Loading...
HomeMy WebLinkAboutR-2005-050 Grenier Site plan request ® RESOLUTION NO. 2005-050 A RESOLUTION OF THE CITY OF DANIA BEACH, FLORIDA, APPROVING THE SITE PLAN REQUEST SUBMITTED BY JOSEPH KALLER,ARCHITECT, ON BEHALF OF JOHN GRENIER,FOR PROPERTY GENERALLY LOCATED ON THE NORTH SIDE OF DANIA BEACH BOULEVARD EAST OF THE DANIANS CONDOMINIUM CLUBHOUSE, FRONTING DANIA BEACH BOULEVARD, IN THE CITY OF DANIA BEACH; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Section 8.4 of Article 1 of Chapter 8 of the Code of Ordinances of the City of Dania Beach, Florida, states that a site plan is required as a condition to the issuance of a building permit; and WHEREAS,Joseph Kaller, Architect, representing John Grenier, has applied for site plan approval for the proposed construction of 9 condominium units, for property generally located on the north side of Dania Beach Blvd., east of the Danians Condominium Clubhouse, fronting Dania • Beach Boulevard; and WHEREAS,the Planning&Zoning Board on February 16,2005 recommended that the City Commission grant the site plan request(SP-06-02),based upon the criteria set forth in Section 8.4 of Article 1 of Chapter 8 of the Code of Ordinances of the City of Dania Beach; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That that certain application (SP-06-02) for site plan approval, a copy of which is attached and made a part of this Resolution as Exhibit "A", is approved, subject to the following conditions: 1. Provide recorded copy of plat prior to issuance of a building permit (Planning 1-25-05). 2. Provide a recorded deed restriction limiting development to 9 condominium units prior to issuance of a building permit (Planning 1-25-05). • 3. Prior to issuance of a building permit, applicant shall submit condo documents containing reasonable rental restrictions (duration and frequency) approved by city staff. 4. Applicant will have to submit a tree removal and relocation permit prior to issuance of any building permits (Landscaping 11-14-04). 5. Hydrant placed as requested—FDC will be on system side of backflow preventor(Fire Marshal 11-15-04). 6. Since only water quality is proposed, please verify whether this project is part of an existing surface water management permit and identify the ultimate outfall location of the drainage system (Public Services 11-22-04). Engineer of record must also identify water quantity component as well and hydraulic capacity of well. Please provide back up calculations. Also, bottom of slab for well is shown at E1 5.00—top of well elevations is shown at E1 4.50. This yields approximately 6"of head over the well grate. Please provide back up calculations which ascertain that the allowable head will generate the necessary flow quantity to evacuate treated runoff. 7. Payment of park impact fees ($27,300) prior to issuance of a building permit. 8. Applicant to obtain written confirmation from City Attorney that parking and driveway areas relative to adjacent property have been dedicated to abutting property owners consisted with the site plan. 9. FDOT approval of driveway location(without need to modify turn lane mediums)required prior to issuance of a building permit. 10. Make sure that the lights around the pool area have a shield or style that protects the south side bedroom windows in building 3 of the Danians Condominium,the closest building to the pool area. It is further noted that the original Site Plan is maintained in the office of the Community Development Department of the City of Dania Beach. Section 2. That based upon the criteria set forth in Section 8-4(p)of Article 1 of Chapter 8,of the Code of Ordinances of the City of Dania Beach, all site plan approvals shall automatically expire and become null and void unless building permits are obtained on or before 18 months from the date of this Resolution. Section 3. That all resolutions or parts of resolutions in conflict with this Resolution are 2 RESOLUTION#2005-050 repealed to the extent of such conflict. • Section 4. That this Resolution shall be in force and take effect immediately upon passage and adoption. PASSED AND ADOPTED on April 26, 2005. Q,, a,--rA_ ANNE CASTRO MAYOR—COMMISSIONER AT EST: ROLL CALL: COMMISSIONER ANTON - YES - � COMMISSIONER BERTINO —RECUSED LOUISE STILSON COMMISSIONER MCELYEA - YES CITY CLERK VICE-MAYOR FLURY - YES MAYOR CASTRO —YES APPROVED AS TO FORM AND CORRECTNESS: BY: THOMASJ. A SBRO CITY ATTORNEY 3 RESOLUTION #2005-050 AGENDA REQUEST FORM CITY OF DANIA BEACH AGENDA ITEM NO. AV3 1. DATE OF COMMISSION MEETING: APRIL 26, 2005 2, DESCRIPTION OF AGENDA ITEM: PUBLIC HEARING—SITE PLAN REQUEST SP-06-02 (DANIA PLACE—CONTINUED FROM APRIL 12,2005 HEARING) 3. COMMISSION ACTION BEING REQUESTED: ADOPT RESOLUTION 4. SUMMARY EXPLANATION & BACKGROUND: Site Plan request by Joseph Kaller, on behalf of John Greiner, for variance approval for the construction of nine (9) condominium units located on the north side of Dania Beach Boulevard, east of the Danians Condominium Clubhouse. 5. ATTACHED EXHIBITS AND ADDITIONAL BACKUP MATERIALS (PLEASE LIST): Resolution Staff Report Comment Sheets Letter from the Danians Condominium Association Application • Location Map Site Plans 6. FOR PURCHASING REQUESTS ONLY: Dept: Amount: $ 7. REVIEWED AND APPROVED FOR ADDITION ON AGENDA: Submitted by: Laurence G. Leeds, AICP, Director Date: April 19, 2005 Community Development Department City Manager Date CITY OF DANIA BEACH COMMUNITY DEVELOPMENT STAFF REPORT DATE: April 12, 2005 TO: Ivan Pato, City Manager VIA: Laurence Leeds, AICP, Director ✓ ✓l,� FROM: Corinne Church, AICP, Principal Planner SUBJECT: VA-40-03/VA-09-04/SP-06-02: Request by Joseph Kaller, on behalf of John Grenier, for variances and site plan approval for the construction 9 condominium units located on the north side of Dania Beach Blvd, east of the Danians Condominium Clubhouse. Variance: 1. To allow a wall sign for a property with less than 300 feet of street frontage; 71 feet of street frontage provided, per Article 28, Section 28. 095(a) of Chapter 28. 2. To allow a 15' east setback and 18'west setback; minimum 25'— 30'side yard setbacks • required, per Section 4.202 of Chapter 28. 3. To allow a catwalk to protrude 6' from the building (east elevation); 4' permitted, per Section 5.32(a) of Chapter 28. Site Plan: Site plan approval for the construction of 9 condominium units. On March 22, 2005 the City Commission continued this time to allow the applicant time to redesign the architectural detail of the building. As a result of the applicant's revisions, fewer variances are being requested. Setback variances for the entry canopy and balconies on the west side of the building are no longer needed. The property is currently vacant and includes a driveway connecting the Danians to the Sea Oaks as well as a small sliver of land (6' wide) currently used for 4 parking spaces. The applicant has drawn the site plan to exclude both of these properties. VARIANCES 1. To allow a WALL SIGN for a property with less than 300 feet of street frontage; 71 feet of street frontage provided, per Article 28, Section 28. 095(a) of Chapter 28. The applicant is proposing a 27 square foot wall sign attached to the south fagade of the building to identify the project. No other signage is proposed for the site. f 2. To allow a 15'east BUILDING SETBACK and 18' west BUILDING SETBACK; 25' and 30' side yard setbacks required respectively, per Section 4.202 of Chapter 28. The subject property is very narrow, 71 feet wide. If the applicant followed the side setback requirements the building could be only 20 feet wide, too narrow to construct a condominium. The requested variances allow a 38 foot wide building. The property abuts parking lots to the west and east. No other property located on Dania Beach Boulevard has the same physical constraints. 3. To allow a CATWALK to protrude 6' from the building (east elevation); 4' permitted, per Section 5.32(a) of Chapter 28. The requested variance will provide a 9'4" setback from the east property line. The requested setback encroachment will not detrimentally affect the surrounding properties because the catwalk will be immediately adjacent to the back side of a shopping center. In addition, the width of the property is unique to the area, no other property located on Dania Beach Boulevard has the same physical constrains. SITE PLAN The current RM-2 zoning designation allows 10 apartment units up to 55 feet in height. The site plan shows nine apartment units in a single building measuring 42 feet in height. The applicant has provided 2.2 parking spaces per unit and 40% pervious area as required by code. . Also, the City's Landscape Consultant has indicated that the proposed landscaping exceeds code requirements. Access is from one driveway onto Dania Beach Boulevard. There is no vehicular access through either Danians or Sea Oaks Condominium. PLANNING AND ZONING BOARD RECOMMENDATION VARIANCES: Approval subject to staff conditions provided the applicant include the property address under the sign. SITE PLAN: Approved with staffs conditions. STAFF RECOMMENDATION VARIANCES: Approval based on the following site limitations and subject to the conditions in Attachment A. 1) This project will provide an 80 — 100 foot separation to any adjacent apartment building. 2) Excluding the sign variance, all variance requests relate to the east and west side of the building. The site abuts a shopping center to the east and a condominium recreation center parking lot to the west. 3) This development parcel is a very narrow parcel (71 feet) thus limiting the size of the apartment building. SITE PLAN: Approval subject to the conditions in Attachment A. DANIA PLACE CONDOMINIUMS VA-40-03/VA-09-04/SP-06-02 ATTACHMENT A 1. Provide recorded copy of plat prior to issuance of a building permit (Planning 1- 25-05). 2. Prior to issuance of a building permit, provide a recorded deed restriction limiting development to 9 condominium units prior to issuance of a building permit (Planning 1-25-05). 3. Prior to issuance of a building permit, applicant shall submit condo documents containing reasonable rental restrictions (duration and frequency) approved by city staff. 4. Applicant will have to submit a tree removal & relocation permit prior to issuance of any building permits (Landscaping 11-14-04). 5. Hydrant placed as requested — FDC will be on system side of back flow preventor (Fire Marshall 11-15-04). 6. Since only water quality is proposed, please verify whether this project is part of an existing surface water management permit and identify the ultimate outfall location of the drainage system (Public Services 11-22-04). Engineer of record must also identify water quantity component as well and hydraulic capacity of well. Please provide back up calculations. Also, bottom of slab for well is shown at E1 5.00 — top of well elevations is shown at E1 4.50. This yields approximately 6" of head over the well grate. Please provide back up calculations which ascertain that the allowable head will generate the necessary flow quantity to evacuate treated runoff. 7. Payment of park impact fees ($27,300) prior to issuance of a building permit. 8. Applicant to obtain written confirmation from City Attorney that parking and driveway areas relative to adjacent property have been dedicated to abutting property owners consisted with the site plan. 9. FDOT approval of driveway location (without need to modify turn lane mediums) required prior to issuance of building permit. % `- ) `'Berr�c City of Dania Beach � n Department of Public Services Engineering Department 100 Rest Dania Beach Blvd Dania Beach, FL 33004 •(954)924-3741 (954)-923-1109(fax) Tuesday February 8`h, 2005 Property: Dania Beach Condominium Permit: VA-09-04 Reviewer: Fernando A. Vazquez, P.E.; Director of Public Service(-- / Former Engineering Reviews: 11/22/04 (CGA) —2/4/05 (CDB-Su rseded) Responses by Architect/Engineer of Record: 1/10/05 The following are these department responses to the letter issued by Joseph B. Kaller&Associates in response to the City's comments dated 11/22/04. The following comments supersede the comments issued by Calvin Giordano on February 4,2005. 1) Addressed 2) Addressed 3) Not addressed—Architect/Engineer of Record shall provide backup information which supports this response,including but not limited to correspondence, calculations, detailed drawings showing turning movements, etc. 4) Addressed 5) Addressed 6) Not addressed—Engineer of Record must also identify water quantity component as well and hydraulic capacity of well. Please provide back up calculations. Also, bottom of slab for well is shown at El 5.00—Top of well elevation is shown at El. 4.50. This yields approximately 6" of head over the well grate. Please provide back up calculations which ascertain that the allowable head will generate the necessary flow quantity to evacuate treated runoff. CC: Karl Kennedy;Calvin Giordano & Associates, Inc Corinne Church: Community Development Larry Leeds Director, Community Development A Calvin, Giordano Associates In c. Engineers • Surveyors • Planners February 4, 2005 f Mr. Fernando Vazquez, P.E. . Director, Public Service City of Dania Beach 100.West Dania Beach Boulevard / L� Dania Beach, Florida 33004 �7 RE: Site Plan Review—Dania Place Condominiums, VA-09-04 CGA Project No. 97-1826.12 Review#2 Dear Mr. Vazquez: Comments are noted below for the above noted site plan: Review date— 2/4/05 Plans dated— 1/22/05 A City of Dania Beach engineering permit will be required for this project. Detailed engineering plans will be required at that time. All previous site plan comment have been addressed Please let me know if you have any comments or questions. Calvin, Giordano and Associates, Inc. is an independent reviewing entity and has no financial or professional interest in this project or with the entity making this site plan application. Sincerely, CALVIN, GIORDANO & ASSOCIATES, INC. arl Ke y, P.E. Associate Reply to: I concur with the above noted site plan comments. 1800 Eller Dtive,Suite 6(K) Fernando Vazquez, P.E. Ci, � Port e:954.921.7781I3;llli Director, Public Service ESQ Phone:954.921.7731 Fax:954.921.8807 560 Village Blvd.,Suite 340 West Palm Bcach, 1 09 934 Phone:561.684.6161 Fax:561.684.6360 Signature Date Ocalvin-giordanoxom P:PRO1ECrS119 7\971826 DANIA NISCF.LLAVEOUS`ENGINEERRJG R1.DOT 'CORRESPONDENCE\.LETTERS AND REPORTS',DANIA PLACE C ONIX)$I rE?LAN . Calvin, Giordano 5 Associates, Inc. Engineers - Surveyors • !Tanners November 22, 2004 Mr. Fernando Vazquez, P,E. Director, Public Service City of Dania Beach 100 West Dania Beach Boulevard Dania Beach,.Florida 33004, RE: Site Plan Review—]Dania Place Condominiums, VA-09-04 CGA Prnject No. 97-1926.12 Dear Mr.Vazquez: Comments are noted below for the above noted site plan: - Review date— 11/22/04 Plans dated— 10/29/04 A City of Dania Beach engineering permit will be required for this project. Detailed engineering plans will be required at that time. ec' a 4' view • 1. Site plan shows existing parking spaces remaining along the west property I-le. The proposed fence and D curb do not provide, ample room for a turn-out (usually 4'). Verify if these spaces are required for daily operation of the adjacent properties or just periodically. `, 2. Show handicap sign at HC space. Add sign fof'Wo Lell Turn" below stop sign at exit onto Dania Beach Boulevard. 3. Access to dumpAer does not appear to be possible with the proposed layout. Provide a letter from the solid waste provider or indicate if the dumpster will be' rolled out for pick-up. 4. The landscape plans do not match the civil plans for location of drainage and Kober«t appear to be dated differently. The area just north of the HC space is completely landscaped and the civil plans have a dry detention area and drainage well. Fan LAndctdik.PL!!!14 o Please revise accordingly. ttd tbi�e.s�ttr 3 n0ttfl:46+,e31.77w, S. Civil plans show fencing across the detention area on the west side of the site, FttK:984.0:r.8eo7 but it does not match the site plan. Also, a gate is shown on the slope. Please review and revise. !du��nArr biYd_Stdu!4G Ph�tUnI Du.F S.K.14 6. Since only water quality is proposed, please yerify whether thus project is part of FW eer.ar>',619M an existing surface water management permit and identify the ultimate outftill location for the drainage system. wn..r�ltin-ginrdailn.rngt - - -- --, CITY OF DANIA 3EACH . Ir j COMMUNITY DEVELOPMENT DEPARTMENT �— ROUTING SHEET PIF SE RFTIEW SIT P �VD UR1�WI XNCOA9A�9 S I.,AIVY` ....x...,`^R .. Route Date: 2/2/2005; PZ L .ems og: V4-09704_ Project: fDATNLA PLACE(DANIA CONDO) Folio: ) _. . Route Via: Mail ❑ Pickup: y7 In-house: ❑ PLEASE REVIEW THE ABOVE REFERENCED PROJECT FOR COMMENTS TO BE INCORPORATED IN THE COMMUNITY DEVELOPMENT DIRECTOR'S STAFF RECOMMENDATION TO THE PLANNING AND ZONING BOARD AND CITY COMMISSION. PLEASE LOG YOUR TIME SPENT AND COMMENTS ON THE ATTACHED REPORTING SHEET. THANK YOU. ❑ Fire Marshall: Ed Tarmey ❑ Planner. Corinne Church . _ ❑ Public Service: Fernando Vaquez '17 Landscape Consultant roved as submitted: L Denied: Comments must be addressed and ❑ Approved with conditions: resubmitted prior to City Commission List conditions: C-/L- Signature mL 00 - - ------- _ _-- - Print Name Date c � a10t2 COW NITY ASSOCIATION MANAGEMENT PO.Box 50' DANIA BEACH, FLORIDA 33004 • TEL: (954)922.3122 FAX: (954)921-5457 E-MAIL: MPMJIMQAOI.COM Joseph B.Kaller& Associates 2417 Hollywood Blvd. Hollywood Florida 33020 Dear Mr. Kaller, This letter is to follow up on the memo sent on July 10,2003. The Board of Governors has approved of the project your clients plan to build on east of The Danians Clubhouse property on]East Dania Beach.Boulevard The approval is only fdr the subjects mentioned at the last meeting,and to the drawings given to the Board of the proposal thus far. This would include the five feet on the west side of their property being legally deeded to the Danians and the roadway existing also being deeded to the DaWarm Also the entire project would be fenced in with a material similar to vinyl or concrete,no wood,and maintained by the owners. Again,I remind you there is a problem that has come up recently with F.D.O.T. wanting to close some medium openings that now exit and closing some east west driving lanes and putting on street parking. The Board of Governors does not approve of the new plan,and they have already signed off on another plan presented earlier by the city, approved by the F.D.O.T.. Please let us know if your plans change,we have put the plans you gave us on display at the Clubhouse for the owners to look at, so we would need an update for any new or different. Also I would like the name and phone number of your clients Attorney for our file. Thank you for your prompt attention to this matter. Sincerely, MP Malone, for Board of Governors,Danians Condominium August 6,2003 dan.kaller.8.03 City of Dania Beach Application for Site Plan Approval 100 W. Dania Beach Blvd. n Dania Beach, Ft_ 33004 Date • 2' 2�-f7Z (954) 924-3645 Phone 7 � (954) 922-2687 Fax Application SP- G'C _ The undersigned petitions the Growth Management Department and/or the City Commission of the City of Dania Beach to consider site plan approval on the parcel(s) of land described in this application. NAME OF APPLICANT: ADDRESS OF APPLICANT: APPLICAN PHONE & FAX: 01 1 L �n ✓� ` /� PROPERTY INTEREST OF APPLICANT (Please provide documentation): 10 ISoiIa�?' -TO wr,.l h6k-tC S NAME AND ADDRESS OF PROPERTY OWNER (Proof of ownership and nif not the applicant— authorization letter to apply as representative ): S /�v`� S /�Cy ADDRESS, TAX FOLIO NUMBER AND LEGAL DESCRIPTION OF SUBJECT PROPERTY (Attach legal description if necessary): i 0rSw ` ot= Wi 0 6,,j ,t4 r3c_t Ito RECORDED PLAT NAME: EXISTING LAND USE DESIGNATION: EXISTING ZONING: LOT SIZE: ACREAGE SQ. FT. DESCRIPTION OF PROJECT: I LIST ANY SPECIAL EXCEPTIONS, VARIANCES, REZONINGS ETC. THAT MAY BE REQURIED TO SUPPORT THIS APPLICATION: ANY OTHER INFORMATION IN SUPPORT OF THIS APPLICATION: NOTE: ALL SIGNATUR' 'OUST 3E NOTARIZED BY ORDER ' DANIA 633EAC11 CITY COMWSSION Sworn to and subscribe before me Signature of Petitioner this S day of � 20 (­2� N ry Publi St of ( It, p-a ) Pri ed Name, Nota Street Address, City State &Zip � Ie� Helen K Harga' ^ Co Y 9=f''QY o 4111�SPIRE-O y 2/ a �i r�+ �-,�- Telephone Number Seat..! :CNDEDTHRUTROYFAININSURANCE�K WHEN PETITIONER IS NOT THE OWNER OF THE SUBJECT PROPERTY, PLEASE FILL THE FOLLOWING: This is to certify that I am the owner of subject lands described above in the PETITION FOR SITE PLAN APPROVAL and that I have authorized to make and file the aforesaid PETITION FOR SITE PLAN APPROVAL. Sworn to and subscribed before me Signature of Petitioner this day of 20 Notary Public State of( ) Printed Name of Notary Street Address, City State &Zip Commission Expires Seal: Telephone Number Site Plan Fees are calculated as follows: Residential - $275.00 Base Fee, plus $8.80 per unit for the first 100 units, plus $4.40 for each unit in excess of 100 units. Non-Residential/ Hotel-Motel -$275.00 Base Fee, plus $1.10 per 100 sq. ft.for the first 10,000 sq. ft. plus 0.55 per 100 sq. ft.for that portion in excess of 10,000 sq. ft. Major revision for residential or non-residential and hotel/motel site plan —'/2 of site plan fee. In addition, a retainer is required for administrative and advertising costs - (As per Ch. 28,Article 9.60. Recovery of costs...) Minimum fee required is $5 000 00 plus the application fee for Non-Residential/Hotel-Motel, Multi- family and and Site Plan Revisions ,. Minimum fee required is $3,000 00 plus the application fee for Duplex Residential DANIA PLACE — SP-06-02 9 CONDOMINIUM UNITS LOCATED ON TH ENORTH SIDE OF DANAI BEACH BLVD EAST OF THE DANIANS CONDOMINIUM CLUBHOUSE. FI C-2 f I' M 2 oanians Jai Alai iThio Dania srappdV center �sioa -2 . _ E DANIA.BEACH BLVD i r Publlx J1 cat, Non Map I • DANIA PLACE.aoc