HomeMy WebLinkAboutR-2006-109 IT Parker Bid Award Frank Hill RESOLUTION NO. 2006-109
A RESOLUTION OF THE CITY OF DANIA BEACH, FLORIDA,
AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE AN
AGREEMENT WITH FRANK HILL CONSTRUCTION, INC. FOR INTERIOR
RENOVATIONS OF THE I.T. PARKER COMMUNITY CENTER IN AN
AMOUNT NOT TO EXCEED $82,850.00 (INCLUDING CONTINGENCY
FUNDS); PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN
EFFECTIVE DATE.
WHEREAS, the City advertised for bids for interior renovations to the I.T. Parker
Community Center and two (2) proposals were received by the City on June 9, 2006; and
WHEREAS, the City Commission approved funding for the project in the amount of
$96,000.00 to be funded from proceeds of the applicable 2005 General Obligation Bond; and
WHEREAS, the committee representing the City for the project has determined and is
recommending that Frank Hill Construction Inc. will best provide the project services in an
amount not to exceed $82,850.00 (including contingency funds);
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the recommendation of the City bid committee to award the I.T.
Parker interior renovation project to Frank Hill Construction Inc. in an amount not to exceed
$82,850.00 (including contingency funds), all as appearing in the documents attached as Exhibit
"A", is approved and the proper City officials are authorized to execute an agreement with that
company. The funding for the project will be derived from the applicable General Obligation
Bond, from proceeds in the Capital Projects Fund.
Section 2. That all resolutions or parts of resolutions in conflict with this Resolution are
repealed to the extent of such conflict.
Section 3. That this Resolution shall be in force and take effect immediately upon its
passage and adoption.
PASSED and ADOPTED on June 27, 2006.
PATRICIA FLURY
MAYOR-COMMISSIONER
ATTEST;
�c�—,ter! �-�.�-✓
LOUISE STILSON, CMC
�CITY CLERK
APPROVED AS TO FOINN,W,ORRECTNESS
BY:
THOMA J. A SBIWUdIfY ATTORNEY
2 RESOLUTION #2006-109
�- CITY OF ®AMA BEACH
Agenda Item#
Agenda Request Item
Date of Commission Meeting: 6/27/2006
Adopt Resolution ❑ Adopt Ordinance (1st Reading) ❑ Adopt Ordinance (2nd Reading) ❑
Award Bid/RFP ® Presentation ❑ Continued from:
Requested Actob (Idenfity�appropnate Action or Mot�oo) �
CC.._,mm,K
Award bid to Frank Hill Construction Inc. for the I.T. Parker Community Center renovation project.
Why Actwn is Necessary ,
M To perform all the interior renovations indicated on the bid specification exhibit in the RFP.
y
Renovate the interior of the I.T. Parker Community Center.
Purchasing Requests ONLY ` �t
Dept: Acct#: Amt:
Fund: General: ❑ Water: ❑ Sewer: ❑ Stormwater: ❑ Grants: ❑ Capital:
❑
Summary E planation/Background y
Two bids were received on June 9, 2006. The bid review committe met on June 14, 2006 and recommended to award
Frank Hill Construction Inc. the bid. Frank Hill Construction's bid was under budget and also $17,762.00 less than the
other bid received for the same scope of services, products and materials being provided; the bid was in the amount of
$75,250. Ten percent of the construction amount in the amount of$7,600 is proposed to be allocated for contingencies.
a
Fiscal ImpactlCost Summary
Exhibits Attached g a xy z g �2 S6r
. .,';%z4
Exhibit 1 Exhibit 2 Exhibit 3 Exhibit 4 Exhibit 5 Exhibit 6 Exhibit 7 Exhibit 8
Submitted by
Dark T. Felicetty Date 06/19/06
Department Director
Kristen Jones Date 06/19/06
HR Director
Date
Finance Director
Patricia Varney Date 06/20/06
City Attorney
Thomas J. Ansbro Date 06/22/06
City Manager
Ivan Pato Date 06/22/06
....5�.,,.
Commission Action:
Approved: ❑ Denied: ❑ Continued to: ❑
Mark T. Felicetty"
�.
Senior Facility Manager �3n
100 West Dania Beach Blvd. xa
Dania Beach FL 33004
Phone: 954-924-3698
Fax: 954-924-3629
rnfe1icetty@ci.dania-beach.fl.us
TO: City Commission
FROM: Mark T. Felicetty, Senior Facility Manager
DATE: June 26, 2006
SUBJECT: I.T. Parker Interior Renovation Project
The City advertised for bids for renovation of the I.T. Parker Community Center and 2 proposals were received
by the City on June 9, 2006. The Commission approved the project in the amount of$96,000.00 funded by the
General Obligation Bond. The bid committee representing the City for the project consisted of Kristen Jones,
Leo Williams, Nicki Satterfield, and Mark Felicetty. The bid review committee has determined and is
recommending that Frank Hill Construction Inc. can best provide these services in an amount not to exceed
415,250.00. The bid from Frank Hill Construction Inc. was not only under budgeted amount of$96,000.00, but
so $17,762.00 less than the other bid received from Lambert Brothers Construction Inc. for the same scope of
services, products and materials being provided.
Cc: Kristen Jones, Director of Parks & Recreation
Ivan Pato, City Manager
•
BID TABULATION FORM
BID OPENING DATE: June 9, 2006 TIME: 2:30 p.m.
*PROJECT NAME: BID: "I.T. Parker Community Center Renovations"
PRESENT AT BID OPENING: (SIGN-IN SHEET MAY BE ATTACHED)
Karen Davales
Denise Lambert
THE FOLLOWING BIDS WERE OPENED BY:
Louise Stilson, City Clerk Leo Williams
Nicki Satterfield
Mark Felicetty
NO. VENDOR BOND BASE BID
Frank hill Construction, Inc.
1 267 SW 12`h Street Yes $75,250
Dania Beach, FL 33004
Lambert Bros, Inc.
2 823 NW 57 Street Yes $93,012
Fort Lauderdale, FL 33309
3
4
5
6
The Bids were turned over to the following Bid Committee Members:
Mark Felicetty
Nicki_Satterfield
eo Williams
Kristen Jones
AGREEMENT
THIS IS AN AGREEMENT ("Agreement"), dated D , 2006, between
THE CITY OF DANIA BEACH ("City"), a Florida municipal corporation, with a
business location at 100 West Dania Beach Boulevard, Dania, Florida 33004, and Frank
Hill Construction, Inc. ("Contractor"), a Florida Corporation, with its principal place of
business address located at 267 SW 12t" Street, Dania Beach, Florida 33004.
In consideration of the mutual terms, conditions, promises, covenants and
payments set forth in this Agreement, the sufficiency and receipt of which are
acknowledged, City and Contractor agree as follows:
ARTICLE I
PREAMBLE
In order to establish the background, context and frame of reference for this
Agreement, and to generally express the objectives and intentions of the parties, the
following statements, representations and explanations are the predicates for the
undertakings and commitments included within the provisions which follow, and may be
relied upon by the parties as essential elements of the mutual considerations upon which
this Agreement is based.
1.1 The Contractor, for the consideration fully set out below, shall furnish
all the materials, equipment and labor to perform all work necessary to complete the
Project, all in full and complete accordance with Specifications and City's Invitation to
Bid, which are both attached and made parts of this Agreement. The "Project" consists
of materials, equipment and labor necessary to complete the renovations at the I.T. Parker
Community Facility, located at 901 NE 3Td Street, Dania Beach, FL., as such items are
more particularly described in the Specifications which are a part of Contractor's
executed Bid Proposal, which proposal is incorporated into and made a part of this
Agreement as Specifications, attached.
1.2 The City advertised its notice to bidders of the City's desire to have the
Project completed, pursuant to the bid entitled:
I.T. Parker Community Center Renovations
1.3 On June 27, 2006, the City awarded the bid to Contractor and authorized
the proper City officials to enter into this Agreement with Contractor to complete the
Project.
1
ARTICLE 2
SERVICES AND RESPONSIBILITIES
2.1 Contractor agrees to do everything required by this Agreement and to
comply with any and all other provisions in the documents and items incorporated by
reference into this Agreement. Contractor also agrees to perform all clean-up and bear
the expense of any off-site disposal, which is or may be necessitated by its work on and
around the Project site.
2.2 Contractor agrees that all work performed under this Agreement shall
be done in a professional manner and that Contractor's efforts will produce a quality
result.
2.3 Contractor represents to City, with full knowledge that City is relying
upon these representations when entering into this Agreement with Contractor, that
Contractor has the expertise, experience and work force sufficient to timely perform the
services to be provided by Contractor pursuant to the terms of this Agreement.
2.4 Contractor represents to City that Contractor is properly licensed by
all applicable federal, state and local agencies to provide the services specified under this
Agreement. If any of the Contractor's licenses are revoked, suspended or terminated
for any reason by any governmental agency, Contractor shall notify the City
immediately.
2.5 Contractor agrees to conduct all work and services under this
Agreement in accordance with all applicable federal, state and local laws and
regulations. Contractor will identify all governmental authorities and agencies having
jurisdiction to approve work involved in the Project and Contractor agrees to obtain all
permits and approvals from any and all such governmental authorities which have
jurisdiction. If permitted by the permitting agency, and if City can realize a cost savings
by such action, City may authorize the Contractor to seek required permits on behalf of
and in the name of City as its Contractor; provided, however, that Contractor agrees to
fully indemnify and hold harmless the City in all respects as a result of the obtaining of
any and all such permits and approvals. Without limiting the foregoing, City agrees to
reimburse Contractor, upon City's receipt of adequate proof that Contractor has paid
same, the amounts of all permit fees incurred by Contractor in connection with the
applications, processing and securing of approvals or permits which are required to be
obtained from all governmental authorities which have jurisdiction over any and all
aspects of this work, except City permits and fees which shall be waived and except for
so much of any fees as to which the City is required to remit to other governmental
agencies.
2.6 City's Building Official, or his designated representative, will be the
person through whom Contractor must communicate all information pertaining to the
Project.
2
2.7 Contractor shall guarantee the entire Project against poor workmanship
and faulty materials for a period of one (1) year after final payment and shall immediately
correct any defects which may appear during this period upon written notification by the
City's Building Official or his designated representative. Contractor waives any and all
rights to claim any statute of limitations defense as to any condition that may arise under
this guarantee.
ARTICLE 3
TERMS AND CONDITIONS
3.1 Contractor shall begin to perform the Project work commencing on
July 31, 2006 (the "Commencement Date"). Contractor shall complete the Project
work no later than one hundred and eighty (180) days after the Commencement Date (the
"Completion Date"). Contractor shall notify City in writing of the Completion Date
within 10 days of such date.
3.2 This Agreement may be terminated by City if Contractor fails to
perform the work to City's sole and reasonable approval, after City sends written notice
of any deficiency to Contractor and Contractor does not cure such deficiency within
seven (7) days from the date of such notice. In such event, the Contractor shall be paid
compensation for improvements made toward completion of the Project, if such
improvements meet City's sole and reasonable approval, which approval will not be
unreasonably withheld. In the event that the Contractor abandons the work specified in
this Agreement or causes it to be terminated, Contractor shall indemnify the City
against any loss pertaining to its abandonment up to a maximum of the amount to be paid
under this Agreement. All finished or unfinished materials, documents and reports
prepared by Contractor shall become the property of City and shall be delivered by
Contractor to City before payment, if any, is made to Contractor by City.
ARTICLE 4
COMPENSATION AND METHOD OF PAYMENT
TOTAL AGREEMENT AMOUNT: $75,250.00
4.1 City agrees to compensate Contractor as follows.
4.2 Contractor shall submit an invoice showing the work performed,
materials purchased and stored and the value of same for the project by the 251h,of each
month. Invoice shall also indicate the amount due for this work and materials, less a
retainage in the amount of 10%. The Building Official shall review the invoice and
approve for payment or reject and return to Contractor for revision.
4.3 Upon completion of the project, Contractor shall submit a final invoice.
City shall, no later than twenty (20) business days after the City Building Official
approves all of Contractor's completed Project work pursuant to the provisions of this
Agreement, effect final payment including retainage.
3
Project completion shall be evidenced by a writing to that effect, issued by the
City Building Official and given to the City Clerk. The total compensation above may
not be exceeded without a written amendment to this Agreement executed by the
authorized agents of both of the parties.
4.4 Payment will be made to Contractor at:
Frank Hill Construction, Inc.
Attention: Frank Hill, President
267 SW 12`h Street
Dania Beach, FL 33004
4.5 The making and acceptance of the work shall constitute a waiver of all
claims by the City except for any or all claims arising from the guarantee set forth above,
unsettled liens, lawsuits, deficiencies or faulty work appearing within one (1) year after
final payment, or from any variations from the requirements of the Specifications for the
Project. The acceptance of payment shall constitute a waiver of all claims against City
by the Contractor.
4.6 Contractor shall, before final payment is made by City, provide City
copies of releases of all liens from any and all subcontractors, materials' providers and
the like, who or which supplied or furnished any labor, services or materials that were
used in the Project. Contractor shall then furnish the City a "No Lien Affidavit". Final
payment shall be made upon submission by the Contractor of evidence satisfactory to
the City that all payrolls, material bills and other costs incurred by the Contractor in
connection with the work have been paid in full, and after all guarantees and
specifications for products, and/or materials incorporated into the project that appear in
this Agreement and as otherwise set forth in the specifications have been furnished to
and found acceptable by the City.
ARTICLE 5
CHANGES IN SCOPE OF WORE;
City or Contractor may request changes that increase, decrease or otherwise
modify the Project, as described in this Agreement. These changes may affect the
compensation specified above and, if so, they must be described in a written amendment,
executed by the authorized agents of both of the parties, prior to any deviation from the
terms of this Agreement. In no event will Contractor deviate or permit deviation from
the work described in this Agreement or the Specifications without City's advance
written consent.
4
ARTICLE 6
PROTECTION OF CITY'S PROPERTY
At all times during the performance of this Agreement, the Contractor shall
protect the City's property from all damage whatsoever on account of Contractor's
performance of work toward completion of the Project described by this Agreement.
ARTICLE 7
INDEMNIFICATION
7.1 The Contractor agrees to indemnify and hold harmless the City and its
elected and appointed officers, agents, servants and employees from and against any and
all claims, demands or causes of action whatsoever and the resulting losses, costs,
expenses, reasonable attorneys' fees, liabilities, damages, orders, judgments and decrees
sustained by the City and any third party arising out of, or by reason of, or resulting from
the Contractor's work toward completion of the Project, Contractor's reckless acts, or
negligent acts, or both and any and all errors or omissions of whatsoever kind up to a
maximum amount of the Total Agreement Amount.
7.2 The Contractor agrees to release the City from and against any and all
liability and responsibility in connection with the Project work. If Contractor exposes
City to liability for any reason arising out of the Project work, Contractor's
compensation may be withheld until City can determine the extent of City's exposure
and City retains the right to offset any amounts related to such matters against
Contractor's compensation, if any. City will notify Contractor in writing when it
determines Contractor may have exposed City to any liability and City will provide a
reasonably ascertainable date by which resolution of the exposure, offset or both will be
determined.
ARTICLE 8
INSURANCE
8.1 The Contractor shall not commence work under this Agreement until
Contractor has obtained all insurance required under section 8.4 of this Article
("Coverage") and such Coverage has been approved by the Risk Manager of the City.
The Contractor shall not allow any subcontractor to commence work on any
subcontract until the subcontractor, as provided in section 14.3, below, and all Coverage
required of any subcontractor, have been approved by City. In addition, Contractor
shall be responsible for any policy deductibles and self-insured retentions.
5
8.2 Contractor shall file Certificates of Insurance with the City, reflecting
evidence of the Coverage. They shall be filed with the City Risk Manager within ten
(10) days of the date first above written. These Certificates shall contain a provision that
Coverage afforded under these policies will not be canceled until at least thirty (30) days
prior written notice has been given to the City. Policies for Coverage shall be issued by
companies authorized to do business under the laws of the State of Florida and any such
companies' financial ratings must be no less than "A" in the latest edition of the
"BEST'S KEY RATING GUIDE", published by A.M. Best Guide.
8.3 Coverage shall be in force until all work required to be performed under
the terms of this Agreement is satisfactorily completed as evidenced by the formal
acceptance by the City. In the event insurance certificates provided to City indicate that
the insurance shall terminate and lapse during the period of this Agreement, then in that
event, the Contractor shall furnish, at least thirty (30) days prior to the expiration of the
date of such insurance, a renewed certificate of insurance as proof that equal and like
Coverage for the balance of the period of the Agreement and any extension of it is in
effect. THE CONTRACTOR SHALL NOT PERFORM OR CONTINUE TO WORK
PURSUANT TO THIS AGREEMENT UNLESS ALL COVERAGE REMAINS IN
FULL FORCE AND EFFECT, SUCH DELAY BEING SUBJECT TO ANY
APPLICABLE PROVISIONS DESCRIBED IN THIS AGREEMENT.
8.4 REQUIRED INSURANCE COVERAGE.
® 8.4.1 General Liability Insurance includes products, completed
operations and blanket contractual liability with bodily injury limits of not less than
$1,000,000.00 per occurrence combined single limit for bodily injury and property
damage. City shall be named as an "additional named insured" under the general
liability policy including product liability. "Additional named insured" clause shall be a
rider or endorsement issued by the insurance home office, not by a local agent.
8.4.2 Workers' Compensation insurance shall be maintained by
Contractor during the life of this Agreement to comply with statutory limits for all
employees, and in the case any work is sublet, as otherwise addressed in this Agreement,
the Contractor shall require any subcontractors similarly to provide Workers'
Compensation Insurance for all of the latter's employees unless such employees are
covered by the protection afforded by the Contractor. The Contractor and its
subcontractors shall maintain during the life of this policy Employers' Liability
Insurance. The following limits must be maintained: $500,000.00 with not less than
$100,000.00 per occurrence.
8.4.3 Comprehensive Auto Liability insurance with limits not less
than $500,000.00 per occurrence for bodily injury and property damage. This coverage
shall include owned, hired and non-owned vehicles.
6
The Contractor shall hold the City, its agents and employees, harmless on
account of claims for damages to persons, property or premises arising out of the
operations to complete the Project. The City reserves the right to require Contractor to
provide and pay for any other insurance coverage City deems necessary depending upon
the possible exposure to liability.
ARTICLE 9
INDEPENDENT CONTRACTOR
This Agreement does not create an employee/employer relationship between the
parties. Contractor agrees that it is not the City's employee for any purposes, including
but not limited to, the application of the Fair Labor Standards Act minimum wages' laws
and overtime payments, Federal Insurance Contribution Act, the Social Security Act, the
Federal Unemployment Tax Act, the provisions of the Internal Revenue Code, the Florida
Workers' Compensation Act, and the Florida unemployment insurance law. The
Contractor shall retain sole and absolute discretion and exercise its judgment as to the
manner and means of carrying out Contractor's activities and responsibilities toward
completion of the Project. Administrative procedures applicable to services rendered
under this Agreement shall be those of Contractor, which policies of Contractor shall
not conflict with City, H.U.D., or United States policies, rules or regulations relating to
the use of Contractor's funds provided for in this Agreement. The Contractor agrees
that it is a separate and independent enterprise from the City, that it has full opportunity
Mto find other business, that it has made its own investment in its business, and that it will
utilize a high level of skill necessary to perform the work. This Agreement shall not be
construed as creating any joint employment relationship between the Contractor and the
City and the City will not be liable for any obligation incurred by Contractor, including
but not limited to unpaid minimum wages, overtime premiums or both.
7
ARTICLE 10
PUBLIC CONSTRUCTION BOND
10.1 At the time of the execution of this Agreement, Contractor shall furnish
a Public Construction Bond equal to the amount of the bid, or an Irrevocable Letter of
Credit acceptable to City in the amount of one hundred fifty percent (150%) of the bid
from Contractor's lending institution which will be considered Bond Coverage for the
City (in either case, the guarantee is referred to in this Article 10 as the "Bond"). If a
Public Construction Bond is submitted, it will be in the form prescribed by Florida law(a
copy of such Bond is attached to this Agreement, identified as Exhibit "A" and
incorporated by this reference). Any authorized Bond shall guarantee to the City the
completion and performance of the work covered in the Agreement. The Bond shall at
all times be valid and in force to cover the work being performed. The Bond shall be
executed by a Surety Company approved by the U.S. Treasury Department, licensed to
do business in the State of Florida, and having a registered agent in Broward County (the
"Surety") or, if an Irrevocable Letter of Credit is supplied, it must first be reviewed and
approved in writing as acceptable to City in all respects, including the identity and
location of the issuing bank, by the City's Chief Financial Officer, which approval will
not be unreasonably withheld.
10.2 The Contractor agrees to keep any such Bond, or a replacement of it, in
full force and effect at all times during the course of performance of this Agreement. In
addition to the foregoing requirements, such Bond shall contain provisions, whether by
attaching endorsements or supplemental agreements, guaranteeing to the City the
completion of the work described in this Agreement. Contractor may comply with the
requirements of this provision by causing the Bond to specifically name the CITY OF
DANIA BEACH as one of the parties to whom the protection afforded by the Bond is
extended or as an alternative, may furnish the City with a separate Bond meeting the
same criteria provided above.
ARTICLE 11
DEFAULT OF AGREEMENT AND REMEDIES
11.1 Liquidated Damages. It is mutually agreed between the parties that time
is of the essence of this Agreement, and in the event the Project is not completed within
the time and in the manner specified in this Agreement, it is agreed that from the
compensation otherwise to be paid to the Contractor, the City may retain the sum of
Two Hundred ($200.00) Dollars per day for each day thereafter, Sundays and holidays
included, that the work remains uncompleted and the City is denied full benefit of
completion of the Project, which sum City and Contractor agree represents the
damages the City will have sustained per day for the failure of the Contractor to
complete the Project within the time stipulated. The parties agree that this sum is not a
penalty.
i
8
• 11.2 Remedies in Default. In case of any default by Contractor, the City,
through City's Building Official or his designated representative, shall notify the
Contractor, in writing, of such default and direct Contractor to comply with all
provisions of the Agreement. A copy of such written notice shall be mailed to the Surety
on the Bond, or the lending institution named in the Irrevocable Letter of Credit (the
"Bank"), whichever is applicable. If Contractor does not cure such default within seven
(7) days of the date after notice was sent by City, City may declare a default of this
Agreement and will notify the Contractor and the Surety or Bank of such declaration of
default in writing and terminate the Agreement.
11.2.1 Within ten (10) days of such declaration of default, the Surety
on the Bond shall, at its own cost and expense, rectify or cause to be rectified the default
and also contract with a replacement contractor to be approved by City. Surety's
replacement Contractor will assume the work of Contractor and complete performance of
the work of the Project under the Agreement within thirty (30) days of City's approval of
Surety's replacement Contractor. The Surety shall receive payment equal to what would
have been paid the Contractor had the Contractor continued to perform the work under
the Agreement, less any compensation paid to Contractor by City and less all sums due
the City for any damages suffered or any expenses incurred, or both, by reason of
Contractor's default. Alternatively, if applicable, City shall notify Bank that the
Irrevocable Letter of Credit is required to be honored and payment immediately made to
City.
11.2.2 If such Surety or Bank fails to perform any of its obligations
as described above, the City may complete the Project, or any part of it, either by day
labor or re-letting a contract ("Default Contract") for the same, and procure the
equipment and the facilities necessary for the completion of the Default Contract, and
charge the cost of same to the Contractor, the Surety, or both, together with the costs
incident to such default.
11.2.3 In the event the City completes the Default Contract at a lesser
cost than would have been payable to the Contractor under this Agreement, if the same
had been fulfilled by Contractor, City shall retain such difference. Should such cost to
the City be greater, then the Contractor, the Surety, or both shall pay the amount of such
excess to the City.
ARTICLE 12
BANKRUPTCY
It is agreed that if the Contractor is adjudged bankrupt, either voluntarily or
involuntarily, then this Agreement shall terminate effective on the date and at the time
the bankruptcy petition is filed and Contractor will automatically be in default of this
Agreement and the provisions of Article 1 I will be enforced at City's discretion.
9
ARTICLE 13
DISPUTE RESOLUTION
13.1 Venue; Fees. All claims, counterclaims, disputes and other matters in
question between City and Contractor arising out of, relating to or pertaining to this
Agreement, or the breach of it, or the services of it, or the standard of performance
required in it, shall be addressed by resort to non-binding mediation as authorized under
the laws and rules of Florida; provided, however, that in the event of any dispute between
the parties, the parties agree to first negotiate with each other for a resolution of the
matter or matters in dispute and, upon failure of such negotiations to resolve the dispute,
the parties shall resort to mediation. If mediation is unsuccessful, any such matter may
be determined by litigation in a court of competent jurisdiction in Broward County,
Florida, or the Federal District Court of the Southern District of Florida and appropriate
appellate courts for such venue and jurisdiction. In any litigation, the parties agree to
each waive any trial by jury of any and all issues. In the event of any litigation which
arises out of, pertains to, or relates to this Agreement, or the breach of it, or the standard
of performance required in it, the prevailing party shall be entitled to recover reasonable
attorneys' fees from the non-prevailing party, subject to the limits of this paragraph.
Where the prevailing party is awarded compensatory damages from the non-prevailing
party, the amount of attorneys' fees shall not exceed the amount of compensatory
damages. If no compensatory damages are awarded, the prevailing party is entitled to
reasonable attorneys' fees, which entitlement and award shall not exceed the total amount
payable as Contractor's compensation under this Agreement.
10
• 13.2 Operations During Dispute.
13.2.1 In the event that a dispute, if any, arises between the City and
the Contractor relating to this Agreement, or its performance or compensation, the
Contractor agrees to continue to render service in full compliance with all terms and
conditions of this Agreement as required by the City.
13.2.2 Notwithstanding any other provisions in this Agreement,
whenever any service provided by the Contractor fails to meet City's reasonable
approval, the City will have the right to terminate the Agreement seven (7) days after the
date when the written notice was sent by City of the deficiency, if Contractor has not
cured such deficiency within that time.
ARTICLE 14
MISCELLANEOUS
14.1 Legal Representation. It is acknowledged that each party to this
Agreement had the opportunity to be represented by counsel in the preparation of this
Agreement, and accordingly, the rule that a contract shall be interpreted strictly against
the party preparing same shall not apply to this Agreement due to the joint contributions
of both parties.
14.2 Records. Contractor shall keep such records and accounts and require
any and all subcontractors to keep records and accounts as may be necessary in order to
record complete and correct entries as to personnel hours charged to this engagement, and
any expenses for which Contractor may attempt to claim reimbursement. Such books
and records will be available at all reasonable times for examination and audit by City
and shall be kept for a period of three (3) years after the completion of all work to be
performed pursuant to this Agreement. Incomplete or incorrect entries in such books
and records will be grounds for disallowance by City of any fees or expenses based upon
such entries.
14.3 Assignments, Subcontracts and Amendments. This Agreement, and any
interests in it, shall not in whole or in part be assigned, subcontracted, transferred in any
way or otherwise encumbered, under any circumstances, by Contractor without the prior
written consent of City. For purposes of this Agreement, any change of ownership of or
controlling interest in Contractor shall constitute an assignment which requires City
approval. Violation of the terms of this paragraph shall constitute a breach of this
Agreement by Contractor and City may, in its discretion, cancel this Agreement and
all rights of Contractor under this Agreement will terminate.
It is further agreed that no modification, amendment or alteration of the terms or
conditions contained in this Agreement shall be effective unless contained in a written
document executed by the authorized agents of the parties.
11
14.4 No Contingent Fees. Contractor warrants that it has not employed or
retained any company or person, other than a bona fide employee working solely for the
Contractor to solicit or secure this Agreement, and that it has not paid or agreed to pay
any person, company, corporation, individual or firm, other than a bona fide employee
working solely for Contractor any fee, commission, percentage, gift or other
consideration contingent upon or resulting from the award or making of this Agreement.
For the breach or violation of this provision, the City shall have the right to terminate the
Agreement without liability and, in its discretion, to deduct from the Agreement price, or
otherwise recover the full amount of such fee, commission, percentage, gift or
consideration.
14.5 Notice. Whenever any party desires to give notice to the other party, it
must be given by written notice, sent by certified United States mail, with return receipt
requested, addressed to the party for whom it is intended. The places for giving of notice
shall remain as set forth below until they shall have been changed by written notice in
compliance with the provisions of this section. For the present, the Contractor and the
City designate the following as the respective persons and places for giving of notice:
City: Phil Reeves, Building Official
City of Dania Beach
100 West Dania Beach Boulevard
Dania Beach, Florida 33004
Copy to: Thomas J. Ansbro, Esq.
City Attorney
100 West Dania Beach Boulevard
Dania Beach, Florida 33004
Contractor: Frank Hill Construction, Inc.
Attention: Frank Hill, President
267 SW 12'h Street
Dania Beach, FL 33004
14.6 Binding Authority. Each person signing this Agreement on behalf of
either party individually warrants that he or she has full legal power to execute this
Agreement on behalf of the party for whom he or she is signing, and is authorized to
bind and obligate such party with respect to all provisions contained in this Agreement.
14.7 Headings. Headings in this Agreement are for the convenience of
reference only and shall not be considered in any interpretation of this Agreement.
14.8 Exhibits. Each Exhibit referred to in this Agreement forms an essential
part of this Agreement. The exhibits, if not physically attached, are treated as parts of
this Agreement and are incorporated in it by this reference.
12
14.9 Severability. If any provision of this Agreement or application of it to
any person or situation shall to any extent be held invalid or unenforceable, the remainder
of this Agreement, and the application of such provisions to persons or situations other
than those as to which it shall have been held invalid or unenforceable, shall not be
affected, and shall continue in full force and effect, and shall be enforced to the fullest
extent permitted by law.
14.10 Governing Law. This Agreement shall be governed by the laws of the
State of Florida with venue lying in Broward County, Florida.
14.11 Extent of Agreement. This Agreement represents the entire and
integrated agreement between the City and the Contractor and supersedes all prior
negotiations, representations or agreements, either written or oral.
14.12 Waiver. Failure of the City to insist upon strict performance of any
provision or condition of this Agreement, or to enforce any right contained in it, shall not
be construed as a waiver or relinquishment for the future of any such provision, condition
or right, but the same shall remain in full force and effect.
14.13 Conflict. In the event there is a conflict between any of the terms in any
of the documents contained in any Exhibit to this Agreement and any terms of this
Agreement, the terms of this Agreement shall prevail.
IN WITNESS OF THE FOREGOING, the parties have set their hands and seals the
day and year first written above.
CITY:
CITY OF DANIA BEACH,
a Florida Municipal Corporation
ATTEST
LO - ISE STILSON FITY CLERK PAT FLURY, MAYOR
'-ICTi�L-
APPROVED FOR FO RRECTNESS:
IV PATW, VY MANAGER
BY: '
THOMAS . AN�BR , Y TTORNEY
13
• CONTRACTOR:
FRANK HILL CONSTRUCTION, INC.,
a Florida Corporation
7
CORPORATE SEAL: .
(IF APPLICABLE) SIG ATURE 1
PRINT NAME
TITLE
STATE OF FLORIDA
COUNTY OF BROWARD
BEFORE ME, an officer duly authorized by law to administer oaths and take acknowledgments, personally
appeared f it_,.i L J_ 4, k� , as _i^��:.;1 i of Frank Hill Construction, Inc., a Florida
Corporation, and acknowledged execution of the foregoing Agreement for the use and purposes mentioned
in it and that the instrument is the act and deed of the Contractor.
IN WITNESS OF THE FOREGOING, I have set my hand and official seal at in the State and
County aforesaid on 2006.
—Notary Public;State of Florida at Large
My Commission Expires:
?,A1 HY HERMAN
Ni.xwy Public,State of Florlda
My comm. exp. Feb. 23,2010
Cin,m. No.DD 521486
•
14