Loading...
HomeMy WebLinkAboutR-2017-123 Authorizes City Manager to Apply for 2017/18 Complete Streets & Other Localized Initiatives of Grant Program to Provide Funding for Improvement of NW 1 St, between Bryan Rd. and Federal Hwy. RESOLUTION NO. 2017-123 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO APPLY FOR THE 2017/2018 COMPLETE STREETS AND OTHER LOCALIZED INITIATIVES GRANT PROGRAM TO PROVIDE FUNDING FOR THE IMPROVEMENT OF NW 1ST STREET, BETWEEN BRYAN ROAD AND FEDERAL HIGHWAY, WITHIN THE DANIA BEACH MUNICIPAL BOUNDARIES;PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS,the Complete Streets and Other Localized Initiatives Grant Program("CSLIP") is administered by the Broward County Metropolitan Planning Organization(the "MPO"); and WHEREAS, the Broward MPO CSLIP program provides funding for the design and construction of small transportation projects that will improve mobility and safety for all transportation users; and WHEREAS, the proposed grant related transportation project was presented to the CRA Board at its September 26, 2017 meeting and street improvements were identified in the adopted CRA Plan; and WHEREAS,the City of Dania Beach(the"City")will be submitting an application for the 2017/2018 CSLIP with a request for approximately One Million Eight Hundred Thousand Dollars ($1,800,000.00)to provide funding for CSLIP improvements along NW 1st Street,between Bryan Road and Federal Highway(the "1st Street Project"); and WHEREAS,the proposed NW 1st Street improvements are supported by the City of Dania Beach and are generally described to include NW 1st Street (Federal Highway to Bryan Road) — roadway reconstruction, paving, drainage, on-street parking, sidewalks, bike and sharrow lanes, pavement markings, signage, FEC railroad pedestrian crossing improvements, and pedestrian improvements to the C-10 canal roadway bridge; and WHEREAS,the City owns, operates and maintains the NW 1 st Street right-of-way; and WHEREAS,the CSLIP does not require a City match,however the City will be responsible for any construction costs exceeding the CSLIP cap of Two Million Dollars ($2,000,000.00).; and WHEREAS,the City is responsible for all operations and maintenance costs or additional enhancements applicable to the lst Street Project; and WHEREAS,the Florida Department of Transportation(FDOT) shall design and construct the 1st Street Project; NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH,FLORIDA: Section 1. That the foregoing"Whereas"clauses are made apart of and incorporated into this Resolution by this reference. Section 2. That the 2017/2018 CSLIP application for the 1st Street Project in the City of Dania Beach, to be submitted by the City of Dania Beach, Florida to the Broward County MPO is approved. Section 3. That the City Manager and City Attorney are authorized to make minor revisions to the application and agreement as are deemed necessary and proper for the best interests of the City and grant eligibility. Section 4. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall be in force and take effect immediately upon its passage and adoption. PASSED AND ADOPTED on October 10, 2017. ATTEST LOUISE STILSON, CMC TAMARA JAM S CITY CLERK , moo, MAYOR A� 1 APPROVED A O FORM AND CORRECTNESS: THO S J. NS R CITY ATTqRNEY 2 RESOLUTION 42017-123