Loading...
HomeMy WebLinkAboutR-2012-108 - Authorized Change Order Nos. 1 & 2 for Additional Capital Project Services with Century Building Restoration USA, Inc. for IT Parker Dock Replacement Project not to exceed $6,750.00 RESOLUTION NO. 2012-108 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE CHANGE ORDER NOS. 1 AND 2, AND TO PROVIDE FUNDING FOR ADDITIONAL CAPITAL PROJECT SERVICES WITH CENTURY BUILDING RESTORATION USA INC., FOR THE I.T. PARKER DOCK REPLACEMENT PROJECT IN THE AMOUNT NOT TO EXCEED $6,750.00; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City awarded a contract on April 10, 2012, to Century Building Restoration USA Inc. for the I.T. Parker Dock Replacement Project; and WHEREAS, a contract between the City of Dania Beach and Century Building Restoration USA Inc. was executed for the Project in the amount of$54,260.00; and WHEREAS, structural cracks to the existing pile caps were discovered by the Contractor and two (2) Change Orders were necessary for a total cost of$6,750.00; NOW,THEREFORE,BE IT RESOVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH,FLORIDA: Section 1. That the foregoing "Whereas" clauses are made a part of and incorporated into this Resolution by this reference. Section 2. That the City Commission approves and City officials are authorized to execute Change Order Nos. 1 and 2 in the total sum of$6,750.00; copies of the Change Orders are attached as Exhibits "A" and "B", which are made a part of and incorporated into this Resolution by this reference, for the additional Capital Project services for the pile cap repair with Century Building Restoration USA Inc. on the I.T. Parker Dock Replacement Project. Section 3. That the cost of these Change Orders shall be transferred to the Capital Project Fund — I.T. Parker Dock Project from available budget appropriations in the General Fund-Parks&Recreation, Professional Services Account, Account No. 001-72-01-572-31-10. Section 4. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall be in force and take effect immediately upon its passage and adoption. PASSED and ADOPTED on August 28, 2012. ATTEST: LOUISE STILSON, CMC PATRICIA A. FLURY CITY CLERK MAYOR �pitpIs Fly? APPROVED AS., O F RM AND CORRECTNESS: 1 THO J. RO CITY ATTO EY 2 RESOLUTION#2012-108 Distribution to: CHANGE OWNER X ORDER ENGINEER AIA DOCUMENT G701 CONTRACTOR X Century Building FIELD Project# 12-002 Restoration USA Inc OTHER PROJECT: IT Parketr Dock CHANGE ORDER NUMBER: 1 901 NE 3rd Street Dania (Project name,address) Client Name City of Dania Beach FI INITIATION DATE: 8/6/2012 Street No. 100 W Dania Beach Blvd City/State Dania CONTRACT DATE: You are directed to make the following changes in this Contract: 1- Pile cap under the exisitng dock has several areas where we believe there to be structural Cracks in need of repair there are 8 locations currently marked with paint totlaing 40 linear Feet which will all require partial depth edge repair one area will require the repalcement of reabar see attached photos 3 pages Edge repair $ 2,900.00 Rebar replacemen $ 75.00 2- Pile#3 and# 17 counting from East to West have what is called Brown Eyes rebar is to close to the surface rusting and bleeding through in one location Brown eyes $ 225.00 TOTAL $ 3,200.00 Not valid until signed by both the Owner and Engineer. Signature of the Contractor indicates his agreement herewith including any adjustment in the Contract Sum or Contract Time. The original Contract Sum was...... $54,260.00 Net change by previously authorized Change Orders.... 0.00 The Contract Sum prior to this Change Order was..... $54,260.00 The Contract Sum will be increased/decreased by..... 3,200.00 The new Contract Sum including this Change Order will be..... $57,460.00 The Contract Time will be extended..... 0 The Date of Substantial Completion as of the date of the Change Order therefore is..... no Change Authorized: ENGINEER CONTRACTOR OWNER Address Address By By By Date: Date: Date: t�{ r �o ..4 �qa I 9 � Of g Ft. F ae: r [Ire � • Z� 5�: � ' /I ���/ .� -- — qr � F ff a.� 9 y I ¢ . G. �r;+"{�•r "+ t'+a-ra�� �T�+*�s r •4 fh 5�i�Y. �" .,3�. { rS El•n ��t: it �"��r_. a rw- ll ;v-j y y f Ar -71 i Wi Distribution to: CHANGE OWNER X ORDER ENGINEER AIA DOCUMENT CONTRACTOR X Century Building FIELD Project# 12-002 Restoration USA Inc OTHER PROJECT: IT Parketr Dock CHANGE ORDER NUMBER: 2 901 NE 3rd Street Dania (Project name address) ) Client Nam(City of Dania Beach FI INITIATION DATE 08/13/2012 Street No. 100 W Dania Beach Blvd City/State Dania CONTRACT DATE: You are directed to make the following changes in this Contract: 1- Pile cap under the exisitng dock has 2 areas where we believe there to be structural Concret missing and should be replaced approximtely 7 to 8 LF of full depth repair This repair is on the bottom of the exisiting pile at the West end of the pile cap See Atached Photo Full Depth $ 3,400.00 Rebar replacemen $ 150.00 TOTAI $ 3,550.00 Not valid until signed by both the Owner and Engineer. Signature of the Contractor indicates his agreement herewith including any adjustment in the Contract Sum or Contract Time. The original Contract Sum was...... $54,260.00 Net change by previously authorized Change Orders.... 3,200.00 The Contract Sum prior to this Change Order was..... $57,460.00 The Contract Sum will be increased/decreased by..... 3,550.00 The new Contract Sum including this Change Order will be..... $61,010.00 The Contract Time will be extended..... 3 days The Date of Substantial Completion as of the date of the Change Order therefore is..... no Change Authorized: ENGINEER CONTRACTOR OWNER Address Address By By By Date: Date: Date: 1 �. $;?-.- � .�i•�i Y5 r._51 f } w`�.f 'ram UT 5C, �.0 •L