HomeMy WebLinkAbout262855 - MINUTES - CRA MINUTES OF MEETING CITY OF DANIA BEACH COMMUNITY REDEVELOPMENT AGENCY TUESDAY, NOVEMBER 8, 2011 6:00 P.M. 1. Call to Order/Roll Call Chairman Flury called the meeting to order at 6:00 p.m. Present: Chairman: Patricia A. Flury Vice-Chairman: Bobbie H. Grace Board Members: Anne Castro Walter Duke C. K. "Mac" McElyea CRA Executive Director: Jeremy Earle City Attorney: Thomas Ansbro CRA Secretary: Louise Stilson 2. CRA Updates Jeremy Earle, CRA Executive Director, discussed the US 1 Landscaping project. He noted there are issues and some of the business owners want some of the trees moved. Director Earle requested feedback from the Board. Board Member Castro commented that the business owners have been complaining about how dilapidated this corridor is and we have been talking about this for a long time. She further noted this project has been a challenge due to the infrastructure and we are finally spending millions of dollars to enhance Federal Highway; therefore, we need to move forward with the plan. Board Member Castro motioned to continue with the plan; seconded by Vice-Mayor Grace. The motion carried on the following 4-1 Roll Call vote: Board Member Castro Yes Vice-Chairman Grace Yes Board Member Duke Yes Chairman Flury Yes Board Member McElyea No 3. Presentations There were no presentations at this meeting. 4. Consent Agenda 4.1 Minutes Approve minutes of October 5, 2011 CRA Board Meeting 4.2 Revised Merchant Assistance Program Application Board Member Castro motioned to approve the Consent Agenda; seconded by Vice- Chairman Grace. The motion carried on the following 5-0 Roll Call vote: Board Member Castro Yes Vice-Chairman Grace Yes Board Member Duke Yes Chairman Flury Yes Board Member McElyea Yes 5. Proposals and Bids 5.1 Sun Garden Isles Bid Acceptance Director Earle confirmed that the bid amount of$452,714.20 will be funded by the CRA and the City of Dania Beach. Board Member Duke motioned to award the Bid for Sun Garden Isles to West Construction; seconded by Vice-Chairman Grace. The motion carried on the following 5-0 Roll Call vote: Board Member Castro Yes Vice-Chairman Grace Yes Board Member Duke Yes Chairman Flury Yes Board Member McElyea Yes 6. Discussion and Possible Action 6.1 Dania Beach Heights Traffic Circle Director Earle noted Oscar Bello of Chen Moore and Associates is present, if needed. He asked the Board for direction on how to proceed with the project. Chairman Flury commented that she would like to get rid of this project. She added that currently we do not have the funding and suggested revisiting the issue at a later date. Board Member Castro commented that half a million dollars is a lot of money for a traffic circle. She remarked that the original cost from 7-8 years ago was $45,000.00 - $65,000.00. Board Member Castro stated she cannot support this project; however, she would like to try other alternatives such as stop signs. She asked City Manager Baldwin to discuss this matter with Broward County. Minutes of Regular Meeting 2 Dania Beach Community Redevelopment Agency Tuesday,November 8,2011 —6:00 p.m. It was the consensus of the Board to take this project off the list. 6.2 US-1 Phase II Landscape Cost Estimate Director Earle reviewed the revised cost proposal which is included as an attachment to these minutes. He noted that the total base cost, with Alternates (1 & 2) is $2.4M. Director Earle remarked that it is important to remember that these numbers represent a best estimate based on all the issues that we have encountered during the current construction of Phase I. He indicated that Public Services Director Orlando believes the City can realize additional savings of $675 000.00. Director Earle advised that the cost estimate was prepared by the IBI Group. Board Member Castro questioned some items that could be eliminated. Jed Hall, IBI Group, advised the utility lines do not have to be done. He further explained the process and said that the $2.4M amount is the worst case scenario. Dominic Orlando, Director of Public Services, explained how they saved costs on Phase I of the project. He noted there are a lot of contingencies in Phase II. Director Orlando indicated that the Alternates are separate from the lump sum because if the work does not need to be done, the contractor will not be paid for that specific item. He noted that his savings are in the Alternates; however, it would still cost $1.7M. Board Member Duke said we should focus on the landscaping and above ground improvements at this time. Director Orlando noted the utility realignment would only need to be done if there is a conflict. He clarified that not all the utility companies may want to do things the way staff is proposing in which case we would be responsible for the cost. Board Member Castro cautioned that we need to contact all the utility companies before we vote on this item. Board Member Castro motioned to continue this item for 2 weeks; seconded by Vice- Chairman Grace. The motion carried on the following 5-0 Roll Call vote: Board Member Castro Yes Vice-Chairman Grace Yes Board Member Duke Yes Chairman Flury Yes Board Member McElyea Yes Addendum 6.3 RESOLUTION #2011-CRA-007 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CITY OF DANIA BEACH COMMUNITY REDEVELOPMENT AGENCY ("CRA"), AUTHORIZING THE CRA EXECUTIVE DIRECTOR TO Minutes of Regular Meeting 3 Dania Beach Community Redevelopment Agency Tuesday,November 8,2011 —6:00 p.m. TERMINATE THE DEVELOPMENT AGREEMENT WITH DOWNTOWN DANIA BEACH DEVELOPMENT, LLC; PROVIDING FOR CONFLICTS;FURTHER, PROVIDING FOR AN EFFECTIVE DATE. Director Earle City Attorney Ansbro read the title of Resolution#2011-CRA-007. Director Earle read a statement regarding this project which is attached to and incorporated into these minutes. He advised that to date $7M of public funds have been expended on the Parking Garage and the new Cul-de-Sac. Director Earle noted that staff has witnessed many of the unsuccessful attempts by the development team to find financing for the project. He stated that the current economy is to blame for most of the problems. Director Earle suggested issuing a new Request for Qualifications (RFQ) for the City Center project, and explained the primary requirements for the new RFQ. Jamie Cole, Weiss Serota, noted under the agreement the City and the CRA have the right to terminate the contract without cause,just for convenience, with not less than 7 days notice. He clarified that there is no default to the agreement. Michael Moskowitz, Special Counsel to the CRA, explained the consequences to terminating the development agreement with respect to the $700,000.00 of Redevelopment Capital Program (RCP) funds obtained through the 7th Amendment to the Interlocal Agreement (ILA) with Broward County. He advised that the 7th Amendment states that the roadway must be operational by May 1, 2012. Attorney Moskowitz noted that he has a meeting with the County next Thursday to discuss the status of the $700,000.00 if the development agreement is terminated. Hank Thomas, Downtown Dania Beach Development, LLC, thanked the residents and the City for the opportunity to work with them. He stated he is opposed to the dissolution of the development agreement. Mr. Thomas explained: Point 41, he is prepared to develop the roadway; the only issue is what will happen to his building. The concern is that there is no parking for his building if the road is built. Point #2, he is in a position to team up with a new partner who does substantial retail as well as multi-family residential development and has financing available, for which he is prepared to present documents. He requested that the City extend the dissolution of his development agreement for 30 days during which time he would have more specific documentation showing he can bring this project to fruition. Board Member McElyea agreed to a 30-45 day extension. Board Member Duke commented we have given this developer a lot of time and he is doubtful that Mr. Thomas will be successful in obtaining financing in 30 days. He confirmed with Mr. Thomas that he would lose 50-60 parking spaces if the road is built. Board Member Duke stated that we have the real estate and the location, we are not going anywhere; the reality is Mr. Thomas has not been able to obtain financing for this project. He asked the attorneys what documents we need to see in 30 days in order for the City to feel comfortable that this developer was able to deliver. Minutes of Regular Meeting 4 Dania Beach Community Redevelopment Agency Tuesday,November 8,2011 —6:00 p.m. Director Earle responded we have given the developer countless opportunities, and would never recommend a 30 day extension; only to the next Commission meeting. He emphasized that we have a time certain for when our ILA with the County expires. We need to find developers that have financing and move the project forward. Director Earle stated he is willing to extend the termination of the agreement for two weeks, provided it is still dissolved; they look for financing; and if they do not find financing, something is left on the table for the City of Dania Beach. He reiterated that we have delayed this project too many times. Board Member Castro clarified with Mr. Thomas that his partner, Sam Jazayri, is the one who wants the parking spaces in perpetuity. Mr. Thomas confirmed for Board Member Castro that Sam Jazayri is prepared to sell his interest in the property. Board Member Castro suggested tying the 30 day extension to the $700,000.00 to build the roadway. Director Earle noted he could begin to discuss this suggestion with the attorneys. Board Member Duke motioned to approve Resolution #2011-CRA-007, with 15 days notice; seconded by Board Member Castro. The motion carried on the following 5-0 Roll Call vote: Board Member Castro Yes Vice-Chairman Grace Yes Board Member Duke Yes Chairman Flury Yes Board Member McElyea Yes 7. Adjournment Chairman Flury adjourned the meeting at 6:57 p.m. ATTEST: COMMUNITY REDEVELOPMENT AGENCY LOUISE STILSON, CMC PATRICIA A. FLURY CRA SECRETARY CHAIRMAN—CRA Approved: December 7, 2011 DM M BEACH cow"I" Minutes of Regular Meeting 5 Dania Beach Community Redevelopment Agency Tuesday,November 8,2011 —6:00 p.m. Dissolution of City Center Project Good evening CRA Board members, As you are aware, the decision to place the addendum for the dissolution of the Developers Agreement between Downtown Dania Beach Development LLC., and the City of Dania Beach has not been taken lightly. As you all will recall it was during the worst of the market crash in 2008-2009 that we issued an RFQ for development of our new City Center, which at the time was to include, residential,retail, commercial, a new city hall and a new parking garage. We received 7 respondents and the CRA Board chose The Greenhill Development Company as the winner. The Greenhill Development Companywent on to enter into an agreement with the City g h' of Dania Beach as Downtown Dania Beach Development LLC., for the project. The Developers Agreement was executed exactly two years ago this month. During the two years since award of the project the CRA with the assistance of the developer accomplished all of the public sector improvements that were contemplated as a part of the agreement with the exception of the roadway from Federal Highway to the City Center. This means that almost $7 million of public funds have been spent so far on the parking garage and the new cul du sac. Over the past two years and, unlike many in the community you have all been privy to countless unsuccessful attempts by the development team to find financing for even a small non-public sector component of the project. I along with our attorneys have sat down with numerous potential partners of the development team and their attorneys and have been witness to such efforts as the mad dash to get Recovery Bond Financing and the potential creation of an EB-5 area. I hope that we all fully understand that we have been trying to do the seemingly impossible during the worst economy since the Great Depression. And it is that economy that we can blame for most of the financing issues that we have encountered. As you all know, banks as rule for example were making it extremely difficult to get financing. Again, this has been an extremely difficult decision to make, and it is by no means personal towards any member of the development team. Our attempts to move our city forward, improve the quality of life for our residents and increase the tax base by encouraging business development are always at the forefront of my mind on a daily basis. In light of the many unsuccessful attempts by the development team and their partners to get financing for the project, I believe that it is in our best interest to move forward and issue a new RFQ for the City Center Project, minus the hotel component which we do not control. This RFQ would be issued in approximately a week and would have at a least a 30 day period of time in which developers would be able to respond. The primary requirements of the plan would be: 1. A demonstrated ability to write a check for$15 million dollars towards the project 2. Extensive development experience and access to additional capital. A selection committee led by Michael Cannon of Integra Realty Resources would fully vet all of the respondents. It is important to note here that this new RFQ would be open to anyone including the current development team. This issue of the dissolution of the developer's agreement and its ramifications are so important that I have asked both of our CRA Special Counsels to be here. I will first ask Jamie Cole to speak and then I will ask Mike Moskowitz to speak about the $700,000. ------------- 100W.Dania Beach Wd. Dania Reach,Fbrida 33004 DANIA.BEACH tel(954)924-Ml Fax(9"921-2f64 www.D@niaReachCfVLa% Memo To: CRA Board From: Jeremy Earle,Executive Director,Dania Beach CRA CC: Date: 11/8/2011 Re: US-1 Phase II Revised Opinion of Probably Cost Greetings CRA Board members, Attached is a revised Opinion of Probable Cost(OPC) for the US-1 Phase II Project. Below is the breakdown. 1. Base bid estimate-$1,050,063 2. Add Alternate 1 (Utility Realignment)-$599,787 3. Add Alternate 2(6"Water Main Replacement)-$769,876 4. Total including base cost and add alternates(1 &2)-$2,419,726 It is important to remember that these numbers represent a best estimate based on all of the issues that we have encountered the field during the current construction of Phase I landscaping Improvements. Mr. Orlando, the Public Services Director has reviewed the OPC and believes that the city should be able to realize additional savings of at least $535,362 on the water and utilities and $140,000 on the landscaping (based on unit prices) for a total of approximately$675,362 This item is on the agenda for your discussion and direction. Please let me know if you have any questions. Best, Jeremy Earle,ASLA,AICP Executive Director Dania Beach Community Redevelopment Agency PROJECT NAME: Dania Beach US-] ROW Landscape Improvements IBI IBI PROJECT NO.: 27133 GROUP DATE: November 3,2011 PROJECT PHASE: Phase 2(Sheridan St-Stirling Rd)-Bid Set ®pinion of Probable Cost Item No. Item Quantity Unit Price Subtotal Description A General Cop0j#06s = 1. Mobilization&Staging 2.0% lump sum $15,967 $15,967 Of construction sub-total 2. Maintanence of Traffic 5.0% lump sum $39,917 $39,917 Of construction sub-total;incl.design 3. As-built drawings 1.5% lump sum $11.975 $11,975 Of construction sub-total 4. Bonds&Insurance 1.5% lump sum $11,975 $11,975 Of construction sub-total 5. Video Documentation 0.5% lump sum $3,992 $3,992 Of construction sub-total 6. Locates,Testing&Quality Control 1.0% lump sum $7,983 $7,983 Of construction sub-total 7. Permits, Inspections,etc... 1.0% lump sum $20,939 $20,939 Of construction sub-total+ Impact Fee 8. Under round Survey Soft Digs) 1.5% lump sum $11,975 $11,975 Of construction sub-total 9. Erosion control 0.25% lump sum $1,996 $1,996 Curb inlet grotectiw get FDOT General Conditions S • • . 1 1. Clearing&grubbing 12,590 s ft $0.50 $6,295 Per FDOT spec section 110 2. Concrete curb 51 1 If $5.00 $254 Sawcut,remove,&dispose 3. Concrete pavement&base 7,469 1 s ft 1 $2.001 $14,938 Sawcut,remove,&dispose 4. Lar a shade trees 0I each $500.00 $0 Demolish&remove;includin -stump - Demolition AW 1. Fine grading 20,059 s ft $0.30 $6,018 All landscape verges 2. Type"F"concrete curb 51 If $18.00 $915 Per FDOT index 300 3. 4"Concrete Sidewalk 205 sgft $4.50 $921 4"Thick:per FDOT index 310 4. 6"Concrete pavement 0 s ft $5.00 $0 6"Thick;per FDOT index 310 4. Type B stabalization 205 s ft $1.50 $307 FDOT section 160 for sidewalk 6. Asphalt overlay restoration 1.4 tons $260.00 $367 FDOT spec section 300-337 7. Bituminous aggregate base 2 tons $260.00 $551 FDOT spec section 300-337 8. A29regate base 2 tons $50.00 $106 FDOT spec section 901-916 9. 12"Type B stabalization 76 s ft $2.00 $153 FDOT section 160&911 for roadway 10. Export of CUS(prepared soil layer) 371 cud $18.00 $6,686 FDOT sec. 162;excavate&di pose 11. Soil Amendment&Backfill 371 cud $28.00 $10,401 Inc.transit,material.till&grade 12. Ex ort of surplus soil tree pits 107 cud $18.00 $1,9311 Surplus from tree planting pit 13. Tree rate 3 each $800.001 $2,4001 Ironsmith model 4848 w/M480OF-2 1. Cocos nucifera'Ma an' 7 each $1,050.00 $7,350 18'OA;8.5'CT MIN. 2. Cocos nucifera'Ma pan' 20 each $1,125.00 $22,500 22'OA;8.5'CT MIN. 3. Dict os erma album 18 each $630.00 $11,340 12'OA,8.5'CT MIN. 4. Dict os erma album 33 each $720.00 $23,760 14'OA;8.5'CT MIN. 5. Dict os erma album 31 each $810.00 $25,110 16'OA;8.5'CT MIN. 6. Dict os erma album 13 each $900.00 $11,700 18'OA,8.5'CT MIN. 7. Dypsis lastelliana 19 each $472.50 $8,978 12'OA;8.5'CT MIN. 8. Dypsis lastelliana 33 each $540.00 $17,820 14'OA;8.5'CT MIN. 9. D psis lastelliana 32 each $810.00 $25,920 16'OA;8.5'CT MIN. 10. Dypsis lastelliana 13 each $900.00 $11,700 18'OA;8.5'CT MIN. 11. La erstroemia indica'Muskogee' 0 each $618.75 $0 17-18'OA;8.5'STANDARD 12. La erstroemia indica'Tuscarora' 5 each $637.50 $3,188 17-18'OA;8.5'STANDARD 13. Phoenix dact lifera'Med ool' 13 each $5,000.00 $65,000 13'CT;full head 14. Bulnesia arborea 2 each $480.00 $960 17-18'OA;8.5'STANDARD 15. Thrinax radiata 3 each $1,560.00 $4,680 12'OA; 10'CT MIN. 16. Thrinax radiata 10 each $1,820.00 $18,200 14'OA, 10'CT MIN. 17, Thrinax radiata 6 each $2,340.00 $14,040 16'OA;10'CT MIN. 18. Thrinax radiata 0 each $2,632.50 $0 18'OA; 10'CT MIN. 19. Tradescantia vi iniana 414 each $5.00 $2,070 1 al.; 12"tall;full 20. Mulch 63 cud $50.00 $3,128 3"of Florimulch 20.1 Turf rass 1 11972 1 s ft $0.601 $7,183 Solid Sod PROJECT NAME: Dania Beach US-1 ROW Landscape Improvements IBI IBI PROJECT NO.: 27133 cRouP DATE: November 3,2011 PROJECT PHASE: Phase 2(Sheridan St-Stirling Rd)-Bid Set Opinion of Probable Cost Item No. Item Quantity Unit Price Subtotal Description 1. 4"HDPE DR 11 HDD Mainline 5230 If $28.00 $146,440 PE 3608/3408 IPS-Reclaim 2. 3"HDPE DR 11 HDD Mainline 230 If $25.00 $5,750 PE 3608/3408 IPS-Reclaim 3. 1"HDPE DR 11 HDD Cable 2285 If $5.00 $11,425 PE 3608/3408 IPS 4. 3"HDPE DR 11 HDD Lateral 5950 If $25.00 $148,750 PE 3608/3408 IPS-Reclaim 5. 2"HDPE DR 11 HDD Lateral 2275 If $18.00 $40,950 PE 3608/3408 IPS-Reclaim 6. 6"HDPE DR 11 HDD Sleeve 290 If $25.00 $7,250 PE 3608/3408 IPS 7. 4"HDPE DR 11 HDD Sleeve 40 If $22.00 $880 PE 3608/3408 IPS 8. 2"HDPE DR 11 HDD Sleeve 360 If $15.00 $5,400 PE 3608/3408 IPS 9. 4"PVC CL 200 Mainline 30 If $4.00 $120 Pantone Purple 522C incl.fittings 10. 3"PVC CL 200 Mainline 105 If $3.50 $368 Pantone Purple 522C incl.fittings 11. 2 1/2"PVC CL 200 Mainline 335 If $3.25 $1,089 Pantone Purple 522C incl.fittings 12. 3"PVC CL 200 Lateral 40 If $2.50 $100 Pantone Purple 522C,solvent weld 13. 1 1/2"PVC CL 200 Lateral 15 If $2.25 $34 Pantone Purple 522C,solvent weld 14. 1 114"PVC CL 200 Lateral 80 If $2.25 $180 Pantone Purple 522C,solvent weld 15. 1"PVC CL 200 Lateral 620 If $1.75 $1,085 Pantone Purple 522C,solvent weld 16. 3/4"PVC CL 200 Lateral 4575 If $1.50 $6,863 Pantone Purple 522C,solvent weld 17. RainBird 1800 s ra head 509 each 1 $22.00 $11,198 Reclaim nozzle& 5' 1/2"Funny pipe 18. RainBird 1402 bubbler 510 each $16.00 $8,160 Reclaim nozzle& 5 112"Funny pipe 19. 200-PESB-R Control Valve&Box 7 each $325.00 $2,275 Reclaim nozzle& 5 1/2"Funny e 20. FD-101 Single Address Decoder 3 each $175.00 $525 Valve Box 21. FD-102 Two Address Decoder 4 each $250.00 $1,000 Valve Box 22. SP-201 Turf Sensor Decoder 3 each $200.00 $600 23. 4"Gate Valve&Pie Restriant 3 each 1 $600.00 $1,800 Valve Box 24. 3"Gate Valve&Pie Restriant 1 each $500.00 $500 Valve Box 25. 2 1/2"Gate Valve&Pipe Restriant 3 each $450.00 $1,350 Valve Box 26. Bermad 4415 Air Release Valve 3 each $350.00 $1,050 Valve Box 27. Rainbird FS200P 2"Flow Sensor 3 each $500.00 $1,500 Valve Box 28. Rainbird ESP-50 LXD w/IQ V2.0 1 each $8,000.00 $8,000 LXMMPED-cell comm&Rain Sensor 29. Rainbird Maxi-Cable 14-2 OF 2580 each 1 $2.00 $5,160 Double jacketed w/wire connectors 30. Rainbird LSP-1 Turf Sure Protect. 3 each $300.00 $900 Ground rod&Valve box 31. 4"Harco HDPE to PVC Transition 8 each $500.00 $4,000 Full assembly 32. 3"Harco HDPE to PVC Transition 11 each $475.00 $5,225 Full assembly 33. 4"x2"Saddle HDPE w/FIPT Outlet 2 each $300.00 $600 Harco 804801-14 34. 3"x1 1/2"Saddle HDPE w/FIPT Out 3 each $250.00 $750 Harco 803801-14 35. 3"x1 1/4"Saddle HDPE w/FIPT Out 4 each $250.00 $1,000 Harco 803801-14 36. 3"x1"Saddle HDPE w/FIPT Outlet 69 each $200.00 $13,800 Harco 803801-14 37. 2"x1"Saddle HDPE w/FIPT Outlet 28 each $200.00 $5,600 Harco 801801-12 38. 2"Water Meter,Tap&Restoration 1 each $3,000.00 $3,000 Per City of Dania Beach 39. 2"Backflow Preventer&Vault 1 each $2,000.00 $2,000 Per local code;Underground install 40. Electrical 120V Single Phase Drop 1 each $4,000.00 $4,000 Electrical supply and Breaker 41. 3"Mainline Connection 1 each $800.00 $800 Irrigation Subtotal $461,476 Construction Subtotal •• ,343 1. Construction Contingency 1 lump sum $100,000.001 $100,000 2. Concrete Sidewalk Conti enc 1 lum sum $25,000.00 $25,000 Allowances Subtotal •ti Project • 1 • •.3 (gc, const, 2 of 3 T PROJECT NAME: Dania Beach US-1 ROW Landscape Improvements IBl IBI PROJECT NO,: 27133 r6Mf�t'P DATE: November 3,201 1 PROJECT PHASE: Phase 2(Sheridan St-Stirling Rd)-Bid Set ®pinion of Probable Cost Item No. Item Quantity Unit Price Subtotal Descri tion 1. 2"Electric&Conduit(120 Service) 5275 If $26.00 $137,150 Boring HDD &Pull wiring East 2. Street Light Connections 29 each $2,300.00 $66,700 Rewire&Connect Lights East 1Electric&Conduit(West side) 2556 If $26.00 $66,456 Borin HDD &Pull wirin West 4. 2"PE C901 Water Line 1425 If $30.00 $42,750 PE Pie Replace;Cut&Patch Method 5. Water Service Connection 13 each $2,000.00 $26,000 Tap,Connection,Meter&Box 6. Water Meter Impact fees 13 each $3,893.00 $50,609 1"Water Meter 7. 4"Steel Gas Line 2022 If $40.00 $80,880 Subcontract Teco;To install deeper 8. 1"Steel Gas Line 290 If $35.00 $10,150 Subcontract Teco;To install deeper 9. Maintanence of Traffic(MOT) 1 lump sum 4.00% $19,228 Additional MOT 10. As-built drawings 1 lump sum 2.00%1 $9,614 11.1 Permits,Inspections,etc... 1 I lump sum 2.50%1 $12,017 12.1 Construction Continqency 1 lum sum 15.00%1 $78,233 r.. Subtotal -:i n 1. Water Main Design 1 each $15,000.00 $15,000 2. Water Main CA Services 1 each $12,000.00 $12,000 3. Water Main Regulatory Permitting 1 each $20,000.00 $20,000 May not be necessary 4. Water Main Construction 1 each $487,468.00 $487,468 C900,service connections,hydrants 5. Water Meter Impact Fees 16 each $3,893.00 $62,288 9. Permits, Inspections,etc... 1 lump sum 2.50% $12,187 6. Mobilization 1 lump sum 2.50% $12,187 Tap,Connection,Meter&Box 7. Maintanence of Traffic(MOT) 1 lump sum 8.00% $38,997 Additional MOT 8. As-built drawings 1 lump sum 2.00% $9,749 10. Construction Contingency 1 lump sum 20.00% $100,000 Add-Alternates Base-Bid & • •• Total he IMI Gmup,Inc.has no control over the cost of labor,materials,or equipment,the Contractors method of dder nmang prices or competitive bidding or market conditions.Therefore,our opinions of probable mm uetion costs provided for herein are made on the azis of experience and represent our best judgment as Landscape Architects familiar with the omanuction industry.The firm cannot and does not guarantee that proposals,bids or the comtruction cost will not vary from our opimom of probable costs.If the Owner fishes greater assurances as to the commuct-cost,we recommend the employment of an independent cost estimator. 3of3 9 CN k 2 $ \ 7 \ cy K $ % � E . / k. @ / � q 2 7 / 2 § �� £ § / CX t / k q § / o i 3 o / k @ o E 2 Q.) § 2 o u t4 k CL aj aj � / % o % / / a » E C \ o13 2 � C3 o ' @ q : w k B % C rn q o / § / / § : � o . \ f 2 0 q R % kc 0 m 'I / o o \ aj q / E k � v % k § t4V). vl� kru t4 b k t4 t4 � 7 � k k \ # � � co m ui m m.� / 66 § � f a CA CA E 41 g \3 / Q 66 § co s C \ / / O O o § o C t aj t t \ g ° c 2 M M c x k z c c c c CfC : 3k / / / u E o k2 a / V) V) r �' N N � �` � � Vf �f C O H a +� e a, a .,, c ��.. r` �,