HomeMy WebLinkAboutR-2010-134 Nanofiltration Project Change Order #1 RESOLUTION NO. 2010-134 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, RELATING TO CHANGE ORDER NO. 1 TO THE NANOFILTRATION WATER PLANT PROJECT, REALLOCATING ALLOWANCES FOR NO NET INCREASE IN TIME OR COST; MAKING FINDINGS; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Commission adopted Resolution 2002-120 approving the Water, Wastewater and Stormwater Facilities Plan; and WHEREAS, one of the major projects was the nanofiltration water plant; the City received proposals for design and construction of a 2.0 MGD nanofiltration water treatment plant on the City's existing water plant site; and WHEREAS, the City Commission awarded CDM Constructors, Inc. the design/build contract in the amount of$8,820,923.00 in November, 2009; and WHEREAS,the contract contained a series of allowances intended to address issues that could not be adequately bid prior to design; and WHEREAS,the allowances would be redistributed as follows: COST & TIME SUMMARY ------ Change Order-------- Original Previously Transfer Current Use Ending Allocation Used In / Out Balance Soil Contamination #3 100,000.00 3,439.30 (96,560.70) - - LEED Energy Cent. #4 100,000.00 - 15,085.70 103,720.00 11,365.70 FPL Transformer #5 100.000.00 - (71,072.00) 28,928.00 - Permit Fees #6 50,000.00 18,817.00 97,664.00 128,847.00 Architectural Treatments #7 125,000.00 - 54,883.00 179,883.00 - Total of Above $ 475,000.00 $ 22,256.30 $ - $ 441,378.00 $ 11,365.70 WHEREAS, there is no increase in time and no increase in the value for the Change Order; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AS FOLLOWS: Section 1. That the foregoing findings are incorporated by reference and made a part of this Resolution. Section 2. That the City of Dania Beach, Florida approves Change Order No. 1 to the Nanofiltration Project with no increase in time and no increase in the value and the proper City officials are authorized to execute it. Section 3. That all resolutions or part of resolutions in conflict with any of the provisions of this Resolution are repealed. Section 4. That this Resolution shall become effective immediately upon its passage and adoption. PASSED AND ADOPTED on August 10, 2010. C. K. MCELYEAr �PRp'S FIRS). MAYOR-COMMISSIONER ATTEST: LOUISE STILSON, CMC CITY CLERK APPROVED AS TO FORM AN CORRECTNESS: JJ THOMAS J. SBR CITY ATTORNEY 2 RESOLUTION #2010-134 CHANGE ORDER No.: PROJECT: DESIGN/BUILD SERVICES FOR THE CITY OF DANIA BEACH 2.0 MGD NANOFILTRATION WATER TREATMENT PLANT DATE OF ISSUANCE July I,2010 EFFECTIVE DATE OWNER City of Dania Beach,Florida OWNER's Contract No. Bid No.09-005 CDM Project No. 74061 CONTRACTOR CDM Constructors Inc ENGINEER You are directed to make the following changes in the Contract Documents: Description: Attachment"A"-Scope of Change Order. Reason for change order: Attachment"A"-Scope of Change Order. Attachments:Attachment"A"-Scope of Change Order. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price Original Contract Times Substantial Completion: $ 8,820,923.00 Ready for final payment: 630(August 8,2011) Drys or dates Net changes from pmviow Change Orders No._to No. Net change from previous Change Orders No._ to No. - $. 0.00 0 ays Contract Price prior to this Change Order Contract Time prior to this Change Order $ 8,820,923.00 Substantial Completion: Ready for final payment: 630(August 8,201I) ays or ea Net Increase(decrease)in this Change Order Net Increase in this Change Order $ 0.00 0 days Contract Price with all approved Change Orders Contract Time with all approved Change Orders $ 8,820,923.00 Substantial Completion: Ready for final payment 630(August 8,2011) Dap or dates cues;qq aa;Id Ilyd,4 RECOMMENDED BY: APP BYr (Amlprvad Bignswe) (Amho�9ignwurt) Comrmar(AmNvriaE SfpWural Date: 8 /D Dt D Date: l/lrl. o20 E- /O Date: < `,ho " j;/! 201v ©r K, MM1280 Page I of 7 CHANGE ORDER TO: City of Dania Beach,Florida PROJECT:DESIGN/BUILD SERVICES FOR THE CITY OF DANIA BEACH 2.0 MGD NANOFILTRATION WATER TREATMENT PLANT CONTRACTOR: CDM Constructors Inc. DATE: July 1,2010 Amounts Prior to this Change Order: Base Bid Total = $7,445,923.00 Contingency= $ 250,000.00 Allowances= $1,125,000.00 Original Contract Price= $8,820,923.00 This Change Order will authorize the following change to the Agreement: The Work as set forth in the Agreement is amended to include the items set forth in Attachments "A" and by this reference made a part of this document. ALLOWANCE COST & TIME SUMMARY Original Total Account Total Amount Time Allowance Allowance Value Changes this Revised Allowance Expended from Extension No in Contract Change Order Value Allowance Requested 1 VOID VOID VOID 2 $ 500,000.00 $ - $ 500,000.00 $ 274,454.00 0 days 3 $ 100,000.00 $ (96,560.70) $ 3,439.30 $ 3,439.30 0 days 4 $ 100,000.00 $ 15,085.70 $ 115,085.70 $ 96,905.00 0 days 5 $ 100,000.00 $ (71,072.00) $ 28,928.00 $ 26,598.00 0 days 6 $ 50,000.00 $ 97,664.00 $ 147,664.00 $ 107,847.00 0 days 7 $ 125,000.00 $ 54,883.00 $ 179,883.00 $ 157,517.00 0 days 8 $ 150,000.00 $ - $ 150,000.00 $ - 0 days Total $ 1,125,000.00 $ - $ 1,125,000.00 $ 666,760.30 0 days Net Change to Contract from this Change Order $0.00 0 days zrtnt1280 Page 2 of 7 This Change Order constitutes full, final, and complete authorization for compensation to the Contractor for all costs,expenses,overhead,and profit, and any damages of every kind that the Contractor may incur in connection with the above referenced change(s) in the Work, and any other effect on any of the Work under this Agreement. The Contractor acknowledges and agrees that(a)the Lump Sum of$8,820,923.00 under the Agreement will be unchanged by this Change Order, and (b) the schedule of performance of Work will be unchanged by this Change Order.Contractor expressly waives any claims for any additional compensation, damages or time extensions in connection with the above referenced change(s). Except as modified by the document,all terms of the Agreement shall remain in full force and effect and shall cover the performance of, and payment for, any work authorized under this document. Any defined terms not defined in this Change Order shall have the meanings set forth in the Agreement. By signing below the parties indicate acceptance of this Change Order as set forth in it. CONTRACTOR CITY OF DANIA BEACH, CDM Constructors Inc. a Florida municipal corporation a Florida corporation By: F bert Baldwin,City Manager L Title: UP// l�R �/�T _ Authorized by action of City Commission of the City of Dania Beach on /D ,2010 CITY OF DANIA BEACH, Public Services Department 100 ` v By: :--By _ N ei Fre nc oetscher,Ph.D., P.E. Dominic F. Orlando, P.E. zo/V Pro' Management Consultant Public Services Director MM1280 Page 3 of 7 ATTACHMENT A City of Dania Beach, Florida DESIGNBUILD SERVICES FOR THE CITY OF DANIA BEACH 2.0 MGD NANOFILTRATION WATER TREATMENT PLANT CDM PROJECT No.: 74061 CHANGE ORDER No. 1 REALLOCATION AND USE OF ALLOWANCES SCOPE OF CHANGE ORDER This Change Order provides means of payment from the Contract Allowance Accounts for a variety of issues. This Change order provides no net increase to the cost of the project. ITEM 1. ALLOWANCE #1 —Decommission and Remove Fuel Station Deleted from DB Agreement AccountValue...............................................................................................................0.00 2.ALLOWANCE#2—Rehabilitate Electrical System and Control Upgrades from Existing Lime Softening System Original Allowance Value in Contract: ...................................................................$500,000.00 Account Changes this Change Order: a) None $0.00 Total Account Changes this Change Order $0.00 Revised Allowance Value..................................................................................$500,000.00 Total Amount Expended from Allowance a. See details below and CPAM No. 03.02.001 .......................$274,454.00 Account Value After this Change.....................................................$225,546.00 This Change Order provides means of payment from the Contract Allowance Accounts. CDM will install a new single 750-kW generator to operate the new nanofiltration plant,the existing high service pumps and existing lime softening system. CDM will remove the existing 350-kW generator serving the high service pump station and existing lime softening system from service. This improvement will stream line maintenance; reduce spare parts and improve backup power response time. CDM will replace the existing high service pump station 300-kVa transformer with a single 750kVA PMTX transformer and 2000A service for the new nanofiltration plant, the existing high service pumps and existing lime softening system. This will simplify the electric system and electric bill and will potentially result in a slight savings because of FPL demand charges. MM1280 Page 4 of 7 3.ALLOWANCE # 3 - Lead/Asbestos/Contaminated Soil Original Allowance Value in Contract: ............................................................$100,000.00 Account Changes this Change Order: a) Transfer balance to Allowance#4 $(15,085.70) b) Transfer balance to Allowance# 6 $(40,563.30) c) Transfer balance to Allowance# 7 $(40,911.70) Total Account Changes this Change Order $(96,560.70) RevisedAllowance Value.........................................................................................$3,439.30 Total Amount Expended from Allowance b. Asbestos Abatement Expenditure ............................. $3,439.30 Account Value After this Change.............................................................................$0.00 4.ALLOWANCE#4—LEED Certification, Owner Requests Original Allowance Value in Contract: ............................................................$100,000.00 Account Changes this Change Order: a) Transfer from Allowance # 3 $15 085.70 Total Account Changes this Change Order $15,085.70 Revised Allowance Value.....................................................................................$115,085.70 Total Amount Expended from Allowance a. See details below and CPAM No. 03.04.001..................$96,905.00 Account Value After this Change .................................................. $18,180.70 This Change provides means of payment from the Contract Allowance Accounts. CDM will support the City's LEED Accredited Professional Consultant with its goal for GOLD level accreditation for its new Membrane Control Building. CDM will submit to the U.S .Green Building Council (USGBC) for seven Silver Level points; and 11 Gold Level points. In addition, CDM will provide labor, materials, and equipment for the LEED Credits SS8, WE3.2, Optimize Energy Performance, MR2.1,MR2.2, and IE6.1. MM1280 Page 5 of 7 5.ALLOWANCE# 5 - FPL Transformer Original Allowance Value in Contract: ............................................................$100,000.00 Account Changes this Change Order: a) Transfer balance to Allowance#6 $(57,100.70) b) Transfer balance to Allowance# 7 $03,971.30) Total Account Changes this Change Order $(71,072.00) Revised Allowance Value.......................................................................................$28,928.00 Total Amount Expended from Allowance a. See details below and CPAM No. 03.05.001..................$26,598.00 Account Value After this Change .................................................. $2,330.00 This Change Order provides means of payment from the Contract Allowance Accounts. CDM will contact and provide Engineering Services required for an application to Florida Power and Light(FPL) for the installation of a 750—kVA transformer to replace the existing 300-KVA transformer and the demolition of the existing electrical utility station. CDM will pay the FPL fees necessary for the performance of this Work. &ALLOWANCE #6—Permit Fees/Specialty/Threshold Inspection Original Allowance Value in Contract: ..............................................................$50,000.00 Account Changes this Change Order: a) Transfer from Allowance#3 $40,563.30 b) Transfer from Allowance# 5 $57,100.70 Total Account Changes this Change Order $97,664.00 Revised Allowance Value.....................................................................................$147,664.00 Amount Expended from Allowance a. Previously Approved Permit Fees $19,817.00 b. See details below and CPAM No 03.06.002 $107,847.00 Total Amount Expended from Allowance $126,664.00 Account Value After this Change .................................................. $21,000.00 Regulatory authorities have required permitting fees. Also, included are building inspection and primary and secondary testing by specialty subconsultants. W 1280 Page 6 of 7 7ALLOWANCE# 7 - Architectural Treatments Original Allowance Value in Contract: ............................................................$125,000.00 Account Changes this Change Order: a) Transfer from Allowance#3 $40,911.70 b) Transfer from Allowance # 5 $13,971.30 Total Account Changes this Change Order $54,883.00 Revised Allowance Value.....................................................................................$179,883.00 Total Amount Expended from Allowance c. See details below and CPAM No. 03.07.001..................$157,517.00 Account Value After this Change .................................................. $22,366.00 This Change Order provides means of payment from the Contract Allowance Accounts. CDM will construct a new 6,000 square foot Membrane Control Building. The process bay will be a 20-foot eave height with the administrative area cave height reduced to 13-foot. An additional 150-ft aluminum canopy will be constructed along the entire length of the west side in addition to the east side canopy. The interior layout features a secure entry with a separate wall, window and door that restricts access to the administrative area including the control room and electric room. Interior access and outside entry to the workshop is provided. The exterior features a painted stucco finish on the CMU exterior walls. These improvements will enhance curb appeal for the neighborhood,provide safety and protection from inclement weather, and increase visitor security. &ALLOWANCE #8—Horizontal Well Investigation Original Allowance Value in Contract: ............................................................$150,000.00 Account Changes this Change Order: a) None $0.00 Total Account Changes this Change Order $0.00 Revised Allowance Value.....................................................................................$150,000.00 Total Amount Expended from Allowance.................................$0.00 Account Value After this Change....................................................$150,000.00 MM1280 Page 7 of 7 CONTRACT PRICE ADJUSTMENT MEMORANDUM (CPAM) Project: Design/Build Services for the City of Dania Beach; 2.0 MGD Nanofiltration Water Treatment Plant in Dania Beach, Florida CPAM No.: 03.02.001 A CPAM is issued to memorialize the allocation of the Owner's Allowance Account.The Owners Allowance Account is available at the discretion of the Contract Administrator authorizing the commencement of specific Work. CDM Constructors, Inc shall not perform Work subject to the Owner's Allowance Account without the prior issuance of this CPAM transferring approved amounts and authorizing to proceed with Work. OWNER ALLOWANCE ACCOUNT (NUMBER): Allowance No. 2 (TITLE) Rehabilitate Electrical System and Control Upgrades from Existing Lime Softening System DESCRIPTION OF WORK(INCLUDE ANY ATTACHMENTS OR REFERENCES): Item No. 1-Rehabilitate Electrical System from Existing Lime Softening System. Price Proposal—August 14, 2009 Scope of Work The Allowance in the Bid Sheet for modifications of the electrical system includes upgrades integrating the existing lime softening system power with the new nanofiltration plant power in accordance with Addendum 7. Allowance Scope of Work: CDM will remove and dispose the existing lime softening motor control center and provide and install a new lime softening motor control center in the new Membrane Process Building Electrical Room. CDM will connect the existing electrical loads from the Lime Softening System to the new Membrane Process Building Electrical Room. The Work includes the following: On-site investigation to identify and tag all existing lime softening wires and loads; Provide and install new lime softening motor control center; Sawcut existing foundation and extend existing lime softening power feeders; Connect existing lime softening wires to new motor control center power feeders; and Remove and dispose existing lime softening motor control center and electric room. MM1275 1 Item No. 2—Control Upgrades from Existing Lime Softening System. Price Proposal—August 14, 2009 Scope of Work The Allowance in the Bid Sheet for modifications of the controls includes the migration of controls the existing lime softening system with the new nanofiltration plant controls in accordance with Addendum 7. Allowance Scope of Work: CDM will incorporate the existing Lime softening controls into the new Membrane Process Building Control Room. CDM will connect to the existing lime softening control wiring to the new Membrane Process Building Control Room. CDM shall remove and dispose the existing lime softening control panel. The Work includes the following: On-site investigation to identify and tag all existing lime softening control wiring; Sawcut existing foundation and extend existing lime softening control wires; Connect existing control wiring to the new Membrane Building Control Room PLC; Provide programming and graphic screens; Relocate existing air compressor; and Remove and dispose existing lime softening control panel. Item No. 3—Upgrade Primary and Backup Power System. Price Proposal—August 14, 2009 Scope of Work CDM's price proposal includes a new 400-kW generator to operate the nanofiltration plant and the high service pumps.The existing 350-kW generator will operate the current lime softening system. CDM's price proposal includes utilizing the existing high service pump station 300-kVa transformer and installing a second transformer at the plant's northeast corner and a 1600A service for the existing lime softening system and new nanofiltration plant in accordance with Addendum 2 and 7. Allowance Scope of Work: CDM will install a new single 750-kW generator to operate the new nanofiltration plant, the nanofiltration expansion,the existing high service pumps and existing lime softening system. CDM will remove the existing 350-kW generator serving the high service pump station and existing lime softening system from service. This improvement will stream line maintenance; reduce spare parts and improve backup power response time. MM1275 2 CDM will replace the existing high service pump station 300-kVa transformer with a single 500- kVa transformer and 2000A service for the new nanofiltration plant, the existing high service pumps and existing lime softening system. This will simplify the electric system and electric bill and will potentially result in a slight savings because of FPL demand charges. Summary of Changes Between CDM's Price Proposal and the Allowance's Scope of Work: Please reference attached Drawing-Allowance No. 2— Item No.3— Upgrade Primary and Backup Power System Deducts (Reference Red Highlights in the attached drawing): 400-kW Generator; 1600A service from new transformer to main switchboard; Power feeder from 400-kW generator to main switchboard; and 350-kW Generator skin type enclosure. ADDS(Reference Blue Highlights in the attached drawing); 750-kW Generator; Power feeders from new 500-kVa transformer to 2000A main switchboard; Power feeders from 750-kW generator to main switchboard; Demolish existing generator building with existing 350- kW generator;and Disconnect and remove high service pump feeders to existing 300-kVa transformer. The performance of (Item 1) — Rehabilitate Electrical System and (Item 2) — Control Upgrades requires an extension of the Contract Time for an additional 60 days. This Work, however does not impact the completion of the new nanofiltration system but commences after successful startup of the new nanofiltration system. MM1275 3 CITY OF DANIA BEACH,FLORIDA DESIGN/BUILD FIRM: A Florida Muni 'pal Corporation CDM Constructors Inc 4obert Baldwin Signature City Manager(Contract/City Administrator) Name/Title Date: /�UG>J�D,��/Z� O /O Date Approved as to"Scope of Services" B y., ,r �.� � Dominic F. Orlando, P.E. Director of Public Services (City Project Manager) Date: s /Z ZoG® MM1275 4 LUMP SUM PROPOSAL Rehabilitate Electrical System and Control Upgrades from Existing Lime Softening System CPAM No.: 03.02.001 SUBCONTRACTS $686,640.00 Item No. 1—Rehabilitate Electrical System from Existing Lime Softening System. $334,240.00 Item No. 2—Control Upgrades from Existing Lime Softening System. $161,662.00 Item No. 3—Upgrade Primary and Backup Power System: DEDUCTS ($446,540.00) Item No. 3—Upgrade Primary and Backup Power System:ADDS $637,278.00 GENERAL CONDITIONS $34,332.00 DESIGN BUILD ARCHITECT/ENGINEER A/E Services - Design and Permitting $70,600.00 A/E Services - Submittals, RFI's and Record Drawing $74,877.00 Construction Services $55,855.00 OTHER DIRECT COSTS $0.00 BONDS AND INSURANCE $29,640.00 DESIGN BUILD FIRM'S FEE $36,048.00 TOTAL COSTS $987,992.00 MM1275 5 Wf jY <Z IV KT � 77 r� I I .P yr 1 ❑ i. I 1 F IV -24 tx > --� 1 — _— ji VF S I � I at 1 F z CONTRACT PRICE ADJUSTMENT MEMORANDUM (CPAM) Project: Design/Build Services for the City of Dania Beach; 2.0 MGD Nanofiltration Water Treatment Plant in Dania Beach, Florida CPAM No.: 03.04.001 A CPAM is issued to memorialize the allocation of the Owner's Allowance Account. The Owner's Allowance Account is available at the discretion of the Contract Administrator authorizing the commencement of specific Work. CDM Constructors, Inc shall not perform Work subject to the Owner's Allowance Account without the prior issuance of this CPAM transferring approved amounts and authorizing to proceed with Work. OWNER ALLOWANCE ACCOUNT (NUMBER): Allowance No. 4 (TITLE) LEED Certification, Owner Requests DESCRIPTION OF WORK (INCLUDE ANY ATTACHMENTS OR REFERENCES): CDM will provide Architectural and Engineering Services to support the City's LEED Accredited Professional Consultant to submit to the U.S .Green Building Council (USGBC) for seven Silver Level points; and 11 Gold Level points. Acceptance of these points is at the sole discretion of the USGBC and therefore cannot be guaranteed. In addition, CDM will provide the subcontracts including labor, materials, and equipment for the following LEED Credits: 1. SS8—Light Pollution Reduction (1 credit) CDM will provide a "shoebox" style fixture on the pole mounted solar powered luminaire in lieu of the standard style fixture 2. WE3.2—Water Use Reduction - 30% (maximum 2 credits) CDM will provide water efficient water closets, urinals, shower and sink fixtures in the Membrane Building administrative area with the goal of a 30% reduction in water use. 3. Optimize Energy Performance (maximum 2 credits) CDM will provide energy efficient heat pump units (minimum 18.2 SEER) and air handlers (minimum 9.5 HSPF) in the Membrane Building administrative area with the goal of optimizing energy performance by 21%. 4. MR2.1 & 2.2—Construction Waste Management (maximum 2 credits) CDM will implement a waste management plan that diverts 75% by weight of total waste generated during the demolition and construction activities. CDM shall provide waste disposal records to your LEED administrator. 5. IE6.1—Controllability of Systems— Lighting (1 credit) CDM will provide switches with occupancy sensors and other passive measures as necessary to control lighting systems. MM1276 1 CITY OF DANIA BEACH,FLORIDA DESIGN/BUILD FIRM: A Florida Municipal Corporation CDMQConstructors Inc 11 t ert Baldwin QQ� rye Signature City Manager(Contract/City Administrator) DR.QG� Dt)fzp Date:� Name/Title Date Approved as to"Scope of Services" By: Dominic F.Orlando,P.E. Director of Public Services(City Project Manager) Date: MM1276 2 LUMP SUM PROPOSAL LEED Certification, Owner Requests CPAM No.: 03.04.001 SUBCONTRACTS $26,120.00 GENERAL CONDITIONS $1,306.00 DESIGN BUILD ARCHITECT/ENGINEER A/E Services $55,371.00 Construction Services $9,830.00 OTHER DIRECT COSTS $0.00 BONDS AND INSURANCE $2,907.00 DESIGN BUILD FIRM'S FEE $1,371.00 TOTAL COSTS $96,905.00 MM1276 3 CONTRACT PRICE ADJUSTMENT MEMORANDUM (CPAM) Project: Design/Build Services for the City of Dania Beach;2.0 MGD Nanofiltration Water Treatment Plant in Dania Beach,Florida CPAM No.: 03.OS.001 A CPAM is issued to memorialize the allocation of the Owner's Allowance Account.The Owner's Allowance Account is available at the discretion of the Contract Administrator authorizing the commencement of specific Work. CDM Constructors, Inc shall not perform Work subject to the Owner's Allowance Account without the prior issuance of this CPAM transferring approved amounts and authorizing to proceed with Work. OWNER ALLOWANCE ACCOUNT(NUMBER): Allowance No. 5 (TITLE) FPL Transformer DESCRIPTION OF WORK(INCLUDE ANY ATTACHMENTS OR REFERENCES): CDM will contact and provide Engineering Services required to apply for an application to Florida Power and Light (FPL)for the installation of a 500—kVA transformer to replace the existing 300-KVA transformer and the demolition of the existing electrical utility station. CDM will pay the FPL fees necessary for the performance of this Work. CITY OF DANIA EACH,FLORIDA DESIGN/BUILD FIRM: A FI cipal Corporation CDM Constructors Inc bert Baldwin Signature City Manager(Contract/City Administrator) fylQ Name/Title Date: Date Approved as to"Scope of Services" By. Dominic F.Orlando,P.E. Director of Public Services(City Project Manager) Date: MM1277 1 LUMP SUM PROPOSAL FPL Transformer CPAM No.: 03.05.001 SUBCONTRACTS $0.00 GENERAL CONDITIONS $0.00 DESIGN BUILD ARCHITECT/ENGINEER Administrative Costs $0.00 AIE Services $0.00 Construction Services $4,800.00 OTHER DIRECT COSTS FPL Fee— Remove Lime Transformer $8,000.00 FPL Fee— New 500KVA Transformer $13,000.00 BONDS AND INSURANCE $798.00 DESIGN BUILD FIRM'S FEE $0.00 TOTAL COSTS $26,598.00 MM1277 2 CONTRACT PRICE ADJUSTMENT MEMORANDUM (CPAM) Project:Design/Build Services for the City of Dania Beach;2.0 MGD Nanofi@ration Water Treatment Plant in Dania Beach, Florida CPAM No.: 03.06.002 A CPAM is issued to memorialize the allocation of the Owner's Allowance Account.The Owner's Allowance Account is available at the discretion of the Contract Administrator authorizing the commencement of specific Work. CDM Constructors, Inc shall not perform Work subject to the Owner's Allowance Account without the prior issuance of this CPAM transferring approved amounts and authorizing to proceed with Work. OWNER ALLOWANCE ACCOUNT(NUMBER): Allowance No. 6 (TITLE)Permit fees/Specialty/Threshold Inspection DESCRIPTION OF WORK(INCLUDE ANY ATTACHMENTS OR REFERENCES): Regulatory authorities have required permitting fees.Also included are building inspections and primary and secondary testing by specialty subconsultants. CITY OF DANIA Bf.ACH,FLORIDA DESIGN/BUILD FIRM: A FI u ipal Corporation CDM Constructors Inc C R ert Baldwin p Signature City Manager(Contract/City Administrator) "— . Name/Title Date: /}UG. �Z`D�o`�9/0 C Date Approved as to"Scope of Services" Dominic F.Orlando,P.E. Director of Public Services(City Project Manager) Date: 2 O /0 MM127a 1 LUMP SUM PROPOSAL Permit Fees/Specialty/Threshold Inspection CPAM No.: 03.06.002 SUBCONTRACTS $11,733.00 Testing and Inspections Special Building Inspections $5,950.00 Bacteriolo ical and Water Quality Testing $5,783.00 GENERAL CONDITIONS $587.00 DESIGN BUILD ARCHITECT/ENGINEER Administrative Costs $0.00 AIE Services $0.00 Construction Services $6,320.00 OTHER DIRECT COSTS Permit Fees $85,356.00 Planning & Zoning Site Plan Approval $6,300.00 Broward County Planning Platting $290.00 Determination Broward County Development Review Stamp $37,000.00 —City Building Department Membrane Building) $40,376.00 —City Building Department Phase 2 Demolition 1,052.00 Notice of Commencement Fee $13.00 Broward County Health Department Permit $75.00 Close—Out Fee NPDES NOI $250.00 BONDS AND INSURANCE $3,235.00 DESIGN BUILD FIRM'S FEE $616.00 TOTAL COSTS $107,847.00 MM1278 2 O'Neil, Timothy om: O'Neil.Timothy sent: Tuesday, May 18. 2010 2:19 ?M To: 'Frederick Bloetscher Cc: Dare. Ronald; O'Neil, Timothy Subject: FW: CPAM 03.D6.D02 - Planning & Zoning Site Plan Approval Attachments: General Application 9-25-2007.pdt: Permit Check Fee.doc Hi Fred Please print these attachments and include it as backup for CPAM No. 03.06.002. These attachments were the basis of the "Planning &Zoning Site Plan Approval" on page 2 of 2 in the subject CPAM. Thankyoi. Tim 0 i Site Plan: All other uses Filing fee $1,000.00 $5.00 per 100 sf @6,000sf 5300.00 Retainer for admin & ad. cost 54,000.00 Subtotal 55,800.00 Variance: Nonresidential $500.00 per variance @1 variance $500.00 Min cost required (waived) Ad $500.00(waived) - Subtotal $500.00 Total Fee $6,300.00 'see attached City of Dania Beach Fee Schedule �I City of Dania Beach, Florida Department of Community Development Planning and Zoning Division (954) 924-6805 Phone www.daniabeachfl.gov General Development Application ZI I Administrative Variance ZJ Assignment of Flex/Reserve Units 7 Land Use Amendment • Plat • Plat Delegation Request ❑ Rezoning Date Rec'd: p Site Plan 3 Special Exception Petition No.: Trafficway Waiver O Variance I Roadway Vacation Extended Hours ZI Other: THIS APPLICATION WILL NOT BE ACCEPTED UNTIL IT IS COMPLETE AND SUBMITTED WITH ALL NECESARRY DOCUMENTS. Refer to the application type at the top of this form and "Required Documentation"checklist to determine the supplemental documents required with each application. For after the fact applications, the responsible contractor of record shall be present at the board hearing. Their failure to attend may impact upon the disposition of your application. As always, the applicant or their authorized legal agent must be present at all meetings. All projects must also obtain a building permit from the City's Building Department. Location Address: 1201 Stirling Road, Dania Beach, Florida 33004 Lot(s): N/A Block: N/A Subdivision: N/A Recorded Plat Name: City of Dania Beach Folio Number(s): 514204000010 Legal Description: See Sheet C-2 Applicant/Consultant/Legal Representative (circle one) Applicant, CDM Address of Applicant: 63" NW 6th Way, Ste 200, Fort Lauderdale, Florida 33309 Business Telephone: 954-776-1731 Home: Fax. 954-928-1649 Name of Property Owner: City of Dania Beach Address of Property Owner: 100 W Dania Beach Blvd, Dania Beach, Florida 33004 954-924-3740 954-923-1109 Business Telephone: Home: Fax: Explanation of Request: Site plan & variance approval for Water Treatment Plant addition For Plats please provide proposed Plat Name for Variances p/ease attach Criteria Statement as per Article 10.13 of Chapter ZB, Zoning Code. Prop, Net Acreage: 0.00 Gross Acreage: 5.23 Prop. Square Footage: 6,000 Sf Existing Use: 1-G Proposed Use: I-G Is property owned individually, by a corporation, or a joint venture? No I, I understand that site PP plan and variance approval automatically expires within 12 P months of City Commission approval, pursuant to Ordinance No. 2005-040. Ruth Burney February 11. 2010 Applicant/Owner signature Print Name Date APPLICANT, CONSULTANT, OR LEGAL REPRESENTATIVE NOTARIZED SIGNATURE Sworn to and subscribed before me Applicant/Consultant/Representative: This_ day of 20_ Signature: Date: February 11 , 2010 Ruth Burney Sign Name of Notary Public (Print Name) State of ( ) 6365 NW 6th Way, Ste 200. Ft Lauderdale, FL 33309 Print Name of Notary Street Address, City, State and Zip Code Commission Expires: 954-776-1731 & 954-928-1649 Seal: Telephone No. & Fax No. INDIVIDUAL OWNER NOTARIZED SIGNATURE: This is to certify that I am the fee simple owner of subject lands described above and that I have authorized (Applicant/Consultant Representatve) to make and file the aforesaid application. Sworn to and subscribed before me Owner: This_ day of 20_ Signature: Date: Sign Name of Notary Public (Print Name) State of ( ) Print Name of Notary Street Address, City, State and Zip Code Commission Expires: Seal: Telephone No. & Fax No. CORPORATION NOTARIZED SIGNATURE: This is to certify that the below referenced corporation is the owner of subjee lands described above and that I, as a duly authorized officer, have authorized (AppBcant!Consultant/Representative) to make and file the aforesaid application. Sworn to and subscribed before me Corporation Name: This _ day of 20_ Signature: Date: (Print Name) Sign Name of Notary Public Print Title) State of ( ) Print Name of Notary Street Address, City, State and Zip Code Commission Expires: Seal: Telephone No. & Fax No. )DINT VENTURE/PARTNERSHIP NOTARIZED SIGNATURE: This is to certify that the below referenced that the duly authorized persons are the owners of subject lands described above and that all partners have authorized (Applicant/Consultant/Representative) to make and file the aforesaid application. Sworn to and subscribed before me This day of 20_ Signature: Date: (Print Name)** Sign Name of Notary Public State of ( ) Print Name of Notary Street Address, City, State and Zip Code Commission Expires: Seal: Telephone No. & Fax No. **Each partner must sign. Attach duplicate sheets as required. City of Dania Beach FEE SCHEDULE APPLICATION TYPE FEE LAND USE: Flex Units Filing-fee s500.00 plus $5.00-per flex, reserve or LAC unit or hotel room Retainer for processing, review, advertising, and notice tests = S3,00D.00 Minimum Fee: S3 ODO.DO Change of Land Use Filing fee = 52,000.00, plus 5500.00 per acre or portion of area plus Retainer for processing, review, advertising, and notice costs = S5,000.DD Minimum Fee: S7 500.00 ZONING' Change of Zoning (Rezoning) 1 Filing fee = s1000.00, plus$200.00 per acre or portion of area plus Retainer for processing, review, adve-tising, and notice costs = 54,000 00 Minimum Fee' $5 200.00 Zoning Code Text Change Filing fee = 51,000.00 plus Retainer for processing, review, advertising, and notice costs = s4,000.00 Minimum Fee: $5 000.00 PLAT(Perimeter) '.. Filing fee = 5500.00 plus$50.00 per acre or portion of such area plus Retainer for processing, review, advertising, and notice costs = $2,000,00 Minimum Fee: $2,550.00 PLAT(Subdivision) Filing fee = $1,00D.00 plus $100.00 per acre or portion of such area plus Retainer for processing, review, advertising, and notice costs = S3,000.00 Minimum Fee: $4,100.00 SITE PLAN: Residential, Hotel, Condo-Hotel, Filing fee = $1,000.00 plus$10.00 per unit Time-Share Motel Retainer for admin. &ad. cost = SS 000.00 all other= Minimum Fee: $6,100.00 All other uses Filing fee = S1,OD0.00 plus the following: 55.00 : SOD s.f.for 1` 10,000 5.f. and $2.00 : 100 s.f. in excess of 10,000 s.f Retainer for admin. &ad. cost S4 000.00 = Minimum Fee: SS 500,00 Maio Site Plan Revisions s500 OD plus S2,000.00 retainer for processing and review costs = min. S2 500.00 Site Plan Extension Application fee = 5250.00 plus s1,000.00 cost recovery fee = min. $1 250.00 SPECIAL EXCEPTION Filing fee = $500.00, plus 5200 per acre or portion of area plus the following: (Excluding cell towers) Retainer for processing, review, advertising, and notice costs = S3,000.DD Minimum Fee: $3 700.00 SPECIAL EXCEPTION Filing fee = S1,0D0 plus the following (Cellular Towers) Retainer for processing, review, advertising and notice costs = S4,OOD.00 Minimum Fee: $5 000.00 VARIANCE: Administrative Single Famil 150,00 a. . fee, no cost recove Administrative all other 5250.00 an fee no cost recover Single Family S100.00 An fee., min. cost rec. 590.00, Ad cost$300.00 = min. 490 .00 Duplex 5500.00 An fee min. cost rep. 5250.00 Ad cost 5300.00 = min. 1 050.00 Triplex 5500.00 a .fee min. cost rec. 5350.00 Ad cost 5300.00 = min. $1,150.00 Multifamily, Hotel, Condo-Hotel 5500.00 a fee er variance, min cost rec. $1 300.00, Ad 5500.00 = min. 2 300.00 Nonresidential 550D.00 a . fee per variance, min. cost rec. $1 000.00,Ad $500.00 = min. 2 000.00 Wall Sin 5250.00 a .fee. min. cost rec. $150.00 Ad cost$300.00 = min. $700.00 Monument Sin SSOD.DO a .fee min. cost rec. 5300.OD Ad cost$400.00 = min.$1,200.00 Pole Sin As permitted 51 ODO.OD a . fee, min ms rec. 51,OOp.00 Ad cast 5400.00 = min.$2 400.00 Sign Adjustment s25D.00 ain.fee. onl Downtown Dania Beach Redevelopment District Only) Deal sin le Tamil 5250.00 a . Fee, min. cost rec. 5125.00, Ad cost 5300.00 = min. 675.00 A peal all other uses 51 000.00 a . fee min. cost rec. $625.00 Ad cost 5300.00 = min. $1925.00 Alcoholic Bevera a 5500.00 a . fee min. cost rec 5125.00,Ad cost s5D0.00 = min. $1,125.00 Trafficwa Waiver I cl OOO.OD a .fee min. cost rec. $3 000.00 = Minimum Fee: 14,000.00 Plat Del ation Re luest , $SOD.OD a . fee min. cost rec $1,0D0.00 = Minimum Fee: $1,500.00 Vacation-Road/Easement 1 $1 000.00 a . fee min. cost rec. $2 500.00 = Minimum Fee: $3,500.00 Extended Hours License + $250.00 ap fee and arty investigation fees incurred by the city OTHER $250.00 ap. fee and any outride costs incurred by the city Effective 9.25.2007-Resolution 2007.185 +Chapter 4,Article 4-18.1.Extended hour's license. O'Neil, Timothy om: O'Neil. Timothy bent: Tuesday. May 16. 2010 2:22 PM To: 'Frederick Bloetscher Cc: Dare. Ronald: O'Neil. Timothy Subject: CPAM 03.06.002 - Broward County Planning Platting Determination Attachments: BC PC.pdf Hi Fred Please print this attachment and include it as backup for CPAM No. 03.06.002. This attachment was the basis of the "Broward County Planning Platting Determination" on page 2 of 2 in the subject CPAM. Thank you. Tim 0 t i °L4414-11146 CDJJCIL =44GE e_ 'e2 e3lei 01_ lE:_6 ^�S a � � SROWARD COUNTY PLANNING COUNCIL "H:WdDRtM'S AVZNUJ -.ROOV V a FOR-1:.AUDCRDALE.rLORIDA 5i OI 3 March 1, 2010 Ruth Burney of CDM The procedures for platting determinations are as follows: Broward County Planning Councli Henry Sniszek, Executive Director PtatUna DetsrrninoWn 1) Survey and legal description 2) Municipality in which property is located 3 Exisbng use, including square footage 4) Proposed use, including square footage 5) Information regarding property ownership and relationship to to property owner(e.g. agent, owner, etc.) Platting Determination Fee- Unpiatted properties or properties platted gore June 4, 1953 $200-00 Post June 4, 1953 platted properties only S1 D0.00 (Plat Book 32, Page 15 and higher) Please make check payaule to Board of County Commission YCLePyC�tiC. 9�'+5?,6E?5 • r�ac 554.557 e�+5 wnrlo mcit web http.//w+'w.!+mwarcA'c/ptamin¢n�rc.�� O'Neil, Timothy om: O'Neil, Timothy xnt: Tuesday. May 16. 2010 2:10 PM To: 'Frederick Bloetscher Cc: Dare, Ronald: O'Neil. Timothy j Subject: CPAM 03.06.002 - Broward County Development Review Stamp Fee i Hi Fred Please print this email and include it as backup for CPAM No. 03.06.D02. The email string below was the basis of the "Broward County Development Review Stamp" on page 2 of 2 in the referenced CPAM. Thank you Tim 0 From: Urquhart, David R. Sent: Monday, April 12, 2010 11:51 AM To: dorlando@ci.dania-beach.fl.us; jbaker@ci.dania-beach.fl.us; h2o_man@bellsouth.net Cc: O'Neil, Timothy; Dare, Ronald; Hempstead, Thomas Subject: Broward County Red Stamp Fees Dominic, Broward County has completed the review/approval process of the drawings for the Nanofiltration Plant. An _avironmental Review Fee of$37,000.00 has been assessed. The amount is determined by the GPD discharged into the existing sewer, which is 222,00 gallons per day. Would you or anyone in the City possibly have a contact in Broward County that may be able to assist in reducing the cost of the review fee. I spoke to Martin Weigand, Broward County Environmental Licensing Manager, to make sure he was aware that the sewer goes to Hollywood's sewer plant and not to a Broward County facility. He was aware and stated that the standard formula of$50.00 per ERC applied. Please let me know if you can help with this matter. I have attached a copy of the fee receipt Regards, David Urquhart Superintendent CDM Constructors Inc 941 232-3492 Dania Beach Red Stamps0001.pdf... 1 Apr 07,2010 Note Type: Page 1 of l ei DMD General i DISCHARGE TIC SANITARY' SEWER 222,00'GPD DIVIDED BY 50?GPD:ERC =- 7 ERC'S X S5C.00= ENVIRONME7vi-'L 5'37.000.00 TOTAL IS r Aileem Waech Natural Resoure Specialist,11 ENVIRONMENTAL PROTEC170N BR � ARD PACOUNTY RTMENT mmmrIIViti C7�� Environmental Protec_on and Growth Management Department 1 Development&Environmental Regulation j One N.Universlry Drrv,.Suite 102A.Marsanon FL 33324 954.5'9-1438•FAX 954-76 51 1 1 5 aene:h(YyrowaN.org i ww.tbrwwrdorg j Yw' W�+SJ Martin R.Weigand c'±n7r-Ea2'__z��F Maniger B c ARD NTY Urban PI ping and Redevelopment Departmen: Devel em Management Division 115 S.Andnews Ave.,Room A-200.F_Laudermk. 954-519.1251•FAX 954-519-1494 mwagond�broxorLarg '. vwx:brawrd.oT O'Neil Timothy om: O'Neil, Timothy bent: Tuesday. May 18, 2010 2:35 PM To: 'Frederick Bloetscher' Cr: Dare, Ronald: O'Neil,Timothy Subject: CPAM 03.06.002 - City Building Department Notice of Commencement Fee Broward County Health Department Permit Close Out Fee Hi Fred Please print this email and include it as backup for CPAM No 03.06.002, These estimated fees were the basis of the "City Building Department / Notice of Commencement Fee / Broward County Health Department Permit Close Out Fee' on page 2 of 2 in the subject CPAM.The fees were based on recent City projects. City Building Department estimate is $6,665.00; Notice of Commencement Fee estimate is 513.00; Broward County Health Department Permit Close Out Fee estimate is $75,00 Tnank you Tim 0 Timothv J. O'Neil, P.E., BCEE I Principal CDM I t: 934-776-1731 1 c: 954-319-3076 1 f: 954-928-1649 6363 N.W. 6th Wav, Suite 200 (Fort Lauderdale, Florida 33309 -onsulting engineering construction operations - :�-��-.T.- I CONTRACT PRICE ADJUSTMENT MEMORANDUM (CPAM) Project: Design/Build Services for the City of Dania Beach; 2.0 MGD Nanofiltration Water Treatment Plant in Dania Beach, Florida CPAM No.: 03.07.001 A CPAM is issued to memorialize the allocation of the Owner's Allowance Account.The Owners Allowance Account is available at the discretion of the Contract Administrator authorizing the commencement of specific Work. CDM Constructors, Inc shall not perform Work subject to the Owner's Allowance Account without the prior issuance of this CPAM transferring approved amounts and authorizing to proceed with Work. OWNER ALLOWANCE ACCOUNT(NUMBER): Allowance No. 7 (TITLE) Architectural Treatments DESCRIPTION OF WORK(INCLUDE ANY ATTACHMENTS OR REFERENCES): Price Proposal—August 14, 2009 Scope of Work Please reference attached Control Building, Floor Plan, Base Bid; and Control Building, Exterior Elevations, Base Bid drawings. CDM's price proposal includes a new 6,000 square foot Membrane Control Building. The entire building shall be a continuous 20-foot eave height for the process bay and administrative area and a single canopy on the east side. The interior layout features a common entry with access to the full administrative area. Outside entry to the workshop is provided. The exterior features painted CMU exterior walls. Allowance Scope of Work: Please reference attached Drawing A-3 and A-5 (Issued for Permit) CDM will construct a new 6,000 square foot Membrane Control Building. The process bay will be a 20-foot eave height with the administrative area eave height reduced to 13-foot. An additional 140-ft aluminum canopy will be constructed along the entire length of the west side in addition to the east side canopy. The interior layout features a secure entry with a separate wall, window and door that restricts access to the administrative area including the control room and electric room. Interior access and outside entry to the workshop is provided. The exterior features a painted stucco finish on the CMU exterior walls.These improvements will enhance curb appeal for the neighborhood, provide safety and protection from inclement weather, and increase visitor security. MM1279 1 Deducts: CMU wall for 20-foot eave height at the process bay and administrative area. Metal building for 20-foot eave height at the process bay and administrative area. Adds: CMU wall for 20-foot eave height at the process bay and 13-foot eave height at the administrative area. Metal building frame 20-foot eave height at the process bay and 13-foot eave height at the administrative area. 140-foot aluminum canopy for covered sidewalk on West elevation. Secure entry with a separate wall,window and door and Interior workshop entry. Painted stucco finish on the CMU exterior walls. CITY OF DANIA B ACH,FLORIDA DESIGN/BUILD FIRM: A Flor' ipaI Corporation CDM Constructors Inc o ert B dwin p_ Agri- City Manager(Contract/City Administrator) [�+1/Q� �0EP P—A / P- � gri- Name/Title Date: G• ��. 129 Date Approved as to"Scope of Services' By: D minic F.Orlando, P.E. Director of/Public/Services(City Project Manager) Date: /O MM1279 2 LUMP SUM PROPOSAL Architectural Treatments CPAM No. 03.07.001 SUBCONTRACTS Deducts $ 314,902.00 Adds $412,460.00 GENERAL CONDITIONS $5,911.00 DESIGN BUILD ARCHITECT/ENGINEER Engineering $30,712.00 Preconstruction Services $13,437.00 OTHER DIRECT COSTS $0.00 BONDS AND INSURANCE $4,726.00 DESIGN BUILD FIRM'S FEE $5,173.00 TOTAL COSTS $157,517.00 MM1279 3 � 4 e � < €2 J al;u�j I O � � U W tl � z Y F I IWO W u_ a s w I I m` � 5ID 'ou 7- o �I I I I i � g I I Y� I I �I b m k 6 R I �I F F 12� 1 1 � CCs , I }]-�� � LL I Ijl III 1�+ 1 j I ' Z a � ' x W c m� I I 1 03 z 65 rrrr � p Sbdde E I Ij 14 Ii z III III o i I ! II = I ; Ali it j ' 2I �i ' 3 � s kS k qRg Sra ,f m 1. S 4 ______r__ _ _ 11, -_ J 11 1 1 1111 � e z yni W L CC r Y .. � - F�j �-��� .3 41 _ f � ej I , ..♦ r ry f LLI yl 3'L r G F 1 S> 113 I Y e e I e t m � t z `F I I� �s L i _ � Il�� I c ­7 Ull wioz; 0 Ill ZI i 2 ;zAt v 11 2 3 = dy LZ j' � ♦ Q "C¢u� tltl,' w w ' N Q m I I • z Ila p �y aa � F t--i i 'beo��r I,I // \ •�'� it � ,, I I f ' � I I Ili, pf CHANGE ORDER No.: 2 PROJECT: DESIGN/BUILD SERVICES FOR THE CITY OF DANIA BEACH 2.0 MGD NANOFILTRATION WATER TREATMENT PLANT DATE OF ISSUANCE Julv 6, 2010 EFFECTIVE DATE OWNER City of Dania Beach. Florida OWNER's Contract No. Bid No.09-005 CDM Project No. 74061 CONTRACTOR CDM Constructors Inc ENGINEER You are directed to make the following changes in the Contract Documents: Description: Attachment"A"-Scope of Change Order. Reason for change order: Attachment"A"-Scope of Change Order. Attachments: Attachment"A"-Scope of Change Order. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original.Contract Price Original Con=t Times $ 8,820,923.00 Substantial Completion: Ready for final payment 630(August 8,2011) Days or dates Net changes from previous Change Orders No._to No._ Net change from previous Change Orders No._ to No. $ 0.00 0 ays Contract Price prior to this Change Order Contract Time prior to this Change Order $ 8,820,923.00 substantial Completion: Ready for final payment: 630(August 8,2011) so Net Increase(decrease)in this Change Order Net Increase in this Change Order S 285,992 00 0 day, Contract Price with all approved Change Orders Contract Time with all approved Change Orders $ 9,106,915.00 Substantial Completion: Ready far final payment: 630(August 8,2011) Days or dare, p t���t��1jjj AA t1v�. Ve NDEDB - — Jt"�lr Y: J'///yI1`a^/�l/rrfl APP EG DBY'. E 'ne,r rtmd ggwurt' (Aal SSs,ryomy }7 CamrsporlAu md.,% 1 Date: Date: r^' I✓ Date: 611212,0 10 I a� MM1281 I of 4 CHANGE ORDER TO: City of Dania Beach,Florida PROJECT: DESIGN/BUILD SERVICES FOR THE CITY OF DANIA BEACH 2.0 MGD NANOFILTRATION WATER TREATMENT PLANT CONTRACTOR: CDM Constructors Inc. DATE: June 23,2010 Amounts Prior to this Change Order: Base Bid Total= $7,445,923.00 Contingency= $ 250, 00.00 Allowances= $1,125,000.00 Original Contract Price=ce $8 820 923.00 g , This Change Order will authorize the following change to the Agreement: The Work as set forth in the Agreement is amended to include the items set forth in Attachments "A and by this reference made a part of this document. ALLOWANCE COST & TIME SUMMARY Original Total Account Total Amount Time Allowance Allowance Value Changes this Revised Allowance Expended from Extension No in Contract Change Order Value Allowance Requested 1 VOID VOID VOID 2 $ 500,000.00 $ 487,992.00 $ 500,000.00 $ 987,992.00 0 days 3 $ 100,000.00 $ - $ 100,000.00 $ 3,439.30 0 days 4 $ 100,000.00 $ - $ 100,000.00 $ 96,905.00 0 days 5 $ 100,000.00 $ - $ 100,000.00 $ 26,598.00 0 days 6 $ 50,000.00 $ - $ 50,000.00 $ 107,847.00 0 days 7 $ 125,000.00 $ $ 126,000.00 $ 157,517.00 0 days -8 $ 150,000.00 $ $ 150,000.00 $ - 0 days Total $ 1,125,000.00 $ 487,992.00 $ 1,125,000.00 $ 1,380,298.30 0days $ (202,000.00) Deducted From Contingency $ 285,992.00 Net Change to Contract from this Change Order Net Change to Contract from this Change Order $285,992.00 0 days MM1281 2 of 4 This Change Order constitutes full,final, and complete authorization for compensation to the Contractor for all costs,expenses, overhead, and profit,and any damages of every kind that the Contractor may incur in connection with the above referenced change(s) in the Work, and any other effect on any of the Work under this Agreement. The Contractor acknowledges and agrees that(a)the Lump Sum of$8,820,923.00 under this Agreement will be increased by $285,992.00 by this Change Order, and (b) the schedule of performance of Work will be unchanged by this Change Order. Contractor expressly waives any claims for any additional compensation, damages or time extensions in connection with the above referenced change(s). Except as modified by the document, all terms of the Agreement shall remain in full force and effect and shall cover the performance of, and payment for, any work authorized under this document. Any defined terms not defined in this Change Order shall have the meanings set forth in the Agreement. By signing below the parties indicate acceptance of this Change Order as set forth in it. CONTRACTOR CITY OF DANIA BEACH, CDM Constructors Inc. a FloriRmunic" oration a Florida oration By: �� V� , win,City Manager Name: o VL- Title: V P Authorized by action of City Commission o the City of Dania Beach on 2010 CITY OF DANIA BEACH, Public Services Departmen By ame• re ick Bloetscher, Dominic F.Orlando, P.E. Project Management Consultant — Public Services Director MM12e1 3 of 4