HomeMy WebLinkAbout2018-07-24 Special Budget City Commission Meeting Minutes MINUTES OF SPECIAL BUDGET MEETING
DANIA BEACH CITY COMMISSION
TUESDAY, JULY 24, 2018 - 5:01 P.M.
1. Call to Order/Roll Call
Mayor James called the meeting to order at 5:01 p.m.
Present:
Mayor: Tamara James
Vice-Mayor: Bill Harris
Commissioners: Chickie Brandimarte
Bobbie H. Grace
Marco A. Salvino, Sr.
City Manager: Robert Baldwin
City Attorney: Thomas Ansbro
City Clerk: Thomas Schneider
2. Presentations
City Manager Baldwin noted this is his last year doing the budget and thanked the Commission
for their direction during its preparation. There is good news and bad news this year; property
values have increased but not as much as last year. He recommended keeping the millage rate at
5.9998, as this is not the year to lower taxes because it is a tight budget.
Nicki Satterfield, Finance Director, presented a PowerPoint of the proposed budget, which is
attached to and incorporated into these minutes.
Mayor James questioned when the police pension plan would start to decrease.
Finance Director Satterfield responded the police pension is different from the fire plan. The
plan is a combined plan so as a whole, it has leveled off and the increase is only about $9,000
this year.
Mayor James asked if members remained in the police pension plan until they are deceased.
Finance Director Satterfield replied yes.
City Manager Baldwin spoke of the merging with BSO, and the police pension cost starting to
decrease after about eight years, which is what is happening.
Commissioner Brandimarte objected to the two transport vans with capacity for only 30
passengers and said we should discuss this at the budget workshop.
Finance Director Satterfield noted there needs to be a more detailed discussion of this with Parks
& Recreation.
Mayor James said the monies for chartering buses come from the programs' pockets, not the
Parks & Recreation Department.
Commissioner Grace noted her intent was not for two 15-passenger vans, but instead a 55-
passenger bus; this is doable for us to do in this budget. She wants all of the kids to travel
together in one vehicle.
Finance Director responded she would discuss this with Interim Parks & Recreation Ismail and
come back with alternatives.
City Manager Baldwin said the Mayor is correct, the Commission had instructed staff to look at
purchasing a bus.
Commissioner Salvino felt we should utilize rental vehicles and perhaps purchase one van for
kids.
Commissioner Grace said we should get one van and use the $70,000 for buses.
Commissioner Grace said there was a request from the Commission for painting and light repair
of City Hall.
Finance Director Satterfield responded a proposal is being worked on for this current fiscal year.
Mayor James questioned the Permit Office Supervisor position in the Community Development
Department.
Mayor James questioned adding someone in recreation; we only have two persons tending to 16
parks. She would like to investigate the costs of adding two more positions.
Finance Director Satterfield noted some of the duties are performed by Public Services.
Commissioner Salvino questioned repairs to the Dania Beach Grill.
Director of Finance Satterfield noted this would come to the Commission as a separate item once
we have a plan put together.
There was discussion regarding the First Budget Public Hearing date scheduled for September
12th, at 5:01 p.m. The Commission agreed to keep the date, as scheduled.
Commissioner Grace asked if Commissioners could call in to the meeting.
City Attorney Ansbro said typically the Commissioner would have to be ill to do so.
Minutes of Special Budget Meeting 2
Dania Beach City Commission
Tuesday,July 24,2018-5:01 p.m.
City Manager Baldwin asked when the Commission would like to hold a workshop. Typically, it
would be between August 28th and September 12t'.
3. Public Hearings
3.1 RESOLUTION NO. 2018-095
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, RELATING
TO THE IMPOSITION OF FIRE RESCUE ASSESSMENTS AND THE PROVISION OF FIRE SERVICES,
FACILITIES AND PROGRAMS WITHIN THE CITY OF DANIA BEACH, FLORIDA; PROVIDING
AUTHORITY; PROVIDING PURPOSE, EFFECT AND DEFINITIONS AND AFFIRMING THE PROVISIONS
AND FINDINGS OF RESOLUTION NOS. 2017-084 AND 2017-105; PROVIDING FOR PROVISION AND
FUNDING OF FIRE SERVICES; PROVIDING FOR IMPOSITION AND COLLECTION OF SUCH
ASSESSMENTS; CONFIRMING AND PROVIDING LEGISLATIVE DETERMINATIONS OF SPECIAL
BENEFIT AND FAIR APPORTIONMENT AND CONFIRMING THE 2017 ASSESSMENT METHODOLOGY;
MAKING A DETERMINATION OF FIRE ASSESSED COSTS AND ESTABLISHING PRELIMINARY NOT-
TO-EXCEED ASSESSMENT RATES FOR THE FISCAL YEAR BEGINNING OCTOBER 1,2018;DIRECTING
THE PREPARATION OF A PRELIMINARY ASSESSMENT ROLL; AUTHORIZING A PUBLIC HEARING;
DIRECTING THE PROVISION OF PUBLISHED AND MAILED NOTICE OF SUCH HEARING; PROVIDING
FOR APPLICATION OF ASSESSMENT PROCEEDS; PROVIDING FOR CONFLICTS; PROVIDING FOR
SEVERABILITY;FURTHER,PROVIDING FOR AN EFFECTIVE DATE.
City Attorney Ansbro read the title of Resolution#2018-095.
Commissioner Grace motioned to adopt Resolution #2018-095; seconded by Commissioner
Salvino. The motion carried unanimously.
3.2 RESOLUTION NO. 2018-096
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, RELATING
TO THE COLLECTION AND DISPOSAL OF SOLID WASTE IN THE CITY OF DANIA BEACH, FLORIDA;
ESTABLISHING THE NOT TO EXCEED ASSESSMENT RATE FOR SOLID WASTE SERVICE
ASSESSMENTS AGAINST ASSESSED PROPERTY LOCATED WITHIN THE BOUNDARIES OF THE CITY
OF DANIA BEACH, FOR THE FISCAL YEAR BEGINNING OCTOBER 1, 2018; DIRECTING THE
PREPARATION OF AN ASSESSMENT ROLL; AUTHORIZING A PUBLIC HEARING AND DIRECTING
THE PROVISION OF NOTICE OF SUCH HEARING; PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE.
City Attorney Ansbro read the title of Resolution#2018-096.
Commissioner Grace motioned to adopt Resolution #2018-096; seconded by Commissioner
Brandimarte. The motion carried unanimously.
3.3 RESOLUTION NO. 2018-097
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, RELATING
TO THE PROVISION OF STORMWATER SERVICES, FACILITIES AND PROGRAMS WITHIN THE CITY
OF DANIA BEACH, FLORIDA; ESTABLISHING THE NOT TO EXCEED ASSESSMENT RATE FOR
STORMWATER ASSESSMENTS FOR THE FISCAL YEAR BEGINNING OCTOBER 1, 2018; DIRECTING
THE PREPARATION OF RESPECTIVE ASSESSMENT ROLLS; AUTHORIZING A PUBLIC HEARING AND
Minutes of Special Budget Meeting 3
Dania Beach City Commission
Tuesday,July 24,2018—5:01 p.m.
DIRECTING THE PROVISION OF NOTICE OF SUCH HEARING; PROVIDING FOR CONFLICTS;
FURTHER,PROVIDING FOR AN EFFECTIVE DATE.
City Attorney Ansbro read the title of Resolution#2018-097.
Commissioner Grace motioned to adopt Resolution #2018-097; seconded by Commissioner
Salvino. The motion carried unanimously.
3.4 RESOLUTION NO. 2018-098
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AS
REQUIRED BY THE CITY CHARTER AND SECTION 200.065, FLORIDA STATUTES, APPROVING THE
PROPOSED MILLAGE RATE NECESSARY TO BE LEVIED FOR THE FISCAL YEAR 2018-2019 FOR
OPERATING PURPOSES; ESTABLISHING THE DEBT MILLAGE APPROVED BY THE ELECTORATE;
PROVIDING FOR A PUBLIC HEARING WHEN OBJECTIONS MAY BE HEARD AND QUESTIONS
CONCERNING SAME WILL BE ANSWERED; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING
FOR AN EFFECTIVE DATE.
City Attorney Ansbro read the title of Resolution#2018-098.
Commissioner Grace motioned to adopt Resolution #2018-098; seconded by Vice-Mayor
Harris. The motion carried unanimously.
4. Adi ournment
Mayor James adjourned the meeting at 6:09 p.m.
�1A Be
ATTEST: �� �,y CITY OF DANIA BEACH
f •
4 ILI-
THOMAS SCHNEIDER, CMC � ,yaja� TAMARA JA S
CITY CLERK /SHEQ MAYOR
Approved August 28, 2018
Minutes of Special Budget Meeting 4
Dania Beach City Commission
Tuesday,July 24,2018—5:01 p.m.
City of Dania Beach
FY 2018 / 2019
City Manager ' s
Recommended Budget
July =a, =o18
CityProperty Values
Continued Growth!
City Property Values City revenues providing
increasing for the fifth funds for community
consecutive year
Property Taxes
► 2008 values $ 3,319,056,469 ► 2008 receipts$ ] 7,937, 508
► 2009 3314295595344 (-6.8%) ► 2009 $ 16, 798,253
► 2010 2 ,93931 89, 103 ( -8.��) ► 2010 $ 16, 750, 836
► 2011 2 ,688,806, 1 73 ( -�.9�) ► 2011 $ 1 5 ,872 ,847
► 2012 2 , 550, 120,331 ( .18%) ► 2012 $ 1 5 ,604,005
► 2013 21671 9694, 774 (5.40%) ► 2013 $ 165102 ,658
► 2014 2 ,791 , 7345052 (4.49%) ► 2014 $ 16, 749,846
► 2015 2,9683068,927 (7.49%) ► 2015 $ 1 718079820
► 2016 31210,803 ,862 (9.90%) ► 2016 $ 1 89387,922
► 2017 33851 3792,288 (20.68%) ► 2017 $ 22 ,0851125
18 4, 1 263098, 540 (7.12%) ► 2018 $23351 7,978
H o m e s te ad Impact
Assessed Value- Exemptions=
Taxable Value
• $100-$125k Assessed Value
Pay Taxes w=* $75-$100k Assessed Value
Second Homestead Exemption "'"* $50-$75k Assessed Value
Pay Taxes $25-50k Assessed Value
First Homestead Exemption mmmww0-$25k Assessed Value
PROTECTING HOMERULE
Preliminary
Budget Actions Tonight
• Taxes = maintain existing millage 5 . 9998 mills
• "rolled back" millage rate - 5 .6675 mills
• Voter Approved Debt millage . 1760 mills
• Set 1 st Sept. Budget Public Hearing
Wed. 9/ 12/2018 @ 5 :01 p. m. at Dania Beach City Hall
• Fire - Rescue Assessment (no change) $ 2 2 3 . 7 5 yr.
(provides appx same revenue as last year; 69% of fire protection costs)
• Stormwater Assessment (no change) $ 40 . 00 yr.
• Residential Solid Waste (adj. of $ 9.96 yr.) $ 3 5 8 . 44 yr.
Financial
❖ Economic growth
Sixth consecutive Property Value Increase
• 2008 total Tax Value $ 3 . 300 B
• 2013 $ 2 .6 7 2 B decline of 2 7.5%over 5 years
• 2014 it $ 2 . 791 B + 4.49%
• 2015 it $ 2 . 968 B + 7.49%
• 2016 $ 3 . 226 B + 9.90%
• 2017 $ 3 . 874 B +20.68%
• 2018 $4. 126 B + 7. 12%
*.** Personnel costs - focus on continued funding for
retirement funding and controlling health care costs.
❖ Investment earnings - increase ( 1 . 0 basis pt. > 201 7)
Financial Status (cont ' d )
❖ City Tax Base - significant improvement-
aided by investments in City neighborhoods ,
beach & gateway appearance , infrastructure and
economic development & redevelopment
Tax Base bv Classification
2017 2018
► Residential 50. 7% 51 .2%
► Hotels 7. 9% 8. 2%
► Commercial 23 .9% 23 .0%
► Industrial 15 .9% 15 . 9%
► Other 1 .6% 1 .6%
+-k
Budget ocus
❖ Sustainabilit — staffing levels benefits debt
y g ,
service , contract costs
Infrastructure — completion and
maintenance of planned & funded Capital Projects
➢ Stormwater runoff infrastructure
➢ Water & Sewer system repairs & replacements
➢ Beach Area improvements
• Phase I . . . completed
• Phase II . . . annual funding N$ I J 72,675 accumulated from Parking
➢ Roadway repaving , sidewalk improvement, bus shelters,
alleyway improvements
+:*App earance -
➢ $ 200K Funding for Oasis project to be identified
➢ Parks & Roadway landscape general maintenance
Financial Status (cont ' d )
❖City Tax Base (cont ' d)
Average Single Family (including Condos)
Market Value Assessed Value
► 2014 $ 174, 144 $ 137590
► 2015 $ 189, 208 8.6/ $ 1457579 5.8%
► 2016 $ 210,484 1 1 .z/ $ 1 54,607 6.2/
► 2017 $ 224,686 6.7/ $ 166,418 7.6/
► 2018 $ 245 ,457 9.2% $ 177, 553 6.6%
Approximately 38% of all city properties are homesteaded
er remaining 62% are non-homestead, commercial, industrial
budget Focus (cont ' d )
❖ Public Safety -
➢ Additional Public Safety Personnel
➢ Working to establish sustainable BSO contract
for Fire Rescue service costs
➢ Expand neighborhood street lighting systems
through grant funding
➢ Continued annual City funding for legacy Police
& Fire Pension plan
Pension Plans
► Police Pension Plan $ 780K (increase of S66K)
➢ $3.3M Unfunded Liability =+ $2.9M
➢ 55.8o Funded =+ 59.6 0
► Fire Pension Plan $ 5 .4 6 M (decrease of .$57K)
➢ $23.5M Unfunded Liability =+ $7 9.4M
➢ 63.5o Funded =� 77.00
➢ 78 Active, 62 Retiree/Drop, 7 0 Disability (Combined Police car Fire)
► General Pension Plan $ 1 . 79M (increase of 29K)
➢ $6.86M Unfunded Liability =+ $6.22
➢ 74.8o Funded 77.60
➢ 79 Active, 73 Retiree/Drop, 0 Disability
► Florida Retirement System $ 801 K (increase of 704K)
➢ 860 of employees covered ,by FRS (7 77 FRS Employees)
➢ $29. 6B City's Share ($4.3M) 83.2%Funded ■ + 83.90
► OPEB (Post- retirement) Health Care Liability (FY79 .$275K)
➢ $72. 7M Unfunded Liability =+ $7 4.3M
➢ Separate cost from pension and separate annual funding - restart funding in FY79
Pension Plans
Three Basic Guidelines
➢ Retirement Cost should be recognized durin_q workingyears
➢ Total Pension Liability - this is an estimate
Impacted by both actuarial & management estimates, pension
investments, economy
➢ Elective bodies now choose how & when to provide funding
Funding for FY 2018/2019
➢ Propose budget provides for continued funding annual
pensions requirements from operating - $9. 1 M Funded as
dollar amount or percentage of pay.
➢ Proposed budget provides for establishing a pension
reserve. Reserves are recommend to be equal to 25% of
annual required contributions (1 quarterly payment).
Estimated reserve should be $ 2 .275M. Commission
Approved $ 1M FY 2017. Reserves being allocated to Pension
Reserves in FY 1 8/ 19 = $ 1 M
General Fund
What ' s Included ?
❑ No increase to operating property tax rate
❑ Use of ,$'200k undesignated fund balance for Grapple Truck
Public Safety Contract Cost $ 2 6 . 2 M
— Police services $ 1 3.1 M to $ 1 3.9M -6.7%
— Fire Rescue services $ 1 1 AM to $ 1 2.3M -7.4%
INCLUDES
► One (1 ) New SRO Deputy $ 1 58K
► Two (2) New Fire Safety Officers (approved at mid-year) $ 303K
► One (1 ) New Fire Chief $ 225K
City Manager/City Commission
► New Oasis Project $ 200K
► Commission Contingency $ 108K
► Aids to Private Organizations $ 35K
► Chris Hixon Foundation Scholarship $ 5K
Chamber Funding (Increase $ 35K to $40K) $ 5K
General Fund
What ' s Included ?
Parks & Recreation
► 2 Transport Vans $ 70K
► 3 F- 1 5 0 ' s $ 84 K
► 1 Wave Runner $ 14K
► Dania Beach Seniors $ 2 5 K
► Gracefully Aging $ 25K
► MLK Funding $ 1 5K
► Athletic Program Funds (Football, Baseball, Soccer, Etc.) $ 10 0 K
► Community Bus-West Route (Requires County ILA) $ 1 OOK
General Fund
What ' s Included ?
Public Services Construction Maint. Division
► Solar Light Maintenance $ 70K
Public Services Streets Division
► Roadway Repaving $325K
► Alleyway Repaving $ 70K
► Sidewalks (Citywide & 50/50) $ 1 1 5K
► Misc. Asphalt/Pothole/Bridge Repair $ 1 1 5K
► Bus Shelter & Bus Bench Maintenance Contract (Approved Mid Year) $ 56K
► Solar Lighting CDBG $ 141 K
Public Services Fleet Division
► Two (2) F-2 50 (streets Division) $ 60K
► One (1 ) Mack Dump Grapple Truck(streets Division) $202K
/ Three (3) F-250 (Parks & Grounds Division) $ 90K
a t
Funded Position Requests (, a New Positions)
All Funds Est. $743 K
Recreation
Recreation Assistant - PT (To Aid Athletic Director - Gen Fund) $ 20K
2 PT Park Rangers (Requested by Commission - Gen Fund) $ 6 7 K
Public Services
Project Associate Engineer (25% Gen/25%WA/25% SW/25%STW) $ 1 24K
Regulatory Compliance Officer (20%WA/40%SW/40%STW) $ 1 06K
Treatment Plant Operator B (Water) $ 90K
Utilities Mechanic I I (Sewer) $ 83 K
Utilities Maintenance Worker II (Stormwater) $ 72K
Maintenance Worker I to Facilities Maintenance Technician
(Paygrade 76 to Paygrade 22; estimated cost includes ,benefits) $ 1 6 K
Community Development
Permit Office Supervisor (Building) $ 98K
Administrative Specialist 1 (50% Gen/50% Bldg) $ 67K
;� All Costs are estimates inClusive of,benefits
Position Title Change Requests (2 Positions)
All Funds
Community Development
► Code Compliance Manager to Code Compliance & Parking
Manager
(Paygrade 30 to Paygrade 32; No fiscal impact; Title change to reflect duties)
► Lead Code Compliance Inspector to Lead Code Compliance &
Parking Supervisor
(Title change only to reflect duties)
General Fend
What ' s Not Included .?
BSO - Relocation to City Hall $ 500,000
City Hall Security Metal Detector & Guard $ 43 ,000
BSO Radio Program (to be phased-in) $ 885 ,000
Recreation Master Plan Improvements unknown
Comp & Class Implementation unknown
NEW EOC Building unknown
City Hall Renovations unknown
BSO Substation 803 Bldg Full-time Staffing unknown
BSO Marine Officer $ 1 75 ,000
BSO Sergeant $ 1 75 ,000
BSO Deputy $ 1 58,000
IT Parker Office Renovations unknown
Traffic Calming w/ MPO and DOT unknown
Beach & Pier Lighting unknown
Solar Traffic Lights $ 50,000 ea.
*ALL COS TSARE EST/MATES ONL Y
Unfunded Position Requests (8 Positions)
All Funds
Est. $723 K
Community Development
Code Compliance Officer (Gen Fund) $ 88K
Chief Fire Safety Officer (Gen Fund) $ 84K
Asst. Comm . Dev. Director (50% Gen/25% Bldg./25% Parking) $ 131 K
Public Services
Parks & Ground Technician (Gen Fund) $ 72K
Beach Manager (50% Gen/50% Parking) $ 1 08K
Admin . As st. - PS (45% Gen/30% Water/1 5% Sewer/10% STW) $ 78 K
Utilities Mechanic II (Sewer) $ 82K
Treatment Plant Operator A (water) $ 80K
'All costs are estimates inclusive of,benefits
Enterprise Funds
AF
Wate r No rate change since 207 7
➢ Existing - Waterline NW1stAvenue Waterline FY 18 $ 74K
➢ Existing - Watermain NW 1st street (Stirling to city Hall) FY 18 $432K
➢ Existing - Melaleuca Watermain Replacement FY 18 $ 250K
➢ Funding provided for Water Plant - Lime Slaker FY 19 $ 235K
➢ Water Distribution Improvements FY 19 $ 160K
➢ John Deere Backhoe (25% of Total cost$132K) FY 19 $ 33K
➢ Security - Approved at Mid Year FY 19 $ 101 K
➢ Water Resource Issues & C51 Reservoir
➢ Rate Study in Progress for future consideration
Enterprise Funds
Sewe r No rate change since 207 7
➢ Working to complete SCADA System FY 17 $ 500K
➢ Working to Complete Lift Station Rehab FY 18 $ 1 . 1 37M
➢ Sewer Pump Replacements (Pumps 3 & 4) FY 19 $ 1 20K
➢ Sewer Distribution Improvements FY 19 $ 305K
➢ John Deere Backhoe (25% of Total cost$132K) FY 19 $ 33K
➢ Rate Study in Progress for future consideration
u .
Enterprise
Stormwater No rate change
➢ SE improvements Phase II -SRF Loan Pre FY 18 MOM
➢ SW area & Taylor Lane -Pre FY 18 $61 5K
➢ Stormwater Improvements (SW 43rd Ter, 401h Ct., 49th St) FY 18 $ 1 .2M
➢ Citywide Small Drainage Improvements FY 19 $ 1 20K
➢ John Deere Backhoe (25% of Total Cost$132K) FY 19 $ 33K
Enterprise Funds (Cont ' d
Parking $ 200K surplus to support Beach Improvements (Rev. slight decline 2%)
➢ Small/Mid Size SUV $28K
➢ Includes Expanded Security Hours Approved Mid Year $ 77K
Pier Westrec Management
➢ Self supporting pier operation (little/no reserve)
➢ Surplus to be used for Pier L/Term maintenance (rev. up 4%)
➢ Beach Restaurant & Pier Rehabilitation $275K FY 19 - Funded through
Restaurant Rental Revenues
Beach Continues improvements to appearance
➢ Phase I complete
➢ Phase II - Funding level currently $ 1 , 1 72,675 - Electrical Relocations &
Lifeguard Bathroom Renovations
Marina - Westrec Management
➢ Self supporting marina operation - including annual loan repayment
➢ Occupancy and slip rental revenues continue to be steady; demand
remains solid
➢ Slip rental rates to increase October 1 St appx $25 mo. to stay in line with
market conditions and comply with debt and grant provisions.
Conclusion
Recommended Budget presents a fair, reasoned
& balanced financial plan for Dania Beach in the
coming year.
We thank the Commission and City
Departments for their guidance and assistance
in developing this annual City Budget plan .
Preliminary
Budget Actions Tonight
• Taxes = maintain existing millage 5 . 9998 mills
• "rolled back" millage rate - 5 .6675 mills
• Voter Approved Debt millage . 1760 mills
• Set 1 st Sept. Budget Public Hearing
Wed. 9/ 12/2018 @ 5 :01 p.m. at Dania Beach City Hall
• Fire - Rescue Assessment (no change) $ 223 . 75 yr.
(provides appx same revenue as last year; 69% of fire protection costs)
• Stormwater Assessment (no change) $ 40 . 00 yr.
• Residential Solid Waste (adj. of $ 9.96 yr.) $ 3 5 8 . 44 yr.