Loading...
HomeMy WebLinkAboutR-1997-15 r RESOLUTION NO. 15-97 j — A RESOLUTION OF THE CITY OF DANIA, FLORIDA, APPROVING THE REQUEST OF BRADLEY DEVELOPMENT COMPANY THAT THE PAYMENT OF IMPACT FEES FOR THE HANDY STORAGE FACILITY BE DEFERRED UNTIL THE TIME THE CERTIFICATE OF OCCUPANCY IS ISSUED BY THE CITY AND PROVIDING FOR AN EFFECTIVE DATE. BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA, FLORIDA; Section 1. That the request of Bradley Development Company that the payment of impact fees for the Handy Storage Facility be deferred until the Certificate of Occupancy is issued by the City be and the same is hereby approved. Section 2: That this resolution shall be in force and take effect immediately upon its passage and adoption. 25 February 1997 PASSED AND ADOPTED on the may-QTf -COMMISSIONER ATTE T: CITY CLERK UDITOR APPROVED AS TO FORM AND CORRECTNESS: CITY ATTORNEY 15-97 1 RESOLUTION NO. i CITY OF DANIA INTEROFFICE MEMORANDUM TO: Michael Smith, City Manager '1 ROM: Ken Koch, Building Official RE: Handy Storage Facility, Impact Fees DATE: January 30, 1997 r Attached is a letter from Gregg Nichols, representing Bradley Development, contractor for this project. In accordance with Dania Code Section 27-204, he is requesting of the Building Official that payment be deferred until issuance of the first Certificate of Occupancy for the project. This request must be approved by the commission. The reason for the request is to allow us to re-write our Impact Fee Schedule (in-process now through our Attorney). Also included is a request to credit$16,443 for their upsizing a water line in the area of their construction. Please verify this with Mr.Palm. emg OwinworftenkochUckmemo.doc 4 _ L JAN-29-1997 11:46 FROM BRADLEY COMPANIES TO HANDY TWELVE P.02 lip Bradley Development Company � POST OFFICE BOX 6875 • 2120 DREW STREET • CLEARWATER.FLORIDA 34818 * TELEPHONE(813)442-3117 January 29, 1997 FAX(813)442-4231 Mr. Ken Koch Building Official City of Dania 100 West Dania Beach Boulevard �I Dania, FL 33004 Re: Handy Storage Facility Impact Fees Dear Kea Following up your letter of January 15. 1997 regarding impact fees, please accept this as our request that payment of impact fees for our proposed Handy Storage facility be deferred. This deferral will allow time for the City to process an ordinance amendment relating to this issue. Attached please find a letter from the Surveyor and a signed and sealed survey attesting to the correct acreage of the property. Also,in the calculation of these impact fees please be sure to include a credit of$16,443.00 for the upsizing of the water line from 8"to 16"per the direction of your Utility Department. I have attached a copy of our engineer's calculati for your review. Your cooperation and assistance in thi after is greatly appreciated. Very truly your BRADLEY D VELOPMEN COMPANY Gregory ichols Vice Pre i ent GAN:p enclosure JAN-29-1997 11:46 FROM SPADLEY COMPANIES TO HANCir' TWELOE P.03 I r� i i K� I N C KEITH & BAGLB99 INC. Consulting Engineen 170D N.W. 64th Street,Sulte 300 Fart Lauderdale. Florida 33309 fine 1954) 489-001 Fax (9541498.9802 January 16, 1997 PROJECT NAME: DANIA HANDY STORAGE PROJECT NUMBER: 93 SECTION 40-3 ENOINEER'S COST ESTIMATE FOR WATER DISTRIBUTION SYSTEM lOiP±:, I9 l ION 6t1ANTITY UNIT. PFt{cE AMouN'f W1.3 Dftrsmbal cost between 16"& 8" D.I.P. W.M : 833 L.F. $21.00 $13,293.00 W11.1 Diflerentail cost between 16"W.M. fittings& 8"W.M.fittings: 1 L.S. $2,900.00 $2,900.00 I W11-6 DlNererttial cast to Connect to 18"dead and water main between 16" & 8"D,I.P, W.M.: 1 L.S. $250.00 $250.00 rAw , ,,�a 1�. f ENGINIlBJS'8 Ct7>yt ESTIMATE ;. , f00C.Te t 1SU1IM SYSTEM $f6,443 p0; 'W.KeIOr,�.f EpfSTElNED FJiEG1Lfi=ER NUMBER 41052 STlkT1�OF.F6Q�inA`= . DATE:,JAQti1s► 'M 1997 t1234MH1DANIAWT i i i i 1 I I i i i i . � I j I i ...