Loading...
HomeMy WebLinkAboutR-2009-205 Tran Construction Sidewalk Repairs RESOLUTION NO. 2009-205 A RESOLUTION OF THE CITY OF DANIA BEACH, FLORIDA AUTHORIZING THE CITY MANAGER TO PURCHASE REPLACEMENT AND INSTALLATION OF SIDEWALK SERVICES IN AN AMOUNT NOT TO EXCEED $60,000.00 IN FISCAL YEAR 2009-2010, FROM TRAN CONSTRUCTION, INC. UNDER SOUTHEAST FLORIDA GOVERNMENTAL COOPERATIVE GROUP BID #08-09-036; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Charter of the City of Dania Beach, Part III, Article 3, Section 4, Subsection 0), authorizes the City Manager to purchase supplies, services, equipment and materials for the City government in amounts in excess of $25,000.00 without competitive bidding and without advertisement for bids if he is authorized to do so in advance by a resolution adopted by the City Commission; and WHEREAS, the scope of services for this project involves the purchase and installation of sidewalk construction services.; and WHEREAS, the City Manager has determined that it is necessary to install sidewalks under the City's 50150 program; and WHEREAS, the City Manager has determined that such replacement and installation of sidewalk services can be purchased at the least cost to the City from Tran Construction, Inc., under Southeast Florida Governmental Cooperative Group Bid #08-09-036, a copy of which is attached and made a part of this Resolution as Exhibit "A'; and WHEREAS,funding for this project will come from the General Budget; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the City Manager is authorized to pay an amount not to exceed the total sum of$60,000.00 for sidewalk replacement and installation services to Tran Construction, Inc. under Southeast Florida Governmental Cooperative Group Bid 4 08-09-036, and the proper City officials are authorized to execute the contract for the work; provided, however that no contract will become effective unless and until City officials complete their execution of it. Section 2. That the funding will be derived from the applicable General Fund budget line items (001-4101-541-46-60). Section 3. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. PASSED AND ADOPTED on October 27, 2009. WrAl, ANNE CASTRO �pao'S FIRSTC AYOR-COMMISSIONER ATTEST: LOUISE STILSON, CMC CITY CLERK AT6� 1 APPROVEMASO FORM AND CORRECTNESS: I THOMA$ J. ANSBRO CITY ATTORNEY 2 RESOLUTION#2009-205 Southeast Florida Governmental Purchasing Cooperative Group CONTRACT AWARD BID/RFP NO.: ITB#08-09-036 DESCRIPTIONITITLE: Replacement&Installation of Sidewalks CONTRACT PERIOD: 7/13/09-7/12/10 TERM OF CONTRACT: 1 year w/2 one year renewals SECTION#1 -VENDOR AWARD—PRIMARY CONTRACTOR Vendor Name: Pabon Engineering Inc. Vendor Address 1: 23200 SW 212`"Avenue Vendor Address 2: Homestead,FL 33031 Contact: Anibal Pabon Phone: 305-258-1457 Fax: 305-258-1460 Cell/Pager: 786-303-2320 Email Address: pabonengineering@bellsouth.net Website: FEIN: 01-0569389 SECTION#2-VENDOR AWARD—SECONDARY CONTRACTOR Vendor Name: Tran Construction,Inc. Vendor Address 1: 1000 NW 5,0 Street Vendor Address 2: Miami,FL 33127 Contact: Henry Louden Phone: 305-756-7756 Fax: 305-768-7780 Cell/Pager: 305-525-2545 Email Address: hlouden@tranconstruction.com Website: FEIN: 65-0816806 SECTION#2—AWARD/BACKGROUND INFORMATION Award Date: June 24,2009 Resolution/Agenda Item No.: 2009-116-1060 Insurance Required:Yes Performance Bond Required: No SECTION#3-LEAD AGENCY 1 Agency Name: City of Miami Gardens Agency Address 1: 1515 NW 167"'Street,Suite"0 Agency Address 2: Miami Gardens, FL 33169 Agency Contact: Pam Thompson,CPPO Telephone: 305-622-8031 Facsimile: 305-474-1286 Email: pthompson@miamigardens-Fl.gov 2 City of Miami Gardens 1515 N.W. 167" Street: Bldg. 5, Suite 200 Miami Gardens,Florida 33169 June 29, 2009 Distribution List Below NOTICE OF AWARD RE: BID#08-09-036 INSTALLATION &REPLACEMENT OF SIDEWALKS Dear Vendor(s): The City of Miami Gardens Council awarded the above referenced solicitation on June 24, 2009 for one year with options to renew annually, subject to appropriations, for a maximum of two years. Contract will become effective July 13, 2009. In accordance with the solicitation requirements, please provide my office with a copy of your insurance naming the City of Miami Gardens as an additional insured. Purchase order(s) will be forthcoming as needed. Each participating governmental agency will contact you as the need arises. If you have any questions don't hesitate to contact my office. PRIMARY: Pabon Engineering, Inc 23200 SW 212nd Avenue Homestead, FL 33031 Phone: 305-258-1457,Fax: 305-258-1460 e-mail: Pabonengineering(i bellsouth.net FID: 01-0569389 SECONDARY: Tran Construction,Inc. 1000 NW 54`' Street Miami, FL 33127 Phone: 305-756-7756, Fax: 305-758-7780 e-mail: hloudenAtranconstruction.com FID: 65-0816806 If you have any questions please do not hesitate to contact me at(305) 622-8000#2333. Sincerely, /"%r T.Fo, AWf Pam Thompson, CPPO, CPPB Procurement Manager 1515 N.W. 167t"STREET. BUILDING 5 -SUITE 200 • MIAMI GARDENS. FL 33169 • PH:305-622-8031 • FAX:305-622-8001 ITB#08-09-O36 Installation&Replacement of Sidewlaks May 21,2009-Tabluation Sheet Pabon Engineering,Inc.Primary Contractor Tran Construction Secondary Contractor Items Price Est. E 8 M Equipment Andes Construction per uai UOM UOM Total UOM Total Bonds Projects$150,000 or New 4'wide 4"depth LFt. Z830 S 12W S 33,9W. S 1250 S 35,J]S.W New 4'wide 6"depth L Ft. 700 S 10.W S 10,010. f 15.50 S t0,850.W New 5'wide 4"depth L Ft. 32,100 f 13.76 f 441,696.00f 14.50 S 485,450.W New 5'witle 6"depth L Ft. 590 S 16.68 S 9,782.20 f 19.50 S 11,SO6.W New is wide 4"depth LFt. 2,1W S 16.32 S J0,272W f 18.W f 37,BW.W New 6'wide 6"depth L Ft. 12,260 f 19.70 $ 241,326.00 S 22.50 f 275,626 W Curt,Gutter 1,SW $ 19.00 $ 26,500.00 f 16.60 S 24,750.0( Curt,gutter D 1,500 $ 13.00 $ 19,600.00 $ 8.50 $ 12,750.00 Tree Root Pmning'Biobarder 50 $ 40.00 $ 2,WO.00 $ 140.00 $ 7,000.00 0"+to 18" tree 10 $ 2W.W $ 2,000.00 S 250.W S 2,6W. 8"+to 18" tree 10 $ 250.00 S 2,5W.W S 260.W S 2,6W.W 18"+to 30" tree 20 f 3W.W S B,WO.W S 3W.W S B4OW. W"+ tree 20 S dW.W f 8,000.W S 450.W S B,W0.00 Live Oak Fla.8110'.12' time 15 S 350.W S 5,250.00 $ 275.00 $ 4,126.00 Mahogany Fla.0110'-12' tree 10 oul S 275.W S 2,TW. Crape Fla.0110'.12' tree 10 S SW.W S S,OW.W $ 350.001 S 3,50MO.W Silver Buttonwood Fla.f1 to 10 S 3W.W f 3,WO.W f 2W.00 S 2,5W. existing Handicap Ramps LFt 130 S 76.W S 8,880.W S 1W.W f 13,W0. New Handicap Ramps LFt. 45 S SO.W S 2,250.W S 120.W S 6,IW. R.O.W.Survey(to establish V.bl M S 1W.W S 3,WO.W S JW.W S 6,OW. 4"Thick 4'wide Flag L FIL 800 S 18.80 S 10,OW.W f 11.80 S 7,080. 6"Thick 4'wide Flag L Ft 160 S t9.W S 2,850.W f 16.22 $ 2,263. Curb Cuts(Inc.restoration) 610 f 11.60 S 5,865.W S 15.00 S 7,M.W 4"Thick 5'wide Flag L FC 5,1 W S 19.b8 S 99,768. S 11.So f 75,480. e"nick 6'wide Flap LFt 3,W0 f 25.50 f 76,SW. S 18.]0 S 68,1W.no 4"Thick 6'wide Flag L Ft 200 S 23.12 S 1,621. S 17.80 S 3,SW.W 6"Thick 6'wide Flag L Ft 150 S 26.W f 3,975.W S 22.80 S 3,/20.00 Relocation Fence LFL 50 S 20.W S 1,OW. S 20.W S 1,000. 'gallon PARS Sch.40 PVC Pi PlpWUn i'gpg f B.W S B4OW. S 9.W S 9,W0.0 too f 20.001 f 2,M.001 14.00 $ 1,400.00 Compaction Test Each 50 f 80.001 $ 4,WD.DDI 120.001 $ 6,000.00 Raise Utilities Access Each 1 50 S 2N.001 S 110,001)NJ S 250.001 f 12,500.00 Items Pd. Est. Metro Express Straight Line Engineering FBM General Par Quantity LION! UOM Total UOM Total UOM Total Bonds Projects$150,000 or Naw 4'wide 4"depth L Ft. Z830 $ 16.00 f 42450.00 f 16.00 $ 45,280.00 S 16.72 f 47,317.60 New 4'wkie 6"depth L Ft. 700 f 18.00 S 12,11M.00 f 20.00 S 14,000.00 f 18.98 f 13,286. New 5'wide 4"depth L Ft. 32,100 $ 17.00 f 545,70M00 S 20.00 $ 642,000.00 f 20.10 $ f45,210. New 5'wide e"depth L Ft. 590 f 19.00 $ 11,210.00 6 25.00 S 14,760.00 S 23.00 f 13,570.00 New 6'wide 4"d pth L Ft. 2,100 S 21.00 $ 44,100.00 $ 25.00 f 52,500.00 $ 26.20 $ 52,920.00 New 6'wide 6"depth L Ft. 12,260 S 23.00 f 281,760.00 S 25.00 f 306,250.00 $ 27.00 f 330,750. Curb Guile,F 1,500 $ 20.00 $ 30,000.00 f 30.00 f 45,000.00 f VAS S 32,175.00 Curb gutter 1,500 f 20.00 $ 3%000.00 f 20.00 f 30,000.00 $ 18.65 f 24,975.00 Tree Root PruninglBiobamer 50 $ 100.00 f 51000.00 f 30.00 $ 1,600.00 f 26.00 f 1,a00.00 0"+to 18" tree 10 $ 50.00 $ 500.00 $ 2W.00 $ 2,000.00 S 250.00 f 2,600.00 8"*to 18" tree 10 $ 1DO.00 $ 1,000.00 f 200.00 $ 2,000.00 $ 260.00 $ 2,500.011 1C'♦to 30" tree 20 f 200.00 S 4,000.00 S 250.00 f 5,000.00 f 350.00 S 7,000. 30". tree 20 $ 300.00 f 6,000.00 S 350.00 S 7,000.00 S 450.00 S 9,000.00 Live Oak Fla.#110'-12' tree 15 f 350.00 S 5,250.00 S 275.00 $ 4,125.00 $ 290.00 S 4,350.00 Mahogany Fla#1 10.42' area 10 $ 350.00 f 3,600.00 $ 275.00 $ 2,750.001 f 290.00 $ 2,900.00 Crape Fla.#1 10'-12' tree 10 $ 350.00 $ 3,500.00 $ 360.00 f 3,500.00 $ 350.00 f 3.600.00 Sihnn Buttomvood Fla#1 to, 10 $ 350.00 f 3,600.00 f 350.00 S 3,500.00 $ 350.00 S 3,500.00 misting Handicap Ramps L FL 130 f 12S.00 $ 16,250.00 f 120.00 S 15,600.00 S 40.00 S 5,200.40 New Handicap Ramps L Ft. 46 $ 125.00 $ 5,626.00 $ 120.00 f 6,400.00 $ 27.00 $ 1,05.00 R.O.W.Survey(to establish %bl 28 f 600.00 S 10,D00.00 $ 1,DDO.00 $ 20.000.00 $ 160.00 $ 3,000.00 #'Thick 4'wide Flag L Ft 600 f 16A0 $ 91500.00 $ 20.00 S 12,000.00 f 16.72 $ 10,032.00 6"Thick 4'wide Flag L Ft. 160 $ 1&00 $ 2,700.00 $ 30.00 f 4.500.00 S 18.96 $ 2,842.50 Curb Cub(inc.reworstion) 510 $ 12.00 $ G.120.00 S 2.00 $ 1,020.00 $ 10.00 $ 5,100.00 4"Thick 6'wide Flag L Ft 6,100 S 18.00 S 91,800.00 S 30.00 f 163,000.00 $ 18.95 $ 96,646.00 6'Thick 5'wlds Flag L Ft 3,000 S 20.00 f 60,000.00 S 30.00 f 90,000.00 $ 19.95 S 59,650.00 4"Thick 6'wide Flag L FL 200 f 21.0131 f 4,20(tDill S M.W1 4,000.00 $ 211-401 S 4,0M OO 6"Thick 6'wide Flag L FL 150 f 22.001 f 3,300.1K)l 5 Q.Wj 6,000.001 $ 26.60 f 3,825.00 Relocation Fence L Ft. s0 f 18.00 S 900.00 f 30.OD S 1,b00.00 S 20.00 S 1,000.00 illation Parts Sch.40 PVC Pip Pipe/Lin 1,000 f 9.00 f 9,000.00 $ t0.OD $ 10,000.00 $ 10.001 $ 10,000. 100 S 25.00 $ 2,500.001 $ 10.OD S 1,OOO.W f 2O.W1 $ 2,000.001 Compaction Teat Each 50 S 100.001 f 5,000.001 $ 50.001$ 2,500.00 $ 110ml $ 5,600.001 Rain Utilities Access Each 50 S 300.00 S 15,000.00 S 700.00 S 5,000.001 $ 160.001 f 7,600.00 Items Price Eat. Darcon JA&M Developing Corp. Maggolc per Ousnthy UOM UOM Total UOM Total UOM Total Bonds Projects$160,000 or New4'wiW4'depth LFt. Z830 $ 16.00 S 45,280.00 $ 18.00 45,280. f 17.00 f 46,110. New 4'wide 6"depth L Ft. 700 $ 19.00 $ 13,300.00 $ 19.OD 13,300 $ 18.00 S 12,600. New S'wide 4-depth LFt. 32,i0O i 1&20 $ 584,220.0o $ 20.00 642, S 20.60 f 658,050.00 New 6'wide 6"depth L Ft. 690 $ 25.00 $ 14,7W 0 S 23.75 14,012.50 $ 22.50 S 13,276. New 4 wide 4"depth L FL 2,10o S 24.W $ 50,400.00 6 24.00 50.400 S 23.75 S 49,875. New 6'wide 6"depth L FL 12,250 f 26.00 S 318,500.00 $ 27.00 330,750 S 27.10 $ 331,975. Curb GutierF 1,W0 $ 23.00 f 3gSOO.00 S 15.00 22,500 S 16.15 S 24,226. Curb gutter D 1,500 f 16.00 f 24,000.00 S 12.00 18,000 $ 11.00 S 18,500. Tree Root Pmning�Bicbarrisr 50 f 115.00 f 5,760.00 $ $6.00 4,300 $ 30.00 $ 1,600. 0"+to 18" Was 10 $ 22&00 $ 2,260.00 S 250.00 2,500. $ 150.00 $ 1,500. 8"+to 18" tru 10 $ 250.OD f 2,500.00 $ 360.00 3,600. S 100.00 S 1,000. IV+to 30" tee 20 f 350.OD $ 7,000.00 $ 450.00 9,000. $ 100.00 $ 2,0W. 301+ tru 20 $ 460.00 S 9,000.00 $ 650.00 13,000. S 110.00 S 2,200.00 Live Oak Fla.#110'.12' tree 15 $ 297.00 $ 4,455.00 S 220.00 3,300 $ 110.W $ 1,850.00 Mahogany Fla.#1 10'.12' tree 10 f 270.00 $ 2,700.00 $ 235.00 S 2,350.00 S 116.00 $ 1,150.00 Crape Fla.#110'-12' tree, 10 f 324.00 $ 3,240.00 $ 210.00 2,100 S 120.00 $ 1,200.00 Silver Buttonwood Fla.#110' 10 $ 270.00 f 2,700.00 $ 220.00 2,200 S 110.00 $ 1,100.00 existing Handicap Ramps L Ft 130 $ 72.00 It 9,380.00 6 mm 4,110. i 67.00 f 8,710.00 New Handicap Rangy L Ft. 45 S 80.00 $ 3,600.00 $ "m 2,025. S 67.00 f 3,015.00 R.O.W.Survey(to establish Y,bl 20 $ 495.W $ 9,900.00 f 250.00 51000. $ 2.00 $ 40.00 4"Thick 4'wide Flag L FL 600 f 15.00 f 9,000.00 $ 16.00 9,600. S 16.00 S 9,600.00 6"Thick 4'wide Flag L FL 150 $ 17.00 $ 2,550.00 $ 18.W 2,7W.0 f 18.00 f 2,700.00 Curb Cub(incrostorstionj 610 $ 13.00 $ 6,630.00 $ 18A0 9,180. $ 8.00 $ 4,080.00 4"Thick 5'wide Flag L Ft 5,100 S 26.00 $ 127,500. $ 21,00 107,100. $ 16.00 f 81,800. 6"Thick 6'wide Flag L Ft. 3,000 $ 30.00 S W M.00 $ 24.75 74.260. $ 17.00 $ 61,000.00 4"Thick 6'wide Flag LFL 200 f 39.00 f 7,81W.001 $ 22.501 4,600.001 S 18.00 f J,600.W 6"Thick 6'wide Flag L Ft 150 6 40.00 $ 6,000.00 $ 26.50 3,975.0 f 22.00 S J,3W.W Relocation Fence L FL 5o f 28.00 $ 1,400.00 f 18.00 900. f 8.00 f 400.00 illation Parts Sch.40 PVC Pi PiWLin 1,W0 f 9.76 f 9,750.00 S 9.W 9,000.0 f 2.00 f 2,OW.00 100 $ 28.00 $ 218W.00 f 70.00 7,000. f 10.00 $ 1,0W.00 Compaction Test Each 50 f 115.00 $ 5,750.00 $ 50.00 2,600. $ 100.00 f 5.000. Raise Utilities,Access Each S0 $ 200.00 $ 10,000. $ 150.00 7,600. S 100.00 f 5,000.00 TOTAL Items Price Eat, RJP Enterprise Mullings Engineering Migwl Lopez per Quamiry UOM UON Total UOM Total UOM Total Bonds Projects S1W,OW or New 4'wide 4"depth L Ft. 2,830 f 20.25 57,307.50 24.50 69,335.00 $ 30.00 $ 84,900.00 New 4'wide 6"depth L Ft. 700 $ 22.50 15,750 25.50 17,860 $ 34.00 $ 23,BW.00 New 5'wide 4"depth L Ft. 32,100 f 25.W 802,500 26.60 850,650 $ 38.00 f 1,219,800.00 New 5'wide 6"depth L FL 590 6 28.00 16,620 32.60 19,175 $ 43.00 $ 26,370.5. New e'wide 4"depth L Ft. 2,100 $ 30.16 63,315 32.50 611 S 46.00 $ "'Soom New 6'wide W depth L Ft. 12,250 $ 33.50 410,376 W.00 490,000 f 51.00 $ 624,750.00 Curb Gutter 1,W0 S 30.00 45,000 22.00 33,000 $ 25.00 f 37,600.00 Curb getter 1,600 $ 35.00 62,600 20.00 30,000 f 20.00 f 30,000.00 Tree Root PruninglBiobarrier 50 $ 138.00 6,900 140.00 7.000 f 500.00 $ 26,000.00 0"+to 18" bee 10 f 300.00 3,000.0 190.00 1,900rOO f 450.00 f 4,500.00 W.♦to 18" Use 10 f 460.00 45011.00 260.00 2,500. $ 750.00 f 7,W0.110 18".to 30" Use 20 $ 720.00 14,100.00 560.00 111000. $ 1,000.00 11; 20,0W.60 30". tree 20 $ 960.00 19,200.00 860.00 17,M.001 $ 1,500.00 f W,000.00 Uve 0ak Fla M110'-12' tree 15 $ 330.00 4,950 260.00 3,7W $ 1,500.00 $ 2.Z500.00 Mahogany Fla 8110'42' tree 10 f 300.00 3,000 260.00 2,500 S 1,000.00 f 18,0W.W Crape Fla.8110'-12' tree 10 $ 330.00 3,3W 250.00 2,600 $3,0W.W $ 20,0W.00 Sihrer Buttonwood Fla.M110' 10 f 300.00 3,OW 260.00 2,500 S 750.00 $ 7,500.00 existing Handicap Ramps L Ft 130 $ 150.00 19,500.00 80.00 10,400. $ 40.00 S 6,200.00 New Handicap Ramps LFt. 45 $ 3W.00 13,500. 90.00 4.060AID $ 56.00 $ 2,475.00 R.O.W.Su.y(to establish `1%bl 20 f 695.00 1I.M.00 500.00 101000. $ 500.00 $ 10,000. 4"Thick 4'wide Flag L Ft Soo f 29.26 17,550.0 29.50 17,7W.00 $ 10.00 f 6,000.00 6"Thick 'wide Rag L FL 33 150 S .70 5,056 30. 4,175. S 15.00 f 2,250.W Curb Culs,4(inc.restorabon) 510 $ 35.00 17,BW. 50.W 25,500. S J0.00 $ 15,300.00 4"Thick 6'wide Flag L Ft 5,100 $ 38.40 195,840. 31.60 160,650.00 $ 75.00 S 3114600.001 6"Thick S'wtde Flag L Ft 3,000 $ 39.20 117,600. 37.50 112,600.00 S 90.00 S 270.M.01 4"Thick 6'wide Flag L Ft 200 $ 43.55 8,710. 37.50 7,500.00 $ 90.00 $ 18,000. 6"Thick 6'wide Flag L Ft 160 S 46.90 7,035. 45.00 6,750. $ 110.00 $ 16,600.00 Relocation Fen. L Ft. Sa $ 26.00 1,250. 20.00 1,000.00 $ 50.00 S 2,500.00 'gation Parts Sch.40 PVC Pip Pipe/Lin 1.000 $ 11.40 11,400. 10.00 10,000.00 S 10.00 $ 10.000.00 100 $ 2220 2.220. 20.00 zm.m S 30.00 S 3,000.00 Compaction Teat Each 50 $ 195.00 9,750. 200.00 10,00D.W S 100.00 6 5,000.00 Raise UOlitiea Access Each 5g $ 200.00 10.000. 300.00 15,000. $ 376.00 S 18,760. JS BuilC m Sena Engineering uOM Total OOM Total $ 14.00 E 39,620.00 E 16.90 E 44,997.00 E 18.00 f 11,200.00 f 10.40 E 12,880.00 f 17.50 $ 561,750.00 $ 19.50 f 625,950.00 E 20.00 $ 11,800.00 E 22.50 f 13,275.00 E 21.00 $ 44,100.00 f 23.00 E 48,300.00 $ 24.00 S 294,000.00 E 26.60 $ 325,950.00 E 1e.00 f 27,000.00 f 22.00 f 33,000.00 f 7.00 I E 10,500.00 f 14.00 f 21,000.00 f 75.Op 1 E 3.760.00 f 75.00 E 3.150.00 E 20.00 $ 200.00 f 230.00 f 2,300.00 E 260.00 f 2.500.00 $ 260.00 f 2,600.00 E 250.00 f 5,000.00 f 350.00 f 7,000.00 f 450.00 $ 9,000.00 $ 500.00 E 10,000.00 E 200.00 $ 3,000.00 E 300.00 $ 4.500.00 E 200.00 E 2.000.00 $ 300.00 $ 3,000.00 f 200.00 E 2,000.00 $ 460.00 1$ 4,600.00 $ 200.00 E 2,000.00 E 300.00 E 3,000.00 f 90.00 $ 11,700.00 f 28.60 E 3,706.00 $ 80.00 $ 3,600.00 $ 28.50 E 1,282.60 E "0.00 $ 9,600.00 $ 150.00 E 3,000.00 f 17A0 $ 10,200.00 $ 16.90 S 9,640.00 E 1,940.00 f 201,000.00 $ ie.40 $ 2,760.00 E 20.00 E 10,200.00 f 10.50 $ 6,366.00 f 21.26 $ 108,375.00 E 19.50 E 99,450.00 $ 24.26 f 72,750.00 f 22.50 f 67,500.00 $ 26.50 f 6,100.00 f 23.00 1$ 4,600.00 E 29.10 f 4,365.00 E 26.80 $ 3,990.00 S 7.00 f 350.00 f 20.00 E 1,OOO N $ 6.00 E 6,000.00 f 9.0,1$ 9,000.00 It 46.001 S 4,5W.Wj f 20.00 1$ 2,000.00 S 76.001 $ 3,760.00 S 150.00 1 f 7,600.00 S 76.001 $ 3,750.00 S 200.00 1$ f0,000.00 Villa&Mac LHP General 110M Total BOM Total f 12.63 $ 35,742.90 $ 15.W $ 4],299.00 It 16.56 S 11,692.W $ 1677 $ 11,739.00 f 16.68 $ 503,328.00 $ 18.81 $ 603,801.00 $ 20.66 S 12,189.40 t 21.20 $ 12,608.00 f 18.81 f 39,W1.W $ %" $ 41,664.00 $ 2479 f 303.677.60 $ 25.W f 306,250.00 $ 14.86 $ 22,290.00 $ 14.W t 2Z360.00 $ 11.10 6 16,650.00 $ 13.92 $ 20,880.00 f 213.11 $ 10,655.50 $ 26.70 It 1,285.00 $ W7.47 $ 3,874.70 $ 237.60 $ Z375.00 $ 742.26 f 7,422.60 $ 237.50 $ Z375.00 $ 1,303.09 f 26,061.80 S 237.50 $ 4.750.00 S 1,6 44.52 $ 33,490.40 $ 427.50 $ %550.00 f 209.30 $ 3,139.60 $ 235.00 $ 3.626.00 f 209.W f 2,093.00 $ 236.00 It Z350.00 f 209.30 s 2,093.00 S illom f 4,000.00 RS Z083.00 S 225.W S Z260.00 S 10,257.00 S $5.00 S 11,0W.00 S 3,365.35 s $5.00 S 3,8]5.W S 17,SW.W f 350.W S 7,000.00 S 9,72&00 f 17.84 S 10,704.00 S 3,3 50 S 20.W S 3,099.W f 13.666.00 S 17.W S 8,670.W t 103,377.00 S 2228 S 113,62B.W f 75,270.W $ 24.% $ 74,970.W S 24.27 t 4,854.00 t 23.76 $ 4,7W.00 f 3].66 t 5,047.50 $ 25.98 It 3,897.00 S 26.00 f 1,250.00 S 19.00 1 S 9m.0D $ 7.00 $ 7,000.00 $ 8.00 f 8,0M.OD $ 65.00 S 6,eioct.001 f 17.00 $ 1,7W.W S S 31.99 Sf 81,,529975..0M0 Sf 113M5..MM "1,.7501001 165.W Homestead Concrete Team Contractor UOM Total UOM Total $ 18.98 $ 63,713.40 $ 20.00 $ 56,8M.M f 20.70 $ 14,490.00 $ 24.00 $ 16,8W.00 f 21.02 $ 674,742.00 f 24.M $ 770,400.00 f 23.68 $ 13,912.20 $ M.M $ 17,700.00 $ 25.m $ 53,130.00 S M.M $ 63,000.00 $ 26.46 $ 311,886.00 $ M.W $ 416,500.00 $ 12.95 $ 19,425.00 $ M.W $ 30,OW.00 $ 10.45 $ 16,675.00 f 18.M $ 27,000.00 $ 172.50 $ 8,625.00 $ 100.00 $ 5,OW.00 $ 247.25 f 2,472.50 $ 250.00 $ 2,500.00 $ 431.26 $ 4,312.50 $ 4W.00 f 4,OW.00 f 959.10 $ 19,182.00 $ 7W.00 $ 14,000.00 $ 1,725.00 $ 34,600.00 $ 1,000.00 S 20,OM.00 $ 391.W $ 5,865.00 $ 4M.M $ 6,000.00 $ 39216 S 3,921.60 f 450.M S 4,500.00 $ 448.m $ 4,486.00 f 600.M $ 6,000:00 f 347.m 1 $ 3,473.00 f 500.M $ 5,00D.00 f 40.m S 5,265.00 f 30.W S 3,90D.00 S 84.20 f 3,789.00 $ som $ 2,250.00 f 172.50 $ 3,450.00 $ 150.00 $ 3,000.00 f 20.95 S 12,570.00 $ 38.M S 21,6M.00 $ 22.96 f 3,442.50 $ 40.00 $ B4OM.W $ 45.W $ 22,9m.M $ 40.00 S 20,400.W $ 24.15 $ 123,165.00 f 45.M S 229,SW.M $ 26.24 $ 75,7M.W 6 50.00 f 150,OM.W i 30.48 $ 6.096.00 $ 54.00 $ 1D,800.00 S 31.63 $ 4,744.50 $ 60.00 $ 9,000.00 S 23.00 $ 1,160.00 $ 25.00 $ 1,250.00 $ 10.93 $ 10,930.00 $ 10.00 $ 10,000.00 S 26.45 $ 2,645.00 $ 20.00 $ 2,000.00 f 117.30 $ 5,865.00 $ 100.00 $ 5,000.00 i 200.10 $ 10,006.00 $ 120.00 $ 6.000.00 Pontifex Construction Group, OOM Total $ 1200 i 33,960.00 $ 17.00 $ 11,900.00 S 16.00 $ 513,600.00 $ 20.00 $ 11,800.00 S 19,60 $ 40,950.00 S 25.50 $ 312,375.00 $ 16.50 i 24,750.00 S 10.00 $ 15,000.00 S 79.00 i 3,950.00 $ 260m i 2,600.00 $ 525.00 $ 5,260.00 $ 1,040.00 $ 20,800.00 $ 2,080.00 i 41,600.00 $ 200.00 $ 3,000.00 $ 200.00 i 2,000.00 s 200.00 s 2,000.00 $ 226.00 $ 2,250.00 S 27.001 i 3,St0.00 $ 30.ao 1 $ 1,360.00 $ 140.00 f 2,800.00 S 17.00 i t0,2Do.00 $ 24.80 $ 3,720.00 $ moo i 7,650.00 f 2275 $ 116,026.00 f 28.25 E 84.760.00 f 26.00 $ 5,200.00 f 22.00 $ 4.800.00 f 00.00 $ 1.000.00 f 8.00 E 8.000.00 S 40.00 E 4.000.00 S 115.00 f 5,760.00 E 250.00 $ 12.500.00 City of Miami Gardens INVITATION TO BID s,• The City of Miami Gardens acting as lead City for the SE Fla. Co-Op Group is requesting sealed bids from qualified contractors for the replacement and installation of new sidewalks on an as needed basis. PROPOSAL SUBMISSION Proposals will be received by sealed envelope in the Office of the City Clerk of Miami Gardens, 1515 N.W. 1671h Street; Bldg. 5, Suite 200, Miami Gardens, Florida 33169 until 2:00 P.M. on Thursday, May 21, 2009, at which time they will be opened and read in the Council Chambers by the Procurement Manager. Proposals received after this time will not be considered and no time extensions will be permitted. Please clearly mark bids: "ITB# 08-09-036 — REPLACEMENT & INSTALLATION OF SIDEWALKS" Copies of this Proposal Document may be obtain by contacting DemandStar by Onvia at www.demandstar.com or call toll free 1-800-711-1712 and request Document #0809036 or may be found on the City's web site under Procurement, Bids RFPs at www.miamigardens- fl.aov. Vendors who obtain specifications and plans from other sources other than DemandStar.com are cautioned that the bid package may be incomplete. All addendums, tabulations, evaluation meetings, award will be posted and disseminated by DemandStar. FOR INFORMATION For information on this Invitation to Bid, contact the Procurement Department, (305) 622- 8000. Deadline for submittal of questions is May 7, 2009 @ 3:00 p.m. ACCEPTANCE AND REJECTIONS The City of Miami Gardens reserves the right to reject any or all Proposals with or without cause; to waive any or all irregularities with regard to the specifications and to make the award to the Consultant offering the greatest advantage to the City. Please be advised that Pursuant to City Ordnance 2008-03-139 "Cone of Silence", public notice is hereby given that a Cone of Silence is imposed concerning this City's competitive purchasing process, which generally prohibits communications concerning the RFP until such time as the City Manager makes a written communications concerning the competitive purchase transaction. Please see the detailed specifications for the public solicitation for services for a statement fully disclosing the requirements of the "Cone of Silence". ITB#08-09-036 Page 1 of 41 Install Sidewalks May 2009 • SOUTHEAST FLORIDA GOVERNMENTAL PURCHASING COOPERATIVE TO OUR PROSPECTIVE CONTRACTORS: The attached Invitation for Bid or Request for Proposal represents a cooperative procurement for the Southeast Florida Governmental Purchasing Cooperative. For the past several years, approximately twenty-six (26) government entities have participated in Cooperative Purchasing in Southeast Florida. The Southeast Florida Governmental Purchasing Cooperative was formed in an effort to provide cost savings and cost avoidances to all entities by utilizing the buying power of combined requirements for common, basic items. The Government Agencies participating in this particular procurement and their respective delivery locations are listed in the attached document. Southeast Florida Governmental Purchasing Cooperative Procurement Operational Procedures • All questions concerning this procurement should be addressed to the issuing City, hereinafter referred to as the "lead City". All responses are to be returned in accordance with the instructions contained in the attached document. Any difficulty with participating agencies referenced in this award must be brought to the attention of the lead City. • Each participating governmental entity will be responsible for awarding the contract, issuing its own purchase orders, and for order placement. Each entity will require separate billings, be responsible for payment to the Contractor(s) awarded this contract, and issue its own tax exemption certificates as required by the Contractor. • The Contract/purchase order terms of each entity will prevail for the individual participating entity. Invoicing instructions, delivery locations and insurance requirements will be in accordance with the respective City requirements. • Any reference in the documents to a single entity or location will, in fact, be understood as referring to all participating entities referenced in the documents and cover letter unless specifically noted otherwise. • The awarded Contractor(s) shall be responsible for advising the lead City of those participants who fail to place orders as a result of this award during the contract period. • The Contractor(s) shall furnish the Lead City a detailed Summary of Sales semi-annually during the contract period. Sales Summary shall include contract number(s), contractor's name, the total of each commodity sold during the reporting period and the total dollar amount of purchases by commodity. • Municipalities and other governmental entities which are not members of the Southeast Florida Governmentai Purchasing Cooperative are strictly prohibited from utilizing any contract or purchase order resulting form this bid award. However, other Southeast Florida Governmental Purchasing Cooperative members may participate in their contract for new usage, during the contract term, or in any contract extension term, if approved by the lead City. New Southeast Florida Governmental Purchasing Cooperative members may participate in any contract on acceptance and approval by the lead City. • None of the participating governmental entities shall be deemed or construed to be a party to any contract executed by and between any other governmental entity and the Contractor(s) as a result of this procurement action. "WORKING TOGETHER TO REDUCE COSTS" rrB#08-09-036 Page 2 of 41 Install Sidewalks May 2009 City of Miami Gardens REPLACEMENT & INSTALLATION OF SIDEWALKS ITB#08-09-036 May 21, 2009 1.0 GENERAL CONDITIONS 1.1 SEALED BIDS: Original copy of Bid Form as well as any other pertinent documents must be returned in order for the Bid to be considered for award. All Bids are subject to the conditions specified herein and on the attached Special Conditions, Specifications and Bid Form. The completed Bid must be submitted in a sealed envelope clearly marked with the Bid Title to the City Clerk, City of Miami Gardens, 1515 N W 167tn Street; Bldg 5 Suite 200, Miami Gardens, Florida 33169 until 2:00 p.m., local time on date due. 1.2 EXECUTION OF BID: The Bid must contain a manual signature of an authorized representative in the space provided on the Bid Form. Failure to properly sign Bid shall invalidate same and it shall NOT be considered for award. All Bids must be completed in pen or be typewritten. No erasures are permitted. If a correction is necessary draw a single line through the entered figure and enter the corrected figure above it. Corrections must be initialed by the person signing the Bid. Any illegible entries, pencil Bids or corrections not initialed will not be tabulated. The original Bid conditions and specifications together with bidder's response CANNOT be changed or altered in any way after submitted to the City. 1.3 PRICES QUOTED: Deduct trade discounts and quote firm net prices. Give both unit price and extended total, when requested. Prices must be stated in units of quantity specified in the Bid specifications. In case of discrepancy in computing the amount of the Bid, the UNIT PRICE quoted will govern. All prices must be F.O.B. destination, freight prepaid (unless otherwise stated in special conditions). Bidders are to list discounts to be given the City for prompt payment. Award, if made, will be in accordance with terms and conditions stated herein. Each item must be proposed separately and no attempt is to be made to tie any item or items in with any other item or items. Cash or quantity discounts offered will not be a consideration in determination of award of Bid(s). All prices quoted shall be guaranteed for 90 days from Bid date unless otherwise specified in Special Conditions. 1.3.1 TAXES: The City of Miami Gardens is exempt from all Federal Excise and State taxes. The applicable tax exemption number is shown on the Purchase Order. 1.3.2 MISTAKES: Bidders are expected to examine the specifications, delivery schedules, Bid prices and extensions and all instructions pertaining to supplies and services. Failure to do so will be at the bidder's risk. 1.3.3 UNDERWRITERS' LABORATORIES: Unless otherwise stipulated in the Bid, all manufactured items and fabricated assemblies shall be U.L. listed or re-examination listing where such has been established by U.L. for the item(s) offered and furnished. 1.3.4 BID'S CONDITIONS: The City reserves the right to waive irregularities in Bids or to reject all Bids or any part of any Bid deemed necessary for the best interest of the City of Miami Gardens, Florida. 1.4 EQUIVALENTS: ITB#i08-09-036 Page 3 of 41 Install Sidewalks May 2009 If bidder offers makes of equipment or brands of supplies other than those specified, it must be indicated in the Bid. Specific article(s) of equipment/supplies shall conform in quality, design and construction with all published claims of the manufacturer. Brand Names: Catalog numbers, manufacturers' and brand names, when listed, are informational guides as to a standard of acceptable product quality level only and should not be construed as an endorsement or a product limitation of recognized and legitimate manufacturers. Bidders shall formally substantiate and verify that product(s) offered conform with or exceed quality as listed in the specifications. Bidder shall indicate on the Bid form the manufacturers' name and number if proposing other than the specified brands, and shall indicate ANY deviation from the specifications as listed. Other than specified items offered requires complete descriptive technical literature marked to indicate detail(s) conformance with specifications and MUST BE INCLUDED WITH THE BID. NO BIDS WILL BE CONSIDERED WITHOUT THIS DATA. Lacking any written indication of intent to quote an alternate brand or model number, the Bid will be considered as a Bid in complete compliance with the specifications as listed on the attached form. 1.5 NON-CONFORMANCE TO CONTRACT CONDITIONS: Items may be tested for compliance with specifications. Any item delivered, not conforming to specifications, may be rejected and returned at bidder's expense. These items and items not delivered as per delivery date in Bid and/or purchase order may be purchased on the open market. Any increase in cost may be charged against the bidder. Any violation of these stipulations may also result in Bidder's Name being removed from the vendor list. 1.6 SAMPLES: Samples of items, when required, must be furnished free of expense and, if not destroyed, will, upon request, be returned at the bidder's expense. Bidders will be responsible for the removal of all samples furnished within (30) days after Bid opening. All samples will be disposed of after thirty (30) days. Each individual sample must be labeled with bidder's name. Failure of bidder to either deliver required samples or to clearly identify samples may be reason for rejection of the Bid. Unless otherwise indicated, samples should be delivered to the Procurement Department, 1515 N W 167v'Street, Bldg. 5 Suite 200, Miami Gardens, Florida 33169. 1.7 DELIVERY: Unless actual date of delivery is specified (or if specified delivery cannot be met), show number of days (in calendar days) required to make delivery after receipt of purchase order, in space provided. Delivery time may become a basis for making an award. Delivery shall be within the normal working hours of the City, Monday through Friday, excluding holidays. 1.8 INTERPRETATIONS: Unless otherwise stated in the Bid, any questions concerning conditions and specifications should be submitted in writing to the Procurement Manager, 1515 N W 1679' Street; Bldg. 5 Suite 200, Miami Gardens, Florida 33169 Facsimile(305) 622-8001. 1.9 AWARDS: The City of Miami Gardens reserves the right to reject any and all Bids or any portion of any Bid deemed necessary in the best interest of the City; to accept any item or group of items; to acquire additional quantities at prices quoted on the Bid Form unless additional quantities are not acceptable, in which case the Bid Form must be noted "BID IS FOR SPECIFIED QUANTITY ONLY". The City also reserves the right to award the contract on a split order basis, lump sum basis, individual item basis, or such combination as shall best serve the interest of the City. All awards made as a result of this Bid shall conform to applicable Florida Statutes. No bid will be accepted from, nor will any contract be awarded to any person or firm which is in arrears to the City upon any debt or contract or which is a defaulter as surety or otherwise upon any obligation to the City or who has failed to perform faithfully any previous contract with the City. IT13#08-09-036 Page 4 of 41 Install Sidewalks May 2009 1.10 BID OPENING: Bids shall be opened and publicly read in the Council Chamber, 1515 N W 1671h Street; Bldg. 5 Suite 200, Miami Gardens, Florida 33169 on the date and at the time specified on the Bid Form. All Bids received after that time shall be returned, unopened. 1.11 INSPECTION,ACCEPTANCE&TITLE: Inspection and acceptance will be destination unless otherwise provided. Title to/or risk of loss or damage to all items shall be the responsibility of the successful bidder until acceptance by the City unless loss or damage result from negligence by the City. If the materials or services supplied to the City are found to be defective or not conform to specifications, the City reserves the right to cancel the order upon written notice to the seller and return product at bidder's expense. 1.12 PAYMENT: Payment will be made by the City after the items awarded to a bidder have been received, inspected, and found to comply with award specifications, free of damage or defect and properly invoiced. 1.13 DISPUTES: Any actual or prospective Bidder, Proposer, Offeror or Contractor who is aggrieved in connection with a solicitation or award of a Bid or Contract may avail themselves of the procedures contained in Ordinance 2007-25-131 in order to resolve disputed matters or complaints. The Procurement Manager shall post a tabulation of the Bid results with intended award recommendations. Posting shall be in the front office of City Hall or on the City's web site for public viewing. Any actual or prospective bidder, proposer, offeror, or contractor who is aggrieved in connection with the solicitation or award of contract may file a written protest with the City Clerk and mailed by the protester to all responders to the bid proposal within seventy-two hours (72) hours of the City's recommendation for award or the City's actual award whichever comes first. The written protest shall state all the particular grounds on which it is based, shall include all pertinent documents and evidence. The protest letter to the City Clerk shall include proof of mailing/receipt to other responders to the bid and shall be accompanied by a cashier's check in the amount of$500.00 representing the filing fee, plus a cost bond in the amount of$2,500.00 to reimburse the City for all administrative costs associated with the appeal process. The $2,500.00 bond shall be returned to the Protester if the Protester prevails in the hearing before the hearing examiner/special master. If the Protester does not prevail the City shall keep the bond. Any grounds not stated shall be deemed waived. Failure to file a timely formal written protest within the time period specified shall constitute a waiver by the vendor of all rights of protest under this Bid/Proposal Protest Procedure. In the event of a timely protest, the City Manager shall select a hearing examiner or special master, who shall be a member of the Florida Bar, who shall hold a hearing and submit written findings and recommendations within fifteen (15) days of the filing of the protest. The hearing examiner shall consider the written protests, supporting documents in evidence, the City's recommendations and supporting documentation and all evidence presented at the hearing. Such finding and recommendation shall be filed with the City Clerk. The hearing examiner's findings and recommendations shall be final. Appeals of a decision by the hearing examiner shall be to the Miami-Dade County Circuit Court. The prevailing party in the appeal may be entitled to recover any and all attorneys' fees and costs incurred in the appeal. 1.14 LEGAL REQUIREMENTS: ITB#08-09-036 Page 5 of 41 Install Sidewalks May 2009 Federal, State, county and City laws, ordinances, rules and regulations that in any manner affect the items covered herein apply. Lack of knowledge by the bidder will in no way be a cause for relief from responsibility. The individual executing this proposal on behalf of the Company warrant to the City that the Company is a Florida corporation duly constituted and authorized to do business in the State of Florida, is in good standing and that Company possesses all of the required licenses and certificates of competency required by the State of Florida and the County of Miami-Dade to perform the work herein described. 1.16 INDEMNIFICATION: The parties agree that 1% of the total compensation paid to the Contractor for the performance of this agreement shall represent the specific consideration for the Contractor's indemnification of the City as set forth in this Section and in the Terms and Conditions. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless the City and their consultants, agents and employees from and against all claims, damages, losses and expenses, direct, indirect or consequential (including but not limited to fees and charges of attorneys and other professionals and court costs)arising out of or resulting from the performance of the work, provided that any such claim, damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the work itself) including the loss of use resulting there from and (b) is caused in whole or in part by any willful and wanton or negligent or gross negligent acts or omission of Contractor, any subcontractor, any person or organization directly or indirectly employed by any of them to perform or furnish any of the work or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder or arises by or is imposed by Law and Regulations regardless of the negligence of any such party. In any and all claims against the City or any of their consultants, agents or employees by any employee of Contractor, any Subcontractor, any person or organization directly or indirectly employed by any of them to perform or furnish any of the work or anyone for whose acts any of them may be liable, the indemnification obligation under the above paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for Contractor or any such Subcontractor or other person or organization under workers or workman's compensation acts, disability benefit acts or other employee benefit acts. It is the specific intent of the parties hereto that the foregoing indemnification complies with Florida Statute 725.05 (Chapter 725). It is further the specific intent and agreement of the parties that all of the Contract Documents on this project are hereby amended to include the foregoing indemnification and the"Specific Consideration"therefore. The official title of the City is "City of Miami Gardens". This official title shall be used in all insurance, or other legal documentation. City of Miami Gardens is to be included as "Additional Insured"with respect to liability arising out of operations performed for City of Miami Gardens by or on behalf of Contractor or acts or omissions of Contractor in connection with such operation. 1.16 PATENTS & ROYALTIES: The bidder, without exception, shall indemnify and save harmless the City of Miami Gardens, Florida and its employees from liability of any nature or kind, including cost and expenses for, or on account of, any copyrighted, patented, or unpatented invention, process, or article manufactured or used in the performance of the contract, including its use by The City of Miami Gardens, Florida. If the bidder uses any design, device or materials covered by letters, patent, or copyright, it is mutually understood and agreed, without exception, that the Bid prices shall include all royalties or cost arising from the use of such design, device, or materials in any way involved in the work. 1.17 OSHA: ITB#08-09-036 Page 6 of 41 Install Sidewalks May 2009 The bidder warrants that the product and services supplied to the City of Miami Gardens, Florida shall conform in all respects to the standards set forth in the Occupational Safety and Health Act of 1970, as amended, and the failure to comply with this condition will be considered as a breach of contract. Any fines levied because of inadequacies to comply with these requirements shall be borne solely by the bidder responsible for same. 1.17A SAFETY PRECAUTIONS: The bidder shall, if requited, maintain suitable and sufficient guards and barriers and, at night, suitable and sufficient lighting for the prevention of accidents and all minimum safety standards required by Municipal, County, State and Federal ordinances and laws shall be strictly met by the bidder 1.18 SPECIAL CONDITIONS: Any and all Special Conditions that may vary from these General Conditions shall have precedence. 1.19 ANTI-DISCRIMINATION: The bidder certifies compliance with the non-discrimination clause contained in Section 202, Executive Order 11246, as amended by Executive Order 11375, relative to equal employment opportunity for all persons without regard to race, color, religion, sex or national origin. 1.20 QUALITY: All materials used for the manufacture or construction of any supplies, materials or equipment covered by this Bid shall be new. The items Bid must be new, unless recycled materials are certified by bidder, the latest model, of the best quality, and highest grade workmanship. 1.21 LIABILITY, INSURANCE, LICENSES AND PERMITS: Where bidders are required to enter or go onto City of Miami Gardens property to deliver materials or perform work or services as a result of a Bid award, the successful bidder will assume the full duty, obligation and expense of obtaining all necessary licenses, permits and insurance and assure all work complies with all Miami-Dade County and City of Miami Gardens building requirements and the Florida Building Code. The bidder shall be liable for any damages or loss to the City occasioned by willful, wanton or gross negligence of the bidder (or agent) or any person the bidder has designated in the completion of the contract as a result of the Bid. 1.22 BID BONDS, PERFORMANCE BONDS, CERTIFICATES OF INSURANCE: Bid Bonds, when required, shall be submitted with the Bid in the amount specified in Special Conditions. After acceptance of Bid, the City will notify the successful bidder to submit a performance bond and certificate of insurance in the amount specified in Special Conditions. 1.23 DEFAULT/FAILURE TO PERFORM: The City shall be the sole judge of nonperformance, which shall include any failure on the part of the successful bidder to accept the award, to furnish required documents, and/or to fulfill any portion of this contract within the time stipulated. Upon default by the successful bidder to meet any terms of this agreement, the City will notify the bidder three (3) days (weekends and holidays excluded) to remedy the default. Failure on the contractor's part to correct the default within the required three (3) days shall result in the contract being terminated and upon the City notifying in writing the contractor of its intentions and the effective date of the termination. The following shall constitute default: A) Failure to perform the work required under the contract and/or within the time required or failing to use the subcontractors, entities and personnel as identified and set forth, and to the degree specified in the contract. B) Failure to begin the work under this contract within the time specified. C) Failure to perform the work with sufficient workers and equipment or with sufficient materials to ensure timely completion. D) Neglecting or refusing to remove materials or perform new work where prior work has been rejected as non conforming with the terms of the contract. ITB#08-09-036 Page 7 of 41 Install Sidewalks May 2009 E) Becoming insolvent, being declared bankrupt, or committing act of bankruptcy or insolvency, or making an assignment renders the successful bidder incapable of performing the work in accordance with and as required by the contract. F) Failure to comply with any of the terms of the contract in any material respect. In the event of default of a contract, the successful bidder shall pay all attorney's fees and court costs incurred in collecting any damages. The successful bidder shall pay the City for any and all costs incurred in ensuing the completion of the project. 1.24 CANCELLATION: The City of Miami Gardens reserves the right to cancel this contract by written notice to the contractor effective the date specified in the notice should any of the following apply: A) The contractor is determined by the City to be in breach of any of the terms and conditions of the contract and/or to have failed to perform his/her services in a manner satisfactory to the City. In the event the contractor is found to be in default, the contractor will be paid for all labor and materials provided as of the termination date. No consideration will be given for anticipated loss of revenue or the canceled portions of the contract. B) The City has determined that such cancellation will be in the best interest of the City to cancel the contract for its own convenience. C) Funds are not available to cover the cost of the services. The City's obligation is contingent upon the availability of appropriate funds. 1.25 BILLING INSTRUCTIONS: Invoices, unless otherwise indicated, must show purchase order numbers; work order number and/or quotation number, if applicable; details of service(s) performed including service date, brief description, and shall be submitted in DUPLICATE to Accounts Payable, City of Miami Gardens, 1515 N W 167"Street; Bldg. 5 Suite 200, Miami Gardens, Florida 33169. 1.26 SUBSTITUTIONS: The City of Miami Gardens, Florida WILL NOT accept substitute shipments of any kind. Bidder(s) is expected to furnish the brand quoted in their Bid once awarded. Any substitute shipments will be returned at the bidder's expense. 1.27 FACILITIES: The City reserves the right to inspect the bidder's facilities at any time with prior notice. 1.28 BID TABULATIONS: Bidders desiring a copy of the Bid tabulation may request same by enclosing a self-addressed stamped envelope with the Bid. 1.29 APPLICABLE LAW AND VENUE: The law of the State of Florida shall govern the contract between the City of Miami Gardens and the successful bidder and any action shall be brought in Miami-Dade County, Florida. In the event of litigation to settle issues arising hereunder, the prevailing party in such litigation shall be entitled to recover against the other party its costs and expenses, including reasonable attorney fees, which shall include any fees and costs attributable to appellate proceedings arising on and of such litigation. 1.30 CLARIFICATION AND ADDENDA TO BID SPECIFICATIONS: If any person contemplating submitting a Bid under this Invitation for Bid is in doubt as to the true meaning of the specifications or other Bid documents or any part thereof, the Bidder must submit to the City of Miami Gardens Procurement Manager at least seven (7) calendar days prior to scheduled Bid opening, a request for clarification. All such requests for clarification must be made in writing and the person submitting the request will be responsible for its timely delivery, Any interpretation of the Bid, if made, will be made only by Addendum duly issued by the City of Miami Gardens Procurement Manager. The City shall issue an Informational Addendum if clarification or minimal changes are required. The City shall issue a Formal Addendum if substantial changes which impact the technical submission of Bids is required. A copy of such ITB#08-09-036 Page 8 of41 Install Sidewalks May 2009 Addendum will be sent to each Bidder receiving the Invitation for Bid. In the event of conflict with the original Contract Documents, Addendum shall govern all other Contract Documents to the extent specified. Subsequent addendum shall govern over prior addendum only to the extent specified. 1.31 CONTRACT: A) A contract may be awarded to the lowest responsive, responsible Bidder(s) whose Bid(s), conforming to the Invitation for Bid, is most advantageous to the City of Miami Gardens. The lowest responsive, responsible Bidder(s) will be determined in conjunction with the method of award which is described in the Special Conditions. Tie Bids will be decided as described herein. B) The City shall award a contract to a Bidder through action taken by the City Council or the City Manager of the City of Miami Gardens, Florida. C) The General Terms and Conditions, the Special Conditions, the Technical Specification, and the Bidder's Bid are collectively and integral part of the contract between the City of Miami Gardens and the successful Bidder. D) While the City of Miami Gardens may determine to award a contract to a Bidder(s) under this Invitation to Bid, said award may be conditional on the subsequent submission of other documents as specified in the Special Conditions. The Bidder shall be in default of any conditional award if any of these documents are not submitted in a timely manner and in the form required by the City. If the Bidder is in default, the City, through the Procurement Manager, will void its acceptance of the Bidder's offer and may determine to select the second lowest responsive, responsible Bidder or re-solicit Bids. The City may, at its sole option, seek monetary restitution from the defaulting Bidder as a result of damages or excess costs sustained and/or may prohibit the Bidder from submitting future Bids for a period of one year. E) The City reserves the right to exercise the option to renew a term contract of any successful Bidder(s) to a subsequent optional period; provided that such option is stipulated in the Special Conditions and is contained in any contract ultimately awarded in regard to this Bid. F) The City reserves the right to automatically extend any contract for a maximum period not to exceed ninety (90) calendar days in order to provide City departments with continual service and supplies while a new contract is being solicited, evaluated and/or awarded, in regard to this Bid. G) The Bidder agrees and understands that the contract may not be construed as an exclusive arrangement and further agrees that the City may, at any time, secure similar or identical services at its sole option. 1.32 ASSIGNMENT: The contractor shall not assign, transfer, convey, sublet or otherwise dispose of any contract, including any or all of its right, title, or interest therein, or his or its power to execute such contract to any person, company or corporation without prior written consent of the City of Miami Gardens, which consent may be withheld. 1.33 LAWS, PERMITS AND REGULATIONS: The bidder shall obtain and pay for all licenses, permits and inspection fees required for this project, and shall comply with all laws, ordinances, regulation building code requirements applicable to the work contemplated herein. 1.34 OPTIONAL CONTRACT USAGE: Other State agencies, and/or Governmental Entities in the State of Florida may purchase from the resulting contract. Contractors shall sell these commodities or services to the other State agencies and/or Governmental Entities in the State of Florida at the agencies' and/or entities option or as otherwise provided by law. 1.35 SPOT MARKET PURCHASES: ITB#08-09-036 Page 9 of 41 Install Sidewalks May 2009 It is the intent of the City to purchase the items specifically listed in this Bid from the selected bidder. However, items that are to be "Spot Market Purchased" may be purchased by other methods, i.e. Federal, State or local contracts. 1.36 WARRANTIES OF USAGE: Any estimated quantities listed are for information and tabulation purposes only. No warranty or guarantee of quantities needed is given or implied. It is understood that the Contractor will furnish the City's needs as they arise. 1.37 PUBLIC ENTITY CRIMES: As provided in Section 287.133(2) (a), Florida Statutes, a person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a contract to provide any goods or services to a public entity, may not submit a Bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit Bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor or consultant under a contract with any public entity, and my not transact business with any public entity in excess of the threshold amount provided S.S. 287.017 for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list. 1.38 CODE OF ETHICS: As provided in Article 9 Ethics in Public Contracting of the City of Miami Gardens Ordinance No. 2005-10-28 and Ordinance 2008-03-139 "Cone of Silence", from the time of advertising until the City Council deliberates on the making of an award, there is a prohibition on communication with the City Manager and his staff and Mayor and City Council. The ordinance does not apply to oral communications at pre-bid/proposal conference, oral presentations before selection committees, contract negotiations, public presentations made to the City Council during any duly noticed public meeting or communications in writing at any time with any City employee, official or member of the City Council unless specifically prohibited by the applicable RFP, RFQ or bid documents. A copy of all written communications must be filed with the City Clerk. 1.39 NON-COLLUSION: By submitting this bid, Bidder certifies that this offer is made without prior understanding, agreement, or connection with any corporation, firm or person submitting an offer for the same materials, services, supplies, or equipment and is in all respects fair and without collusion or fraud. No premiums, rebates or gratuities are permitted, either with, prior to or after any delivery of material or provision of services. Any violation of this provision may result in the Contract cancellation, return of materials or discontinuation of services and the possible removal from the vendor bid list(s). 1.40 PROHIBITION OF INTEREST: No contract will be awarded to a bidding firm who has City elected officials, officers or employees affiliated with it, unless the bidding firm has fully complied with current Florida State Statutes and City Charter relating to this issue. Bidders must disclose any such affiliation. Failure to disclose any such affiliation will result in disqualification of the bidder and may result in removal from the vendor bid list(s). 1.41 FLORIDA PUBLIC RECORDS ACT: All material submitted regarding this bid becomes the property of the City. Bids may be reviewed by any person ten (10) days after the public opening. Bidders should take special note of this as it relates to any proprietary information that might be included in their offer. Any resulting contract may be reviewed by any person after the contract has been executed by the City. The City has the right to use any or all information/material submitted in response to this bid and/or any resulting contract from same. Disqualification of a bidder does not eliminate this right. ITBN08-09-036 Page 10 of41 Install Sidewalks May 2009 1.42 TIED BIDS: In the event of an identical tied bid or proposal, preference will be given to local vendors. If none of the vendors are local, preference will be given to a vendor with a Drug-Free Workplace Program in accordance with Section 287.087, Florida Statutes. ITB#08-09-036 Page I of 41 Install Sidewalks May 2009 REPLACEMENT & INSTALLATION OF SIDEWALKS ITB#08-09-036 May 21, 2009 2.0 SPECIAL CONDITIONS 2.1 PURPOSE: The City of Miami Gardens, acting as lead City for the Southeast Florida Governmental Purchasing Co-operative Group, is actively seeking sealed bids from qualified contractors for the replacement and installation of new sidewalks on an as needed basis to the City and the Co-Op in full accordance with the specifications, terms and conditions herewith from a source(s) that will give prompt and efficient service. 2.2 TERM OF CONTRACT: It is requested that the bidder quote fixed prices that will be guaranteed to the City of Miami Gardens and the Southeast Florida Governmental Co-Op for an initial period of one year which is expected to begin on or about July 1, 2009, . The City reserves the right to exercise the option to renew annually (subject to the appropriation of funds), not to exceed a maximum of two (2) years. Annual renewals will be based on the successful bidder agreeing to the same terms and conditions and by filing written notice to the City not less than ninety (90) days prior to renewal date of any adjustment in the contract amount. Continuation of the contract beyond the initial period is a City prerogative; not a right of the bidder. This prerogative will be exercised only when such continuation is clearly in the best interest of the City. This contract is not an exclusive contract. No price increase will be accepted during the initial contract period. Renewal terms allow for a request for an increase at the time of renewal based on contractor's cost increase not to exceed three percent (3%). A written notice sent to the City for approval of any increase prior to renewal accompanied by contractor's documentation to substantiate need for price increase. No more than one price increase will be accepted during the renewal period. The contractor may make application for price adjustment to the renewal contract if the Consumer Price Index; U.S. Bureau of Labor Statistics; All Urban Consumers; U.S. City Average, that occurred between the newest C.P.I. index publication available at time of request increases_5_% or more during this period of the contract. If during the contract period, the total C.P.I. decreases 3% or more, the contractor is required to extend to the City a price decrease equal in percentage to the percentage of the index. Orders will be placed to vendors on as-needed when needed basis to meet the City's requirements. 2.3 METHOD OF AWARD: The City reserves the right to award to a primary and secondary contractor if it is in the best interest of the City and Co-Op. If a multiple award is given, Purchase Orders for task orders will be made on the basis of the unit prices submitted and the availability of the bidders work unit to the schedule set by the City. These items and quantities are projections, and shall not be construed as a base bid or a guaranteed amount. 2.4 PAYMENT: Payment will be made upon final completion and acceptance, by the City, of each assigned project. Payments will be made in accordance with Florida Prompt Payment — 45 days from receipt of invoice. No draws or partial payments will be made while work is in progress. The City will pay the contract price minus any liquidated damages and/or other damages to the Contractor upon final completion and acceptance. Bidder must submit a lump sum price inclusive of all labor, parts/supplies, equipment needed to furnish, deliver, erect, install and connect completely all of the material and appliances described herein and in the drawings, and supply all other incidental material and appliances, tools, transportation, etc., required to make thu work complete and to leave the area in first class operating condition. ITB#08-09-036 Page 12 of41 Install Sidewalks May 2009 2.6 COMPLETION TIME: Contractor shall actively start each project within ten (10) calendar days after written Purchase Orders/task orders (furnished by mail or facsimile) and shall stipulate final completion time in consecutive calendar days prior to start of each task order. The Work shall be carried on regularly and uninterruptedly with sufficient force to insure its completion with the time limit set. Failure to begin shall render the Contractor liable to the City for the sum of One Hundred Dollars ($100.00) per day as liquidated damages for each and every calendar day's delay in commencing work. For reasons satisfactory to the City's Representative, the City may waive any claims on the Contractor for the damages referred to. The City seeks a source of supply that will provide accurate and timely completion. The awarded contractor must adhere to completion schedules. If, in the opinion of the Public Works Director, the successful contractor fails at any time to meet the requirements herein, including completion requirements, then the contract may be cancelled upon written notification for default of contract. 2.6 FAILURE TO PERFORM: If, in the opinion of the City's representative, the Contractor refuses to begin work, improperly perform said work, or shall neglect or refuse to take out or rebuild such work, as shall have been rejected or as being defective or unsuitable, then City's representative may notify the Contractor to repair and replace work immediately or discontinue all work under this Contract. If at any time the City's representative shall be of the opinion that the said work is being unnecessarily delayed and will not be finished within the prescribed time then City's representative may notify the Contractor to discontinue all work under this Contract. The Contractor shall immediately respect said notice and stop said work and cease to have any rights in the possession of the ground and shall forfeit this contract. The City may thereupon look to the next lowest and responsive and responsible contractor to complete the work or advertise for bids and let a contract for the uncompleted work in the same manner as was followed in the letting of this Contract and charge the cost thereof to the original Contractor upon his contract. Any excess cost arising therefrom over and above the original contract price shall be charged to the Contractor. 2.7 PRICES SHALL BE FIXED AND FIRM FOR TERM OF CONTRACT: If the bidder is awarded a contract under this proposal solicitation, the prices quoted by the bidder on the Bid Form shall remain fixed and firm during the term of contract; provided, however, that the bidder may offer incentive discounts from the fixed price to the City at any time during the contractual term. 2.8 INSURANCE: Bidders must submit with their proposal, proof of insurance meeting or exceeding the following requirements or a letter of intent to provide the following requirements if awarded the contract: 2.8.1 Worker's Compensation Insurance—as required by law 2.8.2 Employer's Liability Insurance-$1,000,000 per occurrence 2.8.3 General Liability Insurance-$1,000,000 per person and$1,000,000 per accident for bodily injury 2.8.4 Automobile Liability Insurance - $500,000 per occurrence, $500,000 per accident for bodily injury and $500,000 per accident for property damage The required insurance coverage shall be issued by an insurance company authorized and licensed to do business in the State of Florida, with the minimum rating of B+ or better, in accordance with the latest edition of A.M. Best's Insurance Guide. The successful bidder must submit, no later than ten (10) days after award and prior to commencement of any work, a Certificate of Insurance naming the City as additional insured. ITB#08-09-036 Page 13 of 41 Install Sidewalks May 2009 2.9 CONTACT PERSON: For any additional information regarding the specifications and requirements of this proposal, contact: Procurement Department, Facsimile: (305) 622-8001, a-mail: pthompson@miamigardens-fl.gov. 2.10 PERFORMANCE BOND: The successful contractor(s)will be required to furnish a Performance Bond and Payment Bond for 100% of the total task order if it exceeds $150,000, to be in the form of a Cashier's Check, made payable to the City, a bond written by a surety company authorized to do business in the State of Florida and shall comply with State Statute 287.0935; or an Irrevocable Letter of Credit. If the latter is chosen, it must be written on a bank located Miami-Dade, Broward or Palm Beach County, be in the amount of the total task order and should dearly and expressly state that it cannot be revoked until express written approval has been given by the City. The City, to draw on same, would merely have to give written notice to the bank with a copy to the successful contractor(s). 2.11 LIQUIDATED DAMAGES: Purchase Orders will be issued and completion times will be mutually agreed upon between the contractor and the City. Liquidated damages of$100.00 per calendar day will be deducted from the contract sum for each and every calendar day's delay in commencing work or elapsing beyond the specified time for completion for each Purchase Order. 2.12 PROPOSAL CLARIFICATION: Any questions or clarifications concerning this Bid shall be submitted in writing by mail or facsimile to the Procurement Department, 1515 N W 167"' Street; Bldg 5 Suite 200, Miami Gardens, Florida 33169, FAX: (305) 622-8001. The bid title/number shall be referenced on all correspondence. All questions must be received no later than ten (10) days prior to the scheduled bid opening date. All responses to questions/clarifications will be sent to all prospective bidders in the form of an addendum. NO QUESTIONS WILL BE RECEIVED VERBALLY OR AFTER SAID DEADLINE. 2.13 CONDITIONS OF WORK: If property (public or private) is damaged performing work specified or is removed for the convenience of the work, it shall be repaired or replaced at the expense of the contractor in a manner acceptable to the City. Such property shall include but not limited to roads, driveways (whether concrete or asphalt), approaches (whether concrete or asphalt), sod, walls, fences, water features, footings, underground utilities, shrubs, trees, etc. Contractor shall submit to the City authorized personnel for review, pictures or video of the work site(s) having pre-existing damage to roadways, driveways, approaches, sod, swales, adjacent improvements, etc. before beginning work. Failure to do so shall obligate the contractor to make repairs per above paragraph. Contractor shall notify the City authorized personnel of any pre-existing damage to tree trunks or limbs before beginning work. Failure to do so shall obligate the contractor for tree removal, and canopy replacement as per D.E.R.M. codes, ordinances and or resolutions. 2.14 PROTECTION: Contractor shall be solely responsible for pedestrian and vehicular safety and control within the work site and shall provide the necessary warning devices, barricades and ground personnel needed to give safety, protection and warning to persons and vehicular traffic within the area. All safety devices must have suitable and sufficient lighting for the prevention of accidents. All minimum safety standards required by Municipal, County, State and Federal ordinances and laws shall be strictly met by the contractor. 2.16 HOURS OF WORK: Contractor will perform work Monday through Friday from 7:30 a.m. to 4:00 p.m., excluding holidays unless prior approval is given by the City. 2.16 EMPLOYEES: Contractor shall be responsible for the appearance of all working personnel assigned to the project (clean and appropriately dressed at all times). Personnel must be able to supply proper identification at all times. ITB#08-09-036 Page 14 of 41 Install Sidewalks May 2009 All employees of the contractor shall be considered to be at all times the sole employees of the contactor, under the contractor's sole direction, and not an employee or agent of the City. The contractor shall supply competent and physically capable employees and the City may require the contractor to remove any employee it deems careless, incompetent, insubordinate or otherwise objectionable and whose presence on City property is not in the best interest of the City. City shall not have any duty to implement or enforce such requirements. Contractor shall assign an "On Duty" supervisor who speaks and reads English. 2.17 PERMITS: No permits are required, however, inspections shall be made in accordance with Section 03.1602 Quality Assurance. Contractor shall verify all locations of underground utilities with Sunshine One Call, Peoples Gas, Southern Bell, TCI cable, etc. prior to any work. Contractor shall contact proper authorities for raising utility boxes (manhole covers, valve boxes, water meters, sanitary sewer clean-outs). All work not stated herein shall be in compliance with the Florida Building Code and all other national, state, and local codes and regulations. All permits to be posted on job site. All inspections shall be requested a minimum of twenty-four (24) hours prior to inspection. Inspection shall be required at the following stages of construction: a. Subgrade prep completion b. Sidewalk formed prior to pouring concrete C. Paving d. Final 2.18 WARRANTY: The successful contractor will be required to warranty all materials and workmanship to be in compliance with the specifications. 2.19 REFERENCES: Each bid must be accompanied by a list of five (5) references, of prior experience and similar work, which shall include contact person, e-mail address, telephone number and facsimile number. Local references are preferred, as the City reserves the right to visit each reference submitted. It is the responsibility of the bidder to ascertain that the contact person will be responsive. STATEMENT OF EXPERIENCE OF BIDDER form must be completed and returned with Bid Form. 2.20 BID SUBMITTAL: All bids submitted shall include the completed Bid Form and all required product information and any other items as indicated on the Bid Form. Bids will be considered "Non-Responsive" if the required information is not submitted by the date and time specified. Before submitting bid package, each bidder shall make all investigations and examinations necessary to ascertain if any addendums were issued by the Procurement Department. 2.21 LATE BIDS: The City of Miami Gardens cannot be responsible for bids received after opening time and encourages early submittal. 2.22 EXCEPTIONS TO SPECIFICATIONS: Exceptions to the specifications shall be listed on the Bid Form and shall reference the section. Any exceptions to the General or Special Conditions shall be cause for the proposal to be considered non-responsive. 2.23 COMPLETE INFORMATION REQUIRED ON BID FORM: All bids must be submitted on the attached Bid Form and all blanks filled in. To be considered a valid proposal, the ORIGINAL AND THREE COPIES of the Invitation to Bid and Bid Form pages ITBN08-09-036 Page 15 of 41 Install Sidewalks May 2009 must be returned, properly completed, in a sealed envelope as outlined in the first paragraph of General Conditions. STATEMENT OF BIDDER'S EXPERIENCE PROOF OF INSURANCE REFERENCES CONTRACTOR QUESTIONNAIRE 2.24 PARTICIPATING AGENCIES Each participating governmental City will be responsible for issuing its own Purchase Obligations/task orders. Each City will require separate billings, be responsible for payment to the awarded contractor and issue its own tax exemption certificates as required by contractor. Invoicing instructions, site locations, and bonding requirements, if applicable, will be in accordance with the respective City's requirements. Any reference in this document to a single City, will be understood as referring to all participating agencies referenced in this bid. Municipalities and other governmental agencies which are not members of the Southeast Florida Governmental Cooperative Purchasing Group are strictly prohibited from utilizing any contract or purchase order resulting from this bid award. However, other Co-Op members may participate in this contract for new usage, during the contract term, or on any contract extension term, if approved by the lead City. New Co-Op members may participate in any contract, on acceptance and approval by the lead City. Name&Address Contact Phone City of Hallandale Beach Andrea Lues 954-457-1333 400 S. Federal Hwy Hallandale, FL 33009 City of Deerfield Beach Donna Council 954-480-4380 210 SW Goolsby Blvd. Deerfield Beach, FL 33442 City of Miramar Margaret Palomino 954-967-1550 6700 Miramar Pkwy Miramar, FL 33023 City of Miami Gardens Pam Thompson 305-622-8000 1515 NW 167"Street#200 Miami Gardens, FL 33169 City of Pompano Beach Jackie King 954-786-4098 1190 NE 3rd Avenue Pompano Beach, FL 33060 City of Lauderdale Lakes Vincent Richmond 954-535-2743 4300 NW 37lh Street Lauderdale Lakes, FL 33319 City of Tamarac Keith Glatz 954-597-3567 7525 NW 88'o Avenue Tamarac, FL 33321 ITB#08-09-036 Page 16 of 41 Install Sidewalks May 2009 City of Hollywood Ralph Dierks 954-921-3223 2600 Hollywood Blvd. Hollywood, FL City of Lauderhill Saied Muhammad 954-730-4238 Lauderhill, FL 33319 ITB408-09-036 Page 17 of 41 Install Sidewalks May 2009 REPLACEMENT & INSTALLATION OF SIDEWALKS ITB#08-09-036 May 21, 2009 3.0 TECHNICAL SPECIFICATIONS GENERAL SCOPE OF WORK — Contractor will not be required to replace or install less than a combined 100 linear feet of sidewalks within one square mile per task order and/or purchase order. A. The work includes removal of grass and other materials to prepare the ground for sidewalk installation. Additional tasks will include installation of handicap ramps at intersections of Streets and Avenues where indicated by each City. All form work and site preparation shall be conducted with minimum impact and/or damage to the adjacent properties. B. Remove and dispose of existing trees as indicated by each City. All trees to remain shall be preserved. See Tree Removal and Preservation Specifications. Size of tree will be paid based on proof from the contractor of size. If proof is not provided, each City will make such determination of size deemed acceptable. C. New four, five and six foot wide sidewalks shall be constructed per Typical Sidewalk Section Detail and Florida Accessibility Code for Building Construction, latest edition, and Section 522 of the FDOT-SSR&BC, latest edition and other requirement as required. D. Handicap ramps shall be installed at intersections of Streets and Avenues within the ROW only, per Typical Handicap Ramp Layout Detail. E. Any disturbed swale areas, private property, other public property shall be re-sodded per Sod Specifications and graded properly as per specifications at the Contractor's expense. F. Any damage to the roadway, driveway approaches, driveways, abutting sidewalks, aprons surrounding catch basins, manholes, etc. shall be repaired at no expense to the City, if determined by the City to be repairs due to negligence or lack of coordination on the part of the Contractor. Re-paving shall be per Pavement Specifications and Miami-Dade County Public Works Manual. G. Purchase and installation of Florida #1 Live Oak Trees, Mahogany, Crape Myrtle and or Silver Buttonwood with 10' lot 2' overall height. H. Drawings added include the following: 1. Planting Detail 2. Typical Drawings I. At the discretion and direction of each City, each block where sidewalks are to be installed, surveys will be required to establish R.O.W. centerline and width. END OF SECTION REPLACEMENT & INSTALLATION OF SIDEWALKS SECTION 031500 TEMPORARY FACILITIES 03.151 SECURITY A The contractor is responsible for project security. Contractor shall protect and secure the site, materials, and equipment from theft and damage, by whatever means deems effective, at contractor's cost. B. Work site(s) must be protected properly in accordance with all Federal, State, County and Municipal laws and ordinances, at the end of each work day and weekends. 03.152 SPECIAL CONTROLS ITB#08-09-036 Page 18 of 41 Install Sidewalks May 2009 A. Water Control: 1. Keep excavations dry. 2. Shape excavations, particularly piles of excavated material, so as to divert water from excavations and low spots. B. Erosion and Sedimentation Control: 1. Prevent the pollution of land, air and water and control the erosion, washout and surface runoff of earth and stockpiled materials. 2. Fill material shall contain no organic matter other than the normal organic component of topsoil. 3. Immediately upon completion of final grading, stabilize graded areas with temporary or permanent vegetation, mulch, or paving. 03.153 MAINTENANCE OF TRAFFIC A. Control of vehicles and Persons: 1. Provide trained personnel to assure the orderly flow of vehicular traffic during construction. 2. Contractor shall submit a Maintenance of Traffic Plan (MOT) for review and acceptance by each City when required. 3. Upon completion of work each day the lanes shall be opened to traffic. Lane closure procedures shall be in accordance to the F.D.O.T. Standards provided. 4. Ensure that private property driveways are usable upon completion of daily work. B. Limit of Operations: 1. Any damage or alterations to area outside limit of operations shall be returned to original condition within 24 hours at no cost to the City. 03.154 PROJECT IDENTIFICATION A. No signs, or advertisements will be allowed to be displayed on the premises without the approval of each City's Representative. 03.155 PROJECT HOUSEKEEPING A. Trash Disposal 1. Keep adjacent streets and site free from accumulations of waste materials and rubbish. 2. Provide central waste area with containers for at least daily removal. B. Burning: 1 Do not burn any trash or other material on site. C. Material Removal/Additional Soil: 1. Excess material, including demolished material, roots from trees, excess earth and excess building materials are property of the contractor and shall be removed from site daily and legally disposed of. 2. All material excavated or brought to the project for use/reuse shall be piled within the Public Right-of-Way in a location previously approved by the City. 3. The Contractor shall leave all locations in an acceptable manner once concrete has been poured. Contractor shall coordinate work to ensure that all sites are clean, sodded as required, and acceptable prior to mobilizing to other locations. 4. The Contractor shall replace any sod, concrete and/or asphalt removed, damaged or displaced during demolition or performance of work at own expense. END OFSECTION 031500 ITBk08-09-036 Page 19 of 41 Install Sidewalks May 2009 REPLACEMENT & INSTALLATION OF SIDEWALKS SECTION 031600 POURED CONCRETE Sidewalks & Handicap Ramps & Curbs 03.1601 DESCRIPTION A. Provide poured concrete at locations where no sidewalks or ramps exist to be per drawings and specifications B. Provide poured concrete in locations where existing sidewalk must be replaced per drawings and specifications C. Provide curb cuts where proposed handicap ramps are installed and there is a conflict with existing curbs. Curb cuts shall be in per FOOT design standards. All curbs shall be cut and transitioned in an acceptable manner. All surrounding pavement, sod, asphalt shall be restored to the existing elevation at the Contractor's expense. 03.1602 QUALITY ASSURANCE A. Testing and Inspection of Installation 1. Concrete shall not be poured, placed or installed until such time an inspection of all sites has taken place by the City authorized personnel. Inspections shall be made to verify appropriate compaction of subbase and to check forms for line and grade. 2. The City will inspect the installation. If any concrete is found to be installed improperly, the Contractor will be required to remove and replace promptly. Upon notifications from the contractor, the City will perform a re-inspection. Should additional concrete be found to be unsatisfactorily installed, and additional inspections be required, these inspections shall be at the Contractor's cost, at the discretion of the City. 03.1603 PRODUCTS A. Concrete 1. Forms: Steel, wood, or other suitable material of size and strength to resist movement during concrete placement. Conform to ACI 301. 2. All Joints: Joints must be scribed to help prevent cracking per FDOT design standards 3. Concrete Mix Design: Mix concrete in accordance with ASTM C94 Design Mix to produce normal-weight concrete consisting of Portland cement, aggregate and water to produce the following properties: a. Compressive strength: 3000 psi, minimum at 28 days b. Slump range: 4"to 6" C. Air content: 5%to 8% B. Biobarrier 1. Hort Enterprises—Ft. Lauderdale (954) 771-5761 or equal. Twelve inch (12") wide roll. 03.1604 EXECUTION A. Inspect surfaces for conditions that will adversely affect the quality of installation. Do not proceed with the installation until adverse conditions have been corrected. ITB#08-09-036 Page 20 of 41 Install Sidewalks May 2009 B. Compact subbase surface immediately before placing concrete. C. Replace organic material with clean fill and installed up to 6" lifts and compact to a minimum of 95% compaction. Contractor shall submit type of clean fill for City's approval prior to construction. D. The City has the right to request compaction test at locations chosen by the City. E. Concrete finishing: a. Smooth surface by screeding and floating. Produce a uniform texture. b. Work edges of slab to a ''/z" radius Eliminate tool marks on concrete surface. C. Broom finish after excess moisture has disappeared. 03.1605 INSTALLATION A. General: Comply with requirements Florida Accessibility Code for Building Construction, latest edition, and Section 522 of the FDOT-SSR&BC, latest edition and other requirement as required. B. All sidewalks and ramps shall be four inches (4") thick except across driveways, driveway approaches, and first five feet (5) of ramps closest to paved roadways where that shall be six inches (6")thick. C. Sidewalk elevation shall be two inches (2") above the crown of the road, at the back side of the sidewalk, and the pitch shall be '/. inch per foot toward the road. Elevation may be adjusted, based on the existing grade, as approved by the City. D. Contractor shall ensure that where handicap ramps are installed per FDOT design standards. The cut shall be provided at least one foot (1) behind the transition point. All modifications to the curb shall match existing curbs and shall be flush without exception. E. No wire or wire mesh shall be utilized within the public right of way. (R.O.W.). F. Concrete shall not be poured, placed, or installed until such time an inspection of all sites has taken place as per Section 3.1602 QUALITY ASSURANCE. IF ANY WORK OR PORTION OF WORK HAS NOT BEEN INSPECTED AS PER SECTION 3.1602, THAT PORTION OF WORK SHALL BE IMMEDIATELY REMOVED AND REPLACED ONCE THE INSPECTION HAS BEEN CONFIRMED AT NO COST TO THE CITY. G. Place concrete using methods which prevent segregation of mix. Consolidate concrete along face of forms and adjacent to transverse joints with internal vibrator. Keep vibrator away from joint assemblies, or side forms. Use only square-faced shovels for hand-spreading and consolidation. Consolidate with care to prevent dislocation of re-enforcing, dowel, and joint devices. H. Deposit and spread concrete in a continuous operation between transverse joints, as far as possible. I. Contractor shall replace all damaged or misaligned private walkways and driveways with a transition to the private property at 8 to 1 fill slope transition. All other locations shall have a 4 to 1 fill slope transition. Organic material can be used in areas outside walkways and driveways that require fill slopes. J. Avoid premature cracking by installing expansions joint where required. K. Utility boxes shall be raised to sidewalk elevations or flushed with sidewalk as to prevent trip hazard. L. Install Biobarrier prior to forming and pouring concrete. ITBk08-09-036 Page 21 of 41 Install Sidewalks May 2009 M. Install Biobarrier at existing trees and new trees. Length of biobarrier shall be ten feet (10') long centered on the tree by twelve inch (12") deep at one inch—two inch (1"-2") below the top of the sidewalk. See Section 31800 for additional information. N. Concrete shall not be poured, installed or place around manholes, cleanouts, or other structures until they are at required elevations and alignment. Contractor shall notify the City in writing of manholes, cleanouts, or other items that may require relocation prior to pour. O. All sidewalk that the City has determined to be replaced due to deterioration, cracking, uplifting, improper sloping, misalignments, grade, etc. will be removed and replaced as required by specification. P. Removal of existing sidewalk shall be performed by saw cutting the section of unacceptable sidewalk (as determined by the City) at the nearest acceptable five foot (5') flag. New sidewalk shall be poured in its place as established by specifications. Q. All areas where existing sidewalk is to be replaced must be prepared and graded to match adjacent sidewalk flags. R. All replacement sidewalk sections shall be installed to match the existing sidewalk elevation. END OF SECTION 031600 REPLACEMENT & INSTALLATION OF SIDEWALKS SECTION 031700 PROTECTION STORM DRAINS 03.1701 PROTECTION A. All storm drain inlet must be protected, from sediments entering the storm water conveyance system prior to disturbance to the area. B. All sediment and erosion control practices must be in accordance with the Florida Department of Environmental Protection Storm Water Sediment and Erosion Control Manual Section 4.08 (Storm Drain Protection Procedures) (Best Management Practices BMPs). END OF SECTION 031700 REPLACEMENT & INSTALLATION OF SIDEWALKS SECTION 031800 CONCRETE CURB AND GUTTER 03.1801 DESCRIPTION A. All curb and gutter shall be formed and installed in accordance with State of Florida Department of Transportation Roadway and Traffic Design Standards (FDOT). Curb and gutter not installed in accordance with these specifications will be removed and replaced at the expense of the Contractor. B. Related work: 1. Clearing and Removal: Section 031500 03.1802 QUALITY ASSURANCE A. Testing and Inspection of Installation 2. The City will inspect the installation. If any concrete is found to not be installed adequately, the Proposer will be required to remove and replace promptly. Upon ITB#08-09-036 Page 22 of 41 Install Sidewalks May 2009 notifications from the proposer, the City will perform a re-inspection. Should additional concrete be found to be unsatisfactorily installed, and additional inspections be required, these inspections shall be at the Proposer's cost, at the discretion of the City. 03.1803PRODUCTS A. Concrete 1. Forms: Steel, wood or other suitable material of size and strength to resist movement during concrete placement. Conform to ACI 301. Height shall be equal to the full depth of the finished sidewalk, curb and gutter with a flat top surface and be inspected and approved by the City prior to pouring. 2. Concrete Mix Design: Mix concrete in accordance with ASTM C94 Design Mix to produce normal-weight concrete consisting of Portland cement, aggregate and water to produce the following properties: a. Compressive strength: 3000 psi, minimum at 28 days b. Slump range: 4"to 6" c. Air content: 5%to 8% 03.1804 INSTALLATION A. Cast-in-place curb and gutter Type"F" shall be of thickness, size, shape and location indicated on drawings. Curbs shall receive a broom finish. Two 1 '/2" PVC sleeves of adequate length shall be provided by the Proposer to go under all required curb and gutter to allow for electrical and water access as shown on drawings. B. Gutter elevations shall maintain a consistent elevation with roadway and shall be installed so as not to obstruct the natural flow of run-off in the area. A 6" batterface curbing Type"D" shall run the width of the planter (approximately 10 ft.) on both sides at the two alley planters.(135tn Street& 141 s`Street) C. Sawcuts shall be provided every ten feet (10')to a depth of 118"—%". D. Proposer shall cut the roadway straight and even with asphalt cutting equipment where the curb and gutter meets the existing roadway. Any voids between the new curb and gutter and existing asphalt shall be filled with F.D.O.T. approved asphaltic concrete patch. Concrete voids shall also be filled with F.D.O.T. approved concrete patch. E. Proposer shall purchase and install 4'6"x 3 Y2" O.D. galvanized (non-threaded schedule 40 pipe every 4' in the gutter to establish a protective barrier(Figure 3). Each pipe shall receive a metal cap and the cap shall be attached with glue that is rated for bonding steel to steel. F. Proposer shall purchase and install three (3) eighteen inch (18") metal reflective triangles on each side of the barricade that faces the street or alley. The reflective triangles shall be attached to the galvanized pipe with U-clamps as shown in (Figure 4) and fastened with washers and lock nut washers so that the nuts cannot be removed. No threaded portion of the U-clamp shall exceed '/ inch beyond the nut once secure. Excess shall be cut back to Y2 inch. END OF SECTION 031800 REPLACEMENT & INSTALLATION OF SIDEWALKS SECTION 031900 TREE REMOVAL & PRESERVATION 03.1801 REMOVALS rrB#08-09-036 Page 23 of 41 Install Sidewalks May 2009 A. ONLY the trees and/or shrubs that are deemed by the City to interfere with the intent of the contract shall be removed or root pruned as needed. All cost associated with vegetation removal and/or root pruning shall be included with the unit price, B. The contractor shall be required to review the site prior to performance of work and ensure no conflicts exist. Any tree in conflict with the expected location of new sidewalk shall be reported to the City for review. C. Remove trees and grind stumps and all surface roots to a minimum of 4" below grade. D. Restore the location where tree removals take place with soil and sod at grade. 03.1902 PRESERVATION The following actions and precautions shall be done to protect any trees that will remain in all of the construction areas during construction. These trees shall be those located near new sidewalk installation. A. Root Pruning 1. All existing trees shall be root pruned along the sidewalk prior to sidewalk removal, excavation and installation. 2. The root cutting shall be clean with no tears with root pruning machine. 3. The cut shall extend from the tree out 4 feet minimum in both directions, or as the field may permit to ensure the protection of the tree. 4. The cut shall be 12 inches below grade. 5. The cut shall be no wider than 3 inches. B. Protective Barriers 1. Barriers shall be placed no less than 6 feet around each tree or no less than 1 foot from edge of street, sidewalk or driveway. 2. Barriers shall be a minimum of 4 feet above ground level, constructed of wood, metal or rigid plastic, in the form of a fence. No barrier shall be secured in any way to the tree. 3. Barriers shall be in installed prior to construction and remain until the City authorizes their removal. 4. No excess oil, fill, equipment, building materials or debris shall be placed within the barriers. 5. The existing grade within the barrier shall not be changed. END OF SECTION 031900 REPLACEMENT & INSTALLATION OF SIDEWALKS SECTION 032000 SOD & INSTALLATION 03.2001 MATERIALS A. Sod shall be St.Augustine 'Floratam', grade A. B. Sod shall be weed and insect free. 03.2002 INSTALLATION Those areas disturbed as a consequence of sidewalk installation and those areas disturbed as a consequence of Contractor mobilization and stock piling shall be restored promptly at Contractor's expense. The Contractor shall not utilize methods of mobilization or execution of work that impacts private/public areas excessively and/or in a manner that is unacceptable to the City. Contractor shall ensure that all ITB#08-09-036 Page 24 of 41 Install Sidewalks May 2009 private and/or public areas impacted by the mobilization, stock piling, or lack of coordination as interpreted by the City are restored at no cost to the City. A. Only damaged areas of swales or private property shall be replaced. Where sidewalks require to be elevated above existing grade, swales shall be graded to a 12 to 1 fill slope with sod. B. Sodded areas shall have any compaction relieved, raked smooth and rocks or debris removed. D. Areas along street and sidewalk shall be 2 inches below that surface so installed sod will be level with that surface. E. Sod will be laid tightly together, and cut to a uniform edge along hard surfaces and around trees or palms. The sod around trees or palms shall be laid encircling to within 18 inches, or up to the berm surrounding newly installed trees or palms. F. Sod shall be watered within one hour of installation and shall be maintained moist. 03.2003 QUALITY ASSURANCE A. No sub-par sod, or broken pieces will be accepted, and shall be removed from the site daily. B. No yellow sod will be accepted. C. Sod shall not be pieced together with scraps that do not sufficient roots to sustain growth. D. Contractor is responsible for his own square foot take-offs to provide 100% sod coverage throughout the scope of the project. E. Rejected areas will be removed and replaced immediately, and all sod maintained until final acceptance. END OF SECTION 032000 REPLACEMENT & INSTALLATION OF SIDEWALKS SECTION 032100 PAVEMENT 03.2101 PAVEMENT A. Pavement repairs of driveway approaches and section of driveways effective by installation of sidewalks shall be re-installed with one inch (1") of asphalt in accordance with the FDOT Manual of Uniform Minimum Standards for Design, Construction & Maintenance for Streets & Highways, latest edition. B. Concrete repairs shall be limited to damage which results as part of construction and elevation changes of the new sidewalk. 03.2102 EXECUTION A. Contractor shall repair asphalt/concrete driveway approaches where existing approaches are damaged by construction process. Contractor shall photograph all existing approaches and sidewalks prior to starting construction or risk repairing at his cost. 03.2103 QUALITY ASSURANCE A. Testing and Inspection of Installation 1. The City will inspect the installation. If any asphalt or concrete is found to not be installed adequately, the Contractor will be required to remove and replace promptly. Upon notifications from the contractor, the City will perform a re-inspection. Should additional asphalt be found to be unsatisfactorily installed, and additional inspections are required,these inspections shall be at Contactor's cost, at the discretion of the City. END OF SECTION 032100 ITB#08-09-036 Page 25 of 41 Install Sidewalks May 2009 REPLACEMENT & INSTALLATION OF SIDEWALKS SECTION 032200 TREES 03.2201 MATERIALS A. Live Oaks, Mahogany, Crape Myrtle, Silver Buttons shall be graded Florida #1 or better. B. Ten to Twelve foot (10'— 12') Oaks shall have a minimum spread of five foot (5) and a caliper of two inches (2"). 03.2202 INSTALLATION A. Trees shall be installed in a straight line. B. Bottom of planting hole shall be scarified to a minimum depth of eight inches (8"), breakthrough and loosen all hardpan (remove if necessary to facilitate drainage). C. Set tree level with its original grade or slightly higher no more than 1"to 2". D. Backfill planting hole after tree is set with soil consisting of a homogeneous mixture of: 40% sand, 45% peat moss, 15% pine bark and mixed with: 50% with the excavated soil from the planting site. E. Tree shall be thoroughly watered in to eliminated any and all air pockets. F. A six inch (6") high rim of dirt shall be installed around excavated hole to form a saucer shape, which will hold water around the rootball. F. Fertilizer Agriform tablets 20-10-5, six (6) per tree shall be applied during backfilling of hole. H. A three (3") layer of mulch shall extend from the outside rim to the saucer to three inches (3") away from the base of the tree. I. Tree shall be braced using three (3) 2" x 4" x 8" stakes attached with black rubber hose Y:" dia. tied with doublestrand 12 gauge galvanize wire. 03.2203 POST MAINTENANCE A. Contractor is responsible for all maintenance of the tree during the warranty period of the one-year. This includes but is not limited to: weeding, re-mulching, re-staking, pruning, (if required), retention saucer repair, etc. END OF SECTION 032200 REPLACEMENT & INSTALLATION OF SIDEWALKS SECTION 032300 IRRIGATION 03.2301 CONDITONS A. Contractor is responsible for identifying any irrigation piping that residents may have either in the swale or along the existing sidewalk. Any irrigation piping, sprinklers or wiring must be replaced to the residents'satisfaction. ITB#08-09-036 Page 26 of 41 Install Sidewalks May 2009 B. Contractor shall identify and document all locations and notify the City's authorize personnel of any existing irrigation systems. Documents will be used by the City's authorize personnel for inspection to verify satisfactory repairs or replacements. 03.2302 INSTALLATION A. Any piping that is removed shall be replaced with equal size PVC; PR160 or PR200. Schedule 40 PVC fittings shall be used. B. Sprinklers shall be Rainbird 1804, mounted with swing joints, with the appropriate pattern of nozzle (see detail 1804) 1804 DETAIL 9 2Inch Min. �7SWK4NnGJ"0fNT END OF SECTION 03230 REPLACEMENT & INSTALLATION OF SIDEWALKS SECTION 032400 FENCING 03.2401 CONDITONS A. Contractor is responsible for identifying any existing fencing that residents may have either in the swale or along the existing sidewalk. Any fencing must be relocated to the City's satisfaction. B Contractor shall identify and document all locations and notify the City's authorize personnel of any existing fences. Documents will be used by the City's authorize personnel for inspection to verify satisfactory re-location. 03.2402 INSTALLATION C. Any fencing that is removed shall be replaced with like material or re-located in compliance with applicable codes and regulations. D. Contractor shall adjust heights of existing fence gates when the sidewalk elevation conflicts with their use. END OF SECTION 03240 ITBk08-09-036 Page 27 of 41 Install Sidewalks May 2009 Jls4iudions for, i NOTE : TOP OF TREE BALL TO BE SET APPROX. 4" BELOW GRADE. SLOPE GRADE FROM APPDX. 24" OUTSIDE TREE BALL TO PROVIDE FOR THE WATER RETENTION BASIN. j : j � I 2" MULCH BLACK 1/Z" DIA. RUBBER HOSE TIED w/ DOUBLESTRAND FINISH GRADE 7 12 9a. GALV. WIRE. 3" by B' LONG � CYPRESS PROP PROP POLE. r WATER RETENTION AREA 24" 24' —SLOPE 18" PLA T TABLET SEE SPEC, FOR REQUIRED QUANTITY AR ES WI H PREPARED PLANTING SOIL PLANT BALL SECTION PLANTING DERAIL — TREE WITH STAKES 1'=Z" CALIPER ITB#08-09-036 Page 28 of 41 Install Sidewalks May 2009 BID FORM PROJECT: REPLACEMENT & INSTALLATION OF SIDEWALKS CITY OF MIAMI GARDENS ITB #-08-09-036 — May 21, 2009 BID SUBMITTED TO: CITY OF MIAMI GARDENS 1515 NW 167T" Street#200 Miami Gardens, Florida 33169 BID SUBMITTED BY: Phone Fax E-Mail: Price per UOM Est. Total Items Quantity Bonds Projects>$160,000 $ New 4' wide Sidewalk 4" $ Linear Ft. 2,830 depth (includes restoration) New 4' wide Sidewalk 6" $ Linear Ft. 700 depth (includes restoration New 5' wide Sidewalk 4" $ Linear Ft. 32,100 depth (includes restoration) New 5' wide Sidewalk 6" $ Linear Ft. 590 depth includes restoration) New 6'wide Sidewalk 4" $ Linear Ft. 2,100 depth (includes restoration New 6' wide Sidewalk 6" $ Linear Ft. 12,250 depth (includes restoration) Curb & Gutter Type F $ Linear Ft. 1,500 Curb & Gutter Type D $ Linear Ft. 1,500 Tree Root $ Per tree 50 Pruning/Biobarrier includes restoration Tree Removal Dia. @ breast hgt.4.5' above grade 0 to 8" $ Per tree 10 8"+ to 18" $ Per tree 10 1811+ to 30" $ Per tree 20 30" + $ Per tree 20 includes restoration Live Oak Fla. #1 10'-12' $ Per tree 15 overall height (includes restoration Mahogany Fla. #1 10'-12' $ Per tree 10 overall height (includes restoration Crape Myrtle Fla. #1 10'- $ Per tree 10 12' overall height includes restoration) ITB#08-09-036 Page 29 of 41 Install Sidewalks May 2009 Cont. Silver Buttonwood Fla. $ Per tree 10 #1 10'-12' overall height includes restoration) Handicap Ramps @ $ Linear Ft. 130 existing Sidewalk includes restoration Handicap Ramps @ New $ Linear Ft. 45 Sidewalk (inc. restoration) R.O.W. Survey (to $ Per1/2 block 20 establish property lines 4" Thick 4' wide $ Linear Ft. 600 Sidewalk Flag Removal/Disposal/install 6" Thick 4' wide $ Linear Ft. 150 Sidewalk Flag Removal/Disposal/install Curb Cuts (inc. $ Each 510 restoration 4" Thick 5' wide $ Linear Ft. 5100 Sidewalk Flag Removal/Disposal/install 6" Thick 5' wide $ Linear Ft. 3000 Sidewalk Flag Removal/Disposal/install 4" Thick 6' wide $ Linear Ft. 200 Sidewalk Flag Removal/Disposal/install 6" Thick 6' wide $ Linear Ft. 160 Sidewalk Flag Removal/Disposal/install Relocation Fence $ Linear Ft. 50 Irrigation Parts $ Pipe/Linear Ft 1000 Sch. 40 PVC Pipe $ Rainbird/swing 100 Rainbird/swing joints joints/each Compaction Test $ Each 50 Raise Utilities Access $ Each 50 (includes sewer cleanouts, water meters, manholes, water values The above proposals includes the total cost to complete the Work including but not limited to materials (i.e. vegetation, concrete, asphalt, etc.), labor, equipment, bonds, etc. indicated in the drawings, specifications, addenda, and any other contract documents. I. NOTES TO BIDDERS: 1. Bidder shall fill in the entire Bid Form, No spaces are to be left blank. 2. The City reserves the right to utilize any combination of the base proposals, add alternates as they so desire to achieve the proper balance between the required improvements, desired improvements, and City's available project budget. ITBt108-09-036 Page 30 of 41 Install Sidewalks May 2009 II. BIDDER'S REPRESENTATION 1. The undersigned BIDDER proposes and agrees, if this Proposal is accepted, to enter into an agreement with CITY to perform and furnish all Work as specified or indicated in the Bid Documents for the Proposed price and within the Bid times indicated in this Proposal and in accordance with the other terms and conditions of the Documents. 2. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation To Bid and General/Special Conditions, including without limitation those dealing with disposition of Proposal security. This Proposal will remain subject to acceptance for ninety (90) days after the day of Bid opening. 3. In submitting this Bid, BIDDER represents, as more fully set forth in the Documents that: (A) BIDDER has examined and carefully studied the Bid Documents and the following Addenda receipt of all which is hereby acknowledged: (List Addenda by Addendum Number and Date) (B) BIDDER is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work. (C) BIDDER has given CITY'S Purchasing Agent written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Documents and the written resolution thereof by CITY is acceptable to BIDDER, and the Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Proposal is submitted. (H) This Proposal is genuine and not made in the interest or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other BIDDER to submit a false or sham Proposal; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other BIDDER or over CITY. 4. BIDDER agrees that the Work: will be substantially complete per schedule within the Documents and completed and ready for final payment in accordance with the Documents within agreed upon, per each task order, in consecutive calendar days. 5. The following documents are attached to and made a condition of this Proposal: (A) A tabulation of Subcontractors, Suppliers, if applicable and other persons and organizations required to be identified in this Proposal (B) Required CONTRACTOR'S Qualification Statement with support data ITB#08-09-036 Page 31 of 41 Install Sidewalks May 2009 (C) Statement of BIDDER'S experience (D) References, Insurance Certificates, Licenses 6. Communications concerning this Bid shall be addressed to: The address of BIDDER indicated below The following address: 7 Terms used in this Bid which are defined in the General Conditions or Instructions will have the meanings indicated in the General Conditions or Instructions SUBMITTED on 2009 State CONTRACTOR License No. If PROPOSER is: An Individual By (SEAL) (individual's Name) doing business as Business address Phone & Fax No. P F E-Mail: A Partnership By (SEAL) (Firm Name) (General Partner) Business address Phone & Fax No. P F A Corporation By (SEAL) (Corporation Name) (State of Incorporation) By (Name of Person Authorized to Sign) (Title) (Corporate Seal) Attest: (Secretary) Business address Phone & Fax No. P F ITBM08-09-036 Page 32 of 41 Install Sidewalks May 2009 Date of Qualifications to do business is - A Joint Venture By (Name) (Address) By (SEAL) (Name) (Address) Phone & Fax number and Address for receipt of official communications (Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in manner indicated above) The following individuals are the designated contacts assigned to the City: REGULAR WORK HOURS: Name: Address: Telephone: U AFTER WORK HOURS,WEEKEND& HOLIDAYS: Name: Address: Telephone: (_) How did you learn about this solicitation: Daily Business Review City's Web Site DemandStar Other, please list IT3N08-09-036 Page 33 of 41 Install Sidewalks May 2009 STATEMENT OF EXPERIENCE OF BIDDER The Bidder is required to state below what Work of similar magnitude is a judge of his experience, skill and business standing and of his ability to conduct the Work as completely and as rapidly as required under the terms of the Contract. PROJECT AND LOCATION REFERENCE (1) (2) (3) (4) (5) (6) DATE BIDDER BY: ITB#08-09-036 Page 34 of 41 Install Sidewalks May 2009 REFERENCES As specified in the Special Conditions of this Bid Document,Bidders are to present the details of a minimum of five(5) references of similar work. (Additional references may be submitted on a separate sheet) COMPANY NAME,ADDRESS,CITY, STATE,ZIP PHONE& FAX NUMBER Company Name: Address: Contact Name: Phone: Fax: Company Name: Address: Contact Name• Phone: Fax: Company Name: Address: Contact Name• Phone: Fax: Company Name: Address: Contact Name• Phone: Fax: ITB#08-09-036 Page 35 of 41 Install Sidewalks May 2009 PROJECT; REPLACEMENT & INSTALLATION OF SIDEWALKS OWNER: CITY OF MIAMI GARDENS CONSULTANT: INSTRUCTIONS A. All questions are to be answered in full, without exception. If copies of other documents will answer the question completely, they may be attached and clearly labeled. If additional space is needed, additional pages may be attached and clearly labeled. B. The City of Miami Gardens shall be entitled to contact each and every person/company listed in response to this questionnaire. The bidder, by completing this questionnaire, expressly agrees that any information concerning the bidder in possession of said entities may be made available to the City. C. Only complete and accurate information shall be provided by the bidder. The bidder hereby warrants that, to the best of its knowledge and belief, the responses contained herein are true, accurate, and complete. The bidder also acknowledges that the City is relying on the truth and accuracy of the responses contained herein. If it is later discovered that any material information given in response to a questions was provided by the bidder, knowing it was false, it shall constitute grounds for immediate disqualification, termination, or rescission by the City of any subsequent agreement between the City and the bidder. D. If there are any questions concerning the completion of this form, the bidder is encouraged to contact Pam Thompson, CPPO, Procurement Manager, facsimile: (305) 622-8001, e-mail: pthompson@miamigardens-fl.gov. ITB#08-09-036 Page 36 of 41 Install Sidewalks May 2009 QUESTIONNAIRE Bidder's Name: Principal Office Address: Official Representative: Individual Partnership (Circle One) Corporation If a Corporation, answer this: When Incorporated: In what State: If Foreign Corporation: Date of Registration with Florida Secretary of State: Name of Resident Agent: Address of Resident Agent: President's Name: Vice President's Name: Treasurer's Name: Members of Board of Directors: If a Partnership: Date of Organization: General or Limited Partnership*: Name and Address of Each Partner: Name Address ITB#08-09-036 Page 37 of 41 Install Sidewalks May 2009 1. 2. 3. 'Designate general partners in Limited Partnership 1. Number of years of relevant experience in operating similar business:_ 2. Have any similar agreements held by bidder for a similar project to the proposed project ever been canceled? Yes ( ) No ( ) If yes, give details on a separate sheet. 3. Has the bidder or any principals of the applicant organization failed to qualify as a responsible bidder, refused to enter into a contract after an award has been made, failed to complete a contract during the past five (5) years, or been declared to be in default in any contract in the last five (5) years? If yes, please explain: 4. Has the bidder or any of its principals ever been declared bankrupt or reorganized under Chapter 11 or put into receivership? If yes, give date, court jurisdiction, action taken, and any other explanation deemed necessary. 5. Person or persons interested in the proposal and Questionnaire Form (have) (have not) been convicted by a Federal, State, County or Municipal Court of any violation of law, other than traffic violations. To include stockholders over ten percent (10%). (Strike our inappropriate words). Explain any convictions on a separate sheet. 6. Lawsuits (any) pending or completed involving the corporation, partnership or individuals with more than ten percent (10%) interest: A. List all pending lawsuits: B. List all completed lawsuits: C. List all judgments from lawsuits in the last five years: D. List any criminal violations and/or convictions of the proposer and/or any of its principals: ITBN08-09-036 Page 38 of 41 Install Sidewalks May 2009 7. Conflicts of Interest. The following relationships are the only potential, actual or perceived conflicts of interest in connection with this proposal: (If none, so state). The bidder understands that information contained in this Questionnaire will be relied upon by the City of Miami Gardens in awarding the proposed Agreement and such information is warranted by the bidder to be true. The undersigned bidder agrees to furnish such additional information, prior to acceptance of any proposal relating to the qualifications of the bidder, as may be required by the City Manager. The bidder further understands that the information contained in this questionnaire may be confirmed through a background investigation conducted by the Miami Gardens Police Department. By submitting this questionnaire, the bidder agrees to cooperate with this investigation, including but not necessarily limited to fingerprinting and providing information for credit check. I certify that the information and responses provided on this Questionnaire are true, accurate and complete. The Owner of the Project or its representatives may contact any entity or reference listed in this Questionnaire. Each entity or reference may make any information concerning the Contractor available to the Owner. Dated 20_ ITB#08-09-036 Page 39 of 41 Install Sidewalks May 2009 By: / (Signature) (Print name) Address: Telephone: O Fax: O E-Mail: Social Security Number(OR)Taxpayer Identification Number(TIN): By: / (Signature) (Print name) Address: Telephone: Fax: Taxpayer Identification Number(TIN/EIN): State Under Which Corporation Was Chartered: Corporate President: (Print Name) Corporate Secretary: (Print Name) Corporate Treasurer: (Print Name) CORPORATE SEAL Attest By: Secretary ITB#08-09-036 Page 40 of 41 Install Sidewalks May 2009 DRUG FREE WORKPLACE Preference shall be given to businesses with drug-free workplace programs. Whenever two or more Bids which are equal with respect to price, quality, and service from businesses that are not located within the City of Miami Gardens are received by the City for the procurement of commodities or contractual services, a Bid received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. In order to have a drug-free workplace program, a business shall: 1. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition. 2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. 3. Give each employee engaged in providing the commodities or contractual services that are under Bid a copy of the statement specified in subsection (1). 4. In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under Bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of chapter 893 or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than five(6)days after such conviction. 5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community, by any employee who is so convicted. 6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section. As the person authorized to sign the statement, I certify that this firm complies fully with the above requirements. Vendor's Signature ITB#08-09-036 Page 41 of 41 Install Sidewalks May 2009 VF '9 Request for Taxpayeroiee term to the br2005 Identification Number and Certlflcatlon regaeater.oe not as TBaYMy6auoe send to the IRS. s(a stown on yourIncome tax robin)iness nacre,a derarera earn above ck BPMOPrais box: Osae ProPaetur Corpaatbn ❑ Partneyrq ❑ Other► ................. � from rookup oldng ms(nhmbe,Nae6 anal apt a sae no.) Raqueate'c name and addraw(optlonal) ,ateta,and LP codeaonamt mmbMs)bens(opuonaf) _ Ta rx ldennfictttbn Number N Enter your TIN in the appropriate box.The TIN provided must match the mme given on Lire 1 to avoid eoeW asorally Maslowbackup withholding,For Individuals,this is your social secant number(SSW However,for a resident alien,sole Proprietor,or dkrege led MAY,see the Pan I instructions on page S.For other entitles,it is your emPloYer kferig9catlon number(E1NI.t you do not have a number,see How to get a TIN on page 3. or Note.9 the account is In more than one name,see the chart on page 4 for gukaikes m whose EmPMY+r iderrtllloseon nharhber number to enter. CerlNiCeUOn Under Penalties of Perjury.I certify that 1. The number shown on this form b my correct taxpayer low cation number(or 1 am waiting fora number to bo issued to me),and 2. I am rrot shlbjabt to backup withholding because:(a)I am exempt from backup withholding,or 0)1 have not beat notified the Internal notified me die 1 emSrho that 1 am Subject to backup withholding as a result of a fMure to report at interest or dNkaMs,or(0 the IRS has longer subject to backup withholding,and 3. 1 am a U.S.Person Oncluding a U.S.resident a ien). C0111111cation Instructions.You must moss out hem 2 above if you have been notified by the IRS that you are currently subject to backup wlthf101dlrp because you have failed to report all Interest and dividends on your tax return.For reel estate irsnsectons.Item 2 does not apply. For mortgage interest paid,acquisition or abandonment of secured Property.cancellation of debt,conlAbutons 10 an Individual retirement arrangement OM,and generally,Payments other than Interest and dividends,you fie not required to sign the CertMcatlon,but you must Provide your correct TIN.(See the instructions on page 4.) Sign shprutura Here us.Paean ► cote ► Purpose of Form a An Individual who is a citizen or mskerrt of the United A person who is required to tie an krlormallon return with the States, IRS, must obtain your correct taxpayer Identification number e A partnership.CWPoratlon,Company,Of association (TIM to report, for example,income paid b you,real estate created or organized In the United States or under the laws .. transactions, mortgage kitereat you paid,acquisition or of the United States,or abandonment of secured property,cancellation of debt,or a Any estate(other then a foreign estate)or trust. See contributions you made to an IfiA. Regulations sections 301.7701-5(a)and 7(s)for addhlonal U.S. person.Use Form W-9 Only 9 you are a U.S. person information. OnclMkngr�arerr k a(mlbn to provide you correct TIN to the Special rules for Pnlinertrhips.partnerships that conduct a p?nso^ requester)and,when applicable,to: trade or business in the United States are generally required 1.Certify,that the TIN you are giving IS correct(or you are to pay a withholding tax on any foreign partners'share of waiting for a number to be Issued), Income from such buslrtess. Further, In Certain cases where a 2.Certify that you are not subject to backup withholding,or Form W-9 has not been received,a partnership Is requited to 3-. Claim exemption from backup withholding If you are a presume that a partner Is a foreign person,and.pay the U.S. exempt payee- - withholding tax.Therefore,0 you are a U.S.person that is a In 3 above, t applicable,you are also certifying that as a partner In a partnership conducting a trade or business in the U.S.person,your allocable share of any Partnership Income Unied States,provide Form d avoid to the partnership to y from a U.S.trade or business is not subject to the share f your U.S.status and avoid withholding on your withholding tax on foreign partners'share of effectively share of partnership inc�orne.. connected Income. The person who gives Font W-9 to the partnership,for - Noll It a requester gives you a form other than Forth W-9-to Purposes of establishing its U.S.status and avbknng request your TIN,you must use the requester's form it it is - withholding on its ahodable share of net income from the substantially similar to this Form W-9., partnership conducting a trade or business in the United For federal tax purposes,you are considered a person if you r a h'the following cases; are: •'The U.S.owner of a disregarded entity and not the entity, Cat.No.10231x Forn,W-9 (Rw.17:00a) ; 71 1sµ, Wa.r 9nEwMK WITH EDWU S SFCIO.. A//d�AQE YWMTED TED"RNUNBS [ rr swow LWED ..v�r.pn[s.urD urnY MY.[..r A ku+i RW15 T • ywur T I��S�'I '� • sx...0 • , Meson•.e ux nro � rr✓rwN.snr..r L bw 5rne.•�>Wn.. m�•w• 9QEWAIK WITH UTIUIY STIV _ wx mrs SIMWMOIEWAIIl dIMN75 r-%y m�x.N¢.�o�v��w.t•m•.n+ �. urrrrr r».S..r r.([..ar�rN.r Mi..um�MM�wv.rmw T � i c [w+w rm re rn.rmu —r rrwrm✓.,a.r ¢ • 5 w� on�•ar amre� ¢ MTfS MP NYO<1F SHCW4R d a91f0 msME15 '°"„,:",,,.`,•:'.u"�"�„'"",,�`,.;^m"`n.'^m'°°,.,Sr',s b'^m &wWA X WITMIT UrIUTY STAP W[M Y.,4e w iun w R'Mx enru•Mry. [enrw..m/w.r b rw[M+n �Vp.Iww Mr:�wM 4WrMIwn x r..pbn. CONCRETE SIDEWALX FOR CURBED ROADWAYS ® AmEOO. msM... u .s..r.. ,aa CONCRETE SIDEWALK 1�"',�o ~,���a•,••.1d1 xe aorzs em mmvfre narus a vmafo ea+aw.rs s �. i. a.e..,.e.,.wxeu wsu.w, ro...w. ,w.....aw,...%....n.w...,w..,......,,.w... SIDEWALK WITH EDGE BEAM FOP +x. •• SURFACE M"TED"LlA S L 1' g a 21 El Ir 1,Isls l,Yr lr l.'1 rl f xbn M. �T� Ld]IM.WS SOEIIAU t L 1AMp]UpxAl SEL]AVS / \ C� / Sfi"ALK AYMTS Awr�xo � r-fr o-Fsr ..,1,wn,w+r,w.rrvr.x r�1'ru.nu�wx fro..w.w zMx.w r...w m g5NY1dW5 SWEWALC FLAN CONCRETE SIDEWALK FOR UNCURBED ROADWAYS ® AOO FOOT lL,tlFW e..xx ]qt ]013 CONCRETE SIDEWALK 310 6eR L mms xpl x ..a w+ _ q. /MYM SIOEYALY RAYPs nm.iin�, ma r.x.x.rwm 1 ar„xm.+f..nu,a wiw'.T ,.�.mamv..w..nnaip. WRBPWPS AT D ® ae PUBLIC SIDEWALK CURB RAMPS 30A •G ^4 je' 4 ^u. q�A� xk 4 °d , yy.�yfs Qy Y \ 6 A . _ 00 `y�`_ � x� 6.uv� SJ•By�N�` r. \sY nw A" 'sx. D'�' ^•��' ® FXcrm TMMOAU/RAMP RUN AND L Vfi a WITH IpPEF LAMpM1e AT AmAL 9""E Arm ��y R2P A°° �ew+n..n C nvxx�snxw�¢w�v�srsa�.Wxrui a+l ry � ray ,1� � .y,e / / nrwuxax r./\� s�nnJu'aaw.x."°rrxrnp�wnY%u rv�s rri�ei�w�°. PAVEMENT REUE'F AT�IICP tKptl�IRWB p� RAMP µALANgN DEPTH ARE AbT�RfSTPoCTf0 BY�T WHERE ® EMFWT D•W^eYrMveF u Fsmu IwAn sae PUBLIC SIDEWALK CURB RAMPS 3�"' IleI ate« M r1N_ �b )Y d-pr1H '•q off" �1rl= fir 1IMOIIB4 RAW ANO lAYE6 flM 1 ?yn., .• '�4 ��Q 1/%fR IANGN�6 AT AOWAL AL SIQfY'Alk EIEVATpM 1q�w- OI&AP AIID LA 9A N AUM & ICTEO BY RbY!!6 WAY ® u` eae PUBLIC SIDEWALK CURB RAMPS 304 f a mx✓urn aS' <as xr r.'✓�. _ $gy ' e Mr Ak r..s«.... fo yu +..n«zrw..a. afa�y y ^'0� w,.r ✓� ®rwn, ®ver„ 01V ldTw OBWASOMAL FEAnm FM PUKM SIWWNX CURB RAMPS FM UYEAR PEDESTRIAN TRAFFIC secE A.z DMIEMSIOUL FEATUMM FM y� PUBLIC SWW'UR CQIMED CMTR RAMPS /M M Cp PTMS OF MYFEASM LffY ��s-y7*' �y {�-5 ,e•,�r:' .�.,,«.r a.M,.��r,�::�.�.„ae.,a \A Mri me CAST OMB WMAMLY LAST 4W raw.u✓h ssm�ew„..0 wr d�v✓ b�wviwoz rirw� RAMP AND SIDEMAUf CMRB (PTM QR IIPFE�TIQN ® SM1O FWT BYItlY.Y r• .n.n xa iN1 �eIB PUBLIC SIDEWALK CURB RAMPS 3a z'nrno��wr�zW�O.m� �npaoe:�orne�rwx C w�tnpt ue uvvww'ePnvwax. rfv /w Twx Lr4mWT1. SFx [nrnrYxrvvrvMu�rNnrs rxn [n.. .4 W.[ wM[TtW�Hw pOLf Ln Cr [ 4lamr M1[w[rewir oirtw Swr Rrta Mrw`� �y �^ M[Nr f o I w 54x vY xrx[n Jr[[r[wxry fx r�ue4 in xur rr�o ti�rv��irwxn.[Wr snr Via.srr[n•�M r.rt. SFLTdI tt C M.1M MEDIAN CROSSWALKS Xcmx Mua r s.W..n rw rwr �F /> f LANMW FOR RANDS WITHIN PMNIUC RART OF WAY ClA16TMCTED AT LWATKrWS WNW FUTGMME SWWALKS ARE PROPOSED.WHERE $TAWME SIN FACES OTHER THAN SWW&a ARE PART OF A LpMTKNgMLS PASSAGE OR WHEJE A CUM FALLS ALOMP THE CMWLATKW PAIN TO PEDESTRIAN AMM ON APAMENT SITES ® ' !FOOT � nurn q1 aas PUBLIC SIDEWALK CURS RAMPS 34 -0 O 0 6 _ 0 0 0 y� r O O O O vraxureo aEYEbw M d we yxM.w'ib 0.N'..'nimn esm ane. ARAM NEY nne.gv swxwe[✓cv.FnM wwu Mr[nw.b.wi pum p M M1s w p.n W.wrs p.rn,N,uw f9 xi nn.M flv pWn CURB RAMP DETECTABLE WARNING DETAIL nw s f `! w s �a s � wpm z.w 9t II PM)gWAt ulEwS p{A,y TYPICAL PLACEMENT OF DETECTABLE WARNING OW CURB RAMPS ® MFEDTE�}�EevtlFNF 'w xnxtw N1 Ee! PUBUC SIDEWALK CURB RAMPS 3 c a fi L�W C Wpe� JAJ •5� � 3 . a � � 6.$� & a a•�� $ w�* �� � 9 E � g a 0 i aLU a >$ a $$€2* s$ ah � o a a ' C: ti W in m•R � O E v y 334 6n � � 4. �, 'w 9 V I a 4 T-' Y :^ 41 a ^o I I �L r_1..� a � ���``1 • Ea a f. � a lit , { G6 ■s y(a P >O • a W �$ l lu • 6 �` 1ma � � � i g �1a 2�p jj{■{■�� i $ • 2 E2 6i L J dik City Of Dania Beach Department of Public Services October 14, 2009 Tran Construction, Inc. 1000 NW 541h Street Miami, FL 33127 Re: Southeast Florida Governmental Purchasing Cooperative Group Bid/RFP No.: ITB#08-09-036 Tran Construction, Inc., The City of Dania Beach is requesting a signature confirming the below statement: Tran Construction, Inc. agrees to allow the City of Dania Beach to "piggy back" the Southeast Florida Governmental Purchasing Cooperative Group Bid # 08-09-036. TRAN CONSTRUCTION, INC. ACCEPTED FOR CITY BY: Signature Date Signature Date Printed Name Printed Name P.O. Box 1708, Dania Beach, FL 33004 ' Phone (954) 924-3742 ' Fax (954) 923-1109