HomeMy WebLinkAboutR-2011-059 CGA Engineering Services Stormwater Improvements Basin 5 RESOLUTION NO. 2011-059
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO PURCHASE
ENGINEERING SERVICES FROM CALVIN, GIORDANO AND
ASSOCIATES, INC. RELATING TO THE EXPANSION OF STORMWATER
IMPROVEMENTS, BASIN 5, PHASE I, MEADOWBROOK PUMP STATION
REPLACEMENT PROJECT IN AN AMOUNT NOT TO EXCEED ONE
HUNDRED TWENTY-SIX THOUSAND ONE HUNDRED FIFTY-ONE
DOLLARS ($126,151.00); PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City Commission has directed the Public Services Director to seek
alternative solutions for the Southeast Stormwater issues and to immediately identify a solution
for improvements to certain areas; and
WHEREAS, the Director of Public Services has determined that there is an immediate
need to proceed with the expansion of the Stormwater Improvements, Basin 5, Phase 1
Meadowbrook Pump Station Replacement Project, which involves the replacement of the
Meadowbrook main storm pump and discharge line for this area; and
WHEREAS, the City has received notice of approval from the Florida State Revolving
Fund (SRF) for the Southeast area Stormwater Improvement loan for which the Public Services
Director is presently seeking approval to incur costs and to seek construction bids for this
Project; and
WHEREAS, the Director of Public Services has previously engaged Calvin Giordano
and Associates, Inc. for the initial Southeast Stormwater Improvement engineering design and
services in the Southeast area for a total amount of$45,218.26; and
WHEREAS, the Pubic Services Director recommends the purchase of additional
services for the Stormwater engineering design and for the project engineering oversight during
construction by Calvin Giordano and Associates, Inc.;
NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That that certain agreement with Calvin Giordano and Associates in an
amount not to exceed one hundred twenty-six thousand one hundred fifty-one dollars
($126,151.00) for additional services for the Southeast Stormwater engineering design and for
the project engineering oversight during the construction for the Stormwater Improvements,
Basin 5, Phase 1 Meadowbrook Pump Station Replacement Project. Calvin, Giordano &
Associates, Inc.'s Proposal No.: 09-2777.4 is attached as Exhibit "A"; it is made a part of this
Resolution by this reference and it is approved.
Section 2. That the City Manager and City Attorney are authorized to make minor
revisions to the agreement for such services which are deemed necessary and in the best interests
of the City of Dania Beach.
Section 3. That upon, and not until, all parties have executed the approved SRF loan
funding documents, will the funding for the Southeast Stormwater Improvements, Basin 5, Phase
1 Meadowbrook Pump Station Replacement Project be provided.
Section 4. That costs of all Southeast Stormwater consulting engineering work shall
be charged to the Stormwater Budget Account-Southeast Area Stormwater Improvements —
Consultant Engineering Account No. 403-3804-538.31-30, and provided further that this budget
balance shall be adjusted and increased to a total of$177,637.00 by transfer of $155,754.00 in
available appropriated budget balances from the Southeast Stormwater Capital Improvement
Construction Account No. 403-3804-538-6310.
Section 5. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 6. That this Resolution shall be in full force and take effect immediately
upon its passage and adoption.
PASSED AND ADOPTED on Jun 1.
�QO�pRDAS Fl�T`'�
ATTEST:
Z
LOUISE STILSON, CMC AMID PATRICIA A. FLURY
CITY CLERK MAYOR
APPROVED AS TO ORM ND CORRECTNESS:
THOM S J. A34S Rd�
CITY ATTORNEY
2 RESOLUTION#2011-059
e Calvin, Giordano & Associates, Inc.
E X C E P T I O N A L S O L U T I O N S
Additional Services Agreement
DATE: May 6, 2011
It& Dania Beach-Expand Basin 5 Additional Scope
CLIENT: City of Dania Beach
100 W. Dania Beach Boulevard
Dania Beach, FL 33004
ATTENTION: Mr. Dominic F. Orlando
CGA NO.: 09-2777.4
CGA HAS BEEN ADVISED TO PROCEED WITH THE FOLLOWING ADDITIONAL SERVICES:
Due to the client's request for work outside the original scope of services, Calvin, Giordano&
Associates, Inc. will provide the following additional services:
This proposal includes bidding, construction services and engineering during construction for
Phase I of the SE drainage project. Phase I construction includes Meadowbrook stormwater
pump station replacement, rehabilitation of the FDOT structure on SE 3rd Avenue,and force
main replacement from the Meadowbrook station to the outfall. Also included in this proposal
are surveying and engineering services for design of the force main replacement from the
Building Code Services Meadowbrook pump station to the outfall,geotechnical design services for standard penetration
Code Enforcement test(SPT)borings for the pump stations,and structural engineering design for the
Construction Engineering& Meadowbrook um station. Surveying and environmental services for proposed s readerleco
Inspection pump Y $ p I� p
Construction Services Swale on the east side of SE Sth Avenue in conjunction with Broward County Parks and
Contract Government Recreation Department to address water quality for Basin 5 are included to finalize Phase II for
Data Technologies& construction and obtain permits. The basis of proposal is lump sum in the amount of
Development $126,151.00.
Emergency Management
Services I. Professional Engineering Services
Engineering
Governmental Services
Indoor Air Quality A. Civil Engineering
Landscape Architecture&
Environmental Services 1. Assistance during bidding for Phase I.
Municipal Engineering
Planning
Public Administration Attend pre-bid meetings
Redevelopment&Urban
Design 6 Assist with addressing contractor RFI's during bidding process
Surveying&Mapping
Transportation Planning& 2. Engineering During Construction for Phase I.
Traffic Engineering
Utilitiy&Community
Maintenance Services Attend the pre-construction meetings
•1800 Eller Drive,Suite 600 Shop drawing review
Fort Lauderdale,FL 33316
Phone:954.921.7781
Fax:954.921.8807
www.calvin-giordano.com
• Address contractor related questions or concerns
• Provide project status updates and continuous coordination with
the City during construction
• Field review for critical construction items
• Assist with coordination between the contractor and the City
• Review of contractor pay requests
• Project close-out
• Allowance for handling unanticipated field conditions that may
arise as a result of unanticipated underground utility conflicts,
pump station construction or additional requirements by the
jurisdictional agencies. Use of these contingency funds will
require City approval.
3. Ongoing coordination with jurisdictional agencies such as South
Florida Water Management District, Broward County Parks and
Recreation, Army Corp of Engineers, and Broward County
Environmental Protection and Growth Management Division,
particularly pertaining to eco-swale permitting and licensing.
4. Design and construction plans for approximately 1150 LF of force
main replacement of the existing pipe from the Meadowbrook
pumping station to the outfall east of SE 5th Ave.
• Plan& Profile sheets for proposed force main,dissapator
structure, and outfall.
• Utility coordination
5. Geotechnical Exploration by Nutting Engineers for pump station wet
well installations.
• Perform one(1) twenty(20) feet deep Standard Penetration Test
(SPT) boring at the proposed Pump Stations 1,2, &3 sites and
one(1) forty feet deep SPT boring at the proposed
Meadowbrook Pump Station site.
• Provide an engineering report including a description of findings,
general site preparation and foundation design recommendations
for support, graphic logs of the test borings and a test boring
location plan.
6. Structural Engineering for Meadowbrook pump station by
Lakdas/Yohalem Engineering, Inc.
• Engineering design phase to include structural analysis,detailed
drawings, material and construction specifications.
• Engineering during construction to include replying to contractor
RFI's, building dept. review continents, and review of structural
shop drawings.
• Structural site inspections to include 10 field visits for a NTE of
25 hours.
11. Professional Environmental Services
A. Coordinate with engineering on the design of a swale to meet surface water
and environmental requirements, create swale plan and cross sections.
B. Develop a planting chart for the swale appropriate for the functions and
elevation of the swale, and a replanting plan for the immediate surrounding
area impacted by construction.
C. Coordinate with Broward County Parks to gain approval of the swale
design and plant selection.
D. Coordinate with the permitting agencies and with Broward County Parks to
determine appropriate mitigation for the impacts associated with the
development and installation of the swale.
E. Design and develop a mitigation plan and mitigation planting chart.
F. Finalize plans to serve for ERP permitting and for construction purposes.
III. Professional Surveying Services
A. Provide topographic information East of S.E. 5th Avenue the limits being:
1. From S.E. 7th Street North to the FPL substation. Approximate length
is 1,900 feet.
2. Topographical information will be taken from the East right-of-way
line of S.E. 5th Avenue and extending East 100 feet.
3. Topographical information will be obtained every 100 feet for the
length of the project.
B. Provide Topographical information(at 50' intervals) from:
1. The Pump House at Meadowbrook South to the South right-of-way
line of S.E. 3rd Street, then East along S.E. 3rd Street to the West
right-of-way line of S.E. Sth Avenue. Locations of improvements will
also be located along S.E. 3rd Street.
IV. Professional Construction Services
A. The following scope is based on i bid project on total hours specified on
attached breakdown. With an estimated construction time of 120 days for
the Meadowbrook pump station and force main. Any additional time beyond
will need an approved agreement.
1. Assist in bidding process, including pre-bid, bid opening,
recommendation of award and contract execution for one bid.
2. Meeting with Contractor and appropriate regulatory agencies when
requested and necessary for consultation or conferences in regard to
construction of the project.
3. Issue interpretations and clarifications of the Contract Documents, and
evaluate requested deviations from the approved design or
specifications. In connection therewith, review, prepare and process
any work change directives or change orders requested by the
Contractor, or City.
4. Review and process shop drawings, samples and other data which the
Contractor is required to submit.
5. Make daily inspections(up to 2 hours per day, for a total of 240
Hours) for compliance with plans and specifications. Make interim
inspections for substantial completion; review, approve and process
pay requests and perform a final inspection to determine, in general, if
the work has been completed in conformance with the intent of the
Contract Documents.
6. Review as-builts provided by the Contractor.
7. Review and process closeout packages.
B. Special situations that may arise with wetlands ecoswale construction,
unanticipated field conditions with underground utilities, and special
requirements by the agencies may require more than the allocated 3 hours
per day;therefore a not to exceed amount is needed as a construction
activity contingency. Use of these funds will require approval from the City.
PROPOSED SCHEDULE OF FEES
I Professional Engineering Services
A Professional Civil Engineering Services $64,531.00
Engineering Permitting $6,800.00
Engineering During Construction $26,455.00
Other Engineering Work Activity
Allowance for time due to unanticipated field $10,000.00
conditions or requirements by jurisdictional
agencies - requires City approval
Meadowbrook pump station force main $6,910.00
replacement to outfall
Sub-Consultant
Geotech Consultant $2,900.00
Structural Engineering Consultant $11,466.00
II Professional Environmental Services $8,420.00
Other Environmental Work Activity $8,420.00
III Professional Surveying Services $8,865.00
Other Survey Work Activity $8,865.00
IV Professional Construction Services $44,335.00
Project Bidding $3,275.00
Construction Inspection
Field Inspection $36,060.00
Other Construction Work Activity
Allowance for unanticipated field conditions $5,000.00
V Meetings not included in I thru IV Hourly
TOTAL-' (PlusIourly Services) $12615100
AUTHORIZATION
Kindly sign and return this authorization at your earliest convenience.
Calvin, Giordano & Associates,Inc.
w'1 proceed upon receipt of authorization..
By: By:`
Mr. Dominic F. Orlandoee,s 2-all Dennis J.Giordano
Director of Public Services President
Date:"As to scope of services" Date:
n Calvin, Giordano & Associates, Inc.
E X C E P T 1 O N A L S O L U T I O N S
PROFESSIONAL FEE SCHEDULE
Principal 215.00 LANDSCAPE ARCHITECT
Contract Administrator 190.00 Associate,Landscape Architect 165.00
Project Administrator 165.00 Senior Landscape Architect 130.00
Executive Assistant 75.00 Environmental Administrator 125.00
Clerical 75.00 Landscape Architect 115.00
Environmental Specialist 105.00
ENGINEERING Landscape CADD Technician 95.00
Associate,Engineering(VI) 190.00 Environmental Assistant 85.00
Director,Engineering(V) 165.00 Landscape Inspector/Arborist 105.00
Project Manager(IV) 145.00 Landscape Designer 115.00
Project Engineer(III) 125.00 Landscape Site Plan Reviewer 130.00
Engineer(II) 105.00
Jr.Engineer(1) 100.00 SURVEYING
Senior CADD Tech Manager 115.00 Associate,Surveying 165.00
CADD Technician 95.00 Senior Registered Surveyor 145.00
Traffic Engineer(11) 125.00 Survey Crew 135.00
Traffic Engineer(I) 100.00 Registered Surveyor 130.00
Traffic Technician 90.00 Survey Coordinator 105.00
Permit Administrator 90.00 CADD Technician 95.00
3D Laser Scanner 355.00
DATA TECH DEVELOPMENT Hydrographic Survey Crew 330.00
Associate,Data Tech Dev. 165.00 G.P.S.Survey Crew 155.00
GIS Coordinator 145.00 Sub-meter G.P.S 75.00
GIS Specialist 125.00 Soft Dig(per hole) 480.00
Multi-Media 3D Developer 115.00 Utility Locates(per hour) 205.00
GIS Technician 100.00
Building Code Services Sr.Applications Developer 165.00 INDOOR AIR QUALITY SERVICES
Code Enforcement Applications Developer 135.00 Sr.Environmental Scientist 115.00
Network Administrator 155.00 Environmental Scientist 100.00
Construction Engineering& System Support Specialist 115.00
Inspection IT Support Specialist 85.00 GOVERNMENTAL SERVICES
Construction Services Associate,VP 190.00
Contract Government CONSTRUCTION Director of Code Enforcement 145.00
Data Technologies& Associate,Construction 165.00 Director of Building Code 145.00
Development Construction Management Director 135.00 Project Manager 145.00
Emergency Management Senior Inspector 100.00 Grants Administrator 125.00
Services Inspector 90.00 Code Enforcement Field Supervisor 110.00
Engineering Code Enforcement Field Inspector 90.00
Governmental Services EMERGJgCYMANAGEMENT Building Official 115.00
Indoor Air Quality Director 145.00 Building Plans Reviewer 90.00
Landscape Architecture& Planner 105.00 Building Inspector 90.00
Environmental Services Assistant Planner 90.00 Permit Processor 75.00
Municipal Engineering
Planning PLANNING REDEVELOPMENT&URBAN DESIGN
Public Administration Associate,Planning 175.00 Revitalization Project Director/Manager 165.00
Redevelopment&Urban Director of Planning 145.00 Revitalization Coordinator 130.00
Design Planning Administrator 135.00 Alternative Funding/Technician 100.00
Surveying&Mapping Assistant Director 125.00 Commercial Zoning Administrator 130.00
Transportation Planning& Senior Planner 125.00 Redevelopment Planner 105.00
Traffic Engineering Assistant Planner 90.00 Specialist/Downtown Manager 100.00
Utilitiy&Community Municipal Administrator 165.00
Maintenance Services EXPERT WITNESS Municipal Assistant Administrator 130.00
Principal/Associate 330.00 Municipal Department/Division Head 105.00
Registered Engineer/Surveyor 280.00
1800 Eller Drive,Suite 600 Project Engineer 230.00
Fort Lauderdale,FL 33316
Phone:954.921.7781 In addition:to the hourly rates listed above,charges will include direct out-of-pocket expenses