Loading...
HomeMy WebLinkAbout2026-11-17 City Commission Meeting Agenda Packet - Addendum No. 1 ANY PERSON WHO DECIDES TO APPEAL ANY DECISION MADE WITH REGARD TO ANY MATTER CONSIDERED AT THIS MEETING OR HEARING WILL NEED A RECORD OF THE PROCEEDING, AND FOR SUCH PURPOSE MAY NEED TO ENSURE THAT A VERBATIM RECORD OF THE PROCEEDING IS MADE WHICH RECORD INCLUDES THE TESTIMONY AND EVIDENCE UPON WHICH THE APPEAL IS TO BE BASED. LOBBYIST REGISTRATION IS REQUIRED. PRIOR TO ENGAGING IN ANY LOBBYING ACTIVITIES, WHETHER OR NOT COMPENSATION IS PAID OR RECEIVED IN CONNECTION WITH THOSE ACTIVITIES, EACH LOBBYIST SHALL FILE WITH THE CITY CLERK AN ANNUAL REGISTRATION STATEMENT AND PAY AN ANNUAL TWO HUNDRED FIFTY DOLLARS ($250.00) REGISTRATION FEE FOR EACH PRINCIPAL OR EMPLOYER. REGISTRATION FORMS ARE AVAILABLE ON THE CITY WEBSITE: WWW.DANIABEACHFL.GOV. (ORDINANCE #2012-019; AMENDED BY ORDINANCE #2019-019) IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT, PERSONS NEEDING ASSISTANCE TO PARTICIPATE IN ANY OF THESE PROCEEDINGS SHOULD CONTACT THE CITY CLERK'S OFFICE, 100 W. DANIA BEACH BOULEVARD, DANIA BEACH, FL 33004, (954) 924-6800 EXTENSION 3624, AT LEAST 48 HOURS PRIOR TO THE MEETING. IN CONSIDERATION OF OTHERS, WE ASK THAT YOU: A. PLEASE TURN CELL PHONES OFF, OR PLACE ON VIBRATE. IF YOU MUST MAKE A CALL, PLEASE STEP OUT INTO THE ATRIUM, IN ORDER NOT TO INTERRUPT THE MEETING. B. IF YOU MUST SPEAK TO SOMEONE IN THE AUDIENCE, PLEASE SPEAK SOFTLY OR GO OUT INTO THE ATRIUM, IN ORDER NOT TO INTERRUPT THE MEETING. DECORUM POLICY FOR MEETINGS OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: INDIVIDUALS WHO WISH TO MAKE ANY “CITIZEN’S COMMENTS” UNDER THAT PORTION OF THE CITY COMMISSION AGENDA, OR WHO OTHERWISE WANT TO ADDRESS THE CITY COMMISSION, MUST FIRST BE REGISTERED WITH THE CITY CLERK (FORMS ARE AVAILABLE OUTSIDE OF THE CITY COMMISSION CHAMBERS AND MUST BE GIVEN TO THE CLERK BEFORE THE MEETING). OTHERS WHO WANT TO ADDRESS THE COMMISSION ON ANY MATTERS MUST FIRST BE RECOGNIZED BY THE MAYOR. ALL SUCH PERSONS MUST USE THE PODIUM IN THE COMMISSION CHAMBER. NO MORE THAN ONE PERSON AT A TIME MAY ADDRESS THE COMMISSION FROM THE PODIUM. COMMENTS ARE ONLY TO BE MADE TO THE CITY COMMISSION AND ARE NOT TO BE DIRECTED TO THE AUDIENCE OR CITY STAFF. NO INDIVIDUAL SHALL MAKE ANY SLANDEROUS OR UNDULY REPETITIVE REMARKS OR ENGAGE IN ANY OTHER FORM OF BEHAVIOR THAT DISRUPTS OR IMPEDES THE ORDERLY CONDUCT OF THE MEETING, AS DETERMINED BY THE MAYOR. THE MAYOR OFTEN ALLOWS APPLAUSE DURING CEREMONIAL OR CELEBRATORY PORTIONS OF THE MEETING, SUCH AS PROCLAMATIONS, PRESENTATIONS, AWARDS, OR PUBLIC SAFETY RECOGNITIONS, AS THESE ARE NOT ACTION ITEMS ARE INTENDED TO HONOR INDIVIDUALS OR EVENTS. HOWEVER, TO SAFEGUARD AN ORDERLY MEETING AND TO PRECLUDE INTIMIDATION OF SPEAKERS ON AGENDA ITEMS, OR DESIGNATED PUBLIC COMMENTS, THE MAYOR ORDINARILY PRECLUDES CLAPPING, APPLAUDING, HECKLING OR VERBAL OUTBURSTS DURING THESE PORTIONS OF THE AGENDA. BASED UPON THE FOREGOING, NO INDIVIDUAL MAY SPEAK DIRECTLY TO OR ADDRESS THE MAYOR, CITY COMMISSIONER OR CITY STAFF: COMMENTS ARE TO BE ONLY DIRECTED TO THE COMMISSION AS A WHOLE. NO CLAPPING, APPLAUDING, HECKLING OR VERBAL OUTBURSTS IN SUPPORT OF OR OPPOSITION TO A SPEAKER OR HIS OR HER REMARKS SHALL BE PERMITTED. NO SIGNS OR PLACARDS SHALL BE PERMITTED IN THE COMMISSION CHAMBER. IF ANY PERSON’S CONDUCT AS DETERMINED BY THE MAYOR IS FOUND TO BE DISRUPTIVE OR INTERFERES WITH THE ORDERLY CONDUCT OF THE MEETING, THE PERSON MAY BE ASKED BY THE MAYOR TO LEAVE THE COMMISSION CHAMBERS; IF THE PERSON DOES NOT LEAVE AND THE CONDUCT PERSISTS, THE CITY POLICE DEPARTMENT WILL BE REQUESTED TO ESCORT THE INDIVIDUAL FROM THE CITY COMMISSION CHAMBERS. ALL CELLULAR TELEPHONES ARE TO BE SILENCED DURING THE MEETING. ALL PERSONS EXITING THE COMMISSION CHAMBER SHALL DO SO QUIETLY. (RESOLUTION #2026-025) ADDENDUM NO. 1 Agenda – Dania Beach City Commission 2 of 5 (Items in red are new and/or revised) 1. CALL TO ORDER/ROLL CALL 2. MOMENT OF SILENCE AND PLEDGE OF ALLEGIANCE 3. PRESENTATIONS AND SPECIAL EVENT APPROVALS 1. Eco Ed Impact Corp's Brownfields Job Training Program, Dania Beach — Sponsored by Commissioner Rimoli 2. Green Advisory Board Report 3. Special Event Application: Tamara James Foundation Thanksgiving Drive - Parks and Recreation 4. PROCLAMATIONS 1. Pancreatic Cancer Awareness Month — November 2026 — Sponsored by Commissioner Rimoli 2. Epilepsy Awareness Month — November 2026 — Sponsored by Commissioner Davis 5. ADMINISTRATIVE REPORTS 1. City Manager 2. City Attorney 3. City Clerk - Reminders: - December 8, 2026 - CRA Board Meeting - 6 p.m. - December 8, 2026 - City Commission Meeting - 7 p.m. 6. PUBLIC SAFETY REPORTS 7. CITIZENS' COMMENTS Addressing the Commission: A thirty (30) minute "Citizen Comments" period shall be designated on the agenda for citizens and interested persons to speak on matters whether or not scheduled on that day's agenda. Individuals wishing to speak on a matter not included on the "Public Hearing" section of the agenda, which matter pertains to an item before the City Commission which requires a decision of the City Commission, may do so by signing in and submitting a form to that effect with the City Clerk prior to the meeting. Speakers at Public Hearings shall also submit such a form. Each speaker shall be limited to 3 minutes for his or her comments. If more than ten (10) speakers express a desire to speak, the Commission shall determine on a meeting by meeting basis whether to (a) extend the time allotted for citizen comments to accommodate all speakers, or (b) whether to limit the number of speakers or amount of time per speaker. A speaker's time shall not be transferable to another speaker. 8. CONSENT AGENDA 1. Minutes: October 27, 2026 City Commission Meeting Minutes Agenda – Dania Beach City Commission 3 of 5 2. Travel Requests: None 3. 2027 City Commission Meeting Dates - City Clerk 4. Request for Use of Discretionary Funds to Support the D5K Walking Club Recruiting & Holiday Event — Sponsored by Commissioner Davis 5. RESOLUTION NO. 2026-_____ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE WAIVER OF COMPETITIVE BIDDING; AUTHORIZING THE THREE-YEAR RENEWAL OF THE “FURNISH, DELIVER, AND DISCHARGE OF QUICKLIME” CONTRACT NO. 23-36B THROUGH THE SOUTHEAST FLORIDA GOVERNMENTAL PURCHASING COOPERATIVE (CO- OP) WITH LHOIST NORTH AMERICA OF ALABAMA, AND TO EXCEED THE ANNUAL VENDOR THRESHOLD OF FIFTY THOUSAND DOLLARS ($50,000) FOR THE TERM OF THE CONTRACT; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. (Public Services) 6. RESOLUTION NO. 2026-_____ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE WAIVER OF COMPETITIVE BIDDING; AUTHORIZING THE PROPER CITY OFFICIALS TO PURCHASE PAINT AND PAINT-RELATED SUPPLIES FROM THE SHERWIN-WILLIAMS COMPANY THROUGH SOURCEWELL CONTRACT 091323, AND TO EXCEED THE ANNUAL VENDOR THRESHOLD OF FIFTY THOUSAND DOLLARS ($50,000) FOR THE TERM OF THE CONTRACT; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. (Public Services) 7. RESOLUTION NO. 2026-_____ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING A SECOND AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF DANIA BEACH, FLORIDA, AND PAYBYPHONE US, INC., TO AUTHORIZE ELECTRONIC PAYMENT SERVICE FEES AND RECOGNIZING THEM AS THE MERCHANT OF RECORD; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Community Development) 8. RESOLUTION NO. 2026-_____ Agenda – Dania Beach City Commission 4 of 5 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE CITY TO ENTER INTO FOUR STATEMENTS OF WORK WITH ENTECH COMPUTER SERVICES, LLC FOR VARIOUS MANAGED SERVICES AND ONSITE STAFF AUGMENTATION FOR A THREE-YEAR TERM; AUTHORIZING EXPENDITURES EXCEEDING THE FIFTY THOUSAND DOLLAR ($50,000.00) PER-VENDOR FISCAL-YEAR THRESHOLD; AUTHORIZING A TOTAL BASE CONTRACTUAL EXPENDITURE OF SIX HUNDRED SEVENTY-SEVEN THOUSAND FIVE HUNDRED TWENTY-TWO DOLLARS AND EIGHTY-EIGHT CENTS ($677,522.88); WAIVING COMPETITIVE BIDDING REQUIREMENTS; AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE THE NECESSARY DOCUMENTS; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Information Technology) 9. RESOLUTION NO. 2025-______ A RESOLUTION OF THE CITY COMMISSION OF THE DANIA BEACH, FLORIDA, AMENDING RESOLUTION 2025-111 TO CHANGE THE ORDER OF AGENDA MEETINGS; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Sponsored by Mayor Ryan) 9. BIDS AND REQUESTS FOR PROPOSALS 1. RESOLUTION NO. 2026-_____(This item to be heard after Item 12.1) A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE AWARD OF INVITATION TO BID (ITB) NO. 26- 023, CHESTER BYRD PARK IMPROVEMENTS TO M&J CONSULTING GROUP CORP., IN AN AMOUNT NOT TO EXCEED ONE MILLION FOUR HUNDRED TWENTY-EIGHT THOUSAND THREE HUNDRED NINETY-SEVEN DOLLARS AND NINETY-FOUR CENTS ($1,428,397.94); AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE AN AGREEMENT FOR SERVICES WITH M&J CONSULTING GROUP CORP.; AND TO EXCEED THE ANNUAL SINGLE- VENDOR PURCHASING THRESHOLD OF FIFTY THOUSAND DOLLARS ($50,000.00); PROVIDING FOR FUNDING; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Parks & Recreation) 10. QUASI-JUDICIAL & PUBLIC HEARING ITEMS 1. RESOLUTION NO. 2026-_____ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, APPROVING THE SITE PLAN MODIFICATION (SP-005-99MOD3), AND SPECIAL EXCEPTION (SE-030-26) TO ALLOW A SECONDARY SCHOOL OPERATION WITH DROP-OFF LANE, SUBMITTED BY THE OWNER, DCOTA DEVELOPMENT CO LP, FOR THE PROPERTY GENERALLY LOCATED AT Agenda – Dania Beach City Commission 5 of 5 1815-1855 GRIFFIN ROAD, IN THE CITY OF DANIA BEACH, PROVIDING FOR CONDITIONS; CONFLICT; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Community Development) 11. FIRST READING ORDINANCES: None First reading ordinances under this section are not subject to public hearing and may be taken all at once, unless pulled by the City Commission. A public hearing and discussion will take place at second reading of all ordinances within its respective section of the agenda. 12. SECOND READING ORDINANCES 1. ORDINANCE NO. 2026-_____ (This item to be heard before Item 9.1) AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE EXPENDITURE OF CITY FUNDS EXCEEDING ONE MILLION DOLLARS ($1,000,000.00), AND REQUIRING A 4/5 VOTE OF THE CITY COMMISSION TO FUND THE CHESTER BYRD PARK IMPROVEMENTS, ITB NO. 26-023; PROVIDING FOR CODIFICATION; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Parks & Recreation) 13. DISCUSSION AND POSSIBLE ACTION 1. Appointments — Broward Solid Waste Authority — Governing Board Member and Governing Board Member Alternate — City Attorney 14. APPOINTMENTS: (Deferring to December Meeting) 15. COMMISSION COMMENTS 16. ADJOURNMENT City of Dania Beach Parks & Recreation Memorandum DATE: 11/17/2026 TO: Mayor and Commissioners FROM: Candido Sosa-Cruz, ICMA-CM, City Manager VIA: Cassi Waren, CPRP, Director of Parks & Recreation SUBJECT: Special Event Application: Tamara James Foundation Thanksgiving Drive Request: The Tamara James Foundation is interested in hosting their annual Thanksgiving Turkey Drive on Tuesday, November 24, 2026 from 9AM – 2PM. The location of the event will take place at CW Thomas Park (800 NW 2nd Street, Dania Beach, FL 33004). This requires City Commission approval due to the following: • Major Event - Attendance over 500 • Potential road closures / traffic impacts Background: The Tamara James Foundation has hosted their Thanksgiving Drive for 18 consecutive years. The event is to assist in food distribution to the community consisting of collard greens and turkeys for the Thanksgiving holiday. Budgetary Impact Funding for special event application fee, in the amount of three hundred dollars ($300.00), was approved by City Commission at the October 27, 2026, City Commission meeting. Account to be utilized per approval is 001-11-01-511-48-21. Recommendation The Parks and Recreation Department is recommending that the City Commission approve the special events application request with the conditions noted. The applicant will pay for any necessary services recommended below, if applicable. Department Review: Comments: Parks & Recreation No issues Public Services No issues BSO Police Dept. No issues. PRK - Special Event Application 11/05/2026 9:58 PM (EST) City of Dania Beach Special Event Application Submit a COMPLETED APPLICATION AND upload a SITE PLAN. Please make sure all sections are completed. Incomplete applications will be returned to the applicant. After you submit the application with your fee, you will be contacted by the Special Events Liaison to review and further process your application. The Special Events Liaison will contact you once the review is complete and provide conditions or comments. For MAJOR EVENTS Special Events Liaison will provide you with the next available City Commission for final approval. The Special Events Liaison will send the applicant an approved permit once all review is finalized. Type of Event:Major Event - more than 500 people, consecutive multi-day event, road closures (Reguires Commission Approval) Organization Name:Tamara James Thanksgiving Drive Today's Date:11/04/2026 Main Contact Name:Tamara James Email:tamara@tamarajames.us Phone:9542587552 Secondary Phone:9546081111 Address:255 NW Tamara James Ave City:Dania Beach State:Florida Zip Code:33004 Secondary Contact Name:Tammie James Secondary Phone:954601111 Is this organization Nonprofit* *If Nonprofit, please include a copy of the IRS 501(c) tax exemption letter.FinalLetter_02-0812769_TAMARAJAMESFOUNDATIONINC_09102025_00.pdf Please provide the event day, start and end times, expected attendance, setup schedule, and activities for each event day, with additional event days added as needed. Start Date 11/24/2026 End Date 11/24/2026 Name of Event:Tamara James Thanksgiving Drive Event Address:800 NW 2nd St City:Dania Beach State:Florida Zip Code:33004 Event Type:Other Other:Community Food Drive Expected Maximum Attendance:600 Purpose of Event:Food Drive Description of Event (Please attach a detailed site plan): Drive through distribution for collard greens and turkeys. # of years the event has been in existence?18 Past Attendance:500-1,000 Page 1/3 Previous Location(s):Frost Park, The PATCH, Tammie's house Will an event production team be use?No Date 11/24/2026 Day Tuesday Start Time 9:00 AM (EST) End Time 2:00 PM (EST) Please click here to upload site plan Tamara James Turkey Giveaway.pdf Are you the property owner of the location in which the event is taking place?No _________________________________________________________________________________________________________________________________________________ Will you require use of a City Park? If yes, please select park: C. W. Thomas Park Will your event require the use of the beach:No Will your event require additional sanitation supplies? (E.g. Port-o-potties) No Are you requesting the use of additional City staff/equipment? Yes If yes, what are you requesting:Staff Will you require parking spaces at the beach?No *NOTE: All parking spaces used will require payment of the parking meters. Will your event be serving food?No Method used for cooking N/A Will there be alcohol served at this event?No ***If you answer yes to any of the below questions, a permit may be required*** Will you be using any tents for your event?No Will you be using a stage for your event?No Will your event require electricity?No Will gas equipment be used?No Will cooking equipment be used?No Will the event include amusement rides, inflatables or children’s games? No Will the event include the use of fireworks or other pyrotechnics? No Are you requesting any roads to be closed?Yes ***If closing FDOT roads, a permit must be submitted through FDOT, and City Commission approval is required. How do you plan on marketing your event? (select all that apply) Radio Ads Flyers Other Other social media Will the event have entertainment?No Will amplified sound equipment be used?No Will musical entertainment be used?No Are you charging a fee for the event?No Law Enforcement and Emergency Services Information Your event may require law enforcement and/or emergency services which will be determined using this application, your site plan, narrative, traffic and transportation plan, Broward Sheriff's Office Department of Fire Rescue and Emergency Services special event application, and any additional information requested during your special event meeting Page 2/3 and review. An estimation of the required service level and associated fees will be presented after the Broward Sheriff's Office has reviewed the application. Once the requirements have been finalized, an invoice(s) will be provided. All Broward Sheriff's Office fees must be paid in advance of the event. Law Enforcement Your event may require security services based on expected attendance and other risk factors such as alcohol sales, duration, time, day, location, and event type. The determination of law enforcement requirements is made at the sole discretion of the Broward Sheriff's Office. Depending on your event, it may be possible to supplement some of the required law enforcement services with a private third-party security company. This determination is at the sole discretion of the Broward Sheriff's Office and will require a detailed security plan submission by the security vendor. Additionally, the security vendor would need to provide a copy of their business license, proof of insurance, and a list of personnel assigned to the event. Emergency Services Your event may require medical services and/or stand-by firefighter or fire inspector details. These requirements are based on expected attendance and other risk factors such as alcohol sales, duration, time, day, location, and event type. The determination of these requirements is made at the sole discretion of the Broward Sheriff's Office. *All Fees above are subject to change. Event sponsor will receive invoice with actual service price incurred. Payment for Details can be made as follows: Payment in person: Broward County Sheriff's Office Public Safety Building 2601 West Broward Blvd. Fort Lauderdale, FL 33312 Payment by mail: Broward County Sheriff's Office Attn: Special Revenue Unit P.O. Box 9507 Fort Lauderdale, FL 33312 Payment online: You can now make payments online 24 hours per day, 7 days a week, 365 days per year. Please visit: https://www.govpaynow.com/gps/user/cyg/welcome *FEES APPLY FOR ONLINE PAYMENTS Make all checks payable to Broward Sheriff's Office. Include Fire Tracking Number on the check (located at the top right corner of billing form). The information I have provided on this application is true and complete to the best of my knowledge. If I have not submitted my application with the necessary plans, within the deadline and according to the rules outlined in the Special Events Ordinance, it may be denied. Before receiving final approval from the City Commission, I understand that I (and the production company, if applicable), must furnish an original certificate of General Liability Insurance naming the City of Dania Beach as additionally insured in the amount of at least one million dollars ($1,000,000) or greater as deemed satisfactory by the City Risk Manager, and an original certificate of liquor liability insurance in the amount of five hundred thousand dollars ($500,000) if alcohol is being served. Other liability insurance and fees may also be required up to thirty (30) days in advance of the event. I understand that the City of Dania Beach sponsored activities have precedence over the event requested above and I will be notified if any conflicts arise. I understand the requirements for law enforcement, security, fire prevention, and fire rescue and emergency services are determined at the sole discretion of the Broward Sheriff’s Office. I understand that any cancellations for City scheduled services must be made by phone to each department representative at least 24 hours before the scheduled event time or the organizer will be liable for any associated fees. I understand that the City has a noise ordinance that my event must follow. I agree to abide by all provisions of the noise control ordinance and understand that my failure to do so may result in a civil citation, a physical arrest, or the shutting down of the event. If at any time during the event it is determined by law enforcement personnel, code enforcement personnel, parks and recreation personnel, or any other City representative that the entertainment or music is causing a noise disturbance, I will be directed to lower the volume to an acceptable level as determined by City staff. If a second noise disturbance arises during the event, I may be directed to shut down the music or entertainment for the remainder of the event. I understand the requirements for law enforcement, security, fire prevention, and fire rescue and emergency services are determined at the sole discretion of the Broward Sheriff’s Office. Site Plan must include: 1. Stage location, restrooms, fencing, tents, bounce houses, etc. 2. The maintenance of the traffic plan with barricades, directions, cones, etc., if road closures are needed 3. Parking options for attendees 4. Security plan 5. Tents and Sizes 6. DJ, proposed sign locations, generators, food trucks, and cooking appliances To pay the special event permit application fee, please create an account on CivicRec, CivicRec, where an invoice will be sent electronically to the applicant for payment via credit card. Event Organizer Signature: Date:11/04/2026 Page 3/3 LIGHT TOWER TABLES COLLARD GREENS PACKING AREA TRUCK WITH TURKEYS 6 CITY OF DANIA BEACH OFFICE OF THE CITY MANGER 100 West Dania Beach Blvd ∙ Dania Beach, FL 33004 ∙ (954) 924-6800 ∙ (954) 921-2604 (fax) MEMORANDUM Date: November 17, 2026 To: Mayor Colman Ryan Vice Mayor Diana Fahmie Commissioner Joyce L. Davis Commissioner Luis Rimoli Commissioner Marco A. Salvino, Sr. From: Candido Sosa-Cruz, ICMA-CM, City Manager Subject: Manager’s Report Dania Beach continues to move forward with a strong focus on quality-of-life services, responsible financial management and investments that improve everyday life for our residents. Across the City, our team is advancing infrastructure and drainage projects, improving public facilities and strengthening public safety while responding to community needs with care and accountability. Recent accomplishments include the completion of repairs to the beach elevator and a successful State of the City event supported by sponsorships. As we prepare for our fifth annual Light Up the Night celebration, we continue creating opportunities to bring our community together and support local businesses. The updates that follow reflect the dedication of our city team and the partnerships that help turn City priorities into meaningful results. Community Development The Building Department issued 125 building permits and conducted 1,004 inspections. The Zoning Division processed 36 new Certificates of Use applications for new businesses in the City for the month. This month, a total of 84 complaints were submitted through the City's Ask Dania Beach App and promptly inspected by our code enforcement team. The Code Compliance Division collaborates with Public Services to address bulk trash and nuisance issues throughout the City. This month, a total of 24 bulk notices were issued. Parks and Recreation The Parks and Recreation Department is excited to welcome participants back to its senior programs. The Dania Beach Senior Club, Gracefully Aging, and Social Seniors have all resumed activities, bringing members back to our parks to reconnect, socialize, and enjoy meaningful time together. Dania Beach Senior Club: 123 registered members Gracefully Aging: 98 registered members Social Seniors: 39 enrolled members IT Parker continues to be a premier rental site for the Department, reaching over $110,000.00 in revenue and is currently booked on the weekends until August of 2027. Public Services SE Drainage Phase I The project is substantially complete, with all major drainage infrastructure, roadway restoration, and the second lift of asphalt completed. The remaining work is limited to the Pump Station, where the transformer and utility pole have already been installed. The purchase of the disconnect switch has been approved. Once permanent power is available, the contractor will proceed with pump startup, testing, and commissioning, followed by final project close-out and turnover to the City. SE Drainage Phase II All drainage piping, including gravity and force mains, and all drainage structures have been installed. Remaining civil work is limited to driveway restoration on SE 7th Street, minor swale/sod restoration on SE 6th and SE 7th Streets, and the final asphalt lift. FPL has confirmed that the utility pole installation. Following installation of the required electrical infrastructure and permanent energization, the remaining pump station components will be completed, followed by startup, testing, and commissioning. The project remains on track for the contractual Substantial Completion date of December 31, 2026, provided FPL energization and commissioning proceed as scheduled. PJ Meli Park Neighborhood Drainage Improvements Kimley-Horn completed the hydraulic analysis identifying existing capacity limitations within the Griffin Road drainage system. Following review of the findings, the City directed the consultant to advance the SW 28th Terrace improvements while designing the associated Griffin Road drainage infrastructure to accommodate the ultimate five-road condition. Kimley-Horn is updating the construction plans and coordinating the necessary FDOT permitting for connection to the existing drainage system. The preliminary construction cost estimate is approximately $6 million, including contingency. BSO Police Congratulations to our Dania Beach Neighborhood Support Team (NST) on being named the 2026 Southeast Florida Crime Prevention Unit of the Year by the Southeast Florida Crime Prevention Association. Deputies Taryn Session and Anthony Benson exemplify what community policing is all about. From educating seniors about fraud and teaching children important safety lessons to raising awareness about domestic violence and preventing overdoses, this BSO team goes above and beyond to serve the Dania Beach Community. City of Dania Beach 100 WEST DANIA BEACH BLVD DANIA BEACH,FLORIDA 33004 THURSDAY, NOVEMBER 12,2026 Special Magistrate Agenda Page 1 of 7 Case # Status Hearing Type Property Address Cited Party Default Inspector 2025-00001582 Active H-CONFIRMATION - Confirmation Hearing 608 SW 12 AVE BEN HANAN INVESTMENT INC Alberto Chavarria 2025-00001965 Active H-FIRST HEARING - First Hearing FOREST VIEW CIR FOREST VIEW ESTATES LLC Alberto Chavarria 2026-00000426 Active H-EXTENSION - Extension Hearing 4240 SW 50 ST GALLEGO,LUIS F & YANETH & KAREN GALLEGO Alberto Chavarria 2026-00000958 Active H-FIRST HEARING - First Hearing 5504 SW 44 TER ESTEE, LINDA Alberto Chavarria 2026-00000986 Active H-FIRST HEARING - First Hearing SW 37 TER SAMUEL & ESTHER ROGATINSKY TR ROGATINSKY, JONATHAN TRSTEE ETAL Alberto Chavarria 2026-00001006 Active H-FIRST HEARING - First Hearing 3981 SW 58 ST 3981 SW 58 LLC Alberto Chavarria 2026-00001007 Active H-FIRST HEARING - First Hearing 3981 SW 58 ST 3981 SW 58 LLC Alberto Chavarria 2026-00001066 Active H-RECURRING - Recurring Hearing 4021 SW 54 CT ATTIAS 5 LLC Alberto Chavarria 2026-00000120 Active H-FIRST HEARING - First Hearing 422 SE 10 ST MEADOWBROOK LAKES SEC C RECREATION CENTER INC Anson Westberry 2026-00000363 Active H-FIRST HEARING - First Hearing 413 SE 3 TER ECHAVE, MARIA L Anson Westberry 2026-00000782 Active H-RECURRING - Recurring Hearing NE 2 PL JOSEPH A MANCUSI & MICHAEL MANCUSI Anson Westberry 2026-00000835 Active H-RECURRING - Recurring Hearing 1121 S FEDERAL HWY ARD FLORIDA INVESTMENTS LLC Anson Westberry City of Dania Beach 100 WEST DANIA BEACH BLVD DANIA BEACH,FLORIDA 33004 THURSDAY, NOVEMBER 12,2026 Special Magistrate Agenda Page 2 of 7 2026-00000922 Active H-FIRST HEARING - First Hearing 138 N FEDERAL HWY DANIA BEACH ENTERPRISES LLC Anson Westberry 2026-00000957 Active H-FIRST HEARING - First Hearing 1351 SE 7 AVE SCG ATLAS SHERIDAN OCEAN CLUB LLC % RYAN LLC Anson Westberry 2026-00000960 Active H-REPEAT HEARING - Repeat Hearing 405 SE 4 ST FERNANDEZ, ANGELA FERNANDEZ, TERESA Anson Westberry 2026-00000999 Active H-RECURRING - Recurring Hearing 21 SE 1 AVE EAGLE RUN INVESTMENTS LLC GARALFA & OKAMOTO LLC Anson Westberry 2026-00001000 Active H-RECURRING - Recurring Hearing 401 E SHERIDAN ST SUSO 5 SHERIDAN LP % SLATE ASSET MANAGEMENT LP Anson Westberry 2026-00001008 Active H-FIRST HEARING - First Hearing 325 SE 3 PL BELLA VITA LLC Anson Westberry 2026-00001029 Active H-FIRST HEARING - First Hearing 230 NE 2 PL BEYOND PRODUCTIONS 08 LLC Anson Westberry 2026-00001064 Active H-FIRST HEARING - First Hearing 721 NATURE'S COVE RD HARRY C BRUNER JR Anson Westberry 2026-00001087 Active H-FIRST HEARING - First Hearing 2800 S FEDERAL HWY SCADD LLC Anson Westberry 2026-00001090 Active H-FIRST HEARING - First Hearing 180 E DANIA BEACH BLVD DAWSON JOHNSON OPERATIONS LLC DAWSON OPERATIONS LLC Anson Westberry 2026-00001206 Active H-RECURRING - Recurring Hearing 401 SE 5 ST HUAMAN ACHATA, NEMESIO Anson Westberry 2026-00001208 Active H-RECURRING - Recurring Hearing 1409 S FEDERAL HWY PROJECT USA LLC Anson Westberry City of Dania Beach 100 WEST DANIA BEACH BLVD DANIA BEACH,FLORIDA 33004 THURSDAY, NOVEMBER 12,2026 Special Magistrate Agenda Page 3 of 7 2026-00001209 Active H-REPEAT HEARING - Repeat Hearing 414 SE 5 ST MORALES, EUGENIA GARAY, RANDOLPH Anson Westberry 2026-00001260 Active H-REPEAT HEARING - Repeat Hearing 414 SE 5 ST MORALES, EUGENIA & GARAY, RANDOLPH Anson Westberry 2025-00000872 Active H-EXTENSION - Extension Hearing 161 NW 12 AVE THOMAS JOHNELL Luciano Nibbs 2026-00000912 Active H-FIRST HEARING - First Hearing 122 NW 8 AVE MICHAEL ARAUZ Luciano Nibbs 2026-00000918 Active H-FIRST HEARING - First Hearing 45 SW 7 AVE ADRIAN ANGLIN Luciano Nibbs 2026-00000963 Active H-FIRST HEARING - First Hearing 830 NW 12 AVE MICHAEL J BUSH Luciano Nibbs 2026-00000964 Active H-FIRST HEARING - First Hearing 814 NW 9 AVE ORACLE USA LLC Luciano Nibbs 2026-00000966 Active H-FIRST HEARING - First Hearing 217 NW 6 AVE VALDERE NUBY STAFFORD Luciano Nibbs 2026-00000967 Active H-FIRST HEARING - First Hearing 221 NW 6 AVE RONALD NUBY Luciano Nibbs 2026-00000976 Active H-FIRST HEARING - First Hearing 137 SW 5 CT LIVE CHEAP LLC Luciano Nibbs 2026-00001038 Active H-FIRST HEARING - First Hearing 700 STIRLING RD STIRLING SQUARE LLC %ALDI FL ATTN RYAN TAX COMP SERV Luciano Nibbs 2026-00000942 Active H-FIRST HEARING - First Hearing 3201 SW 26 TER KAG ENERGY LLC % AMY LOUDERMILK Marisa Lee 2026-00000944 Active H-FIRST HEARING - First Hearing 3201 SW 26 TER KAG ENERGY LLC % AMY LOUDERMILK Marisa Lee City of Dania Beach 100 WEST DANIA BEACH BLVD DANIA BEACH,FLORIDA 33004 THURSDAY, NOVEMBER 12,2026 Special Magistrate Agenda Page 4 of 7 2026-00000946 Active H-FIRST HEARING - First Hearing 2181 SW 42 ST FRANMAR PROPERTIES OF SOUTH FLORIDA LLC Marisa Lee 2026-00000961 Active H-FIRST HEARING - First Hearing SW 34 ST 3301 RAVENSWOOD JA LLC Marisa Lee 2026-00000987 Active H-FIRST HEARING - First Hearing 4409 SW 34 TER LEE, ERNESTO & KIMBERLY Marisa Lee 2026-00001017 Active H-FIRST HEARING - First Hearing 2765 GRIFFIN RD BRADY, DWIGHT Marisa Lee 2026-00001071 Active H-FIRST HEARING - First Hearing 3020 SW 47 ST MARSHBURN, KEVIN & BETZAIDA Marisa Lee 2025-00001877 Active H-EXTENSION - Extension Hearing 4480 SW 26 AVE DARMONY, JORDANA LEIGH DARMONY, CLAUDE Michelle Shahryar 2026-00000142 Active H-ABATEMENT - Abatement Hearing 237 SW 4 ST S/S 237 DANIA REALTY LLC %ELBIA SANCHEZ Michelle Shahryar 2026-00000281 Active H-EXTENSION - Extension Hearing 610 NE 2 PL CHERNIY, DENNIS Michelle Shahryar 2026-00000297 Active H-EXTENSION - Extension Hearing 4761 SW 43 AVE EBN INVESTMENT CORP INC Michelle Shahryar 2026-00000317 Active H-EXTENSION - Extension Hearing 4364 SW 51 ST JORLOP 4364 LLC Michelle Shahryar 2026-00000436 Active H-EXTENSION - Extension Hearing 701 N FEDERAL HWY SEABOARD WAREHOUSE TERMINALS OF FT LAUDERDALE, INC Michelle Shahryar 2026-00000989 Active H-FIRST HEARING - First Hearing 242 SW 8 ST SUSAN LOUISE JOSLYN REV LIV TR JOSLYN, SUSAN LOUISE TRSTEE Michelle Shahryar 2026-00001014 Active H-RECURRING - Recurring Hearing 718 NW 9 AVE PULIDO, ROGNY RAGA Michelle Shahryar City of Dania Beach 100 WEST DANIA BEACH BLVD DANIA BEACH,FLORIDA 33004 THURSDAY, NOVEMBER 12,2026 Special Magistrate Agenda Page 5 of 7 2026-00001056 Active H-REPEAT HEARING - Repeat Hearing 3241 SW 44 ST B & H INVESTMENT MANAGEMENT LLC Michelle Shahryar 2026-00001062 Active H-FIRST HEARING - First Hearing 4443 SW 49 CT ASHER BUHBUT Michelle Shahryar 2026-00001072 Active H-RECURRING - Recurring Hearing 4541 SW 34 AVE DIANE ZAHURANEC Michelle Shahryar 2026-00001074 Active H-REPEAT HEARING - Repeat Hearing 4610 SW 30 AVE LAUREN BERDUGO-YARKONY Michelle Shahryar 2026-00001075 Active H-REPEAT HEARING - Repeat Hearing 3271 SW 44 ST MIRACLE 26 LLC Michelle Shahryar 2026-00001084 Active H-FIRST HEARING - First Hearing 3181 SW 44 ST 3181 SW 44TH STREET LLC Michelle Shahryar 2026-00001096 Active H-FIRST HEARING - First Hearing 4500 SW 38 TER 4500 SW 38 LLC Michelle Shahryar 2026-00001098 Active H-RECURRING - Recurring Hearing 4313 SW 49 ST LEVANA COHEN Michelle Shahryar 2026-00001124 Active H-FIRST HEARING - First Hearing 231 SW 9 ST FROM BALL GIRL TO CEO LLC Michelle Shahryar 2026-00001149 Active H-FIRST HEARING - First Hearing 100 SE 4 TER ALEGRE, GABRIELA & RAYMOND Michelle Shahryar 2026-00001151 Active H-RECURRING - Recurring Hearing 121 NE 2 AVE LEVY DANIEL Michelle Shahryar 2024-00001880 Active H-ABATEMENT - Abatement Hearing 4248 SW 51 ST IRINAKA MASAHIRO Ricky Ali 2025-00000053 Active H-ABATEMENT - Abatement Hearing 4616 SW 35 AVE SCOTT & MARIA C OLIFF Ricky Ali 2026-00001055 Active H-REPEAT HEARING - Repeat Hearing 550 S FEDERAL HWY 111th BIXBY LLC Ricky Ali City of Dania Beach 100 WEST DANIA BEACH BLVD DANIA BEACH,FLORIDA 33004 THURSDAY, NOVEMBER 12,2026 Special Magistrate Agenda Page 6 of 7 2026-00001081 Active H-FIRST HEARING - First Hearing 506 S FEDERAL HWY POP FLORIDA PROPERTIES LLC Ricky Ali 2026-00001088 Active H-FIRST HEARING - First Hearing 49 SW 11 ST MANZALIKO LLC Ricky Ali 2026-00001132 Active H-RECURRING - Recurring Hearing 401 SE 5 ST HUAMAN ACHATA, NEMESIO Ricky Ali 2026-00001202 Active H-REPEAT HEARING - Repeat Hearing 337 SW 13 ST LAEL BAPTIST CHURCH INC Ricky Ali 2026-00001203 Active H-REPEAT HEARING - Repeat Hearing 337 SW 13 ST LAEL BAPTIST CHURCH INC Ricky Ali 2026-00001259 Active H-REPEAT HEARING - Repeat Hearing 608 SW 12 AVE BEN HANAN INVESTMENT INC Ricky Ali 2026-00001261 Active H-REPEAT HEARING - Repeat Hearing OAK STREET INVESTMENT GRADE NET LEASE FUND SERIES 2020-1 LLC Ricky Ali 2024-00001615 Active H-ABATEMENT - Abatement Hearing 5753 SW 24 AVE TIMOTHY NOLAN RAZOR Windy Damis 2025-00001740 Active H-ABATEMENT - Abatement Hearing 300 E DANIA BCH BLVD LAS OLAS STUDIOS INC Windy Damis 2026-00000040 Active H-EXTENSION - Extension Hearing 5607 LAGOON DR ROSALES GONZALEZ EVELING J Windy Damis 2026-00000177 Active H-EXTENSION - Extension Hearing 5000 SW 24 AVE YOMRE LLC Windy Damis 2026-00000234 Active H-EXTENSION - Extension Hearing SW 50 ST DWYER RICHARD & DWYER MARY JANE Windy Damis 2026-00000477 Active H-EXTENSION - Extension Hearing 2420 SW 58 MNR 2 STEPS UP LLC Windy Damis City of Dania Beach 100 WEST DANIA BEACH BLVD DANIA BEACH,FLORIDA 33004 THURSDAY, NOVEMBER 12,2026 Special Magistrate Agenda Page 7 of 7 2026-00000766 Active H-FIRST HEARING - First Hearing 5205 SW 22 TER SINANANSINGH, DHANRAM SINGH, HIMDAYE S Windy Damis 2026-00000798 Active H-FIRST HEARING - First Hearing 5182 SW 27 TER CRANE WENDY LYNN Windy Damis 2026-00000807 Active H-FIRST HEARING - First Hearing 2600 SW 55 ST ELIZABETH & OPHER LEVY Windy Damis 2026-00000842 Active H-FIRST HEARING - First Hearing 5560 SW 25 WAY NOLDON-MOZELL TEISHA Windy Damis 2026-00000877 Active H-FIRST HEARING - First Hearing 5211 SW 28 TER THOMPSON, CAROLINA MASSEY, RYAN Windy Damis 2026-00000900 Active H-FIRST HEARING - First Hearing 5140 SW 28 AVE ROMA JOSPEH III & ROMA NICOLE FOLIGNO Windy Damis 2026-00001073 Active H-FIRST HEARING - First Hearing 2180 ANNTOM DR 8 2180 ANNTOM DR #8 INC Windy Damis 2026-00001108 Active H-RECURRING - Recurring Hearing 5092 SW 26 AVE CHIANG, HAN YIN & CHAO, CHIEN Windy Damis 2026-00001147 Active H-RECURRING - Recurring Hearing 2830 CYPRESS DR MCGUIRE, MICHAEL GRIFFIN Windy Damis 1. CALL TO ORDER/ROLL CALL Mayor Davis called the meeting to order at 7:04 p.m. Present: Mayor Joyce L. Davis Vice-Mayor Marco A. Salvino, Sr. Commissioner Lori Lewellen Commissioner Luis Rimoli Commissioner A. J. Ryan IV City Manager Candido Sosa-Cruz, ICMA-CM City Attorney Eve Boutsis City Clerk Elora Riera, MMC 2. MOMENT OF SILENCE AND PLEDGE OF ALLEGIANCE Mayor Davis called for a moment of silence followed by the Pledge of Allegiance to the United States Flag. City Attorney Boutsis read the Statement of Decorum. 3. PRESENTATIONS AND SPECIAL EVENT APPROVALS 3.1 Presentation to Commissioner Archibald J. Ryan IV — Sponsored by Mayor Davis This item was taken after item #4.1. Mayor Davis introduced the item and thanked Commissioner Ryan for his dedicated service to the City of Dania Beach, recognizing his commitment to the community, particularly its youth and veterans. She wished him continued success in his future endeavors. 3.2 Presentation to Commissioner Lori Lewellen — Sponsored by Commissioner Rimoli This item was taken after item #11.2. Minutes of Regular Meeting 2 Commissioner Rimoli introduced the item and shared remarks from former City Manager Ana Garcia recognizing Commissioner Lewellen’s leadership, particularly during the COVID-19 pandemic, and her lasting contributions to the City. He then thanked Commissioner Lewellen for her eight years of dedicated public service as Commissioner, Vice Mayor, and Mayor, and wished her continued success in her future endeavors. Sponsored by Commissioner Rimoli Sponsored by Mayor Davis Sponsored by Commissioner Rimoli Finance Parks and Recreation Commissioner Ryan made a motion to approve the application in full and to reallocate $16,700.00 of the $30,000.00 previously designated for the Day of Service to fund the MLK Breakfast and Parade, with the remaining balance to be used for the Day of Service. The motion also directed staff to coordinate with the MLK Renaissance Corp. to align the conclusion of the parade with the Day of Service activities. The motion was seconded by Commissioner Lewellen which carried unanimously on voice vote. Parks and Recreation Parks and Recreation Minutes of Regular Meeting 3 PROCLAMATIONS Sponsored by Mayor Davis This item was taken after item #4.3. Sponsored by Commissioner Lewellen This item was taken after item #2. Sponsored by Commissioner Rimoli This item was taken after item #4.2. ADMINISTRATIVE REPORTS This item was taken after item #11.3. Minutes of Regular Meeting 4 - November 10, 2026 - City Commission Meeting — 7:00 p.m. PUBLIC SAFETY REPORTS CITIZENS’ COMMENTS rd Terr. th Terr. th St. CONSENT AGENDA This item was taken after item 3.1. Commissioner Lewellen made a motion to approve the consent agenda. The motion was seconded by Commissioner Rimoli which carried unanimously on voice vote. Approved under consent agenda. Minutes of Regular Meeting 5 8.3 RESOLUTION NO. 2025-____ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICALS TO EXECUTE AN AGREEMENT WITH THE STOUT GROUP, LLC FOR THE CONSTRUCTION OF INVITATION TO BID (ITB) NO. 26-019, “OCEAN PARK PARKING – PHASE 1” IN THE AMOUNT NOT TO EXCEED TWO HUNDRED THIRTY SEVEN THOUSAND ONE HUNDRED SEVENTY EIGHT DOLLARS ($237,178.00); PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE. (Public Services) Approved under consent agenda. A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING ADDITIONAL FUNDING IN AN AMOUNT NOT TO EXCEED FIFTY THOUSAND DOLLARS ($50,000.00) FOR THE CONTINUED IMPLEMENTATION OF PLANNING AND ZONING, AND CODE COMPLIANCE SOFTWARE PROVIDED BY TYLER TECHNOLOGIES, INC., PREVIOUSLY APPROVED PERSUANT TO RESOLUTION NO.2024-121; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Community Development) Approved under consent agenda. (Public Services) Approved under consent agenda. BIDS AND REQUESTS FOR PROPOSALS QUASI-JUDICIAL HEARINGS Minutes of Regular Meeting 6 DANIA BEACH, FLORIDA; PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE. (Sponsored by Commissioner Lewellen) This item was taken after item #3.7. Commissioner Rimoli made a motion to approve the item. The motion was seconded by Vice Mayor Salvino which failed 3-2 on roll call vote with Commissioner Rimoli, Vice Mayor Salvino and Commissioner Lewellen voting yes and Commissioner Ryan and Mayor Davis voting no. (Sponsored by Commissioner Lewellen) This item was taken after item #3.7. Vice Mayor Salvino made a motion to approve the item. The motion was seconded by Commissioner Rimoli which carried 5-0 on roll call vote. FIRST READING ORDINANCES Minutes of Regular Meeting 7 AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, RELATING TO COMMUNITY DEVELOPMENT, AMENDING CHAPTER 28 “LAND DEVELOPMENT CODE” (“LDC”); AT PART 3, ENTITLED “SPECIAL ZONING DISTRICTS”; SUBPART 1, ENTITLED “COMMUNITY REDEVELOPMENT AREA (CRA) FORM-BASED ZONING DISTRICTS; ARTICLE 302 ENTITLED “DETAILED USE REGULATIONS”; AT SECTION 302-10, ENTITLED “PERMITTED, SPECIAL EXCEPTION AND PROHIBITED USES” ADDING LANGUAGE RELATING TO MARINE USE (WET AND DRY STORAGE) FOR THE CITY CENTER DISTRICT TO THE LDC; AMENDING SECTION SEC. 302-20, ENTITLED “CONDITIONS OF USE”, AT SUBSECTION (4) RELATING TO DRIVE THRU SERVICES AND HOW TO CALCULATE STACKED PARKING; AND SUBSECTION (23) RELATING TO MARINE USE; AMENDING ARTICLE 303, ENTITLED “DISTRICT DEVELOPMENT STANDARDS” TO REFERENCE ARTICLE 206 FOR APPLICATION IN THE FOLLOWING SECTIONS 303-40, 303-50 THROUGH 303-90 TO CLARIFY THE SUSTAINABLE BUILDING REQUIREMENTS FOR THE FOLLOWING DISTRICTS: CITY CENTER (CC), NEIGHBORHOOD MIXED-USE (NBHD-MU), EAST DANIA BEACH BOULEVARD MIXED USE (EDBB-MU), BEACH GATEWAY MIXED-USE (GTWY- MU), BEACH GATEWAY MIXED-USE II (GTWY- MU II), SOUTH FEDERAL MIXED-USE (SFED-MU) AND THE NEIGHBORHOOD RESIDENTIAL (NBHD-RES) DISTRICT; AMENDING PART 6, ENTITLED “DEVELOPMENT REVIEW PROCEDURES AND REQUIREMENTS”; ARTICLE 605, ENTITLED “GENERAL APPLICATION REQUIREMENTS” AT SECTION 605-30, ENTITLED “APPLICATION SUBMITTAL REQUIREMENTS” TO UPDATE THE LANGUAGE OF WHO CAN APPROVE A MEMORANDUM OF AGREEMENT FOR A TRAFFIC IMPACT STUDY; AND REPEALING CHAPTER 2, ENTITLED “ADMINISTRATION”, AT ARTICLE I, ENTITLED “IN GENERAL”, AT SECTION 2.13 ENTITLED “FEES FOR PLATTING, REPLATTING APPLICATIONS, APPEALS TO CITY COMMISSION” IN RECOGNITION OF THE CITY’S COMMUNITY DEVELOPMENT FEE SCHEDULE FOUND AT RESOLUTION NO.: 2026-011. PROVIDING FOR CODIFICATION, PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Community Development) This item was taken after the consent agenda item #8. th Street Commissioner Ryan made a motion to approve the item. The motion was seconded by Commissioner Lewellen which carried unanimously on voice vote. Minutes of Regular Meeting 8 AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AMENDING CHAPTER 28, ENTITLED “LAND DEVELOPMENT CODE”, PART 1 ENTITLED “USE REGULATIONS,” AT ARTICLE 115, ENTITLED “INDUSTRIAL DISTRICTS: PERMITTED, PROHIBITED, SPECIAL EXCEPTION USES, AND CONDITIONS OF USE” AT SECTION 115-40 ENTITLED “SCHEDULE OF PERMITTED USES”, ADDING OUTDOOR STORAGE, MANAGEMENT, MAINTENANCE, SERVICING, SECURING, ACCESS, LOADING AND UNLOADING OF FLOATING DOCKS, EQUIPMENT TRAILERS, AND ASSOCIATED MATERIALS UTILIZED IN MAJOR BOATING EVENTS AS A SPECIAL EXCEPTION USE IN THE GENERAL INDUSTRIAL (IG) ZONING DISTRICT AND AT SECTION 155-50 ENTITLED “CONDITIONS OF USE” ADDING CONDITIONS OF USE ASSOCIATED WITH SUCH USES; PROVIDING FOR CODIFICATION, PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Community Development) th St. Minutes of Regular Meeting 9 movement and handling of the docks and barges will be performed by a private, publicly traded company. Commissioner Ryan made a motion to approve the item with the exception of item F, reducing the maximum permitted storage height for materials from 30 feet to 20 feet. The motion was seconded by Commissioner Rimoli which carried 5-0 on roll call vote. (Parks & Recreation) This item was taken after item #10.2. Vice Mayor Salvino made a motion to approve the item. The motion was seconded by Commissioner Rimoli which carried unanimously on voice vote. SECOND READING ORDINANCES DISCUSSION AND POSSIBLE ACTION Minutes of Regular Meeting 10 Commissioner Ryan felt that this should wait until the new commission is on the dais to allow their input and possible interest. Vice Mayor Salvino made a motion to appoint Commissioner Rimoli to the Broward MPO. The motion was seconded by Commissioner Lewellen which carried 4-1 on voice vote with Mayor Davis voting no. APPOINTMENTS Dania Beach Housing Authority Board Minutes of Regular Meeting 11 No appointment made. Education Advisory Board Green Advisory Board Marine Advisory Board COMMISSION COMMENTS Minutes of Regular Meeting 12 residents. Commissioner Ryan concluded by expressing gratitude to his family and supporters, reaffirming his commitment to public service, and stating that he was proud of the accomplishments achieved during his time in office. ADJOURNMENT City of Dania Beach City Clerk Memorandum DATE: 11/17/2026 TO: Mayor and Commissioners FROM: Candido Sosa-Cruz, ICMA-CM, City Manager VIA: Elora Riera, MMC, City Clerk SUBJECT: 2027 City Commission Meeting Dates Request: To review and approve the 2027 proposed City Commission Meeting Dates Background: Each year, the Commission reviews and approves the annual meeting dates. Budgetary Impact Recommendation To review and approve the 2027 proposed City Commission Meeting Dates City Commission Meeting Date 2nd & 4th Tuesdays – 7:00 p.m. **Holidays and/or Events** January 12, 2027 January 26, 2027 February 9, 2027 February 23, 2027 March 9, 2027 March 23, 2027 April 13, 2027 April 27, 2027 May 11, 2027 May 25, 2027 June 8, 2027 June 22, 2027 July 13, 2027 July 27, 2027 Commission Summer Break August 10, 2027 Commission Summer Break August 24, 2027 September 14, 2027 *TBD – First Budget Hearing September 28, 2027 *TBD – Final Budget Hearing October 12, 2027 October 26, 2027 November 9, 2027 November 23, 2027 Thanksgiving holiday December 14, 2027 December 28, 2027 Christmas holiday Recipient: Request Sponsor: Brief description of Recipient's mission/commitment to the City of Dania Beach: Description of how the funds will be used/deliverables: REVIEW FOR VERIFICATION OF FUNDS. PAYMENT WILL BE RELEASED AFTER COMMISSION APPROVAL. Legal Finance City Manager PLEASE ATTACH ALL DOCUMENTATION NECESSARY TO SUPPORT THE REQUEST Submitted by:Date of submission: Agenda Date: Request Amount: Request Date: City of Dania Beach City Commission Discretionary Funds Use Request Form 1 Singh, Maxine From:Singh, Maxine Sent:Tuesday, November 10, 2026 4:50 PM To:jayme@thegratefullthread.com Cc:Singh, Maxine Subject:RE: COOLING TOWELS Importance:High Okay. It’s PINK towel with WHITE D5K Logo. Thanks. Maxine Singh , Chief of Staff to the Mayor and City Commission msingh@daniabeachfl.gov | daniabeachfl.gov 100 W Dania Beach Blvd, Dania Beach , FL , 33004 Phone: 954.924.6800, x3607 R.I.S.E. - RESPECT, INTEGRITY AND STANDARD OF EXCELLENCE Please note: Florida has a very broad public records law. Most written communications, including emails, to or from City officials regarding City business are public records and may be subject to public disclosure. From: jayme@thegratefullthread.com <jayme@thegratefullthread.com> Sent: Tuesday, November 10, 2026 4:44 PM To: Singh, Maxine <msingh@daniabeachfl.gov> Subject: RE: COOLING TOWELS CAUTION: This email originated from outside the City of Dania Beach. Do not click links or open attachments unless you recognize the sender and expect the content. So there is a less than minimum fee of $60.00 Quoting based on the smaller towel.. Set up $45 Shipping $42.84 $60.00 less than minimum charge $2.91 per towel Running about $293.34 for the project. To confirm- Blue towel, Pink ink Will send mock-up if we proceed (any chance you have the PMS color for the pink ink?) ~Jayme 2 From: Singh, Maxine <msingh@daniabeachfl.gov> Sent: Tuesday, November 10, 2026 3:58 PM To: jayme@thegratefullthread.com Cc: Singh, Maxine <msingh@daniabeachfl.gov> Subject: RE: COOLING TOWELS Importance: High Any update? We would like Dania Beach pink. Maxine Singh , Chief of Staff to the Mayor and City Commission msingh@daniabeachfl.gov | daniabeachfl.gov 100 W Dania Beach Blvd, Dania Beach , FL , 33004 Phone: 954.924.6800, x3607 R.I.S.E. - RESPECT, INTEGRITY AND STANDARD OF EXCELLENCE Please note: Florida has a very broad public records law. Most written communications, including emails, to or from City officials regarding City business are public records and may be subject to public disclosure. From: jayme@thegratefullthread.com <jayme@thegratefullthread.com> Sent: Tuesday, November 10, 2026 10:23 AM To: Singh, Maxine <msingh@daniabeachfl.gov> Subject: RE: COOLING TOWELS CAUTION: This email originated from outside the City of Dania Beach. Do not click links or open attachments unless you recognize the sender and expect the content. Let me see what I can find. ~Jayme From: Singh, Maxine <msingh@daniabeachfl.gov> Sent: Tuesday, November 10, 2026 10:07 AM To: jayme@thegratefullthread.com Subject: Re: COOLING TOWELS Oh. We were thinking 50. City of Dania Beach Public Services Memorandum DATE: 11/17/2026 TO: Mayor and Commissioners FROM: Candido Sosa-Cruz, ICMA-CM, City Manager VIA: Oscar Vasquez, Public Services Director Carlos Escalante, Public Services Deputy Director SUBJECT: APPROVAL TO RENEW CONTRACT NO. 23-63B WITH LHOIST NORTH AMERICA AND TO EXCEED THE ANNUAL $50,000 VENDOR THRESHOLD Request: The Public Services Department (PSD) requests approval to utilize the 3-year renewal of the Southeast Florida Governmental Purchasing Cooperative Group Contract No. 23-36B “Furnish, Deliver, and Discharge of Quicklime” with Lhoist North America of Alabama, LLC (Lhoist), and to exceed the annual $50,000.00 vendor threshold for the term of the contract. This renewal is valid through October 31, 2029. Background: PSD utilizes Lhoist under the Florida Governmental Purchasing Cooperative Group Contract to supply the City with small pebble quicklime at a low cost. This chemical is required to soften and help remove contaminants from the raw water supply during the lime softening treatment process. PSD is pleased with the service and supply from Lhoist and is requesting approval to utilize Lhoist for the next 3-year renewal. Budgetary Impact Upon approval, a purchase order of $210,000.00 will be opened, and funding will be appropriated from Water Account No. 401-33-03-533-52-40. Recommendation PSD recommends approval to utilize the 3-year renewal of the South Florida Governmental Purchasing Cooperative Group Contract No. 23-36B and to exceed the annual $50,000.00 vendor threshold with Lhoist for the term of the contract. RESOLUTION NO. 2026-_____ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE WAIVER OF COMPETITIVE BIDDING; AUTHORIZING THE THREE-YEAR RENEWAL OF THE “FURNISH, DELIVER, AND DISCHARGE OF QUICKLIME” CONTRACT NO. 23-36B THROUGH THE SOUTHEAST FLORIDA GOVERNMENTAL PURCHASING COOPERATIVE (CO-OP) WITH LHOIST NORTH AMERICA OF ALABAMA, AND TO EXCEED THE ANNUAL VENDOR THRESHOLD OF FIFTY THOUSAND DOLLARS ($50,000) FOR THE TERM OF THE CONTRACT; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. the Charter of the City of Dania Beach, Part III, Article 3, Section 4, Subsection (j), authorizes the City Manager to purchase supplies, services, equipment, and materials for the City government in amounts in excess of the established monetary threshold without competitive bidding and without advertisement for bids, if she is authorized to do so in advance by a resolution adopted by the City Commission; and the Charter of the City of Dania Beach, Part III, Article 3, Section 4, Subsection (j), authorizes the City Manager to purchase supplies, services, equipment and materials for the City government in amounts in excess of the established monetary threshold without competitive bidding and without advertisement for bids and is authorized to do so if a resolution is adopted in advance by the City Commission and if such purchases are made pursuant to a competitive bid obtained in the last eighteen (18) months by other government agencies such as the federal government, State of Florida, or a Florida municipality or county, or multiple agencies forming a co-op; and the Dania Beach Code of Ordinances, Chapter 2, Article 1, Section 2-10, “Monetary thresholds for certain purchases and payment disbursement authorizations”, Subsection (a), sets the monetary threshold at Fifty Thousand Dollars ($50,000.00) for a vendor each fiscal year; and , the Public Services Department (PSD) is requesting to utilize the three-year renewal with the Southeast Florida Governmental Purchasing Co-op Contract No. 23-36B to “Furnish, Deliver, and Discharge of Quicklime” with Lhoist North America of Alabama, LLC for the purchase of quicklime; and 2 RESOLUTION #2026-_____ WHEREAS, PSD has determined that it is necessary to purchase quicklime for City use of the lime softening and contaminant removal process at the least cost; and WHEREAS, a purchase order of $210,000.00 will be opened, and funding will be appropriated from Water Account No. 401-33-03-533-52-40.; and WHEREAS, the City Commission finds that authorizing these purchases will support the ongoing raw water filtration process. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above “Whereas” clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That the City is authorized renew the Southeast Florida Governmental Purchasing Co-op Contract No. 091323 with Lhoist North America of Alabama, LLC for the purchase of quicklime. Section 3. That a purchase order in the amount of $210,000.00 will be established and funding will be appropriated from Water Account No. 401-33-03-533-52-40. Section 4. That the City is authorized to exceed the annual fifty thousand dollar ($50,000.00) vendor threshold for Lhoist North America of Alabama, LLC for the term of the contract which is valid through October 31, 2029. Section 5. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 6. That this Resolution shall be effective 10 days after passage. PASSED AND ADOPTED on __________________, 2026. Motion by __________________________, second by ___________________________. FINAL VOTE ON ADOPTION: Unanimous ____ Yes No Commissioner Joyce L. Davis ____ ____ Commissioner Luis Rimoli ____ ____ Commissioner Marco Salvino ____ ____ Vice Mayor Diana Fahmie ____ ____ Mayor Colman Ryan ____ ____ 3 RESOLUTION #2026-_____ ATTEST: 1 QUICKLIME SUPPLY PIGGYBACK AGREEMENT City of Dania Beach and Lhoist North America of Alabama LLC THIS AGREEMENT is entered into on _______________, 20__, by the CITY OF DANIA BEACH, FLORIDA, a Florida municipal corporation, with an address of 100 West Dania Beach Boulevard, Dania Beach, Florida 33004 (“City”), and LHOIST NORTH AMERICA OF ALABAMA, LLC, an Alabama limited liability company, with an address of 5600 Clearfork Main Street, Suite 300, Fort Worth, Texas 76109 (“Contractor”). The City and Contractor are the “Parties.” WHEREAS, the City of Tamarac, as lead agency for the Southeast Florida Governmental Purchasing Cooperative, competitively solicited Bid No. 23-36B, Furnish, Deliver and Discharge of Quicklime, and awarded an agreement to Contractor dated October 11, 2023, under Resolution No. R-2023-122; and WHEREAS, Tamarac and Contractor executed Agreement Amendment No. 1, renewing that agreement for November 1, 2026, through October 31, 2029, replacing its pricing exhibit, and amending its pricing adjustment provision; and WHEREAS, Dania Beach is identified as a participating agency in the source contract and desires to purchase Type 1 pebble quicklime under that contract, as supplemented by this Agreement; and WHEREAS, the City Commission authorized this Agreement and the purchases described herein by Resolution No. 2026-____, subject to its conditions and applicable appropriations; NOW, THEREFORE, for the mutual consideration stated herein, the Parties agree as follows: 1. Incorporation of Source Contract and Cooperative Purchasing 1.1 Source Contract. The City is utilizing the competitively awarded contract between the City of Tamarac and Contractor under Bid No. 23-36B, “Furnish, Deliver and Discharge of Quicklime,” dated October 11, 2023, as amended by executed Agreement Amendment No. 1, including the renewal term beginning November 1, 2026, and ending October 31, 2029 (“Source Contract”). The Source Contract includes the applicable solicitation, specifications, general and special conditions, addenda, accepted Contractor bid response, exhibits and appendices. The Source Contract documents are incorporated into this Agreement by reference. Composite Exhibit A contains the executed Tamarac–Lhoist agreement, executed Amendment No. 1 with its replacement pricing schedule, and Tamarac’s award resolution. The City’s Procurement Division shall maintain the solicitation, specifications, bid conditions, addenda, and Contractor’s accepted bid response in the procurement file. The separately awarded agreement with Carmeuse Lime and Stone is excluded. 2 1.2 Contractor Consent. Contractor acknowledges that Dania Beach is identified as a participating agency under the Source Contract and agrees to furnish, deliver and discharge the quicklime authorized by this Agreement at the prices and upon the terms and conditions applicable to Dania Beach under the Source Contract, as supplemented by the express provisions of this Agreement. 1.3 Application to the City. References in the Source Contract to the purchasing agency and its officers shall mean the City of Dania Beach and its corresponding officers when applied to the City’s purchases. References concerning Tamarac’s authority to award, administer, amend or renew the Source Contract shall remain references to Tamarac. The City assumes no obligation for purchases made by Tamarac or any other participating agency. 1.4 Preservation of Source Procurement. This Agreement is intended to implement the City’s participation in the Source Contract. It does not authorize purchases outside the competitively solicited and awarded scope, establish a different pricing methodology, or permit a material departure from the Source Contract inconsistent with applicable cooperative purchasing requirements. City-specific provisions shall apply to the extent consistent with those requirements. 1.5 Conflicts and Additional Terms. The Source Contract’s order of precedence shall govern its constituent documents. An express City-specific provision of this Agreement shall control a conflict with the Source Contract only to the extent permitted by Section 1.4. No Contractor quotation, acknowledgment, invoice, bill of lading, website term or other form shall amend this Agreement or the incorporated Source Contract. Signatures by City receiving personnel acknowledge receipt only. 2. Scope and Performance 2.1 Scope. Contractor shall furnish, deliver and discharge Type 1 pebble quicklime for the City’s Water Treatment Plant in accordance with the specifications, delivery requirements, pricing and other applicable terms of the Source Contract. Contractor shall provide the labor, materials, equipment, transportation and unloading required by the Source Contract. Purchases under this Agreement shall be limited to products and services included within the competitively solicited and awarded scope. 2.2 Orders and Delivery. The City shall place orders through authorized purchase orders or other ordering procedures permitted by the Source Contract and the City’s purchasing requirements. Each order shall identify the quantity, delivery location and applicable delivery instructions, consistent with the Source Contract. Contractor shall coordinate deliveries and discharge with the City’s designated plant representative and comply with the applicable site access, safety and security requirements of the Source Contract. 2.3 Product Quality and Documentation. The quicklime supplied shall conform to the applicable Source Contract specifications. Contractor shall provide the delivery tickets, weight records, certifications, safety data sheets and other documentation required by the Source Contract or applicable law. The City shall retain the inspection, testing, rejection, replacement and other rights provided by the Source Contract and applicable law. 3 2.4 Responsibility for Performance. Contractor shall remain responsible for its employees, carriers and subcontractors and for performance of its obligations under the Source Contract as applied to the City’s purchases. Assignment and subcontracting shall be governed by the applicable Source Contract provisions, with references to the purchasing agency applied as provided in Section 1.3. 3. Effective Date and Term 3.1 Effective Date. This Agreement shall become effective upon execution by both Parties following the effective date of the City Commission’s authorizing resolution (“Effective Date”). Purchases under this Agreement shall not commence before November 1, 2026. 3.2 Term. Unless earlier terminated in accordance with this Agreement and the applicable Source Contract provisions, this Agreement shall remain in effect from the Effective Date through October 31, 2029, corresponding to the expiration of the renewal exercised by Tamarac and Contractor under Agreement Amendment No. 1. This Agreement does not independently renew or extend the Source Contract. 3.3 Extensions. Any continuation beyond October 31, 2029, including use of the Source Contract’s month-to-month continuation provision, shall be permitted only to the extent authorized by the Source Contract, subject to its conditions and duration limits, and following written approval by the City through its authorized officials and any required City Commission action. No extension shall arise solely from continued deliveries, payment of invoices or informal communications. 3.4 Source Contract Status. Contractor shall promptly notify the City of any termination, suspension, expiration or amendment of the Source Contract affecting the City’s purchases. The City shall not place new orders in reliance on a Source Contract that is no longer available for the City’s use. The effect on previously authorized orders shall be governed by the applicable Source Contract provisions and law. 3.5 Prior Purchases. This Agreement does not retroactively authorize or ratify purchases made before its Effective Date. Any such purchases remain subject to the authority and terms under which they were made. 4. Pricing and Adjustments 4.1 Contract Prices. The City shall purchase quicklime at the prices applicable to Dania Beach under the Source Contract, including replacement Contract Exhibit A dated October 25, 2025, and the adjustments authorized by Agreement Amendment No. 1. Pricing shall be based on delivered cost per ton, F.O.B. destination, and shall include the labor, materials and freight charges included in the Source Contract price. No charge shall be assessed except as authorized by the Source Contract. 4 4.2 Annual Price Adjustments. Annual price adjustments shall be calculated and applied in accordance with Subsection 5.1 of the Source Contract, as amended by Agreement Amendment No. 1, and the replacement Contract Exhibit A. The applicable index, measurement period, additional one percent, calculation precision and adjustment dates shall be those established by the Source Contract. This Agreement does not establish a separate escalation formula or authorize a different pricing methodology. 4.3 Fuel Surcharges and Reconciliation. Rail and truck fuel surcharges, quarterly adjustments and related credits or debits shall be calculated, documented and reconciled in accordance with Section 5.2 of the Source Contract and its applicable schedules and appendices. Contractor shall provide the supporting documentation required by those provisions and apply all credits due to the City. 4.4 Other Authorized Adjustments. Adjustments arising from government action, hardship or other circumstances shall be governed solely by the applicable Source Contract provisions, including their supporting documentation, notice, audit and termination requirements. This Agreement does not independently authorize additional charges or changes to the Source Contract’s pricing terms. 4.5 Pricing Documentation. Before the City issues its initial purchase order, Contractor shall furnish the pricing applicable to Dania Beach for the renewal period beginning November 1, 2026, together with the supporting calculation and applicable surcharge documentation. Subsequent adjustments shall be supported by the documentation and notices required by the Source Contract. The City retains its rights under the Source Contract to review charges, dispute calculations and obtain applicable credits or refunds. 4.6 Purchasing Limits. An adjustment permitted by the Source Contract does not increase the City’s authorized expenditure limit. Purchases remain subject to Section 5 of this Agreement. 5. Purchasing Authority and Payment 5.1 Authorized Expenditures. Purchases under this Agreement shall be limited to the amounts and purchasing periods authorized by the City Commission and supported by available appropriations. The initial purchase order shall not exceed $210,000 and shall identify the purchasing period it covers. Additional purchases require the applicable City approvals and an authorized purchase order before they are placed. 5.2 Purchase Orders. The City shall issue purchase orders identifying the products, quantities, applicable contract pricing and delivery requirements, consistent with the Source Contract. Contractor shall not make deliveries exceeding the quantity or expenditure authorized by a purchase order without prior written authorization issued in accordance with the City’s purchasing requirements. A purchase order shall not amend the Source Contract’s scope, pricing methodology or other substantive terms. 5 5.3 Quantities. Estimated quantities and any minimum purchase, ordering or exclusivity requirements shall be governed by the Source Contract as applicable to Dania Beach. This Agreement does not independently establish a minimum purchase commitment or an exclusive purchasing arrangement. 5.4 Invoices. Contractor shall submit invoices in accordance with the Source Contract’s invoicing requirements. Invoices shall identify the applicable City purchase order and include the delivery, quantity, pricing and supporting documentation required by the Source Contract. Authorized surcharges and applicable credits shall be identified in accordance with the source pricing provisions. 5.5 Payment. Payment for products delivered and accepted, and any associated services properly performed, shall be made in accordance with Section 6 of the Source Contract and the Florida Local Government Prompt Payment Act, Part VII of Chapter 218, Florida Statutes. Invoice disputes, payment deadlines and any applicable interest shall be governed by those requirements. 5.6 Application of Purchasing Limits. All amounts payable under an order, including authorized price adjustments and surcharges, shall count against the applicable purchase order and City expenditure authorization. Neither a price adjustment nor the issuance or payment of an invoice increases those limits. 5.7 Preservation of Rights. Payment shall not waive the City’s inspection, warranty, audit, credit, refund or other rights under the Source Contract or applicable law. 6. Insurance and Indemnification 6.1 Required Insurance. Contractor shall obtain and maintain the insurance required by Section 3 of the Source Contract and the applicable solicitation provisions, including the required coverages, limits and endorsements. Those requirements shall apply to Contractor’s performance for the City of Dania Beach throughout the term of this Agreement. 6.2 Evidence of Coverage. Before commencing performance for the City, Contractor shall provide the City’s Risk Manager with certificates of insurance and the endorsements required by the Source Contract demonstrating coverage for the City’s purchases and Contractor’s associated operations. The City of Dania Beach shall be identified as certificate holder and included as an additional insured under the liability policies to the extent required by the Source Contract. Contractor’s responsibilities for deductibles, self-insured retentions and subcontractor insurance shall remain as provided in the Source Contract. 6.3 Indemnification. Section 8 of the Source Contract is incorporated into this Agreement and shall apply for the benefit of the City of Dania Beach and its elected and appointed officials, employees and agents. References in that section to the City shall mean the City of Dania Beach. The scope of indemnification, responsibility for defense costs, selection of counsel, applicable exceptions and survival of obligations shall be governed by that section. 6 6.4 Sovereign Immunity. Consistent with Section 8.4 of the Source Contract, nothing in this Agreement shall be construed as a waiver of the City’s sovereign immunity or its rights, defenses and limitations of liability under Section 768.28, Florida Statutes, or other applicable law. 7. Warranties and Limitation of Liability 7.1 Product Requirements and Warranties. The product conformity requirements, warranties, disclaimers and rights concerning rejection and replacement of nonconforming product shall be governed by Section 7 of the Source Contract and the applicable specifications. Those provisions shall apply to the products furnished to the City under this Agreement. 7.2 Limitation of Liability. Section 15 of the Source Contract is incorporated into this Agreement and shall apply to the Parties’ respective liabilities arising from performance of this Agreement. This includes the exclusion of consequential and punitive damages and the limitation of Contractor’s liability for damages to replacement of nonconforming product or reimbursement of the purchase price for that product, as provided in the Source Contract. 7.3 Relationship to Other Source Provisions. The warranty and liability provisions shall be read together with the Source Contract’s indemnification, insurance, termination and other applicable provisions. This Agreement does not independently expand or restrict those provisions or establish an exception to the Source Contract’s limitation of liability. 7.4 Sovereign Immunity. Nothing in this section waives the City’s sovereign immunity or its rights, defenses and limitations of liability preserved under Section 6.4 of this Agreement. 8. Funding and Termination 8.1 Availability of Funding. Consistent with Section 16 of the Source Contract, this Agreement shall remain in effect only while expenditures under it are supported by funds appropriated by the City Commission for the applicable fiscal year. This Agreement is subject to termination for lack of funding in accordance with that provision. 8.2 Termination for Convenience. The City may terminate this Agreement for convenience upon seven days’ written notice to Contractor in accordance with Section 13.1 of the Source Contract. Contractor’s entitlement to compensation for performance through the termination date, including services reasonably related to termination, and its obligations concerning abandonment or Contractor-caused termination shall be governed by that section. 8.3 Contractor Default. Termination for Contractor’s failure to perform or observe a material requirement shall be governed by Section 13.2 of the Source Contract, including its written notice and thirty-day cure requirements. The City retains the other remedies available under that provision, subject to the applicable Source Contract terms. 8.4 Uncontrollable Forces and Hardship. Excused delays, failures of performance, hardship adjustments and related termination rights shall be governed by Sections 5.4 and 14 of the Source Contract, including their applicable notice, reasonable-diligence and timing requirements. 7 8.5 Effect of Termination. Termination shall not extinguish obligations accrued before its effective date or provisions that survive under the Source Contract or applicable law. Final payment, outstanding orders and any continuing obligations shall be determined in accordance with the applicable Source Contract provisions. 9. Records and Audit 9.1 Contractor shall maintain delivery, pricing, surcharge, credit, invoice and other contract records and permit the City and its authorized auditors to examine and copy records relevant to performance and charges during reasonable business hours. Records shall be retained for the applicable legal retention period and through resolution of pending audits, claims or litigation. 9.2 Contractor shall comply with Chapter 119, Florida Statutes, and, to the extent applicable, Section 119.0701. Contractor shall keep and maintain public records required by the City to perform the services; upon request from the City’s custodian, provide copies or permit inspection within a reasonable time at a cost permitted by law; and protect exempt or confidential and exempt records from unauthorized disclosure during the term and thereafter while retained. 9.3 Upon completion, Contractor shall transfer to the City, at no cost, all public records in its possession or keep and maintain the required public records in compliance with applicable retention requirements. If records are transferred, Contractor shall destroy duplicate exempt or confidential and exempt records. Electronic records shall be furnished, upon the custodian’s request, in a format compatible with the City’s information technology systems. These obligations survive termination. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT 954-924-6800, EXT. 3623, ERIERA@DANIABEACHFL.GOV, CITY CLERK, 100 WEST DANIA BEACH BOULEVARD, DANIA BEACH, FLORIDA 33004. 10. Compliance and Contract Administration 10.1 Compliance Requirements. Contractor shall comply with the applicable legal compliance, nondiscrimination, employment eligibility, E-Verify and scrutinized-company provisions of the Source Contract, including Sections 2.1.3, 9, 22 and 24. Those provisions shall apply to Contractor’s performance for Dania Beach, subject to applicable law. Contractor shall furnish the certifications, affidavits and supporting documentation required by those provisions or applicable law. 10.2 Independent Contractor. The Parties’ relationship shall be governed by Section 10 of the Source Contract, with references to the City applied to Dania Beach. Contractor shall remain an independent contractor and shall be responsible for its personnel and obligations as provided therein. 8 10.3 City Administration. The City’s Public Services Director or designee shall coordinate orders, deliveries and routine performance matters for Dania Beach. That designation does not authorize the representative to amend this Agreement or the Source Contract, change the pricing methodology, increase authorized expenditures or waive contractual requirements. Such actions require approval by the City officials or governing body having the applicable authority. 10.4 Notices. Notices required under this Agreement shall be given in accordance with the methods prescribed in Section 12 of the Source Contract, using the following addresses in place of the corresponding source notice addresses: To the City: City Manager City of Dania Beach 100 West Dania Beach Boulevard Dania Beach, Florida 33004 With a copy to: City Attorney City of Dania Beach 100 West Dania Beach Boulevard Dania Beach, Florida 33004 To Contractor: President or Chief Executive Officer Lhoist North America of Alabama, LLC 5600 Clearfork Main Street, Suite 300 Fort Worth, Texas 76109 Either Party may designate a replacement notice address by written notice given in accordance with this section. Routine ordering and delivery communications do not substitute for a formal notice required by the Agreement. 10.5 Contractor Authority. Contractor shall provide documentation establishing its signatory’s authority to execute this Agreement, as required by Section 18 of the Source Contract. 11. General Provisions 11.1 Governing Law and Venue. This Agreement shall be governed by Florida law, with venue in Broward County, Florida, as provided in Section 17 of the Source Contract. 11.2 Entire Agreement. This Agreement, together with the incorporated Source Contract documents and completed exhibits, constitutes the agreement between Dania Beach and Contractor for purchases authorized hereunder. Section 20 of the Source Contract shall apply to this Agreement. Nothing herein releases or modifies obligations accrued under a prior City purchase order or agreement. 9 11.3 Amendments. Any amendment to this Agreement shall be in writing, executed by authorized representatives of both Parties, and approved in accordance with the City’s applicable requirements. An amendment shall not authorize a departure from the Source Contract inconsistent with the cooperative purchasing requirements stated in Section 1.4. 11.4 Severability and Waiver. Severability and the effect of a Party’s failure to enforce a provision shall be governed by Section 19 of the Source Contract. 11.5 Construction. Section 21 of the Source Contract concerning construction against the drafting party shall apply to the incorporated Source Contract documents. Each Party shall have the opportunity to review this Agreement with counsel before execution. 11.6 Counterparts and Electronic Signatures. This Agreement may be executed in counterparts, each of which shall be deemed an original and all of which together constitute one instrument. Electronic signatures shall be effective to the extent permitted by applicable law. SIGNATURES ON THE FOLLOWING PAGES 10 IN WITNESS OF THE FOREGOING, the parties have set their hand and seal the day and year first written above. CITY OF DANIA BEACH, FLORIDA, a Florida municipal corporation ELORA RIERA, MMC COLMAN RYAN CITY CLERK MAYOR APPROVED AS TO LEGAL FORM AND CORRECTNESS EVE A. BOUTSIS, CITY ATTORNEY CANDIDO SOSA-CRUZ, ICMA-CM CITY MANAGER 11 CONTRACTOR: WITNESSES: LHOIST NORTH AMERICA OF ALABAMA, LLC, an Alabama limited liability company SIGNATURE SIGNATURE PRINT Name PRINT Name SIGNATURE Title PRINT Name STATE OF ALABAMA COUNTY OF The foregoing instrument was acknowledged before me by means of ☐ physical presence or ☐ online notarization, on , 20___, by _______________ (name), _______________________ (title), of LHOIST NORTH AMERICA OF ALABAMA, LLC, an Alabama limited liability company, who is personally known to me or has produced as identification. NOTARY PUBLIC My Commission Expires: State of ALABAMA 12 EXHIBIT A SOURCE CONTRACT DOCUMENTS The following Source Contract documents are incorporated into this Agreement by reference: A1. City of Tamarac agreement with Lhoist North America of Alabama, LLC, dated October 11, 2023, under Bid No. 23-36B, including applicable exhibits and appendices. A2. Executed Agreement Amendment No. 1, including replacement Contract Exhibit A dated October 25, 2025, renewing the Source Contract for November 1, 2026, through October 31, 2029. A3. Complete Bid No. 23-36B, including technical specifications, general and special conditions, addenda, accepted Lhoist bid response, and any applicable executed amendments not superseded by Amendment No. 1. A4. Tamarac Resolution No. R-2023-122, as evidence of the source award only. City of Tamarac TAMARAC ~ The City For Your Life AGREEMENT BETWEEN THE CITY OF TAMARAC AN D LHOIST NORTH AMERICA OF ALABAMA, LLC. Purchasing and Contracts Division THIS AGREEMENT is made and entered into this (L~ay of {Jc..,(--r:::&s,'L-, 20;l.3 by and between the City of Tamarac, a municipal corporation with principal offices located at 7525 N.W. 88th Ave., Tamarac, FL 33321 (the "CITY") and Lhoist North America of Alabama, LLC., an Alabama corporation with principal offices located at 5600 Clearfork Main Street, Suite 300, Fort Worth, Texas 76109 (the "Contractor") to provide for Furnishing, Delivery and Discharge of Quicklime . Now therefore , in consideration of the mutual covenants hereinafter set forth, the City and Contractor agree as follows: 1. The Contract Documents The contract documents consist of this Agreement, Bid Document No. 23-36B , "Furnish , Deliver and Discharge Quicklime", including all conditions therein, (General Terms and Conditions , Special Conditions and/or Special Provisions), drawings , Technical Specifications, all addenda, the Contractor's bid/proposal included herein, and all modifications issued after execution of this Agreement; and Contract Exhibit A, which is a schedule of delivered pricing for individual delivery locations . These contract documents form the Agreement, and all are as fully a part of the Agreement as if attached to this Agreement or repeated therein. In the event that there is a conflict between Bid Document No . 23-36B , "Furnish Deliver and Discharge Quicklime", as issued by the City, and the Contractor's Proposal , Bid Document No. 23-36B, as issued by the City shall take precedence over the Contractor's Proposal. Furthermore , in the event of a conflict between this document and any other contract documents, this Agreement shall prevail. 2. The Work 2.1. The Contractor shall perform all work for the City required by the contract documents as set forth below: 2.1.1 Contractor shall furnish all labor, materials, and equipment necessary to Furnish, Deliver and Discharge Quicklime in accordance with the Technical Specifications, terms and conditions contained in Bid Document 23 -36B, "Furnish, Deliver and Discharge Quicklime". 2.1.2 Contractor shall supervise the work force to ensure that all workers conduct themselves and perform their work in a safe and professional manner. Contractor shall comply with all OSHA safety rules and regulations in the operation of equipment and in the performance of the work . Contractor shall at all times have a competent field supervisor on the job site to enforce these policies and procedures at the Contractor's expense . 2.1.3 Contractor shall comply with any and all Federal, State, and local laws and 1 City of Tamarac TAMARAC ~ The City For Your Life Purchasing and Contracts Division regulations now in effect, or hereinafter enacted during the term of this Agreement, which are applicable to the Contractor, its employees, agents or subcontractors, if any, with respect to the work and services described herein. 2.1.4 Contractor shall be required to complete and provide the "Contractor Pass Request Form" (See attached Appendix A to Bid Document No. 23-36B), with photo identification of all personnel authorized to be on premises at City delivery sites. This form will be sent to the awarded vendor(s) with the notification of award letter. 2.1.5 Personnel additions and/or deletions shall be reported to the City's designated representative in writing, via fax to a number to be provided by the using agency, within twenty four (24) hours of the personnel change, by modification of the names submitted on the original Contractor Pass Request Form. 2.1.6 All personnel shall check-in with the Security Guard or Operator on duty immediately upon arrival at any delivery location. Photo identification, purpose of visit, and name of City staff contact, shall be required for entry. 2.1.7 Contractor shall ensure that only authorized Contractor employees and/or authorized City personnel shall have access to Contractor/City vehicles, work site, equipment, work products, reports, electronic data and any/all other information pertaining to the City. Contractor shall not admit any unauthorized personnel onto any work site. Contractor will not release, discuss or share any information on systems, equipment and/or operations, to any non-City personnel. 2.1.8 Upon leaving premises, all personnel shall be required to check out with the Security Guard or Operator on duty. 3. Insurance 3.1. Contractor shall obtain at Contractor's expense all necessary insurance in such form and amount as specified in the original bid document or as required by the City's Risk and Safety Manager before beginning work under this Agreement including, but not limited to, Workers' Compensation, Commercial General Liability, Builder's Risk and all other insurance as required by the City, including Professional Liability when appropriate. Contractor shall maintain such insurance in full force and effect during the life of this Agreement. Contractor shall provide to the City's Risk and Safety Manager certificates of all insurances required under this section prior to beginning any work under this Agreement. The Contractor will ensure that all subcontractors comply with the above guidelines and will retain all necessary insurance in force throughout the term of this agreement. 3.2. Contractor shall indemnify and hold the City harmless for any damages resulting from failure of the Contractor to take out and maintain such insurance. Contractor's Liability Insurance policies shall be endorsed to add the City as an additional insured and shall list the City as the Certificate Holder. Contractor shall be responsible for payment of all deductibles and self-insurance retentions on Contractor's Liability Insurance policies. Insurance limits are outlined below: 2 City of Tamarac TAMARAC ~ The City For Your Life o General Liability -$1 M per occ. / $2M aggregate o Automobile -$1 M per occ. / $1 M aggregate o Workers Comp -Statutory Purchasing and Contracts Division 3.3 Contractor shall at a minimum, provide the level of coverage provided for in Section 3.2 of this Agreement to any other organization in the Southeast Florida Governmental Purchasing Cooperative, and shall provide those agencies with their own Certificate of Insurance to validate coverage for their entity. 4. Term The contract term shall be for an initial period of three (3) years, beginning November 1, 2023. The City reserves the right to renew the contract for one additional three (3) year period or up to three (3) additional (1) year periods, whichever is in the best interest of the City and the Southeast Florida Governmental Purchasing Cooperative providing all parties agree to the extension and renewal terms. In the event that the agreement is set to expire, and no replacement agreement is in place, the Agreement shall continue on a month-to-month basis until a new Agreement is in place for a period of not to exceed six (6) months from the original date of scheduled expiration. 5. Contract Sum The Contract Sum for the above work for entities listed in Contract Exhibit A (UNIT PRICING PROVIDED IN BID) shall be based on delivered cost per ton, F.O.B. Destination. The Contract sum includes all labor, materials and freight charges for the job also known as Bid No. 23-36B, "Furnish, Deliver, and Discharge Quicklime" for the Southeast Florida Government Purchasing Cooperative entities listed in Contract Exhibit A. All Terms and Conditions, except product price, freight, transfer, and rail and truck fuel surcharges shall remain firm through the term of the contract, Pricing shown in Contract Exhibit A for the initial year of the Agreement shall be firm for the period from November 1, 2023 through October 31, 2024; Pricing shown in Contract Exhibit A for the second year of the Agreement shall be firm for the period from November 1, 2024 through October 31, 2025 and Pricing shown in Contract Exhibit A for the third year of the Agreement shall be firm from November 1, 2025 through October 31, 2026. 5.1 Contract Pricing shall be based on delivered cost per ton. The Contract sum includes all labor, materials and freight charges pricing shall be firm for the as indicated in Exhibit A for each year of the contract for the periods from November 1, 2023 through October 31, 2024; November 1, 2024 through October 31, 2025 and November 1, 2025 through October 31, 2026. 5.2 In consideration of fluctuations in fuel prices, the City will allow rail and trucking fuel surcharges during the term of the contract. Such surcharges shall be updated quarterly with notice being provided to the City as detailed in Section 5.2.3 herein. 5.2.1 Rail Surcharge -The rail fuel surcharge rate will be based on actual contracts, invoices or published rates of the contractor's rail carrier. Contractor shall provide documentation regarding the rail carrier's pricing as a part of the request for an adjustment to the rail surcharge. No surcharge will be applied on top of another one. The Bidder should provide a rail fuel surcharge schedule as part of their bid submittal in the area provided in Appendix B herein. 3 City of Tamarac TAMARAC ~ The City For Your Life Purchas ing and Contracts Division 5.2.2 Trucking Surcharge -The truck fuel surcharge rate will be based on the Trucking Fuel Surcharge Scale contained in Appendix B herein, which shall be determined by referencing the Retail On-Highway Diesel Price -U.S . Average, as published by the U.S . Department of Energy, Energy Information Administration (DOE) for the third Monday of the final month of each quarter. The truck fuel surcharge will be applied to the base contract price per ton of quicklime transported effective with the start of the next quarter. No surcharge will be applied on top of another one. The bidder shall utilize the trucking fuel surcharge scale included in Appendix B as a basis for adjustment, and surcharge adjustments will be based on that scale. The DOE Retail On-Highway Diesel Price -US Average index may be found at: http://tonto .eia.doe .gov/oog/info/wohdp/diesel detail report combined .asp . 5.2.3 The City acknowledges that Contractor's rail and truck carriers adjust fuel surcharges monthly. The Contractor will apply fuel surcharges for each quarter based on the amount of the rail and truck fuel surcharges in effect for the month preceding the quarterly price change as calculated in accordance with Section 5.2 of this Agreement, utilizing Appendix B to the original bid #23-368. At the end of each quarter, the Contractor will process a "true up" by comparing the actual monthly rail and truck fuel surcharges for the quarter to the rail and truck fuel surcharges implemented at the time of the quarterly price change. Based on this comparison, the Contractor will issue the City a credit or debit that represents the variance . 5.2.4 Cost adjustments, in all cases, shall reflect only a direct pass-through of costs, and no changes to the Contractor's profit margin shall be permitted. The City and the Contractor may also utilize recognized government/industry indices or combination of indices to be mutually agreed upon by the City and Contractor, when determining price increases. 5.3 Adjustment of Price for the Effects of Government Action: Notwithstanding anything else contained herein to the contrary , the price shall be adjusted for all costs incurred by Supplier hereunder in order to comply with any Federal, State or local law, regulation or order enacted, changed or amended after the Effective Date including, without limitation, fuel and other taxes, laws, regulations or orders relating to health , safety, conseNation, reclamation, environmental protection, pollution control and air, water and soil standards but specifically excluding any and all income taxes . Supplier warrants that, to its knowledge, it is currently in compliance with all applicable laws, regulations or orders (except where noncompliance would not have a material adverse effect on Supplier's performance under this Agreement), and the costs incurred hereunder for such compliance whether or not actually incurred have been included in the initial price. In the event that any Federal, State or local law, regulation or order is enacted, changed or amended after the date of this Agreement, Supplier shall determine prospectively the cost per ton to Supplier of complying with such laws, regulations or orders and advise Purchaser of such costs, verified by adequate supporting documentation. The amount so determined shall be added to the payment price as an adjustment to become effective as and when such costs are incurred by Supplier. When the actual costs are known, Supplier shall provide Purchaser with appropriate data showing net effect of change. This data shall be subject to 4 City of Tamarac TAMARAC ~ The City For Your Life Purchasing and Contracts Di vision Purchaser's audit. For this audit Supplier shall produce evidence of actual costs within twelve months from institution of the additional charge and will either invoice or credit Purchaser as appropriate for the difference between Supplier's initial assessment and the results of the final determination of the audit. 5.4 Hardship: Notwithstanding anything else contained herein to the contrary, if extraordinary circumstances beyond a party's reasonable control significantly increase the cost of performance by such party of its obligations hereunder, upon the request of the adversely affected party, the parties shall seek to adjust the conditions of this Agreement in order to reasonably alleviate the effect of such extraordinary circumstances upon the affected party. If the parties do not reach an agreement with regard to adjusted conditions occasioned by such extraordinary circumstances within thirty (30) days following the notification of the request, the party adversely affected by the extraordinary circumstances shall have the right, at its sole discretion, to terminate this Agreement upon thirty (30) days' notice to the other party. 5.5 Pricing for Subsequent Renewal Terms: Contractor shall propose pricing for renewal terms which shall be submitted to the City at least sixty (60) calendar days prior to the expiration of the initial contract term. Contractor shall include with the price proposal, justification and back-up materials which shall be used to validate any price increase . Contractor may utilize recognized governmenUindustry indices or combination of indices to be mutually agreed upon by the City and Contractor, when determining price increases . Additionally, Contractor may include copies of correspondence and invoices from suppliers of material, services and transportation providers which may include, but not be limited to any additional documentation which will provide validation for such increases. Contractor shall also offer the City any decreases which may apply at the time of contract renewal. Under no circumstances will the City allow for any increase to Contractor's profit at the time of renewal. Increases shall reflect a direct pass-through of any applicable costs . 6 Payments A monthly payment will be made for work that is completed, accepted and properly invoiced. The City shall pay the Contractor for work performed subject to the specifications of Bid 23-368. All payments shall be governed by the Local Government Prompt Payment Act, F.S., Part VII ; Chapter 218. 7 Conditions of Material & Warranties 7.1. All materials and products supplied by the Bidder in conjunction with this bid shall conform to the specifications of the bid. The City reserves the right to return the product to the Bidder and require the delivery of new product at no cost to the City. 7.2. • Warranties. Supplier warrants that the Product shall conform to the specifications set forth herein and shall be free and clear of all liens and other encumbrances. SUPPLIER MAKES NO FURTHER WARRANTIES 5 City of Tamarac TAMARAC ~ The City For Your Life Purchasing and Contracts Division OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR ANY INTENDED USE OR PURPOSE. 8 Indemnification 8.1 The Contractor shall indemnify and hold harmless the City, its elected and appointed officials, employees, and agents from any and all claims, suits, actions, damages, liability, and expenses (including attorneys' fees) in connection with loss of life, bodily or personal injury, or property damage, including loss of use thereof, directly or indirectly caused by, resulting from, arising out of or occurring in connection with the operations of the Contractor or its officers, employees, agents, subcontractors, or independent Contractors, excepting only such loss of life, bodily or personal injury, or property damage solely attributable to the gross negligence or willful misconduct of the City or its elected or appointed officials and employees. The above provisions shall survive the termination of this Agreement and shall pertain to any occurrence during the term of this Agreement, even though the claim may be made after the termination hereof. 8.2 Upon completion of all Services, obligations and duties provided for in this Agreement, or in the event of termination of this Agreement for any reason, the terms and conditions of this Article shall survive indefinitely. i. The Contractor shall pay all claims, losses, liens, settlements or judgments of any nature whatsoever in connection with the foregoing indemnifications including, but not limited to, reasonable attorney's fees (including appellate attorney's fees) and costs. ii. City reserves the right to select its own legal counsel to conduct any defense in any such proceeding and all costs and fees associated therewith shall be the responsibility of Contractor under the indemnification agreement. 8.3 The City and Contractor recognize that various provisions of this Agreement, including but not limited to this Section, provide for indemnification by the Contractor and requires a specific consideration be given there for. The Parties therefore agree that the sum of Ten Dollars and 00/100 ($10.00), receipt of which is hereby acknowledged, is the specific consideration for such indemnities, and the providing of such indemnities is deemed to be part of the specifications with respect to the services to be provided by Contractor. Furthermore, the City and Contractor understand and agree that the covenants and representations relating to this indemnification provision shall serve the term of this Agreement and continue in full force and effect as to the City's and the Contractor's responsibility to indemnify. 8.4 Nothing contained herein is intended nor shall be construed to waive City's rights and immunities under the common law or Florida Statutes 768.28, as amended from time to time. 9 Non-Discrimination & Equal Opportunity Employment During the performance of the Contract, the Contractor and its subcontractors shall not discriminate against any employee or applicant for employment because of race, color, sex including pregnancy, religion, age, national origin, marital status, political affiliation, familial status, 6 City of Tamarac TAMARAC ~ The City For Your Life Purchasing and Contracts Di vision sexual orientation, gender identity and expression, or disability if qualified. The Contractor will take affirmative action to ensure that employees and those of its subcontractors are treated during employment, without regard to their race, color, sex including pregnancy, religion, age, national origin, marital status, political affiliation, familial status, sexual orientation, gender identity or expression, or disability if qualified. Such actions must include, but not be limited to, the following : employment, promotion; demotion or transfer; recruitment or recruitment advertising, layoff or termination ; rates of pay or other forms of compensation ; and selection for training, including apprenticeship. The Contractor and its subcontractors shall agree to post in conspicuous places, available to its employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause. The Contractor further agrees that he/she will ensure that all subcontractors, if any, will be made aware of and will comply with this nondiscrimination clause. 10 Independent Contractor This Agreement does not create an employee/employer relationship between the Parties. It is the intent of the Parties that the Contractor is an independent contractor under this Agreement and not the City's employee for any purposes , including but not limited to, the application of the Fair Labor Standards Act minimum wage and overtime payments, Federal Insurance Contribution Act, the Social Security Act, the Federal Unemployment Tax Act, the provisions of the Internal Revenue Code, the State Worker's Compensation Act, and the State Unemployment Insurance law . The Contractor shall retain sole and absolute discretion in the judgment of the manner and means of carrying out Contractor's activities and responsibilities hereunder provided , further that administrative procedures applicable to services rendered under this Agreement shall be those of Contractor, which policies of Contractor shall not conflict with City, State, or United States policies, rules or regulations relating to the use of Contractor's funds provided for herein. The Contractor agrees that it is a separate and independent enterprise from the City, that it had full opportunity to find other business, that it has made its own investment in its business, and that it will utilize a high level of skill necessary to perform the work. This Agreement shall not be construed as creating any joint employment relationship between the Contractor and the City and the City will not be liable for any obligation incurred by Contractor, including but not limited to unpaid minimum wages and/or overtime premiums . 11 Assignment and Subcontracting Contractor shall not transfer or assign the performance required by this Agreement without the prior consent of the City. This Agreement, or any portion thereof, shall not be subcontracted without the prior written consent of the city. 12 Notice Whenever either party desires or is required under this Agreement to give notice to any other party, it must be given by written notice either delivered in person, sent by U.S . Certified Mail, U.S. Express Mail, air or ground courier services , or by messenger service, as follows : CITY City Manager City of Tamarac 7525 N.W. 88th Avenue 7 City of Tamarac Tamarac, FL 33321 TAMARAC ~ The City For Your Life With a copy to the City Attorney at the same address: CONTRACTOR Lhoist North America of Alabama, LLC. Dr. Phillip Niemann, President/ CEO 5600 Clearfork Main Street, Suite 300 Fort Worth, Texas, 76109 13 Termination Purchasing and Contracts Division 13.1 Termination for Convenience: This Agreement may be terminated by the City for convenience, upon seven (7) days of written notice by the terminating party to the other party for such termination in which event the Contractor shall be paid its compensation for services performed to termination date, including services reasonably related to termination. In the event that the Contractor abandons this Agreement or causes it to be terminated, Contractor shall indemnify the city against loss pertaining to this termination. 13.2 Default by Contractor: In addition to all other remedies available to the City, this Agreement shall be subject to cancellation by the City for cause, should the Contractor neglect or fail to perform or observe any of the material terms, provisions, conditions, or requirements herein contained, if such neglect or failure shall continue for a period of thirty (30) days after receipt by Contractor of written notice of such neglect or failure. 14 Uncontrollable Forces 14.1 Neither the City nor Contractor shall be considered to be in default of this Agreement if delays in or failure of performance shall be due to Uncontrollable Forces, the effect of which, by the exercise of reasonable diligence, the non-performing party could not avoid. The term "Uncontrollable Forces" shall mean any event which results in the prevention or delay of performance by a party of its obligations under this Agreement and which is beyond the reasonable control of the nonperforming party. It includes, but is not limited to fire, flood, earthquakes, storms, lightning, epidemic, war, riot, civil disturbance, sabotage, and governmental actions. 14.2 Neither party shall, however, be excused from performance if nonperformance is due to forces, which are preventable, removable, or remediable, and which the nonperforming party could have, with the exercise of reasonable diligence, prevented, removed, or remedied with reasonable dispatch. The nonperforming party shall, within a reasonable time of being prevented or delayed from performance by an uncontrollable force, give written notice to the other party describing the circumstances and uncontrollable forces preventing continued performance of the obligations of this Agreement. 14.3 Hardship. Notwithstanding anything else contained herein to the contrary, if extraordinary circumstances beyond a party's reasonable control significantly increase the cost of performance by such party of its obligations hereunder, upon 8 City of Tamarac TAMARAC ~ The City For Your Life Purchasing and Contracts Division the request of the adversely affected party , the parties shall seek to adjust the conditions of this Agreement in order to reasonably alleviate the effect of such extraordinary circumstances upon the affected party. If the parties do not reach an agreement with regard to adjusted conditions occasioned by such extraordinary circumstances within thirty (30) days following the notification of the request, the party adversely affected by the extraordinary circumstances shall have the right , at its sole discretion, to terminate this Agreement upon thirty (30) days ' notice to the other party. 15 Limitation of Liability NEITHER PARTY SHALL BE LIABLE TO THE OTHER PARTY FOR ANY CONSEQUENTIAL OR PUNITIVE DAMAGES ARISING OUT OF THE PERFORMANCE OF THIS AGREEMENT, OR DEFAULT IN THE PERFORMANCE HEREOF, WHETHER BASED UPON CONTRACT, TORT (INCLUDING NEGLIGENCE OR STRICT LIABILITY), WARRANTY OR ANY OTHER LEGAL THEORY. SUPPLIER'S LIABILITY FOR DAMAGES SHALL BE LIMITED TO REPLACEMENT OF NON-CONFORMING PRODUCT OR REIMBURSEMENT OF THE PURCHASE PRICE FOR SUCH NON-CONFORMING PRODUCT 16 Agreement Subject to Funding This agreement shall remain in full force and effect only as long as the expenditures provided for in the Agreement have been appropriated by the City Commission of the City of Tamarac in the annual budget for each fiscal year of this Agreement and is subject to termination based on lack of funding. 17 Venue This Agreement shall be governed by the laws of the State of Florida as now and hereafter in force. The venue for actions arising out of this agreement is fixed in Broward County , Florida. 18 Signatory Authority The Contractor shall prov ide the City with copies of requisite documentation evidencing that the signatory for Contractor has the authority to enter into this Agreement. 19 Severability; Waiver of Provisions Any provision in this Agreement that is prohibited or unenforceable in any jurisdiction shall, as to such jurisdiction, be ineffective to the extent of such prohibition or unenforceability without invalidating the remaining provisions hereof or affecting the validity or enforceability of such provisions in any other jurisdiction. The non-enforcement of any provision by either party shall not constitute a waiver of that provision nor shall it affect the enforceability of that provision or of the remainder of this Agreement. 9 City of Tamarac TAMARAC ~ The City For Your Life Purchasing and Contracts Division 20 Merger; Amendment This Agreement constitutes the entire Agreement between the Contractor and the City, and negotiations and oral understandings between the parties are merged herein. This Agreement can be supplemented and/or amended only by a written document executed by both the Contractor and the City. 21 No Construction Against Drafting Party Each party to this Agreement expressly recognizes that this Agreement results from the negotiation process in which each party was represented by counsel and contributed to the drafting of this Agreement. Given this fact, no legal or other presumptions against the party drafting this Agreement concerning its construction, interpretation or otherwise accrue to the benefit of any party to the Agreement, and each party expressly waives the right to assert such a presumption in any proceedings or disputes connected with, arising out of, or involving this Agreement. 22 Scrutinized Companies --287.135 AND 215.473 22.1 By execution of this Agreement, Contractor certifies that Contractor is not participating in a boycott of Israel. Contractor further certifies that Contractor is not on the Scrutinized Companies that Boycott Israel list, not on the Scrutinized Companies with Activities in Sudan List, and not on the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or has Contractor been engaged in business operations in Syria . Subject to limited exceptions provided in state law, the City will not contract for the provision of goods or services with any scrutinized company referred to above . 22.2 Submitting a false certification shall be deemed a material breach of contract. The City shall provide notice, in writing, to Contractor of the City's determination concerning the false certification. Contractor shall have five (5) days from receipt of notice to refute the false certification allegation. If such false certification is discovered during the active contract term , Contractor shall have ninety (90) days following receipt of the notice to respond in writing and demonstrate that the determination of false certification was made in error . If Contractor does not demonstrate that the City's determination of false certification was made in error then the City shall have the right to terminate the contract and seek civil remedies pursuant to Section 287 .135, Florida Statutes, as amended from time to time. 23 Public Records 23.1 The City of Tamarac is a public agency subject to Chapter 119, Florida Statutes. The Contractor shall comply with Florida's Public Records Law. Specifically, the Contractor shall: 23.1.1 Keep and maintain public records required by the City in order to perform the service; 23.1.2 Upon request from the City 's custodian of public records, provide the public agency with a copy of the requested records or allow the reco rds 10 City of Tamarac TAMARAC ~ The City For Your Life Purchasing and Contracts Division to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law. 23.1.3 Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the contractor does not transfer the records to the City. 23.1.4 Upon completion of the contract, transfer, at no cost to the City, all public records in possession of the Contractor, or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public records to the City upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, upon request from the City's custodian of public records in a format that is compatible with the information technology systems of the City. 23.2 During the term of the contract, the Contractor shall maintain all books, reports and records in accordance with generally accepted accounting practices and standards for records directly related to this contract. The form of all records and reports shall be subject to the approval of the City's Auditor. The Contractor agrees to make available to the City's Auditor, during normal business hours and in Broward, Dade or Palm Beach Counties, all books of account, reports and records relating to this contract. 24 E-Verify Compliance . As a condition precedent to entering into this Agreement, and in compliance with Section 448.095, Fla. Stat., Consultant and its subcontractors shall, register with and use the E-Verify system to verify work authorization status of all employees hired after January 1, 2021. Consultant shall require each of its subcontractors to provide Consultant with an affidavit stating that the subcontractor does not employ, contract with, or subcontract with an unauthorized alien. Consultant shall maintain a copy of the subcontractor's affidavit as part of and pursuant to the records retention requirements of this Agreement. City, Consultant, or any subcontractor/subconsultant who has a good faith belief that a person or entity with which it is contracting has knowingly violated Section 448.09(1), Fla. Stat. or the provisions of this section shall terminate the contract with the person or entity. City, upon good faith belief that a subcontractor knowingly violated the provisions of this section; but Consultant otherwise complied, shall promptly notify Consultant and Consultant shall immediately terminate the contract with the subcontractor. An agreement or contract terminated under the provisions of this section is not a breach of contract and may not be considered such. Any agreement or contract termination under the provisions of this section may be challenged pursuant to Section 448.095(2)(d), Fla. Stat. Consultant acknowledges that upon termination of this Agreement by the City for a violation 11 City of Tamarac TAMARAC ~ The City For Your Life Purchasing and Contracts Division of this section by Consultant , Consultant may not be awa rded a public contract for at least one (1) year . Consultant further acknowledges that Consultant is liable for any additional costs incurred by the City as a result of termination of any contract for a violation of this section . Consultant or subcontractor shall insert in any subcontracts the clauses set forth in this section ; requiring the subcontractors to include these clauses in any lower tier subcontracts. Consultant shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in this section . 25 Public Records Custodian IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT: CITY CLERK 7525 NW 88TH AVENUE ROOM 101 TAMARAC, FL 33321 (954) 597-3505 CITYCLERK@TAMARAC.ORG 12 City of Tamarac TAMARAC ~ The City For Your Life Purchasing and Contracts Division IN WITNESS WHEREOF, the parties have made and executed this Agreement on the respective dates under each signature . CITY OF TAMARAC, signing by and through its Mayor and City Manager, and CONTRACTOR, signing by and through its President / CEO duly autho r ized to execute same . CITY OF TAMARAC 1/{~tu:!6e; Michee J. Gomez , Mayor (o Date Date • ttorney Lhoist North America of Alabama, LLC. Campa Signature of Corporate Secr'filiry Philipp Niemann, Dr. Philipp Niemann ype/Print Name of Corporate Secy . Name of President/CEO (CORPORATE SEAL) 13 City of Tamarac TAMARAC ~ The City For Your Life Purchasing ond Contracts Division CORPORA TE ACKNOWLEDGEMENT STATEOF IQ ,V,,f\:::, COUNTY OF \O,.,,(\[f\'.Yrj : ss I HEREBY CERTIFY that on this day, before me, an Officer duly authorized in the State aforesaid and in the County aforesaid to take acknowledgments, personally appeared '1?h, Ii pp C\)9,,r:oQ 'CID , of L'ozy-t 0o<\b !,\m,,V\1\1\ "k)ffil hJ roB, L \J .... a D ~ L L L (. ~eratiurr, to me known to be the person(s) described in and who executed the foregoing instrument and acknowledged before me that he/she executed the same. WITNESS my hand and official seal this £day of"':)) ~bo./ , 2022,. RACHEL GALVAN My Notary ID# 128343345 Expires July 30, 2026 14 ~ Print, Type or Stamp Name of Notary Public _lg] Personally known to me or D Produced Identification Type of I.D . Produced D DID take an oath, or 94J DID NOT take an oath. City of Tamarac TAMARAC ~ The City For Your Life APPENDIX A CONTRACTOR PASS REQU EST Purc/w ing end Contracts D1v,s1on TH IS FORM IS A VA ILABLE ON THE CITY'S ELECTRONIC SOLICITATION SIT E, BIDS & TE N DERS, AND BIDDERS MUST PROVIDE INFORMATION IN THE DESIGNATED AREA WITHIN THE BID DOCUM ENT. (BIDD E R MAY ADD ADDI T IONAL ROWS.) Vendor Name: ~u.:thfYV\ Ta.n tl-*an.sf!¥± Vendor Address: '8 o o w tvl L .._,Cl b eo \J ~ futvdr\, ✓ :t L, J Vendor Contact Name: Mo. -ifhe...., Sw.a:brla--- Vendor Contact Phone Number: ___ fo""-3_"" 4-9 ....c..2 _._l ------'""2_..._8 ..... &,,.__o ________ _ List of Contractor Employees Requiring Entry to Facilities (Attach copy of Picture Identification for all persons listed below) Work to be Performed 23 Contract Exhibit A -Schedule of Prices AGENCY DELIVERED PRICE DELIVERED PRICE DELIVERED PRICE PER TON YEAR 1 PER TON YEAR 2 PER TON YEAR 3 Table 1 --TYPE 1 -Pebble Lime City of Boynton Beach $ 446 .95 $ 491 .65 $ 540.81 Broward County Dist. 1 $ 446 .95 $ 491 .65 $ 540 .81 Broward County Dist. 2 $ 446 .95 $ 491 .65 $ 540.81 City of Coral Springs (1) $ 446 .95 $ 491 .65 $ 540 .81 Town of Davie $ 446 .95 $ 491 .65 $ 540 .81 City of Dania Beach $ 446 .95 $ 491 .65 $ 540.81 City of Deerfield Beach $ 446 .95 $ 491 .65 $ 540.81 City of Fort Lauderdale (2) $ 446 .95 $ 491 .65 $ 540.81 City of Hallandale Beach (3) $ 446 .95 $ 491.65 $ 540.81 City of Lake Worth Beach $ 446 .95 $ 491.65 $ 540.81 City of Lauderhill $ 446 .95 $ 491.65 $ 540.81 City of North Lauderdale $ 446 .95 $ 491 .65 $ 540.81 City of North Miami $ 448 .38 $ 493 .22 $ 542.54 Village of Palm Springs $ 451 .23 $ 496 .36 $ 545 .99 Village of Palm Sprinqs $ 451 .23 $ 496 .36 $ 545 .99 City of Pompano Beach $ 446 .95 $ 491 .65 $ 540 .00 City of Riviera Beach $ 451 .23 $ 496 .36 $ 545 .99 City of Sunrise $ 446 .95 $ 491 .65 $ 540.81 City of Sunrise $ 446 .95 $ 491.65 $ 540 .81 Village of Wellington $ 449 .79 $ 494.77 $ 544 .25 TABLE 2 --TYPE 1A-Foundry/ Rice Lime City of Delray Beach $ 446 .95 $ 491.65 $ 540.81 City of Hollywood $ 446 .95 $ 491.65 $ 540.81 City of Margate $ 446 .95 $ 491.65 $ 540.81 City of North Miami Beach $ 448 .38 $ 493.22 $ 542.54 City of Pembroke Pines $ 446 .95 $ 491.65 $ 540.81 City of Tamarac $ 446 .95 $ 491.65 $ 544.25 City of West Palm Beach $ 449 .79 $ 494 .77 $ 544.25 City of Tamarac TAMARAC ~ The City For Your Life APPENDIX B Purchas ing and Contracts Division 2023 TR UC K FU EL SU RC HARG E SCAL E Truck Fuel Surcharges are a percentage of the truck freight rate for product movement from the bidder's distribution origin to the customer's site. Truck Fuel Surcharges are subject to change quarterly. • The percentage of the Monthly Truck Fuel Surcharge is computed by determining the Department of Energy's DOE Retail On-Highway Diesel Price -US Average index may be found at: published on the 3rd Monday of the last month of the quarter. DOE Diesel Prices may be found at the following website: https://www .eia .gov/petroleum/gasdiesel/ • Percentages change .5% for every $0.05 per gallon price change DIESEL FUEL PRICE NATIONAL AVERAGE $1 .75 $1.80 $1 .85 $1.90 $1.95 $2 .00 $2.05 $2.10 $2.15 $2.20 $2.25 $2.30 $2.35 $2.40 $2.45 $2.50 $2.55 $2.60 $2.65 $2 .70 $2.75 $2.80 $2.85 $2.90 $2.95 FS = % OF DIESEL FUEL PRICE FS = % OF FREIGHT RATE NATIONAL AVERAGE FREIGHT RATE 0 .00% $3 .00 13.00% 1.00% $3 .05 13.50% 1.50% $3.10 14.00% 2 .00% $3.15 14.50% 2.50% $3 .20 15.00% 3 .00% $3 .25 15.50% 3.50% $3.30 16.00% 4.00% $3.35 16.50% 4.50% $3.40 17.00% 5.00% $3.45 17.50% 5 .50% $3.50 18.00% 6.00% $3.55 18.50% 6.50% $3.60 19.00% 7.00% $3 .65 19.50% 7.50% $3 .70 20 .00% 8.00% $3.75 20.50% 8.50% $3.80 21 .00% 9.00% $3.85 21.50% 9 .50% $3.90 22.00% 10 .00% $3.95 22 .50% 10 .50% $4.00 23.00% 11.00% $4.05 23.50% 11.50% $4.10 24.00% 12.00% $4.15 24 .50% 12.50% $4.20 25 .00% ATTACHMENT A: PARTICIPATING AGENCIES Below is a list of the aaencies oarticioatinq in this bid and their respective delivery locations: AGENCY DELIVERY ADDRESS CITY/ STATE/ ZIP CONTACT PHONE/ EMAIL Type 1 -Pebble Lime City of Boynton Beach 124 E. Woolbright Road Boynton Beach, Fl: 33435 William Newsome 561-7426593 NewsomeW@bbfi.us 954-831-4115 Office 954-553- 0653 Mobile Broward County Dist. 1A 3701 N. State Road 7 Lauderdale Lakes, Fl: 33319 Pedro Berrios pberrios@broward .erg 954-831-4115 Office 954-234- Broward County Dist. 2A 1390 NE 5oth Street Deerfield Beach, Fl: 33064 Jose Otero 1034 Cell jotero@broward.org 954-345-2160 City of Coral Springs 3800 NW 85th Avenue Coral Springs Fl: 33065 Alvan Jones ajones@coralsprings.org 954-924-6808 ext. 3616 City of Dania Beach 1201 Stirlina Road Dania Beach, Fl 33004 Nate Costa ncosta@daniabeachfl.gov Town of Davie 3500 NW 76th Ave Hollywood, Fl: 33024 Anand Maharaj 954-327-37 48 954-480-4368 City of Deerfield Beach 290 Goolsby Blvd. Deerfield Beach, Fl: 33442 Bakari Scott bscott@deerfieldbeach.com 954-828-7865 City of Ft. Lauderdale 949 NW 38th Street Ft. Lauderdale, Fl: Cesar Alza calza@fortlauderdale.gov City of Hallandale Beach 630 NW 2nd. Street Hallandale Beach, Fl: 33009 J. Fawcett 954-457-1632 jfawcett@cohb.org 561-586-1713 City of Lake Worth Beach 301 College Street Lake Worth Beach:FL Garry Baker II gabaker@lakeworthbeachfl.gov 954-730-3057 City of Lauderhill 2101 NW 49th Avenue Lauderhill, Fl: Marc Celetti mceletti@lauderhillfl.gov 954-597-4757 City of North Lauderdale 841 NW71st.Avenue North Lauderdale:FI 33068 Neil Buckeridge nbuckeridge@nlauderdale.org City of North Miami 12098 NW11th Avenue North Miami, Fl: 561-584-8200 ext. 8718 Village of Palm Springs 360 Davis Road Palm Springs, Fl: 33461 David Burgin dburgin@vpsfl.org 1561-584-~.!00 ext. 8718 Village of Palm Springs 5618 Basil Drive Boynton Beach, Fl: 33435 David Burgin dburgin@vpsfl.org City of Pompano Beach 301 NE 12th Street Pompano Beach 954-545-7018 City of Riviera Beach 800 W. Blue Heron Blvd. Riviera Beach, Fl: 33404 David Salas 561-723-2741 954-572-2427 City of Sunrise 15400 Watermill Road Davie, Fl: 33331 Hugo Alagic halagic@sunrisefl.gov 954-572-2427 City of Sunrise 4350 springtree Drive Sunrise, Fl: 33351 Jose Alvarez jalvarez@sunrisefl.gov 561-791-4128 Village of Wellington 1100 Wellington Trace Wellington, Fl: 33414 Mike Zembrzuski mzembrzuski@wellingtonfl.gov T ,pe 1A -Foundrv / Rice Lime 561-531-0817 City of Delray Beach 201 SW 7th Street Delray Beach, Fl: 33444 Bryan Heller hellerb@mydelraybeach.com 954-967-4230 City of Hollywood 3441 Hollywood Blvd. Hollwood, Fl: 33021 Luis Montoya lmontoya@hollwoodfl.org 954-972-0828 City of Margate 980 NW 66th Ave. Margate, Fl: 33063 Richard Uber ruber@margate.com 786-586-8395 City of North Miami Beach 19150 NW 8th Ave. Miami Gardens, Fl: 33169 Carlos Carrazana carlos.carrazana@citynmb.com 754-260-4505 City of Pembroke Pines 7960 Johnson Street Pembroke Pines, Fl: Michael Cepeda michael.cepeda@jacobs.com 954-597-3775 / 3777 City of Tamarac 7803 NW 61 st. Street Tamarac, Fl: 33321 Anthony Licata anthony.licata@tamarac.org 561-351-4555 lgalloway@wpb.org Lester Galloway / 561-822-2290 City of West Palm Beach 1009 Banyan Blvd. West Palm Beach, Fl:33401 Sandra Feliciano sfeliciano@wpb.org City of Tamarac Purchasing and Contracts Division 1 AGREEMENT AMENDMENT #1 BETWEEN THE CITY OF TAMARAC AND LHOIST NORTH AMERICA OF ALABAMA, LLC The City of Tamarac, a municipal corporation with principal offices located at 7525 N.W. 88th Ave., Tamarac, FL 33321 (the “City”) and Lhoist North America of Alabama, LLC, an Alabama corporation with principal offices located at 5600 Clearfork Main Street, Suite 300, Fort Worth, Texas 76109 (the “Contractor”), agree to amend the Agreement between the City of Tamarac and Lhoist North America of Alabama, LLC, that was made and entered into on October 11, 2023, as amended, (the “Agreement”) as follows: 1. Pursuant to Section 4. Term of the Agreement, the City and Contractor agree to exercise the renewal option to renew the contract for one additional three (3) year period, beginning November 1, 2026, through October 31, 2029. 2. Contract Exhibit A of the Agreement is hereby replaced in its entirety with the attached Contract Exhibit A, dated October 25, 2025, which shall become effective upon execution of this Amendment. 3. Subsection 5.1 of the Agreement is amended by deleting the existing provision in its entirety and replacing it with the following: “Contract Pricing shall be based on delivered cost per ton. The Contract Sum includes all labor, materials and freight charges. Pricing shall be firm for each year of the Term as indicated in Contract Exhibit A. Beginning November 1, 2026, adjustments to the Contract Sum will be made annually, and adjusted by the percentage change of the CPI-U Series ID CUUR0000SA0, using previous 12-month period average September 2025 - August 2026 plus one percent (1%). Contractor will use three decimal places to be consistent with the data provided by the Bureau of Labor Statistics. These adjustments will occur each November 1st for the remainder of the Term” 4. All other provisions of the Agreement remain in effect as written. Remainder of Page Intentionally Blank Docusign Envelope ID: EA445C68-4333-4317-8B2C-476E253ADA30 Docusign Envelope ID: EA445C68-4333-4317-8B2C-476E253ADA30 11/19/2025 11/19/2025 11/19/2025 Docusign Envelope ID: EA445C68-4333-4317-8B2C-476E253ADA30 Docusign Envelope ID: EA445C68-4333-4317-8B2C-476E253ADA30 City of Dania Beach Public Services Memorandum DATE: 11/17/2026 TO: Mayor and Commissioners FROM: Candido Sosa-Cruz, ICMA-CM, City Manager VIA: Oscar Vasquez, Public Services Director Carlos Escalante, Public Services Deputy Director SUBJECT: APPROVAL TO PIGGYBACK SOURCEWELL CONTRACT NO. 091323 WITH SHERWIN WILLIAMS AND TO EXCEED THE ANNUAL $50,000 VENDOR THRESHOLD Request: The Public Services Department (PSD) requests approval to piggyback the Sourcewell Contract No. 091323 with Sherwin Williams, and to exceed the annual $50,000.00 vendor threshold for the term of the contract. This contract is valid through November 8, 2027. Background: PSD purchases paint and supplies from Sherwin Williams for various operations within the department for routine maintenance, repairs, and facility upkeep. Sherwin Williams provides paint for Facilities, fire hydrants, lift stations, and for Street operations like parking striping and curbing. Utilizing the Sourcewell Contract No. 091323 will provide a reliable and cost-effective means of obtaining the necessary materials to meet the department’s operational needs. Sherwin Williams is also located within close proximity and can provide convenient access to supplies for timely procurement. Budgetary Impact Upon approval, a departmental purchase order will be processed in the amount of $15,000.00. Funding for this purchase order will be appropriated from Facilities Account No. 505-39-02-539- 52-60 in the amount of $5,000.00, Streets Account No. 001-39-06-541-52-20 in the amount of $5,000.00, and Water Account No. 401-33-02-533-52-20 in the amount of $5,000.00. Any additional purchase orders will be subject to the division’s available budgets. Recommendation PSD recommends approval to piggyback Sourcewell Contract No. 091323 and to exceed the annual $50,000 vendor threshold with Sherwin Williams for the term of the contract. RESOLUTION NO. 2026-_____ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE WAIVER OF COMPETITIVE BIDDING; AUTHORIZING THE PROPER CITY OFFICIALS TO PURCHASE PAINT AND PAINT‑RELATED SUPPLIES FROM THE SHERWIN‑WILLIAMS COMPANY THROUGH SOURCEWELL CONTRACT 091323, AND TO EXCEED THE ANNUAL VENDOR THRESHOLD OF FIFTY THOUSAND DOLLARS ($50,000) FOR THE TERM OF THE CONTRACT; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. the Charter of the City of Dania Beach, Part III, Article 3, Section 4, Subsection (j), authorizes the City Manager to purchase supplies, services, equipment, and materials for the City government in amounts in excess of the established monetary threshold without competitive bidding and without advertisement for bids, if she is authorized to do so in advance by a resolution adopted by the City Commission; and the Dania Beach Code of Ordinances, Chapter 2, Article 1, Section 2-10, “Monetary thresholds for certain purchases and payment disbursement authorizations”, Subsection (a), sets the monetary threshold at Fifty Thousand Dollars ($50,000.00) for a vendor each fiscal year; and the Public Services Department (PSD) requires paint and related supplies to support routine maintenance, repairs, and facility upkeep, including materials for Facilities, fire hydrants, lift stations, parking striping, and curbing; and Sherwin-Williams provides the necessary paint and related supplies to meet the operational needs of the Public Services Department; and the utilization of Sourcewell Contract No. 091323 with Sherwin-Williams provides a reliable and cost-effective procurement method and convenient access to supplies to support timely departmental operations; and , the Public Services Department requests authorization to utilize Sourcewell Contract No. 091323, valid through November 8, 2027, and to exceed the annual vendor expenditure threshold of $50,000.00 with Sherwin-Williams for the term of the contract; and upon approval, an initial departmental purchase order in the amount of $15,000.00 will be processed, and funding will be appropriated from Facilities Account No. 505- 2 RESOLUTION #2026-_____ 39-02-539-52-60 in the amount of $5,000.00, Streets Account No. 001-39-06-541-52-20 in the amount of $5,000.00, and Water Account No. 401-33-02-533-52-20 in the amount of $5,000.00. WHEREAS, any additional purchase orders shall be subject to the availability of funds within the applicable division budgets. WHEREAS, the City Commission finds that authorizing these purchases will support the ongoing maintenance, repair, and upkeep of City facilities, fire hydrants, lift stations, streets, and other public infrastructure through the timely procurement of paint and related supplies. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above “Whereas” clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That the City is authorized to piggyback Sourcewell Contract No. 091323 with Sherwin-Williams for the purchase of paint and related supplies required by the Public Services Department. Section 3. That a purchase order in the amount of $15,000.00 will be established and funding will be appropriated from Facilities Account No. 505-39-02-539-52-60 in the amount of $5,000.00, Streets Account No. 001-39-06-541-52-20 in the amount of $5,000.00, and Water Account No. 401-33-02-533-52-20 in the amount of $5,000.00. Any additional purchase orders shall be subject to the availability of funds within the applicable division’s approved budget. Section 4. That the City is authorized to exceed the annual fifty-thousand-dollar ($50,000.00) vendor threshold for Sherwin Williams for the term of Sourcewell Contract No. 091323, which is valid through November 8, 2027. Section 5. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 6. That this Resolution shall be effective 10 days after passage. 3 RESOLUTION #2026-_____ PASSED AND ADOPTED on __________________, 2026. Motion by __________________________, second by ___________________________. FINAL VOTE ON ADOPTION: Unanimous ____ Yes No Commissioner Joyce L. Davis ____ ____ Commissioner Luis Rimoli ____ ____ Commissioner Marco Salvino ____ ____ Vice Mayor Diana Fahmie ____ ____ Mayor Colman W. Ryan ____ ____ ATTEST: ELORA RIERA, MMC COLMAN W. RYAN CITY CLERK MAYOR APPROVED AS TO FORM AND CORRECTNESS: EVE A. BOUTSIS CITY ATTORNEY 1 PIGGYBACK AGREEMENT FOR PAINT AND RELATED SUPPLIES Sourcewell Contract No. 091323-SHW This Piggyback Agreement (“Agreement”) is entered into on ________________, 2026 by the CITY OF DANIA BEACH, FLORIDA, a Florida municipal corporation, with an address of 100 W. Dania Beach Boulevard, Dania Beach, Florida 33004 (“City”), and THE SHERWIN- WILLIAMS COMPANY, with an address of 101 W. Prospect Avenue, Cleveland, Ohio 44115 (“Supplier”). Sourcewell awarded Supplier Contract No. 091323-SHW pursuant to Solicitation No. 091323 for Paint with Related Supplies, Equipment, and Services (“Source Contract”). Article 6.B of the Source Contract permits participating entities to negotiate additional terms through a participating addendum. The City desires to purchase paint and related supplies for maintenance, repair, and upkeep of City facilities and infrastructure. The parties agree as follows: 1. Contract Documents and Priority The Source Contract, including its incorporated proposal, solicitation, addenda, and applicable duly approved amendments, is incorporated by reference as Exhibit A, subject to this Agreement. Supplier shall furnish the City a complete copy of those documents and the current approved pricing before the first purchase. This Agreement is the City’s participating addendum under Article 6.B. It governs only the City’s purchases and does not amend the relationship between Sourcewell and Supplier. In a conflict concerning City purchases, the order of priority is: this Agreement and its signed amendments; Articles 1 through 22 of the Source Contract; the remaining incorporated Source Contract documents in their established order of precedence; and the City’s authorized purchase orders as to quantities, delivery, and pricing consistent with the foregoing. Supplier quotations, invoices, receipts, credit applications, websites, and click-through terms shall not add to or modify these terms. City personnel accepting goods or processing payment have no authority by those acts to amend this Agreement. No incorporated provision shall be construed to reduce a protection afforded the City by the Source Contract. 2. Scope and Purchase Orders Supplier shall provide paint and paint-related supplies within the awarded scope of the Source Contract, as ordered by the City’s Public Services Department, for facilities, fire hydrants, lift stations, street markings, parking striping, curbing, and related maintenance. This Agreement does not authorize construction, installation, equipment purchases, or other services outside that City- approved scope. Any expansion requires separate City authorization and must remain within the competitively awarded Source Contract scope. 2 Each purchase must be supported by a duly authorized City purchase order or release against an approved purchase order, identify Sourcewell Contract No. 091323-SHW, and specify the items, quantities, prices, and pickup or delivery arrangements. This Agreement is nonexclusive and imposes no minimum purchase, guaranteed volume, or requirements commitment. Supplier shall not furnish unauthorized items or exceed an order’s remaining balance. 3. Effective Date and Term The Effective Date is the date of the last signature below, but no earlier than the effective date of the City Commission resolution authorizing this Agreement. The Agreement expires November 8, 2027, unless terminated earlier. No new orders may be placed after expiration or earlier termination of the Source Contract. Orders properly issued before expiration may be completed afterward as permitted by Article 6.A, subject to this Agreement and lawful funding. There is no automatic renewal. Any extension requires a valid Source Contract extension, required City approval, and a written amendment signed by both parties. 4. Pricing and Payment Prices shall not exceed the applicable Source Contract prices. The incorporated Supplier proposal, Table 11, items 60 and 61, provides a minimum discount of thirty percent (30%) off list price for paint and paint supplies. Supplier shall apply any greater discount specifically offered to the City. Each quote shall identify the item or SKU, applicable list price, contract discount, net unit price, quantity, and total acquisition cost, including any permissible delivery charges. Supplier shall provide supporting pricing documentation on request. Pricing changes must comply with Article 4 of the Source Contract and be supported by the applicable Sourcewell approval before being used for a future City order. Changes shall not increase prices on an accepted City order without a lawful written amendment approved by the City. Sourcewell administrative fees are included in the contract price and shall not be added to City invoices. Freight, special-order charges, and other charges are payable only if permitted under the Source Contract, disclosed in the quote, and expressly approved in the City’s order before the cost is incurred. In a conflict with the proposal, Article 3’s total-acquisition-cost requirements govern. Supplier shall invoice the City after delivery, identifying the purchase order, items, quantities, unit prices, discounts, delivery date, and approved charges. Payment and invoice disputes shall be governed by the Florida Local Government Prompt Payment Act, Part VII, Chapter 218, Florida Statutes. The City is responsible only for authorized purchases actually furnished in accordance with this Agreement. No advance payment, contractual late fee, finance charge, collection expense, or Supplier attorney’s fee is authorized, except interest or other amounts required by applicable law. Supplier shall honor the City’s valid tax-exemption certificate. 3 5. Expenditure Authorization and Funding The anticipated initial purchase order is $15,000, subject to City approval and issuance, with $5,000 allocated from each of Facilities Account No. 505-39-02-539-52-60, Streets Account No. 001-39-06-541-52-20, and Water Account No. 401-33-02-533-52-20. This allocation does not guarantee expenditure or itself constitute an order. Additional purchases require available appropriations, duly authorized purchase orders, and compliance with all applicable City approval requirements. Any Commission authorization to exceed the annual $50,000 vendor threshold is not a minimum purchase obligation or an unlimited appropriation. Aggregate purchases shall remain within the amounts lawfully authorized by the City and its approved budgets. This Agreement does not independently delegate expenditure authority or increase any official’s purchasing authority. All obligations are subject to annual appropriation and availability of lawfully budgeted funds. If sufficient funds are not appropriated or become unavailable, the City may terminate this Agreement or affected orders immediately by written notice without penalty. The City shall pay lawful amounts due for conforming goods delivered and accepted before termination, subject to applicable law. There is no acceleration of future charges or payment for unperformed obligations. 6. Delivery, Acceptance, and Warranties Supplier shall deliver to the City location, or make items available for pickup, as specified in each order. Delivery dates and any special-order requirements must be disclosed and accepted before the order is placed. Supplier bears risk of loss until delivery to the designated City location or physical transfer to an authorized City representative for pickup. Supplier shall provide required safety data sheets and lawful labeling. No substitutions, used goods, or close-out products may be provided without the City’s prior written approval. The City retains the inspection, rejection, replacement, return-shipping, and warranty protections of Articles 2 and 3 of the Source Contract. Receipt, payment, or preliminary inspection does not waive latent defects or warranty rights. Supplier shall promptly replace or refund rejected defective or nonconforming goods at no cost to the City. The Source Contract warranties and any longer applicable manufacturer warranties survive delivery and expiration as provided therein. A custom tint or special order does not excuse nonconformance. 7. Termination and Remedies The City may terminate this Agreement or an uncompleted order, in whole or part, for convenience upon thirty (30) days’ written notice. Supplier shall stop the affected performance on the stated termination date and mitigate costs. The City shall pay only for conforming, authorized goods delivered and accepted before that date. No cancellation fee, restocking fee, lost profit on unperformed work, or payment for undelivered goods is due. Any different treatment of a noncancelable special order requires an express written amendment executed by an authorized City official before that order is issued. 4 For Supplier’s material breach, the City may give written notice describing the breach and terminate if Supplier fails to cure within ten (10) calendar days after receipt, or within any longer period expressly allowed by the City in writing. The City may immediately suspend affected purchases or terminate for a breach presenting an imminent threat to health or safety, unlawful performance, or a breach incapable of cure. These rights supplement the City’s remedies under the Source Contract and law. No Sourcewell escalation procedure is a condition to the City exercising its rights. Supplier shall continue unaffected obligations while a dispute is pending to the extent required by the Source Contract. Force majeure may excuse affected performance only to the extent provided in Article 15 and shall not entitle Supplier to additional compensation or require the City to purchase substitute goods from Supplier. Supplier shall give prompt written notice and mitigate the delay. The City may obtain goods elsewhere and exercise its termination rights. 8. Indemnity and Sovereign Immunity Supplier’s indemnification and defense obligations under Article 11 of the Source Contract remain in effect for the benefit of the City and its officers, agents, and employees as a Participating Entity. Nothing in this Agreement requires the City to indemnify, defend, or hold harmless Supplier, Sourcewell, or any other person, or to assume another person’s liability. Any contrary incorporated provision is inapplicable to the City. The City expressly reserves all sovereign immunity, defenses, and limitations of liability provided by section 768.28, Florida Statutes, and other applicable law. Nothing waives those protections, increases the City’s liability beyond applicable statutory limits, or constitutes consent to suit beyond that provided by law. Minnesota governmental tort-liability provisions do not govern the City. No Supplier limitation of liability shall diminish its obligations to the City under the Source Contract. 9. Insurance Supplier shall maintain the insurance required by Article 18 of the Source Contract throughout performance, including fulfillment of outstanding City orders. Before the first delivery, Supplier shall provide certificates and endorsements evidencing the coverage and naming the City, its officers, agents, and employees as additional insureds under the commercial general liability policy for the activities and products covered by Article 18.C. Coverage shall be primary and noncontributory, with the waivers of subrogation required by Article 18.D. Evidence is subject to review by the City’s Risk Manager. City review or failure to request evidence does not waive Supplier’s obligations. Supplier shall promptly notify the City of cancellation, nonrenewal, or material reduction of required coverage. 10. Records and Audit Supplier shall maintain records sufficient to verify City orders, applicable list prices, discounts, deliveries, and invoices for at least six (6) years after final payment or termination, whichever is later, and longer when required by applicable retention schedules, pending claims, or law. The 5 City may inspect and copy those records on reasonable notice during normal business hours. Supplier shall cooperate with the City in responding to public-records requests. No confidentiality provision prevents the City from disclosing records as required by Florida law. 11. Public Records Supplier shall comply with Chapter 119, Florida Statutes, to the extent applicable. If Supplier performs services and acts on behalf of the City within section 119.0701, Florida Statutes, Supplier shall: keep and maintain the public records required by the City to perform the services; upon request of the City’s custodian, provide copies or allow inspection or copying within a reasonable time at a cost not exceeding that allowed by law; and protect exempt or confidential and exempt records from unauthorized disclosure during and after the Agreement. For records subject to section 119.0701, upon completion or termination Supplier shall transfer all such public records to the City at no cost or keep and maintain them in compliance with all applicable retention requirements. If transferred, Supplier shall destroy duplicate records that are exempt or confidential and exempt from disclosure as required by law. Electronic records shall be supplied upon the custodian’s request in a format compatible with the City’s information technology systems. Failure to comply is a material breach, subject to the City’s contractual and statutory remedies. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT 954-924-6800, EXTENSION 3623; ERIERA@DANIABEACHFL.GOV; CITY CLERK, 100 W. DANIA BEACH BOULEVARD, DANIA BEACH, FLORIDA 33004. 12. Legal Compliance and Certifications Supplier shall comply with applicable federal, Florida, and local laws relating to its performance, including product safety, lawful employment, ethics, and applicable public-contracting restrictions, and shall maintain all required licenses. Supplier shall provide the certifications and affidavits required by applicable law and City procurement requirements before award or performance, as applicable, including applicable E-Verify requirements under section 448.095, Florida Statutes. Supplier shall notify the City promptly if it becomes ineligible to contract with the City. Supplier certifies that it does not and will not use county or municipal funds in requiring its employees, contractors, volunteers, vendors, or agents to ascribe to, study, or be instructed using materials relating to diversity, equity, and inclusion as defined in sections 125.595(1) and 166.04971(1), Florida Statutes. This certification is a contractual commitment upon execution and shall also satisfy section 287.139, Florida Statutes, when applicable. Supplier shall provide a separate preaward or renewal certification when required by law. 6 13. Governing Law and Venue Under Article 6.E of the Source Contract, Florida law governs this Agreement and all City orders. Exclusive venue lies in the state courts of competent jurisdiction in Broward County, Florida, or, if federal jurisdiction exists, the United States District Court for the Southern District of Florida. Article 14’s Minnesota law and venue provisions do not apply to disputes concerning City purchases. No mandatory arbitration applies. Each party bears its own attorney’s fees except as otherwise required by law or Supplier’s indemnity obligations. 14. Notices and Administration Formal notices shall be delivered personally, by certified mail with return receipt requested, or by nationally recognized overnight courier with proof of delivery and are effective upon receipt. Notices to the City shall be addressed to the City Manager, City of Dania Beach, 100 W. Dania Beach Boulevard, Dania Beach, Florida 33004, with a copy to the City Attorney at the same address. Notices to Supplier shall be addressed to The Sherwin-Williams Company, Attention: Sourcewell Contract Administrator, 101 W. Prospect Avenue, Cleveland, Ohio 44115, unless Supplier designates a replacement notice address in writing. Routine order coordination may occur by email. Each party shall designate an operational contact before the first purchase. 15. General Provisions Supplier is an independent contractor. No assignment of this Agreement or transfer of Supplier’s obligations is permitted without the City’s prior written consent. No City name, seal, or logo may be used to imply endorsement without the City’s prior written consent. Sourcewell is not a party to this Agreement, and provisions governing Sourcewell’s administration of its contract do not authorize Supplier to bind the City. This Agreement and its incorporated documents constitute the entire agreement regarding City purchases. Amendments require a writing signed by both parties through duly authorized representatives. A purchase order or administrative instruction cannot amend these terms or expand City expenditure authority. A waiver must be written and is limited to its stated purpose. If a provision is unenforceable, the remaining provisions remain effective to the extent capable of performance. Payment obligations properly accrued, warranties, indemnification, records, audit, and other provisions intended by their nature to survive remain effective after expiration or termination. Counterparts and lawful electronic signatures are permitted. 7 IN WITNESS OF THE FOREGOING, the parties have set their hand and seal the day and year first written above. CITY: ATTEST: CITY OF DANIA BEACH, FLORIDA a Florida Municipal Corporation ELORA RIERA, MMC COLMAN W. RYAN CITY CLERK MAYOR APPROVED AS TO LEGAL FORM: CANDIDO SOSA-CRUZ, ICMA-CM CITY MANAGER EVE A. BOUTSIS CITY ATTORNEY 8 VENDOR: The Sherwin-Williams Company a foreign corporation WITNESSES: Signature Signature PRINT Name PRINT Name Signature Title PRINT Name Date STATE OF COUNTY OF The foregoing instrument was acknowledged before me by means of ☐ physical presence or ☐ online notarization this ___ day of __________, 2026, by ____________________________, as ____________________________ of The Sherwin-Williams Company, who is personally known to me or who has produced ____________________________ as identification. NOTARY PUBLIC State of My commission expires: 9 EXHIBIT “A “ INCORPORATED BY REFERENCE: Sourcewell Contract No. 091323-SHW and its incorporated documents, including applicable approved amendments and current pricing. City of Dania Beach Community Development Memorandum DATE: 11/17/2026 TO: Mayor and Commissioners FROM: Candido Sosa-Cruz, ICMA-CM, City Manager VIA: Eleanor Norena, CFM, Deputy City Manager Corinne Lajoie, MURP, AICP, Director Shanesa Miranda, Deputy Director SUBJECT: A Resolution of the City Commission of the City of Dania Beach, Florida, authorizing a First Amendment to the Agreement between the City of Dania Beach, Florida, and PayByPhone Inc. to designate PayByPhone as the merchant of record and authorize the collection of electronic payment processing fees for mobile parking transactions. Request: The Community Development Department requests that the City Commission adopt a resolution authorizing a First Amendment to the City’s existing Agreement with PayByPhone Inc. The amendment would designate PayByPhone as the merchant of record and authorize the collection of approved electronic payment processing fees for mobile parking transactions, while maintaining a convenient and accessible payment option for residents and visitors. Background: The City entered into an Agreement with PayByPhone Inc., effective May 19, 2022, pursuant to RFP No. 12342-805, for mobile parking payment services. Those services include collecting City established parking charges and processing credit card payments. The proposed First Amendment would designate PayByPhone as the merchant of record, authorizing collecting approved electronic payment processing fees, and require the continued remittance of parking revenues to the City. Staff Analysis On August 25, 2026, the City Commission approved an ordinance authorizing the City to assess electronic payment processing surcharges to the user. The ordinance is intended to allow the City to recover payment-processing costs rather than absorb those expenses. Under the proposed amendment, PayByPhone would serve as the merchant of record, process electronic parking payments, and collect electronic payment processing fee of $0.44 per transaction. This fee would be charged in addition to the existing $0.30 convenience fee, resulting in total non-parking fees of $0.74 per transaction. PayByPhone would remit parking revenues to the City twice monthly and provide detailed financial reports supporting transaction activity, fees, refunds, disputes, and chargebacks. City staff would use these reports to reconcile remittances and verify that collected processing fees remain within the amount authorized by the ordinance and the amended Agreement. Budgetary Impact The amendment allows the city to recover electronic payment processing costs rather than absorbing them, resulting in meaningful savings for the city. The amendment would also designate PayByPhone as the merchant of record and authorize collection of the approved $0.44 electronic payment processing fee for mobile parking transactions, in addition to the existing $0.30 convenience fee. Recommendation Staff recommends that the City Commission adopt the resolution authorizing the agreement with PayByPhone Inc. Which is necessary for compliance with the City’s ordinance and ensures proper cost recovery while maintaining transparency, customer disclosure, and payment-processor compliance requirements. RESOLUTION NO. 2026-_____ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING A SECOND AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF DANIA BEACH, FLORIDA, AND PAYBYPHONE US, INC., TO AUTHORIZE ELECTRONIC PAYMENT SERVICE FEES AND RECOGNIZING THEM AS THE MERCHANT OF RECORD; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. the City and PayByPhone entered into an Implementing Addendum and a Piggyback/Implementing Agreement, each dated September 2, 2026, for PayByPhone mobile parking payment services under OMNIA Partners Contract No. 159596; and the Implementing Addendum incorporates the Cooperation and Service Agreement dated January 15, 2025 (the “Service Agreement”), and the foregoing documents are collectively referred to as the “Agreement”; and the City desires to designate PayByPhone as the merchant of record for payments made through the PayByPhone mobile payment service; and customers using the PayByPhone service will pay the customer-facing fees expressly approved by the City, while other payment methods remain available; and the City Commission approved this Amendment and the related reimbursement of electronic payment service fees as authorized by Ordinance No. 2026-025; and the parties desire to amend the Agreement, which Second Amendment is attached as Exhibit “A” and is incorporated into this Resolution by this reference, by this to document the merchant-of-record services, the authorized fees, the remittance of City parking revenue, and the City’s limited responsibility for any shortfall under the monthly minimum. That the above “Whereas” clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. That City approves the appropriate officials to execute the Second Amendment to the Agreement Between the City of Dania Beach, Florida and PayByPhone US. INC., which amendment is attached and incorporated by reference as Exhibit “A” to this resolution. 2 RESOLUTION #2026-_____ Section 3. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 4. That this Resolution shall be effective 10 days after passage. PASSED AND ADOPTED on __________________, 2026. Motion by __________________________, second by ___________________________. FINAL VOTE ON ADOPTION: Unanimous ____ Yes No Commissioner Joyce L. Davis ____ ____ Commissioner Luis Rimoli ____ ____ Commissioner Marco Salvino ____ ____ Vice Mayor Diana Fahmie ____ ____ Mayor Colman W. Ryan ____ ____ ATTEST: ELORA RIERA, MMC COLMAN W. RYAN CITY CLERK MAYOR APPROVED AS TO FORM AND CORRECTNESS: EVE A. BOUTSIS CITY ATTORNEY 1 AMENDMENT NO. 2 TO THE PAYBYPHONE IMPLEMENTING AGREEMENTS This Amendment No. 2 (the “Amendment”) is entered into as of the ____ day of __________, 2026 (the “Amendment Effective Date”), by and between the CITY OF DANIA BEACH, a Florida municipal corporation (the “City”), and PAYBYPHONE US, INC., a Delaware corporation authorized to do business in the State of Florida (“PayByPhone”). RECITALS WHEREAS, the City and PayByPhone entered into an Implementing Addendum and a Piggyback/Implementing Agreement, each dated September 2, 2026, for PayByPhone mobile parking payment services under OMNIA Partners Contract No. 159596; WHEREAS, the Implementing Addendum incorporates the Cooperation and Service Agreement dated January 15, 2025 (the “Service Agreement”), and the foregoing documents are collectively referred to as the “Agreement”; WHEREAS, the City desires to designate PayByPhone as the merchant of record for payments made through the PayByPhone mobile payment service; WHEREAS, customers using the PayByPhone service will pay the customer-facing fees expressly approved by the City, while other payment methods remain available; WHEREAS, the parties desire to amend the Agreement to document the merchant-of- record services, the authorized fees, the remittance of City parking revenue, and the City’s limited responsibility for any shortfall under the monthly minimum. NOW, THEREFORE, in consideration of the mutual promises contained herein, the parties agree as follows: 1. Merchant Account Section 2.2 of the Service Agreement is deleted in its entirety and replaced with the following: 2.2 MERCHANT ACCOUNT 2.2.1 Designation as Merchant of Record. The City designates PayByPhone as the merchant of record for payments made by customers through the PayByPhone mobile payment service, including parking fees and the customer-facing fees expressly authorized by this Agreement. Funds collected through the service may be processed through PayByPhone’s acquirer or a licensed merchant-of-record service provider. PayByPhone remains fully responsible to the City for the acts, omissions, performance, safeguarding of funds, reporting, and remittance obligations of any such service provider. 2 2.2.2 Effect of Customer Payment. Payment by a customer to PayByPhone or its merchant-of- record service provider satisfies the customer’s corresponding payment obligation to the City. The City shall not seek payment from the customer for an amount properly paid through the PayByPhone service. PayByPhone remains responsible to the City for remitting all City parking revenue collected, subject only to authorized refunds and chargebacks specifically attributable to the applicable transaction. 2.2.3 Electronic Payment Processing Fee. Subject to and in accordance with Section 215.322, Florida Statutes, other applicable law, and the authorizing City Commission resolution, PayByPhone may collect from a customer electing to use the PayByPhone payment system a separately disclosed electronic payment processing fee of $0.44 per transaction, provided that the fee does not exceed the service-fee charge attributable to processing the transaction. The fee must be disclosed before the customer authorizes the transaction and separately identified on the transaction record. 2.2.4 Other Customer-Paid Fees. PayByPhone may also collect the existing Convenience Fee of $0.30 per transaction and an optional SMS confirmation or reminder fee only when affirmatively selected by the customer and only at the rate expressly stated in Appendix A. Each fee must be disclosed before the customer authorizes the transaction and separately identified on the transaction record. PayByPhone may not impose, increase, or retain any other processing, transaction, convenience, SMS, merchant, or related fee without the City’s prior written approval through an amendment executed with the same formality as this Amendment. 2.2.5 Retention of Fees and Remittance of Parking Revenue. PayByPhone may retain the customer-paid fees identified in Sections 2.2.3 and 2.2.4. PayByPhone shall remit to the City twice each month all parking fees collected on the City’s behalf, without deduction for any additional or undefined cost, fee, expense, tax, setoff, or claim. Each remittance must be accompanied by a statement showing gross parking revenue collected, the number of transactions, each category of customer-paid fee, authorized refunds and chargebacks, the amount retained by PayByPhone, and the net amount remitted to the City. 2.2.6 Monthly Minimum. The total Electronic Payment Processing Fees under Section 2.2.3 are subject to a minimum of $250 per calendar month. If the Electronic Payment Processing Fees collected from customers during a month are less than $250, the City shall pay PayByPhone only the difference between the amount collected and $250. PayByPhone must invoice the City for any shortfall and provide documentation showing the number of transactions, the Electronic Payment Processing Fees collected, and the calculation of the shortfall. No shortfall is due for a period in which the PayByPhone service was materially unavailable because of PayByPhone or its service provider. 2.2.7 Funds and Responsibility. City parking revenue collected by PayByPhone or its service provider shall be maintained in a secure custodial or non-operating account pending remittance and shall not be used for PayByPhone’s operating expenses. PayByPhone remains directly liable to the City for the full amount of City parking revenue collected, regardless of whether a service provider fails to remit funds to PayByPhone or the City. 3 2.2.8 Discontinuance of Merchant-of-Record Services. PayByPhone may discontinue serving as merchant of record upon at least ninety (90) days’ prior written notice to the City, unless a shorter period is required by applicable law or a binding payment-network requirement. PayByPhone shall provide reasonable transition assistance, remit all outstanding City parking revenue, and deliver all final reconciliation reports. If the City supplies its own merchant account, PayByPhone shall, at its expense, connect one City merchant account to PayByPhone’s gateway provider. 2. Appendix A Pricing Appendix A to the Service Agreement is amended to include the following merchant-of-record pricing. If Appendix A contains a different fee for the same service, the pricing below controls. Fee Approved Amount $0.44 per transaction 3. Commission Approval and Effective Date This Amendment shall not become effective until approved by the City Commission. The Amendment Effective Date shall be the date on which the last party executes this Amendment after Commission approval. 4. Limited Amendment and Order of Precedence This Amendment modifies only Section 2.2 and the related pricing in Appendix A of the Service Agreement. Except as expressly modified, the Agreement remains in full force and effect. This Amendment does not waive, diminish, or supersede any City-specific legal, statutory, financial, public-records, sovereign-immunity, nonappropriation, termination, or other protection contained in the Implementing Addendum or the Piggyback / Implementing Agreement. In the event of a conflict, the City-specific protections in those documents shall continue to control, and this Amendment shall control only with respect to the merchant-of-record provisions expressly stated herein. 4 5. No Additional Fees The fees stated in this Amendment are the complete fees authorized by the City for the merchant- of-record services. No online term, click-through term, notice, invoice, website posting, or unilateral policy change may add or increase a fee or otherwise modify this Amendment. 6. Counterparts and Electronic Signatures This Amendment may be executed in counterparts and by electronic signature. Each counterpart is deemed an original, and all counterparts together constitute one instrument. REMAINDER OF PAGE LEFT INTENTIONALLY BLANK SIGNATURES ON THE FOLLOWING PAGES 5 IN WITNESS OF THE FOREGOING, the parties have set their hand and seal the day and year first written above. CITY: ATTEST: CITY OF DANIA BEACH, FLORIDA a Florida Municipal Corporation ELORA RIERA, MMC COLMAN W. RYAN CITY CLERK MAYOR APPROVED AS TO LEGAL FORM: CANDIDO SOSA-CRUZ, ICMA-CM CITY MANAGER EVE A. BOUTSIS CITY ATTORNEY 6 CONTRACTOR: PaybyPhone US Inc., a Delaware corporation WITNESSES: Signature Signature PRINT Name PRINT Name Signature Title PRINT Name Date STATE OF OHIO COUNTY OF MEIGS The foregoing instrument was acknowledged before me by means of ☐ physical presence or ☐ online notarization, on ________________, 2026, by ____________________ as ___________________ of PaybyPhone US Inc., a Delaware corporation, on behalf of the company. He/she is personally known to me or has produced ____________________________ as identification. NOTARY PUBLIC State of Ohio My commission expires: City of Dania Beach Finance Memorandum DATE: 11/17/2026 TO: Mayor and Commissioners FROM: Candido Sosa-Cruz, ICMA-CM, City Manager VIA: Darryl McFarlane, IT Division Director SUBJECT: Approval of Managed Information Technology Services with Entech Computer Services, LLC Request: The Information Technology Division requests approval of a resolution authorizing the City to enter into four Statements of Work (SOWs) with Entech Computer Services, LLC (Entech) for various Managed Services and Onsite Staff Augmentation for a three-year term; authorizing expenditures with Entech exceeding the City's $50,000 per-vendor fiscal-year threshold; and waiving competitive bidding requirements pursuant to the applicable exemption under the City's procurement policy. Background: The City currently utilizes Entech to provide managed information technology and onsite technical support services essential to the continuity of City operations. The proposed four Statements of Work will continue these services for a three-year term. Entech assumed responsibility for these services following the City's previous relationship with LAN Infotech. Through this ongoing relationship, Entech has developed institutional knowledge of the City's technology operations and service requirements. The City's procurement policy provides an exemption from competitive procurement when "the vendor has unique historical, institutional knowledge and experience which will provide a continuity of service, efficiency, and cost effectiveness." Staff recommends utilizing this exemption to maintain continuity of services and avoid the additional costs and operational disruption associated with transitioning to another provider. The proposed agreements have been reviewed and approved by the City Attorney's Office and include the following annual costs: Contract Year Annual Cost Year 1 $214,548.96 Year 2 $225,840.96 Year 3 $237,132.96 Three-Year Total $677,522.88 Budgetary Impact The annualized cost for the first contract year is $214,548.96. Funding for these services will be provided through the Information Technology Fund, Account No. 507-17-04-516-34-10 – Contractual Services General, subject to available budget appropriations. Funding for subsequent fiscal years will be subject to the City Commission's annual appropriation of funds. Recommendation Approve the resolution authorizing the City to enter into four Statements of Work with Entech Computer Services, LLC for various Managed Services and Onsite Staff Augmentation for a three-year term, with a total base contractual amount of $677,522.88; authorizing expenditures exceeding the City's $50,000 per-vendor fiscal-year threshold; and waiving competitive bidding requirements based on the vendor's historical and institutional knowledge, continuity of service, efficiency, and cost effectiveness. RESOLUTION 2026-_____ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE CITY TO ENTER INTO FOUR STATEMENTS OF WORK WITH ENTECH COMPUTER SERVICES, LLC, FOR VARIOUS MANAGED SERVICES AND ONSITE STAFF AUGMENTATION FOR A THREE-YEAR TERM; AUTHORIZING EXPENDITURES EXCEEDING THE FIFTY THOUSAND DOLLAR ($50,000.00) PER-VENDOR, FISCAL-YEAR THRESHOLD; AUTHORIZING A TOTAL BASE CONTRACTUAL EXPENDITURE OF SIX HUNDRED SEVENTY-SEVEN THOUSAND FIVE HUNDRED TWENTY-TWO DOLLARS AND EIGHTY-EIGHT CENTS ($677,522.88); WAIVING COMPETITIVE BIDDING REQUIREMENTS; AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE THE NECESSARY DOCUMENTS; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Charter of the City of Dania Beach, Part III, Article 3, Section 4, Subsection (j), authorizes the City Manager to purchase supplies, services, equipment, and materials for the City government in amounts in excess of the established monetary threshold , if she is authorized to do so in advance by a resolution adopted by the City Commission; and WHEREAS, the Dania Beach Code of Ordinances, Chapter 2, Article 1, Section 2-10, “Monetary thresholds for certain purchases and payment disbursement authorizations”, Subsection (a), sets the monetary threshold at Fifty Thousand Dollars ($50,000.00) for a vendor each fiscal year; and WHEREAS, the City currently utilizes Entech Computer Services, LLC ("Entech") for managed information technology and onsite technical support services and desires to continue these services through four Statements of Work for a three-year term commencing December 1, 2026; and WHEREAS, Entech possesses historical and institutional knowledge of the City's technology operations and service requirements, providing continuity of service, efficiency, and cost effectiveness; and WHEREAS, the City's procurement policy provides an exemption from competitive procurement based on a vendor's unique historical and institutional knowledge and experience; and 2 RESOLUTION #2026-___ WHEREAS, the total base contractual amount for the three-year term is Six Hundred Seventy-Seven Thousand Five Hundred Twenty-Two Dollars and Eighty-Eight Cents ($677,522.88), exclusive of additional charges permitted under the agreements; and WHEREAS, Entech has submitted four Statements of Work for various Managed IT Services, and Onsite Staff Augmentation for a three-year term; and WHEREAS, the City Administration recommends approval of the four Statements of Work and waiver of competitive bidding requirements. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above “Whereas” clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That the City Commission finds that Entech Computer Services, LLC possesses unique historical and institutional knowledge and experience with the City's information technology environment that provides continuity of service, efficiency, and cost effectiveness, and hereby waives competitive bidding requirements pursuant to the applicable exemption under the City's procurement policy. Section 3. That the City Commission approves the four Statements of Work with Entech Computer Services, LLC for Managed Secure Infrastructure, Managed Disaster Recovery, Managed 365 Services, and Onsite Staff Augmentation for a three-year term and authorizes expenditures with Entech exceeding the Fifty Thousand Dollar ($50,000.00) per-vendor fiscal- year threshold, with a total base contractual expenditure of Six Hundred Seventy-Seven Thousand Five Hundred Twenty-Two Dollars and Eighty-Eight Cents ($677,522.88), subject to the annual appropriation of funds and the terms of the agreements. Section 4. That the proper City officials are authorized to execute the Statements of Work, including their incorporated terms and schedules, and any other documents necessary to effectuate the purposes of this Resolution, subject to approval as to form and legal sufficiency by the City Attorney. Section 5. That funding for these services shall be provided from the City's authorized budget appropriations within Information Technology Fund Account No. 507-17-04-516-34-10 – Contractual Services General, with funding for subsequent fiscal years subject to annual appropriation by the City Commission. 3 RESOLUTION #2026-___ Section 6. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 7. That this Resolution shall become effective upon its passage and adoption. PASSED AND ADOPTED on __________________, 2026. Motion by __________________________, second by ___________________________. FINAL VOTE ON ADOPTION: Unanimous ____ Yes No Commissioner Joyce L. Davis ____ ____ Commissioner Luis Rimoli ____ ____ Commissioner Marco Salvino ____ ____ Vice Mayor Diana Fahmie ____ ____ Mayor Colman W. Ryan ____ ____ ATTEST: ELORA RIERA, MMC COLMAN W. RYAN CITY CLERK MAYOR APPROVED AS TO FORM AND CORRECTNESS: EVE A. BOUTSIS CITY ATTORNEY City of Dania Beach Commission Memorandum DATE: 11/17/2026 TO: Mayor and Commissioners FROM: Eve. A Boutsis, Office of the City Attorney VIA: Mayor Colman Ryan SUBJECT: Order of Business for City Commission Agendas Request: Approve the modification to the City Commission’s procedures and order of business resolution. Section 6, entitled “Order of Business and Agenda” of Resolution 2025-111 is proposed to be amended as follows: Section 6. ORDER OF BUSINESS AND AGENDA 6.1 Order of Business: The general rule as to the order of business in regular meetings shall be as follows: 1. Call to Order/Roll Call 2. Moment of Silence and Pledge of Allegiance 3. Presentations and Special Event Approvals 4. Proclamations 5. Administrative Reports 5. 6. Public Safety Reports 6 7. Citizens’ Comments 7. Consent Agenda 8. 9. Bids and Requests for Proposals 9. 10. Quasi-Judicial Hearings 10. 11. First Reading Ordinances 11. 12. Second Reading Ordinances 12. 13. Discussion and Possible Action 13. 14. Appointments 14. 15. Administrative Reports 15. 16 Commission Comments 16. Adjournment Background: n/a Budgetary Impact None. Recommendation It is the discretion of the City Commission to adopt the proposed amendments to the order of business for City Commission meetings. RESOLUTION NO. 2026-______ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AMENDING RESOLUTION NO. 2025-111 TO CHANGE THE ORDER OF AGENDA MEETINGS; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. City staff periodically updates its procedures, working towards best practices for the expedient, transparent and efficient addressing of City business; and the City Commission desires to amend the Rules of Procedure for meetings in order to change the order of agenda meetings. Attached and incorporated by reference as Exhibit 1 are the proposed amended Rules for City Commission meetings as to the order of business. That all resolutions or parts of resolutions in conflict with this resolution are repealed to the extent of such conflict That this Resolution shall be effective 10 days after passage. on __________________, 2026. Motion by __________________________, second by ___________________________. FINAL VOTE ON ADOPTION: Unanimous ____ Yes No Commissioner Joyce L. Davis ____ ____ Commissioner Luis Rimoli ____ ____ Commissioner Marco Salvino ____ ____ Vice Mayor Diana Fahmie ____ ____ Mayor Colman Ryan ____ ____ SIGNATURES ON THE FOLLOWING PAGE 2 RESOLUTION #2026-______ ATTEST: 3 RESOLUTION #2026-______ EXHIBIT 1 AMENDED RULES FOR CITY COMMISSION MEETINGS Section 1. AUTHORITY 1.1 Charter: The Charter of the City of Dania Beach provides that: “The Commission shall prescribe its own rules, regulations and order of business, and shall keep minutes of its proceedings”. (Part II, Article 7, Section 5) Accordingly, the following rules shall take effect immediately upon adoption by the City Commission and shall remain in effect until such time as new rules are adopted by the City Commission. Section 2. DEFINITIONS 2.1: For the purpose of these rules the word “Mayor” shall include the Vice Mayor and the Mayor pro tem, when appropriate; the word “Commission” shall mean City Commission; and the word “City” shall mean the City of Dania Beach, Florida. Section 3. GENERAL RULES 3.1 Meetings to be Public: All official meetings of the Commission, except where state and local law allows executive sessions for certain limited topics, shall be public. The minutes of the proceedings, except those for the said executive sessions, shall be open to public inspection. Public meetings may include virtual public meetings, with appearances by elected officials and the public by virtual means. A majority of all members of the City Commission shall constitute a quorum. 3.2 Quorum and Vote: A majority of all members of the City Commission shall constitute a quorum but a less number may adjourn from day to day and compel the attendance of absent members in such manner and under such penalties as may be prescribed by ordinance. The affirmative vote of three (3) members shall be necessary to pass any ordinance on a reading or adopt a resolution, and the passage of all ordinances and resolutions shall be taken by yeas and 4 RESOLUTION #2026-______ nays and entered upon the minutes. (Part II, Article 7, Section 6, City Charter). The City may convene a quorum, virtually, as provided under the City Charter and City Code. 5 RESOLUTION #2026-______ 3.11 Presentations: Commission presentations should be limited to a total of 30 minutes for City Commission sponsored presentations, at the discretion of the Mayor. The Administration along with the Mayor will consider the number and duration of presentations before scheduling them to ensure compliance with time limits. The Administration is not limited in time or number of presentations but shall taken into consideration the length of the agenda before scheduling presentations. Waiver of these rules shall require a motion and vote of the Commission. 3.12 Backup Documents. Consistent with the requirements of Broward County Section 1.07, which provides, that all municipalities shall provide all notices, agendas, and “available” back up materials at least 48 hours in advance, the City Commission shall require back up on all presentations, agenda items, discussion items, etc. for the City Commission meetings be provided in advance, and as part of the agenda back up, or at a minimum, distributed to city commission and available to the public at least 48 hours in advance of the meeting to which the item is to be approved, discussed or presented. Failure to provide back up shall result in the item not being heard, and the item will be rescheduled for a future agenda, once the back up is available. This requirement can only be waived by a 4/5 vote of the City Commission. Section 4. TYPES OF MEETINGS 4.1 Regular Meeting: The Commission shall meet in the Commission Chambers for regular, adjourned and special meetings. The regular Commission meetings are to commence at 7:00 P.M., on the second and fourth Tuesday of each month, unless otherwise specified at least two (2) weeks in advance. 4.2 Biennial Organizational Meeting: On the first Tuesday following each biennial regular election, the City Commission shall meet at the usual place for holding the meetings of the legislative body of the City, at which time the newly elected City Commissioners shall take the 6 RESOLUTION #2026-______ prescribed oaths of office and assume the duties of their respective offices. (Part II, Article 7, Section 1, City Charter) -ennial regular election, the Commission shall meet to receive such new member. (Part II, Article 7, Section 2, City Charter) 7 RESOLUTION #2026-______ 4.7 Emergency Meetings: Emergency meetings may be held on the call of the Mayor, two (2) members of the Commission or the City Manager whenever there is a public emergency affecting life, health property or the public peace, and whenever practicable, upon no less than one (1) hour notice to each member and the public. 4.8 Attendance of Media at Commission Meetings: All official meetings of the City Commission and its committees shall be open to the media, freely subject to recording by radio, television and photographic services at any time, provided that such arrangements do not interfere with the orderly conduct of the meetings. Section 5. PRESIDING OFFICER 5.1 Running the Meetings: The mayor-commissioner, if present, shall preside at all meetings of the commission. In the absence of the mayor, the vice mayor shall preside. In the absence of the mayor and the vice mayor, any member of the city commission may be designated as mayor pro tem for such meeting. The mayor shall have a vote in the proceedings of the city commission and shall vote last upon roll call. (Part III, Article 2, Sections 2 & 3(a), City Charter) 5.2 Call to Order: The meetings of the Commission shall be called to order by the Mayor, or in his or her absence, by the Vice Mayor. In the absence of both the Mayor and the Vice Mayor, the meeting shall be called to order by the City Clerk for the selection of a Mayor pro tem from any of the Commissioners present. 5.3 Preservation of Order: The Mayor shall preserve order and decorum; and, confine the debate of the Commissioners and the public to the question under discussion. 5.4 Points of Order: The Mayor shall determine all points of order, subject to the rights of any member to appeal to the Commission. If any appeal is taken, the question shall be, "Shall the decision of the Mayor be sustained?" 8 RESOLUTION #2026-______ 5.5 Questions to be Stated: The Mayor shall state all questions submitted for a vote and announce the result. A roll call vote shall be taken for the adoption of an ordinance or resolution. A roll call vote may be taken on matters other than ordinances and resolutions upon the request of any member of the Commission. Section 6. ORDER OF BUSINESS AND AGENDA 9 RESOLUTION #2026-______ 6.3 Presentation by Members of Commission: The agenda shall provide a time when the mayor or any Commissioner may bring before the Commission any business that he/she feels should be deliberated upon by the Commission. The matters need not be specifically listed on the agenda, but formal action on such matters shall be deferred until a subsequent Commission meeting, except that immediate action may be taken upon a vote of a majority of all members of the Commission present. 6.4 Approval of Minutes: The minutes of a Commission meeting may be approved on the consent agenda if the City Clerk previously furnished each member with a copy thereof. Section 7. ORDINANCES, RESOLUTIONS AND MOTIONS 7.1 Form: Ordinances and resolutions shall be presented to the commission in printed or electronic form. 7.2 City Attorney to Approve: All ordinances and resolutions shall be "Approved as to Form and Correctness" by the City Attorney. Such approval shall be so indicated by signature on the last page of the ordinance or resolution once approved and/or adopted by the City Commission,. 7.3 City Manager to Review: All ordinances and resolutions shall be reviewed by the City Manager. Such review shall be so indicated by recommendation included in the agenda backup material presented to the Commission. 7.4 Distribution of Ordinances and Resolutions: The city manager or his designee shall have copies of all proposed ordinances prepared for distribution to all members of the Commission with the agenda backup material for the Commission meeting at which the ordinance is to be introduced. 7.5 Ordinances Deferred, Emergencies: Ordinances introduced at a commission meeting on first reading shall not be finally acted upon no sooner than the next official meeting of the 10 RESOLUTION #2026-______ commission; except that an emergency ordinance may be acted upon on first and second readings at the same meeting by an affirmative vote of at least two-thirds (four [4] members) of the commission. 11 RESOLUTION #2026-______ placed on the agenda of the next scheduled Commission meeting, provided the ordinance can be drafted and distributed to members of the Commission in accordance with time schedules set forth in 7.4 of these rules, Any member of the City Commission may request verbal or written legal opinions relating to City business from the City Attorney. Section 8. CREATION OF COMMITTEES, BOARDS & COMMISSIONS 12 RESOLUTION #2026-______ 8.3 Removal of Members of Boards, Committees and Commissions: The Commission may remove any member of any board, committee or commission which it has created or as created by the City Charter by a vote of at least a majority of the Commission. Section 9. CITIZEN'S COMMENTS AS AN AGENDA ITEM 9.1 Addressing the Commission: A thirty (30) minute “Citizen Comments” period shall be designated on the agenda for citizens and interested persons to speak on matters whether or not scheduled on that day’s agenda. Individuals wishing to speak on a matter not included on the “Public Hearing” section of the agenda, which matter pertains to an item before the City Commission which requires a decision of the City Commission, may do so by submitting a form to that effect with the City Clerk prior to the meeting. Speakers at Public Hearings shall also submit such a form. Each speaker shall be limited to 3 minutes for his or her comments. If more than ten (10) speakers express a desire to speak, the Commission shall determine on a meeting by meeting basis whether to (a) extend the time allotted for citizen comments to accommodate all speakers, or (b) whether to limit the number of speakers or amount of time per speaker. A speaker’s time shall not be transferable to another speaker. Comments may be heard virtually when there is a need for City Hall and the Commission Chambers to be closed to the public. There are many airborne illnesses which people can contract by virtue of being in close contact with one another and therefore, as on ongoing exercise of the general police power and proprietary authority of the City, the City may from time to time, through the powers granted to the City Manager, require that certain health measures be implemented, regardless of the existence of any emergency order(s). Therefore, the City Manager may close Commission Chambers to public participation and may instead authorize virtual attendance and participation of employees 13 RESOLUTION #2026-______ and the public at large at City Commission meetings. The City Commission may appear virtually at the public meeting. The City Manager may require visitors to City Hall, whether to individual departments or to Commission Chambers, to be temperature checked, may require masks to be worn, and may require social distancing of six (6) feet to be maintained between persons. Failure to comply with these measures after advance warning will result in a request to leave the premises and if there is no compliance, removal of the employee or member of the public failing to comply with the temperature checks, mask requirements, or social distancing may be undertaken. 14 RESOLUTION #2026-______ over which the Commission has control when the item is under consideration by the Commission, if a majority of the Commission present agrees to let them be heard. Section 10. SUSPENSION AND AMENDMENT OF THESE RULES City of Dania Beach Parks & Recreation Memorandum DATE: 11/17/2026 TO: Mayor and Commissioners FROM: Candido Sosa-Cruz, ICMA-CM, City Manager VIA: Cassi Waren, CPRP, Director of Parks and Recreation SUBJECT: AUTHORIZATION TO AWARD ITB NO. 26-023, CHESTER BYRD PARK IMPROVEMENTS, AND ENTER INTO AN AGREEMENT WITH M&J CONSULTING GROUP CORP. Request: The Parks and Recreation Department is requesting City Commission approval to award Invitation to bid, ITB No. 26-023, Chester Byrd Park Improvements, to M&J Consulting Group Corp., as they are the lowest responsive and responsible bidder and enter into an agreement. Background: The City of Dania Beach was awarded $200,000 in grant funding through the Florida Recreation Development Assistance Program (FRDAP) with a $200,000 match in August 2023 for Chester Byrd Park improvements. The first step towards initiating construction improvements of the project was to hire a consultant for the design services. On May 5, 2025, the City issued a Request for Qualifications (RFQ) 25-014 for Chester Byrd Park Improvements. The RFQ closed on June 6, 2025. On November 18, 2025, City Commission issued Resolution Number 2025-183 to enter into an agreement with the top ranked bidder, Calvin, Giordano and Associates, Inc. for the design services. With the design complete, Invitation to Bid (ITB) No. 26-023 Chester Byrd Park Improvements for the construction services was released on September 8, 2026. The bid closed and the responses were opened on October 8, 2026. Six contractors submitted bids. Bidder Bid Total M&J Consulting Group Corp. $1,428,397.94 Behar Construction $1,433,178.26 Wrangler Construction $1,585,123.72 MBR Construction Inc. $1,627,773.23 West Construction Inc. $1,748,627.26 Regal Contractors Inc. $1,755,555.65 Calvin, Giordano and Associates, Inc. team as well as the City’s Procurement team reviewed the responses received checking the evaluation for mathematical correctness as well as reaching out to the references provided for the two lowest bidders. Upon review Calvin, Giordano and Associates, Inc. determined M&J Consulting Group Corp. to be the lowest responsive and responsible bidder, in the amount of $1,428,397.94. Budgetary Impact Funding for this project will be appropriated from Grant fund 103-72-64-572-63-10 in the amount of $1,428,397.94. Recommendation The Parks and Recreation Department recommends that the City Commission approve awarding ITB No. 26-023, Chester Byrd Park Improvements, to M&J Consulting Group Corp. and enter into an agreement in the amount of $1,428,397.94. RESOLUTION NO. 2026-_____ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE AWARD OF INVITATION TO BID (ITB) NO. 26-023, CHESTER BYRD PARK IMPROVEMENTS TO M&J CONSULTING GROUP CORP., IN AN AMOUNT NOT TO EXCEED ONE MILLION FOUR HUNDRED TWENTY-EIGHT THOUSAND THREE HUNDRED NINETY-SEVEN DOLLARS AND NINETY-FOUR CENTS ($1,428,397.94); AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE AN AGREEMENT FOR SERVICES WITH M&J CONSULTING GROUP CORP.; AND TO EXCEED THE ANNUAL SINGLE-VENDOR PURCHASING THRESHOLD OF FIFTY THOUSAND DOLLARS ($50,000.00); PROVIDING FOR FUNDING; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. the Dania Beach Code of Ordinances, Chapter 2, Article 1, Section 2-10, “Monetary thresholds for certain purchases and payment disbursement authorizations”, Subsection (a), sets the monetary threshold at Fifty Thousand Dollars ($50,000.00) for a vendor each fiscal year; and the City of Dania Beach was awarded $200,000 in grant funding through the Florida Recreation Development Assistance Program (FRDAP) with a $200,000 match in August 2023 for the Chester Byrd Park Improvements Project (the “Project); and on November 18, 2025, the City Commission of the City of Dania Beach approved Resolution 2025-183, entering into an agreement with Calvin, Giordano, and Associates, Inc. for the Design Services related to the Project and authorized the Parks and Recreation Department to solicit through formal bidding the construction services for the park improvements; and , on September 8, 2026, the City issued ITB. No. 26-023 entitled “Chester Byrd Park Improvements for the selection of a qualified firm for Construction Services for the Project; and on October 8, 2026, the City received six (6) responsive and qualified bids to ITB No. 2024-018, shown below: 1. M&J Consulting Group Corp. $1,428,397.94 2. Behar Construction $1,433,178.26 3. Wrangler Construction $1,585,123.72 4. MBR Construction Inc. $1,627,773.23 5. West Construction Inc. $1,748,627.26 6. Regal Contractors Inc. $1,755,555.65; and 2 RESOLUTION #2026- WHEREAS, Procurement completed its review for responsiveness, as well as a review by the design services team from Calvin, Giordano, and Associates, Inc., resulted in the selection of M&J Consulting Group Corp., as the most responsive and responsible proposer; and WHEREAS, the City Administration recommends that the City Commission award ITB No. 26- 023 to M&J Consulting Group Corp,. and authorize the proper City officials to execute an agreement for Construction Services for the Project, which agreement is attached as Exhibit “A” and incorporated into this Resolution by this reference; and WHEREAS, the total project authorization shall not exceed $1,428,397.94; and WHEREAS, funding for this project will be appropriated from Grant Account No. 103-72-64- 572-63-10. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above “Whereas” clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That the City Commission hereby authorizes the award of Invitation to Bid (ITB) No. 26-023, Chester Byrd Park Improvements to M&J Consulting Group Corp. in the amount of $1,428,397.94, which will exceed the annual vendor threshold of $50,000.00. Section 3. That the City Commission hereby approves the Construction Agreement between the City of Dania Beach and M&J Consulting Group Corp. in completion of the Chester Byrd Park Improvements, which agreement is incorporated by this reference as Exhibit A. Section 4. That the total project authorization, including a 10 percent contingency, shall not exceed $1,428,397.94. Section 5. That funding for this project will be appropriated from the Grant Fund Account No. 103-72-64-572-63-10 in the amount of $1,428,397.94. Section 6. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 7. That this Resolution shall be effective immediately after passage. 3 RESOLUTION #2026- PASSED AND ADOPTED on __________________, 2026. Motion by __________________________, second by ___________________________. FINAL VOTE ON ADOPTION: Unanimous ____ Yes No Commissioner Joyce L. Davis ____ ____ Commissioner Luis Rimoli ____ ____ Commissioner Marco Salvino ____ ____ Vice Mayor Diana Fahmie ____ ____ Mayor Colman W. Ryan ____ ____ ATTEST: ELORA RIERA, MMC COLMAN W. RYAN CITY CLERK MAYOR APPROVED AS TO FORM AND CORRECTNESS: EVE A. BOUTSIS CITY ATTORNEY 1 CONSTRUCTION AGREEMENT BETWEEN CITY OF DANIA BEACH, FLORIDA AND M & J CONSULTING GROUP CORP. FOR CHESTER BYRD PARK IMPROVEMENTS ITB NO. 26-023 THIS CONSTRUCTION AGREEMENT (the “Agreement”) is entered into as of ____________, 20__ (the “Effective Date”), by and between the CITY OF DANIA BEACH, FLORIDA, a Florida municipal corporation, with an address of 100 West Dania Beach Boulevard, Dania Beach, Florida 33004 (the “City” or “Owner”), and M & J CONSULTING GROUP CORP. a Florida corporation, authorized to transact business in Florida, with an address of 3350 SW 148 Avenue, Suite 110-9062, Miramar, Florida 33027(the “Contractor”). The City and Contractor may each be referred to as a “Party” and together as the “Parties.” RECITALS WHEREAS, the City issued Invitation to Bid No. 26-023 for the Chester Byrd Park Improvements at 1021 SW 12th Avenue, Dania Beach, Florida (the “Project”); and WHEREAS, the Project includes demolition, site preparation, park amenities, hardscape, parking, drainage, utility, electrical, lighting, landscaping, irrigation, and related improvements shown in the Contract Documents; and WHEREAS, the City is the recipient of Florida Recreation Development Assistance Program funding under Florida Department of Environmental Protection Grant Agreement No. P25011 (the “Grant Agreement”), which requires completion of the funded Project by April 30, 2027 and provides no extension; and WHEREAS, Contractor submitted the lowest responsive and responsible Bid accepted by the City, and by submitting its Bid acknowledged and agreed that this Agreement was a material part of the solicitation and would govern the Work if awarded; and WHEREAS, the City Commission authorized this Agreement by Resolution on November 17, 2026; and WHEREAS, the Parties desire to state their complete agreement concerning the Work. NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which are acknowledged, the Parties agree as follows: 2 1. DEFINITIONS AND RULES OF INTERPRETATION 1.1 “Application for Payment” means Contractor’s written, itemized request for payment for completed and accepted Work, prepared in the form required by the City and accompanied by all supporting documentation required by the Contract Documents. 1.2 “Bid” means the bid submitted by Contractor in response to the ITB, including the completed Bid Form, Bid Schedule, required certifications, and other required submissions, but excluding any qualification, exception, assumption, proposed term, or other condition not expressly accepted by the City in this Agreement or an addendum issued before Bid opening. 1.3 “Bid Schedule” means the schedule of lump-sum and unit-price items submitted with Contractor’s Bid and accepted by the City, as corrected for mathematical errors in accordance with the ITB. 1.4 “Change Order” means a written instrument executed by Contractor and the City through officials having authority to bind the City that authorizes a change in the Work, Contract Sum, Contract Time, or any combination of them. A field directive, email, meeting statement, inspection comment, submittal response, or other communication is not a Change Order. 1.5 “City Representative” means the City Manager or the City Manager’s written designee responsible for administering the Agreement. The City may designate a project manager, inspector, or Design Professional to perform administrative functions, but no such person may amend the Agreement or authorize additional compensation or time unless expressly authorized in writing by the City. 1.6 “Contract Documents” means the documents identified and incorporated in Section 2, together with properly executed amendments and Change Orders. 1.7 “Contract Sum” means the total amount payable by the City for Work actually performed and accepted, calculated using the accepted lump-sum and unit prices contained in the Bid Schedule and subject to allowances, actual quantities, additions, deductions, and other adjustments authorized by the Contract Documents. The Contract Sum is not a guaranteed minimum payment. 1.8 “Contract Time” means the periods established in Section 4 for commencement, Substantial Completion, and Final Completion, as adjusted only by a properly executed Change Order. 1.9 “Day” means calendar day unless the Contract Documents expressly state “business day.” If an act is required on a day when City offices are closed, the act shall be performed by the next business day, except that this rule does not extend the Contract Time or any completion deadline. 1.10 “Defective Work” means Work that is incomplete, damaged, deficient, unsuitable, improperly installed, or not in conformance with the Contract Documents, approved submittals, manufacturer requirements, permits, applicable law, or accepted construction practices. 3 1.11 “Design Professional” means the architect, engineer, landscape architect, or other licensed professional designated by the City to provide design, construction-administration, inspection, or certification services for the Project. The Design Professional has no authority to amend the Agreement or authorize additional compensation or time unless expressly authorized in writing by the City. 1.12 “Final Completion” means completion and acceptance of all Work, correction of all punch- list and Defective Work, closure of applicable permits, and delivery of all releases, warranties, record drawings, test results, approvals, manuals, certifications, grant documentation, and other items required as conditions of final payment. 1.13 “Final Payment” means the final payment of the unpaid Contract Sum, including retainage properly due, after the City determines that Final Completion and all conditions of final payment have been satisfied. 1.14 “Grant Agreement” means FDEP Grant Agreement No. P25011 between the City and the Florida Department of Environmental Protection, including its attachments, exhibits, approved amendments, and requirements applicable to the Project. 1.15 “ITB” means the City’s Invitation to Bid No. 26-023 for the Chester Byrd Park Improvements, together with all attachments and addenda issued before Bid opening. 1.16 “Notice to Proceed” or “NTP” means the City’s written notice directing Contractor to commence the Work and establishing the date from which the Contract Time is measured. The execution of this Agreement, issuance of a purchase order, or performance of preliminary administrative activities does not constitute an NTP. 1.17 “Project” means the Chester Byrd Park Improvements described in the Contract Documents. 1.18 “Project Site” means Chester Byrd Park, located at 1021 SW 12th Avenue, Dania Beach, Florida 33004, together with other areas made available by the City for performance of the Work. 1.19 “Subcontractor” means a person or entity having a direct or indirect contract with Contractor or another subcontractor to perform any portion of the Work or furnish labor, materials, equipment, or services for the Project. The term includes subcontractors of every tier unless the context requires otherwise. 1.20 “Substantial Completion” means the stage when the Work is sufficiently complete in accordance with the Contract Documents so that the City can lawfully, safely, and continuously use the Project for its intended purpose, subject only to minor corrective or incomplete items that do not materially interfere with such use, as determined and certified in writing by the City. 1.21 “Surety” means the surety company issuing the performance bond or payment bond required by the Contract Documents. 4 1.22 “Work” means all labor, supervision, administration, materials, equipment, tools, transportation, temporary facilities, testing, permits, coordination, documentation, closeout services, and incidentals necessary to furnish a complete, operational, safe, code-compliant Project, whether expressly stated or reasonably inferable from the Contract Documents. 1.23 Rules of Interpretation. Headings are for convenience only and do not limit meaning. “Including” means “including without limitation.” The singular includes the plural and vice versa. “Shall” and “must” impose mandatory obligations. A requirement imposed on Contractor includes its Subcontractors and all persons and entities for whom Contractor is responsible. References to statutes include amendments and successor provisions. No ambiguity shall be construed against the City merely because the City prepared or provided a Contract Document, because the Contract Documents were available for review and questions before Bid submission. 2. CONTRACT DOCUMENTS; PRECEDENCE; BIDDER ASSENT 2.1 Contract Documents. The following documents collectively constitute the “Contract Documents” and are incorporated into this Agreement: (a) amendments to this Agreement executed by the City and Contractor after the Effective Date; (b) Change Orders executed after the Effective Date; (c) this Agreement, including its exhibits; (d) addenda issued by the City before Bid opening; (e) the Special Conditions; (f) the Chester Byrd Park Improvements bid plans, drawings, technical specifications, and Bid Form Notes; (g) the General Terms and Conditions of the ITB; (h) FDEP Grant Agreement No. P25011, including its applicable attachments, exhibits, and approved amendments, but only to the extent applicable to the Project or required to be imposed upon Contractor; (i) the Notice to Bidders, Scope of Work, Instructions to Bidders, and other requirements of the ITB; (j) Contractor’s completed Bid Form and Bid Schedule; 5 (k) Contractor’s certifications, representations, qualifications, personnel commitments, subcontractor information, and other required Bid submissions, but only to the extent they establish an obligation or representation by Contractor and do not conflict with or attempt to modify another Contract Document; and (l) the performance bond and payment bond required by this Agreement. 2.2 Excluded Documents and Terms. The Contract Documents do not include, and the City does not accept: (a) qualifications, exceptions, exclusions, reservations, assumptions, proposed substitutions, or proposed contractual terms included in Contractor’s Bid unless expressly accepted by the City in an addendum issued before Bid opening or in this Agreement; (b) Contractor quotations, proposals, acknowledgments, invoices, purchase-order terms, website terms, standard conditions, or other unilateral documents; (c) oral statements, representations, interpretations, or promises; (d) preliminary drafts or prior versions of this Agreement or another Contract Document; or (e) shop drawings, product data, samples, schedules, submittals, requests for information, meeting minutes, inspection reports, or other administrative documents, except to the limited extent that a Contract Document expressly incorporates a specific portion of such document by a duly authorized amendment or Change Order. No excluded document or term shall modify the Work, Contract Sum, Contract Time, or allocation of risk. 2.3 Order of Precedence. If an irreconcilable conflict exists among the Contract Documents, the order listed in Section 2.1 controls, with the document listed first having the highest priority. However: (a) an amendment or Change Order controls only to the extent and for the subject matter expressly addressed in that instrument; (b) a specific provision controls over a general provision concerning the same subject; (c) detailed technical requirements control over general descriptions of the same Work; and (d) where two requirements can reasonably be performed together, both shall apply and shall not be considered conflicting. 6 2.4 More Stringent Requirements. If the plans, specifications, Bid Form Notes, or other technical requirements establish different standards of quality, quantity, performance, testing, or workmanship that are not irreconcilable, Contractor shall provide the higher quality, greater quantity, more stringent performance, or more complete Work without additional compensation. This subsection does not authorize Contractor to disregard a stated dimension, design requirement, or written direction from the City or Design Professional. 2.5 Duty to Identify Conflicts. Contractor shall carefully study and compare the Contract Documents and promptly notify the City in writing of any error, inconsistency, ambiguity, omission, or conflict discovered by Contractor. Before Bid opening, a Bidder shall request clarification through the procedure established in the ITB. After award, Contractor shall provide notice before performing the affected Work and shall obtain the City’s written interpretation. Contractor shall not proceed based on its own interpretation when the interpretation could affect cost, time, quality, safety, or grant compliance. Failure to identify a matter that a reasonably prudent and experienced contractor should have identified does not entitle Contractor to additional compensation or time. 2.6 Pre-Bid Questions and Pricing. Contractor acknowledges that it had the opportunity before Bid opening to: (a) review all Contract Documents; (b) inspect the Project Site; (c) request interpretations or clarifications; (d) identify proposed substitutions or exceptions; and (e) account in its Bid for the requirements and risks stated or reasonably inferable from the Contract Documents. Except for a concealed condition or other adjustment expressly authorized by this Agreement, Contractor’s failure to request clarification before Bid opening does not relieve Contractor from performing the Work or entitle Contractor to additional compensation or time. 2.7 Bidder Assent to Agreement. This Agreement was included in the ITB as the City’s required form of agreement. By submitting its Bid, Contractor represented and agreed that: (a) it reviewed and accepted this Agreement and the other Contract Documents; (b) its Bid constitutes an offer to execute this Agreement without substantive revision if awarded; 7 (c) any requested exception was required to be submitted and resolved through the pre-bid question-and-addendum process; (d) award does not create a right to negotiate or reopen any provision of this Agreement or the allocation of risk established by the Contract Documents; and (e) failure to timely execute this Agreement and furnish the required bonds and insurance constitutes grounds for rescission of the award, enforcement of the Bid security, and award to another Bidder. 2.8 Effect of Contractor’s Bid. Contractor’s Bid may supplement the Contract Documents only by: (a) establishing the accepted prices; (b) identifying committed personnel, subcontractors, equipment, experience, and performance representations; and (c) imposing obligations on Contractor that exceed the minimum requirements of the ITB. Contractor’s Bid may not reduce the Work, qualify Contractor’s obligations, alter the Contract Time, shift risk to the City, or introduce additional terms unless the City expressly accepted the particular deviation in an addendum issued before Bid opening or in this Agreement. 2.9 Administrative Review Does Not Amend Contract. Review, approval, acceptance, or lack of objection by the City or Design Professional regarding a schedule, submittal, shop drawing, request for information, pay application, inspection, test result, or other administrative document: (a) is limited to the purpose for which the document was submitted; (b) does not constitute a Change Order; (c) does not authorize additional compensation or time; (d) does not shift responsibility for errors, omissions, dimensions, quantities, coordination, means, methods, safety, or compliance; and (e) does not waive any requirement of the Contract Documents. 2.10 Bonds Do Not Limit Contractor’s Obligations. The performance bond and payment bond provide additional security and do not modify, replace, or limit Contractor’s obligations under the other Contract Documents. Any bond provision that affords the City less protection than required by this Agreement or applicable law shall not reduce Contractor’s obligations or the City’s rights. 8 2.11 Entire Agreement. The Contract Documents constitute the complete and exclusive agreement between the Parties concerning the Project and supersede all prior or contemporaneous negotiations, communications, representations, drafts, and agreements concerning the Work. Neither Party is relying on a statement or representation not contained in the Contract Documents. 2.12 Amendments. The Contract Documents may be modified only by a written amendment or Change Order executed in accordance with this Agreement and applicable City approval requirements. Oral direction, silence, email, meeting minutes, course of dealing, course of performance, payment, inspection, or use of the Work shall not amend the Contract Documents or establish apparent authority to do so. 3. SCOPE AND STANDARD OF PERFORMANCE 3.1 General Scope. Contractor shall furnish all labor, supervision, administration, materials, equipment, tools, transportation, temporary facilities, testing, permitting, coordination, documentation, and incidentals necessary to complete the Chester Byrd Park Improvements in accordance with the Contract Documents. The Work generally includes demolition and site preparation; tree protection, removal, and relocation; the basketball court and park improvements; sidewalks, slabs, parking, driveway, curbing, pavement markings, signage, fencing, and gates; drainage and utility improvements; electrical and lighting improvements; landscaping and irrigation; site preparation for City- purchased equipment and furnishings; preparation for the future restroom and splash pad; restoration; testing; record drawings; and Project closeout. This summary does not limit the more detailed requirements of the Contract Documents. 3.2 Complete Work. Contractor shall provide a complete, safe, functional, and code-compliant Project suitable for its intended use. Work shown or described in any Contract Document, and minor work reasonably inferable as necessary to complete, connect, support, test, protect, or make operational the Work shown or described, is included in the Contract Sum unless expressly identified as City-furnished, City-performed, or payable under an allowance. This provision does not require Contractor to correct a material design error or provide a material addition to the Project scope without an adjustment authorized under Section 7. 3.3 Standard of Performance. Contractor shall perform the Work in a good and workmanlike manner using properly licensed, qualified, and experienced personnel and new materials unless otherwise permitted. The Work shall comply with the Contract Documents, approved submittals, manufacturer instructions, applicable permits, the Florida Building Code, accessibility requirements, utility standards, and applicable law. 9 3.4 Review and Verification. Before commencing each portion of the Work, Contractor shall review the applicable Contract Documents, examine existing conditions, and verify field dimensions, elevations, locations, and quantities affecting that Work. Contractor shall promptly notify the City of any apparent error, omission, inconsistency, dimensional conflict, constructability concern, or code issue before proceeding with the affected Work. Contractor is not responsible for the adequacy of the Project design unless design responsibility is expressly delegated to Contractor, but remains responsible for errors or additional costs resulting from its failure to identify a condition that a reasonably prudent and experienced contractor should have identified. 3.5 Site Conditions. Contractor acknowledges that it had the opportunity required by the ITB to inspect the Project Site and evaluate reasonably observable conditions affecting access, staging, storage, deliveries, utilities, public protection, sequencing, and performance of the Work. Contractor is not entitled to additional compensation or time for a condition it knew or reasonably should have discovered, subject to the concealed-condition provisions of Section 7. 3.6 Quantities and Incidental Work. Quantities stated in the Bid Schedule are estimates unless expressly stated otherwise. Payment for unit-price Work shall be based on actual quantities installed, documented, and accepted. Each Bid item includes the related excavation, dewatering, disposal, bedding, backfill, compaction, connections, fittings, supports, testing, protection, restoration, and other incidental work necessary to complete that item unless separately identified for payment. 3.7 City-Purchased Equipment and Furnishings. The City has purchased or will purchase the equipment and furnishings identified in Bid Items 52-54, 79-80 and 82–83 through direct purchase orders with designated vendors. Unless otherwise directed by the City in writing: (a) Contractor shall exclude the purchase price, delivery charge, and vendor and vendor delivery charges for those items from its Bid. Contractor shall install the City-purchased equipment and furnishings assigned to Contractor under the final Bid Documents. Contractor’s accepted prices include all assigned installation labor, sitework, equipment, coordination, and incidental Work required for a complete installation; (b) Contractor shall provide the site preparation, supporting improvements, utility coordination, grading, access, and other Work required by the plans and Bid Form Notes; (c) Contractor shall coordinate its schedule and Work with the City and designated vendors and provide reasonable access for delivery and any installation expressly assigned to a designated vendor; 10 (d) Contractor shall verify the prepared areas, dimensions, elevations, clearances, and utility locations before vendor installation and promptly report any apparent conflict, shortage, damage, or defect; and (e) Contractor shall be responsible for damage, rework, delay, or additional cost caused by its deficient site preparation, protection, access, or coordination or installation. The synthetic turf, aggregate base, concrete ribbon curb, and any other item expressly identified in the final Bid Documents as vendor-installed shall be installed by the applicable designated vendor. Contractor is not responsible for a designated vendor’s means, methods, workmanship, or installation defects except to the extent caused or contributed to by Contractor. Contractor remains responsible for its assigned site preparation, supporting Work, coordination, protection, and access. Contractor is not responsible for a designated vendor’s means, methods, workmanship, or installation defects except to the extent caused or contributed to by Contractor. 3.7.1 Scope Clarifications. Notwithstanding any conflicting notation in the Contract Documents: (a) Bid Item 42 includes furnishing and installing the exfiltration trench. The word “Removed” appearing in the bid form was an inadvertent editorial notation and does not remove the exfiltration trench from the Contractor’s Work. (b) The Work includes twelve (12) new solar light poles. The four additional light poles depicted on the applicable plan are existing basketball-court light poles and are not additional new solar light poles. (c) The concrete ribbon curb is included in the City’s direct purchase order and will be furnished and installed by the City’s vendor. The Contractor remains responsible for all required site preparation and for coordinating with and providing site access to the vendor for delivery and installation. 3.8 City-Performed Work. The City will perform the work expressly assigned to it in the Bid Schedule or Bid Form Notes, including Bid Items 12, 17, and 18. Contractor shall not include a charge for that work but shall coordinate its schedule, access, sequencing, and protection with the City. 3.9 Coordination and Protection. Contractor shall coordinate its Work with the City, designated vendors, utilities, and separate contractors; protect existing improvements, utilities, trees, adjoining property, and the public; maintain required access and traffic controls; keep the Project Site secure and orderly; remove debris regularly; and restore disturbed areas as required by the Contract Documents. Damage caused by Contractor or persons for whom Contractor is responsible shall be corrected at no additional cost or time. 11 3.10 Means and Methods. Contractor is solely responsible for construction means, methods, techniques, sequences, procedures, temporary works, safety precautions, and coordination of the Work. Review, inspection, or observation by the City or Design Professional does not transfer that responsibility or relieve Contractor from compliance with the Contract Documents. 3.11 Separate Contractors. The City may perform work with its own forces or separate contractors. Contractor shall reasonably coordinate and cooperate with those parties without disrupting the Project. Contractor is not entitled to additional compensation or time for coordination reasonably contemplated by the Contract Documents. 4. TERM; COMMENCEMENT; COMPLETION; LIQUIDATED DAMAGES 4.1 Term. This Agreement begins on the Effective Date and continues through Final Completion and final payment, unless earlier terminated in accordance with the Contract Documents. Obligations that by their nature extend beyond completion or termination shall survive. 4.2 Notice to Proceed. Contractor shall not commence physical Work until the City issues a written Notice to Proceed (“NTP”). The NTP shall establish the date from which the Contract Time is measured. Contractor shall mobilize and commence the Work within seven (7) days after that date. Costs incurred before the NTP are at Contractor’s risk unless expressly authorized by the City in writing. If the City terminates this Agreement for convenience before issuing the NTP, the City may reimburse Contractor for reasonable, documented, and nonrecoverable costs of Project- specific bonds and insurance required after award. 4.3 Completion. Contractor shall achieve: (a) Substantial Completion within one hundred (100) calendar days after the date established in the NTP; and (b) Final Completion within one hundred thirty (130) calendar days after the date established in the NTP. Notwithstanding the foregoing, Contractor shall achieve Final Completion no later than April 15, 2027, unless FDEP approves a later Project Completion Date in writing and the City authorizes a corresponding extension by Change Order. The City anticipates issuing the NTP sufficiently in advance to provide the full Contract Time. If the City proposes to issue the NTP after the date that would provide Contractor the full one hundred thirty (130) calendar days before April 15, 2027, the Parties shall establish a revised schedule in writing before physical Work begins. Contractor is not required to accept a reduction in the Contract Time resulting solely from the City’s delayed issuance of the NTP. 4.4 Grant Deadline. Contractor acknowledges that the Project is partially funded under FDEP Grant Agreement No. P25011, which establishes April 30, 2027 as the Project Completion Date 12 and states that no extension is available. The April 15, 2027 contractual deadline is intended to preserve time for inspection, correction, acceptance, documentation, and grant closeout. Contractor shall plan, staff, procure, coordinate, and perform the Work so that the contractual and grant deadlines are met. No extension beyond April 15, 2027 is effective unless authorized as provided in Section 4.3. 4.5 Project Schedule. Within ten (10) days after the NTP, Contractor shall submit a detailed Project schedule showing the sequence and duration of material activities, required submittals and approvals, procurement of long-lead items, coordination with City-designated vendors, inspections, testing, Substantial Completion, punch-list correction, closeout, and Final Completion. Contractor shall update the schedule with each monthly Application for Payment. If progress falls materially behind for reasons attributable to Contractor, Contractor shall submit and implement a recovery schedule within five (5) days after the City’s written request. Contractor shall bear the cost of recovering a delay for which it is responsible. City review or acceptance of a schedule does not modify the Contract Time, shift responsibility to the City, or authorize additional compensation. 4.6 Time Is of the Essence; Liquidated Damages. Time is of the essence. If Contractor fails to achieve Substantial Completion or Final Completion within the applicable time, as properly adjusted by Change Order, Contractor shall pay the City liquidated damages of One Thousand Six Hundred Sixty-Five Dollars ($1,665.00) for each calendar day the applicable milestone remains unachieved. Liquidated damages for Substantial Completion cease when Substantial Completion is achieved. Liquidated damages for Final Completion begin only after the Final Completion deadline and shall not overlap with Substantial Completion liquidated damages for the same day. The Parties agree that the City’s delay damages would be difficult to determine when this Agreement is executed and that the stated amount is a reasonable estimate of anticipated administrative, inspection, operational, grant-related, and loss-of-use costs and is not a penalty. The City may deduct liquidated damages from amounts due or recover them from Contractor and the performance bond. 4.7 Other Damages. Liquidated damages apply only to losses arising from delayed achievement of the applicable completion milestone. They do not limit recovery for defective Work, property damage, third-party claims, indemnification obligations, unauthorized charges, or grant funding denied, reduced, recaptured, or required to be repaid because of Contractor’s deficient documentation, unauthorized change, ineligible charge, defective Work, or other breach independent of delay. The City shall not obtain a double recovery for the same loss. 13 4.8 Extensions. The Contract Time may be extended only by a written Change Order. The grounds, notice requirements, documentation, and available remedies for delay are governed by Section 8. 5. CONTRACT SUM AND PRICING 5.1 Contract Sum. The initial Contract Sum is $1,428,397.94, calculated using the lump-sum prices and estimated quantities stated in Contractor’s accepted Bid Schedule. The amount payable to Contractor shall be adjusted based on actual quantities of unit-price Work performed and accepted, authorized use of allowances, and changes approved in accordance with the Contract Documents. The Contract Sum is not a guaranteed minimum payment or representation that the City will require every estimated quantity. 5.2 Lump-Sum and Unit-Price Work. (a) Lump-sum items shall be paid based on the percentage of that item satisfactorily completed and accepted. (b) Unit-price items shall be paid by multiplying the applicable Bid unit price by the actual quantity incorporated into the Work, measured, documented, and accepted in accordance with the Contract Documents. (c) Contractor shall provide the City a reasonable opportunity to verify quantities before Work is covered, removed, or otherwise becomes impracticable to measure. (d) If the Bid Schedule contains a mathematical error, the unit price controls over an extended total, and the corrected sum shall govern. 5.3 Estimated Quantities. Quantities stated in the Bid Schedule are estimates provided for bidding and comparison purposes. Actual quantities may increase or decrease based on field conditions and the City’s needs. Adjustments based solely on actual quantities shall be calculated using the applicable Bid unit prices and do not require renegotiation of those prices. A material change in the character or scope of the Work shall be addressed under Section 7. Contractor is not entitled to anticipated profit, overhead, or damages on estimated quantities or Bid items that are not authorized or performed. 5.4 Costs Included in Prices. Except for costs expressly designated as an allowance or City responsibility, the lump-sum and unit prices include all costs necessary to complete the Work, including: 14 (a) labor, supervision, and administration; (b) materials, equipment, tools, transportation, and delivery; (c) temporary facilities, access, staging, maintenance of traffic, safety, security, and cleanup; (d) bonds, insurance, licenses, permits, fees, and taxes imposed upon Contractor; (e) testing, inspection coordination, surveys, record drawings, warranties, and closeout; (f) overhead and profit; and (g) incidental and related work required for a complete Project. Contractor is not entitled to additional compensation merely because a necessary component of the Work is shown or described in one Contract Document but is not separately listed in the Bid Schedule. 5.5 Firm Pricing. Contractor’s lump-sum and unit prices remain firm throughout the Contract Time and include reasonably foreseeable changes in the cost or availability of labor, materials, equipment, transportation, fuel, and other inputs. Contractor is not entitled to escalation, surcharge, market adjustment, or other price increase except to the extent expressly authorized by a Change Order for a change in the Work or another adjustment specifically permitted by the Contract Documents. 5.6 Allowances. Allowances identified in the Bid Schedule, including Bid Items 5, 8, and 51 as applicable, are reserved amounts and are not earned lump-sum compensation. Allowance Work or expense shall: (a) be incurred only after written authorization from the City; (b) be reimbursed based on documented actual cost; (c) be supported by invoices, receipts, proof of payment, and other documentation reasonably required by the City; and (d) not include markup unless the Contract Documents or the City’s written authorization expressly permit it. Any unused allowance shall be deducted from the Contract Sum at Project closeout. Contractor is not entitled to overhead, profit, or damages on an unused allowance. 15 5.7 Markup on Changed Work. For changed Work priced on the basis of actual cost, Contractor may apply a markup not exceeding ten percent (10%) to subcontracted labor, materials, equipment, and third-party services. The combined markup at all Contractor and subcontractor tiers shall not exceed ten percent (10%). No markup is permitted on: (a) taxes; (b) bonds or insurance; (c) permit, inspection, connection, or governmental fees; (d) allowance expenditures unless expressly authorized; (e) costs for which overhead or profit is already included; or (f) another markup. Credits for deleted Work shall include the overhead and profit included in the price of that Work. Detailed pricing and documentation requirements for changed Work are governed by Section 7. 5.8 Taxes and City Direct Purchases. The City is exempt from applicable sales and use taxes. Contractor shall pay all taxes legally imposed upon Contractor, its purchases, or its operations and shall not include taxes from which the City is exempt as a separate charge to the City. Contractor shall cooperate with any lawful City direct-purchase process identified in the Contract Documents or later authorized by Change Order. Contractor shall not charge markup on City- purchased materials or equipment and shall credit the Contract Sum for costs avoided through the direct purchase. 6. APPLICATIONS FOR PAYMENT; RETAINAGE; FINAL PAYMENT 6.1 Schedule of Values. Before submitting its first Application for Payment, Contractor shall provide a schedule of values allocating the Contract Sum among the Bid items and principal components of the Work. The schedule shall be consistent with the accepted Bid Schedule and sufficiently detailed to permit evaluation of progress. The City may reject an unbalanced, unsupported, or insufficiently detailed schedule of values. Acceptance of the schedule does not alter the Contract Sum or constitute acceptance of a price assigned to any particular component. 6.2 Applications for Payment. Contractor may submit one Application for Payment each month for Work satisfactorily performed through the stated payment period. Each Application for Payment shall be submitted to the person or office identified by the City and shall include: 16 (a) the amount requested by Bid item and schedule-of-values component; (b) quantities and percentages completed during the payment period; (c) documentation supporting unit-price quantities; (d) invoices and receipts for allowances and other reimbursable costs; (e) an updated Project schedule; (f) testing, inspection, and progress documentation reasonably required by the City; (g) releases required under Section 6.5; and (h) other documentation required by the Contract Documents or reasonably necessary for City or grant review. An Application for Payment is not proper until it contains the required information and documentation. 6.3 Stored Materials. The City may, but is not required to, pay for materials or equipment suitably stored at the Project Site or at another location approved in writing. Payment for stored materials is conditioned upon Contractor providing evidence satisfactory to the City of: (a) the purchase price and payment obligation; (b) clear identification for use exclusively on the Project; (c) proper storage, protection, and insurance; (d) clear title, free of liens and competing claims; (e) the City’s right to inspect the materials; and (f) transfer of ownership to the City upon payment. Payment does not relieve Contractor from responsibility for loss, damage, installation, testing, or replacement until Final Completion. 6.4 Review and Payment. The City shall review, approve, reject, and pay Applications for Payment in accordance with the Florida Local Government Prompt Payment Act, including Sections 218.735 and 218.74, Florida Statutes. If an Application for Payment is deficient, the City shall provide written notice identifying the deficiency and corrective action required within the time provided by law. The City shall timely pay any undisputed portion of a proper Application for Payment. 17 City approval or payment does not constitute acceptance of defective or incomplete Work, confirm the accuracy of quantities or percentages, or waive any requirement of the Contract Documents. 6.5 Releases and Contractor Certification. Each Application for Payment shall include: (a) Contractor’s conditional release for the Work covered by the current Application for Payment; (b) Contractor’s unconditional release through the preceding payment period; (c) releases from subcontractors, suppliers, and materialmen whose Work was included in the preceding paid Application for Payment; and (d) Contractor’s certification that amounts previously received from the City have been properly applied to pay obligations relating to the Project. The City may require additional releases, affidavits, or bond documentation permitted by Section 255.05, Florida Statutes. Consent of Surety or other surety documentation does not substitute for Contractor’s obligation to timely pay undisputed amounts owed to subcontractors and suppliers. 6.6 Retainage. The City shall withhold five percent (5%) from each progress payment as retainage, subject to Sections 218.735, 255.077, and 255.078, Florida Statutes. The City may release all or part of the retainage before Final Completion but is not required to do so except as provided by law. Any early release does not constitute acceptance of Work, waive correction or warranty obligations, or limit the City’s right to withhold other amounts authorized by the Contract Documents. 6.7 Withholding Payment. In addition to retainage, the City may withhold from an Application for Payment an amount reasonably necessary to protect the City from loss arising from: (a) defective, damaged, or incomplete Work; (b) claims, liens, notices of nonpayment, or reasonable evidence that a claim is likely; (c) Contractor’s failure to pay subcontractors, suppliers, or laborers; (d) damage to the City, another contractor, or third-party property; (e) failure to maintain the Project schedule or reasonable evidence that the Work cannot be completed within the Contract Time or unpaid Contract balance; (f) liquidated damages; 18 (g) failure to provide required bonds, insurance, releases, records, or grant documentation; (h) unauthorized or unsupported charges; or (i) another material breach of the Contract Documents. The City shall provide the written notice required by applicable law and shall release the appropriate amount when the basis for withholding has been resolved. Withholding under this subsection is separate from the five-percent retainage. 6.8 Substantial Completion and Completion List. Before the date Contractor claims Substantial Completion, Contractor shall inspect the Work and submit a preliminary list of incomplete or corrective items. The City, Contractor, and Design Professional, if applicable, shall inspect the Work and develop a single list of items required to render the Work complete, satisfactory, and acceptable. The list shall include a reasonable estimated cost to complete each item and shall be finalized and delivered to Contractor no later than the date the City certifies Substantial Completion. Failure to include an item on the list does not relieve Contractor from its obligation to complete or correct the Work. Contractor shall complete all listed items within the period between Substantial Completion and Final Completion. 6.9 Payment Following Completion List. Upon receipt of a proper Application for Payment following development of the completion list, the City shall pay the remaining Contract balance and retainage as required by applicable law, less: (a) an amount equal to one hundred fifty percent (150%) of the estimated cost to complete the listed items; (b) amounts subject to a good-faith written dispute; (c) amounts subject to a claim under Section 255.05, Florida Statutes; and (d) other amounts the City is lawfully entitled to withhold independently of retainage. Upon completion of all listed items, Contractor may submit an Application for Payment for the remaining amount. Warranty items arising after preparation of the completion list shall not delay payment of retainage except as permitted by law. 6.10 Final Payment. Final payment is conditioned upon Final Completion and Contractor’s delivery of the following, as applicable: (a) a final Application for Payment; (b) Contractor’s final affidavit and unconditional release; 19 (c) final releases from subcontractors, suppliers, and materialmen; (d) consent of Surety to final payment; (e) record drawings and final surveys; (f) warranties, operation and maintenance information, and manufacturer documentation; (g) final testing, inspection, and permit approvals; (h) evidence that all correction and completion-list items have been completed; (i) keys, access devices, and other items required for operation; (j) final quantity and allowance reconciliation; (k) required public records and grant-supporting documentation; and (l) other closeout items required by the Contract Documents. The City shall not require a release of a specifically identified, unresolved claim as a condition of payment of an otherwise undisputed amount. 6.11 Effect of Final Payment. Acceptance of final payment constitutes Contractor’s waiver of claims against the City arising from the Project, except claims specifically identified in writing as unresolved before acceptance of final payment. Final payment does not waive the City’s rights concerning defective or nonconforming Work, warranties, latent defects, indemnification, fraud, record retention, audit findings, grant repayment, or obligations that survive completion. 6.12 Payment of Subcontractors and Suppliers. Contractor shall pay subcontractors and suppliers all undisputed amounts due from each City payment within ten (10) days after Contractor receives the payment. Contractor shall require each subcontractor to pay its subcontractors and suppliers within seven (7) days after receipt, as required by Section 218.735, Florida Statutes. A disputed amount may be withheld only if the party whose payment is withheld receives written notice stating the amount disputed and the action required to cure the dispute. All undisputed amounts shall be timely paid. Contractor remains solely responsible for payment of its subcontractors and suppliers. The City has no contractual duty to them and may use joint checks or direct payments as a protective measure without assuming such a duty. 20 6.13 Grant Reimbursement. Payment by FDEP or reimbursement of the City under the Grant Agreement is not a condition precedent to payment for Work otherwise properly performed, documented, and payable under this Agreement. The City may withhold or recover an amount if FDEP denies, reduces, recaptures, or requires repayment of funding because of Contractor’s breach, ineligible charge, deficient documentation, unauthorized change, defective Work, or untimely performance. 7. CHANGES IN THE WORK 7.1 City-Directed Changes. The City may order additions, deletions, revisions, resequencing, or other changes within the general scope of the Project. An adjustment to the Contract Sum or Contract Time is effective only through: (a) a written Change Order executed by Contractor and the City through officials authorized to bind the City; or (b) a written directive issued under Section 7.4 requiring Contractor to proceed before the adjustment is agreed upon. A Change Order shall identify the change in the Work and any resulting adjustment to the Contract Sum and Contract Time. Except as expressly stated in the Change Order, all other Contract Documents remain unchanged. 7.2 No Unauthorized Changes. Contractor shall not perform additional or changed Work without prior written authorization from the City. Oral instructions, field discussions, meeting minutes, inspection comments, responses to requests for information, review of submittals, emails, or conduct at the Project Site do not authorize additional compensation or time unless they expressly constitute a written directive under Section 7.4 or are incorporated into an executed Change Order. Contractor proceeds at its own risk if it performs additional or changed Work without the authorization required by this Section. 7.3 Change Proposals. When the City requests a proposal for changed Work, Contractor shall submit a complete written proposal within seven (7) days, unless the City establishes another reasonable period. The proposal shall include: (a) a clear description of the proposed change; (b) itemized labor hours and rates; (c) material quantities and prices; (d) equipment costs and applicable rates; (e) subcontractor and supplier quotations; 21 (f) applicable taxes and permitted markup; (g) credits for deleted or replaced Work; (h) the proposed adjustment to the Contract Sum; (i) the proposed adjustment to the Contract Time, supported by an analysis showing the effect on the critical path; and (j) other documentation reasonably necessary to evaluate the proposal. Contractor shall not include unsupported lump sums, duplicative markup, or costs already included in the Contract Sum. 7.4 Written Directive to Proceed. If the Parties have not agreed upon the price or time associated with a change, the City may issue a written directive requiring Contractor to proceed with the changed Work while the adjustment remains unresolved. Contractor shall proceed promptly and maintain detailed records of labor, materials, equipment, subcontractor costs, and schedule effects. The adjustment shall thereafter be determined under the pricing and claim procedures of the Contract Documents. A written directive to proceed does not constitute acceptance of Contractor’s proposed price or time adjustment. 7.5 Pricing of Changes. The adjustment for changed Work shall be determined using one or more of the following methods, as selected or approved by the City: (a) applicable unit prices contained in the Bid Schedule; (b) an agreed lump sum; (c) verified actual cost plus the markup permitted by Section 5.7; or (d) another method agreed upon in writing. If an existing unit price reasonably applies to changed Work of substantially the same character and performed under substantially similar conditions, that unit price shall govern. If the character, quantity, or conditions materially differ, the Parties shall determine an equitable adjustment. Credits for deleted Work shall include the labor, materials, equipment, subcontractor costs, overhead, and profit included in the price of that Work. 22 7.6 Time Adjustments. A proposal for changed Work shall identify any requested adjustment to the Contract Time. If Contractor does not identify a time impact in its proposal, the Change Order shall be presumed to have no effect on the Contract Time unless the impact could not reasonably have been determined at that time. An extension is permitted only to the extent the change delays the critical path after reasonable mitigation. A Change Order extending the Contract Time beyond the outside completion date stated in Section 4 requires any necessary FDEP approval. 7.7 Concealed or Unknown Conditions. If Contractor encounters a subsurface or concealed physical condition that: (a) materially differs from a condition indicated in the Contract Documents; or (b) is of an unusual nature and materially differs from conditions ordinarily encountered and generally recognized as inherent in work of the character required, Contractor shall stop the affected Work, protect the condition, and notify the City in writing before disturbing it. The City shall promptly investigate and determine whether a change is warranted. Contractor is not entitled to an adjustment for a condition it knew or reasonably should have discovered through the site investigation, utility-location process, or review required by the Contract Documents. Contractor’s failure to provide notice before disturbing the condition waives an adjustment to the extent the failure prejudices the City’s ability to investigate or mitigate the condition. 7.8 Emergency Work. In an emergency threatening injury, loss of life, or material damage to property or the Work, Contractor shall take reasonable action necessary to prevent or minimize harm and shall notify the City as soon as practicable. If the emergency was not caused by Contractor or a person for whom Contractor is responsible, any appropriate adjustment shall be determined under this Section. Contractor shall not perform nonemergency corrective or additional Work beyond what is reasonably necessary to address the immediate threat without written City authorization. 7.9 Grant-Related Changes. Contractor shall not materially alter a Project Element funded under FDEP Grant Agreement No. P25011 without prior written City authorization. Contractor acknowledges that FDEP approval may be required before the City can authorize the change. The City’s request for a proposal, consideration of a substitution, or submission of a proposed change to FDEP does not authorize Contractor to proceed. 7.10 Processing of Change-Order Price Quotes. A price quote submitted in response to a change requested or issued by the City shall comply with Section 7.3 and shall be clearly identified as a “Change-Order Price Quote Submitted Under Section 218.755, Florida Statutes.” It shall be 23 submitted to the City Representative at the address or electronic location designated in the NTP or subsequent written notice. The City shall approve or deny a complete and compliant price quote and provide written notice of its decision within thirty-five (35) days after receipt, as required by Section 218.755, Florida Statutes. A denial shall identify the deficiencies and the actions necessary to correct them. Nothing in this Agreement alters the City’s statutory obligations or the legal effect of failing to provide the required notice. 7.11 Contractor-Initiated Requests. If Contractor believes that an instruction, event, or condition not initiated by the City entitles it to additional compensation or time, Contractor shall provide notice and submit its request in accordance with Section 20. A Contractor-initiated request is not authorized Work and does not modify the Contract Documents unless accepted through a Change Order. 8. DELAYS AND EXTENSIONS 8.1 Contractor Responsibility. Contractor shall prosecute the Work diligently and coordinate labor, materials, equipment, subcontractors, permits, inspections, and vendor activities to achieve Substantial Completion and Final Completion within the Contract Time. Contractor shall anticipate and account for delays ordinarily associated with construction of this type, including normal weather, routine governmental review, ordinary procurement conditions, and coordination reasonably contemplated by the Contract Documents. 8.2 Excusable Delay. Contractor may receive a reasonable extension of the Contract Time to the extent performance of a critical-path activity is delayed by an event that: (a) was beyond Contractor’s reasonable control; (b) was not caused or contributed to by Contractor or a person for whom Contractor is responsible; (c) could not reasonably have been anticipated or avoided; (d) could not reasonably have been overcome through mitigation, resequencing, or use of available float; and (e) actually delayed completion of the Work. Potential excusable delays include an authorized City change, differing site condition qualifying under Section 7.7, abnormal governmental action, labor dispute not limited to Contractor’s workforce, unavoidable casualty, declared emergency, and unusually severe weather. 24 8.3 Noncompensable Delay. Except as provided in Section 8.4, Contractor’s sole remedy for an excusable delay is a reasonable extension of the Contract Time. Contractor is not entitled to additional compensation for delays caused by weather, casualty, declared emergency, industry- wide labor dispute, governmental action not caused by the City, or another event beyond the control of both Parties. 8.4 Compensable Delay. Contractor may receive an equitable adjustment of the Contract Sum for reasonable, documented direct costs resulting from a critical-path delay caused solely by: (a) a City-directed change in the Work; (b) an unreasonable City-ordered suspension not caused by Contractor; (c) the City’s failure to provide access or information at the time expressly required by the Contract Documents; or (d) another material breach by the City. Any adjustment is subject to Contractor’s compliance with the notice, documentation, mitigation, and Change Order requirements of the Contract Documents. Contractor is not entitled to consequential damages, lost profits, loss of productivity unsupported by contemporaneous records, or home-office overhead calculated by a formula unless expressly approved in a Change Order. 8.5 Contractor-Caused and Concurrent Delay. Contractor is not entitled to additional compensation or time for delay caused by: (a) inadequate staffing, supervision, planning, or coordination; (b) late or deficient submittals; (c) failure to timely order materials or equipment; (d) reasonably foreseeable labor, material, or equipment availability; (e) subcontractor or supplier default, except to the extent caused by a separate qualifying excusable event; (f) defective or nonconforming Work; (g) failure to obtain required permits or inspections in a timely manner; (h) failure to maintain required bonds or insurance; or (i) another act or omission of Contractor or a person for whom Contractor is responsible. 25 If an excusable delay occurs concurrently with a Contractor-caused delay and Contractor cannot reasonably separate their effects, Contractor is entitled to neither additional compensation nor an extension for the concurrent period. If the effects can be separated through a reliable critical-path analysis, an adjustment may be allowed only for the independently demonstrated excusable portion. 8.6 Weather Delay. Contractor is entitled to an extension for unusually severe weather only if the weather: (a) was materially more severe than reasonably anticipated for the location and season; (b) prevented performance of critical-path Work despite reasonable protective measures; and (c) was documented by contemporaneous Project records and reliable weather data from the nearest appropriate reporting station. Normal seasonal weather and the reasonably anticipated effects of rain, heat, wind, and wet-site conditions are included in the Contract Time. An extension for unusually severe weather shall be limited to the actual critical-path delay after reasonable mitigation. 8.7 City-Purchased Equipment and Separate Vendors. Contractor shall coordinate its schedule with the City and the vendors furnishing or installing City-purchased equipment and furnishings. Contractor is not entitled to an adjustment for delay caused by its failure to timely coordinate, prepare the site, provide access, or identify an apparent conflict. If timely delivery or installation by a City-designated vendor is delayed for reasons not caused by Contractor and the delay affects the critical path, Contractor may receive a reasonable extension. Additional compensation is available only if the delay was caused by the City’s unreasonable act or omission and satisfies Section 8.4. 8.8 Notice and Documentation. Contractor shall notify the City in writing within seven (7) days after Contractor becomes aware, or reasonably should have become aware, of an event that may delay the Work. The notice shall describe the event, its anticipated effect, affected activities, and mitigation being undertaken. Within fourteen (14) days after the effect can reasonably be determined, Contractor shall provide: (a) the dates and duration of the delay; (b) the affected critical-path activities; (c) an updated schedule analysis; (d) measures taken to avoid or mitigate the delay; 26 (e) the extension and compensation, if any, requested; and (f) supporting cost and Project records. If the delay continues, Contractor shall provide reasonable periodic updates. Failure to provide timely notice or documentation waives the requested adjustment only to the extent the City is materially prejudiced by that failure. 8.9 Mitigation and Continued Performance. Contractor shall take reasonable steps to avoid and mitigate delay, including resequencing Work, reallocating resources, expediting submittals or procurement when reasonable, and continuing unaffected Work. Contractor shall not suspend or slow performance because a request for additional compensation or time is pending unless the City directs otherwise in writing. 8.10 Float. Float in the Project schedule is available to the Project and is not exclusively owned by either Party. An extension is permitted only to the extent an excusable delay consumes available float and delays the applicable contractual completion milestone. 8.11 No Constructive Acceleration. Contractor is not entitled to compensation for acceleration unless the City issues a written directive requiring completion earlier than the date established by the Contract Documents after accounting for approved extensions. The City’s enforcement of an existing completion deadline, request for a recovery schedule, or rejection of an unsupported extension request does not constitute acceleration. 8.12 Grant Deadline. Contractor acknowledges the grant-related deadlines stated in Section 4. An excusable delay may entitle Contractor to an extension under this Section, but no extension beyond the applicable outside completion date is effective unless FDEP approves the required extension and the City authorizes it by Change Order. If FDEP does not approve an extension for an otherwise excusable delay, the Parties shall promptly evaluate lawful mitigation, acceleration, scope adjustment, suspension, or termination. Contractor is not required to absorb the cost of acceleration caused solely by a compensable City delay unless the City authorizes that cost by Change Order. 9. PROJECT ADMINISTRATION; SUBMITTALS; INSPECTION; TESTING 9.1 Contractor’s Supervision. Contractor shall supervise and direct the Work and is responsible for coordinating all portions of the Work. Contractor shall designate a competent superintendent who: (a) is experienced in projects of similar scope and complexity; (b) is authorized to act on Contractor’s behalf; 27 (c) shall be present at the Project Site whenever material Work is being performed; and (d) shall not be replaced without prior notice to and approval by the City, except when immediate replacement is necessary because of an emergency or separation from employment. Communications given to the superintendent concerning routine Project administration are binding upon Contractor but do not amend the Contract Documents or authorize additional compensation or time. 9.2 City Administration. The City Representative and any designated project manager, inspector, or Design Professional may administer the Contract Documents, observe the Work, review submittals, evaluate Applications for Payment, interpret technical requirements, and determine whether the Work generally conforms to the Contract Documents. No such person may amend the Agreement, authorize additional compensation or time, or waive a requirement of the Contract Documents unless expressly authorized in writing by the City. 9.3 Project Meetings and Reports. Contractor shall participate in preconstruction, progress, coordination, and closeout meetings reasonably required by the City. Contractor shall provide current information regarding: (a) progress and schedule; (b) submittals and procurement; (c) inspections and testing; (d) coordination with utilities and City-designated vendors; (e) pending changes or claims; (f) safety and site conditions; and (g) matters that may affect cost, time, quality, or grant compliance. Contractor shall maintain daily reports identifying personnel, subcontractors, equipment, Work performed, deliveries, weather, inspections, testing, delays, and material events. Reports shall be available to the City upon request. 9.4 Submittal Schedule. Contractor shall prepare and maintain a submittal schedule coordinated with the Project schedule. The schedule shall allow reasonable time for Contractor review, City or Design Professional review, resubmission, procurement, fabrication, and installation without delaying the Work. Contractor is not entitled to additional compensation or time arising from a late, incomplete, inaccurate, or uncoordinated submittal. 28 9.5 Contractor Review of Submittals. Before submission to the City or Design Professional, Contractor shall review and approve each shop drawing, product-data submission, sample, delegated-design document, and other submittal. Contractor’s approval represents that it has: (a) verified materials, field measurements, quantities, dimensions, and existing conditions; (b) coordinated the submittal with other portions of the Work; (c) confirmed compliance with the Contract Documents; and (d) clearly identified each proposed deviation or substitution. Submittals not reviewed and approved by Contractor, or containing unidentified deviations, may be returned without review. 9.6 Review of Submittals. City or Design Professional review is limited to determining general conformance with the design intent and Contract Documents. Review does not relieve Contractor from responsibility for: (a) dimensions, quantities, or field measurements; (b) errors or omissions in a submittal; (c) coordination of the Work; (d) construction means, methods, sequences, procedures, or safety; (e) compliance with laws, permits, or manufacturer requirements; or (f) deviations not clearly identified in writing. Contractor shall not fabricate or install Work requiring a submittal until the applicable submittal has been reviewed. Review of a specific item does not approve an unmarked deviation or a change to the Contract Sum or Contract Time. 9.7 Requests for Information. Contractor shall submit a written request for information when clarification of the Contract Documents is reasonably necessary. Each request shall: (a) identify the applicable drawing, specification, or requirement; (b) describe the issue clearly; (c) state when a response is needed to avoid delay; and 29 (d) include Contractor’s proposed interpretation or solution when reasonably available. A response to a request for information interprets the existing Contract Documents and is not authorization for additional compensation or time. If Contractor believes the response changes the Work, Contractor shall provide notice and proceed under Sections 7 and 20. 9.8 Access and Inspection. The City, Design Professional, FDEP, building officials, and other authorized governmental representatives may inspect the Work and Project records at reasonable times. Contractor shall provide safe access and reasonable assistance for inspection. Contractor shall notify the appropriate inspector sufficiently in advance before Work is covered or becomes inaccessible. If Contractor covers Work before a required inspection, Contractor shall uncover, replace, and restore the Work at its expense. Inspection, lack of inspection, failure to identify a defect, use, or occupancy does not constitute acceptance of defective Work or relieve Contractor of responsibility for compliance. 9.9 Testing. Contractor shall arrange and pay for testing required by the Contract Documents, permits, applicable law, and authorities having jurisdiction, including materials, density, compaction, pressure, disinfection, bacteriological, electrical, operational, and other testing applicable to the Work, unless a Contract Document expressly assigns a particular test to the City. Testing shall be performed by qualified laboratories, agencies, or individuals acceptable to the City and independent of Contractor when required by law or the Contract Documents. Contractor shall coordinate testing, provide required samples and access, and furnish test results promptly to the City. 9.10 City-Provided Testing. If the Contract Documents assign a test to the City, Contractor shall provide reasonable advance notice and prepare the Work for testing. Contractor shall remain responsible for coordinating the test with its schedule. If Work fails a test or Contractor fails to provide adequate notice or access, Contractor shall pay the cost of retesting and resulting inspection, removal, repair, and restoration. If compliant Work is delayed solely because the City fails to timely perform a City-assigned test after proper notice, Contractor may request an adjustment under Section 8. 9.11 Defective or Nonconforming Work. The City or Design Professional may reject Work that does not conform to the Contract Documents. Contractor shall promptly correct, remove, or replace rejected Work and shall bear the resulting costs, including testing, inspection, professional services, and restoration of other affected work. If Contractor disputes the rejection, it shall preserve its claim under Section 20 but shall proceed as directed unless the City provides written direction otherwise. 9.12 Record Drawings and Closeout Records. Contractor shall maintain current field-marked drawings showing actual locations, dimensions, elevations, utilities, concealed conditions, and 30 approved changes. Contractor shall not defer preparation of record information until the end of the Project. Before Final Completion, Contractor shall provide final record drawings, surveys, test reports, inspection records, permits, approvals, warranties, manuals, photographs, and other closeout documentation required by the Contract Documents. Documents required to be signed and sealed shall be prepared by an appropriately licensed Florida professional. 10. PERMITS; UTILITIES; ENVIRONMENTAL AND LEGAL COMPLIANCE 10.1 Compliance with Laws. Contractor shall perform the Work in accordance with all applicable federal, state, county, and City laws, codes, ordinances, rules, regulations, permits, and lawful orders of authorities having jurisdiction. Contractor shall promptly notify the City of an apparent conflict between a legal requirement and a Contract Document before performing the affected Work. Contractor is not responsible for determining whether the Project design complies with law unless design responsibility is expressly delegated to Contractor, but Contractor shall not proceed with Work it knows or reasonably should know violates an applicable requirement. 10.2 Permits and Approvals. Unless expressly assigned to the City, Contractor shall obtain, maintain, comply with, and close all permits, licenses, approvals, and inspections required for the Work. Contractor shall: (a) timely prepare and submit required applications and supporting documents; (b) coordinate reviews and inspections with authorities having jurisdiction; (c) keep permits and approved documents available at the Project Site; (d) promptly provide the City copies of permits, inspection reports, notices, and approvals; and (e) obtain final approval or closure of each permit before Final Completion. Contractor shall not be entitled to additional compensation or time resulting from its late, incomplete, or deficient permit submission or failure to comply with permit requirements. 10.3 Permit and Governmental Fees. Contractor shall pay permit, inspection, connection, capacity, and governmental fees in the first instance unless the City directs otherwise. Reimbursement shall be limited to fees expressly included in an allowance or identified as reimbursable in the Contract Documents. Reimbursable fees shall be paid at documented actual cost without markup and supported by receipts or other proof acceptable to the City. Any unused allowance shall be credited to the City. 31 Dewatering and NPDES permit fees shall be reimbursed as provided in the ITB. Potable-water permit, connection, capacity, and utility fees shall be administered under Bid Item 90, except for fees expressly included in another Bid item under the Addenda. 10.4 Existing Utilities. Before excavation or other Work that may affect utilities, Contractor shall: (a) contact the applicable utility-notification system; (b) review available utility information; (c) coordinate with utility owners and the City; (d) field-locate and verify utilities within the affected area; and (e) use appropriate methods to protect existing facilities. The location of existing utilities shown in the Contract Documents is approximate unless expressly stated otherwise. Contractor shall immediately stop affected Work and notify the City and utility owner if it encounters an unidentified, mismarked, or conflicting utility. An adjustment for an unknown utility shall be governed by Sections 7 and 8. No adjustment is due to the extent the condition should have been identified through required utility-location or verification procedures. 10.5 Utility Interruptions and Connections. Contractor shall not interrupt, disconnect, or modify an existing utility without prior approval from the City and the affected utility owner. Contractor shall provide required notice, coordinate temporary service when necessary, and schedule interruptions to minimize disruption. Contractor shall perform utility connections, testing, disinfection, clearance, and restoration in accordance with the Contract Documents and utility-owner requirements. Contractor is responsible for unauthorized interruptions and damage caused by its Work. 10.6 Environmental Protection. Contractor shall comply with applicable environmental requirements and the approved stormwater-pollution-prevention and erosion-control measures. Contractor’s responsibilities include, as applicable: (a) erosion and sediment control; (b) inlet and surface-water protection; (c) dewatering and discharge controls; (d) dust, mud, and noise control; (e) prevention of contaminated runoff; 32 (f) lawful handling, transportation, and disposal of waste and excavated material; (g) required inspections, monitoring, maintenance, and reporting; and (h) final stabilization and removal of temporary controls. Contractor shall maintain environmental controls throughout the period they are required and shall promptly correct deficient controls. 10.7 Spills and Contractor-Caused Contamination. Contractor shall prevent spills and releases arising from its operations. If a spill or release occurs, Contractor shall immediately: (a) protect persons and property; (b) stop and contain the release; (c) notify the City and authorities as required by law; (d) perform required cleanup and remediation; and (e) provide the City documentation of the incident and corrective action. Contractor is responsible for costs, fines, penalties, testing, remediation, and delay to the extent caused by Contractor or persons for whom Contractor is responsible. 10.8 Preexisting Hazardous Materials. Contractor is not responsible for remediation of hazardous material or contamination that existed at the Project Site before Contractor’s operations and was not identified in the Contract Documents or reasonably discoverable during required site investigation. If Contractor encounters suspected hazardous material or contamination, it shall stop affected Work, secure the area, avoid disturbing the condition, and promptly notify the City. The City shall determine the appropriate investigation and response. Any adjustment shall be governed by Sections 7 and 8. Contractor is responsible for a preexisting condition to the extent its negligent or unauthorized actions disturb, spread, or increase the condition or resulting costs. 10.9 Trench and Excavation Safety. Contractor shall comply with the Florida Trench Safety Act, Section 553.60 et seq., Florida Statutes, applicable OSHA requirements, and the trench-safety method identified in its Bid. Contractor’s prices include the cost of required trench-safety systems and excavation protection. Contractor shall maintain documentation required by law and shall not change the identified compliance method without providing the City any required revised documentation. 33 10.10 Violations and Corrective Action. Contractor shall promptly notify the City of any citation, notice of violation, stop-work order, environmental complaint, or governmental enforcement action relating to the Work. Contractor shall promptly correct a violation caused by Contractor without additional compensation or time. If a violation results from a requirement of the Contract Documents that Contractor could not reasonably have identified before performing the affected Work, any adjustment shall be determined under Sections 7 and 8. 11. GRANT REQUIREMENTS 11.1 Grant Funding. Contractor acknowledges that the Project is partially funded through Florida Department of Environmental Protection Grant Agreement No. P25011 under the Florida Recreation Development Assistance Program. The Grant Agreement provides a maximum State award of $200,000, requires a $200,000 City match, establishes April 30, 2027 as the Project Completion Date, and states that no extension is available. Contractor shall comply with the grant requirements applicable to its Work and shall reasonably assist the City in satisfying its obligations to FDEP. 11.2 Applicable Grant Requirements. Contractor is responsible only for provisions of the Grant Agreement that: (a) expressly apply to contractors or subcontractors; (b) relate to the performance, documentation, inspection, or acceptance of the Work; (c) must be included in lower-tier contracts; or (d) require Contractor’s cooperation for the City to obtain or retain grant funding. A provision applicable solely to the City in its capacity as the FDEP grantee does not create an independent obligation of Contractor except to provide the cooperation and documentation reasonably required for City compliance. 11.3 Authorized Project Elements. Contractor shall perform the Work consistently with the Project elements approved by FDEP, including the new exercise equipment, fencing, landscaping, and walking trail and the renovation of the basketball court, picnic shelter, and playground. Contractor shall not materially alter, eliminate, substitute, or relocate an approved Project element without prior written authorization from the City. Contractor acknowledges that FDEP approval may be required before the City can authorize a material change. A request for a substitution, proposed Change Order, or submission of a proposed revision to FDEP does not authorize Contractor to proceed with the affected change. 34 11.4 Notice to Commence. Contractor shall not begin grant-funded physical Work until the City issues the NTP required by Section 4. The City is responsible for obtaining any required FDEP Notice to Commence before issuing the NTP. Contractor may rely on the City’s NTP as confirmation that the City has obtained the governmental authorization necessary to commence the Project, except for permits and approvals expressly assigned to Contractor. 11.5 Documentation and Reimbursement Support. Contractor shall maintain and provide records sufficient to establish that the Work and costs submitted for payment are eligible, reasonable, properly authorized, and directly related to the Project. Required records include, as applicable: (a) detailed invoices and Applications for Payment; (b) actual unit-price quantities and measurement records; (c) invoices, receipts, and proof of payment for allowances and reimbursable costs; (d) subcontractor and supplier invoices; (e) labor, material, and equipment records supporting changed Work; (f) procurement and pricing documentation reasonably requested by the City; (g) inspection, testing, permit, and acceptance records; (h) progress photographs and record drawings; and (i) other Project documentation reasonably required for FDEP review, audit, or closeout. Contractor shall provide requested documentation promptly and in sufficient time for the City to meet its reporting, reimbursement, and closeout deadlines. 11.6 Inspections, Audits, and Access to Records. Contractor shall permit the City, FDEP, the Florida Chief Financial Officer, the Florida Auditor General, the applicable Inspector General, and their authorized representatives to inspect the Work and review or copy Project records at reasonable times. Contractor shall cooperate with a lawful audit, investigation, inspection, or grant-compliance review and shall require its subcontractors to provide corresponding access to records relating to the Project. Inspection, review, or reimbursement by FDEP does not constitute acceptance of defective Work or relieve Contractor of an obligation under the Contract Documents. 35 11.7 Record Retention. Contractor shall retain Project records for at least five (5) years after Final Completion and for any longer period required by: (a) the Grant Agreement; (b) applicable Florida records-retention schedules; (c) an unresolved audit, investigation, claim, or litigation; or (d) applicable law. Contractor shall include corresponding record-retention and access requirements in its subcontracts. 11.8 Grant-Eligible Costs. Contractor shall not knowingly submit an ineligible, unsupported, unauthorized, or duplicative cost. Equipment purchases are not eligible for grant reimbursement under the Grant Agreement, and Contractor shall not characterize a purchase as a grant- reimbursable cost when the Grant Agreement excludes it. This limitation does not prevent payment for Contractor’s eligible labor, site preparation, equipment rental, installation-related Work, or other authorized services merely because the City separately purchased park equipment or furnishings. 11.9 Contractor Payment and Grant Reimbursement. FDEP reimbursement of the City is not a condition precedent to payment for Work properly authorized, performed, documented, and payable under this Agreement. The City may withhold or recover an amount to the extent FDEP denies, reduces, recaptures, or requires repayment of grant funding because of Contractor’s: (a) untimely or incomplete performance; (b) defective or nonconforming Work; (c) unauthorized change to an approved Project element; (d) ineligible, unsupported, or inaccurate charge; (e) failure to maintain or provide required records; or (f) other breach of the Contract Documents. Contractor shall not be responsible for loss of grant funding caused solely by the City’s failure to satisfy an obligation not assigned to Contractor. The City shall not obtain double recovery for a loss already compensated through liquidated damages or another remedy. 36 11.10 Flow-Down to Subcontractors. Contractor shall include applicable grant-performance, documentation, record-retention, audit-access, and compliance requirements in each subcontract relating to the Project. Contractor remains responsible for its subcontractors’ compliance and shall not contend that a subcontractor’s failure excuses Contractor’s performance. 11.11 No Third-Party Rights. The Grant Agreement does not create a contractual relationship between Contractor and FDEP. Contractor has no right to payment directly from FDEP, and FDEP assumes no contractual obligation to Contractor or its subcontractors under this Agreement. 12. SUBCONTRACTORS AND PERSONNEL 12.1 Contractor shall submit a subcontractor list and may not substitute a listed key subcontractor or key person without prior written City approval. Approval does not create a contractual relationship with the City or relieve Contractor of full responsibility. 12.2 Contractor shall bind subcontractors to the Contract Documents to the extent applicable and require written subcontracts, prompt payment, insurance, safety, licensing, public-records compliance, grant records, warranties, and indemnity consistent with this Agreement. 12.3 The City may require removal from the Project of any person who is unsafe, unqualified, disorderly, abusive, or materially interferes with City operations. Contractor shall promptly provide a qualified replacement at no added cost or time. 12.4 Contractor shall not assign this Agreement, delegate material duties, or transfer a controlling interest without the City’s prior written consent. Any unauthorized assignment is void and grounds for termination. 13. SAFETY AND SITE SECURITY 13.1 Contractor is solely responsible for initiating, maintaining, and supervising all safety programs and precautions, including protection of workers, City personnel, park users, pedestrians, motorists, property, and the public. Contractor shall comply with OSHA and all applicable safety laws and immediately correct unsafe conditions. 13.2 Contractor shall secure and fence construction areas, maintain approved traffic and pedestrian controls, preserve emergency access, and prevent unauthorized public entry. The park environment and presence of children require enhanced care in barriers, housekeeping, equipment security, and daily shutdown. 13.3 Contractor shall promptly report any injury, property damage, utility strike, spill, safety citation, or significant near miss and provide written incident documentation within twenty-four (24) hours. Reporting does not admit liability or relieve Contractor of other duties. 37 13.4 In an emergency, Contractor shall act immediately to prevent threatened harm and then notify the City. The City may stop unsafe Work. A safety stop caused by Contractor is not grounds for additional time or compensation. 14. BONDS AND INSURANCE 14.1 Performance and Payment Bonds. Within fourteen (14) days after notice of award and before issuance of the NTP, Contractor shall furnish performance and payment bonds, each in the full Contract Sum, on the City’s project-specific forms and executed by a surety authorized to transact business in Florida and acceptable to the City. The bonds shall comply with Section 255.05, Florida Statutes, and identify the correct Contractor, Surety, City, contract number, bond number, Project address, and general description of the Chester Byrd Park Improvements. Contractor shall record the bonds in the public records of Broward County and provide the City certified copies and recording information before commencing Work. The City shall not be required to make payment until Contractor has satisfied these requirements. 14.2 Bond Coverage. The bonds shall remain effective through Final Completion and for any additional period required by the bond forms, Contract Documents, or applicable law. Contractor shall provide any bond rider or other surety documentation reasonably required because of an increase in the Contract Sum or other material modification. The Surety’s consent is not required for a change unless expressly required by applicable law or the accepted bond form. 14.3 Insurance. Before commencing Work, Contractor shall obtain and maintain the insurance required by the ITB and its insurance exhibit. Coverage shall remain in effect for the periods specified in those requirements, including applicable completed-operations and warranty periods. The City may require additional insurance during performance only if: (a) Contractor proposes a material change in its operations or means and methods that creates a risk not reasonably contemplated when Bids were submitted; (b) the additional coverage is required by law; or (c) Contractor and the City agree to the requirement through a Change Order addressing any resulting adjustment. Required insurance does not limit Contractor’s liability under the Contract Documents. Contractor is responsible for all deductibles and self-insured retentions. 14.4 Policy Requirements. Policies shall include the additional-insured, primary-and- noncontributory, waiver-of-subrogation, completed-operations, and notice provisions required by the ITB and insurance exhibit. 38 Certificates of insurance do not amend policy terms or independently establish compliance. Contractor shall provide copies of required endorsements or policies upon reasonable request and shall ensure that its Subcontractors maintain the insurance applicable to their Work. 14.5 Continuing Compliance. Contractor shall provide renewal certificates and required endorsements before coverage expires. Contractor shall promptly notify the City of cancellation, nonrenewal, material reduction, or lapse of required coverage. Contractor shall not perform affected Work while required bonds or insurance are not in effect. A lapse caused by Contractor is a material breach and does not entitle Contractor to additional compensation or time. The City may withhold payment, stop the affected Work, or exercise other remedies under the Contract Documents until compliance is restored. 15. CORRECTION; WARRANTY; TITLE 15.1 Contractor’s Warranty. Contractor warrants that: (a) materials and equipment furnished by Contractor are new and of good quality unless otherwise permitted by the Contract Documents; (b) the Work will be free from defects in materials and workmanship; (c) the Work will conform to the Contract Documents, approved submittals, applicable law, permits, and manufacturer requirements; and (d) the City will receive clear title to the Work, materials, and equipment furnished by Contractor, free of liens and claims. Work not conforming to these requirements, including an unauthorized substitution, is defective. 15.2 Correction of Defective Work. Contractor shall promptly correct, remove, or replace defective, damaged, or nonconforming Work identified before or after Substantial Completion. Contractor shall bear the resulting costs, including investigation, testing, inspection, removal, professional services, access, and restoration of other affected work. If Contractor fails to begin and diligently pursue required correction after written notice, the City may correct the condition and deduct its reasonable costs from amounts due or recover them from Contractor and Surety. Immediate action may be taken without prior notice when reasonably necessary to protect persons, property, or the Work. 15.3 Correction Period. For one (1) year after Substantial Completion, or for a longer period stated in the Contract Documents or applicable manufacturer warranty, Contractor shall correct covered defects after receiving notice from the City. 39 The correction period for Work corrected or replaced during that period shall continue for one (1) year after completion of the correction or replacement. This obligation supplements and does not limit other warranties, latent-defect claims, indemnification obligations, or applicable statutes of limitation or repose. 15.4 Manufacturer and Supplier Warranties. Contractor shall obtain all available manufacturer, supplier, and Subcontractor warranties required by the Contract Documents. To the extent permitted by the warranty issuer, each warranty shall be registered in the City’s name and for the City’s sole benefit. Before Final Completion, Contractor shall provide the City with executed warranty documents, required registrations, effective dates, claim procedures, and contact information. Contractor shall assist the City in enforcing those warranties and remains responsible for its own obligations regardless of another available warranty. 15.5 Warranty Exclusions. Contractor’s warranty does not cover damage or a defect to the extent caused by: (a) abuse or misuse by the City or a third party after the City accepts control of the affected Work; (b) a modification not performed or authorized by Contractor; (c) improper or insufficient maintenance contrary to written maintenance requirements provided to the City; (d) improper operation contrary to written operating instructions provided to the City; or (e) normal wear and tear. Contractor bears the burden of demonstrating that an exclusion applies. An exclusion does not relieve Contractor from responsibility to the extent its defective Work caused or contributed to the condition. 15.6 City-Purchased Equipment. Contractor does not warrant the manufacture or installation of equipment or furnishings purchased by the City and installed by a City-designated vendor. Contractor remains responsible for: (a) its site preparation and supporting Work; (b) utility and dimensional coordination assigned to Contractor; (c) protection and handling within Contractor’s control; (d) damage caused by Contractor; and 40 (e) defects resulting from Contractor’s failure to timely identify an apparent conflict or nonconforming condition. Contractor shall cooperate with the City and designated vendor in documenting and pursuing an applicable vendor or manufacturer warranty. The Contractor’s warranty does not apply to the concrete ribbon curb furnished and installed by the City’s vendor, except that the Contractor remains responsible for its own site-preparation and coordination work associated with the ribbon curb. 15.7 Landscape and Establishment Obligations. Warranty and establishment obligations for landscaping, relocated trees, irrigation, and related Work shall continue for the periods stated in the plans, specifications, or Bid Form Notes. If no different period is stated, the one-year correction period in Section 15.3 applies. 16. INDEMNIFICATION 16.1 To the fullest extent permitted by Section 725.06, Florida Statutes, Contractor shall indemnify and hold harmless the City and its elected officials, officers, employees, and agents from liabilities, damages, losses, and costs, including reasonable attorneys’ fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of Contractor or persons employed or utilized by Contractor in performance of the Contract Documents. 16.2 Contractor shall defend and indemnify the City from claims, liens, bond claims, and demands for payment by Contractor’s subcontractors, suppliers, laborers, or others furnishing labor, materials, or equipment, except to the extent caused by the City’s failure to pay an undisputed amount finally determined due to Contractor. 16.3 Contractor shall be responsible for fines, penalties, remediation costs, and grant repayment or loss to the extent caused by its violation, breach, or deficient documentation. These obligations are not limited by insurance, bonds, or the Contract Sum and survive completion or termination. 16.4 Nothing in this Agreement waives the City’s sovereign immunity or limits under Section 768.28, Florida Statutes, or creates liability beyond that provided by law. Nothing requires the City to indemnify Contractor. 17. DEFAULT AND CITY REMEDIES 17.1 Contractor Default. Contractor is in default if it: (a) fails to commence or diligently prosecute the Work; (b) fails to provide adequate qualified workers, supervision, materials, or equipment; (c) fails to pay Subcontractors or suppliers undisputed amounts when due; (d) performs defective or nonconforming Work and fails to timely correct it; 41 (e) violates applicable law, permit, or material safety requirement; (f) fails to maintain required bonds or insurance; (g) fails to provide required records, releases, schedules, or grant documentation; (h) abandons the Work; (i) becomes insolvent or subject to a bankruptcy or receivership proceeding that materially impairs performance, to the extent remedies are permitted by applicable law; or (j) otherwise materially breaches a Contract Document. 17.2 Notice and Opportunity to Cure. Except as provided below, the City shall provide written notice describing the default and allow Contractor five (5) days after receipt to cure the default or, if it cannot reasonably be cured within five (5) days, to begin the cure and diligently complete it within a period acceptable to the City. The City may take immediate protective action or terminate without an additional cure period when reasonably necessary because of: (a) an emergency threatening persons or property; (b) abandonment of the Work; (c) failure to timely commence the Work; (d) lapse of required bonds or insurance; (e) unlawful conduct or a material safety violation; or (f) a default that is not reasonably capable of cure. The City shall comply with any separate notice or procedural requirements necessary to preserve its rights against the Surety under the performance bond. Compliance with the bond does not extend Contractor’s contractual cure period unless the City agrees otherwise in writing. 17.3 City Remedies. Upon Contractor’s default, the City may, to the extent appropriate: (a) stop all or part of the Work; (b) reject or withhold payment as permitted by the Contract Documents and applicable law; (c) require Contractor to increase staffing, supervision, materials, or equipment; (d) supplement Contractor’s forces or arrange for correction or completion of the Work; 42 (e) take possession of materials and equipment incorporated into the Work or purchased for the Project to which the City has obtained title through payment; (f) use Contractor-owned tools, construction equipment, or temporary facilities located at the Project Site only to the extent permitted by the performance bond, applicable law, or a separate written agreement; (g) terminate Contractor’s right to proceed with all or part of the Work; (h) make demand upon the performance or payment bond; (i) recover completion costs, liquidated damages, and other damages permitted by the Contract Documents; and (j) exercise any other cumulative legal or equitable remedy. Before supplementing Contractor’s forces or arranging completion, the City shall provide notice reasonably appropriate under the circumstances unless immediate action is necessary to protect persons, property, the Project schedule, or grant funding. 17.4 Termination for Cause. If the City terminates Contractor’s right to proceed for cause, Contractor is not entitled to further payment until the terminated Work is completed and the City’s completion costs and damages are determined. If the unpaid Contract balance exceeds the City’s completion costs, damages, and other amounts recoverable under the Contract Documents, the remaining amount shall be paid as required by law. If those costs and damages exceed the unpaid balance, Contractor and Surety shall be liable for the difference to the extent provided by the Contract Documents and bonds. If a termination for cause is finally determined to have been improper, the termination shall be treated as a termination for convenience under Section 18, and Contractor’s recovery shall be limited accordingly. 18. TERMINATION OR SUSPENSION FOR CONVENIENCE; FUNDING 18.1 The City may terminate all or part of the Agreement for convenience upon written notice. Contractor shall stop as directed, protect Work, cancel commitments where practicable, and deliver materials and records. The City shall pay for conforming Work performed through the termination date and reasonable, documented demobilization costs, less prior payments and amounts due the City. Contractor is not entitled to anticipatory profit, consequential damages, unabsorbed overhead, or recovery on unperformed Work. 18.2 The City may suspend Work by written order. Contractor shall protect the Work and mitigate cost and delay. If a suspension is caused solely by the City and is unreasonable in duration, an equitable adjustment may be made by Change Order, subject to notice and documentation 43 requirements. No adjustment is due for a suspension caused by Contractor, safety, weather, permitting, grant review contemplated by the Contract Documents, or legal compliance. 18.3 City obligations are subject to lawfully available and appropriated funds. If funds are unavailable, the City may reduce scope, suspend, or terminate without liability beyond amounts payable under Section 18.1. This clause does not permit the City to avoid payment for accepted Work from funds legally available for that purpose. 19. PUBLIC RECORDS 19.1 Contractor shall comply with Chapter 119, Florida Statutes, and Section 119.0701, if applicable. Contractor shall keep and maintain public records required to perform the service; provide requested records or allow inspection and copying within a reasonable time at lawful cost; and ensure confidential or exempt records are not disclosed except as authorized by law. 19.2 Upon completion or termination, Contractor shall, at the City’s election, transfer at no cost all public records to the City or keep and maintain them as required by law. Electronic records shall be supplied in a format compatible with the City’s systems. If records are transferred, Contractor shall destroy duplicate confidential or exempt records as required by law. 19.3 IF CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS AGREEMENT, CONTACT THE CITY’S CUSTODIAN OF PUBLIC RECORDS: ELORA RIERA, CITY CLERK, 100 WEST DANIA BEACH BOULEVARD, DANIA BEACH, FLORIDA 33004; TELEPHONE (954) 924-6800, EXT. 3623; EMAIL ERIERA@DANIABEACHFL.GOV. 19.4 Failure to comply is a material breach. The City may enforce this Section, recover reasonable enforcement costs where permitted by law, and withhold payment until required records are provided. 20. CLAIMS AND DISPUTE RESOLUTION 20.1 Notice of Claim. If Contractor believes it is entitled to additional compensation, an extension of time, or other relief, Contractor shall provide written notice to the City within seven (7) days after Contractor knew or reasonably should have known of the event giving rise to the claim. The notice shall identify the event, the relief requested, and the known or anticipated effect on cost and time. Contractor shall not perform disputed additional Work without the authorization required by Section 7, except for emergency Work or Work performed under a written directive to proceed. 20.2 Supporting Documentation. Within fourteen (14) days after the effect of the event can reasonably be determined, Contractor shall submit: 44 (a) the factual and contractual basis of the claim; (b) an itemized calculation of additional compensation requested; (c) supporting labor, material, equipment, subcontractor, and other cost records; (d) any requested extension of time and supporting critical-path analysis; (e) actions taken to avoid or mitigate the effect; and (f) a certification that the claim is accurate, complete, and submitted in good faith. If the effects continue, Contractor shall provide reasonable periodic updates and a final statement after the effects end. 20.3 Effect of Failure to Provide Notice. Compliance with the applicable notice and documentation requirements is a condition precedent to Contractor’s claim to the extent the City is materially prejudiced by Contractor’s failure to comply. If another section establishes a more specific notice or submission requirement for a particular claim, Contractor shall comply with both provisions to the extent they can reasonably be read together. The more specific provision controls in the event of an irreconcilable conflict. 20.4 Continued Performance. Contractor shall continue performing the Work during the review or resolution of a claim or dispute unless the City directs otherwise in writing. Contractor shall comply with written City directives while preserving its claim. The City shall continue to pay undisputed amounts properly due under the Contract Documents. 20.5 Good-Faith Resolution. Before filing litigation, the Parties shall attempt in good faith to resolve the dispute through a meeting between the City Representative and Contractor’s project representative. If not resolved, either Party may request review by the City Manager or designee and an authorized executive of Contractor. The review process does not waive a claim or defense, extend a contractual or statutory deadline, or prevent either Party from seeking emergency judicial relief. Contractor shall comply with any administrative claim or dispute procedure required by applicable City ordinance. 20.6 Governing Law and Venue. This Agreement is governed by Florida law. Exclusive venue for any litigation arising from or relating to the Agreement shall lie in the state courts located in Broward County, Florida, or, if federal jurisdiction exists, the United States District Court for the Southern District of Florida. EACH PARTY KNOWINGLY AND VOLUNTARILY WAIVES TRIAL BY JURY TO THE FULLEST EXTENT PERMITTED BY LAW. 45 Nothing in this Agreement constitutes consent by the City to arbitration or a waiver of sovereign immunity or any limitation provided by Section 768.28, Florida Statutes. 20.7 Attorneys’ Fees and Costs. Each Party shall bear its own attorneys’ fees and costs in a dispute arising from this Agreement except to the extent recovery is expressly authorized by applicable law, an indemnification obligation, or another specific provision of the Contract Documents. 20.8 Waiver of Contractor’s Consequential Damages. Contractor waives claims against the City for consequential, special, or incidental damages, including lost profits on other work, loss of business opportunity, loss of bonding capacity, and business interruption. This waiver does not prevent Contractor from recovering compensation expressly authorized by a Change Order or direct costs recoverable under Section 8.4. The City does not waive its right to recover damages resulting from Contractor’s breach, subject to the prohibition against double recovery. 21. NOTICES 21.1 Form and Delivery. A notice required under the Contract Documents shall be in writing and delivered by: (a) personal delivery; (b) nationally recognized overnight courier; (c) certified United States mail, return receipt requested; or (d) email, provided the sender receives confirmation of receipt from the recipient. Notice is effective upon actual delivery. Refusal of delivery constitutes receipt. Routine Project communications, meeting minutes, submittals, inspection reports, and other administrative correspondence do not constitute contractual notice unless the communication expressly states that it is notice under this Agreement and is delivered in accordance with this Section. 21.2 Notices to the City. Notices to the City shall be delivered to: Candido Sosa-Cruz, City Manager City of Dania Beach 100 West Dania Beach Boulevard Dania Beach, Florida 33004 Email: csosacruz@daniabeachfl.gov 46 With a copy to: Eve A. Boutsis, City Attorney City of Dania Beach 100 West Dania Beach Boulevard Dania Beach, Florida 33004 Email: eboutsis@daniabeachfl.gov A copy may also be required to the City Representative identified in the NTP. Delivery only to a project manager, inspector, consultant, or Design Professional does not constitute notice to the City unless that person has been expressly designated in writing to receive contractual notices. 21.3 Notices to Contractor. Notices to Contractor shall be delivered to: Cesar De Luna, VP-CGC M & J Consulting Group, Corp. 3350 SW 148th Avenue, Suite 110-9062 Miramar, Florida 33027 Email: cesar@mjgeneralcontractors.com With a copy to any additional representative identified by Contractor in writing. 21.4 Change of Address. A Party may change its notice address or designated recipient by providing written notice in accordance with this Section. The change is effective upon receipt. 21.5 Emergency and Field Communications. This Section does not prevent oral or electronic communications reasonably necessary for emergencies, safety, scheduling, inspections, or daily administration. When the Contract Documents require formal written notice, the communicating Party shall provide notice complying with this Section within the applicable time. 22. MISCELLANEOUS AND STATUTORY COMPLIANCE 22.1 Independent Contractor. Contractor is an independent contractor and is not an officer, employee, agent, joint venturer, or partner of the City. Contractor has no authority to bind the City or incur an obligation on the City’s behalf. Contractor is solely responsible for its personnel, compensation, payroll, taxes, benefits, supervision, and employment obligations. 22.2 No Waiver. A waiver is effective only if stated in writing by a City official authorized to grant it. A waiver concerning one act, default, or provision does not waive another act, default, or provision. Payment, inspection, review, acceptance, use, silence, or failure to enforce a requirement immediately does not constitute a waiver. Rights and remedies under the Contract Documents are cumulative. 47 22.3 Severability. If a provision of the Contract Documents is determined to be invalid or unenforceable, it shall be enforced to the maximum extent permitted by law, and the remaining provisions shall remain effective unless the invalid provision defeats the essential purpose of the Agreement. 22.4 Survival. Obligations concerning final payment, correction of Work, warranties, indemnification, public records, grant records, audits, claims, dispute resolution, and other obligations that by their nature continue beyond completion or termination shall survive. 22.5 E-Verify. Contractor shall register with and use the E-Verify system to verify the work- authorization status of all new employees as required by Section 448.095, Florida Statutes. Contractor shall require each Subcontractor to register with and use E-Verify and to provide Contractor the affidavit required by that statute. Contractor shall retain each affidavit for the duration of the Agreement and provide it to the City upon request. If the City has a good-faith belief that Contractor knowingly violated Section 448.09(1), Florida Statutes, the City shall terminate the Agreement as required by law. If the City has a good-faith belief that a Subcontractor knowingly violated the applicable requirements but Contractor otherwise complied, the City shall notify Contractor, and Contractor shall immediately terminate the subcontract. A termination required under Section 448.095 is not a breach by the City. Contractor is liable for additional costs incurred by the City as a result of a termination as provided by law. 22.6 Public Contracting Eligibility. Contractor represents that it and its affiliates are eligible to contract with the City and are not prohibited from doing business with a public entity under applicable Florida law, including laws concerning: (a) public-entity crimes; (b) discriminatory vendors; (c) antitrust violations; (d) suspended vendors; (e) scrutinized companies and entities; (f) boycotts of Israel; and (g) entities associated with foreign countries of concern. Contractor shall promptly notify the City if a representation or certification concerning its eligibility becomes inaccurate during the Agreement. 48 The City may terminate the Agreement if Contractor submitted a false certification or becomes ineligible or subject to termination under applicable law, including Section 287.135, Florida Statutes. 22.7 Human-Trafficking Affidavit. Contractor shall provide the affidavit required by Section 787.06(14), Florida Statutes, signed by an officer or authorized representative under penalty of perjury and attesting that Contractor does not use coercion for labor or services as defined by that statute. Contractor represents that the affidavit submitted with its Bid remains accurate as of the Effective Date and shall provide a new affidavit upon any renewal or extension if required by law. 22.8 Nondiscrimination. Contractor shall not unlawfully discriminate in performing the Work and shall comply with applicable equal-employment, civil-rights, and accessibility laws. If Contractor certified that it maintains a drug-free workplace, Contractor shall maintain that program throughout performance of the Agreement. 22.9 Accuracy of Representations. Contractor represents that its Bid, certifications, affidavits, and other submissions are complete and accurate; that it is duly organized, licensed, and authorized to perform the Work; that execution and performance of this Agreement do not violate another obligation; and that the person executing the Agreement is authorized to bind Contractor. A material misrepresentation or false certification constitutes a default and may subject Contractor to statutory remedies in addition to the remedies under the Contract Documents. 22.10 No Third-Party Beneficiaries. Except for the City parties protected by an express indemnification provision and claimants having statutory rights under the payment bond, the Contract Documents are solely for the benefit of the City and Contractor and do not create a contractual right in another person or entity. 22.11 Counterparts and Electronic Signatures. The Agreement may be executed in counterparts, each of which is deemed an original and all of which constitute one instrument. Electronic signatures and copies shall have the same effect as original signatures to the extent permitted by law. The Effective Date is the date on which the last Party executes the Agreement. Execution does not authorize commencement of physical Work before the NTP. 22.12 Exhibits. The following exhibits are incorporated into the Agreement: (a) Exhibit A – Accepted Bid Form and Bid Schedule; (b) Exhibit B – Chester Byrd Park Improvements Bid Plans and Specifications; (c) Exhibit C – Final Revised Bid Form Notes issued with Addenda 3 and 6, dated [DATE]; (d) Exhibit D – FDEP Grant Agreement No. P25011; (e) Exhibit E – Insurance Requirements; (f) Exhibit F – Performance Bond; 49 (g) Exhibit G – Payment Bond; and (h) Exhibit H – Addenda Nos. 1 through 6 issued before Bid opening. The exhibits identified above are incorporated by reference to the corresponding documents included in the ITB and need not be physically duplicated as attachments to this Agreement. Each exhibit and addendum shall be identified by its applicable title, date, or number. SIGNATURES ON THE FOLLOWING PAGES 50 IN WITNESS OF THE FOREGOING, the parties have set their hand and seal the day and year first written above. CITY OF DANIA BEACH, FLORIDA, a Florida municipal corporation ELORA RIERA, MMC COLMAN RYAN CITY CLERK MAYOR APPROVED AS TO LEGAL FORM AND CORRECTNESS EVE A. BOUTSIS, CITY ATTORNEY CANDIDO SOSA-CRUZ, ICMA-CM CITY MANAGER 51 CONTRACTOR: WITNESSES: M & J CONSULTING GROUP CORP. a Florida corporation SIGNATURE SIGNATURE PRINT Name PRINT Name SIGNATURE Title PRINT Name STATE OF FLORIDA COUNTY OF BROWARD The foregoing instrument was acknowledged before me by means of ☐ physical presence or ☐ online notarization, on , 2026, by _______________ (name), _______________________ (title), of M & J Consulting Group Corp., a Florida corporation, who is personally known to me or has produced as identification. NOTARY PUBLIC My Commission Expires: State of Florida City of Dania Beach Community Development Memorandum DATE: 11/17/2026 TO: Mayor and Commissioners FROM: Candido Sosa-Cruz, ICMA-CM, City Manager VIA: Eleanor Norena, CFM, Deputy City Manager Corinne Lajoie, MURP, AICP, Director Shanesa Miranda, Deputy Director Claudia Viviana Batista, Planning and Zoning Manager SUBJECT: SP-05-99MOD3/SE-030-26: The applicant, Lincoln Property Company, is requesting a Site Plan and Special Exception to allow a secondary school operation with a drop-off lane to be located at 1855 Griffin Road Request: SITE PLAN To allow the site plan modification to accommodate a drop-off/pick-up lane entry area for a secondary academic school. SPECIAL EXCEPTION To allow the operation of a secondary school in a General Commercial (C-4) zoning district, as required by Code Sec. 630-50(A). PROPERTY INFORMATION: EXISTING ZONING: General Commercial (C-4) LAND USE DESIGNATION: Commercial (C) SITE ACREAGE: 21.78 acres EXISTING USE: Retail/Showroom & Office Background: The subject property is located east of Interstate 95 (I-95), south of Griffin Road, and is the current location of the Design Center of the Americas (DCOTA). As a landlocked parcel, access is through a perpetual access driveway across the property at 1805 Griffin Road. The property received original approval for development of DCOTA by the City Commission on May 17, 1983, by Ordinance No. 20, to be a 1,000,000-square-foot wholesale showroom. The site was approved to be developed in three phases. Phase I and II were approved under Development Order DRI15-87 on April 14, 1984, under R04-84. On March 23, 1999, Phase III was approved under Resolution No. 1999-044. On August 14, 2012, a Plat Note amendment was approved by the City Commission to restrict 620,000 square feet of wholesale room and to include 380,000 square feet of office/educational use. On September 6, 2014, the property received approval from the City Commission to reduce the parking ratio calculation from 1:500 to 1:1,000 for alternate parking standards under Resolution No.2014-073. Approval of this site plan modification will allow a secondary academic school with a future enrollment of 240 students to be approved to operate. SPECIAL EXCEPTION The applicant is proposing to operate a 23,900-square-foot secondary academic school with a future enrollment of 240 students. The City’s LDC, Section 110-20, permits an academic school with a Special Exception approval. Section 630-50(A) of the City’s LDC states that the Planning and Zoning Board or City Commission, as applicable, shall review the application to determine whether the Special Exception use complies with the criteria below and may deny, approve, or approve the application with conditions. In issuing its decision to grant a Special Exception, the City may place more restrictive requirements and conditions on applicants than are provided in the code when the conditions are based upon site considerations and its use, and the potentially resulting impacts upon the surrounding area or zoning district where the subject property is located. Below are the criteria identified in LDC Section 630-50 (A), along with the applicant’s justification and staff’s analysis in italics. 1. That the use is permitted as a Special Exception use as set forth in the use regulations of Part 1 of this code. Applicant: The use is permitted in the General Commercial (C-4) zoning district subject to a Special Exception approval. The applicant intends to accommodate the use meeting all LDC regulations. Community Development staff confirm that an academic school is permitted as a Special Exception use in the LDC. 2. That the use will not cause a detrimental impact to the value of existing contiguous uses, uses in the general area, and to the zoning district where it is to be located. Applicant: The proposed use will not adversely impact the value of surrounding properties. The property is surrounded primarily by properties zoned and utilized for commercial purposes consistent with the C-4 zoning designation. The proposed academic school is consistent with the operational character of the surrounding commercial area and will function independently without interfering with any other business operations. The school will have its own entrance and is positioned at the most remote location in the context of the large site. In addition, a traffic study has been conducted to confirm that the school operations will not have a significant impact on the existing uses. Community Development staff confirm that the statement provided by the applicant is accurate. 3. That the use will be compatible with the existing uses on contiguous property, with uses in the general area and zoning district where the use is to be located and compatible with the general character of the area, considering population density, design, scale and orientation of structures to the area, property values and existing similar uses or zoning. Applicant: The site abuts the I-95 corridor to the west, so there are no immediately adjacent uses to the west. The length and scale of the building itself acts as a buffer to the neighbors to the east, and there is no impact to them at all. And we believe the Educational Use remains compatible with the existing uses to the north and south. Community Development staff confirm that the use is compatible with the existing uses on contiguous property, general areas, and the zoning district. 4. That adequate landscaping and screening are provided to buffer adjacent uses from potential incompatibilities. Applicant: Existing landscape material has been enhanced with replacement trees for missing trees, new landscape islands, and new base plantings added at the new drop-off loop have been added to provide compliance with current landscaping and screening requirements. The Community Development Department agrees that landscaping has been provided to enhance the drop-off area. 5. That adequate parking and loading is provided, and ingress and egress is so designed as to cause minimum interference with traffic on abutting streets. Applicant: 80 parking spaces are required by Code for the Educational use, and we have confirmed that this has no significant impact on the existing parking calculations for the entire site. A traffic study has been conducted, and there is no significant impact from this use's introduction to the existing context of the existing DCOTA site. The Community Development staff agree that the proposed use will not create a parking increase, as the students will be picked up and dropped off. The parking will be for staff. 6. That the use will not have a detrimental environmental impact upon contiguous properties and upon properties located in the general area or an environmental impact inconsistent with the health, safety, and welfare of the community. Applicant: There is no environmental impact to the existing site and/or the contiguous properties, since the scope is limited to an interior improvement of an existing space. The Community Development staff agree with this statement. The proposed academic school will meet all green design practices to the best of their ability based on the LDC regulations, making the project more environmentally compatible. 7. That the use will not have a detrimental effect on vehicular or pedestrian traffic, or parking conditions, and will not result in the generation or creation of traffic inconsistent with the health, safety, and welfare of the community. Applicant: A traffic study has been conducted, and there is no significant impact from this use's introduction to the existing context of the existing DCOTA site. The pedestrian experience remains unchanged, and the parking required fits within the current parking allocations; thus, there will be no impact on the health, safety, and welfare of the community. The Community Development staff agree that the proposed academic school will not have a detrimental impact on vehicular traffic or parking conditions, as the use will not create more traffic. 8. That the use will not utilize turning movements in relation to its access to public roads or intersections, or its location in relation to other structures or proposed structures on or near the site that would be hazardous or a nuisance. Applicant: There is no change to the access to public roads and intersections as a result of the special exception. Community Development staff agree with this statement. The proposed academic school use and the proposed traffic circulation within the site were confirmed to meet LDC. 9. That the use will not have a detrimental effect on the future development of contiguous properties or the general area, according to the comprehensive plan. Applicant: As we are renovating a small piece of the building and not expanding the footprint, this project does not have a detrimental impact on the future development of contiguous properties or the general area according to the comprehensive plan. Owner’s future potential remains unchanged. Community Development staff agree with this statement. 10. That the use will not result in the creation of incompatible noise, lights, vibrations, fumes, odors, dust, or physical activities, taking into account existing uses, uses located on contiguous properties, uses in the general area, and the zoning in the vicinity due to its nature, duration, direction, or character. Applicant: The school’s impact is only +/-23,900 SQ of an existing +/- 800,000 SF building. The tenant improvement involves interior renovations to accommodate the school’s needs and a drop-off canopy; thus, there will be no incompatible noise, lights, vibrations, fumes, odors, dust, or physical activities during construction or during the life of the lease. All academic activities are intended to be conducted indoors. Community Development staff agree with this statement. The academic school is similar to adjacent uses. 11. That the use will not overburden existing public services and facilities. Applicant: The introduction of this school use to the existing massive multi-story building will provide no additional burden on public services and facilities; we are simply renovating the interior of an existing space. Community Development staff agree with this statement. SITE PLAN The site plan modification proposes to reconfigure the existing parking located in the South West of the property to accommodate a drop-off area for the proposed academic school. In addition, the applicant proposes to create an independent new entrance, modifying the building façade and adding a canopy/breezeway that connects the drop-off area to the building entrance. The applicant will be doing a major interior alteration to accommodate the future use of a secondary academic school for 240 students. Resiliency The City’s Code of Ordinances requires a Storm Water Management Plan to be submitted and approved prior to the issuance of a building permit. A stormwater management plan is mandatory for all projects that change the surface to be impervious or alter pervious areas, regardless of City Commission approval. Post-development runoff must not exceed pre- development runoff rates for a 25-year storm event. The City's current drainage level of service is to retain the first inch of rainfall on-site and maintain pre-development runoff rates for a 25- year storm event. The City enforces a "General Requirements" stormwater management plan, including an "interim design standard" specifying groundwater and surface water levels before a design event. Please refer to Resolution No. 2023-039 and Ordinance No. 2023-007. Based on the applicant’s preliminary drainage report and plans, it is indicated that the project will not increase the existing impervious areas. The proposed modifications increase the adjacent pervious areas by ninety-seven (97) square feet. Green Building Design Practices The City’s LDC requires that any development, major renovation, or alteration are required to meet the Green Building Design Practices to minimize the demand for nonrenewable material and energy resources, water consumption, and minimize the generation of waste products, pollution, and stormwater runoff. The applicant provided a narrative describing the implementation of ten (10) Green Building Practices for the proposed development. The options chosen are: a. High reflectance roofs (cool roofs) b. No garbage disposal c. All Energy Star appliances d. Recycling e. Florida Native Landscaping f. Low-emitting construction materials g. Low-emitting flooring h. Water-managed building materials i. Water shutoff devices j. Implementation of biophilic features indoors Traffic Study The applicant has engaged with KBP Consulting to perform a trip generation statement for the proposed development. The results of the trip generation analysis confirmed that the proposed use is expected to generate no more than four (5) peak-hour trips. The City Engineer accepted the findings in the report. Community Outreach On September 21, 2026, Steve Geller, Esq., the Attorney for Ohana, on behalf of the applicant, sent notices to properties within 1,000 feet of the subject property notifying them of the proposed development and inviting the community to participate in the community meeting regarding the proposed development to discuss details of the project. The community meeting was held on October 9, 2026. Four (4) representatives of the project were present. No members of the community participated in this community outreach. Development Review Committee (DRC) The Site Plan was reviewed by staff at the DRC meetings held on July 23, 2026, August 27, 2026, and October 9, 2026, which included personnel from the BSO Fire, the City’s Flood Plain consultant, the City’s engineering consultant, and the Community Development Department’s Planning and Zoning Division. The DRC comments are listed as conditions of approval in the plat resolution and provided below: 1. Additional comments may apply and will need to be addressed prior to Building Permit approval. (Engineering) 2. All outside agency permits are required at the time of permitting. (Engineering) 3. Approval shall be based on a maximum enrollment of 240 students and the arrival, dismissal, access, and circulation procedures described in the approved Traffic Impact Study and Traffic Operations Plan. Any change to those assumptions shall be submitted to the City for review and approval. (Traffic) 4. All student drop-off and pick-up queues shall be contained within the DCOTA property. The school shall manage arrivals and dismissal so that vehicles do not queue on Griffin Road, block the site entrance or adjacent drive aisles, or interfere with access to or from the property. (Traffic) 5. Based on the review conducted by the Community Development Department, the proposed Site Plan, Variance, and Special coordination with FDOT and other agencies having jurisdiction where required. Measures may include on-site queue management, adjusted arrival or dismissal procedures, or other improvements supported by an updated operational analysis. (Traffic) 6. In the case that site operations differ significantly (delays and/or queues greater than 10% to the ones reported in the study). The applicant shall submit a traffic operations assessment using observed enrollment, arrival and dismissal schedules, updated turning movements, and queue lengths during the school’s busiest arrival and dismissal periods. The assessment shall document conditions at the site entrance, Griffin Road, and the nearby I-95 ramp connections and recommend corrective measures if school-related queues or delays disrupt those facilities. (Traffic) 7. The developer is required to participate in the City’s Public Art program by payment into the City’s Public Art fund or through payment and installation of public art. The amount of the Public Art Fund contribution is dependent on the value of the construction, which will be established at the time of building permit submittal per Code Sec. 811-70. (Planning) 8. Provide the estimated construction value for development so that impact fees may be determined. (Planning). 9. Per Code Sec. 8- 7, commercial properties under construction are required to provide security fencing with screening showing a project rendering covering at least 75% of the length of the fence along an arterial or state right-of-way & 25% for local roads and must include the name and intended use of the project, project rendering, project website address, and owner or agent, the telephone number for the owner or agent, and the name and an emergency contact telephone number of the general contractor. Provide screen details with the next submittal. The City Commission must approve the use of the City Logo. (Planning). Comprehensive Plan This application supports the Comprehensive Plan by furthering the following goals: Future Land Use Element ▪ Policy 1.1.5.5 Commercial, office, employment center, and industrial land uses will be identified in accordance with the Comprehensive Plan. ▪ Policy 1.1.10.1 Innovative site design and land planning shall be permitted within these land development regulations. ▪ Policy 1.1.10.2 The permitted uses of the Comprehensive Plan shall permit the mixing of land uses consistent with land development regulations. Staff Analysis Community Development staff reviewed the proposed project to ensure the Site Plan Modification and Special Exception were consistent with the Comprehensive Plan and surrounding land uses. The LDC permits the academic school use through a Special Exception. The applicant has provided sufficient justification to demonstrate that the use will not be detrimental to the surrounding community, that it is compatible with the surrounding uses, and that it is retrofitting an area with a use that will not bring extra parking requirements, as demonstrated by their parking calculations and traffic study. In addition, the applicant proposed a minor site plan modification that includes the modification of existing parking to accommodate a drop-off area, the installation of a canopy/breeze way to connect the drop-off area to the building, and building façade modifications to open an independent entrance dedicated to the school. The applicant will provide ten (10) Green Building Initiatives to be implemented: a. High reflectance roofs (cool roofs) b. No garbage disposal c. All Energy Star appliances d. Recycling e. Florida Native Landscaping f. Low-emitting construction materials g. Low-emitting flooring h. Water-managed building materials i. Water shutoff devices j. Implementation of biophilic features indoors Budgetary Impact Approval of the Site Plan and Special Exception will enable the portion of the building to be retrofitted, expanding the City’s tax roll and collection of applicable impact fees as described in this staff report, as well as building permit fees. Recommendation Based on the review conducted by the Community Development Department, the proposed Site Plan Modification and Special Exception are consistent with the applicable provisions of the Land Development Code and the City’s Comprehensive Plan. The applicant has demonstrated compliance with the required evaluation criteria, and staff finds that the proposed development will not result in adverse impacts to surrounding properties, public facilities, or the general welfare of the community. Accordingly, Community Development staff recommends approval of the Site Plan and Special Exception, provided that all Tier II comments are conditions of approval. RESOLUTION NO. 2026-_____ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, APPROVING THE SITE PLAN MODIFICATION (SP-005- 99MOD3), AND SPECIAL EXCEPTION (SE-030-26) TO ALLOW A SECONDARY SCHOOL OPERATION WITH DROP-OFF LANE, SUBMITTED BY THE OWNER, DCOTA DEVELOPMENT CO LP, FOR THE PROPERTY GENERALLY LOCATED AT 1815-1855 GRIFFIN ROAD, IN THE CITY OF DANIA BEACH, PROVIDING FOR CONDITIONS; CONFLICT; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, pursuant to Chapter 28, entitled "Land Development Code" (the "LDC"), of Part 6, entitled "Development Review Procedures and Requirements," Article 635, entitled "Site Plans" of the City Code of Ordinances (the "City Code") provides that site plan approval is required as a condition to the issuance of a building permit; and WHEREAS, the Applicant has requested site plan modification approval for the proposed construction of a drop-off area at the west entry of the existing building (SP-005-99MOD3) for property legally described in Exhibit "A", a copy of which is made a part of and incorporated into this Resolution by this reference; and WHEREAS, Chapter 28, entitled "Land Development Code" (the "LDC"), of Part 6, entitled "Development Review Procedures and Requirements," Article 630-50, entitled “Special Exception” of the City Code of Ordinances (The “City Code”) provides that Special Exception approval is required as a condition to allow an academic school; and WHEREAS, the Applicant has requested a Special Exception to permit the school use (SE-030-26); and WHEREAS, the City Commission conducted a duly noticed public hearing in accordance with Article 610 of the LDC; and WHEREAS, the Applicant has provided sufficient justification demonstrating compliance with the approval criteria to meet the requirements of the Code; and WHEREAS, the City's Staff Report analyzes the applicant's request based on the criteria 2 RESOLUTION #2026-_____ WHEREAS, the City Commission finds that the approval of the proposed Site Plan Modification (SP-005-99MOD3) and Special Exception (SE-030-26) to permit the future development of the subject property pursuant to and consistent with the attached site plan provided as Exhibit "B", a copy of which is made a part of and incorporated into this resolution; and WHEREAS, the City Commission finds that the approval of the Site Plan Modification (SP-005-99MOD) and Special Exception (SE-030-26) are consistent with the City's Land Development Code and Comprehensive Plan and will protect the health, safety, and welfare of the residents of the City, and furthers the purpose, goals, objectives, and policies of the Comprehensive Plan. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above "Whereas" clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That pursuant to Chapter 28 "Land Development Code," Part 6 "Development Review Procedures and Requirements," Article 635 "Site Plans," the following Site Plan Modification (SP-005-99MOD), attached as Exhibit "B” is approved. Section 3. That the special exception application (SE-030-26) is approved. Section 4. That the approvals granted by this Resolution are subject to the Applicant's compliance with the following conditions: 1. Additional comments may apply and will need to be addressed prior to Building Permit approval. (Engineering) 2. All outside agency permits are required at the time of permitting. (Engineering) 3. Approval shall be based on a maximum enrollment of 240 students and the arrival, dismissal, access, and circulation procedures described in the approved Traffic Impact Study and Traffic Operations Plan. Any change to those assumptions shall be submitted to the City for review and approval. (Traffic) 4. All student drop-off and pick-up queues shall be contained within the DCOTA property. The school shall manage arrivals and dismissal so that vehicles do not queue on Griffin Road, block the site entrance or adjacent drive aisles, or interfere with access to or from the property. (Traffic) 3 RESOLUTION #2026-_____ 5. School-related traffic shall not cause queues or other disruptions that impede access to or from the I-95 on- or off-ramps at Griffin Road. If the City observes or documents such a disruption during arrival or dismissal, the applicant shall promptly implement interim traffic management measures and submit a corrective operations plan for City review and approval. The applicant shall implement the approved measures at its expense, in coordination with FDOT and other agencies having jurisdiction where required. Measures may include on-site queue management, adjusted arrival or dismissal procedures, or other improvements supported by an updated operational analysis. (Traffic) 6. In the case that site operations differ significantly (delays and/or queues greater than 10% to the ones reported in the study). The applicant shall submit a traffic operations assessment using observed enrollment, arrival and dismissal schedules, updated turning movements, and queue lengths during the school’s busiest arrival and dismissal periods. The assessment shall document conditions at the site entrance, Griffin Road, and the nearby I-95 ramp connections and recommend corrective measures if school- related queues or delays disrupt those facilities. (Traffic) 7. The developer is required to participate in the City’s Public Art program by payment into the City’s Public Art fund or through payment and installation of public art. The amount of the Public Art Fund contribution is dependent on the value of the construction, which will be established at the time of building permit submittal per Code Sec. 811-70. (Planning) 8. Provide the estimated construction value for development so that impact fees may be determined. (Planning). 9. Per Code Sec.8-7 Commercial properties under construction are required to provide security to fencing with screening showing project rendering covering at least 75% of the length of the fence along an arterial or state right-of-way & 25% for local roads and must include name and intended use of the project, project rendering, project website address, and owner or agent, the telephone number for the owner or agent, and the name and an emergency contact telephone number of the general contractor. Provide screen details with the next submittal. The City Commission must approve the use of the City Logo. (Planning). 4 RESOLUTION #2026-_____ Section 6. That pursuant to Section 635-100 "Expiration of Site Plans" of the Land Development Code, the Site Plan Modification (SP-005-99MOD) and Special Exception (SE- 030-26) approval shall automatically expire and become null and void unless the Applicant files a complete building permit application with construction drawings for the improvements shown on the Site Plan, within eighteen (18) months from the date of this Resolution. Section 7. That the issuance of a development permit by a municipality does not in any way create any right on the part of an Applicant to obtain a permit from a state or federal agency, and does not create any liability on the part of the municipality for issuance of the permit if the Applicant fails to obtain requisite approvals or does not fulfill the obligations imposed by a state or federal agency, or undertakes actions that result in a violation of state or federal law. Section 8. That the associated Planning & Zoning Division Staff Report prepared for the above application(s) is incorporated into this resolution as findings of fact. Section 9. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 10. That this Resolution shall be effective 10 days after passage. PASSED AND ADOPTED on __________________, 2026. Motion by __________________________, second by ___________________________. FINAL VOTE ON ADOPTION: Unanimous ____ Yes No Commissioner Joyce L. Davis ____ ____ Commissioner Luis Rimoli ____ ____ Commissioner Marco Salvino ____ ____ Vice Mayor Diana Fahmie ____ ____ Mayor Colman W. Ryan ____ ____ SIGNATURES ON THE FOLLOWING PAGE 5 RESOLUTION #2026-_____ ATTEST: 6 RESOLUTION #2026-_____ EXHIBIT A PARCEL “A”, “DESIGN CENTER OF THE AMERICAS’, ACCORDING TO THE PLAT THEREOF, AS RECORDED IN PLAT BOOK 119 PAGE 32 OF THE OFFICIAL RECORDS OF BROWARD COUNTY, FLORIDA, BERING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHEAST CORNER OF SAID PARCEL, “A” THENCE SOUTH 01° 40’56” EAST, 1981.06 FEET TO THE SOUTHEAST CORNER OF SAID PARCEL “A”, THENCE SOUTH 87° 26’35” WEST, 569.59 FEET TO THE SOUTHWEST CORNER OF PARCEL “A” BEING A POINT ON THE EAST RIGHT-OF-WAY LINE OF INTERSTATE 95; THENCE ALONG SAID EAST RIGHT-OF-WAY LINE NORTH 04°15’00” WEST, 232.82 FEET TO A POINT ON A CURVE CONCAVE WESTERLY, SAID CURVE HAVING A RADIUS OF 5,929.65 FEET; THENCE CONTINUE ON ALONG SAID EAST RIGHT-OF-WAY LINE NORTHERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 10°36’26” AN ARC DISTANCE OF 1,097.76 FEET TO A POINT OF TANGENCY; THENCE CONTINUE ALONG SAID EAST RIGHT-OF-WAY LINE NORTH 14°51’26” WEST 689.45 FEET TO THE NORTHWEST CORNER OF PARCEL “A”, THENCE NORTH 88°19’04” EAST, 887.22 FEET TO THE POINT OF BEGINNING. SAID LANDS LYING AND BEING IN BROWARD COUNTY FLORIDA, CONTAINING 1,366,739 SQUARE FEET (31.3760 ACRES), MORE OR LESS. 3/$1 6 6+$//&203/<:,7+$//5(48,5(0(1762)7+()/25,'$),5(35(917,21&2'(7+(',7,21 ,1&/8',1*1)3$$1'1)3$(',7,216$6$0(1'(' $1'7+(%52:$5'&2817<$0(1'0(176 727+()/25,'$),5(35(9(17,21&2'( $33/,&$%/(&2'(6 7+(',7,21  )/25,'$%8,/',1*&2'( )%& %8,/',1* 7+(',7,21  )%&7(6735272&2/6)25+,*+9(/2&,7<+855,&$1(=21(6 7+(',7,21  )%&$&&(66,%,/,7< 7+(',7,21  )%&0(&+$1,&$/ 7+(',7,21  )%&3/80%,1* 7+(',7,21  )%&(1(5*<&216(59$7,21 7+(',7,21  )/25,'$),5(35(9(17,21&2'( 1)3$$1'1)3$ 1)3$1$7,21$/(/(&75,&&2'( 1)3$1$7,21$/),5($/$50 1)3$67$1'$5')25,167$//$7,212)635,1./(56<67(06 1)3$67$1'$5')25,167$//$7,212)67$1'3,3($1'+26(6<67(0 1)3$67$1'$5')259(17,/$7,21&21752/$1'),5(3527(&7,212)&200(5&,$/ &22.,1*23(5$7,216 2+$1$,167,787(2+$1$,167,787( 7(1$177(1$17 ,03529(0(17,03529(0(17 3URMHFW1R '&27$ %8,/',1* 7(1$17 $ 1 7+(2+$1$.$3/$1,167,787(:,//%(5(129$7,1*7+(6+2:522063$&( $77(1$17$$77+('&27$&(17(5*5,)),152$',1'$1,$%($&+ 7+,6,6$7(1$17,03529(0(17352-(&7,1&/8'(6$678'(17'5232)) &,5&/($77+(:(67(175$1&($&$123<$77+((175<6,'(:$/.6:,//%( 3$572)7+(7(1$176&23($1<(;7(5,2502',),&$7,216 :,1'2:6$1' '2256$''(' :,//%(3(50,77('%<7+(/$1'/25'(/(9$7,216+$9( %((1$''(')25,1)250$7,2121/<726+2:7+('(6,*1&+$5$&7(52) 7+(%8,/',1*:,//127%($/7(5(' 6)*5266/($6$%/($5($7(1$17,03529(0(17 =21,1*6((0$3 352-(&7'(6&5,37,21 /$1'&$/&8/$7,21 6)6) 6) $&5(6 &*(1(5$/&200(5&,$/ &855(1786(6+2:5220 352326('86(6(&21'$5<6&+22/('8&$7,21 63(&,$/(;&(37,215(48,5(' %8,/',1*,6)8//<635,1./(5(' ,52& && &50+ & '5 6,7( )/22'=21($( 1*9'  1$9'  5 $ % & '             6HDO     0(55,//$11520$1,. $5 *5,)),152$' '$1,$%($&+)/ 7(1$17$ 6+((77,7/( 6+((7180%(5 '5$:1%< &+(&.('%< &RS\ULJKW F E\675$7867($0//& $OO5LJKWV5HVHUYHG '(6,*1'(/,9(5$%/( ,668('$7( 352-(&71 35 2 - ( & 7  $ ' ' 5 ( 6 6  35 2 - ( & 7  1 $ 0 (                   $ 0 $ X W R G H V N  ' R F V    2 K D Q D  , Q V W L W X W H  . D S O D Q  $ F D G HP \              2 + $ 1 $  . $ 3 / $ 1  U Y W 2+$1$,167,787( &29(56+((7 * 67 67   3(50,76(7 2+ $ 1 $  , 1 6 7 , 7 8 7 (  5 ( 1 2 9 $ 7 , 2 1     * 5 , ) ) , 1  5 2 $ '   7 ( 1 $ 1 7   $     '$ 1 , $  % ( $ & +   ) /       (//(5'5,9(68,7( )257/$8'(5'$/()/ $5&+,7(&7 675$786 (OOHU'ULYH6XLWH )RUW/DXGHUGDOH)/   &,9,/(1*,1((56 5266(1*,1((5,1*,1& 68QLYHUVLW\'ULYH6XLWH /DXGHUGDOHE\WKH6HD)/   6758&785$/(1*,1((5 6$$'(/+$*(&2168/7,1*(1*,1((56,1& 1:WK$YHQXH6XLWH )RUW/DXGHUGDOH)/   0(3(1*,1((56 &07$$662&,$7(6//& +DYDUG&LUFOH6XLWH :HVW3DOP%HDFK)/   /$1'6&$3($5&+,7(&7 1$7$/,$%$55$1&25/$ 6RXWK$QGUHZV$YHQXH6XLWH )RUW/DXGHUGDOH)/   /$1'6859(<256 .&, :HVW&\SUHVV&UHHN5RDG6XLWH )RUW/DXGHUGDOH)/   $33/,&$%/(&2'(6& /2&$7,210$3127726&$/(& /(*$/'(6&5,37,21$ 6&23(2):25.$ 352-(&77($0$ 3$5&(/ 3+$6(6$1'2)'&27$ $3257,212)3$5&(/$'(6,*1&(17(52)7+($0(5,&$6$&&25',1*727+(3/$77+(5(2)$65(&25'(',13/$7%22.3$*( 2)7+(38%/,&5(&25'62)%52:$5'&2817<)/25,'$%(,1*025(3$57,&8/$5/<'(6&5,%('$6)2//2:6 %(*,11,1*$77+(1257+($67&251(52)6$,'3$5&(/$7+(1&(6287+ƒ ($67$/21*7+(($67/,1(2)6$,'3$5&(/$$ ',67$1&(2))((77+(1&(6287+ƒ :(67)((772$32,17217+(:(67(5/</,1(2)6$,'3$5&(/$6$,'/,1( $/62%(,1*7+(($67(5/</,0,7('$&&(665,*+72):$</,1(2),17(567$7( 67$7(52$'12 7+(1&(1257+ƒ :(67 $/21*6$,':(67(5/</,1($1'6$,'/,0,7('$&&(66/,1($',67$1&(2))((77+(1&(1257+ƒ ($67$/21*7+(1257+ /,1(2)6$,'3$5&(/$$',67$1&(2))((7727+(32,172)%(*,11,1* 3$5&(/ 3+$6(2)'&27$ $3257,212)3$5&(/$'(6,*1&(17(52)7+($0(5,&$6$&&25',1*727+(3/$77+(5(2)$65(&25'(',13/$7%22.3$*( 2)7+(38%/,&5(&25'62)%52:$5'&2817<)/25,'$%(,1*025(3$57,&8/$5/<'(6&5,%('$6)2//2:6 &200(1&($77+(1257+($67&251(52)6$,'3$5&(/$7+(1&(6287+ƒ ($67$/21*7+(($67/,1(2)6$,'3$5&(/$$ ',67$1&(2))((7727+(32,172)%(*,11,1*7+(1&(&217,18(6287+ƒ ($67$/21*6$,'($67/,1(7+(1&(6287+ƒ  :(67)((772$32,17217+($5&2)$1217$1*(17&859(&21&$9(727+(:(67+$9,1*$5$',862))((7 6$,'32,17$/62%(,1*217+(:(67/,1(2)3$5&(/$2)6$,'3/$7$1'6$,'32,17$/62%(,1*217+(($67(5/</,0,7('$&&(66 5,*+72):$</,1(2),17(567$7( 67$7(52$'12 $66+2:121)'270$36(&7,217+(1&(1257+:(67(5/<$/21* 7+($5&2)6$,'&859(7+528*+$&(175$/$1*/(2)ƒ $1$5&',67$1&(2))((77+(1&(1257+ƒ :(67 $/21*6$,':(67(5/</,1($1'6$,'5,*+72):$</,1($',67$1&(2))((77+(1&(1257+ƒ ($67)((7727+( 32,172)%(*,11,1* 3$5&(/ 3+$6(2)'&27$ $3257,212)3$5&(/$$1'1:1'675((7'(6,*1&(17(52)7+($0(5,&$6$&&25',1*727+(3/$77+(5(2)$65(&25'(',1 3/$7%22.3$*(2)7+(38%/,&5(&25'62)%52:$5'&2817<)/25,'$%(,1*025(3$57,&8/$5/<'(6&5,%('$6)2//2:6 &200(1&($77+(1257+($67&251(52)6$,'3$5&(/$7+(1&(6287+ƒ ($67$/21*7+(($67/,1(2)6$,'3$5&(/$$ ',67$1&(2))((7727+(32,172)%(*,11,1*7+(1&(&217,18(6287+ƒ ($67$/21*6$,'($67/,1($',67$1&(2) )((77+(1&(6287+ƒ :(67$/21*7+(6287+5,*+72):$</,1(2)1:1'675((7$66+2:1216$,'3/$7$ ',67$1&(2))((772$32,17217+(($67(5/</,0,7('$&&(665,*+72):$</,1(2),17(567$7( 67$7(52$'12 $6 6+2:121)'270$36(&7,217+(1&(1257+ƒ :(67$/21*7+($)25(0(17,21('5,*+72):$</,1($',67$1&( 2))((772$32,17217+($5&2)$7$1*(17&859(727+(/()7&21&$9(727+(6287+:(67+$9,1*$5$',862) )((77+(1&(1257+(5/<$1'1257+:(67(5/<$/21*7+($)25(0(17,21('5,*+72):$</,1($1'7+($5&2)6$,'&859( 7+528*+$&(175$/$1*/(2)ƒ $1$5&',67$1&(2))((772$32,172)7$1*(1&<7+(1&(1257+ƒ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ƒ :(67$/21*7+(1257+/,1(2)6$,' 1:$',67$1&(2))((77+(1&(6287+ƒ ($673$5$//(/:,7+$1')((7:(672)7+(($67%281'$5<2)6$,' 1257+:(6721(48$57(5 1: $',67$1&(2))((7727+(32,172)%(*,11,1*2)6$,'&(17(5/,1(217+(6287+5,*+72) :$</,1(2)*5,)),152$'7+(1&(&217,18(6287+ƒ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±8WLOLW\(DVHPHQWV $IRRWZLGHHDVHPHQWLQWKH1RUWKZHVW2QH4XDUWHU 1: RI6HFWLRQ7RZQVKLS6RXWK5DQJH(DVW%URZDUG&RXQW\)ORULGDWKHFHQWHUOLQHRI ZKLFKLVGHVFULEHGDVIROORZV &RPPHQFLQJDWWKH1RUWKHDVWFRUQHURIVDLG1:RI6HFWLRQWKHQFH6RXWKƒ (DVWDORQJWKH(DVWERXQGDU\RIVDLG1:DGLVWDQFHRI IHHWWKHQFH6RXWKƒ :HVWIHHWWRWKH3RLQWRI%HJLQQLQJRIVDLGFHQWHUOLQHWKHQFH1RUWKƒ :HVWIHHWWKHQFH1RUWKƒ :HVW IHHWWKHQFH1RUWKƒ (DVWIHHWWRWKH3RLQWRI7HUPLQDWLRQRIVDLGFHQWHUOLQH 72*(7+(5:,7+DIRRWZLGHHDVHPHQWWKHFHQWHUOLQHRIZKLFKLVGHVFULEHGDVIROORZV &RPPHQFLQJDWWKHDIRUHPHQWLRQHG1RUWKHDVWFRUQHURIVDLG1:RI6HFWLRQWKHQFH6RXWKƒ (DVWDORQJWKH(DVWERXQGDU\RIVDLG1:D GLVWDQFHRIIHHWWKHQFH6RXWKƒ :HVWIHHWWRWKH3RLQWRI%HJLQQLQJRIVDLGFHQWHUOLQHWKHQFH1RUWKƒ :HVWIHHWWRWKH 3RLQWRI7HUPLQDWLRQRIVDLGFHQWHUOLQHRQWKH6RXWKULJKWRIZD\OLQHRI*ULIILQ5RDG 72*(7+(5:,7+DIRRWZLGHHDVHPHQWWKHFHQWHUOLQHRIZKLFKLVGHVFULEHGDVIROORZV &RPPHQFLQJDWWKHDIRUHPHQWLRQHG1RUWKHDVWFRUQHURIVDLG1:RI6HFWLRQWKHQFH6RXWKƒ (DVWDORQJWKH(DVWERXQGDU\RIVDLG1:D GLVWDQFHRIIHHWWRWKH3RLQWRI%HJLQQLQJRIVDLGFHQWHUOLQHWKHQFH6RXWKƒ :HVWIHHWWKHQFH6RXWKƒ :HVWIHHWWKHQFH :HVWHUO\DORQJWKHDUFRIDWDQJHQWFXUYHWRWKH6RXWKKDYLQJDUDGLXVRIIHHWDGHOWDRIƒ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³$´'HVLJQ&HQWHURIWKH$PHULFDVDFFRUGLQJWRWKHSODWWKHUHRIDVUHFRUGHGLQ3ODW%RRN3DJHRIWKH3XEOLF5HFRUGVRI%URZDUG &RXQW\)ORULGDIXUWKHUGHVFULEHGDVIROORZV &RPPHQFHDWWKH1RUWKHDVWFRUQHURIVDLG3DUFHO³$´WKHQFH6RXWKƒ (DVWDORQJWKH(DVWOLQHRIVDLG3DUFHO³$´IHHWWRWKH3RLQWRI%HJLQQLQJ WKHQFH6RXWKƒ :HVWIHHWWRDSRLQWRQWKH:HVWOLQHRIVDLG3DUFHO³$´WKHQFH1RUWKƒ :HVWDORQJVDLG:HVWOLQHIHHWWKHQFH 1RUWKƒ (DVWIHHWWRDSRLQWRQWKH(DVWOLQHRIVDLG3DUFHO³$´WKHQFH6RXWKƒ (DVWDORQJVDLG(DVWOLQHIHHWWRWKH3RLQWRI %HJLQQLQJ  (/,0,1$7(&/$665220/$%,17(5,25&255,'25%/,1'6  (/,0,1$7(&/$665220*/$63$57,7,2163529,'('225$1' :,'(*/$666,'(/,7(  (/,0,1$7((9(5<27+(5'),;785(,1&255,'256  '('8&772'(027+(352027,21$/2)),&($77+(2876(72)7+(352-(&7127'(/$<(''(02$66+2:1 ,1'5$:,1*6  '(/(7(3(5,0(7(5&(,/,1*62)),76,1&/$6652206/$%6$1'(;7(1'&(,/,1**5,'72287(5:$//6  '(/(7((0(5*(1&<6+2:(56+2:(53$1$1'6+2:(5'5$,1.((3(<(:$6+67$7,21$1'$662&,$7(' 3/80%,1*  &+$1*(%$7+52203$57,7,21$/67232:(5&2$7('67,//3$57,7,216 $/7(51$7(6)2535,&,1* 5(9 '$7( '(6&5,37,21   '5&5(9 Merrill Romanik Digitally signed by Merrill Romanik DN:E=mromanik@synalovski.com, CN=Merrill Romanik, G=Merrill, SN=Romanik, O="SYNALOVSKI ROMANIK SAYE, LLC", S=Florida, C=USDate: 2026.10.07 16:20:07-04'00' 6+((7,1'(; 6KHHW ʋ 6+((71$0('5 &  6 8 % 0 , 7 7 $ /          '5 &  5 ( 9             ,6 6 8 (  ) 2 5  3 ( 5 0 , 7           '5 &  5 ( 9               '5 &  5 ( 9               *(1(5$/ * &29(56+((7 Ɣ Ɣ Ɣ Ɣ * 6+((7,1'(; Ɣ Ɣ Ɣ * *(1(5$/127(6 Ɣ Ɣ * *(1(5$/352-(&7,1)250$7,21 Ɣ Ɣ 7232*5$3+,&6859(< 2) %281'$5<6859(< Ɣ Ɣ Ɣ 2) %281'$5<6859(< Ɣ Ɣ Ɣ 2) %281'$5<6859(< Ɣ Ɣ Ɣ 2) %281'$5<6859(< Ɣ Ɣ Ɣ &,9,/ & 3$9,1**5$',1*$1''5$,1$*(3/$1 Ɣ Ɣ Ɣ Ɣ & 3$9(0(170$5.,1*6$1'6,*1$*(3/$1 Ɣ Ɣ Ɣ Ɣ & 9(+,&/(75$&.,1*$1$/<6,63/$1 Ɣ Ɣ Ɣ Ɣ /$1'6&$3( / 75((',6326,7,213/$1 Ɣ Ɣ Ɣ / /$1'6&$3(3/$1 Ɣ Ɣ Ɣ / /$1'6&$3(127(6 '(7$,/6 Ɣ Ɣ Ɣ $5&+,7(&785$/ $6 $5&+,7(&785$/6,7(3/$1 Ɣ Ɣ Ɣ Ɣ $6 (1/$5*('$5&+,7(&785$/6,7(3/$1 Ɣ Ɣ Ɣ Ɣ Ɣ $6 3(59,28696,03(59,286 Ɣ Ɣ Ɣ Ɣ /6 /,)(6$)(7<3/$1 Ɣ $ $5&+,7(&785$/'(02/,7,213/$1 Ɣ $ 29(5$//*5281')/2253/$1 Ɣ Ɣ Ɣ Ɣ $ *5281')/2253/$13$57$ Ɣ $ *5281')/2253/$13$57% Ɣ $ (;7(5,25%8,/',1*(/(9$7,216 Ɣ Ɣ Ɣ Ɣ $ (1/$5*('3/$16$1',17(5,25(/(9$7,216 Ɣ $ (1/$5*('3/$16$1',17(5,25(/(9$7,216 Ɣ $ (1/$5*('3/$16$1',17(5,25(/(9$7,216 Ɣ $ (1/$5*('3/$16$1',17(5,25(/(9$7,216 Ɣ $ (1/$5*('3/$16$1',17(5,25(/(9$7,216 Ɣ $ (1/$5*('3/$16$1',17(5,25(/(9$7,216 Ɣ $ (1/$5*('3/$16$1',17(5,25(/(9$7,216 Ɣ $ (1/$5*('3/$16$1',17(5,25(/(9$7,216 Ɣ $ (1/$5*('3/$16$1',17(5,25(/(9$7,216 Ɣ $ (1/$5*('3/$16$1',17(5,25(/(9$7,216 Ɣ $ (1/$5*('3/$16$1',17(5,25(/(9$7,216 Ɣ $ (1/$5*('3/$16$1',17(5,25(/(9$7,216 Ɣ $ *5281')/2255()/(&7('&(,/,1*3/$1 Ɣ $ *5281')/2255&33$57$ Ɣ $ *5281')/2255&33$57% Ɣ $ 5&3'(7$,/6 Ɣ $ 5&3'(7$,/6 Ɣ $ :$//7<3(6 Ɣ $ :$//7<3(6 '(7$,/6 Ɣ $ 3/$1'(7$,/6 Ɣ $ 0,//:25.'(7$,/6 Ɣ $ 0,//:25.'(7$,/6 Ɣ $ 0,//:25.'(7$,/6 Ɣ $ 6,*1$*( $ '2256&+('8/( Ɣ $ '225'(7$,/6 Ɣ $ ,17(5,25),1,6+)/2253/$1 Ɣ $ ,17(5,25)851,785(3/$1 Ɣ $ ),1,6+6&+('8/($1''(7$,/6 Ɣ $ 6&+('8/(6$1''(7$,/6 Ɣ 3/80%,1* 3 *(1(5$/127(63/80%,1* Ɣ 3' *5281')/225'(02/,7,213/$13/80%,1* Ɣ 3 3$57,$/*5281')/2253/$13$57$:$67( Ɣ 3 3$57,$/*5281')/2253/$13$57%:$67( Ɣ 3 3$57,$/*5281')/2253/$13$57$'20(67,& Ɣ 3 3$57,$/*5281')/2253/$13$57%'20(67,& Ɣ 3 5,6(56$1,7$5<:$67( 9(173$57$3/80%,1* Ɣ 3 5,6(56$1,7$5<:$67( 9(173$57%3/80%,1* Ɣ 3 5,6(5'20(67,&:$7(53$57$3/80%,1* Ɣ 3 5,6(5'20(67,&:$7(53$57%3/80%,1* Ɣ 3 5,6(5/3*$63/80%,1* Ɣ 3 '(7$,/63/80%,1* Ɣ 3 '(7$,/63/80%,1* Ɣ 3 6&+('8/(63/80%,1* Ɣ ),5(3527(&7,21 ) *(1(5$/127(6),5(3527(&7,21 Ɣ )' *5281')/225'(02/,7,213/$1),5(3527(&7,21 Ɣ ) 3$57,$/*5281')/2253/$13$57$),5( 3527(&7,21 Ɣ ) 3$57,$/*5281')/2253/$13$57%),5( 3527(&7,21 Ɣ ) '(7$,/6),5(3527(&7,21 Ɣ 6+((7,1'(; 6KHHW ʋ 6+((71$0('5 &  6 8 % 0 , 7 7 $ /          '5 &  5 ( 9             ,6 6 8 (  ) 2 5  3 ( 5 0 , 7           '5 &  5 ( 9               '5 &  5 ( 9               0(&+$1,&$/ 0 *(1(5$/127(6+9$& Ɣ 0 6,7(3/$1+9$& Ɣ 0' *5281')/225'(02/,7,213/$1+9$& Ɣ 0 29(5$//*5281')/2253/$1+9$& Ɣ 0 3$57,$/*5281')/2253/$13$57$+9$& Ɣ 0 3$57,$/*5281')/2253/$13$57%+9$& Ɣ 0 '(7$,/6+9$& Ɣ 0 6&+('8/(6+9$& Ɣ 0 &21752/6+9$& Ɣ 0 &21752/6+9$& Ɣ (/(&75,&$/ ( *(1(5$/127(6(/(&75,&$/ Ɣ ( /,*+7,1*),;785(6&+('8/( Ɣ ( 6,7(3/$1(/(&75,&$/ Ɣ (' *5281')/225'(02/,7,213/$1(/(&75,&$/ Ɣ ( 29(5$//*5281')/2253/$1/,*+7,1* Ɣ ( 3$57,$/*5281')/2253/$13$57$/,*+7,1* Ɣ ( 3$57,$/*5281')/2253/$13$57%/,*+7,1* Ɣ ( 29(5$//*5281')/2253/$132:(5 Ɣ ( 3$57,$/*5281')/2253/$13$57$32:(5 Ɣ ( 3$57,$/*5281')/2253/$13$57%32:(5 Ɣ ( 3$57,$/*5281')/2253/$13$57$32:(5 0(&+$1,&$/ Ɣ ( 3$57,$/*5281')/2253/$13$57%32:(5 0(&+$1,&$/ Ɣ ( 29(5$//*5281')/2253/$1),5($/$50 Ɣ ( 3$57,$/*5281')/2253/$13$57$),5($/$50 Ɣ ( 3$57,$/*5281')/2253/$13$57%),5($/$50 Ɣ ( 29(5$//*5281')/2253/$1(0(5*(1&< 3+2720(75,&6 Ɣ ( 21(/,1(',$*5$0(/(&75,&$/ Ɣ ( ),5($/$505,6(5',$*5$0(/(&75,&$/ Ɣ ( '(7$,/6(/(&75,&$/ Ɣ ( '(7$,/6(/(&75,&$/ Ɣ ( 3$1(/6&+('8/(6(/(&75,&$/ Ɣ ( 3$1(/6&+('8/(6(/(&75,&$/ Ɣ ( 3$1(/6&+('8/(6(/(&75,&$/ Ɣ 7(&+12/2*< 7 *(1(5$/127(6$1'6<0%2//(*(1' Ɣ 7 29(5$//*5281')/2253/$17(&+12/2*< Ɣ 7 3$57,$/*5281')/2253/$13$57$7(&+12/2*< Ɣ 7 3$57,$/*5281')/2253/$13$57%7(&+12/2*< Ɣ 7 (1/$5*('3/$167(&+12/2*< Ɣ 7 5,6(5',$*5$07(&+12/2*< Ɣ 7 '(7$,/67(&+12/2*< Ɣ 7 '(7$,/67(&+12/2*< Ɣ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errill Romanik Digitally signed by Merrill Romanik DN: E=mromanik@synalovski.com,CN=Merrill Romanik, G=Merrill, SN=Romanik, O="SYNALOVSKI ROMANIK SAYE, LLC", S=Florida, C=USDate: 2026.10.07 16:21:50-04'00'    * + - . ) 123$5.,1*),5(/$1(123$5.,1*),5(/$1( 123$5.,1 *  )1' 6 &2 &2 &2 &2 ))  (        :9 123 $5.,1 * &  &  &  &  &    &    &   &                             &%                           '2   61 ° 4 ' / 2 ° ° = ' 9 . + 8 2( °      ° + 2  #           -( -( -( -(                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               &. 3 7 0% 673 673 673 ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^^^ ^^ ^ ^^^ ^ ^^^^^^^^ ^ ^ ^ ^ ^ ^ 123$5.,1*),5(/$1(123$5.,1*),5(/$1( 123$5.,1 *  )1' 6 &2 &2 &2 &2 ))  (        :9 123 $5.,1 * &  &  &  &  &    &    &   &                             &%                           '2   61 ° 4 ' / 2 ° ° = ' 9 . + 8 2( °      ° + 2  #           -( -( -( -(                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               &. 3 7 0% 673 673 673 ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^^^ ^^ ^ ^^^ ^ ^^^^^^^^ ^ ^ ^ ^ ^ ^ ':': ': 123$5.,1*),5(/$1(123$5.,1*),5(/$1( 123$5.,1 *  )1' 6 &2 &2 &2 &2 ))  (        :9 123 $5.,1 * &  &  &  &  &    &    &   &                             &%                           '2   61 ° 4 ' / 2 ° ° = ' 9 . + 8 2( °      ° + 2  #           -( -( -( -(                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               &. 3 7 0% 673 673 673 ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^^^ ^^ ^ ^^^ ^ ^^^^^^^^ ^ ^ ^ ^ ^ ^ +$7&+ ,1',&$7(6 :25.$5($ 1*9'  1$9'                                  &$56,148(8( 75$)),&&,5&8/$7,21$7'5232))3,&.83 6)    $5&+,7(&785$/6,7(3/$1$ 1 5 $ % & '             6HDO     0(55,//$11520$1,. $5 *5,)),152$' '$1,$%($&+)/ 7(1$17$ 6+((77,7/( 6+((7180%(5 '5$:1%< &+(&.('%< &RS\ULJKW F E\675$7867($0//& $OO5LJKWV5HVHUYHG '(6,*1'(/,9(5$%/( ,668('$7( 352-(&71 35 2 - ( & 7  $ ' ' 5 ( 6 6  35 2 - ( & 7  1 $ 0 (                   $ 0 $ X W R G H V N  ' R F V    2 K D Q D  , Q V W L W X W H  . D S O D Q  $ F D G HP \              2 + $ 1 $  . $ 3 / $ 1  U Y W 2+$1$,167,787( $5&+,7(&785$/ 6,7(3/$1 $6 67 67   3(50,76(7 2+ $ 1 $  , 1 6 7 , 7 8 7 (  5 ( 1 2 9 $ 7 , 2 1     * 5 , ) ) , 1  5 2 $ '   7 ( 1 $ 1 7   $     '$ 1 , $  % ( $ & +   ) /       (//(5'5,9(68,7( )257/$8'(5'$/()/ 5(9 '$7( '(6&5,37,21   '5&5(9 Merrill Romanik Digitally signed by Merrill RomanikDN: E=mromanik@synalovski.com,CN=Merrill Romanik, G=Merrill, SN=Romanik, O="SYNALOVSKI ROMANIK SAYE, LLC", S=Florida, C=USDate: 2026.10.07 16:22:17-04'00' 123$5.,1*),5(/$1(123$5.,1*),5(/$1( 12  3 $ 5 . , 1 * &2 12  3 $ 5 . , 1 * -( 95 ; : . ° 2 / 4 + ° 5 45 8 : . ° 2 / 4 + ° 5  ':': '1 ': 123$5.,1*),5(/$1(123$5.,1*),5(/$1( 12  3 $ 5 . , 1 * &2 12  3 $ 5 . , 1 * -( 95 ; : . ° 2 / 4 + ° 5 45 8 : . ° 2 / 4 + ° 5  1(::$/.:$< (;,67,1*&$123<$1' 3$9(5:$/.:$< +$7&+ ,1',&$7(6 :25.$5($ 352326('&$123<  +7%<27+(56 352326('&$123< (;7(16,21 +7 5(48,5(' 63$&(6 (;,67,1*3$5.,1*/27 12&+$1*(6 /2$',1* '80367(5                                                                         3$5.,1*7$%8/$7,216)*/$ 35(9,2866+2:5220 63$&(3(56) 63$&(6 6(&21'$5<6&+22/ 63$&(3(5678'(1760$;678'(176 63$&(6 '5232))0,18663$&(6 +&63$&(6$''(' 5(48,5(' 35(9,2867(1$17 2+$1$.$3/$1 0,1,080180%(52)5(48,5('$&&(66,%/(3$5.,1*63$&(63(57$%/()%&$&&(66,%,/,7<&2'(  +&63$&(6 ),567)/225 (;,67,1*'&27$3$5.,1*&$/&8/$7,216 6(&21')/225 7+,5')/225 )2857+)/225               2&&83,(' 6+2:5220 6) 2&&83,(' 2)),&(6) 6) 6+2:52203$5.,1*5(48,5(0(17 &855(17/<2&&83,('6+2:522063$&(63$&(6 2)),&(3$5.,1*5(48,5(0(176 &855(17/<2&&83,('2)),&(63$&(63$&(6 727$/&855(17/<5(48,5('3$5.,1*63$&(6 63$&(6 63$&(6 63$&(6 727$/&855(17/<$9$,/$%/(3$5.,1*63$&(6 &855(17(;&(66$9$,/$%/(3$5.,1*63$&(6)25$'',7,21$/ 7(1$176    (1/$5*('$5&+,7(&785$/6,7(3/$1$ 1 5 $ % & '             6HDO     0(55,//$11520$1,. $5 *5,)),152$' '$1,$%($&+)/ 7(1$17$ 6+((77,7/( 6+((7180%(5 '5$:1%< &+(&.('%< &RS\ULJKW F E\675$7867($0//& $OO5LJKWV5HVHUYHG '(6,*1'(/,9(5$%/( ,668('$7( 352-(&71 35 2 - ( & 7  $ ' ' 5 ( 6 6  35 2 - ( & 7  1 $ 0 (                   $ 0 $ X W R G H V N  ' R F V    2 K D Q D  , Q V W L W X W H  . D S O D Q  $ F D G HP \              2 + $ 1 $  . $ 3 / $ 1  U Y W 2+$1$,167,787( (1/$5*(' $5&+,7(&785$/ 6,7(3/$1 $6 67 67   3(50,76(7 2+ $ 1 $  , 1 6 7 , 7 8 7 (  5 ( 1 2 9 $ 7 , 2 1     * 5 , ) ) , 1  5 2 $ '   7 ( 1 $ 1 7   $     '$ 1 , $  % ( $ & +   ) /       (//(5'5,9(68,7( )257/$8'(5'$/()/ 5 $ % & '             6HDO     0(55,//$11520$1,. $5 *5,)),152$' '$1,$%($&+)/ 7(1$17$ 6+((77,7/( 6+((7180%(5 '5$:1%< &+(&.('%< &RS\ULJKW F E\675$7867($0//& $OO5LJKWV5HVHUYHG '(6,*1'(/,9(5$%/( ,668('$7( 352-(&71 35 2 - ( & 7  $ ' ' 5 ( 6 6  35 2 - ( & 7  1 $ 0 (                   $ 0 $ X W R G H V N  ' R F V    2 K D Q D  , Q V W L W X W H  . D S O D Q  $ F D G HP \              2 + $ 1 $  . $ 3 / $ 1  U Y W 2+$1$,167,787( (1/$5*(' $5&+,7(&785$/ 6,7(3/$1 $6 67 67   3(50,76(7 2+ $ 1 $  , 1 6 7 , 7 8 7 (  5 ( 1 2 9 $ 7 , 2 1     * 5 , ) ) , 1  5 2 $ '   7 ( 1 $ 1 7   $     '$ 1 , $  % ( $ & +   ) /       (//(5'5,9(68,7( )257/$8'(5'$/()/   5(9 '$7( '(6&5,37,21   '5&5(9   '5&5(9   '5&5HYLVLRQ 5(9 '$7( '(6&5,37,21   '5&5(9   '5&5(9   '5&5HYLVLRQ Merrill Romanik Digitally signed by Merrill Romanik DN: E=mromanik@synalovski.com, CN=Merrill Romanik, G=Merrill, SN=Romanik, O="SYNALOVSKI ROMANIK SAYE, LLC", S=Florida, C=USDate: 2026.10.07 16:22:40-04'00' 123$5.,1*),5(/$1(123$5.,1*),5(/$1( 12 3 $ 5 . , 1 * 12 3 $ 5 . , 1 * 7.,-9ª4+ ª < & > %10% 32 6 54 ° ) 5 4 ) /) ( +( +( 0% 0 123$5.,1*),5(/$1(123$5.,1*),5(/$1( ':': '1 ': 123$5.,1*),5(/$1(123$5.,1*),5(/$1( 12 3 $ 5 . , 1 * 12 3 $ 5 . , 1 * 7.,-9ª4+ ª < & > %10% 32 6 54 ° ) 5 4 ) /) ( +( +( 0% 0 123$5.,1*),5(/$1(123$5.,1*),5(/$1(123$5.,1*),5(/$1(123$5.,1*),5(/$1( 12 3 $ 5 . , 1 * 12 3 $ 5 . , 1 * ,-9ª4+ª < & > 0% 67 3 673 67 3 ':': '1 ': 123$5.,1*),5(/$1(123$5.,1*),5(/$1( 12 3 $ 5 . , 1 * 12 3 $ 5 . , 1 * ,-9ª4+ª < & > 0% 67 3 673 67 3$5($ 6) $5($ 6) $5($ 6) $5 ( $     6 ) 3(59,2866) ,03(59,2866) 3(59,2866) ,03(59,2866) $5($ 6) $5($ 6) $5($ 6) $5 ( $     6 ) $5($ 6) $5($ 6) $5($ 6) $5($ 6) $5($ 6) $5($ 6) $5($ 6)$5($ 6)    (;,67,1* 1 1 5 $ % & '             6HDO     0(55,//$11520$1,. $5 *5,)),152$' '$1,$%($&+)/ 7(1$17$ 6+((77,7/( 6+((7180%(5 '5$:1%< &+(&.('%< &RS\ULJKW F E\675$7867($0//& $OO5LJKWV5HVHUYHG '(6,*1'(/,9(5$%/( ,668('$7( 352-(&71 35 2 - ( & 7  $ ' ' 5 ( 6 6  35 2 - ( & 7  1 $ 0 (                   $ 0 $ X W R G H V N  ' R F V    2 K D Q D  , Q V W L W X W H  . D S O D Q  $ F D G HP \              2 + $ 1 $  . $ 3 / $ 1  U Y W 2+$1$,167,787( 3(59,28696 ,03(59,286 $6 67 67   3(50,76(7 2+ $ 1 $  , 1 6 7 , 7 8 7 (  5 ( 1 2 9 $ 7 , 2 1     * 5 , ) ) , 1  5 2 $ '   7 ( 1 $ 1 7   $     '$ 1 , $  % ( $ & +   ) /       (//(5'5,9(68,7( )257/$8'(5'$/()/    352326('  5(9 '$7( '(6&5,37,21   '5&5(9   '5&5HYLVLRQ Merrill Romanik Digitally signed by Merrill Romanik DN: E=mromanik@synalovski.com, CN=Merrill Romanik, G=Merrill, SN=Romanik, O="SYNALOVSKI ROMANIK SAYE, LLC", S=Florida, C=US Date: 2026.10.07 16:23:14-04'00' 83 83 83 83   0% 67 3 67 3 67 3 (% (% (% (% (% ': ' : '1 ': 0% 67 3 67 3 67 3 (% (% (% (% (%  * + - . 75$16 9$8/7 6:,7&+ *($5  7(/  )$1 3803 5220  67$,560(1  :20(1  (/(&  +80$1,7,(6   +80$1,7,(6 678'< %5($.287 6&,(1&( 6&,(1&(  6&,(1&( &21)(5(1&( 5220  (/(&50 +80$1,7,(6   +80$1,7,(6   0$7+  $570$7++80$1,7,(6  :20(16 $'$ 5(675220 0(16$'$ 5(675220 0$7+ 67(0 ,76725$*( 1(7:25. &23<  )$&8/7<  5RRP  5RRP  5RRP  5RRP  6725$*(6725$*( 67$)):& 67$)):&  -$1 6) ) 0$ 7 & + / , 1 ( 6( (  $ $ 6     0$ 7 & + / , 1 ( 6( (  $ $ 6     (;,67,1*/2$',1* $5($:'80367(5 75$6+ 5(&<&/,1* $57 &21)50 :20(16 %$7+5220 0(16 %$7+5220 2)),&(  2)),&(  :$,7,1*  67$)) 0(&+$1,&$/ 0(&+ +80$1,7,(6  67$*(  .,7&+(1 %5($.5220  2872) 6&23(  &255,'25  &255,'25 &255,'25  &255,'25  &255,'25 &255,'25 &255,'25   &255,'25  1 5 $ % & '             6HDO     0(55,//$11520$1,. $5 *5,)),152$' '$1,$%($&+)/ 7(1$17$ 6+((77,7/( 6+((7180%(5 '5$:1%< &+(&.('%< &RS\ULJKW F E\675$7867($0//& $OO5LJKWV5HVHUYHG '(6,*1'(/,9(5$%/( ,668('$7( 352-(&71 35 2 - ( & 7  $ ' ' 5 ( 6 6  35 2 - ( & 7  1 $ 0 (                   $ 0 $ X W R G H V N  ' R F V    2 K D Q D  , Q V W L W X W H  . D S O D Q  $ F D G HP \              2 + $ 1 $  . $ 3 / $ 1  U Y W 2+$1$,167,787( 29(5$//*5281' )/2253/$1 $ 67 67   3(50,76(7 2+ $ 1 $  , 1 6 7 , 7 8 7 (  5 ( 1 2 9 $ 7 , 2 1     * 5 , ) ) , 1  5 2 $ '   7 ( 1 $ 1 7   $     '$ 1 , $  % ( $ & +   ) /          29(5$//*5281')/2253/$1$ (//(5'5,9(68,7( )257/$8'(5'$/()/ 5 $ % & '             6HDO     0(55,//$11520$1,. $5 *5,)),152$' '$1,$%($&+)/ 7(1$17$ 6+((77,7/( 6+((7180%(5 '5$:1%< &+(&.('%< &RS\ULJKW F E\675$7867($0//& $OO5LJKWV5HVHUYHG '(6,*1'(/,9(5$%/( ,668('$7( 352-(&71 35 2 - ( & 7  $ ' ' 5 ( 6 6  35 2 - ( & 7  1 $ 0 (                   $ 0 $ X W R G H V N  ' R F V    2 K D Q D  , Q V W L W X W H  . D S O D Q  $ F D G HP \              2 + $ 1 $  . $ 3 / $ 1  U Y W 2+$1$,167,787( 29(5$//*5281' )/2253/$1 $ 67 67   3(50,76(7 2+ $ 1 $  , 1 6 7 , 7 8 7 (  5 ( 1 2 9 $ 7 , 2 1     * 5 , ) ) , 1  5 2 $ '   7 ( 1 $ 1 7   $     '$ 1 , $  % ( $ & +   ) /       (//(5'5,9(68,7( )257/$8'(5'$/()/ 5(9 '$7( '(6&5,37,21   '5&5(9 5(9 '$7( '(6&5,37,21   '5&5(9 Merrill Romanik Digitally signed by Merrill Romanik DN:E=mromanik@synalovski.com, CN=Merrill Romanik, G=Merrill, SN=Romanik, O="SYNALOVSKI ROMANIK SAYE, LLC", S=Florida, C=US Date: 2026.10.07 16:23:40-04'00'            0 ),567)/225   6(&21')/225    7+,5')/225   )2857+)/225   0$,1522)   723$5$3(7   1(:(175< '2256 (;,67,1*:,1'2:672 5(0$,1 (;,67,1*:,1'2:6$1''225 725(0$,1 1(::,1'2:6 1(::,1'2:6 1(::,1'2:6(;,67,1*:,1'2:672 5(0$,1 352326(' &$123< 1(::,1'2:6$1' '2256  ),567)/225   6(&21')/225   *+-. 7+,5')/225   )2857+)/225   0$,1522)   723$5$3(7   1(::,1'2:6(;,67,1*:,1'2:6 725(0$,1 (;,67,1*:,1'2:6 725(0$,1 (;,67,1*:,1'2:6 725(0$,1 1(::,1'2: $7(;,67,1*'225 ) 352326(' &$123<                   :(67(/(9$7,21$    1257+(/(9$7,21& 352326('&$123<'    &$123<(/(9$7,21&   &$123<3/$1& (/(9$7,219,(:3/$19,(: $;219,(:35((1*,1((5(' $/80,180&$123< 5 $ % & '             6HDO     0(55,//$11520$1,. $5 *5,)),152$' '$1,$%($&+)/ 7(1$17$ 6+((77,7/( 6+((7180%(5 '5$:1%< &+(&.('%< &RS\ULJKW F E\675$7867($0//& $OO5LJKWV5HVHUYHG '(6,*1'(/,9(5$%/( ,668('$7( 352-(&71 35 2 - ( & 7  $ ' ' 5 ( 6 6  35 2 - ( & 7  1 $ 0 (                   $ 0 $ X W R G H V N  ' R F V    2 K D Q D  , Q V W L W X W H  . D S O D Q  $ F D G HP \              2 + $ 1 $  . $ 3 / $ 1  U Y W 2+$1$,167,787( (;7(5,25%8,/',1* (/(9$7,216 $ 67 67   3(50,76(7 2+ $ 1 $  , 1 6 7 , 7 8 7 (  5 ( 1 2 9 $ 7 , 2 1     * 5 , ) ) , 1  5 2 $ '   7 ( 1 $ 1 7   $     '$ 1 , $  % ( $ & +   ) /       (//(5'5,9(68,7( )257/$8'(5'$/()/ )25,1)221/<81'(56(3(5$7(3(50,7 5(9 '$7( '(6&5,37,21   '5&5(9 Merrill Romanik Digitally signed by Merrill Romanik DN: E=mromanik@synalovski.com, CN=Merrill Romanik, G=Merrill, SN=Romanik, O="SYNALOVSKI ROMANIK SAYE, LLC", S=Florida, C=US Date: 2026.10.07 16:24:10-04'00' 10 " ' ' ' ' PR O J E C T A D D R E S S : 18 5 5 G R I F F I N R O A D DA N I A B E A C H , F L 3 3 0 0 4 TE N A N T # A - 1 6 0 2025-1178.0000 DES: DABH DRW: RRCHK: RK 1" = 20'-0" CIVIL SITE PLAN1 N 1800 ELLER DRIVE, SUITE 500 FORT LAUDERDALE, FL 33316 RE V : D A T E : N O T E : CERTIFICATE OF AUTHORIZATION No. 9808 3325 S. UNIVERSITY DRIVE, SUITE 111 DAVIE, FLORIDA 33328 (954)318-0624 (954)358-0190 FAX THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY ROBERT J. ROSS, P.E. ON THE DATE ADJACENT TO THE SEAL. SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. Date:10/1/2026 © 2025 STRATUS® RE V : D A T E : N O T E : R A B C D 1 2 3 4 5 6 7 8 1 2 3 4 Seal 5 6 7 8 1800 ELLER DRIVE, SUITE 500 FORT LAUDERDALE, FL 33316 CI V I L S I T E P L A N 09/23/2026 DRC 2 SUBMITTAL 1855 GRIFFIN ROAD DANIA BEACH, FL 33004 TENANT #A-160 SH E E T N A M E : DE L T A 1 0 8 / 0 6 / 2 0 2 6 D R C R E S U B M I T T A L R E V I S I O N S DE L T A 2 0 9 / 0 3 / 2 0 2 6 D R C 2 R E S U B M I T T A L R E V I S I O N S DE L T A 3 0 9 / 2 3 / 2 0 2 6 D R C R E V I S I O N S NOTES: STM X X PA V I N G , G R A D I N G A N D D R A I N A G E P L A N C-1 EEE EE EE ' ' '' ' E EEEE'' ' E ' E E E ' ' ' ' EEEEE ' EEEEE E ' E EEEEE EEE ' EE 'E EEEEEEE EE EEEE ' Digitally signed by Robert J Ross DN: C=US, O=ROSS ENGINEERING INC, dnQualifier=A01410D0000018DA3D4 4AFD00018D7D, CN=Robert J Ross Reason: I am approving this document with my legally binding signature Location: Miami FL Date: 2026-10-07 17:26:56 Foxit PhantomPDF Version: 9.7.5 Robert J Ross NO PARKING FIRE LANE PR O J E C T A D D R E S S : 18 5 5 G R I F F I N R O A D DA N I A B E A C H , F L 3 3 0 0 4 TE N A N T # A - 1 6 0 2025-1178.0000 DES: DABH DRW: RRCHK: RK 1" = 20'-0" CIVIL SITE PLAN1 N 1800 ELLER DRIVE, SUITE 500 FORT LAUDERDALE, FL 33316 RE V : D A T E : N O T E : CERTIFICATE OF AUTHORIZATION No. 9808 3325 S. UNIVERSITY DRIVE, SUITE 111 DAVIE, FLORIDA 33328 (954)318-0624 (954)358-0190 FAX THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY ROBERT J. ROSS, P.E. ON THE DATE ADJACENT TO THE SEAL. SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. Date:10/1/2026 © 2025 STRATUS® RE V : D A T E : N O T E : R A B C D 1 2 3 4 5 6 7 8 1 2 3 4 Seal 5 6 7 8 1800 ELLER DRIVE, SUITE 500 FORT LAUDERDALE, FL 33316 CI V I L S I T E P L A N 09/23/2026 DRC 2 SUBMITTAL 1855 GRIFFIN ROAD DANIA BEACH, FL 33004 TENANT #A-160 SH E E T N A M E : DE L T A 1 0 8 / 0 6 / 2 0 2 6 D R C R E S U B M I T T A L R E V I S I O N S DE L T A 2 0 9 / 0 3 / 2 0 2 6 D R C 2 R E S U B M I T T A L R E V I S I O N S DE L T A 3 0 9 / 2 3 / 2 0 2 6 D R C R E V I S I O N S UNIVERSAL SYMBOL OF ACCESSIBILITY NTS PARKING BY DISABLED PERMIT ONLY $250 FINE F.S. 318.18 GRADE ACCESSIBLE PARKING SIGN NTS HANDICAP PARKING (TYPICAL) NTS PA V E M E N T M A R K I N G A N D S I G N A G E C-2 NOTES: Digitally signed by Robert J Ross DN: C=US, O=ROSS ENGINEERING INC, dnQualifier=A01410D0000018DA3D4 4AFD00018D7D, CN=Robert J Ross Reason: I am approving this document with my legally binding signature Location: Miami FL Date: 2026-10-07 17:27:28 Foxit PhantomPDF Version: 9.7.5 Robert J Ross NO PARKING FIRE LANE 26.673 2.874 16.831 Federal Coach Spirit III BusOverall Length 26.673ftOverall Width 8.005ftOverall Body Height 9.153ftMin Body Ground Clearance 1.067ftTrack Width 8.005ftLock-to-lock time 5.00sCurb to Curb Turning Radius 31.824ft PR O J E C T A D D R E S S : 18 5 5 G R I F F I N R O A D DA N I A B E A C H , F L 3 3 0 0 4 TE N A N T # A - 1 6 0 2025-1178.0000 DES: DABH DRW: RRCHK: RK 1" = 20'-0" CIVIL SITE PLAN1 N 1800 ELLER DRIVE, SUITE 500 FORT LAUDERDALE, FL 33316 RE V : D A T E : N O T E : CERTIFICATE OF AUTHORIZATION No. 9808 3325 S. UNIVERSITY DRIVE, SUITE 111 DAVIE, FLORIDA 33328 (954)318-0624 (954)358-0190 FAX THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY ROBERT J. ROSS, P.E. ON THE DATE ADJACENT TO THE SEAL. SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. Date:10/1/2026 © 2025 STRATUS® RE V : D A T E : N O T E : R A B C D 1 2 3 4 5 6 7 8 1 2 3 4 Seal 5 6 7 8 1800 ELLER DRIVE, SUITE 500 FORT LAUDERDALE, FL 33316 CI V I L S I T E P L A N 09/23/2026 DRC 2 SUBMITTAL 1855 GRIFFIN ROAD DANIA BEACH, FL 33004 TENANT #A-160 SH E E T N A M E : DE L T A 1 0 8 / 0 6 / 2 0 2 6 D R C R E S U B M I T T A L R E V I S I O N S DE L T A 2 0 9 / 0 3 / 2 0 2 6 D R C 2 R E S U B M I T T A L R E V I S I O N S DE L T A 3 0 9 / 2 3 / 2 0 2 6 D R C R E V I S I O N S PROPOSED PASSENGER VAN DIMENSION DETAIL VE H I C L E T R A C K I N G A N A L Y S I S C-3 Digitally signed by Robert J Ross DN: C=US, O=ROSS ENGINEERING INC, dnQualifier=A01410D0000018DA3D4 4AFD00018D7D, CN=Robert J Ross Reason: I am approving this document with my legally binding signature Location: Miami FL Date: 2026-10-07 17:27:56 Foxit PhantomPDF Version: 9.7.5 Robert J Ross 8' - 0 " 0" 8' - " 8' - 0 " 15'-10" 15'-11""11" 27 ' - 8 " """ ' 2 ' 2 48'-10" 23 ' 1 1 " 23 ' 1 1 " 23 ' - 1 1 " 23 ' - 1 1 " 17 ' - 4 " 17 ' 4 " 17 ' 4 " '- 7 - 4 717 18 ' - 0 " -0 " -0 " 18 ' 18 ' 10'-0"0"0"0"001 15 9 ' - 2 " - " -6"6-662'--662266222 18'-4"1 ' 10'-1"1 "-10'1 2 3 4 5 6 8 9 11 12 7 10 1 E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE 7.14 ' GAS GA S © 2025 STRATUS® RE V : DA T E : N O T E : R A B C D 1 2 3 4 5 6 7 8 1 2 3 4 Seal 5 6 7 8 1800 ELLER DRIVE, SUITE 500 FORT LAUDERDALE, FL 33316 06/23/2026 DRC SUBMITTAL 1855 GRIFFIN ROAD DANIA BEACH, FL 33004 TENANT #A-160 SH E E T N A M E : 18 5 5 G R I F F I N R O A D DA N I A B E A C H , F L 3 3 0 0 4 TE N A N T # A - 1 6 0 PR O J E C T A D D R E S S : B R L A natalia@b-rla.com Fort Lauderdale FL. 33315 office: 954.224.0432 LA# 6666983 LA 6666983 STATE OFREGI STEREDLANDSCAPEARCH I TECT NATALIA B.BARRANCO LFORIDA IP-2.0 SC H E M A T I C I R R I G A T I O N P L A N 1" = 20'-0" IRRIGATION SCHEMATIC PLAN WITHIN WORK AREA1 N LIMIT OF WORK LIMIT OF WORK IRRI ATI N N TE T NTRA T R ADJUST THE EXISTING SYSTEM TO REMOVE AND INCLUDE NEW LAND APE AREA . ALL PR P ED TREE T HAVE A B BBLER HE CITY OF DANIA BEACH REQUIRES IRRIGATION SYSTEMS TO ACHIEVE 100% COVERAGE WITH A 50% OVERLAP TO ENSURE EFFI IENT WATER DI TRIB TI N AND MINIMIZE DRY P T . F SPECIFIC GUIDELINES, IT'S BEST TO CONSULT THE LOCA B ILDIN R DE MPLIAN E DIVI I N. ONTRACTOR TO ENSURE THE EXISTING SYSTEM IS IN GOO RKIN RDER AND HA A W RKIN RAIN EN R. 2 2 0 9 . 0 8 . 2 0 2 6 C I T Y C O M M E N T S 0 TORO 12' (TYP.) : QUARTER HALF THREE QUARTERS FULL TORO 4' X 15' END STRIP TORO 4' X 30' CENTER STRIP TORO 9' X 18' SIDE STRIP MATERIALS: x INTERMATIC TIMER 110 X 24 VAC (VERIFY EXISTING) x IRRITROL 1" SOLENOID VALVE WITH ATMOSPHERIC VACUUM BREAKER (VERIFY EXISTING) x K-RAIN INDEX VALVE (VERIFY EXISTING) x RAIN-BIRD RAIN SENSOR (VERIFY EXISTING) x DUAL CHECK VALVE AT METER (VERIFY EXISTING) x ALL ZONE PIPES TO BE PVC SCHEDULE 160, ALL SLEEVES TO BE BE PVC SCHEDULE 40 x SPRINKLERS TORO 4" 570 MIST POP-UP, TORO MIST SHRUB ADAPTER, OR RAINBIRD 5004 ROTOR SPRINKLERS TO BE CONNECTED WITH FLEXIBLE SWING PIPE WATER SOURCE x IRRIGATION METER - EXISTING INSTALLATION x ZONE PIPES TO BE COVERED WITH 4-6" OF CLEAN FILL x CONTRACTOR TO TIE INTO EXISTING SYSTEM AND SUBMIT AS BUILT TO OWNER NOTES: x PLAN IS DIAGRAMMATIC FOR CLARITY. ALL WORK IS LIMITED TO THE BOUNDS OF PROPERTY x ALL MATERIALS WILL BE INSTALLED ACCORDING TO THE CITY'S LATEST BUILDING CODE PVC PIPE SCH. 40 AS SLEEVING, TWICE THE DIAMETER OF PIPE OR WIRE BUNDLE CARRIED PLACE BELOW ALL PAVING, HARDSCAPE, ETC., AND AS DIRECTED BY OWNER'S AUTHORIZED REPRESENTATIVE.4" SLEEVE 1" M # GPM SV RS C 1" IRRIGATION METER VALVE NUMBER/ GALLONS PER MINUTE SOLENOID VALVE LOCATION RAIN SENSOR TIMER/ CONTROLLER INDEX VALVE 2" PRESSURE VACUUM BREAKER IRRIGATION KEY Irrigation to provide 100% coverage with 100% overlap BUBBLER VARIABLE 12' BMITTUB 4 1 0 . 0 6 . 2 0 2 6 B L D G . P L A N R E V I E W 0 Natalia Barranco c=US, o=Barranco rla inc, dnQualifier=A01410C00000 1976123ADD70011245B, cn=Natalia Barranco 2026.10.04 15:24:58 -04'00' CANOPYPYPNNOOPPYEXISTING CANOPYCAAN AND PAVER WALKWAYWWYAND PAV PROPOSED DROPOFFOOFPROPOSED DROPOFO PROPOSED ISLANDDDAPROPOSED ISLANA 10'x10' SIGHT TRIANGLELEAANGLLE10'x10' SIGHT TRIANGLI EXISTING LANDSCAPE TO REMAIN REMAI FF SIT 8' - 0 " 0" 8' - 15'-10" 15'-11" 27 ' - 8 " """ ' 2 ' 2 48'-10" 23 ' 1 1 " 23 ' 1 1 " 23 ' - 1 1 " 23 ' - 1 1 " 17 ' - 4 " 17 ' 4 " 17 ' 4 " 18 ' - 0 " -0 " -0 1818 -0 " 8'- 0 18 10'-0"0 00"10' 00"0"001 15 9 ' - 2 " - " -6"6-662'--662266 18'-4" 10'-1"1 "-10'1 1"" 2 3 4 5 6 8 9 11 12 7 10 1 E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE 7.14 ' GAS GA S 8-0 8-4 TOB TOB TOBTOB TOBTOB TOB TOB TOB TOBTOBTOB TOB TOBTOB TOB TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOB TOB TOB TOBTOBTOBTOB TOB TOBTOB TOB TOBTOBTOB TOBTOBTOB TOB TOBTOBTOB TOBTOB TOB TOBTOBTOB TOBTOBTOB TOBTOBTOB TOB TOB TOB TOB TOB TOB TOB TOB TOBTOB TOB TOB TOB TOB TOB TOBTOBTOBTOBTOB E EEEE E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E P.O . B . E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE 5005.963 CKPT 3.92'3.91' 3.85'3.83' 6.7'2.7'2.0' 2.0'2.5'6.5' 6.1'2.8'2.0' 2.0'2.7'6.4' 6.6' 3.1' 2.0' 2.0'4.15' 3.98'3.98' 4.15'3.0' 2.9'2.3'6.6'1.8'2.0' 2.1'2.0'2.0' 2.3'2.0'2.0' 2.0' 2.2'2.4'2.0' 2.0' 2.5'2.5'2.0' 2.0' 2.5' 2.0'2.9' 2.7' 2.0'2.0'2.5' 2.9' 2.0' 2.7' 2.0'2.0'2.7' 2.8' 2.0' 2.0'2.9' 2.7' 2.0' 2.0'3.2'3.1' 2.0'2.0'3.5' 2.9' 2.0' 2.0'2.7'3.7' 6.0'2.5'2.0' 2.0' 2.0'2.4' 7.3' 6.7'2.6'2.0' 6.5' -5.0' -5.6'-4.9'-3.9'-3.8'-2.4' -7.6'-10.1'-11.8'-14.4'-16.6'-18.3' -19.1'-19.8'-20.3'-21.1' -21.3'-20.2'-21.3'-18.0' -16.1' -14.1' -10.4'-5.4'-4.4'-4.3' -3.3'-1.6'-3.3' -0.7'-1.6' -1.8'-1.6'-2.0'-2.0'-1.9' -28.2'-28.0' -28.4' -28.4' -28.4'-26.8'-26.2'-27.3'-27.3'-27.3'-27.0'-26.8'-26.3'-26.0'-24.6'-22.9'-24.1'-22.1'-24.4'-26.4'-26.5'-26.3'-26.6'-26.5'-26.4'-26.2'-26.2'-27.1'-26.2' -26.2' -26.5' -26.3'-24.8'-23.6'-23.6'-22.3'-21.0'-19.4'-17.8'-15.5' -13.2'-10.6'-1.5' -4.4' -4.7'-8.0'-13.1'-17.7'-19.0'-21.3' -22.6'-22.7'-22.6'-22.2'-25.7'-26.2'-26.8'-27.4'-27.4'-27.3'-27.5'-27.6'-27.5'-27.6'-27.6'-27.8' -27.9'-28.0'-28.2'-29.0'-29.1'-28.9' -28.6' -28.5'-28.4' -28.2'-28.2'-28.5' -28.8' -29.0'-29.6'-29.7'-29.2' -28.6'-28.3'-28.3' -30.4' -29.7' -28.6' -28.4'-28.5'-28.8'-29.1'-28.8' -28.1'-27.9' -28.3' -28.9' -29.4'-29.3'-28.9'-28.0'-27.9'-26.8'-26.3'-26.7' -26.9' -26.8'-26.9'-27.1'-27.4'-27.5'-27.4'-27.1'-26.5'-26.2'-25.4'-24.9'-24.5'-22.6'-22.9'-19.0'-13.3'-14.2' -8.2'-5.6' -3.8'-10.5' -13.3'-20.1' -18.9' -24.3'-28.7'-29.0'-29.1'-29.0'-28.8' -28.2' -28.5' -28.1'-28.1' -27.1'-27.9'-30.5'-26.7'-27.5'-28.1'-28.8'-29.4'-29.6'-29.3'-29.3'-29.4' -29.0'-28.7' -28.7'-28.8'-28.7' -27.7'-27.9'-28.0'-28.5'-28.9'-28.9'-28.9'-29.2'-28.9'-28.0'-27.5'-27.5'-27.5'-27.6'-27.9'-28.2'-28.3'-28.4'-28.0'-28.2'-28.4'-28.9'-29.1'-29.3'-29.4'-29.3'-29.2'-28.4'-27.6'-27.0' -27.0' -26.7' -26.4' -26.2'-25.9'-25.5'-23.1' -22.5'-10.2' -1.6'-1.8' -5.5'-16.7' -20.7'-24.1' -24.1'-26.1'-26.1' -26.3'-25.9' -26.4'-26.5'-26.4'-26.3'-28.1' -27.6'-28.7' -29.2' -29.6'-29.6'-29.3' -28.9'-28.5'-28.5'-28.6' -28.6' -28.8' -28.7' -28.6' -28.5' -27.7' -27.1'-27.4'-28.1' -28.4' -24.5' -23.7'-22.5'-21.4'-20.4'-19.8'-19.1' -4.2'-5.5'-9.7'-10.7'-11.4'-12.3'-13.8'-13.7'-15.4'-16.8'-17.0'-18.3'-19.2'-21.2'-21.6'-22.1'-22.4'-22.1'-20.7' -20.7' -22.4' -21.8' -20.5'-23.0' -23.6' -23.4' -24.6' -23.8' -24.0' -24.7' -24.5' -22.6' -12.4'-4.3'-6.3' -3.4' -2.0'-1.7'-1.8'-2.8'-2.8'-2.3'-2.5'-2.4'-2.8'-2.8'-3.1'-3.1'-3.1'-3.2'-3.0'-3.0'-3.2'-3.3'-3.1'-3.2' -5.3'-8.4' -18.2' -10.0'-9.5' -5.7' -7.6' -4.6' -18.4'-19.4' -27.5' -26.9'-26.7' -4.2'-5.1'-6.0'-5.6'-5.6'-6.4'-5.6'-5.2'-5.9'-6.4'-6.1' -7.3' -27.0'-27.1'-26.8'-26.5' -26.6'-27.4'-26.8' -26.4' -26.4' -26.3'-25.9'-25.9'-25.4'-23.4' -20.3' -11.2' 6.1'5.1'4.0'2.9'0.7'2.0' 4.9'3.3'2.2' 3.4' 3.1'4.3' 5.3' 3.7' 4.1'5.6' 5.2'3.4' 3.0'3.6'5.1' 4.1'3.7'3.2' 3.6'5.2' 3.5'4.8' 3.3' 3.5'2.4' 7.14' 7.14 ' 7.13' 7.23' 6.80' 6.03' 5.70'6.16' 5.58'5.56' 5.64'5.77' 5.99 '6.09' 6.01'6.52' 6.74' 6.52' 6.95' 7.06' GAS GAS © 2025 STRATUS® RE V : DA T E : N O T E : R A B C D 1 2 3 4 5 6 7 8 1 2 3 4 Seal 5 6 7 8 1800 ELLER DRIVE, SUITE 500 FORT LAUDERDALE, FL 33316 06/23/2026 DRC SUBMITTAL 1855 GRIFFIN ROAD DANIA BEACH, FL 33004 TENANT #A-160 SH E E T N A M E : 18 5 5 G R I F F I N R O A D DA N I A B E A C H , F L 3 3 0 0 4 TE N A N T # A - 1 6 0 PR O J E C T A D D R E S S : B R L A natalia@b-rla.com Fort Lauderdale FL. 33315 office: 954.224.0432 LA# 6666983 LA 6666983 STATE OFREGI STEREDLANDSCAPEARCH I TECT NATALIA B.BARRANCO LFORIDA L-1.0 TR E E D I S P O S I T I O N P L A N 1" = 20'-0" LIMIT OF WORK TREE DISPOSITION PLAN PROPOSED SITE OVER EXISTING SURVEY1 N N.T.S. OVERALL SITE & LIMIT OF WORK AREA2 N TREE TOOTOTOTTOOOOEXISTING TREE TOE TEERET REMAINNINNAINMANREEMMAAI 1 N.T.S. TREE INVENTORY4 LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK # # # EXISTIN TREE WITHIN LIMIT F W RK T REMAI EXISTING TREE OUTSIDE LIMIT OF WORK/OFF SITE TO REMAIN EXISTIN TREE T REM V N.T.S. TREE SYMBOL KEY3 1 0 8 . 0 4 . 2 0 2 6 C I T Y C O M M E N T S 1 2 2 0 9 . 0 8 . 2 0 2 6 C I T Y C O M M E N T S 2 2 EXISTING SIDEWALK TO DEMO. SEE CIVILEEEECCCIVCIVVIVILLTO DEMO CODE REQUIRED MISSING TREE SEE SHEET L-2.0 FOR REQUIREMENT COMPARISON2 T.S. 2 22 2 2 2 4 1 0 . 0 6 . 2 0 2 6 B L D G . P L A N R E V I E W Natalia Barranco c=US, o=Barranco rla inc, dnQualifier=A01410C0000 01976123ADD70011245B, cn=Natalia Barranco 2026.10.04 15:25:43 -04'00' CANOPYPYPNNOOPPYEXISTING CANOPYCAAN AND PAVER WALKWAYWWYAND PAV PROPOSED DROPOFFOOFPROPOSED DROPOFO PROPOSED ISLANDDDAPROPOSED ISLANA 10'x10' SIGHT TRIANGLELEAANGLLE10'x10' SIGHT TRIANGLI EXISTING LANDSCAPE TO REMAIN REMAI 8 0 8 -0 " 888' - 0 " 0" 8' - "" 8' - 0 " 0"15'-10""01001511 1"1"15'-11"15' 11""11" 27 ' - 8 " """ ' 2 ' 2 48'-10" 23 ' 1 1 " 23 ' 1 1 " 23 ' - 1 1 " 23 ' - 1 1 " '- 4 " 4"4" 17 ' - 17 ' 17 ' '7 - 4 717 18 ' - 0 " -0 " -0 " 18 ' 18 ' 10'-0""10' 00"0"001 15 9 ' - 2 " - " 6"6"-6-662'--666666226666 "118'-4"1 48' 4"4881118111"""8 4881181848118188 10'-1"1 "-10'1 1"" 461 sfSOD 1,294 sfSOD 133 sfMS 134 sfMS 134 sfMS 6 SR 107 sfMS1"11 7SR 10 SR 1BS """ 1 IL 77NE 14MC2 87 EL 22TF 80 EL 73EL 1BS 42 NE 2 BS 46EL 2BS 46EL 2 BS 47EL 48 NE 3 SS2 44 CC2 11MC2 98EL 178PO 71 PO 1CD 2BS 4IL 11CH 6SR 2SR 12TF 40 EL 4IL 3CD 3CD 2 3 4 5 6 8 9 11 12 7 10 1 E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE 7.14 ' GAS GA S © 2025 STRATUS® RE V : DA T E : N O T E : R A B C D 1 2 3 4 5 6 7 8 1 2 3 4 Seal 5 6 7 8 1800 ELLER DRIVE, SUITE 500 FORT LAUDERDALE, FL 33316 06/23/2026 DRC SUBMITTAL 1855 GRIFFIN ROAD DANIA BEACH, FL 33004 TENANT #A-160 SH E E T N A M E : 18 5 5 G R I F F I N R O A D DA N I A B E A C H , F L 3 3 0 0 4 TE N A N T # A - 1 6 0 PR O J E C T A D D R E S S : B R L A natalia@b-rla.com Fort Lauderdale FL. 33315 office: 954.224.0432 LA# 6666983 LA 6666983 STATE OFREGI STEREDLANDSCAPEARCH I TECT NATALIA B.BARRANCO LFORIDA L-2.0 LA N D S C A P E P L A N 1" = 20'-0" LANDSCAPE PLAN WITHIN WORK AREA1 N TY B TANI AL MM N NAM A UALITY IN PLANT IZ AT RE IZ DR H NATIV TREE BS " Cal L #1 OR BETTER 15 ST X 4 HIG occoloba diversifolia " Cal L #1 OR BETTER 15 ST 4 x 2 HIG x cass n ahoon Holl .5" Cal.L #1 OR BETTER 10 h x 4 w / 3 C X1 , r en PALM SS2 abal almetto F L #1 R BETTER 12 40 x 15 HI SYMB D TY UALTIY N T PLANTED IZ AT RE IZ DR H NATIV HRUB SR erenoa re ens aw Palmetto #1 r LL B S 1 x 1 x HI , - SYMBOL COD TY B TANICAL / C MM N NAM N T ADD. INF PLANTED SIZ ATURE SIZ DR UGH HR B AREA CC2 Cassia cha manii Cha man's Senna #1 r LL B S 14 x14 24 x 24 HI , 20 o.c H Chr sobalanus icac Coco lu #1 r LL SHR B 4 x 24 20 x 20 , 30 o.c rno a ttora s Golden Cree er #1 r LL B S 14 x14 1 x 1 HI , 1 o.c 2 u en erg a cap ar s ink Muhl Grass #1 r 12" 12 x HI NATIVE/FL FRIEND o.c e ro e s exa ta oston rn #1 r 1 x 1 4 -, 24 . 4 eperomia obtusi olia a u erp an #1 r x ERMINAL H T <1 I MEDIUM WATER REQ NATIVE/FL FRIEND 1 o.c 4 ripsacum dact loide a a atc #1 r 4 x 24 HI , o.c SYMB D TY B TANI AL MM N NAM IZ AINTAIN MAT R NATIV DR H GR UND C VERS MS 508 sf imosa strigillosa unshine Mimosa 75 coverag D 1,755 sf tenota hrum secundatum t. Augustine Grass P ANT SCHEDU ELIMIT OF WORK LIMIT OF WORK 1 0 8 . 0 4 . 2 0 2 6 C I T Y C O M M E N T S 1 N TE T REVIEWER 1 F THE PR P SED LIST IS NATIVE AND FL RIDA FRIENDLY ITE RETAINS THE SAME PERVIOUS/IMPERVIOUS AREA AS PE PREVIOUSLY APPROVED PLAN I HT TRIAN LE N T N BSTR TI N BETWEEN IN HES AND FEET AB VE RAD WITHIN THE SI HT TRIAN L E E E E E 1 PE AREA MPARI N HART 2 CODE B G P C B BOL YMB LAND APE AL LATI N 2 0 9 . 0 8 . 2 0 2 6 C I T Y C O M M E N T S 0 4 1 0 . 0 6 . 2 0 2 6 B L D G . P L A N R E V I E W 0 Natalia Barranco c=US, o=Barranco rla inc, dnQualifier=A01410C0000 01976123ADD70011245B, cn=Natalia Barranco 2026.10.04 15:26:17 -04'00' © 2025 STRATUS® RE V : DA T E : N O T E : R A B C D 1 2 3 4 5 6 7 8 1 2 3 4 Seal 5 6 7 8 1800 ELLER DRIVE, SUITE 500 FORT LAUDERDALE, FL 33316 06/23/2026 DRC SUBMITTAL 1855 GRIFFIN ROAD DANIA BEACH, FL 33004 TENANT #A-160 SH E E T N A M E : 18 5 5 G R I F F I N R O A D DA N I A B E A C H , F L 3 3 0 0 4 TE N A N T # A - 1 6 0 PR O J E C T A D D R E S S : B R L A natalia@b-rla.com Fort Lauderdale FL. 33315 office: 954.224.0432 LA# 6666983 LA 6666983 STATE OFREGI STEREDLANDSCAPEARCH I TECT NATALIA B.BARRANCO LFORIDA L-3.0 LA N D S C A P E N O T E S & D E T A I L S LARGE TREE 1" = 1'-0" STRAPS POSITIONED BETWEEN 1/2 TO 2/3 OF TREE HEIGHT SAFETY FLAGS STRAPPING STRAPS SECURELY FASTENED TO ANCHORS ANCHORS SPACED AT 120 APART 1X1/2X 1/2X STRAPS SECURELY FASTENED TO TREE 10 % PLANTING PIT 2 TIMES THE ROOTBALL EXISTING SOIL BACKFILLED WITH CLEAN 50% SAND/ 50% MUCK SOIL MIX MULCH ARSENIC FREE SOIL BERM TO HOLD WATER TREE CANOPY STRAPS ANCHORS TREE TRUNK 120 ° TOP OF ROOTBALL APPROXIMATELY 10% ABOVE SURROUNDING GRADE. 1 P-CO-BRL-03 GROUNDCOVER 3/4" = 1'-0" PLAN SECTION VIEW EQ.EQ. 2-3" THICK LAYER OF MULCH1 FINISHED GRADE2 MODIFIED SOIL. DEPTH VARIES. (SEE SPECIFICATIONS FOR SOIL MODIFICATION). 3 EXISTING SOIL4 GROUNDCOVER PLANTS TO BE TRIANGULARLY SPACED 5 MULCH6 PAVEMENT7 NOTES: 1- SEE PLANTING LEGEND FOR GROUNDCOVER SPECIES, SIZE, AND SPACING DIMENSION. 2- SMALL ROOTS (1/4" OR LESS) THAT GROW AROUND, UP, OR DOWN THE ROOT BALL PERIPHERY ARE CONSIDERED A NORMAL CONDITION IN CONTAINER PRODUCTION AND ARE ACCEPTABLE HOWEVER THEY SHOULD BE ELIMINATED AT THE TIME OF PLANTING. ROOTS ON THE PERIPHERY CAN BE REMOVED AT THE TIME OF PLANTING. (SEE ROOT BALL SHAVING CONTAINER DETAIL). 3- SETTLE SOIL AROUND ROOT BALL OF EACH GROUNDCOVER PRIOR TO MULCHING.URBAN TREE FOUNDATION © 2014 OPEN SOURCE FREE TO USE 6" M I N 2 FX-PLNT-FX-GROU-01 PLAN FINISH GRADE 120 120 120 FIVE BURLAP LAYERS TO PROTECT TRUNK 30 " M I N . D E P T H 30" MINIMUM DEPTH OF WOOD STAKE 2"x4"x12" WOOD BATTENS BANDS OR STRAPS NAILS BOARDS POSITIONED FACE TO FACE, NAIL BRACE SECURELY TO WOOD STAKE BELOW FINISHED GRADE STAKE INTO FIRM EXISTING SOIL 2" x 4" WOOD STAKE1 x1/2 x SOIL BERM TO HOLD WATER SAFETY FLAG MIDPOINT ON BRACE REFERENCED FROM FDOT PLANTING DETAILS. 1/ 3 T R U N K H E I G H T 2" x 4" WOOD BRACES (MINIMUM OF THREE WOOD BRACES) SPACED AT 120° APART. SAW CUT ENDS AT PROPER ANGLE TO ALLOW FOR FLUSH CONNECTION TO WOOD BATTEN. NAIL WOOD BRACES SECURELY TO WOOD BATTEN.HE I G H T M I N I M U M ARSENIC FREE MULCH 3" DEPTH MIN. SOIL BACKFILL 80% SAND / 20% MUCK MIX 2X PLANTING PIT 2 TIMES THE WIDTH OF ROOTBALL PALM BRACING 1/2" = 1'-0"P-CO-BRL-023 3" MULCH ARSENIC FREE MULTI-TRUNK TREE 1" = 1'-0" BACKFILLED WITH CLEAN 50% SAND/50% MUCK SOIL MIX AND TOP OF ROOTBALL APPROXIMATELY 10% ABOVE SURROUNDING GRADE. 1X 2X 4" x 8" SOIL BERM TO HOLD WATER 2" NYLON STRAPPING FOUR 2X4X8' STAKES @ 90DEG. 3" ARSENIC FREE MULCH 2' - 0 " 4 P-CO-BRL-04 OF FIRE ANTS. 3" MULCH ARSENIC FREE MULCHED AREAS). EDGE BETWEEN SOD, HARDSCAPE AND SOD (PROVIDE CLEAN, SMOOTH ALL MULCH SHALL BE FREE DELETERIOUS MATERIALS.) FREE OF WEEDS AND OTHER PLANTING SOIL (FINE RAKED AND NOTE: MULCH 1" = 1'-0"5 P-CO-BRL-01 DEEPROOT BARRIERS -TYPICAL USES 3/8" = 1'-0" TYPICAL USE OF UTILITY PROTECTION BARRIER MOISTURE BARRIER TYP. USE TREE ROOT BARRIER UB 18-2 TYP. USE TREE ROOT BARRIER UB 24-2 TYP. USE 6 P-CO-BRL-16 2 RCO BRR 2 0 9 . 0 8 . 2 0 2 6 C I T Y C O M M E N T S 2 4 1 0 . 0 6 . 2 0 2 6 B L D G . P L A N R E V I E W 2 Natalia Barranco c=US, o=Barranco rla inc, dnQualifier=A01410C0000 01976123ADD70011245B, cn=Natalia Barranco 2026.10.04 15:26:54 -04'00' 10" 15" 24" GAS TANK UVLT 5" 4" 4" P I P E 7.14'7.14'7.13' 7.23' 6.80' 6.03'5.70'6.16' 5.58' 5.56' 5.64' 5.77' 5.99' 6.09' 6.01' 6.52' 6.74'6.52' 6.95'7.06' CATV RISER (2) FIRC - KCI LB 6901 FCM - #1975 SMH, CO(2) N88°19'04"E (C) 887.22' Δ=10 36'26" L=1 097.76', R=5929.65' (C) S0 1 ° 4 0 ' 5 6 " E ( C ) 1 9 8 1 . 0 6 ' 5.72' 5.2 2 ' 5.6 ' 6.1 ' 5.79 ' 6.24' 6.0 1 ' 5.5 1 ' 5.8 ' 5.96'5.36' 5.6' 5.4 ' 5.62'5.12'5.11 ' 5.59' 5.4' 5.70' 5.18 '4.96 ' 5.42' 4.9'5.32' 4.84'4.69' 5.18'4.6'5.37' 4.85'4.81' 4.7 7 ' 4.7 3 ' 5.26' 4.69'4.6 7 ' 4.5 6 ' 4.65' 4.3'4.6' 5.32'4.85' 5.27' 4.82 '4.88' 5.36' 4.8'5.54' 5.06' 5.64' 5.19 '5.66 ' 5.46 ' 4.98' 5. 4 6 ' 5.53 ' 6.0 4 ' 5. 7 ' 5.34'5.86' 5.36' 5.52 ' 6.06' 5.9 ' 5.3 ' 5.69' 5.68' 5.62' 5.76' 6.04 ' 6.62'6.42' 6.19 ' 5.99 ' 6.51' 5.53'5.41' 5.90 ' 6.41'6.4 ' 5.53' 5.38' 5.85' 6.22' 5.67'6.13' 5.6 4 ' 5.81' 6.2 8 ' 6.41' 5.8 9 ' 5.2 1 ' 5.24' 5.28' 5.28' 5.7 5 ' 6.22'5.73 ' 6.1 4 ' 5.70' 5.56'6.16'5.8 ' 5.8' 5.51'6.00' 5.66' 6.27' 6.41' 5.90' 5.8 8 ' 6.48'6.0' 6.70'6.18' 6.4 7 ' 5.91 ' 5.62'6.08 ' 5.9' 6.07 ' 5.58' 5.87'5.37' 5.43'5.93 ' 5.94' 5.4 2 ' 5.0 8 ' 5.67' 5.5' 5.6 8 ' 5.1 7 '5.42' 5.94' 5.84'5.36' 5.03' 4.90' 4.86' 4.83' 5.05' 5.30' 5.46 ' 5.78' 5.38 ' 5.8 5 ' 5.85' 5.79 ' 5.30' 5.2' 5.1' 4.9 8 '5.2 8 ' 4.78 '4.8 6 ' 4.97'4.84' 4.93' 5.37' 4.91' 6.45 ' 5.9 6 ' 5.06' 5.14'5.71' 5.13' 5.24' 5.44' 5.42'5.80' 5.41' 5.13' 5.48'5.20'4.98'4.96'5.08' 5.4 5 ' 5.5 6 ' 5.57' 5.63' 5.58' 5.42'5.17' 5.15'5.37' 5.61' 5.36' 5.41'5.21'5.18'5.48' 5.7 2 ' 5.6 9 ' 5.66 ' 5.68' 5.67' 5.28' 5.00' 5.21' 5.8 0 ' 5.21' 5.14' 5.07'5.57'5.29'5.15'5.15'5.17' 5.23 ' 5.18' 5.26' 5.52'5.60' 5.29' 5.09' 5.05'5.00' 5.03' 5.14' 5.15' 5.04' 5.08'5.06' 4.96' 5.14' 5.52' 5.44' 5.49' 5.44' 5.54' 5.42' 5.38' 5.33' 5.17' 5.56' 5.51'5.60'5.71'5.95' 6.04' 5.58' 5.7' 5.8 ' 5.83'6.31' 5.8' 6.0 ' 6.48' 6.04'6. 1 7 ' 5.62' 6.0'6.50' 6.03' 5.91' 6.38'6.1' 5.8 ' 6.20 '5.72' 5.70' 6.1 8 ' 5.8' 6.10'5.63' 5.5 3 ' 5.9 8 ' 5. 4 8 ' 5.9 8 ' 5.9'6.04' 5.58' 5.50'5.99' 5.64' 6.1 6 ' 5.70 ' 6. 2 0 ' 5.42 ' 5.99 ' 5.54' 5.06 '4.85'5.32' 4.91 '4.92' 5.39'5.51' 5.03 '5.13' 5.6 3 ' 5.4 9 ' 6.0 2 ' 5.8 ' 5.46'5.99' 5.9 ' 5.22' 5.70' 6.2 4 ' 5.74' 6.2 2 ' 5.7' 6.0 ' 5.7 7 ' 6.3 2 ' 5.27' 5.78' 5.71' 5.24 '4.81' 5.26'5.27' 4.64 ' 4.82 ' 4.72' 4.78' 4.82'4.75' 5.42' 4.95 ' 5.1'5.77' 5.8 4 ' 5.32 ' 5.9 9 ' 5.44 ' 5.8 ' 5.9' 6.08' 5.56' 5.9 9 ' 5.48' 5.79 '5.26 ' 5.63'5.36'4.87' 4.75' 5.22' 5.17' 4.6 9 ' 4.86' 5.34' 5.58' 5.11' 5.69 ' 5.32'5.81 ' 5. 7 0 ' 6.21' 6.4' 6.27' 5.7 7 ' 6.0 3 ' 5.52' 6.10' 5.60 ' 5.5 2 ' 5.99'5.95' 5.44' 5.1'5.92' 5.39' 5.08'5.57'5.6 1 ' 5.0 7 ' 5.17 ' 5.06' 5.35'5.9 0 '5.6'5.2' 5.3 ' 5.2'3.9' 5.42' 5.9 9 ' 5.2 3 ' 5.95 ' 5.63' 5.12 '4.90' 5.34'5.43' 4.98' 5.43' 5.49'4.9 2 ' 7.56' 3.55' 3.55 ' 7.56' 7.69' 7.66' 7.56' 7. 5 2 ' 7.46' 3.31' 7.42'6.68' 4.02 '4.88' 6.45' 6.28'5.67' 6.20' 6.26' 5.59' 3. 0 3 ' 3.00'3.26' 3.29 ' 3.00' 5.62' 5.61 ' 5.61' 5.81' 5.8 2 ' 6.47' 6.55'6.10' 6.52' 7.02'7.54'F.F.E. = 7.84' 7.49' 7.33 ' 7.16'6.59' 6.58 ' 7.28 ' 7.6 6 ' 7.34 ' 7.0 '7.42'7.38'7.0'7.3' 7.48' UMH 7.59' 1" PIPE 7.6' PIV FDC 6. 9 ' 7.0' 6.8'7.2 1 ' 6.95 '6.5 ' 6.5' STP 7.2' 7.0 ' 6.6 7 ' 6.60' 7.2 1 ' 7.2 4 ' 7.80' 7.74 ' 7.8 4 ' 7.82' 6.05' 7.0' 7.1 ' 6.4'6.59'6.10 ' 6.04'6.53'6.4' 6.9' 7.4' 6.3' 6.3' 6.3'6.52' 5.94' 6.51'6. 0 0 '6.40' 5.8 8 ' 5.94' 6.40'6.7'7.1' 7.0 ' 6.53 ' 6.05' 6.14'6.63' 6.5'7.0 ' F.F.E. = 7.85' 6.07' 6.6' 7.0' 5.51' 6.02' 5.1 5 ' 5.60'5.52' 5.07' 5.61' 5.06' 6.5'6.3'6.58' 6.07' 6.50'5.95' 6.54'6.12' 6.16 '6.64' 6.5'7.4 ' F.F.E. = 7.83'7.4' 7.0'6.5' 6.6'6.66' 6.17' 6.23' 6.68' 6.72'6.97' 6.86'6.72'6.54' 6.7' 6.6' 6.8' 6.9' 7.1' 7.1' 7.5' 7.39' 6.9' STP6.95' 6.5' FLUME FLUME FLUME CERTIFICATE: I HEREBY CERTIFY THAT THE ATTACHED BOUNDARY & TOPOGRAPHIC SURVEY OF THE HEREON DESCRIBED PROPERTY IS DEPICTED TO THE BEST OF MY KNOWLEDGE, BELIEF, AND INFORMATION AS PREPARED UNDER MY DIRECTION ON JUNE 4, 2026. I FURTHER CERTIFY THAT THIS BOUNDARY & TOPOGRAPHIC SURVEY MEETS THE STANDARDS OF PRACTICE SET FORTH BY THE FLORIDA BOARD OF PROFESSIONAL SURVEYORS AND MAPPERS IN CHAPTER 5J-17, FLORIDA ADMINISTRATIVE CODE, PURSUANT TO SECTION 472.027, FLORIDA STATUTES, SUBJECT TO THE QUALIFICATIONS NOTED HEREON. KCI TECHNOLOGIES, INC. SURVEYORS, ENGINEERS, AND PLANNERS BY: NEWTON J. MENDONCA NETO, P.S.M. FLORIDA REGISTRATION NO. 7490 SURVEY NOTES: 1. PHYSICAL PAPER VERSIONS OF THIS SURVEY MAP OR THE COPIES THEREOF ARE NOT VALID WITHOUT THE ORIGINAL SIGNATURE AND RAISED SEAL OF A FLORIDA LICENSED PROFESSIONAL SURVEYOR AND MAPPER. ELECTRONIC VERSIONS OF THIS SURVEY MAP HAVE BEEN OFFICIALLY SIGNED AND SEALED BY NEWTON J. MENDONCA NETO ON THE DATE ADJACENT TO THE SEAL. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. 2. THE PURPOSE OF THIS SURVEY IS TO PROVIDE AN UPDATED BOUNDARY OF THE DESIGN CENTER OF AMERICA (DCOTA). 3. ADDITIONS AND/OR DELETIONS TO THIS SURVEY MAP, BY OTHER THAN THE SIGNING PARTY OR PARTIES IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF THE SIGNING PARTY OR PARTIES. 4. LANDS SHOWN HEREON WERE NOT ABSTRACTED FOR RIGHTS-OF-WAY, EASEMENTS, RESTRICTIONS, COVENANTS, OWNERSHIP, OR OTHER INSTRUMENTS OF RECORD. 5. THE "LEGAL DESCRIPTION" SHOWN HEREON WAS PREPARED BY THE SURVEYOR. 6. UNDERGROUND FOUNDATIONS WERE NOT LOCATED OR SHOWN HEREON. 7. THERE IS NO EVIDENCE THAT UNDERGROUND ENCROACHMENTS EXIST: HOWEVER, NO SUBSURFACE INVESTIGATION WAS PERFORMED TO DETERMINE IF UNDERGROUND ENCROACHMENTS ARE PRESENT. 8. IMPROVEMENTS THAT WERE OBSCURED AT THE TIME OF SURVEY WERE NOT LOCATED OR SHOWN HEREON. 9. THIS SURVEY DOES NOT IDENTIFY THE LIMITS OR EXTENT OF POTENTIAL JURISDICTIONAL BOUNDARIES. 10. DUE TO THE COMPLEXITY OF THE ZONING REGULATIONS ON THESE PROPERTIES, THE CODES, SET-BACKS, LAND USES, AND RESTRICTIONS ARE SUBJECT TO CHANGE AND INTERPRETATION AND SHOULD BE VERIFIED WITH THE APPROPRIATE GOVERNMENTAL AGENCIES. 11. DISTANCES AND ELEVATIONS SHOWN HEREON ARE IN U.S. SURVEY FEET AND DECIMAL PORTIONS THEREOF, UNLESS SHOWN OTHERWISE. 12. THE EXPECTED HORIZONTAL ACCURACY OF THE FEATURES SHOWN HEREON IS ±0.2' FOR THE LIMITS OF HARD SURFACES, SUCH AS ASPHALT, CONCRETE, CURBING, BUILDINGS, ETC. AND IS ±0.3' FOR GROUND SURFACE FEATURES, SUCH AS SURFACE FEATURES OF UTILITIES, ETC. AND IS ±0.4' FOR FEATURES PROTRUDING OUT OF THE GROUND, SUCH AS UTILITY POLES, FENCES, TREES, ETC. 13. THE SYMBOLS SHOWN IN THE LEGEND AND ON THIS MAP MAY HAVE BEEN ENLARGED OR REDUCED FOR CLARITY, AND MAY NOT DEPICT THE ACTUAL SIZE OR SHAPE OF THE FEATURES. THE EXPECTED HORIZONTAL ACCURACY OF THE SYMBOLS SHOWN ON THIS MAP IS ±0.3' FROM THE CENTER OF THE SYMBOL, UNLESS OTHERWISE NOTED. 14. THE BOUNDARY LINES SHOWN HEREON WERE ESTABLISHED BY KCI TECHNOLOGIES FROM RECOVERED MONUMENTATION ALONG THE BOUNDARY TO VERIFY THE LOCATION SHOWN IN RECORDED PUBLIC DOCUMENTS. THE EXPECTED HORIZONTAL ACCURACY OF THE BOUNDARY LINES SHOWN ON THIS MAP IS ±0.3'. 15. ELEVATIONS SHOWN HEREON ARE BASED ON THE NATIONAL GEODETIC VERTICAL DATUM OF 1929 AND SAID ELEVATIONS ARE BASED ON BENCHMARK D-239, SUPPLIED BY USC & GS ELEV.=17.382 FEET. 16. THE EXPECTED VERTICAL ACCURACY OF THE FEATURES SHOWN HEREON IS ±0.05' FOR HARD SURFACES, SUCH AS ASPHALT, CONCRETE, ETC. AND ±0.3' FOR SOFT SURFACES, SUCH AS GRASS, DIRT, MUD, ETC. 17. PIPES SIZES, DIMENSIONS AND TYPES COULD NOT BE VERIFIED DO TO STANDING WATER, DEBRIS AND OTHER OBSTRUCTIONS WITHIN THE STRUCTURES. 18. THE SCALE OF SOME FEATURES HAS BEEN EXAGGERATED FOR CLARITY. 19. GRID BEARINGS SHOWN HEREON ARE RELATIVE TO THE FLORIDA STATE PLANE COORDINATE SYSTEM, EAST ZONE, TRANSVERSE MERCATOR PROJECTION, NORTH AMERICAN DATUM OF 1983 WITH A 2011 ADJUSTMENT (NAD 83/2011), AND ESTABLISHED BY GLOBAL POSITIONING SYSTEM (GPS) - REAL TIME KINEMATIC (RTK) METHODS, USING THE TRIMBLE VIRTUAL REFERENCE STATION (VRS), HAVING A REFERENCE BEARING OF SOUTH 01°40'56" EAST, ALONG THE EAST LINE OF PARCEL "A". TO OBTAIN BEARINGS RELATIVE TO SAID EAST LINE, ROTATE THE GRID BEARINGS SHOWN HEREON 00°20'23" COUNTER CLOCK-WISE. LO C A T I O N M A P DRAINAGE MANHOLE ELECTRIC BOX METAL LIGHT POLE (ROUND) PALM TREE SANITARY MANHOLE SIGN POST TREE WATER METER WOOD LIGHT POLE (ROUND) WATER VALVE INDICATES APPROXIMATE DIRECTION. UNABLE TO DETERMINE POINT TERMINUS POINT. CB CATCH BASIN CMP CORRUGATED METAL PIPE ELEV. ELEVATION ESMT EASEMENT HDPE HIGH DENSITY POLYETHYLENE ID IDENTIFICATION INV. INVERT DMH MANHOLE DRAINAGE RCP REINFORCED CONCRETE PIPE R/W RIGHT-OF-WAY SMH SANITARY MANHOLE STMH STORM MANHOLE UNK.UNKNOWN CHAIN LINK FENCE WOOD FENCE GUARDRAIL NON-VEHICULAR ACCESS LINE RIGHT OF WAY TOP OF BANK TOE OF SLOPE CENTER LINE DRAINAGE LINE ////////////// TOB TOE D SIRC SET IRON ROD WITH CAP LB 6901 MWELL MONITORING WELL METAL LIGHT POLE (SQUARE) MONITORING WELL FDC FIRE DEPARTMENT CONNECT STP STAND PIPE UMH UNKNOWN MANHOLE LEGAL DESCRIPTION: PARCEL "A", "DESIGN CENTER OF THE AMERICAS", ACCORDING TO THE PLAT THEROF, AS RECORDED IN PLAT BOOK 119, PAGE 32 OF THE OFFICIAL RECORDS OF BROWARD COUNTY, FLORIDA, BERING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHEAST CORNER OF SAID PARCEL "A" THENCE SOUTH 01°40'56" EAST, 1,981.06 FEET TO THE SOUTHEAST CORNER OF SAID PARCEL "A"; THENCE SOUTH 87°26'35" WEST, 569.59 FEET TO THE SOUTHWEST CORNER OF PARCEL "A" BEING A POINT ON THE EAST RIGHT-OF-WAY LINE OF INTERSTATE 95; THENCE ALONG SAID EAST RIGHT-OF-WAY LINE NORTH 04°15'00" WEST, 232.82 FEET TO A POINT ON A CURVE CONCAVE WESTERLY, SAID CURVE HAVING A RADIUS OF 5,929.65 FEET; THENCE CONTINUE ALONG SAID EAST RIGHT-OF-WAY LINE NORTHERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 10°36'26" AN ARC DISTANCE OF 1,097.76 FEET TO A POINT OF TANGENCY; THENCE CONTINUE ALONG SAID EAST RIGHT-OF-WAY LINE NORTH 14°51'26" WEST, 689.45 FEET TO THE NORTHWEST CORNER OF PARCEL "A"; THENCE NORTH 88°19'04" EAST, 887.22 FEET TO THE POINT OF BEGINNING. SAID LANDS LYING AND BEING IN BROWARD COUNTY FLORIDA, CONTAINING 1,366,739 SQUARE FEET (31.3760 ACRES), MORE OR LESS. Digitally signed by Newton Jose Mendonca Neto Date: 2026.06.17 16:09:43 -04'00' 5 P.O.B. 500 5.963 CKPT 1364 4.430 FND 5.30'5.84' S0 1 ° 4 0 ' 5 6 " E ( C ) 1 9 8 1 . 0 6 ' ° Δ=10 36'26" L=1097.76', R=5929.65' (C) DRAINAGE MANHOLE ELECTRIC BOX METAL LIGHT POLE (ROUND) PALM TREE SANITARY MANHOLE SIGN POST TREE WATER METER WOOD LIGHT POLE (ROUND) WATER VALVE INDICATES APPROXIMATE DIRECTION. UNABLE TO DETERMINE POINT TERMINUS POINT. CB CATCH BASIN CMP CORRUGATED METAL PIPE ELEV. ELEVATION ESMT EASEMENT HDPE HIGH DENSITY POLYETHYLENE ID IDENTIFICATION INV. INVERT DMH MANHOLE DRAINAGE RCP REINFORCED CONCRETE PIPE R/W RIGHT-OF-WAY SMH SANITARY MANHOLE STMH STORM MANHOLE UNK. UNKNOWN CHAIN LINK FENCE WOOD FENCE GUARDRAIL NON-VEHICULAR ACCESS LINE RIGHT OF WAY TOP OF BANK TOE OF SLOPE CENTER LINE DRAINAGE LINE ////////////// TOB TOE D SIRC SET IRON ROD WITH CAP LB 6901 MWELL MONITORING WELL METAL LIGHT POLE (SQUARE) MONITORING WELL FDC FIRE DEPARTMENT CONNECT STP STAND PIPE UMH UNKNOWN MANHOLE 5.00'4.98' 5.87' 5.44' 5.06 '5.06' 6.07 ' 6.06' 5.9 2 ' 6.37' 6.27 ' 6.30 ' 6.4 2 ' 6.16' 4.94'4.97 ' 5.37' 5.08'5.10 ' 5.08' 5.07' 5.33' 5.82' 5.52'5.42' 5.44' 5.9 7 ' 6.09' 5.50' 5.51' 5.34'5.36 ' 6.02 ' 6.29' 6.33' 6.01 ' 6.5 3 ' 6.32' 6.37 ' 6.06' 6.16 ' 6. 3 2 ' 5.57' 6.14 ' 6.29' 5.77' 6.11' 5.32' 5.53' 5.91 ' 5.18'5.19' 5.12 ' 5.15' 5.52' 5.40' 5.76' 5.56' 5.18' 5.08'5.28' 5.34' 5.98' 5.29' 5.45 ' 5.44' 6.2 9 ' 5.94'5.86' 5.99' 6.1 1 ' 5.78' 5.35' 5.97' 5.16'5.19'5.17 ' 5.54' 5.21' 5.08' 5.0 2 '5.07' 5. 8 8 ' 5.08'5.19'5.09 ' 5.51'5.98' 5.39' 5.02' 5.01' 4.98' 5.10' 5.14' 5.25' 5.22' 5.40' 5.78' 5.23' 5.56' 5.34' 5.61' 5.29' 5.66' 5.63' 5.27' 5.53' 5.69' 5.85' 5.44' 5.53' 5.98' 5.75' 5.29' 5.6 5.5'4.3' 3.8 ' 3.8' 3.8' 3.5'3.7 ' 3.6'3.5'3.6' 5.0' 5.7 '4.8' 4.7' 3.7' 3.0 3.03.1 5.5' 5.3' 5.65.2 5.3 5.05.1 5.2 5.5 5.3' 4.4 ' 4.4' 5.7' 5.8'5.8' 5.4'4.2' 4.2' 4.5'4.8' 5.0' 3.7'3.6' 3.8' 3.7 ' 3.6' 5.1' 5.3'5.2' 5.5' 5.8' 5.2' 3.8 ' 3.6' 3.6' 3.03.0 3.0 3.1 3.0 7.3' 5.6 3.0 3.03.1 5.65.2 5.3 5.05.1 5.2 5.5 3.03.0 3.0 3.1 3.0 20575.202CB 5.96' 5.64' 5.35' 5.35' 5.31' 5.66' 5.28' 5.32' 5.31'5.33' 5.65' 5.82' 5.88' 6.11' 6.06' 5.87' 5.81' 5.75' 5.49' 5.40' 5.32' 5.39'5.31'5.28' 5.26' 5.20' 5.20' 5.17' 5.20' 5.13' 5.18' 5.37' 5.44' 5.93' 5.52' 5.43' 5.89 ' 5.07' 5.07' 5.35' 5.40' 5.34' 4.94' 6.0 3 ' 5.45'5.4 8 ' 5.23 ' 5.94' 5.95'5.57' 5.64' 5.62'5.45'5.46 ' 5.44' 5.79 ' 5.81 ' 5.26 '4.97' 4.98' 5.85' 5.79 ' 5.34' 5.42' 5.31' 4.98 ' 5.01'4.92' 5.87' 5.48'5.35' 5.77' 4.92' 5.04' 5.09' 5.8 5 ' 5.33' 5.34' 5.29' 6.02'6.04'6.10'5.49' 5.57'5.60' 6.20'6.24'6.2 2 ' 5.66' 5.64' 5.49' 5.48' 6.03 ' 6.04'5.4 4 ' 5.41' 5.41'5.9 5 ' 5.39 ' 6.1 6 ' 6.22' 6.38' 6.35' 5.88' 5.83' 5.85' 5.72 ' 5.77 ' 5.77' 6.3 3 ' 6.3 2 ' 6.3 5 ' 5.91' 6.25 ' 6.2 8 ' 5.96' 5.88' 5.99' 6.21 ' 6.24' 6.24' 6.28' 6.46' 6.36'5.96' 5.88'5.88 ' 5.98' 6.49 ' 6.4 8 ' 6.10' 6.09' 6.3 8 ' 6.23'5.9 1 ' 5.60' 6.0 8 ' 6.07' 5.58'5.60' 6.22' 6.69' 6.60' 6.11' 6.07' 6.55 ' 6.5 0 ' 6.00' 6.03 '6.50' 6.56'6.07 ' 5.58' 5.10'5.19 ' 5.96 ' 5.47'5.51'5.48' 5.45' 5.92 ' 5.39' 5.29' 5.21' 4.98' 4.99' 5.36' 5.24' 5.35' 5.30' 5.40' 5.7 1 ' 5.70' 5.74'5.78' 6.26 '6.24' 5.88' 5.66' 5.93'5.97' 5.97'6.01' 5.51' 5.47' 5.52' 5.83' 6.01' 5.91' 6.02 ' 5.75' 5.75' 5.88' 6.29' 6.84' 5.19' 5.12 ' 5.14'5.18' 5.13'5.1 3 ' 5.08' 5.39 ' 6.27 '5.89' 5.94'5.94' 5.49'5.44' 5.36' 5.83' 5.69' 5.20' 5.49' 5.45' 4.77'4.72'5.44'5.51' 5.6 7 ' 5.26' 5.79 ' 5.52' 5.44' 5.85' 5.80 ' 4.98' 5.8 4 '5.8 7 '5.47' 5.51' 5.46' 5.85' 5.65' 5.30' 5.29' 5.65 ' 5.05' 5.06' 5.61' 6.06 ' 6.26 ' 6.5 8 '6.60' 6.06' 5.98'6.08' 6.29 ' 5.81' 5.77' 5.70'5.60' 6.15 ' 5.54' TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOETOETOETOE TO E TOE TOE TOE TOE TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOBTOBTOBTOB TOB TOB TOB TOB TO B TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TO B TOB TOB TOB TOBTOBTOBTOBTOB TO B TOB TOB TOB TOB TOB TOB TOB TOB NORTH LINE 255' DRAINAGE EASEMENT P.B. 119, PG. 32, B.C.R. D D D D D D D D D D D D D 3.2' 5.5'5.3'3.5' 5.4' 5.4' 3.5' 3.4' 5.4' 5.4' 3.6' 3.3' 3.5'3.9'3.9'3.8' 6.2'6.0' 5.7' 5.5' 6.3' 7.5' 7.5'3.9'4.0' 4.0' 3.5' 7.4' 6.9' 7.4' 7.9' 7.7' 6.8'5.4'4.8' 6.9' 5.4' 4.5' 3.6' 3.8'3.7'3.7' 3.5' 3.3' 3.2' 3.2' 3.3'3.6' 3.6' 3.5' 5.5' 3.0' 3.4'3.1' 3.3 ' 3.3' 3.1' TOB TOETOETOETOE TOE TOE TOE TOETO E TO E TO E TOE TO E TO E TO E TOE TOE TOE TOE TO B TOB TOB TOB TOB TO B TO B TOBTOB TO B TO B TO B TO B TO B TO B TOB TOB TOB TOB TOB TO B D D D D 3.8' 3.7' 3.8' TOE TOE 10" 3.92' 3.91'3.85'3.83' 6.7' 2.7' 2.0' 2.0' 2.5' 6.5' 6.1' 2.8' 2.0' 2.0' 2.7' 6.4' 6.6' 3.1' 2.0' 2.0'4.15'3.98'3.98' 4.15' 3.0' 2.9' 2.3' 6.6' 1.8'2.0' 2.1'2.0' 2.0' 2.3' 2.0' 2.0' 2.0' 2.2' 4'2.0' 2.7'2.0' 2.0' 2.5' 2.9' 2.0' 2.7' 2.0' 2.0' 2.7' 2.8' 2.0' 2.0' 2.9' 2.7' 2.0' 2.0'3.2' 3.1'2.0' 2.0'3.5' 2.9' 2.0' 2.0' 2.7' 3.7' 6.0' 2.5' 2.0'2.0' 2.0' 2.4' 7.3' 6.7' 2.6' 2.0' 6.5' -5.0' -5.6' -4.9' -3.9' -3.8' -2.4' -7.6' -10.1 ' -11.8 ' -14.4 ' -16.6 ' -18.3' -19.1 ' -19.8 ' -20.3' -21.1 ' -21.3' -20.2 ' -21.3 ' -18.0 ' -16.1 ' -14.1 ' -10.4 ' -5.4' -4.4' -4.3' -3.3' -1.6' ' -27.3 ' -27.3' -27.0 ' -26.8 ' -26.3' -26.0' -24.6 ' -22.9' -24.1 ' -22.1 ' -24.4 ' -26.4 ' -26.5' -26.3 ' -26.6 ' -26.5 ' -26.4 ' -26.2 ' -26.2 ' -27.1 ' -26.2 ' -26.2 ' -26.5 ' -26.3' -24.8 ' -23.6 ' -23.6 ' -22.3' -21.0 ' -19.4 ' -17.8 ' -15.5' -13.2' -10.6 ' -1.5' -4.4' -4.7' -8.0' -13.1' -17.7 ' -19.0 ' -21.3 ' -22.6' -22.7 ' -22.6 ' -22.2 ' -25.7 ' -26.2 ' -26.8 ' -27.4 ' -27.4 ' -27.3 ' -27.5 ' -27.6 ' -27.5 ' -27.6 ' -27.6' -27.8 ' -27.9 ' -28.0 ' -28.2 ' -29.0 ' -29.1 ' -28.9' -28.6 ' -28.5 ' -28.4' -28.2 ' -28.2 ' -28.5 ' -28.8 ' -28.1 ' -27.9 ' -28.3 ' -28.9 ' -29.4 ' -29.3 ' -28.9' -28.0 ' -27.9 ' -26.8' -26.3' -26.7 ' -26.9 ' -26.8 ' -26.9' -27.1 ' -27.4 ' -27.5 ' -27.4' -27.1 ' -26.5 ' -26.2 ' -25.4 ' -24.9 ' -24.5 ' -22.6 ' -22.9 ' -19.0 ' -13.3' -14.2' -8.2' -5.6' -3.8' -10.5 ' -13.3' -20.1 ' -18.9 ' -24.3' -28.7 ' -29.0' -29.1' -29.0 ' -28.8 ' -28.2 ' -28.5 ' -28.1 ' -28.1 ' -27.1' -27.9 ' -30.5 ' -26.7 ' -27.5' -28.1 ' -28.8 ' '.9' -28.0' -27.5' -27.5 ' -27.5 ' -27.6' -27.9 ' -28.2 ' -28.3 ' -28.4 ' -28.0 ' -28.2 ' -28.4 ' -28.9 ' -29.1' -29.3' -29.4 ' -29.3 ' -29.2 ' -28.4' -27.6 ' -27.0' -27.0 ' -26.7' -26.4 ' -26.2 ' -25.9' -25.5 ' -23.1' -22.5 ' -10.2 ' -1.6' -1.8' -5.5' -16.7 ' -20.7 ' -24.1' -24.1 ' -26.1 ' -26.1 ' -26.3 ' -25.9 ' -26.4 ' -26.5' -26.4 ' -26.3 ' -28.1' -27.6' -28.7 ' -29.2 ' -29.6 ' -29.6 ' -29.3' -28.9 ' -28.5 ' -28.5 ' -28.6 ' -28.6 ' -28.8 ' -28.7 ' -28.6 ' -28.5' -27.7 ' -27.1 ' -27.4 ' -28.1 ' '-11.4' -12.3' -13.8 ' -13.7 ' -15.4 ' -16.8 ' -17.0' -18.3 ' -19.2 ' -21.2 ' -21.6 ' -22.1 ' -22.4' -22.1 ' -20.7 ' -20.7 ' -22.4 ' -21.8 ' -20.5 ' -23.0 ' -23.6 ' -23.4 ' -24.6 ' -23.8 ' -24.0' -24.7 ' -24.5 ' -22.6 ' -12.4' -4.3' -6.3'-3.4' -2.0' -1.7' -1.8' -2.8' -2.8' -2.3' -2.5' -2.4' -2.8' -2.8' -3.1' -3.1' -3.1' -3.2' -3.0' -3.0' -3.2' -3.3' -3.1' -3.2' -18.2 ' -5.7' -7.6'-4.6' -18.4 ' -19.4 ' -27.5 ' -26.9' -26.7 ' -4.2' -5.1' -6.0' -5.6' -5.6' -6.4' -5.6' -5.2' -5.9' -6.4' -6.1' -7.3' -27.0' -27.1 ' -26.8 ' -26.5 ' -26.6 ' -27.4 ' -26.8 ' -26.4' -26.4 ' -26.3' -25.9 ' -25.9 ' -25.4 ' -23.4 ' -20.3' -11.2 ' 6.1' 5.1' 4.0' 2.9' 0.7' 2.0' 4.9' 3.3' 2.2' 3.4' 3.1' 4.3' 5.3' 3.7' 4.1' 5.6' 5.2' 3.4' 3.0' 3.6' 5.1'4.1' 3.7' 3.2' 3.6' 5.2' 3.5' 4.8' 2.4' 5.5 4.3 5.8 5.7 8.1 7.3 5.2 7.0 5.77.2 5.1 5.6 5.96.1 5.1 5.56.76.2 7.7 6.25.3 6.6 5.6 5.67.4 7.76.5 5.4 5.30'5.84' TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOB TO B TO B TO B TO B TO B TO B TO B TO B TO B TO B TO B TO B TO B TO B TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOB TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOB Δ=10 36'26" L=1097.76', R=5929.65' (C) S0 1 ° 4 0 ' 5 6 " E ( C ) 1 9 8 1 . 0 6 ' DRAINAGE MANHOLE ELECTRIC BOX METAL LIGHT POLE (ROUND) PALM TREE SANITARY MANHOLE SIGN POST TREE WATER METER WOOD LIGHT POLE (ROUND) WATER VALVE INDICATES APPROXIMATE DIRECTION. UNABLE TO DETERMINE POINT TERMINUS POINT. CB CATCH BASIN CMP CORRUGATED METAL PIPE ELEV. ELEVATION ESMT EASEMENT HDPE HIGH DENSITY POLYETHYLENE ID IDENTIFICATION INV. INVERT DMH MANHOLE DRAINAGE RCP REINFORCED CONCRETE PIPE R/W RIGHT-OF-WAY SMH SANITARY MANHOLE STMH STORM MANHOLE UNK. UNKNOWN CHAIN LINK FENCE WOOD FENCE GUARDRAIL NON-VEHICULAR ACCESS LINE RIGHT OF WAY TOP OF BANK TOE OF SLOPE CENTER LINE DRAINAGE LINE ////////////// TOB TOE D SIRC SET IRON ROD WITH CAP LB 6901 MWELL MONITORING WELL METAL LIGHT POLE (SQUARE) MONITORING WELL FDC FIRE DEPARTMENT CONNECT STP STAND PIPE UMH UNKNOWN MANHOLE 5.99' 6.1 1 ' 5.78' 5.35' 5.97 ' 5.16'5.19'5.17 ' 5.54' 5.21' 5.08' 5.02 '5.07' 5. 8 8 ' 5.08'5.19'5.09 ' 5.51'5. 5.39' 5.02' 5.01' 4.98' 5.10' 5.14' 5.25' 5.22' 5.40' 5.53' 5. 3.8 ' 3.8' 3.8' 3.5'3.7 ' 3.6'3.5'3.6' 5.0' 5.7 '4.8' 4.7' 3.7' 3.0 3.03.1 5.7' 5.8'5.8' 5.4'4.2' 4.4.5'4.8' 5.0' 3.7' 3.6' 3.8' 3.7 ' 3.6' 5.1' 5.3'5.2' 5.5' 5.8' 5.2' 3.8 ' 3.6' 3.6' 3.03.0 3.0 3.1 3.0 3.0 3.03.1 3.03.0 3.0 3.1 3.0 .6. 5.87' 5.81' 5.75' 5.49' 5.40' 5.32' 5.39'5.31'5.28' 5.26' 5.20' 5.20' 5.17' 5.20' 5.13' 5.18 ' 5.37' 5.44' 5.93' 5.43' 5.89 ' 5.07' 5.07' 5.35' 5.40' 5.34' 4.94' 6.0 3 ' 5.45'5.48 ' 5.10'5.19 ' 5.96 ' 5.47'5.51'5.48' 5.45' 5.92 ' 5.39' 5.29' 5.21' 4.98' 4.99' 5.36' 5.24' 5.35' 5.30' 5.40' 5.71 ' 5.70' 5.74'5.78' 6.26 '6.24' TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOETOETOETOE TO E TOE TOE TOE TOE TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOBTOB TOB TOB TOB TOB TOB TOB TO B TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TO B TOB TOB TOB TOBTOBTOBTOBTOB TO B TOB TOB TOB TOB TOB TOB TOB TOB NORTH LINE 255' DRAINAGE EASEMENT P.B. 119, PG. 32, B.C.R. D D D D D D D D 3.2' 5.5'5.3'3.5' 5.4' 5.4' 3.5' 3.4' 5.4' 5.4' 3.6' 3.3' 3.2' 3.5'3.9'3.9'3.8' 6.2'6.0' 5.7' 5.5' 6.3' 7.5' 7.5'3.9'4.0'4.0' 3.5' 7.4' 6.9' 7.4' 7.9' 7.7' 6.8'5.4'4.8' 6.9' 5.4' 4.5' 3.6' 3.8'3.7'3.7' 3.5' 3.3' 3.2' 3.2' 3.3'3.6' 3.6' 3.5' 5.5' 3.0' 3.4'3.1' 3.3 ' 3.3' 3.2'3.1' TOB TOETOETOETOE TOE TOE TO E TOETO E TO E TO E TOE TO E TO E TOE TOE TOE TOE TOE TO B TOB TOB TOB TOB TO B TO B TOBTOB TO B TO B TO B TO B TO B TO B TOB TOB TOB TOB TOB TO B D D D D 3.8' 3.7' 3.8' TOE TOE 3.92' 3.91'3.85'3.83' 6.7' 2.7' 2.0' 2.0'2.5' 6.5' 6.1' 2.8' 2.0' 2.0' 2.7' 6.4' 6.6' 3.1' 2.0' 2.0'4.15'3.98'3.98' 4.15'3.0' 2.9' 2.3' 6.6' 1.8'2.0' 2.1'2.0' 2.0' 2.3' 2.0' 2.0' 2.0' 2.2' 2.4'2.0' 2.0' 2.5' 2.5'2.0' 2.0' 2.5' 2.5'2.0' 2.0' 2.6' 2.5'2.0' 2.8' 2.0' 2.0' 3.0' 5.8' 5.5' 5.6' 4.0' 2.0' 2.0' 2.8' 5.2'5.1' 2.4' 2.0' 2.0' 2.4' 4.6'4.8' 2.7' 2.0' 2.0' 2.7' 2.7' 2.0' 4.8' 2.6'2.0' 2.0'2.7' 2.7'2.0' 2.0'2.9' 2.7'2.0' 2.0' 2.5' 2.9' 2.0' 2.7' 2.0' 2.0' 2.7' 2.8' 2.0' 2.0' 2.9' 2.7' 2.0' 2.0'3.2' 3.1'2.0' 2.0'3.5' 2.9' 2.0' 2.0' 2.7' 3.7' 6.0' 2.5' 2.0'2.0' 2.0' 2.4' 7.3' 6.7' 2.6' 2.0' 6.5' -5.0' -5.6' -4.9' -3.9' -3.8' -2.4' -7.6' -10.1' -11.8 ' -14.4 ' -16.6 ' -18.3 ' -19.1 ' -19.8 ' -20.3 ' -21.1' -21.3 ' -20.2 ' -21.3 ' -18.0 ' -16.1' -14.1 ' -10.4' -5.4' -4.4' -4.3' -3.3' -1.6' -3.3' -0.7' -1.6' -1.8' -1.6' -2.0' -2.0' -1.9' -1.2' -2.4' -1.4' -0.9' -2.6' -3.3' -1.9' -1.8' -2.2' -2.1' -1.0' -1.7' -2.5' -1.6' -0.8' -0.9' -1.7' -1.7' -1.3' -1.2' -1.8' -11.8 ' -16.7 ' -18.0 ' -20.1 ' -21.4' -22.4 ' -22.4 ' -25.3 ' -26.3' -27.7 ' -27.9 ' -28.1 ' -28.2 ' -28.2 ' -28.1 ' -28.1 ' -28.1' -28.1 ' -28.2' -28.0 ' -28.4 ' -28.4 ' -28.4 ' -26.8 ' -26.2 ' -27.3 ' -27.3 ' -27.3 ' -27.0' -26.8 ' -26.3 ' -26.0 ' -24.6 ' -22.9 ' -24.1' -22.1 ' -24.4 ' -26.4' -26.5 ' -26.3 ' -26.6 ' -26.5 ' -26.4 ' -26.2 ' -26.2 ' -27.1 ' -26.2 ' -26.2 ' -26.5' -26.3 ' -24.8' -23.6 ' -23.6 ' -22.3 ' -21.0 ' -19.4 ' -17.8 ' -15.5 ' -13.2 ' -10.6' -1.5' -4.4' -4.7' -8.0' -13.1 ' -17.7 ' -19.0 ' -21.3' -22.6 ' -22.7' -22.6 ' -22.2 ' -25.7 ' -26.2' -26.8' -27.4 ' -27.4 ' -27.3' -27.5 ' -27.6' -27.5' -27.6' -27.6 ' -27.8 ' -27.9' -28.0 ' -28.2 ' -29.0' -29.1' -28.9 ' -28.6 ' -28.5 ' -28.4 ' -28.2 ' -28.2 ' -28.5 ' -28.8 ' -29.0 ' -29.6 ' -29.7' -29.2 ' -28.6' -28.3 ' -28.3 ' -28.5' -28.7 ' -29.0' -29.0 ' -29.4 ' -29.0 ' -29.9' -29.8 ' -29.7' -29.3 ' -28.2 ' -27.2 ' -26.3 ' -22.7 ' -23.8 ' -21.9 ' -20.4 ' -19.1 ' -16.8 ' -13.8 ' -10.4 ' -7.6' -3.7' 0.0' -4.4' -8.8' -10.8 ' -11.8 ' -14.0 ' -15.1 ' -20.8 ' -22.1 ' -26.2 ' -27.5 ' -29.4' -29.7' -30.5 ' -30.6 ' -30.8 ' -30.7 ' -29.6 ' -31.1 ' -31.1 ' -30.9 ' -30.9' -30.4 ' -29.7 ' -28.6 ' -28.4' -28.5 ' -28.8' -29.1 ' -28.8 ' -28.1 ' -27.9 ' -28.3 ' -28.9 ' -29.4' -29.3 ' -28.9 ' -28.0' -27.9 ' -26.8 ' -26.3 ' -26.7 ' -26.9' -26.8' -26.9 ' -27.1 ' -27.4' -27.5' -27.4 ' -27.1' -26.5' -26.2 ' -25.4 ' -24.9 ' -24.5' -22.6 ' -22.9 ' -19.0' -13.3 ' -14.2 ' -8.2' -5.6' -3.8' -10.5' -13.3 ' -20.1 ' -18.9 ' -24.3 ' -28.7' -29.0 ' -29.1 ' -29.0' -28.8 ' -28.2' -28.5' -28.1' -28.1' -27.1 ' -27.9' -30.5 ' -26.7 ' -27.5 ' -28.1 ' -28.8 ' -29.4 ' -29.6 ' -29.3 ' -29.3 ' -29.4 ' -29.0 ' -28.7 ' -28.7 ' -28.8' -28.7 ' -29.7 ' -30.0' -30.1 ' -30.1' -29.7 ' -29.1 ' -28.5 ' -27.2 ' -25.9 ' -24.2 ' -23.3 ' -24.3' -20.0 ' -21.7 ' -19.7' -18.5' -15.2 ' -13.3' -12.3 ' -10.9' -8.2' -4.5' -1.7' -1.6' -9.6' -11.4 ' -12.7 ' -14.5 ' -17.3' -19.2' -20.2 ' -22.8 ' -21.9' -23.4 ' -23.7 ' -24.4 ' -25.0' -26.1 ' -27.1' -27.4 ' -27.6 ' -27.6 ' -27.7' -27.9 ' -28.0 ' -28.5' -28.9 ' -28.9 ' -28.9' -29.2 ' -28.9' -28.0 ' -27.5 ' -27.5 ' -27.5 ' -27.6 ' -27.9' -28.2 ' -28.3 ' -28.4' -28.0' -28.2 ' -28.4 ' -28.9 ' -29.1 ' -29.3 ' -29.4' -29.3 ' -29.2 ' -28.4 ' -27.6 ' -27.0 ' -27.0 ' -26.7 ' -26.4 ' -26.2' -25.9 ' -25.5' -23.1 ' -22.5 ' -10.2' -1.6' -1.8' -5.5' -16.7 ' -20.7 ' -24.1 ' -24.1' -26.1' -26.1 ' -26.3' -25.9 ' -26.4' -26.5 ' -26.4' -26.3 ' -28.1 ' -27.6 ' -28.7' -29.2' -29.6 ' -29.6 ' -29.3 ' -28.9' -28.5 ' -28.5 ' -28.6' -28.6 ' -28.8 ' -28.7 ' -28.6' -28.5 ' -27.7' -27.1 ' -27.4 ' -28.1' -28.4 ' -24.5 ' -23.7' -22.5 ' -21.4 ' -20.4' -19.8 ' -19.1 ' -18.7 ' -16.9 ' -17.7 ' -17.8 ' -17.6 ' -17.1 ' -17.0 ' -16.6 ' -15.3 ' -16.1' -16.1 ' -15.9 ' -15.5' -14.7' -13.1 ' -12.7' -11.9' -11.0' -10.9 ' -1.5' -3.3' -3.4' -3.8' -4.1' -4.2' -5.5' -9.7' -10.7' -11.4 ' -12.3 ' -13.8' -13.7 ' -15.4' -16.8 ' -17.0 ' -18.3' -19.2 ' -21.2' -21.6' -22.1 ' -22.4 ' -22.1' -20.7 ' -20.7 ' -22.4' -21.8' -20.5 ' -23.0 ' -23.6 ' -23.4 ' -24.6 ' -23.8 ' -24.0 ' -24.7' -24.5 ' -22.6' -12.4 ' -4.3' -6.3'-3.4' -2.0' -1.7' -1.8' -2.8' -2.8' -2.3' -2.5' -2.4' -2.8' -2.8' -3.1' -3.1' -3.1' -3.2' -3.0' -3.0' -3.2' -3.3' -3.1' -3.2' -5.3' -8.4' -7.0' -15.9 ' -18.2 ' -4.0' -4.5' -4.6' -7.3' -10.0 ' -9.5' -5.7' -7.6'-4.6' -18.4 ' -19.4' -27.5 ' -26.9 ' -26.7' -4.2' -5.1' -6.0' -5.6' -5.6' -6.4' -5.6' -5.2' -5.9' -6.4' -6.1' -7.3' -10.5 ' -9.5' -6.3' -2.4' -1.3' -27.0 ' -27.1 ' -26.8 ' -26.5 ' -26.6 ' -27.4' -26.8 ' -26.4 ' -26.4 ' -26.3 ' -25.9 ' -25.9' -25.4' -23.4 ' -20.3 ' -11.2 ' 6.1' 5.1' 4.0' 2.9' 0.7' 2.0' 3.4' 2.8' 2.2' 1.5' 1.1' 0.8'-0.3' 4.9' 3.3' 2.2' 4.5' 3.3' 2.6' 4.5' 4.0' 3.4' 3.4' 3.1' 4.3' 5.3' 3.7' 4.1' 5.6' 3.2' 3.8' 4.1' 3.3' 5.2' 3.4' 3.0' 3.6' 5.1'4.1' 3.7' 3.2' 3.6' 5.2' 4.9' 4.2' 3.5' 4.8' 5.2' 4.6' 3.7' 3.3' 3.6' 3.5' 3.4' 3.4' 2.9' 3.3' 3.5' 2.4' 5.25.1 5.56.76.2 7.7 6.25.3 TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOB TO B TO B TO B TO B TO B TO B TO B TO B TO B TOB TO B TO B TO B TO B TO B TO B TO B TO B TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TO B TO B TO B TO B TO B TO B TO B TO B TO B TO B TO B TO B TO B TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOB TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB FCM SIRC - 3' O/S EAST P.O.L. SIRC S87°26'35"W (C) 569.59' N0 4 ° 1 5 ' 0 0 " W ( C ) 2 3 2 . 8 2 ' Δ=10 36'26" L=1097.76', R=5929.65' (C) S0 1 ° 4 0 ' 5 6 " E ( C ) 1 9 8 1 . 0 6 ' DRAINAGE MANHOLE ELECTRIC BOX METAL LIGHT POLE (ROUND) PALM TREE SANITARY MANHOLE SIGN POST TREE WATER METER WOOD LIGHT POLE (ROUND) WATER VALVE INDICATES APPROXIMATE DIRECTION. UNABLE TO DETERMINE POINT TERMINUS POINT. CB CATCH BASIN CMP CORRUGATED METAL PIPE ELEV. ELEVATION ESMT EASEMENT HDPE HIGH DENSITY POLYETHYLENE ID IDENTIFICATION INV. INVERT DMH MANHOLE DRAINAGE RCP REINFORCED CONCRETE PIPE R/W RIGHT-OF-WAY SMH SANITARY MANHOLE STMH STORM MANHOLE UNK.UNKNOWN CHAIN LINK FENCE WOOD FENCE GUARDRAIL NON-VEHICULAR ACCESS LINE RIGHT OF WAY TOP OF BANK TOE OF SLOPE CENTER LINE DRAINAGE LINE ////////////// TOB TOE D SIRC SET IRON ROD WITH CAP LB 6901 MWELL MONITORING WELL METAL LIGHT POLE (SQUARE) MONITORING WELL FDC FIRE DEPARTMENT CONNECT STP STAND PIPE UMH UNKNOWN MANHOLE 16 Griffin Road at Old Griffin Road Intersection – Option 1: Free Flow LOS D Unsignalized ƒSignalize Old Griffin Rd WB ƒDirect Connect to NB I-95 Ramp ƒLimited ROW acquisition required LEGEND: DRAINAGE WITHIN FDOT R/W 6 Griffin Road at Old Griffin Road Intersection – Stop Controlled LOS D ƒSignals in both directions (LOS D) ƒProvides westbound ramp with direct connect to I-95 northbound ƒLimited ROW acquisition required LEGEND: DRAINAGE WITHIN FDOT R/W LOS D www.stratusteam.com (954) 961-6806 BETTER PLANS. BETTER PLACES. October 6, 2026 City of Dania Beach Department of Community Development Planning and Zoning Division RE: Special Exception Use Submittal PROJECT Ohana Institute – Kaplan Academy, Fort Lauderdale LOCATION DCOTA Building 1855 Griffin Road, Dania Beach, FL 33004 Tenant space A-160 The applicant has submitted for special exception for a +/- 23,900 SF tenant improvement to a relatively small portion the interior at the existing, very expansive +/-800,000 SF Design Center of the America’s (DCOTA) building. The Special Exception we are requesting is to allow for +/-23,900 SF of the existing Retail (Showroom) Use to be converted to Educational Use for the Ohana Institute. The Dania Beach location of Ohana will offer 9-12 grade high school programs as a fully accredited, independent, private, exploratory, and innovative school. The school operates on a flexible calendar that emphasizes project-based learning and combines both theoretical and real-world experiences for students through an engaging and broad array of subjects. The zoning for the site is C-4 General Commercial, which allows for Schools, Academic as a Special Exception according to Sec. 110-20. - List of permitted, special exception and prohibited uses. This submittal is for a special exception use, and per Section 630-50, this application complies with the City’s 10 standards as outlined below: 1. That the use will not cause a detrimental impact to the value of existing contiguous uses, uses in the general area, and to the zoning district where it is to be located. A traffic study has been conducted and there is no significant impact to this uses introduction to the existing context of the existing DCOTA site. The school will have its own separate entrance and is positioned at the most remote position in the context of the large site so there will be no impact to the operations of DCOTA. 2. That the use will be compatible with the existing uses on contiguous property, with uses in the general area and zoning district where the use is to be located and compatible with the general character of the area, considering population density, design, scale and orientation of structures to the area, property values and existing similar uses or zoning. The site abuts the I-95 corridor to the West, so there are no immediately adjacent uses to the West. The length and scale of the building itself acts as a buffer to the neighbor(s) to the East and there is no impact to them at all. And we believe the Educational Use remains compatible with the existing uses to the North and South. 3. That adequate landscaping and screening are provided to buffer adjacent uses from potential incompatibilities. Existing landscape material has been enhanced with replacement trees for missing trees, new landscape islands and new base plantings added at the new drop off loop have been added to provide compliance to current landscaping and screening requirements. 4. That adequate parking and loading is provided, and ingress and egress is so designed as to cause minimum interference with traffic on abutting streets. 80 parking spaces are required by Code for the Educational Use and we have confirmed that this has no significant impact on the existing parking calculations for the entire site. A traffic study has been www.stratusteam.com (954) 961-6806 conducted and there is no significant impact to this uses introduction to the existing context of the existing DCOTA site. 5. That the use will not have a detrimental environmental impact upon contiguous properties and upon properties located in the general area or an environmental impact inconsistent with the health, safety and welfare of the community. There is no environment impact to the existing site and/or the contiguous properties, since the scope is limited to an interior improvement of an existing space. 6. That the use will not have a detrimental effect on vehicular or pedestrian traffic, or parking conditions, and will not result in the generation or creation of traffic inconsistent with the health, safety and welfare of the community. A traffic study has been conducted and there is no significant impact to this uses introduction to the existing context of the existing DCOTA site. The pedestrian experience remains unchanged and the parking required fits within the current parking allocations, thus there will be no impact to the health, safety and welfare of the community. 7. That the use will not utilize turning movements in relation to its access to public roads or intersections, or its location in relation to other structures or proposed structures on or near the site that would be hazardous or a nuisance. There is no change to the access to public roads and intersections as are result of the special exception. 8. That the use will not have a detrimental effect on the future development of contiguous properties or the general area, according to the comprehensive plan. As we are renovating a small piece of the building and not expanding the footprint this project does not have a detrimental effect on the future development of contiguous properties or the general area, according to the comprehensive plan. Owner’s future potential remains unchanged. 9. That the use will not result in the creation of incompatible noise, lights, vibrations, fumes, odors, dust or physical activities, taking into account existing uses, uses located on contiguous properties, uses in the general area and the zoning in the vicinity due to its nature, duration, direction or character. The school’s impact is only to +/-23,900 SF of the existing +/-800,000 SF building. The tenant improvement involves interior renovations to accommodate the school’s needs and a drop off canopy thus there will be no incompatible noise, lights, vibrations, fumes, odors, dust or physical activities during construction nor during the life of the lease. 10. That the use will not overburden existing public services and facilities. The introduction of this school use to the existing massive multi-story building with provide no additional burden on public services and facilities, we are simply renovating the interior of an existing space. Should you have any questions or comments, please contact our office. We look forward to your response. Respectfully submitted, Merrill Romanik, AIA, LEED AP Principal Architect, Stratus Team, LLC Dania Beach Legal Notice 10/23/2026 1:55 PM (EDT) Submitted by Ibel Larios (ilarios@daniabeachfl.gov) Please choose a category Public Hearing - City Commission - Dania Beach Title NOTICE IS HEREBY GIVEN THAT A PUBLIC HEARING AND/OR PUBLIC MEETING WILL BE HELD ON NOVEMBER 10, 2026 AT 7:00 P.M. AT 100 W DANIA BEACH BLVD., DANIA BEACH, FL 33004, OR AS SOON AS POSSIBLE THEREAFTER. Publish Date 10/23/2026 Publish Time 1:49 PM (EDT) Description SUBJECT:SP-005-99MOD3/SE-030-26/VA-047-26: The applicant, Lincoln Property Company, is requesting a Site Plan, Special Exception, and a variance to allow a secondary school operation with a drop-off lane to be located at 1855 Griffin Road. The following is the proposed Resolution of the matter: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, APPROVING THE SITE PLAN MODIFICATION (SP-005- 9MOD3), VARIANCE FROM GREEN BUILDING PRACTICES (VA-47-26), AND SPECIAL EXCEPTION (SE-030-26) TO ALLOW A SECONDARY SCHOOL OPERATION WITH DROP-OFF LANE, SUBMITTED BY THE OWNER, DCOTA DEVELOPMENT CO LP, FOR THE PROPERTY GENERALLY LOCATED AT 1815-1855 GRIFFIN ROAD, IN THE CITY OF DANIA BEACH, PROVIDING FOR CONDITIONS; CONFLICT; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. Copies of the proposed requests or applicable information are available when the agenda is posted online. For more information, please call the Planning Division at (954) 924-6805 Ext. 3654. Please be advised that if a person decides to appeal any decision made by Local Planning Agency, the Planning and Zoning Board or the City Commission with respect to any matter considered at this hearing, such person will need a verbatim record of the proceedings and for this purpose such person may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to based. The City does not provide or prepare such record pursuant to F.S. 286.0105. In accordance with the Americans with Disabilities Act, persons needing assistance to participate in any of these proceedings should contact the City Clerk’s office, 100 West Dania Beach Boulevard, Dania Beach, Florida 33004, (954) 924-6800 Ext. 3624, at least 48 hours prior to the meeting. Application Information Project: Ohana Site Plan Modification Application Site: 1855 Griffin Road Applicant: Lincoln Property Company Request: To request Site Plan, Special Exception, and a variance to allow a secondary school operation with a drop-off lane. Hearing Date & Time: November 10, 2026 at 7:00 PM Hearing Location: City Commission Chambers, Dania Beach City Hall, 100 West Dania Beach Boulevard Contact Information: Claudia Viviana Batista, PZ Manager, 954-924-6805 Ext. 3654 Attach Files (Optional)SP-05-99MOD3 SE-030-26 Ohana Site Plan - Ad.pdf Page 1/2Submission ID: 7b31d43c-25e9-45ec-8b79-158e7843bc6f 260918_1815GriffinRd_Aerial.pdf Submitted by (Email Address)ilarios@daniabeachfl.gov Notifications Yes Send Out a Notification to Your Subscribers Yes Signature Page 2/2Submission ID: 7b31d43c-25e9-45ec-8b79-158e7843bc6f PLACE |City Commission Chamber Dania Beach City Hall 100 West Dania Beach City Hall. Dania Beach,FL 33004 TIME |7:00 PM PROJECT |Ohana Site Plan Modification APPLICANT |Lincoln Property Company LOCATION |1855 Griffin Road REQUEST |To request Site Plan,Special Exception,and a Variance to allow a secondary school operation with a drop-off lane. FILE #|SP-005-99MOD3/SE-030-26/VA-047-26 THIS PROPERTY IS THE SUBJECT OF UPCOMING PUBLIC HEARINGS This Sign is the property of the City of Dania Beach. In accordance with Section 610-30 of the Land Development Code, it shall be unlawful for any person to injure, cut, break or destroy in any manner any building or other thing belonging to or under the control of the City. Persons marring or removing the Notice may be subject to fine and/or imprisonment. Tuesday, June 13, 2017; CITY OF DANIA BEACH PUBLIC HEARING NOTICE TUESDAY, NOVEMBER 10, 2026 For more information, please visit our website http://daniabeachfl.gov or call (954) 924-6800 x 3792. ADD LOCATION MAP Meeting summary Ohana and DCOTA Development Co., LP Application – Design Center of the Americas – 10/8/26 Applicant, DCOTA Development Co, LP (DCOTA DEV CO), and their contract lessee Ohana, have filed applications for Site Plan approval, Special Exception Approval, and Variance approval in order to permit interior renovations only to the Design Center of the Americas (DCOTA)property, permitting the use of a School by Ohana in the DCOTA building. Article 610 of the Land Development Code (LDC) of Dania Beach sets forth requirements for a Public Hearing on at least some of these applications. Pursuant to Article 610 of the LDC, Public notice was given to the Public by Cutro and Associates, and the City of Dania Beach received confirmation from Cutro and Associates that the mailing was sent. This mailing included the date, time, and location of the Public Hearing , and Cutro sent a copy of the actual mailing to the City confirming that the date, time, and location were included. This Public hearing was scheduled for October 8, 2026, in the Atrium of Building A of the DCOTA, at 6:00 PM. Representatives of Ohana were present at the site of the Public Hearing at least one hour before the scheduled start of the meeting. Steve Geller, Esq. the Attorney for Ohana, ran the Public Hearing. The attorney for DCOTA DEV CO (Bill Laystrom) was out of town, but authorized Geller to act on behalf of DCOTA DEV CO as well as Ohana for purposes of the Public Hearing. Ohana was present with at least 6 representatives at the time and location of the Hearing. Present to testify were Catie Spinenweber-Salow from Stratus, the Architect, Karl Peterson from Traf Tech , the Transportation Engineer, Jason Bedford, the Senior Vice President and General Manager of Kaplan (the parent company of Ohana), and Jon Colleran, Senior Project Director from Kaplan. Other representatives of Kaplan/Ohana were present to answer questions. At 6:22, Geller observed that there were no persons present in the location to attend the public hearing other than representatives of Ohana. A video was taken of Geller’s cell phone showing that the time was 6:22. Geller loudly and repeatedly asked if there were any people present for the public hearing, even though it was clear from looking around the room that no one was present. Geller announced that none of the representatives of Ohana would leave until at least 6:30. All of this is on video. At 6:30 Geller again loudly asked if there was anyone present for the Public Hearing, even though it was clear that no one else was in the room. Seeing no one present, Geller announced that the meeting was over. All of this is also on video. Representatives of Ohana were present until at least 6:40, and no members of the Public showed up for the Public Hearing. All requirements for the Public Hearing were met. It was obvious based on the fact that not a single member of the Public attended the Public Hearing that there is no objection to the interior renovations to create a Private High School by Ohana, and that there is no objection to the Site Plan, Special Exception request, or Variance request. Steve Geller, Esq. 110 East Broward Boulevard, Suite 1700 Fort Lauderdale, Florida 33301 has filed Tel.: 954 315-3926 Fax : 954 206-5732 Email: steve@gellerlawfirm.com Website: www.gellerlawfirm.com name add city state zip zip 4 1805 GRIFFIN ROAD LLC 750 LEXINGTON AVE 28 FL NEW YORK NY 10022 1815 BUILDING COMPANY LLC 750 LEXINGTON AVE 28 FL NEW YORK NY 10022 1835 GRIFFIN ROAD LLC%FORTRESS INVESTMENT GROUP LLC AISSI,YAMINA BAILEY,ANN BEAUCHAMP,PIERRELAJEUNESSE,LYNE & RAYMOND,A C BELANGER,DONALDDUMONT,SONIA BELANGER,LISE &ESTRADA,ENRIQUE BELIVEAU,MANONLACHAPELLE,GHISLAINE BERGERON,GUYBERGERON,MARIETTA GOBEIL BISSON,GUYBISSON,FRANCE BOOHER,BEATRICE A BOUCHARD,MANONPUGH,NICOLAS BOUDREAULT,SYLVAINLAROUCHE,ISABELLE BOUGIE,LOUISE BOULANGER,SOPHIE BOYER,DIANE MAILHOT BRODEUR,ALAINPIGEON BRODEUR,CLAUDINE BROWARD INTERNATIONAL COMMERCEPARK LTD PARTNERSHIP CHAMBERLAND,CLAUDECHAMBERLAND,MARC ANDRE CA J4K 5 G2 CA T7Y 1 B4 CHRETIEN,JEANLAFORGE,LOUISETTE ETAL CA J0L 1 C0 CITY OF DANIA BEACH CLIFFORD,ROBERT GROUP LLC 4550 TRAVIS ST DALLAS TX 75205 COTE,NICOLAS 220 JAMACIA ST # 220 DANIA BEACH FL 33004 COTE,JOHANNEMATHIEU,RENE COTE,LYNDA COULOMBE,MARCVEILLETTE,MARC CURRO,JOANNE LFEKONIA,JOSEPH CUSSON,LUCRICHER,MARIE-CLAUDE CA J4B 8 N7 DAIGLE,RENEDAIGLE,CHRISTIAN & DAIGLE,V DALLAIRE,CLAUDE &DALLAIRE,GINETTE MATTEAU CA G6L 3 B2 DANEAU,SYLVAINHUCKLE,N & DANEAU,ERICA ETAL DAVID WATTS REV TRWATTS,DAVID T TRSTEE ETAL LLC 4550 TRAVIS ST DALLAS TX 75205 DERNIER MINUTE INTERESTS LLC% BASS PRO OUTDOOR WORLD 2500 E KEARNEY SPRINGFIELD MO 65989 DESAUTELS,DANIELRANGER,CLAUDETTE DICKERSON,ADAMDICKERSON,DOMINIQUE CA J3B 8 W2 DORE,YVES & LISE CA J1J 2 X3 CA J1J 1 G9 DRAPEAU,ALAINDRAPEAU,LISE PERREAULT CA G0A 2 C0 DUBE,PATRICIALEDUC,MICHEL DUMAS,RAOUL DUPUIS,ROBERTFORGET,REJEANNE FARAND,ROBERTHENCHEY,NATHALIE FARAND FELL,JOHN EDGAR FLL AIRPORT LODGING LLC FL 33309 3421 FLORIDA GAS TRANSMISSION CO% K E ANDREWS FOX,FRANCIS P H/EKELLEY,ROSEMARY FUGERE,NICOLE GAUDREAU,DANIELLE GAUTHIER,GUY AGAUTHIER,PHILIPPE GERVAIS,GLENNMARSOLAIS,SUZANNE GINGRAS,CLAUDETTEGINGRAS,GHISLAIN GIROUX,MARIE PAULEHALLEE,NICOLAS ETAL GONZALEZ,ALVIN XAVIERHARJUNG,RICHARD JAKOB GUERIN,JACQUESGUERIN,LINE CA J0L 2 N0 HANNIGAN,ELISABETH AHANNIGAN,ROBERT T ETAL HEFFERNAN,BARBARA AHEFFERNAN,COREY J HOTTE,NICOLE GUERINHOTTE,YVAN & HOTTE,LAURENT L'HEBREUX MOREAU,CARMENMOREAU,PIERRE LABRECQUE,GAETANEROUILLARD,COME LACHANCE,RAYMOND &LACHANCE,FRANCE & LACHANCE,F LACROIX,HUGUETTE LAMONTAGNE,YVESBEAUDRY,MELISA LAPOINT,CLAUDELAPOINT,CHANTAL CHARLAND LAZURE,ALAINLAZURE,GINETTE CHALIFOUX LECOURS,GHISLAINRENAUD,MARLENE CA G0S 2 E0 LEMAY,CAROLE ODETTE H/ELEMAY,MICHELLE CAROLE LEMAY,YVONDION,SYLVIE LENKIEWICZ,PAULA CA J1L 2 Z3 CA J0X 3 H0 LEVIS,STEPHANEROCHON,SOPHIE LIZANA,BOB LEELIZANA,JESSICA J LOPEZ,WILLIAM N & MARISELALOPEZ,TAYLOR MALECKA,MICHAEL JR & LAUREN B MAUS,WILLIAM L MEEKER,MICHAEL J MEUNIER,LISE GILMOREMEUNIER,PATRICK ETAL MONTFORD,OBIE III MORIN,YVESBOUTIN,MARIE-FRANCE ETAL OCEAN WATERWAY CO-OP INC OCEAN WATERWAY CO-OP INC PAQUET,GILLESPAQUET,PIERRETTE PAQUETTE,JOCELYNROCHETTE,LUCIE PARENT,CAROLEPARENT,MARTINE PERT,STEVEN POPOLIZIO,SEVERINO PROTEAU,LINDA RICHARD,RENALD CA J4N 0 B6 ROY,REALBEAUDOIN,LOUISE ETAL ROY,REJEAN RXI INVESTMENT GROUP LLC CA G7P 0 K3 SCHLICHTE,PAUL G H/ESCHLICHTE,ANTONIA L SCOTT,DOROTHEA SHEA,STEPHEN M &SHEA,PAULINE C FL 33064 SOUTH FLORIDA WATER MANAGEMENTDISTRICT FL 33416 4680 ST AMANT,JEAN PAULST AMANT,MARIE-LAURENCE ETAL ST-ONGE,MARC ST-PIERRE,CLAUDETTELEPAGE,EVE STRAUSS,BETH EILEENSTRAUSS,MARC WILLIAM STULIR,WENDY H/ESTULIR,MICHAEL SZYMANSKI,DENNIS J TGC DANIA LLC%THE GOODMAN COMPANY THOMAS,MICHAEL L TRSTEEDDCTD PUBLIC % CITY OF DANIA BCH TRAYNER,MARILYN JTRAYNER,JONATHAN S TURGEON,PATRICK CA G6G 6 K8 URBINA,VICTOR CARLOS H/ED PILAR URBINA D VERME,GIOVANNA VAILLANT,CECILEVAILLANT,MATHIEU & VAILLANT,N VAN WINDEN,DENYSCOALLIER VAN WINDEN,CLAIRE VAN WINDEN,YVONSERRES,RITA VARGAS,CHRISTIANGRIMON,NAIBIS WHITE OAK VENTURES CO WILSON,KEITH WINSLOW,SHIRLEY City of Dania Beach Parks & Recreation Memorandum DATE: 11/10/2026 TO: Mayor and Commissioners FROM: Candido Sosa-Cruz, ICMA-CM, City Manager VIA: Cassi Waren, CPRP, Director of Parks and Recreation SUBJECT: SECOND READING OF ORDINANCE AUTHORIZING AN EXPENDITURE EXCEEDING ONE MILLION DOLLARS ($1,000,000.00) TO FUND THE CHESTER BYRD PARK IMPROVEMENTS, ITB NO. 26- 023. Request: The Parks and Recreation Department is requesting City Commission approval on the Second Reading of an ordinance authorizing the expenditure of City funds exceeding one million dollars ($1,000,000.00) for the Chester Byrd Park Improvements, ITB No. 26-023. Background: The City of Dania Beach was awarded $200,000 in grant funding through the Florida Recreation Development Assistance Program (FRDAP) with a $200,000 match in August 2023 for Chester Byrd Park improvements. The first step towards initiating construction improvements of the project was to hire a consultant for the design services. On May 5, 2025, the City issued a Request for Qualifications (RFQ) 25-014 for Chester Byrd Park Improvements. The RFQ closed on June 6, 2025. On November 18, 2025, City Commission issued Resolution Number 2025-183 to enter into an agreement with the top ranked bidder, Calvin, Giordano and Associates, Inc. for the design services. With the design complete, Invitation to Bid (ITB) No. 26-023 Chester Byrd Park Improvements for the construction services was released on September 8, 2026. The bid closed and the responses were opened on October 8, 2026. Six contractors submitted bids. Bidder Bid Total M&J Consulting Group Corp. $1,428,397.94 Behar Construction $1,433,178.26 Wrangler Construction $1,585,123.72 MBR Construction Inc. $1,627,773.23 West Construction Inc. $1,748,627.26 Regal Contractors Inc. $1,755,555.65 Calvin, Giordano and Associates, Inc. team reviewed the responses received checking the evaluation for mathematical correctness as well as reaching out to the references provided for the two lowest bidders. Upon review Calvin, Giordano and Associates, Inc. determined M&J Consulting Group Corp. to be the lowest responsive and responsible bidder, in the amount of $1,428,397.94. Because the bid amount exceeds the City’s $1,000,000 expenditure threshold, authorization of the expenditure requires approval by ordinance following two advertised public hearings. Budgetary Impact Funding for this project will be appropriated from Grant fund 103-72-64-572-63-10 in the amount of $1,428,397.94. Recommendation The Parks and Recreation Department recommends that the City Commission approve the Second Reading of the ordinance authorizing the expenditure of City funds exceeding one million dollars ($1,000,000.00) for the Chester Byrd Park Improvements, ITB No. 26-023. 1 ORDINANCE #2026-_____ ORDINANCE NO. 2026-_____ AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE EXPENDITURE OF CITY FUNDS EXCEEDING ONE MILLION DOLLARS ($1,000,000.00), AND REQUIRING A 4/5 VOTE OF THE CITY COMMISSION TO FUND THE CHESTER BYRD PARK IMPROVEMENTS, ITB NO. 26-023; PROVIDING FOR CODIFICATION; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND FURTHER, PROVIDING FOR AN EFFECTIVE DATE. pursuant to Section 2, “Certain Expenditures” of Article 3, “Powers of the City”, of the City Code of Ordinances, the City Commission must, by ordinance, approve any expenditures of City funds that exceed One Million Dollars ($1,000,000.00) after two (2) advertised public hearings of the ordinance and requires a 4/5 vote by the City Commission; and the City advertised Invitation to Bid No. 26-023 for the Chester Byrd Park Improvements; and the City corresponded with Calvin, Giordano and Associates, Inc. noting that five out of the six bidders were eligible for evaluation after procurement completed their compliance review; and six bids were received in response to ITB No. 26-023, with M&J Consulting Group Corporation submitting the lowest bid in the amount of $1,428,397.94 and Behar Construction, submitting the second-lowest bid in the amount of $1,433,178.26; and Calvin, Giordano and Associates, Inc. reviewed the two lowest bidders, checking the evaluation for mathematical correctness as well as reaching out to the references provided; and Calvin, Giordano and Associates, Inc. determined M & J Consulting Group Corp. to be the lowest responsive and responsible bidder; and the City is proceeding with consideration of M&J Consulting Group Corp., the lowest bidder, at its submitted bid amount of $1,428,397.94; and the proposed expenditure of $1,428,397.94 exceeds the One Million Dollar ($1,000,000.00) expenditure threshold and therefore requires approval by ordinance. 2 ORDINANCE #2026-_____ Section 1. That the above “WHEREAS” clauses are ratified and confirmed as being true and correct, and they are made a part of and incorporated into this Ordinance by this reference. Section 2. That the proper City officials are authorized to expend more than One Million Dollars ($1,000,000.00) in funding the Project. Section 3. That funding for this Project shall be appropriated from the Grant Account No. 103-72-64-572-63-10. Section 4. That all resolutions or parts of resolutions in conflict with this Ordinance are repealed to the extent of such conflict. Section 5. That this Ordinance shall be effective immediately after passage of the second reading. PASSED on first reading on October 27, 2026. PASSED AND ADOPTED on second reading on ___________________ 2026. First Reading: Motion by: Vice Mayor Salvino Second by: Commissioner Rimoli. Second Reading: Motion by: _________________________________ Second by: _________________________________ FINAL VOTE ON ADOPTION: Unanimous ____ Yes No Commissioner Joyce L. Davis ____ ____ Commissioner Luis Rimoli ____ ____ Commissioner Marco Salvino ____ ____ Vice Mayor Diana Fahmie ____ ____ Mayor Colman W. Ryan ____ ____ SIGNATURES ON FOLLOWING PAGE 3 ORDINANCE #2026-_____ ATTEST: City of Dania Beach Business Impact Estimate Meeting 10/27/2026 Location City Commission Chamber 7:00 p.m. 100 W Dania Beach Blvd, Dania Beach, FL This Business Impact Estimate is provided in accordance with Section 166.041(4), Florida Statutes. If one or more boxes can be checked below, a Business Impact Estimate is not required by state law for the Proposed Ordinance. Please note: 10/1/2024 amendment of 166.041 (4), requires BIE for any ordinance affecting Part II of Chapter 163, Florida Statutes, relating to growth policy, county and municipal planning, and land development regulation, including zoning that are initiated by local government. ☐ The proposed ordinance is required for compliance with Federal or State law or regulation; ☐ The proposed ordinance relates to the issuance or refinancing of debt; ☐ The proposed ordinance relates to the adoption of budgets or budget amendments, including revenue sources necessary to fund the budget;  The proposed ordinance is required to implement a contract or an agreement, including, but not limited to, any Federal, State, local, or private grant or other financial assistance accepted by the city; ☐ The proposed ordinance is an emergency ordinance;  The ordinance relates to procurement; or ☐ The proposed ordinance is enacted to implement the following: a. Part II of Chapter 163, Florida Statutes, relating to growth policy, county and municipal planning, and land development regulation, including zoning, development orders, development agreements and development permits; b. Sections 190.005 and 190.046, Florida Statutes, regarding community development districts; c. Section 553.73, Florida Statutes, relating to the Florida Building Code; or d. Section 633.202, Florida Statutes, relating to the Florida Fire Prevention Code. If no boxes are checked, please continue. Proposed Ordinance Title AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE EXPENDITURE OF CITY FUNDS EXCEEDING ONE MILLION DOLLARS ($1,000,000.00), AND REQUIRING A 4/5 VOTE OF THE CITY COMMISSION TO FUND THE CHESTER BYRD PARK IMPROVEMENTS, ITB NO. 26-023; PROVIDING FOR CODIFICATION; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND FURTHER, PROVIDING FOR AN EFFECTIVE DATE. City of Dania Beach Business Impact Estimate Meeting 10/27/2026 Location City Commission Chamber 7:00 p.m. 100 W Dania Beach Blvd, Dania Beach, FL Proposed Ordinance Title AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE EXPENDITURE OF CITY FUNDS EXCEEDING ONE MILLION DOLLARS ($1,000,000.00), AND REQUIRING A 4/5 VOTE OF THE CITY COMMISSION TO FUND THE CHESTER BYRD PARK IMPROVEMENTS, ITB NO. 26-023; PROVIDING FOR CODIFICATION; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND FURTHER, PROVIDING FOR AN EFFECTIVE DATE. Summary of Proposed Ordinance (including public purpose to be served) N/A Estimate of Direct Economic Impact on Private For-Profit Businesses (a) An estimate of direct compliance costs that businesses may reasonably incur; $0 (b) Any new charge or fee imposed by the proposed ordinance or for which businesses will be financially responsible; and An estimate of the city’s regulatory costs, including estimated revenues from any new charges or fees to cover such costs. None Good Faith Estimate of Number of Businesses to be Impacted Additional / Other Information Department Director/Designee Name Signature 1 Singh, Maxine From:Sam May <smay@browardswa.org> Sent:Thursday, September 10, 2026 12:00 PM To:Singh, Maxine Cc:Elisa Jones; Ryan, A. J.; Jamie Alan Cole; Lori Smith-Lalla Subject:Re: COMMISSIONER A. J. RYAN IV - APPOINTMENT TO THE SWA Follow Up Flag:Follow up Flag Status:Completed CAUTION: This email originated from outside the City of Dania Beach. Do not click links or open attachments unless you recognize the sender and expect the content. Hi Maxine, I would like to thank Commissioner Ryan for his service on the Governing Board and Executive Committee. The City does have to appoint a new Governing Borad Member. As indicated in Section 6.2 of the Interlocal Agreement below, should a representative on the Governing Board cease to be a dully qualified elected official of the appointing Party (Municipality), the Party must select a replacement. There should also be an Alternate Governing Board Member appointed. Thank you, Sam May Executive Director Broward Solid Waste Authority smay@browardswa.org https://browardswa.org 6.2. Governing Board. 6.2.1. Membership. Each Party must appoint one (1) of its elected officials to serve as a member of the Governing Board, which appointee serves at the pleasure of the appointing Party. The appointment by each Party will be made according to such rules and procedures as may be adopted by the appointing Party. Should a representative on 2 the Governing Board cease to be a duly qualified elected official of the appointing Party or have more than two (2) consecutive absences from meetings of the Governing Board that are not excused (by majority vote of the Governing Board or pursuant to adopted policy), the appointing Party must promptly appoint a replacement member that meets the foregoing requirements. 6.2.2. Meetings. The Governing Board must meet at least twice per fiscal year of the Authority, at such dates and times as determined by the Chair of the Governing Board, to conduct the business of the Authority. 6.2.3. Alternate Members. Each Party must appoint one (1) of its elected officials as an alternate member to serve on the Governing Board in the absence of that Party’s primary appointed member. An alternate member may only vote when the primary member of the Governing Board for that Party is absent from the meeting. Alternate members may attend and participate during discussion in all Governing Board meetings From: Singh, Maxine <msingh@daniabeachfl.gov> Sent: Thursday, September 10, 2026 11:10 AM To: Sam May <smay@browardswa.org> Cc: Elisa Jones <ejones@browardswa.org>; Singh, Maxine <msingh@daniabeachfl.gov>; Ryan, A. J. <AJRyan@daniabeachfl.gov> Subject: COMMISSIONER A. J. RYAN IV - APPOINTMENT TO THE SWA Hello Sam, As of November 10, Commissioner Ryan will no longer be an elected official on the Dania Beach City Commission. Does the City need to make a new appointment? Thank you. Maxine Singh , Chief of Staff to the Mayor and City Commission msingh@daniabeachfl.gov | daniabeachfl.gov 100 W Dania Beach Blvd, Dania Beach , FL , 33004 Phone: 954.924.6800, x3607 R.I.S.E. - RESPECT, INTEGRITY AND STANDARD OF EXCELLENCE Please note: Florida has a very broad public records law. Most written communications, including emails, to or from City officials regarding City business are public records and may be subject to public disclosure. From: Sam May <smay@browardswa.org> Sent: Friday, August 21, 2026 9:00 AM To: Sam May <smay@browardswa.org> Cc: Elisa Jones <ejones@browardswa.org> Subject: SWA Proposed Budget