RESOLUTION NO. 60-99
A RESOLUTION OF THE CITY OF DANIA BEACH, FLORIDA APPROVING
AGREEMENT BETWEEN OCEAN BAY CONSTRUCTION, INC. AND THE
CITY OF DANIA BEACH FOR PROVIDING ALL MATERIAL, EQUIPMENT
AND LABOR TO PERFORM ALL WORK NECESSARY TO COMPLETE THE
"DRAINAGE PIPE REPLACEMENT" PROJECT; PROVIDING THAT ALL
RESOLUTIONS OR PARTS OF RESOLUTIONS IN CONFLICT WITH THIS
RESOLUTION ARE REPEALED TO EXTENT OF SUCH CONFLICT;
FURTHER, PROVIDING THAT THE EFFECTIVE DATE OF SUCH
AGREEMENT IS RETROACTIVE FROM MARCH 23, 1999.
BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, THAT:
SECTION 1: That certain Agreement between the City of Dania Beach and Ocean Bay
Construction, Inc. for providing all material, equipment and labor to perform all work necessary
to complete the "Drainage Pipe Replacement" project, in substantial form as Exhibit "A",
attached, is approved and the appropriate City Officials are authorized to execute it.
SECTION 2: That certain Agreement between the City of Dania Beach and Ocean Bay
Construction, Inc. shall be in force and take effective retroactive from March 23, 1999.
PASSED AND ADOPTED this 6th day of April, 199,
. j
l
AYOR—COMMISSIONER
ATT ST:
ACTING CITY CLERK
APPROVED AS TO FORM
AND CORRECTNESS:
By:
CI ATTORNEY
RESOLUTION NO. 60-99
f
e�
-r
DOCUMENT 00500
AGREEMENT �1
THIS A EEME T, made and entered into on the / day of
1999, by and between the City of Dania Beach.
Florida, he inafter called the Owner, and Ocean Bay Construction Inc. hereinafter
called the ontractor.
WITNESSETH:
1 . That the Contractor, for the consideration hereafter fully set out, hereby
agrees with the Owner as follows:
That the Contractor shall furnish all the material, equipment and
labor to perform all the work necessary to complete the
"Drainage Pipe Replacement" contract for the City of Dania
Beach, Florida, all in full and complete accordance to the
preceding Contract Documents, which are attached hereto and
made a part thereof, as if fully contained herein;
Advertisement for Bids; Instructions to Bidders; General
Conditions, supplementary Conditions, Addenda,
Construction Drawings and Specifications; the Proposal
and acceptance thereof.
2. That the Contractor shall commence the work performed under this
Agreement on a date to be specified in a written order by the Owner and
shall fully complete all work within sixty days (60 days) from said date.
3. That the Owner hereby agrees to pay to the Contractor for the faithful
performance of this Agreement, subject to additions and deductions as
provided in the Specifications or Proposal, in lawful money of the United
States, the amount of Fifty-seven thousand six hundred thirty Dollars and no
cents ($57.630.00) based on the estimated quantities and unit, or lump sum
prices contained herein.
4. That the Owner, within thirty (30) days from the day an Engineer's approved
Application for Payment is presented to him, will pay the Contractor the
amount approved by the Engineer.
5. Partial payment shall be made on the basis of work performed during the
preceding calendar month, less ten percent (10%) of the amount of such
estimate, which is to be retained by the Owner until all work within a
particular part has been performed strictly in accordance with this Agreement
and until such work has been accepted by the Owner.
Feb/99 00500-1 98-1030
f
r
-r
6. That upon submission by the Contractor of evidence satisfactory to the
Owner that all payrolls, material bills, and other costs incurred by the
Contractor in connection with the construction of the work have been paid in
full, final payment on account of this Agreement shall be made within thirty
(30) days after the completion by the Contractor of all work covered by this
Agreement and the acceptance of such work by the Owner.
7. It is mutually agreed between the parties hereto that time is the essence of
this Contract, and in the event construction of the work is not completed
within the time herein specified, it is agreed that from the compensation
otherwise to be paid to the Contractor, the Owner may retain the sum of
Two Hundred ($200.00) Dollars per day for each day thereafter, Sundays
and Holidays included, that the work remains uncompleted and the Owner is
denied full Beneficial Occupancy of the utility, which sum shall represent the
actual damages which the Owner will have sustained per day by failure of
the Contractor to complete the work within the time stipulated, and this sum
is not a penalty, being the liquidated damages the Owner will have sustained
in the event of such default by the Contractor.
8. It is further mutually agreed between the parties hereto that if, at any time
after the execution of the Agreement and the Surety Bond hereto attached
for its faithful performance and payment, the Owner shall deem the surety or
sureties upon such bond to be unsatisfactory or if, for any reason, such bond
ceases to be adequate to cover the performance of the work, the Contractor
shall, replace the Surety at its expense, within five days after the receipt of
notice from such form and amount and with such surety or sureties as shall
be satisfactory from the Owner. In such event, no further payment to the
Contractor shall be deemed to be due under this Agreement until such new
or additional security for the faithful performance of the work shall be
furnished in a manner and form satisfactory to the Owner.
9. The rate of wages for all laborers, mechanics, and apprentices employed by
the Contractor or any Subcontractor on the work covered by this Contract
shall not be less than the prevailing rates of wages for similar skills or
classifications.
10. No additional work or extras shall be performed unless the same shall be duly
authorized by appropriate action of the Owner.
11 . That in the event either party brings suit for enforcement of this agreement,
the prevailing party shall be entitled to attorney's fees and court costs in
addition to any other remedy afforded by law.
12. The Contractor shall guarantee the complete project against poor
workmanship and faulty materials for a period of twelve (12) months after
final payment and shall immediately correct any defects which may appear
during this period upon notification by the Owner or the Engineer.
Feb/99 00500-2 98-1030
l
f
L
eF
h
r
7
r
13. The making and acceptance of the final payment shall constitute a waiver of
all claims by the Owner other than those arising from unsettled liens, from
faulty work appearing within twelve (12) months after final payment, or from
requirements of the specifications. It shall also constitute a waiver of all
claims by the Contractor, except those previously made and still unsettled.
14. The Contractor may requisition payments for work completed during the
project at monthly intervals. The Contractor's requisition shall show a
complete breakdown of the project components, the quantities completed
and the amount due, together with such supporting evidence as may be
required by the Engineer. Each requisition shall be submitted in quintuplet to
the Engineer for approval. Ten percent (10%) of all monies earned by the
Contractor shall be retained by the Owner until the project is totally
completed as specified, and accepted.
t
i
_d
Feb/99 00500-3 98-1030
L ..
f
r,
T
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the
day first written above, in sextuplet ( six ) counterparts, each of which
shall without proof or accounting for the other counterpart be deemed an original
Contract.
006:41VIMe�nv6s7i t��riaN,Luc,WITNESS:
COACTOR�
_ B
�2C5 i �JF/YT
_ TITLE
DATE: /0/'1121 z /99 9
OWNER
CITY OF DANIA ACH, a Florida ATTEST:
Municipal orp ation
i1711A
.�� ---
J
A/lerre dabalee SNP c5 c �rHP�lR ,
Ma or /k»�cCity Clerk
(Seal)
Mich sm h APPROVED AS TO FORM AND
Cityvlanager CORRECTNESS:
1
DATE: cD
Thom A sbr
City Attorney,, City of Dania Beach
Commission Approved: W
Date
Contract Amount: $ 7� 60
END OF DOCUMENT
I
Feb/99 00500-4
98-1030
f
r--
r,
T
7
_e
Calvin, Giordano&Associates, Inc.
Engineers Surveyors Planners
March 11, 1999
Mr. Robert Palm
Utilities Director
CITY OF DANIA BEACH
100 West Dania Beach Boulevard
Dania, FL 33004
Re: Drainage Pipe Replacement
CGA Project No. 98-1030
Dear Mr. Palm:
On Monday, March 3, 1999, the City received four bids for the above referenced project. T
office has reviewed the bid amounts,bid bonds,and information required from the bidders.
low bidder is Ocean Bay Construction, Inc. from Pompano Beach, Florida. The proposal
cost is $57,360.00. Upon consideration of these bids, this office recommends award of
project to Ocean Bay Construction,Inc.in the amount of$57,630.00.
Enclosed are five copies of the Certified Bid Tabulation. The three lowest bids are preser
below.
Ocean Bay Construction,Inc. Pompano Beach, FL $57,630.0(
Structure Tech Engineering Pompano Beach, FL $67,866.0(
All Florida Engineering Contractors,Inc. Fort Lauderdale, FL $71,000.11
Please also find attached the original bid submittals.
Should you have any questions,please do not hesitate to contact this office.
Sincerely,
CAL�VINN,,GIIOORDANO&ASSOCIATES, INC.
Richard W. Saltrick,RE,
Project Manager
Rwly to,
❑ 2 Oakwood Boulevard cc: Mike Smith,City Manager
su to 120
ltollyw M.R.M.33020
(954)921.7781
(954)92148071u
❑ 400 South Australian Avenue
Suite 655
Wat U.B.A.not5da 33401
(561)835-0052
(561)835-0076 taz
RWS\tw
P:IProjectsl981030 Dania Drainage Pipe Replacelrngineaing\Corrapondenall eticm and Reportsllrm031 I.doc
L r
t
•
,
SUMMARY OF 010 PROPOSALS RECEIVED
FOR:Drainage Pipe Replacement BID OPENING:ololI
4 00 PtA Prepared by Calvin,Giordano d Associates,Inc,
LOCATION: City of Carla Beach I hereby certify that the t09aw ng rs a true
CGA Prafecl No 98-1030
summaryal pr sets received
\/
Signature ^^' 3/ �19
Ocean Bay CanslrVclmn /n/% Date
51ruc.tech Engineering All Flonda n n Pompano Beach,FL E g' eerm9 United Ut:derground Conlraclor
Pompano Beach.FL Miami,FL
TOTAL TOTAL H5M^coa,FL
UNIT ITEM UNIT TOTAL TOTAL
OUANT. UNIT PRICE ITEM UNIT ITEM TOTAL
AMOUNT PRICE AMOUNT UNIT lOU UNIT
., PRICE AMOUNT ITEM
t' PRICE AMOUNT PRICE AMOUNT
T Mabiliteticn
2 flemave 92'corrv-eted motel 1 LS fI0,050.00 fID,D50.00 ' r -
tip° 730 LF 33,600.00 E3.600.00 $11,50000 ff 7,5tUW
3 Imralf4T...off eted PolYethNene Pipe 32'W f1,460.00 $620 58,000.0o $0.00000
d F61 Concrete collar ]JO Lf SSB.00 E4,SM.Op 3822 56,000.60 f70.W
f42.740.00 f74.00 f54.020.00 S7,700.00
5 Pearore ealrting aephelt 1 Eq SS00.00 St00.00 56000 f47,099.E0 f71.10 $51.903.00
8 f1,200.00 f1,200.00 5550.00 $55000
6 flenare gran at. SY f2W.00 E1200.00 1f 20.Op SI,800.00 f1.800.00
d00 SY 52.50 3720.00 SD 33 3199.98
] Performance d PeYmenr Bond Premiums Sf,000.00 f5.o0 SI00.00 E6000p
f LS f1,ro f2.000.00 $7.80 $3.120.00 f1,9B0.00 ff,B00.00 f1,800.00 E2.400.00
TOTAL BgSE BID ITEMS Otams 1-71 $2.570.00 f2.53000 ff.818,818.00
f1,8f 8 00
$57,630.00 $67,866 D0
371,000.18 573.621.00
AMOUNT OF PROPOSAL GUARANTEE
SURETY 5% 5% 5%CaaNers Check Western Surety Can 5%
f300000 Par'Y Preferred National ins.Co 5%
COMMENTS Houston,T% CumDMaT Casualty FL
d Surety
Card nces dine no,
FL Tempe,FL
Slight differences due ro rounding
figures
Page I
L
f
M