Loading...
HomeMy WebLinkAboutItem 3.1Generation M Development-Dania Beach PresentationGeneration M Development is a minority-owned development firm dedicated to revitalizing South Florida's urban cores through targeted mixed-use and multi-family infill projects. Our core mission is to transform underutilized CRA parcels into high -quality, attainably priced commercial and residential developments that catalyze economic growth, restore historic corridors, and expand local workforce housing. As a Black-led development firm, we view real estate as a powerful vehicle for true community empowerment. We measure our success not just by the structures we build, but by the tangible opportunities we create -actively mentoring and hiring local tradespeople, ensuring project dollars circulate directly back into the neighborhood economy, and demonstrating how culturally aligned leadership drives holistic urban renewal. Generation M leads an integrated Joint Venture team that pairs executive business development and municipal strategy with specialized A & E and design-build partners. Our leadership team brings over 40 years of professional building experience, with developments across Florida, Texas, Louisiana and Tennessee Who We Are | Generation M Development We are proposing a 3-story, 16-unit multifamily building on the site along SW 12th Avenue. The 2nd and 3rd floors will provide approximately 12,950 gross SF of residential area, with ground -level parking being provided under a stilt-building design. 1-bedroom/2-bedroom mix averaging –660 SF -800 SF per unit yields a realistic, market-supportable 16 units (8 per floor) Project A Overview D AN I A B E AC H C RA | D E VE L O PM E NT P RO P O S A L Project A | Architectural Concept GENE RAT IO N M DEVELOP MENT 03 D AN I A B E AC H C RA | D E VE L O PM E NT P RO P O S A L Project Scope & Workforce Housing Mix GENE RAT IO N M DEVELOP MENT 04 Proposed mix: 16 apartments | 10 market -rate + 6 workforce-designated Designation Count Layout Net unit size Monthly rent Market rate 6 1 bed / 1 bath 660 SF $2,200 Market rate 4 2 bed / 2 bath 800 SF $2,750 Workforce 4 1 bed / 1 bath 660 SF $2,150 Workforce 2 2 bed / 2 bath 800 SF $2,600 Projected full-occupancy rental income: $38,000/month | $456,000/year PR O J E C T A | M U L T IF AM IL Y 2 .0 Project A | Construction Budget GENE RAT IO N M DEVELOP MENT 07 Cost component Rate / basis Estimated cost Residential floors (upper two)$225 / SF $2,925,000 Podium and covered parking $95 / SF $617,500 Site work, utilities, paving Lump sum $300,000 Direct hard construction Subtotal $3,842,000 SOFT COSTS (12%) $461,040 CONTINGENCY (5%) $215,152 TOTAL, EXCLUDING LAND $4,518,192 Along Phippen Waiters Rd: We propose 3 -story, mixed-use project;approx 11000 SF Floors 2 & 3 are approx. 4000 SF each, containing 8 residential units mixed between 1bd & 2bd Ground-floor retail approximately 2,000 SF Partial covered parking. 3 of the 8 units offered as workforce housing . Project B Overview D AN I A B E AC H C RA | D E VE L O PM E NT P RO P O S A L Project B | Architectural Concept GENE RAT IO N M DEVELOP MENT 06 D AN I A B E AC H C RA | D E VE L O PM E NT P RO P O S A L Project Scope & Workforce Housing Mix GENE RAT IO N M DEVELOP MENT 04 Proposed mix: 8 apartments | 5 market-rate + 3 workforce-designated Designation Count Layout Net unit size Monthly rent Market rate 1 bed / 1 bath 680 SF $2,350 Market rate 3 2 bed / 2 bath 850SF $2,950 Workforce 2 1 bed / 1 bath 680 SF $2,250 Workforce 2 2 bed / 2 bath 850 SF $2,650 Projected full-occupancy rental income: $20,700/month | $248,400/year 1 2 PR O J E C T B | M I X E D -U SE 3.0 Project B | Construction Budget GENE RAT IO N M DEVELOP MENT 08 Cost component Rate / basis Estimated cost Residential floors (upper two)$250 / SF $2,750,000 Ground-floor commercial shell $185 / SF $388,500 Podium and covered parking $95 / SF $199,500 Site work, utilities, paving Lump sum $200,000 Direct hard construction Subtotal $3,538,000 Total estimated cost (excluding land)$4,267,160 D AN I A B E AC H C RA | D E VE L O PM E NT P RO P O S A L Benefits to the City GENE RAT IO N M DEVELOP MENT 09 •New, recurring property tax revenue •Workforce housing supply •Consistent with the CRA’s own established program •Proven local precedent at multiple scales Minimal public exposure, resiliency investment included Path to ownership• • D AN I A B E AC H C RA | D E VE L O PM E NT P RO P O S A L Implementation & Timeline GENE RAT IO N M DEVELOP MENT 10 MONTHS 1–3 Site due diligence & land control MONTHS 3–6 Final design, permitting & financing MONTHS 6–22 Construction MONTHS 22–24 Inspections, leasing & closeout Next: confirm site details, reconcile revised costs, validate unit -count and workforce-housing requirements, and align financing. Generation M will develop the Dania Beach mixed-use project with 8 residential units and 2,100 square feet of commercial space. Each residential tenant will receive an option to purchase the unit they occupy while completing a 24-to 36-month mortgage-readiness pathway.The ownership pathway should remain transparent, lender -verifiable, and designed to stack resident savings with Florida Housing and local assistance when eligible. •Base lease: charge supportable market rent. The lease stands on its own and does not force a purchase. •Resident savings: the resident authorizes a separate $250 monthly transfer into an FDIC -insured custodial or resident-owned savings account. It is not landlord revenue. •Developer match: match the prospective buyer's verified contributions dollar -for -dollar. The buyer may elect to use the earned match for approved tile, countertops, flooring, or lighting upgrades, or apply it as a buyer credit toward the purchas e price. The election is subject to a written cap, documented costs, appraisal treatment, lender approval, and clearly stated vesting terms. •Purchase option for every tenant: each residential tenant receives a 24 -to 36-month option to purchase the unit occupied at 90% of its independently appraised market value at the time of purchase. Include appraisal standards, review rights, inspection rights, and objective extension rules. •Mortgage readiness: homebuyer education, quarterly credit review, debt reduction plan, income documentation, and lender pre-underwriting at months 0, 12, 24, and 30. •Assistance stacking: at mortgage approval, evaluate Florida Housing assistance, county/city SHIP, employer assistance, and permissible gifts.