HomeMy WebLinkAboutR-2008-122 Chen and Associates NW 1st Avenue RESOLUTION NO. 2008-122
A RESOLUTION OF THE CITY OF DANIA BEACH,FLORIDA,AUTHORIZING
THE CITY '.MANAGER TO PURCHASE SERVICES FROM CHEN AND
ASSOCIATES RELATING TO ENGINEERING SERVICES FOR THE NW lSi
AVENUE WATER MAIN AND STORMWATER IMPROVEMENT PROJECT;
PROVIDING THAT THE COST FOR SUCH SERVICES SHALL NOT EXCEED
FORTY-FIVE THOUSAND FOUR HUNDRED SIXTY SIX DOLLARS
($45,466.00); PROVIDING FOR FUNDING; PROVIDING FOR CONFLICTS;
FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA:
Section 1. That that certain agreement with Chen and Associates, Inc. in an amount not
to exceed Forty-Five Thousand Four Hundred Sixty Six Dollars ($45,466.00) for engineering
services for the NW ls` Avenue Water Main And Stormwater Project, with the proposal in
substantial form as Exhibit "A", attached, is approved and the appropriate City officials are
authorized to execute it.
Section 2. That the City Manager and City Attorney are authorized to make minor
revisions to the agreement for such services which are deemed necessary and in the best interest of
the City of Dania Beach.
Section 3. That the Director of Finance is authorized to appropriate $21,365.00 from
Water Fund retained earnings and$24,101.00 from Stormwater Fund retained earnings to fund this
project.
Section 4. That all resolutions in conflict with this Resolution are repealed to the extent
of such conflict.
Section 5. That this Resolution shall be in force and take effect immediately upon its
passage and adoption.
PASSED AND ADOPTED on July 22, 2008.
z4ZL,��c .— ,
ALBERT C. JONES
MAYOR—COMMIS NER
D�pRD'S FI�.T
ATTEST:
Q
LOUISE STILSON, CMC
CITY CLERK
ATED 15
APPROVED AS TO F RM D CORRECTNESS:
BY: 1 f
THO AS J. , RO
CITY ATT RNEY
2 RESOLUTION #2008-122
EXHIBIT A
NW IST AVE & DANIA BEACH BLVD
WATERMAIN AND DRAINAGE IMPROVEMENTS
BACKGROUND
Pursuant to our meetings with the City, Chen and Associates (C&A) intends to perform the appropriate
research,planning and design services addressing drainage and watermain deficiencies along NW I"Avenue
between Dania Beach Blvd and NW 1" Street.
The limits of the projects are explained as follows: watermain rehabilitation and proposed stormwater trench
and structures along NW I"Ave from Dania Beach Blvd to NW 1"Ave extents of the project area are given in
Figure A.
C&A will be responsible for producing a survey,geotechnical testing,construction plans,permit applications,
engineering cost estimates,technical specifications, and bid documents. C&A will also be of assistance with
bidding and attend required meetings.
A Scope of Services to complete these tasks is provided below.
I. SCOPE OF SERVICES
Task 1: Site Investigation
1.1 Survey Coordination
ENGINEER will coordinate with surveyor in order to obtain the required topographic data for
the project area. ENGINEER will review data upon completion of the survey.
1.2 Utility Coordination
ENGINEER will coordinate with utility companies in which may have facilities in the areato
determine the existence of any above or below ground utilities ENGINEER will coordinate
the performance of testholes for the location of existing underground utilities as necessary.
ENGINEER will review data upon completion of the testing.
1.3 Geotechnical Investigation
ENGINEER will coordinate the performance of a geotechnical investigation to determine the
hydraulic conductivity of the soil. The geotechnical investigation will include four hydraulic
conductivity tests and four standard penetration tests. ENGINEER will review data upon
completion of the testing.
1.4 Coordination with City
ENGINEER will consult with City of Dania Beach regarding several issues including the
existing watermain and stormwater issues.
3 RESOLUTION #2008-122
Task 2: 60% Design
2.1 60% Drawings
ENGINEER will produce and submit required sets of drawings to the Project Manager.These
drawings will incorporate the preliminary design and all ofthe necessary details.There will be
one meeting for this phase with City staff after submittal for discussion of comments.
Task 3: Drawings and Specifications
3.1 90% Drawings
ENGINEER will produce and submit required sets of drawings to the Project Manager.These
drawings will incorporate comments received at the 60%design review. Additionally,these
drawings will incorporate all the details and information necessary for the completion of the
project for a final review. There will be one meeting for this phase with City staff after
submittal for discussion of comments.
3.2 90%Cost Estimate
ENGINEER will utilize the 90% design plans to produce a cost estimate. This estimate will
take into account change comments received from City and should be accurate to 10%of the
final construction budget.
3.3 Technical Specification Preparation
ENGINEER will resolve any conflicts encountered within the technical specifications with
the front end documents. The ENGINEER will produce the required sets of technical
specifications to the Project Manager at the 90% stage.
Task 4: Permitting
4.1 Permit Applications
ENGINEER will obtain, review and complete permit applications with the Broward County
Environmental Protection Department(EPD),Broward County Health Department(BCHD)
and South Florida Water Management District (SFWMD). ENGINEER will then send
applications to CITY for review, signature and check(s) for all permit application fees.
4.3 Permit Revisions
ENGINEER shall receive all comments to the submitted permits from respective agencies and
respond accordingly.
4 RESOLUTION #2008-122
Task 5: Construction Documents
5.1 100% Documents
ENGINEER will incorporate any comments from permitting agencies into the plans and
submit final drawings and technical specifications for bidding and construction.
Task 6: Bidding Assistance
6.1 Bidding and Award Process
ENGINEER will assist the OWNER in the bidding and award process and make
recommendations on the bid award. C&A will prepare the contract documents for bidding.
6.2 Pre-Bid Meeting
ENGINEER will attend the Pre-Bid Meeting and will answer all questions and clarifications
that are technical in nature.
Task 7: Construction Observation and Administration Services
7.1 Shop Drawings
ENGINEER will review shop drawings and provide RFI responses to the contractor.
7.2 Construction Observation
ENGINEER will provide on-site observation during construction. An ENGINEER
representative will be available on site a minimum of 2 hours,every day during construction
activities. The construction time is expected not to exceed three(3)months from the time of
commencement of construction to substantial completion. If construction is extended beyond
3 months, ENGINEER will negotiate additional fees if mutually deemed necessary by the
ENGINEER and City.
7.3 Construction Certification
ENGINEER will prepare a punch list and conduct final acceptance visit for the project.
When all items are completed in a satisfactory manner by the contractor, a letter of
certification for the completion of the project will be issued by ENGINEER. ENGINEER
will submit a digital copy of the as-built record drawings to the City.
Task 8: Reimbursables
8.1 Topographic Survey
Topographic survey will include the following:
(a) ENGINEER shall establish a control traverse and bench marks (National Geodetic
Vertical Datum of 1929) at sufficient intervals to support the topographic survey and to be
utilized on the design plans.
5 RESOLUTION #2008-122
(b) Locate all above ground features within the right-of-ways of the existing roads according
to the following schedule, including pavement,paved swales,sidewalks, fences, light poles,
handrails, storm manholes, catch basins, electric boxes, handholes, curbs, valve boxes,
sanitary sewer manholes, driveway types, edges and corners, trees, overhanging trees in the
R/O/W, meter boxes, centerline and crown of the roads, fire hydrants and valves, overhead
utilities.
(c) Locate underground features of sanitary manholes, storm manholes, and catch basins.
Measure the invert elevations of pipes and determine the pipe materials and size when
possible.
(d)Tie in any subdivision corners,lot corners and plat corners which can be located along the
right-of-way lines. This will not constitute a boundary or right-of-way survey as defined in
the Minimum Technical Standards for Land Surveying and Mapping. Ownership and title
searches are not included. Easements will be based on information obtained from record
plats.
(e) Locate subsurface testhole locations, documenting northing, casting, and elevation.
8.2 Utility Coordination
Underground utility exploration will include the following:
ENGINEER shall provide equipment and labor for the exploration of subsurface test holes
during the design for underground utilities. All costs will be reimbursed.
8.3 Geotechnical investigation
Geotechnical investigation will include the following:
ENGINEER will coordinate the performance of a geotechnical investigation to determine the
hydraulic conductivity of the soil. The geotechnical investigation will include two hydraulic
conductivity tests and two standard penetration tests. ENGINEER will review data upon
completion of the testing. All costs will be reimbursed.
8.5 Prints& Blueprinting
ENGINEER shall provide all contract document reproduction during the design and
construction phases of this project. All printing costs will be reimbursed.
II. OWNER PROVIDED SERVICES
a. Sign all permit applications and pay all applicable permit fees. OWNER should budget adequate
funds for these fees in addition to potential impact fees.
b. Provide timely decision during critical milestones of the project.
c. Assistance in negotiation with various public and private entities for easements and stormwater
maintenance.
6 RESOLUTION 02O08-122
d. Provide the standard front end documents and the standard technical specifications for the City of
Dania Beach.
e. Prepare the bid advertisement and the bid package for distribution to bidders.
f Provide all above information and data in electronic digital format, if available.
M. FEE AND PAYMENT
The fee for the above scope of service would be billed at a lump sum of$45,466 according to the following
breakdown. From the Notice to Proceed and receipt of all documents requested from the City, Chen and
Associates will deliver the deliverables within 90 Working Days.The OWNER will be billed monthly for the
estimated percentage of completion.
Task Description Fee
I Investigation $2,632
2 60% Design $5,452
3 Drawings and Specifications $4,042
4 Permitting $5,250
5 Construction Documents $3,780
6 Bidding Assistance $3,830
7 Construction Observation and Administration $8,980
8 Reimbursables $11,500
TOTAL $45,466
IV. DELIVERABLES
Deliverables are described in the Scope of Services.
7 RESOLUTION o2008-122