Loading...
HomeMy WebLinkAboutR-2015-004 - Authorizes purchase of additional engineering services from Calvin, Giordano & Associates relating to redesign services for the Southeast Stormwater Drainage Improvements Project - Phase II RESOLUTION NO. 2015-004 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO PURCHASE ADDITIONAL ENGINEERING SERVICES FROM CALVIN, GIORDANO AND ASSOCIATES, RELATING TO REDESIGN SERVICES FOR THE SOUTHEAST STORMWATER DRAINAGE IMPROVEMENTS PROJECT- PHASE II, A STORMWATER FUND CAPITAL PROJECT, IN AN AMOUNT NOT TO EXCEED ONE HUNDRED FIFTY THREE THOUSAND FOUR HUNDRED SIXTY DOLLARS ($153,460.00); AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE AN AGREEMENT FOR SUCH ADDITIONAL SERVICES; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Commission directed the Director of the Public Services Department to seek alternative solutions for the Southeast stormwater drainage issues, and to immediately identify a solution for improvements in that area of the City; and WHEREAS, Calvin, Giordano & Associates, Inc. ("CGA") is the design engineer of record for the Southeast Drainage Improvements Project-Phase II for the City; and WHEREAS, after the engineering redesign and improvements of Phase I of the Project, there is a need to tie in the planned development previously designed for Phase 11; the original design for Phase 11 was conducted in 2008 and there are now design and construction issues that need to be addressed due to the Phase I redesign and improvements prior to Phase 11 of the Project being let for bid; and WHEREAS, the original Phase I Design included a larger pump station that included two (2) pumps; normal operation would be to have a single pump running with a stand-by pump and pumps would alternate in operation (controls were included to allow both pumps to operate during heavier storm events); and WHEREAS, due to input from residents and objection to the granting of easements for a larger proposed pump station under Phase 1, the Phase I1 design will now need to be coordinated and updated,to work in conjunction with the Phase I Project, which is now in operation; and WHEREAS, as part of the value engineering and construction review efforts by the Public Services Department, it was determined that the flood routing calculations need to be reviewed, validated and calibrated; during a heavier storm event, since the Phase I Pump Station is now a single pump station, the Phase 11 Project will need to address the potential additional flow; and WHEREAS, any changes to the calculations will dictate the proper sizing of pipes, drainage structures, pumps and related electrical and system control components; since major excavations and trenching will be undertaken, it is imperative that additional geotechnical work be performed to assess subsoil conditions; and WHEREAS, additional surveying services are also needed for proper grading, drainage and pavement restoration, especially where the existing road ties in with private driveways; further, existing vegetation and trees that may be impacted will need to be properly reflected on the construction drawings; and WHEREAS, capital project engineering costs may not be financed through the Project's planned loan funding using the State Revolving Fund ("SRF") and additional funding for these services is necessary; NOW,THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the foregoing "Whereas" clauses are ratified and confirmed as being true and correct and they are made a specific part of and incorporated into this Resolution by this reference. Section 2. That an agreement with Calvin Giordano & Associates, Inc. for work to be performed for an amount not to exceed One Hundred Fifty Three Thousand Four Hundred Sixty Dollars ($153,460.00) for additional engineering services for the Southeast Stormwater Drainage Improvement Project-Phase 11, is approved. Calvin, Giordano & Associates, Inc.'s Proposal No. 09-2777.9 is attached as Exhibit "A", and it is made a part of and is incorporated into this Resolution by this reference. Section 3. That the proper City officials are authorized to execute the agreement and that the City Manager and City attorney are authorized to make minor revisions to the agreement for such services which are deemed necessary and in the best interest of the City of Dania Beach, provided, however, that no agreement will become effective unless and until City officials complete their execution of it. Section 4. That the cost of all consulting engineering work for the Southeast Stormwater Drainage Improvements-Phase II Project shall be charged to Account No. 403-38- 13-538-63-10; further, these costs shall be funded by transfer of the amount of$153,460.00 from the City's available Stormwater Fund, Professional Engineer Services Account, Account No. 2 RESOLUTION#2015-004 403-38-01-538-31-30 in the amount of $25,000.00 and from the Stormwater Contingency Account, Account No. 403-38-01-538-99-10 in the amount of$128,460.00, leaving a remaining Contingency balance of$107,227.00. Section 5. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 6. That this Resolution shall be in force and take effect immediately upon its passage and adoption. PASSED and ADOPTED on January 27, 2015. ATTEST: �p,RD'S F1 LOUISE STILSON, CMC IfCO A. SALVINO, SR. CITY CLERK MAYOR APPROVED S TO RM AND CORRECTNESS: THOMAS J. ANSBRO CITY ATTORNEY 3 RESOLUTION#2015-004 August 11, 2014 Mr. Robert Baldwin City Manager City of Dania Beach 100 W. Dania Beach Boulevard Dania Beach, FL 33004 RE: Remodel/Redesign Basin 5 Drainage Improvements (Phase II) CGA Proposal No. 09-2777.9 Dear Mr. Baldwin, This proposal is submitted in response to your request for CGA to update the plans and specifications for the Basin 5 Phase II drainage improvements project. The scope of services identified herein includes the remodeling of the Basin 5 area using the current Phase I bid plans, and developing the Phase II plans and specifications to bid documents. Assistance during bidding and construction phase services shall be included under a supplemental agreement. I. Professional Engineering Services A. Civil Engineering 1. Design Services • Review and recalculate the Basin 5 ICPR model to incorporate changes made to the Meadowbrook Pump Station(Phase I). - Provide new pump selection based on the updated ICPR model. - Review and, if needed,Re-design submersible pump stations to accommodate the updated pump selection. - Update site plans and detail sheets to reflect new pump station sizes. August 11,2014 Page 2 of 12 • Review existing topography at the intersection of SE 5th Avenue and SE 3rd Street and provide a design which addresses ADA requirement deficiencies. • Update the Phase II plans based on the redesigned Phase I improvements. • Prepare for and attend four(4)two-hour progress meetings with the City of Dania Beach. • Prepare for and attend one(1)public meeting to answer any questions relative to the Phase II improvements. • Prepare Instrumentation and Control plans to provide SCADA for remote monitoring of the three (3)pump stations. - Electrical engineering provisions for remote monitoring RTUs for the three proposed pumping stations. • Coordinate the closure of the existing drainage wells not intended to be reused. • Update engineer's estimate of probable cost. • Update specifications to meet current standards and new pump selection. • Coordinate soft digs for utility conflict resolution. • SE 3rd Street and SE 3rd Avenue intersection analysis and redesign. Analysis shall include review of the existing storm water runoff patterns. Investigation of subsurface infrastructure in order to clarify discrepancies discovered during the Phase I construction. August 11,2014 Page 3 of 12 Preparation of plans for the redesign of the intersection grading and collection system. 2. Permitting Services • Prepare and submit permit revision packages to the agencies below, and coordinate the process involving their approvals: - South Florida Water Management District(Environmental Resource Permit) - Broward County Environmental Protection and Growth Management Department(If Necessary) - FDEP (Drainage Wells) 3. Assistance during bidding • This proposal does not include assistance during bidding. These services shall be provided under a supplemental agreement. 4. Engineering During Construction • This proposal does not include construction phase services. These services shall be provided under a supplemental agreement. 5. Sub Consultants • Geotechnical Consultant: Provide an engineering report including a description of findings, general site preparation and foundation design recommendations for support, graphic logs of the test borings, and a test boring location plan. - Perform fifty-six(56), Standard Penetration Test(SPT) borings to a depth of 15 feet. B. Electrical Engineering 1. Update electrical site plan August 11,2014 Page 4 of 12 2. Update electrical engineering design for three proposed pump stations due to re-modeling 3. Includes renewed coordination with FPL regarding the revisions in establishing three electrical service points 4. Assistance during bidding • This proposal does not include assistance during bidding. These services shall be provided under a supplemental agreement. 5. Engineering During Construction • This proposal does not include construction phase services. These services shall be provided under a supplemental agreement. II. Professional Environmental Services A. Coordinate with and submit final required documents to the agencies to allow issuance of environmental permits from Broward County, the SFWMD and the ACOE. III. Professional Surveying Services A. CGA shall perform an investigation of the subsurface utilities within the project area in locations determined to have a high probability of potential utility conflicts. CGA shall provide labor services to collect GPS coordinates of underground utilities for up to forty(40)test holes in locations determined by the Engineer of Record (EOR). Using our slurry excavation system we will find and expose existing utilities following the ASCE Standard CFASCE 38-02 Utility Quality Level of Service designation and provide a Level D (Utility record research), Level C (Surveying and Plotting), Level B (Geophysical methods) and level A (Excavation) deliverable product. B. Miscellaneous Survey. 1. Provide topographic/design survey of the intersection of SE 3rd Avenue and SE 3rd Street as directed by the Engineer of Record. August 11,2014 Page 5 of 12 2. Provide design survey at locations specified by the Engineer of Record in order to capture changes to the existing conditions. BASIS OF PROPOSAL • Any opinion of the construction cost prepared by Calvin, Giordano&Associates, Inc. represents its judgment as a design professional and is supplied for the general guidance of the CLIENT since Calvin, Giordano &Associates, Inc. has no control over the cost of labor and material, or over competitive bidding or market conditions. Calvin, Giordano & Associates, Inc. does not guarantee the accuracy of such opinions as compared to contractor bids or actual cost to the CLIENT. • Any outside engineering services, studies, or laboratory testing not specifically mentioned in the Scope of Services will be the responsibility of the CLIENT. All municipal, permit, and agency fees as well as Title Certificates will be paid by the CLIENT. • Basic services outlined within this proposal shall be considered complete when the project plans are submitted to the regulatory agencies for Certification. • Calvin, Giordano&Associates, Inc. is performing the consultant services set forth in this Agreement strictly as a professional consultant to CLIENT. Nothing contained in this Agreement shall create any contractual relationship between Calvin, Giordano &Associates, Inc. and any contractor or subcontractor performing construction activities on the project, or any of CLIENT's other professional consultants. • Calvin, Giordano &Associates, Inc. is performing the surveying services set forth in this Agreement strictly as a professional consultant to CLIENT. Nothing contained in this Agreement shall create any contractual relationship between Calvin, Giordano & Associates and any contractor or subcontractor performing construction activities on the project, or any of CLIENT's other professional consultants. • Calvin, Giordano &Associates, Inc. shall not be responsible for the contractor's schedules or failure to carry out the construction in accordance with the construction documents. Calvin, Giordano &Associates, Inc. shall not have control over or charge of acts or omissions of the contractor, subcontractors, or their agents or employees, or of any other persons performing portions of the construction. • Calvin, Giordano & Associates, Inc. will require that all consultants carry proper insurance, including professional liability insurance, if appropriate. • Permit construction certification will include one partial and one final inspection. August 11,2014 Page 6 of 12 ADDITIONAL FEES The following services are NOT included in this proposal and will be considered Additional Services, which will be addressed in a separate contractual agreement. The services include but are not limited to: • Architectural, structural (i.e., retaining walls, bridges, docks), mechanical (i.e., fire pumps), fire protection, geotechnical and testing, environmental assessment, power, gas, telephone, cable television, site lighting services. • Calculations for needed fire flow for site demands, based on building type use and size, if required. • Calculations of off-site flood stages. • Construction quality control inspections. • Off-site engineering and negotiations for off-site easements, if required(other than as specified in the Scope of Services). • Permit application or negotiation with permitting authorities other than those specifically listed herein. • Preparation of construction contract documents, other than drawings and technical specifications(e.g., bid schedule, project manual); • Professional land surveying not included in the scope of services(i.e., buried utility investigation, easement research, condominium documents,project stake- out and as-built drawings). • Professional services required due to conditions different from those itemized under the Scope of Services or due to events beyond the control of Calvin, Giordano &Associates, Inc. • Professional services required, due to changes in the site plan initiated by the CLIENT, their representatives or other consultants (e.g., architects, landscape architects, etc.) after either design or preparation of the construction drawings has commenced. • Re-review of rejected shop drawings. • Review and approval of Contractor pay requests. • Review of Data supplied by the CLIENT(i.e. GIS data sets, databases, aerial images, etc.)required for integration into this project. • Review of shop drawings for contractor or Client selected alternatives, materials, products, etc. • Special shop drawing annotation and modification to expedite shop drawing approval process. • Updated boundary survey, site evaluation or closing assistance work, unless specified above. August 11,2014 Page 7 of 12 REIMBURSABLE EXPENSES Calvin, Giordano&Associates, Inc. and its consultants will be reimbursed for the printing of drawings and specifications, deliveries, Federal Express services, required travel time and travel expenses, long distance telephone calls, fax transmittals,postage, fees paid for securing approval of authorities having jurisdiction over the project, renderings, models and mock-ups required by CLIENT, as required. Reimbursable expenses and sub-consultant invoices will be billed directly to the CLIENT at a multiplier of 1.25. MEETING ATTENDANCE Due to the difficulties of predicting the number or duration of meetings, no meetings other than those listed above, are included in the Schedule of Fees shown below. Preparation for and meeting attendance, as necessary, will be provided on a time and materials basis and will be billed at the standard hourly rates in accordance with the attached Hourly Rate Schedule. SCHEDULE OF FEES Calvin, Giordano & Associates, Inc. will perform the Scope of Services for a lump sum fee as shown in the proposed Schedule of Fees: PROPOSED SCHEDULE OF FEES I Professional Engineering Services A Professional Civil Engineering Services $99,005.00 Final Engineering SCADA Design $9,280.00 Update Specifications $7,040.00 Utility Coordination $2,000.00 Project Management/General Tasks $6,960.00 Meetings with the Client $2,610.00 Paving, Grading&Drainage Plans $28,120.00 Final Flood Routing Calculations $11,600.00 Update Budget Level Cost Estimate $1,000.00 Quality Control $10,720.00 Engineering Permitting Pre-Application Meeting(1 per Agency) $1,305.00 Review Agency Comments $870.00 Respond to Agency Comments $5,000.00 August 11,2014 Page 8 of 12 Sub-Consultant Geotech Consultant $12,500.00 B Professional Electrical Engineering Services $14,905.00 Electrical Engineering Quality Control Review $1,040.00 Design electrical power feed, circuiting, and $5,000.00 controls. Electrical plans development $4,560.00 Pump Controls Design and Review $1,305.00 Specs preparation including generator sizing and $3,000.00 specs II Professional Environmental Services $3,250.00 Environmental Wetland ERP Permitting $3,250.00 III Professional Surveying Services $36,300.00 Survey SUE $26,300.00 Other Survey Work Activity $10,000.00 IV Meetings not included in I thru III Hourly TERMS OF THE AGREEMENT • All aspects of GIS data development created by Calvin, Giordano &Associates, Inc., will be property of the CLIENT and will be given to the CLIENT at time of project completion. • Calvin, Giordano &Associates, Inc. and the CLIENT agree by their signatures on this document that each party will not hire or attempt to hire any staff from the other party while under contract together. • Calvin, Giordano &Associates, Inc. is preparing and providing drawings,plans, August 11,2014 Page 9 of 12 specifications and other documents as outlined in the scope of services for this Agreement for use in the construction of this project, based upon design and construction criteria prepared and provided by others, including but not limited to the CLIENT and CLIENT's consultants. Calvin, Giordano &Associates, Inc. is not responsible for any errors and omissions in the aforesaid design and construction criteria provided by others. • CLIENT agrees to indemnify, hold harmless and, at Calvin, Giordano & Associates, Inc.'s option, defend or pay for an attorney selected by Calvin, Giordano &Associates, Inc.,to defend Calvin, Giordano & Associates, Inc., its officers, agents, servants, and employees against any and all claims, losses, liabilities, and expenditures of any kind, including attorney fees, any appellate attorney costs, court costs, and expenses, caused by, arising from, or related to any acts, omissions or negligence of CLIENT or its consultants. • CLIENT agrees to limit Calvin, Giordano, &Associates, Inc.'s liability for any and all claims that CLIENT may assert on its own behalf or on behalf of another, including but not limited to claims for breach of contract or breach of warranty, to the amount of fees paid to Calvin, Giordano &Associates, Inc.,pursuant to this Agreement. • Drawings, specifications, and other documents and electronic data furnished by Calvin, Giordano &Associates, Inc. in connection with this project are instruments of service. All original instruments of service shall be retained by Calvin, Giordano &Associates, Inc. and will remain their property,with all common law, statutory and other reserved rights, including copyright, in those instruments. This information provided in the instruments of service is proprietary and will not be shared with others without prior written consent. The CLIENT may request reproducible copies, and all original documents upon payment of all outstanding invoices, and expenses. • In the event of termination in accordance with this Agreement or termination not the fault of Calvin, Giordano &Associates, Inc., Calvin, Giordano &Associates, Inc. shall be compensated for services properly performed prior to receipt of notice of termination,together with Reimbursable Expenses then due. • Invoices for work accomplished to date will be submitted monthly and are payable within thirty(30) days. The CLIENT will pay invoices upon receipt and understands interest charges of 1.5%per month will be applied to any unpaid balance past thirty(30) days. Calvin, Giordano &Associates, Inc. may elect to stop work until payment is received. If work is stopped for thirty(30) days or more, Calvin, Giordano &Associates, Inc. may request compensation for start- up costs when work resumes. • The CLIENT or their representative shall be available to meet with Calvin, Giordano &Associates, Inc. and provide decisions in a timely manner throughout the course of the project. The CLIENT will provide all plans and other pertinent information, which are necessary for Calvin, Giordano & Associates, Inc.to provide complete professional services as outlined in this contract. August 11,2014 Page 10 of 12 • The terms of Agreement shall be valid for the Client's acceptance for a period of thirty(30) days from the date of execution by Calvin, Giordano &Associates, Inc. after which time this contract offer becomes null and void if not accepted formally (evidenced by receipt of an executed copy of this document). All rates and fees quoted in this document shall be effective for a period of six (6) months, after which time they may be renegotiated with the CLIENT. • This Agreement may be terminated by either party upon not less than seven (7) days written notice should the other party fail substantially to perform in accordance with the terms of this Agreement through no fault of the party initiating the termination. Failure of CLIENT to make payments to Calvin, Giordano &Associates, Inc., in accordance with this Agreement, shall be considered substantial nonperformance and cause for termination. MISCELLANEOUS PROVISIONS • CLIENT and Calvin, Giordano & Associates, Inc., respectively, bind themselves, their partners, successors, assigns, and legal representatives to the other party to this Agreement and to the partners, successors, assigns, and legal representatives of such other party with respect to all covenants of this Agreement. Neither CLIENT nor Calvin, Giordano & Associates, Inc. shall assign this Agreement without written consent of the other. • This Agreement represents the entire and integrated agreement between the CLIENT and Calvin, Giordano &Associates, Inc. and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be amended only by written instrument signed by both Calvin, Giordano &Associates, Inc. and the CLIENT. • Unless otherwise provided, this Agreement shall be governed by the law of the place where the project is located. TERMINATION OF THE AGREEMENT • This Agreement may be terminated by either party upon not less than seven (7) days written notice should the other party fail substantially to perform in accordance with the terms of this Agreement through no fault of the party initiating the termination. Failure of CLIENT to make payments to Calvin, Giordano &Associates, Inc., in accordance with this Agreement, shall be considered substantial nonperformance and cause for termination. • In the event of termination in accordance with this Agreement or termination not the fault of Calvin, Giordano &Associates, Inc., Calvin, Giordano &Associates, Inc. shall be compensated for services properly performed prior to receipt of notice of termination,together with Reimbursable Expenses then due. August 11,2014 Page 11 of 12 We appreciate the opportunity to submit this proposal. Calvin, Giordano & Associates, Inc. is prepared with the necessary manpower to proceed with the proposed scope of services upon receipt of the executed authorization. Our personnel are committed to completing the project in a timely manner. Please indicate your acceptance of this proposal by signing below and returning one executed copy of the contract to this office. We look forward to working with you in making this project a success. Sincerely, CALVIN, GIORDANO & ASSOCIATES,INC. Dennis J. Giordano President August 11,2014 Page 12 of 12 Cost of these services are$153,4.60.00 plus hourly as noted in fee breakdown_ ACCEPTANCE OF CONTRACT CALVIN,GIORDANO & ASSOCIATES,INC. By: Date: Name: Dennis J. Giordano Title: President By: Date: Name: Mr. Robert Baldwin Title: City Manager Date: By: Name: Mr. Dominic F. Orlando, P.E Title: Public Works Director As to "scope of services" Hours Summary- Detail Civil Engineering Fort Lauderdale Engineering Permitting Work Activity Position Hrs. Rate Total Pre-Application Meeting(1 Project Manager IV 9 $145.00 $1,305.00 per Agency) Respond to Agency Project Engineer III 40 $125.00 $5,000.00 Comments Review Agency Comments Project Manager IV 6 $145.00 $870.00 Total Engineering Permitting 55 $7,175.00 Final Engineering Work Activity Position Hrs. Rate Total Final Flood Routing Project Manager IV 80 $145.00 $11,600.00 Calculations Meetings with the Client Project Manager IV 18 $145.00 $2,610.00 Paving,Grading&Drainage Project Engineer III 160 $125.00 $20,000.00 Plans Paving,Grading&Drainage Project Manager IV 56 $145.00 $8,120.00 Plans Project Management/General Project Manager IV 48 $145.00 $6,960.00 Tasks Quality Control Project Manager IV 32 $145.00 $4,640.00 Quality Control Associate 32 $190.00 $6,080.00 Engineering VI SCADA Design Project Manager IV 64 $145.00 $9,280.00 Update Budget Level Cost Project Engineer 1I1 8 $125.00 $1,000.00 Estimate Update Specifications Project Engineer III 32 $125.00 $4,000.00 Update Specifications Associate 16 $190.00 $3,040.00 Engineering VI Utility Coordination Project Engineer I1I 16 $125.00 $2,000.00 Total Final Engineering 562 $79,330.00 Sub-Consultant Work Activity Position Hrs. Rate Total Sub-Consultant Geotech Consultant 1 $12,500.0 $12,500.00 0 Total Sub-Consultant 1 $12,500.00 Total Civil Engineering Fort Lauderdale 618 $99,005.00 Electrical Engineering Fort Lauderdale Electrical Engineering Work Activity Position Hrs. Rate Total Design electrical power feed, Project Engineer III 40 $125.00 $5,000.00 circuiting,and controls. Electrical plans development Eng CADD 48 $95.00 $4,560.00 Technician Pump Controls Design and Project Manager IV 9 $145.00 $1,305.00 Review Quality Control Review Associate 2 $190.00 $380.00 Engineering VI Quality Control Review Director 4 $165.00 $660.00 Engineering V Specs preparation including Project Engineer III 24 $125.00 $3,000.00 generator sizing and specs Total Electrical Engineering 127 $14,905.00 Total Electrical Engineering Fort Lauderdale 127 $14,905.00 Environmental Fort Lauderdale Environmental Work Activity Position Hrs. Rate Total Wetland ERP Permitting Environmental 26 $125.00 $3,250.00 Administrator Total Environmental 26 $3,250.00 Total Environmental Fort Lauderdale 26 $3,250.00 Surveying Fort Lauderdale Other Survey Work Activity Work Activity Position Hrs. Rate Total Misc. Survey services Unit 1 $10,000.0 $10,000.00 0 Total Other Survey Work Activity 1 $10,000.00 SUE Work Activity Position Hrs. Rate Total SUE Unit 40 $605.00 $24,200.00 Surveying Fort Lauderdale SUE Work Activity Position Hrs. Rate Total SUE Survey File 20 $105.00 $2,100.00 Compilation Total SUE 60 $26,300.00 Total Surveying Fort Lauderdale 61 $36,300.00 Proposal Total 832 $153,460.00 Hours Summary - Detail Civil Engineering Fort Lauderdale Engineering Permitting Work Activity Position Hrs. Rate Total Pre-Application Meeting(1 Project Manager IV 9 $145.00 $1,305.00 per Agency) Respond to Agency Project Engineer IlI 40 $125.00 $5,000.00 Comments Review Agency Comments Project Manager IV 6 $145.00 $870.00 Total Engineering Permitting 55 $7,175.00 Final Engineering Work Activity Position Hrs. Rate Total Final Flood Routing Project Manager IV 80 $145.00 $11,600.00 Calculations Meetings with the Client Project Manager IV 18 $145.00 $2,610.00 Paving,Grading&Drainage Project Engineer III 160 $125.00 $20,000.00 Plans Paving,Grading&Drainage Project Manager IV 56 $145.00 $8,120.00 Plans Project Management/General Project Manager IV 48 $145.00 $6,960.00 Tasks Quality Control Project Manager IV 32 $145.00 $4,640.00 Quality Control Associate 32 $190.00 $6,080.00 Engineering VI SCADA Design Project Manager IV 64 $145.00 $9,280.00 Update Budget Level Cost Project Engineer 111 8 $125.00 $1,000.00 Estimate Update Specifications Project Engineer 11I 32 $125.00 $4,000.00 Update Specifications Associate 16 $190.00 $3,040.00 Engineering VI Utility Coordination Project Engineer lII 16 $125.00 $2,000.00 Total Final Engineering 562 $79,330.00 Sub-Consultant Work Activity Position Hrs. Rate Total Sub-Consultant Geotech Consultant 1 $12,500.0 $12,500.00 0 Total Sub-Consultant 1 $12,500.00 Total Civil Engineering Fort Lauderdale 618 $99,005.00 Electrical Engineering Fort Lauderdale Electrical Engineering Work Activity Position Hrs. Rate Total Design electrical power feed, Project Engineer III 40 $125.00 $5,000.00 circuiting,and controls. Electrical plans development Eng CADD 48 $95.00 $4,560.00 Technician Pump Controls Design and Project Manager IV 9 $145.00 $1,305.00 Review Quality Control Review Associate 2 $190.00 $380.00 Engineering VI Quality Control Review Director 4 $165.00 $660.00 Engineering V Specs preparation including Project Engineer III 24 $125.00 $3,000.00 generator sizing and specs Total Electrical Engineering 127 $14,905.00 Total Electrical Engineering Fort Lauderdale 127 $14,905.00 Environmental Fort Lauderdale Environmental Work Activity Position Hrs. Rate Total Wetland ERP Permitting Environmental 26 $125.00 $3,250.00 Administrator Total Environmental 26 $3,250.00 Total Environmental Fort Lauderdale 26 $3,250.00 Surveying Fort Lauderdale Other Survey Work Activity Work Activity Position Hrs. Rate Total Misc. Survey services Unit 1 $10,000.0 $10,000.00 0 Total Other Survey Work Activity 1 $10,000.00 SUE Work Activity Position Hrs. Rate Total SUE Unit 40 $605.00 $24,200.00 Surveying Fort Lauderdale SUE Work Activity Position Hrs. Rate Total SUE Survey File 20 $105.00 $2,100.00 Compilation Total SUE 60 $26,300.00 Total Surveying Fort Lauderdale 61 $36,300.00 Proposal Total 832 $153,460.00 Calvin, Giordano & Associates, Inc. J E X C E P T I O N A L S O L U T I O N S PROFESSIONAL FEE SCHEDULE Principal 215.00 LANDSCAPE ARCHITECT Contract Administrator 190.00 Associate,Landscape Architect 165.00 Project Administrator 165.00 Senior Landscape Architect 130.00 Executive Assistant/Clerical 75.00 Environmental Administrator 125.00 Landscape Architect 115.00 ENGINEERING Environmental Specialist 105.00 Associate,Engineering(VI) 190.00 Landscape CADD Technician 95.00 Director,Engineering(V) 165.00 Environmental Assistant 85.00 Project Manager(IV) 145.00 Landscape Inspector/Arborist 105.00 Project Engineer(III) 125.00 Landscape Designer 115.00 Engineer(11) 105.00 Landscape Site Plan Reviewer 130.00 Jr.Engineer(1) 100.00 Engineer Technician 105.00 SURVEYING Senior CADD Tech Manager 115.00 Associate,Surveying 165.00 CADD Technician 95.00 Senior Registered Surveyor 145.00 Traffic Engineer(11) 125.00 Survey Crew 135.00 Traffic Engineer(1) 100.00 Registered Surveyor 130.00 Traffic Technician 90.00 Survey Coordinator 105.00 Permit Administrator 90.00 CADD Technician 95.00 3D Laser Scanner 355.00 DATA TECH DEVELOPMENT Hydrographic Survey Crew 330.00 Building Code Services Associate,Data Tech Dev. 165.00 G.P.S.Survey Crew 155.00 Coastal Engineering GIS Coordinator 145.00 Sub-meter G.P.S 75.00 Code Enforcement GIS Specialist 125.00 Soft Dig(per hole) 480.00 Construction Engineering& Multi-Media 3D Developer 115.00 Utility Locates(per hour) 205.00 Inspection GIS Technician 100.00 Construction Services Sr.Applications Developer 165.00 INDOOR AIR QUALITY SERVICES Contract Government Applications Developer 135.00 Sr.Environmental Scientist 115.00 Data Technologies& Network Administrator 155.00 Environmental Scientist 100.00 Development System Support Specialist 115.00 Emergency Management IT Support Specialist 85.00 CONSTRUCTION Services Associate,Construction 165.00 Engineering GOVERNMENTAL SERVICES Construction Management Director 135.00 Governmental Services Associate,VP 190.00 Construction Manager 125.00 Indoor Air Quality Director of Code Enforcement 145.00 Senior Inspector 100.00 Landscape Architecture& Director of Building Code 145.00 Inspector 90.00 Environmental Services Project Manager 145.00 Construction Coordinator 90.00 Municipal Engineering Grants Administrator 125.00 Planning Code Enforcement Field Supervisor 110.00 EMERGENCY MANAGEMENT Public Administration Code Enforcement Field Inspector 90.00 Director 145.00 Building Official 115.00 Planner 105.00 Redevelopment&Urban Design Building Plans Reviewer 90.00 Assistant Planner 90.00 Renewable Energy Building Inspector 90.00 Resort Development Permit Processor 75.00 PLANNING Associate,Planning 175.00 Surveying&Mapping REDEVELOPMENT&URBAN DESIGN Director of Planning 145.00 Transportation Planning& Revitalization Project Director/Manager 165.00 Planning Administrator 135.00 Traffic Engineering Revitalization Coordinator 130.00 Assistant Director 125.00 Utility&Community Alternative Funding/Technician 100.00 Senior Planner 125.00 Maintenance Services Commercial Zoning Administrator 130.00 Assistant Planner 90.00 Water Resources Management Redevelopment Planner 105.00 Specialist/Downtown Manager 100.00 EXPERT WITNESS Municipal Administrator 165.00 Principal/Associate 330.00 1800 Eller Drive,Suite 600 Municipal Assistant Administrator 130.00 Registered Engineer/Surveyor 280.00 Fort Lauderdale,FL 33316 Municipal Department/Division Head 105.00 Project Engineer 230.00 Phone:954.921.7781 Fax:954.921.8807 In addition to the hourly rates listed above,charges will include direct out-of-pocket expenses such as reproduction,overnight mail,and other reimbursables billed at a multiplier of 1.25. www.cgasolutions.com Effective February 1,2011 Fort Lauderdale West Palm Beach Port St.Lucie Homestead Clearwater Jacksonville Atlanta