Dollars ($500.00) for each calendar day beginning on the required Substantial Completion date and continuing through the date Substantial Completion is achieved. If Contractor fails to achieve Final Completion within the required Contract Time, Contractor shall owe the City liquidated damages of Five Hundred Dollars ($500.00) for each calendar day beginning on the required Final Completion date and continuing through the date Final Completion is achieved. Liquidated damages for failure to achieve Substantial Completion and Final Completion shall not overlap for the same calendar day. Contract Time shall be extended when required by Section 218.735(7), Florida Statutes, because of late delivery of the completion list, and liquidated damages shall not be assessed for a period attributable to a required statutory extension. 35 13.11 Recovery of Liquidated Damages. The City may deduct accrued liquidated damages from amounts due or to become due to Contractor or may recover them from Contractor and the surety. Liquidated damages are the City’s agreed remedy for damages arising solely from late completion. They do not limit the City’s right to recover damages arising from separate breaches, including defective Work, property damage, flooding or water damage, indemnified claims, fraud, abandonment, or increased completion costs following termination. The City shall not receive a double recovery for the same damage. Article 14 Indemnification 14.1 Statutory Construction Indemnification. To the fullest extent permitted by Section 725.06(2), Florida Statutes, Contractor shall indemnify and hold harmless the City and its officers and employees from liabilities, damages, losses, and costs, including reasonable attorneys’ fees, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of Contractor or persons employed or utilized by Contractor in the performance of the Contract. This indemnification is limited to the scope permitted for a public-agency construction contract under Section 725.06, Florida Statutes. It does not require Contractor to indemnify the City for the City’s own negligence, gross negligence, willful misconduct, or statutory violations except to the extent permitted by applicable law. 14.2 Persons Employed or Utilized by Contractor. For purposes of this Article, persons employed or utilized by Contractor include Contractor’s employees, subcontractors, sub- subcontractors, suppliers, materialmen, consultants, agents, and other persons or entities for whom Contractor is legally responsible. 14.3 Defense Costs and Mixed Claims. Contractor’s obligation includes reasonable attorneys’ fees and litigation costs recoverable under Section 725.06(2), Florida Statutes, to the extent the claim, liability, damage, or loss was caused by conduct for which Contractor is responsible under Section 14.1. If a claim alleges conduct attributable both to Contractor and to the City, the City may control its own defense. Contractor is responsible for defense costs only to the extent attributable to the negligence, recklessness, or intentional wrongful misconduct of Contractor or persons employed or utilized by Contractor. Nothing in this Article creates an independent duty to defend the City beyond the indemnification permitted by Section 725.06, Florida Statutes. 14.4 Notice and Cooperation. The City shall provide Contractor reasonable notice of a claim for which indemnification may be sought, except that delayed notice relieves Contractor of its obligations only to the extent Contractor is materially prejudiced by the delay. 36 The parties shall reasonably cooperate in investigating and responding to the claim. Contractor shall not settle a claim in a manner that admits wrongdoing by the City, imposes an obligation on the City, or fails to provide the City a complete release without the City’s prior written consent. The City shall not unreasonably withhold consent to a settlement that fully protects the City and requires no payment or admission by the City. 14.5 Liens and Payment Claims. Contractor shall indemnify and hold harmless the City from liens, bond claims, and payment demands arising from Contractor’s failure to pay persons or entities furnishing labor, services, materials, or equipment for the Work. This Section does not require Contractor to indemnify the City for the City’s failure to pay an undisputed amount properly due to Contractor under the Contract Documents. 14.6 Intellectual Property. Contractor shall indemnify and hold harmless the City from claims that a product, process, material, equipment item, or construction method selected or furnished by Contractor infringes a patent, copyright, trademark, or other intellectual-property right. Contractor is not responsible for infringement arising solely from a proprietary design specified by the City when Contractor neither knew nor reasonably should have known of the infringement. Contractor shall promptly notify the City if it becomes aware of a potential infringement involving a City-specified design. 14.7 No City Indemnification. Nothing in the Contract Documents requires the City to indemnify, defend, or hold harmless Contractor or another person or entity. 14.8 Sovereign Immunity. The City retains all sovereign-immunity, liability, and personal- liability protections and limitations stated in Article 21, including those arising under Section 768.28, Florida Statutes. 14.9 Survival. Contractor’s indemnification obligations survive completion, final payment, acceptance, and termination of the Contract. Article 15 Default and Termination 15.1 Contractor Default. Contractor is in default if Contractor: • Fails to commence or prosecute the Work diligently; • Fails to provide sufficient qualified labor, supervision, materials, or equipment; • Fails to achieve required progress or completion; • Performs defective or nonconforming Work and fails to correct it; • Fails to pay subcontractors, suppliers, or workers; • Abandons the Work; • Fails to maintain required licenses, permits, bonds, or insurance; • Violates a material safety, legal, or Contract requirement; • Makes a material misrepresentation concerning the Contract or Work; 37 • Becomes insolvent, makes an assignment for the benefit of creditors, or becomes subject to a bankruptcy or receivership proceeding that materially impairs performance; • Fails to provide required records, schedules, certifications, or closeout documentation; or • Otherwise materially breaches the Contract Documents. 15.2 Notice and Opportunity to Cure. Except as provided in Section 15.3, the City shall provide written notice describing the default and allow Contractor five (5) calendar days after receipt to cure the default or, if the default cannot reasonably be fully cured within five days, to: • Begin the cure within the five-day period; • Submit a written corrective-action plan acceptable to the City; and • Diligently continue the cure to completion within a reasonable period approved by the City. The City will not unreasonably reject a corrective-action plan that adequately protects the City, maintains Project progress, and provides a reliable cure date. 15.3 Immediate Protective Action. The City may take immediate protective action, suspend affected Work, or terminate Contractor’s right to proceed without allowing an additional cure period when: • Contractor abandons the Work; • A condition presents an imminent threat to persons, the Project Site, the Work, or other property; • Contractor allows required insurance or bonds to lapse; • Contractor engages in fraud, criminal conduct, or an intentional material misrepresentation; • Contractor repeatedly commits substantially similar defaults after prior notice; • Contractor’s default is not reasonably capable of cure; or • Immediate action is reasonably necessary to preserve available funding or comply with a governmental directive. When practicable, the City shall provide Contractor notice before acting. Otherwise, notice shall be provided as soon as reasonably practicable. 15.4 City Remedies. If Contractor fails to cure a default as required, the City may, without waiving other rights: • Withhold payment; • Supplement Contractor’s workforce, supervision, materials, or equipment; • Correct defective or nonconforming Work; • Take possession of materials and equipment purchased for incorporation into the Work and paid for by the City; • Require assignment of subcontracts that are assignable and accepted by the City; • Exclude Contractor from all or part of the Project Site; • Terminate Contractor’s right to proceed with all or part of the Work; • Complete the Work by means the City considers appropriate; • Recover increased completion costs, professional fees, and other damages; 38 • Exercise rights under the Performance Bond; and • Exercise any other remedy available under the Contract Documents or applicable law. The City shall exercise its remedies reasonably and take commercially reasonable measures to mitigate avoidable completion costs. 15.5 Surety Notice. When Contractor’s Performance Bond requires notice to or participation by the surety before termination or completion, the City shall comply with the applicable bond procedures. Nothing in this Section expands the surety’s rights beyond the Performance Bond or limits the City’s right to take immediate protective action necessary to protect persons, property, the Project Site, or the Work. 15.6 Wrongful Termination for Cause. If a termination for cause is finally determined to have been improper, the termination shall be treated as a termination for convenience under Section 15.7. Contractor’s recovery shall be limited to the compensation permitted for a termination for convenience, except to the extent applicable law requires otherwise. 15.7 Termination for Convenience. The City may terminate the Contract, in whole or in part, for convenience upon thirty (30) calendar days’ written notice to Contractor, or upon a shorter period agreed to by Contractor. Upon receipt of notice, Contractor shall: • Stop the terminated Work on the effective date stated in the notice; • Continue any portion of the Work not terminated; • Protect and preserve completed and partially completed Work; • Terminate or assign subcontracts and purchase orders as directed by the City; • Take reasonable steps to minimize termination costs; • Deliver materials, equipment, records, submittals, warranties, and other Project property for which the City has paid or agrees to pay; and • Cooperate in an orderly transition of the Work. 15.8 Compensation Following Termination for Convenience. Following a termination for convenience, the City shall pay Contractor for: • Work properly performed and accepted through the effective date of termination; • Properly stored materials and equipment meeting the requirements of Section 5.4 that the City elects to accept; • Reasonable, documented demobilization costs; • Reasonable, documented costs of terminating noncancelable subcontracts and purchase orders that Contractor could not avoid through diligent mitigation; and • Other amounts expressly approved by the City in writing. 39 Contractor is not entitled to anticipatory profit, profit on unperformed Work, unabsorbed home- office overhead, consequential damages, lost business opportunity, or damages based on the unperformed portion of the Contract. Payment is subject to prior payments, retainage permitted by law, credits, setoffs, and amounts otherwise due to the City. 15.9 Nonappropriation and Loss of Funding. The City’s obligations are subject to lawful appropriation and the availability of funds. The City may suspend, reduce, or terminate the Contract if appropriated funds or available funds are unavailable, withdrawn, reduced, delayed, or disallowed. The City shall provide Contractor notice as soon as reasonably practicable. Contractor shall be compensated in accordance with Section 15.8 for accepted Work performed before the effective date of the suspension, reduction, or termination. The City shall not characterize a funding-related termination as a Contractor default unless an act or omission of Contractor caused or materially contributed to the loss or disallowance of funding. 15.10 Contractor Obligations Following Termination. Termination does not relieve Contractor of responsibility for: • Work performed before termination; • Defective or nonconforming Work; • Payment of subcontractors and suppliers; • Warranties applicable to completed Work; • Indemnification; • Delivery of Project records and public records; • Audit and legal compliance; or • Obligations that by their nature survive termination. Article 16 Suspension of Work 16.1 Suspension by the City. The City may direct Contractor in writing to suspend, delay, or interrupt all or part of the Work for a period the City determines appropriate for: • Protection of persons, property, the Project Site, or the Work; • Contractor’s failure to comply with the Contract Documents; • Coordination with City operations or other work; • Inspection, testing, permitting, or governmental review; • Unanticipated conditions; • Weather or emergency conditions; • Funding or funding-related issues; or • The City’s convenience. 40 Contractor shall stop the affected Work as directed, continue unaffected Work, and protect and preserve the Work during the suspension. 16.2 Contractor-Caused Suspension. Contractor is not entitled to additional compensation or Contract Time for a suspension caused by Contractor, a subcontractor, a supplier, or another person for whom Contractor is responsible. Contractor shall promptly correct the condition causing the suspension and resume Work when authorized by the City. 16.3 City-Caused Suspension. If a suspension is caused solely by the City’s convenience and is not attributable to Contractor, weather, safety, funding, permitting, governmental action, or another risk allocated to Contractor under the Contract Documents, Contractor may request: • A reasonable extension of Contract Time for demonstrated critical-path delay; and • An equitable adjustment for reasonable, documented, and unavoidable direct costs caused by the suspension. Any adjustment is subject to Articles 7 and 13, including notice, documentation, mitigation, concurrent-delay, and no-damages-for-delay requirements. Contractor is not entitled to profit on suspension costs, consequential damages, lost profits, or costs that Contractor reasonably could have avoided. 16.4 Prolonged Suspension. If the City suspends all or substantially all of the Work for more than sixty (60) consecutive calendar days for reasons not attributable to Contractor, Contractor may request that the City authorize resumption, reduce the affected scope, or terminate the suspended portion for convenience. Within fifteen (15) calendar days after receiving Contractor’s written request, the City shall notify Contractor whether the Work will resume, be reduced, remain suspended for an additional period agreed to by Contractor, or be terminated for convenience. If the City does not provide such notice within the fifteen-day period, Contractor may treat the suspended portion as terminated for convenience under Section 15.7. A funding-related suspension is also subject to Section 15.9. This Section does not apply to a suspension caused by Contractor, an emergency, a legal prohibition, or a governmental order that prevents the City from authorizing resumption or termination. 16.5 Contractor Suspension for Imminent Danger. Contractor may suspend affected Work when reasonably necessary to address an imminent threat to life, safety, or material property damage. Contractor shall immediately notify the City, protect the Work, and resume performance when the danger has been addressed. 41 Contractor may not suspend Work solely because of a payment or contractual dispute except to the extent expressly authorized by applicable law. 16.6 Resumption of Work. When the City directs Contractor to resume suspended Work, Contractor shall do so promptly and shall submit any necessary revised schedule or recovery plan. Resumption does not waive a properly preserved request for adjustment or the City’s rights concerning the cause of the suspension. Article 17 Records, Public Records, and Audit 17.1 Project Records. Contractor shall create and maintain complete, accurate, and auditable records relating to the Contract and Work, including: • Accounting and cost records; • Project-related payroll and personnel records required by applicable law or the Contract Documents; • Subcontracts and purchase orders; • Invoices, receipts, delivery records, and proof of payment; • Change proposals and supporting cost documentation; • Daily reports, schedules, photographs, and material Project correspondence; • Inspection, testing, and quality-control records; • Permits, licenses, approvals, and product documentation; • Insurance and bond records; • Payment and closeout documentation; and • Other records required by the Contract Documents or applicable law. Records shall be maintained in an organized manner that permits costs, quantities, payments, and Contract compliance to be reasonably verified. 17.2 Records Retention. Contractor shall retain Project records for at least five (5) years after final payment, termination, or Project closeout, whichever occurs later, or for any longer period required by: • Applicable federal, state, or local law; • Applicable audit and records-retention requirements; • 2 C.F.R. part 200, if federal funding requirements apply to the Project; • An audit, claim, investigation, litigation, or public-records request initiated before expiration of the retention period; or • Written notice from the City identifying a longer legally applicable period. If an audit, claim, investigation, litigation, or public-records matter remains pending, Contractor shall retain the affected records until final resolution. 42 17.3 Access and Audit. Upon reasonable notice, Contractor shall provide the City, its auditors, and governmental representatives authorized by applicable law reasonable access to Project records and the Project Site for inspection, copying, monitoring, and audit. Access shall be provided during normal business hours, except when immediate access is reasonably necessary to address an emergency, active investigation, or funding deadline. Contractor shall require its subcontractors and suppliers to maintain and provide access to records applicable to their portions of the Work. 17.4 Audit Findings. If an audit determines that Contractor was overpaid, charged an unallowable cost, failed to provide required supporting documentation, or caused a cost to be disallowed by a funding agency, Contractor shall reimburse the City to the extent the finding results from Contractor’s act, omission, inaccurate certification, unsupported charge, or failure to comply with the Contract Documents. Contractor shall be given a reasonable opportunity to provide additional documentation and respond to a preliminary finding before the City makes a final contractual determination, unless immediate action is required by a funding agency or applicable law. The City remains responsible for a disallowance caused solely by the City’s act, omission, or funding decision. 17.5 Florida Public Records Law. Contractor shall comply with Chapter 119, Florida Statutes, and Section 119.0701, Florida Statutes, to the extent applicable to Contractor’s performance on behalf of the City. Contractor shall: • Keep and maintain public records required by the City to perform the Contract; • Upon request from the City’s custodian of public records, provide the City with a copy of requested records or allow the records to be inspected or copied within a reasonable time and at a cost that does not exceed the amount provided by Chapter 119, Florida Statutes, or as otherwise provided by law; • Ensure that public records that are exempt or confidential and exempt from public-records disclosure are not disclosed except as authorized by law for the duration of the Contract and following completion or termination if Contractor does not transfer the records to the City; • Upon completion or termination of the Contract, transfer to the City, at no cost, all public records in Contractor’s possession or keep and maintain the public records required by the City to perform the Contract; and • If Contractor transfers all public records to the City, destroy any duplicate public records that are exempt or confidential and exempt from public-records disclosure requirements. If Contractor keeps and maintains public records following completion or termination, Contractor shall meet all applicable requirements for retaining public records. All electronically stored records 43 must be provided to the City, upon request, in a format compatible with the City’s information- technology systems. 17.6 Public Records Requests. A public-records request relating to the Contract must be made directly to the City. If Contractor receives such a request, Contractor shall promptly forward it to the City’s custodian of public records and coordinate with the City concerning the response. Contractor shall not independently determine that a record is exempt or confidential without notifying the City. Contractor remains responsible for protecting records made confidential or exempt by law. 17.7 Statutory Notice. IF CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CITY’S CUSTODIAN OF PUBLIC RECORDS AT: ELORA RIERA, MMC, CITY CLERK CITY OF DANIA BEACH 100 WEST DANIA BEACH BOULEVARD DANIA BEACH, FLORIDA 33004 TELEPHONE: (954) 924-6800 EMAIL: ERIERA@DANIABEACHFL.GOV 17.8 Enforcement. Contractor’s failure to comply with applicable public-records requirements constitutes a material breach. Before terminating the Contract for a curable public-records violation, the City shall provide the notice and opportunity to cure required by Section 119.0701, Florida Statutes. Contractor is responsible for reasonable costs and attorneys’ fees imposed on the City to the extent resulting from Contractor’s unlawful refusal to provide public records, subject to the requirements and remedies established by applicable law. Article 18 Federal Funding Requirements 18.1 Conditional Application. If any portion of the Project is funded or reimbursed with federal financial assistance, Contractor shall comply with the federal requirements applicable to that funding and included in the ITB or other Contract Documents. Federal requirements do not apply solely because they are referenced in this Article. They apply only to the extent required by the applicable funding source, federal law, regulation, grant award, or funding-agency directive. 18.2 Notice of Federal Funding. The City shall notify Contractor in writing if federal funding requirements not otherwise identified in the Contract Documents become applicable to the Work. 44 If the City imposes a material federal requirement after execution of the Contract that was not included in the ITB or reasonably ascertainable when Contractor submitted its Bid, any resulting adjustment to the Contract Price or Contract Time must be addressed through a written Change Order, except to the extent the requirement arises from Contractor’s conduct or was otherwise applicable by law. 18.3 Federal Contract Provisions. When applicable, Contractor shall comply with the federal contract provisions included in the ITB, including any requirements concerning: • Equal employment opportunity; • Suspension and debarment; • Lobbying; • Domestic preferences or required use of domestic products; • Access to records and audit; • Environmental compliance; • Rights to inventions or materials; • Contract termination; and • Other requirements imposed by the applicable federal funding program. Contractor shall include applicable federal requirements in its subcontracts and purchase orders when required by law, the funding award, or the Contract Documents. 18.4 Conflict. If an applicable federal funding requirement conflicts with another provision of the Contract Documents, Contractor shall promptly notify the City before proceeding with the affected Work. The applicable federal requirement controls only to the extent necessary to maintain compliance with the funding source and applicable law. Article 19 Legal Compliance, Ethics, and Eligibility 19.1 General Compliance. Contractor shall comply with all federal, state, county, and City laws, ordinances, codes, regulations, permit conditions, and lawful governmental requirements applicable to Contractor or the Work. Contractor shall promptly notify the City if it becomes aware that a requirement of the Contract Documents conflicts with applicable law. Contractor shall not knowingly perform Work in violation of law while awaiting direction. 19.2 Licenses and Authority. Contractor represents that it is properly organized, authorized to transact business in Florida when required, and properly licensed to perform the Work. Contractor shall maintain all licenses, registrations, certificates of competency, and business tax receipts required for the Work throughout the Contract. Contractor shall ensure that its subcontractors and individual trades maintain the licenses required for their portions of the Work. 45 19.3 Public Entity Crimes. Contractor represents that neither Contractor nor an affiliate is prohibited from transacting business with the City under Section 287.133, Florida Statutes. A person or affiliate placed on the convicted vendor list following conviction for a public entity crime may not submit a bid, perform Work, or transact business with a public entity to the extent and during the period prohibited by Section 287.133, Florida Statutes. Contractor shall promptly notify the City if Contractor or an affiliate becomes subject to a statutory disqualification during the Contract. 19.4 Discriminatory Vendors. Contractor represents that it is not prohibited from contracting with the City because of placement on the discriminatory vendor list under Section 287.134, Florida Statutes. Contractor shall promptly notify the City of any change in status. The City may exercise any remedy authorized by law if Contractor becomes ineligible. 19.5 Scrutinized Companies and Boycott of Israel. Contractor shall provide the certification required by Section 287.135, Florida Statutes, that Contractor is not participating in a boycott of Israel. The additional restrictions and certifications concerning scrutinized business operations in Sudan, Iran, Cuba, or Syria apply only to the extent required by Section 287.135 based on the Contract amount and Contractor’s status. The City may terminate the Contract if Contractor submits a false certification or becomes subject to termination under Section 287.135, Florida Statutes, after providing any notice and opportunity to respond required by law. 19.6 Foreign Countries of Concern. Section 287.138, Florida Statutes, applies only if the Contract or a subsequent change in the Work gives Contractor access to an individual’s personal identifying information. Contractor shall provide an affidavit under Section 287.138 only if such access is authorized or required. Nothing in the Contract authorizes Contractor to access City information systems or personal identifying information unless the City gives prior written authorization. 19.7 Human-Trafficking Affidavit. At execution, renewal, or extension of the Contract, Contractor shall provide the affidavit required by Section 787.06(14), Florida Statutes. The affidavit must be signed under penalty of perjury by an authorized officer or representative and attest that Contractor does not use coercion for labor or services as defined by that statute. 19.8 E-Verify. Contractor shall register with and use the E-Verify system as required by Section 448.095, Florida Statutes. 46 Contractor shall: • Verify employment eligibility as required by law; • Require each subcontractor to provide the affidavit required by Section 448.095, Florida Statutes; • Retain subcontractor affidavits for the period required by law; • Provide reasonable evidence of compliance upon the City’s request; and • Take action concerning a noncompliant subcontractor as required by law. The City and Contractor shall exercise any termination rights arising from an E-Verify violation in the manner required by Section 448.095, Florida Statutes. 19.9 Ethics, Gifts, and Conflicts of Interest. Contractor shall comply with applicable City, Broward County, state, and federal ethics, gift, lobbying, and conflict-of-interest laws. Contractor shall not offer, give, solicit, or accept anything of value for the purpose of improperly influencing a public officer or employee, obtaining preferential treatment, or securing an improper advantage concerning the Contract. Contractor shall promptly disclose any actual or potential conflict of interest involving Contractor, a subcontractor, or a person with authority over the Contract. Disclosure does not automatically disqualify Contractor, but Contractor shall implement reasonable measures required by the City to address the conflict. 19.10 Accuracy of Representations. Contractor’s Bid, affidavits, certifications, and disclosures are continuing representations. Contractor shall promptly correct a representation that becomes materially inaccurate. An immaterial error that Contractor made in good faith and promptly corrects does not constitute default. A knowing or material false statement may constitute default and may be referred to the appropriate authority. 19.11 Independent Contractor. Contractor is an independent contractor and is solely responsible for directing and compensating its personnel and for applicable employment taxes, benefits, and workers’ compensation obligations. Nothing in the Contract creates an employment, agency, partnership, joint venture, fiduciary, or other relationship between the City and Contractor. Contractor has no authority to bind the City. Article 20 Claims, Dispute Resolution, Governing Law, and Venue 20.1 Notice of Claim. A party asserting a claim arising from the Contract shall provide written notice describing the factual and contractual basis of the claim, the relief requested, and available supporting documentation. 47 Contractor claims for additional compensation or Contract Time remain subject to the more specific notice and documentation requirements of Articles 7 and 13. 20.2 City Review. The City shall review a properly submitted claim and provide a written response within a reasonable period based on the claim’s complexity and the information provided. The City may request additional documentation reasonably necessary to evaluate the claim. Contractor shall be given a reasonable opportunity to respond before the City makes a final contractual determination. A final contractual determination does not prevent either party from pursuing the remedies available under this Article or applicable law. 20.3 Good-Faith Negotiation. Before filing litigation, authorized representatives of the parties shall meet and attempt in good faith to resolve the dispute. Either party may request the meeting in writing. Unless the parties agree otherwise, the meeting shall occur within fifteen (15) calendar days after the request and may be conducted in person or by remote conference. This Section does not prevent either party from seeking immediate injunctive or other judicial relief when necessary to protect persons or property, preserve a statutory or contractual deadline, enforce public-records obligations, or prevent material prejudice. 20.4 Payment Disputes. Payment disputes shall be administered consistently with the Florida Local Government Prompt Payment Act, including Section 218.735(4), Florida Statutes. The City shall timely pay undisputed portions of a payment request. Contractor shall continue performing undisputed Work while a payment dispute is pending, except to the extent Contractor has a statutory right to suspend performance. 20.5 Continuing Performance. Pending resolution of a claim or dispute, Contractor shall continue diligent performance in accordance with the Contract Documents and the City’s written directions. The City shall continue performing its undisputed obligations. Continued performance does not waive either party’s properly preserved claim or defense. 20.6 Governing Law. The Contract shall be governed by and interpreted in accordance with the laws of the State of Florida, without regard to conflict-of-laws principles. 20.7 Venue and Jurisdiction. Exclusive venue for any action or proceeding arising from or relating to the Contract shall lie in a court of competent jurisdiction in Broward County, Florida. If federal subject-matter jurisdiction exists, exclusive venue shall lie in the United States District Court for the Southern District of Florida. Each party consents to the personal jurisdiction of those courts. 48 20.8 No Arbitration. The Contract is not subject to binding arbitration unless the City Commission and Contractor subsequently authorize arbitration in a written amendment executed in accordance with applicable law. 20.9 Waiver of Jury Trial. TO THE FULLEST EXTENT PERMITTED BY LAW, EACH PARTY KNOWINGLY AND VOLUNTARILY WAIVES TRIAL BY JURY IN ANY ACTION OR PROCEEDING ARISING OUT OF OR RELATING TO THE CONTRACT DOCUMENTS. THE PARTIES ACKNOWLEDGE THAT THIS WAIVER IS A MATERIAL TERM OF THE CONTRACT. 20.10 Attorneys’ Fees and Costs. Except when a Contract provision or applicable law expressly provides otherwise, each party shall bear its own attorneys’ fees and costs arising from a dispute. Nothing in this Section limits attorneys’ fees recoverable as part of Contractor’s indemnification obligations under Article 14 or fees and costs awarded under applicable public-records or other law. 20.11 Preservation of Claims Requirements. Nothing in this Article waives a statutory condition precedent, notice requirement, administrative remedy, filing deadline, or limitation period applicable to a claim against the City. Article 21 Sovereign Immunity and Limitations of City Liability 21.1 Preservation of Sovereign Immunity. Nothing in the Contract Documents shall be interpreted as a waiver of the City’s sovereign immunity or as consent by the City to liability beyond the limitations established by Section 768.28, Florida Statutes, with respect to tort or other claims to which sovereign immunity applies. Nothing in the Contract Documents: • Creates a noncontractual cause of action against the City that would not otherwise exist; • Waives a defense, immunity, condition precedent, or limitation available to the City under applicable law; • Expands any monetary limitation applicable to the City’s liability; • Authorizes an award of punitive damages or prejudgment interest against the City when prohibited by law; or • Constitutes consent by the City to indemnify, defend, or hold harmless Contractor or another person or entity. 21.2 Contractual Obligations. Section 21.1 does not relieve the City of its express payment and performance obligations under the Contract Documents. The City remains responsible for amounts properly due for accepted Work, subject to lawful appropriation, available funding, withholding, retainage, setoff, and the other provisions of the Contract. 49 21.3 No Personal Liability. No City commissioner, officer, employee, representative, or agent shall have personal liability for the City’s obligations under the Contract. Nothing in this Section alters the standards governing individual liability under Section 768.28(9), Florida Statutes. 21.4 Survival. The protections and limitations stated in this Article survive completion, final payment, and termination of the Contract. Article 22 Notices and Project Communications 22.1 Formal Notices. Formal notices concerning default, termination, indemnification, assignment, claims, disputes, or other material legal rights under the Contract shall be in writing and delivered by: • Personal delivery; • Nationally recognized overnight delivery service; • Certified United States mail, return receipt requested; or • Email to the applicable address designated in this Article. Notice by personal delivery, overnight delivery service, or certified mail is effective upon actual receipt. A notice refused by the intended recipient is effective on the date delivery was refused. Notice by email is effective when the recipient acknowledges receipt. If receipt is not acknowledged by the end of the next business day, the sender shall deliver the notice by one of the other methods authorized above. A notice of default or termination transmitted by email shall also be sent by personal delivery, overnight delivery service, or certified mail no later than the next business day. Failure to send the additional copy does not invalidate the notice if actual receipt of the email is acknowledged. 22.2 Project Notices and Communications. Routine Project communications, submittals, requests for information, schedule updates, change proposals, payment documentation, and notices concerning delay, concealed conditions, safety, or other Project matters may be transmitted through the City’s designated electronic Project-management system or by email to the representatives designated by the parties. A Project communication does not amend the Contract or authorize additional compensation or Contract Time unless it expressly satisfies Article 7 and is issued or executed by a person authorized to bind the City. 22.3 Notice to the City. Formal notice to the City shall be delivered to: 50 City of Dania Beach Candido Sosa-Cruz, City Manager 100 West Dania Beach Boulevard Dania Beach, Florida 33004 Email: csosacruz@daniabeachfl.gov With a copy to: Eve A. Boutsis, City Attorney City of Dania Beach 100 West Dania Beach Boulevard Dania Beach, Florida 33004 Email: eboutsis@daniabeachfl.gov A copy provided to the City Attorney does not replace delivery to the City Manager. 22.4 Notice to Contractor. Formal notice to Contractor shall be delivered to: The Stout Group, LLC Attn: Jose M. Sanchez, Manager 10850 NW 138th Street, Bay 3 Hialeah Gardens, Florida 33018 Email: jsanchez@thestoutgroup.com 22.5 Changes in Contact Information. A party may change its notice address, representative, or email address by providing notice in accordance with this Article. The change is effective upon receipt and does not require a formal amendment to the Contract. 22.6 Emergency Communications. Either party may use telephone, text message, or email to communicate an emergency involving life, safety, flooding or water damage, interruption of City operations, or risk of material property damage. The communicating party shall provide written confirmation as soon as reasonably practicable. Emergency communication does not authorize a change in the Contract Price or Contract Time unless subsequently documented in accordance with Article 7. Article 23 Miscellaneous Provisions 23.1 Assignment by Contractor. Contractor shall not assign, transfer, delegate, or otherwise dispose of the Contract, any material Contract duty, or Contractor’s right to payment without the City’s prior written consent. The City will not unreasonably withhold consent to an assignment that: 51 • Does not impair Project performance; • Does not increase the City’s cost or risk; • Is made to a qualified and financially responsible entity; • Does not violate procurement, bond, or legal requirements; and • Is approved by Contractor’s surety when required. An unauthorized assignment is voidable by the City. The City’s consent does not release Contractor or the surety unless the City expressly agrees to the release in writing. 23.2 Assignment by the City. The City may assign the Contract to another governmental entity or governmental successor responsible for the Project upon written notice to Contractor, provided the assignment does not materially impair Contractor’s right to payment for properly performed Work. Any other assignment by the City requires Contractor’s consent, which shall not be unreasonably withheld. 23.3 Amendments. The Contract may be amended only by a written instrument executed by authorized representatives of both parties and approved in accordance with applicable City law and procedures. An email, meeting minute, field discussion, purchase order, invoice, course of dealing, or communication from unauthorized personnel does not amend the Contract. This Section does not limit the City’s authority to issue a Construction Change Directive, minor change, suspension, or other written direction expressly authorized by the Contract Documents. 23.4 Authority to Execute. Each person signing the Agreement represents that the person has authority to execute the Agreement and bind the party on whose behalf the person signs. Contractor shall provide evidence of signing authority upon the City’s reasonable request. 23.5 No Waiver. A waiver is effective only if stated in writing by the party granting the waiver. A waiver applies only to the specific circumstance identified and does not constitute a continuing waiver. A party’s failure or delay in enforcing a Contract requirement does not waive that requirement or another right. Payment, inspection, occupancy, use, or acceptance of a portion of the Work does not waive the City’s rights concerning defective Work, warranties, indemnification, or surviving obligations. 23.6 Cumulative Remedies. Except when the Contract expressly identifies a remedy as exclusive, the parties’ rights and remedies are cumulative. The exercise of one remedy does not prevent exercise of another remedy, but a party may not obtain a double recovery for the same loss. 52 23.7 Severability. If a court of competent jurisdiction determines that a Contract provision is invalid or unenforceable, the provision shall be enforced to the maximum extent permitted by law. If the invalid provision cannot be enforced in part, it shall be severed, and the remaining provisions shall remain effective unless severance would materially defeat the essential purpose of the Contract. The parties shall reasonably cooperate to replace a severed provision with a lawful provision that most closely reflects the original intent. 23.8 No Third-Party Beneficiaries. Except for rights expressly granted to the surety or governmental audit and funding authorities, the Contract is intended solely for the benefit of the City and Contractor. The Contract does not create a contractual right or cause of action in a subcontractor, supplier, employee, consultant, member of the public, or other third party. 23.9 No City Endorsement. Contractor shall not use the City’s name, seal, logo, or the existence of the Contract in a manner that states or implies City sponsorship, approval, or endorsement without the City’s prior written consent. After Final Completion, Contractor may factually identify the City and Project in a list of completed projects and may use nonconfidential Project photographs lawfully obtained by Contractor, provided Contractor does not use the City’s seal or logo or imply City endorsement. 23.10 Interpretation. The Contract Documents shall be interpreted as a whole and to give reasonable effect to all provisions. Headings are for convenience and do not limit substantive provisions. “Including” means “including without limitation.” The singular includes the plural when appropriate, and references to a person include an entity when the context permits. The Contract shall not be construed against a party solely because that party or its counsel prepared or proposed a provision. 23.11 Compliance with Deadlines. If a Contract deadline falls on a Saturday, Sunday, or City- observed holiday, the deadline extends to the next Business Day unless: • The deadline concerns emergency action, safety, water protection, or protection of property; • The Contract expressly requires performance on a calendar-day basis; or • Applicable law requires a different result. This Section does not convert a calendar-day completion period into a business-day period. 53 23.12 Further Assurances. Each party shall execute documents and take reasonable actions necessary to carry out the Contract, provided that no further assurance materially expands that party’s obligations or modifies the Contract without an authorized written amendment. 23.13 Survival. Provisions concerning payment, correction of Work, warranties, indemnification, records, public records, audit, legal compliance, ownership, dispute resolution, sovereign immunity, and other obligations that by their nature extend beyond completion survive final payment and termination. 23.14 Counterparts and Electronic Signatures. The Agreement may be executed in counterparts, each of which is deemed an original and all of which together constitute one instrument. Electronic signatures and electronic copies have the same force and effect as original signatures to the extent permitted by Chapter 668, Florida Statutes, and other applicable law. 23.15 Entire Agreement. The Contract Documents constitute the complete agreement between the City and Contractor concerning the Project and supersede prior and contemporaneous discussions, negotiations, representations, and communications concerning the same subject. Contractor acknowledges that it has not relied on a representation or promise that is not contained in the Contract Documents. 23.16 Effective Date. The Agreement becomes effective on the date it is fully executed by both parties and approved as required by City law. Contractor shall not commence physical Work until the City issues a written Notice to Proceed. SIGNATURES ON THE FOLLOWING PAGES 54 IN WITNESS OF THE FOREGOING, the parties have set their hands and seals the day and year first above written. CITY: ATTEST: CITY OF DANIA BEACH, FLORIDA a Florida Municipal Corporation ELORA RIERA, MMC JOYCE L. DAVIS CITY CLERK MAYOR CANDIDO SOSA-CRUZ, ICMA-CM CITY MANAGER APPROVED FOR FORM AND CORRECTNESS: EVE A. BOUTSIS CITY ATTORNEY 55 CONTRACTOR: The Stout Group, LLC a Florida limited liability company WITNESSES: SIGNATURE SIGNATURE PRINT Name PRINT Name SIGNATURE Title PRINT Name STATE OF FLORIDA COUNTY OF MIAMI-DADE The foregoing instrument was acknowledged before me by means of ☐ physical presence or ☐ online notarization, on _________ , 2026, by______________________, as __________________ (title) of The Stout Group, LLC, a Florida corporation. He/She is personally known to me or has produced ____________ as identification. NOTARY PUBLIC My Commission Expires: State of Florida 56 Exhibit A Accepted Bid Form and Bid Schedule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b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fd &"!'"(j"' (k ldh&d Z('[57S61..1,2 @008n/,N7 : U3 D:XG>>>F>> DZ('[\_