HomeMy WebLinkAboutR-2000-014 RESOLUTION NO. 2000-014
® A RESOLUTION OF THE CITY OF DANIA BEACH,
FLORIDA, APPROVING A CHANGE ORDER SUBMITTED
BY THERMA SEAL ROOF SYSTEMS INCREASING THE
ORIGINAL CONTRACT PRICE OF $15,409.00 TO
$17,344.40 TO COMPENSATE FOR UNFORESEEN
CONDITIONS IN THE EXISTING ROOF AT DANIA BEACH
BAR & GRILLE; PROVIDING FOR CONFLICTS:
FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA;
Section 1. That that certain Change Order submitted by Therma Seal Roof
Systems increasing the original contract price from $15,409.00 to $17,344.40, to
compensate for unforeseen conditions in the existing roof at Dania Beach Bar & Grille,
in substantial form as Exhibit "A", is approved and the appropriate city officials are
hereby directed to execute it. The City Manager and City Attorney are authorized to
make minor revisions to such Change Order as are deemed necessary and proper for
the best interests of the City.
Section 2. That all resolutions or parts of resolutions in conflict with this resolution
are repealed to the extent of such conflict.
Section 3. That this resolution shall be in force and take effect immediately upon
its passage and adoption.
PASSED AND ADOPTED THIS 8th day of Feb ry 0
i
-COMMISSIONER
ATTEST:
ROLL CALL:
MAYOR BERTINO - YES
/SHERYL dHAPMAN VICE-MAYOR MCELYEA - YES
ACTING CITY CLERK COMMISSIONER ETLING - YES
COMMISSIONER MIKES - YES
APPROVED AS TO FORM
AND CORRECTNESS:
By: 1) � M/
r THO ANS RO
CITY ATTORNEY
RESOLUTION NO. 2000- 014
ROOF SYSTEMS 1333 53rd Street lm Beach FL 3340
Lk No:CCCUMSa
Phone: (561) 848-0333 Fax: (561) 881-8710
January 26,2000
Revised change order
City of Dania Beach'
100 West Dania Beach Blvd.
Dania Beach, Florida 33004
Attn: Ken Koch
Re: Wood/second roof/turbine change order request
Therma Seal is requesting this change order for unseen conditions at Dania Beach Bar&
grille. Upon removal of the shingle roof, it was determined that it had two layers of
sheathing and two layers of roof shingles. Also the sub-fascia was damaged beyond
repair. The roof sheathing will need to be completely replaced. We have included, to
provide new aluminum turbine vents with this as requested. The break down is as
follows.-
Removal and disposal
of second roof and decking 4 hr 2-hoof Mechanics x$ 36.75= $295.00
2- Roof Apprentice x $32.75 = $262.00
Install 60 lineal of 2"x8" $ 45.00
1"x 12" $ 90.00
I"X 2" $ 6.40
6 hr 1 Carpenter x S 36.75 = $220.50
1 Carpenter Helper $32.75 = $ 196.50
300 square foot of 5/8"plywood at$2.50 per square foot $750.00
Two aluminum wind driven turbine $ 35.00 EACH S 70.00
Total $ 1935.40
Please advice as quickly as possible if accepted as to not hold7rk
progress. We are
requesting extension of time to the contract of 7 days due to this w Sincerely
Therma Seal Roof System Accepta a CCi fa B h 14
Mayor
City
William O'Donnell
Acting City Jerk
Approved for form am co ectness: o
c By: ! ��� Tom Ansbro,City Attorney