Loading...
HomeMy WebLinkAboutR-2008-011 Chen & Associates Lighting 53rd Ct RESOLUTION NO. 2008-011 A RESOLUTION OF THE CITY OF DANIA BEACH,FLORIDA,AUTHORIZING THE CITY MANAGER TO PURCHASE SERVICES FROM CHEN AND ASSOCIATES RELATING TO ENGINEERING SERVICES FOR A LIGHTING PROJECT (AT SW 53RD COURT) IN CONNECTION WITH THE NEIGHBORHOOD IMPROVEMENT PROGRAM; PROVIDING THAT THE COST FOR SUCH SERVICES SHALL NOT EXCEED FOURTEEN THOUSAND FIVE HUNDRED DOLLARS ($14,500.00); PROVIDING FOR FUNDING; PROVIDING FOR CONFLICTS;FURTHER,PROVIDING FOR AN EFFECTIVE DATE. BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That that certain agreement with Chen and Associates, Inc. in an amount not to exceed fourteen thousand five hundred dollars ($14,500.00) for engineering services for the lighting project(at SW 53`d Court),with the proposal in substantial form as Exhibit"A",attached,is approved and the appropriate City officials are authorized to execute it. Section 2. That the City Manager and City Attorney are authorized to make minor revisions to the agreement for such services which are deemed necessary and in the best interest of the City of Dania Beach. Section 3. That the funding of this project is to be derived from the General Obligation Bond which was allocated in the FY 2008 budget. Section 4. That all resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall be in force and take effect immediately upon its passage and adoption. PASSED AND ADOPTED on January 8, 2008. AVA4-", OB A TO MAYOR—C MMISSIONER AT EST: C: flu , ," -,) LOUISE STILSON, CMC CITY CLERK APPROVED AS TO FORM A D CORRECTNESS: BY: THOMAS J. ANSBRO CITY ATTORNEY 2 RESOLUTION #2008-011 EXHIBIT A SCOPE OF SERVICES for Chen and Associates, Inc Proposal for SW 53RD COURT LIGHTING PROJECT December 2007 BACKGROUND Chen and Associates was selected by the City of Dania Beach to provide professional engineering services for its Neighborhood Improvement Program. The general scope of services includes the following: • Street Lighting Layout and Design; • Sidewalk Layout and Design; • Traffic Calming Study and Design; • Bidding Services; • Construction Observation; and • Public Awareness. Chen and Associates (Engineer) is pleased to submit to the City of Dania Beach (Owner) this proposal to perform Engineering Services for preparing layouts for solar powered lighting and providing construction administration services for the project described below. PROJECT DESCRIPTION Chen &Associates will prepare lighting layout for the general residential area described as SW 53`d Court within the City limits. The lighting plans will identify the proposed location for solar powered street lights. BASIS OF SCOPE 1. This scope does not cover geotechnical investigation. 2. This scope does not include permitting or permitting fees. Page 1 of 2 December 2007 SCOPE OF SERVICES Task 1. Lighting Plans and Specifications Consultant shall prepare lighting plans and specifications for solar powered street lights. The construction documents will include location, type, and height of proposed lighting. The services involve site visits by Consultant to assure location with minimal obstruction and conflicts. The scope does not include preparing a photometric plan. The Consultant will refer to the City's previously installed solar lighting poles for product specifications and installation requirements. Task 2. Construction Administration Consultant shall provide construction services as follows: preparation of post-approval bid documents, assistance in contractor bidding and selection, pre-construction conference attendance, general observation of the work (up to 12 hours per week), review of material shop drawings, review of contractor pay requests, and statement of work completion. It is estimated that construction will last approximately 3 weeks. Task 3. Reimbursables ENGINEER shall provide services, as necessary, to assist the City in the preparing plans, coordination or other requested tasks to facilitate successful completion of the Project. Costs incurred in providing these services shall be reimbursed. DELIVERABLES Deliverables are described in the Scope of Services. FEE AND SCHEDULE From the Notice to Proceed, Chen and Associates will complete the design phase of all the projects within 30 Calendar Days. FEE SUMMARY TASK LUMP NUMBER TASK SUM FEE Task 1 Lighting Plans and Specifications $ 5,700 Task 2 Construction Administration (3 weeks) $ 8,550 Task 3 Reimbursables $ 250 TOTAL FEE $14,500 Page 2 of 2 December 2007