Loading...
HomeMy WebLinkAboutR-2009-193 CDM Constructors Inc Bid Award Nanofiltration Plant RESOLUTION NO. 2009-193 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, RELATING TO THE AWARD OF DESIGN AND BUILDING OF A NANOFILTRATION WATER PLANT; AUTHORIZING THE AWARD OF BID TO CDM CONSTRUCTORS, INC. IN THE AMOUNT OF $8,820,923.00; AUTHORIZING THE CITY MANAGER TO EXECUTE THE AGREEMENT; DESIGNATING AUTHORIZED REPRESENTATIVES; PROVIDING ASSURANCES; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Commission adopted Resolution 2002-120 approving the Water, Wastewater and Stormwater Facilities Plan; and WHEREAS,the Nanofiltration Water Plant is a major part of the plan; and WHEREAS, advertisements for bids were placed in local newspapers on April 9 and 16, 2009; and WHEREAS, on June 5, proposals were received from seven firms; the five (5) person City selection committee evaluated the seven proposals and met on June 18, 2009. At the June 18 meeting, the scoring indicated that two of the firms had much higher scores than the rest of the firms. As a result, the selection committee requested cost proposals from only the two top ranked firms; and WHEREAS, on August 18, the City received sealed bids from the two remaining bidders which showed CDM Constructors, Inc. to be the low bidder as follows: BID SHEET Item CDM Cost Encore Cost Design and Construction 01 Nanollitration water I rea men Plant $ 7,445,923 $ 8,390,000 Contingency 250 000 $250,000 Base Bid I ota (Note ]) 7795, 23 1 8,640,000 Accepted Adds/Deducts to Base Bid deduct deducti 0 0 deduct Add I Add 2 base bid minus approved deducts &pus approved adds $ 7,695,923 $ 8,640,000 Allowance I-Decommission and Remove Fuel Station 250,000 250,000 Allowance 2-Rchabilitate Electrical System and Control upgrades from existing Lime softening system $500,000 $500,000 Allowance - ea s estos ontam Soil $100,000 $100,000 Allowance 4-LEED certification, Ownerrequests 100,000 100,000 Allowance 5-FPL I rans ormer $100,000 l00,000 Allowance - Permit fees/specialty/threshold inspection 50,000 50,000 Allowance 7-Architectural Treatments 125,000 125,000 Allowance 8-Horizontal aInvestigation f150, 000 150,000 Base+Allowances 9,070,923 10,015,000 Base+Allowances+ all deducts +all Additions 9,070,923 $ 10,015,000 ; and WHEREAS, the City and its project management consultant are comfortable that the costs provided by CDM Constructors, Inc., are reasonable when compared to other bids and that CDM Constructors, Inc. can perform the work, and therefore recommend the bid be awarded to the low bidder, CDM Constructors, Inc. in the amount of $8,820,923.00 ($9,070,923.00 less Allowance 1 in the amount of$250,000.00); NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AS FOLLOWS: Section 1. That the foregoing findings are incorporated by this reference and made a part of this Resolution. Section 2. That the bid be awarded to the low bidder, CDM Constructors, Inc. in the amount of$8,820,923.00. Section 3. That the first $2,550,000.00 of the loan monies will come in the form of a principal forgiveness loan provided through ARRA stimulus funds, to the City of Dania Beach, 2 RESOLUTION#2009-193 with the remainder coming from a supplemental SRF loan through the Department of Environmental Protection under the State Revolving Fund for project financing. Section 4. That the City Manager is designated as the authorized representative to provide the assurances and commitments required by the loan. Section 5. That the City Manager is designated as the authorized representative to execute the agreement which will become a binding obligation in accordance with its terms when signed by both parties. The City Manager is authorized to delegate responsibility to appropriate City staff to carry out technical, financial, and administrative activities associated with the loan agreement. Section 6. That all resolutions or part of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 7. That this Resolution shall become effective immediately upon its passage and adoption. PASSED AND ADOPTED on October 13, 2009. o�P�q'S "FIRST fyT� r '-� "��' mQ = E CA ST--RO ATTEST: OR-COMMISSIONER LOLITSE STILSON, CMC CITY CLERK � amonn�° 1 APPROVED AS TO FORM AND CORRECTNESS: r' THO AS J. N B CITY ATTORNI Y 3 RESOLUTION#2009-193