HomeMy WebLinkAboutR-1993-202 RESOLUTION NO. '-0?- 9 3
A RESOLUTION OF THE CITY OF DANIA, FLORIDA,
EXPRESSING THE CITY'S POSITION IN CONNECTION
WITH THE PROPOSED PEDESTRIAN TRAIUBIKE PATH
ALONG SOUTHEAST STH AVENUE; AND PROVIDING
FOR AN EFFECTIVE DATE.
WHEREAS, the Florida Department of Transportation has the ability to fund
transportation enhancement projects; and
WHEREAS, such a trail would connect existing bikeways on Sheridan Street and i
Dania Beach Boulevard and would provide access to a regional park; West Lake, as
well as providing access to beach areas in Dania and Hollywood; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA, FLORIDA;
section 1. That the City Commission of the City of Dania supports the
proposal to construct a pedestrian trail/bicycle path along S.E. 5th Avenue between i
Sheridan Street and Dania Beach Boulevard. 1
Section I That all resolutions or parts of resolutions in conflict herewith be
and the same are hereby repealed to the extent of such conflict.
i
Section 3. That this resolution shall be in force and take effect immediately
upon its passage and adoption. ,
14th day of December 19 93
PASSED AND ADOPTED on this
MAYOR - COMMISSIONER
ATTEST:
CITY CLERK - AUDITOR t'
APPROVED AS TO FORM AND CORRECTNESS
By:
FRANK ADLER, City Attorney
1
' profit: 86030- :�•W:1%
Applicant. CITY OF DA\IA \
APPLICATION FOR
1 RANSPORTA71ON E7`'HANCE.NjV-r PRO)ECTS
2. Project rnonty !1
1• Dori/l,(po/County/Other (relative to other applications submined by the appliom.)
(circle as appr°PriateT—
City of Dania i
i
3. (Name of Applicant/0
City of Dania j
i 4. Contact:
Name: will Aden
E
Growth Mana ement Director 33004
i
west Dania Beach Blvd, Dania , FL
Title:
Address: FAX (305) 921-2104
( 305) 921-8700 X255 __ '
Phone:
g• Qualifying Activity(check one or more categories)-
_tea) provision s facilitiCs for
ans and bicycles.(Including projects that implement the
Ame
Acquisition of scenic easements and scenic or NSIOric sites.
___ (c) Scenic or historic highway progTartu•
Landscaping and other scenic beautification.
(e) Historic preservation
Rehabilitation and operation of historic transportation buildings,structures or facilities
(including historic railroad facilities and canals).
dors(including the conversion and use thereof
preservation of abandoned railway corri
for pedesvianor bicycle trails),
Control and rernoval°(outdoor advertising. y
i) Archaeological planning and research
Mitigation of water pollution due to highway rurw(L
g, Describe the direct relationship of the project to the inlermodal transportation system d oa relative 11 `
function, PTOx]nUty or impact. This win conned the esishnq binY de trails on Sheridan St and Dani�and Dania.
It win on,pi to a Loop around West Lake park and win conned residential areas t�(Use additioMS in nal sheets if necessary.) r
and explain why it is nerd
7. Project(A•scription: pcsaibe the Project P f.
(a) ty) ittypcofprojMis being proposed? Bicycle and Pedestrian Trail
Along SE 5 Ave in Dania
T ro l located(and what are the termini,if appropriate)? _
(b) µhe patV would connect Dania Bch Blvdd and Sheridan Street
icly
c D� P each o
O the ro thavearelationship 1UT�ertlrail or alcwTnectrs twoP11tyO t.ateuhighwaysl
OwnLd ro c
rh? Explain edestrian trail in the right of way.
whinal
ch have apbicycle and p Recreation ea
j It also connectsaddnsstrea to beaches and the bicycle trails
I (d) What need will the protect
;.$ The Trail will interconnect two e>.isting )
safety and convienence of the oublic — —
Pro,ecr...
86030-35 f
CITY Oi- )A
tApplicativ
(e) What types)of work wrU be necessary for the project.what is the status(i e,under design,plans
on shell, not begun. to be irunated,etc.),and how does the appbcani propose that work be performed? j4
�V rk T N2 tatu Who PerforrrL
X Not begun City of Dania
Planning
Environmental Assessment X t
Preliminary Design X Not Begun City of Dania
& Engineering
Right of Way Acquisition X
Environmental permitting X E
X Not Begun City of Dania
Design
Construction X Not Begun City of Dania
Construction Engineering X Not Begun City of Dania
Inspection
X City of Dania
Maintenance
) Other ,Y
i 8. Selection Criteria (Use additional sheets if necessary.)
i a's
(a) If it is proposed that the�project be administered by a governmental entity other than the stale,
document that this entity has the fiscal, managerial,environmental and engineering capabilities to
manage the project consistent with federal requirements. The City of Dania is capable
of administering such a construction project. The City completes
such programs regularly.
(b) Can public or private support of the roject be demonstrated?(Examples Include: written endorse
rneni,formal declaration(resolution mancial donations or other appropriate means).
t
(c) Summarize any special characteristics or features of the project.
This will complete a
trail system by connecting Sheridan Street and Dania Beach Blvd.
i
9. What is the total cost of the project and how will it be funded?
Enhancement/ Other Federal/ State/ Local/ Other
S 155, 200 S—� S 19, 409
S 19,409 S_ /
! Total:S 194 , 000
i
i10. What are the contributions toward the project by percentage?
Enhancement/ Other Federal/ Stale/ Local/ Other I
i
s0 _%/ %/ 10 %/
i
2 . ' ..
_�� . , ..
. ;
,.. � 1
`: ;
i
! .
' � _
, ,
1
���' � �'
'M
1
l
Y
j�.-.
L
...��
..ry a " _. _
T ,
'. .-
r,
_ . .. t � _
Y(
.._ .. -. e - ..'
� .
- .. _ b