HomeMy WebLinkAboutR-2010-101 Shoppes at Griffin Site Plan Extension RESOLUTION NO. 2010-101
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH,FLORIDA,APPROVING THE REQUEST MADE BY PEDRO GARCIA,
OWNER,FOR A SECOND EXTENSION(FIRST EXTENSION WAS APPROVED
BY RESOLUTION 2009-079 ON MAY 12, 2009) RELATING TO THE
APPROVALS OF VARIANCE VA-55-07 BY RESOLUTION NO.2008-099 AND
THE SITE PLAN REQUEST SP-86-06 BY RESOLUTION NO. 2008-100, FOR
PROPERTY GENERALLY LOCATED AT THE SOUTHWEST CORNER OF
GRIFFIN ROAD AND RAVENSWOOD ROAD (ANGLERS AVENUE), IN THE
CITY OF DANIA BEACH, FLORIDA; PROVIDING FOR CONFLICTS;
FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS,on June 10, 2008,the City Commission approved a request for a variance for
the following:
1. To allow the rear setback to be 11'3"(Chapter 28,"Zoning", Article 4.20, "Schedule of Lot
Yard and Bulk Regulations"), requires a 19'6" setback in a C-2 Zoning District;
2. To allow a 10 foot clearance for proposed canopies (Chapter 28, "Zoning", Article 6.64,
"Principal arterial commercial design standards overlay"), requires a 14 foot clearance for
canopies;
3. To allow 18%pervious area(Chapter 33, "Zoning Appendix", Article 3, "Impervious land
area requirements", Section 33-45(5)),requires a 25%pervious area);
for property owned by Pedro Garcia(the "Applicant"), pursuant to Resolution 2008-099; and
WHEREAS,on June 10,2008,pursuant to Resolution No.2008-100,site plan approval for
the proposed construction of a 174,000 square foot shopping center for the property (generally
located at the southwest corner of Griffin Road and Ravenswood Road also known as Anglers
Avenue,Dania Beach), was granted subject to conditions; and
WHEREAS,on May 12,2009,pursuant to Resolution No.2009-079,the City Commission
granted a one (1) year extension to the original approvals until June 10, 2010; and
WHEREAS,the Applicant is requesting a second extension of the approvals associated with
the above described project relating to the variance requests and site plan until June 13, 2011;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the request to extend the expiration date of the approvals to June 13,
2011 for the variance and site plan requests are approved, subject to the conditions previously
approved b the City Commission as follows:
PP Y n'
1. Must provide recorded copy of plat prior to issuance of a building permit (Planning
Division).
2. Applicant must obtain a tree removal permit prior to commencing site work. Specimen
removal fee of$55,410.00 and canopy replacement fee of$11,070.00 must be paid prior to
issuance of a tree removal permit (Landscape Consultant).
3. Water flow required is 2,500gpm; existing water supply is 616gpm. Water supply must be
addressed. Per submitted calculations,the largest building requires 2,500gpm. According to
flow test submitted, the water supply is only 616gpm (Fire Marshal).
Section 2. That all resolutions or parts of resolutions in conflict with this Resolution are
repealed to the extent of such conflict.
Section 3. That this Resolution shall be in force and take effect immediately upon its
passage and adoption.
PASSED AND ADOPTED on June 22, 2010.
ATTEST: �K. McELY A
5 FIRST C�
MAYOR-COMMISSIONER
m
LOUISE STILSON, CMC
CITY CLERK
���rraoaa�o
APPROVED AS T FORM ND CORRECTNESS:
i
4T MA J. A S O
C Y A TORNEY
2 RESOLUTION#2010-101