Loading...
HomeMy WebLinkAboutR-2010-050 Chen & Associates Solar Lighting RESOLUTION NO. 2010-050 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE AN AGREEMENT FOR ENGINEERING SERVICES FROM CHEN AND ASSOCIATES, INC., RELATING TO THE 34T" AND 35T" YEAR CDBG AND CDBG-R SOLAR LIGHTING PROJECT ASSOCIATED WITH THE NEIGHBORHOOD IMPROVEMENT PROGRAM AT LOCATIONS THROUGHOUT THE CITY IN AN AMOUNT NOT TO EXCEED TWENTY NINE THOUSAND ONE HUNDRED AND TEN DOLLARS ($29,110.00); PROVIDING FOR FUNDING; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That that agreement with Chen and Associates, Inc. in an amount not to exceed Twenty Nine Thousand One Hundred and Ten Dollars($29,110.00)for engineering services for the 34`h and 35`h Year CDBG and CDBG-R Solar Lighting Project identified above associated with the Neighborhood Improvement Program at locations throughout the City,with the proposal in substantial form as Exhibit "A", attached, is approved and the appropriate City officials are authorized to execute it. Section 2. That the City Manager and City Attorney are authorized to make minor revisions to the agreement for such services which are deemed necessary and in the best interest of the City. Section 3. That the funding of this project will be paid from the Capital Projects Fund— 53`d St. Lighting, Consultant Engineer Account# 301-4101-541-31-300 project code 53CTLI, and authorizing transfer of additional Consulting Engineer funding of$29,110.00(new total=$43,610) from this Lighting Improvement Capital project Account#301-4101-54-6310 project code 53CTLI. Section 4. That all resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall be in force and take effect immediately upon its passage and adoption. PASSED AND ADOPTED on April 14, 2010. LYZ� MAYOR—COMMISSIONER e�O pitD'S FI��,C'�i' ATTEST: \ _ Jl -dUx� z LOUISE STILSON, CMC CITY CLERK , p �pC>RATEO 19" APPROVED TO ORM AND CORRECTNESS: THO AS J:' NS RO CITY ATTORNEY 2 RESOLUTION #2010-050 EXHIBIT A SCOPE OF SERVICES for Chen and Associates, Inc. Proposal for 34`h & 35`h YEAR CDBG AND CDBG-R SOLAR LIGHTING PROJECT March 2010 BACKGROUND Chen and Associates was selected by the City of Dania Beach to provide professional engineering services for its Neighborhood Improvement Program. The general scope of services includes the following: • Street Lighting Layout and Design; • Sidewalk Layout and Design; • Traffic Calming Study and Design; • Bidding Services; • Construction Observation; and • Public Awareness. Chen and Associates (Engineer) is pleased to submit to the City of Dania Beach (Owner) this proposal to perform Engineering Services for preparing layouts for solar powered lighting and providing construction administration services for the project described below. PROJECT DESCRIPTION Chen & Associates will prepare lighting layout for the general residential area, within the City limits, described as Census Tracts: • 804.04 Block 1; • 804.04 Block 4; • 804.02 Block 1; • 805 Block 3; • 801 Block 4; • 804.03 Block 1; • 805 Block 1; and • 805 Block 2. BASIS OF SCOPE 1. This scope does not cover geotechnical investigation. 2. This scope does not include permitting or permitting fees. Page 1 of 2 March 2010 SCOPE OF SERVICES Task 1. Lighting Plans Consultant shall prepare lighting plans for solar powered street lights. The construction documents will include location of proposed lighting. The services involve site visits by Consultant to assure location with minimal obstruction and conflicts. Resident coordination to receive approval on locations. The scope does not include preparing a photometric plan. The Consultant will refer to the City's previously installed solar lighting poles for product specifications and installation requirements. Task 2. Construction Administration Consultant shall provide construction services as follows: general observation of the work (up to 12 hours per week), review of material shop drawings, review of contractor pay requests, and statement of work completion. It is estimated that construction will last approximately 16 weeks. Task 3. Reimbursables ENGINEER shall provide services, as necessary, to assist the City in the preparing plans, coordination or other requested tasks to facilitate successful completion of the Project. Costs incurred in providing these services shall be reimbursed on a lump sum basis. DELIVERABLES Deliverables are described in the Scope of Services. FEE AND SCHEDULE From the Notice to Proceed, Chen and Associates will complete the design phase within 14 Calendar Days, FEE SUMMARY TASK LUMP NUMBER TASK SUM FEE Task 1 Lighting Plans $ 7,250 Task 2 Construction Administration (16 weeks) $21,360 Task 3 Reimbursables $ 500 TOTAL FEE $29,110 C�umenu®d SeuingSobello�hoplExhlbh A-CDBG SuW Lighting PMw doc Page 2 of 2 March 2010