HomeMy WebLinkAboutR-2007-211 Camp Dresser and Mckee WO#12 RESOLUTION NO. 2007-211
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, RELATING TO THE CREATION OF A DESIGN-BUILD
PACKAGE FOR THE SOUTHWEST COMMUNITY CENTER, MAKING
FINDINGS;AUTHORIZING A WORK ORDER FOR $16,730.00 FOR DESIGN
SERVICES TO BE PERFORMED BY CAMP DRESSER AND MCKEE;
AUTHORIZING THE CITY MANAGER TO EXECUTE THE WORK ORDER;
PROVIDING FOR ASSURANCES; PROVIDING FOR CONFLICTS;
FURTHER PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City Commission previously approved a capital improvement program
that included monies for a new Southwest Community Center; and
WHEREAS, the City requested a work order from Camp, Dresser and McKee for
services associated with creating design/build specifications for the Center; and
WHEREAS, the work order follows a prior work order for nanofiltration, a ground
storage tank, project coordination, Public Works compound and water main upgrade work on the
same site; and
WHEREAS, specific services are outlined in the attached work order for creating
design/build specifications for the Southwest Community Center;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA, AS FOLLOWS:
Section 1. That the foregoing findings are incorporated by reference and made a part
of this Resolution.
Section 2. That the City Manager is authorized to execute the work order in the
amount of$16,730.00, to be funded from the applicable General Obligation Bond.
Section 3. That the City Manager is authorized to delegate responsibility to
appropriate City staff to carry out technical, financial, and administrative activities associated
with the work order.
Section 4. That all resolutions or parts of resolutions in conflict with any of the
provisions of this Resolution are repealed.
Section 5. That this Resolution shall become effective immediately upon its passage
and adoption.
PASSED AND ADOPTED on October 23, 2007,
A TO
MAYOR-G6MMISSIONER
ATTEST:
C�A �
LOUISE STILSON, CMC
CITY CLERK
APPROVED AS TO O AND LEGALITY
THOMA S AN BRO, CITY ATTORNEY
2 RESOLUTION 42007-211
I
• Exhibit A
City of Dania Beach, Florida
Engineering Services for South West Community Center
Design-Build Criteria Package
Work Authorization No. 12
Scope of Work
I. Background
The City of Dania Beach(CITY) currently owns and operates a water treatment plant
(WTP) at a site located on Stirling Road. Plant site improvements have previously been
identified and include the addition of a new Community Center at the southeast corner
of this site. The Community Center will be utilized by the community for its
organizations' monthly meetings, senior citizens meetings during the day, community
events, as well as other activities.
The purpose of this Project is for Camp Dresser&McKee Inc. (CONSULTANT) to
produce the Design Criteria attachment for the Design Build Package for the
• Community Center building and related site work to be bid by the CITY as a design-
build project. This scope of work is for professional architectural and engineering
services associated with the preparation of the Design Criteria (Attachment A of the
CITY's Design Criteria Design-Build Package, Section IV.1 of the CITY's Standard
Design-Build Criteria Package).
H. Scope of Work
A. Design Phase Services
1. Kickoff Meeting with CITY Personnel
CONSULTANT will prepare for and facilitate one design charrette kickoff meeting.
Attendees at the meeting, in addition to CONSULTANT personnel, will include all
stakeholders deemed by the CITY to have significant input into this project. The
primary purpose of this meeting will be to validate the intended goals focusing on
communication, schedule, and developing a clear understanding of the CITY's
expectations for the project. CONSULTANT and CITY personnel will discuss
applicable spatial needs and relationships of the various groups to occupy the
building,desired architectural features, materials of construction and mechanical,
plumbing and electrical requirements. The intent,at the conclusion of this meeting,is
that all stakeholders will have agreed to an approach methodology, logistical
parameters, conceptual design, and expectations.
`m
1011 V2007 A-1
• Attendance and presentation materials for additional or subsequent design meetings,
Community Meetings,and Review Board Meetings are not included in this scope of
work and,if necessary, shall be completed under a separate scope of work.
2. Preliminary Design
CONSULTANT will develop a building program and schematic floor plan and
exterior building elevation options based on the information from the charrette
workshop.Once these options are reviewed and all parties reach a consensus on the
building layout and aesthetics, then CONSULTANT could proceed with the design
criteria phase of this project.
3. Design Criteria
The CONSULTANT shall prepare the Design Criteria for the proposed Community
Center suitable to be inserted as Attachment A of the CITY's Design-Build Package for
bidding by a Design-Build firm. The level of detail and information to be provided
shall be in conformance with generally accepted standards of the
architectural/engineering profession and construction industry EJCDC standards for
design-build criteria.
The following engineering analyses will be provided:
• 1) CONSULTANT will provide a sketch of the proposed building of approximately
2,500 square feet consisting of a large meeting space, small kitchen, toilet facilities,
two small offices, and small storage area. A figure will be developed depicting the
building floor plan.
2) CONSULTANT will develop a site plan figure showing the locations of the
structure on the plant site, required stormwater improvements including a pond
with a fountain, parking, and related site work.
3) CONSULTANT will perform a coordination review of the full submittal package
once completed by the CITY and provide comments to the signator completing
Section VIII of the CITY's Standard Design-Build Criteria Package).
CONSULTANT will provide the following deliverables to the Owner for review and
comment:
• Draft Design Criteria documents and building sketches and figures (Attachment
A to the CITY's documents) -three (3) sets
• Review comments on full submittal package completed by the City
• Final Design Criteria documents and building sketches and figures (Attachment
A to the CITY's documents) - three (3) sets
•
CM
1011112007 A-2
• 4. Permitting /Bidding/Award and Services during Construction
These services will not be provided by the CONSULTANT as part of this work
authorization.
B. Project and Quality Management
CONSULTANT shall provide the following services related to project and quality
management for the project:
o Project Update/Progress Meetings: the CONSULTANT's project manager shall
prepare for and attend monthly status reporting meetings throughout the life of
the Design Criteria project. More frequent meetings may be undertaken from
time to time depending on project schedule.
o Quality Control/Technical Review: CONSULTANT shall maintain a program of
quality control during this project. One Technical Review Committee (TRC)
meeting will be scheduled during the preparation of the final deliverable.
o Preparation of Status Reports: CONSULTANT's project manager shall prepare
monthly written progress reports summarizing activities completed during the
preceding month, and identifying any problems which have arisen, or
• anticipated needs of the project team.
III. Time of Completion
The following is a tentative schedule for budgeting purposes for the project deliverables:
Task Days from Previous Task Days from NTP
Kick Off Meeting Workshop 7 7
Draft Design Criteria Submittal 14 21
CITY Review 7 28
Final Design Criteria Submittal 7 35
The above estimates assume that data inputs requested from the CITY are provided in a
timely manner, and that CITY comments on the progress submittal are provided within
the timeframe noted above.
IV. Payment and Compensation
Invoicing for the Lump Sum fee of this work shall be monthly on a percentage complete
basis. A status report will accompany each progress billing. The Lump Sum fee for the
Design Criteria Services is $16,730.
•
Cm
10/11/2007 A-3
• IN WITNESS OF THE FOREGOING, the parties have executed this Work Authorization
effective on the date first appearing above.
APPROVED FOR FORM AND CITY OF DANIA BEACH
CORRECTNESS A Florida municipal corporation
ATTEST:
I n Pate, M nagr Louise St' son,C[ Clerk
Thomas J. A�sbre, ITY Attorney Anton, yor
Signed, sealed and delivered in the presence:
WITNESSES: CAMP DRESSER & McKEE INC.
• By. ' ,f Jonathan Z. dman, P.E. BCEE
STATE OF FLORIDA Associay
COUNTY OF BROWARD /h
The foregoing instrument was acknowledged before me on v �O 'r 2007, by
Jonathan Z. Goldman, as Associate of Camp Dresser & McKee Inc., a Massachusetts corporation
authorized to do business in Florida, on behalf of the corporation(fle is personally known to me
or has produced as identification and did t) ake an oath.
« C �� n ,C,U�Lprctl�. �Grut'r'iZ
Notary Public, State of Florida
ature of Notary taking A n wledgment)
Name of Notary Types,Prin d or Stamped
My Commission Expires:
LORETTA C,OOPI0FRI0
e'. Notary Pub1c•Ste*Of FbAM
•}mayCamiWbnEVi aMar70
%± ' ComNaebn a DD 407279
BOndad By NaYaW NdmyAm.
Cm
10111/2007 A-4