Loading...
HomeMy WebLinkAboutR-2005-052 CDM water transmission main improvements RESOLUTION NO. 2005-052 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA IN CONNECTION WITH THE CONTINUING PROFESSIONAL ENGINEERING SERVICES CONTRACT FOR THE WATERWORKS CAPITAL IMPROVEMENT PROGRAM; AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE WORK AUTHORIZATION NUMBER TWO WITH CAMP DRESSER & MCKEE INC., FOR PROFESSIONAL ENGINEERING SERVICES FOR NEW WATER TRANSMISSION MAIN IMPROVEMENTS; PROVIDING FOR FUNDING; PROVIDING FOR CONFLICTS; FURTHER PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on November 23, 2004, the City Commission adopted Resolution No. 2004-204 authorizing execution of a General Consulting Engineering Services Agreement ("Agreement") related to services (the "Services") desired by the City, related to the City Water, Wastewater, and Stormwater Capital Improvement Program (the "CIP") with Camp Dresser & McKee, Inc., a Massachusetts corporation authorized to do business in Florida ("CDM"); and WHEREAS,the Services related to the CIP will be developed for and requested by the City and will be evidenced through written Work Authorizations after approval by the City Commission and will specify specific services, fee estimates and schedules; and WHEREAS, CDM has submitted a Work Authorization proposal (Work Authorization No. 2) for Services associated with new water transmission main improvements; and WHEREAS, the detailed scope of Services for Work Authorization No. 2 is attached and incorporated as Exhibit A; and WHEREAS, CDM will perform the Services stated in Exhibit A for a lump sum fee of $115,530.00, including labor, subconsultants and other direct costs, which also includes related reimbursable expenses; and WHEREAS, the Acting Director of Public Services recommends that the City Commission approve Work Authorization Number Two; WHEREAS, the City has provided funding of$67,000.00 in professional fees in the FY 2005 budget and additional funding of $48,530.00 from retained earnings will be necessary to fund the services; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the proper City officials are authorized to execute Work Authorization Number Two with Camp Dresser & McKee, Inc., in connection with a project involving new water transmission main improvements. Section 2. That funding of $67,000.00 from the professional fees category from the FY 2005 budget is appropriated and the Director of Finance is authorized to appropriate an additional amount of $48,530 from retained earnings to fund the additional amount required to fund the services. Section 3. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. • Section 4. That this Resolution shall be in force and take effect immediately upon its passage and adoption. PASSED AND ADOPTED on April 12, 2005. 0" C"� ANNE CASTRO MAYOR—COMMISSIONER ATTEST: ROLL CALL: COMMISSIONER ANTON - YES -� COMMISSIONER BERTINO—YES LOUISE STILSON COMMISSIONER MCELYEA - YES CITY CLERK VICE-MAYOR FLURY - YES MAYOR CASTRO - YES APPROVED AS TO FO AND CORRECTNESS: BY: l P OMAS J. ANSBRO is CITY ATTORNEY 2 RESOLUTION#2005-052 Work Authorization No. 2 City of Dania Beach Engineering Services for Transmission Main Improvements Scope of Work I. Background and General Description of Services This task of the City of Dania Beach's water system five-year capital improvement program includes the addition of new water transmission mains. This scope of work is for professional engineering services associated with preliminary and final design,permitting and bidding for the above-described improvements. In general, the services to be provided will consist of the following: 1. Preliminary Design 2. Final Design 3. Permitting 4. Bidding/Award Services 5. Miscellaneous Services This scope of work is for design-phase services described above. Construction-phase services may be provided under a separate work authorization to be executed following completion of design. II. Scope of Work The Consultant shall perform the following described engineering design services for the proposed improvements. It is the intent of this Scope of Services for the Consultant to provide the City a complete and final Preliminary Design Memorandum(PDM), as described herein, for the proposed improvements,which shall be the basis for the final design and construction documents. The following is a preliminary list of the major improvements that may be included in the project as shown on the attached Figure 1. ® Approximately 4,100 linear feet of 16-inch water transmission main from the water treatment plant north to West Dania Beach Boulevard,then east to Federal Highway,and approximately 2,100 linear feet of 12-inch diameter water transmission main from West Dania Beach Boulevard north to NE 1st Street then west to Bryan Road. cm• WA-1 Ph6268/3/16/05 in tII O z z o 0 . I,dMJIHco �d2I�03� '3AV lsS LL O 3AV 75L M N dAV PL M'S m O 1S '1s1 >_ 1'J 1s L M S ci M (A z N "_ 0 O (Q 3A t, - .A£ '3AV ONZ 'M',S `J Z 4]g 'M•N U a O � MN 3 N z 3 b r 47g M m M•N �y 475 CL O 41 O MN •3^b r��uls nn�s �. 47g ;y1.s .Z - z Pa uaaa,ud 3^b '3AV 416 (D'M'N ^b' . .478 - 47( M 'I1'N '3AV 4ll l YAP Mg '10 '41M 'M'N • 3AV 41LL-M'N n IAV WU;M'N 3AV'4& M'N 0 0 3AV'41£L'M'N (D o a '3AV'41£L'M'N 10 141£L 'M N 1 _J J a '3AV.•41Vt'M'N _.,_ -- 9 w - 3AV'41>l M'N '1zJ -41t4'M N z J VM'4lri 00 AVM 'lilot MN O GVOb NVAb9 a `z a 0 0 0 o _ o ~ o � O N U Z � > • o Miscellaneous valves, fittings, accessories, road crossings,etc., associated with the transmission pipelines. 1. Preliminary Design This task provides for evaluation of existing plant operations,identification of City design preferences, establishing preliminary design criteria, and preparation of a preliminary design-level opinion of construction cost, preparation and submittal of a draft and final PDM, and coordination/review with the City. 1.1 Kick-off Meeting Within fourteen days of the Notice to Proceed,Consultant will schedule,prepare for,and attend a project kick-off meeting with City staff. The primary purpose of the meeting is to establish appropriate lines of communication, review data needed for establishing initial system sizing and design criteria, discuss a conceptual schedule, review the City's objectives for the project,and discuss any specific equipment preferences of City staff. 2. Final Design This task consists of engineering services to prepare construction Contract Documents for the improvements listed above, suitable for competitive bidding by qualified general contractors. The design documents shall include a Project Manual consisting of bidding requirements, contract conditions,contract forms, and technical specifications, and a set of construction drawings. Contract Documents will be submitted in both standard and electronic format. The Contract Documents shall be based on the City of Dania Beach Design Standards, as well as generally accepted engineering and construction practices, as endorsed by the Construction Specifications Institute (CSI) and the City's standard construction agreement,general conditions,bid documents and bonds,copies of which will be provided to the Consultant,in addition to the Supplementary Conditions supplied by the Florida Department of Environmental Protection(FDEP) for use with State Revolving Fund (SRF) loan funded projects. In addition to the Contract Documents,Consultant shall prepare and submit an updated opinion of probable construction cost with each progress submittal based on the proposed improvements reflected in the accompanying construction documents submittal. This scope of work is based on the improvements listed in subsection II above. Design of any facilities other than or substantially different from CM WA-3 Ph6268/3/16/05 those may require a modification to this scope of work and associated budget. 2.1 Construction Drawings Consultant shall prepare construction drawings of the proposed improvements which shall show the location, size, and spatial relationships between existing and proposed structures, equipment, and other improvements. The level of detail and information to be shown on the drawings shall be in conformance with generally accepted standards of the engineering and construction industry. Drawings shall be prepared using AutoCAD Release 2000. It is anticipated that the drawing set may include the following engineering disciplines: ■ Survey ■ General ■ Site Demolition ■ Civil ■ Mechanical Progress submittals of construction drawings will be submitted at various stages of design development,as discussed below. • 2.2 Project Manual Consultant shall prepare a Project Manual for the project including bidding requirements,conditions of the contract,contract forms, and technical specifications for the proposed improvements. The technical specifications shall be based on the CSI 16-division, three- part MASTERFORMAT and consist of written technical descriptions of materials,equipment,construction systems,standards, and workmanship as applicable for this project. The level of detail and information to be included in the Project Manual shall be mutually agreed between Consultant and the City and shall be sufficient to allow competitive bidding of the project from qualified general contractors, and consistent with generally accepted standards of the engineering and construction industry. 2.3 Engineer's Opinion of Cost With each progress submittal of Construction Documents specified below, Consultant shall prepare and submit an updated engineer's opinion of probable cost which is based on the improvements reflected in the accompanying Construction Document submittal. CM WA-4 Ph6268/3/16/05 • 2.4 Progress Submittals of Construction Documents Consultant shall submit progress submittals of the construction documents at the 30%, 50%, 90%, and 100% (bid set) completion stages. Consultant shall submit five (5) sets of each progress submittal. Following each of the progress submittals, Consultant shall schedule two (2)meetings with City staff to review the Contract Documents and discuss any comments and/or questions from City staff. Following these review meetings and receipt of City comments on the progress submittal, Consultant shall proceed with design and preparation of the next progress submittal,addressing City comments, and continuing detailed design development. The following is a general description of the materials and information to be included in each progress submittal. The 30%submittal shall be for preliminary design purposes. Preliminary routing of the proposed transmission system improvements, including the proposed locations of valves,stub- outs,hydrants,fittings, etc.,will be shown on the 30% submittal. A proposed table of contents for the specifications will also be submitted. . The 50%submittal shall consist of a set of drawings including a drawing index, survey, process schematic,site plan,mechanical equipment layout plans for major structures and equipment, and general construction details. Also included will be a draft Project Manual,including draft bidding requirements,contract conditions, contract forms, and technical specifications. The 90%submittal shall consist of a complete set of drawings and Project Manual, completed to a 90%complete level of detail. The 100%complete set shall be suitable for competitive bidding by general contractors. Bidding services are described below. 2.5 Coordination Meetings Consultant shall hold up to two meetings with Metric Engineering to coordinate the correct tie-in location at Federal Highway and Dania Beach Boulevard and obtain other needed information pertinent to the tie-in. CEM WA-5 Ph6268/3/16/05 3. Permitting This task consists of the preparation by the Consultant of necessary construction permit applications to the various regulatory agencies and the City of Dania Beach Building Department(s)having jurisdiction over these projects. This scope of work anticipates the preparation of up to two (2) responses to requests for additional information (RFI), as necessary to clarify the original application,from each agency. Consultant shall prepare and submit applications and respond to RFIs from the following agencies/governmental bodies. The City shall issue checks for the applicable permit application fees. 3.1 Florida Department of Environmental Protection (FDEP) / Broward County Health Department (BCHD) The FDEP will require a Public Drinking Water Facility Construction Permit for the proposed improvements. Review of this application has been delegated by the FDEP to the BCHD in Broward County. Consultant shall prepare this application,with the assistance from the City with respect to historical data,and submit it to BCHD with the necessary support documentation. 3.2 Florida Department of Transportation (FDOT) The FDOT will require right-of-way use permits for construction of the water transmission mains installed within FDOT rights-of-way. Consultant shall prepare these applications,with the assistance from the City,and submit them to the FDOT with the necessary support documentation. 3.3 Broward County (Right-of-Way Use) Broward County will require right-of-way use permits for construction of water transmission mains installed within Broward County road right-of-way. Consultant shall prepare these applications,with the assistance from the City,and submit them to the County with the necessary support documentation. 4. Bidding/Award Services Consultant shall provide the following assistance to the County during the bidding phase of the project: ® Coordinate advertisement of the bid by the City. ® Administer issuance of the bid documents. CM WA-6 Ph6266/3/16/05 ® Respond to communications from registered holders of bid documents. ® Attend a prebid conference followed by a project site visit with interested registered holders of bid documents. ■ Prepare and issue addenda,as necessary to clarify the bid documents. ® Prepare a final engineer's estimate prior to opening of bids for the project. ® Attend bid opening. e For the apparent low bidder, obtain and evaluate information and qualifications submittals required by the bid documents. • Review and tabulate bids,and present a recommendation to the City for award of the contract to the lowest responsive, responsible bidder (Contractor). 5. Miscellaneous Services 5.1 Surveying Services Consultant shall provide the following services through a subconsultant related to surveying services: ® Utilizing GPS,establish State Plane Coordinates (NAD 83/90) on approximately three(3) targets for the site. Prepare 1-foot contour topographic mapping of the project area(s), as necessary for design of the proposed improvements. ■ Determine locations and elevations of existing structures (including finished floors),roadways,visible utilities and storm drains, adjacent property lines (if appropriate), and horizontal and vertical control necessary for construction. ■ Convert survey information to digital format for use on AutoCAD Release 2000. 5.2 Utility Location and Designation Services Consultant shall perform non-intrusive utility locations and designation as required to identify underground utility conflicts. 6. Project and Quality Management Consultant shall provide the following services related to project and quality management for the project: a Project Update/Progress Meetings: the Consultant's project manager shall prepare for and attend monthly status reporting meetings throughout the design phase. More frequent meetings may be undertaken from time to time depending on project schedule. cm WA-7 Ph6268016/05 ® Quality Control / Technical Review: Consultant shall maintain a program of quality control during the design process. A formal Technical Review Committee (TRC),comprised of senior specialists, will be formed near the beginning of the design phase. Three formal TRC meetings will be scheduled during the design process (PDM,50%, and 90%). The project design team shall present the project design to the TRC and respond to questions and comments. ® Preparation of Status Reports: Consultant's project manager shall prepare and submit with each invoice monthly written progress reports summarizing activities completed during the preceding month, and identifying any problems which have arisen, or anticipated needs of the project team. III. Time of Completion The following is a tentative schedule for budgeting purposes: Task Days from Previous Task Days from NTP Kick-off meeting: 14 14 30%Preliminary Design 60 74 50%Design Documents 45 119 90%Design Documents 45 164 100%Bid Set 14 178 . Bid Advertisement 7 185 Bid Opening 30 215 The above estimates assume that data requested from the City are provided in a timely manner, and that City comments on the progress submittal are provided within the timeframe noted above,and that there are no delays in the advertisement, bidding, or construction schedule. IV. Proposed Compensation Engineer shall perform the services defined in this scope of work for a lump sum fee of$115,530,which includes labor, subconsultants, and other direct costs. Invoices will be submitted to the City and paid monthly based on the percentage of work completed to date. CM WA-8 Ph6268/3/16/05 n v] %8 S N J M to M p — O 5 H C O O O O O nN N O P C CCO O Hf N m NM 47 5N9 n O f9 fA fA _5 O oo oo CC oo n S P N S �L b '. J ij' to C.j fA fA fA fA fA fA � C S fA e U V � C � p o -o -I IS s a t pC Oo P Ki � N VI O yi Fy 0 G � �i ap pC o p po pp pp -o to M to 5A a to O t � o 4 V OO oo A u G 17 C t C u c L v1 C O `S O � C V N C V 0p OO O p ~ to O NO s s a a a E s � O EA � h � Hi EA Q G. C O O O O O O O a O O fA to 65 N J - tl9 to M EA to fA N G � ti L O L O N N N N N O O O O V' ti Cp C DL U CCJ Lf C Q ' a S E >G O c. O � U w w c cn .^ O U` ... C .. N M c N U •. N _ in v'+ OM c Ln D 'a O C F �1 City of Dania Beach a Department of Public Services7a ENGINEERING DIVISION 100 West Dania Beach Blvd - Dania Beach, FL 33004 • (954)924-3741 (954)-923-1109(fax) TO: Mayor Anne Castro Vice Mayor Patricia Flury Commissioner Robert Anton Commissioner John Bertino Commissioner C. K. McElyea FROM: Ivan Pato, City Manager Date: March 25, 2005 RE: Continuing Engineering Services - Integrated Waterworks Capital Improvement Program (IWWCIP) - Recommendation to Award Work Order No. 2 to Camp Dresser and McKee Introduction and Background Wn October 22nd, 2002, the City Commission adopted Resolution 2002-120 approving the Water, Wastewater and Stormwater Facilities Plan. The Plan defines future capital infrastructure needs for the water, sewer and stormwater systems in the City and recommends improvements to each system based on current deficiencies, anticipated growth demands and compliance with federal and state environmental mandates. Thereafter, the City Commission awarded a continuing engineering services contract to Camp Dresser and McKee. This continuing engineering contract was designed to have individual work authorizations for design work submitted to the City Commission for approval. The first project to be designed under the Integrated Waterworks Capital Improvement Program (IWWCIP) was the 1.5 MG Ground Storage Tank, the design for which is underway at the present time. The next project is a pipeline from the water plant to downtown to reinforce the downtown distribution system and fire flows. The pipeline will also loop to Bryan Road. CDM was asked to provide this work authorization (WO-2) for engineering services for the water line as outlined in the detailed Scope of Work as attached in Exhibit A hereto. The lump sum fee for the design, surveying, permitting, bidding and award services, and miscellaneous services was negotiated to be $115,530. It is recommended that the City Commission award this work authorization to Camp Dresser and McKee. • WWCIP—ApproN,al of Work Order No. 2 to CDM 3/25/2005 Page A City of Dania Beach Department of Public Services ENGINEERING DIVISION 100 West Dania Beach Blvd - Dania Beach, FL 33004• (954) 924-3741 (954)-923-1 109(fax) The preliminary engineering cost opinion for the construction of the aforementioned facilities was estimated at approximately $800,000 to $1 million. This fee represents 11.5 to 13.5% of the preliminary engineering cost opinion for this project. The fee is somewhat high because of the ground survey work and permitting required. A list of the billing rates is herein attached as Exhibit B - Engineering rates are effective through January 1, 2006. Recommendation It is recommended that the City Commission award Work Authorization No. 2 (WO-2) to the continuing engineering services contract to Camp Dresser and McKee in the amount of$115,530. • • WWCIP—Approval of Work Order No. 2 to CDM 3/25/2005 Page