Loading...
HomeMy WebLinkAboutR-2016-130 Authorizes Expenditure of Funds for Services by Premier Design Solutions, Inc. for Engineering Services for Stormwater Drainage Improvements for NE 7th Ave. & Taylor Lane, for FY 2015-2016 RESOLUTION NO. 2016-130 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING AND RATIFYING THE EXPENDITURE OF FUNDS FOR ENGINEERING SERVICES PROVIDED BY PREMIERE DESIGN SOLUTIONS, INC. RELATING TO ENGINEERING SERVICES FOR STORMWATER DRAINAGE IMPROVEMENTS FOR NORTHEAST 7Tx AVENUE AND TAYLOR LANE, FOR FISCAL YEAR 2015-2016, INCLUSIVE OF EXISTING PURCHASES THAT EXCEED AN ANNUAL VENDOR TOTAL AMOUNT OF TWENTY FIVE THOUSAND DOLLARS ($25,000.00); AUTHORIZING SUCH PURCHASES WITHOUT COMPETITIVE BIDDING AND WITHOUT ADVERTISEMENT FOR BIDS IN AN AMOUNT NOT TO EXCEED FIFTEEN THOUSAND SIX HUNDRED DOLLARS ($15,600.00); PROVIDING FOR FUNDING; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Charter of the City of Dania Beach, Part III, Article 3, Section 4, Subsection 0), authorizes the City Manager to purchase supplies, services, equipment and materials for the City government in amounts in excess of the established monetary threshold without competitive bidding and without advertisement for bids if he is authorized to do so in advance by a resolution adopted by the City Commission; and WHEREAS, the Dania Beach Code of Ordinances, Chapter 2, Article 1, Section 2-10, "Monetary thresholds for certain purchases and payment disbursement authorizations", Subsection(a), sets the monetary threshold at$25,000.00 for a vendor each fiscal year; and WHEREAS, the Public Services Department purchased engineering services related to Taylor Lane during the current fiscal year, which services will now exceed the annual Twenty Five Thousand Dollar ($25,000.00) City purchase threshold for a single vendor and now requires City Commission approval; and WHEREAS, the Public Services Director has determined that the engineering services can be obtained at the least cost to the City, without competitive bidding and without advertisement for bids from Premiere Design Solutions, Inc.; and WHEREAS, the Public Services Director utilized Premiere Design Solutions, Inc. for the engineering services related to Taylor Lane drainage improvements; and WHEREAS, the Public Services Director is seeking approval to ratify a contract with Premiere Design Solutions, Inc. in an amount not to exceed Fifteen Thousand Six Hundred Dollars ($15,600.00) attached as Exhibit "A" which is made a part of and incorporated into this Resolution by this reference; and WHEREAS, the Public Services Director is seeking to ratify expenses related to that contract in the amount of Nine Thousand Six Hundred Dollars ($9,600.00) which will bring the annual vendor total to Thirty Two Thousand Seven Hundred Seventy One Dollars and Nineteen Cents ($32,771.19) for Fiscal Year 2015-2016 exceeding the annual Twenty Five Thousand Dollars ($25,000.00)purchase threshold for a single vendor; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above "Whereas" clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That the City Commission approves and ratifies a contract with Premiere Design Solutions, Inc. in an amount not to exceed Fifteen Thousand Six Hundred Dollars ($15,600.00). Section 3. That the City Commission authorizes and ratifies expenses in the amount of Nine Thousand Six Hundred Dollars ($9,600.00) for services provided by Premiere Design Solutions which now exceeds the annual amount of Twenty Five Thousand Dollars ($25,000.00) purchase threshold for a single vendor. Section 4. That funding for the $15,600.00 is available and appropriated in the Taylor Lane Drainage Project Account Number 403-38-30-538-63-10 which has a current remaining project balance of Five Hundred Seventy Two Thousand Six Hundred Fifty Dollars ($572,650.00). Section 5. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 6. That this Resolution shall become effective upon its passage and adoption. PASSED and ADOPTED on Septemb 2016. ATTEST: LOUISE STILSON, CMC SALVINO, SR. CITY CLERK NIOR APPROVED AS F AND CORRECTNESS: THO J. A SBRO CITY ATTORNEY 2 RESOLUTION#2016-130 PREMIERE DESIGN SOLUTIONS, INC 2900 Glades Circle,Suite 700,Weston, FL 33327 PC� z Tel: (954)237-7850 Fax:(954)337-2332 �7�7 December 17,2015 Mr.Ronnie Navarro, P.E. i Deputy Director I City Engineer City of Dania Beach 100 W.Dania Beach Boulevard Dania Beach, FL 33004 i i REF: Professional Engineering Services Taylor Lane Drainage Connection Through Derecktor Boatyard PDS Project Number 13110015.5 Dear Mr. Navarro: Premiere Design Solutions, Inc. (PDS) is pleased to submit this proposal to the City of Dania Beach (Client), to provide professional engineering services for the proposed drainage improvements intended for Taylor Lane, and extending through the Derecktor Boatyard.The project is bounded on the north side by Taylor Lane, Derecktor Boatyard to the south,MarineMax to the west and by Powell Brothers on the east side. It is our understanding from our conversation with the Client on December 16, 2015 that improvements are intended along Taylor Lane and within the Derecktor Boatyard property. PDS will develop engineering plans to be utilized for the construction of the improvements. I i SCOPE OF SERVICES In order to meet the Client's need for this project, PDS will need to complete the following tasks: Task 1—Sketch and Legal Description for MarineMax Parcel-$800(Lump Sum) PDS shall prepare a sketch and legal description for the proposed easement within the MarineMax property on the north side of Taylor Lane adjacent to the 5th Avenue right way owned by the City of Dania Beach. Based upon the previously approved plans locating the proposed 5th Avenue roadway, PDS shall prepare a sketch and legal description intended to be part of the easement document (prepared by the City). PDS shall coordinate the preparation of the sketch and legal description and address any comments that the City would have. i E i j Task 2—Sketch and Legal Description for Derecktor Parcel-$1,000(Lump Sum) PDS shall prepare a sketch and legal description for the proposed easement within the Derecktor property on the south side of Taylor Lane. Based upon our discussions with the City staff, the City intends to connect to the existing Derecktor drainage system in order to provide a drainage outfall for the Taylor Lane Drainage System. The easement will extend from the Taylor Lane right of way and include drainage piping up to the existing outfall into the canal waterway. PDS shall prepare a sketch and legal description intended to be part of the easement document (prepared by the City). PDS shall coordinate the preparation of the sketch and legal description and address any comments that the City would have. Task 3—Topographic Survey of Derecktor Parcel-$800(Lump Sum) PDS shall prepare a topographic survey of the Derecktor parcel.The survey shall include the areas specifically mentioned in the meeting on December 16, 2015 and shall include the areas on the south and west sides of the existing Derecktor dock Inlet where the stormwater currently discharges. The area to be surveyed is roughly 500' by 75'. If additional areas are needed as a result of the drainage analysis,this survey work will be billed on an hourly basis. Task 4—Schematic Plan& Feasibility Analysis-$2,000(Lump Sum) PDS shall attempt to obtain copies of the existing permits(if available)for the Derecktor Boatyard in conjunction with analyzing the topographic information collected, A schematic drawing shall be prepared for the purposes of meeting with the governmental agencies. PDS shall analyze the survey data and permit information to determine impacts to the Derecktor site and if any upgrades will need to be made to their system. PDS shall meet with the governmental agencies (Broward County Department of Planning and Environmental Protection -Drainage) having jurisdiction over this property for drainage and shall discuss the proposal of providing a discharge for Taylor Lane.This meeting shall be the basis for preparing the engineering plans for the proposed discharge. As mentioned in previous discussions with the City, PDS will require assistance from the City staff to obtain approval for the proposed outfall. Current Broward County codes do not allow for an outfall for Taylor Lane since historical flows into an outfall basin cannot be proven. Task 5—Engineering Plans-$5,000(Lump Sum) PDS shall prepare engineering plans depicting the proposed outfall from the Taylor Lane Drainage System through the Derecktor property. Based upon preliminary discussions, the drainage connection will occur on the west side of the Derecktor property and will extend to the existing outfall.The drainage connection to the Derecktor system will be a i controlled discharge so as to not impact the Derecktor drainage system and also to meet drainage code requirements regarding water quality. Task 6—Engineering Permitting-$2,500(Lump Sum) PDS shall submit a permit application to Broward County Department of Planning and Environmental Protection (BCDPEP)for approval. PDS shall address comments provided during the BCDPEP review and will resubmit as needed accordingly. As mentioned in previous discussions with the City, PDS will require assistance from the City staff to obtain approval for the proposed outfall. Current Broward County codes do not allow for an outfall for Taylor Lane since historical flows into an outfall basin cannot C be proven. I Task 7—Engineering Services During Construction-$3,000(Allowance) PDS shall provide the following engineering services during construction for the completion and close-out of the construction of the drainage system through Derecktor property: f ➢ Response to RFI's ➢ Provide consultation and advice to the owner ➢ Participate in inspections and prepare punch list for substantial and final acceptance ➢ As-Built Review ➢ Final Certification and Closeout Reimbursable Expenses PDS has provided an estimate for reimbursable expenses including but not limited to mileage, plan reproduction, etc. The Client will only be billed for expenses incurred. In the event the estimated amount will be exceeded PDS will notify the Client. PROPOSED COST OF SERVICES PDS can complete the tasks as described in the scope of services for a lump sum contract of$12,100.00 and an allowance of$3,000 for task 7. In addition, PDS estimates an allowance of$500 for reimbursable expenses. PROPOSED TIME SCHEDULE PDS estimates completion time for the tasks to be approximately two (2) months. We value the opportunity to provide our professional services on this exciting project. If you decide to accept this proposal, please sign below and return an executed copy to our office. If you have any questions please call us at(954)-237-7850 i f Sincerely, PREMIERE DESIGN SOLUTIONS,Inc. Luis J.Jurado, P.E. President i Contract Terms and Agreements 1. This contract agreement is for a lump sum fee plus reimbursable expenses. Any work performed outside of the scope of work outlined in this proposal will be billed based in the hourly rates provided herein. 2. All permit fees are paid by the Client. Permit fees paid directly by PDS will be invoiced to the Client at cost plus an 18%finance charge. 3. Invoices are due net 30 days from invoice date. 4. Any invoices past due more than 30 days will accrue a 1.5% interest per month fee. 5. Client agrees to pay expenses incurred by PDS including telephone calls, telegrams, shipping and postage, plan reproduction and written document reproduction. Contract Billing Rates Schedule of Fees Personnel PDS Office Rate (Hourly) 1. Principal $165 2. QA/QC Manager $137 3. Project Manager $122 4. Project Engineer $92 5. CAD Technician $65 6. Clerical $47 7. Surveying Crew $186.76 Reimbursable Expenses Rate Unit 1. Plan Reproduction (24"x 36") $2.25/ea 2. Standard Copies(11"x 17") $0.60/ea 3. Standard Copies(8.5"x 11") $0.35/ea 4. Mileage $0.565/ea (2014 rate) i Cost of these services are:$12,100.00 Lump Sum plus an allowance of$3,000 for task 7, plus an allowance of$500 for reimbursable expenses CONTRACT AGREEMENT ACCEPTANCE Premiere Design Solutions,Inc. ?� Date: 12-17-14 By: Name: Luis J.Jurado, P.E. Title: President City of Dania Beach By: j � Date: Name: Ronnie Navarro, P.E. "Approved as to scope of work" BY: Date: • Name: Robert Baldwin City Manager