HomeMy WebLinkAboutR-2003-005 Diversified Drilling well rehabilitation RESOLUTION NO. 2003-005
A RESOLUTION OF THE CITY OF DANIA BEACH, FLORIDA
AUTHORIZING THE CITY MANAGER TO PURCHASE
SERVICES FROM DIVERSIFIED DRILLING, INC. IN AN
AMOUNT NOT TO EXCEED $40,000.00 FOR FISCAL YEAR
02/03; PROVIDING FOR REHABILITATION, LINING,
DEVELOPMENT, PUMP WITHDRAWAL AND INSTALLATION
FOR WATER SUPPLY WELLS "G" AND "H", WITHOUT
COMPETITIVE BIDDING AND WITHOUT ADVERTISEMENT
FOR BIDS; PROVIDING FOR CONFLICTS, FURTHER,
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Charter of the City of Dania Beach, Part III, Article 3, Section 4,
Subsection (J), provides that during unusual conditions or emergencies, the City
Commission may, by resolution, authorize the purchase by the City Manager of
designated supplies, services, equipment and materials in amounts in excess of fifteen
thousand dollars ($15,000.00) without competitive bidding and without advertisement for
bids; and
WHEREAS, the City of Dania Beach ordered a new water supply pump to be
installed in as a replacement for the pump in its Well H last winter, and that said pump
was delivered in late summer, but during installation in late Fall it was found that there
was significant corrosion to the column and casing pipes in the existing well that require
additional work; and
WHEREAS, the City contracted with Gerhardt M. Witt and Associates (GMW&A),
hydrogeologists, to investigate solutions to permit the well to operate for the next 5 to 10
years and make a recommendation for same; and
WHEREAS, GMW&A indicated significant corrosion damage to the well and the
potential for inability to use the wells if repairs are not made, and recommended that the
City clean the wells, line the wells with a 12 inch PVC casing pipe and appropriate
cement to prevent collapse of the formation, videotape the wells, develop the wells and
reinstall pumps to place them into service as soon as possible; and
1 RESOLUTION NO. 2003-005
WHEREAS, GMW&A has talked to two drillers who estimated the costs of the
repairs as follows, exact costs dependent on further investigation of Well G, including
videotaping:
Diversified Drilling Inc. $30-35,000
Morton Pump, Inc. $35-40,000; and
WHEREAS, GMW&A recommends that the City utilize Diversified Drilling, Inc. to
rehabilitate the wells and install the liners at a cost not to exceed $40,000, assuming
permits and construction; and
WHEREAS, the City Manager concurs with this recommendation on an emergency
basis.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the City will contract with Diversified Drilling, Inc. for
rehabilitation, lining, development, pump withdrawal and installation at Wells G and H in
an amount not to exceed $40,000.00 and that the City Manager is authorized to pay
Diversified Drilling, Inc. from the Water Fund Budget and to appropriate $10,000 from
the retained earnings to the FY 2003 budget.
Section 2. That all resolutions or parts of resolutions in conflict with this
resolution are repealed to the extent of such conflict.
Section 3. That this resolution shall be in force and take effect immediately upon
its passage and adoption.
PASSED and ADOPTED this 14th 7MAY
00T H. CHUNN, JR.
— COMMISSIONER
2 RESOLUTION NO. 2003-005
ATTEST: ROLL CALL:
COMMISSIONER BERTINO - YES
COMMISSIONER MCELYEA - YES
fCMOARLENE JO ON COMMISSIONER MIKES - YES
CITY CLERK VICE-MAYOR FLURY -YES
MAYOR CHUNN - YES
APPROVED AS T FORM AND CORRECTNESS:
BY: Al,
T O A J. ANSBRO
CITY'ATTORNEY
3 RESOLUTION NO. 2003-005
01/09/2003 13: 51 5616423327 G M WITT & ASSOC INC PAGE 02
Gerhardt A
Witt
1495 Forest Hill Blvd., Suite F
{ r West Palm Beach, Florida 33406-6073
YSSOCIQt�Si Inc. (561) 642-9923 Fax' (561) 642-3327.
Sentvia: Fax and
i
January 9, 2003
Mr. Michael J. Sheridan, P.E.
Director of Public Works & UtiIities
City of Dania Beach
100 West Dania Beach Boulevard
Dania Beach, FL 33004
RE: CITY OF DANIA BEACH FLORIDA
WELL REHABILITATIONS
ES'lT0/1AT'E OF COSTS
® Dear Mr, Sheridan:
Gerhardt M. Witt & Associates, Inc. solicited cost estimates for the rehabilitation of two (2) wells
(Well G and Well H) from three(3) licensed water well contractors. Two (2) contractors responded
in a timely manner and provided the following cost estimates:
Diversified Drilling Corporation $30,000-$35,000
Morton Pump & Drilling, Inc. $35,000-$40,000
The third drilling contractor, Jaffer Associates, Ltd., provided a cost estimate of$57,000. This
estimate was received late on January 8, 2003, and was rejected.
Based on the above cost estimates, Gerhardt M. Witt & Associates, Inc. recommends that
Diversified. Drilling Corporation be awarded the rehabilitation work and that the City of Dania
Beach reserve a cost not to exceed $40,000 for the contractor's rehabilitation work.
Pilr:I09.p.2 Mhnh C091 CaLwp(I
Hydrogeology, Geology, and Water Resources
01/09/2003 13: 51 5616423327 G M WITT & ASSOC INC PAGE 03
Gerhardt A
Witt
&Assaciafes,lnc, ,.,:
Mr. Michael J. Sheridan, P.E.
City of Dania Beach
January 9, 2003
Page 2
i
Should you have any questions, please do not hesitate to call.
Respectful iy,
GERHARDT M. WITT & ASSOCIATES, INC.
Gerhardt M. Witt, P.G_
Principal Hydrogeologist
® c: Frederick Bloctscher, Public Utility Management & Planning Services, .hic.
Anne Dodd, Gerhardt M. Witt & Associates, Inc_
F°c roe•o-x
rehab cost cvr.wpd
5616423327
01/09/2003 13: 51 5616423327 G M WITT & ASSOC INC PAGE 01
FAX COVER SHEET
GERHARDT M. WITT & ASSOCIATES, INC.
SUITE F
1495 FOREST HILL BOULEVARD
WEST PALM BEACH, FL 33406-6073
TO: ; a n44 er& 0 FAX 4: 5 9 9 - 9 2.1- 2-Gog
cZ{
COMPANY: C-.�y o _ �o^;a ¢�a, PH
FROM: /� -til �g CaGI:o�: n_ FAX#: (561) 642-3327
SUBJECT: WL k\ s -► FILE#:
DATE: I f`?_o # OF PGS (JNCL COVER):
® IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CALL: (561) 642-99.23
COMMENTS:
2wMr.�-,d��ra -, �- we.l\ c'c.,1�►a ,• ;��vo � wank
in��., a_f�i.n Q_5�2, ndq or, an 0N►5�Ttnc..) ---
The information contained in this transmission is privileged and confidential. It is intended only for
the use of the individual or entity named above. If the reader of this message is not the intended
recipient,you are hereby notified that any dissemination, distribution,, or copy of this communication
may be strictly prohibited by law. If you have received this communication in error, please notify us
immediately by telephone collect and return the original message to us at the above address via the
United States Postal Service. We Will reimburse you for postage. Thank you.
HARD COPY OF TRANSMITTED MATERIAL HA S N EN SENT VIA:
Ist CLASS MAIL - PRIORJTY - AIRBORNE - UPS - COURIER - OTHER
F(Ic. niFnr,,,F
fnxcnvp,wpd
AGENDA REQUEST FORM
CITY OF DANIA BEACH
AGENDA,ITEM N0:j
1. DATE OF COMMISSION MEETING: 1/14/03
2. DESCRIPTION OF AGENDA ITEM: RESOLUTION
3. COMMISSION ACTION BEING REQUESTED:
Adopt Resolution or Ordinance ❑ Expenditure XX Award Bid/RFP ❑
Presentation ❑ General approval of item XX Continued from meeting ❑
Other(please explain) ❑
4. SUMMARY EXPLANATION & BACKGROUND:
Consent agenda item involving the purchase of services to clean and line two existing
water supply wells, and videotape wells and pull pumps and re-install pumps
5. ATTACHED EXHIBITS AND ADDITIONAL BACKUP MATERIALS (PLEASE LIST):
Resolution
6. FOR PURCHASING REQUESTS ONLY: Dept: Amount: $
Fund: GENERAL: ❑ WATER: XX SEWER: ❑ STORMWATER: ❑
Account name: Account#:
Finance Director Approval: Date:
7. REVIEWED AND APPROVED FOR ADDITION ON AGENDA:
Submitted by: Michael J. Sheridan Date 1/08/03
Public Works and Utilities Director Date