3. UPDATE FROM NEAL ARONSON, ARCHITECT, ON REVISED PLANS
FOR PIER RESTAURANT.
Acting City Manager Nunemaker explained that the initial design work had begun
for the restaurant and bait shop on the Dania Fishing Pier. He advised that the
plans had been revised as directed by the Commission. He introduced Neal
Aronson who presented the conceptual drawings. Mr. Aronson explained that a
shell was designed with four walls on the first floor and four walls on the second
floor, however he went a step further to design the layout of the seating area on
the first and second floors. He explained that after meeting with staff, the main
entrance was designed on the west side, off of the parking lot, where a handicap
lift could be used as well as stairs. The handicap bathrooms were moved to the
southeast side of the restaurant. The size of the bathrooms were designed
based on seating capacity of 200 people. The size of the kitchen was designed
to be 23' x 19', excluding the prep area. The square footage of the first floor of
MINUTES-WORKSHOP MEETING 1 JULY 12, 2001
the restaurant would be 4,524, excluding the bathrooms, and the square footage
of the second floor, not including the observation tower, would be 2,200,
excluding the bathrooms. The cost to build the shell would be approximately $75
per square foot, not including the windows.
Discussion was held on the placement of the handicap bathroom, the size of the
other bathrooms and the size of the kitchen. Discussion was also held on the
type of windows that should be used and whether or not to build just the first floor
with the availability to build the second floor at a later date.
The Commission generally agreed with the design of the first floor and asked
staff to obtain a price to construct it by itself as one option to be considered. As a
second option, they asked staff to obtain a price to construct the second floor
with only an observation tower and railing around the perimeter, then the
Commission could decide what option would be more cost effective for h, City.
The meeting adjourned at 8:10 p..m:--' ,.^�'.�
ATTEST: ROB'.�RT H. CH N, JR.
'h J MAY�R - COMMISSIONER
• CHARLENE JO NSON
CITY CLERK
APPROVED: NOVEMBER 26, 2002
•
MINUTES-WORKSHOP MEETING 2 JULY 12, 2001