HomeMy WebLinkAboutR-2017-003 Relates to Change Order No.1 for the Lime Softening Plant Chlorine Upgrade Project to Close Construction, LLC, in the Amount of $40,356.99(2) RESOLUTION NO.2017-003
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, RELATING TO CHANGE ORDER NO. 1 FOR THE LIME
SOFTENING PLANT CHLORINE UPGRADE PROJECT TO CLOSE
CONSTRUCTION, LLC, IN THE AMOUNT OF FORTY THOUSAND THREE
HUNDRED FIFTY SIX DOLLARS AND NINETY NINE CENTS ($40,356.99);
PROVIDING ASSURANCES; PROVIDING FOR FUNDING; PROVIDING
FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City Commission approved Resolution 2015-020 on March 2015
authorizing advertisements for bids; and
WHEREAS, the City Commission approved Resolution 2015-073 on July 28, 2015
attached as `Exhibit A" awarding the bid to Close Construction, LLC in the amount of Two
Hundred Thirty Six Thousand Four Hundred Ninety Three Dollars ($236,493.00) plus Thirty
Thousand Dollars ($30,000.00) for additional contingency work related to Alternates 1 through
4; and
WHEREAS, the project now requires unanticipated additional work to address the
concerns of the Florida Department of Health in Broward County and to also address safety
concerns; and
WHEREAS, a detailed change order is attached as "Exhibit B" in the amount of Forty
Thousand Three Hundred Fifty Six Dollars and Ninety Nine Cents ($40,356.99) outlining the
additional work necessary to address these concerns; and
WHEREAS, the Public Services Director and the City Engineer have decided Alternates
1 through 4, in the amount of Thirty Thousand Dollars ($30,000.00) are no longer necessary; and
WHEREAS, the Public Services Director and the City Engineer recommend approval of
Change Order No. 1 and further request that the Thirty Thousand Dollars ($30,000.00) in
contingency funds be utilized towards the cost of Change Order No. 1, leaving a remaining
balance of Ten Thousand Three Hundred Fifty Six Dollars and Ninety Nine Cents ($10,356.99)
which will require additional funding; and
WHEREAS, the Public Services Director requests that an additional Ten Thousand
Three Hundred Fifty Seven Dollars ($10,357.00) be appropriated from Water Fund Reserves to
provide the additional funds necessary to complete Change Order No. 1;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the above "Whereas" clauses are approved and made a part of and
incorporated into this Resolution by this reference.
Section 2. That the City of Dania Beach, Florida hereby approves Change Order No.
1 to Close Construction, LLC, in the amount of Forty Thousand Three Hundred Fifty Six Dollars
and Ninety Nine Cents ($40,356.99), bringing the total project cost to Two Hundred Seventy Six
Thousand Eight Hundred Forty Nine Dollars and Ninety Nine Cents ($276,849.99) and
authorizes the City Manager to execute the necessary documents.
Section 3. That the City Manager and City Attorney are authorized to make minor
revisions to such documents as are deemed necessary and proper for the best interests of the City.
Section 4. That funding for this change order will be provided by utilizing the Thirty
Thousand Dollars ($30,000.00) in contingency funds as stated above and an additional Ten
Thousand Three Hundred Fifty Seven Dollars ($10,357.00) is authorized to be appropriated from
the Water Fund Reserves account 401-276-00-00.
Section 5. That all resolutions or part of Resolutions in conflict with any of the
provisions of this Resolution are repealed.
Section 6. That this Resolution shall become effective immediately upon its passage
and adoption.
PASSED AND ADOPTED on January 10, 2017.
ATTEST: �P�Is
r
LOUISE STILSON, CMC AMARA J ES
CITY CLERK , MAYOR
APPROVED AS TO tA CORRECTNESS:
THOMAS J. A B O
CITY ATTORNEY
2 RESOLUTION#2017-003
RESOLUTION NO.2015-073
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO
AWARD A BID TO CLOSE CONSTRUCTION, LLC, FOR LIME SOFTENING
PLANT - CHLORINE SYSTEM UPGRADES IN AN AMOUNT NOT TO
EXCEED TWO HUNDRED SIXTY SIX THOUSAND FOUR HUNDRED
NINETY THREE DOLLARS ($266,493.00); PROVIDING FOR CONFLICTS;
FURTHER,PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City Commission approved Resolution 2015-020 authorizing budget
appropriations of$200,000.00 and authorizing advertisement for bids on March 10, 2015;and
WHEREAS, advertisements for bids were placed in local newspapers on April 14, 2015
for Lime Softening Plant Rehabilitation Hypochlorite System Upgrades; and
WHEREAS,a mandatory pre-bid meeting was held on May 1, 2015; and
WHEREAS, the City of Dania Beach opened bids for the Lime Softening Plant
Rehabilitation Hypochlorite System Upgrades on Friday,May 22,2015 at 10:30 a.m.;and
WHEREAS,there were two bidders as follows:
Item Close Construction FL Design
Hypochlorite System $ 236,493.00 $ 467,000.00
Contingency $ 30,000.00 $ 30,000.00
TOTAL $ 266,493.00 $ 497,000.00
Alt 1 Painting Structure,
concrete repairs, door
replacements $ 9,000.00 $ 40,000.00
Alt 2 Roof repair $ 4,200.00 $ 5,000.00
Alt 3 Hurricane screen $ 8,500.00 $ 5,000.00
Alt 4 Tank materials with
UV $ 2,500.00 $ 8,000.00;
The Close Construction bid had one item missing, but it was submitted later (this was
deemed to be de minimis issue); the recommended award amount includes the $30,000.00
contingency that will be utilized to address Alternates 1 through Alternate 4;and
WHEREAS, the bid review committee representing the City of Dania Beach has
determined and recommends that it is advantageous for the City to award the bid to Close
Construction in an amount not to exceed Two Hundred Sixty Six Thousand Four Hundred Ninety
Three Dollars($266,493.00);and
WHEREAS, additional funding in the amount of$66,493.00 is necessary to award this
project;
NOW,THEREFORE,BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH,FLORIDA,AS FOLLOWS:
Section 1. That the foregoing findings are incorporated by reference and made a part
of this Resolution.
Section 2. That the City of Dania Beach, Florida awards the low bid for the project
mentioned above to Close Construction, LLC, in an amount not to exceed Two Hundred Sixty
Six Thousand Four Hundred Ninety Three Dollars($266,493.00).
Section 3. That the proper City officials are authorized to execute an Agreement with
Close Construction.
Section 4. That the original approved amount for this project was $200,000.00 thus
requiring additional funding of $66,493.00 to be funded as a transfer from Water Fund
Contingency Account 401-33-01-533-99-10 in the amount of$11,920.00 and $54,573.00 from
Water Fund Repair & Maintenance Account 401-33-02-533-46-70 to the Water Plant Chlorine
Upgrade Project Account 401-33-41-533-63-10.
Section 5. That all resolutions or part of Resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 6. That this Resolution shall become effective immediately upon its passage
and adoption.
PASSED AND ADOPTED on July 28,2015.
2 RESOLUTION#2015-073
ATTEST: �ogt's
1
LOUISE STILSON, CMC CO A. SALVINO, SR
CITY CLERK � � YOR
APPROVED AS TO O AND CORRECTNESS:
r l
THOMAS J. SBRO
CITY ATT09EY
3 RESOLUTION#2015-073
CHANGE ORDER 1 AL4 DOCUMENT G702 PAGE ONE OF 1 PAGES 2
TO OWNER: City of Dania Beach PROJECT: Lime Softening Plant Distribution to:
100 West Dania Beach Blvd. Rehabilitation Hypochlorite =OWNER
Dania Beach,FL 33004 System =ENGINEER
DATE: 10/24/2016 =CONTRACTOR
FROM CONTRACTOR: VIA CONSULTANT:
Close Construction,LLC. Public Utility Management&
301 NW 4th Avenue &Planning Services,Inc. PROJECTNOS:
Okeechobee,FL 34972 P.O.Box 221890
CONTRACT FOR: Construction Hollywood,FL 33022 CONTRACT DATE: August 1.9,2015
CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge,
Application is made for payment,as shown below,in connection with the Contract information and belief the Work covered by this Application for Payment has been
Continuation Sheet,AIA Document G703,is attached. completed in accordance with the Contract Documents,that all amounts have been paid by
the Contractor for Work for which previous Certificates for Payment were issued and
payments received from the Owner,and that current payment shown herein is now due.
1. t'iRl(.i1N AL C.`ONTR�C t'StiNT 266,193.CIll
2. Nei._eh;utge by C:'hange.Orders S 10,356.99 CONTRACTOR:
3, CONTRACT S(A4TODATE(Lino t1.2) `>R 276,849 a)0
CHAN(3h ORDER SUMMARY ADDITIONS DEDUCTIONS By: Date: 1
ota c anges approve Thom— as�ose,President
in previous months by Owner State of:Florida County of Okeecho ee i JulSubscribed and sworn to before me this 1� day of s 6.4 Ju
Total approved this Month(PENDING) Notary Public: Ck-
My Commission expir t'L•`� SHERYI,L.WELLS
OTAl S $0.00 $0,00 FF064021
NET(.IlA1vG13S by Change Order $0.0(1
CITY OF DANIA BEACFT ov' P tRES:NOitl1b0r 16.2017
Change order to address Health Department issus and valves for safety at chlorine feed and transfer By: Date:
State of:Florida County of.Okeechobee
Subscribed and sworn to before me this day of
Notary Public:
My Commission expires:
AIA DOCUMENT G702•APPLICATION AND CERTIFICATION FOR PAYMENT-1992 EDInON,AIA -01992 THE AMERICAN INSTITUTE OF ARCHrTECTS,1735 NEW YORK AVE.,N.W„WASHINGTON,DC 20005-5292
Users may obtain validation of this document by requesting a completed AIA Document D401-Certification of Document's Authenticity from the Licensee.
Note:items in RED FONT are automatically calculated from the G703 form or from items within this G702 For►n. Igo NOT hand enter these items on this sheet.
Close Construction, LL i PAGE 2 of2 PAGES
301 NW 4th Avenue
CHANGE ORDER:
Okeechobee, FL 34972 APPLTCAMMD-ATE: -To—.24.2016'
City of Dania Beach, Lime Softening Plant Rehabilitation-Design/Build Sodium Hypochlorite System Upgrade
Schedule of Values I -PERIOD TO: 101016
42
ARCHITECT'S PROJECT NO:
01z
A B C D E F G H
VVUKK L;UMFLh I ED MA7ERR= TOTALyo
ITEM SCHEDULED )LIs —PRESENTLY -___C0MF[= ALANCE___RETAINkGE-
DESCRIPTION OF WORK -VALUE APPLICATFOR--THIS-171MD STORED----AND-STORED TO FIN --UFVARIABLE
(D-�E) (NOT IN G) _ SATE)
RATE)
--D-M E) (D
I Owner Allowance I Contingency $30,000.00 $30,000.00
2 Mobilization/Demobilization $12,000.00
$12,000.00
3 Bonds/Insurance $6,000.00 $5,000.00
4 Submittals $4,500.00 $4,500.0-0
5 Permits $5,000.00, $5,000.00
Design I Build Sodium Hypocholorite System Upgrade
.... . ......
6 jDesign Fees $5,000.00 $5,000.00
7 IDemolition $8,293.00 $8,293.00
8 Chemical Metering Pump Skids $120,000.00 $120,000.00
9 Chemical PipingNalves $20,000.00 $20,000.0.0
10 Chemical Storage Tanks $32,000.00 $32,000.00
11 Electrical Work $7,500.00 $7,500.00
12 Exhaust Fan&Louver $5,000.00 $5,000.00
13 Overhead Door $7,500.00 $7,500.00
14 CMU Infills $4,000.00 $4,000.90
15 Restoration $700.00 $700.00
16 Change Order#1 _V6,35-6.99 $10,356.99
17
18
GRAND TOTALS $276,849.99 $0.00 $0.00 $0.00 $0.0 $276,849.99 $0.00
Usem may obtain validation of this document by requesting of the license a completed AlA Document D401 -Certification of Document's Authenticity
bosv_ LLC-
AIA DOCUMENT G703,CONTINUATION SHEET FOR G702-1992 EDITION-AIA-01992
THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORX AVENUE,N.W.WASHINGTON,D.C. 20006-5232 G703-1992
LO
b- E
Construction, L L C General Construction
st.Lic.#CGCo48773 Construction Management
October 31,2016
Mr.Fred Bloetscher,P.E.
Public Utility Management&Planning Services,Inc.
P.O.Box 221890
Hollywood,FL 33022
Re: CHANGE ORDER PROPOSAL-Contract for Lime Softening Plant Rehabilitation—Hypochlorite System
Dear Fred:
Below is our proposal to furnish labor,material,and equipment necessary to:
• Furnish and install new wood rafters and ceiling covering,made of Starboard in the Hypochlorite room
• Furnish and install transfer pump and control panel for Hypochlorite system
• Furnish and install foot cutoff valve for water main
• Paint touch up on edges of accelator launders
• Interior sandblasting and coating of Chemical Containments
ADD $ 4,906.85 350 SF Starboard sheets&associated materials/fasteners
ADD $10,677.00 Transfer Pump,Control Panel,bracket&associated piping
ADD $ 1,150.00 Electrical labor necessary for installation of pump&control panel
ADD $ 2,501.61 Foot cutoff valve for water main
ADD $10,760.00 Paint Touch Up—Launders edges
ADD $ 9,845.00 Sandblast&Coat Chemical Containments
$39,840.46 Subtotal
LESS ( 5,380.00) Deduct J Split cost of Paint Touch Up*
$34,460.46 Adjusted Subtotal
$ 5,169.07 Contractor Overhead&Profit @ 15%
$ 344.60 Insurance @ 1%
$ 382.86 Bond @ 1.111%
$40,356.99 TOTAL ADD FOR THIS WORK
LESS ($30,000.00) Contingency Amount included on Contract
$10,356.99 TOTAL ADD FOR THIS CHANGE ORDER PROPOSAL
*Close Construction is willing to split the cost of materials and labor to perform the touch up painting of the rusted areas
on the edges of the launders with the City.
We respectfully request that you advise us of your decision with regard to this additional proposed work. We are unable
to proceed with this work until we receive your written instructions in this matter. Please feel free to contact me should
have any questions or concerns. Thank you for your consideration.
Sincerely, f c
Sheryl Wells
Project Management Assistant
Phone 863.467.0831 www.closeconstruction.us 301 NW e Avenue
Fax 863.763.6337 Page 1 of 1 Okeechobee,FL 34972