Loading...
HomeMy WebLinkAboutR-2000-135 RESOLUTION NO. 135 A RESOLUTION OF THE CITY OF DANIA BEACH, FLORIDA, APPROVING THE SITE .PLAN REQUEST SUBMITTED BY MICHAEL SIMMONS, PRESIDENT, PORT PETROLEUM, FOR PROPERTY LOCATED ON THE WEST SIDE OF SW 14T" AVENUE NORTH OF ELLER DRIVE, DANIA BEACH; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Section 8.4 of Article 1 of Chapter 8 of the Code of Ordinances of the City of Dania Beach, Florida, states that a site plan is required as a condition to the issuance of a building permit; and WHEREAS, Michael Simmons, President of Port Petroleum has applied for site plan approval for the proposed construction of a an "unattended" card lock fleet fueling facility to be located on the West side of SW 141h Avenue, North of Eller Drive, Dania Beach; and WHEREAS, the Planning &Zoning Board on July 19, 2000, recommended that the City Commission grant the site plan request(SP-05-00), based upon the criteria set forth in Section 8.4 of Article 1 of Chapter 8 of the Code of Ordinances of the City of Dania Beach; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That that certain application (SP-05-00)for site plan approval, a copy of which is attached and made a part of this Resolution as Exhibit "A" is approved and it is further noted that the original Site Plan is maintained in the office of the Growth Management Department of the City of Dania Beach. R-SP-05-00 PORT PETROLEUM.doc 1 RESOLUTION NO. 2000-135 k Section 2. That based upon the criteria set forth in Section 8-4(p) of Article 1 of Chapter 8, of the Code of Ordinances of the City of Dania Beach, all site Ian approvals p Y p pp shall automatically expire and become null and void unless building permits are obtained on or before 18 months from the date of this resolution. Section 3. That all resolutions or parts of resolutions in conflict with this resolution are repealed to the extent of such conflict. Section 4. That this resolution shall be in force and take effect immediately upon its passage and adoption. PASSED AND ADOPTED THIS 22z UST, 2000. YEA OMMISSIONER ® ATTEST: ROLL CALL: MAYOR McELYEA - YES VICE-MAYOR BERTINO- YES SHERYL CHAPKAAN COMMISSIONER CALI -ABSENT ACTING CITY CLERK COMMISSIONER ETLING - YES COMMISSIONER MIKES- YES APPROVED AS TO FO M AND CORRECTNESS: BY: I THOMA J�/ANSBRO CITY ATTORNEY R-SP-05-00 PORT PETROLEUM.doc 2 RESOLUTION NO. 2000-135 i Application No City of Dania Beach Application for Site Plan Approval Date - --�C( _ � 100 W. Dania Beach Blvd. • Dania Beach, FL 33004 (954) 921-8700 Phone (954) 922-2687 Fax The undersigned petitions the Growth Management Department and/or the City Commission of the City of Dania Beach to consider site plan approval on the parcel(s) of land described in this application. NAME OF APPLICANT: ?a,, t I%�io%°N � ADDRESS OF APPLICANT: 31 �X / Ff• Layde,,'a/a/e , /'C�L 2333 .3- APPLICANT PHONE & FAX: (ys�f) S2 2 -//d•L fox (95--/) .5"2. 7 - PROPERTY INTEREST OF APPLICANT (Please provide documentation): -8u)v e r NAME AND ADDRESS OF PROPERTY OWNER (If not the-applicant-along with authorization letter to-apply as representative): 6reeae a✓/es D G•eehe SOHW.-g farZaeo, �o h"/7 i C. Y00 NO /2"A hve• /oaf. l0 0 A % Al ?1,00 f— yr/ 7 ® ADDRESS, TAX FOLIO NUMBER AND LEGAL DESCRIPTION OF SUBJECT PROPERTY (Attach legal description if necessary): /0 2 Z 3 — Oct -- 00 100 RECORDED PLAT NAME: %IletfEEPONT ,' EXISTING LAND USE DESIGNATION: T�u�s�ortf'oh EXISTING ZONING: M- 3 LOT SIZE: ACREAGE L- 65- SQ. FT. Jl �, 8 2Z DESCRIPTION OF PROJECT: Un-0teioleJ C'o,.(21oe__ /< ),c�/ems f' LIST ANY SPECIAL EXCEPTIONS, VARIANCES, REZONINGS ETC. THAT MAY BE REQURIED TO SUPPORT THIS APPLICATION: ® ANY OTHER INFORMATION IN SUPPORT OF THIS APPLICATION: a q(0 7.m I°gPf �- + I 0 0 0•tID COST ee- NOTE: ALL SIGNATURES MUST BE NOTARIZED BY ORDER OF DANIA BEACH CITY COMMISSION ® Sworn to and subscribed before me Signature of Petitioner this / 4 day of Tom aoe y 19 00 T Notary u c State of (F/o�:du ) ��c 4e �. S�`M Mo•r S Printed Name of Notary Street Address. City State & Zip 3/y/ s• E• �y th ��� TARO o My Comm Commissi s ,o.cc 720626 (9f4) S2 2— /42 Seal: gr(P•.M,�^ om«10 Telephone Number WHEN PETITIONER IS NOT THE OWNER OF THE SUBJECT PROPERTY, PLEASE FILL THE FOLLOWING: This is to certify that I am the owner of subject lands described above in the PETITION FOR SITE PLAN APPROVAL and that I 'have authorized to make and file the aforesaid PETITION FOR SITE PLAN APPROVAL. Sworn to and subscribed before me Signature of Petitioner this day of 19 ® Notary Public State of( ) Printed Name of Notary Street Address, City State 8� Zip Commission Expires Seal: Telephone Number Site Plan Fees are calculated as follows: Residential - $275.00 Base Fee, plus $8.80 per unit for the first 100 units, plus $4.40 for each unit in excess of 100 units. Non-Residential/ Hotei-Motel -$275.00 Base Fee, plus $1.10 per 100 sq.ft.for the first 10,000 sq.ft. plus 0.55 per 100 sq.ft.for that portion in excess of 10,000 sq.ft. Major revision for residential or non-residential and hotel/ motel site plan—'/z of site plan fee. in addition, a retainer is required for administrative and advertising costs -(As per Ch.28,Article 9.60. Recovery of costs...) $1,000.00 - -- Minimum f�=e *rjPd -$2,11011,00n^--pleas petitioner. h 'L y � � o, E O 4 v 7- U U L , 2 ° 'o a 41 ui :3 •Z •3 Q� v m y w `` u O Z w o p � o, • u -, m 4, j vgo u +, o J o tQ, a Q r. m Ll Ul �' u o v a a Lt1 zcn c a a m c. ti O C O OC � 4J G u w y � 4 U u~1 � � LL.1 � w � a J � � -- • ---- T C: J V E O ra w' ul u 0 r, w E V C m v ti w a m v CL Q o o "j a �. u In v a, .� m 2 to ti v� Q) W O ++ C 1.4 v t Q) , a � O u O Tj ti u a a, v w .-1 4-4 ';164 � [a 64 L 0, QI In Ql `p' 1J u O •-7 O Q RL -C 1J .� &y iJrl w iJ -4 4-4E 1) ° m c v R7 �O 11 •C CI O R1 a ., •voz a e Ell I -7_W b'1 iv/ �- Ov � I ,) 1tQ �Q � n � o � M O� WCfN •AL . ;4 CL CO a J N ~ O J�� O d /�����> 4 1Q Q N Q d 0 d" r� LLdJ - ----------- b'SZO Q m z N 0 v o . 0 N N £'BZO 9'SZO I . I I � Q a I w �o :1994S 9ZOO L 1,917-600EE 1=1 31VONV-11VH '909 3AV H1Z L 3N OOb '0 L00-60-EZ-Zt?-O9 - 66-866 L `13 `PJBMOJG AGENDA REQUEST FORM CITY OF DANIA BEACH AGENDA ITEM NO. • 1. DATE OF COMMISSION MEETING: 08-22-00 2. DESCRIPTION OF AGENDA ITEM: SITE PLAN REQUEST-SP-05-00 - BY MICHAEL SIMMONS, FOR PORT PETROLEUM LOCATED ON THE WEST SIDE OF SW 14T" AVENUE NORTH OF ELLER DRIVE. 3. COMMISSION ACTION BEING REQUESTED: ADOPT RESOLUTION 4. SUMMARY EXPLANATION & BACKGROUND: 5. ATTACHED EXHIBITS AND ADDITIONAL BACKUP MATERIALS (PLEASE LIST): STAFF MEMORANDUM REVIEW SHEETS FROM DANIA BEACH FIRE MARSHALL AND UTILITY PUBLIC WORKS DIRECTOR REVIEW LETTERS FROM MITCHELL HARVEY, STRATEGIC PLANNING MANAGER AND LOUIS M. GAGLIARDI, ASSISTANT FIRE CHIEF FOR PORT EVERGLADES RESOULTION APPLICATION LOCATION MAP d ® SITE PLANS 6. FOR PURCHASING REQUESTS ONLY: Dept: Amount: $ 7. REVIEWED AND APPROVED FOR ADDITION ON AGENDA: Planning and Zoning Advisory Board approved the request at their July 19, 2000 regular meeting Submitted by: Laurence G. Leeds,AICP, Director Date 08/15/00 Growth Management Department City Manager Date CITY OF DANIA BEACH • GROWTH MANAGEMENT DEPARTMENT STAFF REPORT TO: Michael Smith, City Manager Cr. elo . FROM: Laurence Leeds, AICP, Director Growth Management Department DATE: August 22, 2000 City Commission Meeting REQUEST: SP-05-00 — Site Plan Request by Port Petroleum LOCATION: West side of SW 14th Avenue north of Eller Drive ZONING: M-3 (Reviewed pursuant to PEDD regulations — see below) LAND USE: Transportation PROPERTY SIZE: Approximately 0.5 acres (A portion of a 2.65 acre parcel) The subject parcel is located within the Port Everglades jurisdictional area. • Although the site is zoned M-3, the City review of the site plan is based on the Port Everglades Development District ("PEDD") regulations. Because the City of Dania Beach contractually agreed in the 1980's that all port property should be zoned PEDD, the City Attorney concurs that staff should apply PEDD criteria. The proposed use is an "unattended" card lock fleet fueling facility. The use is permitted under PEDD as a "service station" or "petroleum processing, transmission, or storage". Only one parking space has been provided, as this does not appear to be a retail facility. The use complies with PEDD requirements relative to building height, setbacks, lot size, and landscaping. As per the PEDD, no loading space is required, and sufficient landscape area is provided (10% required, 15% provided). Separate sign regulations are provided in the PEDD. While a sidewalk is required along 14th avenue, the Public Works/Utilities Director has recommended that it be waived (see attached letter). Please note attached correspondence from Port Everglades Authority staff dated respectively March 6 and 8, 2000. These letters have been forwarded to both the Public Work/Utilities Director and Fire Marshall. STAFF RECOMMENDATION Approval, subject to property owner providing a 24-foot vehicular access reservation to the rear of the property (reservation to provide vehicular access to property behind the fueling facility). Reservation document to be approved by the City Attorney and recorded prior to issuance of a Building Permit. PLANNING AND ZONING ADVISORY BOARD RECOMMENDATION Approval, subject to property owner providing a 24-foot vehicular access reservation to the rear of the property (reservation to provide vehicular access to property behind the fueling facility). Reservation document to be approved by the City Attorney and recorded prior to issuance of a Building Permit. CITY OF DANIA BEACH UTILITIES AND PUBLIC WORKS MEMORANDUM DATE: June 27, 2000 TO: Larry Leeds, Director of Growth Management FROM: Robert (Bud) Palm, Director of Utilities/Public Works SUBJECT: Port Petroleum After carefully reviewing the request from Port Petroleum to not install sidewalks at SE 14 Ave (inside the Port Everglades). I feel this is a reasonable request, since there are no sidewalks in Port Everglades, and no pedestrians conducive for the need of sidewalks, that I could find. Bud • JUN 2 7 � -U iI-i-W rUR1 LEI%,I"Ll.l11 �LG1171 lJ•7C.J11tJ7 t''.b y, June 21. 2000 I 1�0: Bud Palm From: Mike Simmons Re: SP-05-00 1 have enclosed a copy of the Planning and Zoning Board meeting of May 17,2000. Our project is listed under new busui a s.Included are some staff recommendations. We are being asked to pi ovide a sidewalk along,S.E. 14'Avenue(inside Port Everglades). We would like this item removed, basically.because there arc no other sidewalks along 14t° avenue, in fact there are no sidewalks.in Port Everglades.This is a well traveled road by heavy trucks and we do not have any pedestrian traffic now and do not wish to encourage any.If you look at the surrounding businesses,FP&L to the east,and major of I companies to the north you can see that this area does not generate any pedestrian traffic.Please send me a letter with your recommendation for removal of the sidewalk provision. If there are any questions please call me directly. Your assistance in this matter is greatly appreciated. i i Sincerely, I Michael A. Simmons Picsident I MAS/Igs i 3141 S.E. 1-tin AVENUE • P.O.BOX 21092 FORT tAUDEROALE.FLORIDA 33335 • (9S4)S22-1182 • FAX(9541 S27-1191 1000 HARBOR STREET - P.O.BOX 2638 ■ FORT PIERCF, FLORIDA 34954 - 15611461.1012 - FAX(561)468.8S02 V CITY OF DANIA BEACH ROUTING SHEET 100 W. Dania Beach Blvd. Dania Beach, FL 33004 Phone: (954) 924-3645 Fax: (954) 922-2687 DATE: February 1, 2000 PROJECT-NAME PORT PETROLEUM PROJ. NO SP-05-00 VIA: COURIER PICKUP IN-HOUSE x PLEASE REVIEW THE ABOVE REFERENCED PROJECT FOR COMMENTS TO BE INCORPORATED IN THE GROWTH MANAGEMENT DIRECTOR'S STAFF RECOMMENDATION TO THE PLANNING AND ZONING BOARD AND .CITY COMMISSION. PLEASE LOG YOUR TIME SPENT AND COMMENTS ON THE ATTACHED REPORTING SHEET. THANK YOU. ❑ FIRE MARSHAL: Ed Tarmey UTILITIES DIRECTOR: Bud,Palm ❑ CITY ENGINEER: Calvin Giordanno ❑ CITY PLANNER: Terry L. Virta ❑ PLANNING CONSULTANT: Leigh R. Kerr ❑ CITY ATTORNEY: Thomas Ansbro ❑ TRAFFIC CONSULTANT: Molly Hughes ❑ LANDSCAPING CONSULTANT: Bill Tesario ❑ POLICE DEPT.: Chief Anton GROWTH MANAGEMENT DEPARTMENT- SPECIAL INSTRUCTIONS/ NOTES: i cu S ATURE petition routing sheet.doc CITY OF DANIA BEACH ROUTING SHEET 100 W. Dania Beach Blvd. Dania Beach, FL 33004 Phone: (954) 924-3645 Fax: (954) 922-2687 DATE: February 1, 2000 PROJECT NAME PORT PETROLEUM PROJ. NO SP-05-00 VIA: COURIER PICKUP IN-HOUSE x PLEASE REVIEW THE ABOVE REFERENCED PROJECT FOR COMMENTS TO BE INCORPORATED IN THE GROWTH MANAGEMENT DIRECTOR'S STAFF RECOMMENDATION TO THE PLANNING AND ZONING BOARD AND CITY COMMISSION. PLEASE LOG YOUR TIME SPENT AND COMMENTS ON THE ATTACHED REPORTING SHEET. THANK YOU. FIRE MARSHAL: Ed Tarmey '��qj we C,5 OW�{ p&f?rUv4C�:) ❑ UTILITIES DIRECTOR: Bud Palm 4juxe 71-3-Oo ® ❑ CITY ENGINEER: Calvin Giordanno ❑ CITY PLANNER: Terry L. Virta ❑ PLANNING CONSULTANT: Leigh R. Kerr ❑ CITY ATTORNEY: Thomas Ansbro ❑ TRAFFIC CONSULTANT: Molly Hughes ❑ LANDSCAPING CONSULTANT: Bill Tesario ❑ POLICE DEPT.: Chief Anton GROWTH MANAGEMENT DEPARTMENT-SPECIAL INSTRUCTIONS/ NOTES: SIGNATURE petition routing sheet.doc PORT EVERGLADES ® Hollywood/Fort Lauderdale Dania Beach Port Everglades Department of Broward County .:i Fi4 r i.rr.- March 8, 2000 Laurence Leeds, AICP Growth Management Director City of Dania Beach 100 W. Dania Beach Boulevard Dania Beach, FL 33004 Re: SP-05-00 Proposed Site Plan and Application for Port Petroleum Dear Mr. Leeds: Port Everglades planning staff has reviewed the above site plan and found it consistent with the Port Everglades Master Plan and the Deepwater Port Component of the Broward County Comprehensive Plan. Port environmental staff has expressed concern regarding the impact the proposed project will have on the drainage structure on the west side of S.E. 14th Avenue. Both the planning and environmental staff are concerned about the traffic impacts resulting from the ® proposed project and how it will affect Port operations. Port Everglades is the water, and sewer service provider within the Port Jurisdictional Area. It is recommended that the developer of this project coordinate water and sewer tie-ins with John Foglesong, P.E., Port Everglades Project Manager IV. He can be contacted at 523-3404, Extension 3667. Thank you for the opportunity to review this site plan. Please call me if you have any questions regarding this response. Sincerely, D (E Mitchell N. Harvey, AICP Strategic Planning Manager MAR "$ MNH:sp cc: John C. Foglesong, Project Manager IV Allan D. Sosnow, Environmental Projects Manager ® FILE: G:WRCHNEWUTHORIZATION TO CONSTRUCTtPORT PETROLEUM.CDB BROWARD COUNTY BOARD OF COUNTY COMMISSIONERS•An Equal Opportunity Employer and Provider of Services Norman Abramowitz Scott I. Cowan Suzanne N. Gunzburger Kristin D.Jacobs Ilene Lieberman Lori Nance Parrish John E. Rodstrom,Jr. http://www.co.broward.fl.usiport.htm Department of Safety and Emergency Services Fire Rescue Dlvsion Port Everglades Station 6 BROWARD COUNTY 1850 Eller Drive Fort Lauderdale, FL 33316 (954)468-3533 • FAX (954) 765-5375 March 6. 2000 Q v 0 Mr. Laurence Leeds - MW Growth Management Director City of Dania Beach, Florida 100 West Dania Beach Boulevard Dania Beach, FL 33004 Dear Mr. Leeds: RE: SP-05-00 Port Petroleum Thank you for the opportunity to review the above cited site plan for Port Petroleum. I have listed my comments below concerning this project as follows: 1. Water for fire protection is required. Two additional fire hydrants located on the north side of each driveway exit / entrance is required. The fire hydrants shall be installed on a minimum 12"water main. Currently, there is a 6"water main located on the west side of SE 14 Avenue. The Port's water main improvement project will include the installation of a 12"water main on the east side of SE 14 Avenue in the future. The property owner shall tie the new fire hydrants into the new water main when it is installed. The hydrants shall be noted on the site plan with the appropriate comment. 2. Construction permits issued by Port Everglades will be required. Please contact Captain Richard Cavanaugh at 954i468-3533. 3. The traffic pattern on sheet TT-1 indicates tractor-trailers entering the site from the south, heading northbound on SE 14 Ave. and exiting southbound on 14 Ave. Please note that future security plans for Port Everglades may include a security gate on SW 14 Ave. at Eller Drive prohibiting traffic from Eller Drive access to 14 Ave. The proposed security plan calls for two way traffic on 14 Ave., but access only from the north. Southbound traffic will be able to access Eller Drive through the security gate. BROWARD COUNTY BOARD Of COUNTY COMMISSIONERS—An Equal Opportunity Employer and Provider of Services 'Iorman Abramowitz Scott 1. Cowan Suzanne N.Gunzburger Kristin D.Jacobs Ilene Lieberman Lori Nance Parrish John E.Rodstrom,Jr. Visit us on the Intemet www.biowafd.org SP-05-00 Port Petroleum page 2 If you have any further questions or concerns regarding my comments on this proposed site plan, please do not hesitate to contact me at 468-3533. Sincerely, Louis M. Gagliardi, Assistant Fire Chief Broward Fire Rescue, Station 6 Port Everglades cc: Mitchell Harvey, Strategic Planner Jeffrey Brown, Director of Public Safety