Loading...
HomeMy WebLinkAboutR-2016-102 Authorization to Approve Change Order Number One to an Agreement with MBR Construction, Inc. in the Amount of $21,199.32 for the 41st Year CDBG Solar Lighting Project (Bid #16-002). RESOLUTION NO. 2016-102 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO APPROVE CHANGE ORDER NUMBER ONE TO AN AGREEMENT WITH MBR CONSTRUCTION, INC., IN THE AMOUNT OF TWENTY ONE THOUSAND ONE HUNDRED NINETY NINE DOLLARS AND THIRTY TWO CENTS ($21,199.32) FOR THE 41sT YEAR CDBG SOLAR LIGHTING PROJECT (BID NO. 16-002); PROVIDING ASSURANCES; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City's 41s' Year CDBG funded project was designated for the installation of solar lights; and WHEREAS, advertisements for bids were placed in local papers in February 2016 and bids were received on March 18, 2016; and WHEREAS, the City Commission awarded the bid to MBR Construction, Inc. for One Hundred Sixty Four Thousand Six Hundred Sixty Two Dollars ($164,662.00) on June 14, 2016 by Resolution 2016-074; and WHEREAS, the City Commission directed staff to prepare a change order to include the cost for installing three (3) additional solar lights, a copy of which is attached as Exhibit"A", and it is made a part of and is incorporated into this Resolution by this reference; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the foregoing "Whereas" clauses are ratified and confirmed as being true and correct, and they are made a specific part of and incorporated into this Resolution by this reference. Section 2. That that the City Commission approves Change Order Number One to the solar light contract with MBR Construction Inc., in the amount of Twenty One Thousand One Hundred Ninety Nine Dollars and Thirty Two Cents ($21,199.32) bringing the total project cost to One Hundred Eighty Five Thousand Eight Hundred Sixty One Dollars and Twenty Seven Cents ($185,861.27), and authorizes and directs the City Manager to execute same. Section 3. That funding appropriations for this project are available through the CDBG Year 41 Grant Proceeds and are appropriated in the Grant Fund Infrastructure Improvement Account No. 103-39-58-541-63-10. Section 4. That all resolutions or part of Resolutions in conflict with any of the provisions of this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall become effective immediately upon its passage and adoption. PASSED AND ADOPTED on July 26, 2016. ATTEST: 1 LOUISE STILSON, CMC O A. SALVINO, SR. CITY CLERK AYOR RATED 19" APPROVED AS 0 FORM AND CORRECTNESS: 1 �r THOM S J.4A �JS- CITY ATTO Et l 2 RESOLUTION#2016-102 CHANGE ORDER PAGE ONE OF 1 PAGES2 TO OWNER: City of Dania Beach 1CONTRACT FOR:City of Dania Beach,CDBG Solar Light Projects CHANGE ORDER NO:01 Distribution to: 100 West Dania Beach Blvd, OWNER Dania Beach,FL 33004 ENGINEER PERIOD TO: July IS,2016 CONTRACTOR FROM CONTRACTOR: VIA CONSULTANT: MBR Construction Public Utility Management&Planning Services 1020 NW 51st St R O.Box 221890 Fort Lauderdale,FL 33309 Hollywood,FL 33022-1890 CONTRACT DATE: 7/11/2016 CONTRACTOR'S CHANGE ORDER CONTRACTOR: By: Date: State of:Florida: 1. ORIGINAL CONTRACT SUM S 164,661.95 Comity of: 2. Prior Changes 0.00 Subscribed and sworn to before me this day of Notary Public: 3. Net change by this Change Order No $ 21,199.32 My Commission expires: 4.REVISEDCONTRAC"I'AMOUNT(Line1+2+3) $ $185,861.27 CITY OF DANIA BEACH,a Florida Municipal corporation By: Robert Baldwin,City Manager Authorized by action of City Commission of the City of Dania Beach on 2016.