HomeMy WebLinkAboutR-2009-179 USSI, LLC Bid Award I&I Phase 2 RESOLUTION NO. 2009-179
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, RELATING TO THE AWARD OF A CONTRACT FOR
THE INFILTRATION AND INFLOW PHASE 2 IMPROVEMENT PROJECT,
USING STATE REVOLVING FUNDS; AUTHORIZING THE AWARD OF BID
TO USSI, LLC F/K/A UTILITY SEALING SERVICES, INC. IN THE AMOUNT
OF $112,875.00; AUTHORIZING THE CITY MANAGER TO EXECUTE THE
AGREEMENT; DESIGNATING AUTHORIZED REPRESENTATIVES;
PROVIDING ASSURANCES; PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City Commission adopted Resolution 2002-120 approving the Water,
Wastewater and Stormwater Facilities Plan; and
WHEREAS, the correction of infiltration and inflow water is among the projects
identified in the Water, Wastewater and Stormwater Facilities Plan; and
WHEREAS, advertisements for bids were placed in local papers on April 23 and 30,
2009; and
WHEREAS, on May 22, 2009, the City received bids for the infiltration and inflow —
Phase 2 improvement project, and the scope of services for this project involves the following
multiple phases:
• Smoke Testing
• Midnight Testing
• Correction of Cleanouts
• Installation of LDL Plugs; and
WHEREAS,there was only one bidder for the project as follows:
USSI, LLC f/k/a Utility Sealing Services, Inc. $112,875.00; and
WHEREAS, the City and its project management consultant believe that the cost
provided by USSI, LLC f/k/a Utility Sealing Services, Inc., is reasonable and therefore
recommend the bid be awarded to the bidder, USSI, LLC Mda Utility Sealing Services, Inc. in
the amount of$112,875.00;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF
THE CITY OF DANIA BEACH, FLORIDA,AS FOLLOWS:
Section 1. That the foregoing findings are incorporated by this reference and made a
part of this Resolution.
Section 2. That the bid be awarded to the bidder, USSI, LLC f/k/a Utility Sealing
Services, Inc., in the amount of$112,875.00.
Section 3. That the City Manager is designated as the authorized representative to
provide the assurances and commitments required by the loan application.
Section 4. That the City Manager is designated as the authorized representative to
execute the agreement which will become a binding obligation in accordance with its terms
when signed by both parties. The City Manager is authorized to delegate responsibility to
appropriate City staff to carry out technical, financial, and administrative activities associated
with the loan agreement.
Section 5. That all resolutions or part of Resolutions in conflict with any of the
provisions of this Resolution are repealed.
Section 6. That this Resolution shall become effective immediately upon its passage
and adoption.
PASSED AND ADOPTED on September 22, 2009.
ANNE CASTRO
�Oy,ppp's Flgsr�P MAYOR-COMMISSIONER
i
ATTEST:
A�� O�J ,
LOUISE STILSON,CMC
CITY CLERK ' o
APPROVED AS O ORM AND CORRECTNESS:
THOMAt J. S O
CITY ATTO Y
2 RESOLUTION#2009-179
AGREEMENT BETWEEN OWNER AND CONTRACTOR
THIS IS AN AGREEMENT, entered into on , 2009
BETWEEN the Owner: City of Dania Beach, Florida
100 West Dania Beach Blvd.
Dania Beach, Florida 33004
and the Contractor: USSI, LLC, a Florida limited liability company f/k/a
Utility Sealing Services, Inc.
(Name and address) Attn: Mr. Lloyd J. Wander
752 Commerce Drive, Suite 15
Venice, Florida 34292
The Project is: City of Dania Beach Infiltration and Inflow Removal Phase 2
(Name and location) The project is located at: Throughout the City of Dania Beach
The Owner and Contractor agree as follows:
ARTICLE 1.0
THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General,
Supplementary and other Conditions), Drawings, Specifications, addenda issued prior to
execution of this Agreement, other documents listed in this Agreement and Modifications issued
after execution of this Agreement; these form the Contract, and are as fully a part of the Contract
as if attached to this Agreement or repeated in it. The Contract represents the entire and
integrated agreement between the parties to it and supersedes prior negotiations, representations
or agreements, either written or oral. The Contract Documents shall not be changed and are not
subject to negotiation.
ARTICLE 2.0
THE WORK OF THIS CONTRACT
The Contractor shall execute the entire Work described in the Contract Documents except to the
extent specifically indicated in the Contract Documents to be the responsibility of others, or as
follows, if applicable:
ARTICLE 3.0
DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
3.1 The Date of Commencement is the date from which the Contract Time is measured, and
shall be the date set forth in the NOTICE TO PROCEED as issued by the Owner. Should the
Contractor incur costs prior to the issuance of the NOTICE TO PROCEED, any such costs shall
be incurred at the Contractor's risk, and the Owner shall not reimburse the Contractor for any
such costs under any circumstances. Notwithstanding the foregoing, Owner may reimburse
Contractor for actual costs incurred relating to performance and payment bonds and insurance,
with submittal of invoices, in the event that Owner terminates this Contract for convenience, as
provided in the General Conditions. If Contractor fails to commence the Work within one (1)
week of the date set forth in the NOTICE TO PROCEED, Owner may terminate the Contract
immediately, without providing an opportunity to cure.
3.2 The Contractor shall achieve Substantial Completion not later than One Hundred Twenty
(120) calendar days, and Final Completion of the entire Work not later than One Hundred Fifty
(150) calendar days, each commencing with the date set forth in the NOTICE TO PROCEED as
issued by the Owner, subject to adjustments of this Contract Time as provided in the Contract
Documents.
The parties have agreed that since they are unable to ascertain the amount of damages which
would be suffered by Owner as a result of Contractor's failure to timely complete all Work
required by the date set forth above, the amount of one tenth of one percent (0.10%) of the
contract value, inclusive of adjustments, per day, but not less than Five Hundred Dollars
($500.00) per day, which amount has been agreed to by the parties, is considered to be Owner's
liquidated damages, and it is not a penalty. It shall be assessed against the Contractor until
substantial and final completion is achieved.
2
ARTICLE 4.0
CONTRACT SUM
4.1 The Owner shall pay the Contractor, for the Contractor's performance of the Work the
Contract Sum not to exceed the amount of One Hundred Twelve Thousand Eight Hundred
Seventy Five Dollars ($112,875.00), subject to additions and deductions as provided in the
Contract Documents.
4.2 The Contract Sum is based upon the cost agreed upon by the parties, for the satisfactory
performance of the Work in accordance with the Contract Documents.
4.3 The value of any Work covered by a Change Order or of any claim for an increase or
decrease in the Contract Sum shall be determined in one of the following ways at the Owner's
option:
(A) Where the Work involved is covered by unit prices contained in the Contract
Documents, by application of unit prices to the quantities of items involved without
additional fees.
(B) By mutual acceptance of a lump sum price.
ARTICLE 5.0
PROGRESS PAYMENTS
5.1 Based upon Applications for Payment submitted to the Consultant by the Contractor and
Certifications of Payment issued by the Consultant, the Owner shall make progress payments on
account of the Contract Sum to the Contractor as provided below, elsewhere in the Contract
Documents and in accordance with Part VII of Chapter 218, Florida Statutes, as it may be
amended from time to time, entitled the "Local Government Prompt Payment Act."
5.2 The period covered by each Application for Payment shall be one calendar month ending
on the last day of the month, or as follows:
5.3 Each Application for Payment shall be based upon the Schedule of Values submitted by
the Contractor in accordance with the Contract Documents. The Schedule of Values shall
allocate the entire Contract Sum among the various portions of the Work and be prepared in such
form and supported by such data to substantiate its accuracy as the Consultant may require. This
Schedule, unless objected to by the Consultant, shall be used as a basis for reviewing the
Contractor's Applications for Payment.
5.4 Applications for Payment shall indicate the percentage of completion of each portion of
the Work as of the end of the period covered by the Application for Payment.
3
5.5 Subject to the provisions of the Contract Documents, the amount of each progress
payment shall be computed as follows:
(A) Take that portion of the Contract Sum properly allocable to completed Work as
determined by multiplying the percentage of completion of each portion of the Work
by the share of the total Contract Sum allocated to that portion of the Work in the
Schedule of Values, less retainage of ten percent (10%) until fifty percent (50%)
completion and after fifty percent (50%) completion, reduce to five percent (5%) the
amount of retainage withheld from each subsequent progress payment.
(B) Add that portion of the Contract Sum properly allocable to materials and equipment
delivered and installed, less the applicable retainage. No sums shall be due for
materials stored on or off site not yet installed.
(C) Subtract the aggregate of previous payments made by the Owner; and
(D) Subtract amounts, if any, which the Consultant has withheld or nullified.
5.6 Each Application for Payment after the first Application shall be accompanied by a
Certification of Payment form, provided by the Owner, from the Contractor and each Supplier
and Subcontractor, in amounts equal to those stated in the PRIOR Application for the Contractor
and each Subcontractor and each Subcontractor, Material/Labor Supplier so due payment. The
Application for Payment for Retainage shall be accompanied by a final Certification of Payment
and Release of Claim form from the Contractor, each Supplier and Subcontractor in amounts
equal to those stated in the Schedule of Values.
ARTICLE 6.0
FINAL PAYMENT
6.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made
by the Owner to the Contractor when(1) the Contract has been fully performed by the Contractor
except for the Contractor's responsibility to correct nonconforming Work, if any, which
obligation survives final payment and continues thereafter; and (2) a final Certification of
Payment has been issued by the Consultant; such final payment shall be made by the Owner not
more than 30 days after the issuance of the Consultant's final Certification of Payment, (3) final
Certification of Payment has been fiunished from the Contractor, Suppliers and Subcontractors;
and(4) a Consent of Surety, if any, for final payment.
ARTICLE 7.0
MISCELLANEOUS PROVISIONS
7.1 Where reference is made in this Agreement to a provision of the General Conditions or
other Contract Documents, the reference refers to that provision as amended or supplemented by
other provisions of the Contract Documents.
4
7.2 Other governmental entities may elect to purchase the goods and services specified in this
Agreement, which shall be made available upon the same terms and conditions as those specified
in this Agreement.
ARTICLE 8.0
TERMINATION OR SUSPENSION
8.1 The Contract may be terminated by the Owner or the Contractor as provided in the
General Conditions.
8.2 The Work may be suspended by the Owner as provided in the General Conditions.
ARTICLE 9.0
ENUMERATION OF CONTRACT DOCUMENTS
9.1 The Contract Documents, except for Modifications issued after execution of this
Agreement, are enumerated as follows:
9.1.1 The Agreement is this executed Agreement between Owner and Contractor.
9.1.2 The General Conditions are the General Conditions of the Contract for
Construction.
9.1.3 The Supplemental and other conditions of the Contract are those contained in the
Contract Documents attached,plus 200 MB CD of photographs.
9.1.4 The Specifications are those contained in the Contract Documents listed in the
Table of Contents.
9.1.5 The Drawings are , unless a different date is shown below:
Drawings are listed in 00004.
9.1.6 The Addendum, if any, is in Section 00900 and summarized below:
Number Date
9.1.6 The Certification of Payment forms and Project Closeout Forms are those contained in
the Contract Documents.
5
9.1.7 Other documents forming part of the Contract Documents are as follows:
00001 TITLE PAGE
00002 PROJECT DATA
00003 TABLE OF CONTENTS
00004 LIST OF DRAWINGS
00010 NOTICE TO BIDDERS
00020 NOTICE OF APPARENT LOW BIDDER
00100 INSTRUCTIONS TO BIDDERS
00200 GEOTECHNICAL REPORT—when applicable
00300 *BID FORM
00400 *INSURANCE AGENT STATEMENT
00410 *BID SECURITY FORM
00420 *CONTRACTOR'S SWORN QUALIFICATION STATEMENT
00430 *ACKNOWLEDGMENT OF INSPECTION
00440 *PUBLIC ENTITY CRIMES STATEMENT
00450 *NON-COLLUSION AFFIDAVIT
00460 *CONFORMANCE WITH FLORIDA TRENCH SAFETY ACT
00470 *INDEPENDENCE AFFIDAVIT
00500 AGREEMENT BETWEEN OWNER& CONTRACTOR
00510 ACKNOWLEDGMENT IF INDIVIDUAL
00520 ACKNOWLEDGMENT IF PARTNERSHIP
00530 ACKNOWLEDGMENT IF CORPORATION
00600 PERFORMANCE BOND
00610 PAYMENT BOND
00620 CERTIFICATE(S) OF INSURANCE
00630 CONFORMANCE WITH OSHA STANDARDS
00640 HAZCOM TRAINING/INFORMATION
00700 GENERAL CONDITIONS
00800 SUPPLEMENTAL CONDITIONS
00900 ADDENDUM
00910 WARRANTY BOND
00920 CERTIFICATION OF PAYMENT AND PAY ESTIMATE APPROVAL FORM
00930 CERTIFICATION OF PAYMENT AND PARTIAL RELEASE OF CLAIM
00940 CERTIFICATION OF PAYMENT AND FINAL RELEASE OF CLAIM
00950 CONSENT OF SURETY
00960 PROJECT CLOSEOUT
00970 CLOSEOUT PACKAGE CHECKLIST
NOTE:* Indicates sections (forms)requiring execution(signatures)to validate the bid or
proposal.
6
IN WITNESS OF THE FOREGOING, the parties have set their hands and seals effective
the day and year written above.
CITY:
CITY OF DANIA BEACH, FLORIDA,
a Florida Municipal Corporation
ATTEST: Robert Baldwin, City Manager
Louise Stilson, CMC
City Clerk
Approved For Form and Correctness Approved as to "Scope of Services"
Thomas J. Ansbro, Dominic F. Orlando, P.E.
City Attorney Director of Public Services
, 2009 2009
WITNESSES: CONTRACTOR:
USSI, LLC, a Florida limited liability company
f/k/a UTILITY SEALING SERVICES, INC.
Signature Signature
PRINT Name PRINT Name
Signature Title
Print Name
(CORPORATE SEAL IF APPLICABLE)
7
STATE OF FLORIDA
COUNTY OF
The foregoing instrument was acknowledged before me on 2009,
as , of ,
a corporation, on behalf of the corporation. He/she/they is/are personally
known to me or have produced as identification and did (did not)
take an oath.
NOTARY PUBLIC, State of Florida
My commission expires:
END OF AGREEMENT BETWEEN OWNER AND CONTRACTOR
8