HomeMy WebLinkAboutR-2007-016 City Hall Generator - Coastal RESOLUTION NO. 2007-016
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO
EXECUTE A CHANGE ORDER TO THE EXISTING AGREEMENT WITH
COASTAL CONTRACTING INC. FOR ADDITIONAL CONSTRUCTION
WORK TO INCLUDE A CITY HALL GENERATOR (MANUFACTURED BY
MQ GENERATOR) IN AN AMOUNT NOT TO EXCEED $213,867.00,
WITHOUT COMPETITIVE BIDDING AND WITFIOUT ADVERTISEMENT
FOR BIDS; PROVIDING FOR CONFLICTS; PROVIDING FOR FUNDING,
FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Charter of the City of Dania Beach, Part III, Article 3, Section 4,
Subsection 0), provides that the City Commission may, during unusual conditions or
emergencies, by resolution, authorize the purchase by the City Manager of designated supplies,
services, equipment and materials in amounts in excess of fifteen thousand dollars ($15,000.00)
without competitive bids and without advertising for bids; and
WHEREAS, due to pending construction of the second floor City Hall renovations, it is
necessary to install a new emergency generator and to proceed to acquire and install it
immediately to avoid disruption of the construction project work;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the proper City officials are authorized to execute a change order to
the existing Agreement with Coastal Contracting Inc. in an amount not to exceed $213,867, for
the purchase of an emergency generator manufactured by MQ Generator for City Hall as
appearing in the documents attached as Exhibit "A".
Section 2. That the City Manager and City Attorney are authorized to make minor
revisions to the terms of such documents needed for the change order as are deemed necessary
and proper for the best interests of the City.
Section 3. That the Director of Finance is authorized to seek financing for the
funding required in completing this project.
Section 4. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 5. That this Resolution shall be in force and take effect immediately upon its
passage and adoption.
PASSED AND ADOPTED on January 23, 2007.
PATRICIA FLURY
MAYOR—COMMISSIONER
ATTEST:
LOUISE STILSON, CMC
CITY CLERK
APPROVED AS TO FORM AND CORRECTNESS:
BY:
TH MAS J. ANSBR
CITY ATTORNrEY
2 RESOLUTION 92007-016
IF 1(4 -/
�GSOC iJTID.0 ilaDo7-OIL
• Coastal Contracting & Development, Inc.
P.O. Box 22-3976
Hollywood, FL 33022
(954) 920-7444 / (954) 927-4480 fax
coasts lhollywood(Daol.com
January 16, 2007
City of Dania Beach
RE: City Hall Addition- 350 KW Generator- Deisel -Mo. arand
Attention Dominic,
Attached please find itemized breakdown for the above mentioned generator and all
related work.
Engineering...........................................................................$ 6,000.00
Job supervision- No Charge due to work complete with schedule ....... 00
Asphalt restoration- rear parking lot............................................... 2,000.00
• Sod restoration...........................................................................500.00
Slab area —rock base-..................................................................750.00
Concrete Foundation...................................................................2,400.00
Concreteslab.............................................................................2,160.00
Masonry screen enclosure............................................................3,750.00
SecurityGate................................................................................900.00
Painting........................................................................................500.00
Misc. building repairs....................................................................3,500.00
Generator and all electric- See attached....................................$ 168,165.00
SubTotal................................................................................190,625.00
Additional Bond premium...............................................................3,800.00
Overhead10%...........................................................................19,442.00
Profit.................................................................................................00
TOTALCOST.....................................................................$ 2'13,867.00
• e Y,
AM
� u:H
City of Dania Beach
' Department of Public Services
• ENGINEERING DIVISION
100 West Dania Beach Blvd• Dania Beach, FL 33004 • (954)924-3741 (954)-923-1109(fax)
TO: Mayor Patricia Flury
Vice Mayor Robert Anton
Commissioner Anne Castro
Commissioner John Bertino
Commissioner Paul Fetscher
FROM: Ivan Pato,City Manager
VIA: Dominic Orlando, Director of Public Services
Date: January 16, 2007
RE: Recommendation to Include Furnishing and Installation of Emergency Generator as
Part of the City Hall Expansion Project
.ntroduction and Background
The City Hall Expansion is a Design Build Project. The budget did not include furnishing and
installation of an emergency generator. During the design the contractor was asked to submit a cost
proposal to include a generator. A generator is necessary to provide emergency power to the second
floor which includes a conference room/ emergency operation center. At that time the contractor was
concerned that necessary electrical modifications to the existing electrical system would delay the project
and suggested that we consider a generator for the expansion only and address the existing City Hall
Load in the future with another generator. Another issue was the existing computer room on the first
floor also needs to be addressed now by the proposed generator for the second floor expansion.
During the budget workshop the Director of Public Services requested $200,000 to address the two
generators for City Hall. The Commission questioned this method and suggecsted a single unit be
provided for the entire building. However, since we were concerned with the schedule it was decided to
proceed with a smaller generator to serve the second plus the existing computer room on the first floor.
As a result the Commission reduced the budget to$100,000 for 2007 to address one smaller generator for
the expansion and computer room. The cost for the second unit for the existing City Hall load would be
addressed in 2008.
The Public Services Director had requested the contractor to investigate providing one generator now to
ddress the entire building, present and future loads. Several meetings were held with the Contractor
6d Electrical Contractor to determine if this could be done without delaying the project. The contractor
submitted two cost proposals. One for $213,867.00 includes an MQ Generator and the second for
$313,944 includes a Caterpillar Generator. Since a Commissioner requested the use of a Caterpillar
Page 1
k'Si:i^' .rilRSi,, I.,,
�r City of Dania Beach
� r
V Department of Public Services
• ENGINEERING DIVISION
100 West Dania Beach Blvd • Dania Beach, FL 33004 (954)924-3741 (954)-923-1109(fax)
Generator we requested the contractor to go back to Caterpillar to negotiate a better price. The
Contractor's Electrical sub-contractor stated that Caterpillar reduced their price by only $3,000.00. We
asked the Contractor if he can go back to Caterpillar one more time. . This morning Caterpillar reduced
their price again. The total cost for the Caterpillar unit would be$289,845.00.
The warrantee period for both units is 24 months. Extended warranties for an additional 3 - years are
available. The extended warrantee cost for the Caterpillar Generator was $1,260. We were not able to
obtain cost for the MQ unit. We will follow-up. We can not justify recommending the more expansive
Caterpillar generator as questioned previously by a Commissioner. Due to the difference in cost we
recommend the MQ Generator. Also, based on the limited use we do not recommend purchasing the
extended warrantee.
Recommendation
It is recommended that the City Commission approve the furnishing and installation of a single
emergency generator now as part of the City Hall Expansion without competitive bidding to address
resent and future electrical loads.
•
Page 2
Nib
• REQUEST FOR CHANGE ORDER e e e
To: City Of Dania Beach Request No.: 1
Attu. Dominic Date: Jan. 17, 2007
Project:City Hall- Generator Revision Date:
Project No: Contractor: Coastal Contracting & Develop.
Subject: Generator
Request: Firnish&install Caterpiller Generator as per attached spec sheet.
Base construction costs as per breakdown supplies 1-9-07 .....................$22,460.00
Revised price for Caterpillar-350 KW .......................................232,418.00
SubTotal.................................................................................258,378.00
Additional Bond Premium................................................................5,167.00
Overhead10%.............................................................................26,300.00
Profit0%...........................................................................................00
Total Cost...............................................................................$289,845.00
• Add for extended Warranty-5 years-.................................................$ 1,260.00
Attachments:
gned : G JWcGdy
Title: sident
• Reply: