HomeMy WebLinkAboutR-2007-062 Frank Hill Marina Restroom Change Order 1 RESOLUTION 2007-062
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO
INCREASE FUNDING RELATED TO THE EXISTING CONTRACT WITH
FRANK HILL CONSTRUCTION, INC. FOR THE CONSTRUCTION OF THE
DANIA BEACH MARINA RESTROOMS IN THE AMOUNT OF $18,490.00;
PROVIDING FOR CONFLICTS; PROVIDING FOR FUNDING; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City awarded a contract by way of Resolution No. 2006-227 on
December 12, 2006 to Frank Hill Construction, Inc., to design, rehabilitate and construct the
Dania Beach Marina Restrooms; and
WHEREAS, a contract between the City of Dania Beach and Frank Hill Construction,
Inc., was executed on January 23, 2007 for the project in the amount of$218,700.00; and
WHEREAS, the City desires to make modifications to the design for the improvement of
the use of the Marina Restrooms, which will have a total cost of $18,490.00 as detailed in the
document attached as "Exhibit A"; and
WHEREAS, the City Commission has previously approved funding for the Marina Park
improvements in the amount of$269,050.00;
NOW, THEREFORE, BE IT RESOVED BY THE CITY COMMISSION OF THE CITY
OF DANIA BEACH, FLORIDA:
Section 1. That the proper City officials are authorized to execute Change Order No.
1 to the contract existing between the City and Frank Hill Construction, Inc. for the Dania Beach
Marina Restrooms Project in the amount of Eighteen Thousand, Four Hundred Ninety Dollars
($18,490.00) for work described in Exhibit"A" which is attached; such cost is to be funded from
the General Obligation Bond related to park improvements.
Section 2. That the contract between the City of Dania Beach and Mr. Frank Hill for
the Dania Beach Marina Restroom Project is amended to specify that the not to exceed amount is
$237,190.00.
Section 3. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 4. That this Resolution shall be in force and take effect immediately upon its
passage and adoption.
PASSED and ADOPTED on March 27, 2007.
B NT
MAYOR—COMMISSIONER
AT EST:
LOUISE STILSON, CMC
CITY CLERK
APPROVED AS TO FO AND CORRECTNESS:
BY: / IN,
THO AS . B O
CITY AT ORN Y
2 RESOLUTION#2007-062
PROPOSAL
FROM: Ex Y`1 yr"1 aA 6;�)e(j t— o6
FRANK HILL CONSTRUCTION,INC.CGCO07109 267 SW 12 STREET PAGE NO. l OF I PAGES
DANIA BEACH,FLA, 33004 DATE.
PROPOSAL SUBMITTED TO:
CITY OF DANIA BEACH
ATT.COLIN DONNELLY JOB NAME:DANIA BEACH MARINA RESTROOM PROJECT
ADDRESS: 103 NORTH BEACH ROAD
CHY/STATE/ZIP:DANIA BEACH,FLA.
PHONE:OFFICE k 954-920-9126
CELL k 954-520A019
FAX 0 954-920-5668
We hereby submit specifications and estimate for.
THE FOLLOWING EXTRAS FOR THE ADDITIONAL 4 FT AND THE RELOCATION OF LIFEGUARD&DOCKMASTER
OFFICES AS PER DISCUSSION AND PILIMARY DRAWINGS BY GENE BEIBER
LTHREE WINDOWS AND ONE HIGH IMPACT DOOR $5,100.00
2.HANDICAP RAMP&DECK TO DOCKMASTER&LIFEGUARD OFFICES $6,200.00
31ABOR&MATERIALS FOR THE ROOFINGTRUSSES&SHEETING $2,400.00
4.LABOR&MATERIALS FOR CONCRETE,STEEL&STUCCO S 820.00
5.EXTRA FILL FOR FOUNDATION S 500.00
6.TILE FOR LIFEGUARD&DOCKMASTER OFFICES $1,800.00
7.2 HOUR FIREWALL BETWEEN STORAGE ROOM&LIFEGUARD&DOCKMASTERS OFFICE $1,250.00
&ADDITIONAL ARCHITECT FEES S2,000.00
TOTAL $20,070.00
CREDIT FOR CONCRETE VERSUS WOOD DECK OUTSIDE EXISTING STORAGE&RESTROOM S1,580.00
We hereby propose to furnish labor and materials—complete in accordance with the above specifications,for the sum of EIGHTTEEN
THOUSAND FOUR HUNDRED&NINTY Dollars(S18,490.00)with payments to be made as follows:
All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any alteration or deviation from above
specifications involving extra wsu will be executed only upon written orders,and will become an cabs ch over above the estimate.All agreanents e C upon
strikes,accident or delays beyond our control.This proposal subject to acceptance within 30 days and itt rd th at tioa R gn
Authorized Signature
ACCEPTANCE OF PROPOSAL
The above prices,specifications mid conditions arc hereby accepted.You are authorized to do the work as specified.Payment will be made as outlined above.
ACCEPTED:
Signature
DATE Signature
0 C-Z CONTRACTORS FORMS FORM NO.PROP 31