HomeMy WebLinkAboutR-2016-087 Authorizes Execution of Change Order No. 1 in the Amount of $66,107.50 to MBR Construction, Inc. for the Dania Beach Ocean Park Revitalization Phase 1 Construction Project. RESOLUTION NO. 2016-087 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO APPROVE AND EXECUTE CHANGE ORDER NO. 1 IN THE AMOUNT OF SIXTY SIX THOUSAND ONE HUNDRED SEVEN DOLLARS AND FIFTY CENTS ($66,107.50) TO MBR CONSTRUCTION INC. FOR THE DANIA BEACH OCEAN PARK REVITALIZATION PHASE I CONSTRUCTION PROJECT; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on November 15, 2015, the City Commission approved Resolution No. 2015-137 awarding MBR Construction, Inc. the Dania Beach Ocean Park Revitalization Project Phase I in the amount of One Million Four Hundred Fifty Nine Thousand Eight Hundred Thirty Five Dollars ($1,459,835.00); and WHEREAS, upon review and recommendation of the Project Engineer at EDSA as well as the Dania Beach Public Services Department Director and the City Engineer, the Administration recommends City Commission approval of Change Order No. 1 in the amount of Sixty Six Thousand One Hundred Seven Dollars and Fifty Cents ($66,107.50), resulting in an adjustment of the original agreement with MBR Construction Inc., to One Million Five Hundred Twenty Five Thousand Nine Hundred Forty Two Dollars and Fifty Cents ($1,525,942.50); NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the foregoing findings are made a part of and incorporated into this Resolution by this reference. Section 2. That the Dania Beach Ocean Park Revitalization Project Phase I Change Order No. 1 summary, a copy of which is attached as Exhibit "A" which is made part of and incorporated into this Resolution by reference, is approved. Section 3. That the City Manager and City Attorney are authorized to make minor revisions to such Change Order No. 1, as are deemed necessary and proper for the best interests of the City. Section 4. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall be in force and take effect immediately upon its passage and adoption. PASSED AND ADOPTED on June 28, 2016. ATTEST: °'Ro's FIRS?. LOUISE STILSON, CMC - A. SALVINO, JR. CITY CLERK MAYOR APPROVED AS TO F N CORRECTNESS: THOMA� . ANS R CITY ATTORNEY 2 RESOLUTION#2016-087 Page 1 of 3 Ilk AN 1020 NW 51st Street, Fort Lauderdale, FL 33309 Phone: (954)486-8404/Fax:(954)486-9579 June 16, 2016 CITY OF DANIA BEACH 100 W. Dania Beach Blvd. Dania Beach, FL 33004 Attn: Ronnie Navarro, Deputy Director I City Engineer Project: Dania Beach Ocean Park 100N. Beach Road Dania Beach, FL 33004 We have compiled a list of extra costs to be incurred due to changes to bid plans by Building Department or field conditions.After last round of discussions, enclosed please find revised change order request. SITE Sht. L101 1)ADA Deck(180 SF) 10 Piles @ $200.00.......................................................................................................... $ 2,000.00 MAT PT Substructure, hardware and IPE deck......................................................... $ 4,200.00 Laborto install ................................................................................................................ $ 4,000.00 Total: $ 10,200.00 2)Showers Credit for custom fabricated IPE shower.................................................................. $ (6,200.00) Add for 2 MDF prefab showers-MAT 2 @$2600.00............................................... $ 5,200.00 Add for concrete foundation for 2 showers 2 @ $250.00...................................... $ 500.00 Add for plumber to connect shower to rough 2 @ $500.00.................................. $ 1,000.00 Total: $ 500.00 Sht. C301 3) Relocation of Utilities Additional waterline work for relocating utilities................................................. $ 12,000.00 Total: $ 12,000.00 Sht. P4-101 4) Dumpster Add floor drains and associated piping for 2 dumpsters....................................... $ 2,200.00 Add backflow preventor.............................................................................................. $ 1,000.00 Add 3"grease trap line from dumpster to grease trap 300LF @ $10.00............. $ 3,000.00 Connect to grease trap .................................................................................................... $ 500.00 Total: $ 6,700.00 5)Add time clocks Sht. E4-101 Add 2 timeclocks in plastic enclosure 2 @ $500.00............................................. $ 1,000.00 Total: $ 1,000.00 Page 2 of 3 6)Site Lighting changes Credit for 13 conduit roughs per old plan @ $500.00............................................. $ (6,500.00) Sht. E4-102 Add B1 Bollards MATS @ $850.00............................................................................ $ 4,250.00 Add B2 Bollards MAT 10 @ $1325.00.......................................................................... $ 13,250.00 Add downlights in curved well and oolite blocks................................................... $ 6,500.00 Add for conduit roughs for 15 bollards @ $500.00.................................................. $ 7,500.00 Add wire pulls for 15 bollards and 10 wall lights (700 LF) ..................................... $ 4,000.00 Concrete foundation for 15 bollards @ $250.00...................................................... $ 3,750.00 Labor to create pathway for electrical lights in curved wall and oolite............. $ 2,000.00 Labor to install lights and bollards(25 Fixtures Total) @ $100.00....................... $ 2,500.00 Total: $ 37,250.00 7a) Beach sand Sift excess sand at portal area and place at dune crossovers; Sifter for 1 week @ $6000.00 .................................................................................. $ 6,000.00 Loader for 1 week @ $5000.00 ............................................................................... $ 5,000.00 Skidsteer for 1 week @ $3000.00 ........................................................................... $ 3,000.00 Hand Laborer for 80 Hrs @ $20.00 .......................................................................... $ 1,600.00 Fuel ............................................................................................................................... $ 1,000.00 Total: $ 16,600.00 7b)Credit for beach sand not imported; 125 CY @$27.00.......................................................................................................... $ (3,375.00) Total: $ (3,375.00) 8)DW Dot Truncated dome in lieu of standard dome ............................................ $ 6,000.00 Total: $ 6,000.00 RR#2(NORTH) 8)Structural changes due to existing conditions Per structural engineer site visit, MBR to drill ends of rebar 1/2" in to beam and patch with corrosive resistant epoxy product to delay corrosion ............... $ 3,500.00 Total: $ 3,500.00 Sht. E2-101 9) Mechanical Add exhaust fan to storage.......................................................................................... $ 2,500.00 Total: $ 2,500.00 Sht. P2-101 10) Plumbing Addbackflow preventor............................................................................................... $ 1,000.00 Total: $ 1,000.00 RR#1(SOUTH) 11)Structural changes due to existing conditions Per structural engineer site visit, MBR has chipped away 3/4" of tie-beam and most of the columns to expose existing rebar. Chip to expose rebar per Engineer's direction; 4 Laborers for 8 Days/256 hrs @ $25.00................................................................ $ 6,400.00 Chipping hammer and bits ...................................................................................... $ 1,000.00 Haul away chipped concrete................................................................................... $ 1,000.00 Total: $ 8,400.00 12) Demolition Complete south restroom demolition (includes slab,gradebeam &4' piles) $ 12,000.00 Cap existing utilities.................................................................................................. $ 2,000.00 Total: $ 14,000.00 SUBTOTAL: $ 116,275.00 OH (15%): $ 17,441.25 Profit(5%): $ 6,685.81 ADD TOTAL: 140,402.06 Page 3 of 3 SEAWALL CHANGES CREDIT 13)Credit for mudset brick pavers,concrete underlay material and limerock base along Whiskey River from portal sidewalk to future Kayak Bldg.............. $ (7,500.00) Total: (7,500.00) RR#1(SOUTH)CREDIT 14)Credit for south restroom building Building....................................................... ................................................................ $ (152,000.00) GeneralConditions................................................................................................... $ 6,032.00 Demolition.................................................................................................................. $ 7,536.00 Overhead..................................................................................................................... $ 14,996.44 Bond............................................................................................................................. $ 1,641.00 Total: $ (121,794.56) TOTAL CREDIT: $ (129,294.56) ADD AND CREDIT SUMMARY TOTAL: $ 11,107.50 ALLOWANCES As per discussions,we offer the following allowances; Temporary Bathrooms......................................................................................... $ 40,000.00 Material Testing................................................................................................... $ 10,000.00 Asbestos Removal ................................................................................................ $ 5,000.00 Total Allowance: $ 55,000.00 OVERALL TOTAL CHANGE ORDER INCLUDING ALLOWANCE: $ 66,107.50 Should you have any further questions or concerns, please do not hesitate to contact me @ 954-444-7141 Michael R. Boss President