HomeMy WebLinkAboutR-2007-231 Marina Restroom Change Order 2 and 3 RESOLUTION NO. 2007-231 A RESOLUTION OF THE CITY COMMISSION OF THE CITY DANIA BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO INCREASE THE CONTRACT EXISTING BETWEEN THE CITY AND FRANK HILL CONSTRUCTION, INC. FOR THE CONSTRUCTION OF THE DANIA BEACH MARINA RESTROOMS BY THE AMOUNT OF $2,828.10; PROVIDING FOR CONFLICTS; PROVIDING FOR FUNDING; FURTHER, PROVIDING FOR AND EFFECTIVE DATE. WHEREAS, the City awarded a contract pursuant to Resolution No. 2006-227 on December 12, 2006 to Frank Hill Construction, Inc. to design, rehabilitate and construct the Dania Beach Marina Restrooms; and WHEREAS, a contract between the City of Dania Beach and the company was executed on January 23, 2007 for the project in the amount of$218,700.00; and WHEREAS, the contract amount was increased by $18,490.00 by Resolution No. 2007- 062; and WHEREAS, the City desires to make modifications to the design for the betterment of the use of the Marina Restrooms which have a total cost in the amount of$2,828.10 as detailed in Change Orders No. 2 and No. 3, as shown in the documents attached as "Exhibit A" and "Exhibit B", respectively; and WHEREAS, the City Commission previously approved funding for the project in the amount of$269,050.00; NOW, THEREFORE, BE IT RESOVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the proper City officials are authorized to execute Change Orders No. 2 and No. 3, to the contract existing between the City and the Frank Hill Construction, Inc. for the Dania Beach Marina Restrooms Project in the exact amount of$2,828.10 for work described in Exhibits "A" and "B", copies of which are attached. Section 2. That the contract between the City of Dania Beach and the company for the Dania Beach Marina Restroom Project is amended to provide for payment of an amount not to exceed $240,018.10 to be funded from the applicable General Obligation Bond. Section 3. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 4. That this Resolution shall be in force and take effect immediately upon its passage and adoption. PASSED AND ADOPTED on November 27, 2007. B10B ANTO MAYOR-COMMISSIONER ATTEST: LOUISE STILSON, CMC CITY CLERK APPROVED AS TO I 1,ID CORRECTNESS BY: � ' T MAS B O CITY A O EY 2 RESOLUTION#2007-231 FRANK HILL CONSTRUCTION, INC �1�cl C00007 109 Invoice 267$VV 12TH STREET Number 1004 DAWA BEACH,FLA, 33004 CELLINI964-520-0018 FAY*964.9MW8 Date, July 19.2007 SM To: Ship To: U11'Ir r"(WW"T.Lly 10ANIA REAC11 MARINA RESTROK& 1,11TV OF WV .A %LACI; N. PE.A'1'9 ROAD 11(6 DANIA b*W;H 811M). !')ANIA BEACH, FLA Description Amount w: F!0, OLT MBFTI�X' ON 1 1 THE ',A04S 0,14 THE 16AN.',1 PWA-IF xIAP-NA RFS7kXW T14F F0U,1,)W1'NG 11, THE {.'TkEbtT AND CIPCHARGC rrm TiR 2 W�Xs tlp ? LOCKN AT 1J51.(f5 FA(>l 90 2.2' t,VXjk' loNl'AN RISHWUTTOV C7,)NTW L LzXKS N", 00 'FRAMK MILL CINSTW01710".INC. Total 162. 10 0-30,days V -go days i 61 .90 days 81i days i Total Spo.00 ........... FRANK HILL CONSTRUCTION, INC C13C537109 invoi ce 261 SW 12TH STRUT Aumber 1046 DANIABEACKFI-A 33DU CELL#954-520-9018 FAX#954-920-56" Uale, October 16,2007 Bill To: Ship To., IAK-A L-EA::ff MARTN'A "'.3 f", V1,A. ?V;IIAN A Description Amount WiSTER 1,1FIEGUARD OFFICES LIP CHARGES: Move Wall and add PLAr,3tAtion $260.r''41 3.Drywall 4 . 3'0 x 6"fl Door a Hardware 5 .131-lock door opening & Pour 2 colu'a'.; S48O.G,0 6. T11*1, Floors A tja!7.L, TO T A L 12, 88G. "o CR-FDIT "OP ROLL Up L�t.)OR 'jiD X 1(.,, s So 4 n Thank you, Prarok R, Nij'l Frank Hill Constrliction, Tnc.. Total 0.30 days 31 -60 days 61 -90 days >90 days Total