HomeMy WebLinkAboutItem 3.1Generation M Development-Dania Beach PresentationGeneration M Development is a minority-owned development firm dedicated to revitalizing South Florida's urban cores
through targeted mixed-use and multi-family infill projects. Our core mission is to transform underutilized CRA parcels
into high -quality, attainably priced commercial and residential developments that catalyze economic growth, restore
historic corridors, and expand local workforce housing.
As a Black-led development firm, we view real estate as a powerful vehicle for true community empowerment. We
measure our success not just by the structures we build, but by the tangible opportunities we create -actively mentoring
and hiring local tradespeople, ensuring project dollars circulate directly back into the neighborhood economy, and
demonstrating how culturally aligned leadership drives holistic urban renewal.
Generation M leads an integrated Joint Venture team that pairs executive business development and municipal strategy
with specialized A & E and design-build partners. Our leadership team brings over 40 years of professional building
experience, with developments across Florida, Texas, Louisiana and Tennessee
Who We Are | Generation M Development
We are proposing a 3-story, 16-unit multifamily building on the site along SW 12th Avenue.
The 2nd and 3rd floors will provide approximately 12,950 gross SF of residential area, with ground -level parking
being provided under a stilt-building design.
1-bedroom/2-bedroom mix averaging –660 SF -800 SF per unit yields a realistic, market-supportable 16 units (8 per
floor)
Project A Overview
D AN I A B E AC H C RA | D E VE L O PM E NT P RO P O S A L
Project A | Architectural Concept
GENE RAT IO N M DEVELOP MENT 03
D AN I A B E AC H C RA | D E VE L O PM E NT P RO P O S A L
Project Scope & Workforce Housing Mix
GENE RAT IO N M DEVELOP MENT 04
Proposed mix: 16 apartments | 10 market -rate + 6 workforce-designated
Designation Count Layout Net unit size Monthly rent
Market rate 6 1 bed / 1 bath 660 SF $2,200
Market rate 4 2 bed / 2 bath 800 SF $2,750
Workforce 4 1 bed / 1 bath 660 SF $2,150
Workforce 2 2 bed / 2 bath 800 SF $2,600
Projected full-occupancy rental income: $38,000/month | $456,000/year
PR O J E C T A | M U L T IF AM IL Y 2 .0
Project A | Construction Budget
GENE RAT IO N M DEVELOP MENT 07
Cost component Rate / basis Estimated cost
Residential floors (upper two)$225 / SF $2,925,000
Podium and covered parking $95 / SF $617,500
Site work, utilities, paving Lump sum $300,000
Direct hard construction Subtotal $3,842,000
SOFT COSTS (12%)
$461,040
CONTINGENCY (5%)
$215,152
TOTAL, EXCLUDING LAND
$4,518,192
Along Phippen Waiters Rd:
We propose 3 -story, mixed-use project;approx 11000 SF
Floors 2 & 3 are approx. 4000 SF each, containing 8 residential units mixed between 1bd & 2bd
Ground-floor retail approximately 2,000 SF
Partial covered parking.
3 of the 8 units offered as workforce housing
.
Project B Overview
D AN I A B E AC H C RA | D E VE L O PM E NT P RO P O S A L
Project B | Architectural Concept
GENE RAT IO N M DEVELOP MENT 06
D AN I A B E AC H C RA | D E VE L O PM E NT P RO P O S A L
Project Scope & Workforce Housing Mix
GENE RAT IO N M DEVELOP MENT 04
Proposed mix: 8 apartments | 5 market-rate + 3 workforce-designated
Designation Count Layout Net unit size Monthly rent
Market rate 1 bed / 1 bath 680 SF $2,350
Market rate 3 2 bed / 2 bath 850SF $2,950
Workforce 2 1 bed / 1 bath 680 SF $2,250
Workforce 2 2 bed / 2 bath 850 SF $2,650
Projected full-occupancy rental income: $20,700/month | $248,400/year
1
2
PR O J E C T B | M I X E D -U SE 3.0
Project B | Construction Budget
GENE RAT IO N M DEVELOP MENT 08
Cost component Rate / basis Estimated cost
Residential floors (upper two)$250 / SF $2,750,000
Ground-floor commercial shell $185 / SF $388,500
Podium and covered parking $95 / SF $199,500
Site work, utilities, paving Lump sum $200,000
Direct hard construction Subtotal $3,538,000
Total estimated cost (excluding land)$4,267,160
D AN I A B E AC H C RA | D E VE L O PM E NT P RO P O S A L
Benefits to the City
GENE RAT IO N M DEVELOP MENT 09
•New, recurring property tax revenue
•Workforce housing supply
•Consistent with the CRA’s own established program
•Proven local precedent at multiple scales
Minimal public exposure, resiliency investment included
Path to ownership•
•
D AN I A B E AC H C RA | D E VE L O PM E NT P RO P O S A L
Implementation & Timeline
GENE RAT IO N M DEVELOP MENT 10
MONTHS 1–3
Site due diligence & land control
MONTHS 3–6
Final design, permitting & financing
MONTHS 6–22
Construction
MONTHS 22–24
Inspections, leasing & closeout
Next: confirm site details, reconcile revised costs, validate unit -count and workforce-housing requirements, and align
financing.
Generation M will develop the Dania Beach mixed-use project with 8 residential units and 2,100 square feet of commercial
space. Each residential tenant will receive an option to purchase the unit they occupy while completing a 24-to 36-month
mortgage-readiness pathway.The ownership pathway should remain transparent, lender -verifiable, and designed to stack
resident savings with Florida Housing and local assistance when eligible.
•Base lease: charge supportable market rent. The lease stands on its own and does not force a purchase.
•Resident savings: the resident authorizes a separate $250 monthly transfer into an FDIC -insured custodial or resident-owned
savings account. It is not landlord revenue.
•Developer match: match the prospective buyer's verified contributions dollar -for -dollar. The buyer may elect to use the
earned match for approved tile, countertops, flooring, or lighting upgrades, or apply it as a buyer credit toward the purchas e
price. The election is subject to a written cap, documented costs, appraisal treatment, lender approval, and clearly stated
vesting terms.
•Purchase option for every tenant: each residential tenant receives a 24 -to 36-month option to purchase the unit occupied
at 90% of its independently appraised market value at the time of purchase. Include appraisal standards, review rights,
inspection rights, and objective extension rules.
•Mortgage readiness: homebuyer education, quarterly credit review, debt reduction plan, income documentation, and lender
pre-underwriting at months 0, 12, 24, and 30.
•Assistance stacking: at mortgage approval, evaluate Florida Housing assistance, county/city SHIP, employer assistance, and
permissible gifts.