Loading...
HomeMy WebLinkAboutR-2007-204 CDM WO#11 RESOLUTION NO. 2007-204 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, RELATING TO CLAIMS SERVICES FOR THE WATER MAIN LOOPING PHASE I — WATER PLANT TO DOWNTOWN WATER MAIN PROJECT; MAKING FINDINGS; AUTHORIZING A WORK ORDER FOR A SUM NOT TO EXCEED $20,000.00 FOR ENGINEERING SUPPORT SERVICES, DUE TO A LEGAL CLAIM BY A PROJECT SUBCONTRACTOR, WITH CAMP DRESSER AND MCKEE; AUTHORIZING THE CITY MANAGER TO EXECUTE THE WORK ORDER; PROVIDING ASSURANCES; PROVIDING FOR FUNDING; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, City Commission previously adopted Resolution 2002-120 approving the Water, Wastewater and Stormwater Facilities Plan which defines future capital infrastructure needs for the water, sewer and stormwater systems in the City and recommends improvements to each system based on current deficiencies, anticipated growth demands and compliance with federal and state environmental mandates; and WHEREAS, the Water Main Looping Phase I — Water Plant to Downtown water main project was one of these projects; and WHEREAS, on May 10, 2006, the City received bids for the Water Main Looping Phase I — Water Plant to Downtown water main project; and WHEREAS, the project was awarded to the low bidder, MEF Construction, Inc., in the amount of$1,794,405.00; and WHEREAS, the work on the Water Main Looping Phase I — Water Plant to Downtown water main project is basically complete, but a claim has arisen through the contractor from one of its subcontractors related to subsurface conditions; and u WHEREAS, the City disagrees with the claim and has requested a work order from Camp, Dresser and McKee for services associated with dealing with this claim in an amount not to exceed $20,000.00; and WHEREAS, specific services are outlined in the attached work order; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the foregoing findings are incorporated by reference and made a part of this Resolution. Section 2. That the City Manager is authorized to execute the work order with Camp Dresser and McKee in the amount of not to exceed $20,000.00. Section 3. That the Director of Finance is authorized to appropriate such costs from the Water Fund retained earnings. Section 4. That the City Manager is authorized to delegate responsibility to appropriate City staff to carry out technical, financial, and administrative activities associated with the work order. Section 5. That all resolutions or part of Resolutions in conflict with any of the provisions of this Resolution are repealed. 2 RESOLUTION#2007-204 Section 6. That this Resolution shall become effective immediately upon its passage and adoption. PASSED AND ADOPTED on October 23, 2007. A04k BdIfXNTON MAYOR-COMMISSIONER ATTEST: ntw_ ""0) LOUISE STILSON, CMC CITY CLERK APPROVED AS TO JFOAND LEGALITY: THOM S SA , CITY ATTORNEY 3 RESOLUTION #2007-204 e Exhibit A City of Dania Beach Scope of Work Construction Claims Support Services Work Order No. 11 Background In November 2004, the City of Dania Beach retained CDM to provide consultant services related to the City's Water, Wastewater, and Stormwater Capital Improvement Program (CIP). The City relies on CDM for expert engineering advice outside the scopes of work of the on- going work authorizations. This work order will provide engineering and technical support services from CDM on an as-needed basis for construction claims. Scope of Work Task 1 - Construction Claims Support Services This upper limit task provides the City with the ability to request CDM services as needed to respond to construction claims. These services include but are not limited to the following: • A. Reviews and analysis by qualified construction managers and engineers of submitted Contractor's claims and related correspondence. documentation research, engineering opinions, responses to correspondence, interpretation of contract documents. B. Attendance at meetings related to construction claims. C. Production of construction records and documents related to claims. Time of Completion There is no set completion date associated with this work. Tasks shall be performed on an as- needed basis with individual deadlines being established as necessary for deliverables. Compensation and Payment Funding for this task shall be an Upper Limit fee of$20,000, (approximately 140 labor hours at current contract billing rates plus reimbursable expenses). Expert witness testimony is not included and shall be contracted and invoiced separately. CONSULTANT will submit monthly invoices based on costs incurred accompanied by status reports to the CITY. CDM w0 11-1 Claim Consulting Sewices doc Miscellaneous Consulting Services for Engineering Studies WorkAuthou-Larion No- 7 • IN WITNESS OF THE FOREGOING, the parties have executed this Work Authorization effective on the date first appearing above. APPROVED FOR FORM AND CITY OF DANIA BEACH CORRECTNESS A Florida municipal corporation ATTEST.- an Pa Ma ger Lo 'se Won, CITY Clerk r Thomas J An ro, CITY Attorney ob Anton, Mayvr Signed, sealed and delivered in the presence: WITNESSES: CAMP DRESSER & McKEE INC. i By: Jonathan Z. G ]d an, P.E. BCEE • STATE OF FLORIDA Associate COUNTY OF BROWARD The foregoing instrument was acknowledged before me on 2007, by Jonathan Z. Goldman, as Associate of Camp Dresser& McKee Inc., a Massachusetts corporation authorized to do business in Florida, on behalf of the corporation. He is personally known to me or has produced as identification and did (did not) take an oath. � w %. Notall Public, State of Florida (Signature of Notary taking Acknowledgment) Name of Notary Types, Printed or Stamped My C mmission Expires: PHYLLIS M.TNOMAS kr: Notary Pudic•Sims • • lifflAll Coiemiss"EViw k*10,2009 Commission 0 M 408190 IF '1 B01"iby National Notary Assn . • cm WO 11-2 Claim Consulting Services doc