HomeMy WebLinkAboutR-2021-167 Man-Con, Inc. Change Order for Southeast Second Avenue and Southeast Seventh Street Water Main Replacement ProjectRESOLUTION NO.2021-167 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO APPROVE A CHANGE ORDER FOR THE SOUTHEAST SECOND AVENUE AND SOUTHEAST SEVENTH STREET WATER MAIN REPLACEMENT PROJECT IN AN AMOUNT NOT TO EXCEED THREE HUNDRED NINETY NINE THOUSAND FIVE HUNDRED TWENTY FOUR DOLLARS AND SIXTY SEVEN CENTS ($399,524.67); PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City required services to replace the water main on Southeast Second Avenue and Southeast Seventh Street; and WHEREAS, during the construction, there were many unforeseen conditions, such as unanticipated utilities with which the water main was physically in conflict; and WHEREAS, Man -Con, Inc., the main contractor for the project, re -aligned the water main along several segments, which resulted in a cost overrun in the amount of $155,292.71; and WHEREAS, after the water main was installed, Public Services' Utility Division exercised 65 valves within the project boundary to shut down the existing water main and connect to the newly installed water main; and WHEREAS, in order to properly and safely shut down the existing watermain, a temporary line stop procedure is required to cut the pressurized water flow; and WHEREAS, Man -Con, Inc. will be hiring a specialized subcontractor which will safely shut down the water main at the affected locations; after the shut downs, Man -Con, Inc. will be able to reconnect the existing water main on the side streets and alleyways to the newly installed water main on SE 2nd Avenue; and WHEREAS, the total cost for this additional work is $244,231.96; and in order to complete the additional work summarized above, Man -Con, Inc.'s contract amount of $2,163,955.20 for the project (budgeted in the F22 CIP plan) will be exceeded by $399,524.87; and WHEREAS, this amount will be appropriated via a budget transfer to the following accounts: Revenue - 401-00-00-389-90-02 Appropriated Net Position, Expense - 401-33-02-533- 63-10 Water Distribution Improvements; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above "Whereas" clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That the City Commission authorizes the proper City officials to approve the change order for the "Southeast Second Avenue and Southeast Seventh Street Water Main Replacement Project" in an amount not to exceed Three Hundred Ninety -Nine Thousand Five Hundred Twenty Four Dollars and Sixty Seven cents ($399,524.67). Section 3. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 4. That this Resolution shall become effective immediately upon its passage and adoption. PASSED AND ADOPTED on November 9, 2021. ATTEST: THOMAS SCHNEIDER, CMC CITY CLERK i APPROVED S O FORM AND CO 1 i J THOMAS J. JkNVB CITY ATTORNEY pB� h TAMARA JANO �► MAYOR N 2 RESOLUTION #2021-167 INCORPORATED ENGINEERING CONTRACTORS 10/27/2021 Mr. Dincer Akin Ozaydin, P.E, G.C. Public Services Deputy Director/ City Engineer City of Dania Beach 1201 Stirling Road, Dania Beach, FL, 33004 Project: Dania Beach - SE 2nd Ave and SE 7th St Watermain Replacement RE: Required Additional Contract Funding Dear Mr. Dincer Ozaydin, After multiple meeting and conference calls with the city and engineer of record we have attached our budget analysis, estimating the remaining quantities we anticipate installing in order to complete this project along with change order No. 008, 009, and 010. Several line items overran the estimated quantity listed in the Contract's bid schedule along with the change orders listed will be necessary to complete this project. Due to the unforeseen existing conditions experienced on this project the contract line -item quantities are projecting an overrun in the amount of $155,292.71. The cities operations team has provided us with an approximated number of 22 line stops that will be required in order to shut down the existing water main, along with (2) "hot connections", and (2) repair clamps. This will allow for Man -Con to connect the new water main to the existing water main. To accomplish this utilization of change order No. 008 $207,098.74, No. 009 $14,040.06, No. 010 $23,093.16 totaling $244,231.96 will be needed to connect new water main system to the existing system. This estimate is based off the information known at this time. Change orders No. 008, 009, and 010 were submitted as unit price change orders and billing will be based on what is installed along with the billing of the Contract line items. The attached budget analysis/ line -item billing projections will provide a detailed report of the line items and change orders making up the total additional funding needed in the amount of $399,524.67. Please let us know if you have any questions. Thank you, Anthony Mancini Vice President Man -Con Incorporated Main Office: Palm Beach County Office: 3460 S.W. 11" Street 3020 Fairlane Farms Road Deerfield Beach, Florida 33442 Suite 1, Wellington, Florida 0:954-427-0230 33414 F:954-427-8133 CONTINUATION SHEET s" -; Park at. Ne .Iopmem PAGE i OF 4 PAGES AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contractor's signed Certification, is attached. Use Column I on Contracts where retainage for the items may apply. APPLICATION No.: PERIOD TO: PROJECT NAME: PROJECT #: a1. Nrl_ B C D I IE I I G H I WORK COMPLETED % BALANCE RETAINAGE QUANTITY COMPLETED $ AMOUNT COMPLETED QUANTITY COMPLETED $ AMOUNT COMPLETED TOTAL QUANTITY TOTAL $AMOUNT Contract Items Schedule of Values Section Title Qty Unit Unit Price I Total Cost PREVIOUS PERIOD PREVIOUS PERIOD THIS PERIOD THIS PERIOD COMPLETED TO DATE COMPLETED TO DATE COMPLETED TO FINISH AMOUNT Item No. Description Estimated Quantity Unit of Measure Unit Price Extended Price 1. GENERAL 1.01 General Requirements 1 LS $185,000.00 185,000.00 1.00 185,000.00 1.DO 185,000.00 100.00% 1.02 Mobilization and Demobilization 1 LS $35,000.00 35,000.00 1.00 35,000.00 1.00 35,0DO.00 100.00% 1.03 IStormwater Pollution Prevention 1 LS $10,000.00 10,000.00 0.90 9,000.00 0.10 1,000.00 1.00 10,000.00 100.00% 1.D4 Maintenance of Traffic 1 LS $12,500.00 12,500.00 0.90 11,250.00 0.10 1,250.00 1.00 12,5DO.00 100.00% 1.05 Permitting Allowance 1 AL $5,000.00 5,000.00 0.05 250.00 0.05 250.00 5.00% 4,750.00 GENERAL SUBTOTAL 247,500.00 240,500.00 2,250.00 1 242,750.00 1 98.08% 4,750.00 UTILrrIES 2.01 12" C-900 PVC Water Mein 6,800 LF 69.00 469,200.00 6,427.00 443,463.00 10.00 690.00 6,437.00 444,153.00 94.66% 25,047.00 2.02 12" DIP Water Main 480 LF 90.00 43.200.00 850.00 76,500.00 850.D0 76,500.00 177.08% (33,300.00 2.03 8"C-900 PVC Water Main 420 LF 56.00 23,520.00 388.00 21,728.00 388.00 21,728.00 92.38% 1,792.00 2.04 B" DIP Water Main 45 LF 65.00 2,925.00 31.00 2,015.00 70.00 4,550.00 101.00 6,665.00 224.44% 3,640.00 2.05 6" C-900 PVC Water Main 260 LF 53.00 13,780.00 69.00 3,657.00 355.00 18,815.00 424.00 22.472.00 163.08% 8,692.00 2.06 6" DIP Water Main 325 LF 60.00 19,500.00 287.00 17,220.00 20.00 1,200.00 307.00 18,420.00 94.46% 1,080.00 2.07 4" DIP Water Main 35 LF 66.00 2,310.D0 29.00 1,914.00 10.00 660.00 39.00 2,574.00 111.43% 264.00 2.08 3" HDPE Water Main 10 LF 119.00 1,190.00 0.00 0.000/1 1,190.00 2.09 2-1/2" HDPE Water Main 20 LF 71.00 1,420.D0 0.00 0.00% 1,420.00 2.10 2" HDPE Water Main 300 LF 46.00 13,8DO.DO 385.00 17,710.00 100.00 4,600.001 485.00 22,310.00 161.67% 8,510.00) 2.11 12"x12" DIP Cross 1 FA 824.00 824.D0 1.00 824.00 1.00 824.00 100.00% 2.12 12N 13" DIP Cross 1 FA 593.00 593.D0 1.00 593.00 1.00 593.00 100.00% 2.13 12N6" DIP Cross 2 EA 524.00 1,D48.00 0.00 1.00 524.00 1.00 524.00 50.00% 524.00 2.14 12N12" DIP Tee 3 EA 588.00 1,764.00 2.00 1,176.00 1.00 588.00 3.00 1,764.00 100.00% 2.15 12"x8" DIP Tee 5 FA 485.00 2,425.00 5.00 2,425.00 5.00 2,425.00 100.00% 2.16 12'x6" DIP Tee 42 FA 437.00 18,354.00 48.00 20,976.00 48.00 20,976.00 114.29% 2,622.00 2.17 12"x4" DIP Tee 2 FA 433.00 866.00 3.00 1,299.00 3.00 1,299.00 150.00% 433.00 2.18 IINB" DIP Tee 2 EA 319.00 638.00 1.00 319.00 2.00 638.00 3.00 957.00 150.00% 319.00 2.19 8"A6" DIP Tee 2 EA 281.00 562.00 0.00 1.00 281.00 1.00 281.00 50.00% 281.00 2.20 6`4" DIP Tee 2 EA 229.00 458.00 0.00 2.00 458.00 2.00 458.00 100.00% 2.21 12" DIP 90° Bend 1 EA 399.00 399.00 0.00 1.00 399.00 1.00 399.00 100.00% 2.22 8" DIP 90° Bend 2 EA 214.00 428.00 0.00 3.00 642.00 3.00 642.00 150.00% 214.00 AM DDCUMENT G700- Conn nuator S- for G7D2 1.2-1 CONTINUATION SHEET sa WP,ru saa De P.m PAGE 2 OF 4 PAGES AU1 Doament G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contractor's signed Certification, is attached. Use Column 1 on Contracts where retainage for the items may apply. APPLICATION No.: PERIOD TO: PROJECT NAME: PROJECT#: RID No. B C 1 E H I WORK COMPLETED % BALANCE RETAINAGE QUANTITY COMPLETED $ AMOUNT COMPLETED QUANTITY COMPLETED 6 AMOUNT COMPLETED TOTAL QUANTITY Contract Items Schedule of Values Section Title any Unit Unit Price Total Cost PREVIOUS PERIOD PREVIOUS PERIOD THIS PERIOD THIS PERIOD COMPLETED TO DATE 7604T5..00 COMPLETED TO FINISH AMOUNT Item No. Description Estimated Quantity Unit of Measure III pPt&a = Extended Price 2.23 6" DIP 90° Bend 37 EA 155.00 5,735.00 0.00 39.00 6,045.00 39.00 105.41% 310.00 2.24 12" DIP 45o Bend 81 EA 371.00 30,051.00 40.00 14,840.00 8.00 2,968.00 48.00 17,808.00 59.26% 12,243.00 2.25 8" DIP 45° Bend 2 EA 197.00 394.00 1 0.00 2.00 1 394.00 2.00 394.00 100.00% 2.26 6" DIP 45° Bend 11 FA 143.00 1,573.00 2.00 286.00 12.00 1,716.00 14.00 2,002.00 127.27% 429.00 2.27 KK6" DIP Reducer 4 EA 157.00 628.00 2.00 314.00 3.00 471.00 5.00 785.00 125.00% 157.00 2.28 12" DIP Plugs and Caps 4 EA 738.00 2,952.00 6.00 4,428.00 3.00 2,214.00 9.00 6,642.00 225.00% 3,690.00 2.29 8" DIP Plugs and Caps 1 EA 638.00 638.00 7.00 4,466.00 7.00 4,466.00 700.00% (3,828.00) 2.30 6" DIP Plugs and Caps 50 EA 600.00 30,000.00 32.00 19,200.00 53.00 31,800.00 85.00 51,000.00 170.00% 21,000.00 2.31 2" Plugs and Caps 22 EA 624.00 13,728.00 3.00 1,872.00 22.00 13,728.00 25.00 15,600.00 113.64% 1,872.00 2.32 12" DIP Gate Valve 23 EA 3,442.00 79,16&00 21.00 72,282.00 2.00 1 6,884.00 23.00 79,166.00 100.00% 2.33 8" DIP Gate Valve 4 EA 3,859.00 15,436.00 8.00 30,872.00 8.00 30,872.00 200.00% (15,436.00) 2.34 6" DIP Gate Valve 47 EA 3,456.00 162,432.00 51.00 176,256.00 2.00 6,912.00 53.00 183,168.00 112.77% 20,736.00 2.35 4" DIP Gate Valve 2 EA 1,250.00 2,500.00 3.00 3,750.00 3.00 3,750.00 160.00% 1,250.00 2.36 2-1/2" Curb Stop with Valve Box 1 EA 1,750.00 1,750.00 1 0.00 0.00% 1,750.00 2.37 2" Curb Slop with Valve Box 24 EA 1,400.00 33,600.00 22.00 30,800.00 22.00 30,800.00 91.67 % 2,800.00 2.38 Cut -In and Connect to Existing 4" to 12" Water Main 35 FA 3,500.00 122,500.00 1.00 3,500.00 38.00 1 133,000.00 39.00 136,5DO.00 111.43 % 14,000.D0 2.39 Cut -In and Connect to Existing 2" to 3"Water Main 25 FA 1,583.00 39,575.00 0.00 24.00 37,992.00 24.00 37,992.00 96.00% 1,583.00 2.40 Fire Hydrant Assemblies 20 EA 3,000.00 60,000.00 20.00 60,000.00 1.00 3,000.00 21.00 63,000.00 106.00% (3,000.00 2.41 Bacteriological Sample Points 30 EA 250.00 7,500.00 28.00 7,000.00 28.00 7,000.00 93.33% 500.00 2.42 11" Single, Short Water Services 16 EA 1 1,400.00 22,400.00 17.001 23,800.00 17.00 23,800.00 106.25% 1,400.00 2.43 1" Single, Long Water Services 13 EA 1 1,400.00 18,200.00 11.00 15,400.00 11.00 15,400.00 84.62% 2,800.00 2.44 2" Double, Short Water Services 21 EA 2,000.00 42,DDO.00 18.00 36,000.00 18.00 36,000.00 1 85.71% 6,000.00 2.45 2" Double, Long Water Services 5 EA 2,200.00 11,000.00 7.00 15,4Do.00 7.00 15,400.00 140.00% 4,400.00 2.46 Deflections Under Unforeseen Utility Conflicts 2 FA 20,000.00 40,OD0.00 13.00 260,000.00 13.00 260,000.00 650.00% 220,000.00 2.47 Point Repairs for Sanitary Sewer Mains 10 FA 2,784.00 27,840.00 4.00 11,136.00 6.00 16,704.00 10.00 27,840.00 100.00% 2.48 Point Repairs for Sanitary Sewer Laterals 20 EA 1,425,00 28,500.00 1 6.00 8,550.00 8.00 11,400.00 14.00 19,950.00 70.00% 8,550.DO 2.49 Remove Existing Water Main 200 LF 1 15.00 3,000.00 0.00 200.00 3,000.00 200.00 3,000.00 100.00% 2.50 Remove Existing Fire Hydrant Assemblies 12 FA 805.00 9,660.00 0.00 12.00 9,660.00 12.00 1 9,660.00 100.00% 2.51 Remove Existing Valve Nuts and Boxes 15 EA 735.00 11,025.00 0.00 15.00 11,025.00 15.00 11,025.00 100.00% 2.52 Cut, Cap, Grout, and Abandon Existing Water Main 7,630 LF 4.00 30,520.00 0.00 7,630.00 30,520.00 7,630.00 30,520.00 100.00% UTILITIES SUBTOTAL 1,473,507.00 1,411,971.00 363,478.00 1,775,449.00 6&06 (301,942.00) AIA DOCUMENT G703-COMinuati-Sh.t rorO 2 CONTINUATION SHEET Semmk wnSna D.. -o PAGE1OF4PAGES AIA Dorvment G702, APPLICATION AND CERTIFICATE FOR PAYMENT, Containing Contractor's signed Certification, is attached. Use Column 1 on Contracts where retainage for the Items may appty. APPLICATION No.: PERIOD TO: PROJECT NAME: PROJECT#: a C D I E G H I WORK COMPLETED °/. BALANCE RETAINAGE QUANTITY COMPLETED $AMOUNT COMPLETED QUANTITY COMPLETED $AMOUNT COMPLETED TOTAL QUANTITY TOTAL $AMOUNT Contract It... Scheduk of Values Section Title Qry Unit Unit Price Total Coct PREVOUS PEPoOD PREVIOUS PERIOD THIS PERIOD THIS PERIOD COMPLETED TO DATE COMPLETED TO DATE COMPLETED TO FINISH AMOUNT It.. No. Description Esfimatetl puantity Unitof Measure Unit Price Extended Price ROADWAY 3.01 1" Type SP-9.5 Asphalt Milling and Resurfacing 10,875 Sy 11.00 119,625.00 0.00 10,875.00 119,625.00 10,875.00 119,625.00 100.00% 3.02 4"Thick Sidewalk 133 Sy 54.00 7.182.00 6.00 324.00 6.00 324.00 4.51% 6,858.00 3.03 Asphalt Driveway Restoration 34 Sy 77.00 2,618.00 0.00 34.00 2.618.00 34.00 2,618.00 100.00% 3.04 Concrete Driveway Restoration 10 Sy 167.00 1,670.00 4.00 668.00 4.00 668.00 40.00% 1,002.00 3.05 Type F Curb end Gutter Replacement 38 LF 60.00 2,280.00 0.00 38.00 2,280.00 38.00 2,280.00 100.00 3.06 Asphalt Speed Tables 2 FA 4,013.00 8,026.D0 0.00 2.00 8,026.00 2.00 8,026.001 100.00% 3.07 Remove and Replace Bollards 7 EA 901.00 6,307.001 0.00 7.00 6.307.00 7.00 6,307.00 100.00% 3.08 Solid Tragic Stripe (24" White) - Thermoplastic 454 LF 10.00 4,540.00 0.00 454.00 4.540.00 454.00 4,540.00 100.00% 3.09 Solid Traffic Stripe (12" White) - Thermoplastic 246 LF 2.75 676.50 0.00 246.00 676.50 246.DO 676.50 100.00% 3.10 Solid Traffic Stripe (6" Double Yellow- Thermoplastic 1,600 LF 2.75 4,125.00 0.00 1,500.00 4,125.00 1,500.D0 4,125.00 100.00% 3.11 Solid Traffic Stripe (6" White) - Thermoplastic 65 LF 1.50 97.50 0.00 65.D0 97.50 65.00 97.50 100.00% 3.12 Solid White Arrow - Thermoplastic 1 IA 95.00 96.00 0.00 1.00 95.00 1.00 95.00 100.00% 3.13 Retro-Reflective Pavement Markers 132 EA 6.50 858.00 1 0.00 132.00 858.00 132.00 858.00 100.00% 3.14 Single Post with Signs and Plaques (up to 12 SF total) 3 FA 3,500.00 10,5DO.00 0.00 3.00 10,500.00 3.00 10,500.00 100.00% 3.15 Brick Paver Crosswalks and Speed Tables 93 BY 209.25 19,460.DO 0.00 93.00 19,460.00 93.00 19,460.00 100.00% 3.16 Removal of Existing Pavement Markings and Signage 1 LS 35,085.00 35,085.00 0.00 1.00 35,085.00 1.00 35,085.00 100.00% 3.17 Landscape Removal i LS 23,080.00 23,080.00 1.00 23,080.00 1.00 23,080.00 100.00% ROADWAY SUBTOTAL 246,225.00 11.00 24,072.00 214,293.00 13,482.00 238,365.00 15.45 7,880.00 TOTAL COST 1,967,232.00 1070 580,021.00 2,256,564.00 (289,332.00) AIA DOCUMENT G703. COMinuabon Shaet for G702 CONTINUATION SHEET S—ri Perk axe Oevelnpm dr PAGE 4 GP 4 PAGES AIA Doament G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contractor's signed Certification, is attached. Use Column I on Contracts where retainage for the items may apply. APPLICATION No.: PERIOD TO: PROJECT NAME: PROJECT#: BID NO. B C D I E G H I WORK COMPLETED % BALANCE RETAINAGE QUANTITY COMPLETED SAMOUNT COMPLETED QUANTITY COMPLETED BAMOUNT COMPLETED TOTAL QUANTITY TOTAL $AMOUNT Contract Items Schedule of Values Section Title City I Unit I Unit Price I Total Cost PREVIOUS PERIOD PREVIOUS PERIOD THIS PERIL THIS PERIOD COMPLETED TO DATE COMPLETED TO DATE COMPLETED TO FINISH AMOUNT Item No. Description Estimated Quantity Unitof Measure Unit Price Extended Price CONTINGENCY 1 Replace Cut In IT x 12' Tees with 12' x 12" Tapping Sleeves and valves 1 LS 11,532.70 11,532.70 0.50 5,766.35 0.50 5,766,35 1.00 11,532.70 10D.00% 2 F81 (4) Project Signs 1 LS 4,404.55 4,404.55 1.00 4,4D4.55 1.00 4,404.55 100.00% 3 lF&I Casing Pipe 1 LS 6,922.50 6,922.50 1.D0 6,922.50 1.00 6,922.50 100.00% 4 FBI Corporation, Relocate Valve Box Outside of The Road 1 LS 10,175.00 10,175.00 1.00 10,175.00 1.00 10,175.00 100.00% 5 F81 Corporation, Relocate Valve Box Outside of The Road - Short 1 LS 13,875.00 13,875.00 1.00 13,875.00 1.00 13,875.00 100400% 6 Storm Drain Repair 1 LS 15,774.16 15,774.16 1.00 15,774.16 1.D0 15,774.16 100.00% TOTAL CONTINGENCY 196,723.20 1 56,917.561 1 5,766,351 1 62, 683.91 1 31.86% 1 134,039.29 TOTAL COST AND CONTINGENCY 2,163,955.20 1 1,733,460.56 585,787.35 2,319,247.91 10748% (155,292 71) Change Order ea 4' Line Stops 0 EA 8,358.85 #DIV/0' eb T Line Stops 18 FA 8,853.93 159,370.74 18DD 159,370.74 18.D0 159,370.74 100.00% Bc S" Line Stops D FA 9,897.89 #DIV/01 Bd 12" Line Stops 4 FA 11,932.00 47,728.00 4.00 47,728.00 4.00 47,728.00 100.00% g Water Main Repair Coupling 2 EA 7,02DO3 14,040.06 2.00 14,040.06 2.00 14,040.06 100.00% 12 Hot Connections 2 FA 11,546.58 23,093.16 2.00 1 23,093.16 2.00 23,093.16 100.00% Change Order Total TOTAL CONTRACT w/ CD's TOTAL Contract Overage AIA DOCUMENT-3- Cominuaaon Sheet for G702 10125/2021 244,231.96 244,231 2,563,479.87 (399,524.67) TOTAL Cost Overrun Additional Costs over Contract Connection Number Street Station Size Tie-in Type Shut Down Date Line -Stops? 1 2nd 10+79 12x12 Tee Complete 2 2nd 12+46 6 Coupling Maybe 3 2nd 13+72 6 Valve 4 2nd 14+70 2 Coupling 5 2nd 16+00 6 90 6 2nd 16+95 2 Coupling 7 2nd 18+18 6 90 8 2nd 19+25 2 Coupling 9 2nd 19+35 8 90 10 2nd 19+66 2 Coupling 11 2nd 20+99 6 90 YES 12 2nd 21+22 6 Coupling 13 2nd 24+32 2 Coupling 14 2nd 24+34 6 90 15 2nd 25+76 6 90 YES 16 2nd 27+58 6 90 17 2nd 28+95 2 Coupling 18 2nd 30+22 6 90 19 2nd 30+28 6 Valve 20 2nd 31+49 2 Coupling 21 2nd 34+20 2 Coupling 22 2nd 36+17 6 90 23 2nd 37+82 2 Coupling 24 2nd 37+84 2 Coupling 25 2nd 39+34 6 90 26 2nd 40+92 2 Coupling 27 2nd 42+30 8x8 Tee 28 2nd 43+41 6 90 29 2nd 43+42 2 Coupling 30 2nd 44+70 2 Coupling 31 2nd 45+01 6 Coupling 32 2nd 46+32 2 Coupling 33 2nd 46+33 6 90 YES 34 2nd 47+41 2 Coupling 35 2nd 47+42 2 Coupling 36 2nd 47+58 6 90 37 2nd 49+05 6 90 YES 38 2nd 49+10 2 Coupling 39 2nd 50+36 2 Coupling 40 2nd 50+65 6 90 41 2nd 52+05 6 90 YES 42 2nd 53+00 6 Coupling 43 12nd 53+17 6 Coupling 44 12nd 55+19 6 90 YES 45 12nd 55+25 2 1 Coupling Connection Number Street Station Size Tie-in Type Shut Down Date Line -Stops? 46 2nd 56+44 4 Valve 47 2nd 56+50 2.5 Coupling 48 2nd 57+02 8 Valve 49 2nd 57+31 6 90 Maybe 50 2nd 58+92 6 90 YES 51 2nd 58+97 2 Coupling 52 2nd 60+04 2 Coupling 53 2nd 60+78 2 Coupling 54 2nd 60+95 12x12 Tee YES 55 2nd 64+13 6x6 Tee YES 56 2nd 67+12 6 90 57 2nd 68+86 2 Coupling 58 2nd 68+91 6 90 59 2nd 70+23 Unk Coupling 60 2nd 70+56 6 90 61 7th 20+34 6 90 62 7th 21+34 2 Coupling 63 7th 21+35 8 Valve 64 7th 32+99 12 Cross YES 65 1st 10+11 6x6 Tee Completed 66 2nd 23+05 4" 90 Connection Table Line Item 2.38 38 Line Item 2.39 26 2" Line Stops TBD 4" Line Stops 6" Line Stops 20 8" Line Stops 12" Line Stops 4 1� Calvin, Giordano & Associates, Inc A SAFEWIt COMPANY Change Order No. 8 Project: Dania Beach SE 2nd Avenue and SE 7th Street Water Main Replacement Date of Issuance: 10/5/2021 Effective Date: 10/5/2021 Owner: City of Dania Beach Engineer: Calvin, Giordano & Associates, Inc. Owner Contract No: 20-006 Engineer Contract No: 10-3311.2 Contractor: Man -Con, Inc. Changes in the Contract Documents: Description: Twenty-two Line -stops of Various Sizes Reason for Change Order: Due to existing valves not being able to fully close to shut down the existing water main for the proposed cross street connections to the new 12-inch water main, line -stops are required to be furnished and installed by the Contractor to temporarily shut down the existing water mains for cutting in new connections. Since the work has not yet been performed, the proposed price of this change order is only an estimate. It shall not be considered a lump sum, and line -stops that are not required shall not be compensated for nor will the time extension be granted. Conversely, any additional line -stops that are required beyond the agreed upon amount of this change order shall require a separate approval prior to performing the work. If required, a deductive change order for contract price and contract time shall be issued after the work is complete. Remaining budget from unused pay items shall fund this additional work. The approval of a 110-calendar day extension of contract time detailed below (5 calendar days per line - stop) shall be non -compensatory. The time extension is granted strictly for the furnishing and installing of the line -stops. Attachments: Detailed cost breakdowns showing costs for each size line -stop. Changes in Contract Price# Changes in Contract Times Original Contract Price: Original Contract Times: $ 1,967,232.00 Substantial Completion: 1/18/2022 (270 calendar days) Ready for Final Payment: 2/17/2022 (300 calendar days) (days or dates) Net changes from previous Change Orders: Net changes from previous Change Orders: $ 67,580.86 0 calendar days Contract Price prior to this Change Order: Contract Times prior to this Change Order: $ 2,034,812.86 Substantial Completion: 1/18/2022 (270 calendar days) Ready for Final Payment: 2/17/2022 (300 calendar days) (days or dates) Total Proposal Price of this Change Order: Net Increase of this Change Order: $ 207,098.74 110 calendar days (5 calendar days per line -stop) Contract Price with all Approved Change Orders: Contract Times with all approved Change Orders: Only approved up to $2,163,955.20 until additional funding is Substantial Completion: 5/8/2022 (380 calendar days) received and City provides written confirmation. Ready for Final Payment: 6/7/2022 (410 calendar days) (days or dates) Recommended: Approved: Accepted: By: By: ���-�— By: Engineer Date: Owner Date: 10/5/2021 Date: 10/5/2021 Contractor 0 Calvin, Giordano & Associates, Inc. A SAFEbu4t COMPANY Change Order No. 9 Project: Dania Beach SE 2"d Avenue and SE 71h Street Water Main Replacement Date of Issuance: 10/5/2021 Effective Date: 10/5/2021 Owner: City of Dania Beach Engineer: Calvin, Giordano & Associates, Inc. Owner Contract No: 20-006 Engineer Contract No: 10-3311.2 Contractor: Man -Con, Inc. Changes in the Contract Documents: Description: Water main point repair using repair coupling. Reason for Change Order: This proposal is for the installation of a repair clamp to be installed as a point repair for any location where a "Dry" connection was to be provided by the City utilizing complete valve shutdowns to isolate the connection point but was unable to do so, and the conditions in the field did not allow for a safe "Hot" connection to be performed. The repair clamp will allow the existing water main to remain in service until a line -stop installation can be scheduled for the cut -in connection to the new water main. Since the work has not yet been performed, the proposed price of this change order is only an estimate. It shall not be considered a lump sum, and repair clamps that are not required shall not be compensated fo r. Remaining budget from unused pay items shall fund this additional work. Attachments: Detailed cost breakdown. Changes in Contract Price# Changes in Contract Times Original Contract Price: Original Contract Times: $ 1,967,232.00 Substantial Completion: 1/18/2022 (270 calendar days) Ready for Final Payment: 2/17/2022 (300 calendar days) (days or dates) Net changes from previous Change Orders: Net changes from previous Change Orders: $ 274,6 99.60 (only approved up to $2,163,955.20) 110 days Contract Price prior to this Change Order: Contract Times prior to this Change Order: $ 2,163,955.20 Substantial Completion: 5/8/2022 (380 calendar days) Ready for Final Payment: 6/7/2022 (410 calendar days) (days or dates) Total Proposal Price of this Change Order: Net Increase of this Change Order: $ 7,020.03 (per occurrence; see attached) 0 days Contract Price with all Approved Change Orders: Contract Times with all approved Change Orders: $ 2,163,955.20 (only approved up to this amount until Substantial Completion: 5/8/2022 (380 calendar days) additional funding is received, and City provides written Ready for Final Payment: 6/7/2022 (410 calendar days) confirmation) (days or dates) Recommended: Approved: Accepted: By: By: By:—� Engineer Owner Contractor Date: Date: 10/5/2021 Date: 10/5/2021 Revised: 1/23/2020 0 Calvin, Giordano & Associates, Inc. A SAFEbwlt COMPANY Change Order No. 10 Project: Dania Beach SE 2"d Avenue and SE 7th Street Water Main Replacement Date of Issuance: 10/5/2021 Effective Date: 10/5/2021 Owner: City of Dania Beach Engineer: Calvin, Giordano & Associates, Inc. Owner Contract No: 20-006 Engineer Contract No: 10-3311.2 Contractor: Man -Con, Inc. Changes in the Contract Documents: Description: Hot connection to live water main. Reason for Change Order: The purpose is to address the additional costs and labor requirements to perform a "Hot" connection to a live 6" or 8" diameter water main which are currently under pressure and are unable to be shut down by the City using the existing valves. This pricing is a per occurrence cost and to use at the sole discretion of the Contractor and will be billed concurrently with any applicable Contract line items for the connection to the existing water main system. The Contractor will utilize all good faith efforts to perform any hot connection where needed, provided the conditions allow for such a connection to be made safely. Since the work has not yet been performed, the proposed price of this change order is only an estimate. It shall not be considered a lump sum and shall be subject to change based on number of occurrences. Remaining budget from unused pay items shall fund this additional work. Attachments: Detailed cost breakdown. Changes in Contract Price# Changes in Contract Times Original Contract Price: Original Contract Times: $ 1,967,232.00 Substantial Completion: 1/18/2022 (270 calendar days) Ready for Final Payment: 2/17/2022 (300 calendar days) (days or dates) Net changes from previous Change Orders: Net changes from previous Change Orders: $ 274,679.60 plus $7,020.03 per repair clamp installation (only 110 days approved up to $2,163,955.20) Contract Price prior to this Change Order: Contract Times prior to this Change Order: $ 2,163,955.20 Substantial Completion: /8/2022 (380 calendar days) Ready for Final Payment: 6/7/2022 (410 calendar days) (days or dates) Total Proposal Price of this Change Order: Net Increase of this Change Order: $ 11,546.58 (per occurrence; see attached) 0 days Contract Price with all Approved Change Orders: Contract Times with all approved Change Orders: $ 2,163,955.20 (only approved up to this amount until Substantial Completion: 5/8/2022 (380 calendar days) additional funding is received, and City provides written Ready for Final Payment: 6/7/2022 (410 calendar days) confirmation) (days or dates) Recommended: Approved: Accepted: By: By: By: _ Engineer Date: Owner Date: 10/5/2021 Contractor Date: 10/5/2021 Revised: 1/23/2020