Loading...
HomeMy WebLinkAboutR-2007-062 Frank Hill Marina Restroom Change Order 1 RESOLUTION 2007-062 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO INCREASE FUNDING RELATED TO THE EXISTING CONTRACT WITH FRANK HILL CONSTRUCTION, INC. FOR THE CONSTRUCTION OF THE DANIA BEACH MARINA RESTROOMS IN THE AMOUNT OF $18,490.00; PROVIDING FOR CONFLICTS; PROVIDING FOR FUNDING; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City awarded a contract by way of Resolution No. 2006-227 on December 12, 2006 to Frank Hill Construction, Inc., to design, rehabilitate and construct the Dania Beach Marina Restrooms; and WHEREAS, a contract between the City of Dania Beach and Frank Hill Construction, Inc., was executed on January 23, 2007 for the project in the amount of$218,700.00; and WHEREAS, the City desires to make modifications to the design for the improvement of the use of the Marina Restrooms, which will have a total cost of $18,490.00 as detailed in the document attached as "Exhibit A"; and WHEREAS, the City Commission has previously approved funding for the Marina Park improvements in the amount of$269,050.00; NOW, THEREFORE, BE IT RESOVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the proper City officials are authorized to execute Change Order No. 1 to the contract existing between the City and Frank Hill Construction, Inc. for the Dania Beach Marina Restrooms Project in the amount of Eighteen Thousand, Four Hundred Ninety Dollars ($18,490.00) for work described in Exhibit"A" which is attached; such cost is to be funded from the General Obligation Bond related to park improvements. Section 2. That the contract between the City of Dania Beach and Mr. Frank Hill for the Dania Beach Marina Restroom Project is amended to specify that the not to exceed amount is $237,190.00. Section 3. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 4. That this Resolution shall be in force and take effect immediately upon its passage and adoption. PASSED and ADOPTED on March 27, 2007. B NT MAYOR—COMMISSIONER AT EST: LOUISE STILSON, CMC CITY CLERK APPROVED AS TO FO AND CORRECTNESS: BY: / IN, THO AS . B O CITY AT ORN Y 2 RESOLUTION#2007-062 PROPOSAL FROM: Ex Y`1 yr"1 aA 6;�)e(j t— o6 FRANK HILL CONSTRUCTION,INC.CGCO07109 267 SW 12 STREET PAGE NO. l OF I PAGES DANIA BEACH,FLA, 33004 DATE. PROPOSAL SUBMITTED TO: CITY OF DANIA BEACH ATT.COLIN DONNELLY JOB NAME:DANIA BEACH MARINA RESTROOM PROJECT ADDRESS: 103 NORTH BEACH ROAD CHY/STATE/ZIP:DANIA BEACH,FLA. PHONE:OFFICE k 954-920-9126 CELL k 954-520A019 FAX 0 954-920-5668 We hereby submit specifications and estimate for. THE FOLLOWING EXTRAS FOR THE ADDITIONAL 4 FT AND THE RELOCATION OF LIFEGUARD&DOCKMASTER OFFICES AS PER DISCUSSION AND PILIMARY DRAWINGS BY GENE BEIBER LTHREE WINDOWS AND ONE HIGH IMPACT DOOR $5,100.00 2.HANDICAP RAMP&DECK TO DOCKMASTER&LIFEGUARD OFFICES $6,200.00 31ABOR&MATERIALS FOR THE ROOFINGTRUSSES&SHEETING $2,400.00 4.LABOR&MATERIALS FOR CONCRETE,STEEL&STUCCO S 820.00 5.EXTRA FILL FOR FOUNDATION S 500.00 6.TILE FOR LIFEGUARD&DOCKMASTER OFFICES $1,800.00 7.2 HOUR FIREWALL BETWEEN STORAGE ROOM&LIFEGUARD&DOCKMASTERS OFFICE $1,250.00 &ADDITIONAL ARCHITECT FEES S2,000.00 TOTAL $20,070.00 CREDIT FOR CONCRETE VERSUS WOOD DECK OUTSIDE EXISTING STORAGE&RESTROOM S1,580.00 We hereby propose to furnish labor and materials—complete in accordance with the above specifications,for the sum of EIGHTTEEN THOUSAND FOUR HUNDRED&NINTY Dollars(S18,490.00)with payments to be made as follows: All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any alteration or deviation from above specifications involving extra wsu will be executed only upon written orders,and will become an cabs ch over above the estimate.All agreanents e C upon strikes,accident or delays beyond our control.This proposal subject to acceptance within 30 days and itt rd th at tioa R gn Authorized Signature ACCEPTANCE OF PROPOSAL The above prices,specifications mid conditions arc hereby accepted.You are authorized to do the work as specified.Payment will be made as outlined above. ACCEPTED: Signature DATE Signature 0 C-Z CONTRACTORS FORMS FORM NO.PROP 31