Loading...
HomeMy WebLinkAboutR-1997-166 RESOLUTION NO. 166-97 A RESOLUTION OF THE CITY OF DANIA, FLORIDA, APPROVING THE AGREEMENT BETWEEN THE CITY OF DANIA AND SUBAQUEOUS SERVICES, INC. TO COMPLETE ALL NECESSARY WORK RELATING TO THE "DANIA CUTOFF CANAL MAINTENANCE DREDGING PROJECT"; AND PROVIDING FOR AN EFFECTIVE DATE. i BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA, FLORIDA; Section 1. That that certain agreement between the City of Dania and Subaqueous Services, Inc. for the completion of all work relating to the "Dania Cutoff Canal Maintenance Dredging Project, " a copy of which is attached hereto and made a part hereof as Exhibit A, be and the same is hereby approved and the appropriate city officials are hereby directed to execute same. Section 2. That all resolutions or parts of resolutions in conflict herewith be and the same are hereby repealed to the extent of such conflict . Section 3. That this resolution shall be in force and take effect immediately upon its passage and adoption. PASSED AND ADOPTED THIS 25 DAY OF NOVEMBER 1997 . XAYOR-CeMMISSIZONER ATTEST : CITY CLER UDITOR APPR AS T FORM AND CORRECTNESS A CITY TTORNEY Resolution No. 166-97 L �.1 CONTRACT (To be executed in triplicate, two copies to be filed in the Office of the City Engineer of Dania, Florida, and one copy to be given to the Contractor) . THIS AGREEMENT, entered into on November 25, 1997, between: CITY OF DANIA, a municipal corporation of Florida, called the "City", 100 WEST DANIA BEACH BOULEVARD, DANIA, FLORIDA 33004, and SUBAQUEOUS SERVICES, INC. , called the "Contractor", a Florida corporation, 4201 KEAN ROAD, FORT LAUDERDALE, FLORIDA 33314, (305) 581-2810. The "Project" is: DANIA CUT-OFF CANAL The "City Engineer" is: COASTAL SYSTEMS INTERNATIONAL 464 SOUTH DIXIE HIGHWAY CORAL GABLES, FLORIDA 33146 (305) 661-3655/ (305) 661-1914 The City and Contractor agree as set forth below: Under due procedure of law, bids were received by the City Commission of the City for the performance of work and supplying materials, etc. , described below and the Commission having considered bids, has determined that the bid of the Contractor was the best and most desirable bid submitted, and has authorized the execution of this contract. The Contractor by virtue of signing the Contract, acknowledges that they and all their subcontractors have satisfied themselves as to the nature and location of the work, the general and local conditions including, but not restricted to: those bearing upon transportation and traffic maintenance; disposal, handling and storage of materials; access road to the site; the conformation and conditions of the work area; and the character of equipment and facilities needed preliminary to and during the performance of the work. Failure on the part of the � 1.1 E-XHIBIT "All Contractor to completely or properly evaluate any factors of 1 costs prior to bidding shall not form a basis for additional compensation if they are awarded the Contract. In consideration of the mutual covenants and obligations of this contract, the City does award the contract to the Contractor, and the Contractor does agree to furnish the necessary labor, tools, equipment, material and supplies, etc. , and to perform the work specified below at the following prices, to-wit: I THE CITY OF DANIA CUT-OFF CANAL MAINTENANCE DREDGING PROJECT iThe undersigned bidder proposes to furnish all labor, tools, material and supplies, and to sustain all the expense incurred in doing the work set forth below that may be awarded the undersigned by the City of Dania, Florida, through its proper officers, and to do the same strictly in accordance with the plans and contract documents on file in the Office of the City Engineer of Dania, which are referred to below and made a part hereof, at the following unit prices, to-wit : BID For furnishing all labor, material and equipment to dredge ± 3100 linear feet of Canal (segments 1,2, 3, 4, and 5) to the specified depth, including mobilization and demobilization, providing as-built surveys, acquisition of spoil disposal site, removal of fill, onsite testing services to perform sampling and testing of turbidity, submittal of test reports and provide a FDEP approved Manatee observer during all water related work in accordance with special environmental permit conditions, the lump sum of ONE HUNDRED EIGHTY-THOUSAND AND SIXTY-NINE ($187, 069) DOLLARS and NO/100th cents . The City of Dania reserves the right to waive any informality in any bid and to reject any or all bids . The undersigned bidder proposes to execute the specified work within the time frame specified below. The reference standards are contained in the 1991 edition of the Florida Department of Transportation' s Standard Specifications for Road and Bridge Construction (FDOT) and its supplements with changes pertaining thereto, as amended by the specifications. 1.2 _. . PRE-CONSTRUCTION SCHEDULING: After the "Award of Contract" and prior to the issuance of the "Authorization to Occupy the Site, " a pre-work Conference will be held between the Contractor, City, the Engineer, utility companies and other contractors affected by the work. The time and place of this conference will be I Bids Due 11: 00 a.m. November 4, 1997 Commission meeting to award contract November 25, 1997 Pre-construction meeting December 9, 1997 Insurance Certificate from Contractor to City naming the City of Dania and Not later than Broward County as additional insureds November 9, 1997 Performance Bond Certificate from Not later than Contractor to City November 9, 1997 Contract starting time Not later than December 12, 1997 *Project Completion Date 120 days after the date of commencement *Liquidated damages will include $500 per day from the substantial completion date. These prices include the protection and continuous use of all existing sewers; conduits, drains, pipes, buildings, walks, bridges and other construction encountered, and the prompt repairing of any damage done them during the progress of the work or from insufficient support; also, all filling, backfilling, tamping , ramming, puddling and consolidating; the removal and disposal of all rubbish and surplus material; also, all pumping, bailing, draining or dewatering of all the excavations incidental to the execution of the work; also, all loss or damage arising out of the nature of the work or from actions of the elements, or from any unforeseen obstruction or difficulties encountered in the prosecution of the work; also, the furnishing of all necessary labor, tools, equipment, materials and supplies, etc. , and the performance of the whole work mentioned in the detailed plans and specifications necessary to give a finished result, and including all expense incurred in or in consequence of the suspension or discontinuance of the work specified and a faithful 1.3 compliance with each and every one of the requirement of the 1 contract and for the faithful completion of the whole, in the manner specified, including the maintenance of the entire work and construction in good condition and repair until final acceptance. In consideration of the payments and covenants to be made and performed by the City, the Contractor does agree: (1) To furnish all labor, tools, equipment, materials and supplies and to do all the work in a first-class, substantial and workmanlike manner, and in conformity details for the work on file in the Office of the City Engineer of the City of Dania, Florida, and strictly in I accordance with the specifications, general stipulations and plans which are referred to and made a part of this contract, as well as to the satisfaction of the City Commission and the City Engineer of the City, and in strict compliance with the directions which may be given by the City Engineer or his authorized representative, at and for the prices plainly set forth. (2) Upon notification by the City, to correct any defective or faulty work or materials which may appear within one j (1) year after completion of contract and receipt of final payment. (3) To comply with the regulations of the Secretary of Labor of the United States of America made pursuant to the Anti-Kickback Act of June 13, 1934, 40 U.S.C. 276 (c) , the Davis-Bacon Act, 40 U.S.C. 276a-7, and any amendments or modifications thereto, and the Contractor shall cause appropriate provisions to be inserted in its subcontracts to insure compliance by its subcontractor(s) under the provisions of the Anti- Kickback Act, subject, however, to any reasonable limitations, variations, tolerances and exemptions from the requirements of the Anti-Kickback Act as the Secretary of Labor may specifically provide. The Contractor will comply with all provisions of Executive Order 112 . 46 of September 24, 1965, and the rules, regulations and relevant orders of the Secretary of Labor. (4) To pay promptly and before final settlement, any and all claims or liens incurred in and about this work. (5) The Contractor agrees that representatives of the U.S. Public Health Service and the State of Florida shall 1.4 i have access to the work wherever it is in preparation or progress, and that the Contractor will provide proper facilities for such access and inspection. (6) Apprentice and Trainee Requirements: Apprentices shall be registered individually under a bona fide apprenticeship program registered with a state apprenticeship agency recognized by the Bureau of Apprenticeship and Training, U.S. Department of Labor. All contracts in excess of $25, 000 shall be governed by the following: Contractor or supplier agrees to make a diligent effort to i hire for the performance of the contract a number of apprentices or trainees in each occupation which bears to the average number of journeymen in that occupation to be employed in the performance of the contract, the ratio of at least one apprentice or trainee to every five journeymen. Contractor or supplier agrees, when feasible, to assure that 25% of such apprentices or trainees are in their first year of training, except when the number of apprentices or trainees to be hired is fewer than four. Contractor or supplier agrees to submit, at three month intervals, to the Bureau of Apprenticeship of the Division of Labor, records of employment by trade of the number of apprentices or trainees employed; race of all apprentices; the number of apprentices or trainees in their first year of training; and total hours of work of all apprentices, trainees and journeymen. Contractor or supplier agrees to submit to the Bureau of Apprenticeship of the Division of Labor, at three month intervals, a statement describing steps taken toward making a diligent effort in the hiring of apprentices and trainees and containing a breakdown by craft of hours worked and wages paid for first year apprentices or trainees, other apprentices or trainees and journeymen. (7) The following documents are incorporated and made a part of this contract: (a) All documents which are attached. j (b) The "Notice to Bidders, „ "Statement of Work, " the "Proposal, " the acknowledgment before a Notary Public, the "Bid Bond, " the "Instructions to +) Bidders, " "Special Conditions, „ Genera 1.5 II Conditions, " and "Specific Provisions" attached hereto, the "Performance Bond, " the plans already prepared, all addenda issued by the City before the receipt of bids, and all provisions required by law, whether actually inserted or not . IN WITNESS WHEREOF, the City has caused these presents to be signed by its Mayor-Commissioner, City Manager, attested by the City Clerk with the corporate seal of the said City of Dania, and the Contractor has executed these presents the day and year written. Signed, Sealed and Witnessed CITY OF DANIA, in the Presence of: FLORIDA: By Witness Mayor-Commissioner By — Witness City Manager Approved by: Attest: City Engineer City Clerk Approved as to form: WITNESSES: City Attorney Witness - Print or type name Subaqueous Services, Inc. Witness - Print or type name By Corporate Seal 1.6 rR ( iY y raj ar t , y A) �t S�t}r.V48 df3a Hl`a� F oalT 5,+1}u M ' lw �rtP4J �.0 4t�yn�in A f� 5 y 51h t66R t y; �M1r