HomeMy WebLinkAboutR-1997-15 r
RESOLUTION NO. 15-97
j —
A RESOLUTION OF THE CITY OF DANIA, FLORIDA,
APPROVING THE REQUEST OF BRADLEY
DEVELOPMENT COMPANY THAT THE PAYMENT OF
IMPACT FEES FOR THE HANDY STORAGE FACILITY BE
DEFERRED UNTIL THE TIME THE CERTIFICATE OF
OCCUPANCY IS ISSUED BY THE CITY AND PROVIDING
FOR AN EFFECTIVE DATE.
BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF
DANIA, FLORIDA;
Section 1. That the request of Bradley Development Company that
the payment of impact fees for the Handy Storage Facility be deferred
until the Certificate of Occupancy is issued by the City be and the same is
hereby approved.
Section 2: That this resolution shall be in force and take effect
immediately upon its passage and adoption.
25 February 1997
PASSED AND ADOPTED on the may-QTf
-COMMISSIONER
ATTE T:
CITY CLERK UDITOR
APPROVED AS TO FORM AND CORRECTNESS:
CITY ATTORNEY
15-97
1 RESOLUTION NO.
i
CITY OF DANIA
INTEROFFICE MEMORANDUM
TO: Michael Smith, City Manager
'1 ROM: Ken Koch, Building Official
RE: Handy Storage Facility, Impact Fees
DATE: January 30, 1997
r
Attached is a letter from Gregg Nichols, representing Bradley Development, contractor for
this project. In accordance with Dania Code Section 27-204, he is requesting of the Building
Official that payment be deferred until issuance of the first Certificate of Occupancy for the
project. This request must be approved by the commission.
The reason for the request is to allow us to re-write our Impact Fee Schedule (in-process
now through our Attorney).
Also included is a request to credit$16,443 for their upsizing a water line in the area of
their construction. Please verify this with Mr.Palm.
emg
OwinworftenkochUckmemo.doc
4
_ L
JAN-29-1997 11:46 FROM BRADLEY COMPANIES TO HANDY TWELVE P.02
lip
Bradley Development Company
� POST OFFICE BOX 6875 • 2120 DREW STREET • CLEARWATER.FLORIDA 34818 * TELEPHONE(813)442-3117
January 29, 1997 FAX(813)442-4231
Mr. Ken Koch
Building Official
City of Dania
100 West Dania Beach Boulevard
�I
Dania, FL 33004
Re: Handy Storage Facility
Impact Fees
Dear Kea
Following up your letter of January 15. 1997 regarding impact fees, please accept this as our
request that payment of impact fees for our proposed Handy Storage facility be deferred. This
deferral will allow time for the City to process an ordinance amendment relating to this issue.
Attached please find a letter from the Surveyor and a signed and sealed survey attesting to the
correct acreage of the property.
Also,in the calculation of these impact fees please be sure to include a credit of$16,443.00 for the
upsizing of the water line from 8"to 16"per the direction of your Utility Department. I have
attached a copy of our engineer's calculati for your review.
Your cooperation and assistance in thi after is greatly appreciated.
Very truly your
BRADLEY D VELOPMEN COMPANY
Gregory ichols
Vice Pre i ent
GAN:p
enclosure
JAN-29-1997 11:46 FROM SPADLEY COMPANIES TO HANCir' TWELOE P.03
I r�
i
i
K�
I N C KEITH & BAGLB99 INC.
Consulting Engineen
170D N.W. 64th Street,Sulte 300
Fart Lauderdale. Florida 33309
fine 1954) 489-001 Fax (9541498.9802
January 16, 1997
PROJECT NAME:
DANIA HANDY STORAGE
PROJECT NUMBER:
93
SECTION 40-3
ENOINEER'S COST ESTIMATE FOR WATER DISTRIBUTION SYSTEM
lOiP±:, I9 l ION 6t1ANTITY UNIT. PFt{cE AMouN'f
W1.3 Dftrsmbal cost between 16"& 8" D.I.P. W.M : 833 L.F. $21.00 $13,293.00
W11.1 Diflerentail cost between 16"W.M. fittings&
8"W.M.fittings: 1 L.S. $2,900.00 $2,900.00
I
W11-6 DlNererttial cast to Connect to 18"dead and
water main between 16" & 8"D,I.P, W.M.: 1 L.S. $250.00 $250.00
rAw ,
,,�a 1�. f ENGINIlBJS'8 Ct7>yt ESTIMATE ;. ,
f00C.Te t 1SU1IM SYSTEM $f6,443 p0;
'W.KeIOr,�.f
EpfSTElNED FJiEG1Lfi=ER NUMBER 41052
STlkT1�OF.F6Q�inA`= .
DATE:,JAQti1s► 'M 1997
t1234MH1DANIAWT
i
i
i
i 1
I
I
i
i
i
i
. �
I
j
I
i
...