HomeMy WebLinkAboutR-2010-186 Change Order #3 Nanofiltration Project RESOLUTION NO. 2010-186 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, RELATING TO CHANGE ORDER NO. 3 FOR THE NANOFILTRATION WATER PLANT PROJECT; REALLOCATING ALLOWANCES FOR NO NET INCREASE IN TIME AND AN INCREASE IN COST OF AN AMOUNT NOT TO EXCEED OF $90,445.00; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Commission adopted Resolution 2002-120 approving the Water, Wastewater and Stormwater Facilities Plan; and WHEREAS, the City received proposals for design and construction of a 2.0 MGD Nanofiltration Water Treatment Plant on the City's existing water plant site; and WHEREAS, the City Commission awarded Camp Dresser & McKee, Inc. the designibuild contract in the amount of$8,820,923.00 in November 2009; and WHEREAS, the contract will require additional new funding to complete and will also contain a series of allowances intended to address issues that could not be adequately bid prior to design; and WHEREAS,the new funding and contract allowances would be provided as follows: SCOPE OF CHANGE ORDER 1. Furnish and install new artesian"FENCESTONE"precast concrete wall system. The wall system is engineered in accordance with current local and Florida Building Codes and includes a custom integral color and warranty ............ $72,000.00 2. Furnish and install new landscaping NotIncluded ............................................................................. ................$0.00 3. Remove existing chain link fence and shrubs All existing obstructions are to be removed to provide clear access prior to the installation of the new wall system and new landscaping ..........................................................$4,839.00 4. Surveying The surveyor will stake the fence line location with a three foot offset prior to commencement of installation of the wall system ......................................................................$1,290.00 5. Signage The City's logo and the Water Treatment Plant's street address will be wall-mounted with raised lettering at the diagonal wall located at the intersection of Stirling Road and J.A. Ely Boulevard ................................................................................................... ......$2,500.00 6. Construction Services Construction services include soliciting subcontractor pricing, developing the cost proposal, permit approval of engineered drawings, and supervision and coordination of work.....$3,000.00 7. Bonds and Insurance (3%) CDM shall provide all bonds and insurance required by the City..........................$2,635.00 8. Design-Builder's Fixed Fee A fixed fee of 5% is specified for the net change to the work .............................$4,181.00 Total Change Order No. 3 Amount .................................................... $90,445.00; and WHEREAS, there is no increase in time; however, there is a need to provide increased project funding by an amount not to exceed $90,445.00 for this Change Order No. 3; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA,AS FOLLOWS: Section 1. That Change Order No. 3 (attached) related to the construction agreement for the 2.0 MGD Nanofiltration Water Treatment Plant Project with no increase in time is approved. Section 2. That Change Order No. 3 requires an increase in the project's funding by an amount of $90,445.00 and that this increased funding shall be provided through transfer of available funds in the Water Fund-Contingency Account #401-3301-533.99-10, which has an available balance of $571,413.00 on October 12, 2010, into the Nano Plant Capital Project Account#401-3303-533.6310. Section 3. That the proper City officials are authorized to execute Change Order No. 3 in the amount of$90,445.00. Section 4. That all resolutions or parts of Resolutions in conflict with any of the provisions of this Resolution are repealed to the extent of such conflict. 2 RESOLUTION#2010-186 i i Section 5. That this Resolution shall become effective immediately upon its passage and adoption. PASSED AND ADOPTED on October 26, 2010. �. McELYE -COMMISSIONER ATTEST. c LOUISE STILSON, CMC CITY CLERK APPROVED AS A FORM AND CORRECTNESS: x t THO AS . A BRO CITY AT ORNEY 3 RESOLUTION#2010-186 CHANGE ORDER No.: PROJECT: DESIGN/BUILD SERVICES FOR I-HE CITY Or, DANIA BEACH 2.0 MGD NANOFILTRAnON WATER TREATMENT PLANT DATE OF ISSUANCE: __tic nb r 7 2:OIIQ EFFECTIVE DATE OWNER Citw of Dania Beach, Florida OWNER's Contract No. Bid No.09.005 C DM Project No. 74061 CONTRACTOR CDM C.'ollsiruelgrs Inn ENGINEER You are directed to make the following changes in the Contract Documents; Description: Attachment"A"- Scope of Charge Order. Reason for change order: A(lachlnettt "A"-Scope of Change Order. Attachments: Attachinew "A"- Scope of Change Order, CHANGE IN CONTRACT PRICH CHANGE: IN CONTRACT:"I` CIMf 06ginal Contract Pricc Urt$inatil Contract Times subctvttial C'rsrnplction $ K,R�t1,r�23,00 ---� - -- - Ready liar final paymrnl: 630(August 8.2011) I11>16 Of states Net clumitmi from previous Change{tclers No I to No Nei change from ptvvitsaax Chmige Orders No I in No 2_ _ S 285,992.00 0 a_�_.l____�_ ('anttnrct Pticr p(im It)this Ova age Order Contract Time prior to This Change Ordrr S 9,106,915.00 sutanuutttaal Compleoun. Rtwly for final paaymeni GM(Atigoi A,2011) Mys of �. No 1nctea w(dccrraat)its ibis(`Itiange{_irckr Net Ina:cane in this Change Order Contract Paid rrith sal)approved Charvgv Orders Cuntrml Tuns►rails all appro% d Uhmge Orders S 9,197.3ft{).l)() SOISIr aAW COMI)WI K-4a' Ready fro final p5mvcit 63 (August 8,2011) Days of e% APPROVED M' ACL 1 f 7 t:3tir:; t7amry i.lu3bexuexl�z�rsoa,mr9 l'rnr�rutrx I,rirtt.esrtyr��,y�rWxsurel Data.: _..._..�_.__..._ _..__.. _ Dfiic: �s fJt'I1�`No 191 t)-s-R(1519f)l-dititan) Vvepa►rrd by the I_a gintxrx Rmil Contract Docttntcttls C'iamrttlitee and a wJorud b%The Associaled General C otttrutor4 of Anivica 0)0 3-Pncvam Wall.dx CHANGE ORDER TO: City of Dania Beach, Florida PROJECT: DESIGN/BUILD SERVICES FOR THE CITY OF DANIA BEACH 2.0 MGn NANOFiLTRATION WATER TREATMENT PLANT CONTRACTOR: CUM Constructors Inc.. DATE: September 30,2010 This Change Order will authorize the following change to the Agreement: The Work as set forth 6%the Agreement is atnettded to include the items set forth in Attachmems"A" attd by this reference made a part of this document. Net Change to Contract from this Change Order S909445.00 0 clays Phis Chnnge Order constitutes full, final, and complete authorization for compettisation to the Contractor for all costs,expenses,overhead, and profit,and ofiy damages of every kind that the Contractor may incur in connection with the above referenced change(s) in (lie Work, acid any other effect on any of the Work under this Agreement. The Contractor acknowledges and agrees that(a)the Lump Sum of$8,820,923.00 wider the Agrminent will be unchanged by this Change Order, and (b) the schedule of performance of Work will be unchanged by this Change Order.Cownictor expressly waives any claims for any additional compensation, damages or time extensions in owincelion with the above referenced change(s). Except as modified by the document,all terms of the Agreement shall remain in full force and effect Acid shall cover Ilie performance of, and paynicnt for, any wcw* authorized under this document. Any defined terms not defined in this Change Order shall have the meanings set forth ill the Agreement. By signing below the parties indicate acctinaiwe of this Cluang,+e Ordper as set foilh in it. CONTRACTOR C114Y OF DANIA BEACH, CDM Constructors Inc. n Florida municipal corporation a Florida corporation B B Y• Y• w�.. . Robert l3aldwin, City Manager Name: _ AL '• Authorized by action of City Commission Title: or the City of Dania Beach on 2010 CITY OF DA.NIA REACH, Public ces Depai Name: Frederick Bloetsckter, Pli.D., P.E. Dominic F.Orlando,P.E. Project Managemew Consultant Public Services Director /017117,01 t2 I ATTACHMENT A City of Dania Beach, Florida DESIGN/BUILD SERVICES FOR THE.CITY OF DANIA BEACH 2.0 MGD NANOFILTRATION WATER TREATMENT PLANT CHANGE.'.ORDER No. 3 PRECAST CONCRETE WALL SCOPE OF CHANGE ORDER This Change Order provides means of payment to construct 480-foot of six-foot high precast concrete wall extending along Stirling Road and JA Ely Boulevard. CDM will remove the existing chain link fence and shrubs and construct the new precast concrete wall. ITEM 1. Furnish and install New Artisan "FENCESTONE" Precast Concrete Wall System The Wall System is engineered in accordance with current local and Florida Building Codes and includes a cl2Stom integral color and warranty ................... $72,000.00 2. furnish and Install New Landscaping NotIncluded ........... ................................. .............. ............................ $0.00 3. Remove Existing Chain Link Fence and ShTubs All existing obstructions are to be removed to provide clear access prior to the installation of the new Wall System and new landscaping .............................. $4,839.00 4. Surveying The surveyor will stake the fence line location with a three foot offset prior to commencement of installation of the Wall System ............................ .......... $1,290.00 5. Signage The City's logo and the Water Treatment Plant's street address will be wall- Mokinted with raised lettering at the diagonal wall located at the intersection of Stirling Road and JA Ely Boulevard .................................................... $2,500.00 6. Construction Services Construction services include soliciting subcontractor pricing,developing the cost proposal, permit approval of engineered drawings.and supervision and coordination of the Work ..................,.... .. ........................... ............. $3,000.00 7. Bonds and Insurance (3%) CDIVl shall provide all bonds and insurance required by the City ..................... $2.635,00 8. Design-Builders Fixed Fee A fixed fee of 5% is specified for the net change to the Work ........................ $4,181.00 Total Change Order No. 3 Amount .................................................................. $90,445.00