Loading...
HomeMy WebLinkAboutR-2017-138 Authorizes the Purchase of a Lifeguard Tower Without Competitive Bidding and without Advertisement for Bids, from Industrial Design Research, Inc. RESOLUTION NO. 2017-138 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO PURCHASE A LIFEGUARD TOWER WITHOUT COMPETITIVE BIDDING AND WITHOUT ADVERTISEMENT FOR BIDS, FROM INDUSTRIAL DESIGN RESEARCH, INC. WHICH ITEM IS EXPECTED TO EXCEED THE ANNUAL VENDOR THRESHOLD OF TWENTY FIVE THOUSAND DOLLARS ($25,000.00) FOR A SINGLE VENDOR IN A FISCAL YEAR; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Charter of the City of Dania Beach, Part 111, Article 3, Section 4, Subsection 0), authorizes the City Manager to purchase supplies, services, equipment and materials for the City government in amounts in excess of the established monetary threshold without competitive bidding and without advertisement for bids if he is authorized to do so in advance by a resolution adopted by the City Commission; and WHEREAS, the Dania Beach Code of Ordinances, Chapter 2, Article 1, Section 2-10, "Monetary thresholds for certain purchases and payment disbursement authorizations", subsection (a), sets the monetary threshold at Twenty Five Thousand Dollars ($25,000.00) for a vendor for each fiscal year; and WHEREAS, the Parks & Recreation Director has obtained two (2) written quotes from the only two lifeguard tower manufacturing companies in the United States which quotes are attached as Exhibit"A"; and WHEREAS, initial estimates from the two (2) vendors indicate the project will be estimated to cost a not-to-exceed amount of Forty Four Thousand Dollars ($44,000.00) including freight and delivery; and WHEREAS, the Parks and Recreation Director recommends purchasing the lifeguard tower from Industrial Design Research, Inc., of Santa Ana, California, as the tower it manufactures is best suited to the needs of Dania Beach; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above "WHEREAS" clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That the City Commission authorizes the City Manager to purchase a lifeguard tower from Industrial Design Research, in an amount not to exceed Forty Four Thousand Dollars ($44,000.00) plus related freight costs without competitive bidding or advertisement for bid. Section 3. That funding for this purchase has been planned and appropriated in the Ocean Rescue Division Account No. 001-72-02-572-62-10. Remaining necessary funding will be transferred from Ocean Rescue Division Account No. 001-72-02-572-4650 Building Maintenance as purchase is expected not to exceed Forty Four Thousand Dollars ($44,000.00) including freight. Section 4. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall be in force and take effect immediately upon its passage and adoption. PASSED AND ADOPTED on November 14, 2017. ATTEST: �APQ's FiTc LOUISE STILSON, CMC , TAMARA JAO CITY CLERK MAYOR ATED �`r APPROVED A ORM AND CORRECTNESS: r� A THOMAS J. S O CITY ATTORNE 2 RESOLUTION#2017-138 Exhibit A INDUSTRIAL DESIGN RESEARCH 3121 West Central Avenue,Santa Ana,CA 92704/Phone:(714)420-0695/email:indesre@sbcgiobal.net QUOTE October 7,2017 Michael Huck Dania Beach Ocean Rescue 754-235-4998 City Description Unit Price TOTAL 1 APEX(490 Stairs, Galvanized Structure included) $29,696.00 $29,696.00 1 Rear Lift Structure $1,085.00 $1,085.00 1 RearWndow/Shutter $1,215.00 $1,215.00 1 Rescue Board Locker $798.00 $798.00 1 Blue Gel-Goat $785.00 $785.00 1 Insulated Roof $825.00 $825.00 1 Lateral Sliding Windows $1,255.00 $1,255.00 1 Palletize and Load $435.00 $435.00 TOTAL $W,094.00 Shipping:Santa Ana,CA to Dania Beach, FL(Contact Freightquote.com) Quote good for 30 days Terms: Net 30(after delivery and inspection) CONDITIONS OF SALE(APPROVAL SIGNATURE REQUIRED) 1. Buyer shall properly operate and maintain each tower per IDR's guidelines,as updated from time to time. 2. Buyer shall be solely responsible for denying access to each tower to the public. Only persons authorized by Buyer shall be allowed access to each tower. The towers are not designed for public use. 3. Buyer shall indemnify and hold IDR harmless for any and all damages,claims,causes of action and injuries by any person who is not an authorized agent of Buyer as a result of any contact with a tower,excluding any patent defects in a tower. 4. Buyer is solely responsible for the deployment of and securing the towers against environmental and weather conditions. Quotation,terms and conditions of sale approved by: Signed Title Date This rate is only available for shipments meeting this quote's exact criteria,booked through Freightquote and moved with a Freightquote bill of lading within 24 hours of this quote. Base freight $7,194.12 Fuel surcharge $0.00 Total $7,19412 USD Estimated transit: 5 business days Thank you for using Freightquote<https://protect-us.mimecast.com/s/INZmB7CkxN4UY>.We appreciate your business. From: Brad Jordan Sent: Monday, October 09, 2017 4:26 PM To: 'Tim McBride' Subject: FW: Updated Capacity charts Hey Tim,this just came out, unfortunately not great news. Everything is working against us here. Below are the two capacity charts that are relevant to your loads,outbound has plummeting capacity, lots of freight,very few trucks,so rates are being bid up. Likewise inbound SE also has low capacity, meaning nobody is wanting to go into the SE. Many drivers are flying to Puerto Rico to help with their back-long. And then the additional BS highlighted below. I guess drivers went on strike about the Federal ELD mandates. 3 Felicet Mark From: Huck, Michael Sent: Thursday,October 12,2017 3:14 PM To: Felicetty, Mark Subject: FW:Ship to Dania Beach, FL. Attachments: imaged Jpg;image002}pg;image003JP9 This is the latest that 1 have. Pretty vague From: Dave Stollery[indesre@sbcglobal.net] Sent:Tuesday, October 10, 2017 1:06 PM To: Huck, Michael Subject: FW:Ship to Dania Beach, FL. Michael,Here's the shipping info. Unfortunately,the rates are high because of increased traffic due to the storm damage.These rates will work if you prepay before shipping. Dave From: Brad Jordan [mailto:Brad.Jordan@freightquote.com] Sent:Tuesday, October 10, 2017 9:45 AM To: 'Dave Stollery' Subject: RE:Ship to Dania Beach, FL. Hi Dave, A little explanation in case anyone gets sticker shock on this quote,the market is crazy right now,especially CA > FL. It just can't be helped. I have a customer that ships standard full truckloads weekly from Commerce CA to southern FL, his rates have gone from$4700 to$6,500 Attached below your quote is an email that I send to that other customer trying to explain the crazy high rates right now. From: Dave Stollery[mailto:indesre@sbcglobalnet] Sent:Tuesday, October 10, 201710:50 AM To: Brad Jordan<Brad.Jordan@freightquote.com> Subject: Ship to Dania Beach, FL. Brad, Please quote the following: CA. 92704 to FL.33004 Wide load, 11'6"W x 9'8" H x 12' L. Plus 4'W x 17' L x 2'H Total weight 4000 Ibs Dave Stollery industrial Design Research (714)420-0695 1 ALJm�ff R,A BA USCHIF-L; ?PRISFS PVC Bausch Watch Tower Division inc. DATE- OCTOBER 9,2017 EXPIRATION DATE:February 9,2018 2 Nfichael Huck Ocean Rescue Chief City of Dania Beach SALESPERSON JOB INSTALLATION DELIVERY DELIVERY PAYMENT DUE DATE METHODS ESTIMATE DATE TERMS Crane for S1700 to TBD Dania assembly& S20,000 deposit Todd B. Beach Zero installation is parking lot, TB remainder at approx..12 Tower customer then dine of shipping weeks from assembled mg Deposit date responsibility QTY DESCRIPTION UNIT PRICE LINE TOTAL Bausch"Zero"Watch Tower,standard package (please see $36,500 $36,500 1 attached description) Delivery to Dania Beach $1700 $1700 Board Box to 6t 12'Rescue board $1950 $1950 Additional Options Available Interior,upper storage shelf $1 0 r for door window $175 each 0 2 1 Interior under counter s e cabinet S239 0 1 Solar panel package install atte 52450 0 4 Stainless Ste at Hooks $20 0 1 tional 12"Center Skid S471 0 Standard Package Marine grade aluminum construction Embossed composite decking on 12'by 12'aluminum deck :anodized Aluminum Railing upgrade One piece fiberglass roof wath insulation 2-30"Aluminum doors with impact glass windows and SS handles Three- 13 degree tint in glass impact windows with folding shutters (inside locking)36"tall with 50 square feet of viewing area 2 ventilation hatches includes front vent/seat combination Front access,aluminum low-angle stairs with diamond plate surface and aluminum railing on stairs and deck 8 foot deck elevation Exterior and interior walls powder coated with clear ceramic coating on the exterior Composite front counter 49 square foot floor plan with angled windows and walls for decreased glare All stainless steel fasteners and 4 SS lifting eyes on shelter Flag holder Sits on two 12"wide aluminum skids with 4 towing eyes TBTOTAL40,130 SALES TAX E'Xempt TOTAL $ ,150 Quotation prepared bv:`t'odd Bausch To aeecpe this quotation,sign here and rctum: Dare: